China: Urumqi Urban Transport Project 中国:乌é²?木é½?城市交通项目 Procurement Plan 采购计划 Loan No.贷款å?·: Project ID 项目编å?·No.: P148527 Thresholds for Procurement Method æ‹› 标方法é™?é¢? Description 类别 Thresholds é™?é¢? Civil Works 土建 =USD20,000,000 大于等于2000万美元必须报世行å‰?审 Goods 货物设备 >=USD6,000,000 大于等于600万美元必须报世行å‰?审 Firm: >=USD4,000,000; 对公å?¸å¤§äºŽ400万美元必须å‰?审 Consultancy 咨询æœ?务 Individual: >=USD500,000 对个人:ä¸?å°?于50万美元的å?ˆå?Œå¿…须报世行å‰?审 Threshold for Short List Comprising Only Domestic Firms å’¨ 询æœ?务短å??å?•全部为国内公å?¸çš„é™?é¢?: USD 300,000 大于30万美元必须在è?”å?ˆå›½ç½‘站刊登广告 Disclosure of complaint channel 投 诉渠é?“公开 In all the advertisement and Bid Data Sheets of the bidding documents / RFPs, the following paragraph shall be included: "Any complaint can be sent to urumqipmo@126.com, yjiao3@worldbank.org and jguo@worldbank.org." æ¯?次招标的公告和投标人须知特殊æ?¡æ¬¾ä¸­éƒ½å¿…须包å?«ä»¥ä¸‹æ–‡å­—:“投标人若有任何投诉,å?¯ä»¥å°†æŠ•诉å?‘至以下邮箱: urumqipmo@126.com, yjiao3@worldbank.org å’Œ jguo@worldbank.org。â€? 土建和æˆ?套设备供货安装 Civil Work and Supply & Installation 1 3 4 5 6 7 8 9 10 11 12 æˆ?本估算( æˆ?本估算( RMB 万元 中标价(RMB万 中标价(万USD 预计å?¯åЍ ç¼– 原 万USD) å?ˆå?Œå?· ) å…ƒ)awarded å…ƒ)awarded 采购方å¼? 世行审查(å‰?审/å?Žå®¡) 招标日期 å?· å?ˆ Cost 备注 Reference å?ˆå?Œå??ç§° Contract å?ˆå?Œå†…容 Contract Description Cost contract contract Procureme WB Review (Prior / Expected It å?Œ Estimate Remark No. Estimate price price nt Method Post) Date of em å?· in 10,000 in 10,000 in10,000 RMB in10,000 USD IFB USD RMB I 土建工程 Civil Work C å­?项一——BRT4å?·çº¿ä¸€æœŸï¼ˆé˜¿å‹’æ³°è·¯/æ²³å?—路交å?‰å?£~喀什路/北京路交å?‰ BRT4å?·çº¿ä¸€æœŸæ ‡æ®µI:阿勒泰路/æ²³å?—路交å?‰å?£ï¼ˆK14+063)~喀什路/北京路交å?‰å?£ï¼Œè®¾è®¡å…¨é•¿4.42km,建设路段包括西北路(西虹 W å?£ï¼‰åœŸå»ºå·¥ç¨‹ è·¯~平顶山东一路)和阿勒泰路(平顶山东一路~æ²³å?—路),建设内容包括é?“è·¯ã€?桥涵ã€?排水ã€?绿化工程ã€?过路预埋管线等。 2015.7.13 1 CW-01 - 1535.25 251.68 1306.12 214.12 NCB-Works å‰?审(prior) 2015.6 Subproject I- Phase I of BRT4( from Altay Rd/Henan Rd section BRT4 Phase I Section 1: Altay Rd/He nan Rd intersection(K14+063)~ Kashi Rd/ Beijing Rd Intersection, total 完æˆ?招标 0 to Kashi Rd/Beijing Rd section) Road Works length: 4.42km, including road, bridge and culvert, drainage, virescence, embedded pipeline, etc. 1 C å­?项一——BRT4å?·çº¿äºŒæœŸï¼ˆä¸‰å±¯ç¢‘~æ–°å?Žå?—北路/å?‹å¥½å?—路交å?‰å?£ï¼‰åœŸå»º BRT4å?·çº¿äºŒæœŸæ ‡æ®µI:三屯碑(K0+000)~æ–°å?Žå?—北路/å?‹å¥½å?—路交å?‰å?£ï¼ˆK5+659),设计全长5.7km,建设路段包括新å?Žè·¯ï¼ˆä¸‰å±¯ W 工程 碑~å?‹å¥½å?—路),建设内容包括é?“è·¯ã€?桥涵ã€?排水ã€?绿化工程ã€?过路预埋管线等。 2 CW-02 - 9688.19 1404.09 NCB-Works å?Žå®¡ï¼ˆpost) 2017 Subproject I- BRT 4 Phase II(from Santunbei to Xinhuananbei BRT4 phase II section 1: Santunbei(k0+000)~xinhua nanbei rd/youhao nan rd section(k5+659), total length:5.7 km, 0 Rd/South Youhao Rd section) Road Works contents:roads, bridge and culvert, drainage, virescence, embedded pipeline, etc. 2 C BRT4å?·çº¿ä¸€æœŸã€?æ¤?物园站~å?«æ˜Ÿè·¯ç«™ã€‘,å?«æ¤?物园站ã€?ç?«æŸ´åŽ‚ç«™ã€?啤酒厂站ã€?巴黎路站ã€?å?«æ˜Ÿè·¯ç«™ã€‚BRTç«™å?°å»ºç­‘ã€?站内附属设施 å­?项一——BRT4å?·çº¿ä¸€æœŸï¼ˆæ¤?物园站~å?«æ˜Ÿè·¯ç«™ï¼‰BRTç«™å?°å»ºç­‘ W (风水电)和é…?套站内污水ã€?给水ã€?通信ã€?电力等管线工程。 2015.7.13 3 CW-03 Subproject I- BRT4 Phase I(from Zhiwuyuan Station to Weixing - 1339.91 219.66 782.40 128.26 NCB-Works å‰?审(Prior) 2015.6 BRT4 phase 1[zhiwuyuan station~weixing rd station], including zhiwuyuan station,huochaichang station, pijiuchang 完æˆ?招标 Rd) BRT Stations Construction 0 station, bali rd station,weixing rd station. related infrastructures and facilities in BRT stations. 3 C BRT4å?·çº¿ä¸€æœŸã€?æ²³å?—路站~é?’城巷站】,å?«æ²³å?—路站ã€?亚中机电市场站ã€?è‹?州路站ã€?é?’城巷站。BRTç«™å?°å»ºç­‘ã€?站内附属设施(风 å­?项一——BRT4å?·çº¿ä¸€æœŸï¼ˆæ²³å?—路站~é?’城巷站)BRTç«™å?°å»ºç­‘ W 水电)和é…?套站内污水ã€?给水ã€?通信ã€?电力等管线工程。 2015.7.13 4 CW-04 Subproject I- BRT4 Phase I(from Henan Rd Station to - 1550.67 254.21 966.83 158.50 NCB-Works å‰?审(Prior) 2015.6 BRT4 phase 1:[henan rd station~qingchengxiang rd], including henan rd station,yazhong jidian market station, 完æˆ?招标 Qingchengxiang station) BRT Stations Construction 0 suzhou rd station,qingchengxiang station. related infrastructures and facilities in BRT stations. 4 BRT4å?·çº¿ä¸€æœŸã€?红山站(包å?«å?‹å¥½å?—路交å?‰å?£~西虹路/西北路交å?‰å?£é?“路土建工程,K5+659~K6+476,设计全长0.817km),贵州 C 路站~新医路站】BRTç«™å?°å»ºç­‘,å?«çº¢å±±ç«™ã€?贵州路站ã€?嘉和园站ã€?新医路站ã€?红山站。站内附属设施(风水电)和é…?套站内污水 å­?项一——BRT4å?·çº¿ä¸€æœŸï¼ˆçº¢å±±ç«™(包å?«å?‹å¥½å?—路交å?‰å?£~西虹路/西北路 W ã€?给水ã€?通信ã€?电力等管线工程。 交å?‰å?£é?“路土建工程),贵州路站~新医路站))BRTç«™å?°å»ºç­‘ 2015.7.13 5 CW-05 - BRT4 phase 1[hongshan station(including Youhao Nan Rd intersection/Xibei Rd intersection road road works, 2224.05 364.60 1581.09 259.20 NCB-Works å‰?审(Prior) 2015.6 Subproject I- BRT4 Phase I(Hongshan Station, Guizhou Rd station 完æˆ?招标 0 K5+659~K6+476,total length=0.817km), Guizhou Rd Station~Xinyi Rd Station] BRT station building, respectively to Xinyi Rd station) BRT Stations Construction 5 including stations of Hongshan,Guizhou Rd, Jiaheyuan, Xinyi Rd, Hongshan. related infrastructures and facilities in BRT stations. C BRT4å?·çº¿ä¸€æœŸã€?头工站~西虹路站】,å?«å¤´å·¥ç«™ã€?克拉玛ä¾?ç«™ã€?明园西路站ã€?西虹路站。BRTç«™å?°å»ºç­‘ã€?站内附属设施(风水电) å­?项一——BRT4å?·çº¿ä¸€æœŸï¼ˆå¤´å·¥ç«™~西虹路站))BRTç«™å?°å»ºç­‘ W å’Œé…?套站内污水ã€?给水ã€?通信ã€?电力等管线工程。 2015.7.13 6 CW-06 Subproject I- BRT4 Phase I(from Tougong Station to Xihong Rd - 1756.44 287.94 1169.31 191.69 NCB-Works å‰?审(Prior) 2015.6 BRT4 phase 1:[Tougong station~Xihong Rd station], including stations of Tougong, Kelamayi, Mingyuan Xi Rd, Xihong 完æˆ?招标 station) BRT Stations Construction 0 Rd.Related infrastructures and facilities in BRT stations. 6 C BRT4å?·çº¿äºŒæœŸã€?西大桥站~人民路站】,å?«è¥¿å¤§æ¡¥ç«™ã€?å°?西门站ã€?人民路站。BRTç«™å?°å»ºç­‘ã€?站内附属设施(风水电)和é…?套站内 å­?项一——BRT4å?·çº¿äºŒæœŸï¼ˆè¥¿å¤§æ¡¥ç«™~人民路站)BRTç«™å?°å»ºç­‘ W 污水ã€?给水ã€?通信ã€?电力等管线工程。 7 CW-07 Subproject I- BRT4 Phase II(from Xidaqiao Station to Renmin Rd - 1829.70 265.17 NCB-Works å?Žå®¡ï¼ˆPost) 2017 BRT4 phase 2:[Xidaqiao station~Renmin Rd station], including stations of Xidaqiao, Xiaoximen,Renmin Rd.BRT station) BRT Stations Construction 0 station building,related infrastructures and facilities in BRT stations. 7 C BRT4å?·çº¿äºŒæœŸã€?龙泉街站~动物园站】,å?«é¾™æ³‰è¡—ç«™ã€?团结路站ã€?英阿瓦æ??路站ã€?动物园站。BRTç«™å?°å»ºç­‘ã€?站内附属设施(风水 å­?项一——BRT4å?·çº¿äºŒæœŸï¼ˆé¾™æ³‰è¡—ç«™~动物园站)BRTç«™å?°å»ºç­‘ W 电)和é…?套站内污水ã€?给水ã€?通信ã€?电力等管线工程。 8 CW-08 Subproject I- BRT4 Phase II(from Longquan Street Station to - 1553.22 225.10 NCB-Works å?Žå®¡ï¼ˆPost) 2017 BRT4 phase 2:[Longquanjie station~Dongwuyuan station], including stations of Longquanjie, Tuanjie Rd, Yingawati Dongwuyuan station) BRT Stations Construction. 0 Rd, Dongwuyuan Rd.BRT station building, related infrastructures and facilities in BRT stations. 8 BRT6å?·çº¿æ ‡æ®µI:å?—湖北路/è‹?州路交å?‰å?£ï¼ˆK0+000)~米东å?—è·¯/喀什路交å?‰å?£ï¼ˆK5+249.932),设计全长5.2km,建设路段包括å?— C å­?项一——BRT6å?·çº¿ï¼ˆå?—湖北路/è‹?州路交å?‰å?£~米东å?—è·¯/喀什路交å?‰å?£ 湖北路(è‹?å·žè·¯~红光山路)和米东å?—路(红光山路~喀什路),建设内容包括é?“è·¯ã€?桥涵ã€?排水ã€?绿化工程ã€?过路预埋管线等。B W )土建工程 RT6 Road Works Contract I: from Nanhu N. Rd./Suzhou Rd. (K0+000) to Midong S. Rd./Kashi Rd. (K5+234.079), total 2015.7.9 9 CW-09 - 3886.32 637.10 2407.61 394.69 NCB-Works å‰?审(prior) 2015.6 Subproject I- BRT6(Nanhu N. Rd./Suzhou Rd - Midong S. length 5.2 km, consists of Nanhu N. Rd. from Suzhou Rd. to Hongguangshan Rd. and Midong S. Rd. from 完æˆ?招标 0 Rd./Kashi Rd.) Road Works Hongguangshan Rd. to Kaishi Rd. Major work includes road,bridge and culvert, drainage, virescence, embedded 9 pipeline, etc. C BRT6å?·çº¿æ ‡æ®µII:米东å?—è·¯/喀什路交å?‰å?£ï¼ˆK5+249.932)~稻香å?—è·¯/广兴东街交å?‰å?£ï¼ˆ10+784.867),设计全长5.6km,建设路 å­?项一——BRT6å?·çº¿ï¼ˆç±³ä¸œå?—è·¯/喀什路交å?‰å?£~稻香å?—路交å?‰å?£ï¼‰åœŸå»º W 段包括米东å?—路(喀什路~稻香å?—路),建设内容包括é?“è·¯ã€?桥涵ã€?排水ã€?绿化工程ã€?过路预埋管线等。BRT6 Road Works 工程 2015.7.9 10 CW-10 - Contract II: from Midong S. Rd./Kashi Rd. (K5+249.932) to Daoxiang S. Rd./Guangxing E. St. (10+784.867), total 6435.18 1054.95 3269.01 535.90 NCB-Works å‰?审(prior) 2015.6 Subproject I- BRT 6 (Midong S. Rd./Kashi Rd - Daoxiang S. Rd.) 完æˆ?招标 1 length 5.6km, consists of Midong S. Rd. from Kaishi Rd. to Daoxiang S. Rd.Major work includes road, bridge and Road Works 0 culvert, drainage, virescence, embedded pipeline, etc. BRT6å?·çº¿æ ‡æ®µIII:稻香å?—路交å?‰å?£ï¼ˆ10+784.867)~米东首末站(K18+540.398),设计全长7.7km,建设路段包括稻香å?—路(胜 C 利路~府å‰?路)ã€?府å‰?路(稻香å?—è·¯~建国路)ã€?建国路(府å‰?è·¯~二环路)和二环路(建国路~米东首末站),建设内容包括é?“è·¯ å­?项一——BRT6å?·çº¿ï¼ˆç¨»é¦™å?—路交å?‰å?£~米东首末站)土建工程 W ã€?桥涵ã€?排水ã€?绿化工程ã€?过路预埋管线等。 BRT6 Road Works Contract III: from Daoxiang S. Rd. (10+784.867) to 2015.7.9 11 CW-11 Subproject I- BRT 6 (Daoxiang S. Rd.- Midong Bus Terminal) Road Midong Bus Terminal (K18+540.398), total length 7.7 km, consists of Daoxiang S. Rd. from Shengli Rd. to Fuqian - 4825.72 791.10 3170.59 519.77 NCB-Works å‰?审(prior) 2015.6 完æˆ?招标 Works 1 Rd., Fuqian Rd. from Daoxiang S. Rd. to Jianguo Rd., Jianguo Rd. from Fuqian Rd. to Er Huan Rd. and Erhuan Rd. 1 from Jianguo Rd. to Midong Bus Terminal. Major work includes road, bridge and culvert, drainage, virescence, embedded pipeline, etc. C BRT6å?·çº¿ã€?北郊客è¿?ç«™~å?¡å­?湾站】,å?«ä¸œå…«å®¶æˆ·ç«™ã€?红光山路站ã€?河北路站ã€?五建站ã€?红光山å°?区ã€?å?¡å­?湾站。BRTç«™å?°å»ºç­‘ã€? å­?项一——BRT6å?·çº¿ï¼ˆåŒ—郊客è¿?ç«™~å?¡å­?湾站)BRTç«™å?°å»ºç­‘ W 站内附属设施(风水电)和é…?套站内污水ã€?给水ã€?通信ã€?电力等管线工程 2015.7.9 12 CW-12 Subproject I- BRT 6 (Midongkeyunzhan~Kaziwan Station) BRT - BRT6:[Beijiaokeyun station~Kaziwan station], including stations of Dongbajiahu, Hongguangshan Rd, Hebei 2289.64 375.35 1713.30 280.87 NCB-Works å‰?审(prior) 2015.6 完æˆ?招标 stations construction 1 Rd,Wujian,Hongguanshangxiaoqu,Kaziwan.BRT station building, related BRT infrastructures and facilities in BRT 2 stations. C BRT6å?·çº¿ã€?二钢站~å¼€æº?街站】,å?«äºŒé’¢ç«™ã€?è¾½æº?è¡—ç«™ã€?外贸学校站ã€?新城花园站ã€?å¼€æº?街站。BRTç«™å?°å»ºç­‘ã€?站内附属设施(风 å­?项一——BRT6å?·çº¿ï¼ˆäºŒé’¢ç«™~å¼€æº?街站)BRTç«™å?°å»ºç­‘ W 水电)和é…?套站内污水ã€?给水ã€?通信ã€?电力等管线工程。 2015.7.9 13 CW-13 Subproject I- BRT 6 (Ergang Station~Kayuanjie Station) BRT - BRT6:[Ergang station~Kaiyuan jie station], including stations of Ergang, Liaoyuan jie Rd, Hebei 2580.30 423.00 2121.52 347.79 NCB-Works å‰?审(prior) 2015.6 完æˆ?招标 stations construction 1 Rd,Wujian,Hongguanshangxiaoqu,Kaziwan.BRT station building, related BRT infrastructures and facilities in BRT 3 stations. C BRT6å?·çº¿ã€?米东å?—路稻香å?—ç«™~å?¤ç‰§åœ°è·¯ç«™ã€‘,å?«ç¨»é¦™å?—路站ã€?米东客è¿?站站ã€?碱沟西路站ã€?å?¤ç‰§åœ°è·¯ç«™ã€‚BRTç«™å?°å»ºç­‘ã€?站内附 å­?项一——BRT6å?·çº¿ï¼ˆç±³ä¸œå?—路稻香å?—ç«™~å?¤ç‰§åœ°è·¯ç«™ï¼‰BRTç«™å?°å»ºç­‘ W 属设施(风水电)和é…?套站内污水ã€?给水ã€?通信ã€?电力等管线工程。 2015.7.9 14 CW-14 Subproject I- BRT 6 (Midong Nan Rd Daoxiang Station~Gumudi - BRT6:[Midong Nan Rd Daoxiang station~Gumudi Rd station], including stations of Dongwuxiang, Daoxiang Nan Rd, 2317.76 379.96 1328.48 217.78 NCB-Works å‰?审(prior) 2015.6 完æˆ?招标 Station) BRT stations construction 1 Midongkeyunzhan, Jiangouxi Rd, Gumudi Rd. BRT station building, related BRT infrastructures and facilities in BRT 4 stations. C BRT6å?·çº¿ã€?日月星城站~米东首末站】,å?«æ—¥æœˆæ˜ŸåŸŽç«™ã€?区政府站ã€?建国路站ã€?二环路站ã€?48ç?­ä¸­å­¦ç«™ã€?米东首末站。BRTç«™å?°å»º å­?项一——BRT6å?·çº¿ï¼ˆæ—¥æœˆæ˜ŸåŸŽç«™~米东首末站)BRTç«™å?°å»ºç­‘ W ç­‘ã€?站内附属设施(风水电)和é…?套站内污水ã€?给水ã€?通信ã€?电力等管线工程。 2015.7.9 15 CW-15 Subproject I- BRT 6 (Riyuexing cheng station~Midong shoumo - BRT6:[Riyuexingcheng station~Midongshoumo station], including stations of Riyuexing, Quzhengfu, Jianguo Rd, 2336.76 383.08 1795.04 294.27 NCB-Works å‰?审(prior) 2015.6 完æˆ?招标 station) BRT stations construction 1 Erhuan Rd, 48banzhongxue,Midongshoumozhan. BRT station building, related BRT infrastructures and facilities in 5 BRT stations. C å­?项一——BRT6支线(高é“?å?—广场枢纽~北纬三路/北京路交å?‰å?£ï¼‰åœŸå»º BRT6支线标段I:高é“?å?—广场枢纽(K0+000)~北纬三路/北京路交å?‰å?£ï¼ˆK5+874.109),设计全长5.9km,建设路段包括å?«æ˜Ÿè·¯ï¼ˆ W 工程 高é“?å?—广场枢纽~太原路)ã€?北纬三路(太原路~北京路)建设内容包括é?“è·¯ã€?桥涵ã€?排水ã€?绿化工程ã€?过路预埋管线等。 2016.7.22 16 CW-16 - 2759.78 452.42 1470.02 240.99 NCB-Works å?Žå®¡ï¼ˆPost) 2016 Subproject I- BRT 6a ( Highspeed Rail South Square BRT6a Section 1: Highspeed Rail South Square Hub(K0+000)~ Beiweisan Rd/ Beijing Rd Intersection(K5+874.109), 完æˆ?招标 1 Hub~Beiweisan Rd/Beijing Rd intersection) Road Works. total length: 5.9km, including road,bridge and culvert, drainage, virescence, embedded pipeline, etc. 6 C BRT6支线标段II:北纬三路/北京路交å?‰å?£ï¼ˆK5+874.109)~四平路/京疆路交å?‰å?£ï¼ˆK10+8.685),设计全长4.1km,建设路段包括 å­?项一——BRT6支线(北纬三路/北京路交å?‰å?£~四平路/京疆路交å?‰å?£ï¼‰ W 北京路(北纬三路~河北路)ã€?河北路(北京路~四平路)和四平路(河北路~京疆路),建设内容包括é?“è·¯ã€?桥涵ã€?排水ã€?绿化工 土建工程 2016.7.22 17 CW-17 - 程ã€?过路预埋管线等。 2688.44 440.73 1487.04 243.78 NCB-Works å?Žå®¡ï¼ˆPost) 2016.7 Subproject I- BRT6a (Beiweisan Rd/Beijing Rd 完æˆ?招标 1 BRT6a Section 2: Beiweisan Rd/ Beijing Rd Intersection(K5+874.109)~ Siping Rd/Jingjiang Rd intersection~Siping Rd/Jingjiang Rd intersection) Road Works. 7 intersection(K10+8.685), total length: 4.1km, including road, bridge, drainage, virescence, pipeline, etc. C å­?项一——BRT6支线(四平路/京疆路交å?‰å?£~喀什路/米东å?—路交å?‰å?£ï¼‰ BRT6支线标段III:四平路/京疆路交å?‰å?£ï¼ˆK10+8.685)~喀什路/米东å?—路交å?‰å?£ï¼ˆK13+492.413),设计全长3.5km,建设路段包 W 土建工程 括四平路(京疆路~喀什路)和喀什路(四平路~米东å?—路),建设内容包括é?“è·¯ã€?桥涵ã€?排水ã€?绿化工程ã€?过路预埋管线等。 2016.7.22 18 CW-18 - 2150.26 352.50 1124.25 184.30 NCB-Works å?Žå®¡ï¼ˆPost) 2016.7 Subproject I- BRT6a (Siping Rd/Jingjiang Rd intersection~Kashi BRT6a Section 3: Siping Rd/Jingjiang Rd intersection(K10+8.685)~Kashi Rd/Midong Nan Rd(K13+492.413), total 完æˆ?招标 1 Rd/Midong Nan Rd intersection) Road Works. length: 3.5km, including road, bridge, drainage, virescence, pipeline, etc. 8 å­?项一——BRT6支线(高é“?å?—广场枢纽~北纬三路/北京路交å?‰å?£ï¼‰BRTç«™ C BRT6支线ã€?高é“?å?—广场枢纽~北纬三路/北京路交å?‰å?£æ®µã€‘,å?«å‡ºå?£åŠ å·¥åŒºç«™ã€?泰山路东站ã€?嵩山街站ã€?外è¿?å?¸ç«™ã€?北纬三路站以 å?°å»ºç­‘ W å?Šç?«è½¦å?—站下客站。BRTç«™å?°å»ºç­‘ã€?站内附属设施(风水电)和é…?套站内污水ã€?给水ã€?通信ã€?电力等管线工程。 2016.7.22 19 CW-19 Subproject I- BRT 6a (Highspeed Rail South Square Hub~ - BRT6a [Highspeed Rail South Square Hub~ Beiweisan Rd/ Beijing Rd Intersection], including stations of 1217.22 199.54 686.23 112.50 NCB-Works å?Žå®¡ï¼ˆPost) 2016 完æˆ?招标 Beiweisan Rd/ Beijing Rd Intersection) BRT stations 1 Chukoujiagongqu, Taishan Rd, Songshanjie, Waiyunsi, Beiweisan Rd and Urumqi railway station. BRT station construction 9 building, related BRT infrastructures and facilities in BRT stations. å­?项一——BRT6支线(北纬三路/北京路交å?‰å?£~四平路/京疆路交å?‰å?£ï¼‰ C BRT6支线ã€?北纬三路/北京路交å?‰å?£~四平路/京疆路交å?‰å?£æ®µã€‘,å?«ä½“育中心北站ã€?盛海路站ã€?朗悦盛境站ã€?四平路å?—站以å?Šé“¶å·? BRTç«™å?°å»ºç­‘ W 路下客站。BRTç«™å?°å»ºç­‘ã€?站内附属设施(风水电)和é…?套站内污水ã€?给水ã€?通信ã€?电力等管线工程。 2016.7.22 20 CW-20 Subproject I- BRT 6a(Beiweisan Rd/Beijing Rd - BRT6a [Beiweisan Rd/ Beijing Rd Intersection~Siping Rd/Jingjiang Rd intersection, including stations of North 1186.00 194.43 695.80 114.07 NCB-Works å?Žå®¡ï¼ˆPost) 2016.7 完æˆ?招标 intersection~Siping Rd/Jingjiang Rd intersection) BRT stations 2 sports center,Shenghai Rd, Langyueshengjing, South siping Rd and Yinchuan Rd xiake.BRT station building, related construction 0 BRT infrastructures and facilities in BRT stations. C BRT6å?·çº¿ã€?四平路/京疆路交å?‰å?£~喀什路/米东å?—路交å?‰å?£æ®µã€‘,å?«äº¬ç–†è·¯ç«™ã€?嘉兴街站ã€?四平路北站ã€?东站路站ã€?å?¡å­?湾西站。 å­?项一——BRT6支线(四平路/京疆路交å?‰å?£~喀什路/米东å?—路交å?‰å?£ï¼‰ W BRTç«™å?°å»ºç­‘ã€?站内附属设施(风水电)和é…?套站内污水ã€?给水ã€?通信ã€?电力等管线工程。 BRTç«™å?°å»ºç­‘ 2016.7.22 21 CW-21 - BRT6a [Siping Rd/Siping Rd intersection~Kashi Rd/Midong Nan Rd intersection], including stations of Jingjiang 1115.00 182.79 598.02 98.04 NCB-Works å?Žå®¡ï¼ˆPost) 2016.7 Subproject I- BRT 6a(Siping Rd/Jingjiang Rd intersection~Kashi 完æˆ?招标 2 Rd, Jiaxing Str, North siping Rd, Dongzhan Rd , West kaziwan . BRT station building, related BRT infrastructures Rd/Midong Nan Rd intersection) BRT stations construction 1 and facilities in BRT stations. â…¡ 供货安装 Supply & Installation of Plant and Equipment BRT4å?·çº¿äºŒæœŸè½¦è¾†è®¾å¤‡ï¼ˆè½¦è¾†ç”µå­?站牌ã€?GPS智能车载终端ã€?车辆识别模å?—ã€?车内视频监控终端ã€?车辆抓æ‹?系统等)ã€?ç«™å?°è®¾å¤‡ï¼ˆ LED显示å±?ã€?æ‘„åƒ?机ã€?IP数字广播设备ã€?弱电系统设备ã€?设备间和站务间机柜å?Šé…?套设备等)ã€?调度中心å?‡çº§å?Šæ‰©å®¹è®¾å¤‡ï¼ˆåŒ…括视 C 频存储系统扩容ã€?系统软件授æ?ƒå’ŒæŽ¥å?£å¼€å?‘)å?Šç¡¬ä»¶ç³»ç»Ÿé›†æˆ?。 å­?项一——BRT4å?·çº¿äºŒæœŸæ™ºèƒ½è°ƒåº¦ç³»ç»Ÿ W Line BRT4 phase ii vehicle equipment (vehicle electronic stop,GPS intelligent vehicle terminal,vehicle 22 CW-22 Subproject I- BRT4 phase 2 dispatching system - 730.70 105.90 NCB-SI å?Žå®¡ï¼ˆPost) 2017 identification module,In-car video monitoring terminal,vehicle image capture system, etc.),platform devices (LED 2 display,cameras,IP digital broadcasting equipment,weak current system,equipment room,and related facilities, 2 etc.),dispatch center system and equipment upgrading (including video storage system upgrading, software authorization, and software interface development) and hardware system integration C å­?项一——BRT4å?·çº¿äºŒæœŸå®‰å…¨é—¨ç³»ç»Ÿ W BRT4å?·çº¿äºŒæœŸå®‰å…¨é—¨ã€?安全门控制和监控系统ã€?车载控制器的购置ã€?安装ã€?调试和è¿?行维护。 23 CW-23 Subproject I- BRT4 phase 2 automatic safety gate system - Line BRT4 phase ii safety gates,safety gate control and monitoring system;purchase,installation,debugging,and 911.50 132.10 NCB-SI å?Žå®¡ï¼ˆPost) 2017 2 maintenance. 3 C å­?项一——BRT4å?·çº¿äºŒæœŸå”®æ£€ç¥¨ç³»ç»Ÿ W BRT4å?·çº¿äºŒæœŸé—¸æœºã€?刷å?¡æœºã€?投å¸?箱和é…?套设备å?Šå®‰è£…的购置ã€?安装ã€?调试和è¿?行维护。 24 CW-24 Subproject I- BRT4 phase 2 automatic fare collection system - BRT4 line phase ii:ticket scanning machine, coin box and related facilities;purchase,installation,debugging,and 560.20 81.19 NCB-SI å?Žå®¡ï¼ˆPost) 2017 2 maintenance. 4 å­?项一——BRT4å?·çº¿äºŒæœŸç«™å?°å®‰é˜²ç³»ç»Ÿ C BRTç«™å?°å®‰é˜²è®¾å¤‡ï¼ˆX光行æ?Žæ£€æŸ¥æœºã€?金属探测门ã€?手æŒ?金属探测器å?Šç›¸å…³è¾…助设备等)的采购和安装调试。 Subproject I- BRT4 phase 2 platform safety system W 25 CW-25 BRT station security equipment (metal detector door, X-ray luggage inspection machine, handheld metal 273.40 39.62 NCB-SI å?Žå®¡ï¼ˆPost) 2017 - detectors,and other related ancillary equipment);procurement and installation and debugging. 2 包括BRT6支线车辆设备(车辆电å­?站牌ã€?GPS智能车载终端ã€?车辆识别模å?—ã€?车内视频监控终端ã€?车辆抓æ‹?系统等)ã€?中途站站å?° 设备(LED显示å±?ã€?æ‘„åƒ?机ã€?IP数字广播设备ã€?弱电系统设备ã€?设备间和站务间机柜å?Šé…?套设备等)ã€?调度中心å?‡çº§å?Šæ‰©å®¹è®¾å¤‡ï¼ˆ C 包括视频存储系统扩容ã€?系统软件授æ?ƒå’ŒæŽ¥å?£å¼€å?‘)å?Šç¡¬ä»¶ç³»ç»Ÿé›†æˆ?。 å­?项一——BRT6支线BRT智能调度系统 W 2016.9.8 Including BRT6a vehicle equipment (vehicle electronic stop, GPS intelligent vehicle terminal, vehicle 26 CW-26 Subproject I- BRT6a dispatching system - 2081.4 341.21 1537.47 252.04 NCB-SI å‰?审(prior) 2016.8 完æˆ?招标 identification module, in-car video monitoring terminal,vehicle image capture system etc.), platform 2 工作 equipments(LED display,cameras,IP digital broadcasting equipment,weak current system,equipment room,and related 6 facilities, etc.),dispatch center system and equipment upgrading (including video storage system upgrading, software authorization, and software interface development) and hardware system integration. C å­?项一——BRT6支线安全门系统 BRT6支线站å?°å®‰å…¨é—¨ã€?安全门控制和监控系统ã€?车载控制器的购置ã€?安装ã€?调试和è¿?行维护。 2016.9.8 W 27 CW-27 Subproject I- BRT6a automatic safety gate system Line BRT6a platform safety gates,safety gate control and monitoring system;purchase,installation,debugging,and 1393.1 228.38 728.51 119.43 NCB-SI å?Žå®¡ï¼ˆPost) 2016.8 完æˆ?招标 - maintenance. 工作 2 C W 2016.9.8 å­?项一——BRT6支线售检票系统 BRT6支线站å?°é—¸æœºã€?刷å?¡æœºã€?投å¸?箱和é…?套设备å?Šå®‰è£…的购置ã€?安装ã€?调试和è¿?行维护。 28 CW-28 - 1146.9 188.02 1185.90 194.41 NCB-SI å?Žå®¡ï¼ˆPost) 2016.8 完æˆ?招标 Subproject I- BRT6a automatic fare collection system BRT6a:ticket scanning machine, coin box,and related facilities;purchase,installation,debugging,and maintenance. 2 工作 8 C BRTç«™å?°å®‰é˜²è®¾å¤‡ï¼ˆX光行æ?Žæ£€æŸ¥æœºã€?金属探测门ã€?手æŒ?金属探测器å?Šç›¸å…³è¾…助设备等)的采购和安装调试。 2016.9.8 å­?项一——BRT6支线站å?°å®‰é˜²ç³»ç»Ÿ W 29 CW-29 BRT station security equipment (metal detector door, X-ray luggage inspection machine, handheld metal 345.2 56.59 269.37 44.16 NCB-SI å?Žå®¡ï¼ˆPost) 2016.8 完æˆ?招标 Subproject I- BRT6a platform safegard system. - detectors,and other related ancillary equipment);procurement and installation and debugging. 工作 2 å?ˆè®¡ 64708.21 10607.90 2016年调整为利用世行贷款资金开展的项目 Domestic capital adjustment I 土建工程 Civil Work 北郊客è¿?枢纽建设用地é?¢ç§¯5671m2,总建筑é?¢ç§¯500.7m2;建设内容包括室外总体ã€?绿化工程,BRTç«™å?°ã€?管ç?†è°ƒåº¦ç”¨æˆ¿åœŸå»ºå·¥ç¨‹ 以å?Šå®¤å¤–污水ã€?给水ã€?通信ã€?电力等管线工程ã€?管ç?†è°ƒåº¦ç”¨æˆ¿é…?套设备安装工程ã€?安防监控等。 30 CW-30 北郊客è¿?枢纽土建工程 Civil work of Beijiaokeyun Hub The land area is 5671m2,GFA 500.7m2. The scope of work includes general outdoor work, landscaping, construction 450 73.77 599.11 98.21 NCB-Works å?Žå®¡ï¼ˆPost) 2016.7 2016.7.22 of BRT bus station and management & dispatching room,pipelines of drainage, water supply, telecommunication, 完æˆ?招标 power supply,installation of security equipment and equipment for BRT station and management & dispatching room,etc. U R 米东公交建设用地é?¢ç§¯100075.68m2,总建筑é?¢ç§¯19099.18m2,建设内容包括室外总体ã€?绿化工程,é…?套管ç?†ç”¨æˆ¿ã€?修车库ã€?综å?ˆ C 修车库ã€?洗车间等土建工程以å?Šå®¤å¤–污水ã€?给水ã€?通信ã€?电力等管线工程ã€?é…?套管ç?†ç”¨æˆ¿ã€?修车库ã€?综å?ˆä¿®è½¦åº“ã€?洗车间等é…?套 W 设备的采购与安装。 31 CW-31 米东公交å?œä¿?场土建工程 Civil work of Midong Bus depot 0 The land area is 100075.68m2,GFA 19099.18m2. The scope of work includes general outdoor work, landscaping, 8963.65 1299.08 NCB-Works å?Žå®¡ï¼ˆPost) 2016.12 1 construction of management room, maintenance room, intergrated maintenance shop, and wash shop,pipelines of - drainage, water supply, telecommunication, power supply, and installation of equipment for management room, 2 maintenance room, intergrated maintenance shop, and wash shop,etc. 5 三宫公交建设用地é?¢ç§¯52500m2,总建筑é?¢ç§¯12420.46m2;建设内容包括室外总体ã€?绿化工程,é…?套管ç?†ç”¨æˆ¿ã€?综å?ˆä¿®è½¦åº“ã€?洗车 é—´ã€?水泵房等土建工程以å?Šå®¤å¤–污水ã€?给水ã€?通信ã€?电力等管线工程ã€?é…?套管ç?†ç”¨æˆ¿ã€?综å?ˆä¿®è½¦åº“ã€?洗车间ã€?水泵房等é…?套设备 的采购与安装。。 32 CW-32 三宫公交å?œä¿?场土建工程 Civil work of Sangong Bus depot The land area is 52500m2,GFA 12420.46m2. The scope of work includes general outdoor work, landscaping, 6001.88 869.84 NCB-Works å?Žå®¡ï¼ˆPost) 2016.12 construction of management room, intergrated maintenance shop,wash shop,and pump room, pipelines of drainage, water supply, telecommunication, power supply, and installation of equipment for management room, maintenance room, intergrated maintenance shop, wash shop, and pump room,etc. II 供货安装 Supply & Installation of Plant and Equipment BRT4å?·çº¿äºŒæœŸè·¯å?£ä¿¡å?·ç?¯æ”¹é€ å?Šæ–°å»ºã€?交通监控改造å?Šæ–°å»ºã€?è·¯å?£ä¿¡å?·ä¼˜å…ˆã€?专用é?“抓æ‹?系统ã€?é…?套管线等设备采购ã€?安装ã€?è°ƒ BRT4å?·çº¿äºŒæœŸäº¤é€šç›‘控工程 试和è¿?è?¥ç»´æŠ¤ã€‚ 33 CW-33 540 78.26 NCB-SI å?Žå®¡ï¼ˆPost) 2017 BRT4 Phase II Traffic Inspection Engineering Installation and rehabilitation of signals, traffic inspection system, signal priority system, snap system, and associated pipelines, etc. 二级平å?°å…¬äº¤è½¦æ™ºèƒ½äº¤é€šæ”¹é€  二级平å?°å…¬äº¤è½¦æ™ºèƒ½äº¤é€šæ”¹é€  34 CW-34 1257 182.17 NCB-SI å?Žå®¡ï¼ˆPost) 2016.12 2nd-tier Platform Bus IT Improvement 2nd-tier Platform Bus IT Improvement U R BRT6支线路å?£ä¿¡å?·ç?¯æ”¹é€ å?Šæ–°å»ºã€?交通监控改造å?Šæ–°å»ºã€?è·¯å?£ä¿¡å?·ä¼˜å…ˆã€?专用é?“抓æ‹?系统ã€?é…?套管线等设备采购ã€?安装ã€?调试和 2016.9.8 BRT6支线交通监控工程 C è¿?è?¥ç»´æŠ¤ã€‚ 35 1565.4 256.62 597.2 97.90 NCB-SI å?Žå®¡ï¼ˆPost) 2016.9 完æˆ?招标 CW-35 BRT6a Traffic Inspection Engineering W Installation and rehabilitation of signals, traffic inspection system, signal priority system, snap system, and 工作 0 associated pipelines, etc. 3 U 包括相关的应用系统软件开å?‘(å?œè½¦åœºç»¼å?ˆä¿¡æ?¯æœ?务平å?°ã€?统一收费管ç?†ç³»ç»Ÿã€?æ•°æ?®èµ„æº?中心ã€?æ•°æ?®äº¤æ?¢ç³»ç»Ÿç­‰ï¼‰ã€?å¹³å?°åŸºç¡€çޝ R 境建设(计算资æº?æ± ã€?结构化/é?žç»“构化数æ?®åº“资æº?æ± ã€?网络安全设备ã€?基础软件)ã€?å?œè½¦åœºæ”¹é€ ã€?机房装修,å?Šæµ‹è¯•ã€?验收ã€?培 C 训等工程建设é…?套æœ?务。 二级平å?°å?œè½¦åœºç®¡ç?†å’Œä¿¡æ?¯æœ?务平å?° W Develop application system software (e.g. parking lot comprehensive information service platform, unified 36 CW-36 2nd-tier Platform Parking Lot Management and Information 0 2212 320.58 NCB-SI å?Žå®¡ï¼ˆPost) 2016.12 charging management system, date resource center, data exchange system, etc.),build platform basic environment Service System 3 (computing resource pool, structured/unstructured database resource pool, Network security equipment, basic - software, etc.), parking lot improvement, computer room refurbishment, and other auxiliary service such as test, 0 acceptance, and training. 7 U R å?œä¿?场智能系统(信æ?¯æœ?务系统ã€?安全监控系统ã€?IP数字广播系统ã€?车辆识别设备ã€?网络设备ã€?监控大å±?显示系统ã€?现场调度系 米东公交å?œä¿?场智能信æ?¯åŒ–工程 C 37 CW-37 统等)Depot intelligent system(information service system, safety monitoring system, IP digital broadcasting 179.66 26.04 NCB-SI å?Žå®¡ï¼ˆPost) 2017 Intelligent information system of Midong Bus depot. W system, vehicle identification equipment, network equipment, monitor&display system, the scheduling system, etc.) 0 3 U R å?œä¿?场智能系统(信æ?¯æœ?务系统ã€?安全监控系统ã€?IP数字广播系统ã€?车辆识别设备ã€?网络设备ã€?监控大å±?显示系统ã€?现场调度系 三宫公交å?œä¿?场智能信æ?¯åŒ–工程 C 38 CW-38 统等)Depot intelligent system(information service system, safety monitoring system, IP digital broadcasting 146.89 21.29 NCB-SI å?Žå®¡ï¼ˆPost) 2017 Intelligent information system of Sangong Bus depot. W system, vehicle identification equipment, network equipment, monitor&display system, the scheduling system, etc.) 0 3 主è¦?覆盖北外环(è‹?州路)ã€?å…‹å?—高架以北(å?«å…‹å?—高架ã€?东西外环以å?Šæ²³æ»©è·¯ï¼‰ï¼›åŒ…括é?“路监控视频室内系统(视å±?监控管ç?† 软件ã€?PCæœ?务器ã€?视频信æ?¯å­˜å‚¨ã€?显示大å±?与解ç ?器)ã€?网络设备(æœ?务器交æ?¢æœºï¼‰ã€?室外设备(é?“路交通æµ?采集设备ã€?å?¡å?£ç³» 统)ã€?在建期间的网络通讯设备和è¿?è?¥ç»´æŠ¤ï¼Œå?Šé?“路交通信æ?¯é‡‡é›†æ•°æ?®ç®¡ç?†ã€‚ 全市é?“路交通信æ?¯é‡‡é›† I Supply, installation and maintenance of information collection devices for the roadway north to the North Ring 39 CW-39 1st-tier Platform Roadway Traffic Information Collection System 3998.77 579.53 NCB-SI å?Žå®¡ï¼ˆPost) 2017 (Suzhou Rd.) and Kenan Expressway, including indoor road video monitoring system (e.g. video monitoring I management software, PC server, video information storage system, large screen displayer and encoder), network equipment (e.g. server switcher), outdoor equipment (e.g. road traffic information collector, monitor system) and data management. 主è¦?覆盖å?—外环(钱塘江路)ã€?西虹路以å?—(å?«è¥¿è™¹è·¯ã€?东西外环以å?Šæ²³æ»©è·¯ï¼‰ï¼›åŒ…括é?“路监控视频室内系统(视å±?监控管ç?†è½¯ ä»¶ã€?PCæœ?务器ã€?视频信æ?¯å­˜å‚¨ã€?显示大å±?与解ç ?器)ã€?网络设备(æœ?务器交æ?¢æœºï¼‰ã€?室外设备(é?“路交通æµ?采集设备ã€?å?¡å?£ç³»ç»Ÿ )ã€?在建期间的网络通讯设备和è¿?è?¥ç»´æŠ¤ï¼Œå?Šé?“路交通信æ?¯é‡‡é›†æ•°æ?®ç®¡ç?†ã€‚ 全市é?“路交通信æ?¯é‡‡é›† II Supply, installation and maintenance of information collection devices for the roadway south to the South Ring 40 CW-40 1st-tier Platform Roadway Traffic Information Collection System 3901.23 565.40 NCB-SI å?Žå®¡ï¼ˆPost) 2017 (Qiantangjiang Rd.) and Xihong Rd., includingIndoor road video monitoring system (e.g. video monitoring II management software, PC server, video information storage system, large screen displayer and encoder), network equipment (e.g. server switcher), outdoor equipment (e.g. road traffic information collector, monitor system) and data management. 内资调整为世行资金调整å?ˆè®¡ 21316.48 3181.56 总计 86024.69 12467.35 货物 Goods 1 2 3 4 5 6 7 8 9 10 11 12 中标价(万USD æˆ?本估算 æˆ?本估算(万U 中标价(RMB )awarded (RMB SD) 采购方å¼? 世行审查(å‰?审/å?Ž é¢„è®¡å?¯åŠ¨æ‹›æ ‡ å?ˆå?Œå?· 万元)awarde contract ç¼–å?· å?ˆå?Œå??ç§° å?ˆå?Œå†…容 万元 ) Amount in Procurem 审) WB 日期 备注 Contract d contract price Item Contract Contract Description Amount in 10,000 USD ent Review (Prior / Expected Remark No. price in10,000 10,000 (6.7RMB/1US Method Post) Date of IFB in10,000RMB USD(6.7RMB/1 RMB D) USD) BRT6支线BRT车辆采购 I 60辆12m长气电混å?ˆåŠ¨åŠ›å?•机车 å‰?审 1 GS-01 5100 761.19 NCB-GS 2016-2017 BRT 6a bus Procurement I sixty gas-electric hybrid bus with the length of 12 metres Prior review 快速公交专用救æ?´è½¦è¾†é‡‡è´­ 3辆快速公交专用救æ?´è½¦è¾† BRT Rescue Trailer å?Žå®¡ 2 GS-02 three BRT Rescue Trailers 240 35.82 shopping 2016-2017 Procurement post review BRT车辆采购II bus å‰?审 3 GS-03 40辆专用BRT车辆 forty BRT special buses 5000 746.27 NCB-GS 2017-2018 Procurement â…¡ Prior review å?ˆè®¡ 10340 1498.55 é?žå’¨è¯¢æœ?务 Non-consulting Service 1 2 3 4 5 6 7 8 9 10 11 12 中标价(RMB万 æˆ?本估算(RMB 中标价(USD万)a 世行审查(å‰?审/å?Žå®¡ 预计å?¯åŠ¨æ‹›æ ‡ å?ˆå?Œå?· æˆ?本估算(万USD) å…ƒ)awarded 采购方å¼? ç¼–å?· å?ˆå?Œå??ç§° å?ˆå?Œå†…容 万元 ) warded ) WB 日期 备注 Contract Cost Estimate in contract Procurement Item Contract Contract Description Cost Estimate contract price Review (Prior / Expected Date Remark No. 10,000 USD price Method in 10,000 RMB in10,000 USD Post) of IFB in10,000 RMB 公众宣传教育I å­?项目四-项目实施期间的公共宣传教育工作:电视ã€?广播 询价 1 NCS-1 150 22.4 å?Žå®¡ï¼ˆPost) 2017 Public Promotion and Education Subproject 4--Public promotion:TV/broadcasting Shopping å­?项目四- 项目实施期间的公共宣传教育工作:报纸宣传ã€?公交站å?°å¹¿å‘Šç‰Œå®£ä¼ ã€? 公众宣传教育II å?°åˆ¶ç‰¹å®šä¸»é¢˜ç‰¹å®šäººç¾¤æ•™è‚²çš„宣传册 询价 2 NCS-2 150 22.4 å?Žå®¡ï¼ˆPost) 2017 Public Promotion and Education Subproject 4--Public promotion: newspaper promotion, bus stop Shopping billboard advertises, brochure on specific themes for specific groups å­?项目四- 项目实施期间的公共å?‚与工作:公众å?‚与活动的策划,组织å?Šå®žæ–½ï¼Œå¹¶ 将调查结果进行汇总分æž?,形æˆ?公众å?‚与活动报告。 公众宣传教育III 询价 3 NCS-3 Subproject 4--Public promotion and participation activities: 120 17.9 å?Žå®¡ï¼ˆPost) 2017 Public Promotion and Education Shopping public participation activities planning, organization and implementation, and preparing report for public participation activities å?ˆè®¡ 420.00 62.69 咨询æœ?务 Consulting Service 1 2 3 4 5 6 7 8 9 10 11 12 预计å?¯åŠ¨æ‹› æˆ?本估算(RMB æˆ?本估算(万USD 中标价(RMB万元 中标价(USD万)a 世行审查(å‰?审/å?Žå®¡ ç¼–å?· å?ˆå?Œå?· 采购方å¼? 标日期 å?ˆå?Œå??ç§° å?ˆå?Œå†…容 Contract 万元 ) ) )awarded warded ) WB 备注 Ite Contract Procurement Expected Contract Description Cost Estimate Cost Estimate contract price contract price Review (Prior / Remark m No. Method Date of in 10,000 RMB in 10,000 USD in10,000 RMB in10,000 USD Post) IFB 研究内容包括:1)城市交通现状调查ã€?分æž?与问题研判;2)居民出行特å¾?和机动车å?‘展现状调查; 3)交通需求预测;4)国内外案例分æž?与ç»?验借鉴;5)建立综å?ˆäº¤é€šç®¡ç?†è¯„估体系;6)交通需求管 ç?†æ€»ä½“框架体系研究;7)机动车å?‘展管ç?†æ”¿ç­–和措施研究;8)制定机动车å?‘展管ç?†è¡ŒåŠ¨è§„åˆ’ï¼›9) 建立机动车å?‘展政策实施ä¿?障体系;10)实施效果评估和行动规划调整;11)对业主å?Šç›¸å…³å?•ä½?的培 å­?项目四- 训计划。 无论å‰?å?Žå®¡å?ˆå?Œå…¶TO 乌é²?木é½?市交通需求管ç?†â€”—机动车å?‘展政策研 Major tasks include: i.Urban traffic investigation, analysis and diagnosis; Rå¿…é¡»å‰?审 ç©¶ 1 CS-01 Subproject 4--Urumqi Traffic Demand ii.Investigation on trip characteristic and existing motor vehicle development 200 29.85 QCBS å?Žå®¡ï¼ˆPost) 2017 All TOR shall be situation; iii.Traffic Demand Forecast; iv.case study; v. establish comprehensive subject to Bank Management --- Motor Vehicle Development traffic management evaluation system; vi.TDM frame study; vii.Vehicle development prior review Policy Study Management Policy and measure; viii.Motor vehicle development management action Program; ix.Safeguard system for vehicle development management policy. x.Effect evaluation and action program adjustment; xi.Training for project owner and stakeholders. 该任务研究的主è¦?内容包括:1)æµ?é‡?调查å?Šå¿«é€Ÿå…¬äº¤ç³»ç»ŸçŽ°çŠ¶åˆ†æž?ï¼›2)快速公交系统硬件指标系统 评价;3)乌é²?木é½?市快速公交系统è¿?行状况评价;4)对快速公交系统客æµ?特å¾?分布ã€?调度计划和è¿? 行绩效进行指标评价;5)市民对快速公交系统的满æ„?度评价;6)乌é²?木é½?快速公交系统环境效益评 无论å‰?å?Žå®¡å?ˆå?Œå…¶TO å­?项目四-乌é²?木é½?市综å?ˆå…¬äº¤èµ°å»Šå?Žè¯„ä»· ä¼°ï¼›7)快速公交系统å?Žè¯„估结论和改进建议。 Rå¿…é¡»å‰?审 2 CS-02 Subproject 4--Urumqi Public Transport Major tasks include: i.Traffic survey and existing BRT analysis; ii.BRT hardware 260 38.8 QCBS å?Žå®¡ï¼ˆPost) 2018 All TOR shall be Corridor Post Assessment evaluation indicator system; iii.Urumqi BRT operation evaluation; iv.Index evaluation subject to Bank on BRT passenger distribution characteristics, BRT dispatching plan and operation prior review benefit; v.BRT satisfaction evaluation; vi.BRT environmental benefit assessment; vii.Conclusion and suggestion. 研究任务主è¦?包括:1)城市交通现状调查ã€?分æž?与问题诊断,并对现状慢行系统评价;2)国内外 因市交通局已开展类 慢行交通å?‘展的案例分æž?å’Œç»?验借鉴;3)乌é²?木é½?市å?Šæ–°å»ºBRT走廊慢行交通需求分æž?与å?‘展预测 似项目,故本项目å?– å­?项目四- ï¼›4)制定乌é²?木é½?市慢行交通å?‘展战略;5)制定乌é²?木é½?市慢行交通规划方案;6)乌é²?木é½?市慢 消. 乌é²?木é½?市慢行交通系统规划å?Šç¤ºèŒƒé¡¹ç›®æ–¹æ¡ˆè®¾ 行交通系统分期实施计划;7)针对一体化公交走廊建设æ??出沿线慢行系统完善方案。 Similar projects 计 Major tasks include: i.investigation, analysis and diagnosis of existing urban / CS-03 Subproject 4--Urumqi Slow Mode Traffic traffic situation and assessment of the existing slow mode traffic system; ii.Case 180 26.9 CQS å?Žå®¡ï¼ˆPost) 2016 have been carried out by Department System Planning and Demonstration Project study; iii.Urumqi slow mode traffic demand analysis and forecasting; iv.Develop of Transportatio , Design Urumqi slow mode traffic development strategy; v.Develop Urumqi slow mode traffic so the project was plan; vi.Urumqi slow mode traffic system implementation plan; vii.Slow mode traffic canceled system improvement program for BRT corridors. 研究主è¦?任务包括:1)乌é²?木é½?城市公交线路现状数æ?®çš„调查和æ?œé›†ï¼›2)现状居民公交出行特å¾?å?Š å‡ºè¡Œéœ€æ±‚ï¼›3)目标年公交线路需求分æž?ï¼›4)城市综å?ˆäº¤é€šæ¨¡åž‹çš„优化更新;5)目标年公交线路优 化方案å?Šè¯„ä¼°ï¼›6)建立乌é²?木é½?市公交线路定é‡?定性评估体系;7)乌é²?木é½?公交è¿?è?¥ç®¡ç?†æ”¹å–„方案 ï¼›8)公交线网优化方案实施计划。 Major tasks å­?项目四-乌é²?木é½?市公交线网调整研究 include: i.Urumqi bus routes survey and data collection; ii.analysis of bus travel 该项目2016.11月已 3 CS-04 Subproject 4--Urumqi Bus Route Network characteristics and demand; iii.bus route demand analysis for project year; 200 32.8 212.4 QCBS å‰?审 (Prior) 2016 完æˆ?招标工作 Optimization iv.Optimization of urban comprehensive traffic model; v.Bus routes optimization and assessment for project year; vi.Establish a quantitative and qualitative bus route evaluation system; vii.Urumqi bus operation improvement program; viii.Bus route network optimization implementation plan. è?˜è¯·ç»?验丰富的交通项目管ç?†å…¬å?¸ï¼Œå…¨ç¨‹å?‚与项目的项目管ç?†å’ŒæŠ€æœ¯ç®¡ç?†å·¥ä½œï¼Œä¸ºé¡¹ç›®åŠžå…¬å®¤çš„é¡¹ç›® 管ç?†å·¥ä½œæ??供帮助å?Šæ”¯æŒ?,包括但ä¸?é™?于:项目进度管ç?†ã€?财务管ç?†,项目费用管ç?†ã€?招标书技术标 书部分撰写ã€?方案论è¯?ã€?公共宣传教育技术支æŒ?等任务,并与采购公å?¸å?Šè´¢åŠ¡ç®¡ç?†å…¬å?¸å…±å?Œå?ˆä½œã€‚ 无论å‰?å?Žå®¡å?ˆå?Œå…¶TO Hire an experienced transportation project management company to participate in Rå¿…é¡»å‰?审 å­?项目四-项目管ç?†ä¸ŽæŠ€æœ¯æ”¯æŒ? Subproject 4-- 4 CS-05 Project Management and Technical Support project management and technical management, providing assistance and support to PMO 500 74.6 QCBS å?Žå®¡ï¼ˆPost) 2016 All TOR shall be in not limited to the following: progress management,financial managemen, expense subject to Bank management, composing technical bidding document, project approachment, public prior review promotion, and cooperation with procurement consulting company and financial management consulting company. è?˜è¯·æœ‰ç»?验的项目财务管ç?†é¡¾é—®å…¬å?¸ï¼Œå?‚与指导项目财务管ç?†å·¥ä½œï¼Œç¡®ä¿?财务管ç?†ç¬¦å?ˆä¸–行有关è¦? 求,并å?‚与项目管ç?†å…¶ä»–工作,并与项目管ç?†å…¬å?¸å?Šé‡‡è´­å…¬å?¸å…±å?Œå?ˆä½œã€‚ 本å?ˆå?Œä¸ŽCS-05å?ˆå¹¶ å­?项目四-财务管ç?†å’¨è¯¢é¡¾é—®æœ?务 Hire an experienced financial management consulting company for financial management å?Žå®¡ This contract / CS-06 Subproject 4--Financial Management to ensure the financial management complying with the World Bank rule, participate in 75 11.2 CQS 2016 combined with the Consulting Service post other project management work and cooperate with project management consulting CS-05 company and procurement management consulting company. 无论å‰?å?Žå®¡å?ˆå?Œå…¶TO å­?项目四-交通综å?ˆä¿¡æ?¯å¹³å?°ç®¡ç?†å’¨è¯¢é¡¾é—®æœ?务 è?˜è¯·æœ‰ç»?验的交通综å?ˆä¿¡æ?¯ç®¡ç?†é¡¾é—®å…¬å?¸ï¼Œå?‚与指导综å?ˆä¿¡æ?¯å¹³å?°ç®¡ç?†å·¥ä½œã€‚ Hire an Rå¿…é¡»å‰?审 Subproject 4--Integrated Transport 5 CS-07 Information Platform Management Consulting experienced consulting company in management of integrated transport information 70 10.4 CQS å?Žå®¡ï¼ˆPost) 2017 All TOR shall be platform. subject to Bank Service prior review 2016年调整为利用世行贷款资金开展的项目 Domestic capital adjustment BRT6支线包å?«çš„æ™ºèƒ½è°ƒåº¦ç³»ç»Ÿã€?安全门系统ã€?售检票系统 BRT6支线智能系统监ç?† ã€?ç«™å?°å®‰é˜²ç³»ç»Ÿã€?交通监控工程的监ç?†å·¥ä½œ 该项目2016.11月已 6 CS-08 BRT6a Intelligent system supervision Including BRT6a dispatching system.automatic safety gate system.platform safegard 120 19.7 118.0 CQS å?Žå®¡ï¼ˆPost) 2016 完æˆ?招标工作 system and traffic Inspection Engineering. 本项目主è¦?研究内容涉å?Šä¸‰å¤§å?—:电å­?标识交通物è?”网å?¯è¡Œæ€§ç ”ç©¶ã€?电å­?标识交通物è?”网规划与总体 å­?项目四 - 无论å‰?å?Žå®¡å?ˆå?Œå…¶TO 设计研究ã€?电å­?标识交通物è?”网路侧设施布局研究。 乌é²?木é½?汽车电å­?标识交通物è?”网建设方案å‰?期 Rå¿…é¡»å‰?审 The project is the main research content involves three areas: a feasibility study on 7 CS-09 研究 the Internet of things electronic identity traffic, electronic identification traffic 300 44.8 QCBS å?Žå®¡ï¼ˆPost) 2016 All TOR shall be Subproject 4--Urumqi e-plate Preliminary subject to Bank iot planning and overall design research, electronic identification traffic iot study on construction scheme prior review roadside facilities layout research 包å?«äºŒçº§å¹³å?°å…¬äº¤è½¦æ™ºèƒ½äº¤é€šæ”¹é€ ã€?二级平å?°å?œè½¦åœºç®¡ç?†å’Œä¿¡æ?¯æœ?务平å?°ä»¥å?Šå…¨å¸‚出租行业管ç?†å¹³å?° 无论å‰?å?Žå®¡å?ˆå?Œå…¶TO 二级平å?°ä¿¡æ?¯ç³»ç»Ÿç›‘ç?† 的建设等的监ç?†å·¥ä½œ Rå¿…é¡»å‰?审 The supervisal engineering for the 8 CS-10 information system of the Secondary Including supervisal engineering as 2nd-tier Platform Bus IT Improvement ,2nd-tier 110 16.4 CQS å?Žå®¡ï¼ˆPost) 2016 All TOR shall be Platform Parking Lot Management and Information Service System and Urumqi Taxi meter subject to Bank platform and dispatching system. prior review 主è¦?工作内容包括北外环(è‹?州路)ã€?å…‹å?—高架以北(å?«å…‹å?—高架ã€?东西外环以å?Šæ²³æ»©è·¯ï¼‰ï¼Œä»¥å?Šå?— 外环(钱塘江路)ã€?西虹路以å?—(å?«è¥¿è™¹è·¯ã€?东西外环以å?Šæ²³æ»©è·¯ï¼‰é?“路监控视频室内系统(视å±?监 控管ç?†è½¯ä»¶ã€?PCæœ?务器ã€?视频信æ?¯å­˜å‚¨ã€?显示大å±?与解ç ?器)ã€?网络设备(æœ?务器交æ?¢æœºï¼‰ã€?室外设 备(é?“路交通æµ?采集设备ã€?å?¡å?£ç³»ç»Ÿï¼‰ã€?在建期间的网络通讯设备和è¿?è?¥ç»´æŠ¤ï¼Œå?Šé?“路交通信æ?¯é‡‡é›† æ•°æ?®ç®¡ç?†ç³»ç»Ÿç›‘ç?†å·¥ä½œã€‚ 无论å‰?å?Žå®¡å?ˆå?Œå…¶TO Main tasks and responsibilities include North Circle (Suzhou Road), North part of 全市é?“路交通信æ?¯é‡‡é›†ç›‘ç?† Rå¿…é¡»å‰?审 Kenan Elevated Highway (inlude Kenan Elevated Highway, East-west circle and Hetan 9 CS-11 Urban Road Traffic Information Collection Road), South Circle (Qiantang River Road), Xihong Road South Part (inlude Xihong Road, 150 22.4 CQS å?Žå®¡ï¼ˆPost) 2017 All TOR shall be Supervision subject to Bank East-west circle and Hetan road), Road Supervision Video Indoor System (Video prior review Monitoring Software, PC Server, Video Information Storage, LED Display Screen and Decoder),Internet Equipment (Server Swithes), Outdoor Equipment (Road Traffic Collecting Equipment, Gate System), Internet Communication Equipment and Operation Maintenance during the construction period, and Road Traffic Information and Data Collecting Management System etc. supervison works. 无论å‰?å?Žå®¡å?ˆå?Œå…¶TO BRT4å?·çº¿äºŒæœŸåŒ…å?«çš„æ™ºèƒ½è°ƒåº¦ç³»ç»Ÿã€?安全门系统ã€?售检票系统 BRT4å?·çº¿äºŒæœŸç›‘ç?† Rå¿…é¡»å‰?审 ã€?ç«™å?°å®‰é˜²ç³»ç»Ÿã€?交通监控工程的监ç?†å·¥ä½œ 10 CS-12 The second phase of BRT4 Intelligent Including the second phase of BRT4 dispatching system.automatic safety gate 60 9.0 CQS å?Žå®¡ï¼ˆPost) 2017 All TOR shall be system supervision subject to Bank system.platform safegard system and traffic Inspection Engineering. prior review 围绕乌é²?木é½?市已ç»?å½¢æˆ?çš„BRTã€?常规公交ã€?出租车ã€?网约车等公共交通出行方å¼?,以å?Šå?³å°†å»ºæˆ?通 车的地é“?,研究æ??出æœ?务水平考核体系,为行业管ç?†éƒ¨é—¨çš„管ç?†å’Œæ‰§æ³•æ??ä¾›ä¾?æ?®ï¼Œçº¦æ?Ÿè¿?è?¥ä¼?业,æ?? 无论å‰?å?Žå®¡å?ˆå?Œå…¶TO 高我市整体公共交通æœ?务水平。 乌é²?木é½?市公共交通æœ?务水平考核体系研究 Rå¿…é¡»å‰?审 Taking the existing BRT, Regular Bus, Taxi and Reserved Taxi on Internet etc. travel 11 CS-13 Urumqi Urban Public Transport Service modes as well as the underground, propose a service level evaluation system, and then 150 21.7 CQS å?Žå®¡ï¼ˆPost) 2017 All TOR shall be Level Assessment System Study subject to Bank provide references for the managment and execuation of Administration Department to prior review constrain these operating companies, raise the level of overall public transport services. å?ˆè®¡ 2375 344.20