RP202 Vol. 17 Liede WWTS Phase I and II AC -18.1.11.4AC -18.1.2.4.4AC -18.1.2.7.1.1 .4AC -18.1 .2.7.1.2.4AC -18.1.2.7.1.4AC -18.1 .2.8.4AC -18.1 .4AC -18.3.2.10.1 .4AC-1 -18.3.2.10.1 .4AC-2 -1 8.3.2.10.2.4AC -18.3.2.13.4AC -18.3.2.7.2.4AC -1 8.3.2.9.4AC -Liede WWTS Phase I and II BD -18.1.11.4BD -18.1 .2.4.4BD -18.1.2.7.1.1.4BD -18.1.2.7.1 .2.4BD -18.1.2.7.1.4BD -18.1.2.8.4BD -18.1.4BD -18.3.2.10.1 .4BD-1 -18.3.2.10.1 .4BD-2 -18.3.2.10.2.4BD -18.3.2.13.4BD -1 8.3.2.7.2.4BD Cost estimate of cost for house demolition shared by this project for WWTS Frame structure Composite structure Brick and timber structure Quantity Demolised area Unit price Total Quantity Demolised area Unit price Total Quantity Demolised area Unit price Total Grade I C7 C O El n n 2 2.00 117.76 45.00 5,299.09 El Grade 2 7 n7 l LI n .. n n -I n n n7 Grade 3 nI Li n7 . El El El El nnn n Dashadi Grade 4 O7 El El LI n7 n n7 n c n__ n7 Grade 5 El n7 7 77 n_ El.2n Grade 6 l n c G El El n n n E]r Subtotal 77 7] UI El El 77 2.00 117.76 45.00 5,299.09 page 1 of 2 (phase I and II) project (pipe network) n1 71 71 n El Attachedtable:18.1.11.4AC Simple structure Total Quantity Demolised area Unit price Total Quantity Demolised area Unit price Total c r1 n . 2.00 117.76 45.00 5,299.09 71 71 71 71~~~~~~~~E 71 71 71 3 r rl r r r r r~~~~~~~~~~~~~l 71 71~~E 71 El 71 El 1 171 r1 71 71 71 2.00 117.76 45.00 5,299.09 page 2 of 2 Cost estimate of compenstion for historically used house shared by this projec Frame structure Composite structure Brick and timber stru project area Quantity Floor area Unit price Total price Quantity| Floorarea Unit price Total price Quantity Floor area Unit price Grade 1 El _____ [7 1 [71 [7 [ [ 2.00 117.76 650.00 Grade 2 C] [7 [n [n [n [7 [7 7] [ [nn Grade 3 n n7 El n7 [1 n7 n7 [n [n [7 historically Grade 4 C] [7 n7 [n [7 n7 [7 [7 El [7 used house Grade 5 [7 n7 [ [7 [ [7 [7 [7 [n [7 Grade 6 [- [7 [ [[ [7 [7 [7 [7 [n [7 Subtotal [7 [7 [7 [7 [7 [7 [7 [7 2.00 117.76 650.00 page 1 of 2 :t for WWTS (phase I and II) project (pipe network) #VALUE! icture Simple structure Total FTotal price Quanti Floor area Unit price Total price Quantit Floor area Unit price Total price 76,542.39 C i i C 2.00 117.76 650.00 76,542.39 page L o 2J 76,542.39 Pl PEl 2.00 1 117.76 650.00 1 76,542.39 page 2 of 2 Cost estimate of compenstion for temporary relocation shared by this project for WWTS (phase I and II) project (pipe network) c El E E E l Attached table:18.1.2.7.1.1.4AC project purpose area tpye Quantity Floor area Unit pnce compensatlon Relocation Total Grade I Partially demolished 2.00 117.76 20.00 2,355.15 6.00 14,130.90 Grade 2 Partially demolished - - - - 6.00 Housing Grade 3 Partially demolished - - - - 6.00 Grade 4 Partially demolished - - - - 6.00 Grade 5 Partially demolished - - - - 6.00 Grade 6 Partially demolished - - - - 6.00 - Subtotal 2.00 117.76 20.00 2,355.15 6.00 14,130.90 Grade 1 Partially demolished - - - - 6.00 - Grade 2 Partially demolished - - - - 6.00 - Shop Grade 3 Partially demolished - - - - 6.00 - Grade 4 Partially demolished 6.00 Grade 5 Partially demolished - - - - 6.00 - Grade 6 Partially demolished - - - - 6.00 - Subtotal - - - - 6.00 - Grade I Partially demolished - - - - 6.00 - Grade 2 Partially demolished - - - - 6.00 - Grade 3 Partially demolished - - - 6.00 - Grade 4 Partially demolished - - - - 6.00 House Grade 5 Partially demolished - - - - 6.00 - Propert _Grade 6 Partially demolished - - - - 6.00 - y right Subtotal - - - - 6.00 - and on Grade I Partially demolished - - - - 6.00 - residen Grade 2 Partially demolished - - - - 6.00 - tial plioat Factory Grade 3 Partially demolished - - - - 6.00 - building Grade 4 Partially demolished - - - - 6.00 - Grade 5 Partially demolished - - - - 6.00 - Grade 6 Partially demolished - - - - 6.00 - Subtotal - - - - 6.00 - Grade I Partially demolished - - - - 6.00 - Grade 2 Partially demolished - - - - 6.00 - other Grade 3 Partially demolished - - - - 6.00 - use Grade 4 Partially demolished - - - - 6.00 - Grade 5 Partially demolished - - - 6.00 Grade 6 Partially demolished - - - 6.00 - Subtotal - - - - 6.00 - Grade I Partially demolished 2.00 117.76 20.00 2,355.15 6.00 14,130.90 Grade 2 Partially demolished - - - - 6.00 - Total Grade 3 Partially demolished - - - - 6.00 - Grade 4 Partially demolished 6.00 Grade 5 Partially demolished - - - - 6.00 - Grade 6 Partially demolished, - - - 6.00 - Subtotal 2.00 117.76 20.00 2,355.15 6.00 14,130.90 Cost estimate of compenstion for temporary relocation shared by this project for WWTS (phase I and II) project (pipe network) I C X E El Attached table:18.1.2.7.1.2.4AC Unit Monthly Relocation To project purpose area type quantity Floor area pric comnstion perod Total pGrce compensatdon pe 60od (month) Grade 2 temporary demolished - 6.00 Grade 2 temporary demolished - 6.00 - Grade 3 temporary demolished - 6.00 - Grade 4 temporary demolished - 6.00 - Grade 5 temporary demolished - 6.00 - Grade 61 temporary demolished 6.00 Subtotal - 6.00 - Grade I temporary demolished - 6.00 - Grade 2 temporary demolished - 6.00 Shop Grade 3 temporary demolished - 6.00 - Grade 4 temporary demolished 6.00 Grade 5 temporary demolished = - 6.00 - Grade 5 temporary demolished - - - 6.00 - Subtotal - - - - 6.00 - Grade I temporary demolished - - - - 6.00 - Grade 2 Area of land borrowed - - - - 6.00 - office Grade 3 Area of land borrowed - - - - 6.00 - Grade 4 Area of land borrowed - - - - 6.00 - House Grade 5 Area of land borrowed - - - - 6.00 - with Propert Grade 6 Area of land borrowed - - - - 6.00 - y right Subtotal - - - - 6.00 - and on Grade 1 Area of land borrowed - - - - 6.00 - resilden Grade 2 Area of land borrowed - - - - 6.00 - plot Factory Grade 3 Area of land borrowed - - - - 6.00 - building Grade 4 Area of land borrowed - - - - 6.00 - Grade 5 Area of land borrowed - - - - 6.00 - Grade 6 Area of land borrowed - - - - 6.00 - Subtotal - - - - 6.00 - Grade I Area of land borrowed - - - - 6.00 - Grade 2 Area of land borrowed - - - - 6.00 - other Grade 3 Area of land borrowed - - - - 6.00 - use Grade 4 Area of land borrowed - - - - 6.00 - Grade 5 Area of land borrowed - - - - 6.00 - Grade 6 Area of land borrowed - - - - 6.00 Subtotal - - - - 6.00 Grade I Area of land borrowed - - - - 6.00 Grade 2 Area of land borrowed - - - - 6.00 Total Grade 3 Area of land borrowed - - - - 6.00 TolGrade 4Area of land borrowed 6.00 Grade 5 Area of land borrowed - - - - 6.00 Grade 6 Area of land borrowed 6.00 Total 6.00 - Cost estimate of compenstion for temporary structure before expiration shared by this pro n__El z E Eln 7E n n , 7 r _______ Frame structure Composite structure Brick and timber stru quantity Floor area Unit price Total price quantity aa Unitnprice | quantitya e Unitaprice Grade I temporary demolished n c 250.00 n n 7 250.00 n 7 7 250.00 Grade 2 temporary demolished n 7 250.00 n 7 c 250.00 n 7 7 250.00 Grade 3 temporary demolished D c 250.00 n 7 7l 250.00 G 7 - 250.00 Commercial Grade 4 temporary demolished n 7 250.00 El 7 7 250.00 7 7 7 250.00 Grade 5 temporary demolished 7 c 250.00 O 7 7 250.00 7 7 n 250.00 Grade 6 temporary demolished 7 7 250.00 7 7 7 250.00 7 7 7 250.00 Subtotal 7 7 250.00 7 7 7 250.00 7 7 , 250.00 Frame structure | Composite structure Brick and timber stru loo ara Uit ric Ttalprie qanttyFloor Unit price Ttlquantity ForUi rc area priTota alore Uitprc Grade 1 temporary demolished 7 7n 250.00 C| c| 7| 250.00 7| 7l 7l 250.00 Grade 2 temporary demolished 7 | c 250.00 | l 7 250.00 7 7 7 250.00 Grade 3 temporary demolished 7 7l 250.00 7 O 7| 250.00 7 7 7| 250.00 Other Grade 4 temporary demolished | 7n 250.00 7 7 7l 250.00 7 7 | | 250.00 uses Grade 5 temporary demolished 7 7 250.00 7 7 7 250.00 7 7 7 250.00 Grade 6 temporary demolished 7 7 250.00 7 7 7 250.00 7 7 7 250.00 Subtotal | 7l 250.00 7 7 7 250.00 7 7 7 250.00 pgae 1 of 2 ,ject for WWTS (phase I and II) project (pipe network) L El F] H Attached table:18.1.2.7.1.4AC-l icture _ Simple structure __ _ Total Total quantity Floor Unit price Total price quantity Floor area Unit price Total price 0 H H 250.00 H H H 250.00 Hl n H H 250.00 O H H 250.00 H 0 H H 250.00 H H H0 250.00 H H H H 250.00 H H H 250.00 O H H H 250.00 H H H 250.00 Hl H H H 250.00 Hl 0 H 250.00 H r H Hl 250.00 Hl 1 250.00 H Attached table: 18.1.2.7.1.4AC- 1 icture Simple structure __ _ Total pnce quantity Floor Unit price Total price quantit Floor area Unit price Total price H H H 250.00 H H H 250.00 H H H H 250.00 H H H 250.00 H H H H 250.00 H H H 250.00 H H H H 250.00 H H H 250.00 H H0 H H 250.00 H H H 250.00 H H0 H H 250.00 H H H 250.00 H H H H 250.00 H H H 250.00 H pgae 2 of 2 Cost estimate of cost for rehabilitation of partially affected house with Property right II) project (pipe network) n F] H H F] F] n] HF F] E n LI E LI Frame structure Composite structure Brick and timber structure Quant Floor area Unit price Total price Quantity Floor area Unit Total pnce Quantity Floor area Unit Total price Quantity ity repaired repaired price Toa rc uniy repaired price Grade I O F] 100.00 F F] F] 120.00 F] H H 150.00 O house Grade 2 F F 100.00 F] F] F] 120.00 F F] H 150.00 H F] with Grade 3 O] F] 100.00 F] H F 120.00 F] O F 150.00 L O Propertt Grade 4 O] H 100.00 O F] F] 120.00 F F] H 150.00 F] F] y rig h t-F] 1 0 0 _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Grade 5 O _ _ 100.00 F] F] F 120.00 F F] H 150.00 3 O Grade6 F] nF 100.00 F] H H 120.00 F] F] H 150.00 F] F] Subtotal LI H 100.00 H H H 120.00 H H H 150.00 F] F] page 1 of 2 shared by this project for WWTS (phase I and 3 Fn o Attached table:18.1.2.8.4AC Simple structure _ Total Floor area Unit Total prce Quantity Floor area Unit price Total price [repa price price prc uniy repairedI 3 60.00 O 3 O 3 O 3 60.00 0 3 n 3 3 3 60.00 3 3 El E3 O 60.00 3 3 3O3 E 3 60.00 3 3 o c o 3 60.00 3 3 3 3 3 3 60.00 3l 3] 31 El 3 page 2 of 2 Cost estimate of compenstion for permanently affected house with Property right, house on residential pl shared by this project for WWTS (phase I and II) proje Li IJ Li LI F-7 Li [7 [7i [7 L _______ Frame structure Composite structure Brick and ti quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Wholly demolished [777 71 71 El [7 7 Partially demolished LiL i iL El El El LI [I Grade 11 Temporarily demolished LiL i iL Li Li Li Li [7 Wholly demolished EiL il El Li Li Li Li Li, Partially demolished I: L El Li Li Li LI Li [I El Grade 2 Temporarily demolished Li L Li Li Li Li Li Li Li El Wholly demiolished El Li Li Li Li Li Li Li Li El Partially demolished [7 [l [7, El 71 [7 7l [ [ 7l Grade 3 Temporarily demolished Li L Li El Li i El Li LII Li House with HosWholly demolished EiL L]li LI 'I El El 7 Property Hous Partially demolished Eili El El. El Li Li Li El Li___ right Grade 4 Temporarily demolished Li 1 Eili1 Eil1- Li Li i [I I l Wholly deniolished El Li El 71 Li Li L LI Li LI Partially demolished E I El Li Li El Li Li Li El, Li Grade 5 Temporarily demolished El 7 1 71 DI 7 L Wholly demolished LiL i iL LI El LI Li1 L Partially demolished El7 Li Li Li El Li Eil Li Grade 6 Temporarily demolished II El Li i LI i LiLi L F Wholly demolished LI. El Li LI Li El Li Li LI F]I Partially demolished Li El Li Li Li Li El Li El [7 suhtotal Temporarily demolished El Li Li El El Li Li LI Li F Wholly demolished 7 [ [ [7 7] El7 Partially demolished El 7 [7 71 El7 7 Grade I Temporarily demolished EiL Lil Li Li El Li Li Wholly demolished I 7[ 777[ H Partially demolished III iLiL i 7[ Li Grade 2 Temporarily demolished Li El LI El Li LI Li El Li. L Wvholly demolished Li Li L] FI i [7 Li Li LiL Partially demolished il Li [l LI Li[ Li Li LiL Grade 3 Temporarily demolished El El Li El Ei7__ _l El Ei House with Wholly derrolished 7 77 5L _____ __ _ 7i Li E Property Shop Partially demolished Li LI 7 LI L. [ Li Li page 1 of 48 Cost estimate of compenstion for permanently affected house with Property right,house on residential pl shared by this project for WWTS (phase I and II) proje E 3l L W U LI LI LI [ LI n Frame structure | Composite structure Brick and ti quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area right Grade 4 Temporarily demolished LI 3 Li Li 3i Li Li Li Li 3i Wholly demolished 3 LI 3i Li Li L l Li LI 33 Partially demolished 3i Li El LI r 3i O Li Li L Li Grade 5 Temporarily demolished C El, Li L1 El 3i L Li Wholly demolished 3 El Li ni oi El Li "I El Partially demolished Ci LI 3i 3 Li 3i 3i 3i Grade 6 Temporarily demolished Wi El 3i 3i Li Li Li Li Wholly demolished El Li L El Li Li El El Li 33 Partially demolished 3I El Li 3i 3 3i El 3i L l subtotal Temporarily demolished nI 3 3 El El Li L El Li [I Wholly demolished Li Li El El Ci1 3 3i Li 3i El Partially demolished El Li i 3 l El 3 O Grade 1 Temporarily demolished WI 3I l l El n I 3 Wholly demolished El Li Li Li Li i Li. L rI Li. Partially demolished El Li 3 Li l l L LI LI 33 Grade 2 Temporarily demolished nL [n El Li El ni Li 3i rLi Wholly demolished 3L Li Li I Ii LI Li ri El Partially demolished El Li Li Li LI El Li [I El Grade 3 Temporarily demolished 3L Li 3i 3i El 3i El El House with Wholly demolished Gi l Li LI LI I Li G 3i Gn Propert y Off Partially demolished O O O L n r o o El right Grade 4 Temporarily demolished Li El El Li Li Li LI Li Oi El Wholly demolished Oi El Li Li Li LI LI Li Li El Partially demolished Li LI LI El Wi LI El Li 3i Li Grade 5 Temporarily demolished O Li Li Li c 3i O Li 3 Wholly demolished G Li El Li Li LI t Lr El Li Partially demolished L [ [] wI El Li Li 3i Oi El LI Grade 6 Temporarily demolished El Li Li LI I Gi 3 WI Li LI Wholly demolished Li El El nI n ri 3l El Li L Partialy demolished L L U Li Li El , LI n c subtotal Temporarily demolished LI Li Li Oi El 3 J Wholly demolished El Li El LiE]l 2i "f 4 page 2 of 48 Cost estimate of compenstion for permanently affected house with Property right,house on residential pl shared by this project for WWTS (phase I and II) proje Li ni _ _ nI ni L cii nI LE i Frame structure | Composite structure Brick and ti quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Partially demolished n nL El El ri n n El Grade 1 Temporarily demolished nI Li Li ni El ni n Li Wholly demolished r n Li ni El rL Li n Partially demolished El El LI Li Li n]I Grade 2 Temporarily demolished ri LI Li ri ni rn Wholly demolished ri ri Li LI rL rL Partially demolished Li LI Li Li Li Li ni Li Li ri Grade 3 Temporarily demolished Li Li n Li Li Li r Li El Li House with Foct Whollydemolished El LI Li Li Li LI n L E Property oury Partially demolished El El El El El rn right LiLbuiiliL L i iL ding Grade 4 Temporarily demolished n_ El El n_ n Eln Wholly demolished El El Li El Li El El ri Li Partially demolished nL rL El rn LI Grade 5 Temporarily demolished El El El Li Lin Wholly demolished Li Li Li Li Li rn ni Li r I L Partially demolished Li El LI Fl El Li El El Li ni Grade 6 Temporarily demolished ni LI Li Li Li Li Li Li El Li Wholly demolished nL ni Li ni Li Li LI Li LI Partially demolished Ln Li Li ni Li Li subtotal Temporarily demolished Li El LI Li LI Li Li El Wholly demolished ni oL Li Li Li Li Partially demolished rL Li LI El ri u n Li Grade 1 Temporarily demolished nL El Li r Li Li Li El Wholly demolished Li Li Li Li Li Li nI El El ri Partially demolished nLL LI Li Li ci Li Li Li Grade 2 Temporarily demolished CiLiL ElE LirL I Li Li Wholly demolished L Li rLL LirLi n L rI Lin Partially demolished LI Li Li Li Li u ni r Li Grade 3 Temporarily demolished nJ Li LI Li Li Li Li Li Li House with Othe Whollydemolished ml I r [n U r IL El r Li Property r Partially demolished LI El ni Li right uses Grade 4 Temporarily demolished El Lu i Li Ir[]I ElI El Di page 3 of 48 Cost estimate of compenstion for permanently affected house with Property right,house on residential pl shared by this project for WWTS (phase I and II) proje _ _ r_ _ __r Li LI El FoF oi oi El Frame structure | Composite structure Brick and ti quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Wholly demolished O Li l FU n n o o LI Partially demolished O n LI L I] Li El F U O Grade 5 Temporarily demolished O n o oi ni Li u o oi Wholly demolished O O LiL L FO O F o El Partially demolished O O LI I O O LI Li L Li Grade 6 Temporarily demolished OF F Fo oLi Li LI r] Wholly demolished Fl El O O O O Fn Fn Partially demolished F F F F F F F F F F subtotal Temporarily demolished O F F O F F F o F]I Wholly demolished F F F O O O O Li L Partially demolished O Li F F F F o o oG Grade 1 Temporarily demolished F L LI E E LI Li F O F Wholly demolished F O F FO O O O L Li Partially demolished O [OI G F OLI , O Li G Grade 2 Temporarily demolished O Fn FG GI Oi FG LI Li Wholly demolished O O F G O F F F Fr Partially demolished FO O F n F o o F Li Grade 3 Temporarily demolished F I F r F F F Li El LI House with tot Whollydemolished Li i ° F° LI F Li El El Property toa Partially demolished F F O LI Li Li Li Li O right Grade 4 Temporarily demolished F Li F F F F F F L F Wholly demolished FL Li F F El F F F El Partially demolished F LI FL Li I E E F Grade 5 Temporarily demolished Fl r FL E Fo r Fo Li Wholly demolished [] l E FO O O O C F E Partially demolished F r o F Li Li F F F F Grade 6 Temporarily demolished F Li L F O L F Fn Fn F Wholly demolished F F F F Li I Fo r El Partially demolished LI r F F L I O L r o E subtotal Temporarily demolished LF Li FE r I i rI rLI I Wholly demolished O O r Li °_ r , LL E J Partially demolished L Li Li F o F o L page 4 of 48 Cost estimate of compenstion for permanently affected house with Property right,house on residential pl shared by this project for WWTS (phase I and II) proje r L I rLI I LI LI Li r r Li Frame structure Composite structure Brick and ti quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Grade 1 Temporarily demolished OL Oi El LI LI II Li r Wholly demolished El ri Li Li LI L oi El Partially demolished ni LI El Li ri Li Li o ni oi Grade 2 Temporarily demolished Li Li I l LI oi Li Li LI o Li Wholly demolished El Ui L Li Li Li Li Li Li Li Partially demolished Li El Li Li L Li Grade 3 Temporarily demolished Li ] Li L LO house on Hous Wholly demolished LI LI Li i Li L Li L LI residential . Partially demolished Li El Li Li El Li Li Li El Li plot Grade 4 Temporarily demolished Li El Li El Li El Li Li El Li Wholly demolished El Li Li Li Li El O r I Li II Partially demolished Li O Li El El Li oi Li El Li Grade 5 Temporarily demolished LI Li Li El LI LI O Li LI L]I Wholly demolished Li Li El El Li El El Li LI Li Partially demolished El Oi Li LiI Li Li L I LI Grade 6 Temporarily demolished Li El Li Li LI LO Oi Li LI 3i Wholly demolished rl LI °i LI LI °i El n oL Partially demolished LI Li Li Li Li L LL El Li subtotal Temporarily demolished LI r oi o L l LI El LI PI Wholly demolished El LI LiI Li Li LI O O OO Partially demolished O El Li LI Li L Li Li Li L i Grade 1 Temporarily demolished Li El n Li Li o Li Lu Li oi Wholly demolished Li Li Li El Li Li nI i o o Partially demolished OL Li Li El LI L LI O OL Grade 2 Temporarily demolished L Li El LI LI L o o Wholly demolished El Li Li Li Li LI LI Li Oi Li Partially demolished Oi Li El Li LI Li Li Li El Grade 3 Temporarily demolished Li LI IiIi L ElI Li O house on Wholly demolished Li Li OL O El O Li I residential Shop Partially demolished Ci El c El LI EJ U r L plot Grade 4 Temporarily demolished OL rL Li O O n o oo Wholly demolished D i rLl Cl O O r L Lr page 5 of 48 Cost estimate of compenstion for permanently affected house with Property right,house on residential pl shared by this project for WWTS (phase I and II) proje Li c r__ __________L rl L []LL Li LI L r L Frame structure Composite structure Brick and ti quantity Floor area Unit price Total price quantity Floor area Unitprice |Totalprice quantity Floor area Partially demolished U| Li LI L Li L| Li Li LI Grade 5 Temporarily demolished D LL ri | nl L| L| LE LI r Whollydemolished LI ri |i nl Li L| L| LE Li C Partiallydemolished Li L| LI Li Li L| L| L LI] LI Grade 6 Temporarily demolished LI E. El L LI Li Li L Li Li Whollydemolished L] L LI L Li Li Li Li Li LI Partially demolished L L El LI Li Li [3 L L L subtotal Temporarily demolished L| L| L| L L| Li Li Li L L Whollydemolished Li L| Li Li Li Li LI Li LI LI Partially demolished Li Li Li Li ni |I n || LI Li Grade 1 Temporarily demolished Li L| LI I Li LI LI L Li LI Wholly demolished LI L LI Li LI Li Li Li LI Li Partially demolished LI Li LI Li Li Li L L L Li Grade 2 Temporarily demolished [I Li LJi LI l LI L Li Li L Wholly demolished LI L Li El Li Li Li Li L L Partially demolished Li Li Li Li LI El 3i Li Li 33 Grade 3 Temporarily demolished El Li El I El 3i LI Li I LI house on Offi Wholly demolished i El Li Li Li El Li E l residential ce Partially demolished Mi LI Ln Li El El 3 I plot Grade 4 Temporarily demolished El n Li Li nL 3 3 Li Wholly demolished El Li Li L LI Li 3i El Partially demolished Li El Li LI 3i ni ni El 3i nI Grade 5 Temporarily demolished 3i El Li El El ni Li l Li Li Wholly demolished LI LJ Li Li Li i El I l Li LI Partially demolished LI Li Ui LI LI LI Li 3 LI Grade 6 Temporarily demolished LI 3 Li Li El LI I Li Li Wholly demolished 5L El L3 Li Li Partially demolished 5 El Li El 3 Li Li Li LI Li subtotal Temporarily demolished 3i Li Li U UL Li 3 LI El WVholly demohshed L El El LiL Li U El LI L1 Partially demolished LI Li Li Li 3 ni Li LE Li LI Grade 1 Temporarily demolished L LI Li l rL LI Li L L page 6 of 48 Cost estimate of compenstion for permanently affected house with Property right,house on residential pl shared by this project for WWTS (phase I and II) proje I I r] LI El r Li r Frame structure Composite structure Brick and ti quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Wholly demolished rl Li ni ni El ui Gi Li nn Partially demolished nl ni n Li El ni ni ui nI Grade 2 Temporarily demolished LI El ni l Li Li LI El ui nn Wholly demolished ni El ni El Gi ni Li l Li LI, Partially demolished El ni uJ ni Li Li Li LI ni LI Grade 3 Temporarily demolished nI ni ci G Gi Gi ni oi l L house on Foct Wholly demolished El ni El Gi Oi ri El ni ni El residential bulr Partially demolished LJ Li LI ni Gi El El ri ni l plot ding Grade 4 Temporarily demolished n LL l LL L] Li Li LI, Wholly demolished l G G r n n G n G Partially demolished [:1 Li El n El Li El El El Li Grade 5 Temporarily demolished Gi ni Li Li El Li Li Li Li I Wholly demolished El Eli LioL I El El El O Partially demolished n Gi l LI Li Li nL Li El Grade 6 Temporarily demolished El El nL Li l LI Li El Li Wholly demolished El Li Li Li Li Li Li Li El LI Partially demolished Ui Li LI GL Li Li El Gi On subtotal Temporarily demolished Ci Li Li LL LI Li El G Wholly demolished Li El Li LI El Li LI Li n n Partially demolished 3L Gi El El Li i Il LI Li Grade 1 Temporarily demolished UL El El Li El Li El ni Li l Wholly demolished 5L Li Li D nG Partially demolished rL Li El Li Cc Grade 2 Temporarily demolished Li l l Li LL LI ni El L]I Wholly demolished n n Li ui El El Li Li LI El Partially demolished LI LI El Li oi Li L' Li El Li Grade 3 Temporarily demolished ni Li ni Li El [i Li Li Li Li house on Othe Wholly demolished LI Li El El n Li D Li LI Li residential r Partially demolished nL l LI El El ni El LI Li plot uses Grade 4 Temporarily demolished r ri u G EJ U U UCC Wholly demolished L I r I LicL Lini El GI Partially demolished ri El i n-J LI r I ni I n page 7 of 48 Cost estimate of compenstion for permanently affected house with Property right,house on residential pl shared by this project for WWTS (phase I and II) proje nLI L [ r c Ei rr F L[ L Ll E Frame structure Composite structure Brick and ti quantity Floor area Unit price Total price quantity Floor area Unit pfice Total price quantity Floor area Grade 5 Temporarily demolished LI ui oi LI LI LI Wholly demolished El O I n i o I Lo LL Partially demolished n c L o o n o o L o Grade 6 Temporarily demolished El El El El 3 Li LI Li InI Wholly demolished Li Li Li Li Li ni oI Li El 1L Partially demolished El LI Li ni oi El D Li oi subtotal Temporarily demolished Li 0i Li LiI El oi El El LI Wholly demolished El Li L Li Li Li El El Li oo Partially demolished LI El O El Li El Li Li Li LI Grade 1 Temporarily demolished Oi Li El Li D El Li LI Li Li Wholly demolished Li El L1 Li El LI PI Li oi El Partially demolished El Li Li LI Li Li ni "I Li LI Grade 2 Temporarily demolished Li OL Li D Li Li El Wholly demolished U O LI i Li El LI L] Partially demolished Li El El Li o LI Li i n o Grade 3 Temporarily demolished El LI Li El o- oi Li Li El Li house on Wholly demolished Oi O El Li El Li Li LI Li Li residential tota Partially demolished LH DioL LinL I o Li L LI plot Grade 4 Temporarily demolished n oi El LI i I O Wholly demolished Li LI Li El Li Li El El n Li Partially demolished LI D Li Li Oi Li Li Li Li Grade 5 Temporarily demolished El D Li D LI Li Li "I LI Wholly demolished El ni Li El "I Pi Li Li LI Li Partially demolished Li Li Li Li rL E3 D Li o Grade 6 Temporarily demolished ri El Li Li El LI Li 3 L IU'LI Wholly demolished ni Li El LI l Li Li El Li n3 Partially demolished El r L Li El U El El Li Li LI subtotal Temporarily demolished Li LI Di ni Li Li Li n E lo Wholly demolished El 3i L1 Li El ni Li O Li r Partiafly demolished Li Li El El nL El E. Li 2.00 117.76 Grade 1 Temporarily demolished L] Li El El LI El Fn Li Li L Wholly demolished r E I n o u u 3 L page 8 of 48 Cost estimate of compenstion for permanently affected house with Property right,house on residential pl shared by this project for WWTS (phase I and II) proje ri r-_ Ci_ _ _ _ _ _ _ LLL . r . E L Frame structure Composite structure Brick and ti quantity Floor area Unit price Total price quantity Roor area Unit price Total price quantity Floor area Partially demolished rI I I u Li LI LI Li LI L LI Grade 2 Temporarily demolished Li [ I L LI U Li L Li El oi Wholly demolished El LI LI ni ri ri ri r ni n Partially demolished rI El Li I II LI ti ri El ri Grade 3 Temporarily demolished LI El oi n [I] Li Cl r ri Wholly dernolished ri ri ri riL iLiL historically Hous Partially demolished r r r r used house ing demolished Li Li Li Li LL LI Li l l Grade 4 Temporarily demolished Lr Li Li El LiL El Li Li Wholly demolished Li Li r EJ Li r I EJ Li L Li Partially demolished Lr El Li Li Li El Li Li Grade 5 Temporarily demolished El Pi Li r Li Li ri ri Wholly demolished LnIi Lini niI rI El Li Partially demolished Li El El Li El Li El El Li LI Grade 6 Temporarily demolished G r r r r r r r L L Wholly demolished El Li Li El rn Partially demolished Li LI Li Li Li L LI LI 2.00 117.76 .subtotal Temporarily demolished r r r r r r r r r n Wholly demolished l r r r r r r r r L Partially demolished l Li Li Li Li LE l Grade 1 Temporarily demolished ri Li Li r Li r r L Wholly demolished Li El Li Li Li r Li El Li Li Partially demolished L Li Li Li Li L LI L L L Grade 2 Temporarily demolished L L Li Li LI Li Li Li L L Wholly demolished Li ni ni Li D LI L Li E Li Partially demolished L G L LI LI LI b El L Ui Grade 3 Temporarily demolished L n L b L L L L n L Wholly demolished L t LL L L [ J . L L Li historically Shop Partially demolished L D L L L L L L EL Grade 4 Temporarily demolished L L Li L LI EL Li L LI rl Wholy demiohshed LI L I Li D Li Li El El Partially demolished E L L L Li r I L L L Grade 5 Temporarily demolished L L] Li LE L Li L page 9 of 48 Cost estimate of compenstion for permanently affected house with Property right,house on residential pi shared by this project for WWTS (phase I and II) proje r r- L E u1 K n r n Frame structure Composite structure Brick and ti quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Wholly demolished K LI t K O K O K KI Partially demolished K1 [I K G K K K °i K Grade 6 Temporarily demolished K Kn K o K K K K K Wholly demolished KK KK Kt K I K t I Partially demolished K K [K K K K K K Ko subtotal Temporarily demolished K K n K K K K K K K Wholly demolished K K K K K K K K K K Partially demolished KK K K K K K K K Grade 1 Temporarily demolished K-K K K K K K K K K Wholly demolished K K K K K K K2 K K K Partially demolished K K K K K K K K K K Grade 2 Temporarily demolished K K K K K K K K K K Wholly demolished K K K KK K K K K Partially demolished K K K KK K K K Li Grade 3 Temporarily demolished K K f El K K K K K Ki Wholly demolished K KOKK KOK K K K KI historically Offi Partially demolished O O used house ce Grade 4 Temporarily demolished K K K K K K K K K K Wholly demolished K K K K K K K K K Li Partially demolished K K K K K K K K K K Grade 5 Temporarily demolished K K K K K K K K K K Wholly demolished KK K K K K K K KO Partially demolished K K K K K K K K K K Grade 6 Temporarily demolished KK K K K K K K Li Wholly demolished K K K K K K K K K u Partially demolished K K K K K K K K K K ,subtotal Temporarily demolished K KlK K K K K K K K Wholly demolished K K K K K K K K Kl. Partially demolished K K K K Ki K K K IL F ] Grade 1 Temporarily demolished D E El C7 G K K i i K K Wholly demolished t K i ' K K K G K K Partially demolished K K K K K Kl K Li K page 10 of 48 Cost estimate of compenstion for permanently affected house with Property right,house on residential pi shared by this project for WWTS (phase I and II) proje r I Eln n n n r n Fr nI F r o Frame structure Composite structure Brick and ti quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Grade 2 Temporarily demolished o o Frl El o F F F F Wholly demolished F F F Fl F F F F F Partially demolished O F F F F F F F F E Grade 3 Temporarily demolished F F F F F F F F U Foct Wholly demolished F F F F F F F LO F historically ory Partially demolished O O OC used house buil Prilydmlse ding Grade 4 Temporarily demolished F F F F F L F F F F Wholly demolished FI F Li F1 LI F F F F Partially demolished FO F F F F F F F L F Grade 5 Temporarily demolished FF F F F F F F F Fl Wholly demolished FO FO F F F F F F F Partially demolished F F F F F F Ci FU Grade 6 Temporarily demolished FF F Fo F Fo F F F Wholly demolished FO FO F F F F F F O Partially demolished F F F F F F F Ol n F subtotal Temporarily demolished FF F FF F FO Wholly demolished F F F F F l F F F F Partially demolished F F F F F Fl F F F Grade 1 Temporarily demolished F F FO FF FO F F Ll Wholly demolished F F F Fo F F F F F Partially demolished F F F F F F F F F F Grade 2 Temporarily demolished F FO FC FO II F F F Wholly demolished F F LI F] F F F F F F Partially demolished F F F F F n F F F F Grade 3 Temporarily demolished F F F F F FFCF F F historically Othe Wholly demolished O O C O O O Cn used house r Partially demolished F F F F F LF F F F uses Grade 4 Temporarily demolished F F F F F F F F F F Wholly demolished F F F F FL LF FI F F 1 Partialydemoished Fr F fl Fc r F7 F F Grade 5 Temporarily demolished F F F F F [FL ri F F Wholly demolished F FOF F F F F F page 11 of 48 Cost estimate of compenstion for permanently affected house with Property right,house on residential pl shared by this project for WWTS (phase I and II) proje Li [7 [7 ______ L C [I LI D rr [ Il Frame structure Composite structure Brick and ti quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Partially demolished DI ni ti Li nn rLE Li L[ Grade 6 Temporarily demolished n ni l Li L LI n ni nn LI Wholly demolished 0i l LI LI Li 0 CL Li LI ci Partially demolished ti n ci rL El ni ei ni ei El ,subtotal Temporarily demolished ni nL El ei ei Li EJ LI ee Wholly demolished CL LI LI Ci El oi ei El ni Partiallydemolished El ni oi ni El n el Li 2.00 117.76 Grade 1 Temporarily demolished El El El Li El Li LI ni ei LI Wholly demolished El El ni Li DI Partially demolished niL I e o e Grade 2 Temporarily demolished i i n Li e i L n Wholly demolished C C C t C C n t e L Partially demolished Li LI Li LI El El n Li Li Li Grade 3 Temporarily demolished Li El Li DI Li Li LI Wholly demolished C Li t Li Li Li n t Li n historically tota Partially demolished nL Li LI Li LI El n Li Li Li used house 1 atal eoihdE D1 11 ]E 11 Grade 4 Temporarily demolished Li Li El Li Li Li Li Li Li el Wholly demolished Li Li Li n El ni Li Li El Li Partially demolished Li Li ri n El E El Li II LI Grade 5 Temporarily demolished El Li nL e e e Li Wholly demolished El Li e LI El [n Li Li Li r Partially demolished El Li Pi Li El n ni Li Li LI Grade 6 Temporarily demolished El El El Li Li Li LI El Li L] Wholly demolished Li El Li Li ni Li Li Li ni Partially demolished Li n Li Li Li Li Li 2.00 117.76 subtotal Temporarily demolished Li Li InL I Li Li LI LI Li Wholly demolished El Li i Pi Li Li Li El El L I Partially demolished LI Li LI I i Li LI LI LI ni Grade 1 Temporarily demolished El Li Li n Li Li Li Li II LI. Wholly demoLshed rl ci Li Li Li n El Li LI Partially demolished n n Li i i Li Li e L Grade 2 Temporarily demolished El, [ ri rLI Ii r i n L page 12 of 48 Cost estimate of compenstion for permanently affected house with Property right,house on residential pl shared by this project for WWTS (phase I and II) proje n c r c Li C] I L r] L LI Frame structure Composite structure Brick and ti quantity Floor area Unit price Total price quantity Floor area Unit price |Total price quantity Floor area Whollydemolished Ln ri Li Li El ri 3 L El LI Partially demolished c LI Li El L3 rI LI Li EL LI Grade 3 Temporarily demolished C i Li Li IiI Li c3 LI | LI Temporary Wholly demolished [J LI ci ci c El LI D Li El structure Hous Partially demolished n n n n n | n El before ingLi LLiLLiL ii Lii expiration Grade 4 Temporarily demolished Ci El O C n c Li L Li Li Wholly demolished Li El, Li LI El F| El .l Partially demolished Li Li Oi Li Li O | El Li Li Grade 5 Temporarily demolished rLi El Li F. El Li FLi L 0i Whollydemolished El El Li El F] rL Partiallydemolished 3i rL o L Li LI Li El FL Grade 6 Temporarily demolished L Oi Li Li LI Ti El Li Li LI Wholly demolished El El D D Li El IL 31 Li Partially demolished Li F I oi L F Ii i3 L El Li I subtotal Temporarily demolished Li Li O E Li Li L Li L ol Wholly demolished El LI Li LI Li F] Li Li L] Li Partially demolished i O LI O El LI L Li LI Grade 1 Temporarily demolished El i Li 3 3 0| Li 1L Li Wholly demolished El F] E l LI Li L Li El L I Partially demolished F] Li LI oi Li Li rI LI oI Grade 2 Temporarily demolished El Li Li LI Li rL Wholly demolished I O O r o L L i El L FL Partially demolished Li El 30 n Li El | E LI rL Grade 3 Temporarily demolished Oi El Oi Eil Li "I Li Li L Temporary Wholly demolished El LI Li Li Li El 3i |i Li L structure Shop Partially demolished O n o 3 ru o | 3 | El before _ _ _ _ _ _ _ _ _ _ _ iL iL iL iL iL expiration Grade 4 Temporarily demolished El El Li Oi El LI I El F] LI Wholly demolished o LI Li, ci LI Li, Li ll Partially demolished El "I El Li L Ii E l 1 i LI Grade 5 Temporarily demolished LI Oi Ci [] Li L Li C| L Wholly demolished F] El oi l l LI F] Eli Partially demolished O i C i r Li |i C _ _ |Li Li page 13 of 48 Cost estimate of compenstion for permanently affected house with Property right,house on residential pI shared by this project for WWTS (phase I and II) proje r ~ ~~ ~ [I E c D c1 I O G- r; n r Frame structure Composite structure Brick and ti quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Grade 6 Temporarily demolished Gi G n n n n n n K E Wholly demolished n K n E Eln I n Gi G O Partially demolished Kn n K K K K K G K subtotal Temporarily demolished K K K K K n K r K K Wholly demolished K K Kn K Li K r K Kn Partially demolished KI n G G K n G Grade 1 Temporarily demolished n n K n n o Wholly demolished nK n n n G G n n n Partially demolished O K LI K K K K K K Grade 2 Temporarily demolished K K K K K K K K K K Wholly demolished Gi LI n K K K K K l K Partially demolished K K K K r L K o El Grade 3 Temporarily demolished n r K K K K K K K Li Temporary Wholly demolished K K n K K K I I 1 n structure Offi Partially demolished nK n K K K Kn oG before ce expiration Grade 4 Temporarily demolished K K K K K K n K K L Wholly demolished Kl n K n K K El Partially demolished El K K K K L K Grade 5 Temporarily demolished K K K K K K K K K K Wholly demolished K K K K K o n K o o Partially demolished K L K K K K K E L K Grade 6 Temporarily demolished El K o K o K oi K Wholly demolished KK K o K K K K K Partially demolished El K Li K K K o Kr subtotal Temporarily demolished r n K o K oi K r. K Wholly demolished K K O U K K K K K K Partially demolished OL O K K K K K K LI Grade 1 Temporarily demolished KO El r K K L r K K o Wholly demolished n o o K K K L D r IL K Partialy demolished K1 LI K1 KI K -D K1 KEl Grade 2 Temporarily demolished O O K K K O K L K K Wholly demolished rK K r K K r K El page 14 of 48 Cost estimate of compenstion for permanently affected house with Property right,house on residential pl shared by this project for WWTS (phase I and II) proje 3 r:U r L r____Li U 3 3 U 3 EJ 3 r u Frame structure Composite structure Brick and ti quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Partially demolished L U U r U U u r U U Grade 3 Temporarily demolished [U UtU UrU LIU U ul3 Temporary Foct Wholly demolished 3 U 3 G 3 3 3 U U structure bourly Partially demolished U U-UIU uU U U U U] expiration ding Grade 4 Temporarily demolished r U U [I 3 U] r U U 33 Wholly demolished U U U n 3 2 U 3 U U Partially demolished E U U U 3 U U U U U Grade 5 Temporarily demolished U3 U U U U U U U U Wholly demolished Ur U U U "I U U Ui Partially demolished El U U U U U U Grade 6 Temporarily demolished C 3 U U U U 3 U U 3 Wholly demolished El U nL D r L] U U U Partially demolished U 3 3 3 U U 3 U U U subtotal Temporarily demolished U 3 3 3 U U 3 l 3 3 Wholly demolished U U U U f U U o 3 3 Partially demolished CU 3 U U 3 U 3 3 Grade 1 Temporarily demolished U 3 3 3 U U 3 U U U Wholly dernolished U 3 3 3 U U 3 U U U Partially demolished U 3 3 3 U U U LI U U Grade 2 Temporarily demolished U 3 3 3 U U n n U 3 Wholly demolished U 3 3 3 U U U r U 3 Partially demolished U 3 El U U U 3 D 3U Grade 3 Temporarily demolished 3U 3 U U 3 3 U 33 Temporary Othe Wholly demolished D 3 n n 3 O U U structure r Partially demolished El . before expiration uses Grade 4 Temporarily demolished 3 3 3 3 3 3 3 n U U Wholly demolished U r U3U U D r 3 U U Partially demolished 3 n 3 U 3 3 D [I U 3 Grade 5 Temporarily demolished 3 r 3U D U r U 33 Whollydemoli-hd ___ [II U Li U U Ui U U Partially demolished F] rl 3 I LI u U U U Grade 6 Temporarily demolished U U U Ul U U U U I page 15 of 48 Cost estimate of compenstion for permanently affected house with Property right,house on residential pl shared by this project for WWTS (phase I and II) proje r1 L r_ _[ I G7 Oi Li C [C Frame structure Composite structure Brick and ti quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Wholly demolished ri Li _____ ] nL El LI El E, Li Partially demolished Ci LI LI LI Ui Ci Li El El El subtotal Temporarily demolished Ci L,] Li .i Ci C Li l Li Wholly demolished ri ni ci LI Li 1i 5i CI Partially demolished LI Ci Ci Oi Ci Ci Ci Ci L Grade 1 Temporarily demolished ni El ni l Li Li Li l LI nC Wholly demolished CL Oi CI Ci Ci Li Li Li El Partially demolished E l LE C Li Li Li El El Grade 2 Temporarily demolished ni ni Li l l l Li LI Li cI Wholly demolished CL CL Li LI El Li Li Li Partially demolished El Li Li Li El Li LI LI El Grade 3 Temporarily demolished EJ LL Li LI Li Li El Li Li Temporary Wholly demolished Li CL El pi Li CLi r I El Li structure tota Partially demolished C C L C C C before 1__ _ _ _ _LiLLiLLiLLiL Lii expiration Grade 4 Temporarily demolished Ci t] El Li Li Li C Li Li Li Wholly demolished ni Li El El El Li El El El El Partially demolished Ci Li El El El El El Oi El El Grade 5 Temporarily demolished CL El El Li El E LI Li CC Wholly demolished El El LI Li Li LI Gi El GG Partially demolished G LI LI E El Li L El Grade 6 Temporarily demolished El Li Li El Gi Li El Li Wholly demolished ri Li LiGL I El Li Ui El Li Partially demolished El Li G G Li Ui El Li subtotal Temporarily demolished Gi Eli LiGLi Eli G Li GU Wholly demolished Li Li Li El Li Li El Ui Li G Partially demolished Li E LI I] Li El Li Li LI Li Grade 1 Temporarily demolished n Li G El Gi i LI U Li Li Wholly demolished El n u] Li El El rL El Li Li Partially demolished Li El El Li L LCLi El ,II Grade 2 Temporarily demolished rL 5D Li El ni El LI ULI Wholly demolished Li Ci Li El El PI El ni ci Li Partially demolished E, 7C L LI 7 LI LI 5 [ i page 16 of 48 Cost estimate of compenstion for permanently affected house with Property right,house on residential pl shared by this project for WWTS (phase I and II) proje O] L r] n] Li Li r r I n nr _______ Frame structure Composite structure Brick and ti quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Temporary Grade 3 Temporarily demolished O F] Li or structure Wholly demolished OF OG F] El after Hous Partially demolished O LI Li D. F] I] n] El F] Li expiration/i ing Ilegal Grade 4 Temporarily demolished O I G O G O r G O structure Wholly demolished LI El I I o E Partially demolished O O O O O G n o o Grade 5 Temporarily demolished El O El El Go Wholly demolished El F] EJ Li ri D El D O] O] Partially demolished oF F] o I o] F] Grade 6 Temporarily demolished n D o] r] F] Wholly demolished Li O] C] El F] F] F] F] O I] Partially demolished O] F] o] El oi o] o] o G r, subtotal Temporarily demolished O] F] D FO Oi F] F] LI o no Wholly demolished El O b] F] D D El Li F] FO Partially demolished El F] LI G] D Li O] D LI O _ O Grade 1 Temporarily demolished El G] Oi O El El LI Oi O] El Wholly demolished El F] LI LI Oi El El Oi n] El Partially demolished El O] ni Li Li F] o n] Gi LI Grade 2 Temporarily demolished O O] LI C] O] Oi Li Wholly demolished O] El F] F] oi c] n ] Li Partially demolished OFF El C] O Oi O] O OIO Temporary Grade 3 Temporarily demolished El El O] El O] D On structure Wholly demolished FI El LI O] r] o] o] after Shop Partially demolished OF El Li r o o or expiratilon/i llegal Grade 4 Temporarily demolished El O O O 5 r o o F o structure Wholly demolished El El O] Oi [J F] D Li Partially demolished O] E] F] F] O] F] LI LI r] El Grade 5 Temporarily demolished Oir I LI i F] El El D n] LI Wholly demolished O D. CJ r] Li El oi LI L Partially demolished D Oi LlLi Oi L L Li ouI Grade 6 Temporarily demolished rLi i r r o El o El Wholly demolished .] O - ] LI E r_cb__ page 17 of 48 Cost estimate of compenstion for permanently affected house with Property right,house on residential pl shared by this project for WWTS (phase I and II) proje [7 L [r I [7 n I I[M L [r [n [ L Frame structure Composite structure Brick and ti quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Partially demolished [ [O [O [ [7 [ r [7 [L LI subtotal Temporarily demolished [7 [7 [7 [7 [7 [l [7 [7 [I [7 Wholly demolished [[ [7 [G [7 [ [G [7 [O [7 Partially demolished [[ [7 [7 [G [ L[ [G [7 [7 Grade 1 Temporarily demolished 7 7 7 [ O L[ L[ [ Wholly demolished G [7 [7 [7 [ o7 Partially demolished [7 [7 [7 [7 [7o[7 [7[ [7 Li Grade 2 Temporarily demolished [7 [[ [7 [7 [7 E7 [7 Wholly demolished [7 [7 [7 [7 [7 [7 [O Partially demolished [7 [O [7 [7 [7 [L [7 [7 [7 [7 Temporary Grade 3 Temporarily demolished [7 [7 O7 [7 [7 [7 7 7 [ [ structure Wholly demolished [7 [7 [7 7 7 7 [ [7 [ O after Offi Partially demolished [ [ [ [ [ [ [ [ expiration/i ce llegal Grade 4 Temporarily demolished [ [7 [7 [7 [7 [7 "I [7 structure Wholly demolished [7 [7 [7 _ [7 [7 OD [7 Partially demolished [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 Grade 5 Temporarily demolished [7 [7 [7 [O [7 [7 [7 [7 [7 [n Wholly demolished [[ [7 [7 [7 [7 [7 [7 [ [ 7 Partially demolished [[ [ [7 [7 [ [7 [7 [1 [ Grade 6 Temporarily demolished [7 [7 [7 [7 [7 [7 [[ [7 [7 Wholly demolished [7 [7 [7 [7 [7 [7 [7 [7 L[ [7 Partially demolished [7 [7 [7 [7 [7 [ [7 [7 L[ [ subtotal Temporarily demolished [ [ r [ [7 [7 [7 [ [ Wholly demolished [7 [7 [7 [7 [7 L[ Partially demolished [ 7 L[7 [ [ [ L i [7 [7 [7 I [ Grade 1 Temporarily demolished [7 [7 [7 [7 [7 [7 7 [ [ o Wholly demolished [7 [ [7 [7 L[ [ [7 L[ [ [7 Partially demolished [7 [7 [7 [7 [7 [7 [7 [n [7 [7 Grade 2 Temporarily demolished [7 [7 [7 [7 [7 [7 [ [I [I Lu Whoy demoished [7 [l [n [i7 [ [ [ [ Partially demolished [7 [7 [7 [7 [7 [7 U r[J [7 [7 Temporary Grade 3 Temporarily demolished [r [7 [c [7 [lr[ 7 i I L[ O7 page 18 of 48 Cost estimate of compenstion for permanently affected house with Property right,house on residential pl shared by this project for WWTS (phase I and II) proje E U U n I3[,I r rn L r I Frame structure Composite structure Brick and ti quantity Floor area Unit price Total price quantity Hoor area Unit price Total price quantity Foor area structure Foct Wholly demolished r I I U U r U UI after ory Prilydmlse l 111E 1E expiration/i buil Partiallydemolished 3 U 3 3 r U 3 C C llegal ding Grade 4 Temporarily demolished 3 U 3 3 n 3 1 3U 3 structure Wholly demolished 3 3 3 3 U 3 3 n 3 C Partially demolished U U 3 U U U U U U U Grade 5 Temporarily demolished U U U 3 3 U U U U Wholly demolished U UU U3I U U U U3 Partially demolished U U U U U U U U U U Grade 6 Temporarily demolished U U3 3U U U U Ui Wholly demolished U U3 U-3 U U b Ul Partially demolished U U U U U U U U U U subtotal Temporarily demolished U U U U U UU U U Wholly demolished U U U U U U 3 b Partially demolished U U3UIU U r U U U Grade 1 Temporarily demolished U U U U U 3 Wholly demolished n U U U U U U U U Partially demolished U U U U U U U U U U Grade 2 Temporarily demolished U U U U U U U U U Wholly demolished U3 U U 3 U1 U U U U Partially demolished U U U U U U U n U Temporary Grade 3 Temporarily demolished U r U U U U 3 U U U structure Othe Wholly demolished U U U U U U U LI U expiration/i r Partially demolished U U U U U U E l U U Ilegal uses Grade 4 Temporarily demolished U U U U U U] U U U structure Wholly demolished U U U U uL U U U U Partially demolished U I U U U U U [] U U Grade 5 Temporarily demolished [J U U U U LI UG Ul U Wholly demolished U Li Ul U U 3 U U Partially demolished EU U U [ U U U U {irade 6 Temporarily demolished U U U U U U n U U Wholly demolished U U U [1] 3 U U U LI Partially demolished U I U U L U El U3 page 19 of 48 Cost estimate of compenstion for permanently affected house with Property right,house on residential pl shared by this project for WWTS (phase I and II) proje IrE LI LI r- c n L Li El G 3 Frame structure Composite structure Brick and ti quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area subtotal Temporarily demolished Gi L] l G G OGG Wholly demolished Gi r El G GG Partially demolished El El Gi El Gi G GG Grade 1 Temporarily demolished rL ni G Li L Li Li, Wholly demolished El Gi Li Li LI G ni El Partially demolished ni Gi GL Gi Gi Oi G G Grade 2 Temporarily demolished El Gi Li Li r- Gi ni Li El Li Wholly demolished GL El Oi Gi Li Gi G [. Li Partially demolished GL LI LI LI G ]I LI L I LI Temporary Grade 3 Temporarily demolished G El Gi ri Gi Li l El Li LI structure Wholly demolished 3L LI Li Li Li LI Li LI GG after tota Partially demolished LI Li El Li Li Li El 1] Li expiration/i 1I___ ____ llegal Grade 4 Temporarily demolished El Li El LI Li El LI Gi Li i structure Wholly demolished El rLI l Li Li Li l LI Li LI Partially demolished Gi Li Li LLi I LA O Li GGG Grade 5 Temporarily demolished Li Li Li i rLi LI Li L LI G , Wholly demolished LI Li LI Gi Li Li Gi El El ni Partially demolished El LI El Gi Li Li Gi Li El Grade 6 Temporarily demolished LI Gi Li Li G Li Li LI Wholly demolished Li Gi Li LI l Li DI LI Li LI Partially demolished El G Li Li Li LGi Li G subtotal Temporarily demolished Li LI LI Gi El G Li El Wholly demolished El El Li El LI Gi El Gi El nG Partially demolished Li Li L Li LI Li LI GG 2.00 117.76 Grade 1 Temporarily demolished GI LI LI El LI Li Li Gi Li LI Wholly demolished ri 1 LI n l Li Li LI Li El Partially demolished Gi Gi LI l Li LI Li Li Li [I Grade 2 Temporarily demolished ri LI Li Li LI Li Li Li Li LI Wholly demolished LI Li El Li, LI Li Gi LI Gi G Parially demolished Oi I ni El r Li Li LL Li no Grade 3 Temporarily demolished ElI Gi ni Li El r] Li G .Wholly demolished Li L r G LI I Li page 20 of 48 Cost estimate of compenstion for permanently affected house with Property right,house on residential pl shared by this project for WWTS (phase I and II) proje ni Li nL L L LILI LI L n [ Frame structure Composite structure Brick and ti quantity Roor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Total ing Partially demolished LI Lj Li Li Li LI L IEl El DI Grade 4 Temporarily demolished ni nL ni Li Li n nn Wholly demolished Li Li Li Li Li "I L El Li Li Partially demolished 3LL Li Li El El Li Li Grade 5 Temporarily demolished nL El L n Li Wholly demolished El Li Li Li Li Partially demolished Ll Li Li El El Li Grade 6 Temporarily demolished Li Li Li Li Li Li Li LI LI Li Wholly demolished Ll LI LI El El Li 3n Partially demolished nL nL El Li 2.00 117.76 .subtotal Temporarily demolished Li Li El Li El i r i O Wholly demolished El, "I n Li Li n 3r Partially demolished nL n ni Li El ni or Grade 1 Temporarily demolished n Li Li Li EJ Li El Li Li El Wholly demolished Li 3 Li L Li Li El Li El Partially demolished E. El Li Li Li El Li El Li Li Grade 2 Temporarily demolished Li El Li El Li El El Li LL Wholly demolished El Li Li Li Li El Ln i E l Partially demolished E Li Li Li Li Li LI Li Li El Grade 3 Temporarily demolished Li El Li Li Li L Li Wholly demolished El i l El i i i i c Total Shop Partially demolished El Li Li LI Li E Li Grade 4 Temporarily demolished Li Li El El Li Li Li Li Li Li Wholly demolished El Li Li Li Li El Li El Li Li Partially demolished Li Li El Li Li Li E "I Li LI Grade 5 Temporarily demolished LI El Li LL LLi I_El I Li Li Wholly demolished L] [ El Li El Li LI Li n Li Partially demolished El El 3 El E Li Li El E 3I Grade 6 Temporarily demolished Li El Li Li Li El El L Li Wholly demolished Li Ui LE E E LL C Lin Partially demolished Ln LI Li El subtotal Temporarily demolished DL nL 3 Li Li page 21 of 48 Cost estimate of compenstion for permanently affected house with Property right,house on residential pl shared by this project for WWTS (phase I and II) proje _ _I _ _ _ _ C LJ Li t r r I [r I r Frame structure Composite structure Brick and ti quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Wholly demolished C Oi Oi ri ti oI Li El El oi Partially demolished El Li Oi Li El r1 ni Li El Li Grade 1 Temporarily demolished El Li Li Li Li O Ei LI D Li Wholly demolished Li LI t_ Li LI Oi Li El L or Partially demolished Li Li Li Li Li El El i L L Grade 2 Temporarily demolished LiL Li LI Li Li El Li Li Oi Wholly demolished Li Li O Li Li Li Oi O El Partially demolished ri Oi El C Li Li Li LI Li Li Grade 3 Temporarily demolished Li I]L Li Li Li El El El Wholly demolished Li ni Li Li Li LI o L i Total Offi Partially demolished OL Li Li Li El Li D El Li Ci ce Grade 4 Temporarily demolished Li Li Li Li Li Li Li i L O Wholly demolished Li Li Li Li Li Li Li. Li Li D Partially demolished El Li Li OI Li Li Oi O Li Li Grade 5 Temporarily demolished l Li Li Li LI Li El El O O] Wholly demolished O LI LI El Li o El Partially demolished i i i i i oL El L Grade 6 Temporarily demolished i Li El El El Li [Il El Li El Wholly demolished El Li El El Li Li Li Li D LI Partially demolished El Li Li Li Li LI Li LI El Li subtotal Temporarily demolished OL Li L Li El Li Oi Li Li Li Wholly demolished tL Li Li El Li D o El El Partially demolished LiO OL ni Li oi oi Li LI LI Grade 1 Temporarily demolished U Li O OL Li LI Oi LI Li Li Wholly demolished 'L i Li tJ El Li O Li Li Li Partially demolished LI El Li Li Li D El El L Fli Grade 2 Temporarily demolished LI O [] Li Oi Li El Li Ci L Wholly demolished El Li Li C i El LI LI El D El Partially demolished "I El Li iC El El Li Li LI Li Grade 3 Temporarily demolished El____ Li EJ 0 LL El i Ol r o Li Foct Wholly demolished OL El El n o D Li L Li Total h°,o,rsyl Partially demolished l LI LI LI C O page 22 of 48 Cost estimate of compenstion for permanently affected house with Property right,house on residential pl shared by this project for WWTS (phase I and II) proje E [I CE, n [a G L L I nEr n Frame structure Composite structure Brick and ti quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area ding Grade 4 Temporarily demolished U U U U LI U n U L Wholly demolished UnUU UnE UnU U nI Partially demolished U U n U U U U U U U Grade 5 Temporarily demolished U U U U o U U U U Wholly demolished U LU U U U U U U U Partially demolished U U U U U LU U U U Grade 6 Temporarily demolished U UU U U U U U U Wholly demolished r] U U U U U U U U U Partially demolished UG U U U U U U U Ul subtotal Temporarily demolished Un U UG U U U [O L Wholly demolished Un U UG G] U U n n Partially demolished UU U U1 U U U U U Grade 1 Temporarily demolished UlUI U U U U U U Ul Wholly demolished UL U U U U U U u U D Partially demolished UU U U U U U U Ul Grade 2 Temporarily demolished UU U U U U U U UG Wholly demolished U U U U U U U U U U Partially demolished UU U U U U U U u Grade 3 Temporarily demolished U UU U U U U U U. Othe Wholly demolished U UU U U U U U a n Total r Partially demolished U U U U U U U Un uses Grade 4 Temporarily demolished LU U U U U U U U U Wholly demolished U U U U U U U U U U Partially demolished U U U U U Ll U U U u Grade 5 Temporarily demolished L UIU [lnU UlU U U E Wholly demolished U U U U LU U U U U Partially demolished U uLU UaU U U UI Li Grade 6 Temporarily demolished U U U U Ul U U U U Wholly demolished U U U LU U U LU LU Partially demolished El U] U U U r U U r u subtotal Temporarily demolished U U u U UU U L Un Whollydemolished r a U a n U LU U page 23 of 48 Cost estimate of compenstion for permanently affected house with Property right,house on residential pl shared by this project for WWTS (phase I and II) proje ni LI n n r- Lr LIL L r r Frame structure Composite structure Brick and ti quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Partially demolished Fi r] LI El r Ii ni El 2.00 117.76 Grade 1 Temporarily demolished ni ni n ri L, Li I Li LI ru Wholly demolished [n [b [n r- n7 o7 En n7 n7 El Partially demolished [c [7E[, [77 c E Li El Grade 2 Temporarily demolished Li Li El E Li i Li I Ei F] r n Wholly demolished [l [n [n n7 LI n El G7 Ci n7 Partially demolished El El ni r ni Li Li I LI EJ Grade 3 Temporarily demolished ni ni ni ci Li l Li LI ci cn Wholly demolished [I [7 [I F] ni F] Fr ci ri n c Total tota Partially demolished [n Eli [cI El Fn El o Grade 4 Temporarily demolished LI ni [r ni ni El Gi Li Wholly demolished Li El Li Li Li El Li ni Li E. Partially demolished L] Li Li LI ri [c Li n ni Li Grade 5 Temporarily demolished CI LI l El Ui El Li LI ni El Wholly demolished [l [n [n [n Li c Li n[ Partially demolished O L ni ni ni ni i Ln El Li Grade 6 Temporarily demolished n ni ri El El ci Li Li ]I LI Wholly demolished El [7 [n ri ni El c] ci I Ii Partially demolished r L El LI Li Li Li Li 2.00 117.76 __________psubtotall Temporarily demolished of 48 page 24 of 48 .ot,historically used house,temporary structure before expiration, ct (pipe network) b L H Li I I El Attached table:18.1.4AC Imber structure Simple structure Total |Unit pnce Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price LI El ol ',1 ol o] LI l I oT H Hl Hl Hl H H H- H [] E] o1 ol oI El LI rLI El ol o El El a o o El nl rLI o1 S~~~~~~~1 El o1 o1 o1 =E X l El nI o~~~~~~~1 El o- El r1 o I n oo H. Hl H1 H H H1 HI F H H o H H Ho H H H H H o H H H H H H H H H Hj H1 Hl H1 H H []I HI HI H H H H H H1 Ho H H H H H H H H H H G H H o ~ ~ ~ ~ ~ ~pg o2o5 of n48n o H H H H H H H H H H H L] H H H H H H H H HO H H H H H H H HH H H H H2 H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H n H H H H H H H H H H H H H H H H H H H H H H H [1 H H H o H H H H H H H H Hr H H H H H H H H H H H H H H H H H o H H page 25 of 48 ot,historically used house,temporary structure before expiration, ct (pipe network) r __ I_Li L I L H H L c Attached table: 18.1.4AC Lmber structure Simple structure Total Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price H H LI~ ~~ ~~ j HI El LI_ _ H- El H o H H Ho H H H] H H O1 O El LI r Li LI O OC O O1 O1 n1 Cl El U1 1 O L H H H H H H H H H H1 HI LI1 H H H HHH "I H H H H o H H H H H H H H H H H H H H HoH H H H H H H H H H H H H H H H H H H o H o H H H Ho H Hc H H H H H O H H H H H HlH H H, H n H H H o1 o 1 o F c o 7 o 1 o 1 r Ic H H H L El H H H H H n; El LI n1 El El LI L LLIO O 5 ] H H H I O Li L H H H r ] I O H D H page 26 of 48 .ot,historically used house,temporary structure before expiration, ct (pipe network) Z Li oi oI bI LI Attached table: 18.1.4AC Lmber structure Simple structure _ Total Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price LIi Io L o oi El I i ri L L LI OL Oi El II Oi no e__ oi oi oi ri o L Li L Li El Li Li L Li LI I Li Li, L oi Li LioLi Li Lii LI Li -i Li El LI II LI Li 7i Li L Li Li~1 Li Li Li El Li El Li L Li Li Li O Li Li Li Li Li Li Li ~~~LI LiLIL Li Li Li Eli Li Li~~1 ELiL IiI Li Li El Li El El Li Li i I Li LiLi Eli El Li LI Li ri LI El Li n El Li El Li Li Li Li Li LI LI LiL i Li LI Li El Li Li Li Li Li Li Li L~~~~~~~~ri Li Li LI El LI Li Li Li Li ~~~~~~ ~~~li Li Li Li Li Li Eli El ILiL El Li II Li Li, El El LiLiL Li Li El Li Li El El LiLiL Li Li Li Li Li Li Li~~1 Li Li Li El Li LI Li LII Li L~ ~~i El Li Li Li El Li Li LI Li Li~~r LI Li Li El i Li Li L]I C Oi L Li LI O C C O o1 El oI oE l o El 1ag 7 f 4 8 O O El El Li Li I n o1 o- o~~~~E o r I Li o I o o El L~ ~ ~ ~ ~ ~pg O2O7 Of n48o o .ot, historically used house, temporary structure before expiration, ct (pipe network) n1 L LI Lr n LI r I I Attachedtable:18.1.4AC rmber structure Simple structure Total Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price Li Li ~~~~~li [7I Li Li Lii El Li Li Li Li Li LI Li Li LI Li Li Li LI El El Li Li Li LI Li [7 Li Li p Eil LI Li El, El Li Li Li Li Li Li LI Li Li Li Li Li Li Li El Eli LI Li LI Li LI, Li Li Li El Li Ij Li El Li Li Li El Li Li Li Li Li LI LII Li Li OL Oi Li Li 0i 3 Li Li Li r El oi o Li Li Li Li oi II Li Li Li. Li Li Li Li Li Li Li Li Li Li1 LI Li Li Li1 ij Li Li r~~~~1 El c o r~ o I o1 GC n o i o I n i i o L O~~~~~~~1 C1 El [ J 3 I C El Li Li Li Li1 LiL Li LI Li L Li, Li El El. iiL L Li Li r~ ~ ~ ~ ~ ~pg o2o8 of o483 O Li Li 3 O O n Li o Li Li i 3i Li n Li o o Li Li r o ~ ~ ~ ~ ~~~pg 28o of 48 c o .ot,historically used house,temporary structure before expiration, ct (pipe network) El n L LI 3 L L Attached table: 18.1.4AC imber structure Simple structure Total Unit pnce Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price ni oi LE I 2l oi Li I n LI LI Oi Oi ni LI Oi Oi n L LI Il I3 El LI Li Oi i LI Li O ni oi oi n n o Li ni n L Li Oi Oi ni r O O Li Li L o Li Li Li n n o Li Li n o Li n Li Li Li Li Li Li Li Li Li L Li Li O n L Li Li L Li L Li Li Li Li L n Li oi r i Li Li n n Li Li Li n Li L ni Li Oi Li L n Li Li Li n Li Li n Li Li Li Li Li Li L Li Li Li L Li i Li Li Li Li n Li Li o Li Li L Li n Li Li ni n n Li o Li Li Li Oi O O Li Li n L Li Li Li Li Li Li O OLO Li n Li L Li Li n Li Li Li Li L Li ni oL Li Li Li Li o Li I Li o Li Li n Li o Li Li n Li o Li oLn L Li Li n Li Li Li Li n o Li Li Li Li O O Li Li Li Li LiL Li Li n r Li Li Li Li o Li Li n L Li Li Li O Li Li Li Li Li Li Ln ni oi o n n Li LiL Li Li Li L Li Li Li Li n L Li Li n Li Li [ I Li G3 Li Li Li Li Li n Li Li Li Li Li ri Cl n Li Li Li Li 3_ LiO ni Li Li n n L Oi Li n Li page 29 of 48| ot,historically used house,temporary structure before expiration, ct (pipe network) ci oL ni IL L LI I oi Attached table:18.1.4AC .mber structure Simple structure Total |Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price Li Li ~~ ~ ~~LI Li Li LI] Li LI El Li Li Li Li Li ~~ ~ ~~ ~ ~~ ~ ~~li Li LI LI Li Li Li Li D LI, El LI El Li Li O; Li Li LiEl ij Li LI Li Li O Li Li Li Oi Oi Li U o Li Li LiL Li Li Li LiL LioLi Li Li Li Li Li Li El oo Li ~~~li L L Li Eli ll Li LI Li Li Li Li Li~~~~~1- LI Eli L Li Li FLI Li Li~~1 LI Li Li1 Li Li Li Li Li Li ~~~LI Li Li F]LiL Li Eli Li Eli Li El Eili Eli Li Eli D LI Li Li ~~ ~ ~~ll i Li Eli LI LI LI Li Li Li ~~ ~ ~~Li Li Li El Li Li L ElI page 30 of 48 .ot,historically used house,temporary structure before expiration, ct (pipe network) O LJ LI El LI LE C Attached table:18.1.4AC imber structure Simple structure Total |Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price oL El ci ri u oi oi I L i oi L Li LI ri Li Li LI o Io Li o Li ni oi L l l Li LI LioLiLi l. LI Li El Li I i o] ei Li Li l LL LI Li Li DI LI Li LI Li Li Li Li L Li El L] Li Li Li Li Li Li LI El Li Li 3 tLO Li Li Li Li Li L L Li El Li El Li Li L]I LI El Li Eli L Li LI Li Li Li Li Li [I Li El Li Li El LI Li Ill Li Li I Li Li Li L Li Li LI Li L Li Li Li Li L] Li Li Li Li Li Li Li Li Li Li Li Li Li Li Li Eli LiL LI Li Li Li Li Li Li Li Li Li Li Li Li Li Li Li Li L i L i L i L I L L i El i L i L L i 1 Li Li 1 Ii L El Li Li Li ILi Li Li Li Li1 LI L LI Li Li Li1 Li II Li Li Li El Li Li Li L-i Li Li _ Li Li Li L LiLii EliLLiL Li.L iL iL page 31 of 48 .ot, historically used house,temporary structure before expiration, ct (pipe network) r________________ i G r L LI LI C Attached table:18.1.4AC 'mber structure Simple structure Total |Unit pnce Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price oi ni 'l oi I Ii O_ _ __no__ 0i LI 0i ni oi G L- ri L Li 0i El G i 0 i G i n i o i El Li LI Li Li Li~~~1 1 Li I Li Li Li Li LI El Li n oL Li l Li LI Li Li LiuLi Li Li L i Li E li LI Li LI o1 I I r I n o1E ] 1E El L El n Li Li L L LI L Li Li Li El Li El LI Li Li Li Li El El Gl 0 El El El El El LiaLI l LI G Gi n Li El Li Li Li Li ~~ ~ ~~~~li Li Li Li LI Li Li a ~ ~ ~ ~ I n1 o1 1 n El G1 El G Li "i Eli LI Li El Li LI El Li LioLi Li LI LI 0 Di Li Li LI o1 n G1 n o1 n1 o c n DI o1 F] n1 G n1 G- n c G El Li LI Li Li Li n Li Li Li i- Li Gi Li n oL G Li L Li Li i i n L Li Li Li c L l] Li El LI Li El n cL Li Li Li Li Li~~~~1 Li Li Li LiLillL o n o n n G nage n of 4 Li Li Li Li Li n Li Li Li Li Li o Li Li L Li Li Li o Li Li Li Li G Li r G 0 Li Li 650.00 76,542.39 Li Li r r L 2.0)0 117.76 650.00 76,542.39 0 Li Li Li Li Li Li nL O r Li Li LJ CL ni r r Li page 32 of 48 .ot,historically used house,temporary structure before expiration, ct (pipe network) 3i Li L i r Lr Attached table: 18.1.4AC Lmber structure | Simple structure Total Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price LI Li~~1 Li Li Li Li Li Li Li Li Li Li~~1 Li LI LI] Li Li Li Li Li "I Li L I "I i Li El, Li LI Lj Li El l Li LI 3 Li LI LI Eli Li i Eli El Li El El Li El Li El El Li Li LI Li Li El Li LI II LI El Li L LI El Li Li 650.00 76,542.39 Li Li Li Li 2.00 117.76 650.00 76,542.39 Li El O Li II n 3Li L 0 El 6. 76ID Di 1L Li Li Li Li L L]I Li Li LI Li El Li Li Li L i LI IIL i iL Li i U Li Li LI Li FL LI n LI ILf I r Li Li Li Li Li 0i Li 1C El El [ 11 C] Fl 0 r jFl O LI Li LI LI Li Li Li Li I r I Li Li Li Li L~ ~ ~~ ~ ~~ ~ ~ ILi1 El EilL page 33 of 48 ot,historically used house,temporary structure before expiration, ct (pipe network) L Li L LI Li LI LI 3C Attached table: 18.1.4AC hmber structure Simple structure Total |Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price LI Li LI LI LI LI LI LI LI L Li Li Li L, Li Li Li El Li Li LI Li Li Li II LI Li LI LI LI LI ri Li LII Li LI LiJ LILii Eli Li LI LI Li LI i II El Li Li Eli Li Li El ElLLii LI Li LI Li El Li _I LJi Li Li Li1 Li Li El Li Li Li El El Li Li Li Li El Li El Li LI Li El Li Li Li Li~~~~~~1 ll Li Li1 Di Li Li Ill Li Li Li~~~~1 Li Eli Li Li iI LI Li Li El Li El LI Li Li Li Li El Li Li Li Li- Li LI L7i LI Li Li Li Li Li Li L LI Li Li EJ L-i Li Li LI LI ri LI i Eli LI L-i Eli El Li L LI Li Li Li Li Eli Eli Li LLI Li LII Li LrI Li Li Li El L Li El El Li El Li Li Li Li Li Li LI Li Li Li Li Li L-i LiL Di Li Li Eli El Li -iI Li Li Lii I] L~~~~~~~~~~~~rI I I liLLii page 34 of 48 .ot,historically used house,temporary structure before expiration, ct (pipe network) GL I 7 El E Li LI LI Attached table:18.1.4AC .mber structure Simple structure Total Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price J Li LI Li El O 1 El I Li Li Li El LI Li El Li Li Li Li1 Gi Li Li Li Li Li Li Ii Ci El ci Li Li Li l L Li LI El GG Li Li Li~ ~~ ~ El El Li Li Li Li Li Li Li Li Li~~~~~~1 Li Li L I LI Li Li L I I LiLiL LI Li11F]1 El Li Li Li Li~1 L I Li LI El. Eli LI Li Li Li ~~~li El LiLil Li Li LI Li LI] Li ~~ ~~LI Eli Li Li L Li Li Li Li Li Li~~~~1 Li Li Eli Li, El L [J. Eli LI Li Li1 El Li Li Li El Li Li Li Li~~~~1 El -i Li LI Li El Li Li Li ~~ ~~li Li 71 Li Li El Li El Li Li Li~~~~1 Li Li LI Li Li LiL Li Li~~1 LI Li El LiLiL Li I Li Li Li Li Li Li~~~~~~~~~~1 Li LI LI Li Li Li Li Li El El Li Li Li Li Li Li~1 Li Li Li El L]I LI Li DI Eli LI Li Li Li Eli Li Li L El Li Li~1 Li Li Li Li L I Li Li Li Li ~~~Li Eli Li Li Li Li Li L Li Eli Li Li Li LIII Eili El Eli LI LI Li El. Li Li L Li Li Li Li Li LI L]I LI LI Li Li Li Li Li Li LiLiL L3 El Li Li LII r r 1, G1 G 1G Li ~~~li LI Li LI Li Li L. El. Li page 35 of 48 .ot,historically used house,temporary structure before expiration, ct (pipe network) r] r I r 3 3 Attached table: 18.1.4AC Lmber structure Simple structure | Total Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price H H G G Li G H H] H G 650.00 76,542.39 H H H H 2.00 117.76 650.00 76,542.39 H H H~~~~~1 H1 H L H1 H H HI 3 I M El 31 G1 I I G G H H HG H l H H H H H H H Hl H H H H H 3 H H H H H H H H H 3 H H H H H H H H H3 HrH H H H H H H H I H3H H H H H H Ho rH H H H H H H H H H H H H H H H H H H H O H H H H H H H H H H H H H H H H H H H H 650.00 76,542.39 HI H] H H 2.00 117.76 650.00 76,542.39 3~~~ 1 El r I 3 I O1 O: O1 r1 H H~~~ 1 LI] H1 1 H- H7 HI H H Li [DL HI H H H] Hl H H H H H E H o H H page 36 of 48 .ot,historically used house,temporary structure before expiration, ct (pipe network) r- rI L OI L LI r n,Attached table: 18.1.4AC Lmber structure Simple structure Total Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price El L I LI LI El LI El Ij LI L LI LI El L L LI LI LI LI L L LI LI LI LI rL LI LI LI El "I LI LI El LI LI l LI LI LI L LI LI LI LI LI LI LI LI LI n LI LI LI LI LI L LI LI LI nI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI [U LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI rI LI LI LI LI LI LI LI LI LI LI LI LI LI LI [ LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI r LI LI LI LI LIL LI LI LI page 37 of 48 ot,historically used house,temporary structure before expiration, ct (pipe network) El L LI Li ri n 3C Attached table: 18.1.4AC Lmber structure Simple structure Total Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price Li Li Li~~~~1 El LI Li Li Li El Li Li Li L~ ~ ~~~I LI LI L. Li L] Li Li El El nL Li r I L] Li Li Li Li Li~1 Li Li Eli Li Li Li Li Li Li L] Eli El Li El Li Li Li LII Li Li~~1 Li Li L] L, Li Li El El Li3Li Li LiEl l Li Li Li 33 Li Li Li Li Li~ ~~ ~ ~~ ~ ~ Li El Li Li L] Li Li Li Li LI L~~~~~~~~~~~]I Li El El L] El 3i n 3 Li Li El L El Li El LiL Li Li El El L] L] Eli Li Eli Eli Li Li Li Li Li Eli Li L Li Eli L] Eli Li Eli Eli Li Li Li Li El Di El Li LI LI Li Li Li Li Li~~~~~~~~1 L] Li Li L] Li Li Li Li Li Li~~~~~~~~1 Li L] -i Li Li Li El Li Li EJ -i L] L] Li1 L] Li Li~1: L] El Li El Li Li El Li Li Li~~1 Li, LI L Li Li Li Li Li Li Li~: LI El L] Li Li Li Li LI Li L] Li Li Li Li Li Li D Eli page 38 of 48 ot,historically used house,temporary structure before expiration, ct (pipe network) G El [ l 3 G [ Attached table:18.1.4AC mber structure Simple structure Total Unit price Total price quantity Floor area Unit pfice Total price quantity Floor area Unit price Total price ni Gi 3i 3i bi ni 3i Ci ni 3E Gi Li i LI LI El Li El ni El ri Li I I Li El 3i El LI 3i LI ni nL Li l l Li l LI 3t Oi LI LI LI El El El Gi bi 3i 3i l 3i 3i El Gi 3i Gi El El 3i Li l LI 3i 33 LI ri El n ni El Li 3l l Li LI i nL El Li Li 3 L LiOLi Li l "I 3i 3i Li n Li Li3Li Li Li El LI El LI Li El Li El Li Li LI Li Li Li El Linl Li Li El El Li El 3 Li Li3Li El Li Li 3I El n 3 l Li3Li El Li Li Li Li l LI ti Li Li 3i El Li nI El El Li Li LinLi Li El 3 Li LI i n L Li Li Li Li Li Li ci 3i ni 3l Li Li LI Ui Li 3 3 E i 3 L Li3Li Li LL LI El LI 3 Li Li LI Li Li El n Li Li 33 El ni Li ni Li Li Li L LI LI Li El El n El ri Li Li Li Li Li ti L I LI EJ 3i El F. LI LI LI ti ni Li n Li n El it ni El Li Li Li LI El "I nI Li Li Li Li Li El Li F] El I 3l El El Li Li Li Li LI ni El F] I L][ LI Li Li Li n Li GnI Li Li LI Li LiEli Li El ti El LinLi Li Li Li l LI E Li L J UI El n n n page 39 of 48 .ot, historically used house,temporary structure before expiration, ct (pipe network) Li Lr El G r F[ nl El Attached table: 18.1.4AC Lmber structure Simple structure Total Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price Li LI Li Li Li Li L LI Li Li Li ~~~l Li L LI Li Li EJ Li Li G| Li Li S LI LI L Li i Li El G| Li LiEl G| G| El El El LI Li Li Li ~~~ ~~~~l El LI Li Li Li LI- Li Li El LI Li Li El L El Li Li Li Li Li Li Li Li Li Li Li Li l IiLi L LI i Eli LI LI L Li 1 Ii L Li 11i FL LII Li El El Li ~~~li Li Li El Li LI LI Li Li Li Li Li Li Li Li L-i LI i Eli El El G| G| r1 T E ElG G Li Li LI -i Li Li LI El Li LI 1| El El 1| 21T El Gr1 2 Li Li Li Li LI I ILi LI Li LI Li Li Li Li El Li FL Li El Li LI LI Eli Li El Eil Li El Li r L l l Li El El GG r I Li rx~ ~E G1 El 1 G] El El GG Li, LI I IEli El El I Li .L El LI page 40 of 48 .ot,historically used house,temporary structure before expiration, ct (pipe network) r oi ni I Ln L L LI Attached table:18.1.4AC Lmber structure Simple structure Total |Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price Li Li Li ~~~ ~ ~~~l Ii I. Li1 Li L LI El r1 nF n] r1 El U El, Li L LI Li Li LI LI ij Li Li ni ni L ri r Li ri ri ri Li n Li n Li n n Li Li Li El in r ri El LI L in Li LI El r n l Li LI L Li El Li L Li L~ ~~i Li Li Li Li Li El El L LinLi Li Li L Li r nl Li rL Li ~~~l i El Li Li El Li i Eli LinLi El L LI L ni n El Li Li Li~~1 Li Li El Eil L LI Li Li ~~~l El L L I Li Li Li Li Li Gi Li L Li ni ni Li Li n ni nI Li n n n Li Li Oi n Eli LI LI LI Eili El Li Eil Li LI Li Li Li Li El Li L-i L Li 1 Ii L Li Li i Eli Li El E. En Li Li LI El Li n Li L LI r1 El r1 r r] r-p 4L 8 L El El LIl ° n1 rD 1 ElE [ I LI Li Di Li LI rDi Li page 41 of 48 .ot,historically used house,temporary structure before expiration, ct (pipe network) i LrLi F] Li LG U El n Attached table:18.1.4AC Lmber structure Simple structure Total Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price ni oi ni rL °i ui ni o Li Li Li~~1 Li Li Li Li L LI Li FL Li Li~1 Eili LI El Li, Li L Li El L] Li LI Li Li Li Li Li1 El Li El LI LI] Li EJ El Li Li I] Li Li Li El, Li El El L LI El Li Li El Li LI Li LI Li El El El Li I Li El Li Li Li Li II Li LI Li Li EJ Eli Li El Eil L, El LI Li Li Li LI Li Li Li Li Li Li Li Li LI Li El i El Li Li Li Li Li L Li Li Li LII Li Li Li Li i Eli Li Li Li Li Li LI Li Li Li El Li LI L Eli Li Li Li El LI Li Li El Li1 Li i EJ El Li Li Li Li Li Li LI Eli LI El L-i Li Li LI El I ILi i Li El Eli LI Eli Li Li Li El Li LI Li Li Li Li Li Li Li Li El Li El, Li Li Li Li LI Li Li Li Li Li DI LI Li Li Di LI ILi Li Li Li El ij El El [I Li Eli LI Li L Li El F] LI Li El Li Li Li L Li Li El i El LI LI Li Li Li Li~~~~~~1 Li El El I LI] Li Li Li ~LI Li Li1 i El Li, LI Li page 42 of 48 ot,historically used house,temporary structure before expiration, ct (pipe network) L r n] VL F] LI ui El Attachedtable:18.1.4AC Lmber structure Simple structure Total |Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price El El LI oi Li ni oi LI Erl G Li Li Li Li Li Li Li Li Li ~~~~~~~~~~~~~~~~~~~~~~~~Li, Li ~~~LI Li Li Li Li Li El II LI Li Li Li Li LI Li El Li Li Li Li Li Li Li Li~~~~~~~~1 L]I El LI Li LII Li Li Li~~~1 E LiI El Li Li Li LI Li Li ~~~~~lI Li Li Li Li LI L I~I E] Li Lil ElL Li L iL Li Li L~i Li Li LiL i iL Li Li~1 Eili LI Li L EiLiL Eli Li LI Li El Li Li Li El Li Li Li Li Li L L]I Li Li L]I LI Li LF] Li Li L Li Li L-i Li -i Li L Li Li Li Li LI Li L]I Li L Li Li Li Li El Li Li Li Li LiL Li LI LI El Li Li Li El L Li Li Li Li Li El El, LI' LI Li Li Li. LI LiLiiLii El El EJ Li Li Li El Li Li L Li ~~li LI Li FLi EL Li Li Li Li Li Li ~~~~~li I Li Ii Li] I li page 43 of 48 .ot,historically used house,temporary structure before expiration, ct (pipe network) n t n r r I [1 r Attachedtable:18.1.4AC Imber structure Simple structure | Total | Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price t I El El Hl El EH LI I T r~~~~1 |1 El E7nl nl n| LI1 t,| El :]| LI []I LI |1 Li r7 LI Eln nl tI LI t1 LI E n r El EtTnl nl nl~~~: El nL tl El LI El nT nl Lil F] El n7 nl nl nl El nT ti I F-I nt El 11 nl nl El nT Fl n Gl tt t7 ~~ ~~~~~El l Ej IT LI7 Gl nT nT nl nl n1l nT LI El El a~~~~~~~1 n I n F] C1 El C n, n H H H H n C C I C El n1 n El El El n r CEn 650.00 76,542.39 El n El C 2.00 117.76 650.00 76,542.39 LI Li U cj C1 El c]I n1 n1 r1 r El r El LiC H H H H C H C H HC page 44 of 48 .ot,historically used house,temporary structure before expiration, ct (pipe network) __________ _ 3I r, n n r cSL Attached table: 18.1.4AC imber structure Simple structure Total Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price El Li oi Li Li LI oo LD oi Li EliL Li El El LI Li Li Li Li Li Li Li~~~~1 El Li Li L Li El LI I Li Li Eli LI Li LI Li Li Li 650.00 76,542.39 Li LI Li Li 2.00 117.76 650.00 76,542.39 Li Li Li Li Li L ILi Li EliL Li LI Li L-i Li El Li Li FLL LI Li Li Li Li LI El Li Li LI Li L iL iL iL iL 0 O b 01 El 0 O_ o Li Li Li L El Li Li L Li Li EiL iL il Li Li Li LI FL LI LI El Li L Li LI Li Li Li ~~ ~ ~~Li Li Li Li El LiLiL El El I ILi El Li Ci Li Li LI LI Li C Li Li L El Li I nl Li Li El E. Li Li LI i El Li Li Eli Li Li Li Li Li. LI LI Li; [i LI IL Li LI DI O [] L Li Li Li Li1 i Eli LI Li Li Li L I L El L Li L C O C C page 45 of 48 .ot,historically used house,temporary structure before expiration, ct (pipe network) L L El L L r u n Attached table:18.1.4AC Lmber structure | Simple structure Total Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price El r1 L1 El n r L r LI Li r In_ _ _ n El n o I n I C n~~~~~~~~~~1 LI u1 El n1 n rn n H r H H H H H H ri c H H H H H H H H H HI H HnH H H H H H H H~ ~~ H 1 LI [] 1 HI H H HP H H1 H H H H H H H E H H H H H H ] HHL LH H r ~ ~r] Li n1 c LI F El n In r rj nj o El r LI r r El c H H H H I H H HoH H H H H Hl H LI HH iH H H Hi Hp H6 H I E HI HI H H H HI HEH LI H H H H H~~~~~~~~~~E H HEHHl H H H H H~~~~~~~~~r- H] H HH H H H H H~~~~ag 4 Hf H4HH8 .ot,historically used house,temporary structure before expiration, ct (pipe network) I I El LI LI Li [ [ [, Attached table: 18.1.4AC mber structure Simple structure Total Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price [O Ci L olELI LI [l [, [E lc [C Li Li [r ,O0 [ LI LI Li L I [7 [] [~ ~ ~~71 [7 [7 [I I~ [7 I [7 El LI Li L Li Li LI Li Li Li Li L~~Ij Li Li L El L LI El []I Li Li~~1 [7 LiL Li Li Li Li L Li i I I J El i El Li L -i Li Li Li~1 El Li LI [7 Li Li Li [7i Li Li~1 uL Li El Li Li I Li I l Li Li~~1 Li El Li Li Li. LI LI L Fl [7~~1 El Li Li Li Li Li El Li El LI Li Pi Li El Li Li El Li Li Li Li~ ~~ ~ Li Li Li Li Li Li El Li Li ~~ ~~li Li LI LI Li Li Li E. Li Li Li Li Li Li Li Li Li E Li Li~ ~ Li Li [i LI L]I El Li El Li LI~~1 LI Li ILIi LI Li Li Li Li Li Li Ei i Li Li Li Li El El Eli LiL Eli LI El LI LII LI El Li [~LI LI Li El [7 I LI El El pageC47 o 4 8 E C O ~ ~ ~ ~ ~ ~~~ OI E O] O OElUO O~~~~~~~ ~pg O4O7 Of ,48O O .ot,historically used house,temporary structure before expiration, ct (pipe network) Fl ni El Li L [F L Attached table:18.1.4AC Lmber structure Simple structure Total Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price 650.00 76,542.39 ni ni rI Li 2.00 117.76 650.00 76,542.39 . Li ni El n r C ni LI n LI Li Eil c ci Li Lr ni ni l n 5 r r O Li LI ni ci LI ni Li 1i Li ni n El ni LI I ni ci ni c ci El El ci Li El H ni ni ni ci ni rr ni Li El El ci ci El ci ni rr oi Li ni Di El ni l o o El ni _ ni c Li n n H nI nE ni oL n n ni El c c ri l El El ri El C H nc Li ~~li Li El Li El El El Li LI ci l l l Li ni n oc Li Li Li Li~~1 Eiil Li Li Li DI El Li ~~Li, LI H] Li Li L [F Li L]I 650.00 76,542.39 L]I Li I LI I l1 2.00 1 117.76 650.00 76,542.39 Li, Li Li_ __ _ Li, El El Li, Li Li page 48 of 48 I Cost estimate of compenstion for stop-loss shared by this project for Liede WWTS (phase I and II) project (pipe network) Attached table 18.3.2.10.1.4AC-l project area Use Type Total floor area Unit price Total price Grade I Shop Partially but permanently affected 168.00 Grade 2 Shop Partially but permanently affected 120.00 Grade 3 Shop Partially but permanently affected 80.00 Grade 4 Shop Partially but permanently affected 50.00 Grade 5 Shop Partially but permanently affected 25.00 Grade 6 Shop Partially but permanently affected 15.00 - Subtotal Grade 1 Office Partially but permanently affected 96.00 Grade 2 Office Partially but permanently affected 70.00 Grade 3 Office Partially but permanently affected 50.00 Grade 4 Office Partially but permanently affected 32.00 - Grade 5 Office Partially but permanently affected 20.00 Liede WWTS Grade 6 Office Partially but permanently affected 12.00 (phase I and II) Sboa project Grade I Factory building Partially but permanently affected 60.00 Grade 2 Factory building Partially but permanently affected 48.00 Grade 3 Factory building Partially but permanently affected 36.00 - Grade 4 Factory building Partially but permanently affected 24.00 - Grade 5 Factory building Partially but permanently affected 14.00 - Grade 6 Factory building Partially but permanently affected 7.00 - Subtotal Grade 1 other use Partially but permanently affected 60.00 - Grade 2 other use Partially but permanently affected 48.00 - Grade 3 other use Partially but permanently affected 36.00 - Grade 4 other use Partially but permanently affected 24.00 - Grade 5 other use Partially but permanently affected 14.00 - Grade 6 other use Partially but permanently affected 7.00 - Subtotal Total Cost estimate of compenstion for stop-loss shared by this project for Liede WWTS (phase I and II) project (pipe network) Attached table: 18.3.2.10.1.4AC-2 project area Use Type Total floor area Unit price Total pri Grade 1 Shop Temporarily affected 168.00 - Grade 2 Shop Temporarily affected 120.00 - Grade 3 Shop Temporarily affected 80.00 - Grade 4 Shop Temporarily affected 50.00 Grade 5 Shop Temporarily affected 25.00 - Grade 6 Shop Temporarily affected 15.00 - Subtotal Grade 1 Office Temporarily affected 96.00 - Grade 2 Office Temporarily affected 70.00 -0- Grade 3 Office Temporarily affected 50.00 - Grade 4 Office Temporarily affected 32.00 Liede Grade 5 Office Temporarily affected 20.00 - WWTS Grade 6 Office Temporarily affected 12.00 (phase I Subtotal and II) Grade 1 Factory building or warehouse Temporarily affected 60.00 - project Grade 2 Factory building or warehouse Temporarily affected 48.00 - Grade 3 Factory building or warehouse Temporarily affected 36.00 __ Grade 4 Factory building or warehouse Temporarily affected 24.00 _ Grade 5 Factory building or warehouse Temporarily affected 14.00 - Grade 6 Factory building or warehouse Temporarily affected 7.00 - Subtotal Grade I others Partially demolished 60.00 - Grade 2 others Partially demolished 48.00 Grade 3 others Partially demolished 36.00 - Grade 4 others Partially demolished 24.00 - Grade 5 others Partially demolished 14.00 - Grade 6 others Partially demolished 7.00 - Subtotal Total _ Cost estimate of compenstion for business loss due to relocation s project for Liede WWTS (phase I and II) project (pipe net, Attached project area Use Type Total floor area Unit price Grade 1 Shop Wholly and permanently affected 840.00 Grade 2 Shop Wholly and permanently affected 690.00 WWTS (phase I Grade 3 Shop Wholly and permanently affected 560.00 and II) Grade 4 Shop Wholly and permanently affected 450.00 Grade 5 Shop Wholly and permanently affected 350.00 Grade 6 Shop Wholly and perrnanently affected 270.00 Subtotal I ;hared by this work) table:18.3.2.10.2.4AC Total price Cost estimate of cost for pipe relocation shared by this project for Cost share* Project Type of pipe 4aterial of pip Diarneter/section luber of cores/si2 Quantity Total length Unit I Unit 2 AC M Pt(4M lMA) 3:f 300x200 6L LI 1 - AC A ______f___ _ __ ff 200x200 E 1 158.20 214.17 91.81 AC A _t_______ffi__) _ _ _ _ 200x300 O 1 10.37 289.11 91.81 AC P o;) _ _ 300x200 O 2 14.36 289.11 91.81 AC § _ t ___- ____ (___) 400x200 L 3 84.37 356.03 91.81 AC AM _ 0 ) 0 O 1 251.32 AC t . (FLr ) 1200x400 O 1 179.80 1,241.32 59.26 AC __(_ ) 1300x1000 K 1 21.58 1,618.89 59.26 AC t ____ _ ___ 200x200 O 2 157.81 214.17 59.26 AC t f, _____ 400x 100 O 1 20.75 214.17 59.26 AC t ____ _ _ _ 400x200 C 2 65.18 356.03 59.26 AC t frQ)_ 400x300 [ 2 44.81 446.97 59.26 AC MI __t___ _) _ 540x460 O 3 43.50 661.83 59.26 AC In, _____(_ _) _ 800x5oo O 1 12.79 1,241.32 59.26 AC M ___f_(__) _ 900x200 O 1 62.23 661.83 59.26 AC t ________ 900x400 O 1 69.40 1,072.54 59.26 Subtotal 24.00 1,196.46 AC , __-___ 1240x1000 O 1 - AC t Ph(4k ) _ _ (t%) 800x 1000 O 2 AC tfl P*IMJ($*4 MVL) _ 1500x1300 O 1 - AC 3 H _____t_) 0 1 15.75 1,557.38 679.14 AC rf, ____1__-___ 1240x1000 O 3 193.10 1,557.38 679.14 AC ro ___ _ t_ 1500x1300 O 2 27.35 1,557.38 679.14 AC t f, t _(_ __)_ 400x200 O 1 36.11 343.28 679.14 AC g fit 1i (J (d) ___ 400 x400 O 1 140.38 443.40 679.14 AC _f,______ 800x1000 [O 2 228.26 1,074.52 679.14 Subtotal 14.00 640.96 AC f P 7j((@li1S) _ 1200 1 - 5,600.00 AC r P 7*((iWA A) ___ 1200 O 10 - 5,600.00 AC rt PWI(WMJ ) _ _ 325 O 5 - 1,270.00 AC At, PWI__IJ__) _ 325 O 7 - 1,270.00 AC ro I7(( ) _______ 1200 O 1 19.45 5,600.00 AC MI _______ 100 E 1 57.17 480.00 AC A flit _______ 1200 O 1 20.20 5,600.00 AC Th, MN_______ 150 Ko 1 110.88 570.00 AC r, 200 O 3 360.35 660.00 1 AC ro ____(__) __ _ 300 E 1 23.49 890.00 AC g _ _ _ ________ 400 K 3 268.12 1,550.00 AC r, ________ 600 O 1 2.12 2,360.00 AC r, h7k(Q ) 1200 G 7 756.69 5,600.00 AC __, _____ 300 K 1 9.96 1,020.00 AC r, _______ _ _ 600 K 1 158.01 2,360.00 AC A 7(QR) 700 K 1 77.48 2,750.00 AC In% __ _ _ ___ 219 K 1 117.54 890.00 AC A _____A _ 325 K 2 231.07 1,270.00 AC g __, _ _ __ (W_____ 529 K 2 409.21 2,120.00 IW- 6W I Cost share* Project Type of pipe laterial of pip Diameter/section ,uber of cores/si2 Quantity Total length Unit 1 Unit 2 AC | ________w_) MT _ 133 | 3_ |_ 1 16.53 560.00 | _ _ AC ro 1i (1) t>3 159 3 1 7.91 670.00 AC rv, ____A _____(W _ ) tmw 325 E 6 573.97 1,270.00 Subtotal II158.00 ,3,220.17 1 1Total I _ 1 I 1 96.00 T 5,057.58 T r 2 W 6W Liede WWTS (phase I and II) (pipe network) Attached tablel 18.3.2.1 Unit 3 Total Remar 48,404.51 _ 3,951.14 _ 6,786.78 _ 53,275.02 _ l 233,839.08 36,219.34 52,502.11 5,673.26 30,931.74 25,338.03 36,523.01 _ 16,635.46 44,874.51 78,541.71 673,495.71 35,218.50 694,172.78 79,740.85 36,916.52 157,587.63 555,318.96 1,558,955.23 108,946.88 = 27,441.17 113,116.08 = 63,199.32 237,828.38 20,907.88 = 415,591.43 5,011.08 4,237,475.93 10,158.29 372,913.04 213,075.78 104,610.07 293,463.35 867,514.60 M 3i 4L6 6 I Unit 3 Total Remark 9,258.69 5,300.49 728,945.57 = _ 7,834,758.01 _________ 10,067,208.95 4 4A6if L3. 4AC 5 6 I6~ Cost estimate of compenstion for temporary land borrowing shared by this project for Liede WWTS (phase I and II) project (pipe network) attached table: 18.3.2.7.2.4AC Grade 1 Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Subtotal Area of land borrowed 1,642.98 147.52 1,790.50 Area of cultivated land 164.30 - 14.75 - - 179.05 Unit price for cultivated 6.50 6.00 5.50 5.00 4.50 4.00 land borrowed Average time of 6.00 6.00 6.00 6.00 6.00 6.00 borrowing Cost of borrowing 6,407.62 - 486.82 - - 6,894.43 Cost of rehabilitation 985.79 88.51 - - 1,074.30 Compensation of 821.49 73.76 - - 895.25 standing crop Area of land for 1,478.68 - 132.77 - - 1,611.45 construction Unit price for 8.50 8.00 7.50 7.00 6.50 6.00 construction land Average time of 6.00 6.00 6.00 6.00 6.00 6.00 borrowing Cost of construction lan 75,412.71 - 5,974.55 - - 81,387.26 page 1 of 1 Cost estimate of compenstion for structures shared by this project for Liede WWTS (phase I and II) project (pipe network) Attached tablel8.3.2.9.4AC unit: m2 project Name of structure Quantity Unit price Total price Liede WWTS (phase I and II) Step 134.90 60.00 8,093.84 Liede WWTS (phase I and I) Enclosure wall 831.29 80.00 66,503.13 Liede WWTS (phase I and I) Fence 277.22 120.00 33,266.40 Liede WWTS (phase I and II) Colonnade 114.32 200.00 22,863.10 |Total 130,726.48 nave 1 of I Cost estimate of cost for house demolition shared by other municipal for Liede N Frame structure Composite structure Brick and timber struci Quantity Demolised Unit price Total Quantity Demolised Unit price Total Quantity Demolised Unit pnce area area area i e de Grade I 8.00 1,237.61 70.00 86,632.54 16.00 2,072.98 60.00 124,378.98 2.00 134.63 45.00 WTS Grade 2 2.00 620.18 67.00 41,552.29 5.00 488.98 57.00 27,871.93 5.00 109.01 43.00 H (phase Grade 3 5.00 194.40 63.00 12,247.16 1.00 22.49 54.00 1,214.50 3.00 303.60 41.00 I and Grade 4 0 0 H H H H H H H 0 0 H I I) Grade 5 H H] H H H H H H H 0 project Grade 6 O 0 O 0 O 0 H Subtotal 15.00 2,052.19 68.43 140,432.00 22.00 2,584.45 59.38 153,465.41 10.00 547.25 42.38 page 1 of 2 VWTS (phase I and II) project (pipe network) o_ o n n o Attached table: 18.1.11.4BD ture Simple structure Total Total Quantity | maed Unit price Total Quantity Dea Unit price Total area ae 6,058.25 0 L] n _ o] 26.00 3,445.22 63.01 217,069.78 4,687.56 3.00 255.50 33.00 8,431.34 15.00 1,473.67 56.01 82,543.12 12,447.79 2.00 35.07 32.00 1,122.16 11.00 555.56 48.66 27,031.61 o1 ol El oTo l T o 23,193.61 5.00 290.56 32.88 9,553.49 52.00 5,474.45 59.67 326,644.51 page 2 of 2 Cost estimate of compenstion for historically used house shared by other municipal for I Fn nn o Fi Fn nl n I n n nI Fi n n o nI Frame structure Composite structure Brick and timber stri Unit Unit Unit Quantity Floor area U Total price Quantity Foor area Total price Quantity Floor area pce __________ ________ ______ ______ pric pnce__ _ _ __p c price__ Grade I Total O O LI O LI Fn LI L Fo L o El Grade 2 Total LI LI o L oi LI oI o 2.00 27.49 600.00 LI Grade 3 Total 1.00 13.05 700.00 9,135.00 0I 0I 0l OI 1.00 0.21 550.00 LIhistorically Grd4 TtlL L IL IL L IF I L LI uUstd°houlYGrade 4 Total F] El O L L El El LI Fi LI LI O ~~~~Grade 5 Total O O1 O O O O O El n n o LI Grade 6 Total LI El oi n L LI LI L o LI LI nI ________ Subtotal Total 1.00 13.05 700.00 9,135.00 LI LI L L 3.00 27.70 599.63 page I of 2 Liede WWTS (phase I and II) project (pipe network) F] n F] n F] El Attached table:18.1.2.4.4BD ucture Simple structure Total Total price Quantity Floor area Unic Total price Quantity Floor area Unit price Total price 16,493.73 1.00 13.18 400.00 5,270.54 3.00 40.67 535.20 21,764.27 114.09 1.00 20.64 350.00 7,223.33 3.00 33.90 485.98 16,472.42 F] F] F] F] F] F E] F] F] 16,607.82 2.00 33.81 369.48 12,493.87 6.00 74.56 512.82 38,236.69 page 2 of 2 Cost estimate of compenstion for temporary relocation shared by other project (pipe network) Quantity Floor area Unit price Grade I Partially demolished 9.00 572.58 20.00 Grade 2 Partially demolished 5.00 407.11 18.00 5 Housing Grade 3 Partially demolished 2.00 35.17 16.00 n Grade 4 Partially demolished 2.00 Grade 5 Partially demolished - - - Grade 6 Partially demolished Subtotal 16.00 1,014.86 18.88 C Grade I Partially demolished - - - Grade 2 Partially demolished 1.00 74.37 110.00 Shop Grade 3 Partially demolished 1.00 11.36 65.00 Grade 4 Partially demolished Grade 5 Partially demolished 2 Grade 6 Partially demolished Subtotal 2.00 85.73 87.50 Grade I Partially demolished - - - Grade 2 Partially demolished 1.00 274.01 64.00 Office Grade 3 Partially demolished 4.00 367.57 48.00 Grade 4 Partially demolished - - - Grade 5 Partially demolished n House with Grade 6 Partially demolished - - - L Property Subtotal 5.00 641.58 51.20 right and on residential Grade I Partially demolished - - - plot Grade 2 Partially demolished 1.00 13.18 40.00 Factory Grade 3 Partially demolished - - - building Grade 4 Partially demolished C Grade 5 Partially demolished E Grade 6 Partially demolished Subtotal 1.00 13.18 40.00 Grade I Partially demolished - - - Grade 2 Partially demolished . - - other Grade 3 Partially demolished - - - use Grade 4 Partially demolished - - n Grade 5 Partially demolished - - Grade 6 Partially demolished - - Subtotal . LI Grade I Partially demolished 9.00 572.58 20.00 page 1 of 4 Grade 2 Partially demolished 8.00 768.67 38.00 Grade 3 Partially demolished 7.00 414.09 41.29 Total Grade 4 Partially demolished - - - Grade 5 Partially demolished - - - C Grade 6 Partially demolished - - - Subtotal 24.00 1,755.34 32.21 page 2 of 4 municipal for Liede WWTS (phase I and II) Attached table:18.1.2.7.1.1.4BD G Monthly compensation Relocation period (month) Total lI 11,451.63 6.00 68,709.77 D1 7,327.99 6.00 43,967.97 D 562.66 6.00 3,375.94 - ~~~6.00 - 6.00- - ~~~6.00 - 19,342.28 6.00 116,053.69 D] - ~~~6.00 - D 8,180.75 6.00 49,084.51 El 738.50 6.00 4,430.99 1 - ~~~6.00 - Z 6.00- - ~~~6.00- 8,919.25 6.00 53,515.50 L1 - ~~~6.00 - L 17,536.59 6.00 105,219.57 Li 17,643.19 6.00 105,859.11 E - ~~~6.00 - EK 6.00 - El 6.00 - K~ 35,179.78 6.00 211,078.68 K - ~~~6.00 - K 527.05 6.00 3,162.32 - ~~~6.00 - - ~~~6.00 - - ~~~6.00 - - ~~~6.00 - El 527.05 6.00 3,162.32 El - ~~~6.00 - K1 - ~~~6.00 - E _ _ _ _ _ _ _ _ _ _ _ _ _ 6.00 - 72 _ _ _ _ _ _ _ _ _ _ _ _ _ 6.00 - K - ~~~6.00 - _ _ _ _ _ _ _ _ _ _ _ _ _ 6.00 - F _____ ____ ____ 6.00 - El 11,451.63 6.00 68,709.77 K page 3 of 4 33,572.39 6.00 201,434.37 3 18,944.34 6.00 113,666.05 ] _____ ____ __ _ 6.00 6.00 - _____ ____ __ _ 6.00 - 3 63,968.36 6.00 383,810.19 E page 4 of 4 Cost estimate of compenstion for temporary relocation shared by other mu project (pipe network) quantity Floor area Unit price Grade I temporary demolished 5.00 570.95 20.00 G Grade 2 temporary demolished 3.00 221.74 18.00 .Housing Grade 3 temporary demolished - - - Grade 4 temporary demolished - - - C Grade 5 temporary demolished - - - C Grade 6 temporary demolished - - - Subtotal 8.00 792.69 19.50 Grade I temporary demolished - - - Grade 2 temporary demolished - 23.39 110.00 Shop Grade 3 temporary demolished - - - Grade 4 temporary demolished - - - Grade 5 temporary demolished - - - Grade 6 temporary demolished - - - Subtotal 23.39 110.00 Grade I temporary demolished 1.00 22.59 80.00 Grade 2 Area of land borrowed - 118.79 64.00 Grade 3 Area of land borrowed 1.00 49.84 48.00 Office 4n Grade 4 Area of land borrowed - - - Grade 5 Area of land borrowed -- House with Grade 6 Areaoflandborrowed - - - Property Subtotal 2.00 191.21 57.60 right and on residential Grade 1 Areaoflandborrowed plot Grade 2 Area of land borrowed - - - C Factory Grade 3 Area of land borrowed - - - building Grade 4 Area of land borrowed - - - Grade 5 Area of land borrowed - - - Grade 6 Area of land borrowed - - - Subtotal - - - b Grade I Area of land borrowed - - - Grade 2 Area of land borrowed - - other Grade 3 Areaoflandborrowed 1.00 0.21 20.00 use Grade 4 Area of land borrowed - - - Grade 5 Area of land borrowed . - _. Grade 6 Area of land borrowed - - - Subtotal 1.00 0.21 20.00 LGrade 1 |Area of land borrowed 6.00 593.53 24.62 page 1 of4 Grade 2 Area of land borrowed 3.00 363.92 41.00 D7 Grade 3 Area of land borrowed 2.00 50.05 41.00 Total [L Grade 4 Area of land borrowed - - - Grade 5 Area of land borrowed Grade 6 Area of land borrowed - Total 11.00 1,007.50 31.74 page 2 of 4 nicipal for Liede WWTS (phase I and II) Fl Attached table: 18.1.2.7.1.2.4BD Monthly compensation Relocation period Tota Monthly__compensation (month) Total 11,418.95 6.00 68,513.69 3,991.31 6.00 23,947.89 6.00 - 6.00 - 6.00 - - ~~6.00 - 15,410.26 6.00 92,461.58 6.00 - 2,573.11 6.00 15,438.68 6.00 6.00 . 6.00 6.00 - 2,573.11 6.00 15,438.68 1,806.86 6.00 10,841.14 7,602.28 6.00 45,613.68 2,392.38 6.00 14,354.28 6.00 6.00 ____ ___ ___ ___ 6.00 11,801.52 6.00 70,809.10 ____ ___ ___ ___ 6.00 - 6.00 - 6.00 - 6.00 - 6.00 - __ _ __ _ _ __ _ _ 6.00 - 6.00 4.15 6.00 2 6.00 - 4.15 6.00 24.89 6.00 - 6.00 - ~~6.00 - 4.15 6.00 24.89 13,225.80 6.00 79,354.83 page 3 of 4 I 14,166.71 6.00 85,000.25 2,396.53 6.00 14,379.18 1 6.00 - _ _ _ _ _ _ _ 6.00 - _ _ _ _ _ _ _ _ . 6.00 - 29,789.04 6.00 178,734.25 page 4 of 4 I~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Cost estimate of compenstion for temporary structure before expiration shared by other municipal for L 13 [] U] Ul F] U] F] FlU1 U] U U Frame structure Composite structure Brick and timber struc quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Grade I temporary demolished O O 250.00 O U 1] 250.00 n [n U 250.00 C Grade 2 temporary demolished O O 250.00 O n o 250.00 O O O 250.00 Grade 3 temporary demolished O U 250.00 O O O 250.00 O O U 250.00 Commercial Grade 4 temporary demolished O U 250.00 U U U 250.00 U U U 250.00 Grade 5 temporary demolished n U 250.00 O n U 250.00 O U U 250.00 Grade 6 temporary demolished O U 250.00 U O U 250.00 O U U 250.00 Subtotal U U 250.00 [n n U 250.00 O F U 250.00 Frame structure Composite structure Brick and timber struc quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Grade I temporary demolished O [I 250.00 O O E 250.00 O U U 250.00 Grade 2 temporary demolished O U 250.00 U U U 250.00 U U U 250.00 Grade 3 temporary demolished U] U 250.00 U1 U1 U 250.00 Ul 1.00 0.26 250.00 Other Grade4 temporary demolished O O 250.00 O U U 250.00 U U U 250.00 uses Grade 4 temporary demolished O OI 250.00 O O O 250.00 O O E 250.00 Grade 5 temporary demolished C U 250.00 O U U 250.00 U U U 250.00 Grade 6 temporary demolished U U 250.00 U U U 250.00 U U U 250.00 Subtotal U U 250.00 U U U 250.00 U 1.00 0.26 250.00 %1P 2 O2f ,iede WWTS (phase I and II) project (pipe network) F [] F] F] n Fn Attached table: 18.1.2.7.1.4BD-1 ture Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price E] o] ] 250.00 O] [ E 250.00 n F] 1.00 23.39 250.00 5,847.99 1.00 23.39 250.00 5,847.99 0] E] O] 250.00 F] F] F 250.00 F] F] ] F] 250.00 E] F] F] 250.00 F] FO O] F] 250.00 F] ] F] 250.00 F] O F] F] 250.00 O] O] F] 250.00 El [0 1.00 23.39 250.00 5,847.99 1.00 23.39 250.00 5,847.99 Attached table: 18.1.2.7.1.4BD-2 ture Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price ] O O 250.00 O O F] 250.00 O F] O] F] 250.00 O] 0] O] 250.00 El 65.81 1.00 14.43 250.00 3,607.32 2.00 14.69 250.00 3,673.13 El F] F] 250.00 F] O] E] 250.00 O] ] ] F 250.00 O] F] F 250.00 E] O ] O 250.00 F] ] F] 250.00 n] 65.81 1.00 14.43 250.00 3,607.32 2.00t 14.69 250.00 3,631 M2O ,2 Cost estimate of cost for rehabilitation of partially affected house with Property right shared by other muni| [n [7. [7 [7 [7 [n[ [ [ [ [o [7 [7 [7 Frame structure Composite structure Brick and timber structure Quantity Floor area Unit price Total price Quantity Floor area Unit price Total price Quantity Floor area Unit price Total price repaired repaired - repaired ______ Grade I [ [ 100.00 [7 0 O [ 120.00 [7 O7 E7 150.00 O7 [7 Grade2 [ 118.79 100.00 11,878.56 [7 [7 120.00 [7 I 1.00 0.99 150.00 149.08 7 house with Grade 3 [7 35.15 100.00 3,514.87 [7 [7 120.00 [ [7 [7 150.00 O7 O Property right Grade 4 [7 [7 100.00 [ [7 [7 120.00 [7 [7 [7 150.00 n7 O7 Grade 5 [ [ 100.00 [7 [ [7 120.00 [7 [O [ 150.00 [7 7 Grade 6 [ [ 100.00 [ [7 [7 120.00 [ O7 [ 150.00 O n7 Subtotal [7 153.93 100.00 15,393.44 [7 [7 120.00 [7 1.00 0.99 150.00 149.08 page 1 of 2 cipal for Liede WWTS (phase I and II) project (pipe network) n] Li ni o n Attached table:18.1.2.8.4BD Simple structure Total Quantity Floor area Unit pnce Total pnce Quantity Floor area Unit price Total price Quantity repaired Quniy repaired ni Li 60.00 Oi Oi El Oi ni Oi Li 60.00 Oi 1.00 119.78 Li 12,027.64 Li Li 60.00 Li Li 35.15 Oi 3,514.87 El L 60.00 Li Oi O El O Oi Li 60.00 O n oi Li Li Li Li 60.00 Oi El El 0i Li 60.00 Li 1.00 154.93 El 15,542.52 page 2 of 2 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicall3 municipal for Liede WWTS (phase I and II) project (pipe i n r n1 ] [ n] [ n7 n n7 [n [ no Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Wholly demolished n [7 [o [7 [ [o [ o [n [o [o n] Grade Partially demolished [n [o [o [ [n [n [o [ [ [n [o 1 Temporarily [n __ demolished [[[[[ [n [ [ [ no n Wholly demolished [n [ [ o7 [n [l [ [ [r [ [o [7 Grade Partially demolished n o7 [7 [7 [ [7 [7 [n 2.00 80.53 2,830.00 2 Temporarily [ demolished [7 [O [ [7 [ [ [ [l 1 0.993881822 600 [7 Wholly demolished [[ [ [O [ [ [7 [7 r[ [7 [7 [7 Grade Partially demolished [[ [7 [l [7 [7 [ [7 1.00 23.80 2,550.00 3 Temporarily 7n demolished [O n [7 [7 o_ _ [ 7o n7 Ho°use Wholly demolished [ [7 [ [7 [7 [7 [7 [7 o [ [l with Proper Housin Grade Partially demolished O [7 [ [7 7 7 [ [7 E7 [ o7 ty g 4 Temporarily right demolished [r[[ o [7 7 [ 7 [7 Wholly demolished [7 [7 [ [7 [I [ [ [7 [7 [ [ [7 Grade Partially demolished [ [7 [7 [7 o7 [ [ [ [ [7 [ 5 Temporarily O7 . _ demolished O O O O n o o o o [ [ O7 Wholly demolished O7 77 O7 O7 [7 o7 [o n7 Grade Partially demolished El [ [7 [ 7 [ 7 [7 [7 [7 E7 6 Temporarily [7 __ demolished [O [nD[ [n [ [o Pi [ o_ [7 [7 Wholly demolished [7 [7 [ [ [7 o7 [7 [ [ [7 [ [7 subtot Partially demolished [ [7 [7 [7 [ [7 [ [7 3.00 104.33 2,766.12 al Temporarily [n demolished [ [ [7 [7 [71 7 [7 [7 1 0.993881822 600 [7 Wholly demolished [ [O [n [7 [r [n [7 [7 [7 [ [ [7 Grade Partially demolished [7 [_ _ n_ o n o _ _ nEo I _ Tuilipul artily n7 __ demolished [[ [n n[ n7 7 r 7 [7 [7 r Wholly demolishedt - r[ [ r[ [7 n _ n n on page I of64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Liede WWTS (phase I and II) project (pipe i noF] F] F ] F] cE n] n nE o o] o] F] F] Frame structure | Composite structure | Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price n] Grade Partially demolished 0] n F o] F n n F F] o n 2 Temporarily F] demolished 0 0 F F0 0 F 0 E. F E F] F] Wholly demolished n F] Fo E F E F] E E F 0] Grade Partially demolished E E F] F] F] F F E F 3 Temporarily n _ idemolished LI 0 E E E E 0 C E] House Wholly demolished F O n o] o] o] F] El El o o] with Grade Partially demolished F] O E O E 0 E O E O F] 0 Proper Shop 4 Temporarily tyTeprrl 0 right demolished E 0 0 0 0 0 E F] E0 E Wholly demolished E O O E E F] O] F] O E O F] Grade Partially demolished 0 O F] El E E F] E F] F] O 5 Temporarily El demolished E 0 E F] F] E 0 F] El 0] E F] Wholly demolished n] F] o F] E E E o E E F] F] Grade Partially demolished O E O E F [ E F E F] F 6 Temporarily F] demolished E E 0] 0 0 0 0 0 E 0] E F Wholly demolished O] F E E F] O O E F] E F] n] subtot Partially demolished O E O E E E 0] E E O E al Temporarily 0] demolished E F] El o F] E .F o o E F] E Wholly demolished E F E E F] E E E E E F n] Grade Partially demolished O 0 E E F [ El El F] E F] 1 Temporarily n] _ demolished F] F] F] F] E o E F] c El F] E Wholly demolished F F] FI F E F] O O E F F] F] Grade Partially demolished 1.00 274.01 4,740.00 1,298,804.02 E E O ] ] O 0 2 Temporarily E demolished F] 118.7856138 750 89089.21033 E F. n j a F] E Wholly demolished 1.00 78.37 3,990.00 312,694.70 F] E E F] E E F] n] Grade Partially demolished 1.00 45.11 3,990.00 179,981.13 1.00 22.49 3,710.00 83,440.65 E E F] page 2 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Liede WWTS (phase I and II) project (pipe i HF] H F] IF] ] H F]i [] F] ]]H Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price - Temporarily H demolished H 35.1487484 700 24604.12388 H H H H 0 0 H H House Wholly demolished H H H H H H H HH n p ith Grade Partially demolished [H H H H H H H H H H H H Proper Office 4 _ _ _ _ _ _ _ _ _ _ __ _ _ _ __ _ _ _ ty 4 Temporarily Hright demolished H H H H H o H H H H H H W Wholly demolished H H H H H H H H H H H H Grade Partially demolished 0 H H H 0 H 0 H H H 5 Temporarily H demolished H H H H H H H H H H H H . Wholly demolished H H H H0 0 H H H H H H Grade Partially demolished H H H H H H H H H 6 Temporarily H demolished H H H H H H H H H H H H Wholly demolished 1.00 78.37 3,990.00 312,694.70 0 H H H H H H H subtot Partially demolished 2.00 319.12 4,633.99 1,478,785.14 1.00 22.49 3,710.00 83,440.65 H H H al Temporarily H _ demolished H 153.9343622 738.5832026 113693.3342 0 H 0 H H H H H Wholly demolished 0 H H H H H H H H H H H Grade Partially demolished H H H H H H H H H H H 1 Temporarily H demolished H HH H H H H H H H W Wholly demolished H H H H H H H H H H H H Grade Partially demolished HH H H H H H H H Ho 2 Temporarily H demolished H H H H H H H H H H H H Wholly demolished H H H H 0 0H H Grade Partially demolished H H H H H H H H H H H 3 Temporarily H demolished H H H H H H H H H H H H House Foctor Wholly demolished H H H n H n n o n H Proner y Grade Partially demolished H H H H H H H H H H page 3 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Liede WWTS (phase I and II) project (pipe i noLi Li Li Li Li oi ni rl c F [o oi [n Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price bu ldi Temporarily ty n right ng demolished El oi o oi oi o oo Oi Wholly demolished O Oi O O O Oi Oi O OO Oi Grade Partially demolished O ni oi El oi o oi o oo 5 Temporarily Oi _ demolished O ri °i o o o n o Lo Oi Wholly demolished Oi O O O O Oi O El O Oi O Oi Grade Partially demolished O O Oi n o o n o o o oi 6 Temporarily ni demolished _ O O n o n o n o L Li Oi .Wholly demolished Oi Li El Oi Li O El O El Li subtot Partially demolished O O O O Li O O El O Li El al Temporarily Li __ demolished Li Li O El Oi O Li Li _Wholly demolished O O Oi O O Li Li Li Grade Partially demolished rL o El o El o o Li El El 1 Temporarily Li demolished O L O O O O O O O O O Li Wholly demolished Fl O O O n o n o o o Li Li Grade Partially demolished O Li LI El Li Li O O O 2 Temporarily Li demolished El Li El Li O El El El Li O O Li Wholly demolished r Li LI o o Li Li Li . Grade Partially demolished El El Li Li Li Li Li LI El El Li 3 Temporarily Li Odemolished O Li Li Li El n Li El Li o L niHouse Wholly demolished El O O Li El O Li O O O O Li with Other Grade Partially demolished Li Li Li Li Li Li Li o o n o Proper uses___4 l ty uses 4 Temporarily | nright demolished Li Li Li Li Li n Li Li o o Li | LO Wholly demolished rL Eli Li o o n _ - Li nGrade Partially demolished ni L ni o r LI o Li page 4 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicall] municipal for Liede WWTS (phase I and II) project (pipe i Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Temporarily H demolished H 0 H o o H H Hn H Hl n Whollydemolished 0 ° H H H H1 0 H H H H 0 Grade Partially demolished r H H H H H H H H H H 6 Temporarily n _ demolished H H H H H H H H H H H H _ Wholly demolished 0 H H H H H H H H H H n subtot Partially demolished H H 0 H H H H H H H H al Temporarily H demolished 0 HlH H H H rH H H H H H Wholly demolished H H H H H 0 H H H H H H Grade Partially demolished H H 0 H 0 H H 1 Temporarily H demolished H H H H H H H H H H H H Wholly demolished H 0 0 H 0 H H H Ho H r Grade Partially demolished 1.00 274.01 4,740.00 1,298,804.02 H H H H 2.00 80.53 2,830.00 2 Temporarily H demolished H 118.7856138 750 89089.21033 H H H H 1 0.993881822 600 H Wholly demolished 1.00 78.37 3,990.00 312,694.70 H H H H H H H H Grade Partially demolished 1.00 45.11 3,990.00 179,981.13 1.00 22.49 3,710.00 83,440.65 1.00 23.80 2,550.00 3 Temporarily H demolished H 35.1487484 700 24604.12388 H HO H H H Hl H House Wholly demolished 0 H 0 H H H H H H H H p with Grade Partially demolished H H H H H H H H H H H HProper total 4 eprrl ty Temporarily right demolished H H .H H H H H H H H Hl H Wholly demolished H H H H 0 H H H H H H I r Grade Partially demolished H H H H H H- H H H H H 5 Temporarily demolished H0I H0 F] n H H H H _ Wholly demolished H H H ni _ - or- -n- - Ho Grade Partially demolished H H H Ho Hl rH H H H page 5 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Liede WWTS (phase I and II) project (pipe i Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price - Temporarily n demolished OH O O O n o H H H H Wholly demolished 1.00 78.37 3,990.00 312,694.70 H o H H H H H H subtot Partially demolished 2.00 319.12 4,633.99 1,478,785.14 1.00 22.49 3,710.00 83,440.65 3.00 104.33 2,766.12 al Temporarily H demolished H 153.9343622 738.5832026 113693.3342 H H H H 1 0.993881822 600 H Wholly demolished 4.00 993.62 2,750.00 2,732,468.75 7.00 1,285.48 2,550.00 3,277,971.58 H H H H Grade Partially demolished 2.00 128.57 2,750.00 353,577.80 6.00 390.92 2,550.00 996,858.71 1.00 53.08 2,350.00 1 Temporarily H _____ demolished 2 115.4090142 800 92327.21138 3 396.5789496 750 297434.2122 H 58.95943511 650 H Wholly demolished 1.00 227.39 2,650.00 602,579.79 1.00 86.21 2,450.00 211,215.48 0 H H H Grade Partially demolished 0 0 H H 2.00 182.02 2,450.00 445,961.08 H 0 H 2 Temporarily H demolished H H H O 2 220.7458355 700 154522.0849 H H H H . Wholly demolished H H H H H H H H H H H H . Grade Partially demolished 1.00 11.36 2,550.00 28,971.88 H H H H H H H 3 Temporarily H __ demolished H H H H H H H H H H H H house Wholly demolished H 0 H H H H H H H H H H reside Housin Grade Partially demolished H H H H H H H H H H H ntial g 4 Temporarily O plot . demolished H H H H H H H H H H H H Wholly demolished H H HH 0 H H H H H H H Grade Partially demolished H 0 H0 H H H H H H H 5 Temporarily H demolished H H H H H H H H H H H H Wholly demolished H H H H H H H H H H H H Grade Partially demolished H 0 H H H H H H H H H 6 Temporarily O demolished H H H H H H H H H H H H __ __ Wholly demolished 5.00 1.221.01 2.31.38 3335048.54 8.00 I,37169 2,543.2 3,489,187.06 10 H subtot Partiallydemolished 3.00 139.94 2,733.76 382,549.68 8.00 572.95 2,518.23 1,442,819.79 1.00 53.08 2,350.00 page 6 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicall1 municipal for Liede WWTS (phase I and II) project (pipe i n]F] F] F] F] F] n Pi n] o] o] El n] oo Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price - I Temporarily n] demolished 2 115.4090142 800 92327.21138 5 617.3247851 732.1207701 451956.2971 O] 58.95943511 650 0] Wholly demolished n] o] F o] F] o__F o. o oo n] Grade Partially demolished n] o o o o o o o o o 1 Temporarily 0] demolished O 0 O F] n o] o] o o . 0] Wholly demolished El F] F F] F] O] 0] 0] El El El O] Grade Partially demolished O O 0 O O O O O ] O 2 Temporarily O] __ demolished F] OF O F] El F _ °O F] Wholly demolished O O F] 0 Fl F] El O F 0] Grade Partially demolished 1.00 11.36 2,550.00 28,971.88 O 0 n] El F] o o 3 Temporarily F] demolished ] l O O O C 0 O El O O 0 house W holly demolished n__F] El F] F] o F] F] re ide Shop Grade Partially demolished n F F] ] l El o F] o o ntial 4 Temporarily O plot demolished n o o o o r o o o o o F] Wholly demolished El r F] F] El F] F] F] Grade Partially demolished F] El O F] O El El F] 0 O] O 5 Temporarily F] __ demolished F ] 0 O- F] F] F] o F F] Wholly demolished F] 0] F] El F] F] F] F] O El O F0 Grade Partially demolished El O] F] O 0 0 0 O F] F] F] 6 Temporarily n] __ demolished O ] O O ] r ] ] ] o F n] Wholly demolished F] F] F] F] El F] El F 0 O 0 n] subtot Partially demolished 1.00 11.36 2,550.00 28,971.88 ° F0 F] F] o o o al Temporarily F] demolished O O F F] F] 0 r o] o o El F] Wholly demolished OF El O O O - O O r_ -- o nF_ Grade Partially demolished l El F] OF -F F] E o F] page 7 of 64 r . Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Liede WWTS (phase I and II) project (pipe n] H F] n L o n F] n] n] n] F] n o Frame structure | Composite structure Brick and timber struc- 1_____ quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Temporarily 0] _____ demolished 0 0 0 H 0 0 0 n 1 22.58570755 650 F] Wholly demolished F] F]OF] F]] F] El o F F] Grade Partially demolished El F] O ] F F o F o F 2 Temporarily H __ demolished F] H F] HF F] O] F] F] n o F] Wholly demolished El El F] H o F] F] o El o o F] Grade Partially demolished O O] O] O] O H F] [l o o El 3 Temporarily F] demolished 0 F] H 0 F] 0 El oo n house Wholly demolished F] F] F] O F F] O] 0 reside Office Grade Partially demolished O O F F n F o o o o o ntial 4 Temporarily 0 plot demolished F] o Fo o H H o o o o El Wholly demolished O F] F F] El F F] F] F F F 0] Grade Partially demolished F El El F] F F] H H O O F] 5 Temporarily El demolished 0 El 0 0 0 0 El 0 0 0 0 O Wholly demolished F] O] O O O O] F] O O O F 0. Grade Partially demolished F] O F] H F] O] O] O] O F ° 6 Temporarily O demolished 0 0 0 H O] 0 0 _ 0E 0 El O F] Wholly demolished F] O H F] F] F] F F] F 0 subtot Partially demolished ] O ] H o o o ] o o o al Temporarily 0 demolished n F] o o F] o F] F] 1 22.58570755 650 O] Wholly demolished O H F] F] n F] o] H ° o oo F] Grade Partially demolished F] n] o] E F] o o o o o] I Temporarily F] demolished 0 _ _ 0 _ 0 n_ _ o o oooo F] - ___ W holly demolished O_ El o_ El - o__o_ F] Grade Partially demolished O F] El H1 F] F F] F] F] El El page 8 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicall3 municipal for Liede WWTS (phase I and II) project (pipe i Frame structure Composite structure Brick and timber strucl quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price - Temporarily [7 __ demolished [O [7O[7 [7O[ O [n o [7 a_ [7 Wholly demolished [7 [[ [7 [ [ [7 [7 o7 [o [7 [7 Grade Partially demolished [7 [[ [7 [7 [ [ [7 [7 [7 r7 3 Temporarily O7 demolished 7 O O O O 7 7 o 7 o o 7 house Foctor Wholly demolished 7 7 7 7 7 7 7 7 7 l7 [ n y Grade Partially demolished [7 [ [ [ [7 [7 [7 [7 [7 [7 17 f]reside buildi 4 eprrl ntial Temporarily O plot ng demolished [ [7 [7 [7 [7 [7 [ [7 [7 [7 [ [7 Wholly demolished [7 [ [7 [ [ [ [7 [ [7 [7 [ [7 Grade Partially demolished 7[ [7 [7 [7 [7 [7 7 7 [ [ 5 Temporarily O7 __ demolished [ [7 [ [l [7 [l [7 O7 Wholly demolished [[ [ [7 [7 [7 [7 [7 [7 [7 [7 O7 Grade Partially demolished [7 [ [7 [7 [7 [ [ [7 [7 [7 [7 6 Temporarily [O demolished 7 7 7 o 7 7 7 7 7 [ [ [7 Wholly demolished [7 [7 [7 [7 [ [7 [7 subtot Partially demolished [7 [7 [7 [7 [7 [7 [7 [7 [7 [ [7 al Temporarily [O demolished [7 [7 [ [7 [ [7 [7 [7 [7 [ [7 [7 Wholly demolished [[ [7 7[ [7 [7 [7 [7 [7 Grade Partially demolished [ [ [ [7 [ [7 [ [7 [7 [7 [ 1 Temporarily n7 demolished [ [7 [7 [ [7 [7 [7 [[ [ [7 n7 Wholly demolished [7 7 [7 [7 [7 [7 E7 [[ [7 [7 n7 Grade Partially demolished [7 [7 [ [ [7 [7 [7 [7 [7 [7 [ 2 Temporarily [n __ demolished [ O O 7 O 7 7 7 7 [ [ [7 ____ Wholly demolished n_ _ _ _ - - - n -[- - [ - - - f E7 [7 Grade Partially demolished 7O [7 [ [7 [l [O O_On page 9 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Liede WWTS (phase I and II) project (pipe i F]F] n ] [n o, [7 o] F] r; o] o F] o] o] n Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Temporarily O] demolished O El O El F F] n o o n house Wholly demolished U F] U] El U U] U F reside Other Grade Partially demolished F F U F F] O F] U F F O ntial uses 4 Temporarily n plot demolished n o o n ] o n o o U o F] _ Wholly demolished O F] O U] Fo U F] El U] Grade Partially demolished OF El O] n] F] o o oo S Temporarily n] demolished O O O U o n o U o o U n] . _ Wholly demolished O F] O El O] El O U El O El O] Grade Partially demolished O] O F El FO El U] O O F] F] 6 Temporarily i ] O .demolished .] F F F F] F] U] El F] U] F] U] OWholly demolished n o] o] U] n El F] F] F F] F] El subtot Partially demolished E F F] F] F] F] F F] U O al Temporarily O] ___ demolished O O l O n o o o o o o ] - Wholly demolished 4.00 993.62 2,750.00 2,732,468.75 7.00 1,285.48 2,550.00 3,277,971.58 F] F] U] Grade Partially demolished 2.00 128.57 2,750.00 353,577.80 6.00 390.92 2,550.00 996,858.71 1.00 53.08 2,350.00 1 Temporarily O] demolished 2 115.4090142 800 92327.21138 3 396.5789496 750 297434.2122 1 81.54514265 650 U] Wholly demolished 1.00 227.39 2,650.00 602,579.79 1.00 86.21 2,450.00 211,215.48 F U] Grade Partially demolished U] F] F F] 2.00 182.02 2,450.00 445,961.08 F] 2 Temporarily O] demolished U O O O 2 220.7458355 700 154522.0849 O O F O] Wholly demolished O O] O U O F] F] F] O U] n U] Grade Partially demolished 2.00 22.72 2,550.00 57,943.76 F] O] El n o ,] F 3 Temporarily U] demolished I O O n [ o o n o o_o n house Wholly demolished _ O n n o n o reside total Grade Partially demolished UO F] El n o] oF U] page 10 of 64 r .- Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicalld municipal for Liede WWTS (phase I and II) project (pipe i n]F] n ] n ] n ] n] c] n] o]FE n] r o] o] o] on Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price nt- ial Temporarily n plot demolished O n o F F o o o o n °] n] Wholly demolished O] F] El o F] F] F] F] F] o] o F] Grade Partially demolished r F] ] o F o o o 5 Temporarily 0] _ demolished 0 0 O O O O O O O O [ n] Wholly demolished O F] F F F] F] F] O O n] El n] Grade Partially demolished F] El F] F] 0 FO O F F Fo F 6 Temporarily n] demolished O F] F] oF F] o] F] F] F F] O] . _ Wholly demolished 5.00 1,221.01 2,731.38 3,335,048.54 8.00 1,371.69 2,543.72 3,489,187.06 FF F] F] subtot Partially demolished 4.00 151.30 2,719.96 411,521.56 8.00 572.95 2,518.23 1,442,819.79 1.00 53.08 2,350.00 al Temporarily El I demolished 2 115.4090142 800 92327.21138 5 617.3247851 732.1207701 451956.2971 1 81.54514265 650 F] Wholly demolished F] n F F] o F] F] El El o El F] Grade Partially demolished n El F] o F] F] o] o F] F] El 1 Temporarily n] _ demolished l O O O n o o o o o o F] Wholly demolished 0F] F] O F] F] F] El F F] Grade Partially demolished 0F n] o] o F] F] o F] 2 Temporarily n] demolished OF O O 0 O n o F] F] Wholly demolished 1.00 13.05 700.00 9,135.00 _F F] El F n El n] Grade Partiallydemolished F] El n] F] F] El F] F] o o F] 3 Temporarily n] demolished OF] n El o F] F] F] F] F] O histor Wholly demolished El F 0 OF El O El F] F] F] F] F] ically Housin Grade Partially demolished OF El El F] F] F] F] O El F] used g 4 Temporarily | house demolished O El OF F] O F] F] F] F F] Wholly demolished F ----L ID o _ o o r o F F] Grade Partially demolished i ] ] ] ] ] ] F] F] o F page 11 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicall] municipal for Liede WWTS (phase I and II) project (pipe i Fn P F F F] F] Fn oF o] o] Fo F] F] Fn Frame structure Composite structure Brick and timber struct b _______________ quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Temporarily O] demolished O O O O n [ o o o ] ] n] Wholly demolished F] o o n o n o o o Grade Partially demolished O O n o o o o o o o 6 Temporarily n] demolished Li F F] F] F] F LI LI F] F] F] F] Wholly demolished 1.00 13.05 700.00 9,135.00 O ] O O O] O] O subtot Partially demolished n o F] o] o] o o] oo al Temporarily O] .__ __ demolished El F] O DI O F] F] n] Wholly demolished O O O O n o o o o o o O] Grade Partially demolished F F F F F F F F F F O 1 Temporarily n] __ demolished F El El O] El O O n o o o O] 7 Wholly demolished F] F] F] F F] F] F F] F F] F] F] Grade Partially demolished ] ] ] ] F] F F F F] F] 2 Temporarily O] __ demolished El F F] F F] F] El El F] F] O F] Wholly demolished F F] F] El F] F] F] F] F] F F] O] Grade Partially demolished F F] F] F F] F] F] F] F F] 3 Temporarily O demolished F] El EF F]_ _ F] F F] F] histor Wholly demolished F F] F] F] El El F F] n ically Shop Grade Partially demolished O F] F] F] FO O - n o F used 4 Temporarily O]house demolished El El . ] n o El Fno F] o o o F] Wholly demolished F El El F] F] F] F] F] F] F] F] F] Grade Partially demolished F F] El F ] F] F] F] F] O] F] 5 Temporarily O] demolished n n o o o n o o o o o El Wholly demolished El El O_ _ El O_ OF F] l Grade Partially demolished n El F] El El El page 12 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicall] municipal for Liede WWTS (phase I and II) project (pipe i Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price 6 Temporarily [O demolished H n o o o o o o [ n H n Wholly demolished n o o o o o n H n H o H subtot Partially demolished El n H H H H H H H H al Temporarily HO demolished H H H H EH H H H H H H O Wholly demolished H E H H H H H H H H H H Grade Partially demolished H H H H H H H H H 1 Temporarily H __ demolished O O H H H H H H H H H H Wholly demolished H H H H H H H H H H H H Grade Partially demolished H H H H H H H H H H H 2 Temporarily H demolished H H H H H H H H H H H H Wholly demolished H H H H H H H H H H H H . Grade Partially demolished H H H H H H H H H H H 3 Temporarily H demolished H H H H H H H H H H histor Wholly demolished H H H H H H H H H H H H ically Office Grade Partially demolished H H H H H H H H H H H used 4 Temporarily O house . demolished H H H H H H H H H H H H Wholly demolished H H H H H H H H H H H H Grade Partially demolished H H H H Ho H H H H H 5 Temporarily H __ demolished H H H H Hl H H H H H H Wholly demolished H H H H H H H H H H H H Grade Partially demolished H H H oI H H H H H H H 6 Temporarily H __ demolished H H H H H H H H H H H _ __ Wholly demolished El -n- n n H H subtot Partiallydemolished H H H H H H H H H H H page 13 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Liede WWTS (phase I and II) project (pipe i nF F] n FF] n n F r, nn n El F] Frame structure Composite structure Brick and timber struci quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price a' Temporarily n] ____Idemolished n n El El El r n_onor F] Wholly demolished nF Fr o] El n F] F] F] Grade Partially demolished nF r n F] F) F] Temporarily n] demolished n ] ] ] ] F] F] n n F n] Wholly demolished nF F Fn F] F] F] F 2.00 27.49 600.00 n] Grade Partially demolished OF F] r F] El F] F] F] El El 2 Temporarily n] _ demolished n ] ] ] ] ] F] F] n F F] Wholly demolished F] F] El F] F] F] F] F] F] E F F] Grade Partially demolished F] El F] F] F] F] F] 3 Temporarily F] demolished El F] o] o nn F] ro F histor Foctor Wholly demolished F F] F] P, F] F] El o F] F] F] F] ically y Grade Partially demolished F r] F] F] F] o o F] F used buildi 4 Temporarily F] house ng demolished r] F] Fo F] F] F F] n F El Wholly demolished OF r F] F] El o F] F] F] n] Grade Partially demolished F]nF] F] o]___ oonooo 5 Temporarily F] demolished nF El o o -oo F] Wholly demolished El F] O O F] El F] F] F] F O El Grade Partially demolished F F] F] El _ v _ _ O 6 Temporarily F] demolished ] ] ] ] ] ] ] F F El n Wholly demolished O O O] F] O F] F] 2.00 27.49 600.00 F] subtot Partially demolished F] F] El F F] F] O F] F] o F] al Temporarily O] ___ __ demolished nF F] F] F] F] F] o F n] =____ Wholly demnlished _ P O_El - El --o F] F] l | Grade lPartiallydemolished F]F] ] o F]I F1 El El El n El page 14 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicalld municipal for Liede WWTS (phase I and II) project (pipe i [n[7 [7 [7 [7 [7 [7 [7 F] [ [ [n [ n7 [7 Frame structure Composite structure Brick and timber struct 1_____ ________________ quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Temporarily [7 demolished [7 [7 [7 [7 [7 o [o [7 [ [7 Wholly demolished [ [7 [7 [7 [ [ 7 7 [ [o 7 [ [7 Grade Partially demolished [7 [7 [7 [7 [7 [ [7 [ [7 [7 7 2 Temporarily [7 demolished [ [ [7 [7 [] [] [ o7 [ [7 [7 Wholly demolished [7 [7 D 7 [ [ F] F] [7 [7 Grade Partially demolished [7 [ [7 [7 [7 [7 [ [ F] 3 Temporarily O7 demolished 7 [ [ [7 [ E [ [ 1 0.207442164 550 F] histor Wholly demolished [7 [ [ [ [7 [ 7 [ [o n ically Other Grade Partially demolished [ [ [7 [7 [7 used uses 4 Temporarily [7house demolished [n[7[ [lo[l F]oF] o o oo [7 Wholly demolished [ [7 [7 F) [7 [ [ [l [7 . Grade Partially demolished [E [ 7 77 O [7 O7 5 Temporarily O7 demolished [ [7 [ [ [7 [7 [7 [7 n7 Wholly demolished [7 7 [O O7 [ 7 [ [7 O7 .Grade Partially demolished 7 7 7 7 7 7 [ [ [ 7 [ 6 Temporarily [7 demolished 7 7 7 o 7 7 [ n Wholly demolished 7[ [7 7 El [7 [ [7 [7 [7 [7 [7 subtot Partially demolished [ [ [ [ [ [ [ [ [ [ 7 al Temporarily [O _____ _____ demolished O 7 7 7 7 [ 1 0.207442164 550 [7 Wholly demolished [7 [7 [7 [ [7 [7 [7 [ [7 [7 [7 [7 Grade Partially demolished [7 [7 [7 [ [7 [7 [ [7 7 [ O 1 Temporarily [7 __ demolished [O [O [C [ _ _ [7 O_ [7 _ _ F] [7 Wholly demolished O__El_ l O O ElOl O O - .00 -- 2_7-.49 600.00 [7 Grade Partially demolished P. o7 [7 o F7 [7 E7 [7 7 [ [ page 15 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Liede WWTS (phase I and II) project (pipe i [ ] [ n[7[ [[ [n r, [ [ [o [o Frame structure Composite structure Brick and timber struct 2_____ ________________ quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Temporarily [n __ demolished [n [ [ [ [ [ [ [ [ [7 [n Wholly demolished 1.00 13.05 700.00 9,135.00 [7 [7 [7 [7 [ [7 o] [n Grade Partially demolished [7 [7 [ [ [o [7 [7 [7 [7 [ [7 3 Temporarily O7 _____ demolished 7 7 7 7 7 7 [ [ 1 0.207442164 550 7 histor Whollydemolished [ [7 [ [7 [7 [7 [7 [7 [ [ [7 O ically total Grade Partially demolished [7 [ [7 [7 [7 [7 [7 [7 [7 [7 [7 used 4 Temporarily [7house demolished [ [7 [7 [7 [7 E7 [ [7 7 [7 [7 Wholly demolished 0 [ [7 [7 [ [ [7 [ [7 [7 Grade Partially demolished [ [ 7 7 7 7 [7 [7 [ [ S Temporarily O7 demolished [ [[ [7 [7 [7 [ [7 [7 [ O7 Wholly demolished [7 [7 [7 [7 [7 [7 [7 [7 [7 [ [7 O7 Grade Partially demolished [7 [7 [7 [ [7 [ [7 [7 [7 6 Temporarily [7 demolished [ [ [ [ 7 7 [ [ [ [ [ [7 Wholly demolished 1.00 13.05 700.00 9,135.00 [ [ [7 [7 2.00 27.49 600.00 [7 subtot Partially demolished [7 [7 [ [7 [7 [ [7 [7 [ [7 7 al Temporarily [7 _____ ____ demolished 7 7 7 7 7 7 [ [ 1 0.207442164 550 [7 Wholly demolished [7 [ [7 [7 [7 [ [7 [7 [7 [7 [7 [7 Grade Partially demolished [7 [7 [7 [ [ [7 [ [7 [7 [7 17 1 Temporarily [7 demolished [7 [7 [ [7 [7 [ [7 [ [ [l [7 Wholly demolished O7 O7 7 E7 O7 7 7 O7 7 E7 [7 Grade Partially demolished .[ [ 7 7 [ 7 7 [7 °7 [ 2 Temporarily [7 __ demolished [ [ [ [ [ [ [ [ [ [ [ [7 - ____ _____ ______ W holly demolished P. El El o o_o o o o _ [7 Grade Partially demolished O7 O7 OI O OEO 0 PO_ 0 O_ O page 16 of 64 Cost esti'mate of compenstion for permanently affected house with Property right,house on residential plot,historicaIl3 municipal for Liede WWTS (phase I and 1I) project (pipei [7[7 [7 [7 [7 [7 LI [I] U] [7 [] [7 [7 [7~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~F Frame structure _____Composite structure Brick and timber strucl ______ ~~~~~~~quantity Floor area Unit price lTotal price quantity Floor area Unit price iTotal price quantity Floor area Unit price Temporarily [Tempor __ _ demolished [7 [ [l [7, [7 [7 [7 [l. U] [7 n1ary Wholly demolished [7[ [l [7[7[ [7 [7 [7 17 [7 sture Housin Grade Partially demolished [7 [ [7 [7 [7 [7 [7[E7l7 before g ~ Temporarily ~expira __ _ demolished [7[ [7 [7[ [7 [7 [1 [7 [7[ 17 tion Wholly demolished [7 [ [7 [7 [ [7 [7 [7 [7 [7 17 Grade Partially demolished [7 [7 [7 [7 [7 [7 [7 [7 [7 [7[ 5 Temporarily [7 _ _ ~~~~~demolished [El 7 7[ [7 [7 LI [7_ _ F7 Wholly demolished [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 ~~~~Grade Partially demolished [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [ 6 Temporarily [7 ____ ~~~~demolished [7[ 7[ 7[ 7[ 7[ [7 ~~~~~~~Wholly demolished [7 [7 [7 [7[ 7 7[ [7[ [7 subtot Partially demolished [7 [ [7 [7 [7 [7 [7 [7 [7 [7 17 al Temporarily [7 ___ ___ ~~demolished [7 [ 7 7 [ [El__ [7 [7 [7 [7 ~~~~~~Wholly demolished [7[ 7 7[ [7 E7 [7 [7 [7 [7 [7 ~~~~Grade Partially demolished [7[7[7[ [7 [7 [7 [7 [7 [7 7 1Temporarily [7 _ _ ~~~~~demolished [7[ 7[7[ 7[ [7 [7 [7 F7 [7 ~~~~~~Wholly demolished [7[7[ [7 [7 [7 [7 [7 [7[ [7 [7 Grade Partially demolished [7 [7 [7 [7 [7 [7 [7[7[7[ E7 2 Temporarily [7 ~~~~~~demolished [E[l7[7[ 7[ [7 [7 [7 [7 [7 ~~~~~~Wholly demolished [7 [7 7 [7 [7 [7 [7 7 E7 [7 [7 [7 Grade Partially demolished [7[ [7 [7l[ [7 [7 [7 [7[7 3 Temporarily 7Tempor ___demolished ____ ___ ____ _______ ____ ____ ___ El__ ary _______Wholly demolished ___________ __________ ______ _____ _____ __________[ s truct Grade Partially demolished [7 [ [7 [7 [7 [7 ____ _____ El___ ____ ___ ure ShoD ____ page 17 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historica1l3 municipal for Liede WWTS (phase I and II) project (pipe i FE El El E El El l ElE El El [] El El [] Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price before 4 Temporarily Olexpira demolished E E El, E El E E E E O tion Wholly demolished 0 0 0 Ol O 0l 0l O Ol O 0 Ol Grade Partially demolished 0 O 0 0l Ol O] [ ] ° 5 Temporarily Ol demolished ]E l l E El El E E E nl Wholly demolished O Ol Ol Ol El O Ol 0 O Ol Ol O Grade Partially demolished El Ol 0 Ol Ol 0l Ol Ol O O] Ol 6 Temporarily Ol demolished O O n . ] o o o o o ol El Wholly demolished E El El El El E El El E E Ol subtot Partially demolished E El o El o El o El El E al Temporarily O _ demolished EE E E E E E E E E El O Wholly demolished O El El E El El E El 0 El 0 O Grade Partially demolished El E 0 E E El E E 0 E El 1 Temporarily nl __ demolished El E E El El El El El El El E El Wholly demolished El El 0 El El El El El El El 0 El Grade Partially demolished El E E El El El El El El E E 2 Temporarily El demolished _ _ _ _ _ _ _ _ __ __ _ _ _O El Wholly demolished El El 0 El El El 0E El 0 El El . Grade Partially demolished El El E El 0 El El El 1.00 279.33 0E 3 Temporarily E Tempor demolished E E E E E E E E E 0.263237 550 El ary Wholly demolished 0 EEl E E E El E El 0 struct Grade Partially demolished El El El El El El El El E El El before O Temporarily nlexpira demolished El El E E l l l E E E E nl _~ Wholly demolished Ol Ol O_____ -O- [ 1 l- O l O O E e O El Grade Partiallydemolished OEl E E El El El E El El page 18 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Liede WWTS (phase I and II) project (pipe i n ~ L oI o n nn n nIL n o] o oI n oI Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Temporarily nI __ demolished O El El LI LI El LI Wholly'demolished n [ ° 0 o I o I LI ° I o I o L° O . Grade Partially demolished O O O O O O n El 6 Temporarily OI __ demolished l L L L L L L L L L O 0I Wholly demolished O O_ _____ 0 1 O_ On n o o n OI subtot Partially demolished nI L o oI o o o 1.00 279.33 El al Temporarily OI ____ ____ ____ demolished nL o o o o o oo 0.263237 550 OI .Wholly demolished O El O LI Ol O El O _0 nI Grade Partially demolished OI 1 Temporarily nI demolished OI l LI [I O OI OI El OI OI OO 0I Wholly demolished O O 0 OL OI nI o lI o oI oo n] Grade Partially demolished L OI OI O OI OI El O OI O 2 Temporarily El demolished L L L L L L L L L L O O Wholly demolished El LI OI 0 OI n oI oI oI o LI O Grade Partially demolished OI El OI OI 0I nI o El o o oI 3 Temporarily n Tempor demolished O O O O O O O O l o o E ary Foctor Wholly demolished El ° El 0 OL LI OI OI El 0I O st ruc t ______ I ure y Grade Partially demolished O 0 O O 0 0 O 0 O O O before buildi 4 Temporarily O expira ng demolished [ n l o o o o o o o o L tion Wholly demolished El O O O OI OI OI El O n oI LI Grade Partially demolished L L L L L 5 Temporarily LI __ demolished Ll LL L El LI LI LI OI ____ __ Wholly demolished Eln-l -- - El O Grade Partially demolished Ll L LI LI L El page 19 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Liede WWTS (phase I and II) project (pipe ] nEl U U U [] U~~~~~~~~~~~~~~~~1 El U 1 U- U] El [] U Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price 6 Temporarily n . _ demolished n U U o U U U U U U o O Wholly demolished n U o U U U U U U U o U subtot Partially demolished U U U U U U U U n U U al Temporarily E l demolished U UO U O U U U U U U U Wholly demolished U U U U U U U U U U U U Grade Partially demolished U U U U U 0 U U U U U 1 Temporarily U demolished O_____ n El n_ o o_ o U Wholly demolished UO UU U U U U U Grade Partially demolished UU U U 2 Temporarily U demolished O ______ O _____ n_ o n U Wholly demolished U U U U U U U U U U U U Grade Partially demolished U U Ul U U U U U U U 3 Temporarily n Tempor demolished U U UO U U U U U U U U ary Wholly demolished U U U U U U U U U U U turuect Other Grade Partially demolished U U U U U U U U U U U before uses 4 Temporarily Oexpira demolished U U U U U U U U U U U U tion Wholly demolished U U U U U U U U U U U U Grade Partially demolished U U U U U U U U U U U 5 Temporarily U demolished U U U U U U U U U U U U Wholly demolished U U U U U U U U U U U U Grade Partially demolished U U U U U U U U U U U 6 Temporarily U demolished U U U U U U U U U U U U _ Wholly demolished U LI -U- -U O U n n U U subtot Partially demolished U U U U U U U U U U U page 20 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Liede WWTS (phase I and II) project (pipe i Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price a Temporarily O ___Idemolished U U U U U U U o o U U O Wholly demolished U U o. U U U U o n U U U Grade Partially demolished El U U U U U U U U Temporarily U demolished U U U U U U U U U U U U Wholly demolished U U U 0 0 U U U U U U U Grade Partially demolished U U U U U U U U Uo 2 Temporarily U demolished UU U U U U U U U U U Wholly demolished U U U U U U U U 0 U U U Grade Partially demolished U U U U U U U U 1.00 279.33 U 3 Temporarily U Tempor demolished U U U U U U U U U 0.263237 550 U ary Wholly demolished U U U U 0 U U U U U U U ure total Grade Partially demolished U U U U U U U U U U U before 4 Temporarily Oexpira demolished U U U U U U U U U U U U tion Wholly demolished 0 U U U U U U U U 0 U U Grade Partially demolished U U U U U U U U U U U 5 Temporarily U __ demolished U U U U U U U U U U U U Wholly demolished U U U U U U U U U U U U Grade Partially demolished U U U U U U U U U U U 6 Temporarily U _ demolished U U U U EU U U U U U U Wholly demolished U U 0 U U U U U U U U U subtot Partially demolished U U U U U U U U 1.00 279.33 0 al Temporarily Ul demolished U U U U U U U U U 0.263237 550 U lWholly demolished O___El 0 _ __ n o-_ _ o _ o- U o U Grade Partiallydemolished O UU U U U U U U UO page 21 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicalld municipal for Liede WWTS (phase I and II) project (pipe i Frame structure Composite structure | Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Temporarily Oi demolished U O O O n o o r o o o O] Wholly demolished n n El ni oi o El o ni Grade Partially demolished r El oi o oi oi oi oi oo 2 Temporarily ni _ demolished O Oi El n o oo Oi Wholly demolished O Oi El OI O l Li Li oi o oL n Tempor Grade Partially demolished L El L L Li L L L Li Li O ary Temporarily Oistruct demolished Li Li L Li Li El L Li El El O O ure Wholly demolished Li L Li LI L L L L Li Li O [ after Housin Grade Partially demolished El Oi Oi O Oi O El Oi Oi O O expira g 4 Temporarily Oition/i demolished O i n o i i o i o o o L Ilegal Wholly demolished L L Li Li L Li El L Li L O struct Grade Partially demolished Li El L Li L Li Li Li 5 Temporarily O demolished OL El El o o El o Li Li Wholly demolished Li Li Li El Li L Li L Li Li O Li . Grade Partially demolished L Li L El Li Li Li L Li L Li 6 Temporarily Li demolished Oi El El El Li Li Li Li Li o o Oi Wholly demolished L El LI Li Li L Li Li Li L O n subtot Partially demolished Li El Li Li Li Li Li L Ei L O al Temporarily Li ___ __ __ demolished L L L L L Li Li Li O l L ni Wholly demolished L L Li Li L L L Li Li L O Li Grade Partially demolished L Li El LL L Li El L L O 1 Temporarily Li __ demolished Li Li Li El Li Li Li L [I . Whnlly fdemnlished -O O-- i p I I Li Grade Partially demolished OL Li OL El Oi Li Li Li El page 22 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicall~ municipal for Liede WWTS (phase I and II) project (pipei LF] 'Li Li Li Ei iL iil] Li Li Li Li L Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price - Temporarily Oi __ demolished El Oi Oi O O O O O no D Wholly demolished ni oi El El El El oi oi n D El Tempor Grade Partially demolished O Oi Oi Oi Oi Oi Oi Li L LI Li ary 3 Temporarily nistruct demolished Li Li L Li Li Li El Li Li Li O Oi ure Wholly demolished Li El Oi Oi Oi O n oi n oi o n after Shop Grade Partially demolished Li LL El L Li L El D Li expira 4 Temporarily nition/i demolished Li oL El oL Li Li Li o Li El Li ilegal Wholly demolished L L Li Li D Li Li El Li Li struct Grade Partially demolished O l L l Li L Li Li Li L Li ure 5 Temporarily ni_ demolished Li Li El El El Li Li L Li FL El Li Wholly demolished Oi O OL El D Li El o o El El O Grade Partially demolished ni El o El Li o El Li El Li Li 6 Temporarily Li __ demolished L El L El Li Li Li L Li FL Li Li Wholly demolished Li Li Li II Li Li Li LI L L Li Li subtot Partially demolished L El L Li Li El L i L E l al Temporarily Li ___ __ __ demolished LL El El Li L E L Li L Li Li Wholly demolished Li El El Oi O O Li O Li El O ni Grade Partially demolished El Li El Li Li L Li Li Li Li Li 1 Temporarily n demolished Li Li O ni o o oi Li o oi El ni Wholly demolished L L Li L L Li L L Li Li O ni Grade Partially demolished E] Li Li Li Li Li L L Li L O 2 Temporarily Oi __ demolished i L i Li i i Li L O Li Wholly demolished n____ ____ o o- - - - ----- --o- L L TemDor Grade Partially demolished O D O D Li l Li =i D O Li page 23 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Liede WWTS (phase I and II) project (pipe nH oi o n F, o o LL oiH o o noo Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price ary Temporarily Ostruct demolished O O O r o o o o r o o O ure Wholly demolished H L H L H H Li H H H O O after Office Grade Partially demolished l L H H H H L H L H H expira 4 Temporarily Htion/i Idemolished O H H H n H n o H H H n llegal Wholly demolished H H Oi H H H O H H H H n struct Grade Partially demolished HL H H H H H I H H H 5 Temporarily H _ demolished L L H H H L H H H H H H . Wholly demolished H H HO O H H H H H H H . Grade Partially demolished H. H H Li H H H H H H H 6 Temporarily H . __I demolished H H Hl H H H H H O Wholly demolished HO H H H rH H H H H H H subtot Partially demolished H H H H H H H H H H al Temporarily H __ demolished HO H H O O H H H H H H Wholly demolished H O H H H H H H H H H H Grade Partially demolished H L H H Li H H H H H H 1 Temporarily H demolished HL H H Li H H H H Wholly demolished H Oi H H H H H H H H H H Grade Partially demolished H H H H H H H H H H H 2 Temporarily H . demolished El Li H H L H H L H H H H Wholly demolished H H H H H H H H H H H H Tempor Grade Partially demolished H H H H H H H H H H H ary Temporarily Hstruct demolished OH H H H H H H H Hi ure Foctor _ Wholly demolished O O__ O O O OO H after y Grade Partially demolished H H ElI H H H H H H H page 24 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Liede WWTS (phase I and II) project (pipe i noF] n] Fn o] o] o] o]FE o] n] o o n F] F] Frame structure Composite structure Brick and timber struct _ _ _ ra U1 Temporar ld 4quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price ex-pira FI5TiTT 4 Temporarily O tion/i ng demolished nF] El F] no n llegal Wholly demolished El O] O F F] ] F] O] O n oo n struct Grade Partially demolished O El F] O El El ] Fn o o oo 5 Temporarily F] __Idemolished n F o o n o n o o o o O] Wholly demolished l F] F] ° F] F] O O O O F n Grade Partially demolished O O F] O] F] F] El O F F F] 6 Temporarily F] __ demolished O n o o o o o o o o o F] Wholly demolished El El E] O O F] n F] F] o o F] subtot Partially demolished F] O F] F] F] F] F] O F] O O al Temporarily O] __ demolished En o F] F] o] F] F] o ] o F F] Wholly demolished FO O O] O F] F] O F] F El F] n] Grade Partially demolished n F] F] El F] o F] El o El o 1 Temporarily F] demolished F] El F F] n Fl ° ° ° °] ° F] Wholly demolished F ° El F F] 0 ° F] F] F] F] F] Grade Partially demolished F] F] F] F F] O El F] 2 Temporarily O] __ demolished O ] O O O O O O O O O F] Wholly demolished O O O F El F] F F] F] F] F] O] Tempor . Grade Partially demolished n F] 0 F] El F] F] o o F] ary 3 Temporarily nstruct demolished El F] O DI F] O] n o] El F] oo F] ure Wholly demolished O] F] F] El O El El F] El O O] O after Other Grade Partially demolished OF El ° F] O El O F] expira uses 4 Temporarily | ntion/i demolished O] O O] El O] El DI F] F] O F] O 1legal Wholly demolished O-- - -- oo s t Grade Partiallydemolished El F] F] F] F] P I Fo F] F] DI page 25 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Liede WWTS (phase I and II) project (pipe i no n n o.n n o Elo n [o o [ [] [ Frame structure Composite structure Brick and timber struct ________________ quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price - Temporarily [O demolished O O n o 7 n o o ] [ [ n] Wholly demolished n l o n n n [ [ [ n Grade Partially demolished [7 o [ [n [ [l oo 6 Temporarily [O demolished O[ [O O_ [ nooo n] Wholly demolished a7 El El El [o [o [l [l [o [ [o n7 subtot Partially demolished O Ol [7 [O [O [7 [ [7 [o al Temporarily [n demolished O [ O [ n_ _ [ oo [O Wholly demolished O] [7 [O [ [ [7 [O [7 O O] Grade Partially demolished [. [7 [7 [7 [7 _ _ _ _ __ 1 Temporarily [O demolished [ [ _ [ _ _ [7 [O Wholly demolished [7 [l [7 [ [7 [ [l [ [7 [7 E] [O Grade Partially demolished [7 [O [7 [O __ O_ O_ O n oo 2 Temporarily O] demolished 7 O [ [7 ____ __ _ O n7 Wholly demolished F] [7 [7 [O [ O_ O_ O_ O O O Tempor Grade Partially demolished [ _ El [ _ _ E O ary 3 Temporarily O struct demolished [l E [[ 7 [ _ _ [ 7 [7 O O7 ure Wholly demolished O7 O7 [7 [ El O7 [O [ [7 [ [O after total Grade Partially demolished F] [7 [7 [7 . 7 17 [7 [7 [7 [7 [7 expira tota 4 Temporarily [7tion/i demolished [O [n [l [7 o_ _ o [ o no n l legal W holly demolished [7 [7 [ El 7 [7 [] [7 [ [7 [7 struct Grade Partially demolished [O El [ El [n [7 .[7 [7 [7 [7 [7 r Temporarily n7 demolished I OEl ____ O OIL [7 I O Oo n_ Wholly demolished l n E o o o [ n7 Grade Partially demolished [E7 [7 o7 [o [7 [ non page 26 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historical1I municipal for Liede WWTS (phase I and II) project (pipe i Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price 6 Temporarily n __Idemolished n o H o ° l ° H ° ° ° n Wholly demolished n H H o o H o o o o o n subtot Partially demolished 0 0 O O O H H H H al Temporarily H ° demolished n H H H H H H H H H H Wholly demolished 4.00 993.62 2,750.00 2,732,468.75 7.00 1,285.48 2,550.00 3,277,971.58 Hl H 0 Grade Partially demolished 2.00 128.57 2,750.00 353,577.80 6.00 390.92 2,550.00 996,858.71 1.00 53.08 2,350.00 1 Temporarily H0 demolished 2 115.4090142 800 92327.21138 3 396.5789496 750 297434.2122 H 58.95943511 650 H Wholly demolished 1.00 227.39 2,650.00 602,579.79 1.00 86.21 2,450.00 211,215.48 H 0 H H Grade Partially demolished H H H H 2.00 182.02 2,450.00 445,961.08 2.00 80.53 2,830.00 2 Temporarily H ______ demolished H 0 H H 2 220.7458355 700 154522.0849 1 0.993881822 600 H Wholly demolished 1.00 13.05 700.00 9,135.00 H H H H H H H H . Grade Partially demolished 1.00 11.36 2,550.00 28,971.88 H H H H 1.00 23.80 2,550.00 3 Temporarily H demolished H H H H H H H H H H H H Wholly demolished H HH H H H H H H H Total Housin Grade Partially demolished H HH H1 H H H H H g 4 Temporarily H __ demolished H HH H H H H H H0 H Wholly demolished H H H H H H H H H H H H Grade Partially demolished H H H H H H H H H H H 5 Temporarily H demolished H H H H H H H Ho H H] H Wholly demolished H H H H H H H H H H H H Grade Partially demolished H H H H H H H H H H H 6 Temporarily H demolished H H H H H H H H H H H H- Wholly demolished 6oat 1,234.06 2709(90L ,344,183.54 A7.0 1,37169 -,543i72 -489187.06 -- H subtot Partially demolished 3.00 139.94 2,733.76 382,549.68 8.00 572.95 2,518.23 1,442,819.79 4.00 157.42 2,625.80 page 27 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Liede WWTS (phase I and II) project (pipe] nn H H n H H HH n H H o H Ho Frame structure Composite structure Brick and timber struct 1_____ ______ quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price a Temporarily H ______ ______ demolished 2 115.4090142 800 92327.21138 5 617.3247851 732.1207701 451956.2971 1 59.95331693 649.1711202 H Wholly demolished H HOH H H H H H H H H H Grade Partially demolished H H Ho H H H H H H H Temporarily H demolished H H H H H H H H H H H H Wholly demolished H HH H H H H H H H Grade Partially demolished H HH H H H H H HO 2 Temporarily H demolished H H H H H H H H H H H H Wholly demolished H H H H H H H H H H H H Grade Partially demolished 1.00 11.36 2,550.00 28,971.88 H H H H H H H 3 Temporarily H demolished H H H HC H H H H H H n Wholly demolished H H H H H H H H H H H H Total Shop Grade Partially demolished H H H H H H H H H Hl 4 Temporarily O __ demolished Hl H H H H H H HO HO H Wholly demolished HO H H H H H H H H H H Grade Partially demolished H H H H H H H H H H H 5 Temporarily H __ demolished H H H H H H H H H H H H Wholly demolished H H H H H H H H H H H H Grade Partially demolished H H H H H H H H H H H 6 Temporarily n_ demolished H H H H H H H H H H H n Wholly demolished H H H H H O H H H H H subtot Partially demolished 1.00 11.36 2,550.00 28,971.88 H H H H H H H al Temporarily Hn demolished H H H Hl H H HO H H Hn Wholiv demolished n n_ ______El n o__la- ___ H oo H Grade Partiallydemolished HI H H H H H H H H Ho page 28 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Liede WWTS (phase I and II) project (pipe i [n111 U o o V LI nIL [ nI LI LI oo Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price 1 Temporarily OI demolished LI O n n o oI nL 1 22.58570755 650 Wholly demolished LI El OI n oI El n oI oI oI o OI Grade Partially demolished 1.00 274.01 4,740.00 1,298,804.02 l O O I I 2 Temporarily n ______ demolished O 118.7856138 750 89089.21033 O l E O O L n Wholly demolished 1.00 78.37 3,990.00 312,694.70 OI LI O U O O O [1 Grade Partially demolished 1.00 45.11 3,990.00 179,981.13 1.00 22.49 3,710.00 83,440.65 1.00 279.33 O 3 Temporarily 0 demolished L 35.1487484 700 24604.12388 O O U El El 0.263237 550 O Wholly demolished O O L L O O O L U O O U Total Office Grade Partially demolished U L I O U U I O O 4 Temporarily U __ demolished U OI L U U o L U U L LI n Wholly demolished L L U U O L U U L LI OL U Grade Partially demolished U U O LI oI U L LI U El 5 Temporarily U __ demolished El U U U O U U U L L n Wholly demolished UU LI U U L LI O UO n . Grade Partially demolished Ul U U LI U U L O LI 6. Temporarily U demolished U U U U U U U U L O O U Wholly demolished 1.00 78.37 3,990.00 312,694.70 U L U U U U L U subtot Partially demolished 2.00 319.12 4,633.99 1,478,785.14 1.00 22.49 3,710.00 83,440.65 1.00 279.33 U al Temporarily n ______ demolished U 153.9343622 738.5832026 113693.3342 U O 1 22.84894454 648.8479249 n Wholly demolished O U F U o U U U U U o n Grade Partially demolished U U UU O U U El UO 1 Temporarily n demolished O U U U U LI U U U o U U __ ____ ____ Wholly demolished 00 2749-- 00.00 U71 Grade Partially demolished U U O U U U U OI L O O page 29 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Liede WWTS (phase I and II) project (pipe i n El F F] F] El F] F] n oF] F] o n] F] Fo nn Frame structure Composite structure Brick and timber struct ________________ quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price - - Temporarily O] __ demolished n] El o] o] F] El Fo o] El o] F] n] Wholly demolished O F] O] F] FO O 0 n o o] o] O] Grade Partially demolished El F] o] F] El El o o] o] o] 3 Temporarily O] demolished FF F] F] F] F] El F] F] F] I] n] Foctor Wholly demolished O] O O O O] F] F] F F] 0F F] n Total y Grade Partially demolished El O F] 0 El buildi 4 Temporarily F] ng demolished ] ] ] ] F] ] ] F] O El Wholly demolished O 0 O O O O O n o o o O Grade Partially demolished O O] F] O F] F] F F] O] F[ F] 5 Temporarily O] demolished F F F] F F] F] ] F ] F O O] .Wholly demolished O] F F FO O] O] O] O O F] OO O] Grade Partially demolished O O El O] O] O F] F F] F] 6 Temporarily O] demolished F El E F] F Di _ __ El Wholly demolished O El O] F] ] F] O OO 2.00 27.49 600.00 O subtot Partially demolished O O] O O] O ] F] C1 F] 0F El al Temporarily O] ____ demolished E F] n o F] o F] o F] O] Wholly demolished F] F] F] F] F] 0] O] O F] O O F] Grade Partially demolished 0 ElI F] 0 O] F] 0] O] O 1 Temporarily O] demolished ] F] ] F] F] F] O n] Wholly demolished ] 0 O O ] O O O ] O F O] Grade Partially demolished F] l l O F] El O n o F 2 Temporarily n] __ demolished El F _ F _ _ _ F _ _ O n] __ Whnlly demolished O ~ F] _______ -F]- -F]- E F]- O- O] El- O - F] l § Grade Pariallydemolished F] F] El El n I] F] I F F] page 30 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicall] municipal for Liede WWTS (phase I and II) project (pipe i [7 [7 [7 [2 [7 [n [[ n7 [n o7 [n [ [7 Frame structure Composite structure Brick and timber struct ._____ quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Temporarily [n ____ demolished 7 [ [ 7 n7 [7 [ [ 1 0.207442164 550 [n Wholly demolished [ [ [ [7 [7 [ [7 [ [7 [ [ Total Other Grade Partially demolished [7 [n [ [7 [7 [7 [7 [7 [7 [7 [ uses 4 Temporarily [n idemolished [7 [7 [ [7 [7 [ [ [7 [ [ [7 [n Wholly demolished [ [ [7 [7 [ [7 [ [7 [7 [7 [7 [7 Grade Partially demolished [ [ . [ [7 [ [7 [7 [7 [7 [7 [7 5 Temporarily E l demolished 7 7 7 7 7 7 7 7 7 [ [ E7 Wholly demolished 7 7 7 7 7 7 7 7 7 [ [ 7 Grade Partially demolished [7. [ 7 7 7 7 [7 [7 [ [ 6 Temporarily [7 demolished n[7 [n [ 7 [ n n I n n n [7 Wholly demolished [7 [ [ [7 [7 [ [7 E7 [7 n7 [7 subtot Partially demolished [ [ [ [ [ [ [ [ [ [ [ al Temporarily [n _____ demolished [[ [7 [7 [7 [7 [ [7 1 0.207442164 550 [n Wholly demolished 4.00 993.62 2,750.00 2,732,468.75 7.00 1,285.48 2,550.00 3,277,971.58 [ [7 [7 [7 Grade Partially demolished 2.00 128.57 2,750.00 353,577.80 6.00 390.92 2,550.00 996,858.71 1.00 53.08 2,350.00 1 Temporarily [O demolished 2 115.4090142 800 92327.21138 3 396.5789496 750 297434.2122 1 81.54514265 650 [7 Wholly demolished 1.00 227.39 2,650.00 602,579.79 1.00 86.21 2,450.00 211,215.48 2.00 27.49 600.00 [7 Grade Partially demolished 1.00 274.01 4,740.00 1,298,804.02 2.00 182.02 2,450.00 445,961.08 2.00 80.53 2,830.00 2 Temporarily [7 demolished [ 118.7856138 750 89089.21033 2 220.7458355 700 154522.0849 1 0.993881822 600 [ Wholly demolished 2.00 91.42 3,520.36 321,829.70 [7 [7 [ [7 [7 [7 [ [7 Grade Partially demolished 3.00 67.83 3,507.61 237,924.89 1.00 22.49 3,710.00 83,440.65 2.00 303.13 200.25 3 Temporarily n_ demolished [7 35.1487484 700 24604.12388 [7 [7 [ [C 1 0.470679164 550 n _ Whnily demolished [ O O O O O O O Total total Grade Partially demolished [ [[ [7 [7 [ [7 page 31 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Liede WWTS (phase I and II) project (pipe i [7[7 [7 [7 [n [n [7 [n [o[7 [o [n [n [o [o [7 Frame structure Composite structure | Brick and timber struci quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price 4 Temporarily [n demolished [ [ [ [ [ [ [ [ [ [ [7 Wholly demolished 7 7 7 7 7 [ [7 [7 [7 [7 Grade Partially demolished 7 [7 [ [7 [7 [ [ [ [7 [ 5 Temporarily O7 __ demolished [7 [7 [7 [ [ [l O7 Wholly demolished [[ [7 [7 [O [7 [ [ [ [7 [7 n7 Grade Partially demolished [[ [7 [7 [[ [7 [ [ [7 O7 6 Temporarily [7 __ demolished 7[ [7 7 [ [7 [7 [7 . _ Wholly demolished 7.00 1,312.43 2,786.33 3,656,878.24 8.00 1,371.69 2,543.72 3,489,187.06 2.00 27.49 600.00 [7 subtot Partially demolished 6.00 470.41 4,018.39 1,890,306.70 9.00 595.44 2,563.25 1,526,260.45 5.00 436.75 946.42 al Temporarily demolished 2 269.3433764 764.8992463 206020.5456 5 1451956.29714 4834 page 32 of 64 y used house,temporary structure before expiration, shared by other network) o] [] o] n] n] n Attached table:18.1.4BD :ure _ Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price F] El F] El F] I F] [] F F] F] F] El ] F] F] F] F] 227,898.75 F] F] F EJ 2.00 80.53 2,830.00 227,898.75 596.329093 F _ F El 1.00 0.99 600.00 596.33 O F] F] F] F] O O El F] 60,701.65 F] F] F F 1.00 23.80 2,550.00 60,701.65 _~~~~~~~~~~~~~~~~~~~E _ F]oF] FE F] F F] n F] o El F] F] F] F] F]~~~~~~~~E F] F] F] F]1 F] F] F]F]F F] F] El F] 288,600.40 F] F F F] 3.00 104.33 2,766.12 288,600.40 596.329093 F] _ El F 1.00 0.99 600.00 596.33 p 33 o 64 page 33 of 64 v used house,temporary structure before expiration, shared by other network) o o o o o n Attached table:18.1.4BD zure ________ Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price n o n o G 0~~~~~1 0 El 0 0 01 El D 31 0 3 n n 3 0 n1 = 1 n El 3 nn o o o El n o o o o E O O O El O O O O o o o o o o o o o o~~~~~~E -oL _ _ 7 n _ - 350. 8909_ o n n o o~~~~~~~~~~E 1.00 78.37 3,990.00 312,694.70 o1 El o nn 2.00 67.60 3,896.84 263,421.78 page 34 of 64 v used house,temporary structure before expiration, shared by other network) n______ nI oI El Attached table:18.1.4BD :ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price OI O El OI O] O 35.15 700.00 24,604.12 [] LI LI LI [] LI LI LI L LI LI LI I I I LI LI LI L Ii LI LI I LI I LI r] Fl O OI O OI OI LI LI , LI LI LI LI L LI 1.00 78.37 3,990.00 312,694.70 LI LI LI El LI 3.00 341.61 4,573.15 1,562,225.80 LI L LI L LI LI 153.93 738.58 113,693.33 LI LI LI LI LI LI LI El LI page 35 of 64 v used house,temporary structure before expiration, shared by other network) n o H o n n Attached table:18.1.4BD -ure | Simple structure | Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price Li ~~[ El n1 o] 1 H o H H H H H H H o H H H H H H H H o H H H H H H H H o H H H H H H H Hl o H H H H H H H H o H H H H H- H Hl o H Hl, Ho H Ho H H HH H H H Hl H H H H H H o H H H H H H H H H H H H H H H H H H H H Ho H H H H H Hl H H o~~~~~~~~~~~~~~~~~pg o36o o of 64 H H _ H H- H H H- H H H H H H H H H o H H H H H H H H H~~~~~~~~~~~~~~~~~~pg H6 Hf H64H H v used house,temporary structure before expiration, shared by other network) o] F] FE o] o El Attached table: 18.1.4BD ;ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price [o o] o] o] n o] o] o] ] El o] F] ] F] El o] o] oo o] F] . o o] n] F] Fr oo F] f] F] F F] F == F] n E] El o] o F F] El o o o] n o] o] o] o] o] o] El o] o El o] o o] o o] n] F] o o El o o] o] o o] o] F] o] o] F] o] o] F] F] n] F] El F] F] . El F] F] o]. F] F] F] F] F] o] El F] 227,898.75 O O 3.00 354.54 4,306.16 1,526,702.76 596.329093 O FO El 1.00 119.78 748.76 89,685.54 O O O F] O 1.00 78.37 3,990.00 312,694.70 60,701.65 O F] O O 3.00 91.40 3,546.08 324,123.43 F] O O 0 El F 35.15 700.00 24,604.12 El F] F] F] F] F] F] F] F] F]F] F]I F] F F] F] F]lF F] F F]____ ______L ----EL ______ -F- -_____________ FlF FlF] IF] F]I F] F I page 37 of 64 v used house,temporary structure before expiration, shared by other network) F] Fo [] F] El nn Attached table:l8.1.4BD .ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price F] n n] n] n] El n n] o o] n] El n] n] 1.00 78.37 3,990.00 312,694.70 288,600.40 nF F] EJ 6.00 445.94 4,150.37 1,850,826.19 596.329093 n]I Fo F] 1.00 154.93 737.69 114,289.66 El El F] n] LI 11.00 2,279.10 2,637.19 6,010,440.33 124,744.38 F] F] F] F] 9.00 572.58 2,576.37 1,475,180.89 38323.63282 F] F] n n] 5.00 570.95 749.78 428,085.06 o] El Fo El F] 2.00 313.60 2,595.02 813,795.27 l o n F] Fn 2.00 182.02 2,450.00 445,961.08 F] o El El .n 2.00 220.75 700.00 154,522.08 F] F] F] ] F] F] F] F] El 0 El F] O C 1.00 11.36 2,550.00 28,971.88 C FF F] El O F] F] F] O El El F] O F F] F F] O F] F] O F] F] F] O F]OF] El F] O O O F] F F F F] F] El Fi F] F] F]I El F] 0F F] F] O F] F] F] F] F] F] F] F] ] F]I F] F] El 2- O O -O1-3.0 -2,59.0 2,632.09 6,824,235.60 124,744.38 ] ] O F 12.00 765.97 2,545.95 1,950,113.85 page 38 of 64 v used house-temporary structure before expiration, shared by other network) o U o o n o Attached table: 18.1.4BD .ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price 38323.63282 O O [ [l 7.00 791.69 735.90 582,607.14 o o o o n o o o o o o o o o [n o E l El U U 1.00 11.36 2,550.00 28,971.88 U U U U ~~ ~~ ~~ ~~ ~~U U UEUl c U U U U U U U U o U U U U U U U U o U U U U U U U U C U U U U U U U U El U U] U U 1.00 11.36 2,550.00 28,971.88 page 39 of 64 v used house,temporary structure before expiration, shared by other network) ________V V] V1 V1 Attachedtable:18.1.4BD :ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price 14680.7099 0 0 0 V 1.00 22.59 650.00 14,680.71 o n o o n o o o o O O O O b V V V V V V V V V V V V o o V V V V V V V V o V V V V V V V V n V V V V V l V V o V o V o V V o V V V V V V V V V V V V V V V = V V V V V V V V V V V V VoV V V V V V V V VoV V V V V V V V 14680.7099 0 V V V 1.00 22.59 650.00 14,680.71 page 40 of 64 v used house,temporary structure before expiration, shared by other network) [o r] [n [o [ [ Attached table: 18.1.4BD :ure ________ Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price [1] [7 I] L] [7 [7 [7~~~~~~~~F [7 [n [n n7 o7 [7 [7 n7 oi [o El [n [n [ n [ o [7 [7 [7 1] [7~~~~~~~1 El El [7 [7 o 1 n n1 n1 o o on n o~~~~~~~~~~~~~~~~~~pg o41n n of 64 b7 [7 [O [7 [7 [n [7 [n[ n [7 n [7 [7 o7 o [7 n n [n [7 [7 [7 [7 [7 [7 [n o o [o o [7 [n [o [o [7 o o7 [o [o [o [o [o [7[ o7 o7 [o [o [o [7 o7 [o o o7 Lo o [o [n n [7 o o oI o [o n o n [o [n [7 n [7 [7 o n o [o [G [O o o [o [o [7 [7 [7 o [n page 41 of 64 y used house,temporary structure before expiration, shared by other network) o n o n n U Attached table: 18.1.4BD ~ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price n o_ = [1 n n 3 = CU o o o o o o n o o n U U U U U U o U 11 o El o o El o o o 0 11 0 11 El 11.00 2,279.10 12,637.19 6,010,440.33 124,744.38 01 O 0 O 9.00 572.58 2,576.37 1,475,180.89 53004.34272 0FO0l 6.00 593.53 745.98 442,765.77 O1 0 2.00 313.60 2,595.02 813,795.27 O1 01 El 0 O 2.00 182.02 2,450.00 445,961.08 11 E F] l 0 2.00 220.75 -700.00 154,522.08 El 0 F El 11 2.00 22.72 12,550 00 57,943.76 page 42 of 64 V used house,temporary structure before expiration, shared by other network) F] o] o] o] n] n] Attached table:18.1.4BD .ure |_______ Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price F] F] F] F] F] F] F]~~~~~~~~~~~~~1 F] F] F] F] F] D] F] F] F] El F] F] F] F] F] F] F] F] F] F F] F] F] F] F] 13.00 2,592.70 2,632.09 6,824,235.60 124,744.38 F] F] F] F] 13.00 777.33 2,546.01 1,979,085.73 53004.34272 F] F] F] F] 8.00 814.28 733.52 597,287.85 F] F] F] F] F] F] F] F] F F] F] F] F] F] F] F] F] F] F] F] F] F] F] F] F] F] F F] F] F]~~~E F]F]F F] F] F] F] F] El F] F] 1.00 13.05 700.00 9,135.00 El F] El F] F] F] F] F]I F] F] F] ] F] F] F] F] F] F] El F] F] F] F] F] F] F F] F] F] F] F]~~~~~E F] ] F] F] El F] F]F F] F] F] ] LI F page 43 of 64 v used house,temporary structure before expiration, shared by other network) o o n n n o Attached table:18.1.4BD :ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price El , 1 O1 O1 O O1 El 0 O rl = = o~E 0 n n1 n o O o O o 1.00 13.05 700.00 9,135.00 O C1 U O U U U U o U o - o o o o no o U U o o o o a oo o U U o o o o [o on o o o o o o o oU c . U o o o U U U o n r = o El El = El El E 2 E El 11 1 0 0 g! =~~~~~~~~~~~~~- II n-I = n] -- Eln page 44 of 64 v used house,temporary structure before expiration, shared by other network) El n o n o o Attached table: 18.1.4BD ;ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price ni n oi ni [n ni o o = i ni = i L ci L = = Li Li 1.00 20.64 350.00 7,223.33 1.00 20.64 350.00 7,223.33 O 00 X O O X O O O O OE 0 0El Li Li El Li Li Li o o El Li LinI n Li Li n El Li Li Li Li Li Li o El o Fl O1 1.0 206 35.0 El233 1.0 20.6 35.0 ,233 page 45 of 64 y used house,temporary structure before expiration, shared by other network) o o o H o o Attached table: 18.1.4BD :ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price 16,493.73 H H H 0 2.00 27.49 600.00 16,493.73 O 1.00 13.18 400.00 5,270.54 1.00 13.18 400.00 5,270.54 H H H H H H H H H H H Hl H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H = H H H H H H H H H H H H 16,493.73 H H H H 2.00 27.49 600.00 16,493.73 H 1.00 13.18 400.00 5,270.54 1.00 13.18 400.00 5,270.54 page 46 of 64 y used house,temporary structure before expiration, shared by other network) o o o n o o Attached table: 18.1.4BD ;ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price n [l == nI =I n = o o o o n o o o o 114.0931904 =L El n 1.00 0.21 550.00 114.09 LI ElI LI LI LI LI El LI LI LIOLI El L L OI El LI El LIOLI LI LI L L LI L L LIOLI LI LI L LI LI L El LI LI LI LI LI LI LI LI LI n .i n1 c1 n = n n n 11409319I 4 L I 1.00 .21 550.00 114.09 16,493.73 1 -O -- O ][ 2.00 27.49 6(0000 16 493731 11 1.00 13.18 400.00 5,270.54 1.00 13.18 400.00 114.09 page 47 of 64 v used house,temporary structure before expiration, shared by other network) n] o] o] F] n] o] Attached table:18.1.4BD ;ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price El F] El F] F] F] El F] F o F] Fo n Li 1.00 13.05 700.00 9,135.00 O] 1.00 20.64 350.00 7,223.33 1.00 20.64 350.00 7,223.33 114.0931904 0 O O O 1.00 0.21 550.00 114.09 El F] F] F] F] F] El F] F ] F] F] F] F] F] F] F] F] F] F]F] F] F] F] F] F] F] F]F ] ]F F ]F F] 16,493.73 FF]]F] 3.00 40.54 632.19 25,628.73 F] 2.00 33.81 369.48 12,493.87 2.00 33.81 369.48 12,493.87 114.0931904 F] F] F]F 1.00 0.21 550.00 114.09 F]F] F] F]F F]F F] F] F] F] F] F] F] F]F El F] F] El F] F] F] F] F] El F] page 48 of 64 y used house,temporary structure before expiration, shared by other network) n n] o n o o Attached table: 18.1.4BD ;ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price H H H H H H H H H o H H H H H H H H o HoH H H H H H H o H H H H H H H H o H H H H H H H H o H H H H H H H H _ H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H1 H H H H O1 1.00 74.37 O1 O 1.00 74.37 O] O H H 23.39 400.00 9,356 78 H 23.39 400H00 9,356.78 ° =l .u F n = = o = n1 n o n] n] n n n n page 49 of 64 v used house,temporary structure before expiration, shared by other network) LI EJ LI LI oI [n Attached table:18.1.4BD :ure ________ Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price LI LI LI~~~1 [] F] LIL IL LI 1.00 74.37 LI I] 1.00 74.37 El LI [] L 23.39 400.00 9,356.78 LI 23.39 400.00 9,356.78 LI LI LI LI LI EI LI El LI LI LI F] LI LI I LI LI L LI LI LIL L 1.00 279.33 LI LI 144.7803497 1.00 1.3 350.00 5,050.25 1.00 14.69 353.58 5,195.03 o o1 El o El o o n o page 50 of 64 y used house,temporary structure before expiration, shared by other network) [a [n oa [a [a [n Attached table:18.1.4BD :ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price [a [a [] [a [a [a [a~~~~~~~~~~1 I] [a F] [a [a [a El [a [a [a[ [a [a [a [a [ 1.00 279.33 [a [ 144.7803497 1.00 14.43 1 350.00 5,050.25 1.00 14.69 353.58 5,195.03 n El o1 o o n o1 o1 o 01 1] 0 El El 1.0 27.3 0 0 447039 1.0 14.4 350 00 5002 0 146 335 51 5 03 o~~~~~~~~~~~~~~~~~pg o o c of 64 [0 [3 [a [3 n [n [_ [a [0 [O [a [a O O [a [O [a [a [a [_ [a n [a [a [3 [a [a [a [a [a Oa [a [a [a [a [a [a [a [a [a [O [a [a [a a [a [a [a [a [a [0 [a [a 0a [a [a [a [a [a [a [a [a [a [a [a [a [a [a [a [a [a [a [a [a [a [a [a [a [a [a [a [a [a [a [a [a [a [a [a na [a [a [a [a [a [a [a [a oa [a~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~~~~ ~pg [a [a [a [a[6a4a[ V used house,temporary structure before expiration, shared by other network) H H] H H El F] Attached table:18.1.4BD .ure | Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price [: [1 El ] [] [D [n [u 1 H El H H H H H H H n H HH H Ho H H H H H H H Ho . H1 H Hl H H H H H 0 11 El El E E D El [: 11 [z F1C [ [z - :1 [~~~1 El u 11 u Eln S~~~~~~~~~~~~~F El I g g S page 52 of 64 V used house,temporary structure before expiration, shared by other network) E o o o c n Attached table:18.1.4BD :ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price _ _ _ _ _ _ _ _ El] _ _ _ _~~11 1 El] El _ _ ___ El] ___~~~~~~~1 El LI LILIL LI LI El LI I LI LI LI L LI LI E] LI LI LI LI LI L LI 1.00 74.37 E] LI 1.00 74.37 ElIL LI LI 23.39 400.00 9,356.78 El] 23.39 400.00 9,356.78 LIL LI LI LI 1.00 279.33 LI LI 144.7803497 1.00 14.43 350.00 5,050.25 1.00 14.69 353.58 5,195.03 El] LI El El] LI, E] LI E] L EIl LI El El] LI LI El El El] LI LI~~1 I El] LI LI LI L LI LI LI~~~1 El I LI El] LI E] IEl El El LI LI LI El L El EI LI LI LI L E] LI LI LI 1.00 74.37 LI LI 2.00 353.70 LI LI 144.7803497 1.00 37.82 380.92 14,407.02 1.00 38.08 382.09 14,551.80 page 53 of 64 V used house,temporary structure before expiration, shared by other network) [o [o [o n7 [J [ Attached table: 18.1.4BD .ure ________ Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price [n 1.00 144.56 [7 7 1.00 144.56 [ [ [ [7 [ [7 [ [ [ 7° [7 o E o E7 7 7 [ o [7 o 7 o E [7 l [ [ [7 [7 [ [ [ [7 [ [ [7 [7 [7 [7 [7 o [7 E [7 [7 [ [7 c [7 El 7 = [7 [7 [7o[7 [ [7 [7 [ [7 [ [7 [7o[7 [7 [ [7 [7 7 7 [ [7 [7 [7 [7 [7 [7 [7 E7 [ O 1.0 1445 n1 o F]o El.5 O El [7 1.00 144.56 [7 [7 1.00 144.56 [7 [7 [7 [7 [ [7 [7 [7 .[ [7 [7 n Lj o o n _ C o~~~~~~~~~~ag 5 of 64 page 54 of 64 v used house,temporary structure before expiration, shared by other network) o_El o L Lo oo Attached table:18.1.4BD -ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price O O O O G O O O El LI LI L] LI LI LI~~~~~~~~~1 LI F] LI LI LI LI LI~~~~~F El El LI LIL LI LI LI LI ___ ___- 1 o L L LI LI o L LI o_ oI LI LI LI L El L El oI LI LI LI LI LI LI L LI oI LI LI LI El LI L L LI oI LI LI LI LI LI L o LI El LI El L LI LI L LI El I I L LI LI LI L L o~~~~~~~~~~~~~~~~~~pg o o o of 64 o LI LI LI LI LI LI LI LI n LI LI LI LI LI LILIL LI LI LI LI LI LI LI LI LI | L:I LI LI LI LI rl rl LI '] page 55 of 64 v used house,temporary structure before expiration, shared by other network) n F Fn Fn o Attached table: 18.1.4BD .ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price F F1 F El F F F F F F F F F F F ~~ ~~~~~~~~~~~~~~~~~F] F] F1 F] Fl F1 F1 F F F F o o n n n o o o o~~~~~~~~~~~~~~~~~11E F1 F F1 F1 Fl F1 F F F o o o o n o o n o~~~~~~~~~~~~~~~~~~E1 [I Fl F1 F Fl F] FF n ° ° ° c] ° ° ° °1f] 1 ol El _ - 1 no o~~~~~~~~~~~~~~~~~~pg n56oo of 64 F F F F F F F F F F F F F F F F F_ F F F F F F F F F F o n~ r_ __ _ o__ _ _ _ _ o____ o~~~~~~~~~~~~~~~~~~pg 56 o o of 64 v used house,temporary structure before expiration, shared by other network) nI nI o] [n oI LI Attached table: 18.1.4BD .ure |_______ Simple structure _ Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price -I ElI LI LI LI LI LI El LI oI El L L LI LI El LI LI El LI LI L L L LI El LI o1 0 El n o1 o1 o1 o o o~~~~~~~~~~~~~~~~~pg o57o n of 64 LI LI LI LI LI LI LI LI LI LI LI LI LI LI= LI LnIL LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI LI page 57 of 64 v used house,temporary structure before expiration, shared by other network) [n [7 [o o7 [n [o Attached table:18.1.4BD :ure ________ Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price F][ ID [7 [7 L] [7[7[ r n r7 o n7 [ [ [ [ n7 [7o[7 [ [o [7 [7 [7[ El [7 [7 El [7 [7 [77[ 71 El [7 [7 [7 [7 [77[ [7 10 145 [7 [7 1.0 1445 [7 [7 LI n El o1 EL o n o~~~~~~~~~~~~~~~~~~pg o58o o of 64 n - n[ [7 [7 [7 [7 O7 [7[ O7 [7 [7 [7 [7 [7 [7 [7[ o7 [7 [7 [7 [7 [7 [7 [7 [7 n7 [7 [7 [7 [7 [7 [7 [7 = [ O7 [7 [7 [7 [7 [7 [7 [7 [7 O7 [7 [70 [7.5 [7 [70 [7.5 [7 [7 o~~~~~~~~~~~~~~~~~~pg 58 o o of 64 v used house,temporary structure before expiration, shared by other network) n] o] n] n] n nF] Attached table:18.1.4BD .ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price G] F] 0 G] G] n ] Fn n- o F] F] F] n n ] F F El 1.00 144.56 F] F] 1.00 144.56 F] F] El F] F] El F] n El n F] F F] F] G 11.00 2,279.10 2,637.19 6,010,440.33 124,744.38 0 F 9.00 572.58 2,576.37 1,475,180.89 38323.63282 F] ] n F 5.00 570.95 749.78 428,085.06 ] F] F] F F 2.00 313.60 2,595.02 813,795.27 227,898.75 1.00 144.56 F F - 5.00 407.11 1,655.22 673,859.82 596.329093 F] F] El F] 3.00 221.74 699.55 155,118.41 F] n F] E G 1.00 13.05 700.00 9,135.00 60,701.65 O F] n FG 2.00 35.17 2,550.00 89,673.53 F] F] F] F] F] F] ~~ ~ ~~ ~ ~~~~~~~F] F] F]I F] F] F F] F] F] F] F] El F] F] F] F] F] F] F] F] F] F] F] F] F] F] F El F] F] 0 El n G G n G 0 n1 F] F] F]~~~1 F] F] F] F] F] F] F] ~~-F]- ___ ___a- 14t00& 2,605.75 ~2622742-6, 3O 3_ 413,344.78 1.00 144.56 F] F 16.00 11,014.86 12,205.94 2,238,714.24j page 59 of 64 v used house,temporary structure before expiration, shared by other network) o o o n o H Attached table: 18.1.4BD ;ure ________ Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price 38919.96191 H = H H 8.00 792.69 735.73 583,203.47 H 1.00 74.37 H H 1.00 74.37 H O H H 23.39 400.00 9,356.78 0 23.39 400.00 9,356.78 H H0 H Hl 1.00 11.36 2,550.00 28,971.88 HoH H H H H H H H H H H H H H H H H O 3 0 O 0 El El 1.0 743 n o.0 85.73 33.9 2891.8 O1 _ 23.39 40 0.0 9.356.78 O 23.39 400.00 9,356.78 C ~~~~~~~~~~~~~~~~~~~~~~page 60 of 64 y used house,temporary structure before expiration, shared by other network) [n Li Li [7 o- [n Attached table:l8.1.4BD :ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price 14680.7099 El [7 O [O 1.00 22.59 650.00 14,680.71 o o o n 1.00 274.01 4,740.00 1,298,804.02 0i Ol O OO 118.79 750.00 89,089.21 o oi oi ni o 1.00 78.37 3,990.00 312,694.70 O 1.00 20.64 350.00 7,223.33 4.00 367.57 736.32 270,645.11 144.7803497 1.00 14.43 350.00 5,050.25 1.00 49.84 597.88 29,799.15 oi o Li Li o oi Li Li ni El o EJ Li o o oi Li Li Li n = = n = = = Li Li Li oi oi Li Li oi nE O Oi Li 1.00 78.37 3,990.00 312,694.70 O 1.00 20.64 350.00 7,223.33 5.00 641.58 2,446.24 1,569,449.13 14825.49025 1.00 14.43 350.00 5,050.25 2.00 191,21 698.54 133,569.07 Li i LiL L i FLiLii 16,493-73 0 Li- -Oi- O______ E 2.00 27.49 600.00 16,493.73 E 1.00 13.18 400.00 5,270.54 1.00 13.18 400.00 5,270.54 page 61 of 64 v used house,temporary structure before expiration, shared by other network) n G H H F] n Attached table: 18.1.4BD .ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price o n o H H H H H H O G n G1 G O G 1 n H H H H H H G H o H H H H H H n H 16,493.73 G n1 I G11 2.00 27.49 600.00 16,493.73 G 1.00 13.18 400.00 5,270.54 1.00 13.18 400.00 5,270.54 n H H H H H H H H 3 3 r n ===D E = F page 62 of 64 v used house,temporary structure before expiration, shared by other network) o o o I n n Attached table:18.1.4BD .ure Simple structure | Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price 114.0931904 U 0 0 O 1.00 0.21 550.00 114.09 o U U o n o o r o o o U U U o o U U U U U U U U U U U U U U U U U U U U U U U U oU. U U U U 114.0931904 U U U U 1.00 0.21 550.00 114.09 U U U U U 11.00 2,279.10 2,637.19 6,010,440.33 124,744.38 U U U 9.00 572.58 2,576.37 1,475,180.89 53004.34272 U U U U 6.00 593.53 745.98 442,765.77 16,493.73 U U U U 4.00 341.09 2,434.23 830,289.00 227,898.75 3.00 232.10 22.71 5,270.54 8.00 768.67 2,573.20 1,977,934.38 596.329093 U 23.39 400.00 9,356.78 3.00 363.92 696.76 253,564.40 U U U U U 2.00 91.42 3,520.36 321,829.70 60,701.65 1.00 20.64 350.00 7,223.33 7.00 414.09 940.10 389,290.52 258.8735402 1.00 14.43 350.00 5,050.25 2.00 50.05 597.68 29,913.24 page 63 of 64 v used house,temporary structure before expiration, shared by other network) o [ 7 n [ [ Attached table:18.1.4BD :ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price [O I] 3 [ l [ [ [_ [ [ o n n n [ [ o [ [ o7 o o7 [n o [ [ [o [ [3 [l - [ [ [[ [l [O O El O O7 O O[ O [7 [7 [7 7 [7 O O El [7. [7 [7 [7 [7 [7 [ [7 [7 16,493.73 [7 [7 [ [7 17.00 2,711.61 2,641.44 7,162,559.03 413,344.78 4.00 252.74 49.43 12,493.87 24.00 1,755.34 2,188.98 3,842,405.79 53859.54536 1.00 37.82 380.92 14,407.02 11.00 1,007.50 720.84 726,243.41 page 64 of 64 Cost estimate of compenstion for stop-loss shared by other municipal for Liede WWTS (phase I and II) project (pipe network) Attached table 18.3.2.10.1.4BD- I Use Type Total fl|r Unit price Total price area Grade 1 Shop Partially but permanently affected 168.00 Grade 2 Shop Partially but permanently affected 120.00 Grade 3 Shop Partially but permanently affected 11.36 80.00 908.92 Grade 4 Shop Partially but pernanently affected 50.00 Grade 5 Shop Partially but permanently affected 25.00 Grade 6 Shop Partially but permanently affected 15.00 Subtotal 11.36 908.92 Liede Grade I Office Partially but permnanently affected 96.00 WWTS Grade 2 Office Partially but permanently affected 274.01 70.00 19,180.65 (phas I Grade 3 Office Partially but pernanently affected 67.60 50.00 3,379.94 and I;) Grade 4 Office Partially but permanently affected 32.00 project Grade 5 Office Partially but permanently affected 20.00 Grade 6 Office Partially but permanently affected 12.00 Subtotal 341.61 22,560.59 Grade 1 Factory building Partially but permanently affected 60.00 Grade 2 Factory building Partially but permanently affected 48.00 Grade 3 Factory building Partially but permanently affected 36.00 - Grade 4 Factory building Partially but pernanently affected 24.00 _ Grade 5 Factory building Partially but permanently affected 14.00 _ Grade 6 Factory building Partially but permanently affected 7.00 _ Subtotal _ _ Total 352.97 l 23,469.51 Cost estimate of compenstion for stop-loss shared by other municipal for Liede WWTS (phase I and II) project (pipe network) Attached table: 18.3.2.10.1.4BD-2 Use Type Total floor Unit price Total price area Grade 1 Shop Temporarily affected 168.00 _ Grade 2 Shop Temporarily affected 120.00 _ Grade 3 Shop Temporarily affected 80.00 _ Grade 4 Shop Temporarily affected _____ 50.00 Grade 5 Shop Temporarily affected 25.00 _ Grade 6 Shop Temporarily affected 15.00 _ Subtotal Grade 1 Office Temporarily affected 22.59 96.00 2,168. 23 Liede Grade 2 Office Temporarily affected 118.79 70.00 8,314. 9 WWTS Grade 3 Office Temporarily affected 35.15 50.00 1,757. _ (phase I and Grade 4 Office Temporarily affected 32.00 _ II) project Grade 5 Office Temporarily affected 20.00 _ Grade 6 Office Temporarily affected 12.00 _ Subtotal 176.52 12,240. 6 Grade 1 Factory building or warehouse Temporarily affected 60.00 _ Grade 2 Factory building or warehouse Temporarily affected 48.00 Grade 3 Factory building or warehouse Temporarily affected 36.00 Grade 4 Factory building or warehouse Temporarily affected 24.00 Grade 5 Factory building or warehouse Temporarily affected 14.00 Grade 6 Factory building or warehouse Temporarily affected 7.00 Subtotal _ Total 176.52 12,240. 6 Cost estimate of compenstion for business loss due to relocation shared by other municipal for Liede WWTS (phase I and II) project (pipe network) Attached table:18. 3. 2. 10. 2. 4BD Use Type Total floor area Unit price Total price Grade I Shop Wholly and permanently affected 840.00 Liede Grade 2 Shop Wholly and pernanently affected 690.00 WWTS Grade 3 Shop Wholly and permanently affected 560.00 (phase I and Grade 4 Shop Wholly and permanently affected 450.00 II) project Grade 5 Shop Wholly and permanently affected 350.00 Grade 6 Shop Wholly and permanently affected 270.00 Subtotal I Cost estimate of cost for pipe relocation shared by other municipal for Liede W' project (pipe network) Cost share* Project Type of pipe Material of Diameter/section Nuber of Quantit Total length Unit I Unit 2 Cost share Project Tpe of pipepipe Dimtrscin cores/size y BD r, P (1 i) lOO 10Ox100 i.L l 1I BD r t _ P___N__ _C. 300x200 6L 1 1I BD ., PC9M(4T ML) Q 10Ox100 1?L 3 I . BD re PjttP (M0 ML) I_____ 300x200 6?L El 1 - BD . _____) ___ 300x200 Li 1 89.21 289.11 91.81 BD lof _._ _ _ 1OOxi0O0 4 222.54 167.12 59.26 BD ro ____.____ 200x 100 3 1 145.21 167.12 59.26 BD M, ___________ _(____ 200x200 _ _ 1 22.46 214.17 59.26 BD M _______ 300x200 5 332.77 289.11 59.26 BD Thi MA 'Q) 400xlO0 3 1 1.96 214.17 59.26 BD q _ (I (; k) 400x300 C 3 113.42 446.97 59.26 BD re t M (d) I_____ 400x500 1 13.10 661.83 59.26 BD M tMf( ) 700x500 3 1 58.81 BD . ( 800x700 3 1 21.64 1,618.89 59.26 tM/'j' t 23.00 1,021.12 BD W{. __t_____ _ A lOOOx450 3 1 47.99 903.18 679.14 BD A __ _) 10 lOOxlO0 3 1 14.24 250.80 679.14 BD r. t3(lJf i) 1250xlO00 L 1 183.70 1,557.38 679.14 BD )4 ___ 1250x900 l 2 149.72 1,557.38 679.14 BD _t__ _ 2300x2200 El 1 191.41 3,114.80 679.14 BD r( _________ ___KW 700x300 El 1 38.23 625.42 679.14 BD t 1lIQ) 800x600 2 25.38 625.42 679.14 Lt)'J'it _ 9.00 650.67 . BD ftP-7((49AW) 0% 100 3 1 - BD . PM6 (4(NMA) f t 300 El 2 BD . PWIW(M@JA) _ _ 219 I 2 - 890.00 BD W. It _____(___)___ 150 LI 1 207.01 560.00 BD - M7M(QN-) %A100 El 5 635.91 480.00 BD t ________ ) _VA _ 150 E 1 100.81 570.00 BD p 7 (Qit) 0 300 3 6 313.24 890.00 BD t e7i((')W 400 3 1 44.61 1,550.00. BD ; ( _____L ____ ____ 219 L 1 82.11 890.00 BD ;( __89 1 223.77 310.00 :41It!1'J ' t ________________ _______________ ___________ 21.00 1,607.47 .________ __101 6 7 4 BD*it _ _ _ _____53.00 3,279.26 | M1W ;J2W WTS (phase I and II) attached table 18.3.2.13.4BD Unit 3 Total Rekar 33,982.60 _ 89,942.38 32,873.09_ 6,140.64 194,809.34 535.02 = 70,858.02___ 9,444.33 36,310.97 474,896.40 75,932.06 13,245.69 410,850.96 __ 436,525.91 726,205.64 49,874.11 __ 50,338.77 1,762,973.14 __ 115,925.04 305,238.14 57,463.35 278,782.65 69,152.17 73,077.90 69,369.94 = 969,009.19 r_______ T3,206,878.73t:1 M 23 42 W Cost estimate of compenstion for temporary land borrowing shared by other municipal for Liede WWTS (phase I and II) project (pipe network) attached table 18.3.2.7.2.4BD Grade I Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Subtotal Area of land borrowed 7,638.06 7,558.00 - 15,196.06 Area of cultivated land - 763.81 755.80 - - 1,519.61 Unit price for cultivated land 6.50 6.00 5.50 5.00 4.50 4.00 31.50 borrowed Average time of borrowing 6.00 6.00 6.00 6.00 6.00 6.00 36.00 Cost of borrowing - 27,497.01 24,941.41 - - - 52,438.42 Cost of rehabilitation 4,582.84 4,534.80 9,117.64 Compensation of standing crop 3,819.03 3,779.00 7,598.03 Area of land for construction 6,874.25 6,802.20 - - - 13,676.46 Unit price for construction land 8.50 8.00 7.50 7.00 6.50 6.00 43.50 Average time of borrowing 6.00 6.00 6.00 6.00 6.00 6.00 36.00 Cost of construction land Corrowingd- 329,964.13 306,099.15 - - - 636,063.29 lboffowipg page I of I