International Bank for Reconstruction and Development International Development Association SecM92-430 FROM: Vice President and Secretary April 1, 1992 MONTHLY OPERATIONAL SUMMARY OF BANK AND IDA PROPOSED PROJECTS (As of March 15, 1992) Distribution: Executive Directors and Alternates Office of the President Executive Vice Presidents, IFC and MIGA Vice Presidents, Bank, IFC and MIGA Directors and Department Heads Bank, IFC and MIGA TABLE OF CONTENTS Summary of Bank and IDA ProRosed Projects Information on Environmental Assessment v SECTION REGION PAGES I. AFRICA 1-41 Angoa1........... ................... I Benin................ 2 Benin/Togo................ 3 Burkina Faso............................. 3 Burundi. ............................. 4 Cameroon................................. 5 Cape Verde............................... 7 Central African Republic................. 7 Chad ..................................... Comoros.................................. 9 Cote d'Ivoire............................ 9 Djiboutio....... 10 Equatorial Guinea........................ 11 Ethiopia................. ............... 11 Gabon .... ................................ 13 The Gambia............................... 13 Ghana .................................... 13 Guinea................................... 15 Guinea-Bissau ............................ 16 Kenya.................................... 16 Lesotho.................................. 17 Madagascar............................... 1 Malavi ................................... 20 Mali..................................... 21 Mauritania............................... 23 Mauritius ................................ 23 Mozambique............................... 24 Niger .................................... 26 Nigeria.................................. 27 Rwanda................................... 30 Sao Tome and Principe.................... 31 Senegal .................................. 32 Seychelles............................... 34 AFRICA REGION (Contd.. ./...) Sierra Leone............................. 34 Swaziland................................ 34 Tanzania................................. 35 Togo ..................................... 36 Uganda ................................... 37 Zaire .................................... 38 Zambia................................... .39 Zimbabwe................................. 40 Africa Regional.......................... 41 II. EAST ASIA & PACIFIC REGION 42 - 65 China .................................... 42 Fiji ..................................... 49 Indonesia................................ 49 Korea .................................... 54 Lao, People's Democratic Republic ....... 56 Malaysia................................. 57 Maldives ................................. 59 Papua New Guinea......................... 59 Philippines.............................. 60 Solomon Islands.......................... 63 Thailand ................................. 63 Tonga .................................... 65 Vanuatu .................................. 65 III. EUROPE AND CENTRAL ASIA 66 - 73 Albania..........................****. *** 6 Bulgaria................................. 66 Czechoslovakia........................... 67 Hungary............... ................... 68 Poland................................... 69 Romania.................................. 70 Turkey........... .......................7 Yugoslavia............................... 73 IV. LATIN AMERICA AND CARIBBEAN 74 - 97 Argentina.................. .............. 74 Barbados................................. 75 Belize................................... 75 Bolivia............................ ...... 76 Brazil................................... 77 Caribbean Region......................... 81 Chile .......... .....,,..... ............ 81 Colombia................................. 82 Costa Rica ............................... 84 Dominican Republic....................... 85 Ecuador.................................. 85 El Salvador .............................. 86 Guatemala ................................ 86 Guyana................................... 87 Haiti.................................... 88 Honduras................................. 88 Jamaica .................................. 89 Mexico ................................... 90 Nicaragua ................................ 92 Panama ................................... 92 Paraguayg9.................. ............. 92 Peru ..................................... 93 Trinidad & Tobago........................ 94 Uruguay.............. .................... 95 Venezuela ................................ 95 iv V. MIDDLE EAST AND NORTH AFRICA 98 - 110 Algeria.................................. 98 Egypt, Arab Republic of .................. 101 Iran ..................................... 103 Jordan 1.... .............................. 104 Morocco.................................. 104 Tunisia .................................. 107 Yemen, Republic of....................... 109 VI. SOUTH ASIA 111 - 132 Bangladesh............................... 11 Bhutan................................... 115 India .................................... 115 Nepal .................................... 124 Pakistan................................. 126 'Sri Lanka................................ 130 VII. NEW PROJECTS ADDED IN THIS ISSUE 133 - 137 VIII. PROJECTS DROPPED FROM LENDING PROGRAM 138 -' 140 AND PROJECTS SIGNED MOS ANNEX I Environmental Overview of Category A Projects Il - 178 Environmental Overview of Category B Projects 179 - 1129 MOS ANNEX II Global Environment Facility - Quarterly Report III - 114 Secretary's Department INFORMATION ABOUT THE ENVIRONMENTAL ASSESSMENT PROCESS APPLIED TO BANK AND IDA PROPOSED PROJECTS In September, 1989, the Bank established specific policies and procedures for environmental assessment and related environmental analyses of IBRD and IDA investment lending operations. Under this environmental assessment process, the type, timing and main issues of environmental analysis to be performed by the borrower are to be confirmed at the time that a given lending operation is initiated into the Bank's prospective lending program and thereafter reported and updated in the Monthly Operational Summary. In October, 1991, the Bank revised its policies and procedures so that projects are now assigned one of the following categories based upon the nature, magnitude, and sensitivity of environmental issues: Category A - Environmental Assessment is normally required as the project may have adverse and significant environmental impacts. Category B - More limited environmental analysis is appropriate, as the project may have specific environmental impacts. Category C - Environmental analysis is normally unnecessary. (The former!Category D, used for identifying environmental projects, is now being phased out.) Accordingly, the Monthly Operational Summary now includes in Annex I more detailed information about the status of the environmental assessment of Category A and B projects included in the main text. Annex I is included in the Monthly Operational Summary on a quarterly basis (i.e. issues dated January, April, July and October). "Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project " Consulting Services Action an Procurement 4 I. AFRICA REGION ANGOLA Ministry of About (N) Fisheries Resource Management - To be determined. Project preparation under Fisheries 20.5 Project includes natural resource way. (IDA) management, privatization and infrastructure rehabilitation and has three components: (a) formulation and implementation of a "Fisheries Management Regime"; (b) support to privatization; and (c) rehabilitation/ development of fish landing infrastructure for industrial and small- scale fisheries. There is a possLble addition of two more components: promotion of coastal fisheries and promotion of fish exports. Environmental Assessment Category B. Ministry of About (R) Transport Recovery - Restoration and Consulting services will Negotiations tentatively Planning-INEA- 30.0 preservation of surface access to large be required for scheduled for April/May Lobito Port (IDA) portions of country to support supervision of civil 1992. resumption of economic activities and works and technical repopulation of countryside by ensuring assistance. minimal road, rail and port service. Environmental Assessment Category B. Ministry of Energy About (R) Power System Rehabilitation - Consulting services will Appraisal under way. 25.8 Technical assistance to public utilities be required. (IDA) and rehabilitation of main transmission lines from existing hydroelectric power plants to principal consumption centers. Environmental Assessment Category B. Lobito Corridor 25.0 (R) Lobito Corridor - Rehabilitation of Contract signed for Project preparation under Authority (LCA) (IDA) Lobito Port Transport System, which consultancy services for way. includes Lobito Port and the Benguela feasibility study, Railways. Environmental Assessment approximately Category B. 60 man-months. Ministry of Health 20.0 (R) Health I - Project will provide: Consulting services to Project preparation under (IDA) (a) Institutional reinforcement and - be determined. way. definition of health policies at Health Ministry's level: (b) development of health sector human resources, particularly in Huila province, through creation of a pilot school for training of health staff; (c) rehabilitation of some health institutions selected because of the priority of their services; and (d) support to ongoing national health programs (AIDS, Family Planning). Environmental Assessment Category C. 1/ Addresses of Implementing Agencies of new projects are given in Section V of the Sunary. 1/ The amount is in millions of US dollars and is approximate and tentative? SAF is the acronym for the Special Facility of Sub-Saharan Africa. 2/ The letter (N) before projects means that the project is a new listing in the summary: the letter (R) means the information about the project has been revised since the last issue. /l This column contains available information, if any about action with respect to the procurement of goods and services expected to be financed by the Bank or IDA, including retroactive financing: expenditures under the IBRD/IDA Project. -2- Member Country, Amount & Implementing Probable Stage of Processing a Agency ' Lender 2 Project Consulting Services Action on Procurement ANGOLA (Cont'd) Central 30.0 (R) Financial Institutions Development/ Consulting-services Project under Bank/Ministry of (IDA) Private Sector - Technical assistance to be determined. preparation. Finance and training in support of establishment An IDA PPF advance of of two-tier banking system and private US$900,000 to finance sector development. Environmental equipment, vehicles, Assessment Catezory C. training and consultai has been approved. Ministry of About (R) Education I - Rehabilitation and Consultants have been Appraisal report undei Education 20.5 construction of schools and improvement selected (about 55 preparation. (IDA) of conditions of teaching; institutional staffweeks). development of various units within the Ministry of Education and university's management information system; and human resource development through initial and in-service training of teachers, inspectors and administrators. Environmental Assessment Category C. BENIN Ministere du Plan 16.0 Private Sector Development - The project To be determined. Project under et de la (IDA) will take advantage of the improved preparation. Restructuration medium-term prospects resulting from the Economique adjustment program by: (a) reform of the incentive framework; (b) further streamlining of business regulations; (c) strengthening of the institutional support to firms; and (d) further improvement in the banking environment. Environmental Assessment Category C. Ministry of Plan 10.0 (R) Economic Management Support - The To be determined. Pre-appraisal mission and,Economic (IDA) project will consist of: (a) institu- scheduled for early Al Restructuring tional restructuring; (b) capacity 1992. building through technical assistance and a training center; and (c) studies and institutional measures as needed through the implementation of the adjustment program. Environmental Assessment Category C. Ministere du 14.9 Management of Natural Resources - Consultants needed for Negotiations complete( Developpement (IDA) Protecting, managing and developing preparation of natural December 19, 1991. B( Rural natural resources with emphasis on resources management presentation schedulec forests and watersheds.- Development of plans (forest, water, for March 24, 1992. legislation with particular emphasis on land, wildlife), and an adequate land tenure system. training. Environmental Assessment Category D. -3- Member Country, Amount & Implementing Probable Stage of Processing an Agency ' Lender Project Consulting Services Action on Procurement BENIN (Cont'd) Ministry of 20.0 Education Sector Adjustment - To support Consultants already Project under National Education (IDA) the Government's policy and reform identified. preparation. program for developing primary education A PPF request of and improving the quality and relevance US$380,000 has been of educational services through the approved. implementation of a set of institutional and structural measures for: program development and management; financial resource managemeAt including improved allocation and mobilization of resources, general sector reorganization and decentralization; and personnel management. Environmental Assessment Category C. Agetur & Serhau 22.84 (R) Urban Rehabilitation and Consulting services will Approved by the Execut (IDA) Management - Core of project will be a be required for detailed Directors on February labor-based program of public works engineering studies for 1992. improving sanitation and living urban roads and drainage conditions in Cotonou and Porto-Novo to rehabilitation. fight against urban under-employment and alleviate poverty. Also includes preparation for reorganization of urban management services, land management, and resource mobilization in Cotonou and Porto-Novo. Environmental Assessment Category B. BENIN/TOGO. Communaute 30.0 (N) Adjarala Hydroelectric - Feasibility study and Project under Electrique du (IDA) Hydroelectric project on the Mono River, environment assessment preparation. Benin 97 km downstream of Nangbeto, including under way by Coyne and dam, electric equipment turbines, Belier/EdF (France). related transmission lines, and resettlement (environment). Total project cost US$220.0 million. Environmental Assessment Category A. Communaute 5.5 Engineering and Technical Assistance - Consulting services will Appraisal completed oi Electrique du (IDA) Engineering, environmental, tariff, be required to undertake February 4, 1992. Benin studies, master-plan for generation, studies. Appraisal report unde: transmission and distribution, technical preparation. assistance and training for CEB, a regional entity. Environmental Assessment Category C. BURKINA FASO Ministries of 10.0 (R) Public Institutional Development - Consulting services will Appraisal mission in Finance and Plan (IDA) Increase public administration, be required. field. efficiency and accountability through: (a) strengthen-ing budget preparation and implementa-tic'? and civil service reforms; (b) reforms to commercial laws and training of legal staff; and (c) strengthening public accounting and procurement all through process reform, technical assistance and training. Environmental Assessment Category C. -4- Member Country, Amount & Implementing Probable Stage of Processing an Agency Lender Project Consulting Services Action on Procurement BURKINA FASO (Cont'd) Ministry of 35.0 Private Sector Development - The project Consultants will be Project under Economic Promotion (IDA) would include various technical required. preparation. assistance components. Environmental Assessment Category C. Ministere de 28.0 Agricultural SECAL - Policy reforms in Consultants will be Appraisal report under l'Agriculture et (IDA) the cotton, cereals, livestock and required (estimated at preparation. de 1'Elevage horticulture subsectors, including 200 staffweeks). (Possibility of co- pricing, restructuring of stabilization financing with FAC, CC, mechanisms, marketing regulations and (France), and FED boards. Substantial reforms to improve (European Economic public sector efficiency and possibly Community). some investments. Total project cost estimated at US$70.0 million. Environmental Assessment Category C. Ministere de 66.0 (R) Transport SECAL - This five-year Consultants have Approved by the Execut 1'Equipmentl (IDA) program will assist Government in: prepared feasibility Directors on February Ministere des (a) developing a coherent policy studies. Findings were 1992. Credit was sign Transports framework for the transport sector; and presented and discussed on February 18, 1992. (b) meeting urgent rehabilitation during seminar for requirements of the existing road and Ministry personnel in rail network, and assisting-in March. restructing the local bus company, railway company and air carriers. Total project cost estimated at US$453.0 million. Environmental Assessment Category B. Ministere de la 35.0 Population/Health - Strengthening health Consultants will be Project under Sante (IDA) sector management, extension of required. preparation. population/family planning/nutrition/ tropical disease control activities begun under first project, programs to improve women's conditions. Environmental Assessment Category C. BURUNDI Ministry of 30.3 (N) Education Sector V - Continued To be determined. Identification mission Education (IDA) assistance of Government in implementing tentatively scheduled education reform through financing of September 1992. selected investments in the sector public investment program. Project would also be a continuation of the effort started in the education sector development project to improve education quality and efficiency within the constraints of the sectoral budget quality. Environmental Assessment Category C. Ministry of Land 40.9 (R) Natural Resource Management and To be determined. Project under Planning, Tourism (IDA) Environment - Implementation of preparation. & Environment environmental action plan. Project would focus on: (a) development of soil conservation, agro-forestry, reforestation; (b) rehabilitation of plain irrigation schemes; (c) improvement of land security in priority zones; (d) development of environmental research and (e) improvement of local and central institutions. Environmental Assessment Category B. -5- Member Country, Amount & Implementing Probable Stage of Processing an Agency ' Lender - Project s Consulting Services Action on Procurement BURUNDI (Cont'd) Central Bank, About (R) Private Sector Development - Will Consulting services will Negotiations completed Ministry of 16.0 provide funds to finance: (a) private be required. Board presentation Commerce & (IDA) investments through eligible financial scheduled for April 28 Industry (MCI), intermediaries via BRB as APEX 1992. Ministry of Public institution; with particular emphasis on Works and Urban export-oriented projectsi (b) public Development investment in industrial sites and (MTPDU), Bank of services through MTPDU; and (c) a multi- the Republic of faceted technical assistance to MCI Burundi (BRB) private entrepreneurs, BRB and banks. Environmental Assessment Category B. Ministry of About (R) Agro-Business Promotion - Project Technical assistance Appraisal mission Agriculture & 6.0 , will focus on: (a) privatisation of key will be required for currently in the field Livestock; (IDA) agro-industries; (b) promotion of privatisation of agro- Ministry of private sector involvement in import industries and Commerce & substitution and export diversification; professional expertise Industry and (c) capacity building of GOB and needed to support Chamber of Commerce in support services private enterprises. to private exporters.. Environmental Assessment Category C. Ministry of Health About Health/Population II - Sectoral To be determined. Project under 32.5 development and continuing support to preparation. (IDA) ongoing priority programs. Environmental Assessment Category C. Ministry of Plan About (R) Social Action - To be carried out in Consultancy will be Project under 21.2 conjunction with SAL III, is designed to required. preparation. (IDA) address social dimensions of adjustment -including specific activities focussing on vulnerable groups, such as women, redeployment, community development, essential drug supply, and nutritional surveillance. A Social Dimensions of Adjustment survey will be implemented. Technical assistance and training will be provided. Environmental Assessment Category C. Ministry of Plan; 30.0 (R) SAC III (formerly SAL III) - Consultants will be Appraisal report unde: Ministry of (IDA) Continued support to Government's required. preparation. Finance adjustment program and consolidation of policy reforms undertaken under SAL I and II. Emphasis will be given to agricultural and export promotion reforms. Total project cost estimated at US$95.3 million. Environmental Assessment Cktegory C. CAMEROON Ministry of Urban 40.0 (R) Urban Management Improvement - Consultants were Preparation mission and Housing (Bank) Project would clarify the roles of appointed under the scheduled for Septemb private and public actors and Second Urban Project. 1992. rationalize public in vestments in the urban sector. Project would also improve urban services financing mechanisms and urban land resources management, and rehabilitate parastatal housing agencies. Environmental Assessment Category B. -6 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project s Consulting Services Action on Procurement 4 CAMEROON (Cont'd) National 20.0 Vocational Education Training - To Consulting services will Project being identifie Employment Fund (Bank) support vocational training centers and be required. programs by establishing a fund that would extend financing to those centers that respond to market needs. Environmental Assessment Category C. Ministry of Public 45.0 (R) Transport Sector - Development of Consulting services will Preparation mission in Works and (Bank) transport sector policy objectives and be required to review the field. Transport sectoral investment planning mechanism, different aspects of the based on economic priorities, comprising transport sector and, in All subsectors; development of a new particular; the trade road maintenance strategy, intermodal logistic subsector. efficiency and rationalization of transport sector public enterprise performance (air, rail, maritime, bus transport); promotion of small enterprises; and institutional development, training and technical assistance. Environmental Assessment Category B. Ministere de 15.0 (R) Agriculture Restructuring and Consultants have Project under L'Agriculture (Bank) Diversification - To promote export submitted preparation preparation. Feasibili diversification crops, by private reports. study scheduled for Apr sector, and improve the regulatory 1992. environment for new investments. Environmental Assessment Category B. Ministere de 40.0 (R) Education Sector Adjustment - Consulting services will Preparation mission L'Education (Bank) Implementation of national strategy for be required. scheduled for early May Nationale et sustainable development of education and 1992. Ministere de training in line with needs of the L'Enseignement economy. Environmental Assessment Superieur de la Category C. Technologie et de la Recherche Scientifique Ministry of Public 40.0 Health and Population Sector - Focussing Consultants will be Project under Health and (Bank) on strengthening strategic management required. preparation. Ministry of Plan framework, financial and human resources and Territorial management, improving drug and other Management medical material distribution and strengthening of priority health programs. Environmental Assessment Category C. Ministry of 10.0 (R) Agricultural Research II - Follow up Consultants team Pre-appraisal mission Agriculture (Bank) effort emphasizing support to selected. scheduled for July 199Z implementation of an agreed national agricultural research program, and institutional reform. Environmental Assessment Category B. Ministry of 10.0 (R) Ecological Protection - To improve Consultants have been Project under Agriculture (Bank) institutions in charge of forest selected. preparation. management, conservation and finance activities for environmental protection ,(Possible financing frc of biodiversity parks and reserves. An the Global Environment Environmental Assessment will be Facility (GEF) -- see completed. Environmental Assessment Annex C.) Category A. -7- Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender 2 Project Consulting Services Action on Procurement CAPE VERDE Ministry of Plan 3.0 Public Enterprise Sector Technical To be determined. Project under (IDA) Assistance - Project will assist the preparation. Government in designing a strategy for the public enterprise sector and building its capacity to implement its public enterprise reform program. Environmental Assessment Category C. ENAPOR 18.0 (R) Transport/Infrastructure - Project To be determined. Preparation in progress. (IDA) would: (a) maintain road network; (A PPF of US$710,000 was (b) reduce transport costs; (c) promote approved on January 10, tourism; (d) strengthen management 1992 to finance capabilities; and (e) alleviate water preparation activities.) supply shortages. Total project'cost is US$35.0 million. Environmental Assessment Category B. Ministry of 13.2 (R) Education II - The objective of this To-be determined. Project being identified Education (IDA) project is to outline support to primary education, and development of post primary education including expansion and enhancement of quality or secondary education. Environmental Assessment Category C. (ENAPOR) Empresa 18.8 (R) Public Infrastructure and Factors To be determined. Project under Nacional de (IDA) Upgrading (formerly Export Promotion) - preparation. Administracio dos Upgrading of port facilities at Porto Portos Grande, Mindelo Island, support development of transshipment and attract foreign investments in port based activities. Total project cost is US$30.0 million. Environmental Assessment Category B. Ministries of 9.2 Human Resources - Assist the Government Consulting services will *Project being identifiec Education and (IDA) in implementing its export promotion be required (estimated Health policy. Scope to include definition and at 55.5 staffweeks). implementation of the related training and manpower development strategy and program. Investments to be supported likely to include: (a) vocational training to meet demand for technologically skilled labor; and (b) management training. Environmental Assessment Category C. CENTRAL AFRICAN REPUBLIC Ministry of 40.0 Structural Adjustment IV - To continue Consultants may be Preparation tentatively Finance, Economy, (IDA) to support the government in the required. scheduled for end 1992. Planning and implementation of its adjustment, International integrating approaches to resume growth Cooperation with equity. Environmental Assessment Category C. Ministry of Rural 25.8 (R) Agriculture Services - To support Consulting services will Negotiations scheduled Development (IDA) strengthening of the Ministry of Rural be required. for March 23, 1992. Development, and of research and extension services. Environmental Assessment Category C. -8- Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender 2 Project 3 Consulting Services Action on Procurement CHAD Ministry of Public 60.0 (R) Transport Sector II - Follow up of To be determined. Project under Works & Transport (IDA) the Transport Sector Adjustment and preparation. Feeder Rpads Project to sustain reforms A PPF of US$850,000 was and liberalization of the sector. Total approved on February 21, project cost is US$200.0 million. 1992 to finance Environmental Assessment Category C. preparation activities. Ministry of Public 60.0 Road Maintenance - Follow-up of the To be determined. Project being prepared. Works and (IDA) transport sector adjustment and feeder Transport roads project to sustain reforms and liberalization of the sector. Total project cost is US$200.0 million. Environmental Assessment Category C. Ministry of Public 20.0 (R) Municipal Development - Municipal To be determined. Project being prepared. Works and (IDA) resource mobilization and infrastructure A PPF of US$800,000 was Transport upgrading. More effective public sector approved on February 21, management. Institutional building and 1992 to finance policy reform in the urban sector. preparation activities. - Addressing critical environmental issues. Total project cost is US$40.0 million. Environmental Assessment Category B. To be determined 35.0 Reconstruction Import - To support To be determined. Project increasingly (IDA) public expenditure and other policy doubtful as reforms to sustain and promote activity identification depends oz in key development sectors, satisfactory progress Environmental Assessment Category C. under ongoing operation. To be determined 35.0 Education V - Follow up operation to To be determined. Project being identified (IDA) pursue rehabilitation and extend it to secondary, higher and vocational education. Environmental Assessment Category C. To be determined 20.0 Agricultural Research - To strengthen Consultants will be Project under (IDA) crop, livestock, forestry and natural required (200 preparation. resource management research nationwide. staffweeks). Total project cost US$40 million. Environmental Assessment Category C. Ministry of Health 20.0 Population and Health - The project Consultants will be Project being identified (IDA) would aim to: (a) reorient health care required. service to focus on the provision of an adequate package of basic primary care services to a larger segment of the population; develop and promote an acceptable family planning strategy, including sensitization activities; and (c) develop complementary programs/ activities in the areas of food security (i.e., nutrition), health, and family planning education, focussed particularly on women. If necessary, implementation will begin in one or two pilot zones. Environmental Assessment Category C. 9 Member Country, Amount & Implementing Probable Stage of Processing and Agency a Lender Project Consulting Services Action on Procurement CHAD (Cont'd) Ministry of 20.0 Agricultural Services - Promotion of Consultants will be Project under Agriculture (IDA) effective agricultural support services required. (Estimated at preparation. primarily focusing on research and 200 staffweeks.) (Cafinancing will be extension possibly with functional required possibly from literacy. Total project cost estimated BADEA (Sudan), CCCE at US$40.0 million. Environmental - (France), EEC (Belgium), Assessment Category C. IFAD (Italy).) Ministry of Mines 50.0 Petroleum/Power - to support Under an engineering Project under and Energy (IDA) implementation of a least cost product project approved in preparation. supply system and provide technical November 1990, assistance to strengthen the engineering consultants Engineering project Government's management of the power and have been selected to approved November 1990. petroleum sector. Total project cost prepare three turnkey estimated at US$70.0 million. contracts. Environmental assessment completed under the Engineering Project. Environmental Assessment Category A. COMOROS Ministry of 13.4 Population/Human Resources - Will Consultants have been Project under Health/Education (IDA) strengthen the primary health care selected. preparation. system, particularly the quality of maternal and child health/family planning services; improve quality and efficiency of education through provision of equipment, textbooks and teacher guides; finance community construction/rehabilitation social infrastructure; and establish an appropriate institutional and policy framework. Environmental Assessment Category C. COTE D'IVOIRE Ministry of 25.0 (N) Economic Management Technical Consulting services Appraisal under way. Economic, Finance (Bank) Assistance - Technical assistance being identified. & Planning; training and institutional support to Ministry of Civil Government programs of structural and Service & sectoral adjustment. Support to Employment: ministries responsible for macroeconomic Ministry of management, civil service reform and Justice legal and judiciary reform. Environmental Assessment Category C. Ministry of 20.0 (R) Natural Agricultural Service Consulting services will Project preparation undE Agriculture and (Bank) (formerly National Agricultural Service) be obtained locally. way. Animal Resources, - Support for reorganization/ Ministry of reinforcement of the current structure Scientific of key agricultural services (research, Research, extension) to ensure the adequate supply Professional and and diffusion of alternative Technical technologies and cropping systems. Education Environmental Assessment Category C. - 10 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender 2 Project Consulting Services Action on Procurement COTE D'IVOIRE (Cont'd) Ministry of 20.0 (R) Road Maintenance and Rehabilitation To be determined. Appraisal mission Equipment, (Bank) (formerly Third Road Sector) - The scheduled for June 1992. Transport and 30.0 project will: (a) halt deterioration of Tourism.(METT) (IDA) existing roads; (b) reform organizational structure of road maintenance, partly by privatizing specified activities; and (c) reduce rural transport costs by upgrading the maintenance of farm-to-market roads. Environmental Assessment Catagory B. Prime Minister's 15.0 (R) Privatization Support - Project is Consulting services will Negotiations tentativel) Office, Ministry (IDA) in support of privatization primarily. likely be required for: scheduled for late of Finance Project is a spin-off of the Economic (a) privatization March/early April 1992. Management Project that requires program (b) training in additional preparation of other foreign debt management; components. Environmental Assessment and (c) strengthening of Category C. Abidjan Stock Exchange. Ministry of 50.0 Livestock - Project is aimed at Consulting services will Preparation under way. Agriculture and (Bank) developing the livestock production in a be required to assess Animal Resources cost effective and sustainable manner feasibility of dairy and SODEPRA and at promoting institutional reforms development and needs which reduce and streamline direct for slaughterhouses. public involvement and encourage private participation. Environmental Assessment Category A. Ministere, des 50.0 (R) Private Sector Energy - Would allow Consulting services Investors for the Mines, Industrie (Bank) government to have local gas resources required for: development of the gas I et Energie, developed by the private sector to o Engineering studies: field and for new PETROCI reduce dependence on imported energy. o Offshore petroleum electricity generating Power supply reliability would be studies; capacity preparing form; improved by selected private sector o Offshore pipeline proposition including investments. The project would lessen route surveys; and technical, financial an( the environmental impact of energy o Others to be contractural elements. consumption by moving away from liquid determined. Studies ongoing to fuels and biomass to natural gas, as determine precise well as encouraging additional private electricity component. sector investment in the energy sector. Environmental Assessment Category B. Ministry of Posts 15.0 (R) Third Telecommunications - The Consulting services will Project under. and (Bank) project would support: (a) the be required. preparation. Telecommunications implementation of reform measures Privatization is also regarding sector restructuring and . being prepared. institution building of ONT; and (b) improve.the efficiency of the postal sector and its operating entity ONP. Environmental Assessment Category B. DJIBOUTI Ministry of Health 8.0 Health - Project will: (a) strengthen Project will require Project under (IDA) delivery of primary health care and about 200 staffweeks of preparation. first level referral services; consulting services. (b) strengthen delivery of in-service training for staff; (c) strengthen institutional capacity of the Ministry of Health for sector planning, programming, budgeting and evaluation. Environmental Assessment Category C. - 11 - Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lender 2 Project s Consulting Services Action on Procurement EQUATORIAL GUINEA Ministry of Health 5.5 (R) Health Improvement - Project will Consulting services will Project was negotiated on (IDA) strengthen sector management and service be required. January 27, 1992. Board delivery capacity of the public health presentation scheduled care system. Environmental Assessment for March 26, 1992. Category C. Ministry of 10.0 (R) Natural Resource Management and Consulting services will An identification report Agriculture, (IDA) Conservation - Project would assist be required. has been prepared. Some Livestock, Government in implementing a natural preparation work will be Fisheries, and resource management plan to assure both undertaken with a Forestry an optimal production level from the Japanese Grant. Further forest and conservation of the preparation will be environment. Environmental Assessment carried out at the Category A. beginning of FY93 because of budget constraints. ETHIOPIA To be determined 30.0 Parastatal Reform Technical Assistance - To be determined. Project preparation under (IDA) The project will provide technical way. assistance to enable the Government to define and initiate implementation of a program for public enterprise reform and divestiture. Environmental Assessment CateRor C. Ministry of 150.0 (R) Emergency Recovery and Consultants will be Board presentation Finance (IDA) Reconstruction - The project would required. tentatively scheduled for comprise: (a) an emergency inputs March 31, 1992. program to "jump-start" the economy and basic social services (b) a basic infrastructure reconstruction program to help increase small-scale industrial and agricultural employment for those most affected by the dislocation of communities. Environmental Assessment CateRorv C. To be determined 50.0 (R) Natural Gas and Petroleum - To Consulting services will Reconnaisance mission (IDA) supply LPG, gasoline and gasoil for be required. returned from the field interfuel substitution component to on February 20, 1992. replace domestic use of wood fuels with Back-to-office report LPG, thus mitigating negative issued on March 3, 19P2. environmental impact of deforestation. Preparatio'n mission Contribution to Ogaden Regional scheduled on May 1992. Development by installing electrification line to regional capital and providing local supply of petroleum products for energy and transportation sectors. Social actions program component to diversify income source and activities of poor women engaged in illegal cutting, transport and trade of fuelvood. Environmental Assessment Category B. 12- Member Country, Amount & Implementing Probable Stage of Processing an Agency ' Lender 2 Project s Consulting Services Action on Procurement' ETHIOPIA (Cont'd) Ethiopian Seed 55.0 (R) National Seeds (formerly National To be determined. Appraisal mission Corporation (IDA) Seed) - Would reinforce capability of completed in early Mar( national research system to provide 1992. adequate breeder seeds of Improved varieties; improve capacity to produce high quality seed; stimulate demand for improved seed through improvements and promotion and create an enabling institutional and policy framework to promote the evolution of the industry and promote private sector participation. Environmental Assessment Category B. Ministry of 91.0 (R) Highland Water Conservation - Soil Consultants will be Project design to be Agriculture (IDA) and water conservation support measures required. reviewed in view of for environmental protection and change in Government. enhanced productivity in the Highlands. Would comprise civil works, vehicles, equipment, technical assistance and training. Environmental Assessment Category D. Ministry of About (R) Livestock Conservation - Consulting services will Project has been place Agriculture 35.0 Consolidation and extension of ongoing be required. in the FY95 Lending (IDA) Fourth Livestock Development Project Program. Further plus addition of sub-components, i.e. reporting will be dairy. Environmental Assessment discontinued. Category A. Ministry of 85.0 , (R) Roads Rehabilitation - The project Consultants will be Awaiting confirmation Construction and (IDA) would comprise: (a) civil works - required. project design from th Housing rehabilitation of 198.5 km of the Assab- Government. Mille road; (b) technical assistance - construction supervision consultancy services and training; and (c) local level transport - equipment, raw materials, training and pilot phase running cost. -Project totals US$94.4 million with a foreign component of US$74.4 million. Environmental Assessment Category B. Ministry of Coffee 30.0 (R) Peasant Coffee Development - The Consultants will be Project design to be and Tea (IDA) project would strengthen government required. reviewed in view of Development support services for food and coffee change in Government. production in the major coffee producing areas. Support would also be given to expanding washed coffee primary processing factories, rehabilitating coffee hulleries and improving export processing facilities. Environmental Assessment Category B. To be determined 50.0 (R) Population I - To launch To be determined. Appraisal mission in t (IDA) implementation of Government population field. Project design policy and strategy. Environmental be reviewed in view of Assessment Category C. change in Government. - 13 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project 3 Consulting Services Action on Procurement 4 GABON Ministry of 22.7 (R) Forestry/Environment - (a) better Consultants will be Appraisal completed in Fisheries & (Bank) use of forestry resources through required. December 1991. Forestry, Ministry implementation of management plan in Negotiations tentatively of Environment, First Zone of forest area; (b) reinforce scheduled for end April Tourism and strategic planning, operational 1992. National Parks capability of Government institutions in the sector; (c) resume forestry and environment research; (d) make forestry and environment training more practical and relevant to needs of private sector; (e) prepare an environmental action plan; and (f) support Government in the creation and maintenance of wildlife reserves. An environmental impact assessment was initiated in June 1991. A PPF was approved in June 1991 to finance preliminary studies needed to better define the scope of project components. Environmental Assessment Category A. THE GAMBIA Ministry of 10.0 Urban Environment - Project would: To be determined. Project under Finance (IDA) improve living conditions through preparation. extension of infrastructure network and in sanitation; strengthen principal institutions in the urban sector and operationalize the new enabling legislation and regulation to facilitate administration of land and housing development; and strengthen key tourism institutions, etc. Total project cost is US$23.0 million. Environmental Assessment Category A. Ministry of 13.0 Agricultural Services - Further Consultants will be Project under Agriculture (IDA) development,of extension research and required (estimated at preparation. possibly credit services nationwide. A 100 staffweeks). natural resources management component will address the issue of deteriorating soil fertility throughout the country: Total project cost US$15.0 million. Environmental Assessment Category C. GHANA Environmental 20.8 (R) Environment - Institutional To be determined. Appraisal mission in the Protection Council (IDA) strengthening of the Environmental field. (EPC) Protection Council (EPC) and launching (Possible financing from investment program in one or two high the Global Environment priority neglected sectors. Facility (GEF) -- see Environmental Assessment Category B. Annex C.) - 14 - Member Country, Amount & Implementing Probable Stage of Processing az Agency Lender Project 5 Consulting Services Action on Procurement GHANA (Cont'd) Ministry of 45.0 (R) Tertiary Education - The project To be determined. Appraisal mission in t Education (MOE) (IDA) would support Government reform of field. tertiary education, particularly A PPF of US$580,000 wa universities and polytechnics, which approved in October tc will make them more relevant to national finance expenditures development and consistent with lower including consultant educational levels, and substantially services required to improve quality and cost effectiveness. complete the preparati Environmental Assessment Category B. and planning of implementation, and strengthening of the Ministry of Education. Ghana Water and 37.0 (R) Rural Water - To improve access to Consulting services are Project preparation tu Sewerage (IDA) rural water supply and sanitation being arranged to assist way. Appraisal missic Corporation throughout Ghana, through in preparation of in the field. rehabilitation/construc-tion of institutional appropriate facilities and establishing arrangements and private community responsibility for operation sector role. and maintenance. Environmental Assessment Category: To Be Determined. Bank of Ghana 100.0 (R) Financial Sector Adjustment Consultants will be Approved by the Execul (IDA) (FINSAC III) - Strengthening and required for Directors on December diversifying the financial sector. The strengthening the 1991. Credit was sigi project would: (a) support policies to operational capacity of on February 7, 1992. strengthen the institutional framework the Central Bank in the financial sector, improve privatization of the competition and strengthen financial and commercial banks and operational capacity of the Central other technical Bank; (b) support ongoing restructuring assistance components of formerly distressed banks; under the program. (c) commence recovery of non-performing - . assets; (d) develop an appropriate institutional framework to enhance effectiveness of nonbank financial institutions, and (e) study informal financial markets and help upgrade skills of bankers, accountants and financial professionals. Environmental Assessment Category C. Ministry of 41.0 (R) Livestock - To strengthen livestock Consulting services used Appraisal mission Agriculture, (IDA) production through improvement of animal for preparation and pre- tentatively scheduled Department of health, provision of animal watering appraisal. No further April 1992. Animal Health and points, dry season feeding, breed requirements. Production improvement, and strengthening of the institutional framework for livestock production. Environmental Assessment Category A. Ministry of 30.4 (R) Agricultural Extension - Strengthen Consultants will not be Board presentation Agriculture (IDA) the agriculture extension system through required. scheduled for March 2 improved extension, programming and 1992. supervision; strengthening extension- research linkages and staffing; and emphasizing gender related issues through the Government's women in development program. Environmental Assessment Category B. - 15 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender 2 Project Consulting Services Action on Procurement 4 GHARA (Cont'd) Ministry of 17.4 (R) Adult Literacy - Project would To be determined. Board presentation Education (IDA) consolidate infrastructure developed scheduled for March 26, under Program of Action to Mitigate the 1992. Social Costs of Adjustment (PAMSCAD) and A PPF of US$750,000 was strengthen regional and district approved in October to capabilities in order to support a finance expenditures, massive functional literacy campaign by including consultant providing technical assistance, teaching . services, required to equipment, and training. Environmental complete preparation Assessment Category C. activities. Ministry of 80.0 (R) Agricultural Sector Adjustment - To To be determined. Negotiations completed. Agriculture (IDA) strengthen pricing and marketing Board presentation reforms. Improve sector coordination, scheduled for March 26, and strengthen public expenditure 1992. management. Environmental Assessment (Cofinancing confirmed Category C. with KfW Germany.) GUINEA To be determined 26.0 (R) Urban Environment and Sanitation Consulting services will Pre-appraisal mission (IDA) Improvement - To improve the physical be required for scheduled for October and economic environment of urban preparation and 1992. centers through strengthening of implementation. municipal institutions, the development Preparatory studies of the role of the private sector,.and financed by Japanese the rehabilitation of priority Grant, which was signed infrastructure and services. on February 4, 1992, Environmental Assessment Category D. under way. Ministry of Plan 25.1 (R) Public Enterprise SECAL - Credit to Consultants will be Appraisal mission in the and International (IDA) support the Government's public required for preparation field. Cooperation enterprise reform program' aimed at a and implementation. more efficient and effectively managed public enterprise sector. Environmental Assessment Category C. Ministry of Public 25.0 Health II - Policy-based operation Consulting services will Project preparation unde Health and (IDA) focussing on strengthening investment be required for way. Population and recurrent budget planning, human preparation. A PPF of resources management, renovating. US$450,000 approved in depleted infrastructure and December 1991 to support strengthening priority health programs. preparation work Environmental Assessment Category C. including consultant services. - Ministry of 30.0 (R) Transport and Urban Infrastructure - To be determined. Appraisal mission Transport and (IDA) (a) Priority urban infrastructure scheduled for May 1992. Public Works investments in Conakry and secondary cities; (b) a tranche of additional road upgrading as defined in the long-term 'road development plan (c) priority investments of transport parastatals, including fishing port in Conakry; and (d) improving urban management and environment, including road safety and traffic management. Environmental Assessment Category B. - 16 - Member Country, Amount & Implementing Probable Stage of Processing Agency ' Lender 2 Project Consulting Services Action on Procuremer GUINEA (Cont'd) Ministry of 20.8 (R) Export Crop - Project to strengthen To be determined. Negotiations set for Planning and (IDA) incentives framework and supply response beginning of April 1 Finance in agricultural export sector. Project would include:- (a) institutional building for the private sector (b) support to production; and (c) special programs. Environmental Assessment Category B. ENELGUI 50.0 (R) Power II - Project would seek to: Consulting services will Appraisal completed (IDA) (a) restructure institutional and be required to assist February 8, 1992. regulatory framework; (b) rehabilitate Government in - Appraisal report und power utility infrastructure for implementing its preparation. industrial and commercial activity in privatization strategy the main development zone (Conakry/ for the power sector. Kindia region); and (c) technical assistance to ENELGUI management. Environmental Assessment Category B. GUINEA-BISSAU Bank of Guinea- 7.2 (R) Technical Assistance - To strengthen To be determined. Approved by the Exec Bissau, Ministry (IDA) economic management and institutional . Directors on March 1 of Economy and capacity. Environmental Assessment 1992. Finance Category C. Ministry of 31.8 (R) SAC III - Further policy reforms To be determined. Appraisal mission Economy and (IDA) being taken under SAL I and SAL II. scheduled for June 1 Finance Environmental Assessment Category C. Ministries of 13.0 Social II - To further rehabilitation of Consultants will be Appraisal mission Education, Health (IDA) education and health facilities; provide required for project scheduled for May 19 and Women's inputs; information, education and. preparation. Affairs communications to improve health hygiene and adult literacy; training; income generating activities for women. Environmental Assessment Category C. Ministry of Rural 15.0 (R) Natural Resources - To support agro- Consultants appointed Project under Development and (IDA) forestry sector development. for project preparation. preparation. Pre- Agriculture Environmental Assessment Category A. Additional consultants appraisal scheduled will be required to September 1992. complete preparation. KENYA Kenya Ports 85.0 (R) Transport Corridor - To rehabilitate Consultants shortlisted Project under Authority (KPA), (IDA) container berths, additional container for PPF studies. preparation. Kenya Railways handling equipment, construction of Consulting services will Corporation container freight station, rehabilita- be required during (Department of tion of shunting locomotives, new implementation. Customs) mainline .locomotives, improvements to KR communications, and customs and transit reform. Also, management support to KPA and KRC, and institutional program. Environmental Assessment Category: To Be Determined. - 17 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project Consulting Services Action on Procurement KENYA (Cont'd) Ministry of 21.0 (R) Parastatal Reform and Private Sector Consulting services will Appraisal mission planne Finance (IDA) Development Technical Assistance - be required for for April/May 1992. Operation will provide technical privatization, assistance to: (a) staff technical unit regulatory reform. for privatization; (b) implement refons for strategic parastatals; (c) auditor general (state corporations) to improve auditing functions; (d) registrar general to improve data bases; (e) the capital markets' authority; (f) support legal work on regulatory reform in the Attorney General's office. Environmental Assessment Category C. National Water 43.2 (R) Second Mombasa and Coastal Water Consulting services will Approved by the ExecutiN Conservation and (IDA) Supply Engineering and Rehabilitation - be required for: Directors on February 13 Pipeline Project would provide for: (a) pre- (a) institutional 1992. Corporation investment studies and detailed improvement (studies and engineering designs for expansion of the advisory services; and Mombasa and Coastal Water Supply System; (b) pre-investment (b) assistance to National Water studies and detailed Conservation and Pipeline Corporation engineering designs. for institutional strengthening/capacity building to ensure its ability for the proposed project; and (c) a reduction in the water supply deficit in the near term through rehabilitation/augmentation of the existing water supply facilities. Total project cost is US$48.7 million. Environmental Assessment Category B. To be determined Up to (R) Agricultural Marketing (formerly To be determined. Initial mission report 70.0 Smallholder Dairy) - Project would * received. Project unde (IDA) facilitate implementation of policy, preparation. legislative and structural reforms for strengthening the industry and for sustainable growth. Environmental Assessment Category B. Ministry of About (R) Support for Wildlife Management - To be determined. Approved by the Executi Tourism and 60.0 The project would support improvements Directors on February 1 Wildlife (IDA) to wildlife park and revenues management 1992. and infrastructure, and develop sustainable economic opportunities for people living in and around parks. Environmental Assessment Category D. Ministry of Health About (R) Health and Nutrition Sector Consultants will be Project preparation wil 80.0 Adjustment - Support widespread sectoral required and are likely start once the Health (IDA) reform. Environmental Assessment to be financed under the Rehabilitation Project Category: C Health Rehabilitation becomes effective. Project. LESOTHO Ministry of 6.9 (R) Infrastructure Engineering - To Engineering and Negotiations scheduled Planning (IDA) strengthen highway, water and public institutional studies.in for May 1992. building sectors and prepare for a the three sectors. rehabilitation and maintenance project for FY94. Environmental Assessment Category B. -18- Member Country, Amount & Implementing Probable Stage of Processing a Agency Lender 2 Project Consulting Services Action on Procurement LESOTHO (Cont'd) Ministry of 25.0 Infrastructure Rehabilitation To be determined. Project being identif Planning (IDA) Maintenance - To prepare program (Cofinancing will be rehabilitating and maintaining roads and required.) other infrastructure, and strengthening long-term planning of infrastructure investments. Environmental Assessment Catexory B. Ministry of 10.0 (R) Public Sector Financial Management - To be determined. Project under Finance and (IDA) Expansion of pilot program for improving preparation. Apprais Planning budgetary management and financial . mission scheduled for reporting in government, and April 10, 1992. strengthening linkages between budgetary (Cofinancing of about control and development planning. US$10 million will be Training in the Government's new required.) financial management system will be emphasized. Environmental Assessment Category C. MADAGASCAR Ministry of Urban About (R) Second Urban - To develop the Consulting services will Project under Development and 46.1 capacity building of local governments be required. preparation. Tourism (IDA) to plan and manage their urban development. Environmental Assessment Cateaorv B. Ministry of Posts About (R) Telecommunications - Financing of Consulting services will Project under and - 34.2 investments in the telecommunications be required. preparation. Telecommunications (IDA) sector and support for sectoral policy reforms and institutional assistance. Environmental Assessment Category B. Ministry of 20.0 Export Crop Promotion - Will assist Consulting services Project preparation u Agriculture (IDA) producers, transformers and exporters in will be required. way. prospecting markets, developing new products or improving existing ones, and investing in the agro-industrial sector. Environmental Assessment Category: To- Be Determined. Banque Centrale de 40.0 (R) Financial Sector Development - To To be determined. Project under la Republique (IDA) support further reform in the financial preparation. Democratique de and industrial sectors. Environmental Madagascar Assessment Category C. Ministry of About (R) Rural Finance - Project, an a pilot Specialists in rural Appraisal mission ir Agriculture 9.0 basis, to support and promote a rural savings and loans and field. (IDA) savings and loan movement based on the credit union existing and possibly new grass root movement will be institutions. Environmental Assessment required. Category C. -19- Member Country, Amount & Implementing Probable Stage of Processing a Agency Lender 2 Project Consulting Services Action on Procurement MADAGASCAR (Cont'd) Ministry of About (R) Petroleum Sector Reform - Will Consultants have been Appraisal report undei Industry, Energy 54.7 include reform of the petroleum pricing contracted. preparation. and Mines/SOLIMA, (IDA) and taxation system, new policies to (Petroleum increase efficiency in petroleum supply Company) and distribution, rehabilitation and improvement of the refinery, investments in petroleum transport and distribution and institutional strengthening of MIEM and SOLIMA. Since the project will upgrade existing facilities, environmental effects are limited. Environmental Assessment Category B. Ministry of About (R) Transport Sector - To improve Consultants will be Appraisal mission Transport 47.1 infrastructure for coastal shipping, air required. tentatively scheduled (IDA) and rail transport. Environmental late FY92. Assessment Category B. Ministry of About (R) Vocational Technical Education - Consultants have been Negotiations tentative Education; 23.3 Develop vocational training and selected. scheduled for April 19 Ministry of Civil (IDA) technical education, including Service and Labor establishment of coordination structure and training funds; support for training school for senior civil servants. Environmental Assessment Category C. Ministry of About (R) Food Security and Nutrition - Consultants have been Pre-appraisal mission Agriculture 19.4 (a) Address short and medium-term selected (about 200 tentatively scheduled (IDA) problems of rural and urban food staffweeks). September 1992. insecurity; (b) Support child nutrition programs; (c) Support nutrition education and other programs to improve micro-nutrient intake; (d) Support research and monitoring of nutrition issues; (e) Begin to address the intra- household resource allocation issues. Environmental Assessment Category C. Central Bank of About (R) Private Sector Environment Consultants likely to be Field preparation Madagascar 119.8 Adjustment (PRIVAC) Credit - To required. scheduled to resume in (IDA) consolidate the reforms undertaken so late MarchfApril 1992. far and to support the next stages in the reform of the incentive system and regulatory environment in support of private sector activities. Environmental Assessment Category C. - 20 - Member Country, Amount & Implementing Probable Stage of Processing anc Agency Lender 2 Project Consulting Services Action on Procurement MADAGASCAR (Cont'd) Ministry of About Energy II - The project will continue Consultants have been Project preparation is Industry, Energy 53.4 the rehabilitation of the power network appointed for under way. and Mines (IDA) and may include a new hydro-electric preliminary power plant (Ambodiroka) as well as environmental studies investments in transmission and relating to Ambodiroka. distribution, based on a least-cost power master plan; dissemination of the improved carbonization techniques developed at the Haut Mangoro Fanalamanga's plantation; industrial energy efficiency projects; and continuity for technical assistance for energy and power systems planning. Total project cost estimated at US$80.0 million. The engineering studies for the Ambodiroka power plant, which are being undertaken at this time, include a detailed environmental assessment. The dissemination of improved carbonization techniques will have positive environmental effects. Environmental Assessment Category B. MALAWI Ministry of 55.0 Trade and Distribution Adjustment - Consulting services will Project under Finance (IDA) Final phase of adjustment program with be required. preparation. emphasis on rationalization of trade and (Cofinancing of about distribution sectors. Environmental US$70.0 million will 1 Assessment Category C. required.) Ministry of 37.0 Institutional Development II (ID II) - Consulting services will Identificatlon/ Finance (IDA) Project will continue the efforts begun be required. preparation scheduled under (ID I) to strengthen Government May 1992. capacity for economic and financial management, and to support the Government program to improve the public sector. Environmental Assessment Category C. Ministry of 25.0 (R) Financial Services - Project will Consultant services will Pre-appraisal missior Agriculture (IDA) increase agricultural production and be required. completed in Februar) other productive rural activities by 1992 and appraisal providing financial and technical mission scheduled foi support additional credit for rural 1992. enterprise assistance. Government will (Cofinancing of about strive toward improving the policy and US$7.0 million will I institutional framework for rural required.) financial intermediation. Environmental Assessment Category C. Electricity Supply About (R) Power V - Will provide for expansion To be determined. Negotiations complet Commission; 50.0 and rehabilitation of power generation, Board presentation Department of (IDA) transmission and distribution and scheduled for May 12 Economic Planning provide support to energy planning. A 1992. and Development final report on field studies for (Cofinancing of abou environmental assessment has been US$126.0 million wil completed. Environmental Assessment required, of which Category A. US$41.6 million has to be confirmed.) - 21 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project Consulting Services Action on Procurement MALAWI (Cont'd) Ministry of Local 20.0 (R) Local Government Development - To be determined. Post appraisal mission Government (IDA) Central objective will be strengthening mid-December 1991. of local government to finance essential Negotiations scheduled services and manage traditional housing for mid-April 1992. area programs on a self-sustaining (Cofinancing of basis. Some elements such as US$6.5 million will be rehabilitation of severage treatment and required.) -solid waste services will have Positive effects on sanitation. Environmental Assessment Category C. Ministry of 40.0 (R) Agricultural Services - Will Consultants have been Pre-appraisal mission Agriculture (IDA) continue support for strengthening appointed to prepare under way. Appraisal smallholder services on a national level project. mission scheduled for N and build on current,programs to improve 1992. the national research, extension, and (Cofinancing of about key inputs (especially fertilizers and US$14.0 million will be seeds) credit services to alleviate required.) poverty and food insecurity through increased agricultural productivity of an increased proportion of smallholders. It is unlikely that Proiect will result in significant environmental impact project will support integrated pest management. Environmental Assessment Category B. Ministry of 70.0 (R) Entrepreneurship and Capital Consultants in labor and Negotiations concluded Finance (IDA) Market - Project will provide continued capital market will be February 1992. Board support for Malawi Adjustment Program, needed. presentation scheduled with a focus on factor markets and low for May 1992. income groups. Environmental Assessment (Cofinancing of about Category C. US$72.0 million will bi required.) MALI Ministry of Mines, 3.0 Mining Sector Capacity Building - The A Special Project Project under Hydraulics and (IDA) project is technical assistance to help Preparation Facility preparation. Energy the Government promote foreign and local (SPPF) was used to investment in the sector. Environmental prepare project. Assessment Category C. Ministry of Civil 15.0 (R) Public Works and Capacity Building - To be determined. Appraisal completed. Service and (IDA) The project will finance a program of Negotiations scheduled Employment public works to be carried out by the for April 13, 1992. private sector using labor-intensive A second PPF for technique to create employment. Total US$750,000 was granted project cost is US$25.0 million. October 4, 1991. Environmental Assessment Category C. Institut 29.0 Agricultural Research - To strengthen Consultant will be Project under d'Economie Rurale (IDA) crop, livestock, forestry, and natural required (estimated at preparation. (IER) resource management research nationwide. 200 staffweeks). (Cofinancing will be Total-project cost estimated at required possibly from US$30.0 million. Environmental FAC and USAID.) Assessment Category C. -22- Member Country, Amount & Implementing Probable Stage of Processing an Agency ' Lender Project Consulting Services Action on Procurement MALI (Cont'd) Ministere des 35.0 (R) Private Sector Development - An Consultants have been Appraisal completed on Finances et du (IDA) institutional support component would used to prepare project. March 7, 1992. Commerce provide technical support to private Additional consulting enterprises through a cost sharing services will be mechanism; strengthen the Chamber of required. Commerce and Industry; improve the PE privatization process through the Public Enterprises Bureau; strengthen the Bankers' Association; and improve the information database for banks and train bank staff. An investment (line of credit) component would finance investment needs of private enterprises through the banking system. A studies component would explore the potential for initiating mutual savings and credit schemes in urban areas and examine the appropriate modalities for financing housing. Environmental Assessment Category B. Ministere de 20.4 (R) Natural Resources Management - Consultants will be Appraisal report under l'Environnement et (IDA) Finance a wide range of multi-sectoral required (estimated at preparation. du Developpement natural resource management activities 200 staffweeks). '(Possibility of Rural at village, departmental and national cofinancing with Caiss levels. To include field operations, Centrale (CCCE, France training, data collection and analysis Deutsche Gesellschaft and institutional development. Total Technische Zusammenarb, project cost is estimated at (GTZ, Germany), United US$32..0 million. The project has been Nations Sahelian Offic, specifically designed to have a strongly (UNSO), and United positive environmental impact. Nations Development Environmental Assessment Category C. Programme (UNDP).) Ministry of Public 70.0 Infrastructure/Transport Sector - Would Consultants will be Project being identifi, Works and (IDA) support preparation of comprehensive required for preparing Transport three year investment program focusing the different project on maintenance of existing components. infrastructure and improved management of sector parastatals, based on detailed action plans. The problem of urban and interurban/international transport would be addressed. Total project cost is US$80.0 million. Environmental Assessment Category B. Ministry of 35.0 (R) Irrigation Promotion - Promotion of Consultants will be Pre-appraisal mission Agriculture, (IDA) private irrigation and selected required (estimated at postponed until June Livestock and rehabilitation of some publicly 200 staffweeks). 1992. Project Environment constructed irrigation schemes. Total preparation will only project cost estimated at begin when preliminary US$40.0 million. Environmental studies on irrigation Assessment Category A. have been completed by working group in the Malian Ministry of Agriculture. A PPF has been process, to fund preparation activities through loc; consultants. (Cofinancing will be required. Possibly fr4 KfW and FED.) - 23 - Member Country, Amount & Implementing Probable Stage of Processing and Agency 1 Lender 2 Project 3 Consulting Services Action on Procurement MAURITANIA To be determined 10.0 (R) Construction Industry Development - To be determined. Preparation to begin in (IDA) Project will carry out labor-based works April 1992. for the Ministry of Works and the City Council of Nouakchott. Would also reform and streamline procedures for contract management, and develop the domestic construction industry. Total project cost is US$40.0 million. Environmental Assessment Category B. SONELEC/Ministry 20.0 (R) Water Supply - Reinforce Nouakenott To be determined. Appraisal completed. of Interior (IDA) water supply system, rehabilitate water Negotiations tentativel: and electricity system in interior scheduled for April 28, centers, and strengthen SONELEC through 1992. technical assistance. Strengthen Government agencies in charge of preparing and implementing municipal development strategy. Total project cost is US$70.0 million. Environmental Assessment Category B. Ministry of Health 15.7 (R) Population and Health - To improve Consultants will be Approved by the Executi (IDA) effectiveness of health care systems required. Directors on November 1 including family planning and to assist 1991. Credit was signe in formulating population-related action on March 2, 1992. programs. Environmental Assessment Category C. To be determined 17.0 Agricultural Services - Improvement of Consultants will be Project under (IDA) research and extension, possibly also required (estimated at preparation. crop protection and agricultural 150 staffweeks). (Cofinancing from BMZ education nationwide. Total project (Germany), and FAC cost estimated at US$25.0 million. (France) possible.) Environmental Assessment Category C. To be determined 17.0 (R) Irrigation Promotion - Development Consultants will be Project preparation is (IDA) of private irrigation plus selected required. (Estimated at expected to take place rehabilitation of publicly constructed 100 staff weeks). when all conditions for irrigation schemes. Total project cost release of agriculture estimated at US$40.0 million. Secal second tranche ha Environmental Assessment Category A. been met. (Cofinancing will be required. Possibly fro KfW and FED.) MAURITIUS To be determined 10.0 (N) Technology I - This project will Consulting services will Reconnaissance/identifi (Bank) provide assistance to: (a) assess be required. cation under way. technology needs; (b) obtain technology information; (c) select and acquire technology; and (d) manage technology transfer and dispersion. Environmental Assessment Category: To Be Determined. Ministry of 20.0 (R) Education Sector (formerly Education Consultants 'may be Appraisal mission Education, Arts (Bank) III) - Action would support - required. scheduled for April 199 and Culture implementation of the Education Sector Master Plan (ESMP). Currently under preparation by the Government of Mauritius. Environmental Assessment Category C. -24- Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project I Consulting Services Action on Procurement MAURITIUS (Cont'd) Mauritius Sugar 15.0 (R) Sugar Energy Development - The Consulting services will Board presentation Authority . (Bank) project would: (a) establish a bagasse- be required for detailed scheduled for March 31, cum-coal field power plant at a sugar engineering of power 1992. factory in the southern part of the plants. (Global Environment island; (b) modernize sugar mills and Facility financing of increase surplus bagasse through US$3.3 million approved investment in improved steam generation by the Regional Vice and utilization: (c) develop technology President -- see for biomass utilization: and. Annex C.) (d) strengthen institutions. Environmental Assessment Category A. MOZAMBIQUE National Planning 8.0 (N) Food Security Capacity Building - To Consulting services will Appraisal. mission Commission (CNP) (IDA) gradually increase, within low financial be required. scheduled for May 1992. and human resource availability, the (Cofinancing will be capacity within institutions, to required.) understand the nature and magnitude of the country's food security problems, the main affected groups, methods used to measure food security, and types of policies/activities needed to begin addressing identified issues. Environmental Assessment Category C. To be determined 7.0 (N) Maputo Corridor - Project will To be determined. Appraisal mission in the (IDA) support the first phase of a program to field. privatize the provision of service on the Maputo Corridor through the leasing of the assets and business of Caminhos de Ferro de Mozambique (CFM(s)) (the state-owned railways and ports company). Environmental Assessment Category C. Banco de 150.0 (R) Magambique Financial Sector To be determined. Sector report nearing 'Mogambique/ (IDA) Adjustment - To support the financial completion. Initial Ministry of sector reform program including identification mission Finance strengthening of the Central Bank, planned for July 1992. development of monetary policy instruments of control, and restructuring of the state owned commercial banks and development of competition in the banking sector. Environmental Assessment Category C. To be determined 20.0 Rural Rehabilitation - Rehabilitation of Consultant services will Appraisal mission (IDA) rural infrastructure and productive be required. scheduled for June 1992. structures, and reactivate production services in restricted number of PDP districts. Project components would include: (a) reconstruction/rehabilita- tion of rural infrastructure; (b) rehabilitation of agricultural support services; and (c) technical assistance. Environmental Assessment Category B. -25- Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project 3 Consulting Services Action on Procurement 4 MOZAMBIQUE (Cont'd) Ministry of Health 44.0 (R) Second Health and Nutrition - Consulting services will Project has been placed (IDA) Development of institutional capacity be required. in the Reserve Program. including strengthening health program Further reporting will b management and planning, technical discontinued. guidance and training, and improved implementation in collaboration with NGOs. Project funds for: (a) rehabili- tation equipment of health posts and rural hospitals; (b) limited support for urban health infrastructure; (c) health manpower training; (d) drugs and medical supplies availability and distribution; and (e) support to special health programs (communicable disease control and safe motherhood). Environmental Assessment Category C. Ministry of 60.0 (R) Capacity Building - To create Consulting services will Project under Education/Eduardo (IDA) expanded development capacity with be required. preparation. Appraisal Mondlane special emphasis on the public sector. mission scheduled for University Project likely to include the following April 1992. components: (a) donor-support incentive package for senior civil servants; (b) selected improvements at the university; (c) special enrichment programs for promising secondary school students; (d) short in-service and on- the-job training for public and private employees; and (e) limited pre-service training, both locally and abroad. The project would entail policy reforms in the areas of public pay and employment and in the management of foreign technical assistance. Environmental Assessment Category C. Ministry of State 14.0 (R) Urban - Engineering credit will Consulting services Pre-appraisal mission ir Administration & (IDA) provide: (a) technical assistance and (480 staffweeks) the field. Urban local Ministry of training for urban management and will be required. government review under Construction and institutional strengthening; preparation. Project wG Water (b) technical assistance and financial identified and followed support for environmental by multi-donor workshop rehabilitation; and (c) financing for in November 1991. municipal or districts governments for specific infrastructure and services needs. Probable total cost US$20.0 million. Environmental Assessment Category: To Be Determined. Ministry of 35.0 Agricultural Services Rehabilitation and Consultant services will Approved by the Executi% Agriculture (IDA) Development - To support the Government be required. Directors on February 11 of Mozambique's efforts to rehabilitate 1992. and develop agricultural services; reverse the decline in production of foodorops and cotton thus reducing* poverty and improving food security; and strengthen local capacity to formulate and implement agricultural development activities. Total project cost is US$40.6 million. Environmental Assessment Category B. - 26 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender 2 Project ' Consulting Services Action on Procurement 4 MOZAMBIQUE (Cont'd) Ministry of 62.0 (R) First Roads and Coastal Shipping - Consultants will be Appraisal report under Construction and (IDA) Technical assistance and,studies for required for design and preparation. Water, Ministry of rehabilitation and maintenance of supervision of civil (Cofinancing being sought Transport and selected feeder roads and sections of works, training, and for to cover financing gap.) Communications, the national road network and civil studies, procurement Ministry of works for rehabilitation of small management, and Finance coastal shipping ports. Also, studies technical assistance in for improvement of road,transport and management areas for intermodal limitations. Environmental both roads and coastal Assessment Category B. shipping. Bank of Mozambique 170.0 (R) Economic Recovery - Support for Consulting services will Appraisal report under (IDA) Government's economic rehabilitation be required for banking preparation. program. Environmental Assessment sector reform, reform of (Cofinancing of about Category C. the foreign exchange US$100.0 million will be allocation system, required.) privatization and restructuring of state enterprises. NIGER To be determined 35.0 (R) Water II - Strengthening of the To be determined. Project under (IDA) Water Supply Authority (SUE) in preparation. management and cost recovery and long term planning aspects. Financing SUE's investment program with other doners. Total project cost is US$35.0 million. Environmental Assessment Category B. Non-Governmental 9.4 (R) Private Irrigation - Development of Consultants will be Appraisal report under Agency (IDA) private irrigation (a) small-scale, by required (estimated at preparation. low-lift pumping from shallow aquifers; 38 staffweeks). (Cofinancing with CCCE (b) large-scale, by pumping from the (France).) Niger River. Total project cost estimated at US$12.0 million. Environmental Assessment Category B. Ministry of 16.4 (R) Agricultural Services - Promotion of Consultants will be Board presentation Agriculture and (IDA) effective agricultural support services required (estimated at scheduled for March 31, Livestock nationwide, primarily focussing-on 150 staffweeks). 1992. extension. Total project cost estimated at US$18.5 million. Environmental Assessment Category C. Ministry of Plan 20.0 Municipal Infrastructure - The project Consultant will be Project under (IDA) will sttengthen technical capabilities required for project preparation. of municipalities and their ability to preparation, technical mobilize local resources, increase assistance for design productivity of self-employed artisans and supervision of and micro-enterprises. Total project works, training and for cost is US$50.0 million. Environmental studies. Assessment Category B. Ministere de la 20.0 (R) Population - The project will Consultants will be Negotiations completed. Sante Publique, (IDA) improve population planning and program required in the IEC-mass Board presentation Ministere du Plan, development, develop and extend family media production, scheduled for April 28, Ministere des planning services and maternal health training management and 1992. Affaires Sociales services, and support associated planning. (Cofinancing is expected et de la Promotion programs to improve the status of women. from UNICEF and possibly de La Femme Environmental Assessment Category C. from the Belgian Government.) - 27 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender 2 Project Consulting Services Action on Procurement NIGER (Cont'd) Ministeres de 25.0 Human Resources SECAL - Continued Consultants will be Negotiations date to be L'Education, du (IDA) support to expand and improve quality of required during determined in light of Travail et de primary education; restructuring of implementation. progress of discussions 1'Enseignement technical,and vocational education and with Government regarding Superieur consolidation and quality improvement in policy reform package. higher education. Environmental (Possibility of co- Assessment Category C. financing from CIDA, FAC, Germany, the Netherlands and Norway.) To be determined 51.1 (R) SAL II - Support further adjustment To be determined. Project identification (IDA) of the economy by extending policy will commence when changes to new areas such as industry situation permits. and trade, and the banking sector while deepening civil service reform in agriculture and public resource management. Environmental Assessment Category C. Ministere de 16.6 (R) Natural Resource Management - Consultants (estimated Project under l'Agriculture et (IDA) Finance a wide range of natural at 400 staffweeks) will preparation. de 1'Elevage resources management activities at be required. (Cofinancing with CCCE village, departmental and national (France), NORAD (Norway), levels. This will include field and USAID (US), DANIDA operations, training, data collection (Denmark), and GTZ and analysis and institutional (Germany).) development. Total project cost estimat*d at US$27.0 million. The project has been specifically designed to have a strongly positive environmental impact. Environmental Assessment Category C. Ministry of Public 30.0 Transport Sector II - Project objectives Consultants required to Negotiations tentatively Works: Ministry of (IDA) are: (a) to redirect public expenditure design and supervise rescheduled for Transport in road sector to maintenance; (b) to road works, elaborate April 1992. increase user cost recovery; and (c) to and support execution of consolidate institutional building action plans for achivements. The project will finance a improving transport and three-year tranche of investments and a promote local maintenance program. Total project cost contractors, and provide US$193.5 million. Environmental technical assistance to Assessment Category B. institutional development. NIGERIA Federal Ministry 60.0 (N) Secondary Education - Support to To be determined. Project preparation under of Education (IDA) Government's education development way. program for: (a) upgrading the quality of secondary education; (b) moving towards universal basic education; (c) improving resource allocation, distribution and use; (d) strengthening planning and management; and (e) institutional development. Environmental Assessment Category C. - 28 - Member Country, Amount & Implementing Probable Stage of Processing-and Agency ' Lender 2 Project Consulting Services Action on Procurement * , NIGERIA , (Cont'd) Federal Ministry 22.0 (N) Economic Management - To provide To be determined. Preparation/pre-apprais * of Finance & (IDA) technical assistance in support of mission completed. Economic preparation of projects for Bank Appraisal mission not Development financing, improving implementation of required as sufficient (FMFED) ongoing projects and public enterprise progress was made durin reforms, and broader economic reforms preparation/pre-apprais and important studies in the areas of mission. Negotiations debt relief, budget and expenditure tentatively scheduled f monitoring and the financial sector. April 15, 1992. Environmental Assessment Category: To Be Determined. Federal Ministry 75.0 (R) Multi-State Roads II - Upgrading, For provision of Pre-appraisal scheduled of Works and (IDA) rehabilitation and maintenance of state technical personnel, for April 1992. Housing and State roads in Oyo and Osun States with design and supervision Ministries of limited construction of new roads. of civil works. Works Technical assistance to State Ministries of Works for strengthening planning, management and accounting function. Environmental Assessment Category B. Lagos/State 60.0 (R) Lagos Drainage and Sanitation.- Consulting services will Project under Ministry of (IDA) Investments in stromwater drainage and be required for studies preparation. Environment and limited scale sanitation improvements; and technical Physical Planning the latter could include rehabilitation assistance. Details to of existing sewerage and sewage be determined. treatment facilities, pilot on-site sanitation, and improved septage (septic tank pump-out) disposal. Technical assistance could provide institutional support and strengthening, particularly in the fields of management and design and operation of'sanitary landfills; improvement of maintenance of stormwater drainage system; design of pilot urban renewal and low cost sanitation and components, and planning of further developments; further development and design of sanitary sewerage investments, where feasible; further stormwater drainage design; improved revenue generation measures; and city managements. Environmental Assessment Category: To Be Determined. Ministry of Works 75.0- (R) Lagos Urban Transport - To improve Consulting services have Project preparation un and Transport (IDA) supply and productivity of urban been secured. way. (Lagos State transport. Project would support: Government) (a) improvements in efficiency of transport infrastructure through priority road maintenance and rehabilitation, and traffic management and traffic flows enforcement; (b) facilitate integration of urban transport elements and reduce traffic congestion; and (c) support institutional reforms and human resource development. Environmental Assessment Category B. - 29 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project s Consulting Services Action on Procurement NIGERIA (Cont'd) Nigerian Railway 100.0 Railways - The main objectives of the Consulting services will Project preparation under Corporation (Bank) project are to support the institutional be required. way. strengthening of NRC and to finance a rehabilitation and commer-cialization program (locomotives, wagons, track, telecommunications, workshops). The project will support the 'commercialization program including financial restructuring, and improvements in its organization, corporate planning, and operational capabilities. Environmental Assessment Category B. Federal Ministry 21.0 (R) Development Communication - Support Consultants will be Preparation mission of Information (IDA) to Nigerian television and radio required for upgrading scheduled for April 1992. authority for instructional programming. studios, program Environmental Assessment Category C. development, monitoring and evaluation, and supporting research. National Electric 150.0 (R) Power System Rehabilitation and Consultants will be Appraisal completed. Power Authority (Bank) Development - Rehabilitation of required. Negotiations tentatively generation, (RAINJI Hydroelectric Power scheduled for June 1992. Station), transmission and distribution facilities. Expansion of transmission and distribution network.' Environmental Assessment Category B. Ministry of 25.0 (R) Environmental Management - Project Consulting services will Negotiations completed. Finance (IDA) will finance a "Care Program" of be required. Board presentation environmental activities that are scheduled for April 16, critical for making Nigeria's 1992. environmental program operational. Environmental Assessment Category D. Federal Department 42.5 Agricultural Technology Support - Short-term consultants Negotiations completed. of Agriculture and (Bank) Strengthen the institutional environment will be needed to assist Board presentation Rural Development, and operational activities to adapt . project preparation in scheduled for April 21, State Ministry of improved technology packages and their adaptive research, 1992. Agriculture, delivery system to meet location- monitoring and specific needs of farmers. evaluation, financial Environmental Assessment Category B. accounting, and staff development and training. Federal Department 67.5 (R) Fadama Development - Extending Consultants will be Board presentation of Agriculture and (Bank) small-scale lift pump irrigation to a required in project scheduled for March 26, Rural Development, maximum of 100,000 ha of fadama. implementation for 1992. State Ministry of Environmental Assessment Category B. design supervision of Agriculture road construction and drilling of tubewells by contract. - 30 - Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lender 2 Project Consulting Services Action on Procurement NIGERIA (Cont'd) Federal Ministry 60.0 (R) State Roads - To support a five-year Consultants would be Project under of Works and (Bank) program for state roads upgrading, required in the survey preparation. Appraisal Housing 40.0 rehabilitation and maintenance, of state road networks, mission completed. (IDA) including institutional development and designing of road Negotiations scheduled resource mobilization, in all aspects of rehabilitation and for March 23, 1992. technical and managerial functions. maintenance programs, Project environmental reconnaissance was establishing a training carried out in May/June 1990. program for state Environmental Assessment Category B. personnel, and other ,specialized activities to be determined during Implementation. Federal Government 115.0 (R) State Water I (formerly State Water) Consultants will be Negotiations completed. of Nigeria, Kaduna (IDA) - Program of physical rehabilitation, required for engineering Board presentation and Katsina State expansion, improved operation and design, construction scheduled for April 199 Water Boards maintenance practices, investment supervision, and planning and financial management, and technical assistance. manpower development to improve access to public water supply in Kaduna and Katsina States. Environmental Assessment completed. Environmental Assessment Category B. Nigerian National 218.0 Oso Condensate - To develop the Oso To be determined. Approved by the Executi Petroleum (Bank) Field for export production of Directors on April 9, Corporation (NNPC) condensate, through the construction of 1991. various site facilities. Project to be developed as part of a joint venture (Project contracting fc between NNPC and MPN (Mobil Producing goods and services Nigeria). Environmental Assessment routinely offered by completed. Environmental Assessment Joint Operating Commiti Category A. (Mobil MNPC).) Federal Ministry 256.0 Water Rehabilitation - Provision of Contracts for project Approved by the Execut of Water Resources (Bank) funds through FMWR to assist states with management consultants - Directors on May 21, (FMWR) rehabilitation of existing water supply have been awarded. FMWR 1991. facilities, provide sector training; has invited proposals (Advance contracting a accounting systems; and technical for engineering 3% of loan amount for assistance. Environmental Assessment services. project management Category C. consultancy services w initial financing by Japanese Grant has bee included.) RWANDA Ministry of About Agricultural Research II - Follow up Consulting services will Project under Agriculture, 27.0 effort to support implementation of be required. preparation. Appraisa Institut des (IDA) national agricultural research program. mission scheduled for Sciences Strengthening of research, extension June 1992. Agronomiques linkages, and institutional reform. (ISAR) Total project cost is US$30.0 million. Environmental Assessment Category: To Be Determined. Ministry of 37.6 (R) Communal Development - Strengthening Consulting services are Preparation expected t Interior and (IDA) of communal credit fund (CID); training not required at this - begin in latter half c Communal of local staff in fiscal and investment stage. 1992. Development programming and project preparation; support for high-priority projects of economic and social infrastructure. Environmental Assessment Category: To Be Determined. -31- Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lender 2 Project s Consulting Services Action on Procurement RWANDA (Cont'd) Ministry of Public About (R) Energy Sector - Rehabilitation MV Consulting services will Appraisal mission Works, Energy and 47.8 transmission and distribution networks; be required for scheduled for April/May Agriculture and (IDA) distribution expansion based on policies preparation of terms-of- 1992. ELECTROGAS (public to improve affordability; and assistance reference for technical An IDA PPF advance of utility) to ELECTROGAZ in restructuring and works and for US$750,000 was approved strengthening of power planning. institution to finance expenses to Environmental Assessment Category B. strengthening. complete preparation of project. Ministries of About (R) Agricultural Sector Adjustment - To be determined. Appraisal report under Plan, Agriculture, 64.0 Will promote market integration and preparation. Commerce and (IDA) diversification of agro-exports. Will Industry also increase efficiency of agro- processing, improve input supply and rationalize the enabling environment for agro-industrial investment and production. Environmental Assessment Category C. Central Bank of About Financial Sector - Project would support Consulting services will Board presentation Rwanda, Ministry 40.0 a-financial sector program and other be required. scheduled for end FY92. of Finance (IDA) policy reforms in the incentive and regulatory framework to encourage private sector investment and exports. Environmental Assessment Category C. . Ministry of About (R) Food Security and Social Action - Consulting services will Negotiations scheduled Planning 20.0 Project is a set of poverty alleviation be required. for April,1992. (IDA) programs, including: (a) food security and nutrition activities; (b) labor intensive works; and (c) microenterprise development. Project also includes social surveys and socio-economic surveys. Environmental Assessment Category B. SAO TOME & PRINCIPE Ministries of 11.4 (R) Health and Education (formerly Consultants will be Approved by the Executiv Health and (IDA) Social Sector) - Implementation of a required for preparation Directors on March 19, Education comprehensive'malaria control program, and finalization an the 1992. supply essential drugs, improvements in malaria control program, primary/secondary education. and short-term Environmental Assessment Category B. assignments in education and health planning. Ministry of 9.8 Agricultural Privatisation and Consulting services will Approved by the Board or Economic Affairs, (IDA) Smallholder Development - Support of be required for land December 20, 1991. Directorate of government policy reforms in agriculture distribution, Effectiveness scheduled Agriculture particularly small farmers development topography, accounting for May 1992. through land distribution, and the and privatization. promotion of food crops. Environmental Assessment Category B. -32- Member Country, Amount & Implementing Probable Stage of Processing a ..Agency 'Lender 2Project 'Consulting Services Action.on Procurement SENEGAL To be determined 25.0 (R) Public Works and Employment II -The To be determined. Appraisal completed. (IDA), project will finance a second program of Negotiations tentativ public works to be carried out by the scheduled for April 2 private sector using labor-intensive 1992. techniques to create employment. Total A PPF of US$480,000 w~ project cost is US$27.7 million, approved on December Environmental Assessment Category B. 1991 to finance proje preparation activitie Ministry of 20.0 Urban IV - The project will finance To be determined. Project under Finance and Plan (IDA) civil works, goods and consultants to preparation. &xecute its three main components: * (a) institutional development, including * technical assistance, training and equipment; (b) physical investments,, including public infrastructure and facilities; and (c) project management for recurrent costs of project implementation. Total project coat is US$59.0 million. Environmental Assessment Category A. To be determined 70.0 Public Sector Resources Management - Consulting services will Project to be identil (IDA) Policy Reforms encompassing expenditure be required. restructuring In 'priority sectors' health, water, roads, agriculture): improvements in programming and control procedures; streamlining interagency payment systems; and tackling problems of overhang of Government arrears to the private sector. Other actions to be identified. Environmental Assessment Category C. To be determined 210. 0 Private Sector Development -Consultants will be Project under CIDA) Continuation of financial sector reforms required. preparation. - and establishment of new financing mechanisms for small and medium ---enterprises. Technical assistance to private sector for export promotion and improved management and privatization of existing support services agencies. Policy reforms to improve regulatory environment, Including functioning of judicial system. Development of informatics sector. Environmental Assessment Category B. Ministere du 15.0 Natural Resources Management -Promotion Consultants will be Project under Developpement (IDA) of policy changes conducive to more required (estimated at preparation. Rural, Ministere sustainable land use throughout the 100 staffweeks). ( Cofinancing expecte4 de la Protection country, and implementation of land use with CCCE and FAC de la Nature, plans with village and herder (France), and with Minister 'e des associations. Total project cost Norway.) Resources Animales estimated at US$30.0 million. Project is specifically designed to have a strong positive environmental impact. Environmental Assessment Category C. - 33 - Member Country, Amount & Implementing Probable Stage of Processing anc Agency Lender Project Consulting Services Action on Procurement SENEGAL (Cont'd) Societe Nationale 20.0 Energy II - Project will comprise: Consultants will be Appraisal mission D'Electricite (IDA) (a) a policy reform component (energy required. scheduled for April 199 (SENELEC) pricing, management of charcoal supply, dissemination of improved cooking stoves, better management of sector entities): and (b) an investment component (time-slice of SENELEC's investment program, fuelwood trade monitoring system, manufacture of improved stoves, etc.). Environmental Assessment Category B. Ministry of Rural 30.0 Agriculture SECAL - Deepen structural Consultants will be. Appraisal rescheduled f Development and (IDA) adjustment through further reforms in required (estimated at September 1992. Revise SONACQS pricing policy, marketing and input 200 staffweeks). draft Government policy distribution, credit, natural resources letter unsatisfactory. management and tenure, staff training An IDA Project and career development. Total project Preparation Facility cost estimated at US$100.0 million. advance of US$500,000 w Environmental Assessment Category C. approved for project preparation. - (Cofinancing expected with CCCE for US$18.5 million; USAID for US$20.0 million; EE for US$25.0 million, an KfW for US$11.5 million Ministry of Rural 30.0 Water III - A five year tranche'of Feasibility studies are Negotiations tentativel Development and (IDA) sector investment plan which will completed. Consultants scheduled for December Hydraulics improve sector management, strengthen for detailed studies and 1992. financial discipline, reduce sector technical assistance (Cofinancing will be dependence on the Government budget, will be required after required.) strengthen sewerage subsector, improve appraisal. rural water supply operation and maintenance, and limit water shortages in the greater Dakar area. Total project cost estimated at US$298.0 million. Environmental Assessment Category B. Ministry of 50.0 (R)) Human Resources Development II - Preparatory.studies have Appraisal mission Education/ (IDA) The project will support policy reforms been completed. scheduled for June 15, Ministry of designed to promote more efficient Consultant services and 1992. Vocational resource use in the education sector; technical assistance Training improve access to, and the content and will be required after quality of, primary education; project appraisal. restructure vocational training; and enhance the effectiveness, relevance, and quality of higher education. Within this framework, the project will finance primary school construction and maintenance, teacher training, provision of textbooks, strengthening of administration and management of primary and secondary schools, reinforcement of vocational training, and the implementation of efficiency and quality improvement measures in higher education. Environmental Assessment Category C. -34- Member Country, Amount & Implementing Probable Stage of Processing an Agency ' Lender 2 Project Consulting Services Action on Procurement SEYCHELLES Ministry of About (R) Infrastructure/Environment - Consultants have been Appraisal mission Planning and 10.0 Extension and rehabilitation of water selected for project scheduled for April 19 External Relations (IBRD) supply; road maintenance; and preparation. Project Preparation implementation of Environment Management Facility advance of Plan. Environmental Assessment Category US$400,000 for B. preparation studies ha been approved. (Possible financing fr the Global Environment Facility (GEF) -- see Annex C.) SIERRA LEONE Ministry of 5.0 (R) Technical Assistance (formerly To be determined. Appraisal mission Finance, (IDA) Economic and Financial Management scheduled for Development and Support) - Assistance to the Government March 23, 1992. Economic Plan to improve capacity to design, implement and monitor economic and financial - programs. Environmental Assessment Category C. Ministry of Works 20.0 Roads Rehabilitation and Maintenance - Consulting services will Project preparation uz (IDA) Rehabilitation of gravel and paved be required. way. Appraisal missi( roads, and strengthening road - scheduled for April 11 maintenance. Environmental Assessment Category B. Ministry of 43.4 (R) Import Support - To cover foreign Consulting services will Appraisal mission and Finance (IDA) exchange costs of critical imports not be required. It is negotiations completei including petroleum products, printing provided under a Board presentation of currency notes, spare parts and an companion techical scheduled for April 7 adjustment program. Environmental assistance operation. 1992. Assessment Category: To Be Determined. ICB for petroleum products imports; ano to be determined. National Power 20.0 (R) Power Rehabilitation - Assist NPA Consultant services will Negotiations under wa Authority (NPA) (IDA) with rehabilitation of generation, sub- be required for project Board presentation transmission and distribution facilities management and technical tentatively scheduled in the Western area, and help establish assistance. April 14, 1992. the basis for NPA to become an Technical assistance autonomous and commercially viable financed under PPF. utility. Environmental Assessment Category B. SWAZILAND Ministry of 18.0 (R) Urban I - Improvement of primary To:be determined. Pre-appraisal missior Natural Resources (Bank) infrastructure to urban centers.: scheduled for August Land Utilization & Rehabilitation of industrial estate . 1992. Energy infrastructure, provision of low-income housing and upgrading of settlements. Environmental Assessment Category: To Be Determined. -.35- Member Country, Amount & Implementing Probable Stage of Processing ar Agency Lender 2 Project Consulting Services Action on Procurement TANZAI National Board of 20.0 (N) Financial and Legal Management - To be determined. Appraisal mission Accounts and (IDA) Project aims to proiote accounting, currently in the field Auditors, Legal auditing and legal reforms by Department, IAA, strengthening key public institutions IFM responsible for those activities, through training, technical assistance and supply of essential infrastructure and equipment. Environmental Assessment Category C. Ministry of 200.0 (R) Public Sector Adjustment - To Consulting services will Project under Finance (IDA) support overall macro-economic reforms, be required during preparation. Pre- and to assist in restructuring of the preparation and appraisal mission in t parastatals sector, including public implementation. field. enterprise privatization; restructuring (Cofinancing of about and retrenchment of the civil service, US$90.0 million will b budgetary reform, and improvement of the required.) business environment through exchange rate and tax reform. Environmental Assessment Category C. . Office of the 50.0 (R) Urban Infrastructure Consulting services will Identification under w Prime Minister and (IDA) Rehabilitation - Rehabilitation, be required for First Vice maintenance, and selected expansion of construction/rehabili- President the infrastructure stock in major urban tation of sites/ areas. Environmental Assessment services, roads, water Category C. and other ,local government services. Ministry of 40.0 Education Sector Development - The Consulting services will Identification under ii Education and (IDA) project will focus on reform measures to be required. Culture the education sector to include financing of education; teacher formation; management of the system; and curriculum and instructional materials. Environmental Assessment Category: To Be Determined. Prime Minister's 80.0 Rural Social Services - Strengthening of Consulting services will Identification under t Office (IDA) district level social services including be required. health, nutrition, education and water supply; building up policy formulation and implementation capacity of district governments. Environmental Assessment Category C. Government of 30.0 Telecommunications III - The project's Consulting services Awaiting action by Tanzania (IDA) objectives are to: (a) develop TPTC's required for engineering Government prior to management and implementation planning and appraisal. White cove capabilities to achieve its target for implementation, staff appraisal report system expansion, rationalization and training, and financial being drafted. quality improvement; (b) improve management. (Cofinancing of about financial performance. The project will US$90.0 million will I support TPTC's institutional Development required.) Program and rehabilitation and expansion plans. Environmenal Assessment Category - 36 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender 2 Project ' Consulting Services Action on Procurement TANZANIA (Cont'd) TANESCO 10.0 Engineering - Project is for preparation Consulting services will Approved by the Executi (IDA) of a large component of the proposed be required. Directors on January 14 Power VI project, and will include 1992. financing of technical assistance to carry out detailed design and preparation of bid documents for the Kihansi hydroelectric scheme. Environmental Assessment Category B. Planning 160.0 (R) Public Sector Reform - Adjustment Consulting services will Project has been remove Commission (IDA) operation in support of overall economic be required during from the Lending Progra reform program and, specifically program preparation and Further reporting will of public sector reform.. Program would implementation. discontinued. include budgetary restructuring, including expenditure and tax reform, civil service reform to provide incentives for greater productivity, and public enterprise management reform. Environmental Assessment Category C. Ministry of Energy 100.0 Energy (Power VI) - Additional power Consultant services will Appraisal mission (IDA) generation scheme and associated be required. scheduled for May 1992. transmission line, rehabilitation of (Cofinancing will be existing distribution facilities and . required.) some diesel units. Institutional reforms and studies. Environmental studies ongoing. Environmental Assessment Category A. Ministry of Land, 18.3 Forest Resources Management - The Consultants will be Approved by the Execut Tourism and (IDA) project would include sectoral policy required. Directors on February Natural Resources would include sectoral policy and 1992. institutional reforms, land tenure, land (Cofinancing of about tithing, land use, and pilot woodland US$0.7 million will be management, agro-forestry and charcoal required.) production components. Environmental Assessment Category B. TOGO Ministere de 5.0 (N) Education Management Support - Consulting services will Project preparation un 1'Education (IDA) Project will strengthen the sector's be required. way. Nationale et de la capacity to implement the broad policy Recherche - goals of its sector adjustment program. Scientifique Will focus on: (a) program planning, implementation, and analysis; (b) budget preparation and monitoring; and (c) monitoring and analysis of school processes and student learning. Environmental Assessment Category C. -37- Member Country, Amount & Implementing Probable Stage of Processing an Agency Lender 2 Project Consulting Services Action on Procurement TOGO (Cont'd) Ministry of 20.0 (R) Lome Urban Development - Project is Consulting services will Appraisal mission Equipment and (IDA) designed to: (a) improve sanitary and be required for project scheduled for June 199 Posts and social conditions in high density areas; implementation. Telecommunications (b) improve basic infrastructures to support the functioning of Lome Urban activities; (c) create a financially viable municipal administration; (d) introduce sound practices in management of the urban environment; and (e) expand the Social Dimension of Adjustment in the capital city. Environmental Assessment Category B. I Ministere de 27.0 Education Sector Operation - To Consulting services will Project preparation un 1'Education (IDA) strengthen sector management, improve be required. way. Nationale et de la internal efficiency of educational Recherche system, improve resource allocation and Scientifique revitalize basic education through an emphasis on school level improvement in the quality of teaching and learning. Environmental Assessment Category C. Ministry of 20.0 Economic Management - Will include Consulting services will Pre-appraisal mission Planning (IDA) support to.the specific action plans for be required. tentatively scheduled three central ministries, civil service June 1992. reform, and macro-modelling in the context of SDA activities. Environmental Assessment Category C. Ministry of Rural 10.5 (R) Agricultural Services Rehabilitation Consulting services may Negotiations scheduled Development (IDA) - Reorganization of General Agricultural be required during for April 6, 1992 may Support Services including technical project implementation. slip due to political support services, seed production, turmoil in Togo. applied research and cooperative development. Environmental Assessment Category B. UGANDA Office of the 40.0 (R) Small Towns Water and Sanitation - Consulting services Project preparation un, Prime Minister (IDA) Water supply and sanitation. required for design and way. Environmental Assessment Category B. supervision, Uganda AIDS 10.0 (R) Uganda AIDS Control (formerly Uganda To be determined. Identification complet, Commission (IDA) AIDS) - The project will have three main Project under components: (a) institution-al preparation. strengthening in areas of policy and program development monitoring and evaluation, equipment and motor vehicles, etc.; (b) civil works - office space; and (c) AIDS action evaluation fund for supporting pilot interventions with operations research. Environmental Assessment Category C. Office of the 71.2 (R) Northern Reconstruction - Multi- Consultants have been Negotiations completed Prime Minister (IDA) sectoral reconstruction of Northern selected for some Board presentation Uganda. Environmental Assessment components. scheduled for May 19, Category B. o 1992. - 38 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project Consulting Services Action on Procurement 4 UGANDA (Cont'd) Ministry of Works, 60.0 (R) Transport Sector Rehabilitation Consulting services will Project preparation und Ministry of Local (IDA) (formerly Transport) - .Project would: be required for way. Government, and (a) assist in rehabilitation and strengthening MOWTC, Uganda Railways maintenance of highways; (b) improve MOLG and URC, and Corporation rural feeder road accessibility; detailed engineering of (c) strengthen marine services of Uganda roads. Consultants also Railways; and (d) help restore safety being selected for PPF provisions at Entebbe Airport. . road studies. Environmental Assessment Category B. Ministry of 32.0 (R) Economic and Financial Management - Consultants will be Negotiations completed Finance (IDA) Strengthening the capacity of the required. March 11, 1992. Ministry of Finance, Ministry of Planning & Economic Development, and Bank of Uganda to formulate and implement economic and financial policies. Environmental Assessment Category C. Ministry of About (R) Financial Sector Adjustment Credit I Consultants will be Pre-appraisal mission Finance (MOF) and 110.0 - To provide support for reform of required. currently in the field. Central Bank (BOU) (IDA) financial sector policies and restructuring of key financial institutions. Environmental Assessment Category C. Ministry of 50.0 (R) Education Sector Reconstruction To be determined. Appraisal mission Education (MOE) (IDA) (formerly Education V) - Action would completed. Negotiatioz support implementation of education tentatively scheduled J policy commission recommendations April 1992. focussing on primary schools and related teacher training college, reconstruction and quality improvements and strengthening MOE's capacity. Environmental Assessment Category C. Ministry of Health 50.0 (R) Health II - Follow up of Health I To be determined. Project under (IDA) project to further develop rural health preparation. services. Environmental Assessment Category C. ZAIRE Ministry of About (R) Environment - To develop systems for To be determined. Appraisal delayed due Environment 20.0 effective protection of parks and country situation. (IDA) reserves and to improve management of (Possible financing fr forests and other natural resources. the Global Environment 'Environmental Assessment Category D. Facility (GEF) -- see Annex C.) Ministry of About (R) Capacity Building (formerly Consultants will be Post appraisal mission Planning 10.0 Development Management and required. will be rescheduled (IDA) Decentralization) - Institutional depending on country development project focussed on public situation. resource management, economic management information system, private sector -, support, and decentralization. Environmental Assessment Category C. - 39- Member Country, Amount & Implementing Probable Stage of Processing and Agency - Lender 2 Project Consulting Services Action on Procurement 4 ZAIRE (Cont'd) Ministry of Public About Urban Environment - Project will Consultants will be Negotiations delayed due Works ahd Urban 15.0 include: pilot labor intensive required. to country conditions. Development (IDA) approaches to maintenance of urban infrastructure and environment; urban markets; and land registration and land taxation reform, environmental studies and technical assistance. Project will have positive effect on the urban environment of Kinshasa. Environmental Assessment Category B. ZAMBIA Ministry of Health 30.0 (R) Health and Nutrition Consulting services will Identification under way (IDA) Rehabilitation - Assist with be required. rehabilitation of urban infrastructure and service delivery systems. Environmental Assessment Category: To Be Determined.( Tazama Pipelines, 20.0 Petroleum Rehabilitation - Consulting services will Identification completed Indeni Refinery (IDA) Rehabilitation of Tanzania Oil Pipeline; be required for pipeline Pre-appraisal mission and Zimoil energy efficiency measures at Indeni engineering supervision planned for March/April Refinery; construction of bulk petroleum and supervision of 1992. Appraisal mission handling facilities; and institutional refinery and bulk tentatively scheduled fa strengthening of petroleum supply petroleum handling June 1992. companies. Environmental Assessment facilities. Category B. Ministry of Energy 25.0 (R) Power Sector - Policy and Consulting services will Project was placed into and Water (IDA) investment-based sector operation be required for the Reserve Program. Development involving policy and institutional institution-building Further reporting will b reforms and selective investments to activities. discontinued. rehabilitate, upgrade and expand the power system. Environmental Assessment Category B. To be determined 14.0 (R) Infrastructure Engineering - To be determined. Pre-appraisal mission (IDA) Development/rehabilitation of public scheduled for April 1992 works, roads, etc. Environmental (Cofinancing of Assessment Category: To Be Determined. US$6.0 million will be required.) Ministry of 50.0 (R) Export,Diversification - The Consulting services will Project under Agriculture (IDA) objective is to increase production of be required. preparation. agricultural exports in order to diversify the export base from the heavy dependence on the mining sector. Environmental Assessment Category B. Ministry of 25.0 (R) Education Rehabilitation - Project Consulting services will Project under General Education, (IDA) will provide support for the rehabilita- be required for studies preparation. Appraisal Youth, and Sport tion of the sector including: and- long term scheduled for (MGEYS) construction and rehabilitation of assignments. April 1992. classrooms; provision of books and (Cofinancing will be learning materials and; the training of required.) education managers. It will also institute mechanisms that will prevent further erosion of the sector. Environmental Assessment Category C. - 40 - Member Country, Amount & Implementing Probable Stage of.Processing and Agency Lender 2 Project Consulting Services Action on Procurement ZAMBIA (Cont'd) Ministry of 20.0 (R) Marketing and Processing - The. Consulting services Appraisal report under Agriculture & (IDA) objective is to alleviate policy, required. preparation. Water Development institutional and physical constraints (Cofinancing will be on agricultural marketing and input required.) distribution. Environmental Assessment Category B. Ministry of 193.0 (R) Privatization and Industrial Reform Consultant services Appraisal mission in the Finance (IDA) - To support institutional- and policy required. field. reforms in trade and public enterprise (Cofinancing of about restructuring especially the reform of 'US$10.0 million will be parastatals and the Government's required.) privatization program. Environmental Assessment Category C. Ministry of 100.0 Multisector Adjustment - To extend and Consultant services will Project under Finance (IDA) deepen the Government's adjustment , be sought. preparation. progrAm by providing imported goods and (Cofinancing of about services, particularly production inputs US$250.0 million will be for recovery. Environmental Assessment required.) Category C. ZIMBABWE Ministry of 100.0 (N) Emergency Drought Recovery - Will Consulting services will Project under Finance, Economic .(IDA) support imports and technical assistance be required. preparation. Appraisal Planning and for reconstruction of agriculture and mission scheduled for Development water supply. Environmental Assessment March 1992. Category B. (Cofinancing will be required.) Ministry of 50.0 Telecoms - The purpose of the project is Consulting services will Project preparation Information, Post (IBRD) to develop PTC's management and be required for policy, mission is planned for and implementation capacity to achieve finance and engineering. April 1992. Telecommunications sustainable system expansion and (Cofinancing of about improvement in quality and finances to US$10.0 million will be improve sector policy environment. The required.) process will support institutional development and rehabilitation and expansion plans. Environmental Assessment Category: To Be Determined. Government of 50.0 (R) Agricultural Services - To improve Consulting services Project under Zimbabwe (IDA) income and household goods security (50 staffweeks) will be preparation. among households through reforming required for preparation (Cofinancing will be agricultural marketing, support to and appraisal. required.) research and extension activity, upgrading of livestock support service, and improvement of institutional capacity within the Ministry of Land -Agriculture and Rural Resettlement (MLARR). Environmental Assessment Category B. - 41 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project ' - . Consulting Services Action on Procurement ZIMBABWE (Cont'd) Ministry of 50.0 Education I - Will assist in improving To be determined. Project under Education - (IDA) efficiency and quality of secondary preparation. education and in meeting manpower (Cofinancing will be requirements in selected fields. required.) Environmental Assessment Category C. Government/ 20.0 (R) Second Small Scale Enterprise - Will To be determined. Pre-appraisal mission Reserve Bank (Bank) provide financial and technical scheduled for late March assistance to small-scale micro 1992. enterprises and institution building for (Cofinancing of about . participating financial intermediaries. US$5.0 million will be Environmental Assessment Category C. required.) Ministry of 30.0 (R) Power Distribution - Reinforcement Consultants will not be Board presentation Energy/ZESA (Bank) and extension of power distribution required. scheduled for July 1992. system and public lighting. (Parallel financing for Environmental impact is expected to be related investments is minimal. Environmental Assessment being arranged by the Category B. Government.) Ministry of Local 52.0 (R) Urban Transportation - Improvement Consulting services will Project awaiting Government and (Bank) of urban transport services through be required.- Government response to Rural Development 8.0 assistance to bus companies. issues raised during (IDA) Environmental implications will be appraisal mission. assessed during appraisal and necessary (Co-financing of about actions will be identified. US$38.0 million will be Environmental Assessment Category B. required.) AFRICA REGIONAL Governments of 25.0 (R) Regional Power - Develop the hydro Consultants have been Project under Senegal, (IDA) project.in Manatali and the associated selected and econmic preparation. Mauritania and transmission lines to supply Dakar. feasibility study Mali - (OMVS) Environmental Assessment Category A. completed. Other Organization pour studies to be la Mise en Valeur undertaken. du Fleuve Senegal -42.- Member Country, Amount & Stage of Processing and Implementing Probable Agency Lender Project ' Consulting Services Action on Procurement II. EAST ASIA AND PACIFIC REGION CHINA Ministry of 150.0 (R) Electronics - Would support the Consulting services will Preparation under way. Machinery and (Bank) restructuring of the electronics sector be required for project Electronics within an agreed framework of national preparation and Industry/China strategy. Would assist in build-up of implementation. Electronics the following key infrastructure Corporation elements within the electronics industry: (a) industrial standards and quality control mechanisms; (b) technology assimulation and development; and (c) basic electronic components and materials. Environmental Assessment Category B. Ministry of 50.0 (R) Reform, Institutional Support and Consulting services will Project preparation unde Finance (IDA) Preinvestment - Technical assistance for be required for way. preparation of projects expected to be implementation of financed by the Bank and IDA; subprojects. strengthening of key institutions; and a program of economic studies and training. Environmental Assessment Category C. .Taihu Basin 200.0 (R) Taihu Flood Protection - To Consulting services may Project preparation Authority and (IDA) alleviate severe flood threat in the Tai be required to provide mission under way. Ministry of Water Lake Basin of Eastern China, through: technical assistance for Resources canalization of river outlets to Yangtze, evaluating hydraulic River, Hangzhou Bay, and East China Sea: design,.environmental construction of dikes; and installation assessment, and draft of major pump stations. Environmental specificatibn for Assessment Category A. channel dredging. To be determined 100.0 (R) Shenyang Industrial Development - Consulting services will Identification schedule (Bank) Assistance to the municipal government be required for for May 1992. in the implementation of its overall preparing subsector industrial strategy including subsector development plans. and restructuring plans in a selected number of subsectors together with associated institution building. The financial intermediaries will assess the environmental impact of all subsector projects to ensure that they are consistent with Bank standards. Environmental Assessment Category B. -43- Member Country, Amount &, Implementing Probable Stage of Processing and Agency ' - Lender Project Consulting Services Action on Procurement 4 CHINA (Cont-d) Ministry of 400.0 (R) Sixth Railway - Project seeks to: Individual consultants Pre-appraisal mission in Railways (Bank) (a) support railway policy/system required to provide the field. reform; (b) support railway investment technical assistance. plans for capacity expansion and (c) broaden the scope of system-wide technological modernization. The project has one policy component with three subcomponents (investment prioritizatton, tariff restructuring, and financial accounting procedures revision); one investment component with six subcomponents (capacity expansion, track maintenance, locomotive and rolling stock maintenance, telecommuni- cations, transport management information system, and pilot container transport); and one project preparation component component with three sub- components (railway technology optimization, railway environmental protection, and rail-based container transport). Environmental Assessment Category B. Liaoning 190.0 (R) Songliao Plain Agricultural Consulting services may Preparation is scheduled Provincial (Bank)/ Development - Project would assist the be required for for May 1992. Planning and (IDA) provincial governments in solving irrigation engineering Economic waterlogging, soil salinity and low crop and agro-processing Commission, Jilin -productivity problems in 40 counties in (corn wet-milling Provincial Liaoning and Jilin provinces. It would technologies) during Planning and invest in irrigation and drainage preparation. Economic facilities, plant windbreaks, provide Commission agricultural inputs, rehabilitate fruit orchards, improve livestock and aquaculture production technologies and promote agro-processing and agro- industries, particularly the value-added processing of surplus corn: The project would directly benefit 2.5 million poor farm families. Environmental Assessment Category B. Ministry of 15.0 (R) Ships' Wastes Disposal - Will assist Consulting services will Negotiations tentatively Communications, (IDA) the ports of Dalian, Tianjin, Shanghai, be required, and scheduled for mid-April Six Port .Ningbo, Guangzhou and Xiamen in setting includes about 1992. Authorities up facilities for the reception and safe US$0.78 million of disposal of ships' wastes. Will assist technical assistance and (Possible financing from in development of a plan for dealing studies. the Global Environment with oil spill contingencies. - Facility (GEF) - see Environmental Assessment Category B. Annex C.) Henan Province 120.0 (R) Henan Province Road Transport Consultants completing Appraisal mission in the Communications (Bank) Development - To support highway review of design and field. Department (HPCD) development objectives of the Eighth final engineering for Plan (1991-1995) for the Henan Province Zhengzhou-Louyang with three key elements: (a) integrated expressway and selected development of road system in the provincial roads. Northwestern region of Henan province, centered on the Zhengzhou-Louyang Corridor (b) road improvement program throughout Henan and (c) institutional support and strengthening of highway organizations and highway sector management in the province. Environmental Assessment Category A. -44- - Member Country, Amount & Implementing Probable Stage of Processing anc Agency ' Lender 2 Project I Consulting Services Action on Procurement CHINA (Cont'd) Ministry of 300.0 (R) Grain Distribution - A program of Project preparation Preparation II mission Commerce (Bank)/ investments in grain distribution, likely to require the field. (IDA) markets, handling, transport, and consultants in transit storage facilities required to management of commodity support a changing role of Government markets and food buffer agencies from planned procurement and stocks, modern grain sales of grain, to management of transit storage competitive wholesale markets and technologies, planning market-driven interprovincial grain of logistics of grain trade. Environmental Assessment distribution, and Category B. computerized information systems for bulk logistics and commodity markets price information. Sichuan Petroleum 150.0 (R) Sichuan Gas Development and Consulting services will Project preparation uni Administration (Bank) Conservation - To support Sichuan,gas be required for way. appraisal, development, aging field technical assistance and (Possible financing fr, rehabilitation, transmission, training in project the Global Environment distribution, energy conservation and preparation and Facility (GEF) -- see pollution abatement for selected implementation. Annex C.) fertilizer plants. Environmental Assessment Category A. Ministry of Water 150.0 (R) Loess Plateau - Agricultural Consulting services Study mission report d Resources (IDA) productivity would be improved and will not be required. end March 1992. environmental degradation reversed in eight tributaries critical of the Yellow River in the Loess Plateau area through: (a) construction of terraced crop land, small soil dams and other erosion control works; (b) establishment of pasture, shrubs and trees on steeply sloped land; and (c) improved management of communal grazing lands. Project would improve productivity and incomes of 1.3 million,absolute poor and curtail soil erosion from 15,000 sq. km catchment area. Environmental Assessment Category B., Ministry of 185.0 (R) Second Red Soils Land Rehabilitation To be determined. FAO/CP preparation Agriculture (IDA) - Disseminate techniques of ecologically mission under way. sustainable and economically viable land rehabilitation and voluntary settlement over a wide area of degraded red soils across Jiangxi, Fujian, Human, Zhejiang and Guangxi--and technical assistance to support research and strengthen extension systems. Environmental Assessment Category B. Ministry of 110.0 (R) Agricultural Support Services - The To be determined. Technical review follc Agriculture (IDA) project would support the production of up mission in the fiel foodgrains, oil crops, cotton and Review of MIS and livestock through improvement of support institutional aspects services to farmers--crop, livestock, be provided by UNDP regulatory and management services, and Investment Support project management. Services to be - Project III. - emphasized would be applied research, agricultural extension, seed production, veterinary and quarantine. Environmental Assessment Category C. -45- Member Country, Amount & Implementing Probable . Stage of Processing and Agency ' Lender 2 Project s Consulting Services Action on Procurement 4 CHIRA (Cont,d) Sichuan Province 147.0 (R) Sichuan Agricultural Development - Consulting services Negotiations anticipated Planning (IDA) To support comprehensive agricultural likely to be required in the near future. Commission development in Sichuan Province focusing for training and on irrigation, soil conservation, technical assistance Retroactive financing of sericulture, livestock, and agro- during project up to US$14.0 million processing including a strong poverty implementation. requested. alleviation component, with particular emphasis on the role of women. A detailed environmental assessment has been completed by the Sichuan Environmental Research Institute for Environmental Protection. Environmental Assessment Category B. People's Bank of 60.0 Financial Sector Technical Assistance - Consulting services Negotiations anticipated China (PBC)/ (IDA) To support PBC*s central banking required for project in the near future. Ministry of functions and strengthen financial preparation and Finance sector development through possible implementation. components for improving bank . regulation, supervision and accounting, payments and clearing system,.legal framework, research and statistics and domestic debt management. Environmental Assessment Category C. Cuangdong Province 250.0 (R) Cuangdong Provincial Transport - To be determined. Appraisal mission in the Planning (Bank) Would focus on highway -- new field. Commission construction of two major expressways, upgrading and rehabilitation of secondary roads; equipment for highway maintenance, training program for highway personnel and technical assistance to reform highway financing. Environmental Assessment Category A. Liaoning 150.0 Liaoning Environment - Continuing Consultants required for Preparation under way. Environmental (Bank)/ support to improve water management and project preparation. Protection Bureau; (IDA) water pollution control in the Hun/Taizi Liaoning River Basin; consists of physical and Construction institutional development for works for Commission waste water, hazardous waste management for the cities of Shenyang, Fushun and Anshan and cultural heritage conservation. Environmental Assessment Category D. Shanghai Port 200.0 (R) Shanghai Port II - Rehabilitation To be determined. Appraisal mission Authority/ (Bank) and expansion of port and cargo handling scheduled for May/June Ministry of facilities at Shanghai. Environmental 1992 subject to receiving Communications Assessment Category A. key information from Shanghai Port. State Education 130.0 (R) Education Development in Poor Consultants required for Approved by the Executive Commission -(IDA) Provinces - To support local efforts improving planning of Directors on March 10, aimed at improving efficiency and higher.education, 1992. quality of education in six provinces; training of teachers in Shaanxi, Guizhou, Hubei, Yunnan, Hunan science, and management and Shanxi. Environmental Assessment information system. Category C. -46- Member Country, Amount & Implementing Probable Stage of Processing anc Agency Lender 2 Project s Consulting Services Action on Procurement CHINA (Cont'd) State Education 100.0 (R) Effective Teachers Services - Consultants are likely Preparation under way. Commission (IDA) Support reform of teacher education for to be required for lower middle school teachers and for technical assistance in primary school teachers in under- teacher education and privileged areas, including curriculum instructional methods. reform, development and dissemination of innovative teaching methods, improved efficiency and control through modern management and information systems, and upgrading of facilities and equipment. Environmental Assessment Category C. National Project 110.0 Rural Water Supply and Sanitation - To Consultants required for Negotiations completed Office Under the (IDA) improve rural productivity and health, technical assistance and Approved by the Execut, National Patriotic particularly in poor, remote areas, by training in project Directors on February Health Campaign increasing coverage of water supply and preparation and 1992. Financing of Committee sanitation. The project would provide implementation. consultants for first potable water to about 9,million rural phase project preparat inhabitants in 75 counties of 6 of provided by UNDP umbre China's poorest provinces. Project project. Further UNDP would also provide funds for water assistance for capacit: quality monitoring, demonstration and building approved Augu communal/public latrines and health 1991. education in the project areas. Environmental Assessment Category B. Retroactive financing reouired Planning and 150.0 (R) Southern Jiangsu Environment - To Consultants have been Pre-appraisal mission Economic (Bank) support investments in urban and selected. Two studies completed. Appraisal Commission of industrial projects that demonstrate are being financed under mission tentatively Jiangsu Province significant environmental payoffs and to the Japanese T.A. Grant scheduled for June 199 strengthen institutional, regulatory and Facility. environmental management capabilities of the provincial agencies. Environmental Assessment Category D. Ministry of Public 125.0 Rural Health Manpower Development Consulting services may Pre-appraisal mission Health (IDA) (Health IV) - Assistance in,training and be required during completed. Appraisal re-training rural health manpower in the project implementation. mission tentatively poorest counties of five provinces. scheduled for May 1992 Environmental Assessment Category C. Ministry of 150.0 Fertilizer and General Process Equipment Consultants will be Preparation under way. Machinery and (Bank) Manufacturing - Restructuring of the required for project Electronics fertilizer and general process equipment preparation and related Industry manufacturing industry and selected sector study for which enterprises to enable them to upgrade the terms of reference their products and improve their have been finalized. efficiency. Environmental Assessment Financing arrangements Category A. are being made. Invitations for proposals are expected to be issued after decision on financing arrangements. Changchun 120.0 Changchun Environment and Water Supply - Consultants have Appraisal mission Municipal Planning (IDA) To provide water supply to relieve finalized feasibility scheduled for May 199, Commission serious shortages, and to plan for studies. appropriate disposal of waste water. Environmental Assessment Category B. - 47 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender 2 Project Consulting Services Action on Procurement 4 CHINA (Cont'd) Yellow River 40Q.0 (R) Xiaolangdi Multipurpose - To Consulting services for Environmental panel will Conservancy (Bank)/ construct major dam (Xiaolangdi) on construction supervision be revisiting the projec Commission (IDA) Yellow River to provide protection for will be required. in-early 1992 to review 100 million people from catastrophic the EIA. Final floods on North China Plain, alleviate preparation mission is I siltation and aggradation of river the field. channel, provide irrigation water to over one million ha of farmland, provide municipal and industrial water throughout the region, and generate electric power. There is a resettlement component involving about 167,000 people to be resettled over a 20 year period. Detailed plans have been prepared, and a pilot resettlement site is being prepared for construction in 1992. Potential environmental impact has been reviewed and EIA report being finalized. Environmental Assessment Category A. Tianjin 100.0 (R) Tianjin Industrial Development II - Consultants are Appraisal planned for Municipality and (Bank) Assistance to the municipal government preparing sub-sector June 1992. China Investment in the implementation of its overall development plans. Bank industrial strategy including subsector and restructuring plans in a selected number of industries together with associated institution building. The financial intermediaries will assess the environmental impact of all subsector proiects to ensure that they are consistent with Bank standards. Environmental Assessment Category B. Shanghai Municipal 250.0 (R) Shanghai Industrial Efficiency - Consultants required to Preparation under way. Government (Bank) Assistance to the municipal government help prepare sub-sector in the implementation of its overall development plans. industrial strategy including development and restructuring plans in a selected number of subsectors together with associated institution building. The financial intermediaries will-assess the environmental impact of all subsector projects to ensure that they are consistent with Bank standards. Environmental Assessment Category B. Zhejiang Province 220.0 (R) Zhejiang Provincial Highway - Consultants will be Negotiations under way. Communications (Bank) Provincial transport, including recruited for Department Hangzhou-Ningbo Highway. Environmental construction Assessment Category A. supervision. Ministry of 310.0 (R) Zouxian' Thermal Power - Construction Consultants are already Negotiations under way. Energy/ (Bank) of two generating units of 600 MW each in place. Shandong and associated transmission lines and Procurement: Advance Provincial substations, and technical assistance procurement required fc Electric Power including a study of air quality impact ' boilers and'auxiliaries Bureau . of thermal power plants In China's turbine auxiliaries, ar coastal region. Environmental impact other electrical and statement has been reviewed by the Bank. mechanical equipment fc The analysis indicated that the.project two 600-MW coal-fired will meet World Bank's guidelines and - generating units. all applicable Chinese environmental norms. Environmental Assessment Category A. -48- Member Country, Amount & Implementing Probable Stage of Processing a Agency ' Lender 2 Project Consulting Services Action on Procurement CHINA (Cont'd) Ministry of Energy 120.0 (R) Shuikou Hydra Power II - Second Consultants are already Appraisal report unde (Bank) phase construction of dam and in-place. preparation. powerhouse. Program to enhance resettlement and environmental management are currently being executed under the existing loan. Environmental Assessment Category A. Tianjin Municipal 100.0 (R) Tianjin Urban Development and Consultants have Negotiations tentativ Government (IDA) Environment - To improve municipal assisted preparation of scheduled for May 199 planning, environmental sanitation, and detailed design and bid transport. Environmental Assessment documents. Category D. . Shanghai Municipal 150.0 Shanghai Environment - Continuing Consultants required for Preparation under way Government (Bank)/ program to improve water supply sewerage project preparation. (IDA) and environmental pollution control in the city of Shanghai. Environmental Assessment Category D. State 82.7 (R) Regional Cement - To establish a new Consultants have Approved by the Execu Administration for (Bank) high strength cement plant based on provided technical Directors on March 17 Building Materials regional cooperation in the Shanghai assistance for 1992. Industry - Economic Region: rehabilitate an engineering design. existing cement plant and provide Procurement: Key ten technical assistance for design and packages have been research capabilities of local cement- issued. related institutes. Plant design changes have been agreed to enhance de- . dusting capacities to meet stricter environmental standards. Agreement has been obtained that asbestos cement will not be used for plant construction. Environmental Assessment Category A. Urban Development 150.0 (R) Zhejiang Multi-Cities - Provision of Infrastructure and urban Appraisal mission Project Office of (IDA) urban services, in particular water consultants submitted completed. Negotiati Zhejiang Province supply, liquid and solid waste their field reports. tentatively scheduled management, land development scheme in Consultant services will end July 1992. Shaoxing city, improve public transport be required for and traffic management in Hangzhou, - technical assistance improve institutional strength and during project financial performance in urban services. implementation. Environmental Assessment Category B. Jiangsu Province 100.0 Jiangsu Chemical Sector - Support Consultants have been Negotiations are (Bank) development of provincial chemical hired to assist in tentatively schedulec industry, including associated technology end April 1992. institution building. All subproiects identification. will be subiect to government of China's Consultants are being environmental impact assessment process recruited for various which is satisfactory. Project will technical assistance also establish a center to oversee activities. hazardous and toxic waste management in Jiangsu. Environmental Assessment Category B. -49- Member Country, Amount & Implementing 'Probable Stage Of Processing and Agency Lender 2 Project Consulting Services Action on Procurement 4 CHINA (Cont'd) Ministry of 250.0 Finance I - Loan for development of two To be determined. Project preparation Finance (Bank) major financial institutions (Bank of delayed, pending the Communications and Construction Bank of preparation of a China); and technical assistance to the technical assistance Ministry of Finance. Environmental project for People's Bar Assessment Category C. of China. FIJI Ministry of 10.0 (N) Education - To further develop To be determined. Identification under wa3 Education (Bank) general education, especially pre-school and secondary education, including secondary teacher training and to introduce relevant and cost-effective technical/vocational training programs. Total project cost is US$50.0 million. Environmental Assessment Category C. To be determined 10.0 (R) Energy Sector - Scope of project to To be determined. Project has been remove( (Bank) be determined. Environmental Assessment from the Lending Prograr Category: To Be Determined. Further reporting will I discontinued. Ministry of 20.0 Roads - Upgrading of several high Consulting services will Joint appraisal mission Infrastructure and (Bank) priority sections of the road network; be required for with ADB in the field. Public Utilities improving road management, particularly technical assistance in road maintenance; and institutional road management, strengthening. Environmental Assessment detailed engineering for Category B. selected road sections, construction supervision, and for institutional strengthening. INDONESIA To be determined 15.0 (R) Kerinci Seblat Integrated Consulting services will Awaiting UNDP approval (Bank) Conservation - The project would aim to be required for project Project Preparation develop a model for an Integrated preparation. Facility (PPF). Conservation Development Project (ICDP) (Possible financing fro including: (a) an institutional the Global Environment framework to manage the Kerinci-Seblat Facility (GEF) -- see National Park (b) establishing Annex C.) mechanisms for local community participation in conservation and development activities; and (c) support for provincial governments and NGOs. Environmental Assessment Category A. BAPPENAS/Ministry 75.0 (R) Integrated Pest Management - To be determined. Pre-appraisal mission of Agriculture (Bank) Supports and promotes safe, effective scheduled for Septembez and environmentally sound pest 1992. management practices through the expanded adoption of a more balanced and diversified approach to crop production. Project will train extension workers and farmers in crop management and crop protection practices, support farmer- based research and monitoring and regulatory programs. Total estimated project cost is US$60.0 million. Environmental Assessment Category: To Be Determined. - 50 - Member Country, Amount & Implementing Probable Stage of Processing a Agency Lender Project Consulting Services Action on Procurement INDONESIA (Cont*d) Ministry of 70.0 Forestry III - Strengthening of To be determined.. Project preparation u Forestry (Bank) institutions in the forestry sector way. through human resources development, research and extension activities. May also include further support of improved management of concessions and forest plantations. Environmental Assessment Category B. Environmental 12.0 (R) BAPEDAL Development - Technical Consulting services will Board presentation Impact Management (Bank) assistance for the newly established . be required. scheduled for March 3 Agency (BAPEDAL) BAPEDAL, including institutional 1992. strengthening and direct support for (Cofinancing for proj pollution control efforts at the preparation -has been national level and selected provinces. provided from the Jap Environmental Assessment Category C. Grant Facility.) Perusahaan Umum 80.0 (R) Cirata Hydroelectric (Phase II) - To be determined. Pre-appraisal missior Listrik Negara (Bank) Project would complete the development under way. (PLN) of the Cirata Hydroelectric project by the addition of four generating units of 125 MW each and civil works consisting of two power tunnels and four tailrace tunnels. Environmental Assessment Category B. To be determined 200.0 Gas Utilization II - To promote non- To be determined. Identification under (Bank) tradeable supplies of natural gas for industrial and commercial use to meet demand in Java. Environmental Assessment Category: To Be Determined. . To be determined 280.0 Rural Electrification II - Support for To be determined. Identification under (Bank) the Government's rural electrification program and for further development of Government's role in encouraging private participation in rural electrification. . Environmental Assessment Category: To Be Determined. To be determined 100.0 (R) Industrial Technology Development - To be determined. Identification under (Bank) To support policies, infrastructure and human resource development and to promote financing for technology transfer and development of technological innovation in the industrial sector. Environmental Assessment Category: To Be Determined. , Ministry of Public 50.0 (R) Kalimantan Urban Development - Five- Consulting services are Project preparation Works, Directorate (Bank) year urban infrastructure expenditure needed for project under way. for Programme programs for participating-local preparation and Development governments. These will include implementation including municipalities of Samarinda, Balikpapan, environmental analysis, Banjarmasin, Palangkaraya and Pontianak institutional which account for about 80% of the strengthening, and Kalimantan urban population. training. Environmental Assessment Category B. - 51 - Member Country, Amount & Implementing Probable Stage of Processing an Agency ' Lender Project Consulting Services Action on Procurement INDONESIA (Cont'd) Ministry of Public 90.0 Semarang/Surakarta Urban Development - Consultants are Project preparation in Works, Director (Bank) Improvement of the functioning of the currently being selected progress. General for Human two major cities in Central Java to assist with Settlements . Province through an integrated program continuing preparation of priority infrastructure investments for preappraisal and supported by revenue improvement and appraisal, and detailed. institutional development action plans. environmental Environmental Assessment Category A. assessments. Consultants will also be required for implementation support, detailed design and supervision. To be determined 75.0 Secondary Teacher Development - To To be determined. Project identification (Bank) improve the quality of secondary under way. teachers through in-service and pre- service training. Environmental Assessment Category: To Be Determined. Directorate 75.0 (R) Integrated Swamps - Strengthen Consultants are Pre-appraisal mission General Water (Bank) institutional framework for swamps finalizing project scheduled for April/Me Resources reclamation and support integrated preparation. 1992.. Development development of viable existing reclaimed (DGWRD) swamps; rehabilitate infrastructure, improve agriculture, and support environmental protection. Environmental Assessment Category A. Ministry of Health 70.0 Water and Sanitation for.Low Income Consultants and NGOs Project preparation uz (DG of (Bank) Community - To meet basic needs of low under recruitment for way. Communicable income communities in rural and urban project preparation. Disease), Ministry areas, and Improve health status and of Public Works productivity through provision of safe, (DG Cipta Karya), adequate and easily accessible water Ministry of Home supply and proper sanitation. Affairs (DG Environmental Assessment Category B. Bangda/Bangdes) Ministry of Public 350.0 (R) Highway Sector II - To improve.the Consulting services will Project identificatia Works/Ministry of (Bank) quality of interurban national/ be required for project under way. Communications provincial roads through selective implementation. capacity improvements and maintenance. Also, to improve formulation and implementation of road infrastructure and road transport policies. Environmental Assessment Category A. Perusahaan Umum 350.0 Outer Islands Power - To support To be determined. Project identificatio Listrik Negara (Bank) expansion of generation and transmission under ,way. (PLN) facilities in outer islands, including South Sumatra and South Kalimantan. Project scope not yet defined. Environmental Assessment Category A. - 52 - Member Country, Amount & Implementing Probable Stage of Processing an Agency Lender 2 Project ' Consulting Services Action on Procurement INDONESIA (Cont'd) Bank Indonesia/ 150.0 (R) Emerging Enterprises Development - To be determined. Project has been remov4 Participating (Bank) Provision of term credit and technical from the Lending Progn Financial assistance to small enterprises in all Further reporting will Institutions directly productive sectors through discontinued. participating financial institutions. Subprojects in environmentally sensitive sub-sectors will be recuired to submit a satisfactory environmental impact assessment. Environmental Assessment Category B. Perusahaan Umum 375.0 (R) Telecommunications IV - To provide Consultants will be Negotiations tentative. Telekomunikasi (Bank) additional telephone services in Java, required for project scheduled for' April 19, (PERUMTEL); Bali, East Nusa Tenggra and Sulawesi; implementation, human Posts and and improve service and modernize resource development, Telecommunications telecommunications facilities. financial management (POSTEL) Environmental Assessment Category B. strengthening and future project preparation. Ministry of Public 96.0 (R) Surabaya Urban Development II - To Consultants for project Pre-appraisal mission Works (Bank) help institutional strengthening and preparation have been under way. priority urban infrastructure selected and will be investments in Surabaya. Environmental 'funded under PPF. Assessment Catezory A. Ministry of Home 175.0 (R) Kabupaten Roads III (formerly Consulting services will Appraisal report under Affairs; Ministry (Bank) Kabupaten) - Maintenance and be required for project preparation. of Public Works rehabilitation of local roads in about coordination, 65 districts. Institutional and human institutional Retroactive financing resources development through training development, field consultancy services a and improvement of planning/budgeting implementation and civil works may be and implementation arrangements, training. reguired. particularly for road maintenance. Environmental Assessment Category B. Directorate 60.0 Groundwater Development - Construction Consultant requirements Project preparation un General of Water (Bank) of groundwater irrigation system for an for project . way. Resources, area of about 23,000 ha; pilot support implementation to be , Ministry of Public for private sector development of determined. Works shallow tubewells institutional resources development; and training for water user associations and extension services for on-farm water management and crop diversification. Environmental Assessment Category B. To be determined 75.0 (R) Health IV (formerly Provincial To be determined. Project identification (Bank) Health III) - The project would support under way. health sector expenditure investment programs in selected provinces. Environmental Assessment Category: To Be Determined. Ministries of 100.0 (R) Watershed Management and To be determined. Project under Forestry, (Bank) ,Conservation - Strengthen sustainable, preparation. Agriculture and natural resource management in critical Home Affairs watersheds. Institutional development at national and regional levels and specific conservation activities in Cimanuk Watershed in West Java. Would reduce land and resource degradation and improve social conditions. Environmental Assessment Category B. - 53 - Member Country, Amount & Implementing Probable Stage of Processing anc Agency Lender 2 Project s Consulting Services Action on Procurement INDONESIA (Cont'd) To be determined 50.0 (R) Industrial Skills Development - To To be determined. Project preparation unc (Bank) support industrial skills development. way. Environmental Assessment Category C. Public Port 90.0 Ports Upgrading - The project would Consultants have been Project identification Corporation II (Bank) focus on expansion requirements in recruited by Perumpel II under way. (Perumpel II); secondary ports to meet rapidly for pre-investment Ministry of increasing traffic and improve studies for two ports. Communications installations and practices for Consultants will be (MOC) environmentally safe maritime transport required for other in general. Environmental Assessment components. Category: To Be Determined. Directorate 35.0 (R) Primary School Teacher Development Consulting services will Appraisal report under General of Higher (Bank) (formerly Primary Teacher Development) - be required for project preparation. Education To support the Government's plan to implementation. upgrade qualifications of primary teachers through in-service and pre- service programs to improve the quality and expanded capacity of basic general education systems. Environmental Assessment Category C. Perusahaan Umum 400.0 (R) Suralaya Thermal Power - To support Consultants selected for Negotiations tentative] Listrik Negara (Bank) expansion of Suralaya Thermal Power project implementation. scheduled for April 191 Pusat (PLN) project by the addition of 3 x 400 MW Consulting services will I units, to meet expected growth in demand be required for Advance Procurement: for electric power in Java. technical assistance Action involving tende Environmental Impact Assessment report components. invitation will be was received and the summary was initiated. circulated to the Board. Environmental Assessment Category A. Environmental 80.0 (R) Industrial Efficiency and Pollution Consulting services will Preparation mission in Impact Management (Bank) Abatement - To provide a package of be required for project the field. Agency credit and services to existing preparation and industrial enterprises to enable them to implementation. comply with environmental standards. The project would also develop or strengthen the capability of Ministry of Industry staff, local authorities and consultants in environmental analysis and monitoring. The Project targets the abatement of industrial pollution. Environmental category will be reviewed after March 1992 preparation mission which will reformulate project design. Environmental Assessment Category D. Ministry of -37.0 (R) Primary Education Quality Foreign and local .*Board presentation Education & (Bank) Improvement - To improve the quality of consulting services will scheduled for March 24 Culture primary education. Environmental be required. 1992. Assessment Category C. Ministry of 200.0 (R) Financial Sector Development - Consultant services Post appraisal mission Finance/Bank (Bank) Support of GOI legislation and policy required for bank the field. Negotiatio Indonesia reforms to strengthen the Indonesian supervision and credit tentatively scheduled financial system by strengthening information systems. April 1992. prudential control and supervision, and recapitalization of state commercial banks. Environmental Assessment Category C. -54- Member Country, Amount & Implementing Probable Stage of Processing am Agency Lender Project Consulting Services Action on Procurement INDONESIA (Cont'd) Directorate 87.,6 (R) Tree Crop Smallholder Development - Consultant services will Board presentation General of Estates (Bank) To support Government's efforts to be required for project scheduled for April 21 increase smallholder coconut and rubber implementation.- 1992. production. A revised environmental (Japan has approved Gr impact assessment has been approved by funds for technical GOI addressing all issues regarding land assistance.) use, agricultural practices, and use of agro-chemicals. A related management plan has also been approved. Environmental Assessment Category B. Ministry of 140.0 (R) Transmigration Second Stage Consultant services will Project has been removi Transmigration (Bank) Development - Increased income and be required for a from the Lending Progr. (MOT) agricultural production in 8 existing central advisory team Further reporting will trans-settlements; strengthen MOT and field technical discontinued. coordination and implementation - assistance teams. capacities for second stage development; Retroactive financing and improve overall economic, social and US85.0 million has beei environmental soundness of the requested by the transmigration program. Project Government. includes a component for protecting wildlife to be updated. Environmental assessment prior to completion of appraisal. Environmental Assessment Category A. Ministry of Health 75.0 (R) Community Health and Nutrition III - Consulting services will Appraisal mission (Bank) The project would: (a) reduce infant be required for project .scheduled for June 199 and maternal mortality in selected areas preparation and focussing on the poor; (b) improve implementation. health information system; and (c) health education capability. Environmental Assessment Category C. KOREA Government of 100.0 (N) Financial Sector Investment - The To be determined. IEPS scheduled for Maz Korea (Bank) project will: (a) support the 1992. Preparation Government's program for deregulating mission scheduled for the financial system and strengthening April 1992. the banking system; (b) provide long- term credit through eligible banks to sound private enterprises; and (c) support institutional building programs of participating banks and strengthening technical capabilities of regulators. Environmental Assessment Category C. DAE HAN Oil 90.0 (R) National Oil Pipeline - Consisting To be determined. Pre-appraisal schedulE Pipeline Corp. (Bank) of construction of a nationwide oil for June 1992. Board pipeline network, with a total length of presentation is about 1,000 kilometers in various tentatively scheduled diameters, for transporting petroleum FY93. products. Project makes significant contribution in reducing road hazards Retroactive financing and air pollution and oil spillage up to US$10.0 million incidents. Total project cost is about being considered for US$900.0 million. Environmental partial payment of lo Assessment Category D. delivery equipment. -55- Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender 2 Project 3 Consulting Services Action on Procurement KOREA (Cont'd) Ministry of 100.0 (R) Science Education and Research - Consulting services will Identification mission ii Education/Korea (Bank) Will finance equipment to support not be required. the field. Basic Science quality improvement in science and Center (KBSC) engineering programs in the Open University, Vocational and Engineering colleges. Will also improve the research capacity of KBSC. Environmental Assessment Category C. Ministry of 50.0 (R) Natural Resource Management & Consulting services will Identification mission ix Education (Bank) Research - Will finance equipment to not be required. the field. improve programs in agriculture, research management, and conservation and environmental protection in selected agricultural colleges. Environmental Assessment Category C. Ministry of 50.0 (R) Science Education and Libraries Consulting services will Negotiations scheduled Education (Bank) Computerization - Will finance equipment not be required. for March 16, 1992. to support quality improvement in secondary and undergraduate science education and to assist development of libraries' computer network. Environmental Assessment Category C. Ministry of 30.0 (R) Vocational Schools Development - Contracts will be Negotiations'in progress Education (Bank) Will finance equipment to improve awarded to local quality of vocational education. consultants in the Locally-financed studies aimed at amount of institutional strengthening. US$0.2 million. Environmental Assessment Category C. Ministry of Health 30.0 (R) Public Hospital Modernization - To Consulting services Negotiations tentatively & Social Affairs (Bank) support: (a) improvements in the will not be required. scheduled for April 20, capacity of public hospitals to meet 1992. increased demands for medical care, especially by the urban and rural poor; (b) strengthening of public health institute; and (c) studies of health care financing. Environmental Assessment Category C. Korean National 60.0 Railway Systems Modernization - Consulting services will Appraisal report under Railroad (Bank) Includes: (a) implementation of a be needed to develop and preparation. computerized OIS/MIS: (b) development of implement railroad series of operational action plans; computer management Retroactive financing of (c) acquisition of electric cars; and information systems and up to 10% may be (d) technical assistance training. to prepare an action requested for OIS Implementation over a four year period plan to introduce public packages and electric from 1992-1995. Environmental service contracts in the rail cars. Assessment Category B. railroad. Ministry of 40.0 (R) Pusan and Taejon Sewerage - Consultants have been Negotiations completed. Environment (Bank) Construction of two sewerage treatment appointed. Board presentation plants with capacities of 340,000m'/d scheduled for March 26, and 150,000'/d, and of about.20 km of . 1992. interceptors with large diameters. Environmental Assessment Category B. - 56 - Member Country, Amount & - Implementing Probable Stage af Processing and Agency Lender 2 Project s Consulting Services Action on Procurement KOREA (Cont*d) Seoul Metropolitan 80.0 Solid Waste Management - To assist SMG Local consultants have Appraisal report under Government (SMG) (Bank) in reducing collection costs through been engaged for the preparation. implementation of solid waste transfer first two transfer facilities, and providing environmental- stations. Retroactive financing of ly safe disposal through implementation up to US$8.0 million has of sanitary landfill facilities. Bank been requested by the has received Government clearance for Government to cover cost the environmental assessment. Environ- of trailers and tractors mental assessment has been distributed for the first transfer to the Executive Directors. station. Environmental Assessment Category A. LAO, PEOPLE S DEMOCRATIC REPUBLIC Provincial 10.0 (N) Luang Namtha Provincial Consulting services will Project preparation unde Government of (IDA) Development - To initiate a pilot be required for project way. Luang Namtha provincial development scheme by preparation and (Japan Grant Facility fo addressing some of the urgent implementation. project preparation development needs in the project's signed in January 1992.) province, and to provide affirmative action for WID issues by .supporting income generating activities. Environmental Assessment Category: To Be Determined. To be determined 30.0- (R-) Telephone Systems Expansion - To be determined. Preparation mission (IDA) Extension of telephone network int6 scheduled for March/Apri outlying provinces-through provision of 1992. digital exchanges, cable plant and microwave connections, provision of international link, institutional strengthening of Enterprise des Postes Telecommunications Laos (EPTL) and training of staff. Environmental Assessment Category C. Bank of Lao, PDR 15.0 (R) Industrial Credit II - A line of Consulting services will Initial identification (IDA) credit through the Bank of Lao and be required for: mission completed in selected commercial banks for (a) technical assistance November 1991. Appraisa modernization and expansion of private for financial sector mission scheduled for industrial enterprises and related reform; (b) training for November 1992. service.enterprises; and support with term lending; and technical assistance for strengthening (d) technical assistance financial sector reformi and support to strengthen support services for industry. Environmental infrastructure for Assessment Category: To Be Determined. industry. Electricite du 34.0 (R) Provincial Grid Integration - To be determined. Negotiations tentatively Laos (EDL) (IDA) Project will include: (a) extension of scheduled for June 1992. rural electricity networks in southern and central provinces: (b) feasibility study for a 40 MNW expansion of- the Nam Ngun hydroelectric plant; and (c) institu-tional development component for EDL. Environmental Assessment Category C. -57- Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project Consulting Services Action on Procurement 4 LAO, PEOPLE'S DEKOCRATIC REPUBLIC (Cont'd) 5 Department of 10.0 Northern Rural Development and Watershed To be determined. Project preparation undei Forestry and (IDA) Management - To extend the approach and way,. Environment, methodology of the Upland Agriculture Ministry of Project to Luang Prabang and several Agriculture and other northern provinces, especially Forestry emphasizing environmental issues and poverty alleviation. Environmental Assessment Category B. Ministry of 10.0 (R) National Forestry Management and Consultants have been Appraisal report under Agriculture & (IDA) Conservation - To support selected to finalize preparation. Forestry recommendations of Tropical Forestry preparation. Additional (Japan T.A. Grant Action Plan, including development of services will be Facility support has beer improved legislative and institutional required for obtained to complete framework for the forestry sector; implementation. project preparation. Co- completion of forest resource inventory financing is being work: strengthening of forestry explored with the Global management; and implementation of forest Environment Facility and resource management conservation FINNIDA -- see Annex C.) programs. Environmental Assessment Category B. Ministry of 20.0 Education Sector Development - To Consultants will be Appraisal report under Education and (IDA) respond to imediate needs for quality required for preparation. Sports and efficiency improvements in basic implementation. (Cofinancing is being education through: restructuring of explored with Swiss administration and preparation of an Government. Japan Grant Education Actl establishing an Facility agreement for educational management information project preparation was system, including school mapping; signed on February 6, developing new curricula and related 1991.) instructional materials; and rehabilitation of school infrastructure. Environmental Assessment Category C. Retroactive financing is likely to be needed. Ministry of Health 10.0 (R) First Health - To reduce the high Consulting services Preparation mission in and Social Welfare (IDA) incidence of preventable communicable required for preparing the field. diseases in three priority provinces and and implementing the (Cofinancing to be soughl increase the efficiency of health project. for implementation. services delivery through strengthening Japan Grant Facility for selected provincial and district systems project preparation was and infrastructure. It would also adapt signed on February 3, training curricula to health needs and 1992.) strengthen the government's capability to formulate, analyze and implement health policies. Environmental Assessment Category C. MALAYSIA Ministry of 104.0 (R) Polytechnic Development - Establish Consulting services Negotiations tentatively Education (Bank) three new polytechnic institutes with required for preparing scheduled for May 1992. 12,000 new full-time training stations and implementing the and 3,000 part-time training stations; project. train 1,000 new teachers and administrators; implement major policy reforms to convert national deliver system to be more "demand-driven" and operationally efficient. Would also adapt and introduce a broader range of technical curricula. Environmental Assessment Catenory C. - 58 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project Consulting Services Action on Procurement MALAYSIA (Cont d) Sarawak Public 50.0 Sarawak Roads - Rehabilitation and Consulting services for Project preparation unde Works Department (Bank) upgrading of 160 km of main trunk road supervision and way. (Japan T.A. Grant system, procurement of weighbridges. technical assistance Facility support of yen Total estimated cost US$100.0 million. will be required. 64.0 million has been Environmental Assessment Category A. . awarded for environmenta studies and partial contribution towards detailed design studies. Ministry of 30.0 Non-formal Education and Training (NFET) Consultants will be Project preparation unde National and Rural (Bank) - To build up a national institutional required for supervising way. Development capability for developing NFET, and to the project. (Japan T.A. Grant support selected NFET programs. Facility support of yen Environmental Assessment Cateaory C. 50.62 million has been awarded for WID.) Tenaga Nasional 200.0 (R) Power System Development - Will Consulting services for Negotiations completed. Berhad (TNB) (Bank) finance the following components from Paka will be appointed Approved by the Executiv the Tenaga Nasional Berhad's (TNB's) and financed by Tenaga Directors on February 25 investments: (a) 1 x 300 MW gas-fuelled Nasional. 1992. combined-cycle power block at the existing 900 MW Paka power station; Retroactive financing of (b) 230 km long, 275. kV Kampung Awah- US$10.0 million will be Yong Peng transmission line; (c) 275- allowed. 132 kV system expansion for power.supply in Kuala Lumpur. Environmental Assessment Category A. Federal Land 95.0 (R) Third FELCRA Land Development - Time To be determined. Appraisal report being Consolidation and (Bank) slice financing of most of FELCRA's finalized. Rehabilitation program including the rehabilitation of Authority (FELCRA) low yielding small farms with tree crops Retroactive financing of in schemes under group farming US$9.5 million likely to arrangements, the construction of scheme be needed. access roads, and infrastructure, promotion of improved agricultural technology, institutional strengthening and small farmer entrepreneurship. Environmental Assessment Category B. Ministry of Health 40.0 (R) Health Development - To improve the Consultants appointed Appraisal mission and Chemistry (Bank) capacity to monitor environmental health for project preparation scheduled for April 1992 Department of and infectious diseases, enhance equity and implementation, and (Japan T.A. Grant Science, in access to-health development through financed by Japan T.A. Facility has been Technology and primary health care, support health Grant Facility. approved for project Environment development through use of appropriate preparation.) health technology, and to strengthen Ministry of Health's institutional capacity through management and personnel training, health technology. assessment and quality assurance, occupational health and other policy development. Environmental Assessment Category C. Ministry of 30.0 Drainage and Flood Mitigation - Time Consulting services will Project preparation undc Agriculture, (Bank) slice of national drainage program, be required for project way. through Department - covering 5-8 schemes throughout preparation. (Japan T.A Grant Facilit of Irrigation and Malaysia, and including infrastructural has committed funds for Drainage * investments and related agricultural preparation assistance.) development, as well as institutional strengthening of the drainage and irrigation department. Environmental . Assessment Category A. -59 - Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lender Project s Consulting Services Action on Procurement 4 MALAYSIA (Cont'd) Ministry of 150.0 (R) Primary and Secondary Education To be determined. Negotiations tentatively Education (Bank) III - Improve quality of education, scheduled for June 1992. expand access and increase managerial efficiency. Reinforce and complement ongoing sector projects through strengthening of teacher training; establishment of an effective educational technology network and provision of instructional resources; support to innovation and research. construction of schools, teacher housing and boarding facilities; staff development program and institution building strengthening of school-based evaluation; expansion of teaching and managerial staff development program and studies on major sectoral issues. Environmental Assessment Category C. MALDIVES State Trading 10.0 Fisheries III - Support the fisheries Consultant services will Approved by the Executive Organization, (IDA) sector through: (a) construction and be required for detailed Directors on January 7, Government of provision of equipment and support design and construction 1992. Maldives facilities a fish freezing/cold storage supervision of project (Co-financing from Nordic complex; (b) construction of port port and fish freezing/ Development Fund (NDF), facilities and provision of collector cold storage plant, and Norway, Sweden, OPEC Fund vessels, (c) provision for improving collector vessels. and UNDP). tuna fish stock assessment; Consultant services will (d) technical assistance to develop and also be required for PPF approved for detailed start-up the proposed cold storage technical assistance, design of part, complex, and for institutional including restructuring refrigeration/cold strengthening, and to encourage of public sector storage plant and increased private sector participation fisheries enterprise and collector vessels, and in the fisheries sector. No major encouragement of private for restructuring of environmental impact is expected. sector participation. public sector fisheries Preparation and design, however, include enterprise. environmental assessment/mitigation to address impacts concerning the siting. construction and operation of shore- based facilities: and management of the coastal marine- resources and avoiding over-fishing. Environmental Assessment Category B. PAPUA NEW GUINEA To be determined 20.0 (N) Telecom IV - To strengthen the Post To be determined. Identification under way. (Bank) and Telecommunications Corporation's (PTC) ability to manage the sector efficiency, and to support the Government's investment program to telecommunications development. Environmental Assessment Category: To Be Determined. Department of 10.0 Forestry - To support institutional To be determined. Preparation under way. Forestry (Bank) restructuring-of the forestry sector and other components of the national forest plan. Environmental Assessment Category- A. - 60 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project Consulting Services Action on Procurement PAPUA NEW GUINEA (Cont'd) Department of 11.5 (R) Petroleum Development Technical Consulting services will Negotiations tentativel Mines and Energy, (Bank) Assistance - Technical and economic be required for scheduled for April 195 Government of studies for evaluation of downstream technical and economic Papua New Guinea projects. Review of procedures for . studies, review of evaluation of applications for petroleum procedures, and development licenses, and strengthening institution building. of institutions involved with petroleum exploration and development. Environmental Assessment Category B. To be determined 8.0 Population - Assists Government's To be determined. Project preparation unc (Bank) population policy through: way. (a) strengthening family planning service delivery; (b) promoting demand for family planning; (c) strengthening institutional capacity to develop population policy and direct/manage family planning activities; and (d) improving demographic information base. Environmental Assessment Categorv 2. National 30.0 (R) Education Development Project - Consulting services will Appraisal report under Department of (Bank) Construction and equipping of one likely be required for preparation. Education national high school, school project management. maintenance, regional planning and teacher support services. Environmental Assessment Category C. Department .of 32.8 (R) Oro Smallholder Oil Palm Development To be determined. Negotiations tentative Agriculture and (Bank) - To develop about 6,500 ha of land in scheduled for April 19 Livestock Oro Province into smallholder oil palm - farms. The appraisal mission and government of Papua New Guinea discussed three main environmental issues: factory effluent treatment which should be upgraded choice of project area outside of primary forests: and protection of an endangered butterfly. In addition sound agro-chemical usage and soil protection procedures are to be provided for. Environmental Assessment Category B. PHILIPPINES National Power 365.0 (R) Leyte Geothermal Power - To meet Consultants are Appraisal departure Corp. and (Bank) increasing power demand in Luzon at completing final scheduled for Philippine lowest cost by utilizing geothermal engineering. September 1992. National Oil Co. resources in Leyte. Project will A major reform prograr include: (a) development of Leyte including institution Geothermal;(b) construction of about corporate and financi2 440 MW power generating capacity; and, measures, is under wa: (c) the Leyte-Luzon transmission line. (Cofinanciers' meetin Environmental assessment under for US$1.0 billion preparation. Environmental Assessment scheduled for April Category A. 1992.) (Possible financing f: the Global Environmen Facility (GEF) -- see Annex C.) -61 - Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lender - Project 3 Consulting Services Action on Procurement 4 PHILIPPINES (Cont,d) Premiumed Central 70.0 (R) Third Municipal Development - Consultants have been Negotiations completed. Project Office (Bank) Project will strengthen institutional selected. Board presentation framework developed under Bank's First scheduled for March 31, and Second Municipal Development 1992. projects to provide local governments with access to loan financing to meet their investment needs. Environmental Assessment Category B. Metro Manila 80.0. (R) Metro Manila Solid Waste Local consultants have Appraisal departure Authority (NMA) (Bank) Management - Would include: been engaged. scheduled for September (a) development of two sanitary 1992. landfills; (b) construction of four transfer stations; (c) procurement of transfer trucks and equipment for landfill operations; (d) rehabilitation of maintenance workshops; and (e) technical assistance for operations and management of solid waste operations and related studies. Environmental Assessment Category A. Local Water 40.0 Second Water Supply, Sewerage and Consultants have been Project preparation is Utilities (Bank) Sanitation Sector - To assist the selected. under way. Administration Government in meeting basic needs of (LWUA) urban population through provision of safe, adequate, easily accessible water supplies through implementation of extensions of systems in some 50 towns. Institutionally, the project would seek to accomplish major sectoral and institutional reforms to improve the capabilities and sustainabirity of urban water supply operations and maintenance, development, financing and cost recovery. The feasibility of privatization would be considered. Environmental Assessment Category B. Department of 35.0 (R) Tax Computerization Study - Would Initial studies being Two IMF technical Finance (Bank) improve administration of all taxes in prepared by consultants assistance missions the Philippines by establishing an hired by ADB.. Projects provided assistance on integrated, computerized tax system. for technical assistance improved procedures and Environmental Assessment Category C. financed by additional organization. Japanese Grant remaining components and bidding specifications will be received by March 1992. Department of 70.0 (R) Urban Health and Nutrition - To To be determined. Pre-appraisal mission Health (Bank) assist the Government to expand and scheduled for end March improve public health and nutrition 1992. services for.high-risk urban slum dwellers, especially women and children, in Metro Manila, Cebu and Cagayan de Oro. Environmental Assessment Category C. 62- Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender 2 Project s Consulting Services Action on Procurement PHILIPPINES (Cont,d) National 75.0 Irrigation Operations Support TI - To be determined. Project preparation und Irrigation (Bank) Second Phase of nine-year operations and way. Administration maintenance support program, with (NIA) special emphasis on development of irrigator associations to assume direct responsibility for operations and management of parts of all major national systems. Environmental Assessment Category B. Department of 80.0 Rural Infrastructure - To reduce poverty Consultants have Project preparation und Public Works and (Bank) and accelerate development in the rural completed preparation. way. Highways (DPWH) areas through: (a) provision of basic infrastructure (rural roads, minor drainages, etc.) through improved targeting of DPWH investments in line with the geographical distribution of poverty; and (b) employment generation in construction through increased civil works. Environmental Assessment Category B. Department of 25.0 (R) Land Reform Support - To provide Consultants have been Project preparation unc Agrarian Reform (Bank) managerial, technical and financial selected. way. (DAR) assistance to smallholder beneficiaries (Japan T.A. Grant of agrarian reform; as well as to Facility has committed smallholder outgrowers in the vicinity funds for preparation of estates to be transferred. assistance.) Environmental Assessment Category B. National 90.0 (R) Rural Electrification - A consultancy for a Approved by the Execut. Electrification (Bank) Revitalization project to finance the rural electrification Directors on February Administration uncovered portion of the Sector's master plan has begun 1992. Loan .signing (NEA) investment program for 1992-94. The using USAID financing. tentatively scheduled loan would include components for The same consultancy end March 1992. financing institutional development for will address accounting NEA and the Rural Electric Coops (REC). weaknesses in some 40 Environmental Assessment Category C. RECs. Other consultancies to be determined. Department of 30.0 Technology Development - The project Twinning arrangements Project preparation un Science and (Bank) would stimulate more rapid technology required for project way. Technology development in industry through building implementation. links between key technology institutions and industry, and through creation and restructuring of key institutions in the technology infrastructure. No adverse environmental effects. Environmental Assessment Category C. -63- Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender 2 Project Consulting Services Action on Procurement 4 PHILIPPINES (Cont'd) National Manpower 35.0 Second Vocational Training - Consultant services will Negotiations tentativel3 and Youth Council (IDA) (a) Strengthening the policy, planning, be required. scheduled for March 23, (NMYC) management, research and evaluation 1992. capacity of the National Manpower and Youth Council: (b) improving training standard and cost recovery; (c) rehabilitating existing facilities and expanding training program; and (d) undertaking a sector project preparation study. Better trained technicians are expected to assist with environmental control systems and the project would also attempt to increase . access to technical training for women. Environmental Assessment Category C. Philippine Long 134.0 (R) Telephone System Expansion - Provide Consulting requirements Negotiations tentativel, Distance Telephone (Bank) long distance telecommunications are expected to be scheduled for April 15, company (PLDT) equipment, telephone exchanges and minimal. Prequalifica- 1992. cables for about 100,000 new telephone tion application for lines in PLDT's system throughout the outside plant supply to Philippines. Environmental Assessment be called shortly. Category C. SOLOMON ISLANDS Ministry of 5.0 Third Education - To assist with: To be determined. Preparation under way. Education and (IDA) (a) consolidation of primary schools; Human Resources (b) primary teacher in-service training; (MEHRD) (c) upgrading the quality of existing secondary schools; (d) the supply of educational materials: (e) management and planning training and (f) in the health sector training of nurses and health workers. Environmental Assessment Category C. Ministry of 2.8 Housing - To formulate housing and Consultants are being Identification mission Housing and (IDA) urbanization policies, strengthensector selected by UNCHS for completed. Government Government institutions and provide affordable project preparation agreed with UNDP and Services housing to low-income families. study. UNCHS on project Environmental analysis is included as preparation study. part of project preparation study. (Cofinancing of Environmental Assessment Category B. US$2.5 million has beer secured from EDF.) THAILAND Metropolitan 108.0 Distribution System Improvement & To be determined. Pre-appraisal mission Electricity (Bank) Expansion - Project involves expansion completed. Appraisal Authority (MEA) of MEA's distribution system from 1992 mission scheduled for to 1993, including construction of April 1992. transmission and distribution lines and substations. Environmental Assessment Category B. -64- Member Country, Amount & Implementing Probable Stage of Processing a Agency Lender 2 Project s Consulting Services Action an Procurement lTHAILAND (Cont,d) Petroleum 105.0 (R) Gas Transmission - To utilize Consultant services will Appraisal report unde: Authority of (Bank) natural gas reserves in the Gulf of be required for preparation. Thailand (PTT) Thailand to meet the increasing energy implementation. Negotiations tentativi demand in the central and southern scheduled for April 1' regions. Environmental assessment report completed. Draft is being Procurement: Letter i reviewed. Environmental Assessment intent for procuremen Category A. linepipe issued. Retroactive financing up to US$10.0 million being considered for partial payment of linepipe. Ministry of 177.5 (R) Fourth Highway Sector - Would Consulting services will Approved by the Execu Transport and (Bank) continue support for country's highway be required for Directors on March 19 Communications development program for the 1992-96 plan supervision and 1992. period. Would also support implementation of action implementation of measures to improve -plans. road traffic safety, reduce vehicular air and noise pollution, and improve efficiency of road transport industry. Environmental Assessment Category B. Ministry of 40.0 (R) Industrial Pollution Control - To Contract with Government implementi Industry (Bank) treat industrial waste water, consultants to be signed satisfactory reforms. particularly hazardous waste water and momentarily, financed-by Project preparation u heavy metals which are most serious Japanese Grant. way. environmental risks for the country and Danish International the Gulf of Thailand. Government has - Development Agency approved new environmental law. (DANIDA) trust fundin Environmental Assessment Category: To approved for Be Determined. institutional studies Ministry of 32.0 (R) Tax Computerization - The project Crown Agents (UK) Approved by the Execu Finance - Revenue (Bank) would set modern tax procedures, financed by the Directors on February Department implement a value added tax and improve Government are assisting 1992. Loan was signe the overall tax administration by with project February 21, 1992. providing adequate software and hardware implementation. for all tax charges. Environmental Assessment Category C. Agricultural Land 50.0 Land Reform and Forest Protection - To be determined. Project preparation t Reform Office (Bank) Project consists of two major way.. (ALRO), Royal components: (a) to provide social, . (Japan T.A. Grant Forestry infrastructural and production support Facility has committe Department (RFD) to occupants of degraded public forest funds for preparatior lands alienated for agriculture; and assistance. Cofinanc (b) the demarcation and protection of also being sought frc priority conservation forests, wildlife Global -Environment Ft sanctuaries and national parks. Environmental Assessment B. - 65 - Member Country, Amount & Implementing Probable Stage of Processing and Agency - Lender 2 Project 3 Consulting Services Action on Procurement 4 THAILAND (Cont'd) Provincial 40.0 Distribution System Upgrading - To Consultants are in Approved by the Executiv Electricity (Bank) upgrade PEA's transmission system. place. Directors on Authority (PEA) Environmental Assessment Category B. September 24, 1991. (Possible financing from the Global Environment Facility (GEF).) TONGA To be determined 2.0 Petroleum Exploration Technical To be determined. Identification under way (IDA) Assistance - Scope.of project to be determined. Environmental Assessment Category: To Be Determined. VANUATU Department of 4.0 (R) Petroleum Exploration Promotion and Consulting services will Project preparation unde Geology and Mines, (IDA) Geothermal Development Technical be required for seismic. way. Government of Assistance - Seismic surveys and surveysi geochemical Vanuatu geochemical studies to determine-the studies, economic and hydrocarbon potential of offshore financial studies for sedimentary basins; economic and geothermal development, financial evaluation of geothermal drafting of legislation, resource development; and promotion of regulations and model hydrocarbon exploration and agreements, project strengthening of involved institutions. management, and Environmental Assessment Category B. hydrocarbon exploration promotion. - 66 - Member Country, Amount & Implementing Probable Stage of Processing a Agency Lender 2 Project I Consulting Services Action on Procurement III. EUROPE AND CENTRAL ASIA REGION AL.BANIA S To be determined 7.5 (N) Human Resources I - Human Resources To be determined. Project not yet (IDA) and support for the reform of social identified. security and unemployment compensation schemes and for development of proactive employment services. Environmental Assessment Category C. To be determined 20.0 (R) Critical Imports - Project will To be determined. Project preparation t (IDA) finance the priority import requirements - way. Appraisal missi of key economic sectors. Environmental tentatively schedule Assessment Category C. April 1992. BULGARIA Ministry of 215.0 (R) Debt and Debt Service Reduction To be determined. Project under Finance (Bank) (DDSR) - Project will reduce the preparation. external debt service obligations of the Government to'a level compatible with growth and the restoration of creditworthiness over the medium-term. Environmental Assessment Category: To Be Determined. To be determined 150.0 Sector Adjustment II/Private Sector To be determined. Preparation under wa; (Bank) Development (SAL II/PSD) - Project will: (a) strengthen the framework for private sector development; and (b) support creation of new private sector activities and privatization of state enterprises. Environmental Assessment Category C. To be determined About (R) Human Resources I (formerly Human To,be determined. Identification missi 50.0 Resources I (Education)) - To develop scheduled for April (Bank) educational assessment capability, upgrade educational resources, and support restructuring of higher 'education and research. Also, employment promotion, components still to be identified. Environmental Assessment Category C. To be determined 100.0 (R) Energy/Environment - Likely to To be determined. Project identificati (Bank) support improvements in the power sector mission in the field possibly including nuclear safety (Cofinancing will be equipment, completion of a hydro required.) project, improvements in district heating, automated dispatch equipment and assistance to the main coal mines. Environmental Assessment Category B. -67- Member Country, Amount & Implementing Probable Stage of Processing an Agency ' Lender 2 Project -Consulting Services Action on Procurement BULGARIA (Cont'd) To be determined About (R) ISAL (formerly Enterprise Reform and To be determined. Project preparation un 100.0 Private Sector Development) - To support way. (Bank) creation and growth of private (Cofinancing may be enterprises, privatization and required.) restructuring of state firms, and export development. Environmental Assessment Category C. Bulgarian National 100.0 (R) Financial Sector Adjustment - To To be determined. Identification mission Bank (Bank) support the modernization and postponed. strengthening of the Bulgarian financial system and to improve its ability to mobilize and allocate financial resources efficiently. Environmental Assessment Category C. To be determined About (R) Agricultural Development - To assist To be. determined. Appraisal mission 50.0 in increasing and stabilizing agricul- tentatively scheduled (Bank) tural production for domestic supply and June 1992. export of primary and agro-processed- production through increased mechanization. Environmental Assessment Category B. CZECHOSLOVAKIA Slovak Power About Second Power and Environmental Consulting services will Project preparation ur Enterprise 150.0 Improvement - Project will provide for: be required for auditing way. Appraisal missic (Bank) (a) priority investment/upgrading in and corporate tentatively scheduled Slovakia, Industry and Redevelopment of restructuring of SEP, October 1992. Vojanv Power Station; (b) pollution - the borrower. control for De-nox waste disposal: (c) transmission system upgrading; (d) system control center upgrading; and (e) training cqnsultancy. Environmental Assessment-Category B. To be determined 125.0 Agroindustry - Scope of operation likely To be determined. Project identificator (Bank) to include investments and technical postponed. assistance for restructuring of agroindustrial enterprises. Environmental Assessment Category: To Be Determined. To be determined About (R) Telecommunications - Supports To be determined. Appraisal report undei 190.0 expansion and strengthening of national preparation. (Bank) trunk and international networks to Negotiations tentativi improve congested telecommunications scheduled for May 199d services and provide service to (Cofinancing from EBRI businesses. Includes institutional and EIB expected.) strengthening of telecommunications enterprises and relevant government agencies. Environmental Assessment Category C. Czech Power About Power and Environmental Improvement - To be determined. Appraisal report undel Enterprise 246.0 Supports rehabilitation of existing preparation. (Bank) facilities, including environmental Negotiations complete( component to improve air quality, and Board presentation technical assistance for institutional planned, for early Apr: development. Environmental Assessment 1992. Category B. Retroactive financing will be requested. -68- Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lender . Project Consulting Services Action on Procurement CZECHOSLOVAKIA (Cont'd) To be determined About (R) Environment - Scope of this To be determined. Project preparation und 150.0 operation likely to include support for way. Appraisal mission (Bank) institutional development, technical tentatively scheduled f assistance for strategic and pre- June 1992. investment studies, and investments in - (Possible financing fro areas of municipal services, hazardous the Global Environment waste disposal facilities, and -Facility (GEF) -- see reclamation of mined lands. Annex C.) Environmental Assessment Category A. HUNGARY Ministry of 120.0 (R) Health - Would assist the Government To be determined. Project preparation und Welfare (Bank) in restructuring the health sector and way. Pre-ppraisal , strengthening the institutional capacity mission scheduled for of the Ministry of Welfare and National March 16, 1992. g Social Insurance Administration through reforms in public health promotion, primary health care delivery, rationalization of hospital care and health care management and financing. Environmental Assessment Category: To Be Determined. To be determined 100.0 (R) Product Market Development - Would To be determined. Negotiations tentative] (Bank) provide financing for enterprises to scheduled for April 19i restructure their wholesaling and retailing operations and define a medium-term strategy for the development of the trading industry. Environmental Assessment Category B. National Bank of 200.0 (R) Enterprise Reform - Support for Consulting services Board presentation Hungary (Bank) efficient restructuring on the public will not be required. scheduled for April 7, enterprise sector, including enterprise 1992. governance reform and a realistic privatization program. Environmental Retroactive financing Assessment Category C. up to US$40.0 million i expenditures incurred after December 15, 199: have been requested. To be determined 150.0 (R) Transport Sector - To alleviate To be determined. Preparation under way. (Bank) environmental impact of growing Appraisal mission transport, and restructure the railways. tentatively scheduled Project components likely to include April 1992. continuation of road strengthening program, railway electrification, intermodal facilities, rail track upgrading, and modernization of marshalling yards. Environmental Assessment Category C. To be determined About (R) Second Financial System Consulting services Preparation under way. 100.0 Modernization - Will follow up on first will be required for Appraisal mission (Bank) project, including support for: project preparation and scheduled for June 199 (a) commercial banks in areas of processing. institutional and MIS development and strengthening of portfolios (b) banks supervision agency; and (c) further development of securities marketl including strengthening of institutional investors. Environmental Assessment Category C. - 69 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project s Consulting Services Action on Procurement4 HUNGARY (Cont'd) To be determined 150.0 Energy Environment - To support' Consulting services Preparation under way. (Bank) development and implementation of will be required for Appraisal tentatively appropriate environmental policies in project preparation scheduled for July/ the power sector, and finance power implementation. August 1992. generation, selective expansion of capacity, dispatching and distribution, upgrading emission control equipment and some district heat upgrading. Environmental Assessment Category A. POLAND Ministry of 350.0 (R) Forestry Development - To implement To be determined. Project preparation bei Environmental (Bank) a program of environmentally sound completed. Protection, forest management through the Natural Resources restoration of damaged forest areas and Forestry afforestation, intensification of silvicultural treatments, and privatization of sector activities. Environmental Assessment Category B. To be determined 175.0 Second Transport - Project would finance To be determined. Project preparation und (Bank) a time slice of the railway and roads way. investment program and in addition would ' (Cofinancing may be- include modernization/ required.) expansion of border crossing points, intermodal transport development and road access to Gdansk/Gdynia ports in order to assist Government efforts to improve exports relating to deficient infrastructure. Environmental Assessment Category C. Ministry of Health About (R) Health - To support the Government's Consulting services will Negotiations completed. 130.0 program for health system reform and be required. Board presentation (Bank) restructuring, through heilth promotion, scheduled for April 28, development of primary health care, 1992. health policy and management and A PPF of US$1.5 millior creation of regional health services. has been approved. Environmental Assessment Category C, except for Remional Health Services which is Category B. Ministry of 250.0 (R) Agricultural Sector Adjustment - To To be determined. President's report unde Agriculture and (Bank) support Government reforms in the preparation. Food Economy agricultural sector. Environmental Negotiations expected I Assessment Category C. April 1992. (Financing of technical assistance by EC-PHARE under negotiation.) To be determined 150.0 (R) Cogeneration - Privatisation of Consulting services may Project preparation unt (Bank) combined heat and power plants. be required for way. Appraisal missior Environmental Assessment Category B. feasibility studies. tentatively scheduled I May/June 1992. To be determined About Industrial Environment - Support for To be determined. Project preparation un< 150.0 privatisation and restructuring of major way. (Bank) industrial polluters. Environmental (Cofinancing from EBRD Assessment Category B. possible.) -70- Member Country, Amount & Implementing Probable Stage of Processing an Agency Lender Project Consulting Services Action on Procurement POLAND (Cont'd) Polish Development About (R) Private Enterprise Development - To be determined. Board presentation Bank 62.0 Line of credit for efficient investments scheduled for April 19 (Bank) for start-up and expansion of private sector enterprises, and technical assistance for institutional development. Total project cost is about US$187.2 million, of which US$125.1 million in foreign exchange. Environmental Assessment Category B. Ministry of About (R) Financial Sector Adjustment - To be determined. Project preparation ur Finance 300.0 Further support for the government's way. Appraisal missic (Bank) economic transformation program tentatively scheduled focussing on restructuring of the June 1992. financial sector. Environmental (Cofinancing with EBRI Assessment Category C. possible.) Ministry of About (R) Housing I - To support development Consultants for Appraisal report' Special Economy 200.0 of a market-based housing system through assisting in project completed. Negotiati and Construction (Bank) the creation of housing finance implementation scheduled for April 11 services, and an increased role for the preparation from (Cofinancing under private sector in housing construction. Japanese Grant Facility, preparation.) Environmental Assessment Category C. USAID, UNDP, and others. ROMANIA Ministry of 100.0 (N) Education - To support reform Consulting services will Preparation completed Education (Bank) implementation in: (a) educational be required. Pre-appraisal mission assessment/testing; (b) primary and scheduled for June 19 secondary curriculum and teaching quality: (c) educational materials; and (d) education management and financing. Environmental Assessment Category C. RENEL 150.0 (R) Energy/Environmental - The Consulting services will Project identificatio (Bank) objectives of the project are to provide be required and will be mission completed. assistance to RENEL (the power.utility) identified during (Cofinancing will be for: (a) rehabilitation of thermal project preparation. requested.) power plants; (b) implementation of actions to mitigate environmental degradation; and (c) upgrading its institutional capabilities. Environmental Assessment Category B. To be determined 100.0 (R) Financial Sector Adjustment - This To be determined. Pre-appraisal.tentati (Bank) proposed project is tentatively scheduled for mid-Apr structured as a hybrid operation 1992. comprising two components: (a) a policy-based component for general balance of payments support: and (b) a technical assistance/automation component to finance the institutional strengthening and infrastructure development of the capital market institutions and banking system. Environmental Assessment Category C. - 71 - Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lender Project Consulting Services Action on Procurement ROMANIA (Cont'd) To be determined 100.0 (R) Employment and Social Assistance To be determined. Identification completed. (Bank) (formerly Employment Assistance) - Preparation mission Development of employment, training and planned for June 1992. social assistance services to ease transition to a market economy. Environmental Assessment Category C. Ministry of 150.0 (IR) ISAL Enterprise Reform - Policy- To be determined. Project preparation undex Economy and (Bank) based operation to support Government's way. Appraisal mission Finance, Ministry strategy to restructure the industrial tentatively scheduled for of Resources and and corporate sector and stimulate . June 1992. Industry, National private sector development including (Cofinancing may be Agency for policy, regulatory and institutional required.) Privatization and aspects, and technical assistance. Small and Mid-Size Environmental Assessment Category C. Enterprises To be determined 100.0 (R) Private Farmer and Enterprise Agricultural Economist, Appraisal report under (Bank) Support - Medium and long term credit to Marketing Specialist preparation. private farmers and to viable rural, consultants, and (Support financing from small and medium enterprises. Also, Agricultural Credit EC-PHARE for parallel parallel institutional support and Specialist from Japanese activities being technical assistance. Environmental Trust Funds. arranged.) Assessment Category B. Ministry of 350.0 (R) SAL - Support policy reform for Consulting services Appraisal mission in the Finance (Bank) development of a market economy, will not be required. field. deregulation, reduction in the role of the state and development of the private sector. Environmental Assessment Category C. TURKEY TSKI 400.0 (N) Third Water Supply and Sewerage - Feasibility study Identificaiton mission (Bank) Water supply, sewerage and drainage expected to be financed scheduled for May 1992. system. Environmental Assessment by Nordik Investment Category B. Bank. Treasury 9.0 (R) Technical Assistance for Treasury Consulting services will Negotiations (Bank) Data System - Project aims to strengthen be required. substantially completed. economic policymaking and management by improving the Treasury's data systems. Environmental Assessment Category C. Ministry of Health 120.0 (R) Health III (formerly Health)- Consulting services will Preparation mission (Bank) Project will strengthen and decentralize likely be required for scheduled for April 1992. public health services in implementation. Central/Eastern Anatolia. Environmental Assessment Category: To Be Determined. Antalya About (R) Antalya Environment - Project would Consulting services will Second preparation Municipality 150.0 include water supply, sewerage, solid be required for mission scheduled for (Bank) waste and coastal zone management preparation and April 1992. components and assist the Antalya execution. Proposals Municipality in establishing an have been invited from appropriate policy and institutional short-listed firms. framework for environmental management. Environmental Assessment Category B. - 72 - Member Country, Amount & Implementing Probable Stage of Processing and Agency - Lender 2 Project Consulting Services Action on Procurement TURKEY (Cont'd) Ministry of 150.0 Basic Education - Project would support Consultants likely to be Preparation under way. National Education (Bank) the expansion of basic schooling (Grades required for through 8) to improve system coverage implementation. and relieve overcrowded schools, with particular effort to raise the school attendance of girls. Environmental Assessment Category C. Cukurova Elektrik 262.0 Berke Hydro Power - Would provide for Consultant has been Negotiation papers under A.S. (CEAS) (Bank) installation of 510 MW hydro power plan selected for project preparation. Appraisal comprising three units of 170 MW each. preparation design, and report under preparation Would comprise the construction of a supervision of the (Cofinancing from IFC.) double curvature, thin arch over 201 m project implementation. height, an headrace tunnel of 2.0 km length and an inside diameter of 9 m, and an underground power plant. Environmental Assessment Category A. To be determined About Coal Pollution Abatement - Pollution Consulting services will Preparation mission 120.0 abating investments for power stations. be required for, scheduled for March 1992 (Bank) Environmental Assessment Category B. preparation and (Cofinancing,expected.) implementation. To be determined About (R) Financial Sector Investment - To To be determined. Project has been removed 150.0 develop capital markets by improving from the Lending Progran (Bank) market efficiency and financial prudence Further reporting will b and by supporting institutional discontinued. investors and market facilities. Environmental Assessment Category B. Ministry of About (R) E. Anatolia Watershed Rehabilitation Consultants have been Appraisal 'scheduled for Agriculture and 100.0 - Improved erosion control, recruited to assist with June 1992. Rural Affairs, (Bank) reforestation, sustainable dry land preparation. Consultants (Japanese Grant of Ministry of farming and pasture management programs may also be required to US$326,000 equivalent tc Forestry concentrating on Eastern Turkey; also assist in execution. assist in project studies and research. Positive preparation.) environmental impact expected. Environmental Assessment Category C. Ministry of Health About Health II - Creation of a National To be determined. Preparation mission 80.0 Hygiene Institute and support for scheduled for April 1991 (Bank) development of a regional network to public health laboratories. Environmental Assessment Category C. - To be determined About (R) Employment and Training - To support Consultants will be Negotiations awaiting 60.0 development of employment-oriented required for execution. Government commitment oi (Bank) training, improvement of labor market proposed actions. information, career guidance counseling, improved employment services occupational- standard development, and promotion of women's employment. Environmental Assessment Category C. - 73 - Member Country, Amount & Implementing Probable Stage of Processing and Agency 'Lender roject s Consulting Services Action on Procurement TURKEY (Cont'd) Bursa Municipality About (R) Bursa Environment - The project will Consultants for Appraisal mission and Buski 125.0 provide sewerage, water supply and solid feasibility study for scheduled for May 1992. (Bank) waste management facilities, and will solid waste, and assist in strengthening policies and feasibility studies for Retroactive financing is institutions, to control causes of sewerage and water expected. environmental degradation. supply are expected to Environmental Assessment Category B. complete their work at the end of February 1992. Local government intends to invite proposals for detailed design. Ministry of About (R) Agricultural Research - Civil works, Consulting services will Negotiations tentatively Agriculture and 53.0 equipment and fellowships to assist in be required to assist scheduled for early April Rural Affairs, (Bank) strengthening Turkey's agricultural Government in 1992. Ministry of research programs, concentrating on strengthening research Forestry programs of benefit to the less coordination and developed regions. Project expected to planning, coordination include research in support of better of overseas training, environmental practices. Environmental and assisting specific Assessment Category C. research programs. Ministry of About (R) Southwest Coast Environment - Consultant has prepared Preparation mission is Tourism 150.0 Sewerage and sewage treatment draft town reports. scheduled for May 1992. (Bank) facilities, water supply facilities, Consultants will also be solid waste facilities, and training and required for subsequent technical assistance for selected detailed design, locations along the country's construction southwestern Mediterranean and Aegean supervision, and other Coasts. Project will bring about major technical assistance. improvements in environment by reducing pollution of sea and.shore, and risk of contamination of water supplies. Environmental Assessment Category B. YUGOSLAVIA City of Belgrade About Belgrade Environment - Support for To be determined. Preparation under way. 200.0 expansion of water supply system and (Bank) upgrading of sewerage system. . Retroactive financing of Environmental Assessment Category B. up to US$10.0 million is under consideration. Ministry of About Environment--Rijeka - Support for To be determined. Project is ready for Environmental 100.0 improving health and enhancing planned negotiations, but -furthex Protection (Bank) tourism in Rijeka Bay area and Istria processing is on hold. Coastal areas by reducing air and water pollution, improving water supply, Retroactive financing of improving management,of solid waste and up to US$16.0 million is historic monument preservation. under consideration. Environmental Assessment Category B. Montenegro Coast About Montenegro Coast Water Supply & To be determined. Preparation on hold Organization for 50.0 Pollution Control - Would provide water pending resolution of Water Supply & (Bank) supply for tourism development and international waterway . Sewerage (CPRVK) pollution control facilities for issue. . protection of environment. To include water and waste treatment facilities, Retroactive financing of water distribution and sewage collection US$5.0 million to cover networks, and institutional development. - civil works is under Environmental Assessment Category B. consideration. - 74 - Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lender 2 Project Consulting Services Action on Procurement 4 IV. LATIN AMERICA AND CARIBBEAN REGION ARGENTINA To be determined 300.0 (R) Financial Sector Development Ln. Consulting services will Pre-appraisal mission in (Bank) (formerly Private Sector Development be required in Bank the field. Cr.) - Supports private sector supervision capital investment and financial sector and market development, and capital market development. financial and investment , Environmental Assessment Category: To policies. Be Determined. Ministry of 300.0 (R) Public Enterprise Reform II - Consultants have been Appraisal mission Defense (Bank) Consolidation of public enterprise sale identified and are being scheduled for March 23, and restructuring programs. financed by Japanese 1992. Environmental Assessment Category B. . Grant and PEREL. Direceion General 20.0- (R) Second Tax Administration - To Consulting services Board presentation Inpositiva (DGI) (Bank) complete the modernization process of will be required for scheduled for April 14, the Direccion General Impositiva (DGI), development of software 1992. Argentine's main revenue agency. The and management project will cover a four-year consulting development institutional infrastructure development services. on all aspects of DGI. Environmental Assessment Category C. Yacimiento 28.0 (R) Hydrocarbon Engineering - Consulting services will Approved by the Executiv Petroliferos (Bank) Preparation of necessary engineering and be required. Directors on November 19 Fiscales (YPF) cost estimates for projects to be 1991. Loan was signed o financed under the hydrocarbon sector March 12, 1992. rehabilitation loan. Environmental Assessment Category B. Ministeric de 400.0 (R) Social Security Reform - Systemic To be determined. Preparation under way. Economia (Bank) reform of pension insurance with the objectives of: (a) making it financially.viable; (b) removing labor market distortions and social inequities; and (c) generating long-term savings contributing to capital market development. Environmental Assessment Category C. Ministerio de 150.0 Maternal Child Health and Nutrition - Consultant services will Project preparation unde Salud y Accion (Bank) Human resource maintenance through be required. way. Social health and nutrition support for vulnerable groups. Environmental Assessment Category C. Yacimientos 200.0 (R) Hydrocarbon Sector Rehabilitation - Consultant services will Project has been removed Petroliferos (Bank) To expand private and public investment be required. from the Lending Progran Fiscales (YPF) so as to increase hydrocarbon reserves Further reporting will I and production, improve operational discontinued. efficiency in refineries for energy conservation and pollution reduction, and upgrade exports. Environmental Assessment Category B. - 75 - -Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project' Consulting Services Action on Procurement 4 ARGENTIN1A (Cont'd) Direccion Nacional 300.0 (R) Road Maintenance - Avoidance of: To be determined Project preparation under de Vialidad (Bank) (a) costly road repair and way. reconstruction (b) unnecessary increases in vehicle operations cost. Improvement of coordination and cooperation between agencies (national and provincial). Improvement of road activity funding. Environmental Assessment Category B. Ministerio de 100.0 (R) Buenos Aires Health Development - To be determined. Preparation to be started Salud y Bienestar (Bank) The project is still to be defined. once agreement is reached Social Major institutional and policy reform on health sector orientation are envisaged, in strategy. coordination with Bank and IDB. Environmental Assessment: To be determined. Secretaria de 300.0 (R) Yacyreta II '- Completion of Yacyreta To be determined. Appraisal mission in the Energia Electrica (Bank) first six units and implementation of field. the first phase of the associated transmission system. Environmental Procurement: The civil Assessment Category A. and engineering works contracts for YACYRETA, awarded under a previous loan would likely be financed, including 1992 invoices up to US$60.0 million. BARBADOS To be determined 20.0 (R) Education III - To strengthen the To be determined. Project preparation under (Bank) post secondary technical training and way. related teacher training through provision of improved facilities, equipment, and staff training and the articulation between the training program and the labor market. Environmental Assessment Category C. Ministry of Works 18.0 Road Maintenance & Rehabilitation II - To be determined. Appraisal mission in the (Bank) Financing of a 5-year rehabilitation field. plan, safety program, technical assistance and training. Environmental Assessment Category B. BELIZE Ministry of 7.5 Belize City Municipal Infrastructure - To be determined. Project being identified. Foreign Affairs, (Bank) Project will provide: (a) strengthen- Economic ing of city financing management and Development and revenue generation (b) city transport Education network rehabilitation including streets, coastal of works and traffic management and safety; (c) rehabilita- tion of canal and drains network; and (d) improvement of municipal airports. Environmental Assessment Category B. -76- Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lender Project ' Consulting Services Action on Procurement BELIZE (Cont'd) Ministry of 8.0 (R) Private Sector Development - -To To be determined. Pre-appraisal mission Economic (Bank) provide a line of credit and technical scheduled for end Marcb Development, assistance in support of: (a) private 1992. Central Bank enterprise investment and development; and (b) policy reforms to enhance the enabling environment for sustained and efficient private sector development, and to make the financial sector more efficient and competitive. Environmental Assessment Category B. BOLIVIA To be determined 20.5 Municipal Development - Line of credit To be determined. Preparation mission in (IDA) for investment in municipal services and the field. technical assistance. Environmental Assessment Category B. To be determined 41.5 (R) Public Enterprise Reform and Private Consulting services will Project preparation un (IDA) Sector Development - Term finance for be required for assess- way. Pre-appraisal industrial sector via improved apex ment of major sector. mission scheduled for institutions, support of industrial March 1992. policy reform, and industrial recovery. Environmental Assessment Category B. To be determined 25.0 (R) Education Reform - Support the To be determined. Project preparation un (IDA) Government's planned reform of the way. Pre-appraisal education system and decentralization of mission in the field. public education services. Financing is provided Environmental Assessment Category C. a PPF of US$950,000. Fondo Nacional 5.5 (R) Environmental Technical Assistance - Consultants will be Project preparation un Para el Medio (IDA) Will strengthen key environment-related required for way. Ambiente (FONAMA) institutions; and develop the human environmental legal and resources necessary to plan, evaluate regulatory works and Financing is provided and implement action programs and environmental impact a PPF of US$680,000 at develop an effective legal and assessment. Japanese Grant Facilit regulatory system for environmental of US$314,000. protection and natural resource management. Environmental Assessment (Financing of Category C. US$8.0 million is alac expected from GEF.) To be determined 35.7 (R) Environment, Industry and Mining - To be determined. Project preparation ur (IDA) Further support for mining sector reform way. program and development of private sector in an environmentally sound manner. Environmental Assessment Category A. Ministry Transport 50.0 Road Maintenance Rehabilitation II - Technical assistance Appraisal report undei and Communications (IDA) Maintenance and rehabilitation of the extended for the road preparation. road network, following program worked maintenance financing out applying the maintenance management study. system (SAM) and the equipment management system (SAE). Environmental Assessment Category B. - 77 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project 3 Consulting Services Action on Procurement BOLIVIA. (Cont'd) Yacimientos 160.0 Power/Gas Pipeline - To increase exports Consultants will be Loan processing put on Petroliferos (Bank) by the sale of electricity to Brazil, required for hold until April 1992. Fiscales burning Bolivia natural gas, and to construction, Letter of Intent of Bolivianos (YPFB); support gas field development. The supervision, and November 26, 1991 on the Empresa Nacional project will consist of building a gas- project management. sale of Bolivian natural de Electicidad fired power plant near the Brazilian gas to PETROBRAS (Brazil) (ENDE) border and its associated gas pipeline has led to delay. from Santa Cruz and providing technical Resolution possibly by assistance for exploration promotion and mid-April 1992. institutional strengthening of YPFB and (JEXIM has confirmed ENDE. Environmental Assessment Category interest in financing A. original project.) Retroactive financing of up to 10% of the loan is being considered. Ministry of 22.5 (R) Agro Export Development Program Invitations for Approved by the Executive Agriculture (IDA) (AEDP) - Develop agricultural and management are currently Directors on December 19, livestock products for export and being evaluated. 1991. Credit was signed establish the Bolivia Export Development on March 4, 1992. Foundation (BEF) to manage the project. Environmental Assessment Category B. BRAZIL Banco de 130.0 (R) Water Quality and Pollution Control To be determined. Appraisal mission Desenvolvimento de (Bank) (Minas Gerais) - To assist sector scheduled for April 27, Minas Gerais authorities in most congested areas to 1992. (BDMG) develop methodologies to tackle the cleaning of environment, and specifically to save the scarce water sources for human consumption and agriculture. Environmental Assessment Category A. Banco de 250.0 Minas Municipal Development - Introduce To be determined. Project preparation under Desenvolvimento de (Bank) policy and institutional reforms in way. Minas Gerais selected municipalities and municipal water companies in the State of Minas Gerais; and improve services in selected urban subsectors. Total project cost is US$300..0 million. Environmental Assessment Category: To Be Determined. Ministry of Social 75.0 (R) Early Childhood Development - To To be determined. Identification mission Action (Bank) support expansion of access to child scheduled for October care and other child development 1992. programs for children ages 0 to 6 years in low income families. Environmental Assessment Category C. INFRAERO 100.0 INFRAERO Reform - Finance time-slice of To be determined. Project under (Bank) INFRAERO's investment program and preparation. support sectoral regulatory reforms. Environmental Assessment Category: To Be Determined. -78- Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lender Project' Consulting Services Action on Procurement BRAZIL (Cont'd) Ministerio Infra- 200.0 Telecom Reform - Assists with To be determined. Project under Estrutura (Bank) restructuring, modernization and preparation. expansion of telecommunications services. Will also finance a time- slice of secto; investment program and address sector-wide policy issues. Environmental Assessment Category: To Be Determined. Companhia Vale Up to (R) CVRD Environment - Supports the To be determined. Appraisal mission in th do Rio Doce 105.0 environmental program of Compania Vale field. (Bank) do Rio Doce (CVRD) which includes: (Possible financing fr * (a) an industrial and mining pollution other donors.) control component (b) natural resources component and (c) a research and development component for the preservation of ecosystems. Environmental Assessment Category B. Departamento 250.0 Federal Highway - Will support Consulting services Project preparation un( Nacional de (Bank) decentralization of highway will be required for way. Estradas de. administration and private sector engineering and work Rodagem (DNER) involvement in highway construction, supervision, and for operation and maintenance. Would also institutional help finance the federal highway strengthening. rehabilitation and maintenance programs. Environmental Assessment Category B. Ministry of Up to (R) Northeast Basic Education II - Will To be determined. Appraisal mission Education and 150.0 support basic education in five scheduled for June 15, States (Bank) northeast states. Environmental 1992. Assessment Category C. (Cofinancing of US$1.4 million has bee approved with Japanese Grant Facility.) Secretaria de 75.0 Land Management IV (Mato Grosso do To be determined. Project preparation un Agricultura, (Bank) Sul) - To improve natural resources way. Pecuaria e protection in Pantanal's watershed and Abastecimento do generate sustainable productivity gains Estado de Mato through improved land management and Grosso do Sul soil conservation in the State of Mato (SECAP-MS) Grosso do Sul. Environmental Assessment Category D. Ministeric de Up to Transport Sector Reform - Assist To be determined. Preparation under way. Infras-Estrutura 275.0 Government in implementing a package of Secretaria (Bank) regulatory reforms across the transport Nacional dos . sector, including a privatization Transportes program, and in financing high priority investments included in the federal transport program. Environmental Assessment Catemory B. Brazilian Urban Up to (R) Metropolitan Transport - Sao Paulo - Consulting services will Board presentation Rail Company i126.0 The decentralization of the CBTU from be required for scheduled for March 3 (CBTU) (Bank) the federal government to the state, Sao engineering work, 1992. Paulo, to phase out federal subsidies. supervision and Includes substantial institutional and institutional managerial reforms. Emphasizes modal strengthening. integration, and financial policy reform. Environmental Assessment Category B. - 79 - Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lender 2 Project' Consulting Services Action on Procurement BRAZIL (Cont'd) Secretaria de Up to (R) Water Quality and Pollution Control 'To be determined. Negotiations tentatively Energia e 223.0 (Sao Paula and Parana) - Help sector scheduled for May 1992. Saneamento (Sao (Bank) authorities to address water pollution Paulo), Secretaria issues through a self- sustained de Planejamento investment project in the most congested (Parana) areas of Brazil, to develop methodologies to tackle the cleaning of environment, and specifically to manage the scarce water sources for human consumption and agriculture. Environmental Assessment Category A. Banco Nacional de Up to (R) Private Sector Power Development - To be determined. IFurther processing Desenvolvimento 200.0 To finance new private sector suspended in light of Economico e Social (Bank) investments in power through financial macroeconomic situation (BNDES) intermediaries. Environmental and regulatory Assessment Category A. environment. Further reporting will be discontinued. Banco Nacional de Up to Privatization and Capital Market No consulting services Appraisal report under Desenvolvimento 315.0 Reform - Develop capital markets in required. preparation. Economico e (Bank) coordination with financial sector Sociale (BNDES) strategy and to support preparatory work by Brazil's Privatization Commission and BNDES in the privatization of public enterprises. Environmental Assessment Category B. Ministry of Health Up to (R) Quality Assurance and Health To be determined. Project preparation unde 125.0 Promotion - Support for strengthening way. (Bank) government's normative and regulatory roles in health as well as provision of consumer information. Environmental Assessment C. Banco.Nacional de Up to (R) National Industrial Pollution Consulting services will Negotiations completed. Desenvolvimento 50.0 Control - The project consists of a be required by state Board presentation Economico e (Bank) credit to polluting firms to undertake environmental protection scheduled for May 12, Sociale (BNDES) pollution abatement investments. agencies. 1992. and State Environmental Assessment Category D. Environmental Agencies Ministerio de Acao Up to (R) Water Sector Modernization - Finance To be determined. Approved by the Executi- Social 250.0 investments and bring about sector Directors on March 10, (Bank) 'policy reforms, improved operations 1992. investment planning, and pricing. Environmental Assessment Category B. Mato Grosso State Up to (R) Mato Grosso Natural Resource To be determined. Negotiations tentativel3 Secretariat of 205.0 Management - Consolidation of the first scheduled for March 30, Planning (Bank) phase of North West projects in Mato 1992. Grosso, through improvements in the policy frameworks intensification of agriculture in areas with sustainable development potentials forest management - and conservations environmental and tribal protection and continued support for small farmer community projects, infrastructure and social service. Environmental Assessment Category B. - 80 - Member Country, Amount & Implementing Probable Stage of Processing ar Agency Lender Project ' Consulting Services Action on Procurement BRAZIL (Cont'd) Petroleo Up to (R) Hydrocarbon Transport and Processing Consulting services Approved by the Execul Brasileiro S.A. 260.0 - Assistance to PETROBRAS to develop: will be required to Directors on June 26, (PETROBRAS) (Bank) (a) high priority product distribution provide PETROBRAS with 1991. Loan signing facilities: (b) programs to enhance an in-house capability - tentatively scheduled natural gas utilization to reduce for.assessing: (a) risk May 1992. product losses and for more efficient in connection with energy utilization and environmental operations; (b) air Procurement: Advance control; and (c) technical.assistance in quality and contracting up to transportation planning, industrial risk (c) pollution. US$60.0 million and and safety analysis and measures to retroactive financing improve the safety and environmental to US$25.0 million of conditions of transportation and loan amount would be refinery operations. Environmental considered to finance Assessment Category A. - urgently needed works Sao Paulo State Up to (R) Land Management III (Sao Paulo) - To To be determined. Further preparation Secretariat of 75.0 generate environmental benefits and pending Government Agriculture and (Bank) sustainable productivity gains through authorization. Supply improved land management and soil conservation within about 2,000 microcatchments involving 120,000 farmers in Sao Paulo. Environmental Assessment Category D. Centrals Up to Electricity Transmission and Consulting services will Approved by the Execu Electricas 385.0 Conservation - Financing of time slice not be required. Directors on June 14, Brasileiras S.A. (Bank) of power transmission and conservation 1990. (ELETROBRAS) investments in selected utilities. Project expected to finance investments associated with specific power projects and programs of sector utilities. Includes specific provisions for preparing Environmental Impact Statements and corresponding Action Plans as required by each individual project and country legislation. Does not present maior environmental problems. Environmental Assessment Category B. Ministry of Up to (R) Rondonia Natural Resource Management To be determined. Approved by the Exect Interior/Rondonia 167.0 - The project would consolidate the Directors on March 17 State (Bank) first phase of Northwest projects in 1992. Rondonia, through policy improvements, agricultural intensification in established areas, forest management support, forest extractive activities, environmental and tribal protection, and continued support for small farmer community projects and social services. Environmental Assessment Category D. Ministry of Up to (R) Northeast Basic Education III - The Consulting services Project preparation t Education 150.0 project will support basic education in expected for management way. (Bank) up to four states in the Northeast. studies, investment Environmental Assessment Category C. planning, and project impact evaluation. - 81 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project 3 Consulting Services Action on Procurement BRAZIL (Cont'd) Centrals Up to Electric Distribution and Conservation - To be determined. Further processing on Electricas 300.0 Financing of time-slice of power hold pending resolution Brasileiras S.A. (Bank) distribution and conservation of tariff issue. (ELETROBRAS) investments in selected utilities. Projects expected to finance investments associated with specific power projects and programs of sector utilities. Includes specific provisions for preparing Environmental Imact Statements and corresponding Action Plans as required by each individual project and country legislation. Does not present major environmental problems. Environmental Assessment Category C. Departmento de Up to State Highways Management Project - Consultant services will Appraisal under way. Estradas de 200.0 Rehabilitation and periodic maintenance be required for Rodagem (DER) in (Bank) of state highways and strengthening of engineering, Retroactive financing selected states state highway department's maintenance construction supervision would be considered up t capabilities in the states of Alagoas, and technical 10% of the loan amount t Mato Grosso do Sul, Rio Grande do Sul. assistance. help start implementatic and Santa Catarena. Includes a- of project components. component to strengthen the-state highway agencies environmental capacity. Environmental Assessment Category B. Ministry of Up to Irrigation Subsector II - Private To be determined. Project preparation on Agriculture, 175.0 Irrigation (follow-up to Irrigation hold pending Government' National (Bank) Subsector I) in Northeast. assignment of priority t Irrigation Environmental Assessment Category B. project. Secretariat CARIBBEAN REGION To be determined 9.0 (R) OECS Environment - An OECS regional To be determined. Project preparation unde (IDA) project addressing priority way. environmental views derived to serve as (Possible financing froff a catalyst in attracting interested the Global Environment- donors. It could address policy and Facility (GEF) -- see institutional issues and may include Annex C.) regional as well as national investment. Environmental Assessment Cateaorv A. Caribbean 7.5 OECS Regional Education - Raising the To be determined. Project preparation unde Development.Bank (Bank)/ standards and efficiency of primary and . way. 7.6 secondary education and increasing (IDA) access to post-secondary technical education through cooperation with the private sector. The project would cover all OECS eligible countries. Environmental Assessment Catesory C. CHILE Roads Directorate 300.0 Transport Infrastructure Sector II - Mainly local consultants Preparation is of Ministry of (Bank) Project to finance maintenance and will be hired. progressing according tc Public Works (MOP) : further development of national road - schedule. system. Project is a follow up to Road Sector II (Ln. 3120-CH). Environmental , Assessment Category B. - 82 - Member Country, Amount & Implementing Probable Stage of Processing as Agency Lender Project 3 Consulting Services Action on Procurement CHILE (Cont'd) Comision Nacional 20.0 (R) Environmental/Institutional Consulting services will Pre-appraisal mission del Medio Ambiente (Bank) Development - Strengthen the be required. the field. institutional capacity of the National, PPF advance for Environmental Commission to develop US$250,000 approved tc policies, strategies, and action plans finance consultant's at the national level, and sectors . services. engaged in environmental activities. Environmental Assessment Category -C. Ministerio de 130.0 (R) Small Farmer Services - Main To be determined. Negotiations complete4 Agricultura (Bank) objectives would be institutional Board presentation strengthening; technical assistance scheduled for May 26, (extension) and complementary credit 1992. focussed on small agricultural producers; and land titling. Retroactive financing Environmental Assessment Category B. being proposed. Ministeric de 170.0 Health Sector Reform - Improvement of Consultants are engaged Project appraisal mis Salud (Bank) the coverage and the cost-effectiveness in project preparation. scheduled for June 19 of basic health services through reforms of key health sector policies, conduct of studies and of innovative programs in select health service areas and rehabilitation of some health facilities. Environmental Assessment Category B. Comision Nacional 55.0 Irrigation Development - Rehabilitation To be determined. Appraisal mission wit de Riego (Bank) of existing irrigation systems, and Japanese Grant financ possible development of new irrigated scheduled for May 199 areas. Environmental Assessment Category A. COLOMBIA Ministry of 200.0 Secondary Education Expansion (formerly To be determined. Project being identil Education (MOE) (Bank) Education Sector III) - To improve the coverage, quality and cost effectiveness of secondary education. Environmental Assessment Category C. To be determined 300.0 (R) Financial Sector and Capital Market To be determined. Project preparation i (Bank) Development - To support sector reforms way. to improve the structure efficiency and competitiveness of the financial system, and to remove the existing constraints to capital markets development. In addition to policy support and technical assistance, loan would include multi- sectoral credit line. Environmental Assessment Category C. Ministry of Health, 100.0 Health Services Integration II - To be determined. Project preparation i (Bank) Decentralization of basic health care way. services and improvement of nutritional status of vulnerable groups. Environmental Assessment Category C. - 83 - Member Country, Amount & Implementing Probable Stage of Processing an Agency' Lender Project Consulting Services Action on Procurement COLOMBIA (Cont'd) Empresa de 182.0 Pollution Abatement and Sanitation - Consultants will be Financial/institutiona Acueducto y (Bank) Improve sanitary conditions in the required. action plan and Alcantarillado Bogota river. The project would environmental impact include: major sewerage and drainage studies to be prepared networks: initial works for abating before appraisal. pollution of the Bogota river; secondary water supply networksl and consultancies and training. Studies to control environmental impact under way. Environmental Assessment Category A. To be determined 200.0 Export Development - Project will To be determined. Preparation under way. (Bank) support the components of the government's economic modernization program focusing on trade facilitation policies, institutional strengthening measures and financing mechanisms to foster Colombia's non-traditional exports. Environmental Assessment Category B. Ministry of 60.0 (R) Agricultural Technology Transfer - Consulting services will Appraisal mission Agriculture (Bank) To improve agricultural productivity be required for scheduled for November primarily of small-scale farmers through extension research 1992. strengthening of applied research and training and the system for extepsion of technology institutional. through municipalities in accordance strengthening. with Colombian decentralization reforms. Environmental Assessment Category C. Ministerio de 266.0 National Highway Sector III - Consultants will be Board presentation Obras Publicas y (Bank) Rehabilitation and paving of priority required. scheduled for March 19 Transporte (MOPT) sections of the national highway network, through financing of a time Retroactive financing slice of MOPT Investment Program over being .considered. 1992-1995. River works to close secondary river channels in a 200- kilometer stretch of the middle Magdalena River. Also, technical studies, training and technical assistance. Environmental Assessment Category B. FINAGRO (Fondo 200.0 (R) Agriculture Credit - Provide a To be determined. Appraisal mission para el (Bank) general line of credit for agriculture scheduled for April 19 Financiamiento del to FINAGRO for rediscounting through Sector commercial banks and other financial Agropecuorio), and institutions. Credit would be made Caja Agraria available to large and small farmers for agricultural and agro-processing activities. Would be associated with reforms designed to further improve the efficiency of the financial sector including restructuring of the Agricultural Bank (Caja Agraria)l and to reduce subsidies through the financial system. Environmental Assessment Category B. - 84 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender 2 Project ' Consulting Services Action on Procurement ' COLOMBIA (Cont'd) Instituto de 100.0 (R) IFI Restructuring and Divestiture - To be determined. Board presentation Fomento Industrial (Bank) To assist IFI divestiture program and to scheduled for March 24, (IFI) support strategic and organizational 1991. changes in IFI. Line of credit to finance sub-loans for investments by Retroactive financing o private productive enterprises. up to US$10.0 million i Environmental Assessment Category B. included. Bogota District 62.0 Bogota Transport - Improve transport Consultants will be Board presentation Government (Bank) conditions in Bogota promote more - required for work -scheduled for end efficient use of existing supervision and . March 1992. infrastructure, and strengthen the technical assistance. institutions in charge of planning, Retroactive financing c managing and maintaining the city's up to US$6.0 million vi transport infrastructure. Environmental be provided. Assessment Category B. COSTA RICA Caja Costarricense 30.0 (R) Health and Nutrition - The project To be determined. Project preparation unt del Seguro Social (Bank) would support the implementation of the way. (CCSS) and Government's state reform program for Ministry of Health the health/nutrition sectors, focusing on: institutional developmentl strengthening of basic health delivery systems; privatization of servicess studies; and operational research. Environmental Assessment Category C. Ministry of 41.0 .(R) Agricultural Sector - Project Consultant will be Approved by the Execut Agriculture; (Bank) activities would: (a) strengthen required. Directors on March 19, Agricultural formulation, implementation, and 1992. Development monitoring of agricultural policies and Institute (IDA): programs; and (b) modernize and National decentralize planning, budgeting, and Production Council administrative functions of key sector (CNP) institutions in support of the Government's goals of increasing productivity, agricultural exports, and cultivation of crops in which Costa Rica has a comparative advantage. A land capability classification component is included, which will improve land planning for sustainable development. Environmental Assessment Category B. Instituto 20.0 (R) .Water Supply II - Improvements of Consultants will be Preparation mission it Costarricense de (Bank) water supply and sewerage facilities in required for work the field. Acueductos y San Jose and surrounding areas and supervision and Alcantarillados institutional strengthening and technical assistance. (AyA) technical assistance to nationwide water company. Environmental Assessment Category B. Ministry of Up to Structural Adjustment III - To continue To be determined. Appraisal mission Finance 100.0 providing assistance to Costa Rica!s tentatively scheduled (Bank) structural adjustment and economic. May 1992. recovery efforts. Environmental Assessment Category C. - 85 - Member Country, Amount & Implementing Probable Stage of Processing an Agency Lender 2 Project Consulting Services Action on Procurement DOMINICAN REPUBLIC To be determined 50.0 Private Sector Development - Will To be determined. Project preparation uno (Bank) support structural reform in the way. financial sector aimed at establishing a transparent and competitive financial structure, as well as reforms in the trade, taxation and foreign investment regimes. Will also provide general line of credit to finance investment requirements by the private sector following market mechanisms for the allocation of credit and establishing the on-lending terms. Environmental Assessment Category C. Ministry of Public 80.0 Highway Maintenance V - Financing of a Consultants will be Approved by the ExecutJ Works (Bank) five-year road rehabilitation plan, required. Directors on June 20, equipment, technical assistance and 1991. training. Environmental Assessment Category B. Instituto Nacional 75.0 Irrigated Farming Development - Increase To be determined. Further preparation unc de Recursos (Bank) agricultural output and productivity way by FAO/CP. Hidraulicos from areas with existing irrigation infrastructure. Project will include measures to protect against salinization. Environmental Assessment Category B. ECUADOR Ministry of Public 70.0 (R) Social Development II/Health and Consulting services will Appraisal report under Health (Bank) Nutrition - To strengthen primary health be required. preparation. care -system and increase impact and PPF advance of - efficiency of nutrition programs. US$1,072,000 available Environmental Assessment Category C. finance consultants' services, office equipment, and pilots t strengthen implementati capacity. Retroactive financing aporoved.' Ministerio de - 16.0 (R) Mining TA - Support restructuring Consultants will be Pre-appraisal mission Energia y Minas (Bank) and strengthening of institutional required. scheduled for April/Ma) framework to foster private sector 1992. investment, and improve organization of small scale gold mining including environmental control and social issues. Environmental Assessment Category A. To be determined 10.0 (R) Technical Assistance Environment - Consultants will be Appraisal mission (Bank) Technical assistance for addressing required. tentatively scheduled f institutional framework for April 1992. environmental issues in Ecuador. (Possible financing frc Environmental Assessment Cateeory C. 'the Global Environment / Facility (GEF) -- see Annex C.) - 86 - Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lender Project 3 Consulting Services Action on Procurement (Cont'd) Ministeria de 89.0 (R) Social Development I/Education and Consulting services will Approved by the Executt Educacion/SECAP (Bank) Training - To strengthen decision-making be required. Directors on December 1 and management of public institutions 1991. Loan was signed involved in the delivery of basic March 9, 1992. education and training programs, and improve the quality in the delivery of Retroactive financing their programs targeted to the poor. appro-ed. Environmental Assessment Category C. Corporacion 75.0 Private Sector Development - Financing Consulting services may Negotiations completed. Financiera (Bank) for medium and large scale manufacturing be required for Board presentation date Nacional and service enterprises. Supports technical assistance. to be scheduled. policies of trade and financial liberalization. Environmental Assessment Category B. EL SALVADOR Ministry of 30.0 (R) Agriculture Sector Reform and Consultants will be Post appraisal-mission Agriculture and (Bank) Investment - Support for the required. tentatively scheduled A Livestock Government's sectoral reform and end April 1992. investment program, focussing especially on extension services. Environmental Assessment Category B. GUATEMALA Ministry of 15.0 Social Investment Fund - Loan would To be determined. Further processing Finance (Bank) support establishment of Social pending joint review o: Investment Fund to finance very small project design with social/basic infrastructure and Government, and I productive projects in rural areas being settlement of arrears. carried out by Municipalities, community organizations and non-governmental organizations. Sub-project design and appraisal criteria would address environmental concerns as appropriate. Environmental Assessment Category B. Ministry of Health 25.0 Health/Nutrition Sector - Loan would To be determined. Project preparation wo (Bank) support government efforts to strengthen has been suspended management of Health Sector, including pending settlement of improved and expanded primary health arrears. care, and nutrition programs. Environmental Assessment Category B. Government and 100.0 (R) Structural Adjustment - This quick- To be determined. President's report und Banco de Guatemala (Bank) disbursing loan would support trade preparation. reform and export development as part of a package of stabilization and sector adjustment measures supported by financial assistance from the Bank. Major components include financing of imported inputs for export products and technical assistance. Environmental Assessment Catenory C. - 87 - Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lender Project Consulting Services Action on Procurement 4 rGUATEMALA (Cont'd) Ministry of 31.5 Secondary and Regional Road Consultants will be Approved by the Executiv Communications, (Bank) Rehabilitation - Strengthening of sector required. Directors on December 6, Transport and planning and road management 1988. Loan signing Public Works rehabilitation of 390 km of gravel postponed pending (MCTOP) secondary earth roads, 180 km of paved settlement of arrears. roads, construction of about 500m of small bridges, equipment, training and - Retroactive financing of technical assistance. US$1.5 million would be provided: GUYANA To be determined 10.2 (R) Private Sector Development - The Consulting services will Project under (IDA) project would support: (a) reform of be required in: preparation. the financial sector to strengthen (a) banking supervision regulation and supervision and to and regulation3 (b) the promote capital market development; analysis of financial (b) a reform of the tax system to lower sector iqstitutions; rates while eliminating exemptions and (c) tax reform; and tax holidays; (c) a reduction and (d) Government services rationalization of tariff rates; and to mining and industry. (d) improvements in Government services to the private sector. Environmental Assessment Category C. Ministry of 15.0 Infrastructure Rehabilitation - Proposed To be determined. Preparation under way. Communication and (IDA) project would-consist of: (a) the Works (MCW) institutional strengthening of MCW through technical assistance tq the MCW's Central Transport Planning Unit (CTPU) for improving transport planning and project formulation, to the Roads Division (RD) for maintenance management and to the Transport and Harbours Department (TED) for ports management and river transport operations; (b) rehabilitation of sea defenses; (c) the rehabilitation and minor alignment of selected high priority main roads; (d) rehabilitation and improvement of feeder roads; (e) the rehabilitation and upgrading of river navigation; (f) the expansion of the Georgetown Port; and (g) technical assistance for shipyard rehabilitation. Environmental Assessment Category B. Social Impact 10.3 (R) Health and Nutrition - To help To be determined. Negotiations under way. Amelioration (IDA) address social costs of stabilization PPF advance of US$750,000 Programme Agency and adjustment with focus on primary . approved to finance (SIMAP) health care services in rural services. preparation. Environmental Assessment Category C. GUYSUCO 25.0 (R) Sugar Industry Rehabilitation and Consulting services Appraisal mission (IDA) Privatization - To expand sugarcane engaged by Government scheduled for March 1992. production to meet preferential quotas for sugar factories and and to rationalize, privatize and privatization. enhance the efficiency of the sugar industry. Environmental Assessment Category B. - 88 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lander Project 3 Consulting Services Action on Procurement' HAITI To be determined 15.3 (R) Private Sector Development - To To be determined. Preparation on hold due (IDA) support development of private sector to suspension of all industrial firms following an industrial operations. restructuring project. Environmental Assessment Category B. Ministry of 20.6 (R) Economic and Social Fund II - To be determined. Identification on hold Finance/ESF (IDA) Continue to assist Government's efforts due to suspension of all to provide: (a) health, nutrition, operations. education, physical infrastructure and employment opportunities; and (b) channel donor financing while strengthening community groups and cooperatives. Environmental Assessment Category: To Be Determined. Ministry of Public 35.0 Road Maintenance & Rehabilitation - To Consultants will be Project preparation on Works, Transport (IDA) improve roaS maintenance, upgrade key required. hold due to suspension o and Communications road sections and bridges, and all operations. strengthen Ministry of Public Works. Environmental Assessment Category B. Organisme de 28.8 Agricultural Production and Land To be determined. Further processing on Developpement du (IDA). Development - Increase agricultural/ hold due to suspension a Nord (ODN) livestock production by making vacant all operations. public land available to landless farmers, supporting irrigation development and protecting hilly sectors in the project area against erosion. Land protection measures to be introduced under project. Environmental Assessment Category B. Ministry of 26.1 Forestry and Environmental Protection - To be determined. Approved by the Executi Agriculture, (IDA) To slow the pace of natural resource Directors on Natural Resources degradation and establish the September 24, 1991. & Rural institutional and policy mechanism for Signing of credit on hol Development Haiti to tackle the problems of * due to suspension of al: (MARNDR), protection of forests and ecosystems, operations. Directorate of wood production, and of household energy National Resources-- conservation. Environmental Assessment A PPF advance of Category D. US$750,000 was approved on October 16, 1990. HONDURAS Hondurean Social 10.0 (R) Second Social Investment Fund Consulting services will Appraisal report under Investment Fund (IDA) (FHIS II) - The credit will finance a be required for preparation. (FHIS) range of small-scale subprojects technical assistance. sponsored by municipalities, community organizations, and NGOs in four broad categories: (a) social infrastructure (b) basic needs, (c) economic infrastructure; and (d),credit to informal sector entrepreneurs. Environmental Assessment Category C. - 89 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender I Project 3 Consulting Services Action on Procurement' HONDURAS (Cont'd), PRAF, Ministry of To be Nutrition/Health - Project would target Consulting services will Project under Health (MOH) Deter- nutritional assistance and improved be required. preparation. mined health services to the rural and urban (IDA) poor. Project activities would include: rehabilitation and construction of health centers; provision of equipment, materials, medicines, staff, training, etc.; health nutrition, and family planning education; distribution of food coupons to target beneficiaries; rural sanitation works; and technical assistance. Environmental Assessment Category C. Secretaria de To Be (R) Transport Rehabilitation - Project Consulting services Pre-appraisal mission is Comunicaciones y Deter- will assist the Government's efforts to will be required. in the field. Transportes mined support export-led growth through (SECOPT) (IDA) rehabilitation of the.transport infrastructure, strengthening of - institutional capabilities and increasing the participation of the private sector in the provision of transport services. Environmental Assessment Category: To Be Determined. Ministry of 30.0 (R) Agricultural Sector Adjustment - Consultants will be Appraisal mission Finance/Ministry (IDA) Focus on the structure of sector required. tentatively scheduled foi of Natural incentives, marketing and price policy, April 1992. Resources land tenure and forestry issues, and the institutional/organizational strengthen- ing and redeployment of public sector agricultural agencies. Environmental Assessment Category B. JAMAICA Ministry of Public 45.0 Transport Sector - Institutional To be determined. Project being identified Utilities and (Bank) strengthening of Ministry of Public Transport Utilities and Transport; reorganization/ divestment of publicly-owned railways: strengthening/promoting private sector involvement in public transport; and investment in ports sector to encourage private sector involvement. Environmental Assessment Category B. Ministry of 45.0 Private-Sector - To support private To be.determined. Project preparation is Finance, (Bank) sector development through credit . under way. Development and availability. Environmental Assessment Planning Category C. To be determined 50.0 (R) Private Sector Development Consultants are being Appraisal mission (Bank) Adjustment - Support to regulatory and identified in the areas scheduled for late March institutional reform for private sector of: (a) privatization; 1992. development and the program of (b) regulatory issues; privatization. Environmental Assessment and (c) legal reform. Category C. Previously engaged consultants in the customs reform area will continue. 90 - Member Country, Amount & Implementing Probable Stage of Processing and ABency Lender 2 Project ' Consulting Services Adtion on Procurement JAMAICA i (Cont'd) National Water 30.0- (R) Water Supply and Sewerage - To Consultants are about to Preparation mission Commission (Bank) control pollution from wastes discharged initiate the study scheduled for late 1992. to the Kingston Harbor; and improve- (together with CIDA wastewater collection and disposal in assistance). the Kingston metropolitan and .other tributary areas to the harbor. .Environmental Assessment Category B. Planning Institute 35.0 Social Sectors Development II - Project To be determined. Project preparation under of Jamaica (PIOJ) (Bank) would provide further support for the way. Government's human resources development (Japanese Grant Funds program to improve efficiency, equity have been approved in the and quality of social services. amount of US$1.495 Specific investment priorities under million on December 20, this framework would be focused on 1991.) supporting reform of lower secondary education, improving national education assessment, strengthening health sector maintenance and management, and improving policy analysis and formulation. Environmental Assessment Category C. Jamaica Public 50.0 (R) Energy Sector Deregulation and Consultants will be Appraisal mission in the Service Company (Bank) Privatization - Restructuring the energy required for the field. (JPSC) sector through the establishment of a establishment of a legal, incentive and regulatory framework for PS framework for private sector; and participation, the establishment of an energy fund to setting up of the fund, facilitate the PS participation; support and the privatization the Government in its privatization program. program of the energy sector; support the implementation of this program through Technical Assistance of the Government, JPSCO, PCJ and other institutions and agencies. Environmental Assessment Category B. Ministry of 25.0 (R) Small Farmer Development - Support To be determined. Government interest in Agriculture (Bank) Government's program of watershed proceeding with the management and agricultural support project under review. - services. Project would focus on major environmental issues affecting agriculture. Environmental Assessment Category D. Secretariat of 50.0 (R) Mexico Environment - To increase Consulting services will Board presentation Urban Development (Bank) Government's capacity to implement key be required for tentatively scheduled fi and Ecology environmental protection and natural management consulting, April 7, 1992. resource management functions and to ecological studies water (Possible financing of strengthen institutional and policy quality studies, component from the Glob framework to enable the Government to ecological standards Environment Facility implement these functions in an developments, and (GEF) '-- see Annex C.) efficient and decentralized manner. preparation of protected Environmental Assessment Category D. areas management plans. Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lender 2 Project 3 Consulting Services Action on Procurement 4 MERO (Cont'd) Banco Nacional de 400.0 Railway Restructuring - To improve Consulting services Project preparation under Obras y Servicios (Bank) efficiency through implementation of a will be required. way. Publicos far reaching restructuring plan. (BANOBRAS) Project would assist the railways in Retroactive financing of becdming a commercially oriented and up to 10% is likely to be financially viable organization. recommended. Environmental Assessment Category B. Banco Nacional de 400.0 (R) Housing Sector - To Improve the Consulting services will Appraisal report under Obras y Servicios - (Bank) operation of the housing market by not be required. preparation. Publicos increasing the participation of private (BANOBRAS) financial intermediaries in providing financing to lower income families, promoting deregulation, and removing distortions in land markets. Environmental*Assessment Category B. Secretaria de 150.0 Agricultural Technology - The project To be determined. Board presentation Agricultura y (Bank) will finance civil works, goods, tentatively scheduled for Recuros training, and institutional development June 1992. Hidraulicos (SARH) in the public agricultural research and. extension system with the objective of Retroactive financing may Improving its capacity to develop and be sought by the transfer technology. It will also Government for expenses support technical assistance to the up to US$10.0 million project executing agencies. incurred before Environmental Assessment Category C. December 31, 1991. Comision Federal 400.0 (R) Power Sector - The proposed project To be determined. Project preparation under de Electricidad (Bank) would finance a time slice of the way. (CFE) Comision Federal de Electricidad's (Possible financing of a investment program in transmission and project component from distribution, focusing on reduction of the Global Environment- technical losses and control of Facility (GEF) -- see unmetered energy. Environmental Annex C.) Assessment Category B. Fondo de Garantia 300.0 (R) Rural Financial Sector - To improve Consultants will be Appraisal report under y Famento para-la (Bank) the overall efficiency of rural required. preparation. Agricultura financial markets so that they could Ganaderia y better contribute to increasing the Retroactive financing of Avicultura country's rate of growth. Environmental up to 10% of the loan Assessment Category B. amount would be required to finance sub-loans. Departmento de 120.0 (R) Transport Air Quality Management Consultants are Appraisal report under Distrito Federal (Bank) (for Mexico City) - Assistance in assisting with the preparation. (DDF): Secretaria developing a comprehensive program for preparation of a de Desarollo the control of air pollution in the comprehensive program Retroactive financing of Urbano y Ecologia metropolitan are of Mexico City caused for the control of air up to lOx may be sought. (SEDUE) by urban transport. Environmental pollution in Mexico Assessment Catemory C. City. Banco Nacional de 200.0 (R) Second Urban Transport - Improvement Consultants are Appraisal report under Obras y Servicios (Bank) of urban transport systems in medium- assisting with the preparation. Publicos size cities focussing in particular on preparation of (BANOBRAS) public transport, road maintenance, integrated urban Retroactive financing of traffic management, technical assistance transport studies in the aproximately 10% is and training, and institutional reforms. individual cities. likely to be recommended. Environmental Assessment Category B. Consultants will be required for technical assistance and training. - 92 - Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lender I Project Consulting Services Action on Procurement MEXICO (Cont'd) Banco Nacional de 150.0 Highway Rehabilitation and Safety - To - To be determined. Project preparation undo Obras y Servicios (Bank) consolidate and further strengthen way. Publicos maintenance planning and administration (BANOBRAS) for the federal highway network. Retroactive financing a: Environmental Assessment Category C. up to 10% for expenditures made durin 1992 would be required. Secretaria de 190.0 (R) Science and Technology - To support Consultants will be. Appraisal report under Comercio y Famento (Bank) strengthening the technology-related required. preparation. Industrial infrastructure support systems, and (SECOFI) and reforming the system for allocating Secretaria de scientific research funds. Programacion y Environmental Assessment Category C. Presupuesto (SPP) NICARAGUA Ministry of 30.0 (N) Transport - Rehabilitation of the Consulting services will Project preparation un Construction and (IDA) Port of Corinto, restructuring of the be required for way. Transport port authority and rehabilitation of feasibility and (Cofinancing will be selected roads and bridges. engineering studies. required.) Environmental Assessment Category: To Also institutional be determined. restructuring of the port authority. PANAMA Ministerio de 120.0 (R) Economic Recovery - To support To be determined. Approved by the Execut Planificacion y (Bank) trade, labor and social security reforms Directors on Politics Economica as well as improvements in public sector February 20, 1992. La management. Environmental Assessment was signed on Category C. February 27, 1992. Retroactive financing US$60.0 million (first tranche) has been recommended for eligib imports up to 18 month before loan signing. PARAGUAY Ministry of 3.0 (R) Public Enterprise Reform - To The bulk of the project Appraisal mission Industry and (Bank) provide technical assistance for cost will be deployed to postponed until Fall Commerce implementation of the Government's finance consultancy 1992. Further project policy for privatization, including the services. preparation needed. establishment of regulatory bodies, financial consultancies for valuation, and investment banking/agency services to implement company sales. Environmental Assessment Category C. Ministerio de 45.0 Regional Agricultural Development - Will To be determined. Project under Agricultura (Bank) improve farm incomes and assist with the preparation. Apprais conservation of natural resources with mission tentatively specific measures to benefit indigenous scheduled for June 8, communities in departments of Alto 1992. Parana and Itapua. Environmental Assessment Category A. - 93 - Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lender 2 Project 3 Consulting Services Action on Procurement PARAGUAY (Cont'd) National 14.3 (R) Third Rural Water Supply - To Consulting services will Appraisal report under Sanitation Service (Bank) improve living conditions of rural be required for - preparation. (SENASA) population by providing potable water institutional, financial and sanitation to about 250,000 people. and technical Environmental Assessment Category B. assistance. Banco Central 50.0 (R) Private Sector Development - Loan to Consultants likely to be Appraisal report under (Bank) channel credit to a wide range of final required. preparation. borrowers. The loan will also support the liberalization of the financial sector through strengthening the regulatory and supervisory framework, reform of monetary policy tools, establishment of freely determined interest rates, and the strengthening of the Central Bank. Technical assistance will be included to strengthen the Central Bank, Primarily the Superintendency of Banks. Environmental Assessment Category B. Ministerio de 29.0 (R) Land Use Rationalization - Project To be determined. Approved by the Executive Agricultura (Bank) will create a complete rural cadastre Directors on March 17, and geographic information system (GIS), 1992. and will assist in institutional strengthening of Instituto de Bienestar Rural (IBR). Environmental Assessment Category C. Ministerio de 50.0 (R) Road Transport - Road construction Technical assistance for Appraisal mission Obras Publicas y (Bank) improvements and rehabilitation to - institutional scheduled for May 1992. Comunicaciones increase efficiency and capacity in development, detailed Government obtained a (MOPC) transporting agricultural products and engineering, Project Preparation institutional support for the environmental impact Facility advance to reorganization and modernization of MOPC assessments, and staff finance consulting and its highway directorate. training in the use of services. Environmental Assessment Category B. computer software for engineering applications would be provided during project preparation and implementation. Consultants for detailed engineering have been selected. Proposals for preparing environmental assessments will be invited during March 1992. PERU To be determined 210.0 (N) Privatization Adjustment - To be determined. Project preparation under (Bank) Privatization of public sector way. companies, especially in mining, telecommunications and hydrocarbons, including related policy and regulatory reforms. Environmental Assessment Category: To Be Determined. 0 -94- Member Country, Amount& Implementing Probable Stage of Processing and Agency Lender 2 Project ' Consulting Services Action on Procurement 4 I PERU (Cont'd) To be determined 200.0 (N) Power Sector Privatization/ To be determined. Project preparation unt (Bank) Rehabilitation - Policy, regulatory and way. institutional reforms, including privatization, of the public sector enterprises in power; rehabilitation of existing facilities in power sector enterprises; and possibly new thermal generation plants. Environmental Assessment Category A. To be determined 125.0 Social Development I - The project will To be determined. Pre-appraisal mission (Bank) protect the poor during economic scheduled for Septembe: adjustment, by strengthening financing 1992. and delivery of targeted health and nutrition programs. Environmental Assessment Category C. To be determined 100.0 Social Development II - The project will To be determined. Pre-appraisal mission (Bank) support improvements in quality of scheduled for March 19 primary and pre-primary education, nutrition, and other related services for the children. Environmental Assessment Category C. Ministry of 100.0 (R) Transport Rehabilitation - To be determined. Pre-appraisal mission Transport and (Bank) Infrastructure rehabilitation in scheduled for May 15, Communications transport, railways and ports sector, 1992. including highways. Environmental Assessment Category B. Ministry of 300.0 Financial Sector Reform - To strengthen Consulting services will Appraisal mission Economy and (Bank) financial sector policies and be required for scheduled for March 11 Finance institutions, thereby promoting privatization, banks competition and efficiency. portfolio restructuring, Environmental Assessment Cateaory C. and improved efficiency in financial intermediation. Ministry of 300.0 Trade Policy - Adjustment loan to Consulting services Approved by the Execu Economy/Finance (Bank) support government trade reform. will not be required. Directors on February Environmental Assessment Category C. 1992. Ministry of 300.0 (R) SAL - Reforms in the areas of fiscal Consulting services Board presentation Economy/Finance (Bank) policy, public administration, customs will not be required. scheduled for March 2 and tax reform, labor markets, financial 1992. sector and agricultural marketing. Environmental Assessment Category C. TRINIDAD & TOBAGO Ministry of 27.0 Business Expansion and Industrial To be determined. Approved by the Exect Planning/Central (Bank) Restructuring - To support Directors on Decembez Bank physical/financial restructuring of 1991. private sector industries to increase competitiveness in view of increased import competition from trade reforms and to support expansion of non- traditional exports. Environmental Assessment Category B. - 95 - Member Country, Amount & Implementing Probable . Stage of Processing and Agency Lender Project ' Consulting Services Action on Procurement URUGUAY Central Education 30.0 (N) Pre-School and Primary Education Technical assistance is A preparation mission i. Directing Council (Bank) Improvement - Project will: (a) expand expected in pre-school scheduled for the last (CODICEN) the coverage of pre-school education education models, week of March 1992. focussing on the zones of greatest need, achievement assessment (b) enhance the efficiency, equity and systems, management quality of primary education by information systems, and providing teaching inputs, establishing evaluation. a student achievement system and changing the model of the basic cycle; (c) strengthening the institutional capacity of CODICEN through a management information systemt and (d) fostering the decentralization of educational administration. Environmental Assessment Catemory C. To be determined 25.0 Public Administration Reform - Reform Consulting services will Project preparation undo (Bank) and modernization of the central be required. way. administration. Environmental Assessment Category C. Gobierno del 65.0 Debt and Debt Service Reduction - Consultant services not Approved by the Executi Uruguay (Bank) Adjustment loan to support debt and debt required.. Directors on May 14, service reduction. Environmental 1991. Assessment Category C. Oficina de 10.0 (R) Public Enterprise Reform - To Consultants services to Appraisal mission Planeamiento y. (Bank) support the removal of legal monopolies, be required. scheduled for April 20, Presupuesto privatization or restructuring of key 1992. public enterprises (telecom, ports, gas, aviation). Environmental Assessment Categorv C. To be determined 20.0 (R) Housing Rehabilitation Finance To be determined. Preparation mission (Bank) (formerly Housing Rehabilitation) - To scheduled for March 23, assist Government in strengthening the 1992. Project scope an - private sector role, including the type of operation under creation of a secondary mortgage market. review. Environmental Assessment Category C. VENEZUELA To be determined 60.0 Basic Education - Support the * To be determined. Pre-appraisal mission (Bank) decentralization of education to scheduled for July 1992 increase accountability at all levels and to improve the capacity of the Ministry of Education to implement educational reforms. Environmental Assessment Categorv C. Instituto Nacional 60.0 Natural Resource Protection - Assist the To be determined. Project preparation und de Parques (Bank) Government in implementing the national way. systems of parks, to strengthen institutional capacity of INPARQUES/ MARNR for environmental education programs and involve the local communities in the preparation and implementation of management plans for parks and other conservation units. Environmental Assessment Catezorv C. -96- Member Country, Amount& Implementing Probable Stage of Processing a Agency 1 Lender 2 Project 3 Consulting Services Action on Procurement VENEZUELA (Cont'd) Direccion de 40.0 Agricultural Extension and Training - To be determined. Project preparation w Asistencia Teenica (Bank) Strengthen agriculture technology way. of the Direccion dissemination and agricultural training General Sectoria system. Environmental Assessment de Desarrollo Category C. Agricola, Ministry of Agriculture and Livestock Production Ministry of 150.0 (R) Highway Management - Supports Consulting services will Appraisal mission Transport and (Bank) institutional reforms aimed at be required for scheduled for mid-Apr Telecommunications rationalizing the responsibilities of engineering, 1992. different levels of Government in the construction supervision highways sector and would finance time- and technical Retroactive financing slicing the investment program for the assistance. would be considered uA sector in the 1993-97 period. 10% of the loan amoun Environmental Assessment Category B. help start implementa of project components Consejo Venezolano Up to Urban Transport I - Strengthening of the Consulting services Project preparation u de Transportes 75.0 urban transport sector institutional required in the area of way, with financing f (MTC) (Bank) framework, financing mechanisms and traffic management and the technical assista local coordination. Infrastructure and control, transport loan. traffic management investments in six planning and urban municipalities and the Caracas transport economics. metropolitan region. Environmental Assessment Category B. Ministry of Family Up to (R) Higher Level Manpower Development - To be determined. Negotiations tentativ 65.0 Will support graduate scholarship in scheduled for April 8 (Bank) specialized fields of study. 1992. Environmental Assessment Category C. Ministries of Up to Venezuela Irrigation Rehabilitation - To be determined. Preparation' under way Agriculture and 100.0 Establishment of an economically and Livestock, (Bank) financially viable irrigation system Environment and policy and support for privatization and Renewable rehabilitation of public irrigation Resources systems. Environmental Assessment Category: To Be Determined. To be determined Up to * (R) Power Sector Investment I - Would Consulting services are Pre-appraisal mission 220.0 support a program for institutional required in the area of scheduled for March 1 (Bank) technical and financial rehabilitation thermal repowering, has been canceled at of the power sector, and would consist conversion to gas and Government's request. of: (a) rehabilitation repowering and distribution loss Due to recent events conversion to gas of thermal power reduction program. Venezuela. Date of p plants; (b) reduction of technical and appraisal mission to non-technical losses; (c) construction determined after of transmission lines and sub-stations; discussion with and (d) technical assistance and Government. training. Environmental Assessment Category B. Ministry of Health Up to (R) Endemic Disease Control - Would Consulting services will Pre-appraisal missior 50.0 strengthen public endemic disease be required in the area the field. (Bank) control programs and epidemiological of project design. surveillance. Environmental Assessment Category B. -97- Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender 2 Project. Consulting Services Action on Procurement VENEZUELA (Cont'd) Ministerio del Up to Caracas Water Rehabilitation and To be determined. Preparation under way. Ambiente y los 100.0 Privatization - Rehabilitation of Recursos Naturales (Bank) existing water supply facilities and Renovables (MARNR) support of the privatization of the Caracas water system operation. Environmental Assessment Category B. To be determined Up to (R) Hospital Modernization (formerly To be determined. Project preparation und4 100.0 Health) - Investment in hospital way. (Bank) management modernization along with policy changes to improve efficiency and equity of health care. Environmental Assessment Category C. Ministry of Up to (R) Agriculture Sector Investment - Will Consultants will be Approved by the Executi Agriculture 300.0 finance a slice of the 1991-1993 sector required during project Directors on December 3 (Bank) investment program, strengthen the implementation. - 1991. Loan was signed sector's institutional framework and February 26, 1992. ability to evaluate projects and support the Government's reform program in the agricultural sector. Environmental Assessment Category B. Ministry of Family Up to (R) Low Income Barrios Improvement - To Consulting services to Negotiations tentativel 42.5 counterbalance the effect of the be determined at post scheduled for end April (Bank) Government's macroeconomic adjustments' appraisal. 1992. program on the urban poor, the project would finance investments to improve infrastructure and studies in the slum areas of the country's major cities. Environmental Assessment Category B. - 98 - Member Country, Amount & Implementing Probable Stage of Processing an Agency ' Lender Project Consulting Services Action on Procurement V. MIDDLE EAST AND NORTH AFRICA REGION ALGERIA To be determined 75.0 Vocational Training II - Quality and To be determined. Preparation under way. (Bank) efficiency improvements in basic education. Assessment of quality teacher training and provision of pedagogical materials. Environmental Assessment Category: To Be Determined. Ministry of 150.0 Agricultural Sector Adjustment - Would To be determined. Further project Agriculture (Bank) support medium-term agricultural preparation awaiting adjustment strategy through reforms in Government clearance. policies relating to land markets, prices, input and output marketing, and trade policy. Would identify studies for further reforms. Environmental Assessment Category B. Ministry of 50.0 (R) Irrigation Management Support (IMSP) Consulting services will IEPS will be circulati Equipment and (Bank) - Project would support infrastructure be required. and March 1992. Housing rehabilitation and institutional strengthening of regional authorities responsible for operating existing large scale irrigation system. Environmental Assessment Category B. Ministry of 33.0 (R) Cadastre - Improve land registration Consultants likely to be Draft appraisal repor Economy, (National (Bank) system in urban as well as agricultural required for institution distributed March.16, Agency for areas to foster the private investment building purposes. 1992. Cadastre (ANC), and provide an improved basis for land Conservation taxation. Environmental Assessment Financiere (CF)) Category B. Ministry of 75.0 Local Government Development - Consultants services are Project preparation u Interior and (Bank) Strengthen local capacities in planning, required to prepare a way. Environment I budgeting and implementing investments training program for in infrastructure, housing and each wilaya and to study environmental protection and public the feasibility of services; increase generation of local investments in priority resources to reduce dependence on environmental sub- central government budget. projects. Environmental Assessment Category B. Ministry of 50.0 Basic Education Institutional To be determined. IEPS issued on June 2 Education (Bank) Development - Contribute to enhanced 1991. Project quality and efficiency in basic preparation under way education by improving effectiveness in targetted institutions (grade schools and teacher training institutes). Environmental Assessment Category C. - 99 - Member Country, Amount & Implementing Probable Stage of Processing an Agency Lender Project Consulting Services Action on Procurement ALGERIA (Cont'd) Ministry of 30.0 Forestry and Watershed Management - Consultants required. Negotiations postponed Agriculture (Bank) Pilot project to: (a) design environmentally sound and technically appropriate forest management and exploitation techniques to be used in subsequent larger scale operations; (b) reduce operating costs and strengthen forestry institutions; and (c) prepare erosion control/land management program. Environmental Assessment Category D. Ministry of 57.0 (R) Sahara Development - To assist Consulting services Approved by the Execut Agriculture and (Bank) government in defining and implementing will be required. Directors on Ministry of an environmentally,balanced water September 24, 1991. U Equipment development plan of Northern Sahara; to of signing to be expec strengthen organizations dealing with in April 1992. water management and control and to increase agricultural production through: (a) technical assistance and preparation of studies; (b) institution building; (c) rehabilitation of water extraction and distribution systems, and on farm development in existing oases. Environmental benefits will result from improved drainage, integrated pest management practices, proper use of available water resources, and better water management. Environmental Assessment Category B. Ministere de 5.0 Environmental Management - Provides Consultants required. Project under 1'Interieur et de (Bank) technical assistance to strengthen the preparation. 1'Environnment institutional framework for environmental management, and assistance to industry for temporary storage of hazardous wastes and surveillance systems. Will also assist Government with establishment of water resource management system and water pollution surveillance. Environmental Assessment Category C. Ministry of 250.0 Economic Reform Support II - To support Consultants likely to be Appraisal rescheduled Economy (Bank) implementation of trade, price, tax and required. July 1992. enterprise reform measures. trade reform will focus on rationalizing tariffs and liberalizing foreign exchange allocation. Price reform will support liberalization of price-setting in concert with the establishment of a mechanism to protect vulnerable groups' access to essential goods and services. Fiscal reform will focus on rationalizing direct and indirect taxes. Enterprise reform will focus on restructuring and financial rehabilitation. - 100 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender 2 Project s Consulting Services Action on Procurement ALGERIA (Cont'd) Ministry of 125.0 Highways VI - (a) improve Wilaya To be determined. Project under Equipment (Bank) capabilities for road management and preparation. strengthen ME and Wilayas In program monitoring; (b) provide a more adequate balance between contracted and force account maintenance and foster increased competitiveness in the contracting of road works; and (c) rationalize transport sector planning and policy making. Appropriate conditions would be incorporated in the standard tender and supervision documents covering drainage and erosion, cultural property. borrowing pits, and materials disposal. Environmental Assessment Category B. Ministry of 100.0 Urban Transport Enterprise - Expansion To be determined. Project under Transport (Bank) of the provision of bus services in main preparation. Feasibill Algerian cities, through the: studies to start in 19S (a) rationalization of enterprises operating and management practices; (b) rehabilitation of existing bus fleets and acquisition of new buses; and (c) training and technical assistance for enterprise operations and financial management, and for the preparation of traffic management studies. The project is foreseen to have a positive impact on the environment, mostly as a result of reduced engine emissions arising from improved operation and maintenance of the bus fleets. Further measures to mitigate vehicle pollution, including fuel substitution, would be pursued through a study. Environmental Assessment Category B. Ministry of 125.0 (R) Construction Industry - Foster the Consulting services will Project under Equipment/ (Bank) efficiency of construction industry by be required to carry out preparation. Credit Populaire improving its operational environment, industrial restructuring d'Algerie extending credit for modernization studies, and develop investments, promoting private sector training programs. initiatives, supporting the preparation of enterprise restructuring programs, and developing training program for enterprise managers. Ensure that investment projects financed by credit component take into account environmental concerns. Environmental Assessment Category B. - 101 - Member Country, Amount & Implementing Probable Stage of Processing an( Agency Lender Project s Consulting Services Action on Procurement EGYPT,r ARAB REPUBLIC OF Public Enterprise 27.1 (N) Technical Assistance for Extensive use of local Project preparation unt Office and other (IDA) Privatization and Enterprise Sector and international way. agencies Reform - To assist with the design and consulting services for implementation of critical reforms all project components including public enterprise reform, including: the Public privatization, and reform of the Enterprise Office; securities market, business regulation training professional and the banking sector. Environmental advisory services for Assessment Category: To Be Determined. enterprise privatization and restructuring securities market; and the banking sector and regulatory reform. Ministry of Health About (R) Schistosomiasis Control - Project Consulting services will Appraisal report being' 27.0 would involve: (a) extension of be required. prepared. (IDA) systematic schistosomiasis control activities to five governates of the Delta Region through financing the extension of the national control strategy to the area; (b) rehabilitation of buildings, laboratories and vehicles in other governates; and (c) development of an operational research program and management systems to reduce costs and ensure sustainability. Environmental Assessment Category C. Ministry of 73.2 Basic Education - Expanding access to Consulting services will Preparation under way. Education (IDA) primary education and improving the be required. quality, relevance and resource efficiency of the primary education programs. Environmental Assessment Catezory C. Ministry of 21.6 Matruh Resource Management - Promotes Consulting services for Project preparation un Agriculture and (IDA) sustainable agriculture in northwest feasibility study are way. Land Reclamation coastal zone by improved management of financed through a rainfall and groundwater and of Japanese and UNDP rangelands. No adverse or environmental grants. impact are expected. Environmental Assessment Category BID. Principal Bank for About Agricultural Modernization - Supports To be determined. Project preparation un Development and 100.0 selective mechanization in farming and way. Agricultural (Bank) processing and upgrading of agricultural Credit support services. Environmental Assessment Category B. Egyptian About (R) Kureimat Power - Project will - Consultants will be Approved by the Execut Electricity 220.0 consist of: (a) the supply and required for technical Directors on March 5, Authority (Bank) installation of a net 1200 MW dual fuel- assistance, training, 1992. fired (fuel oil and natural gas) power financial management (Cofinancing arrangeme station; (b) the supply of material and systems, and management with ABD, AF, USAID an equipment for a natural gas pipeline information systems. Saudi Government have interconnecting the power station to the been finalized.) gas grid; (c) the supply and installa- tion of equipment for transmission lines, line loss reduction, and rehabilitation of a substation; and (d) technical assistance. Final environmental impact assessment report completed in July 1991. Environmental Assessment Category A. - 102 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project s Consulting Services Action on Procurement EGYPTr ARA REPUBLIC OF (Cont'd) Building Materials About Industrial Pollution/Energy Conservation "Consulting services will Technical and financial Organization 100.0 - Debottlenecking and modernization at be required. audits to identify (Bank) three cement plants, training and Consultants are already investment options at 60.0 environmental protection components and involved: in project plants now under way. (IDA) policy reforms covering pricing preparation activities. Part of environmental distribution and management. Total Consulting services for preparation completed project cost about US$300.0 million. project implementation through KFW-financed Environmental Assessment Category B. and further policy study; environmental studies may be required. mitigation plan for cement plants and environmental screening of Helvan area to start shortly. Preparation c training component undc way, and market studies and further environmeni programs will be requii prior to appraisal. (Cafinancing would be sought). Ministry of About West Nubaria Agriculture Intensification Consultant services Project preparation un Agriculture and 40.0 - Intensify- crop production, raise likely to be required. way. Government to Land Reclamation (IDA) yields, and introduce oilseed crops in complete field studies West Nubaria reclaimed lands. Social for drainage component and environmental impact positive. Environmental Assessment Category B. Ministry of About (R) Tourism Sector Restructuring and Consulting services will Appraisal mission is Tourism, Tourism 125.0 Privatization - Project would support not be required. tentatively scheduled Development (Bank) the implementation of a long term June 1992. Project Authority strategy and policy for tourism preparation under way. development in Egypt. Would establish a (Possible financing fz Tourism Development Fund to provide long the Global Environment term financing to private sector Facility (GEF) -- see developers and provide needed technical. Annex C.) assistance, and finance of trunk infrastructure by public sector. Environmental impact studies are being undertaken. Environmental Assessment Category B. Ministry of About Northern Sinai Agricultural To be determined. Initial project iF Agriculture and 65.0 Development - As first phase of the preparation completed Land Reclamation (Bank) agricultural development of Northern Timing of further Sinai, the project would expand the processing subject to agricultural base of the country and confirmation of include construction of irrigation and Government's interest drainage works and provision of Bank financing for thi financial support to farmers for on-farm project. development farm machinery and (Cofinancing would be agricultural inputs. Two studies are sought). being carried out to assess the environmental impact of the project - one on migratory birds and the other on the effect on wetlands including the, Bardawil Lake. Appraisal mission will take recommendations of these studies into consideration. Environmental Assessment Category A. - 103 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender 2 Project s Consulting Services Action on Procurement 4 EGYPT, ARAB REPUBLIC OF (Cont'd) River Transport About Navigational Canal Improvements - Consultants selected for Project preparation unde Authority (RTA) 50.0 Rehabilitation of the Damietta-Cairo project preparations, way. Phases I and II (Bank) Branch of the Nile, including deepening and Phase IV contract completed. Phase III of the branch, improvement of docks, signed. ongoing. cargo handling equipment, navigational aids on the Nile River, and technical assistance. Environmental Assessment Category B. Ministry of About (R) Railways III - To assist Government Consultant services will Appraisal report, Transport 200.0 in improving efficiency of railway be required for prepared. Timing of (Bank) operations. It includes track renewal financial and tariff further processing and supply of spare parts for traction, studies, traffic subject to confirmation rolling stock and workshop equipment, costing, economic of Government's interest replacement of old locomotives and analysis and in Bank financing for th coaches and other similar equipment. supervision. project. The project would yield environmental (Parallel financing is gains through diversion of traffic from being sought). roads to railway and replacement of old locomotive with diesel and electric powered units. Environmental Assessment Category C. IRAN Sistan-Baluchistan 64.0 (N) Sistan River Flood Works To be determined. Project preparation unde Regional-Water (Bank) Rehabilitation - Project would consist way. Board of: (a) rehabilitating, upgrading and expanding the essential flood control works in the Sistan river and Birmand lake; (b) providing Sistan river training works and a program for early flood warning and emergency evacuation and (c) monitoring performance of flood works and river regime which would provide protection to the Sistan river flood plain. Total project cost is about US$169.7 million, of which about US$64.0 million would be in foreign exchange. Environmental Assessment Category B. TAVAIVIR, To be (N) Power Sector Efficiency Consulting services will TREC, and RWPA deter- Improvement - Project likely to include be required to supervise mined one or more of the following components: construction and (a) conversion of Qom gas turbines to undertake combined cycle operation; (b) supply and studies.Project installation of Tabriz gas turbines: preparatio7 under way. (c) rehabilitation and upgrading of DEZ (Cofinanci%Lg will be Hydro Plant; (d) rehabilitation and required.) upgrading of Karun I Bydro Plant: and (e) studies and training. Environmental Assessment CateRgory A. Tehran 77.0 (N) Tehran Drainage - Project would To be deteimined. Project preparation unde Municipality (Bank) consist of providing a storm water way. collection and disposal system in the city of Tehran. This system would .protect the central part of Tehran and the low lying areas to the south of the city from frequent floods. Total project cost is estimated at US$95.6 million of which US$77.0 million would be in foreign exchange. Environmental Assessment Category B. - 104 - 'Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lender Project Consulting Services Action on Procurement 4 6JORDAN Social Development About Social Development - Follow-up to social Consulting services,will Appraisal-report under Fund 5.0 component (mitigating impact of not be required for preparation. (Bank) adjustment on economically project expansion and (Germany's Mf has agreed disadvantaged) of Industry and Trade reappraisal. to cofinance Policy Adjustment Loan. Will complete US$6.5 million equivalent institutional development and initiate and US$5.0 million lending for productive activities equivalent from EC.) benefitting particularly women and rural poor. Environmental Assessment Category C. o NoRocc To be determined 150.0 (R) Social Priorities Support (formerly To be determined. Identification scheduled (Bank) Social Sector) - Project would support: for May 1992. (a) implementation of the social action program (defined under SAL II); (b) address systematic issues and cross- sectoral constraints in the public management of human resources and social sectors; and (c) improvement of the provision of basic social services to disadvantaged groups. Environmental Assessment Category: To Be Determined. Ministry of Public 70.0 (R) Industrial Training - Project would: To be determined. Identification miision in Works (Bank) (a) emphasize linkages between the the field March 5 to 20 employers in the industrial sectors and 1992. the training institutions; (b) promote in-company training; and (c) provide human development to enterprises. Environmental Assessment Category C. Ministry of About (R) Rural Poverty Reduction and Consulting services will Project is in Interior, 30.0 Environment Protection - The project be required for project identification stage. Direction Generale (Bank) would provide for economic opportunities preparation. IEPS under preparation. Ides Collectivites and social services to the rural poor, (GEF cofinancing to be Locales in particular in mountain areas, while determined.) at the same time protecting the biodiversity environment. Also, construction of a rural.road access network as a key condition for Bank support. Environmental Assessment Category D. To be determined To be Industrial Technology Enhancement - To be determined. Components are being deter- Project will support the development of identified. mined metrology, standards', testing and quality insurance infrastructure. It will also promote industrial research and development, by making, research activities more market based. A venture capital fund may be set up to finance innovative technological projects and new enterprises. Environmental Assessment Category: To Be Determined. -105- Member Country, Amount & Implementing Probable, Stage of Processing and Agency Lender Project Consulting Services Action on Procurement 4 MOROCCO (Cont'd) To be determined 25.0 Research and Extension In Irrigated To be determined. Project preparation (Bank) Areas - Project would provide funding' mission scheduled for for: (a) strengthening extension April 1992. services of the regional irrigation authorities (ORMVA) and promote the participation of farmers' organizations and the private sector in the development and dissemination of improved technology; (b) an applied research program; (c) staff and farmer training: (d) complementary investments to extend sail testing and develop appropriate mechanization; (e) establishment of a monitoring system and (f) studies. Environmental Assessment Category B. Ministry of 100.0 Second Agriculture Sector Investment To be determined. IEPS to be prepared. Agriculture and (Bank) (ASIL II) - Loan is in support of a Agrarian Reform - tranche of Morocco's investment program in agriculture. It would also promote further sector policy and institutional reforms. Environmental Assessment Category: To Be Determined. Ministere de 100.0 Wastewater Irrigation - The project Consulting services will IEPS issued. l'Information et (Bank) would be a follow-up to the be required for project Government's request de l'Interieur implementation of sewerage and primary preparation, indluding awaited for a Project treatment facilities for Casablanca, the preparation of Preparation Facility. Agadir and Khouibga, and would include: environmental impact (a) additional treatment as required; studies. (b) irrigation systems; and (c) institutional development aiming to set up appropriate organizations for implementation, operation and maintenance; Environmental Assessment Category AID. To be determined 40.0 Labor Market Intermediation - To be determined. Project preparation unde (Bank) Development of labor market information way. and intermediation mechanisms to increase mobility and access to jobs, facilitate small-scale job creation, and promote in-service training. Environmental Assessment Category C. ONPT 50.0 (R) Second Telecommunications - To Consulting services Appraisal mission in the (Bank) support sector restructuring (including may be required. field. promotion of private sector investment in value-added services and development of a new legal and regulatory framework) and to finance expansion of network, with possible parallel financing from multilateral and bilateral agencies. Environmental Assessment Category B. To be determined 100.0 Higher Education Funding Reform - Aims To be determined. Preparation under way. (Bank) at diversifying higher education financing by promoting cost efficiency, and supporting qualitative improvements. Environmental Assessment Category C. - 106 - Member Country, Amount & lImplementing Probable Stage of Processing and Agency ' Lender Project s Consulting Services Action on Procurement 4 (Cont'd) lONCF 60.0 First Railway - Would contribute to To be determined. Project preparation under (Bank) improving use of existing way. infrastructure, reducing costs and (Cofinancing being ensuring financial viability of railway. sought. Preliminary Environmental Assessment Category B. contacts made with the African Development Bank, Japan EXIM Bank.) Ministry of 35.0 National Watershed Management - To To be determined. Project being identified. Agriculture and (Bank) improve land use and natural resources Agrarian Reform management in mountain areas and reduce siltation in reservoirs and associated hydraulic infrastructure. Main components would include: (a) institutional and organizationil development; (b) improvement of legal framework for land use in mountain areas; (c) investments in selected watersheds; (d) applied and adaptive research and extension; and (e) technical assistance and training. Environmental Assessment Category D. Credit Immobiler 100.0 Housing Finance III - Project aims to To be-determined. Preparation postponed. Hotelier (CIH) and (Bank) improve housing conditions in low income Commercial Banks communities, further develop the housing (To be determined) sector, and encourage commercial banks to participate in mortgage lending in the context of the reform of the financial sector. Environmental Assessment Category: To Be Determined. CNCA/Other Banks 100.0 (R) National Rural Finance - Project Consultant services will Project identification (Bank) will provide: (a) Assistance to Credit be required in WID - completed. Preparation Agricole of Morocco (CNCA) to develop activities, banking to begin in April 1992. the sustainable foundations of a high training, and IEPS will be updated. quality and competitive intermediary institutional building. within a progressively liberalized financial system in the country; and (b) a line of credit to CNCA/other banks to support agricultural/agro-industry credit lending to the private sector. Environmental Assessment Category B. Office National de 100.0 (R) Fifth Water Supply - Urgent To be determined. Project under I l'Eau Potable (Bank) rehabilitation and reinforcement works, preparation. Pre- (ONEP) and Regies facilities and social connections appraisal mission program works and technical assistance scheduled for April 1992 studies and training. Improvement of hydrologic and meteorologic data gathering and analysis, and a sanitary education campaign. Environmental Assessment Category B. Ministry of 175.0 Second Large Scale Irrigation - Consultants to be Appraisal scheduled for Agriculture (Bank) Will complete the infrastructure rehabil recruited. early 1992. itation and management restructuring of the Regional Offices for Agricultural Development. Environmental Assessment Category B. - 107 - Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lender Project Consulting Services Action on Procurement 4 MOROCCO (Cont'd) Ministry of 275.0 (R) SAL II - Support adjustment in Consulting services will Negotiations under way. Finance (Bank) public expenditures, trade policies and be required. for studies. Board presentation social sectors, ensure the efficient scheduled for end deployment of public investments and April 1992. consolidate the return of the economy to (Cofinanced by the sustainable growth. Environmental African Development Assessment Category C. Bank.) Ministry of About (R) Municipal Finance (formerly To be determined. Project preparation Interior/Fonds 150.0 Municipal Finance (FEC II)) - Project advanced. Appraisal d'Equipment (Bank) aims to improve urban infrastructure, mission scheduled for Communal continue improving local management and latter part of 1992. intergovernmental finance, and enable commercial banks to lend to local governments and agencies. Environmental Assessment Category B. TUNISIA Ministry of 50.0 Secondary Education - Quality and To be determined. Identification mission Education (Bank) efficiency Improvements in general scheduled for May 1, secondary education. Environmental 1992. Assessment Category: To Be Determined. Ministry of 80.0 (R) Agricultural Sector Investment Consulting services - First preparation mission Agriculture (Bank) (ASIL) - Would support policy reforms in likely to be necessary scheduled for early May four key areas: (a) irrigation and for natural resource 1992. water use efficiency; (b) natural component. resources; (c) marketing/agroindustry; and (d) land tenure. Would also finance priority investments in the budget of the Ministry of Agriculture in-these same areas. Environmental Assessment Category B. Ministry of 70.0 (R) Second Forestry Development - To be determined. Preparation under way by Agriculture (Bank) Project would improve quality and FAO/CP. Final mission quantity of wood production, reduce soil scheduled for May 1992. erosion and preserve wildlife through: (a) forest management; (b) forest plantation; (c) pilot forestry projects; (d) forest pasture and range improvement; (e) nature conservation and development of Ichkeul Park; and (f) institutional development. Environmental Assessment Category B. Ministry of 15.0 Northwest Rural Poverty Alleviation - In To be determined. FAO/CP identification/ &Agriculture (Bank) addition to consolidating the maim preparation miss ion infrastructure components, objectives reports due end of March would be to: (a) alleviate poverty of 1992. rural areas in undeveloped northwest region (b) promote women in development as women contribute significantly to region's.agricultural output; (c) increase the rural population's income and employment opportunities; and (d) improve the environment through soil and water conservation and erosion control. Environmental Assessment Category B. - 108 - Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lender 2 Project Consulting Services Action on Procurement TUNISIA (Cont'd) Ministere de 75.0 (R) Higher Education Restructuring - Consulting services in Negotiations completed. l'Education et des (Bank) Aims at: (a) improving the quality of the amount of Board presentation Sciences higher education by creating 5,000 staffweeks will be scheduled for March 31, institutions more responsive to the required. 1992. needs of the country and restructuring existing curricula; (b) containing the growth of public expenditures by an increase of efficiency; and (c) developing planning and management capacities. Environmental Assessment Category C. Ministere de 65.0 (R) National Flood Protection - The Consultants' terms-of- Preparation under way. 1'Equipment et de (Bank) project would have the following ' reference prepared and 1'Habitat objectives: (a) developing a national consultants, strategy for flood control and prequalification under protection; (b) minimizing, flood damages way. by the construction of appropriate infrastructure; improving flood control operations and maintenance: and improving cost' recovery. Environmental Assessment Category B. Ministere de 70.0 (k) Northern Tunisia Water Resource Consultants will be Preparation under way. l'Agriculture (Bank) Mobilization and Management (formerly required for technical Water Resource Mobilization and assistance in water Management) - The project would improve management. water resource management by addressing existing problems on the efficiency of mobilization, allocation and utilization of water. The project would include physical works for water storage and waste water treatment, and reuse rehabilitation and installation of meters, studies and technical assistance. Environmental Assessment Category A. Societe Tunisienne 60.0 STEG - Natural Gas Development - Consultants will not be Approved by the Executi de 1'Electricite (Bank) Construction of gas pipeline (M'Saken- required. Directors on November et du Gaz (STEG) Gabes) and consumer conversion program 1991. to natural gas., Environmental Assessment Category B. Development and 80.0 Industrial Finance - Provide long term Consultants will be Project preparation unc Commercial Banks (Bank) financing to industry and enhance required for way. (to be determined) competition in Tunisian banking system. institutional Technical assistance envisaged for development of institutional development of participating banks. participating banks. Environmental Assessment Category B. National Bank for 50.0 (R) National Rural Finance - The loan Consultants required for Preparation to begin ii Agriculture (BNA) (Bank) supports: (a) consolidation and training specialists and June 1992. expansion of rural banking systems institution building. (Cofinancing from EIB4 (credit and savings); (b) development of Kredit Anstalt fur institutional capability of BNA and Wiederaufbau (KfW) diversification of credit operations possible.) into private rural non-farm and export promotion activities. Environmental Retroactive financinc Assessment Category B. up to 10% is planned. - 109 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project Consulting Services Action on Procurement 4 TUNISIA (Cont'd) Ministeres de 80.0 Rural Roads - The project would Consultants required for Identification under way. 1'Equipement et*de (Bank) consolidate efforts made under previous technical assistance in l'Habitat/ rural roads programs and would the areas of rural Transports/ strengthen arrangements for adequate highway management. Agriculture maintenance. It would also finance road improvements, road maintenance and maintenance equipment. Environmental r Assessment Category B. Ministeres des 80.0 (R) Transport Sector - Project would: Consultants required for Preparation under way. Transports and de (Bank) (a) increase productivity promote sub-sectoral expertise (Possible financing from l'Equipement/ modernization and rehabilitation in and technical assistance -the Global Environment 1'Habitat railways, ports and airports: and to Ministry of Facility (GEF) -- (b) improve road transport organization Transport. Annex C.) through deregulation, road safety measures, and road user-charge adjustments. Environmental Assessment Category B. Ministry of 75.0 (R) Municipal Sector Investment - Consultants required for Appraisal mission Interior (Bank) Improvement of municipal finance and technical assistance completed in November management, and municipal infrastructure component. 1991. Post appraisal investments. Environmental Assessment mission scheduled for Category B. April 1992. YEMEN, REPUBLIC OF Ministry of 15.0 (R) Livestock Development r Increasing To be determined. Project preparation under Agriculture and (IDA) productivity of indigenous livestock way. Water Resources - through broad actions to improve quality and output centered on: (a) selective upgrading of breeding stock, rehabilitation of rangelands and expanding forage and feedstuffs production; (b) developing extension and veterinary services; and (c) modernizing processing facilities. Environmental Assessment Category C. Ministry of About (R) Basic Education - Likely to include: Consulting services Appraisal report under Education 20.0 (a) access to disadvantaged groups, will be required. preparation. (IDA) especially girls in rural areas; and (b) improvement in quality of education through teacher training and curriculum, textbooks, and achievement test development. Environmental Assessment Category C. Ministry of About (R) National Land and Water Conservation Consultant services will Negotiations tentatively Agriculture and 33.0 First - Focus on improving efficiency of be required. scheduled for mid-April Water Resources (IDA) irrigation and forestry sub-sectors. 1992. Environmental effects would be positive (Cofinancing will be because of water management forestry required). and soil conservation components. Environmental Assessment Category D. - 110 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project Consulting Services Action on Procurement YEMEN. REPUBLIC OF (Cont'd) Ministry of About (R) Industrial Support Services - Consultants likely to be Project processing Economy, Supply 15.0 Technical assistance for industrial required to assist in delayed. Further and Trade, and (IDA) planning for public enterprise reform implementation. reporting will be Industrial Bank of and for extension services to small and discontinued. Yemen medium-scale enterprises, and a line of credit for industrial investment. No adverse social or environmental impacts are expected. Environmental Assessment Category B. Yemeni General About Energy/Power - As a result of the Consultants will be Project preparation und Electricity 10.3 unification of People's Democratic required to supervise way. Corporation (YGEC) (IDA) Republic of Yemen and Yemen Arab construction. (Co-financing will be Republic, the project content is being required). revised. The current tentative scope consists of urban rehabilitation, line loss reduction and technical assistance components. No negative environmental or social impacts are expected. Environmental Assessment Category B. National Water and About (R) Taiz Water Supply and Sewerage Consulting services for Project preparation unc Sanitation 30.0 System Rehabilitation and Reinforcement feasibility studies and way. Pre-appraisal Authority (IDA) (formerly Tais Water -Supply and Sewerage master plans including mission completed. Systems Rehabilitation and technical assistance and Project Preparation Reinforcement) - Rehabilitation -and training. Facility advance of reinforcement of the water utility NWSA US$1.5 million approve< and water production and distribution to finance: facilities and extension of sewerage (a) feasibility study system to improve water supply and master plan started sewerage services in Taiz. Issues: February 1990, expecte, water resources management, cost to be completed by recovery, technical assistance and December 1991 (draft trainin. Environmental Assessment available); (b) water Category B. resource exploratory drilling (ongoing); an (c) equipment for measurement and leak detection. - 111 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender 2 Project s Consulting Services Action on Procurement 4 VI. SOUTH ASIA REGION BANGLADESH Bangladesh Power 80.0 (N) East/West. Interconnector - Project Engineering design being Project preparation undi Development Board (IDA) would provide for the second power prepared by consultants. way. transmission interconnection between East and West zones, and would also strengthen the transmission system in the West Zone. The interconnection would be constructed on the Jamuna River and would be used to transmit electricity generated using indigenous gas in the East zone to the West zone to substitute for electricity generated using imported liquid fuel oil. Environmental Assessment Category B. Ministry of Jute 150.0 (R) Jute Development - Restructure jute Consulting services will Appraisal mission (IDA) manufacturing industry by downsizing be required for project scheduled for first capacity, retrenching excess labor, preparation and quarter of FY93. closing uneconomical mills, improving implementation. management, privatization and financial restructuring. Environmental Assessment Category: To Be Determined. Ministry of 100.0 Second Industrial Sector Adjustment - Consulting services will Appraised April 1991, b Finance (NBR), (IDA) Would support further liberalization of be required for appraisal report not Commerce, quantitative restrictions on imports, institution building in completed pending Industries the structure of tariff rates, export the areas of tariff agreement on policy incentives and investment regulatory analysis, and investment matrix with new procedures and incentives to facilitate promotion. Government. Negotiatio private sector development. tentatively scheduled f Environmental Assessment Cateaory C. May 1992. Ministry of 50.0 (R) Female Secondary School Assistance - To be determined. Pre-appraisal mission i Education (IDA) Project will involve: (a) enhancement the field. of educational opportunities for girls (Cofinancing interest through the provision of stipends and expressed by UNDP, scholarships in Grades 6-12; Norway, EEC and Germany (b) occupational skills development program; and (c) a public information program. Environmental Assessment Category C. Ministry of Health 50.0 Nutrition - Strengthening of Government To be determined. Preparation under way. and Family and (IDA) and NGO coordination of nutrition (Cofinancing to be Welfare activities through support for: (a) the determined.) development and implementation of community-based nutrition programs; and (b) policy-oriented nutrition research programs. Environmental Assessment Category C. Ministry of 25.0 Technical Assistance VI - Line of credit Consuliing services will Appraisal mission Finance (IDA) for financing of feasibility studies be required during tentatively-scheduled I that may lend to investment projects for implementation for March 15, 1992. Board training and technical assistance project preparation and presentation tentativel activities to strengthen the borrower's institutional scheduled for May 1992, institution and planning capacity. development. Environmental Assessment Category C. - 112 - Member Country, Amount & Implementing Probable Stage of Processing ar Agency Lender Project Consulting Services Action on Procurement BANGLADESH (Cont'd) Ministry of .40.0 Agricultural Research III - Would Consulting services will Project under Finance (IDA) improve the relevancy of research output be required to assist preparation. through support to institutional/admini- with preparation and strative restructuring; supplementary implementation. infrastructure, equipment and staff training; research initiatives with private sector; and contract research funding.- Environmental Assessment Category C. To be determined 90.0 Power Sector Investment - Will follow up To be determined. Project is in early (IDA) initiatives under previous credit stages of preparation. (ESAC - Cr. 1999-BD), and other sector work activities. Project may also finance a time-slice of Bangladesh Power and Development's investment program. Environmental Assessment Category: To Be Determined. Ministry of 150.0 Financial Sector II - Would focus on To be determined. Project preparation is Finance (IDA) further liberalization of interest early stages. rates, refining policies for loan reclassification and provisions for bad debts, privatization of one or more commercial banks, commercial bank management reforms and capital market reforms. Environmental Assessment Category C. Ministry of 54.6 (R) Forest Resources Management - The To be determined. Appraisal report Environment and (IDA) project would support: (a) extension of completed. Negotiatic Forest mangrove plantations, industrial/energy tentatively scheduled plantations and preparation and April 1992. implementation of forest management plans for all established plantations and natural forests; (b) investment and planning support for nature conservation areas; and (c) institutional support to the Forest Department; including establishment of an environmental management unit. Environmental Assessment Category B. Bangladesh Water 50.0 (R) Flood Protection I - Would improve Consultants have been Pre-appraisal mission Development Board (IDA) protection against damage caused by recruited for the field. Appraisal (BWDB) normal bank erosion hazards at selected preparation within mission tentatively sites (primarily towns and major ongoing studies. scheduled for June 191 infrastructure), along the Brahmaputra (Cofinancing needs and Meghna rivers by construction of anticipated.) sustainable bank protection and river training works, including repairs or retirement of existing flood control embankments at said locations. Would be subiect to limited environmental assessments. Environmental Assessment Catemory B. - 113 - Member Country, Amount & Implementin Probable Stage of Processing and Agency ' Lender 2 Project s Consulting Services Action on Procurement BANGLADESH (Cont'd) Bangladesh Water 90.0 (R) Cyclone Protection II - Would ensure EEC supported Project under Development Board (IDA) improved protection of reclaimed coastal consultants have been preparation. Pre- (BWDB), Roads and agricultural lands against tidal recruited for project appraisal mission in the Highways Dept. inundation and seasonal to medium preparation. field. Appraisal missio (RED) cyclone tidal surges by repair and tentatively scheduled fo upgrading of sea embankments (and their June 1992. appurtenant structures) by appropriate structural and biological protection measures. The project would also improve evacuation and relief access by construction of several hundred km of all-weather economically justifiable feeder roads. Environmental Assessment Category B. Roads and Highways 75.0 (R) Second Road Rehabilitation and Pre-investment study has Project preparation unde Department (IDA) Maintenance - Rehabilitation oi been completed. way. reconstruction of about 200 km of roads and periodic maintenance works on about 400 km of other major roads in the northwest and southwest, continued implementation of the action plan for improved road maintenance; and implementation of an action plan to strengthen the construction industry. Total project cost US$126.0 million. No significant environmental impact anticipated. Environmental Assessment Category B. Dhaka Water Supply 90.0 (R) Fourth Dhaka Water/Sanitation - Consultants feasibility Project requires re- and Sewerage (IDA) Project now being re-identified but study (funded by identification based on Authority (DWASA) likely to include: (a) development of Government of France) to 'results of feasibility long term water source for Dhaka prepare medium/long-term study, which is under (including ground and surface water); investment program for way. (b) rehabilitation and extension of DWASA to be completed (Cofinancing interest water distribution and sewerage systems; April 30, 1992. expressed by Japan, Asi (c) extension of water and low-cost Development Bank, and t1 sanitation program and (d) further French Government.) institutional development of DWASA. Total cost of first phase of investment program is estimated at US$85.0 million. Positive environmental impact through improved sanitation facilities and rehabilitation of sewage collection treatment works. Environmental Assessment Category B. - 114 - Member Country, Amount & Implementing Probable Stage of Processing ar Agency ' Lender Project Consulting Services Action on Procurement BANGLADESH (Cont'd) Chittagong Water 20.0 (R) Chittagong Water Supply and Recruitment of water Appraisal report undex Supply & Sewerage (IDA) Sanitation III - Objectives are to supply and sewerage preparation. Authority (CWSSA) assist CWSSA to become a more efficient design/supervision and effective institution through consultants by CWSSA rehabilitation/optimization of existing will commence in May facilities and improved technical, 1992. financial, managerial and administrative capabilities. Project has been revised and now includes an institutional reform program to improve CWSSA's financial and operational performance, efforts to reduce unaccounted for water, limited expansion of the water production facilities, extensive rehabilitation of water distribution system, and technical assistance and training. Positive environmental impact by improved sanitation across income groups and by treatment of domestic, commercial and industrial waste water. Environmental Assessment Category B. Bangladesh Bank 50.0 (R) Agricultural and Rural Credit - To Consultants would be Government's program I (IDA) support further reform of agricultural required to assist in forgive all agricultu credit system, strengthen agricultural technical assistance. loans of up to Taka 5, financial institutions and to provide has further deterioral credit for agricultural investments. the loan repayment Environmental Assessment Category B. discipline. Further reporting will be discontinued. Bangladesh Bank 25.5 (R) Private Sector Industrial Credit - Consultants will provide Approved by the Execul (IDA) Provision of term financing to private assistance to Department Directors on March 17, sector industry through private of Environment for 1992. financial institutions to be selected. developing industrial Environmental Assessment Category B. effluence guidelines and standards and data collection. Ministry of 150.0 Public Resource Management Adjustment - Consulting services will Appraisal completed ci Finance (IDA) To assist in resource mobilization and be required to assist in December 19,11991. use. To cover reforms and institutional accounting and budget Project documentation development in public revenue reform and strengthening under preparation. mobilization and public expenditure of expenditure planning planning and implementation. activities. Environmental Assessment Category C. Jamuna 105.0 Jamuna Multipurpose Bridge - . Consultants will be Economic feasibility 4 Multipurpose (IDA) Construction of a major multi-purpose required for project the project is being Bridge Authority (road-energy telecommunications bridge management and civil examined. Appraisal across the Jamuna (Brahmaputra) River to works supervision. mission to be scheduli reduce transport costs and support the (Cofinancing from ADB Northwest's economic integration with US$150.0 million; and the rest of the country. Total project Japan). cost estimated at US$528.0 million. Supplementary Environmental studies Procurement: Civil w under way. Some involuntary components to be finm resettlement will be required. by IDA, and co- Environmental Assessment Catesory A. financiers. Pre- qualification complet, Bidding documents completed. - 115 - Member Country, Amount & Implementing Probable Stage of Processing an Agency Lender Project s Consulting Services Action on Procurement' BANGLADESH (Cont,d) Bangladesh Power 136.0 (R) Power Rehabilitation and Consultants will be Board presentation Development Board (IDA) Distribution - Project includes: required for project scheduled for rehabilitation of selected power plants, implementation. November 10, 1992. grid substations and transmission lines to restore rated generating capacity/extend plant life and improve system efficiency/reliability of supply; and installation of capacitors in selected areas of distribution system to reduce losses/improve voltage. Environmental Assessment Category B. BOGMC 100.0 (R) Gas Infrastructure - (a) integration Experts on gas network Pre-appraisal mission (IDA) of gas grid (Bakhrabad-Ashuganj analysis, pipeline scheduled for June 199 pipeline); (b) grid control and engineering and operations safety systems; (c) further environmental safety appraisal drilling; and (d) technical covered by Japanese assistance in gas network management. Grant Facility. Environmental Assessment Category B. BHUTAN Forest Department 5.0 Third Forestry - To support To be determined. Appraisal mission is (IDA) environmental protection and management, scheduled for April 1S and improve the sustainability of (Co-financing from SDC natural resource use through and collaboration witt afforestation of vulnerable roadsides, IFAD possible.) management and protection of forest and grassland areas, and management and restocking of forest areas designated to supply urban, industrial and institutional needs. Environmental Assessment Category D. INDIA To be determined 200.0 Gas Infrastructure Development - Oil and To be determined. Project is in early si (Bank) gas distribution infrastructure or coal of preparation. mining rehabilitation/development to promote efficient production and distribution of fuels and/or restructuring of coal industry. Environmental Assessment Category B. Government of 25.0 (R) Kerala Urban (formerly Keral To be determined. Pre-appraisal mission Kerala, KUDP (Bank)/ Urban) - Project seeks to improve urban scheduled for Project Management 75.0 financing, management, and efficient September 15, 1992. Unit (IDA) resource utilization in provision of - urban services. Will also focus on improvements in finance, traffic and transport, water supply, and sanitation and environmental improvements. Environmental Assessment Category: To Be Determined. Central Water 100.0 (R) National Water Management II - To be determined. IEPS is scheduled for Commission/State (IDA) Second phase of project to improve water July 1992. Departments of control and delivering on existing Irrigation irrigation schemes. Project would extend improvements to additional states. Environmental Assessment Category: To Be Determined. - 116 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender 2 Project Consulting Services Action on Procurement INDIA (Cont,d) National 200.0 NHPC Baglihar Hydroelectric - The To be determined. Project is in pre- Hydroelectric (Bank) project aims to increase hydroelectric feasibility stage. Power Corporation generation in the northern region, (NHPC) improve maintenance of NHPC's hydro plants, and prepare feasibility studies for potential hydroelectric plants. It comprises: a 450 MW hydroplant at Baglihar; upgrading of existing NHPC hydro plants; and training in maintenance and project management and feasibility studies. Environmental Assessment Category A. To be determined 250.0 Power - SEB Restructuring - Promotes To be determined. Project is in its early (Bank) major changes in the structure and stage of preparation. operations of a group of state . electrical boards. Environmental Assessment Category C. To be. determined 500.0 (R) Transport Structural Adjustment To be determined. Project preparation (Bank) (formerly Transport Secal Adjustment) - activities to be Support of the adjustment process in the determined. transport sector. Environmental Assessment Category: To Be Determined. I Sardar Sarovar 225.0 Sardar Sarovar Canals II - Project To be determined. IEPS issued December Narmada Nigam, (Bank) provides funding for construction of 1991. Further Bank Ltd. 150.0 water delivery and drainage works of the processing awaits (IDA) ongoing 1.9 m ha Sardar Sarovar Project completion of the Morse (SSP). Its components include: Team review of SSP's unfunded segments of main and branch . ongoing resettlement and canals and minor network blocks; canal rehabilitation and hydro generation and pump plants; canal environmental components operations control and communication under Cr. 1552/Ln. 2497- equipment; relocation and resettlement IN (Dam and Power) and of canal affected peoplel and training Cr. 1553-IN (Water and technical assistance. Environmental Delivery and Drainage)., Assessment Category A. Oil and Natural 150.0 Oil and Gas Development II - The primary To be determined. Project is in the Gas Commission (Bank) objective would be to provide technical preparation stage. (ONGC) and financial support to ONGC for speeding up the development of its oilfields with the help of joint ventures. The second objective would be to assist the Government in the implementation of further reforms in the oil and gas sectors that would give commercial considerations more weight in the decisions taken in these sectors. Environmental Assessment Category A. Governments of 70.1 Agriculture Development III - Project To be determined. Project is in pre- I Assam and Madhya (Bank)/ would promote improved strategy for feasibility stage. Pradesh 8.0 development and rationalization of (IDA) public expenditures in agriculture. Project would also finance selected public investments. Environmental Assessment Cateaory B. II - 117 - Member Country, Amount & Implementing Probable Stage of Processing an Agency ' Lender Project s Consulting Services Action on Procurement INDIA (Cont'd) Ministry of 142.0 (R) Rubber - Project would expand rubber To be determined. Staff appraisal report Commerce, Rubber (Bank)/ sector through; (a) replanting of old under preparation. Board, Government (IDA) low yielding rubber (40,000 ha); (b) new of India rubber plantings (30,000 ha); (c) productivity enhancement on existing rubber small holdings (60,000 ha); (d) support for establishment of new rubber processing factories; and (e) institutional support for research, training, tribal development and monitoring and evaluation. Environmental Assessment Category B. To be determined 300.0 (R) National Renewal Fund - Assistance To be determined. Pre-appraisal mission (IDA) for strengthening social safety nets tentatively scheduled related to the potential consequence of April/May 1992. adjustment. Environmental Assessment Category C. Department of 125.0 Nutrition III - Project will further To be determined. Project not yet. Women Welfare and (IDA) strengthen integrated child development identified. Child Development, services. Environmental Assessment Ministry of Human Category C. Resource Development Directorate 125.0 (R) Tropical Disease Control I - Project To be determined. Initial preparation is General of Health (IDA) would develop a leprosy control under way. Service Ministry intervention in selected districts of Health &.Family targeting an expected caseload of Welfare 1.5 million individuals. Would also provide for multi-drug therapy, health education, training, infrastructure, disability care, and support to information. Environmental Assessment Category C. Reserve Bank of 300.0 (R) Financial Sector Adjustment II - To be determined. Project processing India (Bank) Project will support the financial deferred beyond perioc system reform program comprising further current lending progra deregulation of interest rates, lowering Further reporting will reserve requirements and priority sector discontinued. lending targets for commercial banks. Project would also assist commercial banks in clearing up their portfolios and recapitalizing increasing operational autonomy for commercial banks and introducing competition and improving prudential supervision and financial disclosure standards. Environmental Assessment Category C. Ministry of 400.0 Trade Adjustment I - This is a policy .Consulting services will Pre-appraisal mission Finance (Bank) based operation which aims at supporting probably not be scheduled for June 19 India-s trade liberalization policy. required. Environmental Assessment Category NIA. - 118 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender 2 Project Consulting Services Action on Procurement 4 INDIA (Contid) Nodal agency not 300.0 Public Enterprises/Private Sector Consulting services will Dialogue is continuing yet determined (Bank) Development I - To support the be required for the enabling policy Government's efforts at reform of restructuring planning. environment. central public sector enterprises Restructuring studies (CPEs). The enabling policy environment currently under way for seeks to induce greater efficiency in number of selected CPEs CPEs through inter alia divestiture and elimination of budgetary supports. The project will include adjustment actions at the enterprise level, including restructuring, workouts, divestitures, etc. Environmental Assessment Category B. Ministry of Health 84.0 (R) National AIDS Control (formerly Consulting services will Negotiations completed. and Family Welfare (IDA) National AIDS Prevention and Control) - be provided by the World Board presentation The project would initiate a major Health Organization tentatively scheduled f effort in AIDS prevention. The project (WHO). March 31, 1992. would constitute a start up investment to launch expanded control activities Retroactive financing o related to strengthening program up to US$3.0 million is management, promoting public awareness, proposed. General improving blood safety and rational use, procurement notice bein . controlling sexually transmitted prepared by Borrower. diseases, and building surveillance and clinical management capacity. The ultimate objective would be to slow the spread of human immunodeficiency virus so as to reduce future morbidity, mortality and impact of AIDS. Total project cost is estimated at US$83.0 million. Environmental Assessment Categor C. NPTC/ 400.0 (R) Electric Power Systems - Policy To be determined. Pre-appraisal mission NTPC (Bank) changes and regulatory reforms to currently in the field. rationalize power bulk supply and trade, and to fund core components of the investment programs of the National Thermal Power Corporation (NTPC) and the National Power Transmission Corporation' (NPTC). Environmental Assessment Catemory A. Maharashtra State 250.0 (R) Maharashtra Power II - Seventh unit To be determined. Appraisal report under Electricity Board (Bank) (500 MW) of Chandrapur (a mine-mouth, preparation. (MSEB)/Government coal-based power station), and a 735 km of Maharashtra HVDC transmission line to improve the reliability and efficiency of the state supply system, and to bring forward institutional and policy reforms in Maharashtra, including a larger private sector role in power. Environmental Assessment Cateaory A. Ir State Department 25.0 (R) Water Resources Consolidation - To To be determined. Preparation mission Ir of Irrigation (Bank)/ support a state level investment program visited Haryama & Oriss (Haryana & Orissa 125.0 to improve performance of irrigation and in February 1992. States) (IDA) expand irrigation and drainage; improve (Projects for each stat operations and maintenance; complete and are in early stages of rehabilitate irrigation schemes; and preparation.) reform sector institutions. Environmental Assessment Category: To Be Determined. - 119 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender 2 Project Consulting Services Action on Procurement 4 fINDIA (Cant'd) Government of 100.0 (R) UP Sodic - Project would reclaim To be determined. Project appraisal planne Uttar Pradesh (IDA) about 65,000 ha of sodic land in about in June 1992. 10 districts, focusing mainly on privately owned lands to bring them to Procurement: To be double-cropped irrigated arable determined. production, and includes fruit tree planting and pasture development on about 4,000 ha of community land. Environmental Assessment Category B. Government of 15.0 (R) Bihar Plateau - Project would To be determined. The project is being Bihar (Bank) strengthen GOB's development planning prepared by the 130.0 and evaluation capabilities, identify Government of Bihar with (IDA) and support the potential development of Bank support. hydro power generation and minor irrigation for increased agricultural Procurement: To be production in mostly tribal areas, determined. improve village water supply and rural roads, and involve local NGOs in the selection of beneficiary activities and assist in their implementation. The project would also create employment opportunities for women. Environmental Assessment Category B. Govt. of Karnataka 65.0 (R) Agriculture Development II - Project To be determined. Appraisal mission and Rajasthan (Bank) will assist the Governments of Karnataka scheduled for May 1992. 85.0 and Rajasthan in planning and (IDA) investments in priority subsectors consistent with an acceptable agricultural strategy. Environmental Assessment Category B. West Bengal Forest 33.5 (R) West Bengal Forestry - To initate Limited technical Approved by the Executiv Department (IDA) comprehensive approach to forest assistance required in Directors on March 17, resource management in West Bengal in the field of forestry 1992. environmentally sound way,, mainly in the research, seed handling, field of afforestation, horticulture and propagation and fodder Retroactive financing of silvi pasture development on degraded grasses._ up to US$3.3 million is forest land regeneration of degraded proposed mainly for sal forests, wildlife sanctuary plantation establishment improvements; farm forestry; nursery development; seed production, and adaptive forestry research. Would include vegatatLve soil and moisture conservation measures. Institutional strengthening provided to rationalize forest administration, support NGO's and strengthen the village level Forest Protection Committees. Improvements in monitoring forest resources-and improving production/ marketing linkages between the forest department, farm forest producers and wood industries. Environmental Assessment Category D. Department of' About (R) Karnataka-Rural Water Supply & Consultants have been Preparation mission Rural Development, 80.0 Environmental Sanitation - Would improve recruited. currently in the field. Government of (IDA) health and productivity in rural areas Depending upon findings, India through provision of rural water supply, appraisal may be possibl environmental sanitation and health for June 1992. education services in Karnataka. Project would focus on improving environmental sanitation. Environmental Assessment Category B. -120- Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project s Consulting Services Action on Procurement INDIA (Cont'd) Ministry of 200.0 (R) Port Modernization - Project will To be determined. Draft preparatory study Surface Transport (Bank) focus on port modernization and received. Final report productivity improvements with no major expected end April 1992. new construction works. Environmental (Partial Global Assessment Category B. Environmental Facility funding being sought for port hazardous waste component..) Ministry of 80.0 (R) Industrial Pollution Control II - To be determined. Identification delayed Environment (Bank) Set up toxic and hazardous industrial pending further Forests 30.0 waste minimization program. Other experience with first (IDA) objectives include: (a) promoting project. effective and timely application of environmental legislation regarding the generation, disposal and release of toxic and hazardous materials; (b) .supporting efforts by industry to prevent generation or encourage recycle -of hazardous materials or to properly treat and dispose of toxic-substances; and (c) promoting development and application of novel techniques for minimization of toxic and hazardous waste.material. Project will continue the program of support.to the development of the enforcement and monitoring institutions initiated in the Industrial Pollution Control Project. Environmental Assessment Category D. Ministry of Health 214.0 (R) Health I (MCH) - Project would No expatriate Approved by the Executii and Family Welfare (IDA) support national'maternal-child health consultants required. Directors an (MCH) program through support for ' September 17, 1991. equipment, supplies, training and Credit was signed on management components. Total project February 20, 1992. cost is estimated at US$329.6 million. .'Environmental Assessment' Category C. Irrigation 50.0 Subernarekha Multi-Purpose II (Bihar) - To be determined. Further project Department, (IDA)/ A follow-up project to complete dam and processing contingent Government of 100.0 canal construction; establish irrigation upon tangible proof of Bihar (Bank) system for about 160,000 ha, support an satisfactory farm development activities, provide implementation of agricultural support services, improve . resettlement plans. environmental protection, support some resettlement and rehabilitation activities for displaced families as a result of dam and'canal construction, supply water'for municipality and industrial use and generate hydropower for industrial use. An environmental impact assessment is under preparation. Environmental Assessment Category A. Ministry of 300.0 (R) Railways Productivity Improvement - Consultants expected to Negotiations under Railways, (Bank) The project would support the efforts of be used for: preparation. Government of Indian Railways to accelerate intro- (a) a techno-economic India duction and dissemination of more cost- study (to be funded by efficient and-less polluting locomotives Japanese Grant Fund); and modern higher capacity freight'- and (b) 'management wagons and coaches and to improve the accounting. efficiency of their production, maintenance and operation. Environmental Assessment Category C. - 121 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender 2 Project Consulting Services Action on Procurement 4 INDIA (Cont'd) Department of Non- 145.0 (R) Renewable Energy Development - Consultants will be Pre-appraisal of mini- Conventional (Bank) Construction of about 45 mini hydro retained to assist in hydro and TNPL component Energy Sources; plants (for a total capacity of 110 MW) project preparation. completed. Preparation Indian Renewable on existing irrigation canals, and of windfarm and solar Energy Development promotion of other alternative energy photovoltaic component Agency; and Tamil development activities. Also, expansion under way. Nadu Newsprint and of TNPL*s plant for bagasse-based (Co-financing of about Paper Limited newsprint. Environmental Assessment US$30.0 million has been (TNPL) Category A. proposed from the Global Environment Facility (GEF) -- see Annex C.) Department of 200.0 (R) First Primary Education - Project No expatriate Pre-appraisal mission Education; (IDA) would be implemented in selected consultants required. scheduled for June 1992. Ministry of Human districts of Uttar Pradesh and would Resource address issues of enrollment of girls Development; and quality and efficiency improvement Department of through teacher training, curriculum Education, improvement, supply of materials, Government of improvements in teacher utilization and Uttar Pradesh low-cost school construction. Estimated project cost US$370 million. Environmental Assessment Category. C. Departments of 175.0 (R) Integrated Child Development No expatriate Appraisal mission Women and Child (IDA) Services II - Project would aim to consultants required. currently in the field. Developments; improve health and nutritional status of Governments of pre-school children, pregnant women and India and Madhya lactating mothers by means of improved Pradesh; health services, nutritional Department of supplementation and health education Welfare, through the Integrated Child Development Government of Services Program. Environmental Bihar Assessment Category C. Municipal Health 70.0 (R) Population VIII - Project would No expatriate Appraisal mission Departments of (IDA) support strengthening of family welfare consultants required. currently in the field. Hyderabad, (family planning and maternal-child Calcutta, health) services in slum areas of Bangalore, municipalities through establishment and Ahmadabad, Kanpur staffing of urban health posts and and other cities support for training, communication and improved management components under the family welfare urban revamping scheme. Environmental Assessment Category C. Madras 25.0 Madras Water Supply and Sanitation II - Consultants have been Appraisal misson delayed Metropolitan Water (Bank) Project would support major expansion of retained to assist with until the availability of Supply and 200.0 water supply and extension and project preparation. water is assured. Sanitation Board (IDA) operational improvements of sewage (Metrowater) collection and disposal. It would also finance an environmental sanitation program and institutional development. Environmental Assessment Category B. Municipal 260.0 (R) Bombay Sewage Disposal - Would. Expatriate consultants Pre-appraisal mission Corporation of (Bank) finance construction of two 3-km marine have been retained to planned for May 1992. Greater Bombay outfalls 'and two aerated lagoons. assist with project Technical assistance would be included preparation. for construction supervision. Total project cost estimated at US$120.0 million. Environmental Assessment Category A. - 122 - Member Country, Amount & Implementing Probable Stage of Processing and Agency ' Lender 2 Project Consulting Services Action on Procurement (Cont-d) Industrial 400.0 (R) Financial Sector Adjustment I - Loan To be determined. Awaiting details of Development Bank (Bank) to strengthen the financial system by Government's financial of India (IDBI). freeing entry into the commercial sector reform program. Industrial Credit banking sector, deregulating interest and Investment rates, lowering reserve requirements and Corporation of priority sector lending targets, and India (ICICI); and improving prudential guidelines to Industrial Finance ensure future health, autonomy and Corporation of competition within the sector. India (IFCI) Environmental Assessment Category C. Ministry of Water 90.0 (R),Narmada River Basin Development - Studies on environmental Staff appraisal report Resource (IDA) Assistance for catchment treatment in issues and water has been drafted. Boarc (Narmada Control the Sardar Sarovar Project catchment modelling. Also, presentation scheduled I Authority), State area, in Madhya Pradesh (M.P.); and in technical assistance for for July 1992. Governments of the middle Narmada basin. Assistance fisheries and Madya Pradesh, for fisheries development in the Sardar participatory rural Gujarat and Sarovar reservoir, in the Narmada appraisal techniques. - Maharashtra estuary, and the Sardar Sarovar command area. A village development fund to support resettlement assistance for management of wildlife sanctuaries in Gujarat. Technical assistance for training and basin wide environmental management. Environmental Assessment Category D. Government of About Subernarekha (Orissa) Irrigation - To To be determined. Appraisal contingent up Orissa, Department 155.0 develop a new irrigation system for reaching agreement on of Irrigation (Bank) about 100,000 ha including the seasonal distribution o 125.0 construction of three buffer reservoirs, water between Orissa an (IDA) major and distributory canals, field Bihar and tangible proo channels, on-farm development and to of implementation of provide additional agricultural support resettlement plans. All services, improved irrigation water management, and environmental protection works. An environmental impact assessment is under preparation. Environmental Assessment Category A. Government of West About (R) Kangsabati Irrigation Study by water Government disagrees wi Bengal, Department 30.0 Modernization - To rehabilitate and management.(Plan of FAO conclusion that of Irrigation (Bank)/ upgrade an existing irrigation system of Operations and proposed 3-small dams c 60.0 up to 340,000 ha by construction of Maintenance) consultants not feasible and propos (IDA) works including an additional spillway is targeted for reformulation. FAO is and related enhancement of storage completion at end of reviewing reformulatiot utilization of Kangsabati Dam, lining of April 1992. proposal and will inch the canal system and providing improved the Plan of Operations water operations management and on-farm - and Maintenance (POM) development, construction of diversion study results when weirs for reuse of return flows;' completed. Government' development of drainage and potential confirmation of steps groundwater (conjunctive use), taken to conclude the facilities; and provision of above and other issues agricultural support services, training awaited prior to and implementation support. Limited continuation of projec environmental impact. Environmental processing. Assessment Category B. -123- Member Country, Amount & Implementing Probable Stage of Processing and Agency I Lender 2 Project 3. Consulting Services Action on Procurement INDIA (Cont'd) Government of 250.0 (R) Nabard II - Support for Agriculture To be determined. Dependent on financial India, NABARD (Bank) Credit. The project would supplement sector reform adjustment GOI resources for agriculture lending. program. Timetable for Prdject objectives would include further processing still identification and implementation of unknown. appropriate reforms now required to revitalize agriculture lending and to make it more sustainable and effective it would also contribute to the production needs of women and to poverty alleviation. Environmental Assessment Category B. Power Finance 265.0 (R) Power Utilities Efficiency Need for local and Approved by the Executive Corporation (Bank) Improvement - Financial support to the expatriate consultants Directors on January 28, Power Finance Corporation (PFC) which for institutional 1992. Loan was signed on will serve as a development bank in the development and training February 14, 1992. power subsector primarily for the State under review. Electricity Boards (SEBs). Environmen- talfresettlement aspects to be included in proiect selection criteria. Environmental Assessment Category B. Ministry of 150.0 (R) National Highways II - To modernize The participating states Compliance with Surface Transport (Bank) about 290 km of National Highways in six are employing agreements reached at (MOST) 150.0 states; to increase road construction consultants for project negotiations almost (IDA) capacity and promote technology transfer preparation. complete. Board and skill development to promote presentation expected by . institutional improvements, and; May 1992. reconstruction of six bridges in Orissa, has been included. The project has environmental benefits and one Potentially adverse impact (unstructured development that may be induced by road works). Environmental Assessment Category B. Ministry of 250.0 Industrial Energy Conservation - To. Consultant may be Appraisal report Energy, Department (Bank) formulate plans for energy conservation required to: completed. Negotiations of Power in selected industries; to establish (a) establish database; postponed pending mechanisms and institutions needed to (b) conduct subsector completion of Government identify and implement the sub-projects, energy surveys; clearances. to improve efficiency of processes (c) design a tax/subsidy including substitution of petroleum- scheme; (d) identify based fuels by other sources of energy; barriers to and suggest and to minimize dependence on unreliable measures to encourage supplies of power, etc. Project will energy service have a beneficial impact on the companies; (e) identify environment through reduced specific barriers to and suggest energy consumption, and therefore measures to encourage reduces harmful gas emissions per unit cogeneration projects in of output. Environmental Assessment industry; (f) quantify Category D. training needs; (g) assist in the start- up of the Energy Management Center; (h) assist Bureau of Indian Standards in undertaking a related program; and (L) other institutional support. - 124 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project ' Consulting Services Action on Procurement NEPAL Ministry of 18.0 (R) Rural Water Supply and Sanitation - Consultants (both local Pre-appraisal mission i Housing and (IDA) Improvement of rural water supply and and international) are scheduled for May 1992. Physical Planning sanitation under the new policy currently being guidelines with greater involvement of recruited to finalize user committees and non-governmental project preparation. agencies. Project would involve the rehabilitation of about 300 existing schemes and construction of 70 new ones. Environmental Assessment Category B. Sunsari Morang 27.0 Sunsari Morang New Headworks - To Consultants have been Negotiations tentativel Irrigation (IDA) address the serious siltation problem retained to assist with scheduled for June 1992 Development Board with the ongoing Sunsari Morang detailed design and Irrigation II project (Credit 1814-NEP). construction supervision The project would: (a) construct a,new of the new headworks. intake about 1300 m upstream of the existing intake; (b) increase capacity of existing desilting basin; (c) construct a microhydro unit; (d) supply dredging equipment; (e) undertake institutional strengthening and train project staff; (f) provide technical assistance for detailed design and implementation; and (g) undertake environmental protection activities. Environmental Assessment Category B. Department of 57.0 (R) Road Maintenance - Project includes: Consulting services will Project preparation un Roads (IDA) (a) reorganization of the Department of be required for way. Roads; (b) support for a three to four preparation of road year road maintenance; (c) rehabilita- maintenance and tion of priority trunk and feeder roads; rehabilitation program, (d) staff training in management and policy action program execution of road maintenance and workshop and assessment (e) technical assistance for planning of road construction and budgeting exercises as well as to industry. The develop technical capacity for Government is in the engineering design and supervision of process of preparing works proposed. Environmental requests for proposal Assessment Category B. for consultants. Nepal 35.0 (R) Telecommunications V - Includes To be determined. Negotiations tentativc Telecommunications (IDA) 61,000 local telephone lines, rural scheduled for March 1( Corporation transmission to 26 districts, outside 1992. plant network, main trunk network. (Cofinancing from Total cost US$120 million of which FINNIDA, Japan US$100 million in foreign exchange. No International Cooperal major environmental impact. Agency (JICA), and DA Environmental Assessment Category C. and possibly from Fre and Belgium Governmeni - 125 - Member Country, Amount & Implementing Probable - Stage of Processing and Agency ' Lender 2 Project s Consulting Services Action on Procurement 4 NEPAL (Cont'd) Nepal Electricity 65.0 (R) Power Sector Efficiency - Consists Consulting services will Board presentation Authority (IDA) of components aimed at rehabilitation/ be required for project scheduled for March 24, upgrading of the Nepal interconnected supervision and 1992. system (generation, transmission and technical assistance. distribution as well as continue Consultants-are about to Advance Procurement: institutional strengthening of the Nepal be retained for project Advance procurement is Electricity Authority (NEA)). Because supervision. under way for the civil the proposed proiect will be primarily and electro-mechanical .confined to upgrading the efficiency of components of the the existing system, it is not expected Trisuli-Devighat Hydro- to have major environmental impacts: the Electric Upgrading Marsvangdi Watershed Management Project. component would assist in improving environmental management of the Marsyangdi water shed. Environmental Assessment Category B/D. Department of 44.0 Irrigation Sector - To: (a) construct Consulting services to Project preparation under Irrigation (IDA) small and medium farmer managed surface be provided by way. schemes and rehabilitate existing farmer individual consultants managed surface schemes in the Hills and financed under an on- Terai areas; (b) construct farmer-group going UNDP .project. managed groundwater schemes on the Terai; (c) institutional development support. Environmental Assessment Category B. Ministry of 30.6 (R) Basic and Primary Education - To To be determined. Negotiations completed. Education and (IDA) continue support to primary education Board presentation Culture and non-formal education. Environmental scheduled for April 28, Assessment Category C. 1992. (Cofinancing interest expressed by DANIDA, UNDP UNICEF and JICA. Japan T.A. Grant Facility has provided funds for preparation and early implementation stage.) Ministry of Health 15.0 Population and Health - To improve To be determined. Post appraisal mission (IDA) health conditions and reduce population scheduled for April 1992. growth by strengthening of family planning and maternal child health - (Japan T.A. Grant programs. Environmental Assessment Facility agreement being Category C. finalized.) Ministry of Works 22.0 (R) Multimodal Transport - Will focus on All consultancy Project was placed into and Transport; (IDA) introduction of-intermodal container activities have been the Reserve Program. Nepal Transport services and will implement suspended. Further reporting will be Corporation (NTC) administrative/operational improvement discontinued. - measures and training programs for improved transit management. Project components are: procurement of container chassis, trucks, handling equipment, construction of combined - container terminal, technical assistance, and training. Total project cost estimated at US$52.0 million. Environmental impact is expected to be insignificant. Environmental Assessment Category C. - 126 - Member Country, Amount & Implementing Probable Stage of Processing anc Agency ' Lender 2 Project s Consulting Services Action an Procurement NEPAL (Cont-d) Government of 30.0 (R) Financial Institution Development - Consultants may be New Government has aske Nepal (IDA) To support the formulation and financing required. More that the project concel of industrial development programs of information on be reviewed/re-appraise high priority, and to develop a more consultant requirements viable and competitive industrial will be known at a later financing system. Environmental date. Assessment Catezory C. Ministry of 20.0 (R) Third Agriculture Extension - To be determined. Project has been defer: Agriculture (IDA) (a) Increase agricultural, horticultural to Lending Development - and livestock production; (b) improve Further reporting will institutional framework of extension; discontinued. (c) integrate extension services for agriculture, horticulture and livestock production at field level; and (d) strengthen extension/research linkage. Environmental Assessment Category C. Nepal Electricity 173.0 Hydro Power (Arun III) - 402 MW run-of- Consultants have been Project appraisal Authority (IDA) river hydropower-plant with associated appointed. tentatively scheduled transmission facilities and July 1992. institutional strengthening of the Nepal (Cofinancing from ADB, Electricity Authority. Action Plan to Swedish Agency for ameliorate the hydro project's International Technic. environmental impacts is under Economic Cooperation preparation and will be imolemented in (BITS), KfW, ODA (UK), coniunction with this project. OECF, UNDP, Nordic Environmental Assessment Category A. Development Fund, the Governments of Belgiu Finland and Italy and possibly the Governmei of Austria and France well as Export Kreditamnden (Swedish Export Credit Agency) PAKISTAN Environment & 80.0 (N) - Agriculture Environment/Forestry To be determined. Identification under Urban Affairs, (IDA) II - The project consists of three broad Provincial components: (a) institutional Forestry strengthening; (b) social forestry Departments development: and (c) natural resources rehabilitation and protection. Environmental Assessment Category C. To be determined About Private Sector - To assist the To be determined. IEPS to be issued ea7 100.0 Government and financial institutions in FY93. (Bank) delivering better instruments for credit delivery to the private sector and to all sectors. Environmental Assessment Category: To Be Determined. Directorate of About Balochistan Primary Education - Will Consulting services will Project preparation i Primary Education, 76.4 support primary education development in likely be required for way. Balochistan (IDA) Balochistan with particular emphasis on implementation. Department of girls' schooling. Project will likely Education support policy measures, planning, and management reforms to increase girls' access to schooling. Environmental Assessment Cateaory C. - 127 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender Project Consulting Services Action on Procurement 4 PAKISTAN (Cont d) Water and Power 200.0 (R) Ghazi-Barotha Hydropower - Project Consultants (comprising Project feasibility stud Development (Bank) would provide for construction of: a joint venture of 5 completed in May 1991. Authority (a) a Barrage, on Indus River, about firms) have been working Preparation of detailed 7 km d/s of Tarbala dam (b) a 53 km on project preparation designs and tender long single concrete lined power since February 1990. documents is in progress channell (c) a power complex with and scheduled to be 1425 MW power house (5 units of 285 MW completed by August 1992 each) and 15 M.C.M. capacity of head (Cofinancing expected. ponds. Environmental Assessment Donors to be identified. Category A. To be determined About (R) Punjab Urban Environment - Arrest Consultants have been Preparation to be 100.0 decline of urban environment through appointed for project undertaken during 1992 (Bank) hazardous waste control, ground-water preparation. and appraisal planned fa 30.7 resource protection, public awareness late 1992. (IDA) and EPA strengthening. Project will (Possible financing from comprise investments in toxic/hazardous the Global Environment waste clean up and processing, Facility (GEF) -- see industrial wastewater collection and Annex C.) treatment and technical assistance for institutional strengthening. Environmental Assessment Category:, To Be Determined. Pakistan About Telecommunications Sector Consulting services will Preparation under way. Telecommunications 100.0 Restructuring - Project would assist in be required for Corporation (PTC) (Bank) the restructuring of telecommunications preparation and sector including PTC privatization, implementation of the regulatory reform and sector project. vliberalization and support investment aimed at optimizing PTC's telecommunications network and improving network efficiency and quality of services. Environmental Assessment Category: To Be Determined. Departments of About (R) Family Health II - To increase the Consultants likely to be Appraisal mission Health, 78.3 availability and quality of maternal required for preparation scheduled for June 1992. Balochistan and (IDA) health services including family and implementation. Punjab planning, improve the quality and integration of primary health care services, and strengthen institutional capabilities in Punjab and Balochistan. Environmental Assessment Category C. To be determined About Financial Sector Adjustment II - Policy To be determined. Preparation under way. 200.0 loan to support reform program in the IEPS issued on (Bank) financial sector. Follow up loan to September 13, 1991. FSAL I. Environmental Assessment Category B. To be determined About (R) Private Sector Energy Development II To be determined. Project preparation inde 160.0 - Will focus essentially on way. (Bank) strengthening institutions in Pakistan (Cofinancing expected. which will participate in private sector Donors to be identified. investments in the energy sector. Environmental Assessment Category: To Be Determined. - 128 - Member Country, Amount & Implementing Probable Stage of Processing at Agency ' Lender 2 Project ' Consulting-Services Action on Procurement PAKISTAN (Cont,d) Water and Power About Power Sector Development - Consulting services Appraisal mission Development 150.0 Implementation of a time-slice (PY93-96) will be required. scheduled in May 1992. Authority (Bank) of WAPDA's least-cost investment (Cofinancing expected, program, and restructuring program for Donors to be identific WAPDA. Would also include a technical assistance'component. Environmental Assessment Category B. Ministry of About (R) Public Sector Adjustment - Operation To be determined. Appraisal mission Finance 50.0 to support Government's macroeconomic scheduled for April 11 (Bank) program focussing on public resource 150.0 mobilization, the level and composition (IDA). of' public development expenditures, and the policy, institutional and public expenditure framework needed to bring about a significant and substantial improvement in social conditions. Environmental Assessment Category C. To be determined About (R) Integrated Hill Farming II - Project To be determined. Pre-appraisal mission 51.0 will include provision of inputs and currently in the fiel (IDA) support services for increased food and Final EPS to be issue fodder crop production, strengthening of June 1, 1992. extension, animal health 'services and input distribution, afforestation of demarcated forests and hillside planting for fuelvood, construction of feeder roads and soil conservation works and technical assistance for project implementation. Environmental Assessment Category B. Punjab Department 115.0 (R) Middle Schooling - To improve the Consultants likely to be Awaiting fulfillment of Education (IDA) quality of the delivery of lower required for execution. Board conditions. secondary education in the Punjab through improved planning, management. and administration of schools, * supervision, and enhanced educational materials. Environmental Assessment Category C. Water and Power About (R) Eastern Sadiqia (South) Phase I - Consultants will be Appraisal report Development 32.3 Subsurface and surface drainage, water required for project scheduled for March 3 Authority, Punjab (IDA) conservation through canal lining, implementation. 1992. Negotiations Irrigation provision of interceptor'drains, and tentatively schedulei Department watercourse improvement in the ' April 29, 1992. Fordwah/Eastern Sadiqia (South) canal command area in Punjab Province. Phase 1 would include water conservation measures, a monitoring program, and' additional preparation work for the subsurface drainage system to be implemented under a separate Phase 2 project. Environmental effect of Phase 1 expected to be positive. Environmental Assessment Category B. Government of About (R).Environmental Protection and Consultants will be Negotiations tentati Pakistan - 33.3 Resource Conservation - Protection and required for project scheduled for April Environmental and (IDA) management of environmental resources in implementation. 1992. Urban Affairs Pakistan. Positive environmental impact Division expected. Environmental Assessment Category D. - 129 - Member Country, Amount & Implementing Probable Stage of Processing and Agency Lender 2 Project Consulting Services Action on Procurement 4 PAKISTAN (Cont'd) National Housing About (R) Low-Income Communities Consultants have been Pre-appraisal mission Authority together 70.0 Infrastructure - Area upgrading and appointed. completed March 1992. with respective (IDA) basic urban services for squatter Funds obtained from Jap; Provincial communities. -.To facilitate mechanisms and Switzerland for Governments for land markets and shelter development preparation. in urban and high density rural areas. (Cofinancing of up to Land tenure and user fees for services US$10.0 million may be to be addressed. Positive environmental required for impact expected. Environmental implementation.) Assessment: To Be Determined. Government of About (R) Sindh Urban Development - Project, Consultants have been Project delayed until Sindh (GOS) 100.0 would: (a) introduce fiscal and . appointed. supplemental loan for (IDA) administrative policy and institutional Credit 1987-CE is reforms in GOS through: (i) resource processed. Project may mobilization; (ii) decentralization of be restructured. some provincial authority to local (U.S. Trade & Developmei government; (iii) improvement of Program (US$500,000) an( institutional capacity of Government of Japanese Grant Facility Sindh (GOS) (including Karachi grants (US$1.8 million Development Authority (KDA)) and Karachi equivalent) have been Metropolitan Corporation (KMC) including approved for financing setting up a technical unit in GOS for project preparation.) project appraisal and supervision; (iv) preparation of urban transport development in Karachi; and (b) finance sub-projects proposed by GOS and the local government on the basis of eligibility and appraisal criteria agreed during project appraisal. Positive environmental impact expected. Environmental Assessment Category B. Oil and Gas . About (R) Domestic Energy Resource Development. Consultants will be Board presentation Development 180.0 - Support of oil and gas development in required for project tentatively scheduled f4 Corporation (OGDC) (Bank) identified joint ventures and corporate implementation. late May 1992, pending restructuring of OGDC. Environmental . fulfillment of Board Assessment Category A. conditions. (Cofinancing confirmed with USAID (US$1.7 million), and with IDB (US$17.5 million). Retroactive financing o: US$18.0 million propose for the cost of drillinj the delineation wells a: consultancy services. To be determined About (R) Industry and Trade Adjustment - Consulting services Preparation under way.. 200.0 Adjustment loan to promote further required for (Bank) reforms aimed it improving industrial preparation/appraisal. sector efficiency and linkage to agricultural sector and capital markets. . Environmental Assessment Category C. - 130 - Member Country, Amount & Implementing -Probable Stage of Processing ar Agency ' Lender Project Consulting Services Action on Procurement SRI LANKA Mahaveli Authority 30.0 Mahaweli Consolidation - Rehabilitation To be determined. A first preparation of Sri Lanka (IDA) and improvements of irrigation and mission is planned for (MASL), FAO/CP drainage facilities in Mahaweli Systems April 1992. B.C. (and G). Also, formation of farmers' organizations and introduction of improved Operation and Maintenance. Environmental Assessment Category B. Road Development 35.0 Highway Maintenance - Will aim to: Consulting services will Project under Authority (IDA) (a) strengthen road maintenance - be required for preparation. capabilities; (b) address human resource preparation of A PPF of US$0.3 millic -and institutional development issues; maintenance program, may be requested. and (c) restructure the local . feasibility studies, and (Cofinancing will be maintenance contractor industry. Would maintenance explored.) also finance: (a) technical assistance reorganization and (b) part of a five year program of management study. periodic-maintenance and rehabilitation Consultants for project program; laboratory tools and preparation to be maintenance works; and (d) training financed under possible components. Environmental Assessment PPF and bilateral Category B. grants. Ministry of 50.0 Private Sector Development - To promote Consulting services will Project is in early Finance/Ministry (IDA) the development of the private sector be required for policy- stages of preparation of Industry through policy and tariff reform, and tariff reform, Sciences and provision of term credit and technical institution building and Technology - assistance for rehabilitation of enterprise existing enterprises. Project rehabilitation. components will increase the outward orientation of the private sector and enhance its role in the provision of social sciences and infrastructure. Environmental Assessment Category C. Ministry of 60.0 Banking Sector Adjustment - Would Will probably include a Project is in early Finance (IDA) include components to: (a) restructure small technical stages of preparation the two, large state-owned banks, assistance component to strengthen interest rates and monetary provide support for policy; (b) restructure the National strengthening two large Savings Bank; (c) strengthen Central state banks, Bank regulation and supervision; establishing a (d) improve financial sector collection and mobilization and investment of long-term restructuring-agency, funds; and (e) strengthen country's assisting pension plans accounting and auditing. Environmental and insurance companies Assessment Category C. with portfolio management, and strengthening the Auditor General's Office. - 131 - Member Country, Amount & Implementing Probable Stage of Processing anc Agency ' Lender 2 Project ' Consulting Services Action on Procurement SRI IANKA (Cont'd) Ministry of 20.5 (R) Community Water Supply-and Consultants have Appraisal mission was Housing & (IDA) Sanitation (WSSP) - Strengthen prepared District completed in February Construction & planning/programming capability of Development Plans, and 1992. Credit documenta Community Water Government and local authorities: an institutional under preparation. Supply & develop mechanisms for Government framework,.community A PPF for US$0.7 millic Sanitation policies on cost recovery and operations mobilization, health has been approved to Drainage Programme and maintenance; develop education, monitoring provide technical Unit (CWSPU) responsibilities for operations and and evaluation, and assistance for project maintenance capability in the local training. Final reports preparation. authorities and user groups; to promote were received in - involvement of NGOs, the private sector, December 1991. A Retroactive financing women; increase coverage of water and further multi-year US$0.2 million is sanitation in rural and small community consultancy is being proposed. subsector; and improve public health formulated to provide 7 through provision of safe drinking water technical/management and adequate sanitation. Environmental support to CWSPU program Assessment Category B. unit during project implementation. Ministry of 50.0 (R) Tree Crops Restructuring - The To be determined. Project has been remove Finance (IDA) operation would support restructuring of from the Lending Progre the treecrops subsector including: . Further reporting will (a) breaking up of two large state discontinued. plantation corporations into autonomous independent commercial entities; (b) infusion of private management into 22 smaller companies; (c) disposition of loss-making unviable estates; and (d) reform of sector-vide regulatory and incentive framework. Environmental Assessment Category B. Ministry of 35.0 Local Government Development - Project- Consultants to prepare Project preparation.un Finance (IDA) will provide technical assistance and an initial pipeline of way. LLDF Act will ne4 training to 308.rural and urban local projects for the LLDF amending in light of authorities (LAs) and technical , have been appointed, and realignment of central assistance and a line of credit to the consultants to prepare ministries. restructured Local Loans Development the technical assistance Fund (LLDF). Sub-loans would finance LA and training components projects which are not suitable for are now being appointed private investment, e.g., roads, under Credit 1697-CE sidewalks, parks, playgrounds, drainage, (Municipal Management street lighting, municipal offices, Project.) public markets. LLDF would.carry out an environmental assessment as part of its appraisal of sub-projects. Environmental Assessment Category B. - 132 - Member Country, Amount & Implementing Probable Stage of Processing anc Agency ' Lender Project Consulting Services Action onrProcurement (Cont"d) Ministry of 15.0 (R) Agricultural Extension II (formerly Consulting services will Appraisal report under Agriculture, (IDA) Agricultural Extension) - The project be required to implement preparation. Development and aims at restructuring agricultural the extension component Negotiations tentative] Research extension services, developing seed and to develop seed scheduled for April 20 legislation, and streamlining pesticide legislation. 1992. management. Total project cost is US$18.3 million. No negative environmental impacts predicted. Environmental Assessment Category B. Ministry of 35.0 Transport I - To include procurement of Consultants were Appraisal mission Transport/Road (IDA) equipment, spare parts and repairs for appointed. rescheduled for April Development railway operations; improvement of 1992. Authority traffic management in Colombo Municipality; and technical assistance Consulting services ar for transport planning. Total project being financed under a cost US$286.0 million. Environmental IDA Project Preparatio impact is expected to be positive. Facility advance for a Environmental Assessment Category B. total of'US$906,000. (Co-financing from OEC of US$80.0 million has been approved.) I- -133- VII. NEW PROJECTS ADDED IN THIS ISSUE I. AFRICA REGION COUNTRY AND IMPLEMENTING AGENCY PROJECT PAGE ANGOLA Ministry of Fisheries Fisheries Resource 1 Caixa Postal 83 Management Luanda, Angola Telephone: 333097 BENINITOGO Communaute Electrique Adjarala Hydroelectric 3 . du Benin Rue de la Kazah B.P. 1368 Lome, Togo Fax: 228 21 37 64 Telex: 5355 Telephone: 228 21 57 96 BURUNDI Ministry of Education Education Sector V 4 d/o Resident Mission 45, Ave De La Poste B.P. 2637 Bujumbura, Burundi Cable: INTBAFRAD Telex: 5095 Fax: 26005 Telephone: 2244, 23269. COTE D'IVOIRE Ministry of Economic, Economic Management 10 Finance & Planning: Technical Assistance Ministry of Civil Service & Employment; Ministry of Justice MAURITIUS To be determined Technology I 23 NOZAxBIqUE National Planning Food Security 24 Commission (CNP) Capacity Building Caixe Postal 493 Maputo, Mozambique Telex: 6650 Telephone: 492-627 - 134 - I. AFRICA REGION (Cont'd) COUNTRY AND IMPLEMENTING AGENCY PROJECT PAGE MOZAMBIOUE (Cont'd) To be determined Maputo Corridor 24 NIGERIA Federal Ministry of Secondary Education 27 Education cdo Resident Mission First'Floor Plot PC-10 Eng. Close, off Idowu Taylor Street Victoria Island P.O. Box 127 Lagos, Nigeria Cable: INTBAFRAD Fax: 234-1--616-360 Telex: 21174 Telephone: 234-1-615-016 Federal Ministry of Finance Economic Management 28 & Economic Development (FMFED) 1258 Federal Secretariat, Phase I, Lagos, Nigeria Telex: 961-21248 TANZANIA National Board of Accounts Financial and Legal 35 and Auditors, Legal Management Department, IAA, IFM TOO Ministere de 1'Education Education Management 36 Nationale et de la Support Recherche Scientifique Lome, Togo Fax: (228) 21 32 41 Telephone: (228) 21 29 23 ZIMBABWE Ministry of Finance, Emergency Drought 40 Economic Planning and Recovery Development - 135 - II. EAST ASIA & PACIFIC REGION COUNTRY AND IMPLEMENTING AGENCY PROJECT PAGE FIJI Ministry of Education Education 49 Madela House, Suva, Fiji Fax: .679-303-511 Telex: 792-2121 Telephone: 679-314-477 KOREA Government of Korea Financial Sector 54 Kyunggi-Do, Investment Ministry of Finance Kwachon, Korea Fax: (82-2) 503-9324 Telephone: (82-2) 503-9274 LAO, PEOPLE'S DEMOCRATIC REPUBLIC Provincial Government of Luang Namtha Provincial 56 Luang Namtha Development Namtha District, Luang Namtha Province, Lao, People's Democratic Republic Cable: Provincial Government of Luang Namtha, Namtha District, Luang Namtha Province Lao, PDR PAPUA NEW GUINEA To be determined Telecom IV 59 III. EUROPE AND CENTRAL ASIA REGION ALBANIA To be determined Human Resources I 66 BULGARIA Ministry of Finance Debt and Debt Service 66 102 Rakovski Street Reduction (DDSR) Safia 1040 Fax: 359-2-881207 Telex: 865-22727 Telephone: 359-2-870581 - 136 - III. EUROPE AND CENTRAL ASIA REGION (Cont'd) COUNTRY AND IMPLEMENTING AGENCY PROJECT PAGE ROMANIA Ministry of Education Education 70 30 rue General Berthelot Bucharest, Romania Fax: 40-0-157-736 Telephone: 40-045-10-08 TURKEY TSKI Third Water Supply and 71 and Sewerage IV. LATIN AMERICA AND CARIBBEAN REGION NICARAGUA Ministry of Construction Transport 92 and Transport Fax: 505-2-224-322 Telephone: 505-2-225-05 PERU Commission for the Privatization Adjustment 93 Promotion of Private Investment (COPRI) Lima, Peru Fax: 750-078 Telephone: 756-253 To be determined Power Sector Privat./ 94 Rehabilitation URUGUAY Central Education Pre-School and Primary 95 Directing Council Education Improvement (CODICEN) SORIANO 1045 Montevideo, Uruguay Fax: 90-29-62 Telephone: 91-34057 V. MIDDLE EAST AND NORTH AFRICA REGION EGYPT Public Enterprise Office - Technical Assistance 101 and other agencies for Privatization and The Prime Ministry Enterprise Sector Reform Cairo, Egypt Fax: 20-2-355-8016 Telephone: 20-2-354-3484 -137- II. MIDDLE EAST & NORTH AFRICA REGION (Cant-d) COUNTRY AND IMPLEMENTING AGENCY PROJECT PAGE IRAN Sistan-Baluchistan Sistan River Flood 103 Regional Water Board Works Rehabilitation Zahedan, Islamic Republic of Iran Telephone: 0541-24841 Iran Power Generation Power Sector Efficiency 103 and Transmission Company Improvement (TAVAIVIR), Tehran Regional Electricity Company (TREC), Khuzestan Water and Power Authority (KWPA) TREC P.O. Box 17185-1166 Tehran, Iran Telex: 213498 (TAVAIVIR) 212817TREC Telephone: 21-684-088 (TAVAIVIR) 21-349-010 (TREC) Tehran Municipality Tehran Drainage 103 Tehran, Iran Fax: 825884 Cable: 222964 TEDO IR Telephone: 830580, 832446 VI. SOUTH ASIA REGION BANGLADESH Bangladesh Power- East/West 111 Development Board Interconnector Rony House 4th Floor Telex: 675617-BPB-BJ Telephone: 283-671 PAXISTAN Environment & Urban Agriculture Environment/ 126 Affairs, Provincial Forestry II Forestry Departments Government of Pakistan Islamabad, Pakistan - 138 - VIII. PROJECTS DROPPED FROM LENDING PROGRAM AND PROJECTS SIGNED I. AFRICA REGION COUNTRY AND IMPLEMENTING AGENCY PROJECT PAGE BURKINA FASO Ministers de 1'Equipment/ Transport SECAL 6 Ministere des Transports ETHIOPIA Ministry of Agriculture Livestock Conservation 12 GHANA Bank of Ghana Financial Sector 14 Adjustment (FINSAC III) MAURITANIA Ministry of Health Population and Health 23 MozAMaBq Ministry of Health Second Health and 25 Nutrition TANZANIA Planning Commission Public Sector Reform 36 ZAMBIA Ministry of Energy and Power Sector 39 Water Development II. EAST ASIA & PACIFIC REGION FIJI To be determined Energy Sector 49 INDONESIA Bank Indonesia/ Emerging Enterprises 52 Participating Financial Development Institutions Ministry of Transmigration Transmigration Second 54 (MOT) Stage Development -139- II. EAST ASIA & PACIFIC REGION (Cont*d) COUNTRY AND IMPLEMENTING AGENCY PROJECT PACE THAILAND Ministry of Finance Tax Computerization 64 Revenue Department III. EUROPE AND CENTRAL ASIA REGION To be determined Financial Sector 72 Investment IV. LATIN AMERICA AND CARIBBEAN REGION ARGENTINA Yacimientos Petroliferos Hydrocarbon 74 Fiscales (YPF) Engineering Yacimientos Petroliferos Hydrocarbon Sector 74 Fiscales (YPF) Rehabilitation BOLIVIA Ministry of Agriculture Agro Export Develop. 77 Program (AEDP) BRAZIL Banco Nacional de Private Sector 79 Desenvolvimento Economico Power Development e Social (BNDES) ECUADOR Ministerio de Social Development I 86 Educacion/SECAP Education and Training PANAMA Ministerio de Planificacion Economic Recovery 92 y Politica Economica VENEZUELA Ministry of Agriculture Agriculture Sector 97 Investment - 140 - V. MIDDLE EAST AND NORTH APRICA REGION COUNTRY AND IMPLEMENTING AGENCY PROJECT PAGE REPUBLIC OF Ministry of Economy, Industrial Support 110 Supply and Trade, Services and Industrial Bank of Yemen VI. SOUTH ASIA BANGLADESH Bangladdsh Bank Agricultural and 114 Rural Credit Reserve Bank of India Financial Sector 117 Adjustment II INDIA Ministry of Health Health I (MCH) 120 and Family Welfare Power Finance Power Utilities 123 Corporation Efficiency Improvement NEPAL Ministry of Works Multimodal Transport 125 and Transport; Nepal Transport Corp. (NTC) Ministry of Agriculture Third Agriculture 126 Extension SRI LANKA Ministry of Finance Tree Crops 131 Restructuring MONTHLY OPERATIONAL SUMMARY ANNEX I As explained in "Information about, the Environmental Assessment Process," environmental classifications for all projects are included in the Monthly Operational Summary every month. This quarterly annex contains: I o For Category A projects, the environmental data sheet containing information about the issues and schedule of the environmental assessment process; o For Category B projects, a header showing the status of environmental analysis. Environmental data sheets for B, C and the remaining carry-over D projects have not been reproduced here because of the volume involved but are available to the public on a request basis. Any request should identify the data sheets desired by project name and identification number (e.g., 3AFRPA000). Request for a data sheet may be made by writing: Environmental Data Sheets Environment Department Room S-5141 World Bank 1818 H Street, N.W. Washington, DC 20433 USA or by telephoning 1-202-473-1262 and leaving a message. � �i� '1 • 11i � ЭI � � �� , I t ., - �� и �� , 1I, и I1 11 • и, �!�, 1� � 11 и � �� ` д . I� ir , 11 и 11` ' � ��; и � 1� ' 11 � и �i �11; I, �� I1 � , , , , � ENVIRONMENTAL DATA SHEET FOR CATEGORY "All PROJECTS Country AFR. REGION Project ID No: 3AFRPA004 Project Adjarala Hydroelectric Appraisal Date May 15, 1993 Total Project Cost: $212.00 Board Date Mar. 01, 1994 Managing Division AFiIE Sector: Power Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt 'of EA by Bank:.2nd Quarter, 92 Date EA Category Assigned:,11/20/88 MAJOR PROJECT C014PONENTS: ADJARALA HYDRO scheme (80 MW, 250 Gwh) 97 km downstream of Nangbeto on the Mono River on boundary Togo-Beni * n,. with associated transmission, management and engineering services, population resettlement and compensation, and environmental and health protection programs; also power.sector studies, TA and training for CEB, CEET and'SBEE. MAJOR ENVIRONMENTAL I SSUES: Population resettlement and compensation, Environmental protection, Health protection, Downstream hydrology OTHER ENVIRONMENTAL ISSUES: To be determined PROPOSED ACTIONS: Environmental Assessment under preparation. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY:- Category A. About 10,000 people affected by resettlement. SCHEDULE OF CATEGORY A.ENVIRONMENTAL ASSESSMENT:* Consultants appointed and work commenced on all issues listed above. EA first draft issued in October 1991. REMARKS: Environmental reconnaissance has been made. Bidding documents and contracts will include environmental clauses. Environmental panel will be established. Environmental unit will be created.within CEB. Contacts with population involved and NGO underway. 1-2 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : EQ. GUINEA Project ID No: 3EQGPA014 Project : Natural Resource Management and Conservation Appraisal Date. : Nov. 25, 1992 Total Project Cost: $10.00 Board Date : Nov. 09, 1993 Managing Division : AFIAG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: To be determined Date EA Category Assigned: 3/25/92 MAJOR PROJECT COMPONENTS: The project's overall objective would be to assist the Government to implement a national natural resource management plan in order to assure both an optimal production level from the forest and conservation of the environment. In support of the above objectives, the project would include the following components: (a) preparation and implementation of-a natural resource management program; (b) conservation and management of natural forests; (c) establishment and management of protected and multiple use areas; and (d) institutional strengthening of the Ministry of Agriculture and Forestry. MAJOR ENVIRONMENTAL ISSUES: Establishment of sound environmental practices is a major focus of the project. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: Still to be determined. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: According to the OD 4.01 guideline, this project is under Category A. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Separate EA is required. EA will be prepared with technical support from Norway Consultant Trust Fund. REMARKS: Project has institutional building focus as well- as establishment of sound environmental activities.- 1-3 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : GABON Project ID No: 3GABPA011 Project -: Forestry & Environment Appraisal Date : Nov. 15, 1991 Total Project Cost: $35.00 Board Date : Aug. _-11, 1992 Managing Division : AFIAG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: November 1991 Date EA Category Assigned: March 1992 MAJOR PROJECT COMPONENTS: (a) institutional strengthening; (b) forestry research; (c) forestry training; (d) inventory and rehabilitation of Okoume stands; (e) studies for environmental protection; and (f) creation and maintenance of reserves. MAJOR ENVIRONMENTAL ISSUES: Most project components are considered to be D/C activities. The project is expected to have a'positive environmental impact. An Environmental Impact Assessment is however being done. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: N/A JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: The initial classification is a D, however, the new guidelines would reclassify it an A requiring an Environmental Assessment. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Started in June 1991 with first draft-submitted early November 1991. REMARKS: The conservation of forest is a localized issue.mainly in areas with 100 km of coast line and around Libreville. Adequate extensive forest management would be sufficient in the rest of the country. Wildlife of,the coastal and estuarine areas could be protected through the creation of reserves. Additional reserves in the rest the country would ensure further wildland protection. -1-4 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : GHANA Project ID No: 3GHAPAO94 Project : Power VII Appraisal Date : Sep. 15, 1992 Total Project Cost: $65.00 Board Date : Jul. 13, 1993 Managing Division : AF4IE Sector: Industry Lending Instrument: Specific Investment Loan Status: Standby Date (est.) for receipt of EA by Bank: Date EA Category Assigned: MAJOR PROJECT COMPONENTS: Provision of additional thermal generation needed to complement hydro power; possibly additional transmission and distribution based on power master plan; technical assistance for institutional building. MAJOR ENVIRONMENTAL ISSUES: No major environmental issues are expected since the thermal generation will be gas turbine with very minimal environmental impact. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: REMARKS: II 1-5 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : GHANA Project ID No: 3GHAPAO98 Project : Livestock Services Appraisal Date : Mar. 30, 1992 Total Project Cost: $41.00 Board Date : Dec. 08, 1992 Managing Division : AF4AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Completed Date EA Category Assigned: 11/91 MAJOR PROJECT COMPONENTS: (i) Animal health; (ii) Water supply; (iii) Nutrition; and (iv) Breed improvement. MAJOR ENVIRONMENTAL ISSUES: Improved animal health could result in greater pressure on grazing resources, especially around watering points. Use of insecticides in tse-tse control campaign could be harmful to other fauna. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: (a) The establishment of herders' associations to regulate use of water and forage resources; (b) introduction of pasture legumes into grazing areas and a range of herbaceous and tree legumes into mixed livestock/crop farming systems to increase availability and improve quality of forage; and (c) the establishment of a range improvement and monitoring unit in the Department of Animal Health and Production to assist herders' associations in regulating water and forage utilization and to monitor improve range productivity; (d) use of odour baited tse-tse fly traps and screens to be applied as an alternative to insecticides in the tse-tse control program. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Potential for overgrazing natural pastures. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Environmental impact assessment done.as part of project preparation. Little or no adverse impact. REMARKS: The Environmental Protection Council, District Assembly officials, producer groups and some NGOs were consulted. The Ministry of Agriculture has officially submitted the report to the Bank together with the project proposal. 1-6 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : GUINEA BIS. Project ID No: 3GUBPAO35 Project : Natural Resources Management Appraisal Date : JAN. 29, 1993 Total Project Cost: $20.00 Board Date : Dec. 14, 1993 Managing Division : AF4AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: 3/25/92 MAJOR PROJECT COMPONENTS: Forest resource Land use and management. Policy.reform in land tenure, pilot program of community-based resourcemanagement, institution strengthening, and management of timber reserves. MAJOR ENVIRONMENTAL ISSUES: Forest and soil degradation. OTHER ENVIRONMENTAL ISSUES: Land tenure/marine resources depletion. PROPOSED ACTIONS: Conservation and erosion protection. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Project geared towards environmental protection. Project would be designed to improve the environment; hence no adverse effect on the environment. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: To be determined. REMARKS: None. 1-7 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : COTE DIVOIRE Project ID No: 3IVCPA103 Project : Livestock Appraisal Date : Oct. 15, 1992 Total Project Cost: $50.00 Board Date : Jun. 15, 1993 Managing Division : AFlAG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: To be determined Date EA Category Assigned: Mar. 19, 1992 MAJOR PROJECT COMPONENTS: To be determined. MAJOR ENVIRONMENTAL ISSUES: To be determined. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: To be determined. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: The EA Category A is assigned at this early stage of preparation. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Not yet started. REMARKS: None. I-8 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : MALAWI Project ID No: 3MALPAO76 Project : Energy II (Power V) Appraisal Date : Aug. 23, 1991 Total Project Cost: $231.30 Board Date : May 12, 1992 Managing Division : AF61E Sector: Power. Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Nov. 1991 Date EA Category Assigned: Jan. 19, 1990 MAJOR PROJECT COMPONENTS: Expansion and rehabilitation of generation, transmission and distribution facilities. MAJOR ENVIRONMENTAL ISSUES: (i) Kapichira hydroelectric dam has no serious impact on downstream fisheries. (ii) Inundation of 100 ha of the 78000 ha of Majete Game Reserve upstream of dam (habitat 100 elephants); (iii) Socio-economic effects of Kapichira dam are positive through provision of health and schooling facilities; and (iv) Effects of the transmission and distribution components on the environment are negligible, and are limited to resettlement of about 5 families. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: The power utility will: (i) establish an environmental unit to monitor and plan mitigating measures during and after construction; (ii) resettle affected families; and (iii) compensate wildlife conversion. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Kapichira hydro is a major hydro plant on Malawi's major river, and 'hence Category A. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Funding for the Environmental Assessment (EA) has been obtained from Norwegian sources, and the EA started in December 1990 with a 2-day workshop in Lilongwe. The EA report is now completed and the final report, dated November 22, 1991 is available with Government and and ESCOM, AFTEN, AF6IE and Africa Information Center. REMARKS: 1-9 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS The EA has been discussed with Government and ESCOM during the appraisal mission and at negotiations. 1-10 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : MAURITANIA .Project ID No: 3MTAPA049 Project : Irrigation Promotion Appraisal Date : Apr. 01, 1993 Total Project Cost: $40.00 Board Date : Dec. 1.4, 1993 Managing Division : AF5AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt .of EA by Bank: February 1993 Date EA Category Assigned: MAJOR PROJECT COMPONENTS: Development of private irrigation plus selected rehabilitation of publicly constructed schemes. MAJOR ENVIRONMENTAL ISSUES: Not yet identified. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: Not yet identified. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Large scale irrigation projects are Category A under guidelines in OD 4.01. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT:' Not yet started. REMARKS: Project preparation scheduled to start in mid-1992. . I-11 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : MAURITIUS Project ID No: 3MTSPA046 Project : SUGAR ENERGY DEVELOPMENT Appraisal Date : Aug. 14, 1991 Total Project Cost: $50.00 Board Date : Mar. 31, 1992 Managing Division : AF2AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Completed Date EA Category Assigned: MAJOR PROJECT COMPONENTS: The project would include the following main components: (a) Expansion of energy production capacity through investment in a new bagasse-cum-coal plant; (b) increasing bagasse availability through a program of mill modernization; (c) investments in bagasse transport; (d) technology development and dissemination; and (e) program monitoring and evaluation, involving technical assistance support. MAJOR ENVIRONMENTAL ISSUES: The proposed investment in a bagasse-cum-coal power plant would result in significant reduction of air pollutant emissions, compared to the investment in an alternative diesel plant. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: Environmental control measures should be introduced involving: (i) installation of a design to be determined as part of the detailed engineering study; (ii) treatment of ash sluice and scrubber water; (iii) recycling of bagasse ash as a soil supplement; and (iv) recycling of coal ash possibly as supplement for cement block manufacturing. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: N/A SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Environmental assessment completed. Report submitted by Government. Summary circulated to Board of Directors on December 19, 1991. REMARKS: 1-12 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : SENEGAL Project ID No: 3SENPAO95 Project : URBAN IV Appraisal Date : JAN. 15, 1993 Total Project Cost: $59.00 Board Date : Jul. 13, 1993 Managing Division : AF5IN Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Sep. 1992 Date EA Category Assigned: Nov. 27, 1991 MAJOR PROJECT COMPONENTS: Three main components: (a) institutional development on both central and local government levels; (b) physical investments encompassing public infrastracture and facilities; and (c) project management for the recurrent costs. MAJOR ENVIRONMENTAL ISSUES: The situation of environmentally-dangerous living conditions and the low quality of public services, principally of housing, water and sanitation. OTHER ENVIRONMENTAL ISSUES: Industrial hazards and uncontrolled pollution usually in the Cap Vert Peninsula. PROPOSED ACTIONS:' Sectoral Environmental Assessment Study (Diagnostic of the Sector). JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: The project is an A because a number of similar development activities with potentially cumulative impacts are planned for a variety of specific "city projects". SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: The idea of an environmental diagnostic in the urban sector has been submitted to the government. REMARKS: None. 1-13 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : TANZANIA Project ID No: 3TANPA084 Project : Energy (Power IV) Appraisal Date : Jul. 11, 1992 Total Project Cost: $343.00 Board Date : Feb. 09, 1993 Managing Division : AF6IE - Sector: Power Lending Instrument: Specific Investment Loan 1 Status: Lending Date (est.) for receipt of EA by Bank: 2nd Quarter,91 Date EA Category Assigned: MAJOR PROJECT COMPONENTS: (a) Construction of Lower Kihansi Hydro Electric Scheme consisting of 3x54 MW units and associated' transmission; (b) rehabilitation of existing facilities (generation and distribution); (c) extension of the distribution network; (d) institutional reforms, including implementation of the second phase of MIS and training; and (e) studies. MAJOR ENVIRONMENTAL ISSUES: Environmental studies completed (Japan). The study reviewed and the Kihansi site visited by the Bank (AFTEN). Evaluation of the woody vegetation near Kihansi with special emphasis on the avifauna is required. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: A.terrestrial ecologist is carrying out the survey which is expected to be completed by end of June 1991. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: The final environmental assessment report will be prepared based on the study prepared by the Japanese and the outcome of the survey being carried out. REMARKS: No major environmental issues are expected. 1-14 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : CHINA Project ID No: 4CHAPAO96 Project : ZOUXIAN THERMAL POWER Appraisal Date : Apr. 19, 1990 Total Project Cost: $793.90 Board Date : Apr. 21, 1992 , Managing Division : EA2IE Sector: Power Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Completed Date EA Category Assigned: MAJOR PROJECT COMPONENTS: (i) Construction of 2 X 600 MW coal-fired thermal power units; (ii) construction of one 500-kV and nine 220-kV transmission lines; and (iii) provision of technical assistance for a study to analyze air quality implications of long range thermal power expansion programs and development of practical methodologies for appropriate site selection to minimize adverse air quality in China's coastal regions. MAJOR ENVIRONMENTAL ISSUES: (1) Air quality: Ground level concentrations of dust particles and sulfur dioxide should be kept within the limits of the 'national standard (2) Liquid chemical effluent: Plant liquid chemical effluents should be treated prior to discharge. (3) Ash disposal. (4) Water management. OTHER ENVIRONMENTAL ISSUES: The noise level should be within the acceptable limits. PROPOSED ACTIONS: (1) The project will employ high efficiency electrostatic precipitators for dust removal and burn low sulfur coal. Ground-level concentrations of dust particles and sulfur dioxide and NO x would be kept within the limits of the national standard and comply with the World Bank Guidelines. (2) Chemical wastewaters will be treated and then utilized for ash sluicing to the disposal area. No chrome chemicals will be used in the cooling towers. (3) Fly ash and ground bottom ash will be slurried and piped to the gullies disposal site about 12-13 km from the plant. The ash surface will be kept wet to prevent dusting and revegetated up upon completion. The disposal sitee is uninhabited. Water should be recycled from ash ponds for reuse in ash slurrying. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: No change from initial classification. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Environmental Impact Assessment was completed on May 1990. Bank review indicated that the project would meet World Bank Guidelines and 1-15 3 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS all applicable Chinese environmental norms. REMARKS: I3 1-16 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : CHINA Project ID No: 4CHAPA105 Project : Shanghai Port III Appraisal Date : May 15, 1992 Total Project Cost: $200.00 Board Date : Nov. 24, 1992 Managing Division : EA2TP Sector: Transportation Lending Instrument: Specific Investment Loan. Status: Lending Date (est.) for receipt of EA by Bank: Feb. 29, 1992 Date EA Category Assigned: MAJOR PROJECT COMPONENTS: - Construction of two new terminals at Luojing and Waigaoqiao on the Yangtze River - Purchase of equipment for both the new and existing terminals - Implementation of an MIS to upgrade operations and management, including financial management - An action plan for restructuring the existing port facilities on the Huangpu River to rationalize their use MAJOR ENVIRONMENTAL ISSUES: The water quality of the Huangpu and Yangtze Rivers and their tributaries and inland waterways linked to them is poor due to a combination of uncontrolled sanitary sewage, storm water drainage and industrial effluents from small enterprises, leading to contaminated underlying sediments. Thus a major issue is to ensure that the consruction of new terminals will not contribute to the further deterioration of the quality of the water and related ecosystems. The other related issues are: impact of additional traffic on roads that will serve the new terminals, both during construction and in operation after commissioning, and safety measures to deal with it; management and monitoring of construction to protect the environment; monitoring and management of air quality at the new coal handling terminal at Luojing; resettlement of people who may be affected by the construction of the new terminals. As the new facilities are brought into 'operation, use of the older terminals in the city center for cargo handling will be phased out: this will have a positive impact on the environment in the Shanghai urban area. The safe disposal of dredged material resulting from ongoing maintenance dredging in the present port area, which is not in any way affected by the proposed project, will continue to be a matter of concern. Air pollution from coal handling at one of the terminals on the Huangpu River is an environmental hazard, as are illegal discharge of ships' wastes and oil spills caused by marine accidents. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: The impact of dredging and the disposal of dredged material in the on-going 1-17 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS project has been studied by the Chinese authorities and reviewed by an environment expert and provision to help implement the recommended safety measures will be included in the project. At the new terminals at Luojing and Waigaoqiao, sewage and drainage from the facilities and operations will be collected and treated in secondary treatment facilities before discharge into the river. Storm water and other effluents (e.g., wash water from the washing of containers, etc.) will similarly be collected and treated before discharge. Older facilities on the west side of the Huangpu River are connected to the municipal sewage system; those on the east side have their own collection tanks.for sewage which is then trucked away. New facilities to be constructed under the proposed project will be designed so as not to impede the flow of currents in the Yangtze River and will be situated in sufficiently deep water to avoid dredging. Hydraulic model tests are being carried out to arrive at the optimal design of these facilities. For coal handling water sprays will be provided to contain dust. Facilities for the collection and treatment of ships' wastes and the drawing up of a contingency plan to handle accidental oil spillage are being considered for GEF/IDA financing under a separate project. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: The needs to ensure safe disposal of contaminated spoils from dredging and to minimize the potential hazard for further pollution of waters from the operation of the new facilities were factors that contributed to the project being designated as a Category A project for environmental evaluation. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: An environmental assessment report (in Chinese) has been furnished to the Bank. An environment expert assisted SPA in the final preparation of the EA to meet Bank's requirements. The report, along with a summary, recommended additional environment protection measures and these will be discussed with the borrower. REMARKS: As agreed by current Government regulations, SPA has already completed environment impact assessments of the proposed Luojing and Waigaoqiao terminals through the Shanghai Environment Protection Sciences Institute. Recommended mitigatory measures are being incorporated in the design of the new terminals. Currently each existing terminal has its own environment monitoring center, supervised by SPA's Environment Monitoring Office. Also, SPA has developed an 'extensive environment action plan as part of its Eighth Five Year Plan: this includes the upgrading of effluent treatment facilities at existing terminals as well as the provision of facilities for waste treatment. 1-18 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : CHINA Project ID No: 4CHAPA112 Project : Guangdong Provincial Transportation Appraisal Date : Feb. 27, 1992 Total Project Cost: $850.00 Board Date : Dec. 08, 1992 Managing Division : EA2TP Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: February 1992 Date EA Category Assigned: MAJOR PROJECT COMPONENTS: The project would include construction of two four-lane divided, access controlled, highways comprising: (a) the 80 km Foshan-Kaiping Highway and (b) the 149 km Longgang-Tanxi Highway (c) a Provincial Road Improvement Program (RIP) to upgrade National, Provincial and Rural roads, with road sections selected annually to agreed criteria; (d) procurement of equipment for construction supervision, maintenance, and economic analysis; (e) technical assistance and training for construction supervision, highway maintenance, and highway program management; (f) a component to guide reform of highway financing. MAJOR ENVIRONMENTAL ISSUES: The alignments of Foshan-Kaiping and Longgang-Tanxi highways from the points of view of: resettlement provisions, possible pollution from noise and vehicle emissions (on air and water quality) during both construction and operation, erosion effects due to improper construction planning, and the effects of embankments and borrow pits on drainage and landuse. Pollution effects of the new highways will be offset to some extent by reductions in pollution on the existing highways. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: The resettlement process will be monitored. The construction and operation of the two major highways will be monitored by an Environmental Monitoring Unit (now being set up) to ensure that the Environemtnal Action Plans (see below) are implemented adequately. Environmental Management processes are being developed for controlling potential impacts within the RIP component. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Major infrastructure project with important implications for environment and resettlement. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: EAs have been prepared for the Foshan-Kaiping and Longgang-Tanxi highways, together with draft Environmental Action Plans (EAPs) and 1-19 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Resettlement Action Plans (RAPs). Bank environmental and resettlement experts have inspected the routes and have made recommendations to complete the final EA and EAP for each major route; these were submitted to the Bank in February 1992 and the Executive Summary of Environmental Assessment for the Foshan-Kaiping and Longgang-Tanxi highways were circulated to the Executive Directors of the Board on February 20, 1992. A final RAP for each major highway, and each road in the first phase of the Road Improvement Program, is required by Negotiation. The Appraisal Mission will review the assessment process being developed for the RIP component. REMARKS: N/A 1-20 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : CHINA Project ID No: 4CHAPA126 Project : SHANGHAI INDUSTRIAL EFFICIENCY Appraisal Date : Jun. 30, 1993 Total Project Cost; $350.00 Board Date : Feb. 01, 1994 Managing Division : EA2IE Sector: Industrial Devel/Finance Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Ongoing Date EA Category Assigned: 03/19/92 MAJOR PROJECT COMPONENTS: The project would support the development and improved efficiency and effectiveness of a number of industrial subsectors in Shanghai which are still to be determined. MAJOR ENVIRONMENTAL ISSUES:, To be identified. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: During project preparation and appraisal, Bank staff will explore what actions will be necessary to address any subsector environmental problems identified during the preparation process. During preparation of the first project, Bank staff determined that SEPB has the capability and staffing t6 monitor the environmental aspects of the subprojects effectively, and ensure that they meet China's environmental standards, which are adequate for the project subsectors. No subproject will be financed until it is approved by SEPB and the existing operations of the subproject's sponsor are in compliance with SEPB's environmental standards. 2-3 EA's should be reviewed by the Bank. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: To be identified. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: N/A REMARKS: N/A 1-21 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS - Country : CHINA Project ID No: 4CHAPA128 Project : Zhejiang Provincial Highway Appraisal Date : Jun. 17, 1991 Total Project Cost: $626.00 Board Date : Apr. 28, 1992 Managing Division : EA2TP Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Ongoing Date EA Category Assigned: 03/13/92 MAJOR PROJECT COMPONENTS: The project would include: (a) construction of the 138 km long section of the four-lane divided, access controlled Hangzhou-Ningbo Highway (145 km) on new alignment with about 58 km saving in distance over the existing road; (b) construction and improvement of about 31 sections of lower class provincial and country and village roads (970 km) in the southwestern region of the Province under a Road Development Program (RDP); (c) consultant services for the construction supervision of the Hangzhou-Ningbo Highway; (d) staff training programs; (e) purchase of equipment for: (i) road laboratories; (ii) road construction and maintenance; (iii) maintenance and operation of the Hangzhou-Ningbo Highway; and (iv) further development and application of the Road Data Bank and Pavement Management System. MAJOR ENVIRONMENTAL ISSUES: An Environmental Impact Assessment for the Hangzhou-Ningbo Highway has been prepared by the Province and mitigating measures for potential adverse effects on the environment have been identified. Environmental protective measures will be taken with respect to erosion control, effect of pollution (air and noise) during construction, effect of earth embankment and borrow pits on land use, wat6r pollution and drainage. Designs would also mitigate,air and noise pollution during the operations phase of the highway. The orderly resettlement and appropriate compensation of displaced persons have to be assured. The same arrangements will be followed for the sub projects under the PDP. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: During negotiations, scheduled for mid-March 1992 assurances would be obtained from Zhejiang Province regarding (i) the implementation of EAP and RAP for the Hangzhou-Ningbo Highway, and (ii) appropriate procedures for environmental assessment knd resettlement for the subproject included in the RAP. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: N/A 1-22 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: The EA for the Hangzhou-Ningbo was completed in 1990 and after its review by Bank staff an Environmental Action Plan (EAP) was prepared and submitted to the Bank in December 1991. A summary of the EA was submitted to the Executive Directors in December 1991. A Resettlement Action Plan (RAP) was submitted to the Bank in January 1992. REMARKS: Since this is the first highway project in China under which the Bank's EA procedures are being followed, the June/July 1991 appraisal mission discussed with the National Environmental Protection Agency (NEPA) and Environmental Directorate of the Ministry of Communications how the internal procedures and requirements for the environmental assessment of highway projects interact with the Bank's Operational Directive on Environmental Assessment. 1-23 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : CHINA Project ID No: 4CHAPA156 Project : Xiaolangdi Appraisal Date : Oct. 10, 1992 Total Project Cost: $2,860.00 Board Date : May 04, 1993 Managing Division : EA2AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Standby Date (est.) for receipt of EA by Bank: 9/91 Date EA Category Assigned: First Qtr 91 MAJOR PROJECT COMPONENTS: (a) Construction of a rockfill dam 171 m-high, 1370 m crest length and 56 mem of fill; (b) construction of a hydropower station with total capacity of 1800 MW; (c) resettlement of .190,000 people in the two provinces of Shanxi and Henan; and (d) construction of additional works for river channel stabilization. MAJOR ENVIRONMENTAL ISSUES: The project will have very significant environmental benefits. It will provide flood protection for about 1.2 million people, increasing the water supply for cities of about 15 million people, reduce sediment deposition in the lower reaches of the river; firm up irrigation for 1 million ha; and *generate a portion of the peak power needs of Henan and China's central region. The project will increase the safety of some 100 million people downstream from catastrophic floods. The major environmental issue relates .to the resettlement of 190,000 people who live in the reservoir area, over a 15-year period. Dams of this size generally have many other negative impacts on downstream fisheries, water quality, health, etc. However, unlike other rivers, the Yellow River presently has the highest silt load in the world. With this dam, silt load will be dramatically reduced, low flows will be increased, and water quality improved. The downstream drainage conditions will be improved by less periodic flooding. Hence the health effects downstream will improve and because of less silt and increased low flows, the estuary and river fisheries willbe improved quite dramatically. Other environmental impacts of the dam are relatively minor. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: The Yellow River Water and Hydropower Development Corporation (YRWHDC) is completing detailed planning of the resettlement component for all relocatees below 180m level and undertaking detailed resettlement feasibility studies relocatees between 180m and 275m. YRWHDC and the provinces have now had detailed discussions on sites for settlements and industries to be created for the damsite settlers and for the 180m. Government has been informed that detailed designs up to the 180m level are required by the Bank prior to appraisal and detailed feasibility study level plans are for above 180m level relocatees. The YRWHDC has already spent Y3.0 million to start off preparation of the detail designs for the resettlement component. YRWHDC 1-24 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS has now obtained a further Y20 million to undertake settlements on four sites for 2,000 families (10,000 people) for damsite area resettlement to ensure that all contingencies during resettlement operations are adequately covered. By March 1, 1992, YRWHDC is expected to complete detailed designs for resettlement of 37,000 people up to a reservoir inundation of 180m level which will. An international resettlement and environmental panel reviewed in June/October 1991 the draft environmental impact assessment (EIA) which was originally prepared by YRWHDC and is now being revised by Canadian Yellow Joint Venture Consortium of consultant (CYJVC). The environmental panel member reviewed in December 1991 the final EIA report. The preliminary assessment by the panel member is that the project will have some negative impacts in the upstream areas due to rats and some water borne diseases which will be offset by environmental management plans costing Y90 million during the course of the project. But the positive impacts of the project are overwhelming in terms of flood control, irrigation benefits, power production and sediment control benefits. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: N/A SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: YRWHDC has completed an environmental assessment report (fourth edition) which covers in detail all aspects of the project. The reports were reviewed by,a Bank mission in October 1991 and in general, there appear to be no major issues. The resettlement has also a detailed report of the activities and has been reviewed in October 1991. The major issue in the resettlement planning has been the ground truthing of detailed planning of YRWHDC with the countries and the agreements to be reached with host area. The Bank mission has indicated to the government that all relocatees for the damsite areas will have to be completed by Jan. 15, 1992 and also by this period, at least 30% of people will have contractual agreements to move into host.villages. The CYJVC are now preparing detailed reports on the detailed designs up to 180m level, feasibility studies for all settlement areas 180m to 275m levels and compensation payment requirements. The Government is now allocating considerable funds to ensure that the planning and design work are undertaken adequately. The major issues that still remain are that detail studies at field level require the country's and Provincial Planning Design Institutes to be fully involved in the planning and design process. REMARKS: The Government is very serious about ensuring that the - resettlement component is properly executed. They are also very serious about ensuring that all negative impacts as a result of the dam are mitigated. A mission presently in the field is reviewing resettlement issues. I-25 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : CHINA Project ID No: 4CHAPA171 Project : REGIONAL CEMENT INDUSTRY Appraisal Date : May 29, 1989 Total Project Cost: $265.00 Board Date : Mar. 17, 1992 Managing Division : EA2IE Sector: Industry Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Completed Date EA Category Assigned: MAJOR PROJECT COMPONENTS: (1) Construction of a modern new plant with 1.2 million tons per year clinker capacity and related cement- and clinker-grinding facilities, and a regional river transport and distribution network; (2) rehabilitation of an existing cement plant with modern production technology to expand capacity, enhance production efficiency and product quality and (3) strengthening capabilities of four research and design institutes. MAJOR ENVIRONMENTAL ISSUES: Proper pollution control measures should be taken into account at the design stage for the new facilities; improvements in the facilities to reduce pollution discharges to meet international standards should be a main focus of the,rehabilitation component; research and design activities should give a specific emphasis to environmental improvements. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: Incorporate all the measures necessary to meet environmental standards at the design and implementation stages of the project facilities; establish in-house pollution monitoring units for both project entities; training of local staff in modern environmental management skills; a study to improve pollution control of small scale cement plants. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Environmental impact studies have been carried out and approved by local environmental protection agencies, and were found 'to be satisfactory by the Bank. EA Summary was prepared and cleared for Board distribution in February 1992. REMARKS: The appraisal work for the project has followed up on the above proposed actions, and agreements on proper actions have been reached. Major polluters in the cement industry in China are small scale plants; a 1-26 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS study will be carried out as part of the project to investigate measures to mitigate the problem. 1-27 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : CHINA Project ID No: 4CHAPA175 Project : Henan Highways Appraisal Date : Feb. 19, 1992 Total Project Cost: $300.00 Board Date : Dec. 15, 1992 Managing Division : EA2TP Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: February 1992 Date EA Category Assigned: MAJOR PROJECT COMPONENTS: The investment component would cover construction of a single-carriage expressway (120 km), rehabilitation and improvement of five provincial roads (180 km), upgrading of six rural roads (112 km) and other roads that meet agreed technical, economic and environmental criteria. The institutional strengthening and reform component would aim to improve the province's capabilities for investment planning, maintenance and construction; impoeve the capability of road transport services; introduce road user facilities and establish a system of economically efficient toll roads in the expressway. MAJOR ENVIRONMENTAL ISSUES: An Environmental Impact Assessment for the proposed section of the State Expressway 310 between Kaifeng and Luoyang was completed in June, 1989. Major environmental issues that could be associated with the project include an increase in ambient noise during construction and operation of the expressway, possible flooding during high rainfall episodes (due to the road acting as dyke), water quality issues related to cross-road access and pedestrian safety,'and resettlement of people and loss of assigned cropland within the road right-of-way. Transport of construction materials along existing roads may also result in road damage and a temporary increase in traffic problems along roads leading to the expressway. The provincial and rural roads component of the project mainly involves rehabilitation within the existing right-of-way. Only minor environmental issues are likely when work is limited to existing alignments. These relate to transport of materials, construction noise, and air/water quality issues related to the use of bitumin during activities directed at sealing the road surface. Where realignment of provincial roads as required, the issues are more varied and similar, but on a smaller scale, to the expressway. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: The EIA has been reviewed and requests .made to Henan's communications Department to clarify and expand upon traffic issues, quarry and borrow pit operation, design and location of cross-road access, and to provide more detailed identification of areas within or near the road right-of-way that have cultural, archeological and historical significance. The MOC has prepared an Environmental Action Plan (Management and Monitoring plans) and a 1-28 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS resettlement plan that includes this additional information and that conforms with the Bank's EAOD and involuntary resettlement requirements. The Preappraisal Mission reviewed the environmental and resettlement related aspects of the project. This included the Environmental Action Plan submitted by Henan Province. Additional information requested of Henan Province by the preappraisal mission included: (i) identification of organizations responsible for responding to spills and accidents involving toxic and hazardous materials, and training and equipment required to respond safely and effectively to such incidents; (ii) an environmental survey (to be conducted by the Provincial Environmental Protection.Bureau) of quarries and borrow areas identified as possible sources of materials for road works to ensure that they can be operated in an environmentally acceptable manner; and (iii) preparation of guidelines for contractors specifying hours of permissible operation to minimize noise impacts in areas of human habitation and congregation. The February, 1992 appraisal mission would further review the environmental and resettlement related aspects of the project with the involvement of mission environmental and resettlement specialists. The Preappraisal Mission determined that a preliminary environmental assessment was required for that section of provincial road to be constructed on a new alignment. The Appraisal Mission will also review provincial codes of engineering practice for betterment, capacity improvement and rehabilitation of provincial, county and rural roads to ensure that adequate provision is made for environmental management of these works. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: SCHEDULE OF CATEGORY A.ENVIRONMENTAL ASSESSMENT: The Environmental Assessment of the Kaifeng to Louyang segment of State Expressway 310 is completed, as is the draft environmental action and resettlement plans describing the handling of environmental impacts and land compensation and resettlement requirements. Supplementary information on the resettlement plan and on management of potential environmental impacts of the expressway, the preliminary EA and management plan for the new section of provincial road within the project, and detailed resettlement plan will be reviewed by the Appraisal Mission. Details of implementation of the action and resettlement plans will also be discussed and finalized by the Appraisal Mission. This EA is to be completed in time for review by the Appraisal Mission in February, 1992. REMARKS: The next MOS will include an update on the results of the appraisal mission which is still in the field. 1-29 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : CHINA Project ID No: 4CHAPA203 Project : Sichuan Gas Development & Conservation Appraisal Date : Dec. 01, 1992 Total Project Cost: $1,000.00 Board Date : Jun. 29, 1993 Managing Division : EA21E Sector: Energy Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: 3rd Quarter,92 Date EA Category Assigned: 02/13192 MAJOR PROJECT COMPONENTS: (a) Appraisal and development of gas fields, rehabilitation of aging fields; (b) upgrading of gas transmission/ distribution systems; (c) product upgrading, energyy conservation and pollution control measures at selected fertilizer plants; and (d) TA and training. MAJOR ENVIRONMENTAL ISSUES: The proposed project would have significant environmental benefits: increased gas. supply and utilization would reduce coal consumption, which would in turn reduce emissions of S02, C02, and particulates. Nevertheless, various safety and environmental considerations require special attention, including H2S management and treatment, discharge of wastewater from well drillings, gas production and utilization as well as safety concerns in the operation and maintenance of gas pipelines. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: As part- of the preparation effort, international consultants will provide technical assistance to the local agency to carry out environmental assessment and to ensure that the project design and implementation will conform to international engineering and safety standards as well as sound environmental practices. Further, various preinvestment studies would be carried out, taking into account the environmental and safety considerations. These studies would cover the rehabilitation of the gas transmission system as well as technological upgrading of small fertilizer plants. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: N/A SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Chinese regulation requires the preparation of an EA report at the time of project design. The identification mission reached agreement with the Chinese authorities that the EA report will be furnished to the Bank for review and comments prior to project appraisal. - I - ―·, , · . 』 - - I -, 1-31 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country CHINA Project ID No: 4CHAPA216 Project SHANGHAI MTP II Appraisal Date : JAW. 06, 1993 Total Project Cost: $500.00 Board Date i : Dec. 07, 1993 Managing Division : EA2TP Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Oct. 1992 Date EA Category Assigned: MAJOR PROJECT COMPONENTS: To be determined. Likely components -- road investments in key corridors,, traffic management improvements,,institutional development. MAJOR ENVIRONMENTAL ISSUES: To be determined. OTHER ENVIRONMENTAL ISSUES: To be determined. PROPOSED ACTIONS: To be determined. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: To be determined. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: To be determined. REMARKS: To be determined. 1-32 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS- Country : INDONESIA Project ID No: 41NSPA189 Project : SEMARANG-SURAKARTA URBAN DEVELOPMENT Appraisal Date : Nov. 01, 1992 Total Project Cost: $150.00 Board Date : Jul. 13, 1993 Managing Division : EA3IN Sector:-Urbanization Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Under Preparation Date EA Category Assigned: MAJOR PROJECT COMPONENTS: Urban transport, water supply, drainage, solid waste disposal, human waste disposal, KIP, and supporting TA services for cities of Surakarta and Semarang. MAJOR ENVIRONMENTAL ISSUES: The project is in the preparation stage.and preliminary EA screening will be completed by September 1992. The likely inputs which have been identified are as follows: (1) microdrainage problems due to better water supply; (2) need for resettlement due to major-drain construction; (3) treatment and disposal of polluted drainage and waste water; (4) operation of solid waste collection and disposal; (5) sanitation problems in connection with Kampung improvement (community upgrading) project; and (6) traffic disruptions during implementation and construction. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: (1) Carry out selective drainage improvements in areas receiving increased water supply; (2) prepare acceptable resettlement plans and ensure adherence during implementation; (3) provide suitable interceptor and treatment facilities prior to final disposal of storm water and sewage flows; (4) design appropriate systems for solid waste operation and provide necessary facilities, equipment and training for environmentally acceptable disposal; (5) provide credit, TA and community facilities for improved sanitation (human waste); and (6) plan and implement a well-thought-out construction program and stipulate noise and pollution control measures. For the actions which cannot be implemented during the project appraisal process, the procedures for implementation would be clearly set out and agreed during negotiations. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Need for EA explained to and accepted by Government. Government staff and IUIDP project preparation consultants have screened project components for potential environmental impacts and identified need for four 1-33 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS detailed EA studies in accordance with Government regulations and Bank OD. TOR have been agreed and consultants are now being selected by Government. Completion of EA studies expected late in 1992. REMARKS: N/A 1-34 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : INDONESIA Project ID No: 41NSPA217 Project : JAVA (SURALAYA) THERMAL POWER Appraisal Date : Jun. 24, 1991 Total Project Cost: $2,024.50 Board Date : Jun. 09, 1992 Managing Division : EA3IE - Sector: Power Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Completed Date EA Category Assigned: 5/30/90 MAJOR PROJECT COMPONENTS: Expansion of coal fired Suralaya Thermal Power Plant in West Java on an existing site to meet expected growth in demand for electric power. MAJOR ENVIRONMENTAL ISSUES: Environmental issues relate to gaseous emissions (SOx, NOx, particulates), effluents (waste water treatment, leachate), thermal pollution (cooling water), and ash disposal. OTHER ENVIRONMENTAL ISSUES: Drainage and land restoration issues, associated with coal mining. PROPOSED ACTIONS: Environmental assessment report has been prepared -by PLN/consultants. Mitigation plans will be incorporated in the plant design and an environmental management plan agreed with the Bank. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: EIA report submitted by PLN. Environmental Assessment Summary was circulated to the Board in June 1991 (SecM91-708). REMARKS: N/A 1-35 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : INDONESIA Project ID No: 41NSPA238 Project : Integrated Swamps Dev Appraisal Date : JAN. 11, 1993 Total Project Cost: $110.00 Board Date : Jan. 18, 1994 Managing Division : EA3AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Standby Date (est.) for receipt of EA by Bank: Jan.. 15, 1991 Date EA Category Assigned: June 1991 MAJOR PROJECT COMPONENTS: The project which would support second stage development of existing swamp sites in Jambi, Tiau and West Kalimantan provinces would comprise 5 major components: (i) upgrading of existing hydraulic infrastructure, construction of new hydraulic infrastructure in flood-prone areas and construction of pilot irrigation systems; (ii) promotion of agriculture/ aquaculture development through strengthening of support services; (iii) improving potable water supply; (iv) introduction of efficient O&M; and (v) enhancement of the capacity of relevant provincial and district agencies to implement the project. MAJOR ENVIRONMENTAL ISSUES: Declining soil conditions in many areas as result of excessive drainage, soil subsidence/exposure of acid sulphate soils and problems of flooding and saline intrusion in parts of relaimed area; severe shortage of drinking water during the dry season; growing depletion of remaining forests within and on fringes of the project area; poor health services for the settled (about 40,000 farm-families) population; poor access conditions; and proliferation of pests (rats and pigs mainly). OTHER ENVIRONMENTAL ISSUES: Mobilization of heavy equiment to project sites will damage roads and impede traffic flow in the waterways; construction of water gates on canals used as waterways will interrupt the traffic on the canals, seepage of acidic water from the dikes ( due to the pyrite content of the soil used) would destroy the adjacent vegetation cover. Management of use of pesticides and fertilizers for increasing crop yields on a sustainable basis. PROPOSED ACTIONS: Environmental management plan will be prepared for each subproject area and its monitoring system would be set in place. Proposed actions to mitigate above environmental issues will include: (a) upgrading and optimal operation of the hydaulic infrastructure in order to control drainage/flood/ saline intrusion for improving soil conditions and exclusion of unmanageable lands from agricultural use; (b) a major component for provision of safe drinking water; (c) conservation of remaining forests and mangroves through complete restriction on new land clearance and maintenance of buffer zones and restrictins on poaching of timbers; (d) support to health care services; (e) improvement of access to and within the project area; and (f) pest control measures including appropriate use of pesticides and agro-chemicals. 1-36 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Proposed project is given environmental Category A rating as it could, without the planned mitigation measures, have some adverse impacts on the environment in view of the various planned activities including large-scale drainage and flood control, new land development and use of pesticides. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: EA process was started in June 1991 and draft-EA reports for each of the three project sites are under review. The EA process is expected to be completed by April 1992. REMARKS: Consultations, on the environmental/social impacts of proposed project, between Government and local NGOs/representatives of groups which would be affected by the project are underway. The Bank is requesting GOI's permission to release EA. 1-37 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : INDONESIA Project ID No: 41NSPA299 Project : Surabaya Urban Development II Appraisal Date : Jun. 15, 1992 Total Project Cost: $325.00 Board Date : Mar. 02, 1993 Managing Division : EA3IN Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Lending, Date (est.) for receipt of EA by Bank: May 1992 Date EA Category Assigned:* MAJOR PROJECT COMPONENTS: Urban roads, water supply distribution, drainage, solid waste disposal, human waste disposal, KIP, and supporting TA services for city of Surabaya. MAJOR ENVIRONMENTAL ISSUES: (i) Some resettlement/compensation due to road, major stormwater drainage and water distribution construction will be needed: (ii) human waste disposal and sanitation in KIP areas (community upgrading); and (iii), landfill operations for solid waste disposal. OTHER ENVIRONMENTAL ISSUES: (i) Microdrainage problems due to .disruption of water drainage system; (ii) disposal of polluted drainage silts and waste water; (iii) air pollution, noise and traffic due to solid waste collection and disposal activities; and (iv) traffic disruption during construction. PROPOSED ACTIONS: (i) carry out selective sanitation and stormwater drainage measures and improvements in areas receiving increased water supply; (ii) prepare Acceptable resettlement/compensation plans and ensure adherence during implementation; (iii) provide suitable treatment facilities for disposal of storm water and sewage flows; (iv) implement appropriate systems for solid waste operations and provide necessary equipment and training for environmentally acceptable disposal; (v) provide credit, TA and community facilities for improved sanitation (human waste); and (vi) plan and implement noise and pollution control measures in construction programs. For the actions which cannot be completed during project appraisal, the procedures for implementation would be set out and agreed during negotiations. set out and agreed during negotiations. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Based on the nature of the major environmental issues as summarized above. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: PIL (information report) have been completed. Draft ANDALs (impact analysis) were reviewed by preappraisal mission in Feb. 1992. RKLs (Management Plan) and RPLs (Monitoring Plan) are required for water supply 1-38 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS distribution, solid waste and human waste and would be reviewed prior to appraisal mission scheduled for July 1992. REMARKS: Borrower has to permit release of EA prior to appraisal. Project-effects on people/businesses surveyed to determine compensation/resettlement needs. 1-39 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : KOREA Project ID No: 4KORPA120 Project : Seoul Solid Waste Appraisal Date : Jun. 13, 1991 Total -Project Cost: $600.00 Board Date : Nov. 17, 1992 Managing Division : EAlIN Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Standby Date (est.) for receipt of EA by Bank: Jun. 10, 1991 Date EA Category Assigned: MAJOR PROJECT COMPONENTS: (a) A sanitary landfill site; (b) Several transfer stations; (c) Associated access road; and (d) Associated vehicles and rolling stock. MAJOR ENVIRONMENTAL ISSUES: (a) Potential air, land and water pollution and aesthetic nuisances at the disposal site; (b) change in utilization of land at disposal site; and (c) transportation of solid waste from transfer stations to disposal site. OTHER ENVIRONMENTAL ISSUES: (a) Change in land use and inair noise pollution impacts as a consequence of transport investments; and (b) closure and maintenance of existing dump site. PROPOSED ACTIONS: In order to mitigate issues described above, environmental impact assessments (EIA) have been completed for land fill site, the access road and-the transfer stations. They have been reviewed by Bank missions and found satisfactory. Mitigating measures assessed as necessary in the EIAs have been addressed in designs. The Bank has also reviewed Seoul Metropolitan Government's (SMG) Terms of Reference for a feasibility study to close the existing dump and advised SMG on the emphasis of the study. SMG has explained procedures for addressing the situation of scavengers as the existing dump is closed and the Bank has requested additional information. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Risk of river and sea pollution. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT:, As discussed above, the Bank has reviewed the three EIAs undertaken for the various components of this project and found them satisfactory. REMARKS: Advice has just been received from SMG thay they wish, to restructure the proposed project. Details of the proposed changes have been requested. Following receipt, an assessment will be made as to whether the proposed 1-40 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS changes can be supported and whether the change would require a new environmental assessment. 1-41 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : KOREA Project ID No: 4KORPA168 Project : NAT'L OIL PIPELINE Appraisal Date : Jun. 15, 1992 Total Project Cost: $800.00 Board Date : Mar. 09, 1993 Managing Division : EAlIE Sector: Energy Lending Instrument: Specific Investment Loan Status: Standby Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Mar. 13, 1992 MAJOR PROJECT COMPONENTS: Petroleum products and crude pipelines. MAJOR ENVIRONMENTAL. ISSUES: Pre-appraisal mission of May/June 1992 will identify potential environmental issues. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: Will propose after.pre-appraisal mission and site visit by environment experts. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: To be determined after pre-appraisal REMARKS: N/A 1-42 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country MALAYSIA Project ID No: 4MAYPA110 Project : Sarawak Roads Appraisal Date : Oct. 01, 1992 Total Project Cost: $50.00 Board Date : Jul. 06, 1993 Managing Division : EAlIN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: June 1992 Date EA Category Assigned: MAJOR PROJECT COMPONENTS: The project consists of upgrading of trunk and feeder roads (135 kIn) and construction of a new road (25 km) through tropical lowland forest; improvement of drainage and pavements; axle load control program; technical assistance to enhance project planning, management and supervision capabilities of the Sarawak Public Works Department; and improving road maintenance management capabilities. MAJOR ENVIRONMENTAL ISSUES: - New road construction; - Conversion of tropical forests; - Drainage; - Resettlement and Rehabilitation; - Land use options. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: A detailed Environmental Assessment will be undertaken to determine the impact of the project in the area. Particular attention will be paid to the tropical forest, resettlement and rehabilitation of any people displaced as a result of the proposed new road construction. Appropriate mitigation actions to minimize adverse effects to the environment and appropriate actions for Resettlement and Rehabilitation will be included in the project for implementation. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: The proposed project includes new construction in an environmentally sensitive forested area with populations of indigenous people. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: The preparation of the Environmental Assessment and Resettlement and Rehabilitation plans in line with proposed actions will be undertaken by - Consultants financed by the Japanese Grant Facility to Malaysia. Terms of Reference for the EA have been submitted by Government and- reviewed by the Bank. Detailed comments have been provided to Government and a final review of the TORs will be carried out once revisions have been made. A short list 1-43 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS has been prepared and Bank comments provided. Letters of invitation are expected to be issued shortly. The study will be undertaken under the supervision of the Economic Planning Unit and the Sarawak Public Works Department. REMARKS: 1-44 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : THAILAND Project ID No: 4THLPA118 Project : GAS TRANSMISSION Appraisal Date : Dec. 09, 1991 Total Project Cost: $233.00 Board Date : Aug. 04, 1992 Managing Division : EAlIE Sector: Energy Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: October 1991 Date EA Category Assigned: MAJOR PROJECT COMPONENTS: The project consists of (a) 32" diameter, 175 km long; and 24" diameter, 160 km long submarine pipeline for transmission of natural gas to onshore facilities; and (b) expansion of Supervisory Control and Data Acquisition (SCADA) System. MAJOR ENVIRONMENTAL ISSUES: Pipelines under this project will carry non-associated gas and therefore, have much lesser degree of environmental risk than would be the case with oil or associated gas. The potential environmental issues are (a) disruption of marine life which may be caused by the changes in the seabed conditions in the vicinity of the pipes during the pipe laying period; (b) discharge of liquids (produced water, sewage and drainage) from production platforms; (c) noise and vibration caused by equipment on the production platform; (d) disposal of mercury present in the gas; (e) lack of safety and environmental standards in PTT; and (f) lack of environmental regulations, by DMR, for offshore exploration and production. PTT's operational safety record is excellent. The site of production is about 200 km from any onshore location. Pipeline construction will conform to international standards of safety. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: Set up a mitigation plan that will include among others: (a) correction of adverse effect during construction; (b) develop safety and environmental standards for PTT and DMR; and (c) correct the EA prior to appraisal mission. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: The EIA report has been prepared by Team Consulting Co., on behalf of Bechtel/Lavalin, who are the primary consultants to PTT. Prior to the preparation of the EIA, the pre-appraisal mission discussed the terms of reference with PTT and the consultants, and it was agreed that additional points raised by the Bank would be included in the study. The Consultants 1-45 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS have completed the EIA and submitted it to the Bank for comments. The Bank's comments have been taken into account and the final report has been prepared accordingly. REMARKS: N/A 1-46 - ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : THAILAND Project ID No: 4THLPA145 Project : INDUSTRIAL POLLUTION CONTROL Appraisal Date : Feb. 01, 1993 Total Project Cost: $90.00 Board Date : Sep. 28, 1993 Managing Division : EAllE Sector: Industry Lending Instrument: Specific Investment Loan Status: Lending L Date (est.) for receipt of EA by Bank: Date EA Category Assigned: 4/92 MAJOR PROJECT COMPONENTS: The proposed project would have four components: (i) construction of central industrial waste treatment facilities for areas with high concentration of chemical and related industries, including Suksawat and Rangsit; (ii) completion of final engineering and construction of another two treatment systems to be selected among the prefeasbility studies being prepared for Poochao, Samingprai, Teparak, Krathumban and Sampran; (iii) construction of collection, treatment and disposal systems for toxic/hazardous waste at Chonburi and Rachaburi, (iv) funding of waste reduction and pollution abatement schemes for individual industries; (v) training in industrial pollution and environmental management; and (vi) technical assistance to review the institutional management and financial framework of the sector, including the purchase of monitoring and sampling equipment. MAJOR ENVIRONMENTAL ISSUES: The project would reduce significant industrial pollution, which is a serious and rapidly growing problem in the project areas. However, unless some concessional financing is provided by foreign donors, the project approval, its implementation and its benefits may suffer considerable delays. Additional issues include: (a) adequate legal and institutional framework; (b) adequate system for cost recovery, at least for operation; (c) project design to avoid or reduce environmental damage; and (d) the inclusion of the transhipment of toxic waste in the port of Bangkok (which is a contentious issue), is also important, but its priority and the preparation of engineering studies is to be discussed with Government. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: Consultants are being hired to prepare the feasibility and final engineering for the project. After basic design is established an EA will be completed. Any environmental problems identified will be incorporated in the final design. Other actions regarding issues already identified include: (a) To ensure that the legal and institutional framework is adequate, a DANIDA grant of $700,000 will finance studies and technical assistance to DIW and the NEB. These studies will be completed by mid-1992, and their key recommendations will be included in the project; (b) Adequate cost recovery for operation and part of the capital expenditures is needed to ensure the project sustainability. For this purpose the above-mentioned study will provide recommendations, which are expected to be similar to the ongoing pollution 1-47 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS charges implemented for the 11 Industrial Estates, where pollution fees are based on the BOD and volume of waste. (c) The location of the treatment facilities, the type of treatment, the odor and atmospheric emission, the final sludge disposal, etc. will require attention during the engineering studies to prevent or mitigate potential environmental damage. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: The contracts for the final. feasibility and subsequent final design are expected to be signed in November 1991 (being financed by a Japanese Grant). The consultants will prepare an EA for review by the Bank and DIW at the completion of the final feasibility stage (by April 1992), ,and before the initiation of the final design (expected by September 1992). REMARKS: Bank preparation missions, and the support of an environmental professional in the Resident Mission would supervise the project preparation and the consultants' study. 1-48 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : EGYPT Project ID No: 5EGTPA147 Project : IND. POLL/EGY CONSERVATION Appraisal Date : Jun. 22, 1992 Total Project Cost: $168.60 Board Date : Jan. 12, 1993 Managing Division : MN2IE Sector: Energy Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: July 1992 Date EA Category Assigned: MAJOR PROJECT COMPONENTS: (i) assisting the three existing cement plants in Helvan to reduce their emissions and energy consumption down to internationally acceptable levels; (ii) assisting the cement companies in reaching rated output through selected rehabilitation and improvements in operational, management and maintenance procedures; (iii) preparation of a master abatement plan for major non-cement plants in the Helwan area; and (iv) development of the institutional capacity of the Egyptian Environmental Affairs Agency. MAJOR ENVIRONMENTAL ISSUES: Existing cement companies in Helwan area are producing much higher than internationally acceptable levels of particulated emissions and are consuming excessive levels of energy. Project is designed to reduce emissions and increase energy efficiency. OTHER ENVIRONMENTAL ISSUES,: PROPOSED ACTIONS: The project would finance (i) technical assistance, training and equipment to help cement companies reduce their emissions and improve energy conservation; (ii) technical assistance for preparation of a master plan for pollution reduction down to internationally acceptable levels by the major non-cement polluters in the Helvan area; and (iii) technical assistance, training and equipment/office furniture for the Egyptian Environmental Affairs Agency to develop its monitoring and enforcement capability. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Category B proposed. The project aims at reducing pollution caused by the existing three cement plants. Also, the proposed project would not increase rated capacity. Project investments are for pollution abatement and increased energy efficiency (the latter through improved load management). No major adverse environmental impact is anticipated. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: REMARKS: Environmental assessment done by KfW will serve.as input to project preparation. 1-49 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : EGYPT Project ID No: 5EGTPA187 Project : TOURISM INFRA. & ENVIRON. Appraisal Date : Jun. 15, 1992 Total Project Cost: $140.00 Board Date : Dec. 08, 1992 Managing Division : MN2IN Sector: Tourism Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Dec. 19, 1991 MAJOR PROJECT COMPONENTS: Provision of infrastructure (water supply, sewerage, solid waste, road improvement), berthing facilities on the Nile, improvement of access to .antiquity sites. MAJOR ENVIRONMENTAL ISSUES: Those normally associated with solid and liquid waste disposal in touristic areas, especially sensitive areas along the Red Sea and Nile River. OTHER ENVIRONMENTAL ISSUES: None. PROPOSED ACTIONS: Environmental assessments are being carried out for all touristic zones being developed under the project. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Strengthening environmental management in tourism development zones is a specific project objective and the project is designed to avoid significant environmental stress related to town development. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: REMARKS: 1-50 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : TUNISIA Project ID No: 5TUNPA149 Project : NORTHERN TUNISIA WATER RESOURCE Appraisal Date : May 05, 1992 Total Project Cost: $300.00 Board Date : Nov. 24, 1992 Managing Division : MNIlN Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: 2nd Quarter, 91 Date EA Category Assigned: 11/12/91 MAJOR PROJECT COMPONENTS: A. Sidi El Barrak dam on the Oued Zouara in Northern Tunisia. B. Additional works to protect rural population against flooding, realignment of roads and railway. C. Rehabilitation, replacement and installation of new measuring equipment. D. Construction of waste water treatment plant in Tunis and Nefza. E. Training, technical assistance, studies, sector-wide MIS and acquisition of computer equipment and software. MAJOR ENVIRONMENTAL ISSUES: The Bank received in August 1991 the dam's environmental impact study which was reviewed and should be improved on (i) presentation of alternative solutions; and (ii) procedures for resettlement. The direct impact of the dam's construction on flora and fauna to be limited. A more detailed assessment of the required procedures for appropriate resettlement of about 800 households has been requested from the consultants. An indirect beneficial effect of the Sidi El Barrak dam project would be the availability of additional fresh water to preserve the National Bird Reserve at Lake Ischkeul, which is currently endangered by the construction of several dams in its basin. A beneficial impact is also expected from the construction of waste water treatment plants in Tunis and Nefza where presently the environment is heavily polluted by the discharge of raw waste water. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED.ACTIONS: Project appraisal will not take place before the results of the environmental assessment, to be carried out -by independent consultants, are available as they will enable further definition of total project costs and benefits. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Dam Construction Project is always Category "A." SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Draft TOR for the environmental assessment of the project has been 1-51 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS finalized by the Tunisians. The Bank should review them as soon as it receives a copy. REMARKS: 1-52 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : ARGENTINA Project ID No: 6ARGPA116 Project : Yacyreta II Appraisal Date : Mar. 16, 1992 Total Project Cost: $2,840.00 Board Date : Aug. 09, 1992 Managing Division : LA4IE Sector: Energy Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Jan. 28, 1992 Date EA Category Assigned: Sep. 25, 1991 MAJOR PROJECT COMPONENTS: (1) Yacyreta hydroelectric dam civil works and engineering; and (2) first phase of the transmission system. MAJOR ENVIRONMENTAL ISSUES: Impact of the large Yacyreta reservoir on the population and environment, including loss of wildland ecosystems, involuntary resettlement, and water quality problems. OTHER ENVIRONMENTAL ISSUES: Effects of migratory fish and other aquatic life, inundation of cultural properties, potentially increased public health risks. PROPOSED.ACTIONS: Continued monitoring of actions agreed in the Electric Power Sector Project (Loan-2998-AR). Additional mitigatory measures may be identified in the EA study now underway. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Category A is appropriate for a large hydroelectric dam project. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: LATEN is reviewing the EA and improving the summary. The latter should be circulated to EDs by April 9, 1992. No new major issues are expected during appraisal. r REMARKS: EBY has held meetings with NGOs. The outcome of these meetings will be reviewed during appraisal. 1-53 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : BOLIVIA Project ID No: 6BOLPA048 Project : Power/Gas Pipeline Appraisal Date : Nov. 19, 1990 Total Project Cost: $620.00 Board Date : Oct. 20, 1992 Managing Division : LA3IE Sector: Energy Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: . Date EA Category Assigned: MAJOR PROJECT COMPONENTS: Construction of gas pipeline from near Santa Cruz to Puerto Suarez at Brazilian border (557 km); construction of 450 MW gas-fired power plant at Puerto Suarez for sale of electricity to Brazil. MAJOR ENVIRONMENTAL ISSUES: Impact of pipeline on fragile ecosystems and indigenous people, both during construction and thereafter due to opening up of virgin areas. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: Consultants completed environmental impact study, to evaluate alternative alignments and recommend on mitigatory measures, on the shortest route between Santa Cruz and Puerto Suarez. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: N/A SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: The Environmental Report contracted by YPFB was reviewed by appraisal team in Bolivia in February 1991. Conditionality necessary to ensure that the proposed mitigation program will be appropriately implemented has been proposed by the appraisal team. REMARKS: Borrower has given permission to release EA. The EA may need to be updated to factor in the increase of pipeline diameter resulting from Bolivia-Brazil negotiations on natural gas sales to Sao Paulo State. These negotiations are expected to be completed in April 1992. 1-54 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : CHILE Project ID No: 6CHLPAO36 Project : Irrigation Development Appraisal Date : May 15, 1992 Total Project Cost: $120.00 Board Date : Mar. 16, 1993 Managing Division : LA4AG Sector: Agriculture & Rural Devt Lending Instrument: Sector Investment and Maintenance Status: Lending Date (est.) for receipt of EA by Bank: Sep. 1991 Date EA Category Assigned: Apr. 20, 1988 MAJOR PROJECT COMPONENTS: Public investment in rehabilitation, modernization and construction of small and medium-sized irrigation schemes. - Enhanced implementation of the Irrigation Development Law which supports private investment in small scale and on-farm works. - Support to strengthen user associations in operating and maintaining irrigation schemes. - Strengthening, as appropriate, public agencies involved in irrigation, including their capacity to assess and mitigate for dealing with these issues. MAJOR ENVIRONMENTAL ISSUES: The draft sectoral EA has identified a series of potential problems associated with irrigation, including salinity and drainage problems, water quality and agro-chemical contamination, displacement of population by reservoirs and threats to biodiversity in newly-irrigated areas. Further, these aspects will be conditioned by broader long-run issues of intersectoral conflicts over land and water use. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: The project would ensure that the above issues are dealt with a rational and systematic fashion in the course of subproject analysis and selection, with participation by beneficiaries and affected groups. Cost recovery and strengthening of user groups would also contribute to improved use efficiency and water conservation. These groups would also be involved in monitoring water quality. Finally, long-run multiple water use planning would be addressed in river basin studies. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Project would include various sub-projects with different degrees of environmental impact. Some sub-projects could be classified as an A for purposes of EIA, therefore entire operation is considered an A project. 1-55 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: A first draft of the sectoral EA was reviewed in September by LATEN and LA4AG. The draft was also presented to and discussed with several local non-governmental organizations working in issues of the environment and rural development. In March 1992, a revised draft was sent to the Bank and an executive summary forwarded to the Board. REMARKS: A draft of the summary (in Spanish) was circulated to numerous .local non-governmental organizations (NGOs) involved in environmental issues and rural development in Chile, who were invited to participate in a meeting under the auspices of the Ministry of Planning (MIDEPLAN) to discuss and comment on the issues raised. The summary was sent to the following NGOs: Consultorias Profesionales Agraria Ltda. (AGRARIA), Comite Nacional de Pro Defensa de la Fauna y Flora (CODEFF), Centro de Investigacion y Planificacion del Medio Ambiente (CIPMA), Grupo de Investigaciones Agrarias (GIA), Instituto de Ecologia Politica (IEP), Instituto de Educacion Rural (IER), and 'Instituto de Promocion Agraria (INPROA); the meeting was attended by CODEFF, INPROA, .IER and AGRARIA on December 3, 1991 in the office of MIDEPLAN. Profiles of potential investments under the project will be circulated to interested local NGOs and affected groups during March-April for comments. 1-56 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : COLOMBIA Project ID No: 6CLMPA192 Project : Pollution Abatement and Sanitation Appraisal Date : May 15, 1992 Total Project Cost: $500.00 Board Date : Jan. 15, 1993 Managing Division : LA3IE Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Under Discussion Date EA Category Assigned: MAJOR PROJECT COMPONENTS: The project would include: major sewerage and drainage networks; initial works for abating pollution of the Bogota river; secondary water supply networks; and consultancies and training. MAJOR ENVIRONMENTAL ISSUES: While the long-term impacts are environmentally beneficial, issues to be addressed include: (a) impact of sewage and storm drainage works upon threatened wetlands in the project area; (b) short and long-term impact of works upon residents along works corridors; (c) removal and safe disposal of construction wastes and (possibly toxic wastes), dredging sludges from some existing sewage and storm drainage channels. OTHER ENVIRONMENTAL ISSUES Short-term environmental impacts (dust, noise, air pollution) of construction process. PROPOSED ACTIONS: Protection of threatened wetlands in Park system which could protect rare species and improve environmental quality are being studied. Land acquisition strategy and resettlement plan being finalized; solutions for removal and safe disposal of construction wastes and dredging sludges being developed. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: The project classification "A" is correct. All former class "D" (Environment - enhancing) projects are classed as, "A" under the new (October 3, 1991) version of the OD 4.01. Projects involving works of the dimensions foreseen in this project are certainly classed as "A"s. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: EA TORs for proposed works components reviewed by Bank, November 1991. EA for proposed works components prior to appraisal. REMARKS: EA TORs were reviewed and progress will be monitored by Bogota V Project Steering Committee, made up of: Proponent; Regional Autonomous Corporation (CAR) with overall responsibility for natural resources in the project area; 1-57 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS the City of Bogota Environmental Office (DAMA) with close links to local NGOs, universities and neighborhood associations; City Services Department (EDIS) responsible for garbage disposal and management of urban public places; National Planning Department Environmental Policy'-Division (DNP-DEPAC); Regional Government of Cundinamarca. The EAs will be reviewed with and released to the public. 1-58 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : JAMAICA Project ID No: 6JAMPAO69 Project : WTR SUPPLY & SWRGE Appraisal Date : Apr. 15, 1993 Total Project Cost: $55.00 Board Date : Nov. 16, 1993 Managing Division : LA3IE Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Aug. 1992 Date EA Category Assigned: Mar. 18, 1992 MAJOR PROJECT COMPONENTS: Sewage collection, treatment and disposal for Kingston metro area; solid waste management; pollution monitoring programs. MAJOR ENVIRONMENTAL ISSUES: Pollution in Kingston Harbor caused by untreated sewage discharges; leachate intrusion into the Harbor from solid waste dump sites and non-point rources of pollution (stormwater runoffs, etc.) OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: 12-month feasibility study to be commenced in November 1991 aimed at. quantifying pollutional loads, and prescribing solutions to alleviate problems; proposed project will be based on recommendations of above study. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: The project will be aimed at controlling pollution (waste-related) in the Kingston Harbor; it will impact on several subsectors (improved sewage, drainage, solid waste, 'etc.) for the Kingston area. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: EA will be prepared as part of the feasibility study; starting date - Dec. 1991; First Draft - Aug. 1992. REMARKS: N/A 1-59 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : MEXICO Project ID No: 6MXCPA1I1 Project : Rainfed Areas Development Appraisal Date : Sep. 15, 1992 Total Project Cost: $400.00 Board Date : Jul. 13, 1993 Managing Division : LA2AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: 03/16/92 MAJOR PROJECT COMPONENTS: (i) Tropical land development: (a) drainage; (b) irrigation; (c) land clearing; (ii) Rural development: (a) stores; (b) roads, and (iii) agricultural research and extension. MAJOR ENVIRONMENTAL ISSUES: Impact of tropical land development on sustainable productivity. OTHER ENVIRONMENTAL ISSUES: Fertilizer use PROPOSED ACTIONS: Adequate design, execution, and maintenance of works JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: N/A SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Ongoing in Project Tropical Agriculture II (Loan 2658-ME). REMARKS: N/A 1-60 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : PARAGUAY - Project ID No: 6PARPAO71 Project : Regional Agriculture Development Appraisal Date : Jun. 08, 1992 Total Project Cost: $60.00 Board Date : Jan. 15, 1993 Managing Division : LA4AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: To be determined Date EA Category Assigned: 4/20/90 MAJOR PROJECT COMPONENTS: Regional agricultural development in the Departments of Alto Parana and Itapua (norte) including consolidation of settlements, infrastructure, agricultural services, environmental protection and institutional strengthening. MAJOR ENVIRONMENTAL ISSUES: Deforestation for agricultural purposes, without proper land use planning or use of proper soil conservation technology; indigenous communities; increasing population pressures on land resources. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: Detailed design of watershed management and resource conservation to be undertaken using PHRD grant during the late stages of project preparation. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Important environmental issues, which can be dealt with directly in the project's design. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: The EA preparation process was discussed with the borrower during the pre-appraisal mission (Feb 11-29, 1992). Start-up is anticipated for late March and first draft for late May. REMARKS: The arrangements for making available the EA to affected groups of NGOs have not yet been defined. 1-61 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : CZECHOS. Project ID No: 7CZKPA011 Project : ENVIRONMENT I Appraisal Date : Sep. 08, 1992 Total Project Cost: $150.00 Board Date : Jul. 28, 1993 Managing Division : EC2EE Sector: Energy Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: June 1992 Date EA Category Assigned: March,1991 MAJOR PROJECT COMPONENTS: 1. Municipal services (water, sewerage and solid waste) in 8 cities. 2. Hazardous waste incineration in two locations. 3. Mining reclamation program. 4. Activities to implement environmental master plans in Northern Bohemia and Northern Moravia. 5. Institutional strengthening and technical assistance, including feasibility studies for next project. MAJOR ENVIRONMENTAL ISSUES: Siting and design of hazardous waste disposal (incineration) facilities. OTHER ENVIRONMENTAL ISSUES: Design of municipal wastewater treatment plants to meet receiving water standards. PROPOSED ACTIONS: Hazardous waste component will require full EA prior to appraisal. Wastewater treatment plants (and possibly other investments under components 3, 4, and 5, not yet identified) will require adherence to internationally accepted standards. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: Potential dangers from hazardous waste disposal, especially under abnormal or emergency conditions, are inherently high and public awareness is low; this component is clearly "A" category. If this component is dropped or deferred, the project would revert to a "B" rating. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Procedures for undertaking EA work, including the need for public participation, have been discussed with component sponsors and Terms of Reference agreed. Consultants, under an EC/PHARE grant are being selected. Provided field work begins in late-1991, a draft report should be ready by the scheduled appraisal date of June 1992. A more elaborate EA is required for the Czech Republic facility because the present site is probably not acceptable. REMARKS: 1-62 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Borrower has been advised of the need to release EA. A formal reply is awaited but is not expected to be a problem. I-63 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : HUNGARY Project ID No: 7HUNPA045 Project : ENERGY/ENVIRONMENT Appraisal Date : Aug. 15, 1992 Total Project Cost: $150.00 Board Date : Jul. 27, 1993 Managing Division : EC2EE Sector: Energy Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Under Discussion Date EA Category Assigned: MAJOR PROJECT COMPONENTS: The project involves: (i) renovation of two existing combined heat and power stations and expansion of their power generation; (ii) strengthening of the energy management system of the Hungarian Electricity Board; (iii) possible desulphurization facilities on selected coal power stations; and (iv) strengthening of the environmental management and monitoring capability of the Hungarian Electricity Board. MAJOR ENVIRONMENTAL ISSUES: (a) Atmospheric emissions and standards compliance at the power stations; (b) need to demonstrate that desulphurization has priority in national environmental strategy and that the proposed FGD is the least-cost solution to sulphur removal; (c) management of solid wastes at the coal power stations; (d) noise; (e) disturbances to the terrain and properties traversed by the pipeline; and (f) gas pipeline safety. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: (i) The demonstration noted in environmental issue (b) will need to be made before the component can be accepted for Bank financing; and (ii) Environmental assessments are proposed for components (i), (iii) and (iv). JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Environmental assessments of component (i) are to be included in the feasibility studies scheduled to begin in December 1991, and for component (iv); details of (EA) requirements and scheduling were discussed during September 1991 preparation mission. REMARKS: 1-64 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : TURKEY Project ID No: 7TURPA148 Project : BERKE HYDROELECTRIC Appraisal Date : JAN. 06, 1992 Total Project Cost: $650.00 Board Date : May 28, 1992 Managing Division : EClIE Sector: Energy Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: MAJOR PROJECT COMPONENTS: 1. Double curvature thin arch dam of 201 m height. 2. Underground power plant. MAJOR ENVIRONMENTAL ISSUES: 1. Resettlement of 86 people. 2. Closing of the Ilica thermal springs during dam construction. OTHER ENVIRONMENTAL ISSUES: 1. Transmission lines impact. 2. Presence of the Brown Fish Ol. PROPOSED ACTIONS: Mitigation on monitoring plans has been suggested. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: The draft Environmental Assessment and Resettlement Plan were presented to the Bank. Final reports will be ready by end-November 1991. REMARKS: The Society for the Protection of Nature, Istanbul Office, Ministry for Environment. Permission to release EA is expected. 1-65 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : TURKEY Project ID No: 7TURPA206 Project : Coal Pollution Abatement Appraisal Date : Jun. 10, 1992 Total Project Cost: $500.00 Board Date : Mar. 25, 1993 Managing Division : EC1IE Sector: Power .Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: TBD Date EA Category Assigned: MAJOR PROJECT COMPONENTS: The project components have not yet been identified. MAJOR ENVIRONMENTAL ISSUES: OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: REMARKS: 1-66 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : BANGLADESH Project ID No: 8BANPA176 Project : Jamuna Multi Purpose Bridge Appraisal Date : Mar. 06, 1993 Total Project Cost: $528.00 Board Date : Nov. 02, 1993 Managing Division : SA1EI Sector: Transportation Lending Instrument: Specific Investment Loan. Status:,Lending Date (est.) for receipt of EA by Bank: Completed Date EA Category Assigned: MAJOR PROJECT COMPONENTS: This project aims to stimulate economic growth by providing land transport of electricity, passenger and freight traffic and, potentially, natural gas and telecommunications between the northwest quadrant and the eastern half of the country. Components include a four lane.bridge, bridge approaches, river training works technical assistance and training. MAJOR ENVIRONMENTAL ISSUES: Potential pollution and erosion during construction; interference with drainage; increased river bank erosion; disruption of agricultural practices including loss of agricultural land requiring involuntary resettlement; possible impact on fisheries, wildlife, navigation, and reduced dry-season crop yield through closure of northern Dhaleswari River; risk of explosion or fire from gas pipeline; seismic risks; risk of accident during road transport of hazardous materials; bridge and adjunct highways may induce uncontrolled development. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: An EA has been prepared as part of the feasibility study. Construction would be planned and managed to minimize impacts during construction. Plans now being formulated for resettlement and for mitigating impacts on drainage, fisheries and agriculture, and for controlling land use would be implemented. An environment cell would be established in the implementing agency, expert consultants provided and its staff trained. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Supplementary resettlement, fisheries and wildlife studies and plans are under preparation. Studies on mitigation of effects in the upper Dhaleswari and the master plan are in progress. Mitigating measures will be incorporated into final planning and design for implementation. The initial EA is available now. The other studies would be available prior to appraisal. REMARKS: The affected people have been initially consulted as part of the 1-67 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS studies for Dhaleswari River closure mitigation and the involuntary resettlement process, and this will be continued as part of the project preparation process. 1-68 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : INDIA Project ID No: 8INDPA421 Project : Maharashtra Power II Appraisal Date : Feb. 15, 1992 Total Project Cost: $1,200.00 Board Date : Jun. 23, 1992 Managing Division : SA2EG Sector: Power Lending Instrument: Specific Investment Loan Status: Standby Date (est.) for receipt of EA by Bank: Completed Date EA Category Assigned: 10/08/91 MAJOR PROJECT COMPONENTS: (a) construction of last stage of Chandrapur thermal power station by the addition of a 500-MW coal fired unit; (b) extension of Maharashtra's transmission system, including the construction of a +/- 500 kV HVDC line from Chandrapur to Padghe (about 735 km) and the related terminal stations; (c) implementation of a load management and loss reduction program and supply of associated equipment; (d) implementation of a program to strengthen the Board's environmental management capability at the corporate level; (e) study to formulate a restructuring program for MSEB to enhance its operational and managerial efficiency; and (f) implementation of a plan for increasing private sector participation in the development and ownership of new power generation and distribution projects in Maharashtra. MAJOR ENVIRONMENTAL ISSUES: Chandrapur 7: (a) emission of SO 2 and NO x; (b) TSP emissions from existing boilers; (c) liquid effluents from existing and new units; (d) no water flow in the Erai river downstream of the,water supply dam; (e) water recycling and management; (f) contamination of the Erai river by the ash pond effluents; (g) coal dust emissions; (h) plant safety; (i) although not a consequence of the proposed project, the resettlement and rehabilitation (R&R) of the families displaced by the construction of units 5 and 6 (under the Chandrapur Thermal Power Project - Ln. 2544-IN) has not yet been completed. HVDC line: about 5 ha of forest area needs to be cleared for the construction of the line. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: Chandrapur 7: (a) construction of a 275-m high stack at Chandrapur 7 and utilization of low-sulfur coal are considered sufficient to maintain air quality and SO 2 and NO x emissions within acceptable standards. Environmental clearance for the proposed project has however been given by GOI on the condition .that a flue gas desulfurization (FGD) unit be constructed. Final decision on the FGD unit is still pending and will be a condition of negotiation; (b) a waste water treatment plant to dispose of liquid effluents from the existing and new units will be included in the design of the proposed plant; (c) measures related to water management, ash disposal, dust suppression, safety, and performance of the electrostatic precipitators, along with a detailed implementation schedule, will be agreed 1-69 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS with MSEB during appraisal; (d) an institutional development program to strengthen MSEB's environmental management capability will be agreed during appraisal; (e) a program for completing the R&R plan has been prepared with the help of a Bank-financed consultant and will be reviewed in detail during appraisal. HVDC line: forest clearance from GOI's Department of Environment will need to be obtained before project negotiation. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: The environmental assessment report for the project is available. An Executive Summary has been prepared jointly by SA2EG, ASTEG and ASTEN and is being revised in the context of the latest decisions made by GOI on the environmental clearance for Chandrapur 7 and by the Government of Maharashtra on the remaining resettlement issue. The summary is expected to be available for distribution to the Executive Directors by mid-February. REMARKS: Local NGOs are being involved in the implementation of the resettlement plan for Chandrapur. The construction of the waste water treatment plant as Well as the implemenatiozinof various measures related to water management, ash disposal, dust suppression, safety performance of the electrostatic precipitators will be the object of dated covenants. 1-70 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : INDIA Project ID No: 8INDPA422 Project : NTPC Power Generation project Appraisal Date : Apr. 27, 1992 Total Project Cost: $350.00 Board Date : Sep. 22, 1992 Managing Division : SA2EG Sector: Power Lending Instrument: Specific Investment Loan Status: Standby Date (est.) for receipt of EA by Bank: Date EA Category Assigned: April 15, 1992 MAJOR PROJECT COMPONENTS: The proposed project would comprise: (i) a four to five year time-slice of NTPC's least cost investment program and may include up'to 11 different coal and gas-based power stations including the Farakka Power Station Extension (500 MW) and support for NTPC to undertake one or more joint sector operations; and (ii) technical assistance for NTPC's institutional development. MAJOR ENVIRONMENTAL ISSUES: Proposed power stations to be included in the project are coal fired stations and major issues are expected to be related to adherence to emission standards etc. Since the major components comprise extension of existing stations no major resettlement problems are expected. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: (i) ASTEN staff to participate in pre-appraisal scheduled for March 1992; and (ii) NTPC to prepare Environmental Impact Summaries for major components prior to appraisal. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: All power generating stations to be constructed by NTPC fall in the A Category. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: The Farakka Power Station extension was environmentally cleared by the Bank in 1990, as part of the Regional Power Systems Project of NTPC. NTPC is in a process of updating the environmental assessment report and has been requested to submit an EAS in accordance with new Bank guidelines. The pre-appraisal mission would review NTPC's capabilities to satisfactorily implement mitigating measures resulting from the environmental impact of the project as well as the environmental impact studies of other project components with NTPC. REMARKS: NTPC has been briefed on the latest Bank requirements on consultation of 1-71 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS affected people. The adequacy of the measures will be assessed during pre-appraisal. Bank financing would only be used for components with satisfactory environmentally clearances. Note: Until a formal decision is taken to split the Electric Power System Project, the same code is used for this project and the NPTC Power System Project. 1-72 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : INDIA Project ID No: 8INDPA441 Project : Bombay Sewage Disposal Appraisal Date : Sep. 15, 1992 Total Project Cost: $200.00 Board Date : Mar. 30, 1993 Managing Division : SA2IN Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: August 1992 Date EA Category Assigned: Sep. 30, 1991 MAJOR PROJECT COMPONENTS: Completion of facilities for the safe disposal of sewage from the Greater Bombay urban area, comprising two three-kilometer long, three-and-a- half meter diameter marine outfalls to dispose of sewage from two of Bombay's seven drainage zones; two aerated lagoons to treat sewage from two more drainage zones. MAJOR ENVIRONMENTAL ISSUES: (i) Only the first stage of a system for the disposal of Bombay's sewage will be developed under this project; this will provide for discharge of sewage at relatively shallow ocean depths and at three kilometers from the shore line after preliminary treatment for the removal of grit and screenings; this combination of treatment and outfall length will represent a tremendous improvement over present conditions under which raw sewage is discharged at the shore line. However it will not conform to established international practice, and conventional water quality standards, particularly with respect to bacteriological levels, will not be met under this first stage of construction. (ii) The quality of effluent from the aerated lagoons, to be constructed under this first stage of development, will be equivalent to that provided by conventional primary treatment of sewage; again, the improvement over present conditions will be dramatic but the discharge of this effluent to a tidal creek will not conform to established international practice and conventional water quality standards. OTHER ENVIRONMENTAL ISSUES: Facilities to remove grit and screenings from sewage from all of the seven drainage zones serving the Greater Bombay urban area have been constructed or are under construction. Measures for the safe disposal of these wastes are unsatisfactory at present and create an adverse environmental impact. PROPOSED ACTIONS: (i) Oceans outfalls - By monitoring the performance of the first stage works the extent and nature of future works needed to meet the appropriate water quality standards will be identified. Provision will be made in the first stage -to increase the length of the outfalls and/or construct additional treatment facilities in the future. (ii) Aerated Lagoons - The basis of lagoon design is modular, and provision, including the reservation of adequate land areas, is to be made under this first stage of development for extension of the lagoons to meet the desired water quality standards in the 1-73 . ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS future. Measures for the safe disposal of wastes comprising grit and screenings will be identified as part of-the environmental assessment and will be implemented under covenanted action in the proposed project. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: This project is designed to assist Municipal Corporation of Greater Bombay to reduce a serious, adverse environmental impact resulting from the present practice of indiscriminately discharging untreated sewage and sewage effluent to water courses and to the shoreline. Because of the magnitude of the facilities required to effect such improvements, only an initial stage will be implemented under the project. Although this will vastly improve the present situation it will not initially meet with internationally accepted environmental standards. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: In September 1991, the Municipal Corporation of Greater Bombay engaged consultants to prepare an environmental management plan for optimum improvement of environmental quality achieved by the construction of the two outfalls and lagoons. An initial assessment of the existing receiving water quality will be prepared by February 1992. A summary environmental assessment for the lagoons and the outfalls (in terms of- receiving water quality for various lengths of outfall discharging untreated or primary treated and chlorinated effluent) will be.completed in August 1992. Full reports for the lagoons and the outfalls will be completed by September and December 1992, respectively. REMARKS: During a preparation mission in November 1992, the Municipal Corporation of Greater Bombay gave its permission to the Bank to release the environmental assessment, as recorded in the mission aide memoire. During the same mission, the Government of India expressed the view that such clearance would only be given after review of the environmental assessment. 1-74 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : INDIA Project ID No: 8INDPA449 Project : Renewable Energy Development Appraisal Date : Mar. 23, 1992 Total Project Cost: $435.00 Board Date : Sep. 01, 1992 Managing Division : SA2EG Sector: Power Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of'EA by Bank: Dec. 19913rd Quarter,91 Dec. 1991 Date EA Category Assigned: MAJOR PROJECT COMPONENTS: The project will involve installation of: (a) irrigation-based mini-hydros; (b) non-conventional energy systems, i.e., wind farm and solar photovoltaics; (c) expansion of bagasse-based papermill. MAJOR ENVIRONMENTAL ISSUES: (a) There is a need to address noise, odors, safety and fire fighting problems in the existing and expanded papermill; (b) no significant negative environmental issues have been identified for the renewable energy systems to be installed. The proposed systems are small-scale and non-polluting leading to reduced,dependence on fossil fuel for energy and enhanced opportunities for development of rural areas. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: (a) Based on plant site visit and results of EIAS, the following mitigatory actions were agreed with TNPL: in-plant design measures to minimize discharges of odorous compounds; installation of electrostatic precipitators on the power boiler; installation of external treatment systems to reduce suspended solids, BOD and COD to acceptable levels; conduct of a safety audit of chemical storage and handling; (b) IREDA, the financial intermediary for renewable energy sub-projects, would require that as condition for obtaining financing, developers ensure that the project would meet acceptable environmental and social impact standards, environmental clearances are secured and that appropriate consultation with affected groups are made. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: The papermill expansion project can have potentially adverse environmental impacts arising from the chemical pulp production process. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: An EIA study for papermill was conducted by NEERI and government clearance for circulation of report is being awaited. REMARKS: No major environmental problems envisaged for mini-hydro schemes. Work will be done on existing canals and dams and flows will continue to be dictated by irrigation requirements. Comparative water demands will be made to ensure adequate water is available for both-irr'igation and power, and clearance from irrigation departments will be secured. Construction plans are based on minimizing risk of damage to the irrigation system, existing 1-75 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS land use and local environment. Similar assessment will be required by IREDA for wind farms. 1-76 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : PAKISTAN Project.ID No: 8PAKPA226 Project : GHAZI - BAROTHA HYDROPOWER Appraisal Date : Apr. 15, 1993 Total Project Cost: $2,345.00 Board Date : Dec. 14, 1993 Managing Division : SA3EI . Sector: Power Lending Instrument: Specific Investment Loan . Status: Lending Date (est.) for receipt of EA by Bank: Under discussion Date EA Category Assigned: MAJOR PROJECT COMPONENTS: Engineering and installation of about 1425 MW hydroelectric capacity on the Indus River, about 7 km downstream of Tarbela Dam. Facilities comprise the construction of a barrage, a power channel, a power complex and associated infrastructure. MAJOR ENVIRONMENTAL ISSUES: Some issues having environmental impacts are: (a) likely malarial conditions at the barrage pond and head pond; (b) adequacy of releases in the river downstream of barrage; (c) land acquisition; (d) disposal of excavated material; and (e) resettlement. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: To be included in the environment assessment report under preparation. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: N/A SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: (a) Pakistan Hydro Consultants (PHC) prepared draft environmental assessment in June 1991; (b) supplemental studies are underway to develop operational criteria for discharge of compensation water for the management of created impoundments. Proposals for relocation of about 100 dwellings are also underway. REMARKS: N/A 1-77 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : PAKISTAN Project ID No: 8PAKPA235 Project : PUNJAB URBAN ENVIRONMENT Appraisal Date : Nov. 15, 1992 Total Project Cost: $226.00 Board Date : Apr. 27, 1993 Managing Division : SA3EI Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: To be determined Date EA Category Assigned: Nov. 6, 1991 MAJOR PROJECT COMPONENTS: (a) industrial and hazardous wastewater treatment and disposal; (b) toxic waste cleanup together with construction and management of a treatment and disposal facility; (c) technical strengthening and training for EPA and related sector personnel; (d) a financial facility for private sector assistance to promote/ facilitate environmental cleanup investments; and (e) publicity campaigns to inform and raise public awareness of environmental issues. MAJOR ENVIRONMENTAL ISSUES: Location of incinerator for hospital waste and landfill for municipal waste.. Location of facility to management hazardous waste. OTHER ENVIRONMENTAL ISSUES: N/A PROPOSED ACTIONS: Execution of complete EAs. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: As several of the planned components will be rated to the level A, the whole project is classified with this rating. SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: Not yet decided. Most likely the EAs will start in March 1992. REMARKS: N/A 1-78 ENVIRONMENTAL DATA SHEET FOR CATEGORY "A" PROJECTS Country : PAKISTAN Project ID No: 8PAKPA249 Project : Domestic Energy Resources Development Appraisal Date : Mar. 01, 1991 Total Project Cost: $551.80 Board Date : Mar. 31, 1992. Managing Division : SA3EI Sector: Energy Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: 2nd Quarter,91 Date EA Category Assigned: MAJOR PROJECT COMPONENTS: (a) Development of oil and gas fields under joint ventures with the private sector; (b) construction of the Dhodak Condensate Plant, Dhodak-Kot Addu and Qadirpur-spur Gas Pipelines; (c) implementation of measures to mitigate the environmental impact of (a) and (b) above; (d) corporate restructuring of OGDC; (e) institution of organization reforms within the Ministry of Petroleum and Natural Resources (MPNR); and (f) technical assistance for (d) and (e) above. MAJOR ENVIRONMENTAL ISSUES: As is common with other hydrocarbon exploration, production and delivery projects, the environmental issues involve: land use during and after the drilling operations, pipeline routing, impact on flora and fauna. Given that, one of the fields is around the Indus River, environmental issue of marine life will also arise. OTHER ENVIRONMENTAL ISSUES: PROPOSED ACTIONS: In order to ensure that the project components are implemented in an environmentally prudent manner, OGDC and SNGPL are carrying out, with the assistance of consultants, an Environmental Assessment. The EA would verify the development plans and engineering designs for the above physical components. JUSTIFICATION/RATIONALE FOR ENVIRONMENTAL CATEGORY: SCHEDULE OF CATEGORY A ENVIRONMENTAL ASSESSMENT: The environmental assessment was conducted and environmental assessment summary was prepared by OGDC and SNGPL and presented to the Executive Directors on August 28, 1991. REMARKS: I-79 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : ANGOLA Project ID No: 3ANGPA001 Project : Fisheries Resources Management Appraisal Date : JAN. 15, 1993 Total Project Cost: $75.00 Board Date : Sep. 14, 1993 Managing Division : AF3AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Country : ANGOLA Project ID No: 3ANGPA010 Project : LOBITO PORT TRANS Appraisal Date : Nov. 15, 1992 Total Project Cost: $168.00 Board Date : Sep. 28, 1993 Managing Division : AF3IN Sector: Transportation Lending Instrument: Sector Investment and Maintenance Status: Standby Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Country : ANGOLA Project ID No: 3ANGPA014 Project : Power Sector - Technical Assistance Appraisal Date : Feb. 15, 1992 Total Project Cost: $290.00 Board .Date : Jul. 28, 1992 Managing Division : AF3IE Sector: Energy Lending Instrument: Sector Investment and Maintenance Status: Lending Date (est.) for receipt of EA by Bank: Ongoing Date EA Category Assigned: Country : ANGOLA Project ID No: 3ANGPAO24 Project : TRANSPORT RECOVERY PROJECT Appraisal Date : Feb. 15, 1992 Total Project Cost: $74.00 Board Date : Jul. 14, 1992 Managing Division : AF3IN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Standby Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Country : BURUNDI Project ID No: 3BUIPA048 Project : Natural Resource Management Appraisal Date : Apr. 30, 1993 Total Project Cost: $100.00 Board Date : Jan. 25, 1994 Managing Division : AF3AG Sector: Agriculture & Rural Devt Lending Instrument: Sector Adjustment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: 11/4/91 1-80 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : BURUNDI Project ID No: 3BUIPAO62 Project : Private Sector Development Appraisal Date : Jun. 16, 1991 Total Project Cost: $30.00 Board Date : Apr. 21, 1992 Managing Division : AF3IE Sector: Industrial Devel/Finance Lending Instrument: Financial Intermediary Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: 11/26/91 Country : CAMEROON Project ID No: 3CAMPA082 Project : Transport Sector Project Appraisal Date : JAN. 20, 1993 Total Project Cost: $200.00 Board Date : Jun. 15, 1993 Managing Division : AFIN Sector: Public Sector Management Lending Instrument: Sector Investment and Maintenance Status: Lending Date (est.) for receipt of EA by Bank: 4th Quarter,92 Date EA Category Assigned: 11/27/91 Country : CAMEROON Project ID No: 3CAMPA087 Project : Urban Management Improvement Appraisal Date : Feb. 26, 1993 Total Project Cost: $40.00 Board Date : Dec. 07, 1993 Managing Division : APKIN Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Standby Date (est.) for receipt of EA by Bank: 01/15/93 Date EA Category Assigned: IEPS - 07/31/91 Country : CAMEROON Project ID No: 3CAMPA088 Project : Export Promotion & Diversification Appraisal Date : Jun. 22, 1992 Total Project Cost: $50.00 Board Date : May 25, 1993 Managing Division : AFlAG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Under Discussion Date EA Category Assigned: Country : CAMEROON Project ID No: 3CAMPAO90 Project : ECOLOGICAL PROTECTION, Appraisal Date : Jun. 19, 1992 Total Project Cost: $20.00 Board Date : Mar. 16, 1993 Managing Division : AFlAG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: 1-81 - ENVIRONMENTAL DATA 'SHEET FOR CATEGORY "B" PROJECTS Country : CAPE VERDE Project ID No: 3CAPPA015 Project : Transport Infrastructure Appraisal Date : Jun. 15, 1992 Total Project Cost: $35.00 Board Date : Dec..01, 1992 Managing Division : AF5IN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: To be determined Date EA Category Assigned: Nov. 27, 1991 Country : EQ. GUINEA Project ID No: 3EQGPA013 Project : Technical Assistance II/Energy Appraisal Date : Mar. 18, 1992 Total Project Cost: $2.00 Board Date : Jun. 30, 1992 Managing Division : AFlIE Sector: Technical Assistance Lending Instrument: Technical Assistance Loan Status: Standby Date (est.) for receipt of EA by Bank: Date EA Category Assigned: 02/26/92 Country : ETHIOPIA Project ID No: 3ETHPAO68 Project : Peasant Coffee Development Appraisal Date : Jun. 09, 1989 Total Project Cost: $80.00 Board Date : Jun. 29, 1993 Managing Division : AF2AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Standby Date (est.) for receipt of EA by Bank: Completed Date EA Category Assigned: Country : ETHIOPIA Project ID No: 3ETHPA078 Project : Road Rehabilitation Appraisal Date : Sep. 10, 1990 Total Project Cost: $102.00 Board Date : Jun. 09, 1992 Managing Division : AF2IN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Standby Date (est.) for receipt of EA by Bank: N/A Date EA Category Assigned: 2/10/92 Country : ETHIOPIA Project ID No: 3ETHPAO96 Project : National Seeds Appraisal Date : Feb. 20, 1992 Total Project Cost: $55.00 Board Date : Oct. 06, 1992 Managing Division : AF2AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: 1-82 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : ETHIOPIA Project ID No: 3ETHPA102 Project : Natural Gas & Petroleum Appraisal Date : Jun. 01, 1992 Total Project Cost: $50.00 Board Date : Dec. 15, 1992 Managing Division : AF2IE Sector: Industry Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: 2nd Quarter 1992 Date EA Category Assigned: Country : GHANA Project ID No: 3GHAPAO83 Project : Small:-Seale Irrigation Appraisal Date : Apr. 15, 1993 Total Project Cost: $55.00 Board Date : Feb. 15, 1994 Managing Division : AF4AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) fo-r receipt of EA by Bank: Under Discussion Date EA Category Assigned: Country : GHANA Project ID No: 3GHAPAO92 Project : Rural Water/Works Appraisal Date : JAN. 08, 1993 Total Project Cost: $42.00 Board Date : Sep. 14, 1993 Managing Division : AF4IN Sector: Water Supply and Sewerage Lending Instrument: Sector Investment and Maintenance Status: Lending Date (est.) for receipt of EA by Bank: Under Discussion Date EA Category Assigned: 10/92 Country : GHANA Project ID No: 3GHAPAO99 Project : Agricultural Extension Appraisal Date : May 10, 1991 Total Project Cost: $40.00 Board Date : Mar. 19, 1992 Managing Division : AF4AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Completed Date EA Category Assigned: 11/91 Country : GHANA Project ID No: 3GHAPA104 Project : URBAN III Appraisal Date : Apr. 09, 1993 Total Project Cost: $48.00 Board Date : Dec. 14, 1993 Managing Division : AF4IN Sector: Urbanization Lending Instrument: Sector Investment and Maintenance Status: Lending Date (est.) for receipt of EA by Bank: Ongoing Date EA Category Assigned: 10/92 I-83 ENVIRONMENTAL DATA SHEET FOR CATEGORY."B" PROJECTS Country : GHANA Project ID No: 3GHAPA110 Project : Environmental Resource Management Appraisal Date : Feb. 29, 1992 Total Project Cost: $37.80 Board Date : Sep. 15, 1992 Managing Division : AF4AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Completed Date EA Category Assigned: 11/91 Country : GHANA Project ID No: 3GHAPA124 Project, : URBAN TRANSPORT Appraisal Date : Nov. 15, 1992 , Total Project Cost: $135.00 Board Date : May 25, 1993 Managing Division : AF4IN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Standby Date (est.) for receipt of EA by Bank: Date EA Category Assigned: 10/21/91 Country : GHANA Project ID No: 3GHAPA125 Project : HIGHWAY SECTOR Appraisal Date : Aug. 09, 1993 Total Project Cost: $200.00 Board Date : Mar. 01, 1994 Managing Division : AF4IN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Aug.1991 Country : GUINEA Project ID No: 3GUIPAO26 Project ': Power II Appraisal Date : Feb. 08, 1992 Total Project Cost: $120.00 Board Date : May 26, 1992 Managing Division : AFlIE Sector: Power Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: 4th Quarter 92 let Quarter, 92 Date EA Category Assigned: October 1991 Country : GUINEA Project ID No: 3GUIPAO38 Project : Telecommunications Appraisal Date : Jul. 15, 1992 Total Project Cost: $20.00 Board Date : Jun. 29, 1993 Managing Division : AFIIE Sector: Communications Lending Instrument: Sector Investment and Maintenance Status: Standby Date (est.) for receipt of EA by Bank: Under Discussion Date EA Category Assigned: 03/07/91 1-84 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : GUINEA Project ID No: 3GUIPAO51 Project : AGRICULTURA EXPORT PROMOTION Appraisal Date : May 10, 1991 Total Project Cost: $24.80 Board Date : May 12, 1992 Managing Division : AFIAG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Mar. 31, 1992 Date EA Category Assigned: Country : GUINEA Project ID No: 3GUIPA052 Project : Transportation and Urban Infrastructure Appraisal Date : May 06, 1992 Total Project Cost: $30.00 Board Date : Dec. 22, 1992 Managing Division : AFlIN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Apr. 1, 1992 Date EA Category Assigned: Aug. 15, 1990 Country : COTE DIVOIRE Project ID No: 3IVCPAO91 Project : Private Sector Energy Appraisal Date : Sep. 03, 1992 Total Project Cost: $250.00 Board Date : Jun. 01, 1993 Managing Division : AFlIE Sector: Power Lending Instrument: Sector Investment and Maintenance Status: Lending Date (est.) for receipt of EA by Bank: Under Discussion Date EA Category Assigned: 11/26/91 Country : COTE DIVOIRE Project ID No: 3IVCPA115 Project : Third Road Sector Appraisal Date : Jun.. 03, 1992 Total Project Cost: $390.00 Board Date : Dec. 22, 1992 Managing Division : AF1IN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Country : KENYA Project ID No: 3KENPA102 Project : Urban Transport Appraisal Date : Sep. 01, 1992 Total Project Cost: $200.00 Board Date : Jul. 27, 1993 Managing Division : AF2IN Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: 1-85 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : LESOTHO Project ID No: 3LESPAO30 Project : INFRA MAINT Appraisal Date : Feb. 01, 1993 Total Project Cost: $30.00 Board Date : Jan. 18, 1994 Managing Division : AF6IN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Country : MADAGASCAR Project ID No: 3MAGPA067 Project : Energy II . Appraisal Date : Oct. 15, 1992 Total Project Cost: $80.00 Board Date : May 18, 1993 Managing Division : AF3IE Sector: Energy - Lending Instrument: Sector Investment and Maintenance Status: Lending Date.(est.) for receipt of EA by Bank: 3rd Quarter,91 Date EA Category Assigned: 11/26/91 Country : MADAGASCAR Project ID No: 3MAGPAO68 Project : Transport Sector Development Appraisal Date : Apr. 22, 1992 Total Project Cost:.$80.00 Board Date : Sep. 22, 1992 Managing Division : AF3IN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Under Discussion Date EA Category Assigned: Country : MADAGASCAR Project ID No: 3MAGPAO92 Project : Petroleum Sector Adjustment Appraisal Date : Jun. 15, 1991 * Total Project Cost: $70.00 Board Date : Jun. 16, 1992 Managing Division : AF3IE Sector: Energy Lending Instrument: Sector Investment and Maintenance Status: Lending Date (est.) for receipt of EA by Bank: Ongoing Date EA Category Assigned: 11/26/91 Country : MADAGASCAR Project ID No: 3MAGPAO96 Project : URBA N II Appraisal Date : JAN. 15, 1993 Total Project Cost: $90.00 Board Date : Oct. 12, 1993 Managing Division : AF3IN * Sector: Urbanization Lending Instrument: Sector Investment and Maintenance Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: 1-86 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : MADAGASCAR Project ID No: 3MAGPAO97 Project : National Extension Appraisal Date : May 15, 1993 Total Project Cost: $35.00 Board Date : Mar. 15, 1994 Managing Division : AF3AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Standby Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Country : MADAGASCAR Project ID No: 3MAGPA108 Project : EXP CROP PROMOTION Appraisal Date : Mar. 15, 1993 Total Project Cost: $30.00 Board Date : Sep. 14, 1993 Managing Division : AF3AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Country : MALAWI Project ID No: 3MALPAO74 Project : Agricultural Services Appraisal Date. : May 29, 1992 Total Project Cost: $60.00 Board Date : Feb. 09, 1993 Managing Division : AF6AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA-by Bank: Ongoing Date EA Category Assigned: Country : MALAWI Project ID No: 3MALPA081 Project : National Water Development Appraisal Date : Jul. 01, 1993 Total Project Cost:' $25.00 Board Date : Mar. 02, 1994 Managing Division : AF6IN Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Standby Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Country : MALI Project ID No: 314LIPA048 Project : Infrastructure/Transport Sector Appraisal Date : JAN. 15, 1993 Total Project Cost: $80.00 Board Date : Jul. 13, 1993 Managing' Division : AF5IN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Standby Date (est.) for receipt 'of EA by Bank: Under Discussion Date EA Category Assigned: 11/27/91 1-87 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : MALI Project IDNo: 3MLIPA065 Project : Private Sector Development Appraisal Date : Feb. 17, 1992 Total Project Cost: $35.00 Board Date : Jun. 23, 1992 Managing Division : AF5IE Sector: Industry Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Under Discussion Date EA Category Assigned: Country : MOZAMBIQUE Project ID No: 3MOZPAO31 Project : First Roads & Coastal Shipping Appraisal Date : Sep. 16, 1991 Total Project Cost: $166.00 Board Date : May 26, 1992 Managing Division : AF6IN Sector: Transportation Lending Instrument: Technical Assistance Loan Status: Lending Date (est.) for receipt of EA by Bank: Ongoing Date EA Category Assigned: Country MOZAMBIQUE Project ID No: 3MOZPA037 Project : Rural Restructuring Appraisal Date : May 29, 1992 Total Project Cost: $22.00 Board Date : Apr. 01, 1993 Managing Division : AF6AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Country : MAURITANIA Project ID No: 3MTAPAO55 Project : WATER SUPPLY Appraisal Date : Feb. 15, 1992 Total Project Cost: $70.00 Board Date : Jun. 16, 1992 Managing Division : ASIN Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: 10/10/91 Country : NIGER Project ID No: 3NIGPA044 Project : Infrastructure/Transport Sector II Appraisal Date : Nov. 25, 1990 Total Project Cost: $193.50 Board Date : Jul. 21, 1992 Managing Division : AF5IN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Ongoing Date EA Category Assigned: 11/27/91 1-88 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : NIGER Project ID No: 3NIGPA058 Project : Municipal Infrastructure Appraisal Date : Feb. 15, 1993 Total Project Cost: $50.00 Board Date : Jul. 13, 1993 Managing Division : AF5IN Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Ongoing Date EA Category Assigned: 11/27/91 Country : NIGER Project ID No: 3NIGPAO61 Project : Private Irrigation Appraisal Date : Jun. 19, 1991 Total Project Cost: $13.30 Board Date : Jul. 21, 1992 Managing Division : AF5AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Ongoing Date EA Category Assigned: Country : NIGERIA Project ID No: 3NIRPAO78 Project : Power VIII Appraisal Date : Sep. 06, 1991 Total Project Cost: $429.00 Board Date : Sep. 01, 1992 Managing Division : AF4IE Sector: Power Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Country : NIGERIA Project ID No: 3NIRPA105 Project : Multi-State Roads Appraisal Date : Nov. 16, 1991 Total Project Cost: $135.00 Board Date : Jun. 16, 1992 Managing Division : AF4IN Sector: Transportation Lending Instrument: Sector Investment and Maintenance Status: Lending Date (est.) for receipt of EA by Bank: 1990 Date EA Category Assigned: 09/90 Country : NIGERIA Project ID No: 3NIRPA107 Project : Multi-State Water Supply I Appraisal Date : May 26, 1991 Total Project Cost: $175.00 Board Date : Apr. 21, 1992 Managing Division : AF4IN Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Completed Date EA Category Assigned: 12/89 1-89 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : NIGERIA Project ID No:.3NIRPA138 Project : National Agricultural Technological Support Appraisal Date : Mar. 03, 1991 Total Project Cost: $60.00 Board Date : Apr. 21, 1992 Managing Division : AF4AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Completed Date EA Category Assigned: 02/13/91 Country : NIGERIA Project ID No: 3NIRPA142 Project : Railways, Appraisal Date : Jun. 26, 1992 Total Project Cost: $200.00 Board Date : Apr. 20, 1993 Managing Division : AF4IN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: 11/26/91 Country : NIGERIA Project ID No: 3NIRPA146 Project : Fadama Development (Small Irrigation) Appraisal Date : Mar. 02, 1991 Total Project Cost: $105.90 Board Date : Mar. 26, 1992 Managing Division : AF4AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: 9/9/91 Date EA Category Assigned: 09/20/90 Country : RWANDA Project ID No: 3RWAPA045 Project : Communal Development Appraisal Date : Feb. 10, 1993 Total Project Cost: $50.20 Board Date : Nov. 16, 1993 Managing Division : AF3IN Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: To be determined Date EA Category Assigned: 11/26/91 Country : RWANDA Project ID No: 3RWAPAO52 Project : Energy Sector Rehabilitation Appraisal Date : Jul. 15, 1992 Total Project Cost: $55.00 Board Date : Feb. 16, 1993 Managing Division : AF3IE Sector: Power Lending Instrument: Specific Investment Loan Status: Standby Date (est.) for receipt of EA by Bank: Under Discussion Date EA Category Assigned: 11/26/91 I-90 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : RWANDA Project ID No: 3RWAPAO72 Project : FOOD SECURITY & SOCIAL ACTION PROJECT Appraisal Date : Nov. 29, 1991 Total Project Cost: $40.00 Board Date : May 26, 1992 Managing Division : AF3PH Sector: Population Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Country : SENEGAL Project ID No: 3SENPAO76 Project : Water Supply III Appraisal Date : Mar. 28, 1991 Total Project Cost: $298.00 Board Date : Feb. 23, 1993 Managing Division : AF5IN Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Completed Date EA Category Assigned: Country : SENEGAL Project ID No: 3SENPAO78 Project : Energy II Appraisal Date : Apr. 20, 1992 Total Project Cost: $120.00 Board Date : Oct. 06, 1992 Managing Division : AF5IE Sector: Power Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Under Discussion Date EA Category Assigned: Country : SENEGAL Project ID No: 3SENPAO94 Project : Private Sector Appraisal Date : Aug. 30, 1992 Total Project Cost: $30.00 Board Date : Jan. 12, 1993 Managing Division : AF5IE Sector: Industry Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Under Discussion Date EA Category Assigned: Country : SENEGAL Project ID No: 3SENPA101 Project : PUBLIC WORKS & EMPLOYMENT II Appraisal Date : JAN. 18, 1992 Total Project Cost: $27.70 Board Date : May 26, 1992 Managing Division : AF5IN Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: 01/03/92 1-91 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : SEYCHELLES Project ID No: 3SEYPA006 Project : Infrastructure/Environment Appraisal Date : Mar. 23, 1992 Total Project Cost: $64.00- Board Date : Jun. 16, 1992 Managing Division : AF3IN Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Standby Date (est.) for receipt of EA by Bank: January 1992 Date EA Category Assigned: 11/26/91 Country : SIERRA LEONE Project ID No: 3SILPAO21 Project : Roads Rehabilitation & Maintenance Appraisal Date : Apr. 10, 1992 Total Project Cost: $100.00 Board Date : Sep. 29, 1992 Managing Division : AF4IN Sector: Transportation Lending Instrument: Sector Investment and Maintenance Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: 10/21/91 Country : SIERRA LEONE Project ID No: 3SILPA025 Project : Power Sector Rehabilitation Appraisal Date : Oct. 27, 1989 Total Project Cost: $55.90 Board Date : Apr. 02, 1992 Managing Division : AF4IE Sector: Power Lending Instrument: Sector Investment and Maintenance Status: Lending Date (est.) for- receipt of EA by Bank: Completed Date EA Category Assigned: Country : SWAZILAND Project ID No: 3SWAPAO22 Project : Urban Development I Appraisal Date : Dec. 01, 1992 Total Project Cost: $50.00 Board Date : Sep. 14, 1993 Managing Division : AF6IN Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Ongoing Date EA Category Assigned: Country : TOGO Project ID No: 3TOGPAO22 Project : Agricultural Services Rehabilitation Appraisal,Date - : Feb. 26, 1990 Total Project Cost: $21.10 Board Date : Jun. 25, 1992 Managing Division : AF1AG Sector: Agriculture & Rural Devt Lending Instrument: Sector Investment and Maintenance Status: Lending Date (est.) for receipt of EA by Bank: Completed Date EA Category Assigned: 1-92 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : TOGO Project ID No: 3TOGPA039 Project : Lome Urban Development Appraisal Date : Jun. 15, 1992 Total Project Cost: $45.00 Board Date : Mar. 02, 1993 Managing Division : AFlIN Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Standby Date (est.) for receipt of EA by Bank: 06/15/92 Date EA Category Assigned: 5/15/90 Country : UGANDA. Project ID No: 3UANPAO30 Project : Transport Sector Rehabilitation Appraisal Date : Aug. 29, 1992 Total Project Cost: $60.00 Board Date : Mar. 23, 1993 Managing Division : AF2IN- Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Country : UGANDA Project ID No:.3UANPA045 Project : Agric. Res & Extension Appraisal Date : Apr. 17, 1992 Total Project Cost: $20.00 Board Date : Jan. 19, 1993 Managing Division : AF2AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Country : UGANDA Project ID No: 3UANPA088 Project : NORTHERN RECONSTRUCTION Appraisal Date : Sep. 16, 1991 Total Project Cost: $98.20 Board Date : May 05, 1992 Managing Division : AF2IN Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Country : ZAIRE Project ID No: 3ZAIPA104- Project : Urban Environment Appraisal Date : Apr. 19, 1989 Total Project Cost: $16.50 Board Date : Jul. 14, 1992 Managing Division : AF3IN Sector: Urbanization Lending Instrument: Sector Investment and Maintenance Status: Lending Date (est.) for receipt of EA by Bank: Completed Date EA Category Assigned: 1-93 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : ZAMBIA Project ID No: 3ZAMPAO60 Project : Power Rehab. Appraisal Date : Sep. 21, 1992 Total Project Cost: $40.00 Board Date : May 13, 1993 Managing Division : AF6IE Sector: Energy Lending Instrument: Sector Investment and Maintenance Status: Standby Date (est.) for receipt of EA by Bank: TBD Date EA Category Assigned: Feb. 14, 1991 Country : ZAMBIA Project ID No: 3ZAMPAO7O Project : Export Diversification Appraisal Date : Jul. 01, 1992 Total Project Cost: $65.00 Board Date : Apr. 06, 1993 Managing Division : AF6AG Sector: Agriculture & Rural Devt Lending Instrument: Sector Investment and Maintenance Status: Standby Date (est.) for receipt of EA by Bank: N/A Date EA Category Assigned: Country : ZAMBIA Project ID No: 3ZAMPAO73 Project : Marketing & Process Appraisal Date : JAN. 19, 1992 Total Project Cost: $95.00 Board Date : Jun 23, 1992 Managing Division : AF6AG Sector: Agriculture & Rural Devt Lending Instrument: Sector-Investment and Maintenance Status: Standby Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Country : ZIMBABWE Project ID No: 3ZIMPA046 Project : Urban Transportation Appraisal Date : JAN. 14, 1991 Total Project Cost: $240.00 Board Date : Jan. 26, 1993 Managing Division : AF6IN Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Completed Date EA Category Assigned: Country : ZIMBABWE Project ID No: 3ZIMPA047 Project : Power Distribution Appraisal Date : Jul. 15, 1990 Total Project Cost: $48.50 Board Date : Apr. 21, 1992 Managing Division : AF6IE Sector: Power Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Completed Date EA Category Assigned: 1-94 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Couhtry : ZIMBABWE Project ID No: 3ZIMPAO57 Project : AGRI. SERVICES Appraisal Date : May 30, 1992 Total Project Cost: $100.00 Board Date : May 27, 1993 Managing Division : AF6AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Standby Date (est.) for receipt of EA by Bank: Date EA Category Assigned: March 24, 1992 i 1-95 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : CHINA Project ID No: 4CHAPAO64 Project : Zhejiang Multi-Cities Appraisal Date : Feb. 14, 1992 Total Project Cost: $260.00 Board Date : Sep. 01, 1992 Managing Division : EA2EH Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Ongoing Date EA Category Assigned: Country. : CHINA Project ID No: 4CHAPA102 Project : Changchun Water Supply Appraisal Date : May 07, 1992 Total Project Cost: $205.00 Board Date : Nov. 24, 1992 Managing Division : EA2EH Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Ongoing Date EA Category Assigned: Country : CHINA Project ID No: 4CHAPA127 Project : Tianjin Industrial Development Appraisal Date : Jun. 15, 1992 Total Project Cost: $100.00 Board Date : Mar. 16, 1993 Managing Division : EA2IE Sector: Industrial Devel/Finance Lending Instrument: Financial Intermediary Loan Status: Lending Date .(est.) for receipt of EA by Bank: Ongoing Date EA Category Assigned: Country : CHINA Project ID No: 4CHAPA155 Project : Sichuan Agriculture Dev Appraisal Date : Nov. 08, 1991 Total Project Cost: $315.00 Board Date : Jul. 07, 1992 Managing Division : EA2AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Completed Date EA Category Assigned: 5/23/91 Country : CHINA Project ID No: 4CHAPA162 Project : Tianjin Urban Development & Environment Appraisal Date : Apr. 28, 1991 Total Project Cost: $200.00 Board Date : Jul. 07, 1992 Managing Division : EA2EH Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Completed Date EA Category Assigned: 1-96 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country i CHINA Project ID No: 4CHAPA164 Project : Railways VI Appraisal Date : Jun. 30, 1992 Total Project Cost: $600.00 Board Date : Apr. 13, 1993 Managing Division : EA2TP - Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Under Discussion Date EA Category Assigned: Country. : CHINA Project ID No: 4CHAPA167 Project : Jiangsu Chemical Sector Appraisal Date : Feb. 05, 1990 Total Project Cost: $333.70 Board Date : Jun.,16, 1992 Managing Division : EA2IE Sector: Industrial Devel/Finance Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Completed Date EA Category Assigned: Country : CHINA Project ID No: 4CHAPA177 Project : FERTILIZER & GEN. PROCESS EQUIP. MANUFACTURING Appraisal Date : Mar. 15, 1993 Total Project Cost: $430.00 Board Date : Jan. 18, 1994 Managing Division : EA2IE Sector: Industry Lending,Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: To be determined Date EA Category Assigned: Country : CHINA Project ID No: 4CHAPA178 Project : Electronics Appraisal Date : Jul. 01, 1993 Total Project Cost: $330.00 Board Date : Mar. 08, 1994 Managing Division : EA2IE Sector: Industry Lending Instrument: Financial Intermediary Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Country : CHINA Project ID No: 4CHAPA179 A Project : Shenyang Engineering Industry (SEIP) Appraisal Date : Apr. 15, 1993 Total Project Cost: $100.00 Board Date : Dec. 21, 1993 Managing Division : EA2IE Sector: Industry Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Banki Under Discussion Date EA Category Assigned: 1-97 ENVIRONMENTAL DATA SHEET FOR CATEGORY. "B" PROJECTS Country : CHINA Project ID No: 4CHAPA189 Project : RED SOILS II LAND REHABILITATION Appraisal Date : Apr. 04, 1993 Total Project Cost: $285.00 Board Date : Nov. 23, 1993 Managing Division : EA2AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Country : CHINA Project ID No: 4CHAPA197 Project : Housing and Social Security Reform Appraisal Date : Oct. 01, 1992 Total Project Cost: $400.00 Board Date : Jul. 06, 1993 Managing Division : EA2EH Sector: Urbanization Lending Instrument:*Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Feb. 6, 1992 Country : CHINA Project ID No: 4CHAPA221 Project : GRAIN DISTRIBUTION Appraisal Date : Oct. 10, 1992 Total Project Cost: $600.00 Board Date : May 18, 1993 Managing Division : EA2AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Country : CHINA Project ID No: 4CHAPA224 Project : SHIPS' WASTE DISPOSAL FACILITIES Appraisal Date : Apr. 15, 1991 Total Project Cost: $64.10 Board Date : May 05, 1992 Managing Division : EA2TP_ Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: TBD Date EA Category Assigned: Country : FIJI Project ID No: 4FIJPAO20 Project : ROADS Appraisal Date : Feb. 09, 1992 Total Project Cost: $70.00 Board Date : Jun. 16, 1992 Managing Division : EA3IN . Sector: Transportation . Lending Instrument: Specific Investment Loan -Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: 1-98 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : INDONESIA Project ID No: 4INSPA159 Project : Treecrop Smallholder Development Appraisal Date : Sep. 29, 1988 Total Project Cost: $160.30 Board Date : Apr. 21, 1992 Managing Division : EA3AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: 11/30/91 Date EA Category Assigned: 5/7/91 Country : INDONESIA Project ID No: 41NSPA220 Project : Forestry III Appraisal Date : JAN. 08, 1993 Total Project Cost: $120.00 Board Date : Aug. 17, 1993 Managing Division : EA3AG Sector: Agriculture & Rural Devt Lendings,Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Mar. 27, 1992 Country : INDONESIA Project ID No: 41NSPA250 Project : Third Kabupaten Roads Dev Appraisal Date : JAN. 24, 1992 Total Project Cost: $400.00 Board Date : Jun. 16, 1992 Managing Division : EA3IN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Completed Date EA Category Assigned: 12/06/91 Country : INDONESIA Project ID No: 41NSPA271 Project : Financial Sector Restructuring Appraisal Date : JAN. 28, 1991 Total Project Cost: $950.00 Board Date : Jun. 02, 1992 Managing Division : EA3IE Sector: Industrial Devel/Finance Lending Instrument: Financial Intermediary Loan Status: Lending Date (est.) for receipt of EA by Bank: N/A Date EA Category Assigned: 2/06/92 Country : INDONESIA Project ID No: 41NSPA286 Project : WATERSHED MANAGEMENT AND CONSERVATION Appraisal Date : Jun. 26, 1992 Total Project Cost: $100.00 Board Date : Mar. 23, 1993 Managing Division : EA3AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Ongoing Date EA Category Assigned: October 29, 1990 1-99 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : INDONESIA Project ID No: 41NSPA298 Project : TELECOMMUNCATIONS Appraisal Date : Dec. 04, 1991 Total Project Cost: $1,375.00 Board Date : Jun. 02, 1992 Managing Division : EA3IE Sector: Communications Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: 4/91 Date EA Category Assigned: 01/11/91 Country : INDONESIA Project ID No: 4INSPA300 Project : Ground Water Development Appraisal Date : Sep. 01, 1992 Total Project Cost: $90.00 Board Date : Feb. 16, 1993 Managing Division : EA3AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Completed Date EA Category Assigned: 2/25/91 Country : KOREA Project ID No: 4KORPA119 Project : PUSAN & TAEJON SEWERAGE Appraisal Date : Jun. 21, 1991 Total Project Cost: $130.00 Board Date : Mar. 31, 1992 Managing Division : EAlIN Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Country : KOREA Project ID No: 4KORPA121 Project : Railroad System Modernization Appraisal Date : Sep. 04, 1991 Total Project Cost: $190.00 Board Date : Jul. 14, 1992 Managing Division : EAlIN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Country : LAO, P.D.R. Project ID No: 4LAOPA018 Project : IND'L CREDIT II Appraisal Date : Nov. 01, 1992 Total Project Cost: $15.00 Board Date : Jul. 13, 1993 Managing Division : EAlIE Sector: Industrial Devel/Finance Lending Instrument: Financial Intermediary Loan Status: Standby Date (est.) for receipt of EA by Bank: Date EA Category Assigned: I-100 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : LAO, P.D.R. Project ID No: 4LAOPAO20 Project : FOREST MANAGEMENT AND CONSERVATION Appraisal Date : Nov. 19, 1991 Total Project Cost: $24.90 Board Date : Aug. 18, 1992 Managing Division : EA1AG, Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: 10/31/91 Country : LAO, P.D.R. Project ID No: 4LAOPA029 Project : Telephone System Expansion Appraisal Date : Oct. 01, 1992 Total Project Cost: $40.00 Board Date : Jul. 06, 1993 Managing Division : EAlIE Sector: Communications Lending Instrument: Sector Investment and Maintenance Status: Lending Date (est.) for receipt of EA by Bank: N/A Date EA Category Assigned: Country : MALAYSIA Project ID No: 4MAYPA106 Project : THIRD FELCRA (Agriculture) Appraisal Date : Dec. 03, 1991 Total Project,Cost: $265.00 Bpard Date : May 12, 1992 Managing Division : EA1AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: N/A Date EA Category Assigned: 11/8/91 Country : PAPUA NEW G. Project ID No: 4PAPPA044 Project : Oro Small Holder Oil Palm Development Appraisal Date : Mar. 15, 1990 Total Project Cost: $37.20 Board Date : Jun. 09, 1992 Managing Division : EA3AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Completed Date EA Category Assigned: Feb. 6, 1989 Country : PAPUA NEW G. Project ID No: 4PAPPA045 Project : Oro Smallholder Oil Palm Devt Appraisal Date : Jul. 14, 1992 Total Project Cost: $20.00 Board Date : Jul. 13, 1993 Managing Division : EA3AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Completed Date EA Category Assigned: 02/06/89 1-101 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : PAPUA NEW G. Project ID No: 4PAPPA046 Project : PETROLEUM EXPLORATION T.A. Appraisal Date : JAN. 15, 1992 Total Project Cost: $13.50 Board Date : Jun. 09, 1992 Managing Division : EA3IE Sector: Energy Lending Instrument: Technical Assistance Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: 01/10/92 Country : PHILIPPINES Project ID No: 4PHLPA151 Project : LAND REFORM SUPPORT Appraisal Date : Oct. 20, 1992 Total Project Cost: $25.00 Board Date : Jun. 08, 1993 Managing Division : EA1AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Standby Date (est.) for receipt of EA by Bank: Ongoing Date EA Category Assigned: 11/8/91 Country : PHILIPPINES Project ID No: 4PHLPA153 Project : Second Water Supply, Sewerage and Sanitation Sector Appraisal Date : Nov. 15, 1992 Total Project Cost: $50.00 Board Date : Jun. 23, 1993 Managing Division : EAlIN Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Country : PHILIPPINES Project ID No: 4PHLPA184 Project : Irrigation Operation Appraisal Date : Aug. 15, 1992 Total Project Cost: $100.00 Board Date , : Mar. 02, 1993 Managing Division : EA1AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment.Loan Status: Lending Date (est.) for receipt of EA by Bank: Ongoing Date EA Category Assigned: Country : PHILIPPINES Project ID No: 4PHLPA187 Project : Municipal Development III Appraisal Date : Jun. 28, 1991 Total Project Cost: $114.00 Board Date : Mar. 31, 1992 Managing Division : EAlIN Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: N/A Date EA Category Assigned: 1-102 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : PHILIPPINES Project ID No: 4PHLPA188 Project : Rural Infrastructure Appraisal Date : Oct. 15, 1992 Total Project Cost: $145.00 Board Date : Jun. 08, 1993 Managing Division : EAlIN Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Standby Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Country : SOLOMON IS. Project ID No: 4SLIPA015 Project : Housing Appraisal Date : Nov. 15, 1992 Total Project Cost: $7.00 Board Date : Sep. 07, 1993 Managing Division : EA3IN Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Ongoing Date EA Category Assigned: Country : THAILAND Project ID No: 4THLPA138 Project : FOURTH HIGHWAY SECTOR Appraisal Date : Sep. 10, 1991 Total Project Cost: $264.50 Board Date : Mar. 19, 1992 Managing Division : EAlIN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Country : VANUATU Project ID No: 4VANPA013 Project : PETROLEUM EXPLORATION T.A. Appraisal Date : Oct. 15, 1992 Total Project Cost: $4.00 Board Date : Mar. 16, 1993 Managing Division : EA3IE Sector: Energy Lending Instrument: Technical Assistance Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: 6/10/91 1-103 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : ALGERIA Project ID No: 5ALGPAO36 Project : Highways VI Appraisal Date : Sep. 04, 1993 Total Project Cost: $270.00 Board Date : Mar. 01, 1994 Managing Division : MNIlN Sector: Transportation Lending Instrument: Sector Investment and Maintenance Status: Lending Date (est.) for receipt of EA by Bank: 4th Quarter,90 Date EA Category Assigned: Country : ALGERIA Project ID No: 5ALGPAO84 Project : CONSTRUCTION INDUSTRY Appraisal Date : JAN. 04, 1993 Total Project Cost: $250.00 Board Date : May 27, 1993 Managing Division : MNIN Sector: Industry Lending Instrument: Financial Intermediary Loan Status: Standby Date (est.) for receipt of EA by Bank: N/A Date EA Category Assigned: 11/12/91 Country : ALGERIA Project ID No: 5ALGPAO93 Project : CADASTRE Appraisal Date : Nov. 09, 1991 Total Project Cost: $91.00 Board Date : May 28, 1992 Managing Division : MN1IN Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Ongoing Date EA Category Assigned: Country : ALGERIA Project ID No: 5ALGPAO97 Project : IRRIGATION MANAGEMENT SUPPORT . Appraisal Date : Oct. 15, .1992 . Total Project Cost: $50.00 Board Date : Jul. 06, 1993 Managing Division : MN1AG Sector: Agriculture &.Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Country : EGYPT Project ID No: 5EGTPA170 Project : WEST NUBARIA INTENSIFICATION Appraisal Date : Mar. 15, 1993 Total Project Cost: $175.00 Board Date : Jan. 27, 1994 Managing Division : MN2AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Not required Date EA Category Assigned: 1-104 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : EGYPT Project ID No: 5EGTPA176 Project : AGRICULTURAL MODERNIZATION Appraisal Date : Jun. 25, 1992 Total Project Cost: $164.30 Board Date : Feb. 16, 1993 Managing Division : MN2AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Not required Date EA Category Assigned: Country : IRAN Project ID No: 5IRNPAO39 Project : FLOOD WORKS REHAB/TEHRAN DRAINAGE Appraisal Date : Feb. 13, 1992 Total Project Cost: $100.00 Board Date : Jun. 30, 1992 Managing Division : MN2IN Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Country : IRAN Project ID No: 5IRNPA041 Project : POWER SECTOR EFFICIENCY Appraisal Date : JAN. 16, 1992 Total Project Cost: $1,488.00 Board Date : Jun. 09, 1992 Managing Division : MN2IE Sector: Power Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: 8/91 Country : IRAN Project ID No: 5IRNPA042 Project : TEHRAN Drainage Appraisal Date : Jul. 22, 1992 Total Project Cost: $100.00 Board Date : Nov. 19, 1992 Managing Division : MN2IN Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Under discussion Date EA Category Assigned: Country : IRAN Project ID No: 5IRNPA046 Project : RAILWAY/POSTS Appraisal Date : Sep. 14, 1992 Total Project Cost: $600.00 Board Date : Feb. 23, 1993 Managing Division : MN2IN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Standby Date (est.) for receipt of EA by Bank: Date EA Category Assigned: 1-105 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : IRAN Project ID No: 5IRNPA049 Project : TEHRAN SOLID WASTE MANAGEMENT Appraisal Date : May 26, 1993 Total Project Cost: $150.00 Board Date : Nov. 11, 1993 Managing Division : MN2IN Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Standby Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Country, : IRAN Project ID No: 5IRNPA050 Project : TEHRAN SEWERAGE Appraisal Date : Oct. 16, 1992 Total Project Cost: $650.00 Board Date : Apr. 06, 1993 Managing Division : MN2IN Sector: Water Supply and Sewerage. Lending Instrument: Specific Investment Loan Status: Standby Date (est.) for receipt of EA by Bank: Febr6ary 1992 Date EA Category Assigned: Nov. 18, 1991 Country : JORDAN Project ID No: 5JORPA046 Project : TRANSPORT III Appraisal Date : Mar. 11, 1992 Total Project Cost: $78.60 Board Date : Jun. 16, 1992 Managing Division : MN2IN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Standby Date (est.) for receipt of EA by Bank: Under Discussion Date EA Category Assigned: Country : MOROCCO Project ID No: 5MYCPA081 Project : MUNICIPAL FINANCE II Appraisal Date : Jun. 15, 1992 Total Project Cost: $300.00 Board Date : Mar. 09, 1993 Managing Division : MN1IN Sector: Urbanization Lending Instrument: Financial Intermediary Loan Status: Lending Date (est.) for receipt of EA by Bank: Under Discussion Date EA Category Assigned: 11/12/91 Country : MOROCCO Project ID No: 5MYCPAl14 Project : SECOND LSII Appraisal Date : Feb. 10, 1992 Total Project Cost: $300.00 Board Date : Sep. 15, 1992 Managing Division : MN1AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan . Status: Lending Date (est.) for receipt of EA by Bank: 1st Quarter 1993 Date EA Category Assigned: 1-106 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : MOROCCO Project ID No: 5MYCPA136 Project : Private Sector Development Appraisal Date : Jul. 15, 1993 Total Project Cost: $100.00 Board Date : Mar. 08, 1994 Managing Division : MN1IE Sector: Industrial Devel/Finance Lending Instrument: Financial Intermediary Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Country : MOROCCO Project ID No: 5MYCPA152 Project : IRRIGATED AREAS AGRICULTURAL SERVICES PROJECT Appraisal Date : Nov. 15, 1992 Total Project Cost: $40.00 Board Date : May 18, 1993 Managing Division : MNIAG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Standby Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Country : TUNISIA Project.ID No: 5TUNPAO96 Project : MUNICIPAL SECTOR INVESTMENT PROJECT Appraisal Date : Oct. 20, 1991 Total Project Cost: $247.00 Board Date : Jun. 16, 1992 Managing Division : MN1IN Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA'by Bank: Ongoing Date EA Category Assigned: 11/12/91 Country : TUNISIA Project ID No: 5TUNPAl20 Project : INDUSTRIAL FINANCE Appraisal Date : Jun. 28, 1992 Total Project Cost: $250.00 Board Date : Dec. 29, 1992 Managing Division : MN1IE Sector: Industrial Devel/Finance Lending Instrument: Financial Intermediary Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Country : TUNISIA Project ID No: 5TUNPA130 Project : NATIONAL RURAL FINANCE Appraisal Date : Oct.-03, 1992 Total Project Cost: $170.00 Board Date : Jul. 13, 1993 Managing Division : MN1AG Sector: Agriculture & Rural Devt Lending Instrument: Financial Intermediary Loan Status: Lending Date (est.) for receipt of EA by Bank: 3rd Quarter, 92 Date EA Category Assigned: Unchanged 1-107 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : TUNISIA Project ID No: 5TUNPAl31 Project : AGRICULTURAL SECTOR INVESTMENT LOAN Appraisal Date : Feb. 01, 1993 Total Project Cost: $200.00 Board Date : Sep. 07, 1993 Managing Division : MNIAG Sector: Agriculture & Rural Devt Lending Instrument: Sector Investment and Maintenance Status: Lending Date (est.) for receipt of EA by Bank: TBD Date EA Category Assigned:- Country : TUNISIA Project ID No: 5TUNPAl34 Project : TRANSPORT SECTOR DEVELOPMENT Appraisal Date : Oct. 01, 1992 Total Project Cost: $150.00 Board Date : Jul. 13, 1993 Managing Division : MN1IN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Under Discussion Date EA Category Assigned: 11/13/91 Country : YEMEN Project ID No: 5YARPA056 Project : TAIZ WATER SUPPLY & SEWERAGE REHAB. AND REINFORCEMENT Appraisal Date : Apr. 20, 1992 Total Project Cost: $30.00 Board Date : Oct. 13, 1992 Managing Division : MN2IN Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Under Discussion Date EA Category Assigned: Dec. 18, 1991 1-108 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : ARGENTINA Project ID No: 6ARGPAO68 Project : Private Sector Development Credit Appraisal Date : Aug. 15, 1992 Total Project Cost: $950.00 Board Date : Aug. 15, A993 Managing Division : LA4TF Sector: Industrial Devel/Finance Lending Instrument: Financial Intermediary Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: 12/18/91 Country : ARGENTINA Project ID No: 6ARGPA083 Project : Road Maintenance Appraisal Date : May 11,1l992 Total Project Cost: $1,060.00 Board Date : Oct. 06, 1993 Managing Division : LA4IE Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by.Bank: Ongoing Date EA Category Assigned: 11/13/91 Country : ARGENTINA Project ID No: 6ARGPAO92 Project : Public Enterprises Restructuring II Appraisal Date : Apr. 16, 1992 Total Project Cost: $600.00 Board Date : Oct. 15, 1992 Managing Division :jLA4TF Sector: Program Lending/SAL Lending Instrument: Sector Adjustment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Dec. 19, 1992 Country : BARBADOS. Project ID No: 6BARPA016 Project : Road Maintenance & Rehabilitation II Appraisal Date : Feb. 10, 1992 Total Project Cost: $20.00 Board Date : Jun. 23, 1992 Managing Division : LA3IE Sector: Transportation Lending Instrument: Specific Investment'Loan Status: Lending Date (est.) for receipt of EA by Bank: N/A Date EA Category Assigned: Country : BELIZE Project ID No: 6BEZPA012 Project : Municipal Development Appraisal Date : Mar. 15, 1993 Total Project Cost: $7.50 Board Date : Jan. 15, 1994 Managing Division : LA3IE Sector: Tourism Lending Instrument: Specific Investment Loan Status: Standby Date (est.) for receipt of EA by Bank: Date EA Category Assigned: 1-109 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : BELIZE Project ID No: 6BEZPA013 Project : PRIVATE SECTOR DEV. Appraisal Date : Jun. 15, 1992 Total Project Cost: $8.00 Board Date : Mar. 16, 1993 Managing Division : LA3TF Sector: Industrial Devel/Finance Lending Instrument: Financial Intermediary Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Country : BOLIVIA Project ID No: 6BOLPAO64 Project : Private Enterprise Reform and Private Sector Devt Appraisal Date : JAN. 30, 1993 Total Project Cost: $44.50 Board Date : Sep. 14, 1993 Managing Division : LA3TF Sector: Industrial Devel/Finance Lending Instrument: Financial Intermediary Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Nov. 18, 1991 Country : BOLIVIA Project ID No: 6BOLPAO71 Project : Road Maintenance II Appraisal Date : Jun. 26, 1991 Total Project Cost: $250.00 Board Date : Jun. 16, 1992 Managing Division : LA3IE Sector: Transportation Lending.Instrument: Sector Investment and Maintenance Status: Standby Date (est.) for receipt of EA'by Bank: Received Date EA Category Assigned: Country : BOLIVIA Project ID No: 6BOLPA084 Project : MUNICIPAL DEV Appraisal Date : JAN. 15, 1993 -Total Project Cost: $20.80 Board Date : Oct. 15, 1993 Managing Division : LA3IE Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Standby Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Country : BRAZIL Project ID No: 6BRAPA165 Project : State Highways Management Appraisal Date : Apr. 30, 1990 Total Project Cost: $500.00 Board Date : Jul. 14, 1992 Managing Division : LAlIN Sector: Transportation Lending Instrument: Sector Investment and Maintenance Status: Lending Date (est.) for receipt of EA by Bank: Ongoing Date EA Category Assigned: 04/01/88 1-110 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : BRAZIL Project ID No: 6BRAPA166 Project : Metro Transport CBTU - Sao Paolo Appraisal Date : Jun. 29, 1991 Total Project Cost: $281.00 Board Date : Mar. 31, 1992 Managing Division : LAlIN Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Ongoing Date EA Category Assigned: 11/21/90 Country : BRAZIL Project ID No: 6BRAPA236 Project : Irrigation Subsector II Appraisal Date : JAN. 15, 1993 Total Project Cost: $450.00 Board Date : Aug. 15, 1993 Managing Division : LA1AG Sector: Agriculture & Rural Devt Lending Instrument: Sector Investment and Maintenance Status: Lending Date (est.) for receipt of EA by Bank: Ongoing Date EA Category Assigned: Nov. 7, 1989 Country : BRAZIL Project ID No: 6BRAPA284 Project : Privatization Capital Markets REF-92L Appraisal Date : Nov. 26, 1990 Total Project Cost: $1,115.00 Board Date : May 27, 1993 Managing Division : LAlCO Sector: Industrial Devel/Finance Lending Instrument: Sector Investment and Maintenance Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Country : BRAZIL Project ID No: 6BRAPA289 Project : Water Pollution Control Appraisal Date : JAN. 04, 1989 Total Project Cost: $650.00 Board Date : Jul. 14, 1992 Managing Division : LAlIN Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Ongoing Date EA Category Assigned: 5/13/87 Country : BRAZIL Project ID No: 6BRAPA292 'Project : Mato Grosso Natural Resources Management Appraisal Date : Oct. 10, 1991 Total Project Cost: $250.00 Board Date : May 26, 1992 Managing Division : LA1AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: N/A Date EA Category Assigned: 11/11/91 I-111 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : BRAZIL Project ID No: 6BRAPA299 Project : Environment II (CVRD) Appraisal Date : Mar. 16, 1992 Total Project Cost: $220.00 Board Date : Sep. 22, 1992 Managing Division : LA1EI Sector: Other Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: 11/07/91 Country : BRAZIL Project ID No: 6BRAPA319 Project : Federal Highway Appraisal Date : Oct. 20, 1992 Total Project Cost: $1,000.00 Board Date : Mar. 15, 1993 Managing Division : LAlIN Sector: Transportation Lending Instrument: Sector Investment and Maintenance Status; Lending Date (est.) for receipt of EA by Bank: Ongoing Date EA Category Assigned: 1/24/92 Country : BRAZIL Project ID No: 6BRAPA325 Project : Infraero Reform Loan Appraisal Date : Aug. 15, 1993 Total Project Cost: $300.00 Board Date : Feb. 15, 1994 Managing Division : LAlIN Sector: Transportation Lending Instrument: Sector Investment and Maintenance Status: Lending Date (est.) for receipt of EA by Bank: Under Discussion Date EA Category Assigned: 02/05/92 IEPS DATE Country. : BRAZIL Project ID No: 6BRAPA327 Project : Water Pollution Control - Minas Gerais Appraisal Date : Apr. 27, 1992 Total Project Cost: $350.00 Board Date : Oct. 15, 1992 Managing Division : LAlIN Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Ongoing Date EA Category Assigned: May 13, 1987- Country : BRAZIL Project ID No: 6BRAPA328 Project : Water Pollution Control - Sao Paulo/Parana Appraisal Date : Feb. 17, 1992 Total Project Cost: $463.00 Board Date : Jul. 14, 1992 Managing Division : LAlIN Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Ongoing Date EA Category Assigned:' May 13, 1987 1-112 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : CHILE Project ID No: 6CHLPAO60 Project : Small Farmer Services Appraisal Date : Sep. 30, 1991 Total Project Cost: $236.00 Board Date : May 26, 1992 Managing Division : LA4AG Sector: Agriculture & Rural Devt Lending Instrument: Sector Investment and Maintenance Status: Lending 'Date (est.) for receipt of.EA by Bank: Ongoing Date EA Category Assigned: 8/8/90 Country : CHILE Project ID No: 6CHLPAQ63 Project : Health Sector Reform Appraisal Date : Jun. 22, 1992 Total Project Cost: $397.00 Board Date : Mar. 16, 1993 Managing Division : LA4HR Sector: Population Lending Instrument: Sector Investment and Maintenance Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: 7/26/90 Country : CHILE Project ID No: 6CHLPA085 Project : Infrastructure II Appraisal Date : Feb. 15, 1993 Total Project Cost: $1,400.00 Board Date : Jul. 15, 1993 Managing Division : LA4IE Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Mar. 10, 1992 Country : COLOMBIA Project ID No: 6CLMPA191 Project : Export Development Appraisal Date : May 18, 1992 Total Project Cost: $200.00 Board Date : Oct. 12, 1992 Managing Division : LA3TF Sector: Industrial Devel/Finance Lending Instrument: Financial Intermediary Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Nov. 20, 1990 Country : COLOMBIA Project ID No: 6CLMPA193 Project : Bogota Transport Appraisal Date : Jun..18, 1990 Total Project Cost: $119.50 Board Date : Mar. 24, 1992 Managing Division : LA3IE Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Completed Date EA Category Assigned: 1-113 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : COLOMBIA Project ID No: 6CLMPA194 Project : National Highway Sector III Appraisal Date : May 20, 1991 Total Project Cost: $413.00 Board Date : Mar. 31, 1992 Managing Division : LA3IE Sector: Transportation Lending Instrument: Sector Investment and Maintenance Status: Lending Date (est.) for receipt of EA by Bank: Ongoing Date EA Category Assigned: Country : COLOMBIA Project ID No: 6CLMPA195 Project : IFI-Restructuring & Divestiture Appraisal Date : May 05, 1991 - Total Project Cost: $415.30 Board Date , : Mar. 19, 1992 Managing Division : LA3TF Sector: Industrial Devel/Finance Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Ongoing Date EA Category Assigned: 2/19/89 Country : COLOMBIA Project ID No: 6CLMPA196 Project : Agriculture Sector Credit Appraisal Date : Apr. 06, 1992 Total Project Cost: $500.00 Board Date : Jan. 07, 1993 Managing Division : LA3AG Sector: Agriculture & Rural Devt Lending Instrument: Financial Intermediary Loan Status: Lending Date (est.) for receipt of EA by Bank: Completed Date EA Category Assigned: 12/12/89 Country : COSTA RICA Project ID No: 6COSPA047 Project : Water Supply Appraisal Date : Jun. 15, 1992 Total Project Cost: $40.00 Board Date : Dec. 01, 1992 Managing Division : LA2IE Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Standby Date (est.) for receipt of EA by Bank.: Ongoing Date EA Category Assigned: 11/20/91 Country : COSTA RICA Project ID No: 6COSPA049 Project : Agriculture Sector Investment Appraisal Date : Apr. 15, 1991 Total Project Cost: $70.00 Board Date : Mar. 19, 1992 Managing Division : LA2AG Sector: Agriculture & Rural Devt Lending Instrument: Financial Intermediary Loan Status: Lending Date (est.) for receipt of EA by Bank: Completed Date EA Category Assigned: 1-114 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : ECUADOR Project ID No: 6ECUPAO68 Project : Private Sector Development Appraisal Date : Dec. 12, 1990 Total Project Cost: $252.00 Board Date : Jul. 02, 1992 Managing Division : LA4TF - Sector: Industrial Devel/Finance Lending Instrument: Financial Intermediary Loan Status: Lending Date (est.) for receipt of EA.by Bank: Under Discussion Date EA Category Assigned: 8/7/90 Country : EL SALVADOR Project ID No: 6ESLPAO31 Project : Agriculture Sector Investment Appraisal Date : Sep. 30, 1991 Total Project Cost: $45.00 Board Date : Oct. 27, 1992 Managing Division : LA2AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: 11/14/90 Country : GUATEMALA Project ID No: 6GUAPA042 Project : Social Investment Fund Appraisal Date : JAN. 28, 1990 Total Project Cost: $95.30 Board Date : Jul. 07, 1992 Managing Division : LA2HR Sector: Population. Lending Instrument: Sector Investment and Maintenance Status: Lending Date (est.) for receipt of EA by Bank: Completed Date EA Category Assigned: 1/13/89 Country : GUYANA Project ID No: 6GUYPAO34 Project : Road Rehabilitation Appraisal Date :'Jun. 15, 1992 Total Project Cost: $35.00 Board Date ' : Dec. 29,.1992 Managing Division : LA3IE Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: 11/20/91 Country : GUYANA Project ID No: 6GUYPA035 Project : Private SEC CRD Appraisal Date : Jul. 15, 1993 Total Project Cost: $11.10 Board Date : Dec. 15, 1993 Managing Division : LA3TF Sector: Industrial Devel/Finance Lending Instrument: Specific Investment Loan Status: Standby Date (est.) for receipt of EA-by Bank: Date EA Category Assigned: 1-115 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : GUYANA Project ID No: 6GUYPAO36 Project : Sugar Industry Rehabilitation Appraisal Date : Mar. 16, 1992 Total Project Cost: $226.00 Board Date : Sep. 15, 1992 Managing Division : LA3AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Standby Date (est.) for receipt of EA by Bank: Date EA Category Assigned: 2/15/91 Country : HAITI Project ID No: 6HAIPA046 Project : Agric. Prod. & Land Development Appraisal Date : Jun. 15, 1993 Total Project Cost: $39.00 Board Date Mar. 15, 1994 Managing Division : LA3AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Completed Date EA Category Assigned: Country :'HAITI Project ID No: 6HAIPA054 Project : Private Sector Dev. Appraisal Date : Oct. 26, 1992 Total Project Cost: $21.00 Board Date : Jul. 13, 1993 Managing Division : LA3TF Sector: Industrial Devel/Finance Lending Instrument: Financial Intermediary Loan Status: Lending Da'te (est.) for receipt of EA by Bank: Date EA Category Assigned: Country : HONDURAS Project ID No: 6HDSPA047 Project : Agriculture Sector Loan Appraisal Date : Mar. 23, 1992 Total Project Cost: $99.90 Board Date : Jul. 28, 1992 Managing Division : LA2AG Sector: Agriculture & Rural Devt Lending Instrument: Sector Adjustment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: 8/6/90 Country : HONDURAS Project ID No: 6HDSPA057 Project : Transport Sector Rehabilitation Appraisal Date : Jun. 15, 1992 Total Project Cost: $42.20 Board Date : Jun. 15, 1993 Managing Division : LA2IE Sector: Transportation Lending Instrument: Specific Investment Loan Status: Standby Date (est.) for receipt of EA by Bank: Date EA Category Assigned: 1-116 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : JAMAICA Project ID No: 6JAMPAO74 Project : Energy Sector Deregulation and Privatization Appraisal Date : Feb. 24, 1992 Total Project Cost: $275.00 Board Date : Jun. 25, 1992 Managing Division : LA3IE Sector: Power Lending Instrument: Specific Investment Loan Status: Lending Date (est.),for receipt of EA by Bank: October 10, 1991 Date EA Category Assigned: January 1991 Country : MEXICO Project ID No: 6MXCPA149 Project : Railway Sector Appraisal Date : Jun. 15, 1992 - Total.Project-Cost: $400.00 Board Date : Mar. 16, 1993 Managing Division : LA2IE Sector: Transportation Lending Instrument: Sector Investment and Maintenance Status: Standby Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Nov. 20, 1991 Country : MEXICO Project ID No: 6MXCPA152 Project : Urban Transport II Appraisal Date : JAN. 27, 1992 Total Project Cost: $400.00 Board Date : Jun. 16, 1992 Managing Division : LA2IE Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Standby Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Country : MEXICO Project ID No: 6MXCPA168 Project : Power Sector I Appraisal Date : May 15, 1992 Total Project Cost: $3,000.00 Board Date : Jan. 15, 1993 Managing Division : LA2IE Sector: Power Lending Instrument: Sector Investment and Maintenance Status: Standby Date (est.) for receipt of EA by Bank: Under Discussion Date EA Category Assigned: 10/15/91 Country : MEXICO Project ID No: 6MXCPA182 Project : Rural Financial Sector Appraisal Date : Feb. 16, 1992 Total Project Cost: $800.00 Board Date : Jul. 14, 1992, Managing Division : LA2AG Sector: Agriculture & Rural Devt Lending Instrument: Financial Intermediary Loan Status: Lending Date (est.) for receipt of EA by Bank: Ongoing Date EA Category Assigned: 9/22/89 1-117 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : MEXICO Project ID No: 6HXCPA201 Project : HOUSING SCT Appraisal Date : JAN. 28, 1992 Total Project Cost: $400.00 Board Date : Jun. 30, 1992 Managing Division : LA2IE Sector: Urbanization Lending Instrument: Sector Investment and Maintenance Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: 3/15/91 Country : MEXICO Project ID No: 6MXCPA206 Project : PRIV.SCTR.IRRIG Appraisal Date : Oct. 12, 1992 Total Project Cost: $800.00 Board Date : Sep. 15, 1993 Managing Division : LA2AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Country : NICARAGUA Project ID No: 6NICPA053 Project : Social Investment Fund Appraisal Date : Jun. 15, 1992 Total Project Cost: $55.00 Board Date : Nov. 15, 1992 Managing Division : LA2HR Sector: Population Lending Instrument: Sector Investment and Maintenance Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Mar. 16, 1992 Country : PANAMA Project ID No: 6PANPAO53 Project : PERL Appraisal Date : Feb.-15, 1993 Total Project Cost: $50.00 Board Date : Jul. 13, 1993 Managing Division : LA2C2 Sector: Industrial Devel/Finance Lending Instrument: Financial Intermediary' Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Country : PARAGUAY Project ID No: 6PARPAO66 Project : Transport Appraisal Date : May 17, 1992 Total Project Cost: $105.00 Board Date : Nov. 03, 1992 Managing Division : LA4IE Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Under Discussion Date EA Category Assigned: 1/30/90 1-118 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : PARAGUAY Project ID No: 6PARPAO70 Project : Private Sector Development Appraisal Date : JAN. 20, 1992 Total Project Cost: $128.40 Board Date : Sep. 15, 1992 Managing Division : LA4TF Sector: Industrial Devel/Finance Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Under Discussion Date EA Category Assigned: 2/14/90 Country : PARAGUAY Project ID No: 6PARPAO73 Project : Water Supply Appraisal Date : Feb. 17, 1992 Total Project Cost: $30.90 Board Date : Oct. 15, 1992 Managing Division : LA4IE Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: 6/27/91 Country : PERU Project ID No: 6PERPA117 Project : INFRA RHB Appraisal Date : Nov. 17, 1992. Total Project Cost: $275.00 Board Date. : May 20, 1993 Managing Division : LAlIN Sector: Urbanization Lending Instrument: Sector Investment and Maintenance Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: 12/16/91 Country : PERU Project ID No: 6PERPA123 Project : WATER REHAB. Appraisal Date : Nov. 16, 1992 Total Project Cost: $200.00 Board Date : May 20, 1993 Managing Division : LAlIN Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: 12/17/92 IEPS DATE Country : VENEZUELA Project ID No: 6VENPA030 Project : Power Sector Investment I Appraisal Date : Jun. 22, 1992 Total Project Cost: $660.00 Board Date : Jan. 19, 1993 Managing Division : LA1EI Sector: Power Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Under discussion Date EA Category Assigned: 9/17/91 I-119 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : VENEZUELA Project ID No: 6VENPAO31 Project : Urban Transport I Appraisal Date : Sep. 15, 1992 Total Project Cost: $300.00 Board Date : Mar. 15, 1993 Managing Division : LAlIN Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Lending Date.(est.) for receipt of EA by Bank: Date EA Category Assigned: 11/02/90 Country : VENEZUELA Project ID No: 6VENPA033 Project : Low-Income Barrios Improv. Appraisal Date : Dec. 09, 1991 Total Project Cost: $70.00 Board Date : May .26, 1992 Managing Division': LAlIN Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Under Discussion Date EA Category Assigned: 09/21/89 Country : VENEZUELA Project ID No: 6VENPA040 Project : Caracas Water Appraisal Date : Sep. 06, 1992 Total Project Cost: $225.00 Board Date : Jan. 15, 1993 Managing Division : LAlIN Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Under discussion Date EA Category Assigned: 09/12/90 Country : VENEZUELA Project ID No: 6VENPA044 Project : Highway Management Appraisal Date : Apr. 27, 1992 Total Project Cost: $330.00 Board Date : Oct. 15, 1992 Managing Division : LAlIN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Ongoing Ongoing Date EA Category Assigned: 11/15/91 Country : VENEZUELA Project ID No: 6VENPA048 Project : Endemic Disease Control Appraisal Date : May 16, 1992 Total Project Cost: $80.00 Board Date : Nov. 10, 1992 Managing Division : LA1HR Sector: Population Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Under discuss. Date EA Category Assigned: 11/07/91 1-120 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : BULGARIA Project ID No: 7BULPA005 Project : Agricultural Development Appraisal Date : May 18, 1992 Total Project Cost: $110.00 Board Date : Dec. 15, 1992 Managing Division : ECIAG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Ongoing Date EA Category Assigned: Country : CZECHOS. Project ID No: 7CZKPA009 Project : POWER & ENVIRONMENTAL IMPROVEMENT Appraisal Date : Jun. 03, 1991 Total Project Cost: $200.00 Board Date Apr. 07, 1992 Managing Division : EC2EE Sector: Energy Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Country : HUNGARY Project ID No: 7HUNPA048 Project : PRODUCT MARKET DEVELOPMENT Appraisal Date : JAN. 06, 1992 Total Project Cost: $230.00 Board Date : Sep. 11, 1992 Managing Division : EC2AW Sector: Agriculture & Rural Devt Lending Instrument: Financial Intermediary Loan Status: Lending Date (est.) for receipt of EA by Bank: Ongoing Date EA Category Assigned: Country : POLAND Project ID No: 7POLPA016 Project : INDUSTRIAL ENVIRONMENT I Appraisal Date : Apr. 15, 1993 Total Project Cost: $150.00 Board Date : Dec. 15, 1993 Managing Division : EC2EE Sector: Energy Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Under Discussion Date EA Category Assigned: Country : POLAND Project ID No: 7POLPAO21 Project : Private Enterprise Development Appraisal Date : Jun. 28, 1991 Total Project Cost: $180.00 Board Date : Apr. 14, 1992 Managing Division : EC2CO Sector: Industrial Devel/Finance Lending Instrument: Financial Intermediary Loan Status: Lending Date (est.) for receipt of EA by Bank: N/A Date EA Category Assigned: 11/13/91 1-121 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : POLAND Project ID No: 7POLPA043 Project : COGENERATION PRIVATIZATION Appraisal Date : Oct. 01, 1992 Total Project Cost: $400.00 Board Date : Apr. 01, 1993 Managing Division : EC2EE Sector: Energy Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Country : POLAND Project ID No: 7POLPA047 Project : FORESTRY DEVELOPMENT PROJECT Appraisal Date : Jun. 15, 1992 Total Project Cost: $260.00 Board Date : Jan. 12, 1993 Managing Division : EC2AW Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Standby Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Country : ROMANIA Project ID No: 7ROMPA081 Project : TRANSPORTATION Appraisal Date : Dec. 04, 1992 Total Project Cost: $100.00 Board Date : May 27, 1993 Managing Division : ECIIN Sector: Other Lending Instrument: Specific Investment Loan Status: Standby Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Country : ROMANIA Project ID No: 7ROMPA082 Proj.ect : PRIVATE FARMER SUPPORT Appraisal Date : JAN. 13, 1992 Total Project Cost: $150.00 Board Date : Jun. 04, 1992 Managing Division : ECIAG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Ongoing Date EA Category Assigned: 11/08/91 Country :ROMANIA Project ID No: 7ROMPAO83 Project : FINANCIAL SYSTEM MOD. Appraisal Date : May 25, 1992 Total Project Cost: $100.00 Board Date : Dec. 15, 1992 Managing Division : ECICO Sector: Program Lending/SAL Lending Instrument: Structural Adjustment Loan Status: Standby Date (est.) for receipt of EA by Bank: Date EA Category Assigned: 1-122 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : TURKEY Project ID No: 7TURPA152 Project : E. ANATOLIA WATERSHED REHABILITATION Appraisal Date : Jun. 07, 1992 Total Project Cost: $160.00 Board Date : Feb.-16, 1993 Managing Division : ECIAG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Country : TURKEY Project ID No: 7TURPA184 Project : SOUTHWEST COAST ENVIRONMENT Appraisal Date : Sep. 15, 1992 Total Project Cost: $150.00 Board Date : May 11, 1993 Managing Division : EC11N Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Standby Date (est.) for receipt of EA by Bank: Ongoing Date EA Category Assigned: 1/11/90 Country : TURKEY Project ID No: 7TURPA194 Project : BURSA ENVIRONMENT Appraisal Date : Apr. 16, 1992 Total Project Cost: $225.00 Board Date : Oct. 08,' 1992 Managing Division : EClIN Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Ongoing Date EA Category Assigned: 8/21/90 Country : TURKEY Project ID No: 7TURPA222 Project : ANTALYA ENVIRONMENT Appraisal Date : Nov. 23, 1992 Total Project Cost: $350.00 Board Date : Jul. 15, 1993 Managing Division : ECIN Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Standby Date (est.) for receipt of EA by Bank: Under discussio Date EA Category Assigned: 9/91 I1 1-123 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : BANGLADESH Project ID No: 8BANPA121 Project : Private Sector Industrial Credit Appraisal Date : Jun. 22, 1990 Total Project Cost: $40.50 Board Date : Mar. 17, 1992 Managing Division : SA1CI Sector: Industrial Devel/Finance Lending Instrument: Financial Intermediary Loan Status: Lending Date (est.) for receipt of EA by Bank: Ongoing Date EA Category Assigned: Country : BANGLADESH Project ID No: 8BANPA132 Project : Road Rehabilitation and Maintenance II Appraisal Date : Aug. 15, 1992 Total Project Cost: $126.00 Board Date : Mar. 30, 1993 Managing Division : SA1EI Sector: Transportation Lending Instrument: Sector Investment and Maintenance Status: Lending Date (est.) for receipt of EA by Bank: Under discussion Date EA Category Assigned: Feb. 12, 1990 Country : BANGLADESH Project ID No: 8BANPA137 Project : Forest Resources Management Appraisal Date : Nov. 11, 1991 Total Project Cost.: $65.10 Board Date : May 12, 1992 Managing Division : SA1AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: N/A Date EA Category Assigned: Country : BANGLADESH Project ID No: 8BANPA167 Project : THIRD CHITTAGONG WATER SUPPLY PROJECT Appraisal bate : JAN. 14, 1992 Total Project Cost: $25.00 Board Date : Dec. 08, 1992 Managing Division : SA1EI Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Standby Date (est.) for receipt of EA by Bank: April 1992 Date EA Category Assigned: Country : BANGLADESH Project ID No: 8BANPAl92 Project : Power Rehabilitation Appraisal Date : Dec. 01, 1989 Total Project Cost: $244.60 Board Date : Nov. 10, 1992 Managing Division : SAIEI Sector: Power Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: N/A Date EA tategory Assigned: Dec. 1989 1-124 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : BANGLADESH Project ID No: 8BANPA200 Project : Gas III Appraisal Date : Oct. 07, 1992 Total Project Cost: $150.00 Board Date : Mar. 16, 1993 Managing Division : SA1EI Sector: Energy Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Country : BANGLADESH Project ID No: 8BANPA204 Project : East/West Interconnector Appraisal Date : Mar. 06, 1993 Total Project Cost: $168.00 Board Date : Nov. 02, 1993 Managing Division : SA1EI 'Sector: Power Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Ongoing Date EA Category Assigned: Country : BANGLADESH -Project ID No: 8BANPA212- Project : Flood Protection I Appraisal Date : Jun. 25, 1992 Total Project Cost: $153.00 Board Date : Feb. 09, 1993 Managing Division : SA1AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of- EA by Bank: Ongoing Date EA Category Assigned: 5/31/90 Country : BANGLADESH Project ID No: 8BANPA216 Project : Cyclone Protection II Appraisal Date : Jun. 26, 1992 Total Project Cost: $150.00 Board Date : Mar. 30, 1993 Managing Division : SA1AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Ongoing Date EA Category Assigned: Country : BANGLADESH Project ID No: 8BANPA223 - Project : MULTI-PURPOSE CYCLONE SHELTER PROJECT Appraisal Date : Sep. 15, 1992 Total Project Cost: $50.00 Board Date : Apr. 13, 1993 Managing Division : SAlAG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Standby Date (est.) for receipt of EA by Bank: July 1993 Date EA Category Assigned: 1-125 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : INDIA Project ID No: 81NDPA294 Project : KANGSBATI IRRIGATION MODERNIZATION Appraisal Date : Oct. 15, 1992 Total Project Cost: $300.00 Board Date : Jul. 13, 1993 Managing Division : SA2AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Standby Date (est.) for receipt of EA by Bank: October 1991 Date EA Category Assigned: October 1990 Country : INDIA Project ID No: 8INDPA361 Project : NATIONAL HIGHWAYS II Appraisal Date : May 07, 1990 Total Project Cost: $338.70 Board Date : Apr. 21, 1992 Managing Division : SA2IN Sector': Transportation Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Ongoing Date EA Category Assigned: Country : INDIA Project ID No:- 8INDPA368 Project : Railways Productivity Improvement Appraisal Date : Mar. 15, 1991 Total Project Cost: $1,425.00 Board Date : May 05, 1992 Managing Division : SA2IN ' Sector: Transportation Lending Instrument: Sector Investment and Maintenance Status: Lending Date (est.) for receipt of EA by Bank: Under Discussion' Date EA Category Assigned: Country : INDIA Project ID No: 81NDPA374 Project : RUBBER Appraisal Date : Feb. 13, 1992 Total Project Cost: $158.00 Board Date : Jul. 14, 1992 Managing Division : SA2AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: N/A Date EA Category Assigned: Country : INDIA P#oject ID No: 81NDPA376 Project : UP Sodic Lands Reclamation Appraisal Date : Sep. 15, 1992 Total Project Cost: $145.00 Board Date : May 04, 1993 Managing Division : SA2AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Standby Date (est.) for receipt of EA by Bank: NA Date EA Category Assigned: 1-126 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : INDIA Project ID No: 8INDPA398 Project : PORT MODERNIZATION Appraisal Date : Nov. 23, 1992 Total Project Cost: $650.00 Board Date : Jul. 13, 1993 Managing Division : SA2IN Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Country : INDIA Project ID No: 81NDPA431 Project : Bihar Plateau Dev Appraisal Date : May 15, 1992 Total Project Cost: $150.00 Board Date : Dec. 01, 1992 Managing Division : SA2AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Standby Date (est.) for receipt of EA by Bank: N/A Date EA Category Assigned: Country : INDIA Project ID No: 8INDPA435 Project : Karnataka Rural W.S. and Environmental Sanitation Appraisal Date : Oct. 01, 1992 Total Project Cost: $145.00 Board Date : Mar. 30, 1993 Managing Division : SA2IN Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: 12/91 Country : INDIA Project ID No: 81NDPA438 Project : Madras Water Supply and Sanitation II Appraisal Date : Sep. 15, 1992 Total Project Cost: $378.00 Board Date : Mar. 23, 1993 Managing Division : SA2IN Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Standby Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Feb. 28, 1992 Country : INDIA 0 Project ID No: 81NDPA446 Project : SECAL II - Finance Appraisal Date : Mar. 15, 1993 Total Project Cost: $500.00 Board Date : Sep. 21, 1993 Managing Division : SA2CI Sector: Industrial Devel/Finance Lending Instrument: Sector Adjustment Loan Status: Lending Date (est.) for receipt of EA by Bank: TBD Date EA Category Assigned: 1-127 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : INDIA Project ID No: 81NDPA447 Project : IND POLLUTION CONTROL II Appraisal Date : JAN. 01, 1993 Total Project Cost: $210.00 Board Date : Aug. 10, 1993 Managing Division : SA2CI Sector: Industry Lending Instrument: Specific Investment Loan Status: Standby Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Country : NEPAL Project ID No: 8NEPPAO62 Project : POWER SECTOR EFFICIENCY Appraisal Date : Jun. 23, 1990 Total Project Cost: $95.60 Board Date : Mar. 24, 1992 Managing Division : SA1EI Sector: Power Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: Country : NEPAL Project ID No: 8NEPPAO93 Project : ROAD MAINTENANCE Appraisal Date : May 01, 1993 Total Project Cost: $65.00 Board Date : Sep. 28, 1993, Managing Division : SA1EI Sector: Transportation Lending Instrument: Specific Investment Loan Status:-Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: new Country : NEPAL Project ID No: 8NEPPAO95 Project : RURAL WATER SUPPLY & SANITATION Appraisal Date : Sep. 15, 1992 Total Project Cost: $25.00. Board Date : Mar. 16, 1993 Managing Division : SA1EI Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: 3/92 Date EA Category Assigned: 7/90 Country : NEPAL Project ID No: 8NEPPAO96 Project : SUNSARY MORANG II SUPPLEMENT Appraisal Date : Sep. 15, 1991 Total Project Cost: $30.00 Board Date : Aug. 25, 1992 Managing Division : SAIAG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: 1-128 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : PAKISTAN Project ID No: 8PAKPA218 Project : Eastern Sadiqia (South) Phase I Appraisal Date : Jun. 25, 1991 Total Project Cost: $71.60. Board Date : Jun. 16, 1992 Managing Division : SA3AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Completed. Date EA Category Assigned: Country : PAKISTAN Project ID No: 8PAKPA228 Project : Private Sector Energy Development II Appraisal Date : Jun. 01, 1993 Total Project Cost: $2,000.00 Board Date : Feb. 08, 1994 Managing Division : SA3EI Sector: Power Lending Instrument: Sector Investment and Maintenance Status: Lending Date (est.) for receipt of EA by Bank: Under discussion Date EA Category Assigned: Country : PAKISTAN Project ID No: 8PAKPA232 Project : INT. HILL FARMING II Appraisal Date : Jun. 15, 1992 Total Project Cost: $69.60 Board Date : Feb. 09, 1993 Managing Division : SA3AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Ongoing Date EA Category Assigned: Country : PAKISTAN Project ID No: 8PAKPA233 Project : POWER SECTOR DEVELOPMENT PROJECT (WAPDA X) Appraisal Date : May 25, 1992 Total Project Cost: $4,050.00 Board Date : Dec. 08, 1992 Managing Division : SA3EI Sector: Power Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Ongoing Date EA Category Assigned: Country : SRI LANKA Project ID No: 8SRIPA080 Project : TRANSPORT I Appraisal Date : Jun. 25, 1992 Total Project Cost: $286.00 Board Date : Mar. 16, 1993 Managing Division : SA3EI Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Under Discussion Date EA Category Assigned: 9/25/91 1-129 ENVIRONMENTAL DATA SHEET FOR CATEGORY "B" PROJECTS Country : SI LANKA Project ID No: 8SRIPA081 Project : Community Water Supply & Sanitation Appraisal Date : Feb. 03, 1992 Total Project Cost: $47.50 Board Date. : Sep. 29, 1992 Managing Division : SA3EI Sector: Water Supply and Sewerage Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Ongoing Date EA Category Assigned: Country : SRI LANKA Project )ID No: 8SRIPA082 Project : LOCAL GOVT. DEVELOPMENT Appraisal Date : Sep. 15, 1992 Total Project Cost: $32.50 Board Date : Mar. 16, 1993 Managing Division : SA3EI Sector: Urbanization Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: TBD Date EA Category Assigned: 02/12/90 Country : SRI LANKA Project ID No: 8SRIPA087 Project : Second Agricultural Extension Appraisal Date : Jun. 2'8, 1991 Total Project Cost: $18.30 Board Date : May 26, 1992 Managing Division : SA3AG Sector: Agriculture & Rural Devt Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Completed Date EA Category Assigned: Country : SRI LANKA Project ID No: 8SRIPAO97 Project : HIGHWAY MAINTENANCE PROJECT Appraisal Date : Dec. 01, 1992 Total Project Cost: $150.00 Board Date : Jul. 13, 1993 Managing Division : SA3EI Sector: Transportation Lending Instrument: Specific Investment Loan Status: Lending Date (est.) for receipt of EA by Bank: Date EA Category Assigned: 11/91 *l || ANNEX II GLOBAL ENVIRONMENT FACILITY - QUARTERLY REPORT ON INVESTMENT PROJECTS The Global Environment Trust Fund (GET) under the framework of the Global Environment Facility (GEF) was established in the Bank on March 14, 1991 to assist developing countries by way of grants and concessional financing in carrying out programs to protect the global environment. The GEF is a three-year pilot program designed to demonstrate cost-effective, innovative technologies or approaches to mitigate selected global environmental problems. It has four objectives for the operations of the Facility: a) reducing and limiting emission of greenhouse gases which cause global warming; b) preserving the earth's biological diversity and maintaining natural habitats; c) arresting the pollution of international waters; and d) protecting the ozone layer from further depletion. However, projects to reduce emissions of ozone depleting substances will largely be funded from the Bank's Ozone Layer Protection Trust Fund which receives funds from the Interim Multilateral Fund under the Montreal Protocol. GEF is a cooperative venture among national governments, the World Bank (for investment projects), the United Nations Development Programme-UNDP (for pre-investment studies and technical assistance), and the United Nations Environment Programme-UNEP (for scientific and technical advice). Further, the Bank has been asked to administer the program funded by GET, and in its capacity as Trustee, the Bank is also authorized to enter into Cofinancing Arrangements with potential cofinanciers. This quarterly Annex II provides information on investment projects that have been reviewed by the GEF Participants (Donors) and have been approved for further processing by the Bank, as well as investment projects that are in the project pipeline to be presented for review at subsequent GEF Participants' meetings. 」 GLOBAL ENVIRONMENT FACILITY ANNEX 11-1 QUARTERLY REPORT ON PNESTMENTPROJECTS (As of March 15,1992) Country/ Amount($m) GEF Prej GEF Implementing & Probable jFree-standing/ Objective & Consulting Stage of Processing and Agency Lender Associated Bank Proled) Project Description Services Action on Procurement AFRICA CAMEROON 5.0 Tropical Forest Blediversity To be determined Project Pipeline (GEF) (Ecological Protection) Development of land use plans for priority areas; execution of faunal and floral surveys; and development and implementation of management plans of reserves. CENTRAL AFRICA 1J Acquisition and Distribution of Bl"Versity To be determined, Project Pipeline (GEF). Comprehensive Landint TM Acquisition of Landsat TM data sets for To be presented to Satellite Imagery monitoring land-use changes and GEPParticipants (F- standing project) evaluating cffectiveness of environmental in April 1992 management and conservation efforts in the ireSion. CONGO 10.0 Congo Wildlands Protection Blodiversity Consulting services Work Program Min. of Planning (GEF) and Management Preservation of several unique coo- will be required Appraisal on-going. & Eronomy (Five a-ding project) system through institutional support, inventories of reserves and management plims, technical assistance and studies. GHANA 10.0 Coastal Ecosystems Blodiversity To be determined Work Program Env.Protection (GEF) (Environment) Management of five coastal wetlands; Appraisal on-going Council 20.0 survey and demarcation of site boundaries (IDA) and development of management plan studies; identification of development options; establishment of investment funds; training and education KENYA 4.2 Tana River Primates Blediversity To be determined Work Program Min. of Wildlife (GEF) (Agr. Sector lifiriagernent) Establishing cffective management Project Preparation Advance & Tourisra 60.0 of the Reserve and reducing of $520,000 is being requested (IDA) reliance by local community an front GEF. resources of the Reserve. MALAWI 4.0 Lake Malawi Conwvadon Blocliverilty Consulting serv low Work Program (GEF) or Blodliersity Artisanal fisherman training and, will be required. Appraisal scheduled (Malawi Fisheries Proj.) biodiversity management public for June 1992 awareness, riparian state. institutional building MAUR171US 3J Sugar Energy Biotechnology Global Warming Consulting Services Work Program Mauritius Sugar (GEF) (Sugar Energy Development) Sugar \ mill energy efficiency will be require& Board presentation of associated Authority 15.0 improvements; trials and experiments Bank project scheduled (Bank) -on harvesting, handling, storage, and for March 31, 1992 combustion for cane field trash and cane tops; technical assistance and studies; reduction of greenhouse gas emissions. NIGERIA 30.0 Gas Flaring Reduction Global Warming To be determined Project Pipeline (GEF) (To be determined) Reduction of greenhouse gases through 20Z-30.0 gas flare reduction, energy efficiency (GEF Colin. sought) and conservation. SEYCHELLES 1.8 Blodiversily Conservation Blodiversity To be determined Work Program Dept. of (GEF) Abatement or Marine Pollution Protection of endangered sea turtles; Appraisal scheduled Environment 10.0 (hifirestructure and Environment) restoration of ecosystem of Aldabra world for May 1992 (Bank) licAtage site, long tmrn management plans. Abatement of marine pollution. Design of facilities and strengthening of capacity to treat waste from ships; technical assistance; application of cost recovery methods. UGANDA 4.0 Bwbull Forest Gorilla Rewve Blodiversity To be determined Work Prognm (GEF) (Fin standing project) Conservation of biological divcraity Prujoct under preparation 30.0 and natural forest ecosystems, Pre-investment study of $151,000 (01hers) including strengthening GovernmentIs has been approved by UNDP. capacity to protect and manage protectedarcas. GLOBAL ENVIRONMENT FACILITY ANNE 11-2 QUARTERLY REPORT ON INVESTMENTPROJECIS (As of March 15,1992) Country/ Amount (Sm) GEF Proj GEF Implementing & Probable (Free-standingl Objective & Consulting Stage of Processing * and Agency Lender Associated Bank Prolect) Project Description Services Action on Procurement ZAIRE 4.0 Blodiveralty Protection Bodiversity To be detenmined Project Pipeline (GEF) (Environment) Improve management of protected uass Major delays incurred due to explore alternative forest management systems; political situation promote agroforestry and natural resource management; strengthen national capacity for policy analysis, eny. assessment and research; training. ZIMBABWE 5.0 Wildlife Cons. and Env. Mgmt Blodiversity To be determined Project Pipeline (GEF) (Wildlife and Environmental Campfire program, local community To be presented to Management Project) wildlife management, biological corridors GEPParticipants cohabitation of agriculture, livestock and in April 1992 wildlife EAST & SOUTH ASIA BHUTAN 10.0 Trust Fund for Env. Conservation Biodiversity To be determined Work Program (GEF) (Free standing project) Management planning and MOD under preparation 10.0 institutional strengthening, training (Bilateral/NOO and surveys Cofinancing sought) CHINA 30.0 Marine Pollution International Water Pollution To be determined Work Program Six ports (GEF) (Ships Wastes Disposal Project) Poilution reduction through Appraisal Report under preparatior; authorities 15.0 modemizing facilities at six posts Board presentation of associated Bank (IDA) for handling oil and other wastes. project scheduled for April 15, 1992. CHINA 20.0 Blodivernlty Action Plan Blodiversity To be detrmined Project PIpeline Min. of Forestry (GEF) (Technical Asti. for the Env.) Biodiversity conservation action plan. Project under preparation 5.0-10.0 investment identification and preparation (bilateral coin. education and training sought) CHINA 10.0 Sichuan Gas Dev. & Conservation Global Warming To be determined Project Pipeline (CEF) (Sichuan Gas Conservation) Distribution and transmission To be presented to 10.0 gas loss evaluation and reduction GEF Participants (GEF Cofm. sought) in April 1992 INDIA 30.0 Alternative Energy Global Warming To be determined Work Program IREDA (GEF) (Renewable Energy Dev.PIhj.) Reduction in global warming, PV and Project under preparation. 50.0 windpower technologies Appraisal in March 1992. (GEF Cofin. sought) INDONESIA 12.0 Blodiverity Conservation Biodiverslty Tobe determined Project PIpeline To be determined (GEF) (Kerinci-Seblat Integrated Management plan preparation, fauna To be presented to 10.0-15.0 Conservation) and floral surveys, institutional reforms GEFParticipants (GEF and bilateral in April 1992 cofinancing sought) LAO PDR 5J Wildlife & Protected Areas Mgmlt. Biodiversity To be determined Work Program (GEF) (National Forestry Management Protected areas system development Yellow cover report to be 10.0 and Conservation) and management training; environmental completed by May 15,1992. (IDA) monitoring and evaluation and community participation in conservation programs PHILIPPINES 30.0 Geothermal Energy Development Global Warming To be determined Work Program Natl Power Corp. (GEF) (Leyte Geothermal Project) C02 avoidance through replacement Project under preparation Phil. NatI Oil Corp. 40.0 of coalbased power plant with (GEF cofin. sought) geothermal energy 350.0 I PHILIPPINES 20.0 Conservation of Priority Bodiversity To be determined Work Program Dept of Env. (GEF) Protected Areas Implementation of the Integrated Bank SECAL approved & Nat. Resources 158.0 (Environment and Natural Protected Areas System to preserve and on Jone 21,1991. GEP (Bank) Reources Sector Adj. Pms.) rehabilitate forests, coral reefs, and component to be appraised 66.0 watlands. in Much 1992 (IDA) GLOBAL ENVIRONMENTFACILITY ANNEX 11-3 QUARTERLY REPORT ON INVESTMENT PROJECTS (As of March 15. 1992) Country/ Amount ($m) GEF Proj GEF Implementing & Probable (Free"tandlag Objective & Consulting Stage of Processing * and Agency Lander Associated Bank Project) Project Description Services Action on Procurement THAILAND 15.0 Electricity Conservation Global Warming To be determined Work Program (GEP) (To be detennined) Energy end-use efficiency Appraisal scheduled 15.0 forJune 1992 (GEF Corn sought) THAILAND 10.0 Forest Blodiveruity Blodiverulty To be detennined Project Pipeline (GEF) (Forest Area Protection. Mgmt. Integrated community development and Project under preparation. 10.0-20.0 and Dev. Pmj.) biodiversity protection, endangered forest (GEF and bilateral biodiversity. policy and inst. strengthening cofinancing Sought) IMNA & ECA ALGERIA 10.0 El Kali National Park Blodiversity To be determined Work Program (GEF) (Free standing project) Ramsar site wetlands conservation, Project under preparation endangered species, migratory birds, deer, archeology BYELORUSSIA 1.0 Forest Blodiveralty Blodiveralty To be detennined Work Program (GEF) (Free standing project) Unique forest species, relic stands, air Project under preparatien pollution threat, gene banks, preservation CZECHOSLOVAKIA 4.3 Planning and Management of Biodiverslty To be determined Work Program (GEF) Czech and Slovak Reserves Establishing and financing sustainable Appraisal scheduled 150.0 (Environment 1) nstwork of protected areas: "Ecological for May 15, 1992 (Bank) Bank of Europe" program EGYPT 4.8 Red Sea Control Zone MgmL International Waters To be determined Project Pipeline (GEF) (Tourism Sectoral Privatization) Ecotourism impact management protection To be presented to policy and incentives for sustainable use. GEF Participants in April building block for regional cooperation 1992 under Red Sea convention, coral refs IRAN 2.0 Transport Energy - Global Warming To be determined Prqject Pipeline (GEF) (Free standing project) Transport fleet efficiency upgrade, To be presented to strategic planning, global environment GEFMPaticipants in April coefficient of urban management 1992 systems design MEDITERRANEAN 10.0 Ports Waste Disposal International Waters To be determined Project Pipeline Regional Sea (GEF) (Algeria-Third Ports Project, Coordinated regional damage control from To be presented to Pollution Proj. Momcco-Ports Sector, oil spills and oil pollution, emergency response GEFParticipants in April Algeria Tunisia-Trans. Sector planning, strengthening regional 1992 Morocco Development Project) cooperation for marine pollution Tunisia control PAKISTAN 11.0 Waste to Energy Systems Global Warming To be determined Project Pipeline (GEF) (Pnjab Urban Dev. Proj.) Landifll gas recoverytotilization To be presented to major methane source globally GEPParticipants in April 1992 POLAND 25.0 Coal-to-Gas Conversion Global Warmlng To be determined Work Program District Heat (GEP) (Heat Supply Restructuring Energy efficiency. natural gas, Appraisal scheduled for Corporation 340.0 and Conservation) small scale industry, household energy July 20,1992 (Bank) ROMANIA 4.0 Danube Delta International Waters To be determined Project Pipeline (GEF) (Rural Credit Danube Delta) Wetlands management; rare European To be presented to migratory birdlife; Black Sea hydrologic/ OEF Participants in April 1992 biological filter. TURKEY 3.0 Genetic Biodiversity Biodiversity To be determined Project Pipeline (GEF) (East Anatolia Waterehed Preservation of predecessor genetic To be presented to Management Project) stocks of new world cereals. GE Participants in April 1992 GLOBAL ENVIRONMENT FACILITY ANNEX 11-4 QUARTERLY REPORT ON INVESTMENT PROJECIS (As of March 15,1992) Country/ Amount (sm) GEF Proj GEF Implementing & Probable (Free.standinal Objective & Consulting Stage of Processing * and Agency Lender Associated Bank Project) Project Description Services Action on Procurement LAC BOLIVIA 4.5 Blodiverslty Conservation Proj. Blodiversity To be determined Project Pipeline (GEF) (Free standing project) Protected areas management, education, To be presented to and training, demarcation, legislation and policy GEF Participants actions, indigenous people knowledge system in April 1992 for design of cosystem management. BRAZIL 30.0 National Conservation Unit - Biodiversity To be determined Work Program IBAMA (GEP) (National Environment) Conservation units, megadiversity Appraisal scheduled forMay 1992 BRAZIL 23.0 Blamass Galflcatilon'Gas Turbine Global Warming To be determined Project Pipeline (GEF) (To be determined) Gasification of low value residues and 7.0 energy crmps for high efficiency (UNDP OE TA) electricity generation CARIBBEAN SEA 19J OECS/Pollution of Intemational International Waters To be detennined Project Pipeline (GEF) Waters Regional pilot port waste reception, (OSCS Regional Env. Proj.) land based-garbage, disposition and recycling. framework for regional coop. ECUADOR 4.0 Blodiversity Protection Blodiversity To be detennined Project Pipeline (GEF) (TA for Environmental Mgmt) Technical assistance and training for To be presented to 4.0 preparation and execution of management GEFParticipants in April 1992 GEForbilateral plan for seven conservation units cofinancing sought ECUADOR 2.5 BOTROSA/ENDESA Afrorestation Global Warming To bedeterined Project Pipeline (GEF) (IPC Project) Carbon sequestration, indigenous To be presented to hardwood species, mixed plant/multi- GEF Participants in April 1992 purpose trees, private sector JAMAICA 3.8 Demand Side Management Global Warming To be detennined Project Pipeline (GEF) (Free standing project) Carbon sequestration, biomass power, integrated demand management MEKMCO 30.0 Blodiversity Conservation Blodiversity To be determined Work Program SEDUE (GEF) (Environment) Megadiversity, biological corridors, arid Board presentation of associated 50.0 lands, forests and coastal wetlands. Bank project scheduled for April 1992. (BAnk) MEXICO 10.0 Electric Power End-Use Emdency Global Warming To be determined Work Program (GEF) (Power Sector) Demonstration of energy efficient Appraisal scheduled lighting technologies and organizational for September 1992 development for program delivery and marketing techniques. PERU 4.0 Trust Fund for Conservation Unit Blodiversity To be determined Work Program Min. of Agr. (GEF) (Free standing project) Endemism, sustainable protection, Appraisal scheduled 4.5 endangered species, tust fund for April 13,1992. (GEF cofin. sought) Classification of GEF projects based on processing status: a) Projects in GEF Work Program are those that have been presented for review by Participants at semi-annual meetings of the GEF and have been retained for further processing and appraisal. b) Projects in GEF Pipeline are those projects which have passed the three critical hurdles to be included in the GEF Program but are not scheduled for approval before the next semiannual meeting of Participants and have not been presented to the Particpants for their review. The three hurdles are Govermments formal request for the project, passing a technical review, and clearance for eligibility by the EF Implementation Commtittee. Projects in this category are necessarily less certain in terms of content and costs than those in the GEE Work Program. IaAT5n45hiie