The World Bank Implementation Status & Results Report Second National Ganga River Basin Project (P169111) Second National Ganga River Basin Project (P169111) SOUTH ASIA | India | Water Global Practice | IBRD/IDA | Investment Project Financing | FY 2020 | Seq No: 1 | ARCHIVED on 24-Sep-2020 | ISR43061 | Implementing Agencies: India, National Mission for Clean Ganga, Ministry of Jal Shakti Key Dates Key Project Dates Bank Approval Date: 25-Jun-2020 Effectiveness Date: 21-Jul-2020 Planned Mid Term Review Date: 15-May-2023 Actual Mid-Term Review Date: Original Closing Date: 31-Dec-2026 Revised Closing Date: 31-Dec-2026 pdoTable Project Development Objectives Project Development Objective (from Project Appraisal Document) The objective of the Project is to reduce point-source pollution from targeted Urban Areas of the Ganga river basin and support the Central Ministry to strengthen the institutional framework for Ganga river basin management. Has the Project Development Objective been changed since Board Approval of the Project Objective? No Components Table Name Institutional Development:(Cost $30.00 M) Infrastructure Development:(Cost $1045.00 M) IBRD Guarantee:(Cost $19.00 M) Program Communications and Management:(Cost $24.00 M) Contingent Emergency Response Component Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO -- Satisfactory Overall Implementation Progress (IP) -- Satisfactory Overall Risk Rating -- Substantial Implementation Status and Key Decisions The Project was declared effective on July 21, 2020 and activities to be implemented under the Project are being prepared. Bidding documents for the HAM PPPs in Agra and Meerut are under review. Tenders for these two cities are expected to be launched in September 2020. 9/24/2020 Page 1 of 6 The World Bank Implementation Status & Results Report Second National Ganga River Basin Project (P169111) Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance Substantial -- Substantial Macroeconomic Moderate -- Moderate Sector Strategies and Policies Substantial -- Substantial Technical Design of Project or Program Substantial -- Substantial Institutional Capacity for Implementation and Substantial -- Substantial Sustainability Fiduciary Moderate -- Moderate Environment and Social Substantial -- Substantial Stakeholders Substantial -- Substantial Other -- -- -- Overall Substantial -- Substantial Results PDO Indicators by Objectives / Outcomes Reduce point-source pollution from targeted Urban Areas of the Ganga river basin IN00879618 ►Amount of BOD pollution load reduced due to Project interventions (Metric tons/year, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 30,000.00 Date 21-Jul-2020 -- 11-Sep-2020 31-Dec-2026 IN00879620 ►Number of STPs constructed or rehabilitated under the Project which meet the national discharge standards at least 95 percent of the time (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 8.00 Date 21-Jul-2020 -- 11-Sep-2020 31-Dec-2026 Support the central ministry to develop an institutional framework for Ganga river basin management IN00879617 ►Adopted recommendations of the study on institutional framework for Ganga river basin management are implemented (Percentage, Custom) 9/24/2020 Page 2 of 6 The World Bank Implementation Status & Results Report Second National Ganga River Basin Project (P169111) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 80.00 Date 21-Jul-2020 -- 11-Sep-2020 31-Dec-2026 IN00879619 ►A public online system for continuous monitoring of water quality and flow in the Ganga and selected tributaries is functional (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No -- No Yes Date 21-Jul-2020 -- 11-Sep-2020 31-Dec-2026 Intermediate Results Indicators by Components Institutional Development IN00879646 ►Number of States which have a roadmap for sustained O&M sanitation assets beyond the timeframe funded by Central Government (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 1.00 Date 21-Jul-2020 -- 11-Sep-2020 31-Dec-2026 IN00879648 ►A system for more detailed water balance tracking in key reaches is developed and implemented to guide operational flow regime optimization (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No -- No Yes Date 21-Jul-2020 -- 11-Sep-2020 31-Dec-2026 IN00879651 ►Detailed assessment of environmental flow options for all impacted river reaches completed, documented and disseminated (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No -- No Yes Date 21-Jul-2020 -- 11-Sep-2020 31-Dec-2026 IN00879653 ►Number of ULB with an integrated city-wide sanitation plan informed by a GIS and roadmap for financing long-term operation and maintenance approved by the ULB (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 2.00 Date 21-Jul-2020 -- 11-Sep-2020 31-Dec-2026 9/24/2020 Page 3 of 6 The World Bank Implementation Status & Results Report Second National Ganga River Basin Project (P169111) IN00879655 ►Percentage of female staff in NMCG and state-wise EAs (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 4.30 -- 8.80 20.00 Date 21-Jul-2020 -- 11-Sep-2020 31-Dec-2026 IN00879657 ►Share of grievances redressed within 30 days of receipt (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 80.00 -- 80.00 90.00 Date 21-Jul-2020 -- 11-Sep-2020 31-Dec-2026 No complaints have been received under the Second National Ganga River Basin Project as the works are yet to begin. The actual value for this indicator is therefore kept at the baseline level (derived from the Comments: ongoing National Ganga River Basin Project). Infrastructure Development IN00879649 ►Wastewater treatment capacity created under the Project (Liters (Million), Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 800.00 Date 21-Jul-2020 -- 11-Sep-2020 31-Dec-2026 IN00879652 ►Volume of wastewater treated due to Project interventions (Liters (Million), Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 600.00 Date 21-Jul-2020 -- 11-Sep-2020 31-Dec-2026 IN00879654 ►Number of facilities setup for fecal sludge treatment under the Project (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 5.00 Date 21-Jul-2020 -- 11-Sep-2020 31-Dec-2026 IN00879656 ►Number of water quality monitoring stations generating real-time data (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target 9/24/2020 Page 4 of 6 The World Bank Implementation Status & Results Report Second National Ganga River Basin Project (P169111) Value 44.00 -- 44.00 150.00 Date 21-Jul-2020 -- 11-Sep-2020 31-Dec-2026 IN00879658 ►Nb of km of network laid under the Project (Kilometers, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 800.00 Date 21-Jul-2020 -- 11-Sep-2020 31-Dec-2026 IN00879659 ►Nb of house connections delivered under the Project (Number (Thousand), Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 200,000.00 Date 21-Jul-2020 -- 11-Sep-2020 31-Dec-2026 Program communication and management IN00879647 ►Number of mass media campaigns implemented to promote behavior change (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 4.00 Date 21-Jul-2020 -- 11-Sep-2020 31-Dec-2026 IN00879650 ►Share of core staff positions filled in each implementing agency maintained above 80% at any point in time (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 80.00 -- 84.00 90.00 Date 21-Jul-2020 -- 11-Sep-2020 31-Dec-2026 Performance-Based Conditions Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed 9/24/2020 Page 5 of 6 The World Bank Implementation Status & Results Report Second National Ganga River Basin Project (P169111) P169111 IBRD-91360 Effective USD 381.00 381.00 0.00 0.95 380.05 0.3% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P169111 IBRD-91360 Effective 25-Jun-2020 07-Jul-2020 21-Jul-2020 31-Dec-2026 31-Dec-2026 Cumulative Disbursements PBC Disbursement Achievement Disbursed amount in Disbursement % PBC ID PBC Type Description Coc PBC Amount Status Coc for PBC Restructuring History There has been no restructuring to date. Related Project(s) P174312-Second National Ganga River Basin Guarantee 9/24/2020 Page 6 of 6