Yunnan Honghe Prefecture Diannan Center Urban
                    Transport Project
                   Procurement Plan

I. General

1.    Bank’s approval Date of the procurement Plan [Original:
      August2014]: Revision 6 of Updated Procurement Plan, April 2018]
2.    Date of General Procurement Notice: July 9, 2014
3.    Period covered by this procurement plan: The procurement period
      of project covered from year April 2018 to June 2020


II. Goods and Works and non-consulting services.

1.    Prior Review Threshold: Procurement Decisions subject to Prior
      Review by the Bank as stated in Appendix 1 to the Guidelines for
      Procurement:

                  Procurement Method          Prior Review          Comments
                                               Threshold
                                                  US$
      1.   ICB and LIB (Goods)             Above US$ 10 million         All

      2.   NCB (Goods)                     Above US$ 2 million      First contract
                                                                  regardless value
      3.   ICB (Works)                     Above US$ 40 million           All

      4.   NCB (Works)                     Above US$ 10 million     First contract
                                                                  regardless value
      5.       (Non-Consultant Services)           NA                     NA


2.    Prequalification. Bidders for _Not applicable_ shall be prequalified in
      accordance with the provisions of paragraphs 2.9 and 2.10 of the
      Guidelines.

3.    Proposed Procedures for CDD Components (as per paragraph.
      3.17 of the Guidelines: Not Applicable

4.    Reference to (if any) Project Operational/Procurement Manual:
      Project Implementation Manual for World Bank Loan Project 8369CN
      06/01/2016 issued by Honghe PMO

5.    Any Other Special Procurement Arrangements: Not Applicable

6.    Summary of the Procurement Packages planned during the first 18
July 9, 2010
       months after project effectiveness : The updated procurement plan
       comprises of three categories, i) Category A including 12 civil works
       contracts with a total estimated value of US$82.80 million (6 prior-
       review contracts); ii) Category B including 6 goods contracts with a
       total estimated value of US$18.40 million (4 prior-review contracts);
       and iii) Category C including 8 consultancy services contracts with a
       total estimated value of US$2.66 million (4 prior-review contracts).

[List the Packages which require Bank’s prior review first and then the other
packages]

   1           2          3          4      5          6          7

  Ref.   Descripti    Estimat   Packages   Dome     Review     Comme
  No.       on           ed                 stic    by Bank      nts
                       Cost                Prefe    (Prior /
                        US$                rence     Post)
                      million              (yes/
                                            no)
         Summary      0         0          No      Prior
         of the ICB
         (Works)
         Summary      6.25      1          No      Prior
         of the ICB
         (Goods)
         Summary      82.80     12         No      Post        1st
         of the NCB                                            contrac
         (Works)
                                                               t of
                                                               each
                                                               subproj
                                                               ect for
                                                               Prior
                                                               Review
         Summary      12.15     3          No      Post        1st
         of the NCB                                            contrac
         (Goods)
                                                               t of
                                                               each
                                                               subproj
                                                               ect for
                                                               Prior
                                                               Review
         Summary      0         0          No      Prior
         of the ICB
         (Non-
         Consultant
         Services)

III. Selection of Consultants


July 9, 2010
1.    Prior Review Threshold: Selection decisions subject to Prior Review
      by Bank as stated in Appendix 1 to the Guidelines Selection and
      Employment of Consultants:

                     Selection Method                Prior Review            Comments
                                                      Threshold
       1.       Competitive Methods (Firms)        Above US$1 million
       2.       Single Source (Firms)              Above US$1 million
       3.       Individual                        Above US$0.3 million

2.    Short list comprising entirely of national consultants: Short list of
      consultants for services, estimated to cost less than
      $_500,000_equivalent per contract, may comprise entirely of national
      consultants in accordance with the provisions of paragraph 2.7 of the
      Consultant Guidelines.
3.    Any Other Special Selection Arrangements: [including advance
      procurement and retroactive financing, if applicable or delete if not
      applicable] Not Applicable

4.    Consultancy Assignments with Selection Methods and Time
      Schedule

            1             2           3           4          5           6

     Ref. No.       Description   Estimat     Package     Review     Comment
                    of            ed          s           by Bank    s
                    Assignmen     Cost                    (Prior /
                    t             US$                     Post)
                                  million
                    Summary       0.71        1           Prior
                    of number
                    of
                    contracts
                    that will
                    be let
                    under
                    QCBS
                    Summary       1.95        7           Prior/Po   CQS/SSS
                    of number                             st
                    of
                    contracts
                    that will
                    be let
                    under
                    other
                    methods


July 9, 2010
PROCUREMENT
                  China : CN Yunnan Honghe Prefecture Diannan Center Urban Transport
PLAN
General Information
Country:             China                            Bank’s Approval Date of the Original Procurement Plan:     2018-05-18
                                                                                                                 2021-06-05
                                                      Revised Plan Date(s): (comma delineated, leave blank if none)
Project ID:          P101525                          GPN Date:
Project Name:        CN Yunnan Honghe Prefecture Diannan Center Urban Transport
Loan / Credit No:    IBRD / 83690
                     Honghe PMO
Executing Agency(ies):


WORKS
 Activity Reference No. /                                                                                                                                                                                           Estimated       Actual                                                                            Draft Bidding                                                                         Bid Evaluation Report
                                   Loan / Credit                                                                                           Procurement        Prequalification   High SEA/SH     Procurement                                      Process      Draft Pre-qualification      Prequalification                             Specific Procurement    Bidding Documents as Proposal Submission /                                                    Contract
        Description                                       Component                   Review Type       Method         Market Approach                                                                               Amount        Amount                                                                             Document /                                                                            and Recommendation         Signed Contract
                                       No.                                                                                                   Process               (Y/N)             Risk       Document Type                                      Status            Documents             Evaluation Report                              Notice / Invitation            Issued         Opening / Minutes                                                     Completion
                                                                                                                                                                                                                      (US$)         (US$)                                                                             Justification                                                                               for Award
                                                                                                                                                                                                                                                                Planned      Actual       Planned      Actual     Planned       Actual    Planned     Actual      Planned      Actual  Planned     Actual    Planned      Actual     Planned     Actual     Planned

 JS-CW-03-A / South Bypass
                                                   Jianshui Part - Component J3:
Package 1: To build South                                                                                                                Single Stage - One                                                        15,070,000.0   11,128,064.                                                                                                                                                                                                               2020-02-
                                  IBRD / 83690     Urban Road Network            Prior              Request for Bids   Open - National                                                                                                           Signed                                                          2018-08-01 2018-12-21 2018-08-06 2019-01-17                          2018-09-05 2019-02-27 2018-09-19 2019-05-10 2018-10-24 2019-05-27
Bypass K0+000-K1+320 and                                                                                                                 Envelope                                                                             0            77                                                                                                                                                                                                                  16
                                                   Improvement
K1+400-K3+140.


 JS-CW-03-B / South Bypass                         Jianshui Part - Component J3:
                                                                                                                                         Single Stage - One                                                        16,344,000.0   7,991,949.9                                                                                                                                                                                                               2020-02-
Package 2: To build South  IBRD / 83690            Urban Road Network            Prior              Request for Bids   Open - National                                                                                                           Signed                                                          2018-08-01 2018-12-21 2018-08-06 2019-01-17                          2018-09-05 2019-02-27 2018-09-19 2019-05-10 2018-10-24 2019-07-08
                                                                                                                                         Envelope                                                                             0             4                                                                                                                                                                                                                  16
Bypass K3+140-K6+465.419.                          Improvement


 JS-CW-03-C / South Bypass
                                                   Jianshui Part - Component J3:
Package 3: To build South                                                                                                                Single Stage - One                                                                                                                                                                                                                                                                                                 2020-02-
                                  IBRD / 83690     Urban Road Network            Post               Request for Bids   Open - National                                                                             1,094,000.00   915,977.22     Signed                                                          2018-08-01 2019-03-13 2018-08-06                                     2018-09-05 2019-07-04 2018-09-19 2019-07-04 2018-10-24 2019-08-30
Bypass's railway intersection                                                                                                            Envelope                                                                                                                                                                                                                                                                                                              16
                                                   Improvement
K1+320-K1+400.


 MZ-CW-05-01 / Jinhua Road
                                                   Mengzi Part - Component                                                                                                                                                                       Pending
South Section: Reconstruction                                                                                                            Single Stage - One                                                                                                                                                                                                                                                                                                 2019-10-
                                  IBRD / 83690     M1: Road Network Re-        Post                 Request for Bids   Open - National                                                                             2,751,000.00         0.00     Implementat                                                     2018-10-27              2018-11-01                                   2018-12-01            2018-12-15              2019-01-04
of south section of Jinhua                                                                                                               Envelope                                                                                                                                                                                                                                                                                                              06
                                                   functioning and Improvement                                                                                                                                                                   ion
Road


 MZ-CW-13 / Integrated
Intermodal Yard at Datiepu of
                                                   Mengzi Part - Component                                                               Single Stage - One                                                                       6,495,322.2                                                                                                                                                                                                               2019-11-
Wenlan Town: To build             IBRD / 83690                                     Post             Request for Bids   Open - National                                                                             6,294,000.00                  Signed                                                          2018-09-26 2020-01-20 2018-10-01                                     2018-10-31 2020-03-16 2018-11-03 2020-03-16 2018-11-23 2020-07-31
                                                   M3: Public Transport Priority                                                         Envelope                                                                                           8                                                                                                                                                                                                                  23
integrated intermodal yard at
Datiepu of Wenlan Town.


 MZ-CW-15 / Civil Works of
                                                   Mengzi Part - Component
Improving School Safety: Civil                                                                                                           Single Stage - One                                                                       1,751,632.8                                                                                                                                                                                                               2019-02-
                                  IBRD / 83690     M4: School Transport Safety     Post             Request for Bids   Open - National                                                                             3,119,000.00                  Signed                                                          2018-06-26              2018-07-01 2018-11-29                        2018-07-31 2019-01-03 2018-08-03              2018-08-23 2019-03-25
works of improving school                                                                                                                Envelope                                                                                           0                                                                                                                                                                                                                  19
                                                   Improvement
safety.


 JS-CW-04 / Ancilliary works                       Jianshui Part - Component J2:                    Request for                          Single Stage - One                                                                                                                                                                                                                                                                                                 2019-07-
                                  IBRD / 83690                                   Prior                                 Open - National                                                                              168,000.00          0.00     Canceled                                                                                2019-03-16                                                                                 2019-04-22
of the bus depots                                  Public Transport Priority                        Quotations                           Envelope                                                                                                                                                                                                                                                                                                              21


 MZ-CW-09 / Integrated                             Mengzi Part - Component                          Request for                          Single Stage - One                                                                       5,878,650.0                                                                                                                                                                                                               2019-08-
                                  IBRD / 83690                                     Post                                Open - National                                                                             6,119,000.00                  Signed                                                          2019-04-02              2019-04-02                                   2019-04-02            2019-04-02 2018-01-26 2019-04-02 2018-04-20
Station of Beijing South Road                      M3: Public Transport Priority                    Proposals                            Envelope                                                                                           6                                                                                                                                                                                                                  31


 MZ-CW-14 / Non-corridor
                                                   Mengzi Part - Component                          Request for                          Single Stage - One                                                                       5,807,866.8                                                                                                                                                                                                               2019-05-
Road Bus Station Renovation       IBRD / 83690                                     Post                                Open - National                                                                             5,897,000.00                  Signed                                                          2019-04-02              2019-04-02                                   2019-04-02            2019-04-02 2017-03-29 2019-04-02 2017-06-02
                                                   M3: Public Transport Priority                    Proposals                            Envelope                                                                                           6                                                                                                                                                                                                                  31
and Construction


 JS-CW-02 / Public                                 Jianshui Part - Component J2:                    Request for                          Single Stage - One                                                                       2,356,125.9                                                                                                                                                                                                               2019-08-
                                  IBRD / 83690                                   Prior                                 Open - National                                                                             2,442,000.00                  Signed                                                          2019-04-02              2019-04-02                                   2019-04-02            2019-04-02 2016-08-11 2019-04-02 2016-10-08
transportation station                             Public Transport Priority                        Proposals                            Envelope                                                                                           6                                                                                                                                                                                                                  31


 JS-CW-03BA / South Bypass                         Jianshui Part - Component J3:
                                                                                                                                         Single Stage - One                                                        16,344,000.0   8,280,553.1                                                                                                                                                                                                               2020-09-
Package 2: To build South  IBRD / 83690            Urban Road Network            Prior              Request for Bids   Open - National                                                                                                           Signed                                                          2019-06-27 2019-07-12 2019-06-27 2019-07-16                          2019-06-27 2019-02-27 2019-06-27 2019-07-22 2019-06-27 2019-06-06
                                                                                                                                         Envelope                                                                             0             8                                                                                                                                                                                                                  27
Bypass K3+140-K6+465.419.                          Improvement


 JS-CW-01A / Transformation                        Jianshui Part - Component J1:                                                                                                                                                                 Pending
                                                                                                                                         Single Stage - One                                                        10,640,000.0                                                                                                                                                                                                                             2021-10-
of Jianshui Avenue, Chaoyang      IBRD / 83690     Core Urban Area Integrated    Prior              Request for Bids   Open - National                                                                                                  0.00     Implementat 2020-01-09                  2020-03-26              2020-03-26              2020-01-14                                   2020-05-07            2020-06-06              2020-07-11
                                                                                                                                         Envelope                                                                             0                                                                                                                                                                                                                                04
North Road, Yinghui Road                           Transport Improvement                                                                                                                                                                         ion


 MZ-CW-06A / To build a new
road east to Honghe
                                                   Mengzi Part - Component                                                                                                                                                                       Pending
University, change function of                                                                                                           Single Stage - One                                                        17,126,800.0                                                                                                                                                                                                                             2021-09-
                               IBRD / 83690        M1: Road Network Re-        Prior                Request for Bids   Open - National                                                                                                  0.00     Implementat 2020-01-15                  2020-03-20              2020-03-20              2020-01-20                                   2020-03-23            2020-04-22              2020-05-27
Xuefu Road so as to integrate                                                                                                            Envelope                                                                             0                                                                                                                                                                                                                                19
                                                   functioning and Improvement                                                                                                                                                                   ion
it into the campus transit
system


 MZ-CW-07A / construction
of bus lanes, bus stations,
entrances, intersections;
                                                   Mengzi Part - Component                                                                                                                                                                       Pending
canalization and                                                                                                                         Single Stage - One                                                        12,726,300.0                                                                                                                                                                                                                             2021-03-
                                  IBRD / 83690     M2: Integrated Corridor         Prior            Request for Bids   Open - National                                                                                                  0.00     Implementat 2020-01-15                  2020-03-20              2020-03-20              2020-01-20                                   2020-04-19            2020-05-19              2020-06-23
reconstruction of the existing                                                                                                           Envelope                                                                             0                                                                                                                                                                                                                                20
                                                   Management                                                                                                                                                                                    ion
intersections; provision of
traffic safety, ITS and parking
facilities.


 JS-CW-06 / Evidence
Preservation of Surrounding                        Jianshui Part - Component J3:
                                                                                                    Request for                          Single Stage - One                                                                                                                                                                                                                                                                                                 2020-12-
Structures during the             IBRD / 83690     Urban Road Network            Post                                  Open - National                                                                               19,780.44     19,951.12     Signed                                                                                  2020-06-12 2020-06-19                                                                      2020-08-07 2020-07-03
                                                                                                    Quotations                           Envelope                                                                                                                                                                                                                                                                                                              15
Construction of South Bypass                       Improvement
in Jianshui.


 JS-CW-05 / Bus stations
                                                   Jianshui Part - Component J2:                                                         Single Stage - One                                                                                                                                                                                                                                                                                                 2021-12-
(construction of 197 bus          IBRD / 83690                                   Post               Request for Bids   Open - National                                                                             3,241,700.00         0.00     Canceled                                                        2020-12-10              2020-12-30                                   2021-01-31            2021-02-14              2021-03-21
                                                   Public Transport Priority                                                             Envelope                                                                                                                                                                                                                                                                                                              16
stations)

                                                                                                                                                                                                National
                                                                                                                                                                                                Procurement                                      Pending
 JS-CW-05A / Bus stops                             Jianshui Part - Component J2:                                                         Single Stage - One                                                                                                                                                                                                                                                                                                 2021-11-
                               IBRD / 83690                                      Post               Request for Bids   Open - National                                                          Document - 1        510,000.00          0.00     Implementat                                                     2021-06-03              2021-06-13                                   2021-07-13            2021-07-15              2021-08-26
(construction of 51 bus stops)                     Public Transport Priority                                                             Envelope                                                                                                                                                                                                                                                                                                              24
                                                                                                                                                                                                Envelope process                                 ion
                                                                                                                                                                                                (Non Bank-SPD)




GOODS
 Activity Reference No. /                                                                                                                                                                                                                                                                     Draft Bidding                                                                         Bid Evaluation Report
                                   Loan / Credit                                                                                           Procurement        Prequalification    Estimated     Actual Amount        Process      Draft Pre-qualification         Prequalification                               Specific Procurement    Bidding Documents as Proposal Submission /
        Description                                       Component                   Review Type       Method         Market Approach                                                                                                                                                        Document /                                                                            and Recommendation         Signed Contract      Contract Completion
                                       No.                                                                                                   Process               (Y/N)         Amount (US$)       (US$)             Status            Documents                Evaluation Report                                Notice / Invitation            Issued         Opening / Minutes
                                                                                                                                                                                                                                                                                              Justification                                                                               for Award
                                                                                                                                                                                                                                   Planned         Actual       Planned      Actual       Planned       Actual    Planned      Actual     Planned      Actual  Planned     Actual    Planned      Actual      Planned    Actual      Planned     Actual




                                                                                                                                                                                                                                        Page 1
                                                Jianshui Part - Component J1:
 JS-GD-01 / Traffic Control                                                                                                                 Single Stage - One
                               IBRD / 83690     Core Urban Area Integrated    Prior              Request for Bids    Open - National                                                  6,473,000.00       6,061,089.04   Signed                                                           2018-06-22 2018-09-14 2018-06-30 2018-10-08                             2018-07-30 2018-11-07 2018-08-19 2018-12-17 2018-09-28 2019-01-21 2019-03-27
and Monitoring Equipment                                                                                                                    Envelope
                                                Transport Improvement


 JS-GD-02 / Bus Priority                        Jianshui Part - Component J2:                                                               Single Stage - One
                               IBRD / 83690                                   Prior              Request for Bids    Open - National                                                  3,332,000.00               0.00   Canceled                                                         2018-07-01 2019-03-04 2018-07-15 2019-06-02                             2018-08-14 2019-07-02 2018-08-28              2018-10-02                2019-03-31
Intelligent System                              Public Transport Priority                                                                   Envelope


 MZ-GD-05 / Bus Priority                        Mengzi Part - Component                                                                     Single Stage - One
                               IBRD / 83690                                     Prior            Request for Bids    Open - National                                                  2,344,000.00       5,800,270.93   Signed                                                           2018-10-12 2018-09-10 2018-11-01 2018-12-05                             2018-12-01 2019-01-04 2018-12-15 2019-01-29 2019-01-28 2019-02-27 2019-07-27
Intelligent System                              M3: Public Transport Priority                                                               Envelope


                                                                                                                                                                                                                        Under
 JS-GD-07 / Fire prevention                     Jianshui Part - Component J2:                    Request for                                Single Stage - One
                               IBRD / 83690                                   Post                                   Open - National                                                     29,000.00               0.00   Implementati                                                                               2019-04-05 2019-04-30                                                                       2019-05-31                2019-11-27
goods of the bus depots                         Public Transport Priority                        Quotations                                 Envelope
                                                                                                                                                                                                                        on


 JS-GD-02A / Bus Priority                       Jianshui Part - Component J2:                                                               Single Stage - One
                               IBRD / 83690                                   Prior              Request for Bids    Open - National                                                  3,136,000.00       2,360,063.98   Signed                                                           2019-07-30 2019-07-17 2019-08-13 2019-07-24                             2019-09-12 2019-08-22 2019-09-26 2019-09-10 2019-10-31 2019-10-12 2020-04-28
Intelligent System                              Public Transport Priority                                                                   Envelope


 MZ-GD-03A / Traffic Control                    Mengzi Part - Component
                                                                                                                                            Single Stage - One
and Monitoring Equipment,      IBRD / 83690     M2: Integrated Corridor         Prior            Request for Bids    Open - International                                             9,461,200.00       6,510,840.95   Signed                                                           2019-11-25 2019-12-16 2019-11-30 2019-12-17                             2020-01-11 2017-09-19 2020-02-10 2019-12-30 2020-03-16 2018-01-04 2020-09-12
                                                                                                                                            Envelope
and traffic command center                      Management


 MZ-GD-08 / Purchase of 165
                                                Mengzi Part - Component                                                                     Single Stage - One
nos. e-Bus and Related      IBRD / 83690                                        Prior            Request for Bids    Open - International                                            16,298,555.10       9,717,021.67   Signed                                                           2020-04-27 2020-05-13 2020-05-27 2020-05-16                             2020-07-11 2020-08-07 2020-08-01 2020-09-08 2020-09-05 2020-10-25 2021-01-03
                                                M3: Public Transport Priority                                                               Envelope
facilities


 MZ-GD-07 / Traffic safety
                                                Mengzi Part - Component
improvement (purchasing a                                                                                                                   Single Stage - One
                               IBRD / 83690     M1: Road Network Re-        Prior                Request for Bids    Open - International                                            29,384,615.40     24,568,117.80    Signed                                                           2020-06-19 2020-09-08 2020-07-10 2020-09-09                             2020-08-24 2020-11-06 2020-09-14 2020-11-20 2020-10-19 2020-12-16 2021-07-16
total of 906 sets of equipment                                                                                                              Envelope
                                                functioning and Improvement
items)


 JS-GD-08 / Purchase of 100
                                                Jianshui Part - Component J2:                                                               Single Stage - One
nos. e-Bus and Related         IBRD / 83690                                   Prior              Request for Bids    Open - International                                             9,600,000.00       6,563,577.47   Signed                                                           2020-08-25 2020-09-10 2020-09-07 2020-09-14                             2020-10-27 2020-11-05 2020-11-17 2020-11-19 2020-12-29 2020-12-15 2021-03-29
                                                Public Transport Priority                                                                   Envelope
facilities




NON CONSULTING SERVICES
Activity Reference No. /                                                                                                                                                                                                                                                                      Draft Bidding                                                                           Bid Evaluation Report
                                Loan / Credit                                                                                                 Procurement        Prequalification    Estimated       Actual Amount        Process      Draft Pre-qualification      Prequalification                               Specific Procurement    Bidding Documents as Proposal Submission /
       Description                                     Component                   Review Type        Method         Market Approach                                                                                                                                                          Document /                                                                              and Recommendation          Signed Contract        Contract Completion
                                    No.                                                                                                         Process               (Y/N)         Amount (US$)         (US$)             Status            Documents             Evaluation Report                                Notice / Invitation            Issued         Opening / Minutes
                                                                                                                                                                                                                                                                                              Justification                                                                                 for Award
                                                                                                                                                                                                                                        Planned        Actual     Planned       Actual    Planned       Actual      Planned     Actual      Planned      Actual  Planned     Actual    Planned      Actual      Planned       Actual      Planned     Actual




CONSULTING FIRMS
Activity Reference No. /                                                                                                                                                                                                                                                                                                                                                    Combined Evaluation
                                Loan / Credit                                                                                                Contract Type        Estimated         Actual Amount                                                    Expression of Interest    Short List and Draft   Request for Proposals   Opening of Technical        Evaluation of
       Description                                     Component                   Review Type        Method         Market Approach                                                                 Process Status       Terms of Reference                                                                                                                                  Report and Draft       Signed Contract        Contract Completion
                                    No.                                                                                                                          Amount (US$)           (US$)                                                               Notice            Request for Proposals        as Issued          Proposals / Minutes      Technical Proposal
                                                                                                                                                                                                                                                                                                                                                                            Negotiated Contract
                                                                                                                                                                                                                         Planned         Actual       Planned      Actual      Planned     Actual      Planned       Actual    Planned      Actual     Planned     Actual   Planned     Actual      Planned      Actual      Planned       Actual

 HH-CS-06 / Public                              Mengzi Part - Component                          Consultant
Transportation Policy          IBRD / 83690     M1: Road Network Re-        Prior                Qualification       Open - International                             270,000.00        226,237.59   Signed                                                                                                                                                                            2015-02-06              2015-02-26
Research                                        functioning and Improvement                      Selection


 HH-CS-03 / Project                             Mengzi Part - Component
                                                                                                 Quality And Cost-
Management Consultant          IBRD / 83690     M1: Road Network Re-        Prior                                    Open - International                             670,000.00        704,735.50   Signed                                                                                                                                                                            2016-02-19              2016-02-25
                                                                                                 Based Selection
Selection                                       functioning and Improvement


 HH-CS-01 / Parking and
Traffic Calming Policy                          Mengzi Part - Component                          Consultant
Research, Planning the         IBRD / 83690     M5: Institutional               Prior            Qualification       Open - International                             250,000.00        245,002.18   Signed             2018-12-17                   2018-12-17               2018-12-17 2018-12-21                                                                         2018-12-17 2019-01-08 2018-12-17 2018-04-18 2019-12-17
Implementation of Pilot                         Strengthening                                    Selection
Programs


                                                Mengzi Part - Component                          Consultant
HH-CS-11 / Public vidio for                                                                                                                                                                          Under
                               IBRD / 83690     M5: Institutional               Post             Qualification       Open - National                                  105,000.00         74,083.12                      2021-01-18     2021-01-19 2021-01-28 2021-02-01 2021-02-06 2021-04-07                                                                               2021-02-07 2021-04-07 2021-02-09                2021-05-10
Mengzi Project                                                                                                                                                                                       Implementation
                                                Strengthening                                    Selection




INDIVIDUAL CONSULTANTS
Activity Reference No. /                                                                                                                                                                                                                                  Invitation to
                                Loan / Credit                                                                                                Contract Type        Estimated         Actual Amount                                                                               Draft Negotiated
       Description                                     Component                   Review Type        Method         Market Approach                                                                 Process Status       Terms of Reference          Identified/Selected                                Signed Contract       Contract Completion
                                    No.                                                                                                                          Amount (US$)           (US$)                                                                                       Contract
                                                                                                                                                                                                                                                           Consultant
                                                                                                                                                                                                                         Planned         Actual       Planned       Actual     Planned     Actual      Planned       Actual    Planned      Actual

 HH-CS-02 / School Traffic Po
licy Research, Construction Co
nsultation, Effect Evaluation C
onsulting and Training To fo                    Mengzi Part - Component
rmulate the strategy, the plan, IBRD / 83690    M5: Institutional               Prior            Direct Selection    Direct                                           300,000.00              0.00   Canceled           2018-12-17                   2018-12-17                                       2018-12-17              2020-06-09
the security mechanism, the s                   Strengthening
ecurity planning, the travel sat
fety management mechanism
and polices for school distri



 HH-CS-02A / School Traffic
                                                Mengzi Part - Component
Policy Research, Construction
                                IBRD / 83690    M5: Institutional               Prior            Direct Selection    Direct                                           300,000.00        294,389.79   Signed             2018-12-27                   2018-12-27                                       2018-12-27 2018-06-13 2018-12-27
Consultation, Effect Evaluation
                                                Strengthening
Consulting and Training



 HH-CS-09 / With the
development of various tasks,
Honghe PMO hopes to hire
                                                Mengzi Part - Component                          Individual
one qualified and experienced
                              IBRD / 83690      M5: Institutional               Prior            Consultant          Open                                                7,000.00         8,129.58   Signed             2019-11-28     2019-12-02 2019-12-26 2020-02-12 2020-01-02 2020-02-18 2020-01-16 2020-02-24 2021-01-15
personnel to take charge of
                                                Strengthening                                    Selection
Honghe PMO's financial work
through the way of expert
comparison.


 HH-CS-10 / With the
development of various tasks,
Mengzi PEO hopes to hire
                                                Mengzi Part - Component                          Individual
one qualified and experienced
                              IBRD / 83690      M5: Institutional               Post             Consultant          Open                                                8,000.00         7,702.42   Signed             2019-11-28     2019-11-28 2019-12-26 2021-04-08 2020-01-02 2020-02-13 2020-01-16 2020-02-24 2021-01-15
personnel to take charge of
                                                Strengthening                                    Selection
Mengzi PEO's financial work
through the way of expert
comparison.




                                                                                                                                                                                                                                            Page 2