Public Disclosure Copy The World Bank Implementation Status & Results Report Sarajevo Waste Water Project (P090675) Sarajevo Waste Water Project (P090675) EUROPE AND CENTRAL ASIA | Bosnia and Herzegovina | Water Global Practice | IBRD/IDA | Specific Investment Loan | FY 2010 | Seq No: 10 | ARCHIVED on 24-Dec-2015 | ISR22191 | Implementing Agencies: Key Dates Key Project Dates Bank Approval Date:22-Dec-2009 Effectiveness Date:15-Jul-2010 Planned Mid Term Review Date:09-Mar-2014 Actual Mid-Term Review Date:26-Oct-2014 Original Closing Date:30-Nov-2015 Revised Closing Date:31-Mar-2017 Project Development Objectives Project Development Objective (from Project Appraisal Document) Improve the living conditions of populations in the areas covered by the Sarajevo Water and Waste Water Company and in downstream riverside communities by: (a) reducing the population's exposure to, and reliance on highly polluted water from the Miljacka and Bosna Rivers; and (b) improving the efficiency of the waste water collection network in the Sarajevo Canton. Has the Project Development Objective been changed since Board Approval of the Project Objective? No PHRPDODEL Components Name Component A: High Priority Infrastructure Rehabilitation:(Cost $45.00 M) Component B: Institutional Development Support:(Cost $0.50 M) Component C: Project management:(Cost $0.50 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO  Moderately Satisfactory  Moderately Satisfactory Overall Implementation Progress (IP)  Moderately Satisfactory  Moderately Satisfactory Overall Risk Rating  Moderate  Moderate 12/24/2015 Page 1 of 6 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report Sarajevo Waste Water Project (P090675) Implementation Status and Key Decisions Progress towards achievement of the Project Development Objectives (PDO) has been rated moderately satisfactory, with reported results generally on track to meet end target values for PDO indicators. Under project Component A, 17.24 km was completed exceeding target value, which was set at 16 km. More than 32,000 households have benefited from sewage network rehabilitation, against a total target of 48,000 household connections. New contracts were signed for additional works for reparation and rehabilitation. Activities under component A, “High Priority Infrastructure Rehabilitation” that consist of (A1) the repair and replacement of primary and secondary sewers in Sarajevo, were completed. However, PMU completed the bidding process and signed contracts for the additional rehabilitation for the sewers in Sarajevo. (A2) Rehabilitation of the Sarajevo wastewater treatment plant (WWTP), construction works is improved to 75% completed.The reaming work that consist mainly of installation electro-mechanical and site cleaning and landscape work are critical, and should follow the work schedule and closely supervised by the utility and the ministry. For Sarajevo wastewater treatment plant contract, the required construction permits were granted and the works were accelerated over the last six months and as such, the disbursement rate is increased up to 72%. The project was extended up to May 31, 2017 Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance  --  Moderate  Moderate Macroeconomic  --  Moderate  Moderate Sector Strategies and Policies  --  Low  Low Technical Design of Project or Program  --  Moderate  Moderate Institutional Capacity for Implementation and Sustainability  --  Moderate  Moderate Fiduciary  --  Low  Low Environment and Social  --  Moderate  Moderate Stakeholders  --  Moderate  Moderate Other  --  --  -- Overall  --  Moderate  Moderate Results Project Development Objective Indicators 12/24/2015 Page 2 of 6 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report Sarajevo Waste Water Project (P090675) PHINDPDOTBL  Reduction in river pollution measured by amount of BOD5 removed at the WWTP (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 8640.00 Date 22-Dec-2009 11-Jun-2015 04-Dec-2015 30-Nov-2015 PHINDPDOTBL  Volume of waste water collected treated at primary level (m3/day) (Cubic Meter(m3), Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 150000.00 150000.00 200000.00 Date 22-Dec-2009 11-Jun-2015 04-Dec-2015 30-Nov-2015 PHINDPDOTBL  Number of sewer connections benefiting from rehabilitation works (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 32000.00 32000.00 48000.00 Date 22-Dec-2009 11-Jun-2015 04-Dec-2015 30-Nov-2015 PHINDPDOTBL  Number of sewer blockages per year (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 3300.00 2056.00 2800.00 2900.00 Date 22-Dec-2009 11-Jun-2015 04-Dec-2015 30-Nov-2015 PHINDPDOTBL  People provided with access to "improved sanitation facilities” under the proj. (Number, Core) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 300000.00 12/24/2015 Page 3 of 6 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report Sarajevo Waste Water Project (P090675) Date 15-Dec-2012 11-Jun-2015 04-Dec-2015 30-Nov-2015 PHINDPDOTBL  People provided with access to “improved sanitation facilities” - urban (Number, Core Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 300000.00 Date 15-Dec-2012 11-Jun-2015 04-Dec-2015 30-Nov-2015 Overall Comments Intermediate Results Indicators PHINDIRITBL  Cumulative length of sewage collectors repaired and/or rehabilitated (km) (Kilometers, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 17.24 17.24 16.00 Date 22-Dec-2009 11-Jun-2015 04-Dec-2015 30-Nov-2015 PHINDIRITBL  % of WWTP rehabilitation works completed (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 36.00 100.00 100.00 Date 22-Dec-2009 11-Jun-2015 04-Dec-2015 30-Nov-2015 12/24/2015 Page 4 of 6 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report Sarajevo Waste Water Project (P090675) PHINDIRITBL  Increased revenues (in %) (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 3.00 17.00 10.00 Date 22-Dec-2009 11-Jun-2015 04-Dec-2015 30-Nov-2015 Overall Comments Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed Disbursed P090675 IBRD-78420 Effective USD 35.00 35.00 0.00 16.15 15.99 46% P090675 TF-12937 Closed USD 11.01 11.01 0.00 11.59 0.00 105% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P090675 IBRD-78420 Effective 22-Dec-2009 17-Mar-2010 15-Jul-2010 30-Nov-2015 31-Mar-2017 P090675 TF-12937 Closed 20-Dec-2012 20-Dec-2012 21-May-2013 31-Dec-2014 31-Aug-2015 Cumulative Disbursements 12/24/2015 Page 5 of 6 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report Sarajevo Waste Water Project (P090675) Restructuring History There has been no restructuring to date. Related Project(s) There are no related projects. 12/24/2015 Page 6 of 6 Public Disclosure Copy