The World Bank Implementation Status & Results Report Cambodia Southeast Asia Disaster Risk Management Project (P160929) Cambodia Southeast Asia Disaster Risk Management Project (P160929) EAST ASIA AND PACIFIC | Cambodia | Urban, Resilience and Land Global Practice | IBRD/IDA | Investment Project Financing | FY 2017 | Seq No: 7 | ARCHIVED on 25-Sep-2020 | ISR43327 | Implementing Agencies: The Kingdom of Cambodia, Ministry of Economy and Finance, Ministry of Rural Development Key Dates Key Project Dates Bank Approval Date: 14-Apr-2017 Effectiveness Date: 05-Jun-2017 Planned Mid Term Review Date: 18-Nov-2019 Actual Mid-Term Review Date: 02-Dec-2019 Original Closing Date: 31-Mar-2022 Revised Closing Date: 31-Mar-2023 pdoTable Project Development Objectives Project Development Objective (from Project Appraisal Document) The Project Development Objective is to improve climate resilient rural road connectivity in select provinces. Has the Project Development Objective been changed since Board Approval of the Project Objective? No Components Table Name Resilient Rural Corridors:(Cost $58.00 M) Financial Planning for Disaster Resilience:(Cost $1.00 M) Project Management:(Cost $3.50 M) Contingent Emergency Response Component Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Moderately Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory Overall Risk Rating Substantial Substantial Implementation Status and Key Decisions The project is progressing. Under Component 1, first works under the first civil works package commenced in May 2020.The contracts for civil works packages 2 were signed in August/September 2020 except for one lot and work has commenced for the signed contracts. Bid evaluation for Package 3 is expected to be completed by September and signed in October 2020 respectively. Procurement of a firm to carry out activities supporting institutional strengthening on disaster resilience is ongoing and expected to be completed by September 2020. Institutional strengthening activities will include road data collection across six Project Provinces; network risk assessment for rural roads; capital investment and institutional improvement measures for road network disaster resilience; and capacity building and knowledge transfer. Under Component 2, most consulting contracts have been completed including legal feasibility and product design and selection studies for the RGC to participate in SEADRIF risk pool. 9/25/2020 Page 1 of 7 The World Bank Implementation Status & Results Report Cambodia Southeast Asia Disaster Risk Management Project (P160929) Following delays related to COVID-19, restructuring of the project was approved on August 28, 2020. The (IDA) project closing date has been extended from March 31, 2022 to March 31, 2023. The Recipient Executed Trust Fund (RETF) closing date has been extended by 2 months from August 30, 2020 to October 31, 2020.. The results framework has also been updated to take into account improved baseline data, disbursement projections have been updated, and Systematic Operations Risk-rating tool (SORT) has been updated. Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance Substantial Substantial Substantial Macroeconomic Moderate Moderate Moderate Sector Strategies and Policies Moderate Moderate Moderate Technical Design of Project or Program Moderate Moderate Moderate Institutional Capacity for Implementation and Substantial Substantial Substantial Sustainability Fiduciary High Substantial Substantial Environment and Social Moderate Moderate Moderate Stakeholders Moderate Moderate Moderate Other -- Substantial Substantial Overall Substantial Substantial Substantial Results PDO Indicators by Objectives / Outcomes To improve climate resilient rural road connectivity in select provinces IN00888747 ►Number of beneficiaries benefitting from all-season rural roads (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 325,000.00 Date 31-Mar-2017 10-Mar-2020 02-Sep-2020 31-Mar-2023 IN00888749 of which are women (Percentage, Custom Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 50.00 9/25/2020 Page 2 of 7 The World Bank Implementation Status & Results Report Cambodia Southeast Asia Disaster Risk Management Project (P160929) To enhance the Government’s capacity for financial planning for disaster resilience IN00888746 ►Public financial investment planning takes into account disaster and climate risks (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 31-Mar-2017 10-Mar-2020 02-Sep-2020 31-Mar-2023 IN00888748 ►Cambodia has information and capacity to access sovereign disaster risk insurance (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 31-Mar-2017 10-Mar-2020 02-Sep-2020 31-Mar-2023 Intermediate Results Indicators by Components Resilient Rural Corridors IN00888750 ►Length of rural roads upgraded (Kilometers, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 250.41 Date 31-Mar-2017 10-Mar-2020 02-Sep-2020 31-Mar-2023 This will include all roads which are (re-)surfaced, as well as those that are raised or have enhanced Comments: drainage features integrated IN00888752 ►Number of schools and health facilities connected by resilient rural roads (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 109.00 Date 31-Mar-2017 10-Mar-2020 02-Sep-2020 31-Mar-2023 Comments: The number of schools and health facilities along strengthened rural roads. IN00888754 ►Rural road investment plan developed in project provinces, incorporating vulnerability information (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 6.00 9/25/2020 Page 3 of 7 The World Bank Implementation Status & Results Report Cambodia Southeast Asia Disaster Risk Management Project (P160929) Date 31-Mar-2017 10-Mar-2020 02-Sep-2020 31-Mar-2023 This indicator will demonstrate that the road asset inventory has been further developed to better inform Comments: resilient road investment prioritisation. IN00888756 ►Proportion of beneficiaries satisfied with road condition, safety, and accessibility of rehabilitated and maintained roads (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 60.00 Date 31-Mar-2017 10-Mar-2020 02-Sep-2020 31-Mar-2023 Citizen engagement indicator to be measured through surveys amongst representative sample of Comments: communities along the target road corridors at the start and end of the project. IN00888758 of which women (Percentage, Custom Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 50.00 IN00888759 ►Improvement of road condition (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 15.00 0.00 15.00 4.00 Date 31-Mar-2017 19-Jun-2020 02-Sep-2020 31-Mar-2023 IN00888760 ►Increase of traffic volume (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 5.00 Date 31-Mar-2017 19-Jun-2020 02-Sep-2020 31-Mar-2023 IN00888761 ►Number of rehabilitated and additional infrastructure structures to improve disaster resilience (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 521.00 0.00 521.00 955.00 Date 31-Mar-2017 19-Jun-2020 02-Sep-2020 31-Mar-2023 IN00888762 ►Number of government staff who participated in capacity-development training related to project activities (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 25.00 25.00 25.00 100.00 9/25/2020 Page 4 of 7 The World Bank Implementation Status & Results Report Cambodia Southeast Asia Disaster Risk Management Project (P160929) Date 31-Mar-2017 19-Jun-2020 02-Sep-2020 31-Mar-2023 IN00888763 Of which women (Percentage, Custom Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 20.00 20.00 20.00 30.00 IN00888764 ►Grievances registered related to delivery of project benefits addressed (%) (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 100.00 90.00 Date 31-Mar-2017 10-Mar-2020 02-Sep-2020 31-Mar-2023 Financial Planning for Disaster Resilience IN00888751 ►National disaster risk finance strategy developed (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 31-Mar-2017 10-Mar-2020 02-Sep-2020 31-Mar-2023 IN00888753 ►Options for mainstreaming disaster and climate resilience into public investment planning developed (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 31-Mar-2017 10-Mar-2020 02-Sep-2020 31-Mar-2023 Guideline, which outlines a set of actions, tools and methodologies for MEF to ensure that disaster and Comments: climate resilience is recognized in development plans, investment programs, and public investment projects. IN00888755 ►Number of government staff and other stakeholders who participated in consultations and training on disaster risk financing and insurance topics (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 150.00 150.00 Date 31-Mar-2017 19-Jun-2020 02-Sep-2020 31-Mar-2023 IN00888757 ►Number of technical studies related to disaster risk financing and insurance prepared (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 1.00 2.00 3.00 9/25/2020 Page 5 of 7 The World Bank Implementation Status & Results Report Cambodia Southeast Asia Disaster Risk Management Project (P160929) Date 31-Mar-2017 19-Jun-2020 02-Sep-2020 31-Mar-2023 Performance-Based Conditions Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P160929 IDA-60140 Effective USD 60.00 60.00 0.00 5.07 57.52 8.1% P160929 TF-A4488 Effective USD 1.00 1.00 0.00 0.73 0.27 73% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P160929 IDA-60140 Effective 14-Apr-2017 05-Jun-2017 06-Jul-2017 31-Mar-2022 31-Mar-2023 P160929 TF-A4488 Effective 05-Jun-2017 05-Jun-2017 05-Jun-2017 30-Aug-2020 31-Oct-2020 Cumulative Disbursements 9/25/2020 Page 6 of 7 The World Bank Implementation Status & Results Report Cambodia Southeast Asia Disaster Risk Management Project (P160929) PBC Disbursement Achievement Disbursed amount in Disbursement % PBC ID PBC Type Description Coc PBC Amount Status Coc for PBC Restructuring History Level 2 Approved on 01-Sep-2020 Related Project(s) There are no related projects. 9/25/2020 Page 7 of 7