Page 1 Procurement Plan IGA-GeoFund, updated April 4, 2008 1 Assignment is co-financed by the German government and has been already procured as per procurement procedures of the German government. 1 2 4 5 6 7 Ref. No. Description of Assignment Selection Method Review by Bank (Prior / Post) Proposals Submission Date Comments 1.1 Dissemination material for Course on Geothermal Feasibility Studies and Project Implementation TU a. Preparation of materials IC-SSS Post 04/01/2007 ToR will be reviewed by the WB b. Preparation of materials IC-SSS Post 04/01/2007 ToR will be reviewed by the WB c. Preparation of materials IC-SSS Post 04/01/2007 ToR will be reviewed by the WB d. Preparation of materials IC-SSS Post 04/01/2007 ToR will be reviewed by the WB e. Preparation of materials IC-SSS Post 04/01/2007 ToR will be reviewed by the WB f. Coordination of material development and dissemination IC-SSS Post 04/01/2007 ToR will be reviewed by the WB g. Software requirements IC-SSS Post 04/01/2007 ToR will be reviewed by the WB 1.2 Targeted international studies and workshops on mineral co-production in geothermal development CQS Prior 09/10/2007 ToR will be reviewed by the WB 1.3 Roster of International Geothermal Experts/Support to the GeoFund Advisory Forum IC-SSS Post 12/15/2007 ToR will be reviewed by the WB 1.4 International Geothermal Workshop 2008 CQS Prior 04/04/2008 ToR will be reviewed by the WB 1.5 Publications on GeoE, including maintenance of the GeoFund web site IC-SSS Post 05/31/2008 ToR will be reviewed by the WB 1.6 Series of case studies of projects that have been developed IC Prior 08/15/2008 ToR will be reviewed by the WB 2.1 Identify barriers for geothermal development and provide advisory services to ministries in priority countries CQS Prior 07/31/2008 ToR will be reviewed by the WB 2.2 Road mapping session for best ways to remove barriers to geothermal development CQS Prior 05/31/2008 ToR will be reviewed by the WB 2.3 Country assessment of barriers to GeoE use for power production in Hungary N/A 1 n/a 12/31/2006 n/a 2.4 Assistance in evaluation of project proposals for second phase of GeoFund IC Post 09/30/2008 ToR will be reviewed by the WB 2.5 Workshop on Geological Risk Insurance (GRI) CQS Prior 04/30/2008 ToR will be reviewed by the WB 43413 Page 2