The World Bank                                                                                       Implementation Status & Results Report
         Rural Mobility and Connectivity Project (P164543)



Rural Mobility and Connectivity Project (P164543)


 AFRICA WEST | Guinea | Transport Global Practice |
 IBRD/IDA | Investment Project Financing | FY 2019 | Seq No: 5 | ARCHIVED on 18-Nov-2020 | ISR44311 |


 Implementing Agencies: Republic of Guinea, Ministère de l'Agriculture



 Key Dates


  Key Project Dates

   Bank Approval Date: 10-Dec-2018                                             Effectiveness Date: 21-Aug-2019
   Planned Mid Term Review Date: 30-Jun-2021                                   Actual Mid-Term Review Date:
   Original Closing Date: 28-Jun-2024                                          Revised Closing Date: 28-Jun-2024
 pdoTable

 Project Development Objectives

  Project Development Objective (from Project Appraisal Document)
  The Project Development Objective (PDO) is to improve and sustain the rural population's road access to markets and basic services.

  Has the Project Development Objective been changed since Board Approval of the Project Objective?
  No


 Components Table

 Name
 Rural roads and small community facilities rehabilitation:(Cost $30.00 M)
 Capacity building for road maintenance and safety:(Cost $6.60 M)
 Project management:(Cost $3.40 M)
 Contingent Emergency Response

 Overall Ratings

 Name                                                                        Previous Rating                          Current Rating

 Progress towards achievement of PDO                                         Moderately Satisfactory                 Moderately Satisfactory
 Overall Implementation Progress (IP)                                        Satisfactory                            Satisfactory
 Overall Risk Rating                                                         Substantial                             Moderate


 Implementation Status and Key Decisions

  The project has progressed well despite challenges posed by the COVID-19 pandemic. The start of the first works in the prefectures of Dubréka,
  Dalaba and Pita has been delayed to December 2020 after completion of the compensation process for the 12 persons identified under the
  Reinstallation Action Plan (PAR). Additional revisions are needed to the project safeguard documents as a result of revisions done to the list of
  project roads to be rehabilitated. The next six months of the project implementation will be critical to avoid any slippage in the schedule and to
  speed up the implementation of the project.




11/18/2020                                                                                                                     Page 1 of 6
            The World Bank                                                                                        Implementation Status & Results Report
            Rural Mobility and Connectivity Project (P164543)




  Risks


 Systematic Operations Risk-rating Tool


  Risk Category                                                 Rating at Approval              Previous Rating               Current Rating

  Political and Governance                                      High                           Substantial                  Moderate
  Macroeconomic                                                 Substantial                    Substantial                  Moderate
  Sector Strategies and Policies                                Substantial                    Substantial                  Substantial
  Technical Design of Project or Program                        Moderate                       Moderate                     Moderate
  Institutional Capacity for Implementation and
                                                                High                           Substantial                  Substantial
  Sustainability
  Fiduciary                                                     High                           Substantial                  Substantial
  Environment and Social                                        High                           Substantial                  Substantial
  Stakeholders                                                  Moderate                       Moderate                     Moderate
  Other                                                         Moderate                       Moderate                     Moderate
  Overall                                                       High                           Substantial                  Moderate



  Results


 PDO Indicators by Objectives / Outcomes



   Improve and sustain rural population accessibility to markets and basic services

    IN00918428
    ►People provided with an all season road (Number, Custom)

                                        Baseline                     Actual (Previous)             Actual (Current)           End Target

    Value                               0.00                         0.00                          0.00                       314,824.00

    Date                                01-Jan-2019                  25-Sep-2020                   13-Nov-2020               29-Dec-2023
                                        Rural population living within a buffer of 2 kilometers of an road improved by the project. It is assumed that
   Comments:                            the road became all year passable as a result of the project, not only the civil works but also the routine
                                        maintenance. Link with PDO : Rural population benefiting from an improved road
    IN00918429
    ►Number of markets reached by an improved road (Number, Custom)

                                        Baseline                     Actual (Previous)             Actual (Current)           End Target

    Value                               0.00                         0.00                          0.00                       65.00

    Date                                01-Jan-2019                  25-Sep-2020                   13-Nov-2020               29-Dec-2023
                                        Number of markets situated at less than 2 km from the road that have become accessible all year round
   Comments:
                                        as a result of the project. The markets could have existed before the project but were not all year round


11/18/2020                                                                                                                       Page 2 of 6
           The World Bank                                                                                       Implementation Status & Results Report
           Rural Mobility and Connectivity Project (P164543)



                                       accessible due to the poor condition of road. The baseline value is zero. It is roughly estimated that at
                                       least 100 markets will be targeted at completion of 800 km.
    IN00918430
    ►Number of accessible schools and health centers (Number, Custom)

                                       Baseline                     Actual (Previous)             Actual (Current)           End Target

    Value                              0.00                        0.00                           0.00                       325.00

    Date                               01-Jan-2019                 25-Sep-2020                    13-Nov-2020               29-Dec-2023
                                       Number of schools (primary and secondary) and health centers (community health centers, dispensariesm
                                       maternity) that have become accessible all year round as a result of the project. These facilities existed
   Comments:
                                       before the project and were located along th eproject but were not accessible due to the poor condition of
                                       road. The baseline is hence zero. Link to PDO : improve and sustain accessibility to basic services
    IN00918451
    ►Proportion of project roads under communities routine maintenance (Percentage, Custom)

                                       Baseline                     Actual (Previous)             Actual (Current)           End Target

    Value                              0.00                        0.00                           0.00                       100.00

    Date                               31-Dec-2018                 25-Sep-2020                    13-Nov-2020               29-Dec-2023
                                       Ratio between the km of roads improved by the project and receiving routine maintenance through the
                                       mechanism established by the project and the km of roads improved by the project. The roads receiving
   Comments:                           routine maintenance means the roads for which the regional delegation of the DNGR in charge of
                                       inspecting routine maintenance have delivered a satisfactory inspection report. Link with PDO : to sustain
                                       accessibility


 Intermediate Results Indicators by Components



   Roads rehabilitation works

    IN00918452
    ►Share of civil works costs dedicated to small common facilities (Percentage, Custom)

                                       Baseline                     Actual (Previous)             Actual (Current)           End Target

    Value                              0.00                        0.00                           0.00                       10.00

    Date                               03-Jan-2019                 25-Sep-2020                    13-Nov-2020               29-Dec-2023
                                       Ratio between the total amount of civil works for roads improvement and the amount dedicated to the
                                       restoration or construction of small common facilities. The nature of the small common facilities 9 crop
   Comments:                           storage, wells, drills, community facility as schools or dispensaries) will be decided in consultation with
                                       communities located along the roads. The amount dedicated to the facilities must represent at least 10%
                                       of the total cost of civil works.
    IN00918457
    ►Roads rehablitated (Kilometers, Corporate)

                                       Baseline                     Actual (Previous)             Actual (Current)           End Target

    Value                              0.00                        0.00                           0.00                       800.00

    Date                               01-Nov-2018                 25-Sep-2020                    13-Nov-2020               28-Dec-2023


11/18/2020                                                                                                                      Page 3 of 6
           The World Bank                                                                                      Implementation Status & Results Report
           Rural Mobility and Connectivity Project (P164543)



     IN00918461
     Roads rehabilitated - rural (Kilometers, Corporate Supplement)

                                     Baseline                     Actual (Previous)             Actual (Current)            End Target

     Value                           0.00                         0.00                          0.00                        800.00


   Road maintenance

    IN00918453
    ►Number of person-days worked for routine maintenance (Number, Custom)

                                       Baseline                    Actual (Previous)             Actual (Current)           End Target

    Value                              0.00                        0.00                          0.00                       84,000.00

    Date                               01-Jan-2019                 25-Sep-2020                   13-Nov-2020                29-Dec-2023

   Comments:                           Number of person-days worked for routine maintenance under the CVEP mechanism.

    IN00918458
    ►Share of women employed in routine maintenance (Percentage, Custom)

                                       Baseline                    Actual (Previous)             Actual (Current)           End Target

    Value                              0.00                        0.00                          0.00                       35.00

    Date                               01-Nov-2018                 25-Sep-2020                   13-Nov-2020                28-Dec-2023

                                       In a average group of 10 persons dedicated to routine maintenance of a portion of road, 35% of jobs
   Comments:
                                       expressed in person x hours must benefit women.
    IN00918460
    ►Number of women represented in decision commitee of each community maintenance group (Number, Custom)

                                       Baseline                    Actual (Previous)             Actual (Current)           End Target

    Value                              0.00                        0.00                          0.00                       3.00

    Date                               03-Dec-2018                 25-Sep-2020                   13-Nov-2020                29-Dec-2023

                                       A minimum of 3 woman must chair in the decision committee of the road maintenance group in executive
   Comments:
                                       position such as President, vice president, secretary general or treasurer.


   Road Safety

    IN00918455
    ►Decree of creation of the Road Safety Observatory (Yes/No, Custom)

                                       Baseline                    Actual (Previous)             Actual (Current)           End Target

    Value                              No                          No                            No                         Yes

    Date                               03-Jan-2019                 25-Sep-2020                   13-Nov-2020                29-Dec-2023
                                       The creation of a road safety observatory will contribute to collect and analyze road accident data
   Comments:                           collection in the project area. The project will support the adoption of the decree creating the Road Safety
                                       Observatory


11/18/2020                                                                                                                     Page 4 of 6
           The World Bank                                                                                          Implementation Status & Results Report
           Rural Mobility and Connectivity Project (P164543)




   Grievance Mechanism Effectiveness

    IN00918454
    ►Grievances addressed within the stipulated timeframe (Percentage, Custom)

                                         Baseline                    Actual (Previous)               Actual (Current)          End Target

    Value                                0.00                       0.00                             0.00                      100.00

    Date                                 01-Jan-2019                25-Sep-2020                      13-Nov-2020              29-Dec-2023

                                         Share of all grievances received by the Grievance Redressed Mechanism (GRM) that have been
   Comments:
                                         addressed within the stipulated timeframe of two (2) months.


   GBV mitigation activities reporting

    IN00918456
    ►Percentage of villages covered by information and awareness sessions on violence against women (Percentage, Custom)

                                         Baseline                    Actual (Previous)               Actual (Current)          End Target

    Value                                0.00                       0.00                             0.00                      100.00

    Date                                 01-Jan-2019                25-Sep-2020                      13-Nov-2020              29-Dec-2023

                                         Percentage of villages covered by information and awareness sessions on violence against women
   Comments:
                                         carried out by specific NGO with PIU support.
    IN00918459
    ►GBV risk monitoring (Yes/No, Custom)

                                         Baseline                    Actual (Previous)               Actual (Current)          End Target

    Value                                No                         No                               No                        Yes

    Date                                 03-Jan-2019                25-Sep-2020                      13-Nov-2020              29-Dec-2023

   Comments:                             This indicator measures the effectiveness of the GBV reporting by the NGO service providers.



 Performance-Based Conditions



 Data on Financial Performance


 Disbursements (by loan)

 Project       Loan/Credit/TF     Status        Currency       Original    Revised       Cancelled        Disbursed     Undisbursed             % Disbursed


 P164543       IDA-D4120          Effective     USD              40.00       40.00            0.00             3.26           37.58                     8%


 Key Dates (by loan)




11/18/2020                                                                                                                        Page 5 of 6
           The World Bank                                                                              Implementation Status & Results Report
           Rural Mobility and Connectivity Project (P164543)




 Project        Loan/Credit/TF     Status      Approval Date    Signing Date   Effectiveness Date   Orig. Closing Date      Rev. Closing Date

 P164543        IDA-D4120          Effective   10-Dec-2018      23-Jan-2019    21-Aug-2019          28-Jun-2024             28-Jun-2024


Cumulative Disbursements




 PBC Disbursement

                                                                                    Achievement     Disbursed amount in        Disbursement %
 PBC ID                     PBC Type    Description            Coc    PBC Amount
                                                                                    Status          Coc                        for PBC




  Restructuring History


  There has been no restructuring to date.