The World Bank Implementation Status & Results Report Cameroon - Multimodal Transport Project (P143801) Cameroon - Multimodal Transport Project (P143801) AFRICA | Cameroon | Transport Global Practice | IBRD/IDA | Investment Project Financing | FY 2014 | Seq No: 8 | ARCHIVED on 16-Sep-2019 | ISR38067 | Implementing Agencies: Cellule BAD-BM, Ministry of Public Works, Republic of Cameroon Key Dates Key Project Dates Bank Approval Date: 27-May-2014 Effectiveness Date: 19-Nov-2014 Planned Mid Term Review Date: 31-Oct-2017 Actual Mid-Term Review Date: 31-Oct-2017 Original Closing Date: 30-Jun-2021 Revised Closing Date: 30-Jun-2021 pdoTable Project Development Objectives Project Development Objective (from Project Appraisal Document) The project development objective is to increase multimodal transport efficiency and effectiveness along the Yaoundé–Kousseri Corridor. Has the Project Development Objective been changed since Board Approval of the Project Objective? No Components Table Name Road Infrastructure Improvements:(Cost $57.00 M) Rail Infrastructure Improvements:(Cost $9.00 M) Infrastructure Sector Institutional Strengthening; Project Management:(Cost $5.00 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Moderately Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory Overall Risk Rating Substantial Substantial Implementation Status and Key Decisions The project performance rating is maintained at “Moderately Satisfactory” (MS) because progress made leading to this reclassification has been maintained in spite the insecurity and administrative challenges affecting both Contractor and the Supervising Engineer. The overall disbursement rate is projected to improve in the coming months with the current planned trends of the Railway component as well as the works and supervision contracts for the rehabilitation of the Maroua-Mora road section which constituted about 70% of the total credit amount. The study for the elaboration of the Integrated Multimodal Transport Infrastructures Strategy for Cameroon is back on track and will equally help improve the performance of the project. The effective implementation of the various agreed action plans jointly elaborated by the project and the bank Teams during previous missions as well as the GoC’s commitment should helped improve project performance. 9/16/2019 Page 1 of 4 The World Bank Implementation Status & Results Report Cameroon - Multimodal Transport Project (P143801) Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance -- High High Macroeconomic -- Moderate Moderate Sector Strategies and Policies -- Moderate Moderate Technical Design of Project or Program -- Moderate Moderate Institutional Capacity for Implementation and Sustainability -- Moderate Moderate Fiduciary -- Moderate Moderate Environment and Social -- Substantial Substantial Stakeholders -- Moderate Moderate Other -- High High Overall -- Substantial Substantial Results PDO Indicators by Objectives / Outcomes Share in good and fair condition of the YaoundéKousseri national road IN00729328 ►Share in good and fair condition of the YaoundéKousseri national road (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 62.00 -- 71.00 87.00 Date 09-Jun-2014 -- 30-Jun-2021 30-Jul-2019 Intermediate Results Indicators by Components Road Infrastructure Improvements IN00729329 ►road rehabilitated (Kilometers, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 12.00 61.00 9/16/2019 Page 2 of 4 The World Bank Implementation Status & Results Report Cameroon - Multimodal Transport Project (P143801) Date 10-Jun-2014 -- 10-Jul-2019 30-Jun-2021 Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P143801 IDA-54650 Effective USD 71.00 71.00 0.00 35.13 27.91 56% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P143801 IDA-54650 Effective 27-May-2014 20-Aug-2014 19-Nov-2014 30-Jun-2021 30-Jun-2021 Cumulative Disbursements 9/16/2019 Page 3 of 4 The World Bank Implementation Status & Results Report Cameroon - Multimodal Transport Project (P143801) Restructuring History Level 2 Approved on 07-Apr-2019 Related Project(s) There are no related projects. 9/16/2019 Page 4 of 4