The World Bank Implementation Status & Results Report Saint Lucia - Caribbean Regional Air Transport Connectivity Project (P170860) Saint Lucia - Caribbean Regional Air Transport Connectivity Project (P170860) LATIN AMERICA AND CARIBBEAN | St. Lucia | Transport Global Practice | IBRD/IDA | Investment Project Financing | FY 2020 | Seq No: 1 | ARCHIVED on 13-Nov-2020 | ISR43415 | Implementing Agencies: Saint Lucia, Saint Lucia Air and Sea Ports Authority Key Dates Key Project Dates Bank Approval Date: 28-May-2020 Effectiveness Date: 16-Oct-2020 Planned Mid Term Review Date: -- Actual Mid-Term Review Date: Original Closing Date: 30-Jun-2027 Revised Closing Date: 30-Jun-2027 pdoTable Project Development Objectives Project Development Objective (from Project Appraisal Document) The Project Development Objectives (PDO) are to (i) improve operational safety and navigation efficiency of air transport and (ii) enhance resilience of Saint Lucia’s airport infrastructure to natural disasters. Has the Project Development Objective been changed since Board Approval of the Project Objective? No Components Table Name Component 1: Improvement of UVF Runway Safety and Resilience:(Cost $32.50 M) Component 2: Modernization of Air Navigation Systems:(Cost $4.00 M) Component 3: Institutional Strengthening:(Cost $4.50 M) Component 4: Project Management:(Cost $4.00 M) Component 5: Contingent Emergency Response Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO -- Satisfactory Overall Implementation Progress (IP) -- Satisfactory Overall Risk Rating -- Substantial Implementation Status and Key Decisions The Project was approved on May 28, 2020. The Financing Agreement was signed on July 31, 2020 and the project was declared effective on October 16, 2020. The Project Implementing Entity has finalized the terms of reference for the recruitment of key personnel. The terms of reference for the elaboration of key studies are being finalized, including the vulnerability assessment and airfield resilience plan and the design study for Hewanorra International Airport’s airfield improvements. 11/13/2020 Page 1 of 9 The World Bank Implementation Status & Results Report Saint Lucia - Caribbean Regional Air Transport Connectivity Project (P170860) Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance Moderate -- Moderate Macroeconomic Substantial -- Substantial Sector Strategies and Policies Moderate -- Moderate Technical Design of Project or Program Moderate -- Moderate Institutional Capacity for Implementation and Substantial -- Substantial Sustainability Fiduciary Substantial -- Substantial Environment and Social Moderate -- Moderate Stakeholders Moderate -- Moderate Other -- -- -- Overall Substantial -- Substantial Results PDO Indicators by Objectives / Outcomes Improve operational safety and navigation efficiency of air transport IN00891181 ►UVF runway in compliance with additional ICAO standards/requirements (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 4.00 Date 31-Mar-2020 -- 10-Sep-2020 30-Jun-2027 UVF runway improved to meet additional ICAO standards and requirements. This will be assessed by the following elements: (i) rehabilitation of the runway pavement, (ii) construction of 7.5 meter wide shoulders Comments: in both sides, (iii) installation of LED lighting, and (iv) new runway marking. These will be defined while the designs are finalized. IN00891183 ►Modernization of air navigation systems and oversight (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 3.00 Date 31-Mar-2020 -- 10-Sep-2020 30-Jun-2027 11/13/2020 Page 2 of 9 The World Bank Implementation Status & Results Report Saint Lucia - Caribbean Regional Air Transport Connectivity Project (P170860) Air traffic monitoring and control capacity upgraded to the international standards at UVF and SLU through (i) installation of ILS at UVF, (ii) installation of ADS-B monitors at UVF and SLU, and installation of ADS-B Comments: on Saint Lucia-based aircraft, and (iii) modernization of UVF aeronautical charts. The target will be assessed and revised after the final designs for Component 2 are finalized. IN00891184 ►Regional change in airspace area covered by globally standardized air traffic monitoring system (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 100.00 Date 31-Mar-2020 -- 10-Sep-2020 30-Jun-2027 Change in area of airspace covered by ADS-B which will be installed by the CATCOP program in the Caribbean region. The target value will be re-defined once the feasibility studies identify of the additional ADS-B coverage area in each CATCOP participating country. The indicator will be estimated as a change Comments: of the total coverage area in the region. The ADS-B is the globally standardized air traffic monitoring system which will benefit not only to flights taking off/landing tin the installed countries, but to all flights passing through the airspace covered by the system. IN00891185 ►Regional capacity building program on air traffic control and management prepared and endorsed (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No -- No Yes Date 31-Mar-2020 -- 10-Sep-2020 30-Jun-2027 Regional capacity building program for all the SOP participants on air traffic control and management Comments: prepared and endorsed. Enhance resilience of Saint Lucia’s airport infrastructure to natural disasters IN00891182 ►Change in discharge capacity of the runway drainage system at UVF (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 100.00 Date 31-Mar-2020 -- 10-Sep-2020 30-Jun-2027 Change in discharge capacity of the runway drainage system at UVF due to the drainage improvement Comments: works in the airfield. The baseline value of the discharge capacity will be set by the design study. If necessary, the target will be updated. Intermediate Results Indicators by Components Improvement of UVF Runway Safety and Resilience IN00891186 ►UVF runway rehabilitated (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 100.00 11/13/2020 Page 3 of 9 The World Bank Implementation Status & Results Report Saint Lucia - Caribbean Regional Air Transport Connectivity Project (P170860) Date 22-Oct-2019 -- 10-Sep-2020 30-Jun-2027 Comments: Percentage of the UVF runway pavement rehabilitated. IN00891190 ►Shoulders constructed along the UVF runway (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 100.00 Date 31-Mar-2020 -- 10-Sep-2020 30-Jun-2027 Comments: Construction work of installing the new shoulders along the UVF runway IN00891194 ►LED lighting system installed for UVF runway (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No -- No Yes Date 31-Mar-2020 -- 10-Sep-2020 30-Jun-2027 Comments: LED lighting system installed for UVF runway IN00891197 ►Runway End Safety Areas constructed on the UVF runway (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 100.00 Date 31-Mar-2020 -- 10-Sep-2020 30-Jun-2027 Comments: Construction of Runway End Safety Areas (RESA) in the both end of the runway at UVF IN00891200 ►Airfield drainages improved at UVF (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No -- No Yes Date 31-Mar-2020 -- 10-Sep-2020 30-Jun-2027 Comments: Improvement of airfield drainage system at UVF IN00891202 ►Airfield resilience plan prepared for UVF (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No -- No Yes Date 31-Mar-2020 -- 10-Sep-2020 30-Jun-2027 11/13/2020 Page 4 of 9 The World Bank Implementation Status & Results Report Saint Lucia - Caribbean Regional Air Transport Connectivity Project (P170860) Comments: Airfield resilience plan for UVF is prepared. IN00891204 ►Firefighters control room upgraded at UVF (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No -- No Yes Date 31-Mar-2020 -- 10-Sep-2020 30-Jun-2027 Comments: Firefighters control room at UVF is upgraded. IN00891205 ►Annual passenger volume of UVF (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 830,000.00 -- 830,000.00 1,000,000.00 Date 31-Dec-2018 -- 31-Dec-2018 30-Jun-2027 Number of annual passenger volume of UVF who will be benefited by the safer and more resilient UVF Comments: airport once the project interventions are completed. Modernization of Air Navigation Systems IN00891187 ►ILS approach installed for UVF Runway (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No -- No Yes Date 31-Mar-2020 -- 10-Sep-2020 30-Jun-2027 Comments: ILS approach system is installed for UVF Runway for arrival flights. IN00891191 ►ADS-B monitors installed for UVF and SLU (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No -- No Yes Date 31-Mar-2020 -- 10-Sep-2020 30-Jun-2027 Comments: Installation of ADS-B monitors at UVF and SLU. IN00891195 ►Number in Saint Lucia-based aircraft equipped with ADS-B (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 3.00 11/13/2020 Page 5 of 9 The World Bank Implementation Status & Results Report Saint Lucia - Caribbean Regional Air Transport Connectivity Project (P170860) Date 31-Mar-2020 -- 10-Sep-2020 30-Jun-2027 Number in Saint Lucia-based aircraft equipped with ADS-B technology. As of March 2020, 3 helicopters Comments: are registered in Saint Lucia as a whole. IN00891198 ►UVF Aeronautical Charts updated (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No -- No Yes Date 31-Mar-2020 -- 10-Sep-2020 30-Jun-2027 Comments: UVF Aeronautical Charts is updated Institutional Strengthening IN00891188 ►Air Traffic Controllers trained on updated equipment and aeronautical charts (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No -- No Yes Date 31-Mar-2020 -- 10-Sep-2020 30-Jun-2026 Comments: Air Traffic Controllers trained on updated equipment and aeronautical charts IN00891193 Percentage of female participants of training (Percentage, Custom Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 50.00 IN00891196 ►Gap analysis conducted on airport operational capacity (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No -- No Yes Date 31-Mar-2020 -- 10-Sep-2020 30-Jun-2027 Comments: Gap analysis conducted on airport operational capacity IN00891199 ►Change in number of women hired for middle-skilled jobs by SLASPA (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 50.00 Date 31-Mar-2020 -- 10-Sep-2020 30-Jun-2027 Change in number of women hired for middle-skilled jobs by SLASPA. The definition of middle-skilled job Comments: will be determined during the implementation. 11/13/2020 Page 6 of 9 The World Bank Implementation Status & Results Report Saint Lucia - Caribbean Regional Air Transport Connectivity Project (P170860) IN00891201 ►Semi-annual meetings held with stakeholders to discuss their suggestions and related actions taken by the project (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 12.00 Date 31-Mar-2020 -- 10-Sep-2020 30-Jun-2027 Number of meeting minutes documenting the discussion on decisions and/or actions taken based on Comments: stakeholders' focus group's feedback IN00891203 ►Share of women included in the medium-skills training (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 30.00 Date 31-Mar-2020 -- 10-Sep-2020 30-Jun-2027 The project will finance training by a certified agency for SLASPA and ECCAA capacity building for development of medium skills, including those related to air traffic controllers, supervisors, and public Comments: safety and security screening staff. The indicator will measure how many women will participate in this training Project Management IN00891189 ►Percentage of grievances received by project staff that are addressed according to the agreed GRM procedures and the results communicated back to the involved stakeholders (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 100.00 Date 31-Mar-2020 -- 10-Sep-2020 30-Jun-2027 The indicator will monitor the claims submitted to the GRM and follow-up actions. PIU under SLASPA will ensure that the GRM will receive claims from stakeholders and respond in accordance to the agreed GRM Comments: procedures. Stakeholders include neighboring communities, airport passengers, civil society organizations, airlines, cargo handlers, ECCAA, relevant governmental agencies, etc. IN00891192 ►Number of stakeholder meetings held to discuss the decisions and/or actions taken based on beneficiaries’ feedback. (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 12.00 Date 31-Mar-2020 -- 10-Sep-2020 30-Jun-2027 Number of stakeholder meetings held to discuss the decisions and/or actions taken based on Comments: beneficiaries’ feedback. At least semi-annually during the project implementation period. Performance-Based Conditions Data on Financial Performance 11/13/2020 Page 7 of 9 The World Bank Implementation Status & Results Report Saint Lucia - Caribbean Regional Air Transport Connectivity Project (P170860) Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P170860 IDA-66530 Effective USD 45.00 45.00 0.00 0.00 45.00 0% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P170860 IDA-66530 Effective 28-May-2020 31-Jul-2020 16-Oct-2020 30-Jun-2027 30-Jun-2027 Cumulative Disbursements PBC Disbursement Achievement Disbursed amount in Disbursement % PBC ID PBC Type Description Coc PBC Amount Status Coc for PBC 11/13/2020 Page 8 of 9 The World Bank Implementation Status & Results Report Saint Lucia - Caribbean Regional Air Transport Connectivity Project (P170860) Restructuring History There has been no restructuring to date. Related Project(s) There are no related projects. 11/13/2020 Page 9 of 9