Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan [Original: April 2016]: Revision of Updated Procurement Plan, April 2017] 2. Date of General Procurement Notice: November 1 2016 3. Period covered by this procurement plan: The procurement period of project covered from year November 2016 to December 2017 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Threshold Comments US$ 1. ICB and LIB (Goods) Above US$ 4 million All 2. NCB (Goods) Above US$ 4 million All 3. ICB (Works) Above US$ 15 million All 4. NCB (Works) Above US$ 15 million All 5. (Non-Consultant Services) Above US$ 4 million 0 All 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Ningbo Sustainable Urbanization Project 01/20/2016 issued by Ningbo PMO 4. Any Other Special Procurement Arrangements: None 5. Summary of the Procurement Packages planned during the first 18 months after project effectiveness (including those that are subject to retroactive financing and advanced procurement) July 9, 2010 1 2 3 4 5 6 7 Ref. Description Estimated Packag Domestic Review Comments No. Cost es Preference by US$ (yes/no) Bank million (Prior / Post) XGP3 purchase of 30 new- 2.344 1 No Prior energy buses (Goods) XCP3 Huancheng Road 34.7 1 No Prior West construction (from Danshan Road to Binhai Avenue): main road with total length 2952m, L652m/2300m, W36m/25m, and related municipal pipeline facilities. (Works) NCP1 Taoyuan Road 5.625 1 No Post Middle reconstruction: urban primary road, lenght 1.3km, width 60m/55m, cross section optimization, four motor lanes broden to six motor lanes, drainage inlet reconstruction, lighting facilites, greening and landscape (Works) XCP5 Overall renewal of 10.56 1 No Post Tian'an Road (Xiangshan Harbour Road to Binhai Avenue section), public space improvement along Dannan Road, commercial area renovation (Jianshe Road to Xiangshan Harbour Road). (Works) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: July 9, 2010 Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) Above US$ 2,000,000 2. Single Source (Firms) All 3. Individual Above US$ 400,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: None 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description of Estimated Packages Review Comments Assignment Cost by Bank US$ (Prior / million Post) NBTA1 Project 1.2 1 Prior QCBS Management, Institutional Strengthening and Training July 9, 2010 PROCUREMENT China : Ningbo Sustainable Urbanization Project PLAN General Information Country: China Banks Approval Date of the Original Procurement Plan: 2016-09-27 Revised Plan Date(s): (comma delineated, leave blank if none) 2017-07-27 Project ID: P149485 GPN Date: 2016-11-01 Project Name: Ningbo Sustainable Urbanization Project Loan / Credit No: IBRD / 86220 Executing Agency(ies): Ningbo sustainable urbanization PMO WORKS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NCP1 / Taoyuan Road Middle reconstruction: urban primary road, lenght 1.3km, width 60m/55m, cross section Single Stage - One optimization, four motor lanes IBRD / 86220 Component 2: Urban Transport Post Request for Bids Open - National 5,625,000.00 3,614,570.73 Signed 2017-01-16 2017-01-18 2017-01-23 2017-03-06 2017-02-23 2017-04-05 2017-04-07 2017-05-10 2017-04-11 2017-11-06 Envelope broden to six motor lanes, drainage inlet reconstruction, lighting facilites, greening and landscape XCP5 / Overall renewal of Tian'an Road (Xiangshan Harbour Road to Binhai Avenue section), public Single Stage - One Pending space improvement along IBRD / 86220 Component 2: Urban Transport Post Request for Bids Open - National 10,560,000.00 0.00 2017-08-07 2017-08-12 2017-09-23 2017-10-23 2017-11-27 2018-05-26 Envelope Implementation Dannan Road, commercial area renovation (Jianshe Road to Xiangshan Harbour Road). XCP3 / Huancheng Road West construction (from Danshan Road to Binhai Avenue): main road with Single Stage - One Pending total length 2952m, IBRD / 86220 Component 2: Urban Transport Prior Request for Bids Open - National 34,700,000.00 0.00 2017-08-14 2017-09-01 2017-10-13 2017-11-12 2017-12-17 2018-06-15 Envelope Implementation L652m/2300m, W36m/25m, and related municipal pipeline facilities. GOODS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual XGP3 / purchase of 30 new- Single Stage - One IBRD / 86220 Component 2: Urban Transport Prior Request for Bids Open - National 2,344,000.00 2,142,527.84 Signed 2016-10-27 2016-11-09 2016-11-01 2016-12-13 2017-03-09 2017-01-12 2017-06-09 2017-02-16 2017-07-07 2017-06-16 energy buses Envelope NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Technical Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NBTA1 / Project Management, Component 4: Technical Quality And Cost- Under Institutional Strengthening and IBRD / 86220 Assistance and Capacity Prior Open - International 1,200,000.00 0.00 2016-10-10 2016-10-19 2016-10-31 2016-11-03 2016-12-14 2017-04-26 2017-01-11 2017-06-12 2017-02-10 2017-07-24 2017-03-17 2017-04-21 2020-12-31 Based Selection Implementation Training Building INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Contract Type Estimated Actual Amount Draft Negotiated Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1