The World Bank Implementation Status & Results Report Strengthening DRM and Climate Resilience Project (P165870) Strengthening DRM and Climate Resilience Project (P165870) LATIN AMERICA AND CARIBBEAN | Haiti | Urban, Resilience and Land Global Practice | IBRD/IDA | Investment Project Financing | FY 2019 | Seq No: 3 | ARCHIVED on 10-Sep-2020 | ISR43163 | Implementing Agencies: Ministry of Interior and Local authorities, Ministry of Economy and Finance Key Dates Key Project Dates Bank Approval Date: 16-May-2019 Effectiveness Date: 07-Aug-2019 Planned Mid Term Review Date: 15-Jun-2022 Actual Mid-Term Review Date: Original Closing Date: 30-Apr-2025 Revised Closing Date: 30-Apr-2025 pdoTable Project Development Objectives Project Development Objective (from Project Appraisal Document) The Project Development Objective is to improve: (i) early warning and emergency evacuation capacity in selected municipalities in high climate risk-prone areas, and (ii) the provision of and accessibility to safe havens. Has the Project Development Objective been changed since Board Approval of the Project Objective? No Components Table Name Strengthening Disaster Preparedness and Emergency Response Capacity; and Promoting Building Regulation and Resilient Construction Practices:(Cost $8.00 M) Construction and Rehabilitation of “Safe Havens”:(Cost $23.00 M) Contingent Emergency Response Project Management and Implementation Support:(Cost $4.00 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Satisfactory Moderately Satisfactory Overall Risk Rating Substantial Moderate Implementation Status and Key Decisions Project implementation has been delayed due to the political instability in the context of the “Peyi Lok” followed by the COVID-19 pandemic. Despite the difficult context, some progress has been achieved such as the launch of procurement processes for main activities. The procurement of the shelter design firm and the Delegated Implementing Agencies (MDODs) in charge of the construction are expected to be finalized soon. 9/10/2020 Page 1 of 6 The World Bank Implementation Status & Results Report Strengthening DRM and Climate Resilience Project (P165870) Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance High High High Macroeconomic Substantial Substantial Substantial Sector Strategies and Policies Substantial Substantial Moderate Technical Design of Project or Program Moderate Moderate Moderate Institutional Capacity for Implementation and Substantial Substantial Substantial Sustainability Fiduciary High High Substantial Environment and Social Substantial Moderate Moderate Stakeholders Substantial Substantial Moderate Other -- -- Moderate Overall Substantial Substantial Moderate Results PDO Indicators by Objectives / Outcomes Population is warned with reliable information and provided with effective evacuation support IN00883017 ►Number of CCPCs with excellent competencies in emergency planning and management, in high climate risk-prone areas - Level 1 certification (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 1.00 1.00 1.00 10.00 Date 03-Jun-2019 18-Feb-2020 21-Aug-2020 03-Jun-2024 IN00883020 ►Improved National Early Warning and Communication System for Hydromet events based on approved and adopted standard protocols (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No Yes Yes Yes Date 03-Jun-2019 18-Feb-2020 21-Aug-2020 03-Jun-2024 Population takes refuge in a safe haven that is accessible and provides emergency needs IN00883018 9/10/2020 Page 2 of 6 The World Bank Implementation Status & Results Report Strengthening DRM and Climate Resilience Project (P165870) ►Increase in number of people living in flood-risk areas who are covered by a safe haven (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 20.00 Date 03-Jun-2019 18-Feb-2020 21-Aug-2020 03-Jun-2024 IN00883019 Increase in number of females living in flood-risk areas who are covered by a safe haven (Percentage, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 20.00 Date 03-Jun-2019 18-Feb-2020 21-Aug-2020 03-Jun-2024 Intermediate Results Indicators by Components Strengthening Disaster Preparedness and Emergency Response Capacity & Promoting Building Regulation IN00883041 ►Number of CCPCs with improved competencies in emergency planning and management - Level 2 certification (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 118.00 118.00 118.00 140.00 Date 03-Jun-2019 18-Feb-2020 21-Aug-2020 03-Jun-2025 IN00883043 ►Share of municipalities in risk-prone areas with an improved emergency preparedness and response capability (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 90.00 Date 03-Jun-2019 18-Feb-2020 21-Aug-2020 03-Jun-2025 IN00883045 ►Percentage improvement in the level of understanding of early warning messages (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 60.00 Date 03-Jun-2019 18-Feb-2020 21-Aug-2020 03-Jun-2025 IN00883047 ►Number of persons trained to apply resilient construction techniques (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 17,000.00 9/10/2020 Page 3 of 6 The World Bank Implementation Status & Results Report Strengthening DRM and Climate Resilience Project (P165870) Date 03-Jun-2019 18-Feb-2020 21-Aug-2020 03-Jun-2025 Construction and rehabilitation of safe havens IN00883042 ►Number of safe havens constructed/rehabilitated by the project (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 30.00 Date 03-Jun-2019 18-Feb-2020 21-Aug-2020 30-Apr-2025 IN00883044 Number of safe havens constructed/ rehabilitated by the project benefitting from gender friendly infrastructure design (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 27.00 Date 03-Jun-2019 18-Feb-2020 21-Aug-2020 30-Apr-2025 IN00883046 ►Share of women participation in the shelter management committees for each “safe-haven” constructed/ rehabilitated by the project (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 50.00 Date 03-Jun-2019 18-Feb-2020 21-Aug-2020 03-Jun-2025 IN00883048 ►Share of women leadership in the shelter management committees for each “safe-haven” constructed/ rehabilitated by the project (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 50.00 Date 03-Jun-2019 18-Feb-2020 21-Aug-2020 25-Apr-2025 IN00883049 ►Percentage of grievances appropriately addressed as part of the Project (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 90.00 Date 03-Jun-2019 18-Feb-2020 21-Aug-2020 30-Apr-2025 IN00883050 ►Percentage of beneficiaries reporting satisfaction with project interventions (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 90.00 9/10/2020 Page 4 of 6 The World Bank Implementation Status & Results Report Strengthening DRM and Climate Resilience Project (P165870) Date 03-Jun-2019 18-Feb-2020 21-Aug-2020 30-Apr-2025 Performance-Based Conditions Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P165870 IDA-D4720 Effective USD 35.00 35.00 0.00 1.00 33.84 2.9% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P165870 IDA-D4720 Effective 16-May-2019 05-Jun-2019 07-Aug-2019 30-Apr-2025 30-Apr-2025 Cumulative Disbursements 9/10/2020 Page 5 of 6 The World Bank Implementation Status & Results Report Strengthening DRM and Climate Resilience Project (P165870) PBC Disbursement Achievement Disbursed amount in Disbursement % PBC ID PBC Type Description Coc PBC Amount Status Coc for PBC Restructuring History There has been no restructuring to date. Related Project(s) There are no related projects. 9/10/2020 Page 6 of 6