International Bank for Reconstruction and Development MONTHLY OPERATIONAL SUMMARY OF BANK AND IDA PROPOSED PROJECTS (As of November 30, 1981) SecM81-974 FROM: Vice President and Secretary December 10, 1981 CONTENTS Section Pages I. - Eastern Africa· 1 - 14 II. - Western Africa 15 - 28 III. - East Asia and Pacific 29 - 38 IV. South Asia 39 - 47 V. - Europe, Middle East and North Africa 48 - 60 VI. - Latin America and Caribbean 61 - 75 VII. New Projects 76 - 77 Member Country, and Borrower or Amount & Stage of Process- .Implementing Probable ing and Action on Agency lf Lender ']j Procurement !:_I I. EASTERN AFRICA BOTSWANA (BOTSWANA About (R) Power I (Coal) - Construction of Negotiations tentatively POWER 30.0 90 MW Pithead power station at scheduled for March. (Co- CORPORATION) (Bank) Morupule, and transmission lines. financing being sought.) ,, Project cost estimated at $262 million, with foreign exchange component of about $204 million. Ministry of 20.0 (R) Education Ill - Construction, furnish- Approved by the Executive Education (Bank) ing of primary school classrooms; Directors on November 10. textbooks; construction of new primary teacher training college. Total project cost about $30.0 million. (WATER UTILITIES About Water Supply Ill - Surface or Project identification CORPORATION) 7.0 groundwater development to meet under way. (Bank) Gaberone's future water supply requirements. Total project cost to be determined. BURUNDI Ministry of 19.3 Kirimiro Rural Development - Inte- Approved by the Agriculture (IDA) grated rural development (food, crops, Executive Directors and Livestock coffee, rural services) in about on June 16. 6 communes in the Kirimiro region; extension services to increase ·pro- duction of cash crops and foodcrops; provision of agricultural inputs; improvement of marketing and social infrastructure. Total project cost estimated at $21.4 million. l/ If the Government is the borrower, the name of the department, ministry or agency which is to implement the project is given. If the Government is to relend the proceeds to another entity, the name of that entity is given. If the Government is not the borrower, the borrower's name is given in capital letters in parentheses. 2/ The amount is in millions of U.S. dollars and is approximate and tentative. J__/ The letter (N) before the project means that the project is a new listing in the Summary; the letter (R) means that the information about the project has been revised since the last issue of the Summary. Section VII of the Summary contains a recapitulation of the new projects listed in this issue. ':_I This column contains available information, if any, about action with respect to the procurement of goods and services expected to be financed by the Bank or IDA. Distribution: Executive Directors and Alternates President Senior Vice Presidents President's Council Vice Presidents, IFC Directors and Department Heads, Bank and IFC - 2 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency lf Lender'!:_/ Procurement'!._/ BURUNDI (Cont'd) Ministry of 16.0 (R) Integrated Rural Development II/Ngozi Board presentation on Agriculture (IDA) III - Continuation of coffee improve- December 8. (Co-financing ment program and development of arrangements with !FAD foodcrops in context of an integrated and Kuwait Fund agreed.) rural development of the Ngozi-Muyinga An advance of $500,000 from the region. Total project cost estimated IDA Project Preparation Facility at $28.9 million. has been approved for the establishment of the project implementation agency, including technical assistance for ex~ension services. Ministry 25.0 Highway III - Construction of first Approved by the Executive Directors of Public (IDA) section of Ngozi-Kobero road (about on April 21. IDA Project Preparation Works and 39 km) and continuation of road main- Facility advance of $1,000,000 Equipment tenance. Total project cost for first approved to complete preparation section estimated at $32.1 million. of project. (Co-financing agreed with Belgium, France, Japan, UNDP and AGCD.) Ministry of About (R) Local Construction Industry - Negotiations,tentatively Energy and 5.0 Promotion of local construction scheduled for January. Mines (IDA) industry. Total project cost An advance of $300,000 from estimated at $7.1 million. the IDA Project Preparation Facility has been approved for the establishment and start up of operations of the project unit, including the recruitment of consultants. Ministry of About Water Supply II - Rehabilitation Project preparation underway. Rural 15.0 of 48 rural aqueducts. Total project IDA Project Preparation Facility Development (IDA) cost to be determined. advance of $470,000 approved to complete preparation. Regie de produc- About (R) Rwegura Hydroelectric Power - Con- Appraisal report being prepared. tion et distri- 28.0 struction of a hydroelectric plant. (Co-financing with KfW and bution d'eau et (IDA) Total project cost estimated at CCCE agreed.) d'electricite $76 .0 million. (REGIDESO) . Ministry of About (R) Education Ill - Expansion of basic Project to be identified. National 20.0 education. Total project cost to Education (IDA) be determined. Ministry of About Technical Assistance - Improving Project under preparation. Planning 6.0 efficiency of public sector enter- Appraisal mission scheduled (IDA) prises and project preparation for April 1982. capabilities. Total project cost to be determined. Banque About (R) DFC II (Artisan Centers) - Second Appraisal report being prepared. Nationale de 8.0 line of credit to BNDE. Total Developpement (IDA) project cost to be determined. Economique (BNDE) Ministry About Agriculture Muyinga - Pilot Project under preparation. of Agriculture 20.0 settlement scheme and development (IDA) of coffee and foodcrop production in the Muyinga province. Total project cast to be determined. COMOROS Ministry of 6.0 (R) Education - Primary education curric- Board presentation scheduled Education (IDA) ulum improvement including provision for December 15. IDA Project of textbooks; training of teachers, Preparation Facility advance health personnel and agricultural of $205,000 approved to finance staff. Project based on UNESCO project preparation activities. study. Total project cost estimated at $6.5 million. See page 1 for footnotes. - 3 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency y · Lender Y Procurement 4/ COMOROS (Cont'd) Ministry of 6.3 (R) Highways II -·Continuation for 3 years Approved by the Executive Equipment and (IDA) of road maintenance and improvement Directors on November 10. Environment program started under first -highway (Co-financing with AfDB agreed.) project. Total project cost estimated at $13.5 million. Ministry of About (R) DFC I - Line of credit for financing Project under preparation. Finance and 3.0 of agroindustry and small-scale · Plan (IDA) industry. DJIBOUTI Ministry of About (R) Technical Assistance - Technical Negotiations scheduled for December/ Finance and 3.0 assistance in planning, and project January, ( Co-financing w:Lth Economy (IDA) preparation and evaluation. Total with UNDP agreed; Bank project cost estimated at $5.5 is executing agency million. for UNDP-financed part of project.) Ministry of About (R) Road Maintenance - Strengthening of Appraisal report being Public Works 6.0 the road maintenance capability prepared. (Co-financing (IDA) of Ministry of Public Works. being explored with the Arab Fund,) Ministry of About Urban Sites - Services and Housing Project under preparation, Public Works/ 8.0 Development - Urban facilities, An IDA Project Preparation District of (IDA)- · support for. small scale industry, Facility advance of $500,000 Djibouti artisanal enterprise and training. has been approved to finance primarily consultants' se.rvices. ETHIOPIA Addis Ababa To be Addis Ababa Water Supply II - Further Project preparation Water & Sewer- deter- expansion of the water supply system underway. age Authority mined of Addis Ababa. (AAWSA) (IDA) Ministry of To be Livestock Development and Marketing - Preparation report to be Agriculture deter- A sector credit for further livestock revised on completion of mined development. Government's comprehensive (IDA) review of livestock sector. Ministry of .. To be (R) Urban Development 1 · - Upgradi·ng of Appraisal report being Public Works deter- existing settlements in Addis Ababa updated, & Housing mined· with basic-services and house improve- (IDA) ment loans·and development of new sites for self-help housing construction. Ethiopian To be Power Ill - Electric transmission and Preparation work Electric Light deter- possibly hydroelectric generation underway by EELPA, and Power mined facilities. to be assisted by Authority (IDA) Consultants. (EELPA) AIDB To be DFC IV - Provision of credit and tech- Appraisal report under review. deter- nical assistance to small-scale enter- mined prises, and assistance to the agri- (IDA) cultural and industrial sector, through the Agricultural and Industrial Devel- opment Bank for medium- to large-scale enterprises. Ethiopian To be Roads VIII - Seco.nd phase of Preparation underway in Transport deter- 1978/82 Road Sector Program. course of supervision of Construction mined Roads VII, (IDA) Ministry of To be (R) Coffee Processing II and Marketing - Appraisal report under Coffee and Tea deter- Second phase of the ongoing coffee review. Development mined processing project. (IDA) See page 1 for footnotes. - 4 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency Y Lender'!:_/ Procurement!!._/ ETHIOPIA (Cont'd) Ethiopia To be Sugar - Establishment of new sugar Project preparation underway. Sugar deter- production complex at Finchaa, (Co-financing is being Corporation mined includipg infrastructure. sought.) (IDA) Ministry To be Agricultural Minimum Package Project Preparation work of deter- III - Support for expansion and underway. Agriculture mined intensification of integrated agri- (IDA) cultural services, tncluding con- struction of rural roads, seed multiplication programs; provision of training facilities. KENYA Ministries of 25 .o Industry I - Soda Ash Project. Expan- · Project preparation underway. Commerce and (Bank) sion of soda ash production and Industry/1:(enya improved railway and port facilities. Port Authority Ministry of 40.0 (R) Population II - Support for family Negotiations tentatively scheduled Health (IDA) planning and rural integrated health 'for January. (Co-financing being programs. Estimated total project arranged.) cost $60.0 million. Ministry of 25.0 Agricultural Credit IV - Institutional Approved by the Execµtive Agriculture (Bank) strengthenipg in areas of planning, Directors on May 19. and Agricul- 10.0 credit management and training; and tural Finance (IDA) line of credit to Agricultural Corporation Finance Corporation. Estimated total project cost $50.0 million. Ministry of Up .to (R) .Cotton Processing and Marketing Negotiations in early Agriculture 30.0 Marketing; storage and processing December. (IDA) of cotton. Total cost estimated at $45.1 million. Ministries of 35.0 Industry II - Leather Production Project being reassessed. Commerce and (Bank) Project. Processing of hides and Industry production of leather goods. Ministry of 20.0 Urban Transport - Improvement of Further project process!.ng Urban Develop- (Bank) ·public transport and pedestrian delayed pending the resolutio.n ment and Housing 15.0 facilities, road maintenance, and of counterpart fl.nancing (ID!) strengthening of transport manage- issues. ment in Nairobi and Mombasa. Total project cost estimated at $48.3 million. Ministry of 15.0 (R). Urban (Small Towns) - Extension Appraisal mission scheduled Urban Develop- (Bank) of urban development programs for February. ment and Housing 24.0 to smaller towns. (IDA) (INDUSTRIAL' 45.0 Fifth line of credit to IDB. Project under preparation. DEVELOPMENT (Bank) BANK) Ministry 35 .0 (R) Forestry III - Maintenance and Negotiations in early of Environ- (Bank) rehabilitation of existing planta- December. (Co-financing ment and 16.0 tions, new industrial plantations, being explored.) Natural (IDA) fuelwood plantations, development Resources of sawmilling industry, and various studies. Total project cost esti- mated at $79 million. See page 1 for footnotes. - 5 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency}:_/ Lender '!:_/ Procurement !!__/ KENYA (Cont'd) Ministry 4 .O (R) Petroleum Exploration Promotion: Board presentation on of Energy (Bank) Would provide technical assistance December 8. in petroleum exploration and for legal consultants. Total project An IDA Project Preparation Facility cost estimated at $5.3 million. advance of $300,000 has been approved to finance geological/geophysical review of existing exploration data, and legal studies. A second advance of $700,000 has also been approved to complete the work. Ministry of 41.0 Grain Marketing and Storage - Project preparation underway. Agriculture (IDA) Components to be identified. (TANA RIVER 50.0 (R) Power IV (Kiambere Olkaria) Civil Appraisal mission tentatively DEVELOPMENT (Bank) work including powerhouse with two scheduled for February. (Co- COMPANY) 70 MW units and associated mechanical financing being explored.) and electrical equipment. Total project cost estimated at about $300 million. Ministry To be Second Structural Adjustment Appraisal report being prepared. of Finance/ ' deter- Credit - Support for program Ministry of mined of economic measures agreed with Economics, (Bank/ the Government. Planning IDA) & Develop- ment Ministry 15.0 Cotton Production - Components Preparation dependent of Agri- (IDA) still to be identified. on progress of Cotton culture Processing/Marketing Project. Ministry 6.0 (R) Agriculture Technical Assistance: Post-appraisal mission of Agriculture (IDA) Technical assistance to the scheduled for January. agricultural sector to support structural adjustment program. Kenya Post. and 37.0 (R) Telecommunications II - Telecommuni- Appraisal report being Telecommunica- (Bank) cations Development. Total project prepared. tions Corporation cost estimated at $124.7 million. LESOTHO Ministries of About Highways IV - Continuation of road Project preparation Works, and 12.0 maintenance and rehabilitation underway. (Co-financing Transport and (IDA) begun under Third Road Project. expected to be needed.) Communications Possible assistance for construction of Oxbow-Mokhotlong road. Total project cost estimated at $28 million. Lesotho About DFC III - Third line of Credit to Project to be defined. National 5.0 Lesotho National Development Corpora- Development (IDA) tion. Corporation Ministry of About Health/Nutrition - Components to be Project under identification. Health and 12.0 identified. Social.Welfare (IDA) MADAGASCAR Ministries of About (R) Fokonolona I (Rural Development) - Project under preparation by Rural Develop- 12.0 Rural development fund to finance Government, with assistance ment; Finance (IDA) village-level infrastructure, such from RMEA. and Planning as irrigation systems, feeder roads, collective storage facilities, and village water supply systems; training; and establishment of central project management unit. See page 1 for footnotes. - 6 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency Y Lender '};_/ Procurement 4/ MADAGASCAR (Cont'd) Ministry of About (R) Urban I - Upgrading of low income Pre-appraisal mission scheduled Finance and 20.0 neighborhoods in Antananarivo and for February, Plan, Industrial (IDA) Toamasina; employment and income Bank and Munici- generation; serviced sites for new pality of housing in Antananarivo; municipal Antananarivo assistance. Ministry of About (R) Second Village Livestock and Rural Negotiations in early December. Rural Develop- 15.0 Development - Extension of veteri- (Co-financing with IFAO under ment (IDA) nary services to the whole Mahajunga discussion.) Faritany, including development of social and road infrastructure; pilot component of integrated mixed farming and cattle fattening; and imports of veterinary supplies and provision of technical assistance to the livestock sub-sector, Total project cost estimated at $25,8 million. Ministry of About (R) Lac Alaotra II - Intensification Post-appraisal mission in the Rural Develop- 30.0 of cultivation in Lac Alaotra area field, (Co-financing ment (IDA) (mainly rice). Includes seed with BAOEA being explored.) production, marketing, irrigation maintenance, extension, and assistance to SOMALAC. Ministry About (R) Middlewest Mixed Farming Integrated Appraisal mission tentatively of Rural 20.0 mixed farming development. scheduled for January, (Co- Development (IDA) financing likely to be required.) Ministry About (R) Highways VI - Highway maintenance. Project being prepared. of Public 25 .o (Co-financing likely to be Works (IDA) required.) Office Militaire About (R) Petroleum II - Further development Post-appraisal mission in National pour 35.0 of the petroleum sector, including the field. les Industries (IDA) financing of a feasibility study Strategiques for heavy oil exploitation in (OMNIS) Tsimiroro. Total project cost to be determined. Ministry of About Agricultural Institutions: Tech- Appraisal report being prepared, Rural 5,0 nical Assistance - Parastatal reform, IDA Project Preparation Facility Development (IDA) management studies, planning assistance, advance of $1,000,000 has been and research, approved to complete preparation and start essential assistance to the sector, Ministry About Petits Perimetres - Strengthening Project preparation of Rural 15.0 of national systems for operation underway. Development (IDA) and maintenance of efficient irrigation network and rehabilita- tion of selected networks. Bankin' NY About DFC II - Second line of credit to Project preparation underway. Indostria 15.0 Bankin' NY Indostria (BNI), (National (IDA) Industrial Development Bank (BNI)) Ministry of About Cotton - Smallholder cotton Project under preparation, Rural 10.0 development and ginnery Development (IDA) modernization. MALAWI Department of About Water Supply_ II - Expansion of Project under preparation, Lands, Valuation 26,0 water supply facilities for City and Water; (Bank/ of Lilongwe. Office of IDA) the President and Cabinet See page 1 for footnotes. - 7 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency }j Lender Y Procurement!!_/ MALAWI (Cont'd) Ministry of 7.3 National Rural Development Program Approved by the Executive Agriculture (IDA) III - Third consolidation stage of Directors on October 13. and Natural the Karonga/Chitipa Project. Total Resources project cost estimated at $8,6 miilion, (INVESTMENT About DFC II - Assistance to the Investment Project preparation underway. AND DEVELOPMENT s.o and Development Bank. of Malawi; Second BANK OF MALAWI (Bank) Line of Credit. ( INDEBANK)) Ministry of About. Health - Improve hea•lth services, Project preparation Health 21. 7 with·particular attention to underway. (IDA) administrative and medical training, and drug distribution. Ministry About Structural Adjustment Loan II. To be defined following of 80.0 utilization of first loan and Finance (IDA) outcome of program. ·Ministry of About (R) National Rural Development Program Appraisal mission scheduled Agriculture 35,0 IV - Expansion of NRDP concept into for March. and Natural (IDA) new developing areas - Dedza Hills Resources and Lilongwe East. Ministry About Education V - Primary teacher Project preparation of Education 35,0 training, Secondary Education, underway. (IDA) accounting and management training. Ministry of About Highways V - Highway maintenance, Project preparation underway. Works and 46.0 including workshop equipment Supplies (Bank) and staff training; road construction. MAURITIUS Ministry About (R) Road Maintenance and Rehabilitation - Project under preparation, of Public 10.0 Total project cost estimated at $15.4 (Cofinancing being explored Works (Bank) million. with NORDIC Investment Bank,) Bank Project Preparati;h Facility advance of $246,000 has been approved to finance engineering and economic studies, Ministry of To be Education III - Post-primary tech- Project identification Education deter- nical schools and vocational underway •. and Cultural mined education, Affairs (Bank) Central About (R) Water Supply - Rehabilitation Appraisal report being Water 10.0 and expansion of water supply prepared. (Kuwait Fund, CCCE Authority (Bank) systems. Total project cost still and Abu Dhabi co-financing for undetermined. water supply improvement,) Development About (R) DBM VI - Sixth Line of Credit to Appraisal· mission in the Bank of 10.0 Development Bank of Mauritius. field, Mauritius (Bank) (DBM) Irrigation To be (R) Northern Plains Irrigation - Mission in the field to Authority deter- Irrigation infrastructure for review preparatory work. (Co- mined about 2,500 ha; provision of financing with AfDB agreed.) (Bank) agricultural services and inputs for about 1,200 small farmers growing sugar cane and foodcrops, RWANDA Ministry of About Education II - Projest to focus on Appraisal report being_prepared, Education 10.0. quality improvement of occupationally- (IDA) oriented secondary education. Total project cost estimated at $11,8 million. Banque About Local Construction Industry - Assis- Project to be identified. Rwandaise de 10.0 tance in the promotion of the local Developpement (IDA) construction industry through technical assistance and credits for equipment. Total project cost undetermined, See page l for footnotes. - 8 - Member Country, and Borrower or Amount & Stage·of Process- Implementing Probable ing and Action on Agency Y Lender'!:__/ Procurement 4/ RWANDA (Cont'd) Ministry of About (R) Highways V - Construction of the Negotiations tentatively Public Works 23.0 Butare-Kilati road (53.5 km); scheduled for January. (Co- and Equipment (IDA) technical assistance preinvestment financing with EEC agreed·.) study. Total project,cost estimated at $27.2 million. Ministry of About (R) Water Supply - Rehabilitation, Project being prepared. Public Works 19 .o improvement and extension of rural and Equipment (IDA) aqueducts in the Gisenyi and IDA Project Preparation Ruhengeri Prefectures; construction Facility advance of $500,000 of sanitation facilities for Kigali; approved to finance consultants' and renovation and extension of water services during one year of supply systems in a few secondary preparation as well as the urban centers. Total project cost necessary local support staff to be estimated. and equipment. Banque About (R) BRD III - Third line of Credit Appraisal mission scheduled Rwandaise de 15.0 to the Development Bank of Rwanda for February. Developpement (IDA) to finance industrial development. (BRD) Total project cost to be determined. Ministry of About (R) Bugesera (Phase II) - Possible com- Appraisal report being Agriculture 15.0 ponents to include mixed crop and prepared. (IDA) livestock farming. Total project cost to be determined. Ministry of About (R) Technical Assistance - Provision Negotiations tentatively Planning s.o of technical assistance to scheduled for January. (Co- (IDA) Ministry of Planning •. Total financing with UNDP agreed.) project cost about $5.2 million. SEYCHELLES Ministry of About (R) Ports/Land Reclamation - Reclamation Appraisal mission scheduled for Planning 6.• 0 of land, improvement of fishing and June 1982. Bank Project·Preparation (Bank) commercial ports, and development of' Facility advance of .$300,000 approved industrial site. Total project cost to complete project preparation. (Co- estimated at $25.0 million. financing being explored.) SOMALIA Somali To be (R) DFC II - Assistance to the Somali Project preparation Development deter- Development Bank. underway. Bank mined (IDA) Government To be (R) Roads IV - Strengthening of the Appraisal report being reviewed. of Somalia deter- Algoi-Baidoa road; pilot road main- (Co-financing being sought.) mined tenance program; training of Somali (IDA) engineers abroad·,· Mogadishu To be Mogadishu Water Supply - Extension Appraisal report being reviewed. Water deter- of Mogadishu water supply facilities. (Co-financing is being Authority , mined sought.) (MWA) (IDA) Procurement: Retroactive financing of up to $100,000 will be recommended to cover the initial cost of consulting services for water resource investigations. Government To be (R) Fisheries - Support for small Project preparation of Somalia deter- fisheries development, including underway. mined financing of infrastructure and (IDA) processing facilities; financial and technical assistance to artisanal fisheries. See page 1 for footnotes. - 9 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency];__/ Lender 'l:_/ Procurement 4/ SUDAN Government To be Urban Water Supply - Expansion of Preparation underway by of Sudan deter- Water Scheme in Khartoum. Government and consultants. mined (IDA) Agricultural 18.0 Agriculture Services Project - Credit Negotiations substantially completed. Bank of Sudan (IDA) for small farmers and possibly agri- IDA Project Preparation Facility cultural machinery through Agricultural advance of $600,000 approved to Bank of Sudan. finance consultancy services, provision of vehicles, equipment and seed material. Ministry of To be Gezira Rehabilitation - Trials, studies Project preparation underway. Irrigation deter- and possibly some investments aimed and Gezira mined at improving Gezira production. Board (IDA) Government 2.5.0 (R) Port Development II - Extension Negotiations rescheduled of Sudan (IDA) of facilities at Port Sudan. for early 1982. IDA Project ,Preparation Facility advance of $250,000 approved to finance consulting services for prepara- tion of tender documents. Government To be Sugar Rehabilitation - Credit Project identification of Sudan deter- would provide assistance for underway. mined rehabilitation of sugar industry (IDA) and would support policy changes in the subsector generally. Government To be Highways III - Construction of Project preparation of Sudan deter- national and/or secondary/feeder underway. mined roads; improvement and maintenance (IDA) of secondary roads; technical assistance to the Southern Region Ministry of Communications, Transport and Roads (SRMCTR), Government To be (R) Petroleum - Petroleum development Appraisal mission tentatively o.f Sudan deter- and distribution, scheduled for early 1982. IDA mined Project Preparation Facility (IDA) advance of $100,000 approved to finance consultancy services for distribution study. Government 13.0 Savanah Development Consolidation - Approved by the Executive of Sudan (IDA) A pilot operation which would, aver Directors on October 6. 3 years, provide, 3 development (Cofinancing with Saudi centers, 4 settlement areas, 400 ha. Fund and ODA agreed.) of flood irrigation, a range program, veterinary services, and rehabilita- tion of water resources facilities. Government To be (R) Railways V - Technical assistance, Project preparation under- of Sudan deter- training and communications. way. mined (IDA) Government To be Program Credit - Industrial Program identification of Sudan deter- Rehabilitation. underway, mined (IDA) Government To be Power IV - Expansion of power Project preparation of Sudan deter- generation and transmission underway. mined facilities. (IDA) See page l for footnotes. - 10 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency y Lender 3_/ Procurement!!._/ SWAZILAND Ministry of About Low Veldt Development - Irrigation Project identification Agriculture 11.0 for crop production and, potentially, underway. (Bank) for ranch development. (NATIONAL About DFC II - Line of credit for medium- Awaiting utilization of INDUSTRIAL 7.0 scale industrial enterprises. funds in first loan. DEVELOPMENT (Bank) CORPORATION) Minis try for About Urban I - To be identified. Project identification Water, Power 12.0 underway. and Communi- (Bank) cations Ministry of About (R)' Roads IV - Upgrading Ngwavuma River - Processing of the project has Works, Power 6.5 Luvumisa road and technical been suspended pending out- and Communi- (Bank) assistance to strengthen road main- come of internal Swazi cations tenance, and feeder road study. discussions. Total project cost estimated at $8. 6 million. · TANZANIA Office of Prime 14.0 Rural Development IV (Mara) - Road Further processing awaits Gove Minister (IDA) rehabilitation, wa.ter supply improve- ment decisions on public inves ments, and suppo.rt services for ment program. IDA Project Pre smallholder dairy and coffee ation Facility advance of $228 production in Mara Region. Total approved to finance improvemen project cost estimated at $17.5 existing infrastructure and se million with foreign exchange in Mara region. component of $13.4 million. Mini~try of 15.0 Water Supply II - Urban Water Supply Project requires re-appraisal Water, Energy (IDA) for Iringa and Moshi •. Total project to ma.jar increase in projected and Minerals cost estimated at $22.8 million, with water requirements. IDA Proje foreign exchange component of about Preparation Facility advance o $17 .o million. $700,000 approved to finance engineering consultant costs t prepare preliminary and detail design for the expansion of th water system in two towns (lri and Moshi). Ministry of 21.0 (R) Harbours I - Improvements to Dar-es- Appraisal mission in the field Communications (IDA) Salaam Port. Total project cost (Co-financing possibilities and Transport estimated at $75.0 million, with being explored.) foreign exchange component of about $50.0 million. (NATIONAL BANK 10.0 Small Scale Industries Project - Project being reviewed in ligl OF COMMERCE (IDA) To provide a line of credit to of Government's overall invest (NBC)) NBC for onlending to small-scale priori ties. industry and to assist in the development of institutional IDA Project Preparation FacilJ capabilities. advance of $500,000 approved 1 finance consultant costs to pl detailed projections, help NB< organizing and establishing a special department, help Ministry of Industry to revie, overall development plans, an, assist the Bank of Tanzania tc set up a credit guarantee fum to finance training. Ministry of 27.0 Telecommunications I - A three- Approved by the Executive Dir, Communications (IDA) year program of expansion and on July 21. and Transport rehabilitation of telecommunica- tion facilities. Total project cost estimated at $47.0 million, with a foreign exchange component of $27.0 million. • See page l for footnotes. - 11 - Member ·Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency Y ' Lender'!) Procurement 4/ TANZANIA (Cont'd) (TANGANYIKA 10 .o (R) TDFL II - Second line of credit Negotiations postponed, pending DEVELOPMENT (IDA) to TDFL, Total project cost Government's review of invest- FINANCE CO,, estimated at $15,0 million with ment priorities, LTD,) (TDFL) .a foreign exchange component of $10,0 million, Ministry of 15,0 Dar-es-Salaam Sewerage - Rehabili- .Appraisal report being prepared, Land, Housing, (IDA) tation of Dar-es-Salaam sewerage IDA Project Preparation Facility and Urban system, Total project cost esti- advance of $1,0 million approved to Development mated at $27.2 million, with a finance consultants for completion of foreign exchange component of preparatory, work, feasibility $11,2 million, studies and detailed design. (TANZANIA 15,0 (R) TIB V - Fifth line of credit to TIB. Appraisal report being prepared, INVESTMENT (IDA) Total project cost estimated at BANK) (TIB) $20.0 million, with a foreign exchange component of $15,0 million. (TANZANIA 20.0. (R) Petroleum II - This project will be Negotiations substantially com- PETROLEUM (IDA) the second phase of Songo-Songo pleted. (Co-financing DEVELOPMENT Petroleum Exploration Project, Total with European Investment CORPORATION) project cost estimated at $45.0 Bank and OPEC Special Fund,) million with a foreign exchange component of $40 million, Mini~try 12,0 Forestry II - Second phase of the Appraisal report being reviewed, of Natural (IDA) Sao Hill Forestry Project: Total Resources project cost estimated at $15,0 and million, with foreign exchange Tourism component of about $6,2 million, Ministry 12,0 (R) Technical Assistance III - Assis- Negotiations expected mid- of Finance (IDA) tance to Government in implementing December, An IDA Project the Export Rehabilitation Program Preparation Facility advance and in preparing more wide-ranging of $200,000 was approved economic adjustment measures, Total to help finance technical personnel project cost estimated at $15,0 and training in key areas, as well million, with a foreign exchange as an Advisory Group to assi~t component of $12,0 million, the Government in preparing an ec9nomic recovery program. Ministry 20,0 Education VIII - Secondary education,. Project being identified. of Education (IDA) Tanzania 20.0 (R) Power IV - Rehabilitation of existing Appraisal mission in the field, Electric (IDA) diesel units and construction of a 75 (Co-financing possibilities Supply Co, MW hydr.ostation on the existing Mtera being explored.) Limited dam with the necessary tunnel, trans- (TANESCO) mission line and substations, Total project cost estimated at $250,0 million, Ministry of 30,0 Highways VI - Rehabilitation/ Project being prepared, Communication (IDA) strengthening of the Tan Zam and Transport Highway, and road maintenance. Ministry 5.0 Coal Engineering - Engineering Project being prepared, of Mines . (IDA) services for possible development of coal deposits in southern Tanzania. UGANDA Ministry To be Reconstruction Credit II.· Combined President's/Appraisal of Finance deter- Report under preparation, mined (IDA) Ministry of 50,0 (R) Roads III - Rehabilitation of trunk Project preparation underway. Works (IDA) road; re-equipping of maintenance unit, technical assistance; some upgrading, and construction of vital links under consideration, See page 1 for footnotes. - 12 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency]:__/ Lender Jj Procurement':._/ UGANDA (Cont'd) Ministry of 26.6 DFC I - Credit for the rehabilitation Appraisal report under preparation. Industry (IDA) of industry. Ministry of 3.9 (R) Phosphate Engineering - Feasibility Combined President's/Appraisal Industry (IDA) and engineering studies preparation; Report being completed. Nego- audits of existing facilities; and a tiations scheduled for end- survey of possible additional February. deposits. Total project cost estimated at $4.S million. Ministry of 40.0 Education III - Rehabilitation of the Project preparation underway. Education (IDA) school system and reconstruction of school infrastructure. Ministry of 30.0 (R) Export Crops Promotion - Program Project preparation tentatively Agriculture (IDA) credit type operation to help scheduled to begin in January. restore production of export crops. ZAIRE Department 26.0 Onatra Modernization - River trans- Approved by the Executive Directors of Trans- (IDA) port equipment, shipyard equipment; on October 6. (Co-financing has portation railroad equipment; training. Total been agreed with KfW-Germany,·ADB, (ONATRA) project cost estimated at $84.0 and BADEA.) million. GECAMINES About Gecamines II - Rehabilitation, main- Appraisal mission tentatively 41.0 tenance and expansion of existing scheduled for December/January. (IDA) mining facilities. Total project cost to be determined. Societe About (R) Shaba Power System - Rehabilita- Negotiations scheduled for December. Nationale 17.0 tion of power plants in Shaba. Total (Co-financing agreed with Belgium d'Electricite (IDA) project cost estimated at and the OPEC Fund.) (SNEL) $37 .0 million. IDA Project Preparation Facility advance of $500,000 will finance consultant services for work planning, document preparation, and bid evaluation. Regie de pro- 12.0 (R) Water Supply II - Distribution to Negotiations scheduled for duction et (IDA) several cities. Total project January. distribution cost estimated at $26.3 million. d'eau et d'electricite (REGIDESO) Department of About (R) Highways V - Continuation of Highway Negotiations tentatively scheduled Transportation 40.0 Maintenance Program. Total project for January. (Co-financing of (IDA) cost estimated at $180.2 million. $86.0 million will be required.) Department About (R) Ports I (ONATRA) - Rehabilitation Appraisal mission scheduled of Trans- 40.0 of Matadi and Kinshasa Ports; total for March. IDA Project portation (IDA) project cost estimated at Preparation Facility advance (ONATRA) $120.0 million. of $1.0 million has financed consultant services to begin preparation of design and tender documents, bid evaluation, and contract negotiation. (Co- financing will be required.) Department About (R) Cotton II - Rehabilitation including Negotiations tentatively scheduled of 11.0 road rehabilitation; extension for January. Agriculture (IDA) services, spare parts, farm tools and social infrastructure. Total project cost estimated at $39.3 million. See page 1 for footnotes. - 13 - Member Country, and Borrower or Amount Ii Stage of Process- Implementing Probable ing and Action on Agency'];_/ Lender'!:_/ Procurement'!_/ ZAIRE (Cont'd) Department To be (R) NE Ituri II - Improvement of Appraisal report being of Agriculture deter- productivity of farmers' livestock prepared. mined and agricultural holdings through (IDA) provision of inputs and extension services. Total project cost estimated at $15.0, million. SOFIDE About DFC VI - Sixth DFC credit to SOFIDE Appraisal report being prepared. 21.5 including lines of credit for.invest- (IDA) ments; pre-investment/policy studies and for technical assistance. Department About (R) Agricultural Technical Assistance - Negotiations tentatively scheduled of Agriculture 5.0 Technical assistance to strengthen for January. IDA Project (IDA) Ministry of Agriculture and Rural Preparation Facility advance of Development. Total project. cost $600,000 to finance finalization estimated at $5.8 million. of the Agriculture Action Plan and initiate its implementation, which would be continued under the proposed project. ZAMBIA Ministry of About Rural Water Supply - Provision and Appraisal report under prepara- Agriculture 15.0 extension of water supply in six tion. and Water (IDA) rural districts and institution Development building. Total project cost estimated at $28.3 million. Ministry of 25 .O (R) Education V - Assistance for expansion Negotiations tentatively Education (IDA) and improvement of basic education; scheduled for January. (Co- and Culture maintenance program. Total project financing with ADF being cost estimated at $46.6 million. explored.) Ministry of 11.0 (R) Eastern Province Agricultural Loan signed on November 23. Agriculture (Bank) Development - Expansion of agri- and Water cultural production in the Eastern Development Province through strengthening extension and marketing services and providing farm inputs on credit. Total project cost estimated at $29 .0 million. Ministry of 18 .O (R) Southern Province Agricultural Board presentation on Agriculture (IDA) Development III - Expansion of agri-. December 8. and Water cultural production in the Southern Development Province through strengthening extension and marketing services, and providing farm inputs on credit. Total project cost estimated at $24. 6 million. Ministry of About (R) Forestry III - Expansion of the long- Project preparation underway. Lands and 11.0 term planting and maintenance program Natural (Bank/ for industrial plantations. Resources IDA) Ministry of About Fisheries - Improvement of fish Project preparation underway. Lands and 7.0 production systems and marketing Natural- (IDA) channels. Resources Ministry of About (R) Mining Rehabilitation - Rehabilita- Pre-appraisal mission scheduled Mines 60.0 tion of copper mining facilities; for end-November. (Co-financing (Bank) exploration and training programs, being explored.) technical assistance. ·Ministry of 7. 5 (R) Dairy - Introduction of improved Board presentation on Agriculture (IDA) production techniques and services December 15. and Water to increase milk production. Total Development project cost estimated at $11.6 million. See page 1 for footnotes. - 14 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on ~gency }j ~y Procurement !:.J ZAMBIA (Cont'd) Development About DFC III - Third Line of Credit to Appraisal report under preparation. Bank of 19.0 Development Bank of Zambia. Zambia (Bank) Ministry of About (R) Refinery Engineering - Feasibility Negotiations tentatively scheduled Industry 3.0 study for modification of ·Indeni for February. (IDA) refinery, audit of existing facilities, engineering and technical assistance during implementation. Ministry of About (R) Petroleum Exploration - Geophysical Pre-appraisal mission in the Mines 6.2 surveys, technical assistance, field. (Bank) training and equipment. Ministry of About (N) Lusaka Fuelwood: Establishment of Pre-appraisal mission scheduled I.ands and 20.0 eucalyptus plantations for produc- for January. Natural (IDA) tion of charcoal for commercial Reso\\rces sales to Lusaka residents. ZIMBABWE Ministry of About (R) Agriculture - Small farm credit: Appraisal report under Agriculture 40.0 Credit ·to farmers in the higher preparation. (Bank/ potential areas. IDA) Ministry of About (R) Power I - To be identified. Appraisal mission in the field. Industry 80.0 and Energy (Bank) Ministry About Highways I - Construction and Appraisal mission scheduled for of Roads 30.0 improvement of state roads, January. '1nd Road (Bank/ feeder roads and training. Traffic IDA) Ministry About (R) Intensive Rural Development Area Government is reconsidering of 10.0 Project I - Rural development project project concept. Agriculture (IDA) in former tribal trust lands. Ministry of About (R) Manufacturing Rehabilitation Appraisal mission scheduled for Finance 45.0 Imports Program Loan 11 - Provide December/January. (Bank) foreign exchange for underutilized capacity in manufacturing sector. Ministry of About DFC I. To be determined. Project identification underway. Industry 30.0 and Energy (Bank) Local About Urban I - To be determined. Project identification underway. Government 20.0 and Housing (Bank/ IDA) Ministry of About (N) Forestry Wood Energy: Support Project identification underway. Natural 20.0 for rural afforestation. Resources (IDA) See page 1 for footnotes. - 15 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency }j Lender 3_/ Procurement 4/ II. WESTERN AFRICA BENIN Ministere de 14.0 (R) Education II - Construction and equip- Negotiations scheduled for early l'Enseignement (IDA) ment of three teacher training 1982. IDA Project Preparation Mayen General, colleges, construction of facilities Facility advance of $400,000 Technique et and provision of technical assistance approved to prepare architectural Professionel for production and distribution of studies and bidding documents. teaching materials, and technical (Co-financing being arranged assistance for project implementation. with the German and Swiss Total cost estimated at $25.6 million. Governments.) Ministere de l' 8.0 (R) Technical assistance for development Negotiations substantially com- Industrie, des (IDA) of appropriate policies for petroleum pleted. Two advances totalling Mines et de l' exploration, assessment of enhance- $1 million under the IDA Project Energie ment methods proposed for exploitation Preparation Facility have been of Seme oilfield, training and insti- approved to finance consultants to tution building. (a) review geophysical and geo- logical data, prepare a work program for oil exploration outside the Seme field and to formulate an exploration strategy; (b) prepare a training program for Beninese nationals. Governments 3.8 (R) Engineering design and preparation Approved by the Executive of Benin (IDA) of tender documents for the regional Directors on November 10. An and Togo Nangbeto hydroelectric project. advance of $400,000 each for Total cost $5.0 million, of which Benin and Togo under the IDA $4.7 million in foreign exchange. Project Preparation Facility has been approved to finance project preparation. (Co- financing has been arranged with FAG.) Procurement: Retroactive financing of $1.12 million to cover consulting services approved. Government 15.0 (R) Zou Province Rural Development III: Appraisal mission in the field. of Benin (IDA) Integrated rural development, with emphasis on food crop production and involving strengthening extension, training, marketing services as well as applied research and seed production. Total project cost about $50.0 million. CAMEROON Mini st ere 40.0 Urban Development Sites and Services Negotiations tentatively scheduled de l'Urbanisme (IDA) in Yaounde and Douala; squatter set- for early 1982. (Co-financing with et de l' Habitat tlements upgrading in Douala. Switzerland of about $7.0 million under consideration.) Procurement: Retroactive financing of approximately $3.0 million for civil works, detailed engineering and technical assistance to be recommended. To be 32,0 Wood Processing Industries. Total Project preparation underway. determined (Bank) cost about $37.0 million plus $10.0 million for infrastructure. See page 1 for footnotes. - 16 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency ·y Lender'!:._/ Procurement!:._/ CAMEROON (Cont'd) Ministere de 100.0 Roads V - Construction of one section Appraisal report being reviewed. l'Equipement (Bank) of a paved road between Douala and (Co-financing considered with Yaounde; preparation of transport plan. Abu Dhabi Fund, AfDB, BADEA, Total cost of overall program esti- Canada, FED, France, Islamic mated at $390.0 million. Total cost Bank, Kuwait Fund, and of Bank-financed section estimated Netherlands.) at $272 million of which foreign exchange component $211 ~illion. Ministere de 17 .o (R) Forestry project - Pulpwood planta- Negotiations substantially l'Agriculture (Bank) tion to supply the Cellucam pulp- completed. (CDC will co- through Fonds mill of Edea; pole and utility finance Edea plantation National Forestier timber piantations to supply the component.) et Piscicole Northern Province; fuel and pole (FNFP) plantation for the Maga area. Total project cost estimated at $35.5 million. Office National 20.0 (R) Ports III - Extension of general Appraisal report being prepared. du Port (Bank) cargo facilities, with provision Pre-qualification of contractors for banana handling and floating for civil works under review by craft, and extension of data Cameroonian authorities. Tender processing system. Total project documents being reviewed by the cost $22 million. National Ports Authority and the Government. Ministere des 7. 5 (R) Technical Assistance - To Board presentation scheduled Pastes et Tele- (Bank) establish a commercially- for December 17. communications oriented post and telecommunication corporation; improve technical training; and prepare an investment program, including telecommunications projects for external financing. SOCAPALM, 50.0 (R) Tree Crops - Bring to maturity Appraisal report being prepared. CAMDEV, (Bank) 9,000 ha. of rubber and 6,800 ha. (Possible co-financing with CDC, FONADER of oil palms. Preparation of all CCCE and BEI.) the above areas for exploitation. Provision of additional processing facilities for CAMDEV's rubber estates. Replanting of about 3,700 ha. of rubber and up to 700 ha. of oil palm on CAMDEV's estates. Provision for small-holders. Total project cost about $152.0 million. Ministere de 40.0 Education IV - Qualitative improve- Preparation underway. l'Education (Bank) ment of primary and secondary tech- nationale nical education through teacher training, curriculum development, textbook production, rehabilitation of workshops and laboratories, and establishing an equipment maintenance unit. Strengthening of educational planning and administration; improv- ing organizational and upgrading capacity of the General Inspectorate of the State. Total project cost about $60 million. To be 25.0 (N) Western Province Rural Development Project preparation underway. deter- (Bank) Project. Increasing rural incomes mined and living standards through coffee and food crop production, and improv- ing rural infrastructure. Extension of development actions initiated during the Western Highlands I Project (Cr. 784), promotion of ·a larger participation of target population in the province's develop- ment by strengthening the farmers' cooperatives. Total project cost $81.0 million. See page 1 for footnotes. - 17 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency "}j Lender ?:__/ Procurement 4/ CAPE VERDE Ministry of 5.0 (R) Inter-island Shipping - Purchase of IDA Project Preparation Transport (IDA) replacements and additions to inter- Facility advance of island fleet, and consulting $100,000 approved, to services for transport survey. finance the first stage of project preparation. Ministry 7.0 (R) Port of Praia - Rehabilitation of the Appraisal mission scheduled of (IDA) port; purchase of equipment; for late January. IDA Transport technical assistance and a mari- Project Preparation Facility time training center. advance of $100,000 approved to finance consultant's services. (Co-financing by Portugal for the construction of berths. Additional co-financing will be required.) CENTRAL AFRICAN REPUBLIC Ministere des 18.0 (R) Highways IV - Road rehabilitation Appraisal report being reviewed. Travaux Publics (IDA) program. Total project cost IDA Project Preparation et de l'Urbanisme estimated at $52.5 million, of Facility advance of $490,000 which $37.6 million in foreign approved. (Discussions with exchange. potential co-financiers in process: France, Federal Republic of Germany, AfDB, BDEAC, OPEC Fund, Saudi Fund, Abu Dhabi Fund.) · _. 1,. Ministere 15.0 (R) Cotton Areas Integrated Rural Preparation underway. de !'Agriculture (IDA) Development - Rehabilitating and et de improving the production of cotton l'Elevage and food crops; strengthening SOCADA, the proposed executing agency. Total project cost about $60 .O million. CONGO, PEOPLE'S REPUBLIC OF THE Ministere des 8.0 Third Highway Project - Road Main- Appraisal report being prepared. Travaux Publics (IDA) tenance including procurement of Report on preparatory studies, et de la equipment and spare parts, workshop by consultants under IDA Project Construction improvements, and technical assistance. Preparation Facility advance Total cost estimated at $16.0 of $125,000, has been completed. million, of which $12.0 million in foreign exchange. To be 6.0 (R) Forestry - Logging and processing Project no longer under considera- determined (IDA) unit in the northern provinces near tion and further reporting will Ouesso, and technical assistance for be discontinued. sector institutions and policies. Agence Trans- 17.0 Rehabilitation and expansion of Approved ·by the Executive Directors congolaise des (IDA) river transport services; equipment on October 6. Communications and technical assistance to improve (ATC) waterways, services and administration. _EQUATORIAL GUINEA Ministei:io de 2.0 (R) Technical assistance in the petro- Documentation being prepared. Industrias, (IDA) leum sector. Minas y Energia THE GAMBIA .Ministry of 8.0 Agricultural Development Project - Appraisal delayed, pending reorganiza- Agriculture (IDA) Second phase of ongoing Rural Develop- tion of the credit system and and Natural ment Project (Credit 644) would strengthening of management under the Resources include support for. : traditional First Rural Development Project. IDA farm~rs, including extension, input Project Preparation Facility advance of supply and marketing services on a $300,000 to finance detailed country-wide basis; the national architectural and engineering designs and seed multiplication scheme and preparation of tender documents for the research into irrigated and upland buildings. (Possible co-financiers: food crops; and possibly for live- ODA, IFAD, and USAID.) stock marketing and rehabilitation of small irrigation schemes. See page l for footnotes. - 18 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency}) Lender 3__/ Procurement'!__/ THE GAMBI~ (Cont'd) Ports Authority 5.5 (R) Second Banjul Port Project - ·Rehabil- Appraisal report being prepared. (IDA) itation of Banjul Port facilities; IDA Project Preparation construction of new berth, floating Facility advance of $480,000 craft and spare parts for existing approved to finance the com- cargo handling equipment, technical pletion of the feasibility assistance, and emergency rehabili- study, preparation of tation works. Total cost estimated engineering design and tender at $20 million, of which $16.1 documents, and carrying out million in foreign exchange. soil and siltation studies; Also, $500,000 for certain related emergency rehabilitation works. Contract for these emergency works was signed on November 16. Procurement: Prequalification of contractors for civil works completed on August 20, and review of draft bid documents by co-donors underway. (Co-financing with AfDB, and possibly, Germany.) Ministry of 1.5 (R) Energy - Technical assistance for Approved by the Executive Economic (IDA) geophysical studies and energy Directors on November 3. Planning and sector planning, including forestry; Industrial training; and improvements to Development power distribution facilities. GHANA Ministry 14.5 (R) Urban development including upgrading Project preparation financed by of Works (IDA) in Accra and support to the Accra an IDA Project Preparation '& Housing, Municipality. Total original cost Facility advance of $175,000 or a new estimated at $43.9 million, of which underway. agency about $10.0 million was the foreign exchange component. Cost figures will be revised at reappraisal. To be 40.0 (R) Cocoa Ill - Replanting and rehabil- Pre-feasibility studies have determined (IDA) itation of existing cocoa areas; been completed. technical assistance for training and institution building. Ghana Water 10.0 Water Suppiy Technical Assistance Negotiations substantially and Sewerage (IDA) and Rehabilitation - Managerial, completed. An IDA Project Corporation financial, operational assistance to Preparation Facility advance, (GWSC) Ghana Water and Sewerage Corporation not to exceed $400,000, has and rehabilitation of the water supply been approved for the services facilities in the Accra-Terna area; of technical assistants to project preparation assistance. Total organize the administration cost about $13.0 million, of which and expedite the start-up of $10.0 million in foreign exchange. activities. To be To be Rehabilitation of wood industry, Project preparation completed. determined deter- forestry operations, forestry and Decision to appraise awaiting mined forest industries development Government policy decisions. (IDA) planning study, strengthening of (Co-financing will be.required.) institution. Ghana Highway 10.0 Fourth Highway - Rehabilitation of Project preparation underway. Authority (IDA) bridges and main roads, extension of An advance of $1.0 million the road maintenance program, and from the IDA Project Pre- technical assistance. Total cost paration Facility has been estimated at $200 million, of approved to finance the which $110.0 million in foreign feasibility study. (Co- exchange. financing will be required.) See page l for footnotes. - 19 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency y Lender '!:._/ Procurement!!_/ GHANA (Cont'd) To be 9.5 (R) Petroleum Pre-development - Technical Project preparation, financed by determined (IDA) assistance, studies and surveys IDA Project Preparation Facility needed for petroleum exploration, advance of $340,000, underway. strengthening petroleum institutions and energy planning assistance. Total. cost estimated at $10.0 million of which $9.5 million in foreign exchange. To be 7.0 Public Administration Technical President's Report being prepared. determined (IDA) Assistance to strengthen the Office ·Project preparation financed by of the Head of Civil Service; moni- an IDA Project Preparation toring and supervision of parastatals; Facility advance of $155,000. and retraining and redeployment of (Commonwealth Fund and UNDP staff. Total cost about $11.3 million have expressed interest in co- of which $8.9 million in foreign financing.) exch'ange. Ghana· Oil Palm 15.0 Oil Palm II - Consolidation and Appraisal report being prepared. Corporation (IDA) completion of activities undertaken {GOPC) under ongoing Oil Palm I project· through continued provision of tech- nical assistance, management support, training and developmental operating costs. Extension of existing small outgrower planting pr(!gram·. Total cost about $37.9 million of which about $10.0 million in foreign exchange. Electric 20.0 (R) Fourth Power Distribution - Rehabili- President's Report being prepared. Corporation (IDA) tation of ECG's distribution network, (ODA h~s expressed interest in of Ghana system maintenance, technical assis- co-financing the training component {ECG) tance and training. Total project by a ~rant of about $1.8 million.) cost estimated at $26.0 million, of which $20.6 million in foreign exchange. To be To be Export Rehabilitation Credit. Spare Prqject appraisal underway. deter- deter- parts and foreign input requirements of min.ed mined cocoa, forestry, gold mining sectors, (IDA) as well as commercial trucking fleet and technical assistance. GUINEA Ministere 50.0 Nimba Iron ore mining and beneficia- Technical partner and manager des Mines (Bank) tion with evacuation via existing agree~. Feasibility studies et Geologie facilities in Liberia. to be revised and finalized. Ministry of 17.0 Industrial Rehabilitation - Appratsal report being prepared. Industry (IDA) Rehabilitation of selected public IDA.Project Preparation and Credit sector industrial enterprises, Facility advances of $290,000 National promotion of privately-owned small- anq $240,000 approved. (Co- and medium-scale enterprises, financing with OPEC Fund, CIDA technical assistance for industrial and EEC identified.) planning and to project institutions. Ministry of 10.0 {R) Port of Conakry - Rehabilitation German-financed feasibility study Transport (IDA) of por't facilities, provision of complete\!. The Government cargo handling equipment, technical has agreed to establish an assistance to improve port adminis- autonomous port authority. tration and operations. Total cost Appraisal mission tentatively about $20.0 million. rescheduled for March. (Co- financing of project by Federal Republic of Germany anti- cipated.) See page 1 for footnotes. r 1 I I I - 20 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency Y Lender'!:._/ Procurement!!_/ GUINEA (Cont'd) Ministry 10.0 (R) Education II - Construction of Appraisal mission scheduled for of Higher (IDA) facilities and provision of equip- February. (Co-financing with Education, ment, technical assistance and AfDB identified,) Ministry fellowships for 3 existing of Pre- industrial vocational schools; 2 University primary teacher training colleges Education and the pedagogical institute; curriculum development and textbook production for primary education; strengthening of educational and manpower planning; equipment, technical assistance and fellowships for project implementation. Total cost estimated at $25.4 million. Ministry 15.0 Highways III - Rehabilitation and Feasibility study of Conakry-Mamou of Public (IDA) strengthening of Conakry-Mamou Road, Road being finalized. Other Works Periodic resealing and regravelling components being prepared. (Co- of trunk roads. Assistance to road financing being sought,) transport and domestic construction industries. Preparation of a transport plan. Technical assistance to Ministry of Public Works. Total cost about $95.0 million, of which $71.0 million in foreign exchange. GUINEA-BISSAU Ministry of 14 .o (R) Rehabilitation of Bissau Port; Appraisal mission deferred to Transport (IDA) technical assistance for port early February to allow time for management and operations, and completion of soil tests reconstruction of river ports. required under feasibility study. Consultants, under IDA Project Preparation Facility advance of $800,000, to complete studies. (Co-financing with Kuwait Fund and BADEA envisaged.) IVORY COAST Regie 30.0 (R) Railways II - Realignment Petionara- Railway investment plan being Abidjan- (Bank) Tafire; track renewal in Ivory Coast discussed with Government and Niger and Upper Volta; locomotive main- borrower. Appraisal processing (RAN) tenance facilities; railway equip- will follow agreement on RAN's ment, consulting services and overall investment program, to training. Total cost about $76.7 be reviewed at co-donors' meeting million of which about $58.5 not yet scheduled, (Co-financing million in foreign exchange. with CCCE and CIDA envisaged,) PETROCI 100.0 Petroleum development. Appraisal report being prepared. (Petrole de (Bank) la Cote d'Ivoire) Ministere des 40.0 (R) Improvement of water supply and Negotiations scheduled for Travaux Publics (Bank) sanitation in Abidjan and other January. et des urban·centers. Transports Ministere de 13.0 (R) Centre-West Rural Development - Appraisal report being reviewed. !'Agriculture, (Bank) Strengthening regional agricultural (Co-financing arranged with CCCE.) SATMACI development agency; development of smallholder crops; co-operatives; applied research; staff retraining. Total cost $55.1 million. See page 1 for footnotes. - 21 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action.on Agency y Lender 3J Procurement!:_/ IVORY COAST (Cont'd) Government of 50.0 Soubre Hydroelectric Project. Con- Appraisal mission in the field, Ivory Coast (Bank) struction of dam on Sassandra River; (Co-financing will be required.) and Energie powerhouse, civil works, equipment, Electrique de resettlement and engineering. 328 MW la Cote d'Ivoire capacity to meet growing demands in Ivory Coast.· Total cost in 1980 ·prices estimated at $540.0 million. Government of 150.0 (R) Loan for structural adjustment. Approved by the Executive Ivory Coast (Bank) Directors on November 24. Loan signing on December 3. Government ·of 16.0 (R) Loan for technical assistance. Approved by the Executive Ivory Coast (Bank) Directors on November 24. Loan signing on December 3. LIBERIA Ministry of 3,0 (R) Education IV - Ministry of Education Project preparation underway Education, (Bank) institutional development; develop- financed by an IDA Project National Youth 6.0 ment and purchase of textbooks; in- Preparation Facility advance and Sports (IDA) service teacher training; primary of $500,000, Appraisal ·scheduled Commission, school development; establishment for first quarter of 1982, (Co- and University of commercial training center; financing being sought.) of Liberia university staff development. Total l( cost estimat~d at $20.0 million, of which $9.0 million in foreign exchange. To be To be Rural 'Development I - Technical and Project scope being reviewed. determined deter- financial support for rural develop- mined ment institutions, development of I I Ministry 13.0 (R) smallholder production, and rural infrastructures in three south- eastern counties. Highways V - Road maintenance; Pre-appraisal mission in the l of Public (Bank) technical assistance and fellowships field. (Co-financing will Works to Ministry of Public Works. Total be needed.) cost estimated at $37.0 million of ) which $24.0 million in foreign exchange. I Mon.rovia City Corporation 10.0 (IDA) (R) Urban development including upgrading, assistance in land and ownership registry and institu- Board presentation tentatively scheduled· for January, subject to enactment of tax legislation, tional development. Total cost Consultants' sev.ices, equipment estimated at $13.3 million, including and training being financed by foreign exchange costs of $6.7 mil~ an advance of $450,000 under lion. Bank Project Preparation Facility. Ministry of 10 .o Agricult'ural Development (LOFA) II - Appraisal report being prepared, Agriculture (IDA) Expansion of existing project (Co-financing will be required,) activities .in LOFA county and into new areas of the county. Project , would strengthen agricultural services and develop swamp rice, upland rice, cocoa and coffee, and provide feeder roads and wells. Total cost estimated at $27.8 million of which $13.6. million in foreign exchange. Ministry of 18.0 (R) National Iron Ore Company (NIOC) - Board presentation scheduled for \ Lands and (Bank) Rehabilitation.of mining equipment, early January. Preparation financed Mines, and construction of ore surge facility; by Bank Project Preparation Facility I National improvements in concentrator; repair advance of $1.0 million. (ADB, OPEC Iron Ore of railroad and railways bridge; Fund and Netherlands, FMO considering Company financial restruc't:uring of company. co-fin~ncing; commercial ~ank f~nancing (NIOC) Total cost estimated at $51.l'mil- for ·working capital being considered.) lion, of which· $45.4 million in foreign exchange costs, Procurement: Retroactive financing I of $2,0 million for spare parts and management servi.ces being . recommended. ' See page l for ,foot.notes. - 22 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency ]j Lender'!:_/ Procurement!:._/ MALI Office de 6,5 Technical Assistance to ODIPAC Approved by the Executive Directors Developpement (IDA) aimed at: increasing the effi- on July 28, Financing to help Integre de ciency of agricultural production in preparation was provided for la Production through the retraining of extension by an advance of $50,000 under d'Arachides staff, improving seed production, IDA Project Preparation et de distribution and storage, and Facility. (Co-financing with Cereales overhauling the credit and market- FAG for $2,5 million,) (ODIPAC) ing system; promoting the estab- lishment of self-managed farmers' organizations able to take over village development activities; testing diversification programs to reduce the area's dependence on groundnuts as an export crop, Total cost $11.4 million of which $6,6 million in foreign exchange, Off.ice des 13.5 (R) Second Telecommunications Project - Negotiations substantially com- Postes et (IDA) Completion of Mali main transmis- pleted. IDA Project Prepar- Telecommuni- sions route, including the micro- ation Facility advance of cations du Mali wave section Segou-San Sevare and $310,000 approved for consulting the Apur VHF links Sevare-Mopti, services for detailed Sevare-Bandiara-Sanga and Segou- design of local networks, Dioro; supply and installation of updating bidding documents; 1,400 lines of switching equipment provide financial expertise in four towns, including construction to Office des Pastes et of telephone exchange buildings; Telecommunications du Mali, rehabilitation and extension of local Consultants studies underway. networks; engineering consultants for (Co-financing with CCCE/FAC detailed engineering of network for $7,7 million,) extensions, preparation of bidding documents, and assistance in organizing maintenance programs; consultants to study organization of postal and financial services and establishment of training programs, Total cost estimated at $25,3 million of which $18.3 million in foreign exchange, Office du 5.0 Gasohol Production of ethyl Appraisal report being prepared, Niger (IDA) alcohol from surplus molasses, Studies on feasibility of modification of existing introducing gasohol, financed distillation facilities and by IDA Project Preparation provision of infrastructure to Facility advance of $50,000, have handle and store ethyl alcohol for been completed, eventual blending with gasoline. Energie du 26.0 (R) Power/Water - First phase of two- Negotiations in progress. Mali (EdM) (IDA) stage program to extend power Project prepared with advance distribution; rehabilitate utility; of $970,000 from IDA Project promote fuel savings through intro- Preparation Facility. (Co- duction of biomass fuels and initiate financing with OPEC and CCCE/FAC,) preliminary reforms in the water sector, Total cost estimated at $43,2 million of which $41.2 million is foreign exchange, Ministere 12 .o Rural water supply in the Western Pre-appraisal mission scheduled du (IDA) Region - Project to be executed for February. IDA Project Developpement in parallel with IDA Health Preparation Facility advance of Industriel Project. $440,000 approved; consultants appointed for preparation of studies. Compagnie 20.0 (R) Mali Sud II - (i) extension of Appraisal report being prepared. Malienne pour (IDA) production of cotton, maize and (Co-financing with CCCE/FAC, Japan le Developpement rice; (ii) development of livestock and the Netherlands envisaged,) des Textiles and (iii) strengthening of public health services, See page 1 for footnotes. - 23 - Memb/,!r Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on , Agency }j Lender y Procurement ·1:_; MALI (Cont'd) To be 17.0 (R) Rural Health, comprising (i) Appraisal mission scheduled for deter- (IDA) training, (ii) basic health program, May. An IDA Project Preparation mined (iii) drug supply and (iv) applied Facility advance of $350,000 has research. been approved to help preparation of the project. MAURITANIA Ministere de 3.5 Fourth Highway Project - Road Re-appraisal of project will be l'Equipement (IDA) maintenance study, preinvestment. needed in light of ongoing discussions studies for pavement strengthening, with Government on project scope. completion of unpaved roads started (Kuwait Fund is financing $5.1 under Third Highway Project. Total million and Arab Fund for Economic cost estimated at $13.0 million, Development $4.4 million.) of which $10.4 million in foreign exchange. Ministry of 3.0 Petroleum exploration promotion Approved by the Executive Directors Energy and (IDA) project. on August 25. Project prepared with Mines advance of $800,000 from IDA Project Preparation Facility. I/ Ministere 5.4 (R) Education II - Strengthening of Negotiations in mid-December. de !'Education (IDA) educational planning and administra- An IDA Project Preparation Facility Nationale tion, training of lower· secondary advance of $400,000 was approved Ministere school teachers, and vocational to finance professional fees de l'Emploi training for the Fisheries and for architectural design work of et de la Industrial Sectors. Total cost project-financed buildings; Formation about $14.4 million. specialists services for project des Cadres; management and start-up of project Ministere de la institutions; scholarships for the Peche et de training of local instructors. l'Economie (Co-financing with AfDB and EEC.) Maritime To be 5.0 (R) Technical Assistance to the Rural Appraisal report being prepared. deter- (IDA) Sector. mined Ministry of 3.5 Second Technical Assistance Appraisal report being prepared. Economy and (IDA) Project for Planning. Finance NIGER Ministere 35.0 (R) Highways IV - Strengthening and Appraisal report being prepared. des Travaux (IDA) resealing of bitumen roads, road Publics construction, training of ·road maintenance personnel. Total cost estimated at $48.0 million (net of taxes). Ministere 10.0 Technical assistance for project Project content being reviewed du Plan (IDA) preparation and to strengthen by Government. planning, monitoring, and evalua- tion capabilities of Ministry of Plan and technical ministries. Total project cost estimated at $8.0 million, of which $6.9 million in foreign exchange. Banque de 16.0 Employment Creation II - A follow-up Appraisal report being Developpement (IDA) project consisting of a line of credit prepared. de la Republique t9 BDRN, technical assistance to du Niger (BDRN)/ OPEN, and development of leather Office de Promotion crafts. de l'Entreprise Nigerienne (OPEN) See page 1 for footnotes. - 24 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency}:_/ Lender '!:._/ Procurement~/ NIGER (Cont'd) Ministere de 11.0 Forestry II - Establishment and Appraisal report being prepared. Developpement (IDA) management of state-managed and (Co-financing with FAG.and Rural rural forestry plantations; CCCE.) management of rural forests; soil conservation program; institution building; establishment and monitoring of rural mini-nurseries, Total project cost estimated at $17.0 million, of which $8.0 million in foreign exchange. Ministere de 30.0 (R) Irrigation Rehabilitation Project Financing to help preparation Developpement (IDA) To rehabilitate existing irrigation was provided fer by an advance Rural works; procure equipment for main- of $900,000 from the IDA tenance and operation of irrigation Project Preparation Facility. works; supply agricultural inputs; train project staff, cooperative managers and farmers. Ministere de 5.0 (R) Water Supply - Technical Assistance Appraisal mission in the field, l'Hydraulique (IDA) and Rehabilitation, Total cost (Co-financing with UNDP being estimated at $7,0 million, sought.) · Ministere de 10.0 (R) Small Rural Operations - Small-scale Preparation underway. Financing Developpement (IDA) irrigation and bottomland development to help preparation was provided Rural schemes; cooperative and group support for by an advance of $430,000 activities; medium term loans to from the IDA Project Preparation farmers, Facility. NIGERIA Federal 145,0 Kaduna State Agricultural Develop- Appraisal report under review, Ministry of (Bank) ment would include a statewide Further processing awaiting decision Agriculture package of basic agricultural of State Government concerning services to farmers, and a feeder project organization and implemen- road and rural water program, tation, Total cost estimated at $375,0 .million, Federal 117,0 (R) Cocoa Project III - Four state- Pending Governments' decision Ministry of' (Bank) wide smallholder cocoa projects, concerning details of credit and Agriculture Main components would be new financing, further processing planting and replanting of cocoa, and reporting will be discontinued, rehabilitation of existing cocoa; pest and disease control, feeder roads, strengthening of cocoa development units and staff and farmer training. Total cost esti- mated at $544,0 million, of which $117,0 million in foreign exchange. Federal 41. 0 (R) Small and medium-scale enterprise: Negotiations in early December, Ministry (Bank) pilot project, Total cost estimated of Industries at $72,7 million, of which $31.7 million in foreign exchange, Federal 100.0 Fertilizer project - Nitrogen Government has signed agreement Ministry of (Bank) complex at Onne, with foreign equity and Industries technical partner, and preappraisal mission tentatively scheduled for January. National 100.0 Power VI (Distribution) - Power trans- Board presentation awaiting appoint- Electric (Bank) mission and distribution facilities ment of Consultants for design and Power for 23 cities and interconnection of supervision of project, (Co- Authority Lagos thermal plant, ·Total cost esti- financing may be required.) mated at $224,2 million, of which $148,5 million in foreign exchange. Procurement: Retroactive financing of $2,0 million proposed to cover consultant costs for project design and engineering, See page 1 for footnotes. - 25 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency Y Lender '.Y Procurement ,!:_I NIGERIA (Cont'd) Anambra 67,0 (R) Anambra Water Supply and Sanitation.- Loan signed on November 13, State Water (Bank) Expansion and improvement of water Corporation supply and sanitation facilities in Onitsha, provision of health and urban development facilities, and strengthen- ing of implementing agency, Total cost estimated at $120,0 million, of which $67,0 million in foreign exchange. Federal 147,0 Sokoto Agricultural Develop- Board presentation awaiting Government Ministry of (Bank) ment - Extension of Gusau Agricul- decision on organization of fertilizer Agriculture tural Development Project (Ln. 1099), distribution, including statewide rural water and training programs and Procurement: Retroactive financing improvement of agricultural of up to $1,0 million proposed to service centers, Total cost cover hiring of key staff and other estimated at $499,0 million, of which project initiation costs, $221,0 million in foreign exchange, Federal 37,0 Second Urban Development - Imo Board presentation awaiting Government Ministry (Bank) State, Total cost estimated at action on funding of ongoing projects of Housing $87.4 million, of which $37,0 in Imo State. million in foreign exchange. Procurement: Retroactive 1 financing of $2 million proposed to cover project start-up costs l Kano State 115,0 Kano State Water Supply IV - Expansion from September 1, 1980. Appraisal report being prepared, Water (Bank) of water supply facilities in Greater Resources Kano, Provision and/or expansion of Engineering water supplies in several semi-urban and Con- centers. Total cost estimated at struction $210,0 million, of which $115,0 Agency million in foreign exchange, Federal 70.0 Third Urban Development - Ogun State, Consultants being selected Ministry (Bank) Ondo State and Benue State, to undertake feasibility study, of Housing Federal 35.0 Mambilla (formerly Sardauna) Agri- Appraisal report being rrepared, Ministry (Bank) cultural Development - To develop of Agri- seasonal and permanent crops, live- culture stock and forestry by smallholders in a high-potential highland area through farmer services, general infrastructure and land reform, Total cost estimated at $80,0 million, Federal 150.0 Imo State Agriculture Development - Preparation report being Ministry (Bank) This statewide project would reviewed by Government, of strengthen the existing Ministry Agriculture of Agriculture and Natural Resources to provide technical advice and support to farmers throughout the State, Total cost estimated at $200,0 million, Federal . 150.0 Berno State Agricultural Develop- Preparation report being Ministry (Bank) ment - This statewide project reviewed by Government, of would strengthen the existing Agriculture Ministry of Agriculture and Natural Resources to provide technical advice and support t'o farmers throughout the State, Total cost estimated at $400.0 million, Berno State 100.0 Berno State Water Supply - Improve- Feasibility report being pre- Water Board (Bank) ment and expansion of water supply prepared by Water Board, facilities in Maiduguri and other assisted by Consultants. centers. See page l for footnotes, - 26 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency];_/ Lender !f Procurement!:._/ NIGERIA (Cont'd) Ministry of 50.0 Gari Irrigation - To strengthen Project preparation underway. Agriculture and (Bank) the existing Gari dam in Kano Water Resources- State and provide supplementary Kano State irrigation infrastructure and other support services for irrigated agriculture. Federal 60 .0 (R) Sokoto Health - Construction and Consultants selected and Ministry of (Bank) equipping of about 75 rural health project preparation underway. Health and clinics, technical assistance in ·sokoto State training for staff development, Ministry of childhood immunization program, Health project monitoring, and institu- tional improvement of the Sokoto Ministry of Health. Project also includes strengthening institutional capacity of the Federal Ministry of Health. SAO TOME & PRINCIPE Ministry of 5.0 First Power/Water - 4 MW diesel- Appraisal report being prepared. Energy and (IDA) electric power plant; reinforcement Project prepared by consultants Fisheries of distribution system; supply of financed by IDA Project transport and communications equip- Preparation Facility ment; technical assistance and train- advance of $350,000. (Co- ing; rehabilitation and extension financing will be required.) of water supply facilities and water supply master plan. Total Procurement: Retroactive cost estimated at $12.8 million. financing of $0.6 million to cover hiring of key staff, as well as urgent purchase of spares, materials, etc. to be proposed. SENEGAL Secretariat 19 .5 Agricultural Research - Program of Approved by the Executive Directors d'Etat a la (IDA) works and technical assistance to on September 8. IDA Project Recherche improve the national agricultural Preparation Facility advance of $1 Scientifique research system and to strengthen million approved to finance consulting et Techniques the generation and transfer of services and eventual detailed agricultural technology. Total engineering studies. (Co-financing cost estimated at $106.1 million. with French Ministere de la Co- operation, USAID and UN technical agencies.) Office des 20.0 Telecommunications II - Extension of Preparation underway. Pastes et (Bank) Dakar telephone exchanges; extension of des Telecom- transmission network to the South and munications East of country; technical assistance. Government 15.0 (R) Primary Health Care Project - Appraisal report being prepared. of Senegal (IDA) including components for institution IDA Project Preparation Facility building, drug supplies, intermediate advance of $95,000 approved to health facilities and information, finance consulting services for and education programs. Total detailed project preparation. estimated cost $20.5 million. To be 12,5 Dome Flore Appraisal Drilling--Seismic Project preparation including deter- (IDA) tests and drilling to appraise light seismic work underway financed mined oil deposit and collect heavy oil by a $1,000,000 Bank Project samples; geological work; engineering. Preparation Facility advance. study to develop light/heavy oil (Commercial drilling partner and fields; and technical assistance to cofinancers will be sought.) the Department of Mines. Preliminary project costs $17.0 million. See page 1 for footnotes. - 27 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency Y Lender 'l:./ Procurement !!./ SENEGAL (Cont'd) Societe 31.0 (R) Irrigation IV - Rehabilitation of Appraisal mission tentatively d'Amenagement (IDA) 5,870 ha of irrigation perimeters scheduled for January, et d'Exploitation in the Senegal River delta; elec- (Possible co-financing with du Delta (SAED) trification of pumping stations at FAC, CCCE, USAID, FRG, FED Rong and Boundoum; construction and Kuwait Fund.) of a power line, Estimated total cost $66 million, Government 4,5 (N) Regional Management School - Preparation underway, of Senegal (IDA) Construction and equipment of facilities and technical assistance to facilitate the transformation of the Senegalese Management School into a Regional Management Training School for CEAO member states, SIERRA LEONE To be 4.0 (R) Engineering - Technical assistance Preparation underway, (Co- · deter- (IDA) to help finalize the Bumbuna financing of $6,0 million mined hydroproject and to initiate a required; OPEC has been National Power Authority, Spare approached.) parts for the Sierra Leone Electric Corporation, Total project cost Procurement: Retroactive estimated at $10,0 million, financing of approximately $1,5 million will be required to finance detailed engineering, To be 37 .o (R) Power (Hydro) V - Development of Detailed engineering underway, determined (IDA) Bumbuna hydro plant on Seli river, (Co-financing will be required, Total project cost estimated at Co-financing meeting tentatively $352,0 million, of which $281,0 scheduled for early 1982,) million in foreign exchange, (NATIONAL Up to Industrial Finance Company - To Institutional issues being discussed DEVELOPMENT 5,0 provide a line of credit for small with Government, BANK (NDB)) (IDA) and medium enterprise development, Ministry of 10,0 Agricultural Services - Technical Preparation underway, financed in part Agriculture and (IDA) assistance to reorganize and under IDA Technical Assistance Project, Forestry strengthen Ministry's ability to deliver services to farmers; establishment of national rural credit program, Ministry of 10,0 Education III - Primary school Preparation underway. Appraisal Education (IDA) construction, primary teacher tentatively scheduled for first quarter training and upgrading, education 1982, materials and textbooks production, and goods and services for institu- tional improvements in education sector. TOGO Governments 3.8 (R) Engineering design and preparation Approved by the Executive Directors of Benin (IDA) of tender documents for the regional on November 10, An advance of and Togo Nangbeto hydroelectric project. Total $400,000 each for Benin and Togo project cost $5,0 million, of which under the IDA Project Preparation $4,7 million in.foreign exchange, Facility has been approved to finance project preparation, (Co-financing has been arranged with FAC.) Procurement: Retroactive financing of $1,12 million to cover consulting services approved, See page 1 for footnotes, - 28 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency]) Lender'!:._/ Procurement!!._/ TOGO (Cont'd) Ministere 14.0 (R) Rural Development II - Development Appraisal mission in the field. du Developpement (IDA) of cotton and food crops production Rural by following up on the activities of the cotton project (Cr. 741), and, possibly, including viable elements of the Maritime project (Cr. 638). The project will include institution strengthening, provision of farm inputs and extension services, seed production, animal traction and infrastructure. Total cost about $40.0 million, UPPER VOLTA Ministere du 10.0 Koudougou Pilot - Experimental program Appraisal report being prepared. Developpement (IDA) to improve production techniques and Rural farming systems, Regie Abidjan- 7.0 Railways II~ IDA funds would help Appraisal processing will follow Niger· (IDA) finance Upper Volta's share of RAN agreement on RAN's overall· invest- (RAN) railway project, Total· project ment program, to' be reviewed at cost estimated at $72.7 million of co-donors meeting not yet scheduled. which $58.5 million in foreign exchange. Ministere 46.0 Highways IV - Four year phase Approved by the Executive Directors des Travaux (IDA) (FY82-85) of maintenance operations; on June 16. (Co-financing agreed Publics feeder roads construction and improve- with the Netherlands.) ments. Total cost estimated at $56.7 million, of which $45.0 million in foreign exchange. Ministere du 15.0 (R) Rural Development Fund Ill - Invest- Negotiations in mid-December. Developpement (IDA) ments in small scale rural projects (Co-financing with the Rural such as bottomland development, small Netherlands and BOAD.) irrigation projects, erosion controls, open and tubewells, ·medium term credit for· oxen, agricultural equipment and · unidentified projects. Total project cost estimated at $28.9 million of which $17,0 million in foreign exchange, Ministere du 15.0 (R) West Volta II - Continuation of rural Appraisal report being prepared.· Developpement (IDA) development in the ORDs of Bobo (Co-financing With CCCE/FAC, !FAD, Rural Dioulasso and Dedougou, including Canada, and the Netherlands continued development of extension envisaged.) services, expansion of cotton and food crops, support to village groups. Total cost estimated at $48.0 million of which $23.0 million in foreign exchange. Ministere 23.0 (R) Kompienga Hydroelectric Project, Appraisal tentatively scheduled des Travaux (IDA) Total cost estimated at $100.0 for March. (Co-financing with Publics million, CIDA, FED, CCCE/FAC, KgW, ADB, Islamic Development Bank and Saudi Development Fund.) Ministere 17.0 (R) Telecom III - Expansion and upgrading Appraisal report being reviewed. des Po.stes (IDA) of telephone and telex facilities (Co-financing with FAC/CCCE and et Telecom- and increase penetration into rural The Netherlands.) munications areas, Total cost estimated at $45.0 million, of which $28.5 million in foreign exchange. Ministere de 3.0 Technical Assistance - Establishment· Pre-appraisal completed. l'Economie et (IDA) of Development Investment Budget· du Plan to strengthen investment budgeting and monitoring development· expenditures. Total project cost estimated at $3.0 million. See page 1 for footnotes. - 29 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency}:./ Lender Y Procurement !:./ I III. EAST ASIA AND PACIFIC I '/1 CHINA Ministry 60.0 (R) North China Plain Agricultural Appraisal report being prepared. of Agri- Development Project - Provision culture of irrigation and drainage facilities for approximately 200,000 ha of farm land. Project focuses on problems of soil salinity and provides agricultural support services. Ministry 133.0 (R) Three Ports Project - Modernization of Negotiations scheduled for of Com- existing ports and provision of January. munications modern facilities to meet short- term requirements of increasing container traffic at Shanghai, Tranjfu and Huangpu. State 65.0 (R) Agricultural Training and Appraisal report being prepared. Agricultural Research Project - Financing Commission of ·equipment and technical assistance to strengthen education and research capa- bilities at selected agricultural colleges and research institutes. China To be (R) Industrial Credit - Establishment Appraisal mission scheduled 1: Investment deter- and institutional development for· early 1982. Bank (CIB) mined of the China Investment Bank (CIB); provision of credit through CIB to light industries. Ministry To be Daqing Oilfield Development - Reser- Appraisal mission of deter- voir development and study of tentatively scheduled Petroleum mined enhanced oil recovery. for January. Ministry To be Dongpu Oilfield Development - Explo- Project preparation of deter- ration and development of the oil- underway. 1 Petroleum mined field. Ministry To be Heilongjiang Grain Base - Development Project preparation of State deter- of 200,000 ha of uncultivated land underway. Farms and mined to grow wheat, soybeans and corn. Land Reclamation Ministry .of To be (N) Lubuge Hydropower - Construction of Project preparation underway. Electric deter- a rockfill dam, tunnels, and a 600 (Co-financing sought.) Power mined MW underground powerhouse in Yunnan Province. Ministry of To be (N) Luan/Jincheng Coal Mines Project - Project preparation underway. Coal deter- Development of two fully-mechanized mined longwall underground mines of up to 4 mtpa each in Shanxi Province. FIJI Ministry 20.0 Tree Crops - To develop a Project preparation by Govern- of Agriculture (Bank) variety of export crops ment with assistance from FAO. in various regions of the country. See page 1 for footnotes. - 30 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency lj Lender'}_/ Procurement!!._/ INDONESIA Ministry of 73.0 (R) Small Towns Water Supply - Project preparation by Public Works (Bank) Assistance for.urban and rural Government and consultants water systemD in East Java. underway. Ministry o{ 100.0 Maririe Transport III (Shipping and Project being prepared by Communications (Bank) Ports) - To develop selected ports, the Government. (Co-financing improve shipping, and possibly develop is envisaged.) dredging capability. Ministry of 75.0 (R) Transmigrati9n III - Development of Appraisal report being prepared. Manpower and (Bank) transmigration schemes in East Transmigration Kalimantan and South Sumatra. Ministry of 75.0 Watershed Development I - Integrated Project Preparation Fac.ility Agriculture (Bank) program of reforestation, soil advance of $463,000 approved conservation, and related develop- to finance consultants and ment in Java. mapping services to advance the preparation of this project. Minist.ry 65.0 North Sumatra Transport - To Project being prepared by· of Com- (Bank) develop transport system for Government and consultants. munications estates and other regional (Co-financing is envisaged.) goods and passenger traffic. P.N. Batubara 185 .O (R) Bukit Asam Coal Mining and Trans- Negotiations substantially com- and Directorate (Bank) port - Rehabilitation and expansion pleted. Board presentation of States of Bukit Asam coal mine and the scheduled for January S. (Co- Railways necessary infrastructural financing is envisaged.) (PJKA) improvements. The output of the mine would be transported for use at Sura.laya Power Plant. Total project cost is estimated at $1 billion. Ministry of 22.0 (R) Education X - Textbooks and Negotiations scheduled for early Education (Bank) instructional material development. January • . and Culture Ministry of 92;0 (R) Education XI - Second phase Negotiations scheduled for Education (Bank) of teacher training program. mid-January. and Culture Ministry of 15 .O (R) Seeds II - Second phase of seed Board presentation on December 8. Agriculture (Bank) industry development covering twelve provinces. Ministries of 100.0 (R) Rural Roads - Programs to improve Negotiations substantially com- Home Affairs (Bank) rural road operations, including pleted. Board presentation and Public new construction, betterment, and scheduled for January 19. Works maintenance in about 25 selected districts. Ministry of 100.0 Central Java - Pulp and Paper - A pulp Appraisal mission scheduled Industry (Bank) and paper complex in Central Java. for early January. (Co- It will include a pulp and paper plant financing is envisaged.) and mechanical wood industries. Ministry 75.0 (R) Education XII - Public Works Manpower Appraisal mission scheduled of Public (Bank) Development Project. for March. Works Ministry of 75.0 Nucleus Estates VI - Assistance to Appraisal report being prepared. Agriculture (Bank) smallholders. through nucleus estates. (Co-financing envisaged.) Ministry of 70.0 ·Jakarta .Sewerage I - Improvement of Project being-prepared with Public Works (Bank) , Jakarta sewerage system. the help of c'onsultants. Ministry of 40.0 Urban V - Urban services and infra- Project being prepared Public Works (Bank) structure improvement in East Java by the Government. cities. See page 1 for footnotes. - 31 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency}) Lender'!:._/ Procurement !±J INDONESIA (Cont'd) Ministry of 170.0 (R) Power XI - Transmission and dis- Loan signed on November 16, Mining and (Bank) tribution networks in Java from (Co-financing envisaged,) Energy 1982-86, Estimated cost $1.l billion. Ministry of 50.0 Forestry - Trial and pilot industrial Project preparation underway. Agriculture (Bank) forest plantations; strengthening of forestry sector institutions, and National Forest Land and Timber Inventory, Ministry of 62.0 Irrigation XVI - Primary and Appraisal report being Publi<:. Works (Bank) secondary canals, and sector reviewed, components on tertiary canals; operation and maintenance and general institution building, Ministry 10.0 Energy - Engineering loan to Project preparation underway, of Mines (Bank) prepare feasibility report on and Energy energy project, P,T, Pupuk 58 ,0 (R) National Fertilizer Distribution - Negotiations scheduled for early Sriwijaya (Bank) to increase capacity to distribute January, (Co-financing is (PUS RI) output.of new fertilizer plants. envisaged,) Ministry 53,0 Irrigation XVII - Improvement of Appraisal report being reviewed, of Public (Bank) provincial operation and maintenance Works through training, equipment, facil- ities and transport; development of groundwater potential (East Java) through 180 production tubewells as well as large numbers of exploratory holes, test wells and piezometer wells; rehabilitation works for about 50,000 ha, Ministry of 150.0 Nucleus EstatP.s VII - Assistance to Project preparation underway, I. Agriculture (Bank) smallholders through nucleus estates, (Co-financing· is envisaged,) Ministry of 130.0 Nucleus Estates Sugar - Smallholder Project preparation underway. Agriculture (Bank) development in South Kalimantan for 1,800 families and cultivation of about 3,000 ha of sugarcane land; nucleus estate development of about 2,000 ha of sugarcane area and about 200 ha of cane nurseries; establishment of a sugar factory with capacity of 2-3,000 tons of cane per day. Ministry of 90.0 Health I - The project would cover the Project preparation underway, Health (Bank) three provinces of South, Southeast and Central Sulawesi and would comprise components on infrastructure and staff development, drug supply and distri- bution, disease control programs, health management and administration, and project administration, Ministry of 200.• 0 (R) Power XII - The project covers mostly Appraisal mission scheduled Mining and (Bank) distribution requirements in Java and for January. Energy some important outlying areas of Indonesia for the period 1983-87. Ministries of 100.0 Irrigation XVIII - Preliminary works Project preparation underway. Public Works (Bank) for Jatigede, Kdungombo, and and Mines Batutegi multipurpose dams, and Energy See page l for footnotes, - 32 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency~/ Lender 2/ Procurement'!._/ ---- INDONESIA (Cont'd) Ministry of 90.0 Swamp Reclamation II - Development Project preparation underway. Public (Bank) of 40,000 ha of low-lying lands on Works the south Sumatra coast to settle about 14,000 families from Java/Bali; drainage, settlement, agricultural infrastructure. Ministry 50.0 (R) Rural Credit II - Provision of rural Project processing in abeyance. of (Bank) credit through, and institutional Agriculture strengthening of, Bank Rakyat Indonesia. Ministry of 30 .O (N) Coal Exploration - Engineering loan Appraisal report being prepared. Mining and (Bank) for exploration of coal in East Energy Kalimantan. Bank Pemban- 60.0 (N) BAPINDO V - Provision of credit to Project.preparation underway. gunan (Bank) and institutional strengthening of Indonesia Bapindo - State Development Bank. KOREA Ministry of 50 .0 (R) Agricultural Marketing I - Construc- Appraisal report being reviewed. Agriculture (Bank) tion of urban wholesale markets for and Fishery fruits and vegetables and fishery products, with ice making and cold storage facilities. Ministry of 60.0 (R) Small and Medium Machinery Industry - Appraisal mission scheduled Commerce and (Bank) To provide technical and financial for mid-January. Industry assistance to a selected group of small enterprises. Ministry of 50 .O (R) Technological Development - Develop- Appraisal report being reviewed. Science and (Bank) ment of policies and institutions Technology for advanced industrial techno- (MOST) logical development. Ministry of 90.0 (R) Water Supply I - To help improve water Board presentation scheduled Construction (Bank) supply and sewage system in Daegu, for December 17. Masan, Changwon, Jimhae and Gwangju. Ministry of To be Ports III - To provide additional Project under preparation Transportation/ deter- capacity, especially container by Government and con- Korea Maritime mined handling capacity. sultants. (Co-financing and Port (Bank) is envisaged.) Authority Ministry 250 .0 (R) Structural Adjustment Loan - To Board presentation scheduled of Finance/ (Bank) help the Government implement its for December 17. Economic structural adjustment policies Planning over the 1980/81 period. The Board policies in question are related to energy conservation, rationaliza- tion of industry, and resource mobilization. Ministry 100.0 Cement and Coal Distribution - To Project under preparation by of Trans- (Bank) ·finance part of the foreign exchange Government and consultants. portation needed to improve the efficiency of (Co-financing is envisaged.) coal and cement distribution in Korea. Ministry of 125 .o Rural Roads - To finance part of Project under preparation by Home Affairs (Bank) the foreign exchange costs of Government and consultants. constructing roads in rural areas. (Co-financing envisaged.) Ministry of 80 .o Jeonju Regional Development - Feasibility studies being _Construction (Bank) To help further develop economic prepared by Government growth, employment and urban and consultants. infrastructure in the region's major urban areas of Jeonju, Gunsan and Iri. See page 1 for footnotes. - 33 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency y Lender 3__/ Procurement!:_/ KOREA (Cont'd) Citizens 40 .O (R) CNB II - To help meet the foreign Appraisal report being National (Bank) exchange cost of CNB lending program prepared. Bank (CNB) for 1983-84 and strengthen its insti- tutional capabilities. LAO PEOPLE'S DEMOCRATIC REPUBLIC Ministry of 10.0 Agricultural Rehabilitation and Project being reviewed Agriculture (IDA) Development IV - Strengthening of and start of negotiations agricultural support services. deferred. (Co-financing from Total project cost estimated at !FAD and parallel financing $23.6 million, of which $17.4 mil- from UNDP being arranged.) lion is foreign exchange. Electricite 15.0 (R) Nam Ngum Power Expansion - Third Negotiations substantially du Laos (EdL) (IDA) stage expansion of Nam Ngum for completed. Board presentation sale of. electricity to Thailand; scheduled for December 22. (Co- technical assistance. Total project financing of $4.0 million with cost estimated at $20 million with OPEC Fund arranged.) foreign exchange component of about $18.9 million. Ministry of To be Small Scale Irrigation - Development Project to be prepared by Agriculture deter- of small and medium-size irrigation consultants financed out mined project covering a total area of of IDA Project Preparation (IDA) about 13,000 ha. Facility advance of $375,000. (Co-financing envisaged.) Ministry of To be Forestry Project - Forest production Project to be prepared by Agriculture deter- and plantation and support to FAO/CP program. mined forest industries. (IDA) Ministry of 16.8 (R) Agricultural Training - Development Appraisal report being prepared. Agriculture (IDA) of an improved and expanded program (Co-financing with UNDP/FAO for training middle-level technicians and SIDA being explored.) in agriculture. Total project cost $16.8 m111i,:.p MALAYSIA Ministry of 35.0 Education VI - Strengthening of Appraisal report being prepared. Education (Bank) vocational and in-plant training. and Ministry of Labor and Manpower Ministry of 25.0 Malacca Agricultural Development - Appraisal report being prepared. Agriculture (Bank) The state rural development has now been renamed Malacca Agri- cultural Development. The project will cover rubber replanting and rehabilitation in the state of Malacca and construction of rural roads. Government 55.0 Industries I - Assistance for Project being prepared (Bank) manufacturing and institutional by Government. development. Government 50.0 Road Construction - Strengthening Project being prepared (Bank) the planning and construction by Government. capability of the road construction industry, technical assistance and training, as well as financing for road construction and maintenance. See page 1 for footnotes. - 34 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency}) Lender 3_/ Procurement!!_/ MALAYSIA (Cont'd) Ministry of 70.0 Western Johore - Integrated Develop- Project being prepared by Agriculture (Bank) ment - Construction of farm roads Government, and drainage facilities, and provision of agric•Jlt~ral support services, National 85.0 Rural Electrification I - Expansion Appraisal report being prepared. Electricity (Bank) of the rural power network with Board mini-hydro schemes, Total cost is estimated to be $163 million. Government 35.0 Kedah Agricultural Development - Project being prepared by (Bank) Rubber replanting, irrigation Government, and drainage, rural roads, live- stock and fishery development and agricultural support services. PAPUA NEW GUINEA Department 15 .0 (R) Agricultural Credit II - A Credit signing on December 7. of Primary (IDA) nationwide agricultural project Industry/PNG to support agricultural-produc- Development tion and processing through credit Procurement: Retroactive financing Bank and technical assistance, It would of $1,5 million for undertaking also include a pilot T&V extension expansion of staff and facilities, component and provincial data processing subloans and making collection and analysis, field management arrangements from June 1, 1980. Department 5, 0 (R) Petroleum Technical Assistance - Appraisal mission scheduled for of Minerals (IDA) Technical assistance for promotion January. and of petroleum exploration, Energy Department 6. 0 (R) Enga Provincial Development - Negotiations in mid-December, of (Bank) Integrated rural development in Provincial 2,0 Enga province. Affairs, (IDA) National Planning Office Department 16,0 (N) Transport Development - Construc- Project being prepared by of Works (Bank) tion and improvement of primary Government and consultants. and Supply/ and tertiary roads, and transport Department system studies, of Transport and Communica-· tions PHILIPPINES Development 70.0 (R) DBP - Commercial Tree Crops Production Appraisal report being prepared. Bank of the (Bank) and Processing - Agricultural credit Philippines for tree crop production, processing (DBP) and marketing, Ministry 19.0 National Fisheries Development - Insti- Appraisal report being prepared, of Natural (Bank) tutional· support and infrastructure Resources for fisheries sector, including pro- grams for poor municipal fishermen. To be 80.0 Urban IV (Regional Cities) - Invest- Project being prepared determined (Bank) ments in 4 cities including selected by Government, primary infrastructure, employment generation and industrial estates, transport, municipal services and facilities, and sanitation and shelter to support a program of spurring regional urban economic development, See page 1 for footnotes, - 35 - Member Country, and Borrower or Amount & Stage of Process- -Implementing Probable ing and Action on Agency Y Lender Y Procurement 4/ PHILIPPINES (Cont'd) To be 140 .O (R) Small and Medium Industries III - Appraisal report being prepared. deter- (Bank) To provide funds for relending to (Co-financing may be sought,) mined small and medium industry, and supporting technical assistance to specific subsectors. Ministry 160 .O (R) Textile Sector - Restructuring Appraisal report being reviewed. of Industry (Bank) of the textile sector, (Co-financing may be sought,) Ministry 60.0 (R) Rural Development IV (Land Project being prepared of Agrarian (Bank) Settlement II) - Further assis- by Government. Reform tance for planning and execution of Government's land settlement program, National 60.0 Rural Electrification I I - To finance Project being prepared Electrification (Bank) expansion of Government's on-going by Government, Admini·stration rural electrification program. National 70.0 (R) Communal Irrigation - To finance Appraisal report being Irrigation (Bank) a part of the Government's communal p,;epared, Administration irrigation program covering about (NIA) 20,000-30,000 ha. Ministry of 175.0 Road Transport - Construction and Project being prepared Public Highways (Bank) improvement of rural roads; nationwide by Government, bridge program on national roads; and maintenance and rehabilitation of national roads, Land Bank 50.0 Small Farmer Development (Land Bank Project being prepared of the (Bank) II) - Further credit, support services by LBP, Philippines and minor infrastructure assistance (LBP) for land reform beneficiaries. Ministry 60.0 Rainfed Agricultural Development Project being prepared of (Bank) II (Mindanao) - Support services by Governmeqt, Agriculture and infrastructure to promote diversified rainfed and upland crop/livestock systems in Mindanao region, To be 120 .0 (R) Geothermal Exploration - To assess Appraisal m!ssion scheduled deter- (Bank) geothermal resources, assist in for January. mined developing one field, and provide institutional strengthening, National 24.0 (R) Education VIII (Skills Training) - To Appraisal report being prepared. Manpower (Bank) support Government's industrial devel- and Youth opment strategy with emphasis on re- Council gional diversification and training (NMYC) needs of small-and medium-scale industries, To be 70.0 (R) Central Visayas (Region VII) Rural Project beipg prepared deter- (Bank) Project - Integrated program of by Government. Bank Project mined agro-forestry, agrarian reform, Preparation Facility advance infrastructure and re~earch in of $500,000 approved to finance Central Visayas. consultancy services, incremen- tal costs in connection with recruitment of st_aff, and vehicles and equipment. National 8.0 (R) Urban Engineering - To finance pre- Board presentation on Economic and (Bank) liminary and detailed engineering December 8, Development for the preparation of two urban Authority projects (Urban IV and VI). Ministry of 50.0 (R) Rural Water Supply - To help.improve Appraisal mission scheduled Public Works (Bank) water supply and sanitation in for January, and selected rural areas using low-cost Highways schemes. See page 1 for footnotes, - 36 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency ]j Lender'!:./ Procurement'!_/ PHILIPPINES (Cont'd) To be 20,0 (R) Coal Exploration - Basic exploration Project being prepared deter- (Bank) for two coal-bearing areas; establish- by Government, mined ment of a coal testing center, and detailed exploration for one or two coal deposits, SOLOMON ISLANDS Government of 6.0 Primary Education (Multisector Credit) - Appraisal report being reviewed, Solomon Islands (IDA) Multisector credit with emphasis on primary education. A small rural Procurement: Retroactive financing transport component likely to be not to exceed $300,000 is being included, Total project cost considered for consultant services estimated at $8 million. and for force account construction of roads, Government 2.0 Lungga Hydroelectric Power Project - Project dropped from FY82 lending of Solomon (IDA) Total project cost estimated at program, Total project cost estimate Islands, $55 million, now exceeeding $65 million, Govern- Electricity ment looking at alternative designs, Authority Project will most probably be postponed until FY83, THAILAND Ministry of 60,0 (R) Education VI - Strengthening of Appraisal report being Education (Bank) diversified secondary education and prepared, of Ministry of Education, Planning and Management, Total project cost estimated at $142 million. Ministry of 80,0 Irrigation XIII (Medium Scale/Nam Mun) Project being prepared by .\gricul ture (Bank) - "lice of Royal Irrigation Depart- Royal Irrigation Department, · and Cooperatives ment's irrigation development program, assisted by consultants, including construction/rehabilitation (Co-financing from KfW of medium-scale irrigation systems and being explored,) construction of storage dams on head- wacers of Mun River and of irrigation systems for about 25,000 hectares. Ministry of 30 .o Forestry I - Forest protection, Project scope being revised, Agriculture (Bank) wood lot development, industrial Government is undertaking and Cooperatives plantations, forest villages and preparation, (Co-financing research, extension and training for with Australia being explored,) Royal Forestry Department, (RUBBER 142,0 (R) Second Tree Crops - Second phase Board presentation scheduled for REPLANTING (Bank) of rubber replanting project, and January. (Co-financing of about AID FUND initiation of rubber new planting b 10 million with CDC has been BOARD) and coconut development programs, arranged; UNDP grant of up to Total cost estimated at $360,0 mil- $1.5 million equivalent is being lion, of which $143.5 million in sought,) foreign exchange. (TELEPHONE 140,0 Fourth Telecommunications Project - Appraisal mission in the field, ORGANIZATION (Bank) Expansion of telephone facilities (Co-financing with Japan and Sweden OF THAILAND) particularly in rural and provincial and private sources being explored,) areas, Total cost estimated at $545 million with a foreign exchange com- ponent of $320 million, Ministry of 150.0 Rural Roads - Construction of rural Project preparation underway. Communications (Bank) roads countrywide. (Co-financing being explored,) Ministry of 17.0 (R) Land Reform Area Development - Land Negotiations scheduled for Agriculture (Bank) development, titling, irrigation, January, (Co-financing with and Cooper- reforestation, infrastructure and UNDP being explored,) atives other services in settlement areas. Total project cost estimated at $28,2 million with a foreign exchange component of about $6.9 million. See page l for footnotes, - 37 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency y Lender'!:_/ Procurement'!_/ THAILAND (Cont'd) (PETROLEUM 100 .0 (R) Energy I - Natural gas processing Appraisal report being prepared. AUTHORITY (Bank) and liquified petroleum gas distri- (Co-financing from OPEC Fund, OF THAILAND bution; assistance to exploration/ OECF and DCD expected; major (PTT)) delineation drilling and institution- additional financing from export building measures. Total cost credit agencies and commercial estimated at $450 million, with a banks being explored.) foreign exchange component of $330 million. Ministry of 75.0 Population/Health II - Expansion of Identification mission· recently Public Health (Bank) the Government's population, health returned. Government exploring and nutrition activities through the financing requirements for pos- construction of rural health facili- sible project in later years ties, provision of equipment, materials of current 5-year plan. (Co- and supplies and training of staff. financing likely.) (PETROLEUM To be Energy II - Retrofitting of industries Project preparation underway. AUTHORITY deter- and institution-building measures OF THAILAND mined to encourage energy conservation or (PTT)) (Bank) subs ti tut ion of fuels •. (ELECTRICITY 140,0 (R) Upper Quae Yai Hydroelectric - Appraisal report being GENERATING (Bank) 580 MW hydro station. Total cost prepared. (Export AUTHORITY estimated at $615 million of which credit and private OF THAILAND $275 million in foreign exchange. co-financing peing explored.) (EGAT)) (STATE 115 .O (R) Railways VI - To support SRT's rail Appraisal report being RAILWAY (Bank) service expansion program in the prepared. (Co-financing OF THAILAND FY83-86 period. Total project · with commercial banks and (SRT)) cost estimated at $400 million export credit agencies being with foreign exchange component explored.) of $280 million. (PROVINCIAL 130 .O (R) Power Sector II - To support 2-3 Appraisal mission tentatively \. ELECTRICITY (Bank) year time slice of PEA's investment scheduled for May 1982. (Co- I AUTHORITY (PEA)) program. financing to be explored with Saudi Fund, OPEC Fund, export credits' and private sources.) (BANK FOR 75.0 (R) Agriculture Credit II - Further Appraisal mission tentatively AGRICULTURE (Bank) support to BMC to help strengthen scheduled for January. AND AGRICUL- the cooperative system as a vehicle TURAL COOPERA- for channeling credit and other TIVES (BMC)) services to small farmers. National 16.0 (R) Eastern Seaboard Engineering - Appraisal mission tentatively Economic and (Bank) Study and design of transportation scheduled for March. Social Develop- and other infrastructure projects ment Board required to support industrial and . (NESDB) town development in Eastern Seaboard region. Ministry of 150.0 (R) Structural Adjustment Loan - To help Negotiations in mid-December. Finance (Bank) the Government implement its structural adjustment policies related to agriculture, industry, energy, fiscal policy and institutional reform. \ Ministry 30.0 (R) Land Titling and Registration - Identification mission in the of (Bank) Acceleration of cadastral surveying field. Interior and issuance of land titles in rural areas, and strengthening of land registration and adminis- tration system. \ VIET NAM I I Ministry of To be Coal Expansion I - Development of a Project processing in Electricity deter- coal mine in Quang Ninh Province. abeyance. and Coal mined Total project costs tentatively I (IDA) e.stimated at $112 million. I See page. 1 'tor footnotes. !. _ _~ - - 38 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency}:_/ Lender'±_/ Procurement !!_j VIET NAM (Cont'd) Viet Nam To be Industrial Rehabilitation Project - Project processing in Bank for deter- Rehabilitation and expansion of abeyance, Industry mined textile, pulp and paper, and food (IDA) processing industries, Total proj- ect cost tentatively estimated at $50 million, Ministry To be Nghe Tinh Agricultural Rehabilitation Project processing in of Water deter- and Development - Repair of flood abeyance, Conservancy mined damage on irrigation and drainage (IDA) works in northern part of Viet Nam heavily damaged by typhoons and floods in 1978, and construction of salinity and flood control works, Total project cost estimated at $128 million. Ministry of To be Transport Rehabilitation - Rehabili- Project processing in Transport deter- tation of port, roads and railways abeyance. mined facilities and inland waterways. (IDA) Ministry To be Agricultural rehabilitation and Project processing in of Water deter- development in provinces with high abeyance, Conservancy mined food production potential, (IDA) See page 1 for footnotes. - 39 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency }j Lender '!:/ Procurement!!._/ IV. SOUTH ASIA BANGLADESH -Ministry of Up to Inland Water Transport III - Project preparation underway. Ports, Ship- 35.0 Components not yet identified. ping and (IDA) Inland Water Transport Telecommuni- About (R) Telecommunications III - Next Negotiations tentatively scheduled cations Board 44.0 phase of Government's develop- for January. (Co-financing, (IDA) ment program. including Germany and Japan, envisaged.) Ministry About Road Maintenance - Strengthening Project preparation underway. of Roads, 40.0 of maintenance organization through Highways (IDA) training, provision of equipment and Road and materials and technical assist- Transport ance, possibly including selective rehabilitation of existing primary roads. Ministry of About Business Management Training - Assis- Appraisal report being prepared. Education and 10.0 tance to Institute of Public Adminis- Ministry of (IDA) tration and Dacca University for Industries strengthening management training and education. Seed About Seeds II, Construction of facili- Project processing suspended Corporation 14.0 ties for seed production, processing, pending resolution of issues still (to be (IDA) distribution, storage, research and outstanding. established) techntcal assistance. Ministry of About Extension and Research II. To Negotiations tentatively scheduled Agriculture 27.0 support extension and research for January. (IDA) on production of rice and wheat. Chittagong About (R) Chittagong Fertilizer - Establish- Awaiting Government's comments Urea Fertilizer, 15.0 ment of an integrated ammonia/urea on credit documents. (ADB is Ltd. (IDA) fertilizer plant at Chittagong with organizing co-financing arrangements a rated capacity of 1,700 metric tons under which seven lenders would of urea per day, using domestic provide a total of about $292 natural gas as feedstock. million for the project.) Chittagong About Ports I - Possibly to include Negotiations tentatively scheduled Port Authority 60.0 construction of multipurpose berths, for March. (CPA) (IDA) dredging, cargo handling, equipment, improved lighting, technical assistance and training. Bangladesh (R) Textile Industry - Balancing, Negotiations completed. Board Textile 30.0 modernization and replacement, presentation scheduled for Manufacturing (IDA) and imported raw materials, February 2. Corporation Bangladesh About (R) Sugar - May include mill rehabili- Appraisal report being prepared. Sugar & Food 17.0 tation, improvement in mill farms Corporation (IDA) and transportation in mill zones, (BSFIC) strengthening extension and research, and a pilot gur improve- ment program. Dacca Water About Dacca WASA III - Extensions to Project being prepared by WASA, and Sewerage 25.0 water supply and sewerage assisted by consultants. Authority (IDA) systems. (WASA) Water Devel- About Drainage and Flood Control II - Credit approved by the Executive opment Board 27 .o Includes several small-scale Directors on October 27. (WDB), (IDA) drainage and flood control subprojects, See page 1 for footnotes. - 40 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency Y Lender II Procurement 4/ BANGLADESH (Cont'd) Planning 100.0 (R) Imports Program X - Provision of Board presentation scheduled Commission (IDA) foreign exchange for procurement for December 15. of raw materials and spare parts required to improve utilization of existing capacity. Power About Power II - Expansion of Ashuganj Appraisal report under prepar- Development 80.0 Plant to provide additional ation. Board (IDA) generating capacity. Water About (R) WDB Sector Credit - Small irrigation/ Preparation mission scheduled Development 28.0 drainage/flood control projects. for January. Board (WDB) (IDA) Water About Barisal Patuakhali - Irrigation, FAO is assisting WDB in Development 60.0 drainage and flood control works project preparation. Board (WDB) (IDA) in Barisal and Patuakhali districts in southwest Bangladesh. Water & About District Town Water Supply - Preappraisal mission scheduled Sewerage 25.0 Water supply .systems for for March. Authorities (IDA) Khulna and Rajshahi. (to be established) Petrobangla About Gas and oil exploration - To be Project preparation report by 40.0 identified. Government underway. (IDA) Ministry.of About (R) Rural Development II - Extension FAO/CP preparation mission Local 30.0 of Integrated Rural Development tentatively scheduled for Government, (IDA) Program (IRDP). January. Rural Development and Cooperatives Rural · About Power III -· Rural Electrification. ·Appraisai report. being· ·prepared. Electrification 40.0 Board (REB) (IDA) Establishment About Public Administration - Expansion Appraisal mission tentatively Division of 30.0 · of the public administration scheduled for January. the Cabinet (IDA) training complex. Secretariat National 19.0 '(R) Agricultural Training II - Includes Project being reviewed by IDA Committee (IDA) (a) facilities and equipment for and may need modification. on Rural agriculture extension training Training institutes and a regional academy and of rural development; (b) experi- Ministry mental facilities to try new modes of of extension in trial areas; Agriculture (c) in-service training for present extension staff; and (d) technical assistance. Ministry About (R) Supplementary Credit - -First Highway Post-appraisal mission in the of Roads, 6.0 Project - Strengthening and remedial field. Railways, (IDA) work on the 17-1/2 miles Feni Bypass Highways constructed under Highway Cr. 408-BD. and Road Transport Water Devel- About (R) Drainage and Flood Control III - Awaiting selection opment Board 20.0 Expected to· include several small- of consultants. (WDB) (IDA) scale drainage and flood control subprojects. Ministry of About (R) Foodgrain Storage III - Emphasizing Appraisal mission scheduled Food 40.0 investment_s to strengthen inland for February. (IDA) storage system for domestic procure- ment. See page 1 for footnotes. - 41 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action o·n Agency Y Lender'!:./ Procurement ':../ BANGLADESH (Cont'd) Fisheries About Fisheries II Project identification Department 20.0 underway. (IDA) Bangladesh About Phosphate Gypsum - To manufacture Study by consultants and Chemical 25.0 'cement clinker and recover sulphur IDA underway. Industries (IDA) dioxide, Gypsum washing facilities, Corporation calcination and storage equipment, cement kiln and ancillary facilities will be included, Ministry of About Rural Roads & Marketing - Project being identified Local Govern- 30.0 Rehabilitation of rural roads, by FAO/CP, ment, Rural (IDA) rural markets and construction Development, and of small-scale storage, Cooperatives Ministry of About (R) Deep Tubewells II - Nationwide Appraisal report being prepared, Agriculture 50.0 follow-up to the successful (IDA) Northwest Region Tubewells Project (Credit 341BD), Ministry of About (R) Agricultural Research II - To Project preparation underway; Agriculture 25.0 support and develop agricultural I \' Ministry of Roads, Highways and (IDA) About 35.0 (IDA) research over a five year period, Secondary Roads - To rehabilitate and/or build about 200 miles of all-weather roads in foodgrain Preparation mission scheduled for January, Road Transport surplus areas, I Planning Commission About 88.0 (R) Imports Program XI - Provision of foreign exchange for procurement Appraisal mission tentatively scheduled for March, (IDA) of raw materials and spare parts required to improve utilization of existing capacity. Bangladesh About (R) Agricultural Credit II - To support Project preparation underway, Bank 50.0 further reform of agricultural credit (IDA) system, including provision of credit to farmers for on-farm investments. Bangladesh About Machine Tool Management Contract, Project preparation underway, Steel and 25.0 balancing equipment, and imported Engineering (IDA) raw materials, Corporation and Bangladesh Machine Tool Factory BURMA Ministry of To be (R) Fuelwood Supply - First phase of Further reporting of this Agriculture deter- ten-year plantation program to project will be discontinued, and Forests mined supply fuelwood and small timber (IDA) for domestic use, particularly for rural areas. Ministry of Up to (R) Fisheries - Investment for fisheries Project issues being discussed Agriculture 22.0 development in the Irrawaddy Delta, with the Government; appraisal and Forests (IDA) which includes a minor fishing harbor, report being prepared, shore facilities, fishing vessels and a net-making ·plant, Ministry of Up to (R) Power I - Power transmission project Appraisal report being prepared. Industry II 80.0 to interconnect the power supply (IDA) system, See page l for footnotes. - 42 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency Y Lender '!:J Procurement!:._/ BURMA (Cont'd) Ministry of To be Arakan Pulp and Paper - To construct Project preparation under way Industry II deter- a pulp and paper mill with a capacity by Government, with assistance mined of 100 tons per day of printing and from consultants financed (IDA) writing paper produced from a mixture by an advance of $150,000 from of bamboo and indigenous hardwoods. the IDA Project Preparation The project also includes associated Facility. infrastructure facilities. Ministry of To be (R) Construction Industry (Formerly, Road Appraisal mission in the Construction deter- Rehabilitation and Road Transport field. mined Project.) - A First Phase to (IDA) strengthen the capacity of road rehabilitation and maintenance by providing equipment, materials, spare parts and technical assistance and training. Ministry To be Tubewells I - To increase agriculture Project being prepared of deter- productivity in the Central Dry Zone, by Government with consultants Agriculture mined through installation of tubewells financed by UNDP and IDA, and (IDA) and provision of agriculture support Forests facilities. Ministry of To be (R) Wood Industries II - To further Preparation mission to be Agriculture deter- improve the supply of wood rescheduled after consultation and Forests mined products to the domestic market, with the Government, (IDA) Ministry of Up to (R) Rubber Rehabilitation II - New Project preparation underway. Agriculture 15.0 plantings and replantings in and Forests (IDA) about 10,000 acres, expand reprocessing facilities, staff training and technical assistance. Ministry of To be Tank Irrigation - Increase crop Appraisal mission in the field, Agriculture deter- production and farm incomes with and Forests mined development of tank irrigation (IDA) schemes in the Magwe Division and Man State, INDIA Indian 285.0 Railway Electrification: Support Appraisal report being prepared. Railways (IDA) of IR's ongoing electrification (IR) program to modernize railway operations and improve efficiency. Government .of 25.0 (R) Kanpur Urban Development - Program Credit approved by the Executive Uttar Pradesh (IDA) of shelter and infrastructure Directors on October 27, Signing investment at Kanpur in Uttar awaiting availability of IDA Pradesh State, funds. Procurement: Retroactive financing of $0,5 million, Government of 220.0 Madhya Pradesh Major Irrigation - Credit approved by the Executive Madhya Pradesh (IDA) Irrigation and command area Directors on September 15, Signing development in major irrigation awaiting availability of IDA funds, systems in Madhya Pradesh State, Government of 100.0 Commercial Forestry - Afforestation Timing of appraisal mission to be Madhya Pradesh (IDA) of unused land and degraded forests decided upon receipt of Government in Madhya Pradesh, of India's decision on project scope. National Thermal 400,0 Power - Development of the second Credit approved by the Executive · P~wer Corpora- (IDA) phase ~f Korba.Thermal Power· Devel- Di rec tors on ·July 7. Signing tion (NTPC) opment in Madhya Pradesh State. awaiting availability of IDA funds, Government 29.0 West Bengal Sociai Forestry Project - Approved by the Executive Directors .of West (IDA) Afforestation of unused land and on October 6. Signing awaiting Bengal degraded forests. availability of IDA funds, Procurement: Retroactive financing of up to $1,0 million, See page 1 for footnotes. - 43 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency}:_/ Lender!:._/ Procurement 4./ INDIA (Cont'd) To be 30.0 Rainfed Agriculture Project - Devel- Project preparation determined (IDA) opment of rainfed agriculture system underway. in selected State(s). To be 30.0 Erosion and Flood Control - Installa- Project preparation underway. determined (IDA) tion of erosion and flood control systems in the selected States. Government 250.0- Madhya Pradesh Pulp and Paper Project preparation underway. of Madhya 300.0 (formerly Forestry Industry) - Pradesh (IDA) Development of forestry industry in Madhya Pradesh State. Government 70.0 Upper Ganga Irrigation - Modernization Project preparation of Uttar (IDA) of irrigation systems in Uttar Pradesh underway. Pradesh State. National 300 .O (R) Power - Development of the second Negotiations completed. Thermal (Bank) phase of the Ramagundam Thermal Power Board presentation scheduled Power Development in Andhra Pradesh State. for December 22. Corporation (NTPC) r Ministry of Shipping and 250.0 (IDA) Nhava Sheva Port - Construction of a new port facility to relieve serious Project preparation underway. Transport/ overcrowding and delays at Bombay Bombay Port Port. Agricultural 350.0 (R) Agricultural Refinance and Develop- Negotiations completed. Board Refinance and (Bank) ment Corporation (ARDC) Credit IV - presentation tentatively Development Financing of portion of ARDC's lend- scheduled for January. Corporation ing program for on-farm investments. Government 76.0 Gujarat Water Supply and Sewerage Appraisal report being prepared. of Gujarat (IDA) Project; Implementation of 13 water supply and 5 sewerage sub-projects, Procurement: Retroactive financing as Weil a~ a low-cost sanitation of up to $2.5 million will be component, for the State of Gujarat. proposed for consultancy services. Oil and 250.0 (R) Oil/Gas Development - Assistance Appraisal report being prepared. Natural Gas (Bank) for development of South Bassein Commission offshore gas field. Procurement: Retroactive financing of up to $10.0 million will be proposed. To be 300.0 Petrochemicals - Production of Timing of appraisal to be decided determined (IDA) petrochemicals based on Bombay High after GOI approval of project details. natural gas and/or production of basic aromatics and selected derivatives. Government 80.0 (R) Kallada Irrigation - Irrigation Appraisal report being revised. of Kerala (IDA) development in South Kerala. Oil and 150.0- (R) Krishna - Godavari: petroleum Appraisal report being prepared, Natural 200.0 exploration assistance. Gas (Bank) Commission (ONGC) Rural 300.0 (R) Third Rural Electrification Negotiations postponed at Electrification (IDA) Corporation - Assistance for Government's request; now Corporation construction and reinforcement tentatively .scheduled for (REC) of rural electricity distribution January. network. See page 1 for footnotes. - 44 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency Y Lender 'l:._/ Procurement!!._/ INDIA (Cont'd) Indian 415.0 Railway Modernization and Maintenance Appraisal mission's findings Railways (IDA) Project II - Construction and equip- being discussed with Government. (IR) ment of component building workshop; import of components and of 20 proto- Procurement: Retroactive type electric locomotives. financing of up to $1.0 million being proposed. Government so;o (R) Tamil Nadu Water Supply and Sanitation Findings of preappraisal mission of Tamil (IDA) Project: Water supply for three being reviewed. Nadu large towns, and 60 middle-sized towns, and law-cost sanitation for 15 small towns. Ministry of 100.0 (R) Fertilizer Distribution Project - Project preparation underway. Agriculture (IDA) Development of an integrated system for the distribution of imported/ domestically-manufactured fertilizers to main distributing (nodal) points. Government of 52 .O (R) Chambal (Madhya Pradesh) Irrigation Negotiations scheduled for Madhya Pradesh (IDA) II - Irrigation and command area December. development in the Chambal River valley in Madhya Pradesh. Government of 50.0 (R) Chambal (Rajasthan) Irrigation II Follow-up appraisal mission Rajasthan (IDA) Project - Irrigation and command scheduled for early 1982. area development in the Chambal River valley in Rajasthan. Government 200.0 (R) Upper Indravati Hydro-Electric Pre-appraisal mission tentatively of Orissa (Bank) Project - Construction of a 600 scheduled for January. MW hydro-electric generating station together with associa.ted dams, channels and tunnels in Orissa State. To· be 200.0 (R) Fifth Power Transmission Project - .Pre-appraisal mission tentatively determined (IDA) Construction of a network of 400 scheduled :for January. KV transmission lines and associ- ated sub-stations in several states, spanning four Regions. Five Public 200 .O (R) Oil Refinery Conversion - Addition Negot.iations · scheduled for mid- Sector Oil (Bank) of fluid catalytic cracker (FCC) December. Companies units, energy efficiency and pollution control measures to Procurement: Retroactive financing refineries in Bombay, Vizag and of up to $20.0 million will be Madras. proposed. Government 100.0 (R) Subernarekha Irrigation (Bihar) - Appraisal mission in the field. of Bihar (IDA) Irrigation and command area development of Subernarekha Project in Bihar. Government 45 .O (R) Subernarekha Irrigation (Orissa) - Appraisal mission in the field. of Orissa (IDA) Irrigation and command area develop- ment of Subernarekha Project in Orissa State. Government of 75.0 UP Tubewells II - Construction of Project preparation underway. Uttar Pradesh (IDA) approximately 5,000 tubewells for irrigation in Uttar Pradesh. Government 6.0 Andhra Pradesh Extension - Appraisal report being prepared. of Andhra (IDA) Improvements to the agricultural Pradesh extension system in the State. Procurement: Retroactive financing of up to $600,000 will be proposed. See page l for footnotes. - 45 - Member Country., and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency !J Lender Y Procurement !!_I INDIA (Cont'd) Government of 40.0 Haldia Water Supply and Sewerage Project preparation underway. West Bengal (IDA) Project - Construction of 225 million liters/day treatment plant, 4 pumping stations and a 90 km long water transmission main to serve the Haldia Development Authority, 2 towns and rural communities en route. Government 50.0 Bihar Water Supply - Provision Project preparation underway. of Bihar (IDA) of piped water supply to about 8 towns and surrounding villages in the State of Bihar. Government of 25 .o Madhya Pradesh Urban Development Project preparation underway. Madhya Pradesh (IDA) Project - Shelter and infrastructure investments in several medium-sized cities in the State of Madhya Pradesh. Government 30.0 Jammu-Kashmir and Haryana Social Appraisal mission in the field. of Jammu-Kashmir (IDA) Forestry Project~ Afforestation and Haryana of wasteland and degraded forests. Government of 50.0 Third Calcutta Urban Development Project preparation underway. ( West Bengal (IDA) Project - Expansion and improvement of urban service systems and institutional capabilities in the Calcutta Metropolitan District. \ To be 200.0 (N) Madhya Pradesh Fertilizer - Project preparation underway. (, deter- mined (Bank) Construction of one ammonia unit of 1,350 tons per day and two urea units· of 1,100 tons per day each. Estimated project cost $600 million. MALDIVES Ministry of 6.0 Second fisheries - Local storage Project components being Fisheries (IDA) and collection facilities for land- identified. based fish export operations; technical assistance for fish survey, and testing of new technology. NEPAL Department of Up to (R) Cottage Industries - Promotion of Approved by the Executive Cottage and 6.5 cottage and small-scale industries. Directors on November 24. (Co- Village (IDA) financing arrangements with UNDP Industries to be completed.) Ministry of Up to (R) Marsyangdi Hydroelectric - Hydro- Project preparation under- ·Water Resources 75.0 electric power station in Central way. (Co-financing with (IDA) Nepal with about 50 MW capacity, Federal Republic of Germany and transmission to central grid. being arranged. Additional co-financing required; other sources, including Japan, being approached.) Ministry of 14 .3 (R) Education II - Expansion of programs Board presentation scheduled Education (IDA) for technical education in engineer- for December 22. ing and agriculture. Ministry To be Cash Crops - Sector line of credit Project preparation of Food deter- to develop sugar, tea, etc., underway. and mined with funds to be channelled through Agriculture (IDA) Agricultural Development Bank in Nepal (ADBN), which.would appraise the subprojects. See.page 1 for footnotes. - 46 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency y, Lender 3._/ Procurement !!._/ ~ (Cont'd) Minl.stry of Up to Transport III - Completion of the Project being prepared Works and 35.0 East/West Highway (tentative); by consultants financed Transport (IDA) road maintenance; and assistance by UNDP, to construction industry, Nepal Up to Telecommunications IV - Follow-up Project components being Telecom- 35.0 for expansion of local and inter- identified, munications (IDA) national services, Corporation PAKISTAN Karachi 50.0 (R) Expansion of Bulk Water Supply Aprraisal deferred; now Development (IDA) System and.improvement of sewer- scheduled for early 1982, Authority age system in Karachi, Ministry of 45.0 (R) Irrigation Systems Rehabilitation - Appraisal report being prepared, Water and (IDA) Program to improve institutional Power and financial capability of provincial irrigation departments. Telegraph and· 40.0 (R) Telecommunications IV - To support Negotiations scheduled for mid- Telephone (IDA) Telegraph and Telephone Development December, Department Investment Program for period 1981-1984, Water and Power 35.0 (R) Irrigation/Drainage IV Project - Project under preparation by Development (IDA) Includes reclamation of saline/ Government, Authority alkaline land and improvement of (WAPDA) extension services, Oil & Gas 80,0 (R) Oil and Gas II - Development of Project preparation by Development (IDA) Dhodak field and technical assis- Government underway, Corporation tance, training and studies, An IDA Project Preparation Facility advance of $210,000 was approved to help prepare a field development study,· Lahore · 22.0 Lahore Urban Development Project - Appraisal· report being Development (IDA) Including upgrading of low-income prepared, Authority areas, sites and services, solid waste disposal, and improvements to urban transportation system, Industrial 30.0 (R) Industrial Development Bank of Approved by the Executive Development (IDA) Pakistan - Second project for Directors on November 3, Bank of onlending to industry. Pakistan (IDBP) Pakistan 50.0 (R) Railways XI - For modernizing and Appraisal report being prepared, Railway (IDA) increasing efficiency of railways. Board Sui 60.0 Expansion of capacity of SNGPL's Timing .of appraisal mission Northern (IDA) gas transmission system and asso- dependent upon results of gas Gas ciated facilities. study, being undertaken by Pipelines consultants. Ltd, (SNGPL) Government 31.0 (R) Fertilizer Industry IV (Rehabili- Appraisal report being prepared, of (IDA) tation) - Financial and technical Pakistan assistance to increase production capac.ity and _storage facilities·, Government Up to Baluchistan Agriculture Development - Appraisal report being prepared, of 20.0 including perennial and flood irri- Pakistan (IDA) gation schemes, groundwater recharge and improvement of range and live- stock production. See page l for footnotes, - 47 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency}:_/ Lender'±._/ Procurement'!._/ PAKISTAN (Cont'd) Government To be (R) Structural Adjustment Loan - Appraisal report being prepared, of Pakistan deter- To support economic adjustment mined program of Government by providing foreign exchange for import of raw materials and intermediate goods, Government Up to Population - To assist the The Bank and the Government of Pakistan 30.0 Government of Pakistan in imple- of Pakistan have agreed on an (IDA) menting its population program, advance of $290,000 from the Priority will be given to IDA Project Preparation Facility intensifying services and for the completion of project information·, education and preparation work, for the communications,· training of key.personnel and preparation of an operational plan for the project areas. SRI LANKA I Ministry Up to Second Tree Crops Rehabilitation Appraisal report being of State 35.0 (Tea) - .Project is expected to prepared. Plantatlon (IDA) comprise rehabilitatfon of .tea Corporation estates and factories over about Procurement: Retroactive 17,000 ha, including infilling financing of about $1,2 and replanting, timber planting, million recommended, labor housing, improved labor, water supply and health services, and factory rehabilitation, The project will also have a diversi- ficatio~ component, Ministry Up to Forestry - Support to Government Project preparation report of Lands 15.0 Scheme to establish 75,000 acres of finalized, and Land (IDA) industrial and fuelwood plantations De'1elopment over five years; strengthening forestry sector institutions and formulation of a forestry·master plan, Ministry 36.0 (R) Mahaw'eli Power· Transmission - To.·· Negotiations·subsbantially com- of Power (IDA) transmit power generated from proposed pleted, (Co-financing with and Energy hydroelectric stations in Mahaweli OPEC Fund of $11,0 million being Program, Project components include arranged,) 220 kv transmission line, associated switching and grid substation facilities, and technical assistance. National 30.0 Small and Medium Industries II - Credit approved by the Executive Development (IDA) Replenishment of fund established Directors on.October 13. Bank in first project for onlending to private sector small and medium industries. National Up to (R) Industrial Investment Credit - A Appraisal mission in the field, Development 20.0 credit line to NDB and DFCC for Bank (NDB)/ (IDA) onlending to private and public Development sector projects.• Finance Co,::porations (DFCC) Ministry of To be (R) Diesel Power Generation - About Designs and specifications Power and deter- 80 MW total capacity; 10 MW. under discussion with the Energy; Ceylon mined. generating capacity for 8 Government, (Co~financing Electricity · (IDA) generating units, to be arranged; Japan Board approached.~ · See page 1 for footnot'es, - 48 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency Y Lender 2/ Procurement'!__/ ---- V, EUROPE, MIDDLE EAST AND NORTH AFRICA AFGHANISTAN Progress reports on the Afghanistan program are being discontinued until circumstances permit renewed project preparation, ALGERIA Ministry of 100.0 Telecommunications - Project would Project processing suspended, pending Posts and (Bank) consist of elements included in the resolution of issues still outstanding, Telecommuni- first three years of the telecommuni- cations cations investment plan, To be To be (R) Urban Development - Project would Goverrun~nt no longer envisages need determined deter- consist of slum upgrading, sites a'nd for Bank financing, and has mined services and technical assistance requested, instead, Bank .technical (Bank) to local construction industry in assistance in project preparation Annaba, and execution, Reporting on this project will be '·discoritinued. Ministry cif To be First phase of general agriculture Appraisal report being· prepared. Agriculture deter- development in the region of Sidi Bel Government response on key issues and Agrarian mined Abbes of about 73,000 ha. including ·awaited as a prerequisite for Revo1ution (Bank) supply of machinery and equipment, further project proc_essing. land consolidation, training, strengthening of research and extension facilities. Ministries _of 29 .O (R) Education VI - Would include a vete- Further processing would hinge Education, (Bank) rinary college and technical on progress in procurement Higher Edu- assistance, arrangements. cation, Heavy Industry and Forests State Secre- To be (R) Fi'sheries I· - Small and medium-size .Further proces'sing. to b.e tariat for . deter-. boats for private fishermen . and determined.,. ,following Government· s Fisheries mined public .fishing company, maintenance decision on project scope, (Bank) and supply of fishing equipment, Improvements of fishing port facilities, Ministry of To be Water Supply· in' greater Algiers - Appra'i'sal report being prepared,. Hydraulics deter- Expected to include works needed mined to help alleviate the critical Procurement: Project involves (Bank) water sho'rtage in that area, and advance contracting, with award water supply/sewerage studies in of a single contract for major small and intermediate cities. civil works, and the possibility ·of retroactive financing of a small portion. ·To be To be (R) Rural roads development, including Goverrunent no longer envisages deter- deter- a maintenance and improvement need for Bank financing, and mined mined program, in selected regions, 'has requested, instead, Bank (Bank) technical assistance in project preparation and execution, Reporting. on this project will be discontinued, SONELGAZ To be Power III - Pr'oject would Preparation underway by deter- include rural electrification, Goverrunent, mined (Bank) CYPRUS. Republic 12.0 Third Highway Project - Project Appraisal report being of Cyprus (Bank) would include road construc·tion, prepared. (Co-financing maintenance and upgrading of is being sought.) rural and secondary roads, and related technical assistance, See page 1 for footnotes. - 49 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency}:_/ Lender 'l:_/ Procurement!:._/ CYPRUS (Cont'd) To be To be Southern Conveyor Water Resources Project preparation underway determined deter- Development Project. by Government with assistance mined of consultants. (Bank) To be To be (R) Project for energy conservation and Project preparation underway determined deter- renewable energy production on a by Government. mined pilot basis. (Bank) EGYPT, ARAB REPUBLIC OF National 56.6 (R) Beheira Provincial Water Supply Credit signed on November 25. Organization (IDA) Project. for Potable Water and Sanitary Drainage/ Beheira Water Company I I Egyptian Public To be deter- Fifth Drainage Project - Continued support for Egypt's field drainage Project to be prepared by EPAD and Ministry Authority mined and bilharzia control program. of Health. for Drainage (Bank) Projects (EPAD) and Ministry of Health To be To be (R) Rural Development Project - Support At the.request of the Government, determined deter- for developing rural services and this project has been withdrawn. -mined infrastructure to promote agriculture Further reporting will be (Bank) development in the Governorate of discontinued. Minya. Arab Republic 64.0 Third Telecommunications - Rehabilita- Loan approved by the Executive of Egypt Tele- (Bank) tion and expansion of the local tele- Directo_rs on July 21. communications phone systems and the long ·distance Organization network in the smaller towns in (ARE TO) lower Egypt and all the towns of Upper Egypt, as well as selected rural areas. To be To be (R) El-Dikheila Port Project - Construction Appraisal report being prepared. determined deter- of additional port capacity. mined (Bank) Arab Republic About Second Urban Development - Project Invitation to negotiate issued. of Egypt, 49.0 would consist of urban transport IDA Project Preparation Facility Governor ates (Bank) improvements, pilot area upgrading, advance of up_ to $1 million approve of Cairo and and solid waste management schemes to prepare designs of.selected Giza for greater Cairo. project items. Procurement: Retroactive financing of up to $400,000 to be recommended. To be To be (R) El Dikheila Steel - Direct Basic agreements, including determined deter- Reduction/Electric Furnace Plant details of joint venture agreement mined to produce rebars and light and financing plan, signed by (Bank) sections. Egyptian authorities and Japanese consortium of three steel mills. Appraisal mission scheduled for early 1982. Procurement: Prequalification of civil works contractors underway. See page 1 for footnotes. - 50 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and AC'tion on Agency y Lender 3J P_E"o~e~':_/ EGYPT, ARAB REPUBLIC OF (Cont'd) Egyptian About (R) Abu Qir off-shore natural gas Appraisal report being prepared. General 90.0 development ancl. delineation Petroleum (Bank) project. Procurement: Contract for off- Corporation shore production platform awarded (EGPC) in November 1981 (value approximately $8 million). Utility platform and other long-lead items estimated to cost up to $17 million will also be procured through advance contracting. Retroactive financing of up to $2.5 million to be recommended. Ministry To be Population III - Continued support Project to be prepared of deter- for Egypt's health and population by Ministry of Health. Health mined programs. (Bank) Development 120 .0 (R) Fifth Development Industrial Bank/ Board presentation scheduled Indu~trial (Bank) Small and Medium-Scale Industries for December 22. Bank of Project - Project will be designed. to Egypt meet priority areas in Egypt's industrial strategy, through the Development Industrial Bank of Egypt, I as well as provide continued technical and .financial assistance to the small-and medium-scale industrial sector. \ To be deter- To be deter- Agricultural Credit - Provide long- term credit for agro-industries Project being developed by the Government. mined mined development. (Bank) To be About (R) Irrigation Modernization - Improve Appraisal report being prepared. deter-· 40.0 water control in existing major mined (Bank) irrigation systems. · JORDAN Ministry of To be (R) Development of rainfed agriculture. Project composition being Agriculture deter- reviewed by Bank and Government. mined (Bank) Jordan Valley To be Construction of a multi-purpose dam Further project processing Authority deter- on the Yarmouk River at Maqarin and suspended at Government's mined improvement of irrigation facilities request, pending progress on (Bank) in Jordan Valley. international riparian issues. Water Supply To be Expansion and rehabilitation of Preparation underway by Corporation deter- water, sewerage, and sanita- Government. (Co-financing (WSC) mined tion systems in Zarqa and Ruseifa. likely to be required.) (Bank) Ministries 25 .O (R) Education IV - Expansion of technical Board presentation on December of Education (Bank) and vocational education centers, 15. and Health; community colleges and comprehensive Vocational secondary schools. Training Institute (ARAB To be (R) Dead Sea Chemicals - Production of Preparation mission in the POTASH deter- magnesium oxide arid magnesium oxide field. I COMPANY) mined (Bank) products as by-products of the potash refinery currently under r construction. - l See page l for footnotes. I I - 51 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency);/ Lender'!:_/ Procurement!:_/ JORDAN (Cont'd) Jordan 25,0 Power V - Stage I of the Aqaba Appraisal report being prepared. Electricity (Bank) steam power plant (2 x 130 mw) (Co-financing being arranged.) Authority and 400 KV transmission line (JEA) Aqaba-Amman, Procurement: $500,000 retro- active financing after January l, 1982 for consultant services. To be To be Upgrading selected low-income Preparation underway by deter- deter- areas and development of new Government and consultants. mined mined housing areas in secondary cities. (Bank) To be To be (N) Construction, extension and Preparation underway by deter- deter- equipping ·of vocational and Government. mined mined technical training institutions, (Bank) MOROCCO To be To be (R) Fisheries - Development of fishing Preparatory studies underway. determined deter- fleet and related port infrastructure, mined support services to fishing industry, (Bank) and marketing facilities, Ministry of 49.0 Education V - Strengthening secondary Appraisal report being Education (Bank) teacher training, rural primary prepared, education, and research coordination. To be To be Sewerage - priority treatment Preparation u.nderway by determined deter- facilities; submarine outfalls; Government and consultants. mined extension of sewer network for (Bank) Casablanca-Mohammedia region. Ministry of 40.0 (R) Agricultural Development in Negotiations in early December, Agriculture (Bank) the Middle Atlas, including and Agrarian development of 40,000 ha of Reform pasture land for livestock, forestry development, extension services, small-scale irrigation and related infrastructure. Ministry of To be Family Health Program including Preparation underway Public Health deter- basic health services, training, by Government. mined health education, environmental (Bank) sanitation, and technical assis- tance to Ministry of Public Health, Government 100.0 Structural Adjustment Loan - Financing Negotiations in progress. of Morocco (Bank) of selected agricultural and industrial imports, equipment and spare parts in support of Government's short and medium term program to enhance finan- cial stability, and to maintain credit- worthiness and adequate levels of investment and growth; technical assistance for needed policy and institutional reforms, Fonds 20.0 Municipal and Village Loan Fund - Preparation underway d'Equipement (Bank) Support for FEC's program to assist by Government, Bank and FEC, Communal (FEC) local authorities to identify, prepare, and finance communal infrastructure and production projects, Ministry of To be (R) Agricultural development on about Pre-appraisal mission in the Agriculture deter- 250,000 ha. in the Khemisset province, field. mined including: crop, forage and live- (Bank) stock development on rainfed lands; rehabilitation and extension of small-scale irrigation; and soil conservation measures. See page 1 for footnotes. - 52 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency]:__/ Lender 3__/ Procurement 4/ MOROCCO (Cont'd) CADETAF 9.0 Small-Scale Mining: Preparation Date of negotiations to (Bank) and pilot phase testing of technical be determined. assistance and equipment programs to increase and upgrade ores mined by small-scale and artisanal miners. National 20.0 Construction and equipment, and Negotiations in progress. Petroleum (Bank) experimental operation, of a pilot Research and unit to extract oil from shale Exploration deposits and studies to determine Procurement: Retroactive Office (ONAREP) the economic feasibility of commercial financing of $2.0 million oil shale extraction; to compare expected to be proposed to several extraction technologies cover expenditures related and to compare oil extraction and to project preparation. direct combustion of shale. To be 27.0 Establishment of 23,000 ha. of Appraisal report being prepared. determined (Bank) forest plantations for timber, fuelwood and tannin; construction of 170 km. of forest roads; strengthening forest management. To be 60.0 Construction of Debar el Oued Pre-appraisal mission tentatively deter- (Bank) multi-purpose dam and power scheduled for February. mined plant. Ministry of 80.0 Highway IV - Rehabilitation of Preparation underway by Transport (Bank) primary and secondary roads, Government and consultants. construction and improvement of rural roads, completion of Casablanca-Rabat Expressway, and maintenance equipment. Government To be (R) Telecommunication project - Sector/identification mission of Morocco deter- Components to be identified. in the field. mined (Bank) Government To be (R) Third Urban Development - Preparation by Government of Morocco deter- Includes slum upgrading in underway. mined Settat, Khouribga and Sale (Bank) and low cost housing to be financed by Credit Immobilier et Hotelier (CIH). Government To be (R) Electro-mechanical Industries Reconnaissance mission in the of Morocco deter- Project - To provide sectoral field. mined support; project scope to be (Bank) defined. To be To be Development of small and medium Preparation mission tentatively deter- deter- irrigation perimeters. scheduled for January. mined mined (Bank) Office To be (R) Establishment of about 10 Preparation underway by Govern- Cherifien deter- fertilizer blending and dis- ment. des Phosphates mined tribution centers. (OCP) (Bank) ONAREP To be (R) Petroleum Engineering - Follow-up Preparation mission in mid- deter- to ongoing exploration project to December, mined support_continuation of drilling (Bank) in Essaouira and preparation of market and engineering studies. Ministry of To be (N) Beni Amir Irrigation - Rehabili- FAO/CP preparation mission Agriculture deter- tation of 13,000 ha and construction scheduled for January. mined of new system on 5,400 ha. (Bank) See page- 1 for footnotes. \ I II ----------------------~ - 53 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency!_/ Lender '!:_/ Procurement f:_I OMAN Ministry of 15 .O (R) Highways Maintenance II - Components Negotiations substantially com- Communications (Bank) may include equipment, rehabilita- pleted, Board presentation tion, maintenance, and technical schedule~_for January 12, assistance and training, PORTUGAL Ministry of To be (R) Railways I - Technical assistance Preparation underway, Housing, Public deter- for rehabilitation of National Works and mined Railways. Transportation (Bank) To be To.be Industrial Restructuring - Textiles - Preparation underway. (Co- determined deter- Project components to be identified, financing likely to be required,) mined (Bank) Republic About (R) Rural Development in the Tras-os- Negotiations expected in February, of 50.0 Montes area, Portugal (Bank) To be To be Porto Region Water Supply and Sewer- Preparation underway, determined deter- age - Improvement of water supply and (Co-financing likely to be mined sewerage systems in Porto Region, required,) (Bank) Minho and Tras-os-Montes, To be To be Fisheries development project, Fish stock assessment survey determined deter- Components to be defined, underway (financed under mined Loan 1603). Government (Bank) preparing fisheries master plan. Siderurgia About (R) Expansion of capacity of Seixal Negotiations scheduled for Nacional 50.0 steel plant, January. (Co-financing (SN) (Bank) will be required.) To be To. be Agro-industry - Credit for expanded Preparation underway. deter- deter- production and processing of fruits, {Co-financing likely to be mined mined vegetables, wine, and dairy products, required.) (Bank) To be About Industrial Energy Efficiency - Retro- Appraisal report being prepared, deter- 25.0 fitting of equipment to minimize (Co-financing likely to be mined (Bank) energy use. required,) Electricidade To be (R) Power VII - Investment Program for Appraisal report being prepared, de Portugal deter- 1982-84 to meet growth in electricity (Co-financing will be (EdP) mined demand and to maintain reliability required,) (Bank) of the power system, ROMANIA (INVESTMENT To be (R) Industry XII (Galati Steel) - Project undergoing further BANK) deter- C.onstruction at Galati steel enter- preparation, Appraisal rescheduled mined prise of a cold reduction mill and for April, (Bank) tinning line, (INVESTMENT To be Industry (Pigments) - Construc- Feasibility study underway. BANK) deter- tion at Giurgiu of a plant to mined produce pigments for the paint (Bank) industry. (INVESTMENT To be (R) Industry X (Polyurethanes) - Plant Appraisal report being prepared, BANK) deter- to produce about 50,000 tpy of mined polyurethane systems, (Bank) (INVESTMENT To be Industry XI (Energy Saving Project Feasibility study underway. BANK) deter- and Process Improvement in Steel {Co-financing likely to be mined Sub-sector) - Project components sought,) (Bank) to be determined, See page 1 for footnotes. - 54 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency y Lender'!:../ Procurement !:J ROMANIA (Cont'd) (AGRICULTURAL 95.0 (R) Agricultural Credit (Moldova) - Agri- Board presentation tentatively BANK) (Bank) cultural credits for Moldova Region scheduled for January 5. (Co- through Bank for Agriculture and financing likely to be sought.) Food Industry. (AGRICULTURAL To be Agricultural Credit (Transylvania) - Appraisal report being prepared. BANK) deter- Regional development project, (Co-financing likely to be mined including financing of agricultural sought.) (Bank) and agro-industrial investment in Transylvania Region. (AGRICULTURAL To be Agricultural Credit (Oltania) - PreJect preparation underway. BANK) deter- A line of credit through BAFI (Co-financing likely to be mined for agricultural development in sought.) (Bank) the Oltania Region. (AGRICULTURAL To be Irrigation IX - Drainage, land Preliminary subsector review/ BANK) deter- reclamation and other related identification mission took mined works on a sectorwide basis place in October. A follow-up (Bank) within the context of the Five- mission scheduled for December. Year Plan. (Co-financing likely to be sought.) (INVESTMENT To be (R) Petroleum I - Enhanced oil recovery in Negotiations tentatively sche- BANK) deter- existing fields (Videle and Balaria). duled for March.· (Co-financing mined likely to be sought.) (Bank) (INVESTMENT To be Industry XIII (Pharmaceuticals) - Feasibility study BANK) deter- Investment in 4 to 5 plants for underway. mined the manufacture of pharmaceutical (Bank) products and packaging materials. (INVESTMENT To be Power V - Unidentified, but likely Preliminary studies underway. BANK) deter- to cover time slice investment for (Co-financing likely to be mined second half of 1981-85 Plan. sought.) (Bank) (INVESTMENT To be (R) South Constanta - Agigea Port - A Appraisal mission tentatively BANK) deter- deep sea port and inner barge basin scheduled for January/February. mined and other related structures (Co-financing likely to (Bank) and equipment. be sought.) SYRIAN ARAB REPUBLIC To be 40.0 Sewerage I - Sewerage facilities Awaiting Government decision determined (Bank) for Hama and Homs, apd institution- on institutional arrangements. building in sub-sector. (Co-financing arranged with Arab Fund.) Syrian 28 .O (R) Telecommunications II - Expansion Feasibility study underway. Telecommu- (Bank) of telecommunication services in nications selected urban and rural areas. Establish- ment (STE) To be To be Priority roads in NE Syria, main~ Feasibility study underway. determined deter- tenance operations and training. mined (Bank) Ministry of 15.6 Education II - Expansion of Approved by the Executive Education (Bank) technical/vocational training. Directors on April 23. To be 32.0 Development of rainfed areas, Appraisal report being determined (Bank) fruit tree planting· and farm prepared. (Co-financing being mechanization in Southern region. arranged with IFAD and KfW.) To be To be Sewerage II - Secondary treatment Project under preparation deter- deter- works, main interceptors and second- by Government. (Co-financing mined mined ary collection system for Damascus being sought.) (Bank) sewerage facilities. .See page l for footnotes. - 55 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency Y Lender'!:._/ Procurement'!_/ SYRIAN ARAB REPUBLIC (Cont'd) To be To be Education III - Extension of Preparation by Government deter- deter- vo.cational education and underway, mined mined training. (Bank) TUNISIA Banque de 30.0 Financial and technical assistance Appraisal report being prepared, Developpement (Bank) support to electrical and mechanical Economique de industries subsector; financial Tunisie (BDET) support to BDET's general operations. Ministry of To be Construction of rural roads, and Appraisal report being prepared, Equipment/ deter- associated agricultural investments, Ministry of mined Agriculture (Bank) To be To be Urban Development III - Financial Pre-appraisal mission scheduled deter- deter- and technical assistance for the for December, mined mined rehabilitation of low-income (Bank) housing areas in several Tunisian towns. Ministries of To be Education V - Establishment and Project being prepared Education and deter- extension of vocational and apprentice by Government, Agriculture mined training centers and agriculture (Bank) Teacher Training Institute. Ministry of 25,0 (R) Irrigation and agriculture Appraisal report being prepared, Agriculture (Bank) development in the Medjerda and Nebhana areas. Societe 30,0 (R) Water supply project focusing on Appraisal report under prepara- Nationale (Bank) rural areas and covering portion tion, d'Exploitation of SONEDE's 1982-86 development et de program. Procurement: Retroactive Distribution financing of up to $2 million des eaux recommended to finance project (SONEDE) works from January 1982. Office To be Rehabilitation and expansion Project being prepared National de deter- of sewerage systems in about by ONAS and Consultants, l'Assainissement mined 30 towns. (ONAS) (Bank) Societe de To be Rehabilitation and expansion Project under preparation by Fonderie et deter- of foundry. SOFOMECA and Government, de Mecanique mined (SOFOMECA) (Bank) To be To be Irrigation Network at the Lower Project under preparation by deter- deter- Medjerda River using treated Government and FAO/CP, mined mined sewerage, and water from Sidi (Bank) Salem Dam. To be To be Miskar Gas Development - Project being prepared by deter- deter- ·Development of the off-shore Government and SEGMA, a mined mined gas field of Miskar (Gulf of joint-venture company estab- (Bank) Gabes). lished for this purpose. Ministry of To be Rehabilitation of groundwater Pre·paration underway by Agriculture deter- irrigation perimeters in Central Government and FAO/CP, mined Tunisia, and a pilot scheme for (Bank) combined irrigated development and rainfed agriculture in one of the perimeters. See page 1 for footnotes, - 56 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency}) Lender'!:._/ Procurement':__/ TURKEY To be To be (R) Phase I of sewerage system for inner Second stage appraisal mission determined deter- city population of Istanbul, including in the field, Bank Project mined sewer networks and marine disposal; Preparation Facility advance (Bank) land use and sewerage study of of $500,000 helped finance Golden Horn area; and training, foreign exchange costs of consultant services for project preparation, Republic of 40,0 (R) Rural Development in Erzurum Negotiations planned for early Turkey (Bank) province, January. (Joint financing under consideration by !FAD.) Procurement: Advance contracting and retroactive financing of up to $4 million for downpayments on construction equipment to be recommended, Agricultural To be Agricultural Credit II, To be identified and prepared Bank of deter- during supervision of on-going Turkey (TCZB) mined projects. (Bank) To be To be Production, processing and Government exploring possibility determined deter- marketing of improved seeds, of private sector involvement in mined proposed project, IFC may be (Bank) involved, State Pulp To be Paper Rehabilitation - Expansion Preparation by SEKA and con- and Paper deter- and modernization of existing sultants underway. Bank Project Enterprise mined facilities, Preparation Facility advance of (SEKA) and (Bank) $500,000 provided to finance con- Selected sultants' services for completing Private details for rationalizing, and Sector Paper energy saving at existing mills, Companies To be To be (R) Livestock Products Development - Project preparation underway determined deter- Modernization of extraction and by Government with Bank mined processing of livestock products assistance, (Bank) from slaughtering stage onwards, for both export and domestic markets; and rationalization and expansion of milk and milk prod- ucts industry. Republic 100.0 (R) Export-Oriented Industries I, Loans Negotiations in early December, of Turkey (Bank) to private sector for investment and (Commercial Bank co-financing to imported raw materials, technical be sought for funds to provide assistance and training, short-term credit to exporters for imported raw materials,) Republic of To be Cement-Rehabilitation/modernization Project being prepared by public Turkey deter- of public and private sector sector cement company (CISAN) mined plants, and improvement of port and by consultants, (Bank) facilities for cement export. Republic To be (R) Structural Adjustment Loan III - Timing dependent upon progress of Turkey deter- To support structural adjustment under Structural Adjustment mined in key areas, Loan II, Tranche review (Bank) underway, Appraisal mission scheduled for February, Selected Public 60.0 (R) Fertilizer Rehabilitation II - Negotiations planned for mid- and Private (Bank) Rehabilitation and modernization January, (Co-financing being Sector of selected facilities. sought,) Fertilizer Companies Procurement: Advance contracting and retroactive financing of about $3 million for downpayments 'i for critically needed equipment to be recommended, I See page l for footnotes, - 57 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency):./ Lender 3_/ Procurement'!_/ TURKEY (Cont'd) To be To be Completion of on-going Project being prepared by deter- deter- irrigation and on-farm works; Government and Bank, with mined mined strengthening of extension FAO/CP assistance, (Bank) services. General 70.0 (R) Highway Rehabilitation - Rehabili- Appraisal report being prepared. Directorate (Bank) tation and strengthening of (Co-financing is being of Highway priority highway sections and considered by Kuwait Fund.) improvements in highway rehabili- tation program. Republic To be Development of selected Project Preparation Facility of Turkey; deter- lignite field(s) to expand advance of $950,000 approved TKI mined production; confirmation of to help finance foreign (new (Bank) lignite local deposits and exchange costs of preparation company) related technical assistance. work, Republic of To be (N) Structural Adjustment Loan IV - Timing dependent upon progress Turkey deter- To support structural adjust- under earlier str~ctural mined ment in key areas. adjustment loans. (Bank) YEMEN ARAB REPUBLIC National About (R) Industry - Support for construction Preparation report underway. Company for 5.0 materials industry. (Co-financing likely to be Industrial (IDA) required.) and Con- struction Materials (YEMROC) Ministry of About (R) Education IV - Components include Negotiations in early December, Education 12.0 educational development center (IDA) and faculty of engineering. Ministry of About (R) Urban I - Upgrading of low income Negotiations in early December. Municipalities 15.0 settlements and provision of sites IDA Project Preparation (IDA) and services in Sanaa; construction Facility advance of $480,000 advisory services; housing credit; approved to finance contingency institution building. services. Ministry of About (R) Agricultural research. Appraisal report being prepared. Agriculture 13.0 IDA Project Preparation.Facility (IDA) advance of $250,000 approved to finance consultants' services for project preparation. (Co-financing is required; Italy's Department of Development Corporation has expressed interest.) Ministry of To be Wadi Jawf - Agricultural development. Preparation underway. (Co- Agriculture deter- financing likely to be required: mined Islamic Bank has expressed interest,) (IDA) Ministry About (R) Health - Physical extension of Appraisal report being prepared. of Health 12.0 Health Manpower Institute; (IDA) institutional support to Ministry of Health and Health Manpower Institute. Highway About (R) Highways IV - Strengthening of Taiz- Appraisal mission in the field, Authority 14.4 Almafraq Road, construction of 37 km (Co-financing likely to be (IDA) of high-priority secondary roads, required.) and engineering studies. See page 1 for footnotes. - 58 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency ij Lender'!:_/ Procurement 4/ YEMEN ARAB REPUBLIC (Cont'd) Yemen Oil About (R) Engineering Credit for selected phases Appraisal report being prepared. and Mineral 1.6 of Oil and Gas Exploration; feasi- IDA Project Preparation Facility Resources (IDA) bility studies for petroleum pipeline; advance of $850,000 approved Corporation and technical assistance to YOMINCO. to finance feasibility studies (YOMINCO) for petroleum pipeline and services of consultant geologist. Confederation To be Rural Development Support - Preparation underway. of Yemeni deter- Assistance to development by means Development mined of increasing the operating effective- Associations (IDA) ness of the Local Development Associations (LDAs). Ministry of About Agricultural Credit. FAO/CP preparation report Agriculture 10.0 being prepared. (IDA) Yemen General About Power III - Regional Electrification Preparation underway. (Co- Electricity 12.0 Phase II. financing likely to be required;) Corporation (IDA) I (YGEC) YEMEN, PEOPLE'S I I DEMOCRATIC REPUBLIC OF Public To be (R) Power II - Electrification of the Appraisal report being prepared. Corporation deter- villages east of Mukalla and technical (Co-financing likely to be ) ; for Electric mined assistance. required.) IDA Project Prepara- I Power (PCEP) (IDA) tion Facility advance of $300,000 r· has been approved to finance consultants' services for the preparation of a feasibility study, and for the preparation of bid documents and the evaluation of bids received. Ministry of To be Wadi Hadramout II - follow-up Preparation report being prepared Agriculture deter- project to Wadi Hadramout I to by consultants. Appraisal mission mined increase crop production through scheduled for March. (Co-financing (IDA) groundwater development and likely to be required.) irrigation improvement. An IDA Project Preparation Facility advance of $500,000 has been approved to finance consultants' services for the preparation of detailed designs; hydro-geological studies and topographical maps. Ministry To be Fisheries III - Provision of fisheries Appraisal report being prepared. of Fish deter- training institute at Aden, and (Co-financing likely to be Wealth mined village fisheries development in required.) (IDA) five selected villages. Ministry of To be Education III - Industrial, commer- Negotiations scheduled for late- Education deter- cial, agricultural and teacher January. (Co-financing mined training institutes and technical likely to be required.) (IDA) assistance·. Public To be (R) Water Supply II - Water supply for Project to be identified by Water deter- Greater Seiyun, and assistance to a mission in January. Corporation mined Public Water Corp. (PWC) on sector (IDA) investment priorities. ) Ministry To be Health and Nutrition I - Components Government preparing project of deter- to be determined. with assistance of consultants I Health mined financed by IDA Project ~ (IDA) Preparation Facility advances of $83,000 and $183,400. See page 1 for footnotes. - 59 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency Y Lender'!:._/ Procurement!:._/ YEMEN, PEOPLE'S DEMOCRATIC REPUBLIC OF (Cont'd) Ministry To be Petroleum II - Onshore exploration Government preparing project. of deter- of Shabwa-Mareb Sedimentary Basin. Industry mined (IDA) Ministry To be (R) Education IV - Components to be Identification mission in the of deter- determined. field. Education mined (IDA) Ministry To be Highways IV - Components to be Identification mission of deter- determined. scheduled for early 1982, Construction mined (IDA) YUGOSLAVIA (JUGEL) About Power Transmission Ill - Appraisal mission in the 80 .o Financing of investments for field. (Substantial co- (Bank) national transmission network financing required.) and control system. Community of About (R) Railway VI - To finance a portion of Investment plans and feasibility Yugoslav 90.0 the 1981-85 Development Plans of the studies being revised. Railways (Bank) Yugoslav Railway Enterprises. Privredna About Industrial Credit VI - Line of Appraisal report being prepared. Banka Sarajevo; 65.0 credit primarily for export- (Co-financing likely to be Stopanska Banka (Bank) oriented and energy saving/ required.) Skopje substituting industries in Bosnia- Herzegovina and Macedonia. Privredna About (R) Bosnia Agriculture - Development of Appraisal report being prepared. Banka 29.0 agriculture and agro-industries Sarajevo (Bank) in Bosnia-Herzegovina. Procurement: Retroactive financing is recommended for procurement of agro-industries equipment through international competitive bidding for which tender notices have been issued. Gracanka 41.0 (R) Kosovo/Pristina Water Supply - To Approved by the Executive Directors Water (Bank) improve water supply and distribution on November 10. Enterprise facilities for Pristina, Obilic, Kosovo Polje and Podujevo. Procurement: Retroactive financing up to $6.2 million. Awards for the supply of pipes and construction of transmission lines have been made. To be To be Serbia Regional Development - Regional Preparation underway by determined deter- development primarily focussing on Government authorities. mined agriculture and agroindustries in (Bank) less-developed areas of Serbia. To be To be Montenegro Regional Development - Preliminary preparation determined deter- Regional development primarily begun by Government mined focussing on agriculture and authorities, with FAO/Bank (Bank) agroindustries in less-developed Cooperative Program Assistance. areas of Montenegro. To be To be Kosovo Regional Development - Preparation underway by determined deter- Regional development primarily government authorities, with mined focussing on agriculture and assistance from FAO Co- (Bank) agroindustries in less-developed operative Program. areas of Kosovo. To be To be (R) Water Supply/Sewerage for towns of Preparation underway by determined deter- Tuzla and Ohrid. Government authorities. mined (Bank) See page 1 for footnotes. - 60 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency Y Lender l:_/ Procurement 4/ YUGOSLAVIA (Cont'd) To be To be (R) Sava Drainage II - Provision of Appraisal report being prepared. determined deter- drainage to about 40,000 ha in mined Lenske Polje (Croatia), and 15,000 (Bank) ha in Semberija (Bosnia Herzegovina), pumping stations, soil amelioration, and construction and farm equipment. To be About Highways XII - Sector loan covering Master Plans being pre- determined 90.0 a three-year tranche (FY83-85) pared by Republican/ (Bank) of the Highway Master Plans of Provincial governments. selected less-developed Regions. Kosovoska About Industrial Credit VII - Line of Appraisal mission scheduled Banka Pristina; 55.0 credit primarily for lab.or intensive for February/March. (Co- Investiciona (Bank) projects in Kosovo and Montenegro, financing likely to be Banka Titograd required.) Privredna To be Bosnia Forestry - Development of Preparation underway by Banka deter- forest roads and plantations, and Government authorities· Sarajevo mined provision of logging equipment. with assistance from FAO/CP. (Bank) (Substantial cofinancing· to be I required.) l. See page 1 for footnotes. ( i I I I --------------------------------------------------- - 61 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency}:_/ Lender 3_/ Procurement~/ VI, LATIN AMERICA ARGENTINA Ministry of 105,0 (R) Ports I - Expansio, and moderniza- Preparation mission in the field, Commerce and (Bank) tion of Bahia Blan a port facilities Maritime for grain exports, Total project cost Affairs estimated at $180 illion of which about $130 millionlin foreign exchange. To be 50 .0 (R) Bajos Submeridiona es - Flood control Project postponed indefinitely. deter- (Bank) and agricultural dlvelopment in Reporting will be discontinued, mined northern provinces Obras Up to (R) Water Supply and S werage - Improve- Project preparation underway, Sanitarias 50,0 ments and extensiorls to water supply de la Nacion (Bank) and sewerage systeirls in the provinces (OSN); Direccion of Mendoza and Sant Fe, including Provincial de technical assistan e for Obras Sanitarias institutional impro(ement. (DIPOS) and ( Obras Sanitarias I de Mendoza (OSM) I (BANCO 100,0 (R) Industrial Credit I - Financing Board presentation on NACIONAL (Bank) structural adjustme tin industry December 1. DE through BANADE, l. DESARROLLO) Procurement: Retroactive .financing (BANADE) of -up to $5 million to be proposed · to finance the foreign exchange cost of equipment, Retroactive financing would be restricted to subloans not I exceeding the equivalent of $500,000. I Ministry 100.0 Highway sector - Im~rovements and Further processing of project delayed of (Bank) construction of sections of the until after Government and Bank review Transport national highway network in FY1982- 1981-82 program of the National and Public 84 investment program, Total Department of Roads. Works program cost estimated at $1,060 million of which $3 0 million in foreign exchange, (YACIMIENTOS 150,0 Oil and Gas Develop ent II Project identification PETROLIFEROS (Bank) in progress, FISCALES (YPF) BAHAMAS Ministry 5.8 (R) Urban Development - Improvement Awaiting final approval from Govern- of (Bank) in low-income area of Nassau ment. Board presentation planned for Finance including upgrading lof infra- January, (Cofinancing with commercial structure and housing; clearing banks envisaged,) of land titles, inve1stment promotion and techni1cal assistance, Procurement: Retroactive Total project cost e1stimated at financing of up to $500,000 to $24.3 million of whi~h $10,6 mil- be propose·d to cover equipment lion in foreign exch nge. and technical assistance, BARBADOS Ministry 12.0 Structural Adjustmen Loan - To Proposal under consideration, of (Bank) support government e anomic program, Finance Ministry 2.5 (R) Technical As~istance - Strengthening President's Report being of (Bank) of institutions deal ng with agri- prepared, Finance culture and energy conservation; project preparation. Total cost estimated at $3,5 million of I which $2,5 million in ·foreign exchange. See page l for footnotes. I I ) - 62 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency};_/ Lender '!:./ Procurement!!_/ BOLIVIA (EMPRESA 35.0 Power V - Central Oriental inter- Appraisal report being reviewed. NACIONAL DE (Bank) connection system, fourth unit for ELECTRICIDAD- Santa Isabel, and study of ENDE's (ENDE)) and DINE's organizational expansion, Procurement: Advance and a national tariff study. Total contracting under ICB project cost estimated at $57.3 satisfactory to Bank for million of which $45 million in about $2.8 million; foreign exchange. retroactive financing of $0.2 million. Ministry of 10.0 Santa Cruz Agricultural Development - Appraisal report being reviewed. Rural and (IDA) Credit, technical assistance and IDA Project Preparation Facility Agricultural social infrastructure for settlement advance of $50,000 approved for Affairs consolidation in Northern Santa Cruz. technical studies. Total project cost estimated at $16.9 million of which $5.7 million in foreign exchange. Ministry of Up to Agricultural Credit II - Credit and Project preparation dependent Rural and 10.0 technical assistance for crop and on measures now being considered Agricultural (Bank) livestock development. for institutional and financial Affairs strengthening of Banco Agricola de Bolivia. (YACIMIENTOS 60.0 Oil and Gas Development - Liquids Negotiations completed. PETROLIFEROS (Bank) condensate extraction and gas re- FISCALES cycling at Vuelta Grande gas Procurement: (a) Project Prepara- BOLIVIANOS) condensate field and secondary oil tion Facility advance of $1 million (YPFB) recovery at Monteagudo oil fields. approved for gas recycling simulation Total project cost estimated at study, detailed design and prepara- $74 million of which $60 million tion of bidding documents; (b) advance in foreign exchange. contracting under ICB satisfactory to Bank for up to $24 million and retroactive financing of up to $6 million for drilling under con- sideration. Ministries 20.0 Fourth Mining Credit - Assistance for Appraisal report being prepared. of Finance (Bank) small and medium mining operations and Mines through local financial intermediaries, and Banco Industrial and Banco Minero. Metallurgy BRAZIL (COMPANHIA Up to (R) Carajas Iron Ore Mining - Mine, Appraisal report being prepared. VALE DO RIO 300.0 rail and port facilities for (Private cofinancing DOGE (CVRO)) (Bank) export of up to 35 million tons expected to be needed.) per year of high grade iron ore. (REDE Up to RFFSA III (Railways) - Expansion and Project preparation underway. FERROVIARIA 200.0 rehabilitation program. FEDERAL, S .A. (Bank) (RFFSA)) (CENTRAIS 180.0 (R) Power Distribution - Credit line for Appraisal mission scheduled ELETRICAS (Bank) power distribution sub-projects - for January. BRAS ILE IRAS sector loan. S.A.) (ELETROBRAS) Territory of 240.0 (R) Northwest Region Development Board presentation on Rondonia and (Bank) Program - Highway construction December 1. Loan signing Federative component. Total project cost scheduled for December 15. Republic of estimated at $687 million of which Brazil $240 million in foreign exchange. Instituto 70.0 (R) Northwest Region Development Preappraisal missi·on scheduled for Nacional de (Bank) Program III - New land settlement. January. Colonizacao e Reforma Agraria (INGRA) See page 1 for footnotes. - 63 - Member Country, and Borrower or Amount & ,Stage of Process- Implementing Probable ing and Action on Agency y Lender '!:./ Procurement ~_/ Federative Up to Northwest Region Development ' Negotiations scheduled for Republic of 26.0 Program II - Rural development December. Brazil (Bank) in state of Mato Grosso. Total project cost estimate_d at $76 .4 million of which $12.2 million in foreign exchange. To be 50.0 Maranhao Rural Development - Develop- Post-appraisal mission scheduled determined (Bank) ment project in ·two adjacent areas for January. (Baixada Maranhense and part of Alto Turi region) to improve agri- culture and social infrastructure, land tenure situation and access to land by landless farmers. Total project cost estimated at $145 million of which $29 million in foreign exchange. State of Up to (R) Health - Development of health Mission, to undertake further \ Sao Paulo 50.0 services in State of Sao ·Paulo. preparation, scheduled for I (Bank) January. To be i5o .o (R) Secbndary and Feeder Roads III - Appraisal mission tentatively determined (Bank) C6nstruction and improvement. scheduled for January. ( To be determined 110.0 (R) (Bank) Integrated Urban Development in Recife Metropolitan Region. Appraisal report being prepared. i To be 30 .0 (R) Amazonas Agricultural Development - Appraisal report being prepared. determined (Bank) Project aimed at improving production of foodcrops in selected areas of flood lands and introducing rational cultivation of highlands. About 5,000 ha. of smallholder oil palm may be developed. The project would assist from 8,000 to 10,000 small farmers. Territory 67.0 (R) Northwest Region Development Program - Board presentation on of Rondonia (Bank) Agricultural development and envir- December l; loan signing and Federative orunental protection. Consolidation screduled for December 15. Republic of and rural development in Territory Brazil of Rondonia, establishment of measures to protect forest reserves and eco- logical stations; ecological research. Total project cost estimated at $200 million of which $42 million in foreign exchange. Territory of 13 .0 (R) Northwest Region Development Pro.gram Board presentation on Rondonia and (Bank) I - Health component. Total project December l; loan signing Federative cost estimated at $37.7 million of scheduled for De,cember 15. Republic of which $6.l million in foreign exchange. Brazil (BANCO 200.0 Water supply and sewerage in the Appraisal mission postponed NACIONAL (Bank) low-income areas of State of Sao pending notification by DE HABITACAO Paulo. Goverrunent of availability (BNH) of counterpart funds. See page l for footnotes. - 64 - Member Country, and Borrower or Amount & Stage of Process- Implementing Probable ing and Action on Agency}) Lender'!:._/ Procurement'!_/ BRAZIL (Cont'd) Secretaria de 50.0 Bahia Rural Development II - Preparation mission scheduled Planejamento da (Bank) Integrated rural development in for January, Presidencia da northeast Bahia to assist small Republica farmers through provision of improved support services, land redistribution and infrastructure development. To be Up to (R) Forestry Development, including Project preparation underway. determined 60.0 reforestation for production of (Bank) charcoal in Minas Gerais. Ministry of Up to (R) Education V - Strengthening of Brazil's Preparation mission scheduled Education so.a secondary agricultural school system for January. and Culture (Bank) through provision of training, equip- ment, furniture, curriculum develop- ment and other technical assistance. (BANCO 250.0 (R) Development Banking II - Implemen- Preparation mission in the NACIONAL DO (Bank) tation of integrated assistance field. DESENVOLVIMENTO programs for small and medium ECONOMICO (BNDE)) enterprises. CHILE Ministry To be (R) Highways Reconstruction 11 - Consultants have been engaged of Public deter- Reconstruction of sections of to prepare studies, Works mined the longitudinal highway. (Bank) COLOMBIA Ferrocarriles 77.0 (R) Railways VII - Track and equipment Board presentation scheduled Nacionales de (Bank) rehabilitation, engineering studies for February, Colombia (CNR) and consultants' services for institutional strengthening. Total project cost estimated at $176.8 mil- lion of which $110.3 million in foreign exchange. Ferrocarriles Up to Railways VIII - Rehabilitation and Project preparation dependent Nacionales 120.0 modernization of railways and tech- on progress of Railways VII. de Colombia (Bank) nical assistance; possibly construc- (CNR) tion of improved alignments. (CARBOCOL- 10.0 Coal Engineering - National survey Project preparation INGEOMINAS) (Bank) of coal deposits and engineering of underway. one or two most promising cases. Also marketing studies and training. (EMPRESA Up to (R) Petroleum Development I - Financing Negotiations postponed to COLOMBIANA 150.0 of secondary recovery, seismic sur- permit Borrower to firm-up DE PETROLEOS (Bank) veys and follow-up discovery invest- investment program and (ECOPETROL)) ments. Total project cost estimated financing plan. (Co- at $341 million of which $205 million financing of about $70 in foreign exchange. million required.) (EMPRESA 359.0 Guavio Power Development - Construction Loan approved by the Executive ENERGIA (Bank) of hydro plant. Total project require- Directors on May 28. ELECTRICA ments estimated at $1,303 million of (Parallel IDB financing of up DE BOGOTA which $928 million in foreign exchange. to $100 million and co-financing (EEEB)) of up to $470 million, including $130 million suppliers credits, envisaged.) (CORPORACION 36.0 Atlantic Distribution Expansion - Loan approved by the Executive ELECTRICA DE (Bank) Village electrification. Total Directors on May 21. LA COSTA project cost estimated at $68.7 ATLANTICA million of which $36 million in (CORELCA)) foreign exchange, See page 1 for footnotes. - 65 - Member Country, and Borrower or Amount & Stage o~ Process- Implementing Probable ing and Action on Agency Y Lender'!:_/ Procurement 4/ . COLOMBIA (Cont'd) (BANCO DE LA 60,0 Agro-Industries - Credit for large- Project preparation underway. REPUBLICA (Bank) and medium-scale agro-industries; (BOR)) possible pilot credit/technical assistance component· for small scale agro-industries; agro-industrial research, · (CARBONES DE Up to El Cerrejon Coal - Coal mining for. Appraisal to be scheduled when basic COLOMBIA 300.0 export (Block B of the Cerrejon understanding reached with project (CARBOCOL)) ·(Bank) deposit) and ort. ·and. railway sponsors, (Substantial co- construc~ion. financing required;) (CAJA 29.0 Agricultural redit V (Caja) - .Credit Appraisal dependent on agreement AGRARIA) (Bank) .for small- an medium-scale farmers by_ CAJA/Government on financ.iai and ·and ranchers swell as for small- "management improvements as pro- scale agro-in ustries·and rural posed by Bank. enterprises. ( INSTITUTO DE 9.0 (R) . Upper Magdale a Watershed Manage-· Board presentation scheduled.for LOS RECURSOS (Bank): inent -. Pilot r_oject to. d_ev.e.lop .. December 15. NATURALES support sy_ste for managing. wat·er.:. RENOVABLES shed. area and f~.r prev.entirig fur.ther Y DEL MEDIO ~~osion, Pii t·~hase will test out AMBIENTE series·of rventions in 3 sub- (INDERENA)) watershed are s and prepare large project for. ost important basin, Total project cost estimated at $25,3 million of which $8,9 million ih f_oreign ex hange. (EMPRESAS 29.0 Barranquilla ate~ - Expansion o~ Project preparation· PUBLICAS (Bank) water facilit es (construction of underway, MUNICIPALES DE a new. water t eatment plant); BARRANQUILLA) extension of ater distribution I and sewerage etworks and tech- I nical assista ce. · Instit.uto 37 .o Irrigatiiin' Re· abi'li t~i:iori': I - .Loan . approved .by the Execti.ve Carticipatiori_of target population in the province's de~elopment by strengthening the farmers' cooperatives. Total project cost $81.0 millio9, I I 4.5 .Region~l Manag~ent Sch~ol - Construction Preparation under way, (IDA) ·and equipment of facilities and '-technical assistance to facilitate the transformation of the Senegalese Management School into a Regional Management Training Sc~ool for CEAO Member states, ' EAST ASIA & PACIFIC To be Lubuge Hydropower - Construction of a rock- Project preparation under deter- fill dam, tunnels, and a 600 MW underground way. (Co-financing sought,) mined powerhouse in Yunnan Province, To be Luan/Jincheng Coal Mines Project1 - Development Project preparation under deter- of two fully-mechanized longwall'. underground way, mined mines of up to 4 mtpa each in Shanxi Province. INDONESIA 30.0 Coal Exploration - Engineering loan for explor- Appraisal report being (Bank) ation of coal in East Kalimantan,- prepared. 60,0. BAPINDO V - Provision of credit to and insti- Project preparation under (Bank) tutional strengthening of Bapindo - State way. Development Bank, 'PAPUA·NEW GUINEA 16.0 Transport Development - Construction and. im- Prqject being ,prepared by (Bank) provement of primary and tertiary roads, and Government and consultants. transport system studies, SOUTH ASIA 200.0 Madhya Pradesh Fertilizer - Construction of one Project preparation under (Bank) ammonia unit of 1,350 tons per day and two urea way, units ·of 1,100 tons per day each( Estimated project. cost $600 million. I. - 77 - Amount & Member Probable Country Lender 'Project Stage of Processing EUROPE, MIDDLE EAST & NORTH AFRICA To be Construction, extension and equipping of voca- Preparation under way by deter- tional and technical training institutions. Government. mined (Barik) To be Beni Amir Irrigation - Rehabilitation of 13,000 FAO/CP preparation mission. deter- ha and construction of new system on 5,400 ha. scheduled for January, mined (Bank) To be Structural Adjustment Loan IV - To support Timing dependent upon progress deter- structural adjustment in key areas. under earlier structural adjus mined ment loans. (Bank) LATIN AMERICA & CARIBBEAN COSTA RICA 25.0 Credit t.o promote exports, Appraisal mission in the field (Bank) NICARAGUA 6.0 Rehabilitation. of existing coconu~ plantation, Appraisal mission in the (Bank) and provision of processing facilities for field, small producers. ~ 5.0 Technical Assistance to strengthen public sector Appraisal mission in the (Bank) management. field. I I 1·