Procurement Plan Community Development Program Support Project – Phase III (Programme National de Développement Participatif – Phase III) I. General 1. Bank’s approval Date of the procurement Plan [Original: February 2016]: Revision of Updated Procurement Plan, May 05, 2017 2. Date of General Procurement Notice: February 15, 2016 3. Period covered by this procurement plan: The procurement period of project covered from year January to December 2017 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Threshold Comments US$ 1. ICB and LIB (Goods) Above US$ 1,500,000 All 2. NCB (Goods) None 3. ICB (Works) Above US$ 5 million All 4. NCB (Works) Above US$ 5 million 5. DC (Non-Consultant Services) none 2. Prequalification. Not applicable. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Procurement (works, goods and services) for subprojects of communes, such as small infrastructure, social infrastructure, classrooms, health centers, community halls, , minor works or rehabilitation, will be procured on the basis of community participation in accordance with the clause 3.19 of the World Bank Procurement Guidelines (Community Participation in Procurement), and the Guidelines for Simplified Procurement and Disbursement for Community-Based Investments (March 3, 1998) detailed in the specific manual or guidelines to communes approved by the bank. 4. Reference to (if any) Project Operational/Procurement Manual: Guide des Acteurs intervenant dans le processus de passation et de l’exécution des marchés communaux financés par le PNDP – Juin 2010, révisé en Janvier 2016 5. Any Other Special Procurement Arrangements: 5 ICB works packages will be financed under - retroactive financing 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness (including those that are subject to retroactive financing and advanced May 05, 2017 procurement) 1 2 3 4 5 6 7 Ref. Description Estimated Packages Domestic Review Comments No. Cost Preference by Bank US$ million (yes/no) (Prior / Post) Summary of 2.328 2 No Prior the ICB (Goods) Summary of 0.700 1 No Post 1st contract for the NCB Prior Review (Goods) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) Above US$ 500,000 2. Single Source (Firms) Above US$ 500,000 Justification prior reviewed by bank 3. Individual Above US$ 200,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: not applicable 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 7 Ref. Description of Assignment Estimated Selection Review by Expected Comments/ No cost (US$ method the Bank proposals completion equivalent) (prior/post) submission date date For the first 1 Support for the preparation Post year 20,000 IC 21/08/15 of Statutory Instruments 24/09/15 (30 days) 2 Study on the definition of a 40,000 Post CQS 22/04/16 planning methodology at 25/01/16 (03 months) regional level 3 Study on the planning 40,000 CQS Post 25/01/16 22/04/16 process in the communes and (03 months) urban communities May 05, 2017 1 2 3 4 5 6 7 Ref. Description of Assignment Estimated Selection Review by Expected Comments/ No cost (US$ method the Bank proposals completion equivalent) (prior/post) submission date date 4 Study for the establishment 20,000 IC Post 19/02/16 24/03/16 of local public service in (30 days) communes 5 Study on the sustainability of 40,000 CQS Post 11/04/16 18/07/16 the PNDP (03 months) 6 Evaluation of the 40,000 CQS Post 13/07/16 18/10/16 decentralization process in (03 months) Cameroon/supports to the finalization of the national strategy for decentralization 7 Selection of a consultant to 20,000 IC Post 20/11/15 30/12/15 develop the practitioner's (30 days) manual for the 31 communes 8 Municipal staff training 100,000 SSS Prior NA Service provided by the CEFAM (Convention) 9 Training of procurement 100,000 SSS Prior NA Service commissions provided by ARMP (Convention) 10 Financial Audits of the 150,000 LCS Post 10/03/15 Contract for 2 project for the first 2 years years 11 legal advice 10,000 IC Post 28/12/15 Annual contract 12 Design and development of 90,000 CQS Post 12/02/16 22/08/16 an internet portal on the (06 months) PNDP and communes 13 Translation of documents 90,000 CQS Post 11/05/16 20/08/16 (03 months) 14 Technical audit 80,000 QCBS Post 16/02/16 31/08/16 (06 months) 15 Beneficiary assessment 50,000 QCBS Post 15/11/16 22/05/17 (06 months) 16 Environmental and Social 70,000 QCBS Post 13/12/16 26/06/17 Assessment (06 months) 17 Follow-up of training Service deployment and technical SSS Prior NA provided by 70,000 assistance to Sim_ba AIMF expert software in communes (Convention) 18 IC Post 27/05/15 Annual contract (the current 10,000 contract ends June 30, Insurance advice 2015) 19 Preparation of CDPs for the QCBS Post 01/12/16 16/04/16 80,000 31 communes (06 months) May 05, 2017 May 05, 2017 PROCUREMENT Cameroon : Community Development Program Support Project-Phase III PLAN General Information Country: Cameroon Banks Approval Date of the Original Procurement Plan: 2017-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) 2017-05-22 Project ID: P144637 GPN Date: Project Name: Community Development Program Support Project-Phase III Loan / Credit No: IDA / 57180 Executing Agency(ies): NATIONAL COMMUNITY DRIVEN DEVELOPMENT PROGRAM, CELLULE REGIONALE DE COORDONATION - SOUTH WEST, CELLULE REGIONALE DE COORDINATION - ADAMAOUA WORKS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CM-CRC ADAMAOUA-8083-CW- RFQ / Aménagement du marché Kassouan-Dolé (Marché B) de Banyo par la construction de 32 Component A: Local Request for Single Stage - One Pending IDA / 57180 Post Limited 176,700.00 0.00 2017-03-18 2017-05-29 2017-11-25 Boutiques Bloc A & B, 01 development support Quotations Envelope Implementation Hangar de marché (48 comptoirs) Vivres frais et 01 Blocs de 03 Latrines, Commune de Banyo CM-CRC ADAMAOUA-8090-CW- RFQ / Travaux de construction Component C: Coordination, d'un Pont de 8 m de long et de 5 Request for Single Stage - One Pending IDA / 57180 management, monitoring and Post Limited 105,819.00 0.00 2017-03-18 2017-05-29 2017-11-25 m de large sur le Mayo-Soulabé, Quotations Envelope Implementation evaluation and communication Commune de Banyo, Région Adamaoua CM-CRC ADAMAOUA-8095-CW- RFQ / Travaux de construction d'un Pont de 8 m de long et de 5 Component A: Local Request for Single Stage - One Pending IDA / 57180 Post Limited 77,184.00 0.00 2017-04-07 2017-06-18 2017-12-15 m de large sur le Mayo Mandjoa, development support Quotations Envelope Implementation Commune de Banyo, Région Adamaoua CM-CRC ADAMAOUA-8099-CW- RFQ / Travaux de construction Component A: Local Request for Single Stage - One Pending du parc vaccinogène à IDA / 57180 Post Limited 19,000.00 0.00 2017-03-18 2017-05-29 2017-11-25 development support Quotations Envelope Implementation Boudjounkoura, commune de Banyo, Région Adamaoua CM-CRC ADAMAOUA-8104-CW- RFQ / Travaux de construction d'un pont de 12 m de portée sur 7 mètre de large en béton armé Component A: Local Request for Single Stage - One Pending sur le cours d'eau Baraya reliant IDA / 57180 Post Limited 123,669.00 0.00 2017-04-05 2017-06-16 2017-12-13 development support Quotations Envelope Implementation le quartier Marouaré à l'EP Annexé de Tignère, Commune de Tignère, Département du Faro et Déo, Région de l'Adamaoua CM-CRC ADAMAOUA-8106-CW- RFQ / Travaux de construction d'un bâtiment R+1 de 20 Component A: Local Request for Single Stage - One Pending IDA / 57180 Post Limited 173,600.00 0.00 2017-03-18 2017-06-22 2017-12-19 boutiques avec bureau et latrines development support Quotations Envelope Implementation incorporées au Marché de Tignère, Région Adamaoua CM-CRC ADAMAOUA-8113-CW- RFQ / Travaux de construction é uipe d'un système d'un forage q solaire pour l'approvisoinnement Component A: Local Request for Single Stage - One Pending IDA / 57180 Post Limited 36,100.00 0.00 2017-03-18 2017-05-29 2017-11-25 en eau et en l é ectricité du d'un development support Quotations Envelope Implementation bâtiment R+1 du Marché de Tignère, Commune de Tignère, Région Adamaoua CM-CRC ADAMAOUA-8115-CW- RFQ / Travaux de construction Component A: Local Request for Single Stage - One Pending d'une case communautaire avec IDA / 57180 Post Limited 75,546.00 0.00 2017-03-18 2017-05-29 2017-11-25 development support Quotations Envelope Implementation bloc latrines à Galim-Tignére, Région Adamaoua CM-CRC ADAMAOUA-8117-CW- RFQ / Travaux de construction d'un marché à bétail composé d'un Parc de contention, d'un Quai d'embarquement, d'un Component A: Local Request for Single Stage - One Pending IDA / 57180 Post Limited 93,948.00 0.00 2017-03-18 2017-05-29 2017-11-25 Hangar simple et d'un Bloc de development support Quotations Envelope Implementation deux latrines à Galim-Tignère, Commune de Galim Tignère, Département du Faro et Déo, Région de l'Adamaoua CM-CRC ADAMAOUA-8121-CW- RFQ / Travaux de construction Component A: Local Request for Single Stage - One Pending d'un abattoir avec latrines IDA / 57180 Post Limited 85,333.00 0.00 2017-03-18 2017-05-29 2017-11-25 development support Quotations Envelope Implementation incorporées à Galim-Tignére, Région Adamaoua CM-CRC ADAMAOUA-8124-CW- RFQ / Travaux de construction de 02 forages dont l'un qé uipé de PMH au Marché à bétail et l'autre é uipé de pompe solaire avec q Component A: Local Request for Single Stage - One Pending IDA / 57180 Post Limited 40,000.00 0.00 2017-03-18 2017-05-29 2017-11-25 support métalique et réservoire development support Quotations Envelope Implementation de 2 m3 à l'abattoir de Galim Tignère, Commune de Galim Tignère, Département du Faro et Déo, Région de CM-CRC ADAMAOUA-8127-CW- RFQ / Travaux de construction d'un magasin de stockage et un Component A: Local Request for Single Stage - One Pending bloc de deux latrines à Ngouri IDA / 57180 Post Limited 40,048.00 0.00 2017-04-05 2017-04-26 2017-10-23 development support Quotations Envelope Implementation HAMAN, Commune de Galim Tignère, Département du Faro et Déo, Région de l'Adamaoua Page 1 CM-CRC ADAMAOUA-11713- CW-RFQ / Travaux de réalisation d'une clôture de 19 KM linéaire en vue de sécuriser une zone agricole de 2 396 Component A: Local Request for Single Stage - One Pending IDA / 57180 Post Limited 107,992.00 0.00 2017-04-10 2017-06-05 2017-12-02 hectares autour des villages Bola development support Quotations Envelope Implementation Galé-Bello, Ba-Zaïre, Mbibale, Kanan et Gbawa, Commune de Tibati, Département du Djérem, Région de l'Adamaoua CM-CRC ADAMAOUA-11716- CW-RFQ / Travaux de construction d'un pont long de 8 Component A: Local Request for Single Stage - One Pending m et large de 5 m sur le Mayo IDA / 57180 Post Limited 77,661.00 0.00 2017-04-10 2017-06-05 2017-12-02 development support Quotations Envelope Implementation Massim réliant le village Pangar à Ngaoundal, Département du Djérem, Région de l'Adamaoua CM-CRC ADAMAOUA-11747- CW-RFQ / Travaux de construction de 02 dalots (01 dalot simple de section 1,50m x 2,00m et 01 dalot quatre de Component A: Local Request for Single Stage - One Pending IDA / 57180 Post Limited 85,052.00 0.00 2017-04-10 2017-06-05 2017-12-02 section 1,50mx2,20m) sur la development support Quotations Envelope Implementation rivière Mbirim réliant l'Ecole Publique de Mbirim au Centre du Village Mbirim et 01 dalot simple de section 1,50mx2,00m CM-CRC ADAMAOUA-11749- CW-RFQ / Travaux de construction de cinq (05) boutiques, quatres (04) blocs Component A: Local Request for Single Stage - One Pending sécrétariats bureautiques et un IDA / 57180 Post Limited 83,880.00 0.00 2017-04-05 2017-05-24 2017-11-20 development support Quotations Envelope Implementation bloc de deux latrines au Carrefour Malang, Commune de Ngaoundéré 3, Département de la Vina, Région de l'Adamaoua CM-CRC ADAMAOUA-11751- CW-RFQ / Travaux de construction de cinq (05) buses et aménagement des rigoles sur Component A: Local Request for Single Stage - One Pending IDA / 57180 Post Limited 54,938.00 0.00 2017-04-05 2017-05-24 2017-11-20 les points crtiques de la route development support Quotations Envelope Implementation Manwi - Mbella, Commune de Ngaoundéré 3, Département de la Vina, Région de l'Adamaoua CM-CRC ADAMAOUA-11752- CW-RFQ / Travaux de construction d'une case communautaire et un bloc de Component A: Local Request for Single Stage - One Pending IDA / 57180 Post Limited 72,697.00 0.00 2017-04-05 2017-05-24 2017-11-20 deux latrines à Martap, development support Quotations Envelope Implementation Commune de Martap, Département de la Vina, Région de l'Adamaoua CM-CRC ADAMAOUA-11753- CW-RFQ / Travaux de construction de deux Hangars de Marché de 32 comptoires chacun Component A: Local Request for Single Stage - One Pending en Beton Armés et un bloc de IDA / 57180 Post Limited 44,492.00 0.00 2017-04-05 2017-05-24 2017-11-20 development support Quotations Envelope Implementation deux latrines au Marché des Femmes de Tekel, Commune de Martap, Département de la Vina, Région de l'Adamaoua CM-CRC ADAMAOUA-11754- CW-RFQ / Travaux de contruction d'une AEP à travers le captage d'une source d'eau et la construction d'un reservoir de Component A: Local Request for Single Stage - One Pending IDA / 57180 Post Limited 131,119.00 0.00 2017-04-05 2017-05-24 2017-11-20 12 métres cubes, 04 bornes development support Quotations Envelope Implementation fontaines et 04 abreuvoirs à bétail dans le village Bawa, Commune de Martap, Département de la Vina, Région de l'Ada CM-CRC ADAMAOUA-11756- CW-RFQ / Travaux de construction d'un bain détiqueur Component A: Local Request for Single Stage - One Pending IDA / 57180 Post Limited 67,572.00 0.00 2017-04-05 2017-05-24 2017-11-20 à Toumbouroum, Commune de development support Quotations Envelope Implementation Martap, Département de la Vina, Région de l'Adamaoua CM-CRC ADAMAOUA-11758- CW-RFQ / Traveaux de réalisation d'une barrière (clôture é ) de 13 196 en fils barbéls métres linéaires pr la Component A: Local Request for Single Stage - One Pending sécurisation de 04 espaces IDA / 57180 Post Limited 76,407.00 0.00 2017-04-05 2017-06-02 2017-11-29 development support Quotations Envelope Implementation agropastoraux de 2 211,5 Hectares dans 04 villages : Boforo (1 589 ha), Malingara (381 ha), Bindiba (153 ha) et Kalaldi (8ha) CM-CRC ADAMAOUA-11760- CW-RFQ / Travaux de construction d'une case Component A: Local Request for Single Stage - One Pending communautaire et un bloc de IDA / 57180 Post Limited 88,855.00 0.00 2017-04-05 2017-06-02 2017-11-29 development support Quotations Envelope Implementation deux latrines à Dir, Commune de é Dir, Département du Mbér, Région de l'Adamaoua CM-CRC ADAMAOUA-11763- CW-RFQ / Travaux de construction de 02 blocs de 02 é uipés de 60 salles de classe q Component A: Local Request for Single Stage - One Pending tabales bancs et un bloc de 02 IDA / 57180 Post Limited 94,598.00 0.00 2017-04-05 2017-06-02 2017-11-29 development support Quotations Envelope Implementation latrines chacun au CETIC de Dir et à l'EP de DOBIRI, Département du Mbér, é Région de l'Adamaoua CM-CRC ADAMAOUA-11764- CW-RFQ / Travux de construction d'un forage positif Component A: Local Request for Single Stage - One Pending IDA / 57180 Post Limited 17,148.00 0.00 2017-04-05 2017-06-06 2017-12-03 é uipe de PMH au CETIC de Dir, q development support Quotations Envelope Implementation Département du Mbér,é Région de l'Adamaoua Page 2 CM-CRC ADAMAOUA-11765- CW-RFQ / Travaux de construction de deux blocs de 02 salles de classe qé uipés de 60 tables bancs et un bloc de deux Component A: Local Request for Single Stage - One Pending IDA / 57180 Post Limited 107,510.00 0.00 2017-04-05 2017-06-02 2017-11-29 latrines chacun à EP de Dilecti development support Quotations Envelope Implementation et à l'EP Bilingue de Gadjiwan, Commune de Mayo Baléo, Département du Faro et Déo, Région de l'Adamaoua CM-CRC ADAMAOUA-11766- CW-RFQ / Travaux de construction de trois forages é uipés des PMH dans positifs q les EP de Dilecti et Gadjiwan et Component A: Local Request for Single Stage - One Pending IDA / 57180 Post Limited 51,596.00 0.00 2017-04-05 2017-06-02 2017-11-29 au Centre de Promotion de la development support Quotations Envelope Implementation Femme et de la Famille (CPFF) du Mayo Baléo, Département du Faro et Déo, Région de l'Adamaoua CM-CRC ADAMAOUA-11768- CW-RFQ / Travaux de construction et d'équipement d'un Centre de Promotion de la Component A: Local Request for Single Stage - One Pending Femme et de la Famille (CPFF) IDA / 57180 Post Limited 156,105.00 0.00 2017-04-05 2017-06-02 2017-11-29 development support Quotations Envelope Implementation avec latrines incorporées de Mayo Baléo, Commune de Mayo Baléo, Département du Faro et Déo, Région de l'Adamaoua CM-CRC ADAMAOUA-11769- CW-RFQ / Contruction de 02 é uipés des forages Positifs q PMH au Lycée de Béka Modibo et à l'EP de LIPAO et Component A: Local Request for Single Stage - One Pending IDA / 57180 Post Limited 66,399.00 0.00 2017-04-05 2017-06-06 2017-12-03 Réhabilitation de 04 forages: development support Quotations Envelope Implementation Goungel Pastoral (Quartier Tola), Baringo, Mambéré Hassimi, Mayo Badji et 01 puits q é uipé de PMH à l'EP Goumgel Troua CM-CRC ADAMAOUA-11770- CW-RFQ / Travaux de réalisation d'une mini adduction d'eau avec Component A: Local Request for Single Stage - One Pending sept (07) bornes fontaines à IDA / 57180 Post Limited 130,910.00 0.00 2017-04-05 2017-06-06 2017-12-03 development support Quotations Envelope Implementation Bandam, Commune de Bankim, Département du Mayo Banyo, Région de l'Adamaoua CM-CRC ADAMAOUA-11772- CW-RFQ / Travaux de réalisation d'une clôture de séparation de 5 750 métres des espaces agricoe (3 6168 Component A: Local Request for Single Stage - One Pending IDA / 57180 Post Limited 44,033.00 0.00 2017-04-09 2017-06-11 2017-12-08 Hectares) et pastoral (3 965 development support Quotations Envelope Implementation Hectares) dans la localité de Bandam, Commune de Bankim, Département du Mayo Banyo, Région de l'Adamaoua CM-CRC ADAMAOUA-11773- CW-RFQ / Travaux de réhabilitation de quatre (04) forages dans quatre (04) Component A: Local Request for Single Stage - One Pending quartiers de la ville de Bankim IDA / 57180 Post Limited 22,811.00 0.00 2017-04-09 2017-06-11 2017-12-08 development support Quotations Envelope Implementation (Nguinklo, Chefferie Bankim, Newton et Tchim), Commune de Bankim, Département du Mayo Banyo, Région de l'Adamaoua CM-CRC ADAMAOUA-11774- CW-RFQ / Travaux de construction d'un parc Component A: Local Request for Single Stage - One Pending vaccinogène à Haïnaré, IDA / 57180 Post Limited 30,160.00 0.00 2017-04-09 2017-06-11 2017-12-08 development support Quotations Envelope Implementation Commune de Bankim, Département du Mayo Banyo, Région de l'Adamaoua CM-CRC ADAMAOUA-11775- CW-RFQ / Travaux de construction d'une case communautaire et un bloc de Component A: Local Request for Single Stage - One Pending IDA / 57180 Post Limited 64,703.00 0.00 2017-04-09 2017-06-11 2017-12-08 deux latrines à Diéki, Commune development support Quotations Envelope Implementation de Bankim, Département du Mayo Banyo, Région de l'Adamaoua CM-CRC ADAMAOUA-11776- CW-RFQ / Travaux de construction d'une case communautaire et un bloc de Component A: Local Request for Single Stage - One Pending IDA / 57180 Post Limited 64,703.00 0.00 2017-04-09 2017-06-11 2017-12-08 deux latrines à YIMBERE, development support Quotations Envelope Implementation Commune de Bankim, Département du Mayo Banyo, Région de l'Adamaoua 001/T/SW/MENJI/CRC/2017 / Travaux de construction et é uipement d'un foyer q communautaire et Component A: Local Request for Single Stage - One Pending IDA / 57180 Post Open - National 60,000.00 0.00 2017-04-27 2017-05-18 2017-11-14 multifonctionnel et un bloc latrine development support Quotations Envelope Implementation à trois compartiments à MBOEH dans la Commune de Menji, Région du Sud-Ouest 001/T/SW/BAMUSSO/CRC/2017 / Travaux de Construction d'un magasin de stockage et d'un Component A: Local Request for Single Stage - One Pending bloc latrine à deux (02) IDA / 57180 Post Open - National 54,967.00 0.00 2017-05-02 2017-06-27 2017-12-24 development support Quotations Envelope Implementation compartiments à Bekiri Beach dans la Commune de Bamusso, Région du Sud-Ouest 001/T/SW/MUYUKA/CRC/2017 / Travaux de construction d'un Component A: Local Request for Single Stage - One Pending grand hangar au marché de Yoke IDA / 57180 Post Open - National 63,558.00 0.00 2017-05-02 2017-06-27 2017-12-24 development support Quotations Envelope Implementation dans la Commune de Muyuka, Région du Sud-Ouest 001/T/SW/EKONDO TITI/CRC/2017 / Travaux de Construction de l'Ecole Component A: Local Request for Single Stage - One Pending IDA / 57180 Post Open - National 55,020.00 0.00 2017-05-02 2017-06-27 2017-12-24 Maternelle de Funge dans la development support Quotations Envelope Implementation Commune d'Ekondo Titi, Région du Sud-Ouest Page 3 001/T/SW/TOMBEL/CRC/2017 / Travaux de construction d'un grand Hangar, d'un bloc latrine à Component A: Local Request for Single Stage - One Pending trois compartiments et d'une IDA / 57180 Post Open - National 72,523.00 0.00 2017-05-02 2017-06-27 2017-12-24 development support Quotations Envelope Implementation borne fontaine au marché de Tombel dans la Commune de Tombel, Région du Sud-Ouest 002/T/SW/EKONDO TITI/CRC/2017 / Travaux de réalisation Réalisation d'un forage positif qé uipé d'une pompe Component A: Local Request for Single Stage - One Pending IDA / 57180 Post Open - National 27,657.00 0.00 2017-05-02 2017-06-27 2017-12-24 é ectrique fonctionnant avec l development support Quotations Envelope Implementation l'energie solaire à l'EM de Funge la Commune d'Ekondo Titi, Région du Sud-Ouest 001/T/SW/MBONGE/CRC/2017 / Travaux de réalisation de deux (02) forages productifs qé uipés de pompes à motricité humaine Component A: Local Request for Single Stage - One Pending IDA / 57180 Post Open - National 34,135.00 0.00 2017-05-02 2017-06-27 2017-12-24 dans les cé oles publiques de development support Quotations Envelope Implementation Marumba et Kotto Barumbi dans la Commune de Mbonge, Région du Sud-Ouest 001/T/SW/MUNDEMBA/CRC/20 17 / Travaux de réalisation de trois (03) forages productifs é uipés de pompes à motricité q Component A: Local Request for Single Stage - One Pending humaine dans les c é oles IDA / 57180 Post Open - National 59,575.00 0.00 2017-05-06 2017-07-01 2017-12-28 development support Quotations Envelope Implementation primaires de Ndian Estate, Besingi et Fabe dans la Commune de Mundemba, Région du Sud-Ouest GOODS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CM-PNDP-2738-GO-RFQ / Fourniture des groupes Component B: Support to the Request for Single Stage - One Pending IDA / 57180 Post Open - National 68,000.00 0.00 2017-02-17 2017-04-14 2017-10-11 é ectrogènes pour les communes l decentralization process Quotations Envelope Implementation sim_ba CM-PNDP-2739-GO-RFQ / Acquisition des fournitures de Component C: Coordination, Request for Single Stage - One Pending bureau, produits d'entretien, IDA / 57180 management, monitoring and Post Limited 80,000.00 0.00 2016-10-26 2016-12-21 2017-06-19 Quotations Envelope Implementation matériel et produits pause-café, evaluation and communication et consommables informatiques Component B: Support to the CM-PNDP-2836-GO-UN / decentralization process Pending Acquisition de véhicules et IDA / 57180 Component C: Coordination, Prior UN Agencies (Direct) Direct 2,328,000.00 0.00 2016-10-27 2016-11-01 2016-12-06 2017-06-04 Implementation motos par UNOPS management, monitoring and evaluation and communication Component C: Coordination, CM-PNDP-2839-GO-RFQ / Request for Single Stage - One Pending IDA / 57180 management, monitoring and Post Limited 60,000.00 0.00 2016-11-01 2016-12-27 2017-06-25 Edition des documents à la CNC Quotations Envelope Implementation evaluation and communication CM-PNDP-2835-GO-RFB / Component C: Coordination, Single Stage - One Under Fourniture du mobilier de bureau IDA / 57180 management, monitoring and Post Request for Bids Open - National 200,000.00 0.00 2016-12-11 2016-12-22 2016-12-16 2017-01-27 2017-01-27 2017-02-26 2017-04-02 2017-09-29 Envelope Implementation pour la CNC et les 10 CRC evaluation and communication CM-PNDP-2736-GO-RFB / Component C: Coordination, Fourniture et installation du Single Stage - One Pending IDA / 57180 management, monitoring and Prior Request for Bids Open - National 490,000.00 0.00 2016-11-09 2016-11-14 2016-12-26 2017-01-25 2017-03-01 2017-08-28 matériel informatique et du Envelope Implementation evaluation and communication matériel didactique au PNDP CM-PNDP-6227-GO-RFQ / Component C: Coordination, Fourniture des supports de Request for Single Stage - One Pending IDA / 57180 management, monitoring and Post Limited 10,000.00 0.00 2017-02-09 2017-04-06 2017-10-03 communication dans le cadre du Quotations Envelope Implementation evaluation and communication lancement du PNDP III CM-PNDP-2932-GO-RFB / Production du bulletin trimestriel Component B: Support to the Single Stage - One Pending de certaines communes (10 IDA / 57180 Post Request for Bids Open - National 360,000.00 0.00 2016-12-12 2016-12-17 2017-01-28 2017-02-27 2017-04-03 2017-09-30 decentralization process Envelope Implementation Agences de communications au niveau régional) CM-CRC SOUTH WEST-7988- GO-RFQ / Acquisition des Component C: Coordination, Request for Single Stage - One Pending fournitures de bureau, du matériel IDA / 57180 management, monitoring and Post Limited 8,000.00 0.00 2017-04-14 2017-05-14 2017-05-31 Quotations Envelope Implementation d'entretien et divers à la CRC, evaluation and communication Région du Sud-Ouest CM-CRC SOUTH WEST-8044- Component C: Coordination, GO-RFQ / Acquisition des Request for Single Stage - One Pending IDA / 57180 management, monitoring and Post Limited 8,000.00 0.00 2017-04-09 2017-06-04 2017-12-01 consommables informatiques à Quotations Envelope Implementation evaluation and communication la CRC, Région du Sud-Ouest CM-CRC SOUTH WEST-8049- GO-RFQ / Acquisition des fournitures pour véhicules (pneus, Component C: Coordination, Request for Single Stage - One Pending boîte à pharmacie, extincteur de IDA / 57180 management, monitoring and Post Limited 9,998.00 0.00 2017-04-09 2017-06-04 2017-12-01 Quotations Envelope Implementation véhicule, petit matériel evaluation and communication (machette, lampe de poche ) Région à la CRC, du Sud-Ouest CM-CRC SOUTH WEST-8055- GO-RFQ / Fourniture des services de maintenance du parc Component C: Coordination, Request for Single Stage - One Pending et réseau informatique, IDA / 57180 management, monitoring and Post Limited 4,000.00 0.00 2017-03-11 2017-05-06 2017-11-02 Quotations Envelope Implementation é honique ainsi que du télp evaluation and communication matériel de reprographie à la CRC, Région du Sud-Ouest CM-CRC SOUTH WEST-8066- GO-RFQ / Fourniture des Component C: Coordination, Request for Single Stage - One Pending services de collecte, transport et IDA / 57180 management, monitoring and Post Limited 2,400.00 0.00 2017-03-11 2017-05-06 2017-11-02 Quotations Envelope Implementation distribution des courriers et colis evaluation and communication à la CRC, Région du Sud-Ouest CM-CRC SOUTH WEST-8070- Component C: Coordination, GO-RFQ / Fourniture des Request for Single Stage - One Pending IDA / 57180 management, monitoring and Post Limited 7,200.00 0.00 2017-04-09 2017-06-04 2017-12-01 services de gardiennage à la Quotations Envelope Implementation evaluation and communication CRC, Région du Sud-Ouest Page 4 CM-CRC SOUTH WEST-8075- GO-RFQ / Acquisition de 12 é agères de rangement en boîtes t Component C: Coordination, Request for Single Stage - One Pending bois massif 1,5x1,2x1) , une IDA / 57180 management, monitoring and Post Limited 7,900.00 0.00 2017-04-09 2017-06-04 2017-12-01 Quotations Envelope Implementation table en bois massif et 04 evaluation and communication chaises en bois massif à la CRC, Région du Sud-Ouest CM-CRC ADAMAOUA-8079-GO- Component C: Coordination, RFQ / Acquisition caisse à outil Request for Single Stage - One Pending IDA / 57180 management, monitoring and Post Limited 1,445.00 0.00 2017-05-03 2017-06-28 2017-12-25 de l'ingénieur de la CRC, Région Quotations Envelope Implementation evaluation and communication Adamaoua CM-CRC SOUTH WEST-8091- GO-RFQ / Acquisition du kit de Component C: Coordination, Request for Single Stage - One Pending l'Ingénieur (pied à coulisse, IDA / 57180 management, monitoring and Post Limited 1,500.00 0.00 2017-04-09 2017-06-04 2017-12-01 Quotations Envelope Implementation double deca metre,...) à la CRC, evaluation and communication Région du Sud-Ouest CM-PNDP-2737-GO-RFQ / Component B: Support to the Request for Single Stage - One Pending Fourniture de Kits solaires pour IDA / 57180 Post Open - National 52,000.00 0.00 2017-02-10 2017-04-07 2017-10-04 decentralization process Quotations Envelope Implementation les communes de sim_ba CM-PNDP-9661-GO-RFB / Acquisition du matériel Component B: Support to the Single Stage - One Pending informatique (ordinateurs et mini- IDA / 57180 Post Request for Bids Open - National 349,600.00 0.00 2017-03-22 2017-03-27 2017-04-26 2017-05-10 2017-05-24 2017-07-08 decentralization process Envelope Implementation réseau) pour SIM-BA dans les 184 communes CM-PNDP-9664-GO-RFB / Fourniture des groupes é ectrogènes dans le cadre de la l Component B: Support to the Single Stage - One Pending IDA / 57180 Post Request for Bids Open - National 480,000.00 0.00 2017-03-22 2017-03-27 2017-04-26 2017-05-10 2017-06-07 2017-07-22 mise en oeuvre du logiciel decentralization process Envelope Implementation Sim_ba dans 187 communes ( Relance) CM-PNDP-9665-GO-RFB / Fourniture des plaques solaires pour Sim_ba dans le cadre de la Component B: Support to the Single Stage - One Pending IDA / 57180 Post Request for Bids Open - National 440,000.00 0.00 2017-03-27 2017-04-01 2017-05-01 2017-05-15 2017-06-12 2017-07-27 mise en oeuvre du logiciel decentralization process Envelope Implementation Sim_ba dans 40 commune ( deuxième vague) CM-PNDP-9669-GO-RFQ / Fourniture de bureau (lot 1), Component C: Coordination, Request for Single Stage - One Pending produits d'entretien et matériel et IDA / 57180 management, monitoring and Post Limited 80,000.00 0.00 2017-10-28 2017-12-09 2018-12-04 Quotations Envelope Implementation produits pause-café ( lot 3) à la evaluation and communication CNC du PNDP CM-PNDP-9671-GO-RFQ / Component C: Coordination, Fourniture des consommables Request for Single Stage - One Pending IDA / 57180 management, monitoring and Post Limited 80,000.00 0.00 2017-10-28 2017-12-09 2018-12-04 informatiques à la CNC du PNDP Quotations Envelope Implementation evaluation and communication (LOT4) CM-PNDP-9799-GO-RFQ / Component C: Coordination, Request for Single Stage - One Pending Acquisition des fournitures pour IDA / 57180 management, monitoring and Post Limited 19,600.00 0.00 2017-12-09 2018-01-13 2019-01-08 Quotations Envelope Implementation les véhicules de la CNC evaluation and communication CM-PNDP-9806-GO-RFQ / Component C: Coordination, Request for Single Stage - One Pending Fourniture et installation du IDA / 57180 management, monitoring and Post Limited 60,000.00 0.00 2017-04-22 2017-06-03 2017-06-24 Quotations Envelope Implementation mobilier de bureau au PNDP evaluation and communication CM-PNDP-9813-GO-RFQ / Acquisition des fournitures dans le cadre de l'appui au Ministère Component B: Support to the Request for Single Stage - One Pending IDA / 57180 Post Limited 4,000.00 0.00 2017-04-22 2017-06-03 2017-06-17 des Affaires Sociales pour la decentralization process Quotations Envelope Implementation Journée Internationale des Peuples Autochtone (JIPA) CM-PNDP-9817-GO-DIR / Souscription pour la participation du PNDP à la Journée Africaine Component B: Support to the Pending IDA / 57180 Post Direct Selection Direct 4,000.00 0.00 2017-03-30 2017-04-04 2017-04-25 2017-04-27 de la Décentralisation et du decentralization process Implementation Développement Local (JADDEL 2017) CM-PNDP-9820-GO-RFQ / Conception et pose d'affichettes Component B: Support to the Request for Single Stage - One Pending IDA / 57180 Post Limited 28,000.00 0.00 2017-06-23 2017-08-04 2017-08-25 sur les comportements souhaités decentralization process Quotations Envelope Implementation dans le cadre du PNDP III CM-PNDP-9822-GO-RFB / Component C: Coordination, Fourniture et installation du Single Stage - One Pending IDA / 57180 management, monitoring and Post Request for Bids Open - National 322,730.00 0.00 2017-07-07 2017-07-12 2017-08-11 2017-08-25 2017-09-08 2017-10-23 matériel informatique et Envelope Implementation evaluation and communication didactique au PNDP CM-PNDP-9825-GO-RFQ / Component C: Coordination, Fourniture du matériel de Request for Single Stage - One Pending IDA / 57180 management, monitoring and Post Limited 9,600.00 0.00 2017-04-22 2017-06-03 2017-06-17 formation (paper board) pour la Quotations Envelope Implementation evaluation and communication CNC et les CRC CM-PNDP-9828-GO-RFQ / Component C: Coordination, é hones Fourniture de 182 télp Request for Single Stage - One Pending IDA / 57180 management, monitoring and Post Limited 44,120.08 0.00 2017-04-22 2017-05-27 2017-06-03 portables pour le personnel du Quotations Envelope Implementation evaluation and communication PNDP CM-PNDP-9833-GO-DIR / Convention de partenariat avec la CRTV poste nationale pour la Component B: Support to the Pending IDA / 57180 Post Direct Selection Direct 2,000.00 0.00 2017-03-14 2017-03-19 2017-04-09 2018-04-04 diffusion des messages dans decentralization process Implementation l'émission radio" Croissance Plus" CM-PNDP-9838-GO-DIR / Convention de partenariat pour la diffusion de programmes sur les Component B: Support to the Pending IDA / 57180 Post Direct Selection Direct 2,400.00 0.00 2017-05-08 2017-05-13 2017-05-27 2018-05-22 stations réionales Extrême-nord, decentralization process Implementation Nord, Adamaoua, et est de la CRTV CM-PNDP-9840-GO-DIR / Convention de partenariat avec les radios communautaires pour Component B: Support to the Pending IDA / 57180 Post Direct Selection Direct 12,000.00 0.00 2017-05-08 2017-05-13 2017-05-27 2018-05-22 la difusion d'émissions sur les decentralization process Implementation thématiques chères au PNDP III dans les quatres régions Page 5 CM-PNDP-9843-GO-DIR / Acquisition des ouvrages sur la Component B: Support to the Pending IDA / 57180 Post Direct Selection Direct 10,000.00 0.00 2017-05-08 2017-05-13 2017-05-27 2017-06-03 décentralisation et le decentralization process Implementation développement local CM-PNDP-2928-GO-RFB / Production des outils de Component C: Coordination, communication du PNDP 3 ( Single Stage - One Pending IDA / 57180 management, monitoring and Post Request for Bids Open - National 245,200.00 0.00 2017-04-03 2017-04-08 2017-04-29 2017-05-29 2017-06-19 2017-07-10 Plaquette, Kakemonos, agenda, Envelope Implementation evaluation and communication présentoires, pagnes, polos, t- shirts, casquette, etc) CM-PNDP-2931-GO-DIR / Component C: Coordination, Pending Edition du Magazine Trimestriel " IDA / 57180 management, monitoring and Post Direct Selection Direct 50,000.00 0.00 2017-03-17 2017-03-22 2017-04-26 2018-04-21 Implementation LES ECHOS DU PNDP" evaluation and communication CM-PNDP-2837-GO-RFB / é uipement Acquisition du petit q (GPS et supports pour le Component B: Support to the Single Stage - One Pending IDA / 57180 Post Request for Bids Open - National 150,000.00 0.00 2017-04-13 2017-04-18 2017-05-09 2017-06-08 2017-06-29 2017-08-13 Système d'Information decentralization process Envelope Implementation Géographique) pour 75 communes CM-PNDP-2929-GO-RFQ / Component C: Coordination, Production de la signalétique des Request for Single Stage - One Pending IDA / 57180 management, monitoring and Post Limited 16,000.00 0.00 2017-03-31 2017-05-19 2017-07-03 11 sites du PNDP (agence de Quotations Envelope Implementation evaluation and communication communication) CM-PNDP-11813-GO-RFQ / Accompagnement des communes d'intervention du Component B: Support to the Request for Single Stage - One Pending PNDP de la Région de IDA / 57180 Post Limited 22,222.00 0.00 2017-04-10 2017-06-05 2017-12-02 decentralization process Quotations Envelope Implementation l'Adamaoua dans l'édition d'un bulletin trimestriel d'informations communal CM-PNDP-11814-GO-RFQ / Accompagnement des communes d'intervention du Component B: Support to the Request for Single Stage - One Pending PNDP de la Région du Centre IDA / 57180 Post Limited 70,000.00 0.00 2017-04-10 2017-06-05 2017-12-02 decentralization process Quotations Envelope Implementation dans l'édition d'un bulletin trimestriel d'informations communal CM-PNDP-11815-GO-RFQ / Accompagnement des communes d'intervention du Component B: Support to the Request for Single Stage - One Pending IDA / 57180 Post Limited 33,000.00 0.00 2017-04-10 2017-06-05 2017-12-02 PNDP de la Région de l'Est dans decentralization process Quotations Envelope Implementation l'édition d'un bulletin trimestriel d'informations communal CM-PNDP-11817-GO-RFQ / Accompagnement des communes d'intervention du Component B: Support to the Request for Single Stage - One Pending PNDP de la Région de l'Extreme IDA / 57180 Post Limited 47,000.00 0.00 2017-04-10 2017-06-05 2017-12-02 decentralization process Quotations Envelope Implementation Nord dans l'édition d'un bulletin trimestriel d'informations communal CM-PNDP-11818-GO-RFQ / Accompagnement des communes d'intervention du Component B: Support to the Request for Single Stage - One Pending PNDP de la Région du Littoral IDA / 57180 Post Limited 34,000.00 0.00 2017-04-10 2017-06-05 2017-12-02 decentralization process Quotations Envelope Implementation dans l'édition d'un bulletin trimestriel d'informations communal CM-PNDP-11819-GO-RFQ / Accompagnement des communes d'intervention du Component B: Support to the Request for Single Stage - One Pending IDA / 57180 Post Limited 21,000.00 0.00 2017-04-10 2017-06-05 2017-12-02 PNDP de la Région du Nord dans decentralization process Quotations Envelope Implementation l'édition d'un bulletin trimestriel d'informations communal CM-PNDP-11820-GO-RFQ / Accompagnement des communes d'intervention du Component B: Support to the Request for Single Stage - One Pending PNDP de la Région du Nord IDA / 57180 Post Limited 34,000.00 0.00 2017-04-10 2017-06-05 2017-12-02 decentralization process Quotations Envelope Implementation Ouest dans l'édition d'un bulletin trimestriel d'informations communal CM-PNDP-11821-GO-RFQ / Accompagnement des communes d'intervention du Component B: Support to the Request for Single Stage - One Pending PNDP de la Région de l'Ouest IDA / 57180 Post Limited 40,000.00 0.00 2017-04-10 2017-06-05 2017-12-02 decentralization process Quotations Envelope Implementation dans l'édition d'un bulletin trimestriel d'informations communal CM-PNDP-11824-GO-RFQ / Accompagnement des communes d'intervention du Component B: Support to the Request for Single Stage - One Pending IDA / 57180 Post Limited 29,000.00 0.00 2017-04-10 2017-06-05 2017-12-02 PNDP de la Région du Sud dans decentralization process Quotations Envelope Implementation l'édition d'un bulletin trimestriel d'informations communal CM-PNDP-11825-GO-RFQ / Accompagnement des communes d'intervention du Component B: Support to the Request for Single Stage - One Pending PNDP de la Région du Sud IDA / 57180 Post Limited 31,000.00 0.00 2017-04-10 2017-06-05 2017-12-02 decentralization process Quotations Envelope Implementation Ouest dans l'édition d'un bulletin trimestriel d'informations communal CM-CRC ADAMAOUA-11965- Component C: Coordination, GO-RFQ / Acquisition des Request for Single Stage - One Pending IDA / 57180 management, monitoring and Post Limited 19,000.00 0.00 2017-04-28 2017-06-16 2017-12-13 fournitures pour véhicules de la Quotations Envelope Implementation evaluation and communication CRC, Région Adamaoua CM-CRC ADAMAOUA-11971- GO-RFQ / Acquisition et Component C: Coordination, Request for Single Stage - One Pending installation d'un groupe IDA / 57180 management, monitoring and Post Limited 30,000.00 0.00 2017-04-27 2017-06-22 2017-12-19 Quotations Envelope Implementation é ectrogène avec abri de la CRC, l evaluation and communication Région Adamaoua CM-CRC ADAMAOUA-11973- GO-RFQ / Achat d'autres Component C: Coordination, Request for Single Stage - One Pending fournitures (acquisition des IDA / 57180 management, monitoring and Post Limited 9,000.00 0.00 2017-04-28 2017-06-23 2017-12-20 Quotations Envelope Implementation consommables informatiques) de evaluation and communication la CRC, Région Adamaoua Page 6 CM-CRC ADAMAOUA-11975- GO-RFQ / Fourniture des Component C: Coordination, services de Collecte, transport et Request for Single Stage - One Pending IDA / 57180 management, monitoring and Post Limited 2,852.00 0.00 2017-04-13 2017-06-08 2017-12-05 distribution des courriers et colis Quotations Envelope Implementation evaluation and communication de la CRC, Région de l'Adamaoua CM-CRC ADAMAOUA-11978- GO-RFQ / Fourniture des Component C: Coordination, services de maintenance des Request for Single Stage - One Pending IDA / 57180 management, monitoring and Post Limited 5,520.00 0.00 2017-05-05 2017-06-30 2017-12-27 matériels informatiques et Quotations Envelope Implementation evaluation and communication copieurs de la CRC, Région de l'Adamaoua CM-CRC ADAMAOUA-11980- GO-RFQ / Acquisition d'un stand et production des supports de communication dans le cadre de Component B: Support to the Request for Single Stage - One Pending la participation à des foires et IDA / 57180 Post Limited 7,000.00 0.00 2017-04-28 2017-06-23 2017-12-20 decentralization process Quotations Envelope Implementation expositions sur la décentralisation (nationales et internationales), Région Adamaoua NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CM-PNDP-2947-NC-DIR / Component C: Coordination, Insertion (souscription) dans le Pending IDA / 57180 management, monitoring and Post Direct Selection Direct 9,000.00 0.00 2016-11-04 2016-11-09 2016-12-14 2017-06-12 journal de l'édition 2016 des JEC Implementation evaluation and communication (Journées de l'Entrepreneuriat) CM-PNDP-2838-NC-RFB / Component C: Coordination, Fourniture des services Single Stage - One Pending IDA / 57180 management, monitoring and Post Request for Bids Open - National 218,000.00 0.00 2016-11-09 2016-11-14 2016-12-26 2017-01-25 2017-03-01 2017-08-28 d'assurances automobiles, Envelope Implementation evaluation and communication maladies et responsabilité civile CM-PNDP-2856-NC-DIR / Insertions et publi-reportages Component C: Coordination, Pending spéciaux dans le Magazine IDA / 57180 management, monitoring and Post Direct Selection Direct 13,000.00 0.00 2017-01-16 2017-01-21 2017-02-25 2017-08-24 Implementation international CAMEROUN ECO, evaluation and communication en 2017 (Convention) CM-PNDP-2857-NC-DIR / Component C: Coordination, Insertions et publi-reportages Pending IDA / 57180 management, monitoring and Post Direct Selection Direct 6,000.00 0.00 2016-11-09 2016-11-14 2016-12-19 2017-06-17 spéciaux 1, dans le quotidien Implementation evaluation and communication "CAMEROUN TRIBUNE" CM-PNDP-2858-NC-DIR / Component C: Coordination, Pending Insertions et publi-reportages IDA / 57180 management, monitoring and Post Direct Selection Direct 6,000.00 0.00 2016-12-17 2016-12-22 2017-01-26 2017-07-25 Implementation spéciaux dans d'autres journaux evaluation and communication CM-PNDP-2860-NC-DIR / Component C: Coordination, Insertions et publi-reportages Pending IDA / 57180 management, monitoring and Post Direct Selection Direct 6,000.00 0.00 2016-12-17 2016-12-22 2017-01-26 2017-07-25 spéciaux dans les autres radios Implementation evaluation and communication et televisions CM-PNDP-6228-NC-RFQ / Fourniture des services de Component C: Coordination, Request for Single Stage - One Pending maintenance préventive et IDA / 57180 management, monitoring and Post Limited 10,000.00 0.00 2017-02-09 2017-04-06 2017-10-03 Quotations Envelope Implementation curative du parc des machines evaluation and communication de la CNC du PNDP CM-PNDP-6229-NC-RFQ / Component B: Support to the Fourniture des services de decentralization process Request for Single Stage - One Pending dédouanement et enlèvement IDA / 57180 Component C: Coordination, Post Limited 120,000.00 0.00 2017-04-05 2017-04-26 2017-10-23 Quotations Envelope Implementation des 31 motos et 28 véhicules management, monitoring and acquis par UNOPS evaluation and communication CM-PNDP-2851-NC-DIR / Participation du PNDP au SAGO Component C: Coordination, (Salon de l'Action Pending IDA / 57180 management, monitoring and Prior Direct Selection Direct 6,000.00 0.00 2017-06-08 2017-06-13 2017-07-04 2017-08-03 Gouvernementale) en 2017 Implementation evaluation and communication (Souscription d'une Convention avec "Mon Communicateur") CM-PNDP-2849-NC-DIR / Participation du PNDP à Component C: Coordination, Pending PROMOTE 2017 (Souscription IDA / 57180 management, monitoring and Post Direct Selection Direct 10,000.00 0.00 2016-10-26 2016-10-31 2016-12-05 2017-06-03 Implementation d'une Convention avec INTER evaluation and communication PROGRESS) CM-PNDP-2923-NC-DIR / é ucatifs Projection de films d dans les 10 régions sur la Component B: Support to the Pending décentralisation et le IDA / 57180 Post Direct Selection Direct 60,000.00 0.00 2017-05-07 2017-05-12 2017-06-16 2017-12-13 decentralization process Implementation développement local (Convention avec l'Association Cinéma Numérique Ambulant) CM-PNDP-2861-NC-DIR / Co- production d'une m é ission de Component B: Support to the Pending é ision intitulée "Gouvernance IDA / 57180 télv Post Direct Selection Direct 36,000.00 0.00 2017-06-11 2017-06-16 2017-07-21 2018-01-17 decentralization process Implementation Locale" à diffusée à la CRTV (Convention avec Zenu Network) CM-PNDP-2862-NC-DIR / Co- production d'une m é ission de é ision intitulée " Lumière sur télv Component B: Support to the Pending IDA / 57180 Post Direct Selection Direct 12,000.00 0.00 2017-06-18 2017-06-23 2017-07-28 2018-01-24 la décentralisation"à diffuser sur decentralization process Implementation CANAL 2 (Convention avec Peace Communication) CM-PNDP-2850-NC-RFQ / Component C: Coordination, Appui à l'aménagement et Request for Single Stage - One Pending IDA / 57180 management, monitoring and Post Limited 10,000.00 0.00 2016-12-10 2017-02-04 2017-08-03 animation du stand du PNDP à Quotations Envelope Implementation evaluation and communication PROMOTE 2017 CM-PNDP-2855-NC-RFQ / Appui à l'amménagement et Component B: Support to the Request for Single Stage - One Pending IDA / 57180 Post Limited 6,000.00 0.00 2017-05-19 2017-07-14 2018-01-10 annimation du stand du PNDP au decentralization process Quotations Envelope Implementation SACO en 2017 CONSULTING FIRMS Page 7 Activity Reference No. / Combined Evaluation Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Technical Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CM-PNDP-1203-CS-LCS / Audit Component C: Coordination, financier et comptable des IDA / 57180 management, monitoring and Prior Least Cost Selection Open - National 80,000.00 0.00 Canceled 2016-08-22 2016-09-12 2016-10-26 2016-11-23 2016-12-23 2017-01-27 2017-03-03 2017-08-30 exercices fiscaux 2016 et 2017 evaluation and communication du PNDP CM-PNDP-3202-CS-CQS / Component C: Coordination, Consultant Gestion des doléances à travers Under IDA / 57180 management, monitoring and Post Qualification Open - National 44,000.00 0.00 2016-09-19 2016-10-13 2016-10-10 2016-10-24 2016-11-23 2016-12-23 2017-01-27 2017-07-26 un Centre d'Appel et un Numéro Implementation evaluation and communication Selection vert dans le cadre du PNDP III CM-PNDP-3201-CS-CQS / Component C: Coordination, Consultant Under Migration de Pro-ADP vers une IDA / 57180 management, monitoring and Post Qualification Open - National 52,000.00 0.00 2016-09-19 2016-10-13 2016-10-10 2016-10-24 2016-11-23 2016-12-23 2017-01-27 2017-07-26 Implementation version Web.2.0 evaluation and communication Selection CM-PNDP-2939-CS-CQS / Component C: Coordination, Consultant Pending Etude sur le marketing social IDA / 57180 management, monitoring and Post Qualification Open - National 30,000.00 0.00 2017-04-02 2017-04-23 2017-06-06 2017-07-06 2017-08-10 2018-02-06 Implementation dans le cadre du PNDP 3 evaluation and communication Selection CM-PNDP-2944-CS-CQS / Sélection des experts (1 par région) en langues locales pour Consultant Component B: Support to the Pending la conception ou la traduction IDA / 57180 Post Qualification Open - National 20,000.00 0.00 2017-04-03 2017-04-24 2017-06-07 2017-07-07 2017-08-11 2018-02-07 decentralization process Implementation d'émissions sur les thématiques Selection chères au PNDP 3 à diffuser sur les radios communautaires 001/C/OAL/KOMBO ITINDI/SW/2017 / Sélection d'un Consultant Component A: Local Pending consultant pour l'actualisation du IDA / 57180 Post Qualification Open - National 32,580.00 0.00 2017-03-08 2017-03-29 2017-05-12 2017-06-11 2017-07-16 2018-01-12 development support Implementation PCD de la commune de Kombo Selection Itindi, Région du Sud-Ouest 001/C/OAL/IDABATO/SW/2017 / Sélection d'un consultant pour Consultant Component A: Local Pending l'actualisation du PCD de la IDA / 57180 Post Qualification Open - National 24,480.00 0.00 2017-03-08 2017-03-29 2017-05-12 2017-06-11 2017-07-16 2018-01-12 development support Implementation commune de Idabato, Région du Selection Sud-Ouest 001/C/OAL/KOMBO ABEDIMO/SW/2017 / Sélection Consultant d'un consultant pour Component A: Local Pending IDA / 57180 Post Qualification Open - National 21,510.00 0.00 2017-03-08 2017-03-29 2017-05-12 2017-06-11 2017-07-16 2018-01-12 l'actualisation du PCD de la development support Implementation Selection commune de Kombo Abedimo, Région du Sud-Ouest 001/C/OAL/MUYUKA/SW/2017 / Sélection d'un consultant pour Consultant Component A: Local Pending l'actualisation du PCD de la IDA / 57180 Post Qualification Open - National 23,490.00 0.00 2017-03-08 2017-03-29 2017-05-12 2017-06-11 2017-07-16 2018-01-12 development support Implementation commune de Muyuka, Région du Selection Sud-Ouest 001/C/OAL/IDENAU/SW/2017 / Sélection d'un consultant pour Consultant Component A: Local Pending l'actualisation du PCD de la IDA / 57180 Post Qualification Open - National 12,600.00 0.00 2017-03-08 2017-03-29 2017-05-12 2017-06-11 2017-07-16 2018-01-12 development support Implementation commune de Idenau, Région du Selection Sud-Ouest 001/C/OAL/KONYE/SW/2017 / Sélection d'un consultant pour Consultant Component A: Local Pending l'actualisation du PCD de la IDA / 57180 Post Qualification Open - National 34,620.00 0.00 2017-03-08 2017-03-29 2017-05-12 2017-06-11 2017-07-16 2018-01-12 development support Implementation commune de Konye, Région du Selection Sud-Ouest 001/C/OAL/MBONGE/SW/2017 / Sélection d'un consultant pour Consultant Component A: Local Pending l'actualisation du PCD de la IDA / 57180 Post Qualification Open - National 55,560.00 0.00 2017-03-08 2017-03-29 2017-05-12 2017-06-11 2017-07-16 2018-01-12 development support Implementation commune de Mbonge, Région du Selection Sud-Ouest 001/C/OAL/NGUTI/SW/2017 / Sélection d'un consultant pour Consultant Component A: Local Pending l'actualisation du PCD de la IDA / 57180 Post Qualification Open - National 42,960.00 0.00 2017-03-08 2017-03-29 2017-05-12 2017-06-11 2017-07-16 2018-01-12 development support Implementation commune de Nguti, Région du Selection Sud-Ouest 001/C/OAL/TINTO/SW/2017 / Sélection d'un consultant pour Consultant Component A: Local Pending l'actualisation du PCD de la IDA / 57180 Post Qualification Open - National 43,260.00 0.00 2017-03-08 2017-03-29 2017-05-12 2017-06-11 2017-07-16 2018-01-12 development support Implementation commune de Tinto, Région du Selection Sud-Ouest 001/C/OAL/TIKO/SW/2017 / Sélection d'un consultant pour Consultant Component A: Local Pending l'actualisation du PCD de la IDA / 57180 Post Qualification Open - National 22,500.00 0.00 2017-03-08 2017-03-29 2017-05-12 2017-06-11 2017-07-16 2018-01-12 development support Implementation commune de Tiko, Région du Selection Sud-Ouest 001/C/OAL/LIMBE I/SW/2017 / Sélection d'un consultant pour Consultant Component A: Local Pending l'élaboration du PCD de la IDA / 57180 Post Qualification Open - National 100,000.00 0.00 2017-03-08 2017-03-29 2017-05-12 2017-06-11 2017-07-16 2018-01-12 development support Implementation commune de Limbe I, Région du Selection Sud-Ouest 001/C/OAL/LIMBE II/SW/2017 / Sélection d'un consultant pour Consultant Component A: Local Pending l'élaboration du PCD de la IDA / 57180 Post Qualification Open - National 100,000.00 0.00 2017-03-08 2017-03-29 2017-05-12 2017-06-11 2017-07-16 2018-01-12 development support Implementation commune de Limbe II, Région Selection du Sud-Ouest 001/C/OAL/LIMBE III/SW/2017 / Sélection d'un consultant pour Consultant Component A: Local Pending l'élaboration du PCD de la IDA / 57180 Post Qualification Open - National 100,000.00 0.00 2017-03-08 2017-03-29 2017-05-12 2017-06-11 2017-07-16 2018-01-12 development support Implementation commune de Limbe III, Région Selection du Sud-Ouest CM-PNDP-10307-CS-CQS / Consultant Sélection des OAL pour l'appui à Component B: Support to the Pending IDA / 57180 Post Qualification Open - National 7,102.24 0.00 2017-04-11 2017-05-02 2017-06-15 2017-07-06 2017-08-03 2017-10-02 la mise en oeuvre du Scorecard decentralization process Implementation Selection par les OSC CM-PNDP-10340-CS-INDV / Sélection d'un consultant pour la Consultant Component B: Support to the Pending création et la gestion d'une IDA / 57180 Post Qualification Open - National 37,600.00 0.00 2017-06-26 2017-07-17 2017-08-21 2017-09-04 2017-10-02 2017-11-16 decentralization process Implementation plateforme de présentation des Selection communes Page 8 CM-PNDP-3101-CS-QCBS / Component C: Coordination, Audit financier et comptable des Quality And Cost- Pending IDA / 57180 management, monitoring and Prior Open - National 80,000.00 0.00 2017-03-31 2017-04-21 2017-06-04 2017-07-02 2017-08-01 2017-09-05 2017-10-10 2018-10-10 exercices fiscaux 2016 et 2017 Based Selection Implementation evaluation and communication du PNDP CM-PNDP-2846-CS-QCBS / Recrutement d'un consultant Consultant Component B: Support to the Pending pour l'élaboration des modèles de IDA / 57180 Post Qualification Open - National 100,000.00 0.00 2017-06-13 2017-07-04 2017-08-17 2017-09-16 2017-10-07 2018-04-05 decentralization process Implementation gestion et d'entretien des Selection ouvrages d'infrastructures CM-PNDP-2847-CS-QCBS / Audit technique externe Component C: Coordination, Quality And Cost- Pending périodique de la cosommation IDA / 57180 management, monitoring and Prior Open - National 300,000.00 0.00 2017-07-03 2017-07-24 2017-09-06 2017-10-04 2017-10-18 2017-11-22 2017-12-27 2018-12-27 Based Selection Implementation des allocations par les evaluation and communication communes CM-CRC ADAMAOUA-11781- CS-CQS / Suivi - contrôle des travaux de réalisation d'une mini Consultant adduction d'eau avec sept (07) Component A: Local Pending IDA / 57180 Post Qualification Open - National 5,236.00 0.00 2017-04-05 2017-04-16 2017-05-30 2017-06-29 2017-08-03 2018-01-30 bornes fontaines à Bandam, development support Implementation Selection Commune de Bankim, Département du Mayo Banyo, Région de l'Adamaoua CM-CRC ADAMAOUA-11791- CS-CQS / Suivi-controle des travaux d'Aménagement du marché Kassouan-Dolé (Marché Consultant B) de Banyo par la construction Component A: Local Pending IDA / 57180 Post Qualification Open - National 7,683.00 0.00 2017-04-06 2017-04-16 2017-05-30 2017-06-29 2017-08-03 2018-01-30 de 32 Boutiques Bloc A & B, 01 development support Implementation Selection Hangar de marché (48 comptoirs) Vivres frais et 01 Blocs de 03 Latrines, Commune de Banyo, Département du Mayo Banyo CM-CRC ADAMAOUA-11872- CS-CQS / Suivi-contrôle des Travaux de construction d'un bâtiment R+1 de 20 boutiques Consultant Component A: Local Pending avec bureau et latrines IDA / 57180 Post Qualification Open - National 6,944.00 0.00 2017-04-06 2017-04-16 2017-05-30 2017-06-29 2017-08-03 2018-01-30 development support Implementation incorporées au Marché de Selection Tignère, Commune de Tignère, Département du Faro et Déo, Région de l'Adamaoua CM-CRC ADAMAOUA-11876- CS-CQS / Sélection d'un consultant pour l'élaboration de l'étude de faisabilité technique et Consultant environnementale du microprojet Component A: Local Pending IDA / 57180 Post Qualification Open - National 200,000.00 0.00 2017-04-06 2017-04-09 2017-05-24 2017-06-23 2017-07-28 2018-01-24 d'Aménagement d'un périmètre development support Implementation Selection irrigué des cultures maraichère + un réservoir d'eau dans la périphérie de la ville de Mayo- darlé CM-CRC ADAMAOUA-11879- CS-CQS / Sélection d'un consultant pour l'élaboration de l'étude de faisabilité technique et Consultant environnementale du microprojet Component A: Local Pending IDA / 57180 Post Qualification Open - National 200,000.00 0.00 2017-04-06 2017-04-07 2017-05-24 2017-06-23 2017-07-28 2018-01-24 de construction d'un ouvrage d'art development support Implementation Selection sur le Mayo-Yiel et réalisation d'une té ude complémentaire pour viabiliser le pont sur le Mayo- Boumdo CM-CRC ADAMAOUA-11882- CS-CQS / Sélection d'un consultant pour l'élaboration de l'étude de faisabilité technique et Consultant Component A: Local Pending environnementale du microprojet IDA / 57180 Post Qualification Open - National 200,000.00 0.00 2017-04-06 2017-04-07 2017-05-24 2017-06-23 2017-07-28 2018-01-24 development support Implementation d'extension du réseau l é ectrique Selection de Wourtababal I et II, dans la ville de Tibati, région de l'Adamaoua CM-CRC ADAMAOUA-11888- CS-CQS / Sélection d'un consultant pour t é ude de faisabilité technique et environnementale du MP de Consultant Component A: Local Pending Réalisation de 6 barrières de la IDA / 57180 Post Qualification Open - National 200,000.00 0.00 2017-04-06 2017-04-07 2017-05-24 2017-06-23 2017-07-28 2018-01-24 development support Implementation sécurisation en fils barbelés et Selection en bois de 06 espaces agropastoraux dans les localités de Djohong (2 sites), Dawé, Zone, Laïndé-Ma CM-CRC ADAMAOUA-11940- CS-CQS / Sélection d'un consultant pour l'élaboration de l'étude de faisabilité technique et Consultant environnementale du MP de Component A: Local Pending IDA / 57180 Post Qualification Open - National 4,000.00 0.00 2017-04-06 2017-04-07 2017-05-24 2017-06-23 2017-07-28 2018-01-24 Réalisation d'un forage positif development support Implementation Selection é uipé d'une pompe immergée q alimentée par l'énergie solaire + un château + 04 bornes fontaines au marché Mayo Dar CM-CRC ADAMAOUA-11942- CS-CQS / Etudes pour la const ruction de: - 3 hangars de Marché (Tourni ngal, Bayara et Mayo Badji) - 3 blocs de 2 salles de classe Component A: Local Consultant Pending IDA / 57180 Post Qualification Open - National 4,000.00 0.00 2017-04-06 2017-04-07 2017-05-24 2017-06-23 2017-07-28 2018-01-24 s (EP LIPAO, EP DJERKOKA 2 development support Implementation Selection et EP SINDERE), - réhabilitation 2 blocs de 2 sa lles de classe (EP Tello et EP Ngaoudamdji) Commune de Bélel Page 9 CM-CRC ADAMAOUA-11945- CS-CQS / Sélection d'un consultant pour l'élaboration de l'étude de faisabilité technique et Consultant environnementale des MP Component A: Local Pending IDA / 57180 Post Qualification Open - National 4,000.00 0.00 2017-04-06 2017-04-07 2017-05-24 2017-06-23 2017-07-28 2018-01-24 d'aménagement d'un complexe development support Implementation Selection sportif de Bélel (Terrain de Foot Ball, Hand Ball, Basket Ball, Volley Ball et une tribune de 2 à 5 000 places) CM-CRC ADAMAOUA-11947- CS-CQS / Sélection d'un consultant pour l'élaboration de Consultant l'étude de faisabilité technique et Component A: Local Pending IDA / 57180 Post Qualification Open - National 4,000.00 0.00 2017-04-06 2017-04-07 2017-05-24 2017-06-23 2017-07-28 2018-01-24 environnementale du microprojet development support Implementation Selection d'électrification en né ergie solaire des villages Djilougou et Didjawa, Commune de Bélel INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Contract Type Estimated Actual Amount Draft Negotiated Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CM-PNDP-2933-CS-INDV / Etude d'audience des m é issions Component C: Coordination, Individual Consultant Pending 'Gouvernance Locale (CRTV)" et IDA / 57180 management, monitoring and Post Limited 3,600.00 0.00 2017-01-02 2017-01-07 2017-01-28 2017-03-04 2017-08-31 Selection Implementation " Lumière sur la décentralisation evaluation and communication (CANAL 2) CM-PNDP-2942-CS-INDV / Component C: Coordination, Conception des articles du Individual Consultant Pending IDA / 57180 management, monitoring and Post Limited 2,000.00 0.00 2016-12-11 2016-12-16 2017-01-06 2017-02-10 2017-08-09 Magazine trimestriel " LES Selection Implementation evaluation and communication ECHOS DU PNDP", en anglais CM-PNDP-9851-CS-INDV / Recrutement d'un consultant pour l'élaboration du Guide des Component B: Support to the Individual Consultant Pending IDA / 57180 Post Open 30,000.00 0.00 2017-05-17 2017-07-05 2017-07-12 2017-08-02 2017-09-01 autorités communales pour le decentralization process Selection Implementation suivi de l'exécution des microprojets CM-PNDP-10172-CS-INDV / Component C: Coordination, Recrutement d'un consultant Individual Consultant Pending IDA / 57180 management, monitoring and Post Limited 9,600.00 0.00 2017-03-29 2017-04-03 2017-04-17 2017-05-08 2017-12-29 pour le conseil en assurance au Selection Implementation evaluation and communication PNDP CM-PNDP-10317-CS-INDV / Sélection d'un consultant en appui à la formation des acteurs Component B: Support to the Individual Consultant Pending IDA / 57180 Post Limited 4,000.00 0.00 2017-04-03 2017-04-08 2017-04-22 2017-05-06 2017-05-13 locaux à l'alignement du budget decentralization process Selection Implementation communal à la nomenclature du budget programme CM-PNDP-10322-CS-INDV / Sélection d'un consultant pour la Component B: Support to the Individual Consultant Pending IDA / 57180 Post Open 30,000.00 0.00 2017-04-10 2017-05-20 2017-06-03 2017-07-01 2017-07-31 réalisation des té udes sur la decentralization process Selection Implementation fiscalité locale CM-PNDP-10323-CS-INDV / Sélection d'un consultant pour la Component B: Support to the Individual Consultant Pending é udes liées à la IDA / 57180 réalisation des t Post Open 20,000.00 0.00 2017-04-24 2017-06-03 2017-06-17 2017-07-15 2017-08-14 decentralization process Selection Implementation stratégie de décentralisation en cours de validation CM-PNDP-10333-CS-INDV / Sélection d'un consultant en appui à la formation des TSP Component B: Support to the Individual Consultant Pending IDA / 57180 Post Direct 3,000.00 0.00 2017-04-24 2017-05-04 2017-05-11 2017-05-25 2017-06-01 (prestataires de services, decentralization process Selection Implementation consultants pour la mise en oeuvre des micropjets, etc CM-PNDP-10337-CS-INDV / Sélection d'un consultant en Component B: Support to the Individual Consultant Pending appui au développement de IDA / 57180 Post Direct 12,000.00 0.00 2017-04-04 2017-04-14 2017-04-21 2017-05-05 2017-05-12 decentralization process Selection Implementation l'Economie Sociale et Solidaire (ESS) CM-PNDP-10344-CS-INDV / Sélection d'un consultant pour la Component C: Coordination, Individual Consultant Pending production d'un film documentaire IDA / 57180 management, monitoring and Post Limited 19,200.00 0.00 2017-04-20 2017-04-25 2017-05-09 2017-05-30 2017-06-13 Selection Implementation sur le PNDP dans le septentrion evaluation and communication ( français/anglais) CM-PNDP-10347-CS-INDV / Sélection d'un consultant pour la Component C: Coordination, Individual Consultant Pending conception de l'application IDA / 57180 management, monitoring and Post Open 6,000.00 0.00 2017-04-10 2017-05-13 2017-05-27 2017-06-17 2017-07-17 Selection Implementation mobile du site internet du PNDP evaluation and communication et mise en ligne CM-PNDP-10348-CS-INDV / Sélection d'un consultant en appui à la participation du PNDP Component B: Support to the Individual Consultant Pending à la Journée Africaine de la IDA / 57180 Post Direct 6,000.00 0.00 2017-04-24 2017-05-04 2017-05-18 2017-06-01 2017-06-08 decentralization process Selection Implementation Décentralisation et du Développement Local (JADDEL 2017) CM-PNDP-10358-CS-INDV / Component C: Coordination, Sélection d'un consultant pour Individual Consultant Pending IDA / 57180 management, monitoring and Post Open 20,000.00 0.00 2017-04-25 2017-06-04 2017-06-18 2017-07-02 2017-08-01 l'étude sur la prise en compte du Selection Implementation evaluation and communication genre dans le mode opératoire Component C: Coordination, CM-PNDP-2842-CS-INDV / Individual Consultant Pending IDA / 57180 management, monitoring and Post Limited 10,000.00 0.00 2017-03-22 2017-03-27 2017-04-17 2017-05-15 2018-05-10 Conseil juridique au PNDP Selection Implementation evaluation and communication CM-PNDP-2843-CS-CDS / Recrutement d'un consultant pour l'actualisation des données du système d'information Component B: Support to the Pending IDA / 57180 Post Direct Selection Direct 100,000.00 0.00 2017-05-15 2017-05-25 2017-07-06 2018-01-02 géographique dans les 31 decentralization process Implementation communes d'arrondissement (Convention avec l'Institut National de Cartographie) Page 10 CM-PNDP-2943-CS-INDV / Mise Component C: Coordination, en page du Magazine trimestriel Individual Consultant Pending IDA / 57180 management, monitoring and Post Limited 5,200.00 0.00 2017-03-17 2017-03-22 2017-04-05 2017-04-26 2017-10-23 " LES ECHOS DU PNDP" Selection Implementation evaluation and communication (infographie) CM-PNDP-2941-CS-INDV / Component C: Coordination, Conception des articles du Individual Consultant Pending IDA / 57180 management, monitoring and Post Limited 3,600.00 0.00 2017-03-17 2017-03-22 2017-04-05 2017-05-03 2017-10-30 Magazine trimestriel " LES Selection Implementation evaluation and communication ECHOS DU PNDP", en français CM-PNDP-2934-CS-INDV / Component C: Coordination, Individual Consultant Pending Formation de journalistes sur les IDA / 57180 management, monitoring and Post Limited 4,800.00 0.00 2017-04-24 2017-04-29 2017-05-20 2017-06-24 2017-12-21 Selection Implementation thématiques chères au PNDP 3 evaluation and communication CM-PNDP-2938-CS-INDV / Component C: Coordination, Individual Consultant Pending É aboration de la charte l IDA / 57180 management, monitoring and Post Open 6,201.00 0.00 2017-03-05 2017-04-07 2017-04-21 2017-05-19 2017-11-15 Selection Implementation graphique et sonore du PNDP 3 evaluation and communication CM-PNDP-2936-CS-INDV / Component C: Coordination, Revue mensuelle de la presse Individual Consultant Pending IDA / 57180 management, monitoring and Post Limited 4,000.00 0.00 2017-01-02 2017-01-07 2017-01-21 2017-02-11 2017-08-10 spécialisée et les notes Selection Implementation evaluation and communication conjoncturelles CM-PNDP-2935-CS-INDV / Component C: Coordination, Individual Consultant Pending Revue de la quotidienne et IDA / 57180 management, monitoring and Post Limited 3,000.00 0.00 2017-01-02 2017-01-07 2017-01-28 2017-03-04 2017-08-31 Selection Implementation monitoring des médias evaluation and communication CM-PNDP-2937-CS-INDV / Maintenance et animation du Component B: Support to the Individual Consultant Pending IDA / 57180 Post Open 8,000.00 0.00 2017-02-05 2017-03-26 2017-04-16 2017-05-21 2017-11-17 portail internet sur le PNDP et decentralization process Selection Implementation les communes CM-PNDP-2841-CS-CDS / Formation, assistance technique Component B: Support to the Pending IDA / 57180 Post Direct Selection Direct 70,000.00 0.00 2016-12-03 2016-12-13 2017-02-16 2017-08-15 et déploiement du logiciel sim_ba decentralization process Implementation dans les communes CM-PNDP-2840-CS-INDV / Sélection d'un consultant pour l'étude sur la définition d'une Component B: Support to the Individual Consultant Pending méthodologie de planification au IDA / 57180 Post Limited 30,000.00 0.00 2017-03-05 2017-03-10 2017-03-31 2017-05-05 2017-11-01 decentralization process Selection Implementation niveau des communes d'arrondissement et au niveau régional CM-PNDP-11826-CS-INDV / Component C: Coordination, Traduction des documents et Individual Consultant Pending IDA / 57180 management, monitoring and Post Open 20,000.00 0.00 2017-09-03 2017-10-22 2017-11-12 2017-12-17 2018-06-15 autres supports du PNDP (année Selection Implementation evaluation and communication 2017) CM-PNDP-11851-CS-INDV / Recrutement d'un consultant chargé d'accompagner le Component B: Support to the Individual Consultant Pending technique pour la proposition d'un IDA / 57180 Post Open 30,000.00 0.00 2017-04-05 2017-05-24 2017-06-14 2017-07-19 2018-01-15 decentralization process Selection Implementation dispositif d'entretien et de maintenance des ouvrages dans le cadre du PNDP 001/C/EF/NGUTI/CRC/2017 / Sélection d'un consultant pour é ude de l'élaboration d'une t faisabilité technique et environnementale pour la Component A: Local Individual Consultant Pending IDA / 57180 Post Limited 4,000.00 0.00 2017-04-08 2017-04-13 2017-05-04 2017-06-08 2017-12-05 construction d'une case de development support Selection Implementation passage à Nguti, et la construction de dix boutiques, un bloc latrine à la gare routière de Manyemen, commune de Ngut 002/C/EF/NGUTI/CRC/2017 / Sélection d'un consultant pour é ude de l'élaboration d'une t faisabilité technique et environnementale pour Component A: Local Individual Consultant Pending IDA / 57180 Post Limited 4,000.00 0.00 2017-04-08 2017-04-13 2017-05-04 2017-06-08 2017-12-05 l'approvisionnement en eau de la development support Selection Implementation case de passage et la gare routière de Manyemen, communes de Nguti, Région du Sud Ouest 001/C/EF/TINTO/CRC/2017 / é ude de faisabilité pour les t travaux de construction d'un marché et un bloc latrine à Component A: Local Individual Consultant Pending Fumbe, la construction et IDA / 57180 Post Limited 4,000.00 0.00 2017-04-08 2017-04-13 2017-05-04 2017-06-08 2017-12-05 development support Selection Implementation l'équipement d'un bloc de deux salles de classe, la construction d'un bloc latrine à l'EP de SABES, commune de Tinto 002/C/EF/TINTO/CRC/2017 / é ude de faisabilité technique et t environnementale pour Component A: Local Individual Consultant Pending l'approvisionnement en eau du IDA / 57180 Post Open 4,000.00 0.00 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18 development support Selection Implementation marché de Fumbe et l'EP de SABES, commune de Tinto, Région du Sud Ouest 001/C/EF/WABANE/CRC/2017 / é ude de faisabilité technique et t environnementale pour les travaux de construction des Component A: Local Individual Consultant Pending IDA / 57180 Post Open 3,000.00 0.00 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18 boutiques, d'un hangar et un bloc development support Selection Implementation latrine à Mbecho, construction d'une case de passage à Bechati- Wabane, commune de Wabane 002/C/EF/WABANE/CRC/2017 / é ude de faisabilité technique et t environnementale pour les Component A: Local Individual Consultant Pending travaux de construction d'un IDA / 57180 Post Open 2,000.00 0.00 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18 development support Selection Implementation ouvrage de franchissement sur la rivière Meghop dans le village Folepi, commune de Wabane 003/C/EF/WABANE/CRC/2017 / é ude de faisabilité technique et t environnementale pour Component A: Local Individual Consultant Pending l'approvisionnement en eau du IDA / 57180 Post Open 3,000.00 0.00 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18 development support Selection Implementation marché de Mbecho et la case de passage de Bechati dans la commune de Wabane Page 11 001/C/EF/BUEA/CRC/2017 / é ude de faisabilité technique et t environnementale pour la construction de dix hangars, un Component A: Local Individual Consultant Pending IDA / 57180 Post Open 5,000.00 0.00 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18 bloc latrine au marché de development support Selection Implementation Wotutu, cinq hangars et un bloc latrine au marché de Muea, commune de Buea 002/C/EF/BUEA/CRC/2017 / é ude de faisabilité technique et t environnementale pour Component A: Local Individual Consultant Pending IDA / 57180 Post Open 3,000.00 0.00 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18 l'approvisionnement en eau des development support Selection Implementation marchés de Wotutu et Muea, commune de Buea 001/C/EF/MAMFE/CRC/2017 / é ude de faisabilité technique et t Component A: Local Individual Consultant Pending environnementale pour la IDA / 57180 Post Open 2,000.00 0.00 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18 development support Selection Implementation construction d'un hangar et un bloc latrine au marché de Mamfe 002/C/EF/MAMFE/CRC/2017 / é ude de faisabilité technique et t environnementale pour l'approvisionnement en eau du Component A: Local Individual Consultant Pending marché de Mamfe, la IDA / 57180 Post Open 6,000.00 0.00 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18 development support Selection Implementation réhabilitation du réseau d'AEP de Nfaitock et la réalisation d'un forage à Eyang Ntui, commune de Mamfe, 001/C/EF/ALOU/CRC/2017 / é ude de faisabilité technique et t environnementale pour les travaux de construction et Component A: Local Individual Consultant Pending IDA / 57180 Post Open 2,500.00 0.00 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18 qé uipement des c é oles development support Selection Implementation maternelles de Fonjumetaw et Mendia-M'mockmbie, commune d'Alou 002/C/EF/ALOU/CRC/2017 / é ude de faisabilité technique et t environnementale pour les travaux de réhabilitation de 12km Component A: Local Individual Consultant Pending IDA / 57180 Post Open 3,000.00 0.00 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18 de routes rurales de Atulah à development support Selection Implementation Menky, ouverture de la route rurale de Akung-Njenawung à la limite avec Wabane 003/C/EF/ALOU/CRC/2017 / é ude de faisabilité technique et t environnementale pour Component A: Local Individual Consultant Pending l'approvisionnement en eau des IDA / 57180 Post Open 2,500.00 0.00 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18 development support Selection Implementation cé oles maternelles de Fonjumetaw et Mendia- M'mockmbie, commune d'Alou, 001/C/EF/EYUMOJOCK/CRC/20 é ude de faisabilité 17 / t technique et environnementale pour construction et l'équipement Component A: Local Individual Consultant Pending d'un bloc de deux salles de IDA / 57180 Post Open 4,000.00 0.00 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18 development support Selection Implementation classe, un bloc latrine dans les EP de Onaku, Bayenti et Ayukaba, construction d'un magasin de stockage à Ekok 002/C/EF/EYUMOJOCK/CRC/20 é ude de faisabilité pour 17 / t l'approvisionnement en eau des é oles publiques de Onaku, c Bayenti et Ayukaba, le site de Component A: Local Individual Consultant Pending IDA / 57180 Post Open 4,009.00 0.00 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18 construction du magasin de development support Selection Implementation stocage d'Ekok, réalisation de é uipés de deux forages positifs q pompes à motricité humaine à Agborkem et Ayaoke 001/C/EF/TIKO/CRC/2017 / é ude de faisabilité technique et t Component A: Local Individual Consultant Pending environnementale pour IDA / 57180 Post Open 1,400.00 0.00 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18 development support Selection Implementation l'électrification du village Ombe Native, commune deTiko 002/C/EF/TIKO/CRC/2017 / é ude de faisabilité technique et t environnementale pour la construction d'un Centre de Component A: Local Individual Consultant Pending IDA / 57180 Post Open 1,600.00 0.00 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18 Santé Intégré à Mondoni Native, development support Selection Implementation une case de passage et un restaurant municipal à Tiko, commune de Tiko 003/C/EF/TIKO/CRC/2017 / é ude de faisabilité technique et t environnementale pour l'approvisionnement en eau du Component A: Local Individual Consultant Pending IDA / 57180 Post Open 810.00 0.00 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18 site de construction du CSI de development support Selection Implementation Mondoni Native, la case de passage et le restaurant municipal de Tiko 001/C/EF/MUYUKA/CRC/2017 / é ude de faisabilité technique et t environnementale pour la Component A: Local Individual Consultant Pending IDA / 57180 Post Open 4,000.00 0.00 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18 construction de l'Ecole development support Selection Implementation Maternelle de Bafia, les marchés de Malende et Munyenge 002/C/EF/MUYUKA/CRC/2017 / é ude de faisabilité technique et t environnementale pour l'approvisionnement en eau des Component A: Local Individual Consultant Pending IDA / 57180 Post Open 3,000.00 0.00 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18 site de constructrion de l'Ecole development support Selection Implementation Maternelle de Bafia, les marchés de Malende et Munyenge, commune de Muyuka 001/C/EF/IDENAU/CRC/2017 / é ude de faisabilité technique et t environnementale pour la Component A: Local Individual Consultant Pending construction et l'équpiement d'un IDA / 57180 Post Open 4,000.00 0.00 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18 development support Selection Implementation foyer communautaire à Bakingili et une librairie à Idenau commune d'Idenau Page 12 002/C/EF/IDENAU/CRC/2017 / é ude de faisabilité technique et t environnementale pour Component A: Local Individual Consultant Pending l'approvisionnement en eau du IDA / 57180 Post Open 4,000.00 0.00 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18 development support Selection Implementation site du foyer communautaire de Bakingili et de la librairie municipale d'Idenau 001/C/EF/MENJI/CRC/2017 / é ude de faisabilité technique et t environnementale pour Component A: Local Individual Consultant Pending l'approvisionnement en eau du IDA / 57180 Post Open 2,000.00 0.00 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18 development support Selection Implementation site du foyer communautaire de Mbeuh dans la commune de Menji 002/C/EF/MENJI/CRC/2017 / é ude de faisabilité technique et t environnementale en vue des Component A: Local Individual Consultant Pending IDA / 57180 Post Open 2,000.00 0.00 2017-04-27 2017-06-15 2017-07-06 2017-08-10 2018-02-06 travaux de construction des development support Selection Implementation boutiques et un bloc latrine au marché de Menji 001/C/EF/BAMUSSO/CRC/2017 /té ude de faisabilité technique et environnementale pour la Component A: Local Individual Consultant Pending IDA / 57180 Post Open 2,000.00 0.00 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18 construction d'une case de development support Selection Implementation passage à Bamusso commune de Bamusso 002/C/EF/BAMUSSO/CRC/2017 /t é ude de faisabilité technique et environnementale pour Component A: Local Individual Consultant Pending IDA / 57180 Post Open 2,000.00 0.00 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18 l'approvisionnement en eau du development support Selection Implementation site de la case de passage de Bamusso, 003/C/EFBAMUSSO/CRC/2017 /té ude de faisabilité technique et environnementale pourla Component A: Local Individual Consultant Pending construction d'un ouvrage de IDA / 57180 Post Open 2,000.00 0.00 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18 development support Selection Implementation franchissement à l'entrée de la case de passage d'Iloini, commune de Bamusso 001/C/EF/MUNDEMBA/CRC/201 7/t é ude de faisabilité technique et environnementale pour la Component A: Local Individual Consultant Pending construction et l'équipement d'un IDA / 57180 Post Open 4,000.00 0.00 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18 development support Selection Implementation foyer communautire et une c é ole maternelle à Mundemba, commune de Mundemba 002/C/EF/MUNDEMBA/CRC/201 7/t é ude de faisabilité technique et environnementale pour l'approvisionnement en eau du Component A: Local Individual Consultant Pending IDA / 57180 Post Open 4,000.00 0.00 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18 site de construction de la case development support Selection Implementation de passage et l'école maternelle de Mundemba, commune de Mundemba 001/C/EF/KONYE/CRC/2017 / é ude de faisabilité technique et t environnementale pour la Component A: Local Individual Consultant Pending IDA / 57180 Post Open 3,000.00 0.00 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18 construction et l'équipement du development support Selection Implementation Centre de Santé Intégré de Matondo II, commune de Konye 002/C/EF/KONYE/CRC/2017 / é ude de faisabilité technique et t environnementale pour l'approvisionnement en eau du Component A: Local Individual Consultant Pending IDA / 57180 Post Open 5,000.00 0.00 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18 site de construction du Centre de development support Selection Implementation Santé Intégré de Matondo II, l'alimentation en eau potable des villages Matoh et Koba 001/C/EF/TOMBEL/CRC/2017 / é ude de faisabilité pour la t construction et l'équipement de l'école maternelle d'Ebonji, d'un bloc de deux salles de classe Component A: Local Individual Consultant Pending IDA / 57180 Post Open 5,500.00 0.00 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18 dans les Ecoles primaires de development support Selection Implementation Mbabe et Ngab, d'un hanga au marché d'Ebonji, des bloc latrines dans les EP de Mbabe et Ngab 002/C/EF/TOMBEL/CRC/2017 / é ude de faisabilité technique et t environnementale pour Component A: Local Individual Consultant Pending l'approvisionnement en eau des IDA / 57180 Post Open 2,500.00 0.00 2017-04-08 2017-05-27 2017-06-17 2017-07-22 2018-01-18 development support Selection Implementation Ecoles d'Ebonji, Mbabe et Ngab ainsi que le marché d'Ebonji, commune de Tombel, 001/C/EF/EKONDO TITI/CRC/2017 / t é ude de faisabilité technique et environnementale pour la Component A: Local Individual Consultant Pending IDA / 57180 Post Open 1,600.00 0.00 2017-05-16 2017-07-04 2017-07-25 2017-08-29 2018-02-25 construction et l'équipement des development support Selection Implementation é oles maternelles de c Iribanyange et Kumbe Balue, commune d'Ekondo Titi, 002/C/EF/EKONDO TITI/CRC/2017 / t é ude de faisabilité technique et environnementale pour Component A: Local Individual Consultant Pending l'approvisionnement en eau des IDA / 57180 Post Open 1,600.00 0.00 2017-05-16 2017-07-04 2017-07-25 2017-08-29 2018-02-25 development support Selection Implementation é oles sites de construction des c maternelles d'Iribanyange et Kumbe Balue, commune d'Ekondo Titi, 001/C/EF/KOMBO ITINDI/CRC/2017 / t é ude de faisabilité technique et environnementale pour la construction des logements Component A: Local Individual Consultant Pending IDA / 57180 Post Open 6,000.00 0.00 2017-08-07 2017-09-25 2017-10-16 2017-11-20 2018-05-19 d'astreinte pour enseignants, d'un development support Selection Implementation block latrine et aménagement d'un passage piéton à Gold Coast, commune de Kombo Itindi, Page 13 001/C/EF/IDABATO/CRC/2017 / é ude de faisabilité technique et t environnementale pour la construction d'un marché et un Component A: Local Individual Consultant Pending bloc latrine à Kombo Amunja, IDA / 57180 Post Open 6,000.00 0.00 2017-08-07 2017-09-25 2017-10-16 2017-11-20 2018-05-19 development support Selection Implementation construction de cinq bloc latrines à Shell Creek, Idabato II, Jabane et Kombo Amunja, commune d'Idabato 001/C/EF/KOMBO ABEDIMO/CRC/2017 / t é ude de faisabilité technique et environnementale pour la réhabilitation de l'Ecole Publique Component A: Local Individual Consultant Pending IDA / 57180 Post Open 4,000.00 0.00 2017-08-07 2017-09-25 2017-10-16 2017-11-20 2018-05-19 bilingue et l'hôpital de district development support Selection Implementation d'Akwa, la consruction d'un magasin de stockage et un bloc latrine à Akwa Beach, commune de Kombo Abedimo 002/C/EF/KOMBO ABEDIMO/CRC/2017 / t é ude de faisabilité technique et environnementale pour Component A: Local Individual Consultant Pending IDA / 57180 Post Open 4,000.00 0.00 2017-08-07 2017-09-25 2017-10-16 2017-11-20 2018-05-19 l'approvisionnement en eau du development support Selection Implementation site de construction du magasin de stockage d'Akwa, commune de Kombo Abedimo 001/C/EF/ISANGELE/CRC/2017 /té ude de faisabilité technique et environnementale pour la Component A: Local Individual Consultant Pending IDA / 57180 Post Open 1,600.00 0.00 2017-08-07 2017-09-25 2017-10-16 2017-11-20 2018-05-19 construction des logements development support Selection Implementation d'astreinte des enseignants à Isangele , commune d'Isangele 002/C/EF/ISANGELE/CRC/2017 /t é ude de faisabilité technique et environnementale pour l'approvisionnement en eau Component A: Local Individual Consultant Pending IDA / 57180 Post Open 2,400.00 0.00 2017-08-07 2017-09-25 2017-10-16 2017-11-20 2018-05-19 potable du site de construction development support Selection Implementation des logements d'astreinte des enseignants à Isangele , commune d'Isangele 001/C/SC/BAMUSSO/CRC/2017 / Suivi/contrôle des Travaux de construction d'un magasin de Component A: Local Individual Consultant Pending stockage et d'un bloc latrine à IDA / 57180 Post Open 2,199.00 0.00 2017-04-27 2017-06-15 2017-07-06 2017-08-10 2018-02-06 development support Selection Implementation trois compartiments à Bekery Beach dans la Commune de Bamusso 001/C/SC/MUYUKA/CRC/2017 / Suivi/contrôle des Travaux de construction des hangars au Component A: Local Individual Consultant Pending IDA / 57180 Post Open 2,542.00 0.00 2017-04-27 2017-06-15 2017-07-06 2017-08-10 2018-02-06 marché de Yoke dans la development support Selection Implementation Commune de Muyuka, Région du Sud-Ouest 001/C/SC/EKONDO TITI/CRC/2017 / Suivi/contrôle des Travaux de Construction et Component A: Local Individual Consultant Pending d'équipement en mobilier de IDA / 57180 Post Open 2,201.00 0.00 2017-04-27 2017-06-15 2017-07-06 2017-08-10 2018-02-06 development support Selection Implementation l'Ecole Maternelle de Funge dans la Commune d'Ekondo Titi, Région du Sud-Ouest 002/C/SC/EKONDO TITI/CRC/2017 / Suivi/contrôle des Travaux de réalisation d'un é uipé d'une forage productif q Component A: Local Individual Consultant Pending IDA / 57180 Post Open 1,106.00 0.00 2017-04-27 2017-06-15 2017-07-06 2017-08-10 2018-02-06 pompeà energie solaire à l'Ecole development support Selection Implementation Maternelle de Fonge dans la Commune d'Ekondo Titi, Région du Sud-Ouest 001/C/SC/MENJI/CRC/2017 / Suivi/contrôle des Travaux de construction et d'équipement en Component A: Local Individual Consultant Pending mobilier d'un foyer IDA / 57180 Post Open 2,400.00 0.00 2017-04-27 2017-06-15 2017-07-06 2017-08-10 2018-02-06 development support Selection Implementation communautaire dans le village Mbeuh de la Commune de Menji, dans la Région du Sud-Ouest 001/C/SC/MUNDEMBA/CRC/201 7 / Suivi/contrôle des Travaux de réalisation de trois (03) forages productifs qé uipés de pompes à Component A: Local Individual Consultant Pending motricité humaine dans les trois IDA / 57180 Post Open 2,383.00 0.00 2017-04-27 2017-06-15 2017-07-06 2017-08-10 2018-02-06 development support Selection Implementation (03) cé oles publiques de Ndian Estate, Fabe et Besingi, dans la Commune de Ndian, Région du Sud-Ouest 001/C/SC/TOMBEL/CRC/2017 / Suivi/contrôle des Travaux de construction d'un marché, un bloc latrine à trois (03) Component A: Local Individual Consultant Pending IDA / 57180 Post Open 2,902.00 0.00 2017-04-27 2017-06-15 2017-07-06 2017-08-10 2018-02-06 Compartiments et une borne development support Selection Implementation fontaine à Tombel, dans la Commune de Tombel, Région du Sud-Ouest 001/C/SC/MBONGE/CRC/2017 / Suivi/contrôle des Travaux de réalisation de deux (02) forages productifs qé uipés de pompes à Component A: Local Individual Consultant Pending motricité humaine dans les IDA / 57180 Post Open 1,365.00 0.00 2017-04-27 2017-06-15 2017-07-06 2017-08-10 2018-02-06 development support Selection Implementation é oles publiques de Marumba et c Kotto Barumbi dans la Commune de Mbonge, Région du Sud- Ouest 001/C/CC/LIMBE II/CEC/2017 / Recrutement d'un agent financier Component A: Local Individual Consultant Pending IDA / 57180 Post Open 4,320.00 0.00 2017-04-18 2017-06-06 2017-06-27 2017-08-01 2018-01-28 pour la commune de Limbe II, development support Selection Implementation Région du Sud-Ouest 002/C/CC/LIMBE II/CEC/2017 / Recrutement d'un agent de Component A: Local Individual Consultant Pending développment pour la commune IDA / 57180 Post Open 5,400.00 0.00 2017-04-18 2017-06-06 2017-06-27 2017-08-01 2018-01-28 development support Selection Implementation de Limbe II, Région du Sud- Ouest Page 14 001/C/CC/LIMBE III/CEC/2017 / Recrutement d'un agent financier Component A: Local Individual Consultant Pending IDA / 57180 Post Open 4,320.00 0.00 2017-04-18 2017-06-06 2017-06-27 2017-08-01 2018-01-28 pour la commune de Limbe III, development support Selection Implementation Région du Sud-Ouest 002/C/CC/LIMBE III/CEC/2017 / Recrutement d'un agent de Component A: Local Individual Consultant Pending développment pour la commune IDA / 57180 Post Open 5,400.00 0.00 2017-04-18 2017-06-06 2017-06-27 2017-08-01 2018-01-28 development support Selection Implementation de Limbe III, Région du Sud- Ouest 001/C/CC/KUMBA I/CEC/2017 / Recrutement d'un agent financier Component A: Local Individual Consultant Pending IDA / 57180 Post Open 4,230.00 0.00 2017-04-18 2017-06-06 2017-06-27 2017-08-01 2018-01-28 pour la commune de Kumba I, development support Selection Implementation Région du Sud-Ouest 002/C/CC/KUMBA I/CEC/2017 / Recrutement d'un agent de Component A: Local Individual Consultant Pending développment pour la commune IDA / 57180 Post Open 5,400.00 0.00 2017-04-18 2017-06-06 2017-06-27 2017-08-01 2018-01-28 development support Selection Implementation de Kumba I, Région du Sud- Ouest 001/C/CC/KUMBA II/CRC/2017 / Recrutement d'un agent financier Component A: Local Individual Consultant Pending IDA / 57180 Post Open 4,320.00 0.00 2017-04-18 2017-06-06 2017-06-27 2017-08-01 2018-01-28 pour la commune de Kumba II, development support Selection Implementation Région du Sud-Ouest 002/C/CC/KUMBA II/CEC/2017 / Recrutement d'un agent de Component A: Local Individual Consultant Pending développment pour la commune IDA / 57180 Post Open 5,400.00 0.00 2017-04-18 2017-06-06 2017-06-27 2017-08-01 2018-01-28 development support Selection Implementation de Kumba II, Région du Sud- Ouest 001/C/CC/KUMBA III/CRC/2017 / Recrutement d'un agent Component A: Local Individual Consultant Pending IDA / 57180 Post Open 4,320.00 0.00 2017-04-18 2017-06-06 2017-06-27 2017-08-01 2018-01-28 financier pour la commune de development support Selection Implementation Kumba III, Région du Sud-Ouest 002/C/CC/KUMBA III/CRC/2017 / Recrutement d'un agent de Component A: Local Individual Consultant Pending développment pour la commune IDA / 57180 Post Open 5,400.00 0.00 2017-04-18 2017-06-06 2017-06-27 2017-08-01 2018-01-28 development support Selection Implementation de Kumba III, Région du Sud- Ouest Page 15