Ministry of Education Education for All- Fast Track Initiative SOCIAL ASSESSMENT REPORT ON BAYAN-ULGII SUBCOMPONENT OF PRE-SCHOOL EDUCATION PROJECT Prepared by Erdenechimeg Tserendorjiin, National Consultant Center for Social Work Excellence For World Bank Education for All-Fast Track Initiative July, 2011 1 Table of Contents I. BACKGROUND ........................................................................................................... 45 Project description ............................................................................................................. 45 Purpose and scope of the social assessment ...................................................................... 45 Methodology for Social Assessment ................................................................................. 56 II. LEGAL AND INSTITUTIONAL FRAMEWOR APPLICABLE TO INDIGENOUS PEOPLES .............................................................................................................................. 78 World Bank Operational Policy on Indigenous people .................................................... 78 National Program of Kazak Children’ Education............................................................. 78 III. DEMOGRAPHIC AND SOCIO-ECONOMIC PROFILE OF BAYAN-ULGII AIMAG ................................................................................................................................. 89 Demographic profile of the aimag..................................................................................... 89 Social Vulnerability Indicators ...................................................................................... 1112 Education and Health Indicators.................................................................................... 1112 Migration ....................................................................................................................... 1314 IV. DEMOGRAPHIC AND SOCIAL PROFILE OF THE ULGII SOUM AND THE PROJECT SITES .............................................................................................................. 1415 Population ...................................................................................................................... 1415 Pre-school facilities and enrollment .............................................................................. 1415 Description of the Project Sites ..................................................................................... 1516 Land Resettlement Issus ................................................................................................ 1819 Community awareness and participation in decision making ....................................... 1819 V. Summary and Conclusions..................................................................................... 2021 References used.......................................................................................................... 2223 2 Glossary of the terms Aimag - the highest sub-national administrative unit in the country. There are 21 aimags within the country. Each aimag is divided into several soums. Soum - administrative unit under the aimag. Each aimag center is considered a central soum of the aimag and usually larger than other soums. Bagh - the lowest administrative unit under the soum administration. dzud - any winter weather conditions which prevent livestock from obtaining open forage for grazing. ger - round felt dwelling used by pastoral herders khural - elected council of people's representatives, found at bag, soum, aimag and national levels. tugrig - mongolian currency equivalent to 1 US$ = 1250 Mongolian Tugrig (MNT) Acronyms used OP Operational Policy of World Bank TOR Terms of Reference Km kilometer MNT Mongolian Tugrig 3 BACKGROUND Project description In the context of requesting additional funding from Education for All Fast Track Initiative (EFA-FTI) fund in 2011-2012 for a “Graduation Grantâ€?, Mongolia’s Ministry of Education, Culture and Science (MECS) aims to expand access to Early Childhood Development Education in both urban and rural areas of the country. The project activities include constructing a total of 40 new kindergartens in Ulaanbaatar and one in each provincial center, providing mobile alternative kindergarten classes in rural soums and conducting teacher trainings. There are the following three components for this grant project: Component 1: Increasing Kindergarten Capacity in Urban and Rural Areas ($11,430,000) Build 40 new kindergartens, of which 21 will be built in aimag centers and 19 in Ulaanbaatar. This will create 160 new classrooms for 4,000 children (9,830,000 USD). Supply furniture, equipments, indoor and outdoor playgrounds, toys, teaching materials and kitchen for the new kindergartens ($1,600,000). Component 2: Creating Alternative Pre-school Classes in Rural Areas ($475,000) Provide 100 mobile ger-kindergartens in rural areas to serve herders’ children. Each ger-kindergarten consists of two gers, desks, chairs, board, carpet, toys, stereo player, portable toilet and other learning materials ($475,000). Component 3: Grant Management and Monitoring and Evaluation ($300,000) The existing FTI project implementation unit (PIU) will execute the proposed project and provide smooth and quality implementation to the project. Procurement and Financial Management will follow the World Bank’s rules and procedures. Monitoring and evaluation of the progress and outcomes of the project objectives and activities fall under this component. Under the Component 1, one kindergarten will be constructed in Ulgii soum of Bayan-Ulgii Province, where Kazakh communities are present in and under Component 2, certain number of mobile Kindergartens will be distributed to the province. Purpose and scope of the social assessment The Kazakh communities are “Indigenous Peopleâ€? as defined in the World Bank’s OP4.10. Therefore, purpose of social assessment is to provide to the Ministry of Education, Culture and Science, the implementing agency for the project, information on the Bayan-Ulgii subcomponent’s potential positive and adverse effects on the Indigenous People, related to project implementation and to examine project alternatives where adverse effects may be significant. Moreover, the social assessment is to assist the project entity in designing and implementing the subcomponent with the broad support and active involvement of individuals and groups that will potentially be the most directly affected by project activities (especially the poor, 4 minority nationalities, women, or other groups whose views may otherwise be under- represented), so that the subcomponent ’s positive benefits are identified and maximized while its negative social impacts are avoided or mitigated. The social assessment also establishes a basis for subsequent project monitoring and evaluation. The recommendations from the social assessment are to be incorporated in the project design and operation plan. As required by the TOR (see Anned 1), the social assessment includes the following elements, as needed: (a) A review, on a scale appropriate to the project, of the legal and institutional framework applicable to Indigenous Peoples. (b) Gathering of baseline information on the demographic, social, cultural, and political characteristics of the affected Indigenous Peoples’ communities, the land and territories that they have traditionally owned or customarily used or occupied, and the natural resources on which they depend. (c) Taking the review and baseline information into account, the identification of key project stakeholders and the elaboration of a culturally appropriate process for consulting with the Indigenous Peoples at each stage of project preparation and implementation. (d) An assessment, based on free, prior, and informed consultation, with the affected Indigenous Peoples’ communities, of the potential adverse and positive effects of the project. Critical to the determination of potential adverse impacts is an analysis of the relative vulnerability of, and risks to, the affected Indigenous Peoples’ communities given their distinct circumstances and close ties to land and natural resources, as well as their lack of access to opportunities relative to other social groups in the communities, regions, or national societies in which they live. (e) The identification of measures necessary to avoid adverse effects, or if such measures are not feasible, the identification of measures to minimize, mitigate, or compensate for such effects, and to ensure that the Indigenous Peoples receive culturally appropriate benefits under the project. Methodology for Social Assessment The current Social Assessment involved a variety of methods for collecting and analyzing data, including both quantitative and qualitative techniques. First, it analyzed the secondary statistical data from existing statistics and previous reports related to kazak communities of Bayan-ulgii aimag and its central soum, i.e. Ulgii soum. In addition, more in depth information was gathered through consultation with local key stakeholders during the consultant’s visit to Bayan-ulgii aimag. Key stakeholders interviewed during the visit were: • Head of the Byan-ulgii aimag education department • Pre-school education specialists and kindergarten directors • Ulgii soum governor and its Bagh bovernors • Bagh citizens, parents of preschool children and families of the bagh No. 4 residing around the kindergarten project area during the site visits • In order to make comparison, the consultant has selected another bagh with a similar problem of pre-school facilities, namely Bagh No.6. 5 • Doctors, nurses from Family Clinics • Representatives of international organizations implementing pre-school related projects such as Mercy Corps and World Vision In addition, 6 community focus groups were organized including various community members representing different groups. Description is given in the Table below and in the Annex 4. Table. Community focus groups discussions and their participants FGDs Representation Participants by gender Community Focus groups with parents of the kindergarten 4 male and 4 female focus group 1 children at the kindergarten No.9 Community Focus groups with kindergarten teachers and 9 female participants focus group 2 staff members at the kindergarten No. 9 Community Focus group with parents of the kindergarten 3 female & 4 male focus group 3 age children at the 4th bagh participants Community Focus groups teachers and parents of the 4 female & 2 male focus group 4 children attending kindergarten at the 4th bagh participants Community Focus groups with residents residing near the 4 parents, 2 mother focus group 5 proposed kindergarten sites and 2 father Focus group 6 Focus group with health professionals and 6 female participants volunteers at the Family Clinic of 4th Bagh 6 LEGAL AND INSTITUTIONAL FRAMEWORK APPLICABLE TO INDIGENOUS PEOPLES World Bank Operational Policy on Indigenous people On July, 2005, World Bank adopted Operational Policy OP 4.10 on Indigenous People requiring to apply it to all World bank financed projects starting after July 1, 2005. For purposes of this policy, the term “Indigenous Peoplesâ€? refers to a distinct, vulnerable, social and cultural group possessing the following characteristics in varying degrees: (a) self-identification as members of a distinct indigenous cultural group and recognition of this identity by others; (b) collective attachment to geographically distinct habitats or ancestral territories in the project area and to the natural resources in these habitats and territories (c) customary cultural, economic, social, or political institutions that are separate from those of the dominant society and culture; and (d) an indigenous language, often different from the official language of the country or region. Kazak people are considered as the indigenous people due to their distinct (kazak) language and (muslim) religion that are different from the official language (mongolian) and religion (Buddistm) of the rest of the country. The kazak people mostly live in Bayan-ulgii aimag. Therefore, kazak language is widely used for interpersonal communications in Bayanulgii aimag, although official language of the country is mongolian. According to the OP 4.10, the World Bank requires the following actions from the borrower for all projects that are proposed for World Bank financing and affect Indigenous Peoples: (a) screening by the Bank to identify whether Indigenous Peoples are present in, or have collective attachment to, the project area; (b) a social assessment by the borrower; (c) a process of free, prior, and informed consultation with the affected Indigenous Peoples’ communities at each stage of the project, and particularly during project preparation, to fully identify their views and ascertain their broad community support for the project; (d) the preparation of an Indigenous Peoples Plan or Planning Framework if the indigenous presence or collective attachment cannot be determined until the programs or subprojects are identified. National Program of Kazak Children’ Education Education Law of Mongolia established basic principle of non-discrimination on education by saying “Education shall be accessible to all citizens regardless of nationality, language, color of skin, age, sex, social and property status, work and official position, religion, and opinions; the citizen shall be provided with conditions to learn in his/her native language.â€? In 2005, Save the Children, UK published situation analysis report on “Education of Kazak Childrenâ€? which highlighted that in many important ways Kazakh children are not being 7 afforded the same opportunities to learn as other children in Mongolia. In addition to the barriers shared to some extent by children in other poor and rural areas, the language of teaching and learning for Kazakh children is compounding their disadvantage. The particularly low preschool participation rates in Bayan-Olgii aimag and the lack of either Kazakh language preschool materials or Mongolian as a second language instructional strategies mean Kazakh children start school lagging behind in language and literacy skills and may not gain a sound footing in either Mongolian or Kazakh. The Report recommended to set up education policies targeted toward Kazak children, particularly a clear policy on mother tongue or bilingual language approach. In 2010, Government of Mongolia has adopted the actions to improve quality of educational services to Kazak children2010 онд Казак хүүхдийн боловÑ?ролын үйлчилгÑ?Ñ?ний чанарыг Ñ?айжруулах арга Ñ…Ñ?мжÑ?Ñ?г баталÑ?ан Уг тогтоолд үндÑ?Ñ?Ñ‚Ñ?н/угÑ?аатны цөөнх хүн амын хүүхдийн боловÑ?ролд ихÑ?Ñ?Ñ…Ñ?н анхаарал хандуулÑ?ны дотор үндÑ?Ñ?ний Ñ…Ñ?мжÑ?Ñ?нд казак Ñ…Ñ?лний боловÑ?ролын аÑ?уудал Ñ?рхÑ?лÑ?Ñ?н Ñ?ектор байгуулж, багш нарыг давтан Ñ?ургах, боловÑ?ролын чанарыг Ñ?айжруулах, хоÑ? Ñ…Ñ?лний Ñ?ургалт нÑ?втрүүлÑ?Ñ… Ñ…Ñ?Ñ€Ñ?гцÑ?Ñ?г зÑ?ргийг туÑ?гажÑ?Ñ? Law of Pre-school education of Mongolia (2008) has aimed to increase enrollment of herders children in pre-school education through introducing alternative training options such as summer training and mobile ger kindergarten. The Law also removed parent’s contribution to meal costs of the children to fully fund it from state budget. As a result of this decision, the demand for kindergarten is increased drastically. DEMOGRAPHIC AND SOCIO-ECONOMIC PROFILE OF BAYAN-ULGII AIMAG Bayan-Ulgii aimag is situated in the far west of the country and borders with Russia and China. The majority of the population is kazak. The other main ethnic groups in the province are Uriankhai, Tuva, Dorvod and Khalkh. Demographic profile of the aimag By end of the 2010, Bayanulgii aimag has over 100.800 population divided into 20.700 households. Out of them, 44% are children under 18, of which 34.3% are 0-14 years of age. The percentage of children is slightly higher from national average and regional averages. In relation to this, birth rate and dependency ratio are also higher from national and regional averages. 8 Average life expectancy of 69.8 years is also higher from national average, particularly make life expectancy is higher. 9 Table. Population and demographic indicators of the Byanulgii aimag Indicators 2000 2006 2007 2008 2009* 2010* 2010 National 2010 Western average* regions’ avergaeâ€? Total population 94094 95226 94399 93931 101900* 100800* Male 51000 50600 50900 50200 Female Rural population*, % 68.4 67.8 65.9 - Number of households* 21.400 21200 20700 - Life expectancy* 68.9 69.7 69.8 68.1 - Male 65.1 67.2 67.8 64.9 Female 71.2 72.1 72.5 72.3 Children 0-18 years of age, % 42.9 41.3 44.0 35.0% 41.3% Children 0-14 years of age, % 34.3 27.3 32.3% Total Number of Births 2933 2405 2486 2609 2562 2415 - Birth rate 32.3 25.2 26.2 27.6 27.4 26.4 22.9 22.1 Mortality rate 5.5 5.0 5.2 5.5 6.3 5.7 6.6 6.2 Population growth per 1000 26.8 20.2 21.0 22.1 21.1 20.7 Economically active population, in thousands. 30.4 34.7 34.5 33.8 33.5 31.0 Number of employed people, in thousands. 29.1 32.5 32.7 32.6 32.2 29.8 Number of unemployed people 1313 2218 1841 1173 1292 1140 Unemployment per 10000 140 232 193 124 138 128 Unemployment rate, % 4.3 6.3 5.3 3.5 3.8 3.7 Source: Bayanulgii Statistical Office, 2011. * Statistics were taken MSWL. 2011. Facts and Figures: Population, Social welfare and Labour Indicators. Ulaanbaatar 10 Social Vulnerability Indicators Unemployment, poverty, disability and orphanage are the problems that lead to social vulnerabilities. Poverty rate for western region is 51.1% and for the country is 39.2% (MSWL, 2011). Although poverty rate is not counted by aimags, acccording to the aimag statistics (see Table below), 7938 out of its 20700 households are poor (38.4%) and 3963 are very poor ( 19.2%), meaning that they live less than 40% of the poverty thresh hold. As per 2010 national statistics, employment participation is 77.6%, which is higher from national average of 61.6% and regional average of 71.6%. The registered unemployment rate, 2.8% is lower than national average of 9.9% and regional average of 10.1%. Table. Vulnerability indicators of the population Indicators 2000 2003 2007 2008 2009 2010 2010/2009 Unemployed people 11697 7811 7773 9216 8734 10800 123.7 Poor households 7346 8004 8240 9150 9832 7938 80.7 Very poor households 3790 4453 4052 4909 5373 3963 73.8 Large households with 1806 1749 1004 924 831 846 101.8 8+ members Female headed 1317 1805 1630 1603 2039 2000 98.1 households Single persons 137 120 112 120 189 191 101.1 Persons with 1600 3867 3541 3796 4396 4149 94.4 disabilities Children of single 2666 2927 2748 2770 2649 2518 95.1 parents Orphans 229 271 291 302 352 355 100.9 Source: Bayanulgii aimag statistical office. (2011) Aimag population and household statistics. Ulgii. Orphans and children of single parents are one of the vulnerable groups in society. As of 2010, there are 355 orphan children and 2518 children from single parents. Among them, children of 0-6 years of age constitute 4.2% of the orphans and 14.9% of the children of single parents. Female heads of households makes up 9.8% of the households. According to the aimag demographic and households statistics, 52.4% of the female headed households have 2-4 children and 20.4% of them have more than 5 members. Number of people with disabilities is also increasing in the aimag. According to the disability survey conducted in 2004, the aimag was 3rd in the country with number of people with disabilities which was counted 3907 persons (of them 2135 were male). In 2010 census, this number has increased by 6.2%. Education and Health Indicators Education indicators 11 Government of Mongolia has adopted National Program to Support Kazak Children’s Education which emphasized their right to dual language education taking into account the fact that their language is different from the rest of the country. However, due to lack of funding, as well as appropriate dual language educational curriculum, availability of textbooks, lower standards for mongolian language teaching, Bayanulgii aimag is below national averages on various educational indicators. For instance, school drop out rate is 4.7% (while national average is 1.1%), pre-school education enrollment is 65.4% (while national average is 76%). As per 2009-2010 academic year, out of total 4373 out-of- school children aged 6-14 years, 837 are in Byanulgii aimag. According to 2009 statistics, national level illiteracy rate among 7 years of old children was 4.6%, but in Bayan-ulgii aimag, it was 6,8%. Kazak children have less chance to enter the school at the required age, which results in higher drop outs rate and lower performance. Health Issues As of 2010, both infant mortality rate (24.9) and under 5 years mortality rate (36.5) of the Buyanulgii aimag are higher from the respective national averages, however the infant mortality is slightly lower from the regional average. Table. Infant and child mortality of the aimag Infant and 2000 200 2005 2006 2007 2008 2009 2010 2010 2010 Child 4 * western nationa mortality region* l average * Infant 20 19 22 17 18 17.6 27.0 24.9 26.9 20.2 mortality per 1000 live births child 46 28 22 17 19 16 25 36.2 35.2 25.6 mortality of children under 5 years of age Source: Source: Bayanulgii Statistical Office, 2011. * Statistics with asterisk were taken MSWL. 2011. Facts and Figures: Population, Social welfare and Labour Indicators. Ulaanbaatar The main reasons for infant and child under 5 death cases are respiratory tract infections. Table. main causes of child death for 0-1 year and 1-5 years of age years 2006 2007 2008 2009 2010 infant/child 0-1 1-5 0-1 1-5 0-1 1-5 0-1 1-5 0-1 1-5 Respiratory tract 15 10 13 9 15 8 14 6 14 7 infections Digestive diseases 10 2 4 4 3 4 Stillbirth 5 16 9 7 Birth defects 9 8 11 1 4 1 Injuries and poisoning 2 5 5 6 8 3 1 2 2 12 БүтÑ?лттÑ?й төрөлтөөÑ? 8 heart disease 2 1 Table. Occurrence of the Infectious diseases per 10000 population Infectious disease end of 2009 end of 2010 - Diarrhea 1 3 - Hepatitis 408 357 - Meningitis 0 1 - тарвaган тахал 1 1 - Brucellosis 1 2 - Tuberculosis 33 37 - Gonorrhea 319 237 - Syphilis 14 10 - Trichomonisis 98 70 - Itchy 13 13 Source: Bayanulgii Statistical Office, 2011 Migration Migration to Kazakstan is a significant social problem in Byanulgii aimag. The out-of- the-country migration makes up 57.1% of the total out-of-aimag migration and 15.2% of the migrant move to other big cities of the country. Table. Migration trends of the aimag 2004-2010 Migration trends 2004 2005 2006 2007 2008 2009 2010 In migration 28 5 31 29 84 126 22 of which from 37 Kazakstan Out migration 1655 3068 2073 1385 780 1497 2721 of which to 1294 2448 1758 1062 450 855 2203 Kazakstan Among the out-of-the-aimag migrants, 32.8% are elderly and children. Table. Out of the aimag migration status of the aimag year household persons of which by age groups: migrated migrated 0-14 15-29 30-54 55-above years years years 2000 9130 42020 12926 14430 12630 2037 2004 278 1294 534 326 375 59 2005 612 2848 876 978 856 138 2006 369 1758 559 532 583 84 2007 216 1062 333 273 367 89 2008 113 450 157 140 130 23 13 2009 165 855 217 217 368 63 2010 457 2203 783 727 604 89 DEMOGRAPHIC AND SOCIAL PROFILE OF THE ULGII SOUM AND THE PROJECT SITES Population As end of 2010, Ulgii soum, the capital city of the Bayanulgii aimag, has 29068 population in 6661 households, and of which, 3216 are under children under 5 years of age. Table. Population of Ulgii soum by years 2000 2005 2006 2007 2008 2009 2010 Ulgii soum 25763 28248 28512 27929 28496 28448 29068 Source: Bayan-ulgii statistical department, 2011 The aimag center is divided into 9 baghs, and corresponding number of population and households are shown in the following table. Table. Population of the Ulgii soum baghs as of 2010 Bagh Bagh name households population Ulgii soum total 6627 29068 1- баг ХуÑ?Ñ‚ арал 797 3486 2- баг Цагаан Ñ?Ñ€Ñ?г 717 3364 3- баг Бөхөн уул 924 4224 4- баг Их булан 1271 4733 5- баг Ховд гол 828 3439 6- баг Ð¥Ó©Ñ… толгой 846 3533 7- баг Хотгор 134 596 8- баг Ð?Ñ… хуÑ? тау 623 2922 9- баг Ð¥Ó©Ñ… хад 803 3438 Pre-school education facilities and enrollment In Ulgii soum, pre-school facilities are generally lacking. Out of 5300 children aged 0-5 years, around 1300 children are enrolled in the 12 kindergartens. Among them, only 3 kindergartens have kindergarten standard building and the rest of the kindergartens would eventually need a new building. According to the 2011 Performance Contract of the Education and Culture Department (ECD) of the aimag, last year preschool enrollment was 71.2% of which 44.2% through kindergartens and 26.9% through alternative trainings. This year, the ECD is 14 expecting to increase pre-school enrolment up to 73% and kindergarten coverage up to 45%. Pre-school curriculum and teaching materials are in Mongolian. But the instructional language is Кazak. Since the most teachers and assistant are dual lingual, they communicate with children in both language, but mostly ion kazak. Other than the language, there is no other cultural and food item differences in the pre-school education and in the pre-school facilities. Table. Number of children aged 2-5 years who are out of the pre-school facilities (Aimag Education and Culture Department statistics) Bagh No Number of children aged 2-5 who are out of the pre-school 1- баг 88 2- баг 80 3- баг 105 4- баг 178 5- баг 72 6- баг 161 7- баг 50 8- баг 70 9- баг 169 10-Ñ€ баг 80 Ð?ийт 1053 Mobile Ger Kindergarten Because kazak people also live in ger dwelling, the mobile ger kindergarten project is widely welcomed. Unfortunately, in urban cities such as in aimag centers, mobile ger kindergartens are not often allocated. Therefore, most people interviewed were proposing to implement the mobile ger kindergarten project in Ulgii soum because most of the children stay in the aimag center during summer and do not go to rural areas like in rural soums; and there is great need for kindergarten enrollment and pre-school education. Kindergarten teachers also expressed their interest in running ger kindergarten in summer. Description of the Project Sites The soum governor’s office has made a decision to build the new kindergarten planned under the Component 1 in the territory of Bagh 4. As per the statistics about out of the kindergarten children, this bagh has highest number of children, who are not enrolled in pre-school and kindergartens. The bagh has largest with its population of 4734 persons divided ino 1271 households, as of the end of 2010. This number is even higher from rural soum population. For instance, Bugat soum has 150 households only. In-migration to the Bagh is higher which resulted in a huge expansion of the residents’ area. (see Picture 1) Only this year, the bagh is increased by 300 new households. Around 540 households are considered as poor households. There are 670 children under 5 years of age. Last year, the number was 570. Currently, 211 households have received “honored mother’s medal: level 2â€? which is 15 given to those mothers with 4-5 children, and 73 households received Level 1 medal which is given to the mothers with 6+ children. Each year, 140 mothers give a birth. Currently, the bagh has only one kindergarten which enrolled 120 children (see kindergarten (1) in the Bagh map). There is a great need for kindergarten services. However due to limited size of the facility, it is currently not possible to increase the enrollment yet. The kindergarten is located in the same building with Bagh Governor’s office and Family Doctors. The distance from the kindergarten to farthest resident area is 5 km. There is microbus route go to the center which cost 200 tugrig per person. Responding to the need for kindergarten enrollment, Mercy Corps has selected the 4th bagh as one of their 4 project target baghs. The project has selected 40 vulnerable households from each of four baghs and enroll their children in 6 months kindergarten classroom which is opened temporarily at the Primary School No. 2, where new kindergarten is planned to be built next to it. The temporary kindergarten has taken one classroom from school, purchased beds, chairs, toys, etc from the project and started with 25-30 children. The new kindergarten location is in 2 km from the old kindergarten and adjacent to the Primary school No. 2. (see on the Picture for dark marks written Plan 1 next to it) This location is closer to newly expanded residents’ areas. Many children in this area is not enrolled in kindergartens. We moved over here 3 years ago. Now have 2 children of kindergarten age. None of them are enrolled in the kindergarten. The reason is first, we could not register on the registration day because it admits “first come first servedâ€? principles. It is too far to walk in winter. (Family of 6 who lives closer to the new kindergarten site) 16 17 Land Resettlement Issus The land accusation for the newly proposed kindergarten does not require resettlement of residents because this area was empty for long period of time since the factory building that started during the centrally planned economy has stopped and left abandoned. Therefore, there is no land resettlement issue is involved in building new kindergarten. According to the Land Law of Mongolia, the soum governor should issue an order for allocating land for new kindergartens and schools based on the aimag center’s infrastructure development plan. Accordingly, the soum governor based on the evaluation from the soum Land management officet has allocated the land adjacent to the Primary School No. 2 physical training area (marked as Plan 1 in the picture). Land allocation is usually based on a thorough evaluation of future and current infrastructure including heating and electricity supply of the city and in relation to other planning issues such as having schools in closer location. However, it should mentioned that 4th Bagh governor was proposing the other end of this empty area for the new kindergarten (marked as Plan 2 in the picture). Bagh governor’s rational for proposing empty location is that in the future, he would like to build Bagh governor’s office next to the new kindergarten. In this case, the currently operating old kindergarten will have possibility to have one more classroom for 25 children. The bagh governor was concerned that conflict might rise later on between the kindergarten and the Primary School in relation to the playground issues. Picture 1. Area next to Sschool No. 2, Plan 1 Picture 2.Other side of the empty area, plan 2 Community awareness and participation in decision making 18 According to the Law of Mongolia on Administrative and Territorial Units and their Governance, public khurals are the highest level local decision making structure at the bagh and khoroo levels, then at the aimag and district level, it has elected khural Representatives. As per requirement, Bagh khural is organized not less than 4 times a year. In the Ulgii soum, Bagh meetings are held regularly. Because it is organized in kazak language, this creates opportunity for everyone to participate in the decision making process of the important issues related to their communities. Once a year, there is an annual planning meeting is organized. At the annual planning meeting of the bagh, officials from government departments including health and education officials report their activities and introduce their plan for the next year. Community interviews unanimously supported the decision to build the new kindergarten in the 4th Bagh. Even the citizens’ bagh No. 6 who also have a difficulties related to old kindergarten building which was closed down by Professional Inspection Agency, are recognizing the 4th Bagh as a priority area. Kindergarten No. 9 at the Bagh No. 6 of Ulgii soum In order to make comparison between, the consultant had visited the bagh No. 6 which is in serious need for new kindergarten building. The soum governor said that if another funding for a new kindergarten is allocated, the soum will support this kindergarten which enrolls 125 children. The kindergarten building is too old, there is no space for physical training class or educational materials corner. In 2008, the kindergarten was closed down by Professional Inspection Agency as in this building, children are not allowed to bring. However, parents insisted to re-consider the decision because there no other way to enroll their children in the kindergartens. Therefore, the close down decision was postponed temporarily after redoing roof and other problems. This year, there is no hope to continue. In 2009, World Vision approved a 400 million MNT for funding a new building. Preparing for this, they cut all the trees inside their fence and purchased land from their neighboring households to create more space. However, the soum government could not pay 10% local contribution. As a result, this money was withdrawn. Community people around the new kindergarten area were aware about the Bagh decision to build a kindergarten in the area. I would like to extend my fence little bit. But I am aware of that this area is kept for new kindergarten. (female head of household lives near the project site) Family Clinic is implementing World Vision project on nutrition education for pregnant women and younger children According to the statistics provided by the Family Clinic and interview with doctors and nurses, the number of unregistered and temporary residents is increased during school year as a result of children and students coming to study at the aimag center. The 4th Bagh has 692 children 0-5 years of age, of which 442 are 2-5 years old. There are 2904 children under 0-16 years. Last year, 46 children got infected by hepatitis. Most of them were children from newly migrants’ or temporary residents’ families. The family clinic usually organize Hepatitis test for all children before enrolling them into kindergarten and monthly health check-ups during the year. They will do the same thing is new kindergarten start its operation. 19 Summary and Conclusions Majority of the Bayanulgii aimag population is kazak by their ethnicity. As per the World Bank definition, kazak people are considered as “Indigenious Peopleâ€? due to their specific language and religion that are different from the other parts of the country. Government of Mongolia has adopted a program to support the education of kazak children creating opportunity for them to get dual language education. However, due to lack of funding, as well as appropriate dual language educational curriculum, availability of textbooks, lower standards for mongolian language teaching, Bayanulgii aimag is below national averages on various educational indicators, such as school enrollment rate, drop-out rate. The new kindergarten will contribute to increased pre-school enrollment which in turn will increase number of children entering the school at the required age. Although the kazak people speak in distinct language, their participation in decision making is granted through their participation in the bagh public meetings which organized in kazak language. It is recommended that to report about the decision and process of building new kindergarten to the bagh citizens at the Annual Bagh Public Meetings which is organized by end of the year. Consultant found only possible positive impacts from building new kindergarten in the Ulgii soum such creating opportunities to enter the kindergarten for the children who never attended the kindergarten before, increased pre-school enrollment, increased employment opportunity for mainly women, resulting in reduced number of children entering the school later than the required age, etc. Both the analysis of the local statistics and results of the community interviews supported the decision to build the new kindergarten in the 4th Bagh. Even the citizens of the Bagh No 6 which have serious problem with their kindergarten building, are supportive to build the new kindergarten in the 4th bagh. Selective interview with the community people living around the project sites showed that people were aware of the decision to build new kindergarten. There is no land resettlement issues involved in building this kindergarten. Soum governor’s office made legal decision to allocate the land in this area. Bagh governor has slightly different opinion on the exact site of building new kindergarten. However, decision was made according to the legal requirements. The mobile ger kindergartens were supported by all stakeholders including soum and bagh governors, kindergarten teachers and administrators and bagh citizens. There is no concern about need and cultural competencies to organize mobile ger kindergarten other than availability of the mobile kindergartens due to its need for rural soums. The only concern is related to infectious diseases such as hepatitis among the children. If new kindergarten starts its operations, it is recommended to get regular check up of the children to be enrolled. Most probably new children who will be enrolled in the new kindergarten will be from the group who are currently left out of the pre-schools education. As per health statistics, this group has high risk for getting infectious diseases. 20 21 References used Bayanulgii aimag Statistical Dept. (2011). Bayanulgii aimag population and household indicators for 2010. Retrieved from http://www.nso.mn/bayan-ulgii Bayanulgii aimag Statistical Dept. (2011). Bayanulgii aimag social economic status as of 2010. Retrieved from http://www.nso.mn/bayan-ulgii БÐ?ЯÐ?-ӨЛГИЙ Ð?ЙМГИЙÐ? ХӨГЖЛИЙÐ? ХӨТӨЛБӨР 2010-2021 он. Ð?ймгийн ИТХ- ын 2009 оны 12 дугаар Ñ?арын 24-ний өдрийн V хуралдаанаар атлав. Education Law of Mongolia, 1994 Law of Pre-school education of Mongolia, 2008 Law on Administrative and Territorial Unit and their Governance of Mongolia. 2006 edition. Government of Mongolia. Plan of Action to Support Kazak Children’s Education. Approved in 2010. Save the Children, UK. (2006). Education of Kazak Children: Situation Analysis Report. Prepared by Sandra S. Huang. Ulaanbaatar. UNDP and Government of Mongolia. Minority Needs Assessment 2010. Assessment Report for UNDP and Government of Mongolia- Rural Livelihood Security through provision of comprehensive social services project. Ulaanbaatar World Bank. Operational Manual OP 4.10-Indigenious People. Approved on July, 2005. 22 Annex 1. Terms of Reference for Social Assessment (SA) On Bayan-Ulgii Subcomponent of Pre-School Education Project Background In the context of requesting additional funding from Education for All Fast Track Initiative (EFA-FTI) fund in 2011-2012 for a “Graduation Grantâ€?, Mongolia’s Ministry of Education, Culture and Science (MECS) aims to expand access to Early Childhood Development Education in both urban and rural areas of the country. The project activities are constructing a total of 40 new kindergartens in Ulaanbaatar and at each province center, providing mobile alternative kindergarten classes in rural soums and conducting teacher trainings. The purpose of this consultancy service is to provide technical assistance to the Ministry of Education, Culture and Science, the implementing agency for the project, to reduce adverse impacts of resettlement on families and indigenous people, if any, related to project implementation. There are three components: Component 1: Increasing Kindergarten Capacity in Urban and Rural Areas ($11,430,000) • Build 40 new kindergartens, of which 21 will be built in aimag centers and 19 in Ulaanbaatar. This will create 160 new classrooms for 4,000 children (9,830,000 USD). • Supply furniture, equipments, indoor and outdoor playgrounds, toys, teaching materials and kitchen for the new kindergartens ($1,600,000). Component 2: Creating Alternative Pre-school Classes in Rural Areas ($475,000) • Provide 100 mobile ger-kindergartens in rural areas to serve herders’ children. Each ger-kindergarten consists of two gers, desks, chairs, board, carpet, toys, stereo player, portable toilet and other learning materials ($475,000). Component 3: Grant Management and Monitoring and Evaluation ($300,000) The existing FTI project implementation unit (PIU) will execute the proposed project and provide smooth and quality implementation to the project. Procurement and Financial Management will follow the World Bank’s rules and procedures. Monitoring and evaluation of the progress and outcomes of the project objectives and activities fall under this component. One kindergarten will be constructed in Ulgii soum of Bayan-Ulgii Province, where Kazakh communities are present in (Component 1). And certain number of mobile Kindergartens will be distributed to the province (Component 2). The Kazakh communities are “Indigenous Peopleâ€? as defined in the World Bank’s OP4.10. And therefore the subcomponent will trigger Bank’s OP4.10 on Indigenous People. The SA Purpose According to the OP4.10 Indigenous People, the project will undertake a social assessment to evaluate the Bayan-Ulgii subcomponent’s potential positive and adverse 23 effects on the Indigenous People, and to examine project alternatives where adverse effects may be significant. The subcomponent will engage in free, prior and informed consultation with Kazakh communities and will assess whether the Kazakh Communities provide their broad support to the subcomponent or not. Moreover, the SA is to assist the project entity in designing and implementing the subcomponent with the broad support and active involvement of individuals and groups that will potentially be the most directly affected by project activities (especially the poor, minority nationalities, women, or other groups whose views may otherwise be under-represented), so that the subcomponent ’s positive benefits are identified and maximized while its negative social impacts are avoided or mitigated. The social assessment also establishes a basis for subsequent project monitoring and evaluation. The recommendations from the SA are to be incorporated in the project design and operation plan. For this end, specific goals of the social assessment exercise should be achieved in consultation with a broad sample of resident households, community leaders, local authorities, Kazakh Culture Scholars, etc. Scope of the SA Work The social assessment includes the following elements, as needed: (a) A review, on a scale appropriate to the project, of the legal and institutional framework applicable to Indigenous Peoples. (b) Gathering of baseline information on the demographic, social, cultural, and political characteristics of the affected Indigenous Peoples’ communities, the land and territories that they have traditionally owned or customarily used or occupied, and the natural resources on which they depend. © Taking the review and baseline information into account, the identification of key project stakeholders and the elaboration of a culturally appropriate process for consulting with the Indigenous Peoples at each stage of project preparation and implementation. (d) An assessment, based on free, prior, and informed consultation, with the affected Indigenous Peoples’ communities, of the potential adverse and positive effects of the project. Critical to the determination of potential adverse impacts is an analysis of the relative vulnerability of, and risks to, the affected Indigenous Peoples’ communities given their distinct circumstances and close ties to land and natural resources, as well as their lack of access to opportunities relative to other social groups in the communities, regions, or national societies in which they live. (e) The identification and evaluation, based on free, prior, and informed consultation with the affected Indigenous Peoples’ communities, of measures necessary to avoid adverse effects, or if such measures are not feasible, the identification of measures to minimize, mitigate, or compensate for such effects, and to ensure that the Indigenous Peoples receive culturally appropriate benefits under the project. SA Methodologies 24 The SA will involve a variety of methods for collecting and analyzing data, including both quantitative and qualitative techniques. The SA should make use of the secondary statistic data from existing bibliography and reports. Meanwhile, detailed information will be gathered by consulting key stakeholders in a participatory manner. Most of the consultations require face-to-face qualitative interviews or focus groups with informants. It is important that the selection of the informants is random and representative of the community population. Every effort should be made to reach the poor and marginal and remote individuals or groups. Outputs The SA exercise will be assigned with two primary outputs, each subject to review and acceptance by project entity and World Bank: 1. A work plan, establishing scope and methods for the social assessment process, is required before initiating fieldwork; 2. A social assessment report summarizing findings and making recommendations as may be warranted for the project design with its social objectives; and to ensure ethnic minority communities have equitable opportunity to gain access to and benefits from the project at their wills; and recommendations from the SA being incorporated in the project design and operation plan. 3. Report is required to be written in both English and Mongolian Skills and Qualifications The consultant (person or team) should possess the following qualifications: • Degree in social sciences or other field related to project social assessment; • Minimum of five years of experience with social assessment or other participatory research methodologies, preferably related to the World Bank or other international agencies supported projects; • Well know the World Bank social safeguard policies, especially OP4.10; • Knowledgeable of ethnic minority relations in the and preferably able to communicate directly in the language of prevalent use within the relevant ethnic minority communities; and • Excellent oral and written communication skills in English. Timeframe Estimated person/days required for the assessment is 10. Deadlines for submission of the outputs to the MECS will be included in the consultant contract. 25 Annex 2. Consultant’s timetable Date Location Activities 4-9 July Monday UB Contract negotiation and finalization of work plan 11-13 Jul Mon-Wed Public Holiday 14-15 Jul Thu-Fri UB Desk review of legal framework and gathering baseline information about project sites 18-19 Jul Mon-Tue UB Identify key stakeholders and develop detailed interview plans 20-22 Jul Wed-Fri Bayan-ulgii Bayanulgii field trip – Field interviews and field data collection 25-28 Jul Mon-Thu UB Analysis of the findings and report writing 29-31 Jul Fri-Sun UB Translation of the English report into Mongolia 26 Annex 3 List of People Interviewed Names Titles Contact details Togtorkhan Director of Education and Culture Dept. 99429412 (ECD) of Bayan-ulgii aimag Ainagul Pre-school education specialist, Aimag ECD 99429164 Ontugan Ulgii soum governor 99422040 Airgulkhan Director of kindergarten No. 9, Ulgii soum Nurgul Curriculum specialist of the kindergarten No. 9, Ulgii soum Xali 4th Bagh governor 99423683, 88423686 Aibek 4th Bagh deputy governor 50421073 Aijan Training & vaccination specialist, Family 99420727 Clinic of 4th bagh Doctor 4th bagh family doctor, Ulgii soum Zaurish 4th bagh counselor/nurse 99429059 Daulet 6th Bagh governor 99423094 Jumagul Aimag coordinator for Social protection (01-422) 21159 Network project, Mercy Corps bu@mercycorps.org.mn Teacher 1 kindergarten teacher, Mercy Corps kindergarten Teacher 2 kindergarten teacher Mercy Corps temporary 27 Annex 4 GUIDELINES FOR DATA COLLECTION, FOCUS GROUPS AND INTERVIEWS NATIONAL LEVEL STATISTICS TO COLLECT: • Demographic indicators for the aimag and national and regional averages, such as population by age groups, gender, life expectancy, etc • Employment and social welfare and poverty indicators for the aimag and national averages • Education enrollment, drop outs and literacy indicators of the aimag and national and regional avergaes • Health indicators for the aimag and national averages, such as maternal mortality ratio, infant and child mortality rate, cause of the infant and child mortality, infectious diseases and morbidity of the children under 5 years of age AIMAG LEVEL STATISTICS • Demographic indicators for the aimag and its soums, such as population by age groups, gender, life expectancy, • Employment and social welfare and poverty indicators for the aimag and its soums • Education enrollment, drop outs and literacy indicators of the aimag and its soum • Health indicators for the aimag and its soums, such as maternal mortality ratio, infant and child mortality rate, cause of the infant and child mortality, infectious diseases and morbidity of the children under 5 years of age ULGII SOUM LEVEL STATISTICS • Demographic indicators for the soum and its baghs, such as population by age groups, gender, life expectancy, etc • Employment and social welfare and poverty indicators for the soum and its baghs • Education enrollment, drop outs and literacy indicators of the soum and its baghs • Health indicators for the soum and its baghs, such as maternal mortality ratio, infant and child mortality rate, cause of the infant and child mortality, infectious diseases and morbidity of the children under 5 years of age INTERVIEW WITH SOUM AND BAGH GOVERNORS • Population and household characteristics of the soum abd baghs • Poverty and migration issues • Pre-school access and enrollment • Citizens participation in bagh meetings and in decision making process • Land usage and allocation issues INTERVIEW WITH KINDERGARTEN DIRECTOR AND TEACHERS • Pre-school access and enrollment • Problems and difficulties the kindergarten face • Community attitude towards the kindergarten including ger kindergarten 28 • Language of instruction and training materials INTERVIEW WITH COMMUNITY PEOPLE AND PARENTS • Pre-school access and enrollment • Reasons for not attending kindergarten and difficulties they face to get kindergarten • Language of instruction and training materials • Their view on the need of new kindergarten and its location Annex 5 Summary Notes of the Community Focus Group Discussion Community Focus groups with parents of the Participants: focus group 1 kindergarten children at the kindergarten 4 male and 4 female No.9 Community Focus groups with kindergarten teachers and 9 female participants focus group 2 staff members at the kindergarten No. 9 Community Focus group with parents of the kindergarten 3 female & 4 male focus group 3 age children at the 4th bagh participants Community Focus groups teachers and parents of the 4 female & 2 male focus group 4 children attending kindergarten at the 4th participants bagh Community Focus groups with residents residing near the 4 parents, 2 mother and focus group 5 proposed kindergarten sites 2 father Focus group 6 Focus group with health professionals and 6 female participants volunteers at the Family Clinic of 4th Bagh 29 Community focus Community focus Community focus Community focus Community Focus group 6 group 1 group 2 group 3 group 4 focus group 5 at the kindergarten at the kindergarten No. 9 at the 4th bagh at the 4th bagh at the 4th at the Family No.9 bagh Clinic of 4th Location: Bagh Parents of the Kindergarten teachers Parents of the Teachers and parents of Residents Health kindergarten and staff members kindergarten age the children attending residing near professionals children children kindergarten the proposed and volunteers Participa kindergarten nts: sites Pre- There is only one The Mercy Corps project school kidnergarten in this has selected 40 access Bagh. Kindergarten vulnerable households and which is located from each of four baghs enrollm right in the middle and enroll their children ent in of the community. in 6 months kindergarten Most of them the Many people could classroom which is moved to the Bagh: not get enrolled in In the 4th bagh, opened temporarily at aimag, 3 years The 4th Bagh their children in the The 6th bagh has 411 there is only one the Primary School No. 2, ago. Now many has 692 children kindergartens due to children with 0-5 years old kindergarten. where new kindergarten of the 0-5 years of age, space limitations. including 205 boys & 206 Recently, there is is planned to be built households of which 442 are girls. Out of 289 children one temporary next to it. The temporary building 2-5 years old. aged 2-5, 125 are enrolle kindergarten class is kindergarten has taken houses. Pre- There are 2904 din kindergarten and 136 opened. But they one classroom from school age children under children are outside pre- enrolled only those school, purchased beds, children do not 0-16 years. school. Classroom is families which chairs, toys, etc from the attend There is only crowded with 25-40 selected for their project and started with kindergarten kindergarten in children. project. 25-30 children. yet. the Bagh 30 Problem The building is so Building is so old, so it was Last year, 46 s and cold in winter closed down on 2008 by children got difficulti because it is build Inspection office. But infected by es from stones. It used with requests from hepatitis. Most related before simple parents, it was opened of them were to the heating, later again after slight children from kinderg upgraded with new renovations. Because it is newly migrants’ arten low pressure heating so crowed, there is no or temporary face system. Still it is physical training room or Many of them were residents’ cold. Children often even training corner in the not able to send families. The get sick. Last year, classtoom. Last year, their children to Most of the children family clinic there was insect some insect was falling kindergarten were never attended to usually organize droping down from from roof, so again they because first, it is kindergarten before. There is limited Hepatitis test for roof and biting have repaired the roof. difficult to get in, With the Mercy Corps space and in all children Although the World Vision second, inw inter it support they were able addition, the before enrolling children. So the has approved 400 mln is too far to walk to to send their children to current them into building was tugrig fro new building, take their children the kindergaten. The kindergarten is kindergarten disinfected. the fund was withdrawn to the kindergarten. project is planning to far from the and monthly because the 10% local If new kindergarten handover the recent health check- consitribition could not wil be build, it is kindergarten equipments settlement ups during the raised. much closer. to the new kindergarten. areas. year. Commu There is many nity households migrated Director have experience If summer attitude from rural soums. in organizing mobile ger kindergarten is towards Usually mothers kindergarten and know organized, they the take care of their that many people would If summer all will be kinderg children when they be interested in sending kindergarten is interested in arten at home. They all their children. Some even organized, they all sending their includin want to send their request to organize paid will be interested in Since this kindergarten children. g ger children to the class during summer. sending their operates only in one Unfortunately, kinderg kindergarten., there However, there is no children. room, Ger kindergarten it is not arten is negative view allocation for them with Unfortunately, it is can be used for organized in about the the mobile ger and not organized in recreational activites for theaimag kindergarten. funding. theaimag center. the children. center. NA 31 Langua No problem at all. ge of Not having educational Teachers communicate instructi corner due to space with children in on and limitation is a problem. kazaklanguages.since training Other than that teachers they are all dual langual, material do not have much is child speaks mongolian s problem in teaching and they talk to the child in care. No problem mongolian also. NA NA Reasons Many people want to for not send their children to attendin the kindergarten, g Bus there is not kinderg enough space. There arten is one Turkish and language difficulti kindergarten es they operates with 2 face to classrooms. But they get charge 70.000 MNT Before, their children kinderg per a month from were not attaneding the arten: each children, which Avalaibility of the kindergarten due to is not affrodable to The kindergartens have kindergarten is the inavailability of the close many families limited space. problem. by kindergarten facilities. NA NA Their view on the need The clinic will of new do the same kinderg Agrees that bagh No 4 If there is an opportunity If the routine health arten has more problem Agrees that bagh No 4 has It is most needed. to enroll their children in kindergarten check up if new and its related to the pre- more problem related to Location is closer to regualr ckindergarten, will be built, kindergarten location school access the pre-school access newly migrants they will all send their they will send start its : compared to theirs compared to theirs areas. children. their children. operation. 32 33