INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT INTERNATIONAL DEVELOPMENT ASSOCIATION CONFIDENTIAL SecM66-12 FROM: The Secretary January 10, 1966 MONTHLY OPERATIONAL SUMMARY ' OF BANK AND IDA PROPOSED PROJECTS · December 1965 Amount 2/ & Probab!e Member State 1/ Lender Project~/ Present Status I. AFRICA BURUNDI 1.1 (R) Bujwnbura Water Negotiations to (IDA) supply begin Jan. 17. CAMEROON To be de- (R) Plantation (CAMDEV) Appraisal report termined project in West being prepared. (IDA) Cameroon To be de- (R) Agricultural and Pre-appraisal mission termined road project report being pre- (IDA) ( Cocoa rehabili- pared. tation program) To be de- N 1 Gaoundere- Final feasibility termined Garoua road report expected (IDA) project shortly. 1/ The Government is the proposed borrower, unless otherwise indicated. y The amount is in millions of U.S. dollars and is approximate and tentative . JI The letter (N) before the project means that the project is a new listing in the Summary: the letter (R} means that information about the project has been revised since the last issue of the Summary. Distribution: Executive Directors and Alternates President President's Council Executive Vice President, IFC Department Heads, Bank and IFC Deputy Department Heads Division Chiefs - 2 - Amount 2/ & Probable Member State 1/ Lender Project '}_/ Present Status CONGO (Brazzaville) Cie des To be de- Potash mining and Awaiting sponsors' Potasses du termined Pointe Noire port further proposals on Congo (Bank) extension financial plan and marketing arrange- ments, and completion of studies on port facilities. Agence Trans- To be de- Railroad improve- Awaiting additional equatoriale termined ment information. des Connnunica- (Bank) tion (ATEC) To be de- Roads Technical assistance termined by UN Development (Uncertain) Programme/Special Fund under considera- tion for forestry survey and additional feasibility studies. EAST AFRICA 4/ East African 13.0 (R) Telecommunications Appraisal report Connnon CT3ank) ~ansion be"ing constderen. Services Authority ETHIOPIA 7.o (R) Secondary and tech- Negotiations to (IDA) nical education begin on Jan. 17. Imperial Board 4.8 (R) Teleconnnunications Loan signed on of Teleconnnuni- (Bank) Dec. 28. cations in Ethiopia (IBTE) Imperial High- To be de- Road construction Application being way Authority termined reviewed; awaiting (Uncertain) final engineering estimates (expected in mid-1966) • Seep. 1 for footnotes 1/ 2/ and 3/. !v Kenya,Tanzania and Uganda. - - 3- Amount 2/ & Probable Member State 1/ Lender I2:~jec1 }./ Present Status GABON To be de- (R) Raj.lway for iron Bank to be Executing - - termined ore project Agency for final (Bank) engineering study subject to approval by UN DeveJ.opmen+, Programme Governing Council in Jan. To be de- (N) Education project Under preliminary termined consj_deration. (Bank) GUINEA To be de- Railway and port Awaiting completicn termined for Boke bauxite of engineering, (Bank) mining operations revised cost estimates and bauxite marketing arrangements. 1.3 (N) Engineer:.ng of Negotiations in (Bank) Boke infra,.. progress. structure KENYA 7.0 Secondary Appraisal report (IDA) education being prepared. To be de- (it-) Agricultural Project-infurma:ti-on termined credit being exwn..i.ned. (IDA) To be de- Livestock Awaiting project termined development in:formationo (IDA) LIBERIA To be de- (R) Roads - II Appraisal report termined being prepared. (IDA) MALAGASY 10.0 (R) Irrigation Preliminary review REFUBI.,IC (Uncertain) mission planned for Feb. 9.6 Road improvement ) (Uncertain) Majunga-Tananarive )Appraisal reports )being considered. J.5 Education ) (IDA) ) Seep. 1 for footnotes 11 ~ and lf· - 4- Amount 2/ & Probable Member State 1/ Lender Project lf Present Status MALAWI To be de- (R) Roads Report for possible termined engineering credit (IDA) being prepared. To be de- (R) Secondary Appraisal mission termined education scheduled for Feb. (IDA) MALI 9.3 (R) Railroad Appraisal report (IDA) rehabilitation being prepared. MOROCCO Office To be de- Phosphate mining Preliminary informa- Cherifien termined tion under review. des Phosphate (Bank) B.N.D.E . To be de- Industrial Appraisal report termined finance - II being prepared. (Bank) NIGERIA 4.5 (R) Cocoa Development ) Negotiations (Bank) (Western Nigeria) )completedi awaiting ) appointment of 2.3 (R) Cocoa Development )project coordinators (Bank) (Eastern Nigeria) ) and other actions. Nigerian Indus- To be de- (R) Industrial finance Negotiations trial Develop- termined scheduled for late ment Bank (Bank) in Jan. To be de- Palm oil Revised loan request termined production and from Eastern Nigeria (Bank) processing under consideration. To be de- Water Supply Preliminary review termined {Eastern Nigeria) mission preparing (Bank) its report. Electricity 4.8 (R) Transmission and Appraisal report Corp. of (Bank) distribution being prepared. Nigeria facilities Nigerian Ports To be de- (R) Port extension Pre-appraisal report Authority termined and improvement being prepared. (Bank) Seep. 1 for footnotes 1/ 2/ and 3/. - 5- Amount 2/ & Probable Member State 1/ Lender Project'}_/ Present Status SENEGAL 7.0 (R) Railway Appraisal report (IDA) rehabilitation being prepared. To be de- (R) Dakar Port improve- Appraisal mission termined ment and extension scheduled for Feb. (Uncertain) SIERRA LEONE To be de- Roads Awaiting completion termined of feasibility (Uncertain) studies. To be de- (R) Education Appraisal report termined being prepared. ( Uncertain) To be de- Agriculture Awaiting outcome of termined (Palm oil) talks between Govt. (Uncertain) and specialized agencies for carry- ing out project. SUDAN 31.0 (R) Railways - II .. Loan signed on (Bank) Dec. 27. To be de- (R) Agriculture: tree Appraisal report termined clearance being prepared. (Uncerta"in) To be de- (R) Education Report of Bank/ termined Unesco project (IDA) identification mission being con- sidered. 25.0- (R) Electric Power Appraisal report 30.0 being prepared. (Bank) To be de- (R) Irrigation of Awaiting findings of termined Rahad area with UNSF Team. (Uncertain) Roseires water Seep. 1 for footnotes 1/ 2/ and 3/. - 6 - Amount 2/ & Probable Member State 1/ Lender Project J/ _, _ Status Present TANZANIA 5.0 (R) Agricultural Credit approved by (IDA) credit Executive Directors on Nov. 23. Signing expected in Jan. To be de- Secondary ) termined education - II ) (IDA) )Under preliminary )consideration. To be de- Feeder roads ) termined ) (IDA) ) TUNISIA To be de- Agriculture Appraisal report termined being prepared. (Uncertain) To be de- (R) Secondary Appraisal mission termined education - II scheduled for F'eb. (Uncertain) Societe Nat- 5.0 (R) Industrial Negotiations fer ionale d 1 (Bank) finance Bank loan and IFC Investissement investment sub- stantially complete . UGANDA To be de- Roads Awaiting further termi."1ed information to (IDA) complete appraisal report. 3.4 Smallholder tea Negotiations sub- (IDA) development stantially complete; awaiting Govt.'s approva1 of draft documents and establishment of project agency. 10.0 (R) Secondary Appraisal r epor t (IDA) education being prepared. ZAMBIA 15.0 (R) Roads Appraisal report (Bank) being prepared. Seep. 1 for footnotes 1/ 2/ a."1.d 3/. - - - - 7 - Amount 2/ &Probable Member State 1/ Lender Project 1/ Present Status II. EUROPE AND MIDDLE EAST FINLAND 24.5 (R) Roads - II Appraisal report (Bank) under consideration. GREECE 20.0 Roads Goverrunent preparing (Bank) project submission. ICELAND 16.0 (R) Burfell hydro- Further discussions (Bank) electric project with Govt. and Alusuisse on drafts of master agreement, power contract and other documents in progress in Zurich. IRAQ 23.0 Highway Economic report and (Bank) construction revised appraisal report being prepared. ISRAEL Dead Sea 12.0 (R) Expansion of Further consideration Works Ltd. (Bank) potash production awaiting progress on dike construction. JORDAN Arab Potash 30.0 (R) Potash production Detailed arrangements Co. (APC) (Bank) for proposed partici- pation by Internation- al Minerals and Chemicals Corp. (IMC) being worked out with Govt. and APC. PORTUGAL Enpresa Termo- 10.0 Electric power ) electrica (Bank) ( Carregado - II) )Awaiting Govt. 1 s Portuguesa )reply on power rates )before beginning Hidro Electrica 20.0 Electric power )negotiations. do Douro (Bank) (Carrapatelo) ) Seep. 1 for footnotes_!/ 3_/ and}./. - 8 - Amount 2/ & Probable Member State 1/ Lender Project 3/ Present Status SOUTH AFRICA Electricity To be de- Electric power Govt. informed of Supply termined Bank's willingness Commission (Bank) to lend for power project in conjunc- tion with borrowing in market. SPAIN 40.0 (R) East Coas~ Tell Awaiting Govt. (Bank) Road (Autopista) decision on arrange- ments for financing project. TURKEY Industrial De- To be Industrial Appraisal report velopment Bank termir finance being prepared. (IDAJ UNITED KINGDOM Basutoland 4, - (R) Roads Legislation enacted (IDA) authorizing Govt. to borrow. Credit documents expected t;o oe present"ed to Executive Directors in Jan./Feb. fTI. FAR EAST JAPAN The Metropolis 50.0 (R) Tone River project Preliminary of Tokyo (Bank) of Tozyo Water discussions in System progress. M.t\.LAYSIA To be de- Kemubu Irrigation Appraisal mission termined tentatively planned. (Bank) for Feb. National To be de- Power Appraisal miss ion Electricity termined tent atively pl ar.ned Board (Bank) for Feb./Harch. Seep. 1 for footnotes 1/ 2/ and 3/. - 9 - Amount 2/ & Probable Member State 1/ Lender Project '}/ Present Status NEW ZEALAND 42.0 (R) Railways ) ~Bank) )Loans signed on )Dec. 17. 20.5 (R) Power ) (Bank) ) PHILIPPINES 7.5 (R) Irrigation Program Pre-appraisal mission (Bank) tentatively planned for March. National Power 12.0 Power - Bataan Appraisal report Corporation (Bank) Thermal and Maria being considered. (NPC) Cristina No. 4 SINGAPORE 5/ Port of 15.o Port development In abeyance pending Singapore (Bank) Singapore's member- Authority ship in Bank. THAILAND To be de- (R) Nan River Mission to review termined irrigation hydrological data (Bank) planned for Feb. 6.0 Technical and Negotiations complete; (Bank) vocational expected to be education presented to Executive Directors in 2nd quarter 1966. Up to 28.0 (N) Telecommunications Appraisal mission (Bank) planned for March. To be de- (R) Highways Appraisal report termined being prepared. (Bank) r.v. SOUTH ASIA INDIA 2).0 Indus Basin To be presented to (Bank) equipment Executive Directors after AID and India are ready to sign their loan agreement. 25.0 Bangalore water Appraisal report (IDA) supply being prepared. Seep. 1 for footnotes 1/ 2/ and 3/. 5/ Not yet a member. - - - - 10'- Amount 2/ & Probable Merr.ber State 1/ lender Proj~ '},/ Present Status INDLI\. 18.5 (R) Koyna power - In abeyance at (Cont'd) (Bank) stage III request of Govt. To be de- (R) Punjab flood Awaiting additional terrnined contrcl and drain- data required tr) (Bank) age - stage II complete appraisal report. 68.o (R) Ra.:i.lways Appraisal report (Uncertain) being prepared. To be de- (R) Ha::i..dia Port App::-aisal report terrnined expansion being prepared. (Bank) Tata Iron and To be de- Coal mining and Awaiting Govt. Steel Co. termined improved utiliza- decisions arising out (Bank) tion of steel of Companies (Amer.d.) capacity Act, 1963. India Iron and To be de- (R) Improved utiliza- Appraisal report Steel Co. termined tion of steel being prepared. (Bank) capacity Hindustan To be de- (R) Kothagudem In abeyance. Alliad_G~ ermined ..feI'..ti Ji zer ical Ltd. (Bank) IRAN To be de- (R) Ghazvin irriga- Pre.-appraisal report terrnined tion project being prepared. (Bank) IMDBI To be de- Industrial Appraisal mission terrnined finance - III scheduled for mi d- (Bank) Jan. PAKISTAN 19,2 (R) Foodgrain storage Negotiations complet- (IDA) ed. Credit docu."Tl.ents expected to be pre- sented to Executive Directors early in Feb. 1.0 Engineering credit Awaiting consultants' (IDA) for West Pakistan proposals, particu- roads project . larly as to costs. Seep. 1 for footnotes 1/ 2/ and 3/. - 11 - Amount 2/ & Probable Member State 1/ Lender Project]./ "?resent Status PAKISTAN 1.5.0- East and West Awaiting progress on (Cont'd) 20.0 Pakistan educa-· steps to be taken by (IDA) tion - II Govt. 2.5.0 (R) Modernization and Credit documents to (IDA) expansion of com- be presented to mercial vehicle Executive Directors fleet on Jan. 11. To be de- (R) Lahore water Information from termined supply and Govt. under study. (IDA) sewerage V. WESTERN HEMISPHERE ARGENTINA 10.0 (R) Livestock (pasture Appraisal mission (Bank) improvement) scheduled for Jan. ACINDAR 40.0- (R) Steel Awaiting action by Industria 4S.o Company to increase Argentina de (Bank) its share capital. Aceros S.A. Servicios Elec- 60.0- Second power Definition of tricos del Gran 80.0 expansion program Buenos Aires (Bank) .and conditionsJ'or. (SEGBA) local procurement being discussed. BOLIVIA To be de- (R) Livestock Report of FAO project termined preparation mission (IDA) under consideration. BRAZIL Centrais Ele- 49.0 (R) Jaguara hydro- Negotiations to tricas de Minas (Bank) electric power begin on Jan. 17. Gerais, S.A. Central Ele- 40.0 Estreito hydro- ) trica de Furnas (Bank) electric power - II) )Appraisal reports To be To be de- (R) Expansion of power )being prepared. determined termined distribution ) (Bank) facilities formerly) owned by AMFORP ) Seep. 1 for footnotes 1/ 2/ and 3/. - 12 - Amount 2/ & Probable Member State 1/ Lender Project]/ Present Status GHILE - Empresa Nae- To be de- Power expansion Detailed irlformation ional de termined program received and under Electricidad (Bank) review. and Col'poracion de Fomento de la Produccion Undetermined .s.o (N) Private Develop- Appraisal report (Bank) ment Bank being prepared. COLOMBIA Banco da la 25.0 (R) Private Invest. Negotiations to Republic a (Bank) Fund (for begin on Jan. 17. Financieras) Empresa Nae- 23.0 (R) Teleconununications Appraisal report ional de Tele- (Bank) program being prepared. comunicaciones Tv be To be de- Power inter- Consultants' studies determined termined connection between on organization and (Bank) Bogota, Medellin, operations being Cali and Manizales discussed by power companies. Caja de Credito 17.0 (R) Livestock Appraisal report Agrario, Indus- (Bank) being prepared. trial y Minero Corporacion To be de- (R) Additional thermal Appraisal miss~on Autonoma termined unit at ··Yumbo scheduled for Jan. Regional del (Bank) Station Cauca Incora To be de- (N) Atlantico Sur Consultant 1 8 report termined irrigation project received and under (Bank) study. COSTA RICA To be To be de- Port expansion Awaiting completion determined termined of preliminary (Banlc) engineering by Govt. consultants. Seep. 1 for footnotes~/~/ and J/. - 13 - Amount 2/ & Probable Member State 1/ Lender Project'}/ Present Status COSTA RICA (Cont'd) Banco Central 11.0- (R) Agricultural Appraisal report de Costa Rica 13.0 credit being considered; (Bank) detailed discussion of Govt. ' s financial plans scheduled for Jan. ECUADOR Comite de To be de- Rio Daule/Rio Awaiting further Vialidad termined Babahoyo bridge information. (Uncertain) Corporacion 3.0 Private Awaiting organization Financiera (Bank) development bank of corporation along Ecuatoriana satisfactory lines and appointment of general manager. EL SALVADOR To be de- Rio Grande de San Awaiting completion termined Miguel irrigation of feasibility study. (Bank) project 2.8 (R) Highway construe. Negotiations sub- (Bank) tion (supplement- stantially completed. ary) Awaiting Govt. approval of draft loan documents. To be de- Education Project submission termined being prepared by (Bank) Govt. GUATEMALA To be de- Port construction Additional informa- termined tion received from (Bank) Govt. being consider& ed. Institute 12.5 Expansion of Awaiting further Nacional de (Bank) power facilities information to com- Electricidad plete appraisal report. Seep. 1 for footnotes 1/ 2/ and 3/. - 14 - Amount 2/ & Probable Member State 1/ Lender Projec! J/ Present Status GUATEMALA To be de- Highway Technical assis+,ance (Cont'd) termined construction for feasibility (Bank) studies under consideration. HONDURAS Port Authority 4.5 (R) Rehabilitation and Appraisal report (Ba,nk) reorganization of being considered. Puerto Cortes JAMAICA Jamaica Public 22.0 (R) Expansion of 1ppraisal report Service Company (Bank) power facilities being considered. To be de- Education Awaiting preparation termined of project. (Bank) MEXICO Comision Fed- 110.0 (R) Electric power Loan signed on eral de (Bank) Dec. 15. Electricidad and-Naci-ona-1 Financiera ( 19.0 Irrigation Appraisal report ( (Bank) being considered. ( Nacional (To be de- Federal Awaiting completion Financiera ( termined highways of project studies. ( (Bank) ( (To be de- Federal District Preliminary informa- (termined Water and Sewerage tion received and ( (Bank) under review. NICARAGUA Autoridad To be de- Port expansion Feasibility study Portuaria termined under way. de Corinto (Bank) Seep. 1 for footnotes ];I~/ and J/. - 15 - Amount 2/ & Probable Member State 1/ Lender Project J/ Present Status NICARAGUA (Cont'd) F;rnpresa Nae- Rio Tuma power - Consideration post- ional de Luz stage II paned pending y Fuerza completion of com- prehensive study of river basin. Empresa Nae- 1.0 Interim power Appraisal mission ional de Luz (Banlc) scheduled for Jan. y Fuerza PANAMA 6.0 (R) Supplementary Awaiting further (Bank) road information from Govt. on roads organization. Institute de 28.0 Bayano Awaiting further Recurses (Bank) hydroelectric information to Hidraulicos y complete appraisal. Electricidad PARAGUAY 2. 75 (R) Port improvement Loan signed on (Banlc) and development Dec. 16. 7.5 Livestock - II Appraisal report (Uncertain) being considered. To be de- Coronel Oviedo- Appraisal report termined Villarica road being prepared. (Uncertain) PERU 5.0- Livestock FAQ project identifi- 6.o cation report being (Banlc) prepared. 9.0 Port of Pisco Appraisal report (Bank) being prepared. Lima Light 9.2 Power distribution Under preliminary (Bank) consideration. Seep. 1 for footnotes 1/ 2/ and 3/. - 16 - Amount 2/ &Probable Member State 1/ Lender Project }I Present Status TRINIDAD AND TOBAGO To be J.O Port facilities Awaiting additional determined (Bank) at Port-of-Spain information on organizational and financial matters. 8.S- Southern Project submission 10.0 highway being prepared by (Bank) Govt. To be To be de- (R) Crown lands FAO project identifi- determined termined development cation missicn (Bank) report being considered. URUGUAY Administracion To be de- (R) Power Awaiting additional General de Las termined information on Usinas Electri- (Bank) expansion program cas y los Tele- and rates. fonos del Estado (UTE) VENEZUELA C.A. Nacional 37.0 (R) Expansion of Loan signed on de Telefonos (Bank) t.e1acommunications Dec. 13. de Venezuela system ( CA.1\JTV) Institute 21.J Caracas water Negotiations sub- Nacional de (Bank) supply stantially complete; Obras Sanit- awaiting approval arias (INOS) of draft loan documents by borrower and guarantor, 5.0 Extension of port ) (Bank) of Puerto Cabello )Appraisal missions )scheduled for late 45.0 Highways - III )Jan. and Feb. (Bank) ) Seep. 1 for footnotes]:/ 3_/ and 3/. - 17 - Amount 2/ & Probable Member State 1/ Lender Project'}./ Present Status VENEZUELA To be de- Zulia flood control) (Cont'd) termined and drainage ) (Bank) )Awaiting completion )of feasibility Corporacion To be de- Guayana )studies. Venezolana de termined agriculture ) Guayana (CVG) (Bank) ) Seep. 1 for footnotes !f ~/ and J/.