Lao PDR: Agriculture Competitiveness Project Procurement Plan (as of December 21, 2017) 1. Project information: Country: Lao PDR Borrower/Recipient: Lao PDR Project Name: Agriculture Competitiveness Project Project ID No: P161473 Project Implementing Agency: Ministry of Agriculture and Forestry (MAF) 2. Bank’s approval date of the Procurement Plan • Original Plan: December 21, 2017 • First Revision: 3. Date of General Procurement Notice: 4. Period covered by this procurement plan: at least 18 months I. Works and Goods and Non-Consultant Services 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Annex II of the Procurement Regulations: Procurement Method Prior Review Thresholds Thresholds Applicable Category Applicable thresholds Remarks thresholds Remarks (in US$ (in US$) equivalent) Works RFB through ≥ 2.0 million – Above US$ 10 This has not been Open million foreseen at the International project preparation market approach stage. RFB through ≥ 200,000 < – None - Open National 2.0 million market approach Request for < 200,000 – None – Quotation Direct Selection None No threshold; Same as for This has not been meet competitive foreseen at the requirements of selection project preparation regulations 7.13- stage. 7.15 Goods and Non-Consulting Services RFB through ≥ 0.6 million – Above US$ 2 This has not been Open million foreseen at the International project preparation market approach stage. RFB through ≥ 100,000 < - None Risk-based approach Open National 0.6 million market approach Request for < 100,000 None Quotation 1 Direct Selection None No threshold; Same as for This has not been meet competitive foreseen at the requirements of selection project preparation regulations 7.13- stage. 7.15 2. Prequalification. Not expected for the works/goods packages. 3. Any Other Special Procurement Arrangements: National procurement procedures as specified under paragraph 5.4 of the Procurement Regulations and the conditions specified in Annex 1 to this Procurement Plan 4. Leased assets as specified under paragraph 5.10 of the Procurement Regulations: Not applicable. 5. Procurement of second hand Goods as specified under paragraph 5.11 of the Procurement Regulations: Not applicable. 6. Hands-on Expanded Implementation Support (HEIS) as specified under paragraph 3.10 and 3.11 of the Procurement Regulations: Not applicable. 7. Procurement packages for Goods (prior and post reviews) with method and Time Schedule Revi Expect Contract Procurement ew ed Estima Bids by Ref. (Description) ted Method Openi Commen Bank No. Cost ng ts (US$) (Prio r/ Date Post) Khammouane Upgrade of infrastructure KM/W- Request for Execute for KM PAFO for seed, GAP 30,000 Post Sep-18 RFQ 01 Quotation by PAFO and general extension Upgrade of infrastructure KM/W- Request for Sep Execute for KM DAFOs for seed 30,000 Post RFQ 02 Quotation 20118 by PAFO and GAP Upgrade of critical RFB (National) / KM/W- Execute productive infrastructure 900,000 Request for Post Jun-19 RFB 01 by PAFO in KM (multiple contracts) Quotation Equipment for KM Execute KM/G- Request for PAFO/DAFO for seed and 21,000 Post Dec-18 by RFQ 01 Quotation GAP PAFO/MAF Bolikhamxay Upgrade of infrastructure BLK/W- Request for Sep Execute for BLK for seed, GAP and 30,000 Post RFQ 01 Quotation 20117 by PAFO general extension Upgrade of infrastructure BLK/W- Request for Execute for BLK DAFOs for seed 30,000 Post Sep-18 RFQ 02 Quotation by PAFO and GAP Upgrade of critical RFB (National) / BLK/W- productive infrastructure Sep Execute 900,000 Request for Post RFB 01 in BLK (multiple 20118 by PAFO Quotation contracts) Equipment for BLK Execute BLK/G- Request for PAFO/DAFO for seed and 21,000 Post Dec-18 by RFQ 01 Quotation GAP PAFO/MAF 2 Revi Expect Contract Procurement ew ed Vientiane Capital Estima Ref. ted Commen Upgrade of infrastructure VC/W- No. Cost Request for Execute ts for VC for seed, GAP and 30,000 Post Sep-18 RFQ 01 (US$) Quotation by PAFO general extension Upgrade of infrastructure VC/W- Request for Sep Execute for VC DAFOs for seed 40,000 Post RFQ 02 Quotation 20118 by PAFO and GAP Upgrade of critical RFB (National) / VC/W- Execute productive infrastructure 900,000 Request for Post Sep-18 RFB 01 by PAFO in VC (multiple contracts) Quotation Equipment for VC Execute VC/G- Request for PAFO/DAFO for seed and 23,000 Post Dec-18 by RFQ 01 Quotation GAP PAFO/MAF Vientiane Province Upgrade of infrastructure VP/W- Request for Execute for VP PAFO for seed, GAP 30,000 Post Sep-18 RFQ 01 Quotation by PAFO and general extension Upgrade of infrastructure VP/W- Request for Execute for VP DAFOs for seed and 20,000 Post Sep-18 RFQ 02 Quotation by PAFO GAP Upgrade of critical RFB (National) / VP/W- 1,000,0 Execute productive infrastructure Request for Post Sep-18 RFB 01 00 by PAFO in VP (multiple contracts) Quotation Equipment for VP Execute VP/G- Request for PAFO/DAFO for seed and 21,000 Post Dec-18 by RFQ 01 Quotation GAP PAFO/MAF Xayabouly Upgrade of infrastructure XYL/W- for XYL PAFO for seed, Request for Execute 30,000 Post Sep-18 RFQ 01 GAP and general Quotation by PAFO extension Upgrade of infrastructure XYL/W- Request for Sep Execute for XYL DAFOs for seed 40,000 Post RFQ 02 Quotation 20118 by PAFO and GAP Upgrade of critical RFB (National) / XYL/W- Execute productive infrastructure 900,000 Request for Post Sep-18 RFB 01 by PAFO in VP (multiple contracts) Quotation Equipment for XYL Execute XYL/G- Request for PAFO/DAFO for seed and 23,000 Post Dec-18 by RFQ 01 Quotation GAP PAFO/MAF MAF Execute MAF/W Request for by -RFQ Seed storage at NAFRI 70,000 Post Sep-18 Quotation NAFRI/MA 01 F Execute MAF/G- Machine and equipment Request for by 20,000 Post Sep-18 RFQ 01 for NAFRI-ARC Quotation NAFRI/MA F MAF/G- Machine and equipment Request for Execute 25,000 Post Sep-18 RFQ 02 for NAFRI- HRC Quotation by MAF MAF/G- Request for Execute Lab equipment for DOA 20,000 Post Dec-18 RFQ 03 Quotation by MAF MAF/G- Equipment for DOA Clean Request for Execute 20,000 Post Dec-18 RFQ 04 Agriculture Dev. Center Quotation by MAF MAF/G- Extension materials for Request for Execute 10,000 Post Sep-18 RFQ 05 DOA Quotation by MAF 3 Revi Expect Contract Procurement ew ed MAF/G- Extension materials for Estima Request for Execute 50,000 Post Sep-18 Ref. RFQ 06 DAEC ted Quotation Commen by MAF No. Rapid test kits and Cost ts MAF/G- (US$) Request for Execute chemicals and reagents 9,000 Post Sep-18 RFQ 07 Quotation by MAF for DOA Office equipment for MAF, MAF/G- Request for Execute MOIC, 5 provinces and 133,200 Post Sep-18 RFQ 08 Quotation by MAF districts MAF/G- Motorbikes for Provinces, Request for Execute 84,000 Post Sep-18 RFQ 09 MAF and MOIC (42 units) Quotation by MAF MAF/G- Pick-up for 5 provinces, Execute 630,000 RFB (National) Post Sep-18 RFB 01 MAF and MOIC (14 units) by MAF 6,090, Total Works and Goods 200 4 III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Annex II of the Procurement Regulations: Procurement Method Prior Review Thresholds Thresholds Applicable Applicable Category thresholds thresholds Remarks Remarks (in US$ (in US$, equivalent) millions) QCBS, QBS, FBS, ≥ 300,000 Shortlist of only ≥ 1.0 million Risk-based LCS (Using the National Consultants approach most appropriate (Firms) for contract market agreed in the PP approach) CQS (Open or < 300,000 QCBS, QBS, FBS, None limited LCS) can be applied competition for contracts with through national value under or international $300,000 market approach, specified in the PP and agreed with the Bank. Direct Selection None No threshold; meet Same as for This has not been of firms requirements of competitive foreseen at the regulations 7.13- selection project preparation 7.15 stage. Individual N/A depending Essential individual ≥ 300,000 and Risk-based Consultants on nature of assignments will be for the positions approach services defined in the as specified in Procurement Plan the PP agreed agreed with the with the Bank Bank and in line with regulations 7.34- 7.39 using the most appropriate market approach 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than US$ 200,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 7.1, Section VII of the Procurement Regulations. 5 3. Consultancy Assignments with Selection Methods and Time Schedule Estimat Selecti Revi Expecte ed on ew d Proposa Metho by ls Description of Cost Ref. No. d Bank Submiss Comments Assignment ion (Prio US$ r/ Date Post) Khammouane Technical consultant for Execute by KM/IC-01 KM PAFO in extension 120,000 IC Post Jun-18 MAF services Technical assistance for Execute by KM/IC-02 FOs on Productive 50,000 IC Post Jul-18 MAF partnerships (PPs) in KM Technical assistance to Execute by KM/IC-03 120,000 IC Post Jul-18 KM PICO MAF Project accountant for KM Execute by KM/IC-04 66,000 IC Post Mar-18 PAFO MAF Bolikhamxay Technical consultant for Execute by BLK/IC-01 BLK PAFO in extension 120,000 IC Post Jun-18 MAF services Technical assistance for Execute by BLK/IC-02 FOs on Productive 50,000 IC Post Jul-18 MAF partnerships (PPs) in BLK Technical assistance to Execute by BLK/IC-03 120,000 IC Post Jul-18 BLK PICO MAF Project accountant for BLK Execute by BLK/IC-04 66,000 IC Post Mar-18 PAFO MAF Vientiane Capital Technical consultant for Execute by VC/IC 01 VC PAFO in extension 120,000 IC Post Jun-18 MAF services Technical assistance for Execute by VC/IC-02 FOs on Productive 50,000 IC Post Jul-18 MAF partnerships (PPs) in VC Technical assistance to VC Execute by VC/IC-03 120,000 IC Post Jul-18 PICO MAF Project accountant for VC Execute by VC/IC-04 66,000 IC Post Mar-18 PAFO MAF Vientiane Province Technical consultant for Execute by VP/IC-01 VP PAFO in extension 120,000 IC Post Jun-18 MAF services Technical assistance for Execute by VP/IC-02 FOs on Productive 50,000 IC Post Jul-18 MAF partnerships (PPs) in VP Technical assistance to VP Execute by VP/IC-03 120,000 IC Post Jul-18 PICO MAF Project accountant for VP Execute by VP/IC-04 66,000 IC Post Mar-18 PAFO MAF Xayabouly 6 Estimat Selecti Revi Expecte ed on ew d Technical consultant for XYL /IC- Execute by XBL PAFO in extension 120,000 IC Post Jun-18 01 Description of MAF Ref. No. services Comments Assignment Technical assistance for Execute by XYL/IC-02 FOs on Productive 50,000 IC Post Jul-18 MAF partnerships (PPs) in XYL Technical assistance to Execute by XYL/IC-03 120,000 IC Post Jul-18 XYL PICO MAF Project accountant for XYL Execute by XYL/IC-04 66,000 IC Post Mar-18 PAFO MAF MAF SSS/QB S TA for AB Matching Grants (Qualit MAF/QBS- Management and Execute by 600,000 y Post Sep-18 01 Capacity Building for rice MAF Based mills Selecti on) SSS MAF/SSS- Technical assistance to Execute by 770,000 (with Post Sep-18 01 support implementation (1) MAF FAO) Completed MAF/SSS- Environment safeguard (Keoduangc 84,000 SSS Post Aug-17 hay 02 specialist (DoPF) Keokhamph ui) Completed MAF/SSS- Social safeguard specialist 84,000 SSS Post Aug-17 (Bounhome 03 (DoPF) Phothimath) MAF/SSS- Monitoring and evaluation Execute by 132,000 SSS Post Jul-18 04 specialist (DoPF) MAF Completed MAF/SSS- Finance management 132,000 SSS Post Aug-17 (Khayta 05 specialist* (DoPF) Sithivong) Completed MAF/SSS- Procurement specialist (Keophouth 120,000 SSS Post Aug-17 06 (DoPF) one Inthivong) Local Consultant on MAF/IC- Execute by Survey-Design of 144,000 IC Post Jun-18 01 MAF irrigation system (DOI) Local Consultant on MAF/IC- Execute by strengthening of WUA and 180,000 IC Post Jun-18 02 MAF O&M (DOI) Study on integrated MAF/IC- farming Execute by 30,000 IC Post Jul-18 03 systems/diversification for MAF nutrition MAF/IC- National Project Advisor Execute by 198,000 IC post Mar-18 04 (DoPF) MAF International Project MAF/IC- Execute by Advisor (Project 225,000 IC post Mar-18 05 MAF management DoPF) MAF/IC- Execute by Accountant – chief 132,000 IC Post Mar-18 06 MAF MAF/IC- Execute by Accountant- assistant 66,000 IC Post Mar-18 07 MAF 7 Estimat Selecti Revi Expecte ed on ew d MAF/IC- Execute by Accountant- assistant 66,000 IC Post Mar-18 08 MAF Description of Ref. No. MAF/IC- Comments Execute by Assignment Cashier – assistant 66,000 IC Post Mar-18 09 MAF MAF/IC- Administrative staff – Execute by 66,000 IC Post Mar-18 10 assistant MAF MAF/IC- Execute by Procurement assistant 66,000 IC Post Mar-18 11 MAF MAF/IC- Project Advisor (part time) Execute by 72,000 IC Post Jul-18 12 for MOIC DOPC MAF MAF/IC- Administrative staff for Execute by 46,000 IC Post Jul-18 13 MOIC DOPC MAF Nutrition social behavior MAF/CQS- Execute by change communication 400,000 CQS Prior Jul-18 01 MAF (SBBC) MAF/CQS- Panel of Expert – Dam Execute by 100,000 CQS Post Jul-18 02 Safety MAF MAF/CQS- TA firm for baseline, mid- Execute by 180,000 CQS Post Mar-18 03 term and final assessment MAF MAF/CQS- Execute by DOPF - Project Audits* 180,000 CQS Post Dec-18 04 MAF 5,919,0 Total consulting services 00 Total Works, Goods and 12,009, Consulting Services 200 1 Consultants under FAO SSS package: Estimated Position Cost (USD) FAO-Int 01 Int. Policy on seed management (MAF DoPF) 15,000 FAO-Int 02 Int. Nutrition Specialist (MAF DoPF) 45,000 FAO-Int 03 Int. Crop/GAP Specialist (MAF DoPF) 45,000 FAO-Int 04 Int. Institutional Specialist (MAF DoPF) 45,000 FAO-Int 05 Int. consultant to develop MIS system (MoIC) 60,000 FAO-Int 06 Int. consultant on rice mill standard promotion policy (MoIC) 45,000 Int. consultant to review and develop rice export strategy FAO-Int 07 45,000 (MoIC) FAO-Int 08 Int. TA for Preparing for GMP and HACCP certification (MoIC) 15,000 FAO-Int 09 Int. consultant to develop guidelines on Quality Mark (MoIC) 45,000 Subtotal International Consultants 360,000 FAO-Nat DOA - Technical Consultant for certification of organic 108,000 01 production and GAP (MAF) FAO-Nat DAEC - Technical Consultant on seed certification for R3 (MAF) 108,000 02 FAO-Nat DALAM -Technical Consultant on organic fertilization (MAF) 108,000 03 FAO-Nat Develop a system for M&E and reporting on SPS (MAF) 10,000 04 FAO-Nat Improve the system of plant quarantine inspection (MAF) 12,000 05 FAO-Nat DIMEX- National consultant on Rice import and export 24,000 06 legislations (MOIC) FAO-Nat DOSMEP - National consultant on GMP, HACCP (MOIC) 30,000 07 8 FAO-Nat DOTP - Promotion of Quality Mark (MOIC) 10,000 08 Subtotal National Consultants 410,000 GRAND TOTAL 770,000 * Although these packages are subject to procurement Post Review, the World Bank will do prior technical review or the EOI evaluation reports and draft negotiated contracts. 9 Annex 1 - Additional National Procurement Provisions. Procurement under National Procurement Procedures will be carried out in accordance with national regulations including the Procurement Decree #03, dated January 9, 2004 and Implementation Rule and Regulations (IRR) #0063 issued by MOF on March 12, 2004 and #0861/MOF, dated May 5, 2009 (amended version); Procurement Manual dated May 2009 and harmonized bidding documents for national competitive bidding and request for quotations agreed between Government of Lao PDR, World Bank and Asia Development Bank. In addition to the provisions stipulated in the above documents, Government and Implementing agencies for Bank financed projects shall implement the following additional provisions: i. The request for bids/request for proposals document shall require that bidders/proposers submitting bids/proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, Bank Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights; ii. Information related to award of contract including reasons for rejection of unsuccessful bidders shall be published on the implementing agency websites and/or newspaper of wide circulation. iii. All complaints on procurement related matters including complaints arising from procurement under Bank financed Projects whilst using National Procurement Procedures shall be dealt with in accordance with Article 33 of the Procurement Decree. Borrower shall put in place an effective complaints review mechanism for dealing with procurement related complaints, and shall disclose the details in all the bidding documents. All complaints shall be recorded by the Borrower in the appropriate tracking and monitoring system, as agreed between the Bank and the Borrower. 10 PROCUREMENT Lao People's Democratic Republic : Agriculture Competitiveness Project PLAN General Information Country: Lao People's Democratic Republic Bank’s Approval Date of the Original Procurement Plan: 2017-07-20 2021-06-08 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P161473 GPN Date: 2018-10-17 Project Name: Agriculture Competitiveness Project Loan / Credit No: IDA / V0940, IDA / 62050 D Executing Agency(ies): epartment of Planning and Cooperation, Ministry of Agriculture and Forestry WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned MAF/W-RFQ02 / Office Request for Single Stage - One 2019-03- Renovation and Extension of IDA / 62050 C. Project Management Post Limited 22,000.00 21,484.34 Signed 2018-08-04 2018-07-30 2018-09-29 2018-09-24 Quotations Envelope 28 CPMO KM/W- RFQ 01 / Upgrade of infrastructure for KM PAFO for A. Improved Agricultural Request for Single Stage - One 2019-08- IDA / 62050 Post Limited 30,000.00 29,862.49 Signed 2018-12-08 2018-11-13 2019-02-02 2018-12-11 seed, GAP and general Efficiency and Sustainability Quotations Envelope 01 extension KM/W-RFQ 02 / Upgrade of A. Improved Agricultural Request for Single Stage - One 2019-08- infrastructure for KM DAFOs IDA / 62050 Post Limited 30,000.00 29,944.02 Signed 2018-12-08 2018-12-04 2019-02-02 2019-01-04 Efficiency and Sustainability Quotations Envelope 01 for seed and GAP BLK/W-RFQ 01 / Upgrade of A. Improved Agricultural Request for Single Stage - One 2019-08- infrastructure for BLK for IDA / 62050 Post Limited 30,000.00 29,821.38 Signed 2018-12-08 2018-12-11 2019-02-02 2019-01-04 Efficiency and Sustainability Quotations Envelope 01 seed, GAP and general extension BLK/W-RFQ 02 / Upgrade of A. Improved Agricultural Request for Single Stage - One 2019-08- infrastructure for BLK DAFOs IDA / 62050 Post Limited 30,000.00 9,889.69 Signed 2018-12-08 2018-12-05 2019-02-02 2019-01-04 Efficiency and Sustainability Quotations Envelope 01 for seed and GAP VC/W- RFQ 01 / Upgrade of A. Improved Agricultural Request for Single Stage - One 2019-08- infrastructure for VC for seed, IDA / 62050 Post Limited 30,000.00 29,644.13 Signed 2018-12-08 2018-11-20 2019-02-02 2018-12-14 Efficiency and Sustainability Quotations Envelope 01 GAP and general extension VC/W- RFQ 02 / Upgrade of A. Improved Agricultural Request for Single Stage - One 2019-08- infrastructure for VC DAFOs IDA / 62050 Post Limited 40,000.00 28,541.17 Signed 2018-12-08 2019-01-30 2019-02-02 2019-03-01 Efficiency and Sustainability Quotations Envelope 01 for seed and GAP VP/W- RFQ 01 / Upgrade of infrastructure for VP PAFO for A. Improved Agricultural Request for Single Stage - One 2019-08- IDA / 62050 Post Limited 30,000.00 50,450.60 Signed 2018-12-08 2018-12-24 2019-02-02 2019-01-16 seed, GAP and general Efficiency and Sustainability Quotations Envelope 01 extension VP/W- RFQ 02 / Upgrade of A. Improved Agricultural Request for Single Stage - One 2019-08- infrastructure for VP DAFOs IDA / 62050 Post Limited 20,000.00 50,450.60 Signed 2018-12-08 2018-12-24 2019-02-02 2019-01-16 Efficiency and Sustainability Quotations Envelope 01 for seed and GAP XYL/W- RFQ 01 / Upgrade of infrastructure for XYL PAFO A. Improved Agricultural Request for Single Stage - One 2019-08- IDA / 62050 Post Limited 30,000.00 30,697.50 Signed 2018-12-08 2018-12-10 2019-02-02 2019-01-14 for seed, GAP and general Efficiency and Sustainability Quotations Envelope 01 extension XYL/W- RFQ 02 / Upgrade of A. Improved Agricultural Request for Single Stage - One 2019-08- infrastructure for XYL DAFOs IDA / 62050 Post Limited 40,000.00 42,698.20 Signed 2018-12-08 2019-02-04 2019-02-02 2019-02-22 Efficiency and Sustainability Quotations Envelope 01 for seed and GAP XYL/W- RFQ 01.1 / Upgrade of critical productive A. Improved Agricultural Request for Single Stage - One 2021-05- IDA / 62050 Post Open - National 121,387.08 50,556.62 Signed 2020-10-06 2020-12-01 2020-12-03 infrastructure (Nam Ngeum 2) Efficiency and Sustainability Quotations Envelope 30 in Xienghone District XYL/W- RFQ 01.4 / Upgrade of critical productive A. Improved Agricultural Request for Single Stage - One 2021-05- IDA / 62050 Post Open - National 55,110.45 111,926.29 Signed 2020-10-06 2020-12-01 2020-12-03 infrastructure (Na Ngao) in Efficiency and Sustainability Quotations Envelope 30 Xayabuly District XYL/W- RFQ 01.5 / Upgrade Pending of critical productive A. Improved Agricultural Request for Single Stage - One 2021-12- IDA / 62050 Post Open - National 36,664.21 0.00 Implementat 2021-05-06 2021-07-01 infrastructure (Na La) in Efficiency and Sustainability Quotations Envelope 28 ion Xayabuly District XYL/W- RFQ 01.7 / Upgrade Pending of critical productive A. Improved Agricultural Request for Single Stage - One 2021-12- IDA / 62050 Post Open - National 196,899.10 0.00 Implementat 2021-05-06 2021-07-01 infrastructure (Nam Tan) in Efficiency and Sustainability Quotations Envelope 28 ion Phieng District KM/W-RFQ 01.5 / Upgrade of Pending critical productive A. Improved Agricultural Request for Single Stage - One 2021-12- IDA / 62050 Post Open - National 51,200.27 0.00 Implementat 2021-05-06 2021-07-01 infrastructure in (Ban Mahaxay Efficiency and Sustainability Quotations Envelope 28 ion Neua) Mahaxay District BLK/W-RFQ 01.1 / Upgrade of critical productive A. Improved Agricultural Request for Single Stage - One 2021-11- IDA / 62050 Post Open - National 168,880.99 157,685.59 Signed 2021-04-06 2021-06-01 2021-04-20 infrastructure in (Ban Pak Efficiency and Sustainability Quotations Envelope 28 Peung 1-3) Paksan District GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MAF/G-RFQ 08 / Office Single Stage - One equipment for MAF, MOIC, 5 IDA / 62050 C. Project Management Post Request for Bids Open - National 133,200.00 75,416.00 Signed 2018-09-01 2019-01-08 2018-09-06 2018-10-18 2019-01-30 2018-11-17 2019-01-30 2018-12-22 2019-02-14 2019-06-20 Envelope provinces and districts Page 1 MAF/G- RFQ 09 / Motorbikes Single Stage - One for Provinces, MAF and MOIC IDA / 62050 C. Project Management Post Request for Bids Open - National 84,000.00 57,680.00 Signed 2018-12-01 2019-03-26 2018-12-06 2019-01-17 2019-04-25 2019-02-16 2019-04-29 2019-03-23 2019-05-31 2019-09-19 Envelope (42 units) MAF/G- RFB 01 / Pick-up for A. Improved Agricultural Single Stage - One 5 provinces, MAF and MOIC IDA / 62050 Post Request for Bids Limited 630,000.00 628,400.00 Signed 2018-12-03 2019-01-11 2018-12-08 2019-01-11 2019-01-19 2019-02-08 2019-02-18 2019-02-08 2019-03-25 2019-03-11 2019-09-21 Efficiency and Sustainability Envelope (14 units) C3/G001 / Accounting software for the project Request for Single Stage - One IDA / 62050 C. Project Management Post Limited 25,000.00 24,200.00 Signed 2017-07-29 2017-12-18 2017-09-23 2018-01-31 2018-03-22 preparation and project Quotations Envelope implementation periods. C3/G002 / Computers for each project implementation Request for Single Stage - One unit involve in the PPA and IDA / V0940 C. Project Management Post Limited 30,000.00 27,168.00 Signed 2017-07-29 2017-11-01 2017-09-23 2017-12-06 2018-03-22 Quotations Envelope project implementation stages. MAF/G-RFQ 02 / Machine A. Improved Agricultural Request for Single Stage - One and equipment for NAFRI- IDA / 62050 Post Limited 25,000.00 41,327.00 Signed 2018-12-08 2019-11-26 2019-02-02 2020-01-22 2019-08-01 Efficiency and Sustainability Quotations Envelope HRC MAF/G-RFQ 10 / Lab A. Improved Agricultural Request for Single Stage - One Equipment and Tractor for IDA / 62050 Post Limited 70,000.00 55,597.00 Signed 2019-02-09 2019-04-29 2019-04-05 2019-06-25 2019-10-02 Efficiency and Sustainability Quotations Envelope NAFRI MAF/G- RFQ11 / Notebooks of 20 sets and Cellphone with Request for Single Stage - One IDA / 62050 C. Project Management Post Open - National 32,000.00 32,000.00 Signed 2019-07-06 2019-08-31 2020-08-03 2020-02-27 4-5G of 20sets Quotations Envelope (NPMO,PPMO,Districts) MAF/G- RFQ 12 / Additional Request for Single Stage - One IDA / 62050 C. Project Management Post Open - National 35,000.00 28,853.00 Signed 2019-07-06 2019-08-31 2020-09-14 2020-02-27 Equipment for DALAM Quotations Envelope MAF/G-RFQ 01 / Machine A. Improved Agricultural Request for Single Stage - One IDA / 62050 Post Limited 26,000.00 41,327.00 Signed 2019-11-20 2019-11-26 2020-01-15 2020-01-22 2020-07-13 and equipment for NAFRI-ARC Efficiency and Sustainability Quotations Envelope MAF/G-RFQ-13 / Office Request for Single Stage - One IDA / 62050 C. Project Management Post Limited 7,000.00 4,607.12 Signed 2019-12-06 2019-11-21 2020-01-31 2020-01-21 2020-07-29 Extension/Renovation Quotations Envelope MAF/G-RFQ-14 / Lab Request for Single Stage - One Equipment for PAFO & DAFO IDA / 62050 C. Project Management Post Limited 92,000.00 101,388.16 Signed 2020-01-06 2020-05-11 2020-03-02 2020-07-10 2020-08-29 Quotations Envelope of 5 Provinces MAF/G-RFQ 15 / Office Request for Single Stage - One Equipment for PAFO, DAFO, IDA / 62050 C. Project Management Post Open - National 94,100.00 68,260.50 Signed 2020-07-06 2020-08-31 2020-08-03 2021-02-27 Quotations Envelope PICO & DICO NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MAF/QBS-01 / TA for AB Matching Grants Management B. Enhanced Agricultural Quality Based IDA / 62050 Post Open - National 600,000.00 654,548.22 Signed 2018-12-15 2018-10-02 2019-01-05 2019-02-18 2019-03-13 2019-03-18 2019-04-30 2019-04-17 2019-05-23 2019-05-17 2019-08-30 2019-06-21 2019-10-25 2020-06-20 and Capacity Building for rice Commercialization Selection mills Consultant MAF/CQS-04 / Project Audits IDA / 62050 C. Project Management Post Qualification Limited 180,000.00 177,100.00 Signed 2018-12-03 2018-09-26 2018-12-17 2018-11-23 2019-01-16 2019-03-25 2019-02-20 2019-05-06 2019-08-19 for NPMO Selection Consultant MAF/CQS-02 / Panel of IDA / 62050 C. Project Management Post Qualification Limited 100,000.00 0.00 Canceled 2019-02-01 2019-09-05 2019-02-15 2019-03-17 2019-04-21 2019-10-18 Expert – Dam Safety Selection MAF/CQS-03 / TA firm for Consultant baseline, mid-term and final IDA / 62050 C. Project Management Post Qualification Limited 180,000.00 97,262.00 Signed 2019-02-01 2019-02-08 2019-02-15 2019-03-25 2019-03-17 2020-06-10 2019-04-21 2020-06-16 2019-10-18 assessment Selection Consultant MAF/CQS-05 / M&E Software IDA / 62050 C. Project Management Post Qualification Open - National 32,000.00 0.00 Canceled 2020-07-01 2020-07-17 2020-07-22 2020-09-04 2020-10-04 2020-11-08 2021-05-07 Selection MAF/LCS-01 / Mid Term Least Cost IDA / 62050 C. Project Management Post Open - National 100,000.00 0.00 Canceled 2021-08-01 2021-08-22 2021-10-05 2021-11-02 2021-12-02 2022-01-06 2022-02-10 2022-08-09 Review Selection INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual C1/C001 / Senior Technical Individual Advisor (International) IDA / V0940 C. Project Management Post Consultant Open 25,000.00 39,930.00 Signed 2017-07-19 2017-07-24 2017-09-06 2017-07-24 2017-09-27 2017-11-13 2017-11-01 2017-11-13 2018-04-30 working with DPC in Lao PDR. Selection Individual C3/C001 / Procurement staff IDA / V0940 C. Project Management Post Consultant Open 8,000.00 32,400.00 Signed 2017-07-19 2017-07-24 2017-09-06 2017-08-29 2017-09-27 2017-08-29 2017-11-01 2017-10-01 2018-04-30 working in DPC Selection C3/C003 / Environmental Individual Safeguard Specialist working IDA / V0940 C. Project Management Post Consultant Open 12,000.00 14,250.00 Signed 2017-07-19 2017-08-07 2017-09-06 2017-08-29 2017-09-27 2017-10-05 2017-11-01 2017-10-09 2018-04-30 with DPC. Selection Page 2 Individual C3/C004 / Social Safeguard IDA / V0940 C. Project Management Post Consultant Open 12,000.00 8,360.00 Signed 2017-07-19 2017-08-01 2017-09-06 2017-08-29 2017-09-27 2017-10-05 2017-11-01 2017-10-09 2018-04-30 Specialist working with DPC Selection XYL /IC-01 / Technical Individual A. Improved Agricultural consultant for XBL PAFO in IDA / 62050 Post Consultant Open 120,000.00 31,200.00 Signed 2018-08-01 2018-07-02 2018-09-19 2018-07-02 2018-10-10 2018-09-19 2018-11-14 2018-09-26 2019-05-13 Efficiency and Sustainability extension services Selection Individual KM/IC-04 / Project A. Improved Agricultural IDA / 62050 Post Consultant Open 66,000.00 15,000.00 Signed 2018-08-01 2017-12-18 2018-09-19 2017-12-18 2018-10-10 2018-08-23 2018-11-14 2018-09-24 2019-05-13 accountant for KM PAFO Efficiency and Sustainability Selection Individual BLK/IC-04 / Project A. Improved Agricultural IDA / 62050 Post Consultant Open 66,000.00 10,800.00 Signed 2018-08-01 2017-12-18 2018-09-19 2017-12-18 2018-10-10 2018-08-21 2018-11-14 2018-09-24 2019-05-13 accountant for BLK PAFO Efficiency and Sustainability Selection Individual VC/IC-04 / Project A. Improved Agricultural IDA / 62050 Post Consultant Open 66,000.00 20,400.00 Signed 2018-08-01 2017-12-18 2018-09-19 2017-12-18 2018-10-10 2018-09-05 2018-11-14 2018-09-24 2019-05-13 accountant for VC PAFO Efficiency and Sustainability Selection Individual VP/IC-04 / Project A. Improved Agricultural IDA / 62050 Post Consultant Open 66,000.00 18,000.00 Signed 2018-08-01 2017-12-18 2018-09-19 2017-12-18 2018-10-10 2018-09-04 2018-11-14 2018-09-24 2019-05-13 accountant for VP PAFO Efficiency and Sustainability Selection Individual XYL/IC-04 / Project A. Improved Agricultural IDA / 62050 Post Consultant Open 66,000.00 13,200.00 Signed 2018-08-01 2017-12-18 2018-09-19 2017-12-18 2018-10-10 2018-08-23 2018-11-14 2018-09-24 2019-05-13 accountant for XYL PAFO Efficiency and Sustainability Selection Individual MAF/IC-14 / Monitoring and IDA / 62050 C. Project Management Post Consultant Open 132,000.00 35,000.00 Signed 2018-08-01 2018-05-31 2018-09-19 2018-05-31 2018-10-10 2018-09-17 2018-11-14 2018-10-09 2019-05-13 evaluation specialist (DoPF) Selection Individual MAF/IC-08 / Accountant- IDA / 62050 C. Project Management Post Consultant Open 66,000.00 18,000.00 Signed 2018-08-01 2018-01-05 2018-09-19 2018-01-04 2018-10-10 2018-06-12 2018-11-14 2018-06-29 2019-05-13 assistant Selection Individual MAF/IC-11 / Procurement IDA / 62050 C. Project Management Post Consultant Open 66,000.00 18,000.00 Signed 2018-08-01 2018-05-31 2018-09-19 2018-06-04 2018-10-10 2018-09-03 2018-11-14 2018-09-03 2019-05-13 assistant Selection KM/IC-01 / Technical Individual A. Improved Agricultural consultant for KM PAFO in IDA / 62050 Post Consultant Open 120,000.00 33,600.00 Signed 2018-08-01 2018-07-02 2018-09-19 2018-07-02 2018-10-10 2018-09-10 2018-11-14 2018-09-26 2019-05-13 Efficiency and Sustainability extension services Selection VP/IC-01 / Technical Individual A. Improved Agricultural consultant for VP PAFO in IDA / 62050 Post Consultant Open 120,000.00 31,200.00 Signed 2018-08-01 2018-07-02 2018-09-19 2018-07-02 2018-10-10 2018-09-14 2018-11-14 2018-09-26 2019-05-13 Efficiency and Sustainability extension services Selection VC/IC 01 / Technical Individual A. Improved Agricultural consultant for VC PAFO in IDA / 62050 Post Consultant Open 120,000.00 33,600.00 Signed 2018-08-01 2018-07-02 2018-09-19 2018-07-02 2018-10-10 2018-09-14 2018-11-14 2018-09-26 2019-05-13 Efficiency and Sustainability extension services Selection BLK/IC-01 / Technical Individual A. Improved Agricultural consultant for BLK PAFO in IDA / 62050 Post Consultant Open 120,000.00 33,600.00 Signed 2018-08-01 2018-07-02 2018-09-19 2018-07-02 2018-10-10 2018-09-11 2018-11-14 2018-09-26 2019-05-13 Efficiency and Sustainability extension services Selection C1/C002 / Technical Advisor Individual (Lao National) working with IDA / V0940 Post Consultant Open 8,000.00 0.00 Canceled 2017-07-19 2017-09-06 2017-09-27 2017-11-01 2018-04-30 DPC. Selection MAF/IC-1 / Local Consultant Individual on Survey-Design of irrigation IDA / 62050 C. Project Management Post Consultant Open 144,000.00 44,800.00 Signed 2018-08-01 2018-05-31 2018-09-19 2018-05-31 2018-10-10 2018-10-04 2018-11-14 2018-10-10 2019-05-13 system (DOI) Selection Individual MAF/IC-4 / National Project IDA / 62050 C. Project Management Post Consultant Open 198,000.00 42,000.00 Signed 2018-09-03 2018-05-31 2018-10-22 2018-06-13 2018-11-12 2018-09-25 2018-12-17 2018-10-15 2019-06-15 Advisor (DoPF) Selection Individual MAF/IC-07 / Accountant- IDA / 62050 C. Project Management Post Consultant Open 66,000.00 18,000.00 Signed 2018-09-03 2018-01-04 2018-10-22 2018-06-28 2018-11-12 2018-06-28 2018-12-17 2018-07-13 2019-06-15 assistant Selection Individual MAF/IC-09 / Cashier – IDA / 62050 C. Project Management Post Consultant Limited 66,000.00 9,600.00 Signed 2018-09-01 2018-04-05 2018-09-06 2018-04-06 2018-09-27 2018-04-23 2018-11-01 2018-04-26 2019-04-30 assistant Selection MAF/SSS-06 / Procurement IDA / 62050 C. Project Management Post Direct Selection Direct 120,000.00 38,400.00 Signed 2018-10-01 2018-08-13 2018-10-11 2018-08-14 2018-12-15 2018-09-03 2019-06-13 specialist (DoPF) MAF/SSS-05 / Finance management specialist* IDA / 62050 C. Project Management Post Direct Selection Direct 132,000.00 26,195.00 Signed 2018-12-03 2018-10-24 2018-12-13 2018-10-29 2019-02-16 2018-11-19 2019-08-15 (DoPF) MAF/SSS-03 / Social IDA / 62050 C. Project Management Post Direct Selection Direct 84,000.00 19,000.00 Signed 2018-09-01 2018-08-14 2018-09-11 2018-08-15 2018-11-15 2018-08-27 2019-05-14 safeguard specialist (DoPF) MAF/IC-05 / International Individual Project Advisor (Project IDA / 62050 C. Project Management Post Consultant Limited 225,000.00 0.00 Canceled 2018-10-01 2018-10-06 2018-10-27 2018-12-01 2019-05-30 management DoPF) Selection MAF/SSS-07 / International IDA / 62050 C. Project Management Post Direct Selection Direct 225,000.00 62,000.00 Signed 2018-11-01 2018-10-12 2018-11-11 2018-11-22 2019-01-15 2019-01-17 2019-07-14 Project Advisor for NPMO Individual MAF/IC-010 / Administrative IDA / 62050 C. Project Management Post Consultant Limited 90,000.00 19,500.00 Signed 2018-11-01 2018-10-12 2018-11-06 2018-10-29 2018-11-27 2018-11-30 2019-01-01 2018-11-30 2019-06-30 & Public Relations Officer Selection MAF/IC-15 / 2nd Individual Procurement Assistant for IDA / 62050 C. Project Management Post Consultant Limited 36,000.00 0.00 Canceled 2018-11-01 2018-10-12 2018-11-06 2018-10-29 2018-11-27 2018-11-30 2019-01-01 2019-06-30 NPMO Selection Individual MAF/IC-012 / Project Advisor IDA / 62050 C. Project Management Post Consultant Limited 72,000.00 12,727.20 Signed 2018-11-01 2018-10-12 2018-11-06 2018-10-29 2018-11-27 2018-11-30 2019-01-01 2018-12-05 2019-06-30 (part time) for MOIC DOPC Selection Page 3 Individual MAF/IC-13 / Administrative IDA / 62050 C. Project Management Post Consultant Limited 46,000.00 7,200.00 Signed 2018-11-01 2018-10-12 2018-11-06 2018-10-29 2018-11-27 2018-12-26 2019-01-01 2018-12-24 2019-06-30 staff for MOIC DOPC Selection Individual KM/IC-03 / Technical IDA / 62050 C. Project Management Post Consultant Limited 120,000.00 24,000.00 Signed 2019-03-04 2019-05-17 2019-03-09 2019-05-28 2019-03-30 2019-11-29 2019-05-04 2019-12-27 2019-10-31 assistance to KM PICO Selection Individual BLK/IC-03 / Technical IDA / 62050 C. Project Management Post Consultant Limited 120,000.00 21,600.00 Signed 2019-03-04 2019-05-17 2019-03-09 2019-05-28 2019-03-30 2019-11-29 2019-05-04 2019-12-27 2019-10-31 assistance to BLK PICO Selection Individual VC/IC-03 / Technical IDA / 62050 C. Project Management Post Consultant Limited 120,000.00 24,000.00 Signed 2019-03-04 2019-05-17 2019-03-09 2019-05-28 2019-03-30 2019-11-29 2019-05-04 2019-12-27 2019-10-31 assistance to VC PICO Selection Individual VP/IC-03 / Technical IDA / 62050 C. Project Management Post Consultant Limited 120,000.00 21,000.00 Signed 2019-03-04 2019-05-17 2019-03-09 2019-05-28 2019-03-30 2019-11-29 2019-05-04 2019-12-27 2019-10-31 assistance to VP PICO Selection Individual XYL/IC-03 / Technical IDA / 62050 C. Project Management Post Consultant Limited 120,000.00 25,200.00 Signed 2019-03-04 2019-05-17 2019-03-09 2019-05-28 2019-03-30 2019-11-29 2019-05-04 2019-12-27 2019-10-31 assistance to XYL PICO Selection MAF/IC-02 / Local Individual Consultant on strengthening IDA / 62050 C. Project Management Post Consultant Limited 180,000.00 31,900.00 Signed 2019-01-07 2018-10-12 2019-01-12 2018-10-29 2019-02-02 2018-12-03 2019-03-09 2019-01-28 2019-09-05 of WUA and O&M (DOI) Selection Individual MAF/IC-16 / National Project IDA / 62050 C. Project Management Post Consultant Limited 198,000.00 36,000.00 Signed 2019-02-04 2019-02-05 2019-02-09 2019-02-11 2019-03-02 2019-07-02 2019-04-06 2019-07-02 2019-10-03 Advisor (NPMO) Selection MAF/SSS-08 / International Individual Procurement Advisor for IDA / 62050 C. Project Management Post Consultant Direct 51,000.00 29,480.00 Signed 2019-02-04 2019-02-11 2019-02-14 2019-02-11 2019-03-07 2019-02-11 2019-04-11 2019-02-28 2019-10-08 NPMO Selection MAF/IC-18 / National Individual Consultant on Institutional IDA / 62050 C. Project Management Post Consultant Open 130,500.00 31,200.00 Signed 2019-06-01 2019-06-05 2019-07-20 2019-08-06 2019-08-10 2019-08-12 2019-09-14 2019-08-12 2020-03-12 and Gender for MAF Selection MAF/IC-19 / National Individual Consultant on Seed, GAP and IDA / 62050 C. Project Management Post Consultant Open 130,500.00 36,000.00 Signed 2019-06-01 2019-06-05 2019-07-20 2019-06-10 2019-08-10 2019-08-14 2019-09-14 2019-08-14 2020-03-12 Organic Production and Selection Certification for MAF MAF/IC-20 / National Individual Consultant on Rice Import- IDA / 62050 C. Project Management Post Consultant Open 24,000.00 21,120.00 Signed 2019-06-01 2019-07-02 2019-07-20 2019-09-03 2019-08-10 2019-11-06 2019-09-14 2019-11-26 2020-03-12 Export Legislation and Selection Strategy to DIMAX for MoIC MAF/SSS-001 / Technical assistance to support IDA / 62050 C. Project Management Post Direct Selection Direct 485,000.00 695,955.00 Signed 2019-06-01 2019-05-22 2019-06-11 2019-06-03 2019-08-15 2020-01-08 2020-02-11 implementation (1) MAF/SSS-01 / Technical assistance to support IDA / 62050 C. Project Management Post Direct Selection Direct 770,000.00 0.00 Canceled 2018-12-03 2018-09-13 2018-12-13 2018-10-10 2019-02-16 2019-08-15 implementation (1) MAF/IC-22 / National Individual Consultant on Seed, GAP and IDA / 62050 C. Project Management Post Consultant Open 121,500.00 18,000.00 Signed 2020-01-01 2019-06-05 2020-02-19 2019-12-09 2020-03-11 2020-02-17 2020-04-15 2020-02-21 2020-10-12 Organic Production and Selection Certification for MAF Individual MAF/IC-23 / International IDA / 62050 C. Project Management Post Consultant Open 163,000.00 94,840.00 Signed 2020-01-01 2019-11-01 2020-02-19 2019-11-05 2020-03-11 2019-12-25 2020-04-15 2020-02-10 2020-10-12 Project Advisor for NPMO Selection MAF/IC-24 / National Individual Consultant on Business IDA / 62050 C. Project Management Post Consultant Limited 26,400.00 41,184.00 Signed 2020-03-01 2019-12-05 2020-03-06 2020-01-27 2020-03-27 2020-02-17 2020-05-01 2020-02-21 2020-10-28 Planning Advisor Selection MAF/IC-25 / National Consultant on Strengthening Individual of Water User Association IDA / 62050 C. Project Management Post Consultant Limited 151,000.00 19,800.00 Signed 2020-03-01 2019-12-13 2020-03-06 2020-01-15 2020-03-27 2020-01-21 2020-05-01 2020-02-21 2020-10-28 (WUAs) and Operation and Selection Maintenance (O&M) Individual KM/IC-05 / Junior IDA / 62050 C. Project Management Post Consultant Open 12,000.00 3,971.16 Signed 2020-04-01 2019-11-19 2020-05-20 2020-03-06 2020-06-10 2020-06-19 2020-07-15 2020-06-23 2021-01-11 Agronomist for KM PAFO Selection Individual BLK/IC-05 / Junior IDA / 62050 C. Project Management Post Consultant Open 12,000.00 3,968.64 Signed 2020-04-01 2019-11-19 2020-05-20 2020-03-06 2020-06-10 2020-06-19 2020-07-15 2020-06-22 2021-01-11 Agronomist for BLK PAFO Selection Individual VP/IC-05 / Junior IDA / 62050 C. Project Management Post Consultant Open 12,000.00 17,858.88 Signed 2020-04-01 2019-11-19 2020-05-20 2020-03-06 2020-06-10 2020-06-19 2020-07-15 2020-06-22 2021-01-11 Agronomist for VP PAFO Selection Individual XYL/IC-05 / Junior IDA / 62050 C. Project Management Post Consultant Open 12,000.00 15,477.70 Signed 2020-04-01 2019-11-19 2020-05-20 2020-03-06 2020-06-10 2020-06-19 2020-07-15 2020-06-22 2021-01-11 Agronomist for XYL PAFO Selection Individual VC/IC-05 / Junior IDA / 62050 C. Project Management Post Consultant Open 12,000.00 11,913.48 Signed 2020-04-01 2019-11-19 2020-05-20 2020-03-06 2020-06-10 2020-06-19 2020-07-15 2020-06-27 2021-01-11 Agronomist for VC PAFO Selection VC/IC-06 / Local service Individual providers – Farmer Group A. Improved Agricultural IDA / 62050 Post Consultant Open 63,000.00 0.00 Canceled 2020-04-01 2020-05-20 2020-06-10 2020-07-15 2021-01-11 Investment Plan Development Efficiency and Sustainability Selection for VC PAFO KM/IC-06 / Local service Individual providers – Farmer Group A. Improved Agricultural IDA / 62050 Post Consultant Open 59,000.00 0.00 Canceled 2020-04-01 2020-05-20 2020-06-10 2020-07-15 2021-01-11 Investment Plan Development Efficiency and Sustainability Selection for KM PAFO Page 4 MAF/IC-21 / National Individual Consultant to develop Market IDA / 62050 C. Project Management Post Consultant Limited 45,000.00 0.00 Canceled 2019-08-01 2019-12-19 2019-08-06 2020-01-08 2019-08-27 2019-10-01 2020-03-29 Information System (MIS) for Selection DIMEX, MoIC KM/IC-06.01 / Local service Individual providers – Farmer Group A. Improved Agricultural IDA / 62050 Post Consultant Open 29,500.00 29,500.00 Signed 2020-08-01 2020-03-03 2020-09-19 2020-04-06 2020-10-10 2020-06-22 2020-11-14 2020-06-30 2021-05-13 Investment Plan Development Efficiency and Sustainability Selection for KM PAFO KM/IC-06.02 / Local service Individual providers – Farmer Group A. Improved Agricultural IDA / 62050 Post Consultant Open 29,500.00 29,500.00 Signed 2020-08-01 2020-03-03 2020-09-19 2020-08-10 2020-10-10 2020-09-25 2020-11-14 2020-09-30 2021-05-13 Investment Plan Development Efficiency and Sustainability Selection for KM PAFO BLK/IC-06.01 / Local service Individual providers – Farmer Group A. Improved Agricultural IDA / 62050 Post Consultant Open 25,500.00 25,500.00 Signed 2020-08-01 2020-03-03 2020-09-19 2020-04-06 2020-10-10 2020-06-22 2020-11-14 2020-06-30 2021-05-13 Investment Plan Development Efficiency and Sustainability Selection for BLK PAFO BLK/IC-06.02 / Local service Individual providers – Farmer Group A. Improved Agricultural IDA / 62050 Post Consultant Open 25,500.00 25,500.00 Signed 2020-08-01 2020-03-03 2020-09-19 2020-08-10 2020-10-10 2020-09-25 2020-11-14 2020-09-30 2021-05-13 Investment Plan Development Efficiency and Sustainability Selection for BLK PAFO VC/IC-06.01 / Local service Individual providers – Farmer Group A. Improved Agricultural IDA / 62050 Post Consultant Open 31,500.00 31,500.00 Signed 2020-08-01 2020-03-03 2020-09-19 2020-04-06 2020-10-10 2020-06-22 2020-11-14 2020-06-30 2021-05-13 Investment Plan Development Efficiency and Sustainability Selection for VC PAFO VC/IC-06.02 / Local service Individual providers – Farmer Group A. Improved Agricultural IDA / 62050 Post Consultant Open 31,500.00 31,500.00 Signed 2020-08-01 2020-03-03 2020-09-19 2020-08-10 2020-10-10 2020-09-25 2020-11-14 2020-09-30 2021-05-13 Investment Plan Development Efficiency and Sustainability Selection for VC PAFO VP/IC-06.01 / Local service Individual providers – Farmer Group A. Improved Agricultural IDA / 62050 Post Consultant Open 25,000.00 25,000.00 Signed 2020-08-01 2020-03-03 2020-09-19 2020-07-13 2020-10-10 2020-06-22 2020-11-14 2020-06-30 2021-05-13 Investment Plan Development Efficiency and Sustainability Selection for VP PAFO VP/IC-06.02 / Local service Individual providers – Farmer Group A. Improved Agricultural IDA / 62050 Post Consultant Open 25,000.00 25,000.00 Signed 2020-08-01 2020-03-03 2020-09-19 2020-08-10 2020-10-10 2020-09-25 2020-11-14 2020-09-30 2021-05-13 Investment Plan Development Efficiency and Sustainability Selection for VP PAFO XYL/IC-06.01 / Local service Individual providers – Farmer Group A. Improved Agricultural IDA / 62050 Post Consultant Open 92,500.00 0.00 Canceled 2020-08-01 2020-09-19 2020-10-10 2020-11-14 2021-05-13 Investment Plan Development Efficiency and Sustainability Selection for XYL PAFO XYL/IC-06.02 / Local service Individual providers – Farmer Group A. Improved Agricultural IDA / 62050 Post Consultant Open 92,500.00 0.00 Canceled 2020-08-01 2020-09-19 2020-10-10 2020-11-14 2021-05-13 Investment Plan Development Efficiency and Sustainability Selection for XYL PAFO KM/IC-07.01 / Local Service Individual Providers to assist ABs in B. Enhanced Agricultural Under IDA / 62050 Post Consultant Open 12,000.00 0.00 2020-08-01 2020-05-28 2020-09-19 2020-10-10 2020-11-14 2021-05-13 Developing Business Plans for Commercialization Implementation Selection KM PAFO KM/IC-07.02 / Local Service Individual Providers to assist ABs in B. Enhanced Agricultural Under IDA / 62050 Post Consultant Open 9,000.00 0.00 2020-08-01 2020-05-28 2020-09-19 2020-10-10 2020-11-14 2021-05-13 Developing Business Plans for Commercialization Implementation Selection KM PAFO BLK/IC-07.01 / Local Service Individual Providers to assist ABs in B. Enhanced Agricultural Under IDA / 62050 Post Consultant Open 6,000.00 0.00 2020-08-01 2020-05-28 2020-09-19 2020-10-10 2020-11-14 2021-05-13 Developing Business Plans for Commercialization Implementation Selection BLK PAFO BLK/IC-07.02 / Local Service Individual Providers to assist ABs in B. Enhanced Agricultural Under IDA / 62050 Post Consultant Open 3,000.00 0.00 2020-08-01 2020-05-28 2020-09-19 2020-10-10 2020-11-14 2021-05-13 Developing Business Plans for Commercialization Implementation Selection BLK PAFO VC/IC-07.01 / Local Service Individual Providers to assist ABs in B. Enhanced Agricultural Under IDA / 62050 Post Consultant Open 12,000.00 0.00 2020-08-01 2020-05-28 2020-09-19 2020-10-10 2020-11-14 2021-05-13 Developing Business Plans for Commercialization Implementation Selection VC PAFO VC/IC-07.02 / Local Service Individual Providers to assist ABs in B. Enhanced Agricultural Under IDA / 62050 Post Consultant Open 12,000.00 0.00 2020-08-01 2020-05-28 2020-09-19 2020-10-10 2020-11-14 2021-05-13 Developing Business Plans for Commercialization Implementation Selection VC PAFO VP/IC-07.01 / Local Service Individual Providers to assist ABs in B. Enhanced Agricultural Under IDA / 62050 Post Consultant Open 12,000.00 0.00 2020-08-01 2020-05-28 2020-09-19 2020-10-10 2020-11-14 2021-05-13 Developing Business Plans for Commercialization Implementation Selection VP PAFO VP/IC-07.02 / Local Service Individual Providers to assist ABs in B. Enhanced Agricultural Under IDA / 62050 Post Consultant Open 9,000.00 0.00 2020-08-01 2020-05-28 2020-09-19 2020-10-10 2020-11-14 2021-05-13 Developing Business Plans for Commercialization Implementation Selection VP PAFO XYL/IC-07.01 / Local Service Individual Providers to assist ABs in B. Enhanced Agricultural Under IDA / 62050 Post Consultant Open 6,000.00 0.00 2020-08-01 2020-05-28 2020-09-19 2020-10-10 2020-11-14 2021-05-13 Developing Business Plans for Commercialization Implementation Selection XYL PAFO XYL/IC-07.02 / Local Service Individual Providers to assist ABs in B. Enhanced Agricultural Under IDA / 62050 Post Consultant Open 6,000.00 0.00 2020-08-01 2020-05-28 2020-09-19 2020-10-10 2020-11-14 2021-05-13 Developing Business Plans for Commercialization Implementation Selection XYL PAFO KM/IC-08.01 / Local Service Individual A. Improved Agricultural Provider for Farmer Group IDA / 62050 Post Consultant Open 4,800.00 3,843.36 Signed 2020-08-01 2020-08-05 2020-09-19 2020-10-05 2020-10-10 2021-01-20 2020-11-14 2021-01-20 2021-05-13 Efficiency and Sustainability Facilitator for KM PAFO Selection Page 5 KM/IC-08.02 / Local Service Individual A. Improved Agricultural Provider for Farmer Group IDA / 62050 Post Consultant Open 4,800.00 3,843.36 Signed 2020-08-01 2020-08-05 2020-09-19 2020-10-05 2020-10-10 2021-01-20 2020-11-14 2021-01-20 2021-05-13 Efficiency and Sustainability Facilitator for KM PAFO Selection KM/IC-08.03 / Local Service Individual A. Improved Agricultural Provider for Farmer Group IDA / 62050 Post Consultant Open 4,800.00 3,843.36 Signed 2020-08-01 2020-08-05 2020-09-19 2020-10-05 2020-10-10 2021-01-20 2020-11-14 2021-01-20 2021-05-13 Efficiency and Sustainability Facilitator for KM PAFO Selection BLK/IC-08.01 / Local Service Individual A. Improved Agricultural Provider for Farmer Group IDA / 62050 Post Consultant Open 4,800.00 3,843.36 Signed 2020-08-01 2020-08-05 2020-09-19 2020-10-05 2020-10-10 2021-01-15 2020-11-14 2021-01-18 2021-05-13 Efficiency and Sustainability Facilitator for BLK PAFO Selection BLK/IC-08.02 / Local Service Individual A. Improved Agricultural Provider for Farmer Group IDA / 62050 Post Consultant Open 4,800.00 3,843.36 Signed 2020-08-01 2020-08-05 2020-09-19 2020-10-05 2020-10-10 2021-01-15 2020-11-14 2021-01-18 2021-05-13 Efficiency and Sustainability Facilitator for BLK PAFO Selection BLK/IC-08.03 / Local Service Individual A. Improved Agricultural Provider for Farmer Group IDA / 62050 Post Consultant Open 4,800.00 3,843.36 Signed 2020-08-01 2020-08-05 2020-09-19 2020-10-05 2020-10-10 2021-01-15 2020-11-14 2021-01-18 2021-05-13 Efficiency and Sustainability Facilitator for BLK PAFO Selection VC/IC-08.01 / Local Service Individual A. Improved Agricultural Provider for Farmer Group IDA / 62050 Post Consultant Open 4,800.00 3,843.36 Signed 2020-08-01 2020-08-05 2020-09-19 2020-10-05 2020-10-10 2021-01-20 2020-11-14 2021-01-21 2021-05-13 Efficiency and Sustainability Facilitator for VC PAFO Selection VC/IC-08.02 / Local Service Individual A. Improved Agricultural Provider for Farmer Group IDA / 62050 Post Consultant Open 4,800.00 3,841.92 Signed 2020-08-01 2020-08-05 2020-09-19 2020-10-05 2020-10-10 2021-01-20 2020-11-14 2021-02-12 2021-05-13 Efficiency and Sustainability Facilitator for VC PAFO Selection VC/IC-08.03 / Local Service Individual A. Improved Agricultural Provider for Farmer Group IDA / 62050 Post Consultant Open 4,800.00 3,843.36 Signed 2020-08-01 2020-08-05 2020-09-19 2020-10-05 2020-10-10 2021-01-20 2020-11-14 2021-01-21 2021-05-13 Efficiency and Sustainability Facilitator for VC PAFO Selection VP/IC-08.01 / Local Service Individual A. Improved Agricultural Provider for Farmer Group IDA / 62050 Post Consultant Open 4,800.00 3,843.36 Signed 2020-08-01 2020-08-05 2020-09-19 2020-10-05 2020-10-10 2021-01-15 2020-11-14 2021-01-18 2021-05-13 Efficiency and Sustainability Facilitator for VP PAFO Selection VP/IC-08.02 / Local Service Individual A. Improved Agricultural Provider for Farmer Group IDA / 62050 Post Consultant Open 4,800.00 3,843.36 Signed 2020-08-01 2020-08-05 2020-09-19 2020-10-05 2020-10-10 2021-01-15 2020-11-14 2021-01-18 2021-05-13 Efficiency and Sustainability Facilitator for VP PAFO Selection VP/IC-08.03 / Local Service Individual A. Improved Agricultural Provider for Farmer Group IDA / 62050 Post Consultant Open 4,800.00 3,843.36 Signed 2020-08-01 2020-08-05 2020-09-19 2020-10-05 2020-10-10 2021-01-15 2020-11-14 2021-01-18 2021-05-13 Efficiency and Sustainability Facilitator for VP PAFO Selection XYL/IC-08.01 / Local Service Individual A. Improved Agricultural Provider for Farmer Group IDA / 62050 Post Consultant Open 4,800.00 3,840.48 Signed 2020-08-01 2020-08-05 2020-09-19 2020-10-05 2020-10-10 2021-01-20 2020-11-14 2021-01-25 2021-05-13 Efficiency and Sustainability Facilitator for XYL PAFO Selection XYL/IC-08.02 / Local Service Individual A. Improved Agricultural Provider for Farmer Group IDA / 62050 Post Consultant Open 4,800.00 3,840.48 Signed 2020-08-01 2020-08-05 2020-09-19 2020-10-05 2020-10-10 2021-01-20 2020-11-14 2021-01-25 2021-05-13 Efficiency and Sustainability Facilitator for XYL PAFO Selection XYL/IC-08.03 / Local Service Individual A. Improved Agricultural Provider for Farmer Group IDA / 62050 Post Consultant Open 4,800.00 3,840.48 Signed 2020-08-01 2020-08-05 2020-09-19 2020-10-05 2020-10-10 2021-01-20 2020-11-14 2021-01-25 2021-05-13 Efficiency and Sustainability Facilitator for XYL PAFO Selection XYL/IC-08.04 / Local Service Individual A. Improved Agricultural Provider for Farmer Group IDA / 62050 Post Consultant Open 4,800.00 3,840.48 Signed 2020-08-01 2020-08-05 2020-09-19 2020-10-05 2020-10-10 2021-01-20 2020-11-14 2021-01-25 2021-05-13 Efficiency and Sustainability Facilitator for XYL PAFO Selection XYL/IC-08.05 / Local Service Individual A. Improved Agricultural Provider for Farmer Group IDA / 62050 Post Consultant Open 4,800.00 3,840.48 Signed 2020-08-01 2020-08-05 2020-09-19 2020-10-05 2020-10-10 2021-01-20 2020-11-14 2021-01-25 2021-05-13 Efficiency and Sustainability Facilitator for XYL PAFO Selection XYL/IC-08.06 / Local Service Individual A. Improved Agricultural Provider for Farmer Group IDA / 62050 Post Consultant Open 4,800.00 3,840.48 Signed 2020-08-01 2020-08-05 2020-09-19 2020-10-05 2020-10-10 2021-01-20 2020-11-14 2021-01-25 2021-05-13 Efficiency and Sustainability Facilitator for XYL PAFO Selection XYL/IC-08.07 / Local Service Individual A. Improved Agricultural Provider for Farmer Group IDA / 62050 Post Consultant Open 4,800.00 3,840.48 Signed 2020-08-01 2020-08-05 2020-09-19 2020-10-05 2020-10-10 2021-01-20 2020-11-14 2021-01-25 2021-05-13 Efficiency and Sustainability Facilitator for XYL PAFO Selection XYL/IC-08.08 / Local Service Individual A. Improved Agricultural Provider for Farmer Group IDA / 62050 Post Consultant Open 4,800.00 0.00 Canceled 2020-08-01 2020-08-05 2020-09-19 2020-10-10 2020-11-14 2021-05-13 Efficiency and Sustainability Facilitator for XYL PAFO Selection XYL/IC-08.09 / Local Service Individual A. Improved Agricultural Provider for Farmer Group IDA / 62050 Post Consultant Open 4,800.00 0.00 Canceled 2020-08-01 2020-08-05 2020-09-19 2020-10-10 2020-11-14 2021-05-13 Efficiency and Sustainability Facilitator for XYL PAFO Selection XYL/IC-08.10 / Local Service Individual A. Improved Agricultural Provider for Farmer Group IDA / 62050 Post Consultant Open 4,800.00 0.00 Canceled 2020-08-01 2020-08-05 2020-09-19 2020-10-10 2020-11-14 2021-05-13 Efficiency and Sustainability Facilitator for XYL PAFO Selection MAF/IC-021 / International Individual Consultant on develop Market IDA / 62050 C. Project Management Post Consultant Open 60,000.00 54,692.00 Signed 2020-07-01 2019-12-19 2020-08-19 2020-01-08 2020-09-09 2020-05-26 2020-10-14 2020-06-05 2021-04-12 Information System (MIS) for Selection DIMEX MoIC Individual MAF/IC-28 / National Project IDA / 62050 C. Project Management Post Consultant Open 153,000.00 17,824.80 Signed 2020-08-01 2019-01-11 2020-09-19 2021-01-26 2020-10-10 2021-03-10 2020-11-14 2021-03-29 2021-05-13 Advisor (NPMO) Selection MAF/IC-27 / National Individual Consultant on Seed, GAP and IDA / 62050 C. Project Management Post Consultant Open 114,000.00 20,538.84 Signed 2020-08-01 2020-05-13 2020-09-19 2020-07-21 2020-10-10 2020-09-25 2020-11-14 2020-09-30 2021-05-13 Organic Production and Selection Certification for MAF Individual MAF/IC-29 / Local Irrigation A. Improved Agricultural IDA / 62050 Post Consultant Open 78,000.00 0.00 Canceled 2020-10-01 2020-08-14 2020-11-19 2020-12-10 2021-01-14 2021-07-13 Design Engineer Efficiency and Sustainability Selection MAF/IC-30 / International Individual A. Improved Agricultural Consultant of Irrigation IDA / 62050 Post Consultant Open 42,900.00 0.00 Canceled 2020-10-01 2020-08-14 2020-11-19 2020-12-10 2021-01-14 2021-07-13 Efficiency and Sustainability Design Selection Page 6 XYL/IC- 06.1 / Local service Individual providers – Farmer Group A. Improved Agricultural IDA / 62050 Post Consultant Open 37,000.00 37,000.00 Signed 2020-11-01 2020-03-03 2020-12-20 2020-04-06 2021-01-10 2020-09-25 2021-02-14 2020-10-30 2021-08-13 Investment Plan Development Efficiency and Sustainability Selection for XYL PAFO XYL/IC- 06.2 / Local service Individual providers – Farmer Group A. Improved Agricultural IDA / 62050 Post Consultant Open 37,000.00 37,000.00 Signed 2020-11-01 2020-03-03 2020-12-20 2020-04-06 2021-01-10 2020-09-25 2021-02-14 2020-10-30 2021-08-13 Investment Plan Development Efficiency and Sustainability Selection for XYL PAFO XYL/IC- 06.3 / Local service Individual providers – Farmer Group A. Improved Agricultural IDA / 62050 Post Consultant Open 37,000.00 37,000.00 Signed 2020-11-01 2020-03-03 2020-12-20 2020-10-10 2021-01-10 2020-11-25 2021-02-14 2020-11-26 2021-08-13 Investment Plan Development Efficiency and Sustainability Selection for XYL PAFO XYL/IC- 06.4 / Local service Individual providers – Farmer Group A. Improved Agricultural IDA / 62050 Post Consultant Open 37,000.00 37,000.00 Signed 2020-11-01 2020-03-03 2020-12-20 2020-10-10 2021-01-10 2020-11-26 2021-02-14 2020-11-26 2021-08-13 Investment Plan Development Efficiency and Sustainability Selection for XYL PAFO XYL/IC- 06.5 / Local service Individual providers – Farmer Group A. Improved Agricultural Pending IDA / 62050 Post Consultant Open 37,000.00 0.00 2020-11-01 2020-12-20 2021-01-10 2021-02-14 2021-08-13 Investment Plan Development Efficiency and Sustainability Implementation Selection for XYL PAFO KM/IC-9 / Technical Individual consultant for KM PAFO in IDA / 62050 C. Project Management Post Consultant Open 52,800.00 20,664.96 Signed 2020-11-01 2018-07-22 2020-12-20 2020-10-05 2021-01-10 2020-12-01 2021-02-14 2020-11-30 2021-08-13 extension services Selection VC/IC-9 / Technical Individual consultant for VC PAFO in IDA / 62050 C. Project Management Post Consultant Open 57,600.00 30,000.00 Signed 2020-11-01 2018-07-22 2020-12-20 2020-10-05 2021-01-10 2020-11-23 2021-02-14 2020-11-30 2021-08-13 extension services Selection Individual KM/IC- 10 / Local Irrigation A. Improved Agricultural IDA / 62050 Post Consultant Open 72,000.00 0.00 Canceled 2020-11-01 2020-12-20 2021-01-10 2021-02-14 2021-08-13 Design Engineer for KM PAFO Efficiency and Sustainability Selection Individual BLK/IC- 09 / Local Irrigation A. Improved Agricultural IDA / 62050 Post Consultant Open 72,000.00 0.00 Canceled 2020-11-01 2020-12-20 2021-01-10 2021-02-14 2021-08-13 Design Engineer for BLK PAFO Efficiency and Sustainability Selection Individual VC/IC- 10 / Local Irrigation A. Improved Agricultural IDA / 62050 Post Consultant Open 72,000.00 0.00 Canceled 2020-11-01 2020-12-20 2021-01-10 2021-02-14 2021-08-13 Design Engineer for VC PAFO Efficiency and Sustainability Selection Individual VP/IC- 09 / Local Irrigation A. Improved Agricultural IDA / 62050 Post Consultant Open 72,000.00 0.00 Canceled 2020-11-01 2020-12-20 2021-01-10 2021-02-14 2021-08-13 Design Engineer for VP PAFO Efficiency and Sustainability Selection Individual XYL/IC- 09 / Local Irrigation A. Improved Agricultural IDA / 62050 Post Consultant Open 72,000.00 0.00 Canceled 2020-11-01 2020-12-20 2021-01-10 2021-02-14 2021-08-13 Design Engineer for XYL PAFO Efficiency and Sustainability Selection Individual MAF/IC-31 / Monitoring and IDA / 62050 C. Project Management Post Consultant Open 67,000.00 15,317.28 Signed 2021-04-01 2021-01-01 2021-05-20 2020-11-24 2021-06-10 2021-02-25 2021-07-15 2021-03-09 2022-01-11 Evaluation Specialist Selection Individual VP/IC-10 / Technical IDA / 62050 C. Project Management Post Consultant Open 99,000.00 0.00 Under Review 2021-05-01 2021-05-28 2021-06-19 2021-07-10 2021-08-14 2022-02-10 assistance to VP PICO Selection Individual VC/IC-11 / Technical IDA / 62050 C. Project Management Post Consultant Open 96,000.00 0.00 Under Review 2021-05-01 2021-05-28 2021-06-19 2021-07-10 2021-08-14 2022-02-10 assistance to VC PICO Selection Individual MAF/IC-32 / Monitoring and Pending IDA / 62050 C. Project Management Post Consultant Open 67,000.00 0.00 2021-06-01 2021-07-20 2021-08-10 2021-09-14 2022-03-13 Evaluation specialist Implementation Selection MAF/DS-01 / Monitoring Pending IDA / 62050 C. Project Management Post Direct Selection Direct 25,000.00 0.00 2021-07-01 2021-07-11 2021-09-14 2022-03-13 Geotagging Website Implementation MAF/IC-33 / Provincial Individual A. Improved Agricultural Pending Irrigation Survey and Design IDA / 62050 Post Consultant Open 72,000.00 0.00 2021-07-01 2021-08-19 2021-09-09 2021-10-14 2022-04-12 Efficiency and Sustainability Implementation Engineer for VC & VP Selection MAF/IC-34 / Provincial Individual A. Improved Agricultural Pending Irrigation Survey and Design IDA / 62050 Post Consultant Open 36,000.00 0.00 2021-07-01 2021-08-19 2021-09-09 2021-10-14 2022-04-12 Efficiency and Sustainability Implementation Engineer for XYL Province Selection MAF/IC-35 / Provincial Individual A. Improved Agricultural Pending Irrigation Survey and Design IDA / 62050 Post Consultant Open 42,000.00 0.00 2021-07-01 2021-08-19 2021-09-09 2021-10-14 2022-04-12 Efficiency and Sustainability Implementation Engineer for BOL Province Selection MAF/IC-36 / Provincial Individual A. Improved Agricultural Pending Irrigation Survey and Design IDA / 62050 Post Consultant Open 48,000.00 0.00 2021-07-01 2021-08-19 2021-09-09 2021-10-14 2022-04-12 Efficiency and Sustainability Implementation Engineer for KHM Province Selection Individual MAF/IC-37 / Environment & Pending IDA / 62050 C. Project Management Post Consultant Open 32,000.00 0.00 2021-07-01 2021-08-19 2021-09-09 2021-10-14 2022-04-12 Social Safeguard Specialist Implementation Selection Individual MAF/IC-38 / Regional A. Improved Agricultural Pending IDA / 62050 Post Consultant Open 92,400.00 0.00 2021-07-01 2021-08-19 2021-09-09 2021-10-14 2022-04-12 Irrigation Expert Efficiency and Sustainability Implementation Selection Page 7