PROCUREMENT PLAN (Textual Part)
Project information:
Country: Afghanistan
Project name: Citizens' Charter Afghanistan Project
Project ID: P160567
Project Implementation agency: MRRD
Date of the Procurement Plan: July 9, 2017
Period covered by this Procurement Plan: Only three packages provided
not the full procurement plan.


Preamble

In accordance with paragraph 5.9 of the “World Bank Procurement Regulations
for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s
Systematic Tracking and Exchanges in Procurement (STEP) system will be
used to prepare, clear and update Procurement Plans and conduct all
procurement transactions for the Project.

This textual part along with the Procurement Plan tables in STEP constitute the
Procurement Plan for the Project. The following conditions apply to all
procurement activities in the Procurement Plan. The other elements of the
Procurement Plan as required under paragraph 4.4 of the Procurement
Regulations are set forth in STEP.

The Bank’s Standard Procurement Documents: shall be used for all
contracts subject to international competitive procurement and those
contracts as specified in the Procurement Plan tables in STEP.

National Procurement Arrangements: In accordance with paragraph 5.3
of the Procurement Regulations, when approaching the national market (as
specified in the Procurement Plan tables in STEP), the procurement documents
agreed by the bank will be used.
When the Borrower uses its own national open competitive procurement
arrangements as set forth in the Procurement Law of the Islamic Republic of
Afghanistan dated 27/06/13965 (September 17, 2016) published in the Official
Gazette No.1223, such arrangements shall be subject to paragraph 5.4 of the
Procurement Regulations and the following conditions Agreed Procedures
for National Competitive Bidding:
   I.   Standard bidding documents approved by the Association shall be used.
  II.   Invitations to bid shall be advertised in at least one (1) widely circulated
        national daily newspaper and bidding documents shall be made
        available to prospective bidders, at least twenty-eight (28) days prior to
        the deadline for the submission of bids.
 III.   Bids shall not be invited on the basis of percentage premium or discount
        over the estimated cost.
 IV.    Bidding documents shall be made available, by mail or in person, to all
        who are willing to pay the required fee.
  V.    Foreign bidders shall not be precluded from bidding.
 VI.    Qualification criteria (in case pre-qualifications were not carried out)
        shall be stated on the bidding documents, and if a registration process
        is required, a foreign firm determined to be the lowest evaluated bidder
        shall be given reasonable opportunity of registering, without any
        hindrance.
VII.    Bidders may deliver bids, at their option, either in person or by courier
        service or by mail.
VIII.   All bidders shall provide bid security or a bid security declaration form
        as indicated in the bidding documents. A bidder’s bid security or the
        declaration form shall apply only to a specific bid.
 IX.    Bids shall be opened in public in one place preferably immediately, but
        no later than one hour, after the deadline for submission of bids.
  X.    Evaluation of bids shall be made in strict adherence to the criteria
        disclosed in the bidding documents, in a format, and within the specified
        period, agreed with the Association.
 XI.    Bids shall not be rejected merely on the basis of a comparison with an
        official estimate without the prior concurrence of the Association.
XII.    Split award or lottery in award of contracts shall not be carried out. When
        two (2) or more bidders quote the same price, an investigation shall be
        made to determine any evidence of collusion, following which: (A) if
        collusion is determined, the parties involved shall be disqualified and the
        award shall then be made to the next lowest evaluated and qualified
        bidder; and (B) if no evidence of collusion can be confirmed, then fresh
        bids shall be invited after receiving the concurrence of the Association;
XIII.    Contracts shall be awarded to the lowest evaluated bidders within the
         initial period of bid validity so that extensions are not necessary.
         Extension of bid validity may be sought only under exceptional
         circumstances.
XIV.     Extension of bid validity shall not be allowed without the prior
         concurrence of the Association (A) for the first request for extension if it
         is longer than four (4) weeks, and (B) for all subsequent requests for
         extensions irrespective of the period in case of prior review.
 XV.     Negotiations shall not be allowed with the lowest evaluated or any other
         bidders.
XVI.     Re-bidding shall not be carried out without the Association’s prior
         concurrence in case of prior review; and
XVII.    All contractors or suppliers shall provide performance security as
         indicated in the contract documents. A contractor’s or a supplier’s
         performance security shall apply to a specific contract under which it
         was furnished.


        When other national procurement arrangements other than national open
        competitive procurement arrangements are applied by the Borrower,
        such arrangements shall be subject to paragraph 5.5 of the Procurement
        Regulations.



 Leased Assets as specified under paragraph 5.10 of the Procurement
 Regulations: Leasing may be used for those contracts identified in the
 Procurement Plan tables. “Not Applicable”
 Procurement of Second Hand Goods as specified under paragraph 5.11 of
 the Procurement Regulations – is allowed for those contracts identified in the
 Procurement Plan tables “Not Applicable”
 Domestic preference as specified under paragraph 5.51 of the Procurement
 Regulations (Goods and Works). Specify for each
        Goods: [is not applicable/is applicable for those contracts identified in the
        Procurement Plan tables]; NA
        Works: [is not applicable/is applicable for those contracts identified in the
        Procurement Plan tables]; NA
Hands-on Expanded Implementation Support (HEIS) as specified under
paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. “Not
Applicable”
Other Relevant Procurement Information.
Procurement for CDC will be conducted in line with the agreed manual
prepared by the project and has been agreed by the bank.
Also the Procurement in Situations of Urgent Need of Assistance or Capacity
Constraints apply for the project.
PROCUREMENT
                  Afghanistan : Citizens' Charter Afghanistan Project
PLAN
General Information
Country:             Afghanistan                           Bank’s Approval Date of the Original Procurement Plan:     2016-08-23
                                                                                                                      2021-05-11
                                                           Revised Plan Date(s): (comma delineated, leave blank if none)
Project ID:          P160567                               GPN Date:
Project Name:        Citizens' Charter Afghanistan Project
Loan / Credit No:    TF / A3827, IDA / D1390, / , IDA / D7520, IDA / D2130
                     Independent Directorate of local governance
Executing Agency(ies):


WORKS
 Activity Reference No. /                                                                                                                                                                                           Estimated       Actual                                                                         Draft Bidding                                                                        Bid Evaluation Report
                                    Loan / Credit                                                                                            Procurement        Prequalification   High SEA/SH      Procurement                                  Process    Draft Pre-qualification      Prequalification                             Specific Procurement   Bidding Documents as Proposal Submission /                                                   Contract
        Description                                         Component              Review Type        Method        Market Approach                                                                                  Amount        Amount                                                                          Document /                                                                           and Recommendation         Signed Contract
                                        No.                                                                                                    Process               (Y/N)             Risk        Document Type                                  Status          Documents             Evaluation Report                              Notice / Invitation           Issued         Opening / Minutes                                                    Completion
                                                                                                                                                                                                                      (US$)         (US$)                                                                          Justification                                                                              for Award
                                                                                                                                                                                                                                                             Planned      Actual       Planned      Actual     Planned       Actual    Planned     Actual     Planned      Actual  Planned     Actual    Planned      Actual     Planned     Actual    Planned

 AF-IDLG-166682-CW-RFQ /
                                                                                                 Request for                               Single Stage - One                                                                                                                                                                                                                                                                                          2020-07-
Procurement of Office              IDA / D1390      2.   Institution Building   Post                                Open - National                                                                                   34,825.00         0.00    Canceled                                                                              2020-05-15                                                                                2020-06-27
                                                                                                 Quotations                                Envelope                                                                                                                                                                                                                                                                                                       27
Extension




GOODS
 Activity Reference No. /                                                                                                                                                                                                                                                                  Draft Bidding                                                                         Bid Evaluation Report
                                    Loan / Credit                                                                                            Procurement        Prequalification    Estimated      Actual Amount      Process     Draft Pre-qualification      Prequalification                               Specific Procurement    Bidding Documents as Proposal Submission /
        Description                                         Component              Review Type        Method        Market Approach                                                                                                                                                        Document /                                                                            and Recommendation         Signed Contract     Contract Completion
                                        No.                                                                                                    Process               (Y/N)         Amount (US$)        (US$)           Status           Documents             Evaluation Report                                Notice / Invitation            Issued         Opening / Minutes
                                                                                                                                                                                                                                                                                           Justification                                                                               for Award
                                                                                                                                                                                                                                   Planned        Actual     Planned      Actual       Planned       Actual    Planned      Actual     Planned      Actual  Planned     Actual    Planned      Actual     Planned     Actual     Planned     Actual

 CCEP-IDLG/G-5 / IT                                 4. Project Implementation                    Request for                               Single Stage - One
                                   TF / A3827                                   Post                                Open - National                                                    50,000.00        43,821.11   Completed                                                                                 2016-08-30                                                                                 2016-11-02 2017-05-20 2017-05-01 2017-06-20
Equipment                                           and Management                               Quotations                                Envelope


 CCEP-IDLG/G-4 / Furniture                          4. Project Implementation                    Request for                               Single Stage - One
                                   TF / A3827                                   Post                                Open - National                                                    50,000.00        42,389.02   Completed                                                                                 2016-08-30                                                                                 2016-10-25 2017-04-30 2017-04-23 2017-05-30
for PIU Unit Establishment                          and Management                               Quotations                                Envelope


 CCAP-IDLG/G-6 /
Procurement of IT Equipment                         4. Project Implementation                                                              Single Stage - One
                                   IDA / D1390                                  Post             Request for Bids   Open - National                                                   120,000.00             0.00   Canceled                                                          2018-01-20              2018-01-25                                     2018-03-08            2018-04-07            2018-05-12             2018-11-08
for PIU and PMUs in the Year                        and Management                                                                         Envelope
2018


 CCAP-IDLG/G-7 /
Procurement of IT Equipment                         4. Project Implementation                                                              Single Stage - One
                                   IDA / D1390                                  Post             Request for Bids   Open - National                                                    84,500.00             0.00   Canceled                                                          2019-01-20              2019-01-25                                     2019-03-08            2019-04-07            2019-05-12             2019-11-08
for PIU and PMUs in the year                        and Management                                                                         Envelope
2019


 CCEP-IDLG/G-2 / Furniture
for PIU Unit and Four Cities -                      4. Project Implementation                                                              Single Stage - One
                                   IDA / D1390                                  Post             Request for Bids   Open - International                                              100,000.00        78,286.63   Completed                                                         2017-02-02 2017-08-29 2017-02-07                                       2017-03-21 2017-09-23 2017-04-20 2017-10-23 2017-05-25 2017-12-03 2017-08-23 2018-01-03
Herat, Mazar, Kandahar and                          and Management                                                                         Envelope
Jalalabad for the year 2017


 CCAP-IDLG/G-8 /
Procurement of Furniture for                        4. Project Implementation                                                              Single Stage - One
                                   IDA / D1390                                  Post             Request for Bids   Open - National                                                     9,000.00             0.00   Canceled                                                          2018-02-03              2018-02-08                                     2018-03-22            2018-04-21            2018-05-26             2018-08-24
PIU and PMUs for the year                           and Management                                                                         Envelope
2018


 CCAP-IDLG/G-9 /
Procurement of Furniture for                        4. Project Implementation                                                              Single Stage - One
                                   IDA / D1390                                  Post             Request for Bids   Open - National                                                    90,000.00             0.00   Canceled                                                          2019-02-04              2019-02-09                                     2019-03-23            2019-04-22            2019-05-27             2019-11-23
PIU and PMUs for the year                           and Management                                                                         Envelope
2019


 CCAP-IDLG-RFQ-7-1-002 /
Procurement of Office
                                                    4. Project Implementation                    Request for                               Single Stage - One
Appliances for Project             TF / A3827                                   Post                                Limited                                                            50,000.00        44,276.13   Completed                                                                                 2017-08-11 2017-06-17                                                                      2017-10-06 2017-07-26 2018-04-04 2017-08-13
                                                    and Management                               Quotations                                Envelope
Implementation Units and
PMUs


 CCAP-IDLG/RFQ-7-4-0005 /
                                                    4. Project Implementation                    Request for                               Single Stage - One
Procurement of Security   TF / A3827                                            Post                                Limited                                                            30,000.00        24,757.67   Completed                                                                                 2017-08-15 2017-07-05                                                                      2017-10-10 2017-07-19 2018-04-08 2017-08-16
                                                    and Management                               Quotations                                Envelope
System for PIU


 CCAP-IDLG/NCB-G8-0019 /
                                                    4. Project Implementation                                                              Single Stage - One
Procurement of Generators for TF / A3827                                        Post             Request for Bids   Open - National                                                    12,000.00        10,455.02   Completed                                                         2017-08-14 2017-01-05 2017-08-19                                       2017-09-30 2017-01-31 2017-10-30 2017-02-25 2017-12-04 2017-04-11 2018-06-02 2017-05-29
                                                    and Management                                                                         Envelope
PIU


 CCAP-IDLG/RFQ-8-0006 /
                                                    4. Project Implementation                                                              Single Stage - One
Procurement of 4 Generators        TF / A3827                                   Post             Request for Bids   Open - National                                                    65,000.00             0.00   Canceled                                                          2017-09-27              2017-10-02                                     2017-11-13            2017-12-13            2018-01-17             2018-07-16
                                                    and Management                                                                         Envelope
for PMUs


 CCAP-IDLG/GO-RFQ-10-
0010 / Procurement of PBX                           4. Project Implementation                    Request for                               Single Stage - One
                              TF / A3827                                        Post                                Limited                                                            45,000.00             0.00   Canceled                                                                                  2017-11-04                                                                                 2017-12-30             2018-06-28
Telephonic System for PIU and                       and Management                               Quotations                                Envelope
PMUs


 CCEP-IDLG/G-1 / IT
Equipment for four years and                        4. Project Implementation                                                              Single Stage - One
                                   IDA / D1390                                  Prior            Request for Bids   Open - International                                              220,000.00             0.00   Canceled                                                          2016-10-01 2017-04-05 2016-10-06 2017-04-25                            2016-11-17 2017-06-12 2016-12-17            2017-01-21             2017-04-21
in Five office - four cities and                    and Management                                                                         Envelope
PIU Unit


 IDLG/CCAP/SSS/G13 /
Procurement IVR Interactive
                                                    4. Project Implementation
voice response Telephone           TF / A3827                                   Prior            Direct Selection   Direct                                                             10,000.00             0.00   Canceled                                                          2017-10-31              2017-11-05                                                                                 2017-12-10             2018-06-08
                                                    and Management
System,s Short Code system
and data base systems.


 AF-IDLG-54642-GO-RFB /
Procurement of Printing and                         4. Project Implementation                                                              Single Stage - One
                                   TF / A3827                                   Post             Request for Bids   Open - National                                                   200,000.00        41,488.14   Signed                                                            2018-05-26 2018-10-09 2018-05-31                                       2018-07-12 2018-11-10 2018-08-11 2018-12-19 2018-09-15 2019-02-23 2019-03-14
Publishing Materials for PIU                        and Management                                                                         Envelope
and PMUs


 AF-IDLG-55908-GO-RFB /
                                                    4. Project Implementation                                                              Single Stage - One
Procurement Generators for         TF / A3827                                   Post             Request for Bids   Open - National                                                    64,000.00        59,460.69   Signed                                                            2018-05-31 2018-10-29 2018-06-05                                       2018-07-17 2018-12-01 2018-08-16 2018-12-29 2018-09-20 2019-02-27 2019-03-19
                                                    and Management                                                                         Envelope
PIU and Four PMUs


 AF-IDLG-73781-GO-RFB /
                                                    4. Project Implementation                                                              Single Stage - One
Procurement of IT Equipment        TF / A3827                                   Post             Request for Bids   Open - International                                              340,000.00       273,712.77   Signed                                                            2018-09-08 2018-10-10 2018-09-13 2018-10-10                            2018-10-25 2018-11-25 2018-11-24 2018-12-29 2018-12-29 2019-02-23 2019-06-27
                                                    and Management                                                                         Envelope
for PIU and PMU




                                                                                                                                                                                                                                       Page 1
 AF-IDLG-76635-GO-RFQ /
                                               4. Project Implementation          Request for                               Single Stage - One
procurement of Goods Heater      TF / A3827                                Post                      Open - National                              10,000.00    4,545.37   Completed                                     2018-09-06                                                          2018-11-01 2018-10-13 2019-04-30 2018-11-06
                                               and Management                     Quotations                                Envelope
and Cylinder


 AF-IDLG-73792-GO-RFB /
Procurement of Furniture for                   4. Project Implementation                                                    Single Stage - One
                                 TF / A3827                                Post   Request for Bids   Open - National                              66,000.00   43,399.46   Signed                  2018-08-27 2018-10-07 2018-09-01              2018-10-13 2018-11-06 2018-11-12 2018-12-19 2018-12-17 2019-02-05 2019-06-15
the year of 2018 to PIU and                    and Management                                                               Envelope
PMUs of CCNPP-IDLG


 AF-IDLG-76637-GO-RFQ /
Procurement of safety vaults
                                               4. Project Implementation          Request for                               Single Stage - One
for better and safer storage of TF / A3827                                 Post                      Open - National                               1,000.00    4,232.80   Completed                                     2018-09-06                                                          2018-11-01 2018-11-28 2019-04-30 2018-12-28
                                               and Management                     Quotations                                Envelope
cash and important and
valuable documents.


 AF-IDLG-72146-GO-RFQ /
Procurement of Goods Supply
                                               4. Project Implementation          Request for                               Single Stage - One
of Grievance Boxes for PMUs      TF / A3827                                Post                      Open - National                              15,000.00   12,929.89   Signed                                        2018-08-05                                                          2018-09-30 2018-08-28 2019-03-29 2018-09-27
                                               and Management                     Quotations                                Envelope
of Herat, Mazar, Jalalabad and
Kandahar Provinces.


 AF-IDLG-75525-GO-RFB /
                                               4. Project Implementation                                                    Single Stage - One
Procurement of Technician     TF / A3827                                   Post   Request for Bids   Open - National                              26,000.00        0.00   Canceled                2018-08-29            2018-09-03              2018-10-15            2018-11-14            2018-12-19            2019-06-17
                                               and Management                                                               Envelope
Equipment's for PIU and PMUs.


 CCAP-IDLG/NCB-G9 /
Procurement of technical                       4. Project Implementation                                                    Single Stage - One
                                 TF / A3827                                Post   Request for Bids   Open - National                             100,000.00   95,145.48   Signed                  2017-09-03 2018-08-27 2017-09-08              2017-10-20 2018-09-26 2017-11-19 2018-12-25 2017-12-24 2018-11-13 2018-06-22 2018-12-12
Engineering Equipment for                      and Management                                                               Envelope
CCNPP


 IDLG/CCNPP/GO-RFQ-03-
2019 / Procurement of IT
                                               4. Project Implementation          Request for                               Single Stage - One
Equipment for Installation of    TF / A3827                                Post                      Open - National                               6,000.00   16,685.97   Completed                                     2019-02-08                                                          2019-04-05 2019-03-03 2019-10-02 2019-04-03
                                               and Management                     Quotations                                Envelope
Internet and Server Room in
the new house


 IDLG/CCNPP/GO-RFQ-04-
                                               4. Project Implementation          Request for                               Single Stage - One
2019 / Security Tools for PIU    TF / A3827                                Post                      Open - National                              45,000.00   47,329.96   Completed                                     2019-04-23                                                          2019-06-18 2019-05-12 2019-12-15 2019-07-12
                                               and Management                     Quotations                                Envelope
Office


 IDLG/CCNPP/GO-RFQ-05-
                                               4. Project Implementation          Request for                               Single Stage - One
2019 / Security Tools for PMU    TF / A3827                                Post                      Open - National                              38,000.00   48,082.67   Completed                                     2019-04-23                                                          2019-06-18 2019-05-14 2019-12-15 2019-07-14
                                               and Management                     Quotations                                Envelope
Jalalabad office


 AF-IDLG-128868-GO-RFQ /
Supply of Goods CISCO                          4. Project Implementation          Request for                               Single Stage - One
                                 IDA / D1390                               Post                      Open - National                              17,000.00        0.00   Canceled                                      2019-09-08                                                          2019-10-04            2019-11-18
Conference System with                         and Management                     Quotations                                Envelope
installation


 AF-IDLG-94070-GO-RFB /
Engineering Equipment for PIU                  4. Project Implementation                                                    Single Stage - One
                              TF / A3827                                   Post   Request for Bids   Open - National                              68,650.00        0.00   Canceled                2019-04-21            2019-04-26              2019-06-07            2019-07-07            2019-08-11            2020-02-07
and PMUs (Kabul, Mazar,                        and Management                                                               Envelope
Jalalabad, Herat and
Kandahar)

 AF-IDLG-94057-GO-RFB / IT
Equipment for PIU and PMUs                     4. Project Implementation                                                    Single Stage - One
                           TF / A3827                                      Post   Request for Bids   Open - National                              75,586.24        0.00   Canceled                2019-04-21 2019-10-13 2019-04-26 2019-10-14   2019-06-07            2019-07-07            2019-08-11            2020-02-07
(Kabul, Mazar, Jalalabad,                      and Management                                                               Envelope
Herat and Kandahar)


 AF-IDLG-166156-GO-RFB /                       4. Project Implementation                                                    Single Stage - One
                                 IDA / D1390                               Post   Request for Bids   Open - International                        479,628.00        0.00   Canceled                2020-04-15 2020-07-22 2020-04-20 2020-07-22   2020-06-01 2020-09-12 2020-07-01 2020-12-01 2020-08-05            2020-10-04
Procurement of IT Equipment                    and Management                                                               Envelope


 AF-IDLG-166162-GO-RFQ /
                                               4. Project Implementation          Request for                               Single Stage - One
Procurement of Engineering       IDA / D1390                               Post                      Open - National                              49,810.00   37,690.62   Signed                                        2020-04-17                                                          2020-05-30 2020-11-03 2020-06-29
                                               and Management                     Quotations                                Envelope
Equipment


 AF-IDLG-166678-GO-RFQ /
                                                                                  Request for                               Single Stage - One
Procurement of Office            IDA / D1390   2.   Institution Building   Post                      Open - National                              42,147.00   26,189.85   Completed                                     2020-04-24                                                          2020-06-06 2020-08-06 2020-07-06 2020-09-20
                                                                                  Quotations                                Envelope
Equipment


 AF-IDLG-166681-GO-RFQ /
                                                                                  Request for                               Single Stage - One
Procurement of Toilet and        IDA / D1390   2.   Institution Building   Post                      Open - National                               7,800.00    4,867.76   Signed                                        2020-05-04                                                          2020-06-16 2020-11-01 2020-07-16
                                                                                  Quotations                                Envelope
Storage Containers


 AF-IDLG-166683-GO-RFB /                                                                                                                                                  Pending
                                                                                                                            Single Stage - One
Procurement of Vehicles (4       IDA / D1390   2.   Institution Building   Post   Request for Bids   Open - International                        287,300.00        0.00   Implementati            2020-05-27            2020-06-01              2020-07-13            2020-08-12            2020-09-16            2020-11-15
                                                                                                                            Envelope
Minivans and 2 SUVs)                                                                                                                                                      on


 AF-IDLG-210512-GO-RFQ /                                                                                                                                                  Under
                                               4. Project Implementation          Request for                               Single Stage - One
Procurement of MIS               TF / A3827                                Post                      Open - National                              26,200.00        0.00   Implementati                                  2020-12-30 2021-02-24                                               2021-01-27            2021-02-16
                                               and Management                     Quotations                                Envelope
Computers                                                                                                                                                                 on


                                                                                                                                                                          Under
 AF-IDLG-210529-GO-RFB /                       4. Project Implementation                                                    Single Stage - One
                                 TF / A3827                                Post   Request for Bids   Open - International                        241,100.00        0.00   Implementati            2020-12-25 2021-03-15 2020-12-30 2021-03-15   2021-02-13 2021-05-01 2021-03-15            2021-04-19            2021-06-18
Procurement of IT Equipment                    and Management                                                               Envelope
                                                                                                                                                                          on


                                                                                                                                                                          Under
 AF-IDLG-223715-GO-RFB /                       4. Project Implementation                                                    Single Stage - One
                                 IDA / D7520                               Post   Request for Bids   Open - International                        405,940.00        0.00   Implementati            2021-04-03 2021-04-21 2021-04-08 2021-04-20   2021-05-20            2021-06-19            2021-07-13            2021-08-30
Procurement of IT Equipment                    and Management                                                               Envelope
                                                                                                                                                                          on


 AF-IDLG-166168-GO-RFQ /
                                                                                  Request for                               Single Stage - One
Procurement of Security          IDA / D1390   2.   Institution Building   Post                      Open - National                               8,076.00        0.00   Canceled                                      2020-05-03                                                          2020-06-15            2020-07-15
                                                                                  Quotations                                Envelope
Equipment


                                                                                                                                                                          Under
 AF-IDLG-223933-GO-RFB /                       4. Project Implementation          Request for                               Single Stage - One
                                 IDA / D7520                               Post                      Open - National                              49,675.00        0.00   Implementati                                  2021-03-27 2021-04-10                                               2021-04-17            2021-05-17
Procurement of Furniture                       and Management                     Quotations                                Envelope
                                                                                                                                                                          on


 AF-IDLG-223944-GO-RFB /                                                                                                                                                  Under
                                               4. Project Implementation                                                    Single Stage - One
Procurement of Engineering       IDA / D7520                               Post   Request for Bids   Open - National                              65,668.00        0.00   Implementati            2021-03-28 2021-04-26 2021-04-02              2021-05-02            2021-05-23            2021-06-16            2021-07-28
                                               and Management                                                               Envelope
Equipment                                                                                                                                                                 on


                                                                                                                                                                          Under
 AF-IDLG-223958-GO-RFB /                       4. Project Implementation                                                    Single Stage - One
                                 IDA / D7520                               Post   Request for Bids   Open - National                             135,000.00        0.00   Implementati            2021-03-30 2021-04-27 2021-04-04              2021-05-04            2021-05-25            2021-06-18            2021-08-02
Procurement of Generators                      and Management                                                               Envelope
                                                                                                                                                                          on




                                                                                                                                                                                         Page 2
 AF-IDLG-223971-GO-RFQ /                                                                                                                                                                                               Under
                                                  4. Project Implementation                    Request for                               Single Stage - One
Procurement of Containers for IDA / D7520                                     Post                                Open - National                                                     18,701.00                 0.00   Implementati                                                                             2021-04-08 2021-04-22                                                                       2021-05-03             2021-06-02
                                                  and Management                               Quotations                                Envelope
Office Guards                                                                                                                                                                                                          on


 AF-IDLG-224040-GO-RFQ /                                                                                                                                                                                               Under
                                                  4. Project Implementation                    Request for                               Single Stage - One
Procurement of Safe Vault for    IDA / D7520                                  Post                                Open - National                                                      2,571.00                 0.00   Implementati                                                                             2021-04-07                                                                                  2021-04-19             2021-05-04
                                                  and Management                               Quotations                                Envelope
9 PMUs' Offices                                                                                                                                                                                                        on


 AF-IDLG-180046-GO-RFQ /
Procurement of Personal
                                                  MCCG and Social Inclusion                    Request for                               Single Stage - One
Protective Equipment (PPE) for   IDA / D1390                                  Post                                Open - National                                                     62,855.00                 0.00   Canceled                                                                                 2020-06-29                                                                                  2020-08-11             2020-09-25
                                                  Grants                                       Quotations                                Envelope
Jalalabad, Kandahar, Herat
and Mazar e Sharif


                                                                                                                                                                                                                       Pending
 AF-IDLG-223713-GO-RFQ /                          4. Project Implementation                    Request for                               Single Stage - One
                                 IDA / D2130                                  Post                                Open - National                                                      1,784.00                 0.00   Implementati                                                                             2021-04-17                                                                                  2021-05-12             2021-06-11
Procurement of Office Tools                       and Management                               Quotations                                Envelope
                                                                                                                                                                                                                       on


 AF-IDLG-223960-GO-RFQ /                                                                                                                                                                                               Pending
                                                  4. Project Implementation                                                              Single Stage - One
Procurement of Office            IDA / D7520                                  Post             Request for Bids   Open - National                                                     56,022.00                 0.00   Implementati                                                     2021-04-11              2021-04-16                                    2021-05-16             2021-06-06             2021-06-30             2021-08-11
                                                  and Management                                                                         Envelope
Equipment                                                                                                                                                                                                              on




NON CONSULTING SERVICES
 Activity Reference No. /                                                                                                                                                                                                                                                                    Draft Bidding                                                                         Bid Evaluation Report
                                  Loan / Credit                                                                                            Procurement        Prequalification    Estimated       Actual Amount          Process      Draft Pre-qualification      Prequalification                              Specific Procurement   Bidding Documents as Proposal Submission /
        Description                                       Component              Review Type        Method        Market Approach                                                                                                                                                            Document /                                                                            and Recommendation          Signed Contract      Contract Completion
                                      No.                                                                                                    Process               (Y/N)         Amount (US$)         (US$)               Status            Documents             Evaluation Report                               Notice / Invitation           Issued         Opening / Minutes
                                                                                                                                                                                                                                                                                             Justification                                                                               for Award
                                                                                                                                                                                                                                       Planned        Actual     Planned       Actual    Planned       Actual    Planned       Actual    Planned      Actual  Planned     Actual    Planned      Actual      Planned      Actual    Planned     Actual

 CCEP-IDLG/G-3 / Internet
                                                  4. Project Implementation                                                              Single Stage - One
Service provision to PIU Unit    TF / A3827                                   Post             Request for Bids   Open - International                                               486,000.00            97,901.18   Signed                                                           2016-10-01 2018-02-25 2016-10-06                                      2016-11-17 2018-03-24 2016-12-17 2018-04-23 2017-01-21 2018-07-18 2018-01-22
                                                  and Management                                                                         Envelope
and Four Cities


AF-IDLG-
CCAP/VIRTUALSERVER/SSS /                          4. Project Implementation
                                 TF / A3827                                   Post             Direct Selection   Direct                                                               3,000.00             3,000.00   Signed                                                           2018-06-30 2018-07-28 2018-07-05 2018-09-22                                                                         2018-08-09 2018-09-29 2019-02-05
Virtual Sever for IDLG CCAP                       and Management
MIS




CONSULTING FIRMS
 Activity Reference No. /                                                                                                                                                                                                                                                                                                                                                  Combined Evaluation
                                  Loan / Credit                                                                                           Contract Type        Estimated         Actual Amount                                                      Expression of Interest    Short List and Draft   Request for Proposals   Opening of Technical      Evaluation of
        Description                                       Component              Review Type        Method        Market Approach                                                                 Process Status         Terms of Reference                                                                                                                                  Report and Draft      Signed Contract       Contract Completion
                                      No.                                                                                                                     Amount (US$)           (US$)                                                                 Notice            Request for Proposals        as Issued          Proposals / Minutes    Technical Proposal
                                                                                                                                                                                                                                                                                                                                                                           Negotiated Contract
                                                                                                                                                                                                                        Planned         Actual       Planned     Actual       Planned     Actual     Planned      Actual      Planned     Actual    Planned     Actual     Planned     Actual     Planned     Actual     Planned     Actual

 CCEP-IDLG/CS-FP-4 /
                                                                                               Fixed Budget
Facilitating Partner 4 -         TF / A3827       2.   Institution Building   Prior                               Open - International                            1,145,000.00     1,145,000.00   Signed               2016-09-01                   2016-09-22               2016-11-05 2016-10-13                           2016-12-03 2016-11-27 2017-01-02 2017-02-22 2017-02-06 2017-03-28 2017-03-13 2017-05-03 2018-03-13
                                                                                               Selection
Jalalabad (Urban)


 CCEP-IDLG/CS-FP-3 /
                                                                                               Fixed Budget
Facilitating Partner 3 - Mazar   TF / A3827       2.   Institution Building   Prior                               Open - International                            1,717,500.00     1,717,500.00   Signed               2016-09-01                   2016-09-22               2016-11-05 2016-10-13                           2016-12-03 2016-11-26 2017-01-02 2017-02-22 2017-02-06 2017-03-28 2017-03-13 2017-05-03 2018-03-13
                                                                                               Selection
(Urban)


 CCEP-IDLG/CS-FP-2 /
                                                                                               Fixed Budget
Facilitating Partner 2 -         TF / A3827       2.   Institution Building   Prior                               Open - International                            1,717,500.00     1,715,199.00   Signed               2016-09-01                   2016-09-22               2016-11-05 2016-10-11                           2016-12-03 2016-11-22 2017-01-02 2017-02-22 2017-02-06 2017-03-28 2017-03-13 2017-05-03 2018-03-13
                                                                                               Selection
Kandahar (Urban)


 CCEP-IDLG/CS-FP-1 /
                                                                                               Fixed Budget
Facilitating Partner 1 - Hirat   TF / A3827       2.   Institution Building   Prior                               Open - International                            2,290,000.00     2,290,000.00   Signed               2016-09-01                   2016-09-22               2016-11-05 2016-10-13                           2016-12-03 2016-11-23 2017-01-02 2017-02-22 2017-02-06 2017-03-28 2017-03-13 2017-05-03 2018-03-13
                                                                                               Selection
(Urban)


 AF-IDLG-165698-CS-FBS /
Hiring Facilitating Partner (FP):
                                                                                               Fixed Budget
Urban CCAP Second                 IDA / D1390     2.   Institution Building   Post                                Open - International                             481,500.00        480,013.12   Signed               2020-04-05     2020-05-17 2020-04-26 2020-05-20 2020-06-09 2020-08-05                                 2020-07-07 2020-09-15 2020-08-06 2020-11-05 2020-09-10 2020-11-21 2020-10-15 2021-01-01 2023-04-03
                                                                                               Selection
Additional Financing
Expansion: Mazar-i-Sharif


 AF-IDLG-165699-CS-FBS /
Hiring Facilitating Partner (FP):
                                                                                               Fixed Budget
Urban CCAP Second                 IDA / D1390     2.   Institution Building   Post                                Open - International                             481,500.00        479,771.52   Signed               2020-04-06     2020-05-11 2020-04-27 2020-05-20 2020-06-10 2020-08-05                                 2020-07-08 2020-09-16 2020-08-07 2020-11-07 2020-09-11 2020-11-18 2020-10-16 2021-01-01 2023-04-04
                                                                                               Selection
Additional Financing
Expansion: Lashkhaga


 AF-IDLG-165700-CS-FBS /
Hiring Facilitating Partner (FP):
                                                                                               Fixed Budget
Urban CCAP Second                 IDA / D1390     2.   Institution Building   Post                                Open - International                             481,500.00        476,172.84   Signed               2020-04-07     2020-05-11 2020-04-28 2020-05-20 2020-06-11 2020-07-28                                 2020-07-09 2020-09-09 2020-08-08 2020-11-04 2020-09-12 2020-11-16 2020-10-17 2021-01-01 2023-04-05
                                                                                               Selection
Additional Financing
Expansion: Ghazni City


 AF-IDLG-165703-CS-FBS /
Hiring Facilitating Partner (FP):
                                                                                               Fixed Budget
Urban CCAP Second                 IDA / D1390     2.   Institution Building   Post                                Open - International                             481,500.00        479,590.65   Signed               2020-04-08     2020-05-11 2020-04-29 2020-05-20 2020-06-12 2020-07-28                                 2020-07-10 2020-09-12 2020-08-09 2020-10-22 2020-09-13 2020-11-04 2020-10-18 2021-01-01 2023-04-06
                                                                                               Selection
Additional Financing
Expansion: Farah City


 AF-IDLG-165705-CS-FBS /
Hiring Facilitating Partner (FP):
                                                                                               Fixed Budget
Urban CCAP Second                 IDA / D1390     2.   Institution Building   Post                                Open - International                             481,500.00        472,998.42   Signed               2020-04-09     2020-04-07 2020-04-30 2020-05-20 2020-06-13 2020-07-20                                 2020-07-11 2020-08-31 2020-08-10 2020-10-31 2020-09-14 2021-01-20 2020-10-19 2021-03-01 2023-04-07
                                                                                               Selection
Additional Financing
Expansion: Charikhar


 AF-IDLG-165708-CS-FBS /
Hiring Facilitating Partner (FP):
                                                                                               Fixed Budget
Urban CCAP Second                 IDA / D1390     2.   Institution Building   Post                                Open - International                             395,100.00        391,970.08   Signed               2020-04-11     2020-05-11 2020-05-02 2020-05-20 2020-06-15 2020-07-20                                 2020-07-13 2020-09-01 2020-08-12 2020-11-04 2020-09-16 2020-11-17 2020-10-21 2021-01-01 2023-04-09
                                                                                               Selection
Additional Financing
Expansion: Shiberghan


 AF-IDLG-165710-CS-FBS /
Hiring Facilitating Partner (FP):                                                              Fixed Budget
                                  IDA / D1390     2.   Institution Building   Post                                Open - International                             395,100.00        394,356.64   Signed               2020-04-12     2020-05-11 2020-05-03 2020-05-20 2020-06-16 2020-07-20                                 2020-07-14 2020-09-02 2020-08-13 2020-11-02 2020-09-17 2020-11-13 2020-10-22 2021-01-01 2023-04-10
Urban CCAP Second                                                                              Selection
Additional Financing
Expansion: Faizabad

 AF-IDLG-165717-CS-FBS /
Hiring Facilitating Partner (FP):                                                              Fixed Budget
                                  IDA / D1390     2.   Institution Building   Post                                Open - International                             395,100.00        393,973.59   Signed               2020-04-13     2020-05-11 2020-05-04 2020-05-20 2020-06-17 2020-07-26                                 2020-07-15 2020-09-06 2020-08-14 2020-10-28 2020-09-18 2020-11-08 2020-10-23 2021-01-01 2023-04-11
Urban CCAP Second                                                                              Selection
Additional Financing
Expansion: Gardez




                                                                                                                                                                                                                                           Page 3
 AF-IDLG-169600-CS-FBS /
Hiring Facilitating Partner (FP):
                                                                                                Fixed Budget
Urban CCAP Second                 IDA / D1390      2.   Institution Building   Post                                Open - International                       308,350.00       307,510.08   Signed           2020-04-29   2020-05-11 2020-05-20 2020-05-20 2020-07-03 2020-07-26                            2020-07-31 2020-09-07 2020-08-30 2020-11-02 2020-10-04 2020-11-14 2020-11-08 2021-01-01 2023-04-27
                                                                                                Selection
Additional Financing
Expansion: Puli-i-Alam


 AF-IDLG-169609-CS-FBS /
Hiring Facilitating Partner (FP):                                                               Fixed Budget
                                  IDA / D1390      2.   Institution Building   Post                                Open - International                       338,775.00       333,836.41   Signed           2020-04-30   2020-05-11 2020-05-21 2020-05-20 2020-07-04 2020-07-26                            2020-08-01 2020-09-09 2020-08-31 2020-11-02 2020-10-05 2021-01-20 2020-11-09 2021-03-01 2023-04-28
Urban CCAP Second                                                                               Selection
Additional Financing
Expansion: Zarang

 AF-IDLG-193083-CS-FBS /
Hiring of Facilitating Partner
(FP): Expansion in Jalalabad                                                                    Fixed Budget
                                  IDA / D1390      2.   Institution Building   Post                                Open - International                       203,725.00             0.00   Canceled         2020-09-19                 2020-10-10              2020-11-23                                  2020-12-21              2021-01-20          2021-02-24            2021-03-31            2022-11-21
City as Part of the Peace Pilot                                                                 Selection
Sub-Program: Partial
Facilitation Only


                                                                                                Consultant
 CCEP-IDLG/CS-SE-1 / Urban                         4. Project Implementation
                                  /                                            Post             Qualification      Open - National                            100,000.00             0.00   Canceled         2019-01-01                 2019-01-22              2019-03-07                                                                              2019-04-06            2019-05-11            2019-11-07
Specific Evaluation                                and Management
                                                                                                Selection




INDIVIDUAL CONSULTANTS
 Activity Reference No. /                                                                                                                                                                                                                    Invitation to
                                   Loan / Credit                                                                                          Contract Type    Estimated       Actual Amount                                                                          Draft Negotiated
        Description                                        Component              Review Type        Method        Market Approach                                                          Process Status    Terms of Reference         Identified/Selected                             Signed Contract     Contract Completion
                                       No.                                                                                                                Amount (US$)         (US$)                                                                                  Contract
                                                                                                                                                                                                                                              Consultant
                                                                                                                                                                                                              Planned       Actual       Planned       Actual    Planned     Actual    Planned     Actual    Planned     Actual

CCEP-IDLG/CS-OC-1 /
                                  TF / A3827       2.   Institution Building   Prior            Direct Selection   Direct                                   3,870,864.00     3,870,864.00   Completed        2016-10-01   2016-12-15 2016-10-18 2016-12-15                            2016-12-30 2017-06-14 2017-08-29 2019-03-14
Oversight Consultant (OC)


 CCEP-IDLG/CS-IC-3 / Urban                                                                      Individual
                                                   4. Project Implementation
Rural Linkage Expert Int. for 6   IDA / D1390                                  Post             Consultant         Open                                        90,000.00             0.00   Under Review     2019-12-31   2019-07-15 2020-02-18                 2020-03-10            2020-04-14            2020-10-11
                                                   and Management
Months                                                                                          Selection


 CCAP-IDLG/CS-FP-5 / Hiring
of Facilitating Partners for
CCAP under Additional             IDA / D1390      2.   Institution Building   Prior            Direct Selection   Direct                                   1,717,500.00     1,717,500.00   Signed           2017-09-27   2017-12-05 2017-10-07                                       2017-12-11 2018-01-17 2018-06-09
Financing - Package No. 2
Kandahar City


 CCAP-IDLG/CS-FP-6 /
Selection of Facilitating
Partner under Additional          IDA / D1390      2.   Institution Building   Prior            Direct Selection   Direct                                   1,145,000.00     1,145,000.00   Signed           2017-09-27   2017-11-11 2017-10-07                                       2017-12-11 2018-03-10 2018-06-09
Financing for Package No. 4
Jalalabad City


 CCEP-IDLG/CS-IC-5 /
                                                                                                Individual
Intrernational Oversight                           4. Project Implementation
                                  /                                            Prior            Consultant         Open                                       360,000.00             0.00   Canceled         2017-01-01   2016-11-21 2017-02-19                 2017-03-12            2017-04-16            2018-12-31
Advisor to DMM for 24                              and Management
                                                                                                Selection
Months


 CCAP-IDLG/CS-IC-5 /
International Oversight
Advisor to DMM for 24                                                                           Individual
                                                   4. Project Implementation
Months whole period.              TF / A3827                                   Prior            Consultant         Direct                                     360,000.00             0.00   Canceled         2018-10-08                 2018-10-18 2018-08-04 2018-10-24              2018-12-31            2018-12-31
                                                   and Management
Currently the contract will be                                                                  Selection
issued i.e., up to December
2018


 IDLG-CCAP/IC-5-1 / Hiring
                                                   4. Project Implementation
of International Senior           TF / A3827                                   Post             Direct Selection   Direct                                     150,000.00        86,225.00   Completed        2018-12-18   2019-02-03 2018-12-28 2019-02-02                            2019-03-03 2019-02-25 2019-08-30 2019-12-16
                                                   and Management
Oversight Advisor


 AF-IDLG-135587-CS-INDV /
                                                                                                Individual
Hiring of International                            4. Project Implementation
                                  IDA / D1390                                  Post             Consultant         Open                                       132,435.00       101,310.00   Signed           2019-10-02   2019-10-19 2019-11-04 2019-12-30 2019-11-18 2019-12-30 2019-12-23 2020-03-15 2020-09-18
Engineering/ Technical                             and Management
                                                                                                Selection
Capacity Expert Advisor


 CCEP-IDLG/CS-IC-2 /
                                                                                                Individual
Operation Advisor (Expert                          4. Project Implementation
                                  /                                            Post             Consultant         Open                                       135,000.00             0.00   Canceled         2019-01-01   2019-07-15 2019-02-19                 2019-03-12            2019-04-16            2019-05-16
finance, procurment ) for 9                        and Management
                                                                                                Selection
Months


 CCEP-IDLG/CS-IC-4 /                                                                            Individual
                                                   4. Project Implementation
Capacity Building Advisor for     /                                            Prior            Consultant         Open                                        90,000.00             0.00   Canceled         2020-01-01                 2020-02-19              2020-03-11            2020-04-15            2020-10-12
                                                   and Management
6 Months                                                                                        Selection


AF-IDLG-135484-CS-INDV /                                                                        Individual
                                                   4. Project Implementation
Hiring of International           IDA / D1390                                  Post             Consultant         Open                                       176,000.00             0.00   Canceled         2019-10-01   2019-10-19 2019-11-03 2020-11-20 2019-11-17                 2019-12-22            2020-12-16
                                                   and Management
Operations Expert                                                                               Selection




                                                                                                                                                                                                                               Page 4