Procurement Plan I. General 2. Bank’s approval Date of the procurement Plan: March 1, 2017 3. Date of General Procurement Notice: Sep 2017 4. Period covered by this procurement plan: The procurement period of project covered from year March 2017 -Jun 2018 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) US$ 2 million All 2. NCB (Goods) US$ 2 million All 3. ICB (Works) US$ 10 million All 4. NCB (Works) US$ 10 million All 5. (Non-Consultant Services) US$ 2 million All 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Reference to (if any) Project Operational/Procurement Manual: Is under preparation the first draft was shared in Aug 2017. 4. Any Other Special Procurement Arrangements: Not Applicable 5. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) The main contract; two works and one consultancy have already been awarded. 1 2 3 4 5 6 7 R Description Estima Packages Dome Review Comme e ted stic by Bank nts f. Cost Aug 8, 2017 N US$ Prefe (Prior / o million rence Post) . (yes/ no) Reconstructio 7 NCB No Post n of three roads in Kornagi an Malir Reconstructio 8 NCB No Post n of education and cultural area III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 1 m 2. Single Source (Firms) Above US $ 1 m Justification alongwith identification of SSS in procurement plan 3. Individual Above US$ 300, 000 In addition the selection of procurement staff 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_500,000_equivalent per contract, may comprise entirely of national consultants in accordance with the OPCS guidance. 3. Any Other Special Selection Arrangements: NA 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. Description of Estimat Package Review Comment No. Assignment ed s by Bank s Cost (Prior / US$ Post) million Aug 8, 2017 1 Contract 0.4 1 Post Management and Construction Supervision for Year-1 Civil Works 2 Design and 2.5 1 Prior Construction Supervision of Year-2 Civil WorksSaddar downtown Area and Korangi- Malir Area 3 Monitoring and 1.5 1 Prior Evaluation Improving on 1.2 1 Prior source revenue Consultancy for 0.2 1 Post Developing Parking Strategy Activity 3 Activity 4 Improving on source revenue Activity 5 Consultancy for Developing Parking Strategy Aug 8, 2017 PROCUREMENT Pakistan : Karachi Neighborhood Improvement Project PLAN General Information Country: Pakistan Bank’s Approval Date of the Original Procurement Plan: 2017-09-14 2021-07-26 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P161980 GPN Date: 2017-09-08 Project Name: Karachi Neighborhood Improvement Project Loan / Credit No: IDA / 60220 K Executing Agency(ies): arachi Neighborhood Improvement Project WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned PK-KNIP-28861-CW-RFB / Rehab & Improvement of Public Spaces and Mobility Khokhrapar Road (Malir- Single Stage - Two 2018-10- IDA / 60220 Improvements in Selected Post Request for Bids Open - National 7,000,000.00 0.00 Canceled 2017-10-30 2017-11-04 2017-12-16 2018-02-28 2018-04-04 Korangi area) and Road from Envelope 31 Neighborhoods Coast Guard Chowrangi to Fishing Village PK-KNIP-36610-CW-RFB / Re- Public Spaces and Mobility development of Culture and Single Stage - One 13,767,980.0 14,891,942. 2018-12- IDA / 60220 Improvements in Selected Prior Request for Bids Open - National Signed 2017-11-17 2017-11-21 2017-11-22 2017-12-08 2017-12-16 2017-12-28 2018-01-05 2018-01-17 2018-02-09 2018-02-23 Education Area in Saddar Envelope 0 22 06 Neighborhoods Downtown PK-KNIP-28857-CW-RFB / Re- Public Spaces and Mobility development of Culture and Single Stage - Two 2018-11- IDA / 60220 Improvements in Selected Post Request for Bids Open - National 8,000,000.00 0.00 Canceled 2017-10-05 2017-10-08 2017-11-19 2018-01-02 2018-01-30 Education Area in Saddar Envelope 26 Neighborhoods Downtown PK-KNIP-51617-CW-RFB / Rehabilitation & Improvement Public Spaces and Mobility of Khokhrapar Road (Malir) Single Stage - One 12,981,300.0 10,268,806. 2019-01- IDA / 60220 Improvements in Selected Prior Request for Bids Open - National Signed 2018-03-28 2018-12-21 2018-04-02 2019-01-11 2018-05-14 2019-02-18 2018-06-06 2019-03-30 2018-07-11 2019-05-17 and 9000 Road Coastguard Envelope 0 64 07 Neighborhoods Chaurangi to Ibrahim Haidri Village (Korangi) PK-KNIP-52168-CW-RFB / Support to Improved Automation of Construction Single Stage - One 2019-01- IDA / 60220 Administrative Services and Post Request for Bids Open - National 454,545.00 401,808.13 Signed 2018-03-26 2018-04-05 2018-03-31 2018-05-12 2018-06-05 2018-06-11 2018-09-04 2018-07-16 2018-12-07 Permits by SBCA - Envelope 12 City Capacity Development Rehabilitation of SWF PK-KNIP-243099-CW-RFB / Request for Bids - Rehabilitation & Upgradation Public Spaces and Mobility Pending Single Stage - One Small Works SPD 2022-06- of Boat basin to Schon IDA / 60220 Improvements in Selected Post Request for Bids Open - National 4,375,000.00 0.00 Implementat 2021-07-12 2021-07-27 2021-08-17 2021-08-23 2021-09-09 Envelope (1 envelope 28 Chowrangi and Gizri Sport Neighborhoods ion process) Ground (Upper) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-KNIP-28958-GO-RFB / Support to Improved Establishment of KMC - Single Stage - Two IDA / 60220 Administrative Services and Prior Request for Bids Open - International 3,000,000.00 0.00 Canceled 2017-10-23 2017-10-28 2017-12-09 2018-02-21 2018-03-28 2018-09-24 Financial Management Envelope City Capacity Development Information System PK-KNIP-28968-GO-RFB / Support to Improved Single Stage - Two Automation of Construction IDA / 60220 Administrative Services and Post Request for Bids Open - National 1,500,000.00 0.00 Canceled 2017-10-23 2017-10-28 2017-12-09 2018-02-12 2018-03-19 2018-09-15 Envelope Permits by SBCA City Capacity Development Support to Improved PK-KNIP-28971-GO-RFB / Single Stage - Two IDA / 60220 Administrative Services and Post Request for Bids Open - International 300,000.00 0.00 Canceled 2017-12-18 2017-12-23 2018-02-03 2018-04-18 2018-05-23 2018-09-20 KMC Web based Platform Envelope City Capacity Development PK-KNIP-29332-GO-RFQ / IT Support to Implementation Request for Single Stage - One IDA / 60220 Post Limited 51,067.00 24,278.64 Completed 2017-10-12 2017-12-08 2017-12-07 2018-01-03 2018-01-06 2018-02-20 Equipment for PIU and Technical Assistance Quotations Envelope PK-KNIP-29376-GO-RFQ / Support to Implementation Request for Single Stage - One Office Appliances and IDA / 60220 Post Limited 16,029.00 17,167.52 Completed 2017-10-07 2017-11-30 2017-11-16 2018-01-03 2017-12-16 2018-04-09 and Technical Assistance Quotations Envelope Machinery for PIU PK-KNIP-29379-GO-RFQ / Support to Implementation Request for Single Stage - One Office Communication IDA / 60220 Post Limited 23,333.00 31,268.18 Completed 2017-10-12 2017-12-08 2017-11-23 2018-01-03 2018-01-07 2018-02-20 and Technical Assistance Quotations Envelope Systems for PIU Under PK-KNIP-29386-GO-RFQ / Support to Implementation Request for Single Stage - One IDA / 60220 Post Limited 135,238.00 0.00 Implementati 2017-10-21 2018-02-27 2017-12-16 2018-01-30 Office Vehicles for PIU and Technical Assistance Quotations Envelope on PK-KNIP-29401-GO-RFQ / Support to Implementation Request for Single Stage - One IDA / 60220 Post Limited 1,333.00 835.33 Completed 2017-10-14 2018-02-27 2017-12-09 2018-10-01 2018-01-08 2018-10-12 Motorbikes for PIU and Technical Assistance Quotations Envelope PK-KNIP-29404-GO-RFQ / Support to Implementation Request for Single Stage - One IDA / 60220 Post Limited 28,571.00 11,804.50 Completed 2017-10-14 2017-11-29 2017-12-09 2018-01-03 2018-01-08 2018-02-20 Power Generator for PIU and Technical Assistance Quotations Envelope Support to Improved PK-KNIP-29502-GO-RFQ / IT Request for Single Stage - One IDA / 60220 Administrative Services and Post Limited 9,114.00 0.00 Canceled 2017-10-12 2017-11-23 2017-12-23 Equipment for PEOSS (SBoI) Quotations Envelope City Capacity Development PK-KNIP-29412-GO-RFQ / Support to Implementation Request for Single Stage - One IDA / 60220 Post Limited 47,619.00 45,579.69 Completed 2017-11-06 2017-12-12 2018-01-01 2018-01-03 2018-02-15 2018-02-20 Furniture and Fixture for PIU and Technical Assistance Quotations Envelope PK-KNIP-28967-GO-RFB / Support to Improved Single Stage - Two One Stop Shop for Business IDA / 60220 Administrative Services and Post Request for Bids Open - National 1,500,000.00 0.00 Canceled 2018-04-25 2018-04-30 2018-06-11 2018-08-24 2018-09-28 2019-03-27 Envelope Registration by SBoI City Capacity Development Page 1 PK-KNIP-54469-GO-RFQ / Support to Improved Business Registration by SBoI Request for Single Stage - One IDA / 60220 Administrative Services and Post Limited 83,592.00 38,224.35 Completed 2018-03-24 2018-06-07 2018-05-08 2018-08-01 2018-11-04 2018-12-20 - Procurement of Furniture Quotations Envelope City Capacity Development and Fixture PK-KNIP-54470-GO-RFB / IT Equipment/Data Automation Support to Improved for Automation of Single Stage - One IDA / 60220 Administrative Services and Post Request for Bids Open - National 993,387.00 613,974.66 Signed 2018-03-26 2018-04-13 2018-03-31 2018-05-12 2018-07-03 2018-05-27 2018-09-04 2018-07-01 2018-12-14 2018-08-30 Construction Permits by SBCA Envelope City Capacity Development and One Stop Shop for Business Registration by SBoI PK-KNIP-51952-GO-RFB / Establishment of Integrated Support to Improved Single Stage - One Financial Management IDA / 60220 Administrative Services and Prior Request for Bids Open - International 2,663,700.00 0.00 Canceled 2018-03-19 2018-03-24 2018-05-05 2018-06-04 2018-07-09 2019-04-05 Envelope Information System (IFMIS) for City Capacity Development KMC PK-KNIP-244076-GO-RFQ / Pending Support to Implementation Request for Single Stage - One Finance & HR Management IDA / 60220 Post Limited 31,250.00 0.00 Implementati 2021-09-10 2021-10-16 2022-01-14 and Technical Assistance Quotations Envelope Software for PIU on NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-KNIP-185215-NC-DIR / Support to Improved Under Additional IT and Software IDA / 60220 Administrative Services and Post Direct Selection Direct 287,000.00 0.00 Implementati 2020-07-22 2020-06-06 2020-07-27 2020-08-11 2020-08-31 2021-08-31 Services for SBCA - Single City Capacity Development on Window Facility CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-KNIP-27271-CS-QCBS / Contract Management and Support to Implementation Quality And Cost- IDA / 60220 Post Open - National 400,000.00 707,747.16 Signed 2017-09-06 2017-03-02 2017-09-07 2017-09-09 2017-08-03 2017-09-14 2017-09-14 2017-10-05 2017-10-09 2017-11-02 2017-11-01 2017-12-07 2018-01-26 2018-12-07 Construction Supervision for and Technical Assistance Based Selection Year-1 Civil Works PK-KNIP-27333-CS-QCBS / Design and Construction Support to Implementation Quality And Cost- Under IDA / 60220 Prior Open - International 2,500,000.00 795,825.52 2017-10-01 2019-09-24 2017-10-22 2019-10-15 2017-12-05 2020-06-02 2018-01-02 2020-07-10 2018-02-01 2021-01-22 2018-03-08 2021-03-22 2018-04-12 2019-04-12 Supervision of Year-2 Civil and Technical Assistance Based Selection Implementation Works PK-KNIP-27341-CS-QCBS / Support to Implementation Quality And Cost- IDA / 60220 Prior Open - International 1,500,000.00 949,635.85 Signed 2017-09-18 2018-06-05 2017-10-02 2018-08-14 2017-11-06 2019-03-24 2017-12-04 2019-05-03 2017-12-25 2019-07-17 2018-01-22 2019-12-10 2018-02-22 2020-06-19 2019-02-22 Monitoring and Evaluation and Technical Assistance Based Selection PK-KNIP-27369-CS-QCBS / Support to Improved Quality And Cost- Under Improving Own-Source IDA / 60220 Administrative Services and Prior Open - International 1,200,000.00 0.00 2018-01-01 2018-01-22 2018-03-07 2018-04-04 2018-05-04 2018-06-08 2018-07-13 2019-07-13 Based Selection Implementation Revenue City Capacity Development PK-KNIP-27381-CS-CQS / Consultant Support to Implementation Under Consultancy for Developing IDA / 60220 Post Qualification Open - National 200,000.00 0.00 2017-09-25 2018-06-25 2017-10-16 2018-09-03 2017-11-29 2018-10-08 2017-12-29 2019-02-13 2018-02-02 2018-08-01 and Technical Assistance Implementation Parking Strategy Selection PK-KNIP-86125-CS-QCBS / Environmental and Social Impact Assessment, EMPs, SAPs, RAPs for Priority Sewerage Network Support to Implementation Quality And Cost- Rehabilitation across 06 IDA / 60220 Post Open - National 500,000.00 0.00 Canceled 2018-11-14 2018-11-21 2018-12-17 2019-01-16 2019-01-23 2019-02-20 2019-03-27 2019-07-25 and Technical Assistance Based Selection Districts of Karachi AND for S- III Phase-II (Malir Basin) Project (Treatment Plant-IV and Conveyance works) for KWSSIP PK-KNIP-86741-CS-FBS / Environmental Impact Support to Implementation Fixed Budget IDA / 60220 Post Open - National 200,000.00 0.00 Canceled 2018-11-15 2018-11-22 2018-12-20 2019-01-19 2019-01-26 2019-02-19 2019-03-26 2019-09-22 Assessment for Karachi Urban and Technical Assistance Selection Mobility Project PK-KNIP-86752-CS-FBS / Support to Implementation Fixed Budget Social Impact Assessment for IDA / 60220 Post Open - National 175,000.00 0.00 Canceled 2018-11-15 2018-11-22 2018-12-20 2019-01-19 2019-01-26 2019-02-19 2019-03-26 2019-07-24 and Technical Assistance Selection Karachi Urban Mobility Project PK-KNIP-216455-CS-CQS / Consultant Design and Construction Support to Implementation Pending IDA / 60220 Post Qualification Open - National 375,000.00 0.00 2021-01-28 2021-02-01 2021-02-26 2021-07-15 2021-07-29 2022-05-30 Supervision of Emergency and Technical Assistance Implementation Selection Civil Works INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Individual PK-KNIP-82076-CS-INDV / Support to Implementation IDA / 60220 Post Consultant Open 42,858.00 27,685.53 Completed 2018-10-17 2018-09-04 2018-10-20 2017-07-11 2018-10-21 2018-10-23 2017-08-01 2018-10-31 2018-10-31 Environment Specialist and Technical Assistance Selection Individual PK-KNIP-82418-CS-INDV / Support to Implementation IDA / 60220 Post Consultant Limited 102,858.00 15,301.25 Signed 2018-10-17 2018-09-14 2018-10-19 2018-09-28 2018-10-24 2018-10-09 2018-11-24 2018-12-03 2019-11-23 Social Development Specialist and Technical Assistance Selection Individual PK-KNIP-82432-CS-INDV / Support to Implementation IDA / 60220 Post Consultant Limited 51,429.00 5,737.97 Signed 2018-10-17 2018-09-14 2018-10-19 2018-09-28 2018-10-24 2018-10-09 2018-11-24 2018-10-31 2019-11-23 Junior Engineer and Technical Assistance Selection Page 2 PK-KNIP-82438-CS-INDV / Individual Support to Implementation Under Financial Management IDA / 60220 Post Consultant Limited 102,858.00 0.00 2018-10-17 2018-09-14 2018-10-19 2018-10-24 2018-11-24 2019-11-23 and Technical Assistance Implementation Specialist Selection PK-KNIP-82439-CS-INDV / Individual Support to Implementation Monitoring & Evaluation IDA / 60220 Post Consultant Limited 102,858.00 15,298.80 Signed 2018-10-17 2018-09-14 2018-10-19 2018-09-28 2018-10-24 2018-10-09 2018-11-24 2018-11-20 2019-11-23 and Technical Assistance Specialist Selection Individual PK-KNIP-82469-CS-INDV / Support to Implementation IDA / 60220 Post Consultant Limited 102,858.00 20,659.96 Signed 2018-10-17 2018-09-14 2018-10-19 2018-09-28 2018-10-24 2018-10-09 2018-11-24 2018-11-01 2019-11-23 Environment Specialist and Technical Assistance Selection Individual PK-KNIP-84532-CS-INDV / Support to Implementation IDA / 60220 Post Consultant Limited 30,000.00 20,079.68 Completed 2018-10-30 2018-01-15 2018-10-31 2017-11-02 2018-11-01 2018-01-10 2018-11-03 2018-01-19 2018-11-04 2019-01-31 IFMIS Specialist and Technical Assistance Selection PK-KNIP-86760-CS-CDS / Update of the Preliminary Support to Implementation Design and Cost Estimates for IDA / 60220 Post Direct Selection Direct 125,000.00 144,199.93 Completed 2018-11-15 2019-01-18 2018-11-25 2019-02-12 2019-01-29 2019-03-21 2019-05-29 2020-06-19 and Technical Assistance 'Karachi Urban Mobility Project' PK-KNIP-86770-CS-INDV / Individual Support to Implementation Urban Planning & Design IDA / 60220 Post Consultant Limited 34,286.00 5,737.05 Signed 2018-11-19 2019-04-22 2018-11-26 2019-04-23 2018-12-03 2019-05-03 2019-01-03 2019-06-28 2020-01-02 and Technical Assistance Officer Selection Individual PK-KNIP-86777-CS-INDV / Support to Implementation Under IDA / 60220 Post Consultant Limited 34,286.00 0.00 2018-11-19 2019-09-25 2018-11-26 2018-12-03 2019-01-03 2020-01-02 IT Officer and Technical Assistance Implementation Selection Individual PK-KNIP-84494-CS-INDV / Support to Implementation Under IDA / 60220 Post Consultant Limited 11,428.00 0.00 2018-10-30 2017-09-30 2018-11-06 2018-11-16 2018-12-23 2019-12-23 Internal Auditor 1 and Technical Assistance Implementation Selection Individual PK-KNIP-84510-CS-INDV / Support to Implementation IDA / 60220 Post Consultant Limited 17,143.00 0.00 Under Review 2018-10-30 2018-07-02 2018-11-14 2018-11-24 2018-12-31 2019-12-31 Junior Engineer 1 and Technical Assistance Selection Individual PK-KNIP-82164-CS-INDV / Support to Implementation Under IDA / 60220 Post Consultant Limited 34,286.00 0.00 2018-10-16 2017-09-30 2018-10-18 2018-10-23 2018-11-23 2019-11-22 Internal Auditor and Technical Assistance Implementation Selection Individual PK-KNIP-82434-CS-INDV / Support to Implementation IDA / 60220 Post Consultant Limited 68,572.00 0.00 Canceled 2018-10-17 2018-10-19 2018-10-24 2018-11-24 2019-11-23 Admin & HR Officer and Technical Assistance Selection PK-KNIP-82417-CS-INDV / Individual Support to Implementation Pending Senior Civil and Transport IDA / 60220 Post Consultant Open 90,000.00 0.00 2019-10-03 2019-11-21 2019-12-12 2020-01-16 2021-11-30 and Technical Assistance Implementation Engineer Selection PK-KNIP-82431-CS-INDV / Individual Support to Implementation Assistant Contract & IDA / 60220 Post Consultant Open 91,429.00 0.00 Under Review 2019-10-07 2017-08-01 2019-11-26 2019-12-06 2020-01-12 2021-11-30 and Technical Assistance Procurement Specialist Selection Individual PK-KNIP-82427-CS-INDV / Support to Implementation Pending IDA / 60220 Post Consultant Open 171,000.00 0.00 2019-10-07 2019-11-26 2019-12-11 2020-01-17 2021-11-30 Resettlement Specialist and Technical Assistance Implementation Selection Individual PK-KNIP-82429-CS-INDV / Support to Implementation IDA / 60220 Post Consultant Open 170,000.00 0.00 Under Review 2019-10-07 2017-08-01 2019-10-30 2019-11-09 2019-12-16 2021-11-30 Communication Specialist and Technical Assistance Selection PK-KNIP-82162-CS-INDV / Individual Support to Implementation Pending Junior Financial Management IDA / 60220 Post Consultant Limited 110,000.00 0.00 2018-10-16 2018-10-31 2018-11-15 2018-12-30 2021-11-30 and Technical Assistance Implementation Specialist Selection PK-KNIP-82061-CS-INDV / Individual Support to Implementation Pending Senior Contract and IDA / 60220 Post Consultant Open 175,000.00 0.00 2018-10-16 2019-01-14 2019-02-13 2019-03-22 2021-11-30 and Technical Assistance Implementation Procurement Specialist Selection PK-KNIP-82077-CS-INDV / Individual Support to Implementation Pending Urban Planning and Design IDA / 60220 Post Consultant Open 175,000.00 0.00 2019-10-06 2019-11-25 2019-11-30 2020-01-06 2021-11-30 and Technical Assistance Implementation Specialist Selection Individual PK-KNIP-82079-CS-INDV / Support to Implementation Pending IDA / 60220 Post Consultant Open 170,000.00 0.00 2019-10-04 2019-11-22 2019-12-13 2020-01-17 2021-11-30 Gender Specialist and Technical Assistance Implementation Selection PK-KNIP-185033-CS-INDV / Technical Assistance for screening, shortlisting and Individual Support to Implementation Pending conceptual design of potential IDA / 60220 Post Consultant Direct 8,000.00 0.00 2020-07-21 2020-07-31 2020-08-21 2020-09-25 2020-10-25 and Technical Assistance Implementation public space improvement to Selection be undertaken during phase II of the Project Individual PK-KNIP-82416-CS-INDV / Support to Implementation Pending IDA / 60220 Post Consultant Open 137,143.00 0.00 2018-10-17 2019-01-15 2019-01-30 2019-03-08 2021-11-30 Senior Engineer and Technical Assistance Implementation Selection PK-KNIP-244081-CS-INDV / Individual TA for establishment of Support to Implementation Pending IDA / 60220 Post Consultant Limited 25,000.00 0.00 2021-07-15 2021-08-20 2021-08-27 2021-09-03 2021-12-10 Internal Audit Wing in P&D and Technical Assistance Implementation Selection department PK-KNIP-244099-CS-INDV / Individual Support to Implementation Pending Financial Management IDA / 60220 Post Consultant Open 22,500.00 0.00 2021-07-28 2021-08-11 2021-08-13 2021-09-16 2022-06-30 and Technical Assistance Implementation Specialist Selection PK-KNIP-244104-CS-INDV / Individual Support to Implementation Pending Contract & Procurement IDA / 60220 Post Consultant Open 22,500.00 0.00 2021-07-15 2021-07-16 2021-07-16 2021-08-06 2022-06-30 and Technical Assistance Implementation Specialist Selection PK-KNIP-244106-CS-INDV / Individual Support to Implementation Pending Urban Planning & Design IDA / 60220 Post Consultant Open 22,500.00 0.00 2021-07-28 2021-08-11 2021-08-13 2021-09-16 2022-06-30 and Technical Assistance Implementation Specialist Selection Page 3 Individual PK-KNIP-244107-CS-INDV / Support to Implementation Pending IDA / 60220 Post Consultant Open 22,500.00 0.00 2021-07-28 2021-08-11 2021-08-13 2021-09-16 2022-06-30 Resettlement Specialist and Technical Assistance Implementation Selection Page 4