65343 1 of 3 PROCUREMENT PLAN UNDER PSDP-IV LOAN [AS ON 30.09.2011] Completion of Date of Contract S. Package No. Description of Works/Goods Estimated Method of Preparation Bank's No Bids Contract Award Bank's No Contract Contract No. Name of Contractor/ No. Cost (in procurement of Bid Objection to decided (Date/ Objection to Signed Nationality & ZIP Million $) ICB/NCB Document Bidding Value/ Contract (Date/ Code Documents (Date) Currency) Award (Date) Value/ (Date) Currency) Invitation (Date) Opened on (Date) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 2500 MW HVDC BIPOLE ALONGWITH BIPOLE CONVERTOR STATIONS AT BALIA & BHIWADI 1.1 C-46002-S656-1 HVDC Terminal Package at Ballia 335.90 ICB 09.09.05 21.09.05 30.09.05 08.12.05 22.02.06 20.04.06 and Bhiwadi (S+I) '(1st Stage) '(1st Stage) '(1st '(1st 15.12.06 15.01.07 Stage) Stage) (2nd Stage) (2nd Stage) 31.01.07 15.02.07 (2nd Stage) (2nd Stage) 30.10.06 for 29.11.06 07.12.06 15.12.06 02.03.07 C-46002-S656- JV OF SIEMENS NOV'2009 Adjustment in 1/2316, 2317 & AG, GERMANY & First Bid 17.01.07 25.01.07 19.02.07 2318 BHEL & 18.12.06 (2nd Stage) (2nd Stage) (2nd Stage) SIEMENS LTD, (2nd Stage) INDIA 1.2 C-46014-L679-1 210 KN COMPOSITE LONG ROD 0.60 ICB 01.08.06 26.10.06 09.08.07 NA 24.12.07 C-46014-L679-1/ XIANGFAN, CHINA AUG'2008 INSULATORS (S) 2408 2 NORTH - WEST TRANSMISSION CORRIDOR STRENGTHENING SCHEME 2.1 C-13802-L179-1 INSULATOR PKG-C1 (FOR T/L PKG- 1.15 ICB 02.05.06 N.A. ** 15.05.06 22.12.06 26.03.07 N.A. ** 25.04.07 C-13802-L179-1/ BHEL, INDIA MAY'2008 A1) (S) 2342 2.2 C-13804-S119A-1 400 KV GWALIOR, ZERDA (GEB), 10.73 ICB N.A. ** N.A. ** 21.11.06 20.02.07 22.05.07 N.A. ** 02.07.07 C-13804-S119A-1/ L&T LTD, INDIA DEC'2008 AGRA & KANKROLI SUBSTATIONS (S+I) 2374 EXTENSION PACKAGE 3 WESTERN REGION SYSTEM STRENGTHENING SCHEME-II (SET-B) BID DOCUMENT NO.- XXX (MBD) 3.1 C-33021-S119A-1 400/220kV Pune (New) Sub-station 21.98 ICB 18.12.06 09.02.07 16.03.07 13.06.07 22.08.07 11.10.07 29.01.08 C-33021-S119A-1/ ABB, INDIA JAN'2010 PACKAGE- A (S+I) 2426 3.2 C-33022-S1919A-1 400/220kV Sholapur (New) Sub- 19.26 ICB 18.12.06 09.02.07 16.03.07 13.06.07 22.08.07 11.10.07 29.01.08 C-33022-S119A-1/ ABB, INDIA JAN'2010 station PACKAGE-B (S+I) 2428 3.3 C-33023-S119A-1 Extension of 400kV Aurangabad 6.15 ICB 18.12.06 09.02.07 16.03.07 13.06.07 22.08.07 11.10.07 29.01.08 C-33023-S919A-1/ ABB, INDIA JAN'2010 (MSEB), 400 kV Parli and 400 kV (S+I) 2430 Kolhapur (MSEB) Sub-stations PACKAGE- C 4 WESTERN REGION SYSTEM STRENGTHENING SCHEME-II (SET-D) BID DOCUMENT NO.- XXI 4.1 C-33025-L075-1 Conductor Package (for Tower T1 & 22.30 ICB 15.04.07 N.A. ** 18.04.07 20.06.07 31.10.07 N.A. ** 21.02.08 C-33025-L075-1/ JV OF GUPTA, APR'2009 T2) Package-U (S) 2449 APAR & DEEPAK, INDIA BID DOCUMENT NO.- XXII 4.2 C-33025-L079-1 Insulator Package (for Tower T1) 1.96 ICB 13.04.07 N.A. ** 17.04.07 15.06.07 26.12.07 N.A. ** 20.02.08 C-33025-L079-1/ NANJING, CHINA FEB'2009 PACKAGE-V1 (S) 2440 4.3 C-33026-L079-1 Insulator Package (for Tower T2) 1.33 ICB 15.04.07 N.A. ** 17.04.07 15.06.07 26.12.07 N.A. ** 20.02.08 C-33026-L079-1/ NANJING, CHINA FEB'2009 PACKAGE-V2 (S) 2442 BID DOCUMENT NO.- XXIII 4.4 C-33006-L195A-1 400 kV D/C Korba-Birsinghpur line - 22.63 ICB 29.11.06 11.01.07 28.10.06 02.02.07 14.02.07 05.04.07 14.05.07 C-33006-L195A-1/ JV of SPIC-SMO, MAY'2009 227 kms. Package- W1 (S+I) 2348 INDIA & ASTER, INDIA 4.5 C-33007-L195A-1 400 kV D/C Birsinghpur-Damoh line - 20.00 ICB 29.11.06 11.01.07 28.10.06 02.02.07 14.02.07 05.04.07 15.05.07 C-33007-L195A-1/ KALPATARU MAY'2009 254 kms. Package- W 2 (S+I) 2350 POWER, INDIA 4.6 C-33008-L195A-1 400 kV D/C Damoh-Bhopal line -234 18.43 ICB 29.11.06 11.01.07 28.10.06 02.02.07 14.02.07 05.04.07 14.05.07 C-33008-L195A-1/ JV of SPIC-SMO, MAY'2009 kms. Package - W3 (S+I) 2350 INDIA & ASTER, INDIA ** These documents are post review and are ready based on prior review documents as approved by World Bank. NA - Not Applicable, NYA - Not yet awarded 2 of 3 Completion of Date of Contract S. Package No. Description of Works/Goods Estimated Method of Preparation Bank's No Bids Contract Award Bank's No Contract Contract No. Name of Contractor/ No. Cost (in procurement of Bid Objection to decided (Date/ Objection to Signed Nationality & ZIP Million $) ICB/NCB Document Bidding Value/ Contract (Date/ Code Documents (Date) Currency) Award (Date) Value/ (Date) Currency) Invitation (Date) Opened on (Date) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 BID DOCUMENT NO.- XXIV (MBD) 4.7 C-33006-L175-1 Conductor Package (for Tower W1) 18.10 ICB 21.12.06 28.03.07 11.04.07 29.05.07 31.10.07 04.01.08 20.02.08 C-33006-L175-1/ STERLITE, INDIA AUG'2009 PACKAGE- X1 (S) 2446 4.8 C-33007-L175-1 Conductor Package (for Tower W2) 18.00 ICB 21.12.06 28.03.07 11.04.07 29.05.07 31.10.07 04.01.08 20.02.08 C-33007-L175-1/ STERLITE, INDIA AUG'2009 PACKAGE- X2 (S) 2447 4.9 C-33008-L175-1 Conductor Package (for Tower W3) 17.33 ICB 21.12.06 28.03.07 11.04.07 29.05.07 31.10.07 04.01.08 20.02.08 C-33008-L175-1/ STERLITE, INDIA AUG'2009 PACKAGE- X3 (S) 2448 BID DOCUMENT NO.- XXV (MBD) 4.10 C-33006-L179-1 Insulator Package (for Tower W1) 2.29 ICB 21.12.06 28.03.07 11.04.07 31.05.07 21.09.07 23.10.07 19.02.08 C-33006-L179-1/ BHEL, INDIA MAY'2009 PACKAGE-Y1 (S) 2438 4.11 C-33007-L179-1 Insulator Package (for Tower W2 & 3.88 ICB 21.12.06 28.03.07 11.04.07 31.05.07 21.09.07 23.10.07 19.02.08 C-33007-L179-1/ WSI, INDIA AUG'2009 W3) PACKAGE-Y2 (S) 2439 BID DOCUMENT NO.- XXXIII 4.12 C-33009-S117-1 Shunt Reactor Package 7.51 ICB 05.06.07 15.02.08(*) 08.06.07 07.03.08 06.05.08 22.05.08 04.07.08 C-33009-S117- CROMPTON JAN'2010 (S + I) 1/2565 GREAVES LTD., INDIA BID DOCUMENT NO.- XXXIV 4.13 C-33009-S119A-1 Extension of 400kV Damoh, 400 kV 8.86 ICB 27.11.06 N.A. ** 11.04.07 29.05.07 22.08.07 N.A. ** 20.02.08 C-33009-S119A-1/ SIEMENS, INDIA NOV'2009 Gwalior, 400 kV Bina, 400 kV Korba (S + I) 2444 (NTPC) and 400 kV Bhopal (MPSEB) Sub-stations 5 EAST - WEST TRANSMISSION CORRIDOR STRENGTHENING SCHEME BID DOCUMENT NO.- I 5.1 C-46201-L195A-1 400 KV D/C Ranchi - Rourkela TL - 14.04 ICB 28.04.06 NA 22.11.06 05.02.07 02.08.07 NA 18.01.08 C-46201-L195A- KEC, INDIA OCT'2009 170 kms PACKAGE- A1 (S+I) 1/2422 5.2 C-46202-L195A-1 400 KV D/C Rourkela - Raigarh TL - 21.01 ICB 28.04.06 NA 22.11.06 05.02.07 27.02.07 NA 10.07.07 C-46202-L195A-1/ JV of TATA JULY'2009 220 kms PACKAGE- A2 (S+I) 2379 PROJECTS & ASTER TELE, INDIA 5.3 C-46203-L195A-1 400 KV D/C Raigarh - Raipur TL - 19.77 ICB 28.04.06 NA 22.11.06 05.02.07 27.02.07 NA 10.07.07 C-46203-L195A-1/ JV of B&C & JULY'2009 225 kms PACKAGE- A3 (S+I) 2381 ICOMM TELE, INDIA BID DOCUMENT NO.- III 5.4 C-46201-L179-1 Insulator Package-C (for Tower 5.65 ICB 26.04.07 NA 27.04.07 14.06.07 02.08.07 NA 22.02.08 C-46201-L179- ADITYA BIRLA, JAN'2009 A1,A2 & A3) (S) 1/2451 INDIA BID DOCUMENT NO.- V 5.5 C-46204-S119A-1 Extensions of 400kV Ranchi, 400 kV 15.13 ICB 05.03.07 N.A. ** 06.03.07 25.05.07 22.08.07 NA 18.02.08 C-46204-S119A-1/ AREVA T&D, NOV'2009 Rourkela, 400 kV Raipur and 400 kV (S + I) 2436 INDIA Raigarh Sub-stations 6 EASTERN REGION STRENGTHENING SCHEME-I BID DOCUMENT NO.- I 6.1 C-46801-L195A-1 400 KV D/C Durgapur - Jamshedpur 19.61 ICB 17.11.06 NA 21.11.06 07.02.07 27.02.07 NA 15.05.07 C-46801-L195A-1/ KEC, INDIA SEPT'08 TL - 181 kms PACKAGE- A1 (S+I) 2352 6.2 C-46802-L195A-1 400 KV D/C Jamshedpur - Baripada 16.33 ICB 17.11.06 15.05.07 C-46802-L195A-1/ JV of TATA SEPT'08 TL - 135 kms PACKAGE- A2 (S+I) 2354 Projects & MAN NA 21.11.06 07.02.07 27.02.07 NA Structures, India BID DOCUMENT NO.- II 6.3 C-46803-L195A-1 400 KV D/C Baripada - Mendhasal 14.12 ICB 21.11.06 NA 24.11.06 09.02.07 27.02.07 NA 30.03.07 C-46803-L195A-1/ JV of Abengoa, NOV'08 TL (Part-I) - 127.5 kms PACKAGE- (S+I) 2334 Spain & Unitech, A3 India 6.4 C-46804-L195A-1 400 KV D/C Baripada - Mendhasal 18.92 ICB 21.11.06 NA 24.11.06 09.02.07 27.02.07 NA 30.03.07 C-46804-L195A-1/ JV of TATA NOV'08 TL (Part-II) - 127.5 kms PACKAGE- (S+I) 2336 Projects & ASTER, A4 India ** These documents are post review and are ready based on prior review documents as approved by World Bank. NA - Not Applicable, NYA - Not yet awarded 3 of 3 Completion of Date of Contract S. Package No. Description of Works/Goods Estimated Method of Preparation Bank's No Bids Contract Award Bank's No Contract Contract No. Name of Contractor/ No. Cost (in procurement of Bid Objection to decided (Date/ Objection to Signed Nationality & ZIP Million $) ICB/NCB Document Bidding Value/ Contract (Date/ Code Documents (Date) Currency) Award (Date) Value/ (Date) Currency) Invitation (Date) Opened on (Date) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 BID DOCUMENT NO.- VI 6.5 C-46801-L179-1 Insulator Package-D (for Tower 3.17 ICB 22.05.07 N.A. ** 28.05.07 27.02.08 24.06.08 NA 12.08.08 C-46801-L179-1/ NANJING, CHINA AUG'2009 A1,A2, A3 & A4) (S) 2616 BID DOCUMENT NO.- VII 6.6 C-46806-S119A-1 Extensions of 400kV Durgapur, 400 19.57 ICB 05.03.07 N.A. ** 07.03.07 24.05.07 26.09.07 NA 26.02.08 C-46806-S119A-1/ SIEMENS LTD, OCT' 09 kV Jamshedpur, 400 kV Baripada (S + I) 2452 GURGAON and 400 kV Mendhasal Sub-stations and renovation of 400 kV Siliguri & Purnea S/Stns. 7.0 SYSTEM STRENGTHENING - XIII IN SOUTHERN REGION BID DOCUMENT NO.-I 1 Transmission Line Tower 12.72 ICB 05.01.2011 21.01.2011 07.01.2011 23.02.2011 20.05.2011 07.06.2011 21.06.2011 NYA NYA June'13 PRIOR REVIEW Package for 400 KV D/C Gooty- (S+I) (PP) (PP) (PP) (PP) (PP) (PP) (PP) (PP) Madhugiri Transmission Line (Part- 09.02.2011 18.02.2011 24.03.2011 22.06.2011 04.10.2011 25.10.2011 11.11.2011 Nov'13 I): Tower Package - P227 TW01 (A) (A) (A) (A) (R) (R) (R) (R) 2 Transmission Line Tower 10.22 ICB 05.01.2011 21.01.2011 07.01.2011 23.02.2011 20.05.2011 07.06.2011 21.06.2011 NYA NYA June'13 PRIOR REVIEW Package for 400 KV D/C Gooty- (S+I) (PP) (PP) (PP) (PP) (PP) (PP) (PP) (PP) Madhugiri Transmission Line (Part- 09.02.2011 18.02.2011 24.03.2011 22.06.2011 04.10.2011 25.10.2011 11.11.2011 Nov'13 II): Tower Package - P227 TW02 (A) (A) (A) (A) (R) (R) (R) (R) 3 Transmission Line Tower 17.04 ICB 05.01.2011 21.01.2011 07.01.2011 23.02.2011 20.05.2011 07.06.2011 21.06.2011 NYA NYA June'13 PRIOR REVIEW Package for 400 KV D/C (Quad) (S+I) (PP) (PP) (PP) (PP) (PP) (PP) (PP) (PP) Madhugiri-Yelahanka 09.02.2011 18.02.2011 24.03.2011 22.06.2011 04.10.2011 25.10.2011 11.11.2011 Nov'13 Transmission Line: Tower (A) (A) (A) (A) (R) (R) (R) (R) Package - P227 TW03 BID DOCUMENT NO.-II 4 ACSR ‘Moose’ Conductor for 8.41 ICB 31.05.2011 NA 06.06.2011 26.07.2011 28.10.2011 NA 18.11.2011 NYA NYA Aug'13 POST REVIEW 400 KV D/C Gooty-Madhugiri (S) (PP) (PP) (PP) (PP) (PP) (PP) (Part-I) Transmission Line: 12.08.2011 19.08.2011 30.09.2011 16.12.2011 30.12.2011 Sept'13 Conductor Package - P227 (A) (A) (A) (R) (R) (R) CD01 5 ACSR ‘Moose’ Conductor for 6.76 ICB 31.05.2011 NA 06.06.2011 26.07.2011 28.10.2011 NA 18.11.2011 NYA NYA Aug'13 POST REVIEW 400 KV D/C Madhugiri-Yelahanka (S) (PP) (PP) (PP) (PP) (PP) (PP) Transmission Line: Conductor 12.08.2011 19.08.2011 30.09.2011 16.12.2011 30.12.2011 Sept'13 Package - P227 CD02 (A) (A) (A) (R) (R) (R) 6 ACSR ‘Moose’ Conductor for 11.07 ICB 31.05.2011 NA 06.06.2011 26.07.2011 28.10.2011 NA 18.11.2011 NYA NYA Aug'13 POST REVIEW 400 KV D/C Madhugiri-Yelahanka (S) (PP) (PP) (PP) (PP) (PP) (PP) Transmission Line: Conductor 12.08.2011 19.08.2011 30.09.2011 16.12.2011 30.12.2011 Sept'13 Package - P227 CD03 (A) (A) (A) (R) (R) (R) BID DOCUMENT NO.-III 6 Insulator Package: Insulator 2.74 ICB 05.04.2011 NA 08.04.2011 27.05.2011 30.08.2011 NA 15.09.2011 NYA NYA Mar'13 POST REVIEW Package - P227 IS01 (S) (PP) (PP) (PP) (PP) (PP) (PP) 14.10.2011 21.10.2011 09.12.2011 31.01.2012 29.02.2012 Nov'13 (R) (R) (R) (R) (R) (R) 7 BID DOCUMENT NO.- IV POST REVIEW Substation package for 400/220 11.91 ICB 05.03.2011 NA 08.03.2011 27.04.2011 30.07.2011 NA 15.08.2011 NYA NYA June'13 kV Madhugiri substation (new) (S +I) (PP) (PP) (PP) (PP) (PP) (PP) and extension of Gooty 18.07.2011 25.07.2011 08.09.2011 25.11.2011 23.12.2011 Oct'13 substation: Substation package - (A) (A) (A) (R) (R) (R) P227 SS01 Abbreviations: PP - target dates as per Procurement Plan; R - Revision; A - actual date; NA - Not applicable; NYA - Not yet awarded. ** These documents are post review and are ready based on prior review documents as approved by World Bank. NA - Not Applicable, NYA - Not yet awarded