PROCUREMENT PLAN
Project information: Zambia: Mining and Environment remediation and
improvement Project [P154683]
Project Implementation agency: Ministry of Mines and Mineral
Development
Date of the Procurement Plan: February 14, 2017
Period covered by this Procurement Plan: [December 1, 2015- July 30,
2017]
Preamble

In accordance with paragraph 5.9 of the “World Bank Procurement Regulations
for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic
Tracking and Exchanges in Procurement (STEP) system will be used to prepare,
clear and update Procurement Plans and conduct all procurement transactions
for the Project.

This textual part along with the Procurement Plan tables in STEP constitute the
Procurement Plan for the Project. The following conditions apply to all
procurement activities in the Procurement Plan. The other elements of the
Procurement Plan as required under paragraph 4.4 of the Procurement
Regulations are set forth in STEP.

The Bank’s Standard Procurement Documents: shall be used for all contracts
subject to international competitive procurement and those contracts as
specified in the Procurement Plan tables in STEP.

National Procurement Arrangements: In accordance with paragraph 5.3 of the
Procurement Regulations, when approaching the national market (as specified in
the Procurement Plan tables in STEP), the country’s own procurement procedures
may be used.
Leased Assets as specified under paragraph 5.10 of the Procurement
Regulations: Leasing may be used for those contracts identified in the
Procurement Plan tables. – Not Applicable
Procurement of Second Hand Goods as specified under paragraph 5.11 of the
Procurement Regulations – is allowed for those contracts identified in the
Procurement Plan tables – Not Applicable
Domestic preference as specified under paragraph 5.51 of the Procurement
Regulations (Goods and Works).
    For Goods is applicable for those contracts identified in the Procurement
    Plan tables];
    For Works is applicable for those contracts identified in the Procurement Plan
    tables]
Other Relevant Procurement Information: Not applicable
PROCUREMENT
                  Zambia : Zambia - Mining and Environmental Remediation and Improvement Project
PLAN
General Information
Country:             Zambia                             Bank’s Approval Date of the Original Procurement Plan:    2017-04-19
                                                                                                                  2020-12-14
                                                       Revised Plan Date(s): (comma delineated, leave blank if none)
Project ID:          P154683                            GPN Date:
Project Name:        Zambia - Mining and Environmental Remediation and Improvement Project
Loan / Credit No:    IDA / Q9880, IDA / 59370
                     Kabwe Municipal Council
Executing Agency(ies):


WORKS
 Activity Reference No. /                                                                                                                                                                                        Estimated       Actual                                                                           Draft Bidding                                                                         Bid Evaluation Report
                                   Loan / Credit                                                                                          Procurement        Prequalification   High SEA/SH      Procurement                                  Process      Draft Pre-qualification      Prequalification                             Specific Procurement    Bidding Documents as Proposal Submission /                                                    Contract
        Description                                       Component                  Review Type        Method        Market Approach                                                                             Amount        Amount                                                                            Document /                                                                            and Recommendation         Signed Contract
                                       No.                                                                                                  Process               (Y/N)             Risk        Document Type                                  Status            Documents             Evaluation Report                              Notice / Invitation            Issued         Opening / Minutes                                                     Completion
                                                                                                                                                                                                                   (US$)         (US$)                                                                            Justification                                                                               for Award
                                                                                                                                                                                                                                                            Planned      Actual       Planned      Actual     Planned       Actual    Planned     Actual      Planned      Actual  Planned     Actual    Planned      Actual     Planned     Actual     Planned

                                                   Enhancing Institutional
ZM-KMC-96066-CW-RFQ /                              capacity to strengthen                          Request for                          Single Stage - One                                                                                                                                                                                                                                                                                              2019-03-
                                  IDA / 59370                                    Post                                 Limited                                                                                     44,000.00     29,181.03    Completed                                                                               2018-08-06 2018-08-01                                                                      2018-10-01 2018-10-03
Office Rehabilitation - Kabwe                      environmental governance                        Quotations                           Envelope                                                                                                                                                                                                                                                                                                           30
                                                   and compliance


 ZM-KMC-141673-CW-RFB /
                                                   Remediation of Contaminated                                                                                                                                                               Pending
Dredging and construction                                                                                                               Single Stage - One                                                                                                                                                                                                                                                                                              2021-02-
                                  IDA / 59370      Hotspots and Improvement of Post                Request for Bids   Open - National                                                                           1,150,000.00         0.00    Implementat                                                     2020-04-30              2020-05-05                                   2020-06-16            2020-07-16              2020-08-20
works for concrete lining of                                                                                                            Envelope                                                                                                                                                                                                                                                                                                           16
                                                   Environmental Infrastructure                                                                                                                                                              ion
the canal and landscaping


 ZM-KMC-141674-CW-RFB /                            Remediation of Contaminated                                                                                                                                                               Pending
                                                                                                                                        Single Stage - One                                                                                                                                                                                                                                                                                              2021-02-
In-situ remediation works in      IDA / 59370      Hotspots and Improvement of Post                Request for Bids   Open - National                                                                           1,200,000.00         0.00    Implementat                                                     2020-04-30              2020-05-05                                   2020-06-16            2020-07-16              2020-08-20
                                                                                                                                        Envelope                                                                                                                                                                                                                                                                                                           16
public spaces                                      Environmental Infrastructure                                                                                                                                                              ion


 ZM-KMC-141678-CW-RFB /
Provision of water supply                          Reducing environmental
                                                                                                                                        Single Stage - One                                                                                                                                                                                                                                                                                              2021-01-
(Borehole drilling and            IDA / 59370      health risks through localized Post             Request for Bids   Open - National                                                                            200,000.00    188,020.00    Signed                                                          2020-03-31 2019-12-13 2020-04-05                                     2020-05-17 2019-12-04 2020-06-16 2019-12-13 2020-07-21 2020-01-20
                                                                                                                                        Envelope                                                                                                                                                                                                                                                                                                           17
installation in school and                         interventions
selected communities)


 ZM-KMC-141681-CW-RFQ /
                                                   Remediation of Contaminated                                                                                                                                                               Pending
rehabilitation of council                                                                          Request for                          Single Stage - One                                                                                                                                                                                                                                                                                              2020-09-
                                  IDA / 59370      Hotspots and Improvement of Post                                   Open - National                                                                             25,000.00          0.00    Implementat                                                                             2020-02-05                                                                                 2020-04-01
nursery infrastructure plus                                                                        Quotations                           Envelope                                                                                                                                                                                                                                                                                                           28
                                                   Environmental Infrastructure                                                                                                                                                              ion
borehole installation


 ZM-KMC-141829-CW-RFQ /                            Reducing environmental                                                                                                                                                                    Under
                                                                                                   Request for                          Single Stage - One                                                                                                                                                                                                                                                                                              2020-10-
Rehabilitation of health          IDA / 59370      health risks through localized Post                                Open - National                                                                             50,000.00          0.00    Implementat                                                                             2020-03-04                                                                                 2020-04-29
                                                                                                   Quotations                           Envelope                                                                                                                                                                                                                                                                                                           26
facilities                                         interventions                                                                                                                                                                             ion


 ZM-KMC-141831-CW-RFQ /                            Remediation of Contaminated                                                                                                                                                               Pending
                                                                                                   Request for                          Single Stage - One                                                                                                                                                                                                                                                                                              2020-08-
Rehabilitation of office          IDA / 59370      Hotspots and Improvement of Post                                   Open - National                                                                             25,000.00          0.00    Implementat                                                                             2020-01-05                                                                                 2020-03-01
                                                                                                   Quotations                           Envelope                                                                                                                                                                                                                                                                                                           28
building                                           Environmental Infrastructure                                                                                                                                                              ion


 ZM-KMC-145021-CW-RFQ /                            Remediation of Contaminated                                                                                                                                                               Pending
                                                                                                   Request for                          Single Stage - One                                                                                                                                                                                                                                                                                              2020-09-
In-situ Dust Suppression in       IDA / 59370      Hotspots and Improvement of Post                                   Limited                                                                                    100,000.00          0.00    Implementat                                                                             2020-01-10                                                                                 2020-03-06
                                                                                                   Quotations                           Envelope                                                                                                                                                                                                                                                                                                           02
Schools in Hotpots Area                            Environmental Infrastructure                                                                                                                                                              ion


 ZM-KMC-145026-CW-RFQ /
                                                   Remediation of Contaminated
Construction of A Wall Fence                                                                       Request for                          Single Stage - One                                                                                                                                                                                                                                                                                              2020-07-
                                  IDA / 59370      Hotspots and Improvement of Post                                   Limited                                                                                     40,000.00     31,156.20    Completed                                                                               2019-11-16 2019-11-11                                                                      2020-01-11 2019-12-17
and drainage At Mine Primary                                                                       Quotations                           Envelope                                                                                                                                                                                                                                                                                                           09
                                                   Environmental Infrastructure
School


 ZM-KMC-178992-CW-RFQ /                            Remediation of Contaminated
                                                                                                   Request for                          Single Stage - One                                                                                                                                                                                                                                                                                              2021-02-
In-situ remediation for 200       IDA / 59370      Hotspots and Improvement of Post                                   Limited                                                                                    100,000.00          0.00    Canceled                                                                                2020-07-05                                                                                 2020-08-30
                                                                                                   Quotations                           Envelope                                                                                                                                                                                                                                                                                                           26
household in Kasanda                               Environmental Infrastructure


 ZM-KMC-179125-CW-RFQ /
                                                   Remediation of Contaminated                                                                                                                                                               Pending
Rehabilitation of EPIC centers-                                                                    Request for                          Single Stage - One                                                                                                                                                                                                                                                                                              2021-03-
                                IDA / 59370        Hotspots and Improvement of Post                                   Limited                                                                                     40,000.00          0.00    Implementat                                                                             2020-08-07                                                                                 2020-10-02
Kasanda, Makululu, Katonda                                                                         Quotations                           Envelope                                                                                                                                                                                                                                                                                                           31
                                                   Environmental Infrastructure                                                                                                                                                              ion
and Town center


 ZM-KMC-184763-CW-RFQ /                            Remediation of Contaminated                                                                                                                                                               Under
                                                                                                   Request for                          Single Stage - One                                                                                                                                                                                                                                                                                              2021-04-
Voluntary In-situ Remediation     IDA / 59370      Hotspots and Improvement of Post                                   Limited                                                                                     25,000.00          0.00    Implementat                                                                             2020-08-22                                                                                 2020-10-17
                                                                                                   Quotations                           Envelope                                                                                                                                                                                                                                                                                                           15
for 20 Households in Kasanda                       Environmental Infrastructure                                                                                                                                                              ion


 ZM-KMC-144021-CW-RFQ /                            Remediation of Contaminated                                                                                                                                                               Pending
                                                                                                                                        Single Stage - One                                                                                                                                                                                                                                                                                              2021-05-
Voluntary In-situ House Dust      IDA / 59370      Hotspots and Improvement of Post                Request for Bids   Open - National                                                                            530,000.00          0.00    Implementat                                                     2020-07-31              2020-08-05                                   2020-09-16            2020-10-16              2020-11-20
                                                                                                                                        Envelope                                                                                                                                                                                                                                                                                                           19
suppression                                        Environmental Infrastructure                                                                                                                                                              ion


 ZM-KMC-141665-CW-RFB /
Construction of engineered                         Reducing environmental                                                                                                                                                                    Pending
                                                                                                                                        Single Stage - One                                                                                                                                                                                                                                                                                              2022-08-
landfill and installation of      IDA / 59370      health risks through localized Post             Request for Bids   Open - National                                                                           2,000,000.00         0.00    Implementat                                                     2021-10-29              2021-11-03                                   2021-12-15            2022-01-14              2022-02-18
                                                                                                                                        Envelope                                                                                                                                                                                                                                                                                                           17
weigh bridge, material                             interventions                                                                                                                                                                             ion
recovery facility,HAZ mat cells


 ZM-KMC-209474-CW-RFQ /                            Enhancing Institutional
                                                                                                                                                                                                                                             Pending
Improvement of the Drainage                        capacity to strengthen                          Request for                          Single Stage - One                                                                                                                                                                                                                                                                                              2021-08-
                              IDA / Q9880                                        Post                                 Limited                                                                                     35,000.00          0.00    Implementat                                                                             2021-01-05                                                                                 2021-03-02
System at Mine Primary School                      environmental governance                        Quotations                           Envelope                                                                                                                                                                                                                                                                                                           29
                                                                                                                                                                                                                                             ion
Kabwe                                              and compliance




GOODS
 Activity Reference No. /                                                                                                                                                                                                                                                                 Draft Bidding                                                                         Bid Evaluation Report
                                   Loan / Credit                                                                                          Procurement        Prequalification    Estimated      Actual Amount     Process      Draft Pre-qualification        Prequalification                               Specific Procurement    Bidding Documents as Proposal Submission /
        Description                                       Component                  Review Type        Method        Market Approach                                                                                                                                                     Document /                                                                            and Recommendation         Signed Contract      Contract Completion
                                       No.                                                                                                  Process               (Y/N)         Amount (US$)        (US$)          Status            Documents               Evaluation Report                                Notice / Invitation            Issued         Opening / Minutes
                                                                                                                                                                                                                                                                                          Justification                                                                               for Award
                                                                                                                                                                                                                                Planned        Actual       Planned      Actual       Planned       Actual    Planned      Actual     Planned      Actual  Planned     Actual    Planned      Actual      Planned    Actual      Planned     Actual

 ZM-KMC-68194-GO-RFQ /                             Reducing environmental
                                                                                                                                        Single Stage - One
Procurement of lead cure          IDA / Q9880      health risks through localized Post             Request for Bids   Open - National                                              500,000.00            0.00   Canceled       2018-07-05                  2018-09-20                2018-09-20              2018-07-10 2018-07-13                           2018-11-29           2018-12-29            2019-02-02              2020-07-26
                                                                                                                                        Envelope
medicine                                           interventions


 ZM-KMC-83374-GO-RFB /                             Reducing environmental
Procurement of Lead Care          IDA / Q9880      health risks through localized Post             Direct Selection   Direct                                                       500,000.00            0.00   Canceled                                                             2018-10-26              2018-10-31                                                                                 2018-12-05              2019-06-03
Medicines                                          interventions


 ZM-KMC-83376-GO-DIR /                             Reducing environmental
Procurement of Lead               IDA / Q9880      health risks through localized Post             Direct Selection   Direct                                                       350,000.00            0.00   Canceled                                                             2018-10-26              2018-10-31 2019-01-10                                                                      2018-12-05              2019-06-03
Analysers and Test Kits                            interventions




                                                                                                                                                                                                                                    Page 1
 ZM-KMC-95948-GO-DIR /                             Remediation of Contaminated
Procurement of lead care          IDA / 59370      Hotspots and Improvement of Prior               Direct Selection   Direct                                                       500,000.00              0.00   Canceled                                                      2018-10-26 2019-02-04 2018-10-31 2019-02-07                                                                        2018-12-05            2019-06-03
medicine                                           Environmental Infrastructure


 ZM-KMC-95947-GO-DIR /                             Remediation of Contaminated
Procurement of lead Analysers IDA / 59370          Hotspots and Improvement of Prior               Direct Selection   Direct                                                       350,000.00      1,583,291.80   Signed                                                        2018-10-26 2019-02-18 2018-10-31 2019-03-02                                                                        2018-12-05 2019-08-13 2019-06-03
and Test Kits                                      Environmental Infrastructure


                                                   Enhancing Institutional
 ZM-KMC-95928-GO-RFQ /
                                                   capacity to strengthen                          Request for                          Single Stage - One
Procurement of Office             IDA / 59370                                     Post                                Limited                                                       80,000.00         12,220.83   Completed                                                                             2018-07-23 2018-07-09                                                                      2018-09-17 2018-07-17 2019-03-16 2018-07-23
                                                   environmental governance                        Quotations                           Envelope
Equipment
                                                   and compliance


                                                   Enhancing Institutional
 ZM-KMC-95946-GO-RFQ /                             capacity to strengthen                          Request for                          Single Stage - One
                                  IDA / 59370                                     Post                                Limited                                                       89,000.00         41,461.06   Completed                                                                             2018-07-23 2018-08-21                                                                      2018-09-17 2018-11-28 2019-03-16 2018-12-21
Procurement of IT Equipment                        environmental governance                        Quotations                           Envelope
                                                   and compliance


                                                   Enhancing Institutional
ZM-KMC-95945-GO-RFQ /                              capacity to strengthen                          Request for                          Single Stage - One
                                  IDA / 59370                                     Post                                Limited                                                       20,000.00          3,946.82   Signed                                                                                2019-01-08 2019-02-20                                                                      2019-03-05 2019-03-14 2019-09-01
Networking                                         environmental governance                        Quotations                           Envelope
                                                   and compliance


 ZM-KMC-96058-GO-RFQ /
                                                   Project Management,                             Request for                          Single Stage - One
Field monitoring vehicles -       IDA / 59370                                     Post                                Limited                                                       60,000.00         38,948.01   Completed                                                                             2018-07-23 2018-07-09                                                                      2018-09-17 2018-07-17 2019-03-16 2018-07-23
                                                   Monitoring and Evaluation                       Quotations                           Envelope
one


 ZM-KMC-107310-GO-DIR /                            Remediation of Contaminated
Procurement of Lead Care          IDA / 59370      Hotspots and Improvement of Prior               Direct Selection   Direct                                                      2,500,000.00     2,500,000.00   Signed                                                        2019-03-22 2019-04-09 2019-03-27 2019-04-17                                                                        2019-05-01 2019-04-11 2019-10-28
Medicines and Supplements                          Environmental Infrastructure


 ZM-KMC-141839-GO-RFB /                            Reducing environmental
                                                                                                                                        Single Stage - One
procurement of nutritional        IDA / 59370      health risks through localized Post             Request for Bids   Open - National                                              200,000.00          9,970.36   Signed                                                        2019-11-29 2020-02-26 2019-12-04 2020-02-26                          2020-01-15 2020-03-24 2020-02-14 2020-04-09 2020-03-20 2020-06-18 2020-09-16
                                                                                                                                        Envelope
supplements                                        interventions


 ZM-KMC-141842-GO-DIR /                            Reducing environmental                                                                                                                                         Under
Procurement of nutritional        IDA / 59370      health risks through localized Prior            Direct Selection   Direct                                                       300,000.00              0.00   Implementati                                                  2019-11-29 2020-04-15 2019-12-04                                                                                   2020-01-08            2020-07-06
supplements (RUTF)                                 interventions                                                                                                                                                  on


 ZM-KMC-141844-GO-RFQ /                            Reducing environmental
                                                                                                   Request for                          Single Stage - One
Procurement of medical            IDA / 59370      health risks through localized Post                                Open - National                                               50,000.00              0.00   Canceled                                                                              2019-12-04                                                                                 2020-01-29            2020-07-27
                                                                                                   Quotations                           Envelope
equipment and supplies                             interventions


 ZM-KMC-141847-GO-RFQ /
Procurement of two (2) XRF                         Reducing environmental
                                                                                                   Request for                          Single Stage - One
machines, 2 digital GPS,PPE,      IDA / 59370      health risks through localized Post                                Open - National                                              100,000.00              0.00   Canceled                                                                              2019-12-04                                                                                 2020-01-29            2020-07-27
                                                                                                   Quotations                           Envelope
Plotter (including                                 interventions
Maintenance)


 ZM-KMC-141854-GO-RFQ /
                                                                                                                                                                                                                  Pending
procurement of network                             Project Management,                             Request for                          Single Stage - One
                                  IDA / 59370                                     Post                                Open - National                                               25,000.00              0.00   Implementati                                                                          2020-01-04                                                                                 2020-02-29            2020-08-27
infrastructure and installation                    Monitoring and Evaluation                       Quotations                           Envelope
                                                                                                                                                                                                                  on
for data management


 ZM-KMC-141856-GO-RFQ /                            Project Management,                             Request for                          Single Stage - One
                                  IDA / 59370                                     Post                                Open - National                                               50,000.00              0.00   Canceled                                                                              2020-02-04                                                                                 2020-03-31            2020-09-27
Procurement of GIS                                 Monitoring and Evaluation                       Quotations                           Envelope


 ZM-KMC-172558-GO-RFQ /                            Reducing environmental
                                                                                                   Request for                          Single Stage - One
Procurement of medical            IDA / 59370      health risks through localized Post                                Limited                                                       50,000.00         27,537.53   Completed                                                                             2020-05-12 2020-05-20                                                                      2020-07-07 2020-05-22 2021-01-03 2020-05-22
                                                                                                   Quotations                           Envelope
Equipment and supplies                             interventions


 ZM-KMC-179146-GO-RFQ /                            Remediation of Contaminated                                                                                                                                    Under
                                                                                                   Request for                          Single Stage - One
Procurement of one motor          IDA / 59370      Hotspots and Improvement of Post                                   Limited                                                       47,000.00              0.00   Implementati                                                                          2020-07-05 2020-07-08                                                                      2020-08-30            2021-02-26
                                                                                                   Quotations                           Envelope
vehicle                                            Environmental Infrastructure                                                                                                                                   on


 ZM-KMC-179159-GO-RFQ /
                                                   Remediation of Contaminated                                                                                                                                    Pending
Procurement of software and                                                                        Request for                          Single Stage - One
                                  IDA / 59370      Hotspots and Improvement of Post                                   Limited                                                       15,000.00              0.00   Implementati                                                                          2020-07-05                                                                                 2020-08-30            2021-02-26
hardware to support smart                                                                          Quotations                           Envelope
                                                   Environmental Infrastructure                                                                                                                                   on
care


 ZM-KMC-179168-GO-RFQ /                            Remediation of Contaminated
                                                                                                   Request for                          Single Stage - One
Procurement of power back         IDA / 59370      Hotspots and Improvement of Post                                   Limited                                                       10,000.00          5,537.19   Completed                                                                             2020-06-16 2020-04-14                                                                      2020-08-11 2020-05-18 2021-02-07 2020-06-19
                                                                                                   Quotations                           Envelope
up for 3 health facilities                         Environmental Infrastructure


 ZM-KMC-179175-GO-RFQ /                            Remediation of Contaminated                                                                                                                                    Pending
                                                                                                   Request for                          Single Stage - One
Procurement of Computers        IDA / 59370        Hotspots and Improvement of Post                                   Limited                                                         4,000.00             0.00   Implementati                                                                          2020-07-05                                                                                 2020-08-30            2021-02-26
                                                                                                   Quotations                           Envelope
and printers for health centers                    Environmental Infrastructure                                                                                                                                   on


 ZM-KMC-184843-GO-RFQ /                            Reducing environmental
                                                                                                   Request for                          Single Stage - One
Procurement of Furniture (for     IDA / 59370      health risks through localized Post                                Limited                                                       18,000.00         14,125.91   Completed                                                                             2020-07-19 2019-12-05                                                                      2020-09-13 2019-12-23 2021-03-12 2020-01-20
                                                                                                   Quotations                           Envelope
the New Office)                                    interventions


 ZM-KMC-184844-GO-RFQ /                            Reducing environmental
                                                                                                   Request for                          Single Stage - One
Procurement of Power Backup       IDA / 59370      health risks through localized Post                                Limited                                                         4,000.00         3,587.43   Completed                                                                             2020-07-24 2019-11-15                                                                      2020-09-18 2020-01-21 2021-03-17 2020-01-31
                                                                                                   Quotations                           Envelope
for the office                                     interventions


 ZM-KMC-184845-GO-RFQ /                            Reducing environmental
                                                                                                   Request for                          Single Stage - One
Procurement of Vehicle            IDA / 59370      health risks through localized Post                                Limited                                                         2,500.00         1,703.05   Signed                                                                                2020-07-24 2019-10-16                                                                      2020-09-18 2019-11-06 2021-03-17
                                                                                                   Quotations                           Envelope
canopy                                             interventions


 ZM-KMC-207224-GO-RFQ /                            Reducing environmental                                                                                                                                         Pending
                                                                                                   Request for                          Single Stage - One
procurement of drugs and          IDA / Q9880      health risks through localized Post                                Limited                                                       15,628.65              0.00   Implementati                                                                          2021-01-05                                                                                 2021-03-02            2021-08-29
                                                                                                   Quotations                           Envelope
medical supplies                                   interventions                                                                                                                                                  on


 ZM-KMC-207231-GO-RFQ /                            Reducing environmental                                                                                                                                         Pending
                                                                                                   Request for                          Single Stage - One
procurement of laboratory         IDA / Q9880      health risks through localized Post                                Limited                                                       11,516.22              0.00   Implementati                                                                          2021-01-05                                                                                 2021-03-02            2021-08-29
                                                                                                   Quotations                           Envelope
commodities                                        interventions                                                                                                                                                  on




NON CONSULTING SERVICES
 Activity Reference No. /                                                                                                                                                                                                                                                            Draft Bidding                                                                         Bid Evaluation Report
                                   Loan / Credit                                                                                          Procurement        Prequalification    Estimated       Actual Amount      Process      Draft Pre-qualification     Prequalification                           Specific Procurement    Bidding Documents as Proposal Submission /
        Description                                       Component                  Review Type        Method        Market Approach                                                                                                                                                Document /                                                                            and Recommendation         Signed Contract     Contract Completion
                                       No.                                                                                                  Process               (Y/N)         Amount (US$)         (US$)           Status            Documents            Evaluation Report                            Notice / Invitation            Issued         Opening / Minutes
                                                                                                                                                                                                                                                                                     Justification                                                                               for Award
                                                                                                                                                                                                                                  Planned      Actual      Planned     Actual    Planned       Actual    Planned     Actual      Planned      Actual  Planned     Actual    Planned      Actual     Planned     Actual    Planned     Actual




                                                                                                                                                                                                                                      Page 2
CONSULTING FIRMS
Activity Reference No. /                                                                                                                                                                                                                                                                                                                                    Combined Evaluation
                                  Loan / Credit                                                                                          Contract Type    Estimated       Actual Amount                                                Expression of Interest    Short List and Draft   Request for Proposals   Opening of Technical      Evaluation of
       Description                                       Component                  Review Type        Method     Market Approach                                                          Process Status    Terms of Reference                                                                                                                               Report and Draft       Signed Contract     Contract Completion
                                      No.                                                                                                                Amount (US$)         (US$)                                                           Notice            Request for Proposals        as Issued          Proposals / Minutes    Technical Proposal
                                                                                                                                                                                                                                                                                                                                                            Negotiated Contract
                                                                                                                                                                                                             Planned       Actual      Planned      Actual       Planned     Actual      Planned     Actual      Planned     Actual    Planned    Actual    Planned     Actual     Planned     Actual    Planned     Actual

 ZM-KMC-56403-CS-CQS /
Engagement of a partner
service provider for the                          Reducing environmental                          Consultant
implementation of livelihood     IDA / Q9880      health risks through localized Post             Qualification   Open - National                            200,000.00       199,999.97   Signed           2018-04-13   2018-05-24 2018-05-04 2018-07-24 2018-06-17 2019-01-10                                                                             2018-07-17 2019-04-26 2018-08-21 2019-07-10 2019-02-17
enhancement activities for                        interventions                                   Selection
Kabwe,Kitwe,Mufulira and
Chingola Districts.


 ZM-KMC-96084-CS-CQS /                            Remediation of Contaminated                     Consultant
Development of an integrated     IDA / 59370      Hotspots and Improvement of Post                Qualification   Open - National                             50,000.00             0.00   Canceled         2019-01-23   2019-01-29 2019-02-13                  2019-03-29                                                                                  2019-04-28            2019-06-02            2019-11-29
database for lead data                            Environmental Infrastructure                    Selection


 ZM-KMC-38770-CS-CQS /
Feasibility and detailed                          Remediation of Contaminated                     Consultant
engineering design for In-situ   IDA / 59370      Hotspots and Improvement of Post                Qualification   Open - National                             50,000.00             0.00   Canceled         2017-12-29   2018-02-07 2018-01-19 2018-07-05 2018-03-04 2019-01-10                                                                             2018-04-03            2018-05-08            2018-11-04
remediation of hotspots in                        Environmental Infrastructure                    Selection
Kabwe


 ZM-KMC-10319-CS-CQS /                            Remediation of Contaminated                     Consultant
Detailed engineering design      IDA / Q9880      Hotspots and Improvement of Post                Qualification   Open - National                             50,000.00             0.00   Canceled         2017-03-31   2018-02-07 2017-04-21 2018-07-05 2017-06-04 2019-01-10                                                                             2017-07-04            2017-08-08            2018-02-04
of Kabwe Canal                                    Environmental Infrastructure                    Selection


 ZM-KMC-37559-CS-CQS /
Feasibility, including waste                      Remediation of Contaminated                     Consultant
characterization and design of IDA / Q9880        Hotspots and Improvement of Post                Qualification   Open - International                       100,000.00             0.00   Canceled         2017-12-29   2018-02-08 2018-01-19 2018-07-05 2018-03-04 2019-01-10                                                                             2018-04-03            2018-05-08            2018-11-04
Kabwe hazardous and solid                         Environmental Infrastructure                    Selection
waste landfill


 ZM-KMC-37559-CS-CQS-2 /
Feasibility,including waste                       Remediation of Contaminated                     Consultant
                                                                                                                                                                                           Under
characterization and design of IDA / Q9880        Hotspots and Improvement of Post                Qualification   Open - National                            200,000.00       248,295.42                    2019-02-15   2019-03-18 2019-03-08                  2019-04-21 2019-04-19                                                                       2019-05-21 2019-10-08 2019-06-25            2019-12-22
                                                                                                                                                                                           Implementation
Kabwe hazardous and solid                         Environmental Infrastructure                    Selection
waste land fill


 ZM-KMC-10319-CS-CQS-2 /
                                                  Remediation of Contaminated                     Consultant
Detailed engineering design
                            IDA / Q9880           Hotspots and Improvement of Post                Qualification   Open - National                            200,000.00       197,268.83   Signed           2019-02-15   2019-03-21 2019-03-08                  2019-04-21 2019-04-19                                                                       2019-05-21 2019-08-06 2019-06-25 2019-07-31 2019-12-22
of the Kabwe Canal and
                                                  Environmental Infrastructure                    Selection
Landscapping


 ZM-KMC-38770-CS-CQS-2 /
Environmental assessment of                       Remediation of Contaminated                     Consultant
the Kabwe Canal and In-situ IDA / 59370           Hotspots and Improvement of Post                Qualification   Open - National                            100,000.00        97,026.44   Signed           2019-02-15   2019-03-26 2019-03-08                  2019-04-21 2019-05-15                                                                       2019-05-21 2019-06-23 2019-06-25 2019-07-31 2019-12-22
remediation of hot spots in                       Environmental Infrastructure                    Selection
Kabwe


 ZM-KMC-103628-CS-CQS /
Feasibility and detailed                          Remediation of Contaminated                     Consultant
engineering design for In-situ   IDA / Q9880      Hotspots and Improvement of Post                Qualification   Open - National                            300,000.00       294,603.28   Signed           2019-03-18   2019-04-05 2019-04-08                  2019-05-22 2019-04-19                                                                       2019-06-21 2019-08-08 2019-07-26 2019-11-06 2020-01-22
remediation of hotspots in                        Environmental Infrastructure                    Selection
Kabwe


 ZM-KMC-119155-CS-CQS /
Engagement of a partner
service provider for the                          Reducing environmental                          Consultant
implementation of livelihood     IDA / Q9880      health risks through localized Post             Qualification   Open - National                            200,000.00             0.00   Canceled         2019-06-14   2018-05-24 2019-07-05                  2019-08-18 2019-01-10                                                                       2019-09-17 2019-04-25 2019-10-22            2020-04-19
enhancement activities for                        interventions                                   Selection
Kabwe, Kitwe, Mufulira and
Chingola Districts




INDIVIDUAL CONSULTANTS
Activity Reference No. /                                                                                                                                                                                                                   Invitation to
                                  Loan / Credit                                                                                          Contract Type    Estimated       Actual Amount                                                                           Draft Negotiated
       Description                                       Component                  Review Type        Method     Market Approach                                                          Process Status    Terms of Reference        Identified/Selected                                 Signed Contract      Contract Completion
                                      No.                                                                                                                Amount (US$)         (US$)                                                                                   Contract
                                                                                                                                                                                                                                            Consultant
                                                                                                                                                                                                             Planned       Actual      Planned       Actual      Planned     Actual      Planned     Actual      Planned     Actual

 ZM-KMC-100457-CS-CQS /                           Remediation of Contaminated                     Individual
Development of an integrated     IDA / 59370      Hotspots and Improvement of Post                Consultant      Limited                                     50,000.00             0.00   Canceled         2019-03-22   2019-04-11 2019-03-27                  2019-04-17              2019-05-22              2019-11-18
database for lead data                            Environmental Infrastructure                    Selection




                                                                                                                                                                                                                              Page 3