PROCUREMENT PLAN (Textual Part) Project information: [country] [Project name] [P-number] Project Implementation agency: [insert legal name] Date of the Procurement Plan: [insert date] Period covered by this Procurement Plan: [insert from – to period] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in [insert appropriate references to the national procurement legislation], such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. List only the applicable conditions required to ensure consistency with paragraph 5.4 of the Procurement Regulations. If no conditions apply, delete the phrase “and the following conditions”. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Otherwise state “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Otherwise state “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Specify for each Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables] Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. [Include this sentence only if the Bank has formally agreed to provide the Borrower with HEIS. Otherwise delete] Other Relevant Procurement Information. Provide any other relevant procurement information such as procedures for CDD components, Procurement in Situations of Urgent Need of Assistance or Capacity Constraints etc. PROCUREMENT Central African Republic : CAR Rural Connectivity Project PLAN General Information Country: Central African Republic Bank’s Approval Date of the Original Procurement Plan: 2018-02-05 2021-10-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P160500 GPN Date: Project Name: CAR Rural Connectivity Project Loan / Credit No: IDA / V0540, IDA / D2230 CEMAC-CAR - COORDINATION OF TRANSPORT-TRANSIT FACILITY PROJECT Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned 15-TRAVAUX HIMO-AGETIP- ED / AGETIP- Recrutement de l'Agence d'Exécution Passation de Rural Roads Rehabilitation 5,798,516.2 2019-05- AGETIPCAF pour les travaux IDA / D2230 A priori marché de gré à Direct 3,500,000.00 Signé 2018-10-15 2018-03-12 2018-10-20 2018-11-24 2018-04-06 and Maintenance 5 23 HIMO dans la zone Nord- gré Ouest de 500 km dans l'Ouham et l'Ouham Péndé PCR/026/TX/ED/20 / Exécution des travaux Rural Roads Rehabilitation 2020-11- d'urgence dans la zone Nord IDA / D2230 A posteriori Régie Direct 500,000.00 0.00 Annulé 2020-04-10 2021-03-11 2020-04-15 2020-05-20 and Maintenance 16 Ouest principalement dans l'Ouham et l'Ouham Pendé. PCR-38/TX/SED/21 / TX Request for Bids - Bossemptélé/Baoro - Passation de Rural Roads Rehabilitation Works (without 2021-11- Exécution des travaux de IDA / D2230 A priori marché de gré à Direct 839,376.00 0.00 Annulé 2021-04-12 2021-04-14 2021-04-17 2021-04-14 2021-05-22 and Maintenance prequalification) 18 point à temps de la section de gré SPD route Bossemptélé - Baoro. PCR-39/TX/SED/21 / TX infra pèse essieux - Exécution Request for Bids - Passation de des travaux de construction Rural Roads Rehabilitation Works (without 2021-11- IDA / D2230 A priori marché de gré à Direct 416,132.00 0.00 Annulé 2021-04-20 2021-05-10 2021-04-25 2021-04-21 2021-05-30 des infrastructures de pèse - and Maintenance prequalification) 26 gré essieux au PK30 route de SPD Boali. PCR-35/TX/AON/21 / Travaux de drainage - Request for Bids - Exécution des travaux de Rural Roads Rehabilitation Single Stage - One Works (without 2022-03- IDA / D2230 A priori Appel d'offres Open - National 4,794,521.00 0.00 Annulé 2021-05-31 2021-06-05 2021-07-17 2021-08-16 2021-09-20 drainage et d'assainissement and Maintenance Envelope prequalification) 19 de la secction de route Baoro SPD - Bouar. PCR-36/TX/SED/21 / Travaux de signalisation - Request for Bids - Exécution des travaux de Rural Roads Rehabilitation Single Stage - One Works (without 2022-03- IDA / D2230 A priori Appel d'offres Limited 1,198,630.00 0.00 Annulé 2021-05-25 2021-05-30 2021-07-11 2021-08-10 2021-09-14 signalisation et divers de la and Maintenance Envelope prequalification) 13 section de route bitumée SPD Baoro - Bouar. PCR-40/TX/SED/21 / Plateforme gare routière - Request for Bids - Passation de Exécution des travaux Rural Roads Rehabilitation Works (without 2021-12- IDA / D2230 A priori marché de gré à Direct 256,850.00 0.00 Annulé 2021-04-30 2021-05-05 2021-06-09 d'aménagement de la and Maintenance prequalification) 06 gré plateforme de stationnement SPD de la gare routière de Bouar. PCR-37/TX/SED/21 / TX Request for Bids - Bossembélé/Yaloké - Passation de Rural Roads Rehabilitation Works (without 2021-11- Exécution des trvaux de point IDA / D2230 A priori marché de gré à Direct 2,893,030.00 0.00 Annulé 2021-04-12 2021-04-14 2021-04-17 2021-05-22 and Maintenance prequalification) 18 à temps de la section de route gré SPD Bossembélé - Yaloké. PCR-41/TX/DP/21 / Hangars Request for Bids - de repos - Travaux de Rural Roads Rehabilitation Single Stage - One Works (without 2021-12- construction des hangars sur IDA / D2230 A priori Demande de prix Limited 17,150.00 0.00 Annulé 2021-05-01 2021-06-26 and Maintenance Envelope prequalification) 23 le site de l'aire de repos de SPD Yaloké. 12- TRAVREGIE-ED / Travaux en régie-Recrutement d'un prestataire pour l'exécution Rural Roads Rehabilitation 2019-09- IDA / D2230 A posteriori Régie Direct 6,000,000.00 0.00 Annulé 2019-02-20 2019-02-25 2019-04-01 des travaux de remise en état and Maintenance 28 des routes en terre dans le NO- Ouham 13-TRAVAUX-AON / Travaux de Route-Recrutement d'une entreprise pour exécuter les Rural Roads Rehabilitation Single Stage - One 2019-12- IDA / D2230 A posteriori Appel d'offres Open - National 6,000,000.00 0.00 Annulé 2019-02-20 2019-02-25 2019-04-08 2019-05-08 2019-06-12 travaux de remise en état de and Maintenance Envelope 09 routes rurales de 300 km dans l'Ouham-Péndé GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 16-AMENAGMENT BUREAUX- DC / Bureaux des experts- Project Implementation, Single Stage - One IDA / V0540 A posteriori Demande de prix Limited 50,000.00 27,022.53 Signé 2018-03-05 2018-09-04 2018-04-30 2020-02-26 2018-10-27 Aménagement des bureaux Management and Monitoring Envelope des experts du projet 17-MOBILIERS-DC / Mobiliers- Acquisition des mobiliers des Project Implementation, Single Stage - One IDA / V0540 A posteriori Demande de prix Limited 50,000.00 11,965.54 Signé 2018-03-20 2020-02-04 2018-05-15 2019-01-10 2018-11-11 bureaux pour les nouveaux Management and Monitoring Envelope experts du projet 18-VEHICULE-AON / Acquisition des véhicules du Project Implementation, Single Stage - One IDA / V0540 A posteriori Appel d'offres Open - National 450,000.00 282,574.80 Signé 2018-02-25 2018-06-15 2018-03-02 2018-04-13 2018-07-20 2018-05-13 2018-07-31 2018-06-17 2018-09-03 2018-12-14 projet dont 3 légers et 3 Management and Monitoring Envelope renforcés en 4x4 Page 1 PCR/23/FOUR/DC/18 / Matériel informatique - Project Implementation, Single Stage - One Acquisition des équipements IDA / D2230 A posteriori Demande de prix Limited 50,000.00 20,360.07 Signé 2018-05-20 2020-02-08 2018-07-15 2018-07-24 2019-01-11 Management and Monitoring Envelope informatiques et bureautiques pour l'Unité de Gestion PCR-43/FOUR/DC/21 / Acquisition et installation des équipements solaires (panneaux avec battéries, Project Implementation, Single Stage - One En attente IDA / D2230 A posteriori Demande de prix Limited 75,000.00 0.00 2021-06-20 2021-07-22 2021-10-29 concertisseurs) et climatiseurs Management and Monitoring Envelope d'exécution solaires pour l'électrification du nouveau bureau de la Coordination du Projet. PCR-44/FOUR/DC/21 / Mobiliers Bureaux - Acquisition des mobiliers de Project Implementation, Single Stage - One En attente IDA / D2230 A posteriori Demande de prix Limited 50,000.00 0.00 2021-06-20 2021-08-15 2021-11-30 bureau pour la dotation du Management and Monitoring Envelope d'exécution nouveau bâtiment de la Coordintation. PCR-53/FOUR/SD/21 / TOMPRO - Acquisition du logiciel tompro et Passation de Project Implementation, En attente paramétrage pour la IDA / D2230 A posteriori marché de gré à Direct 45,000.00 0.00 2021-10-30 2021-11-04 2021-12-09 2022-06-07 Management and Monitoring d'exécution Coordination du Projet PURIC. gré Cette acquisition sera faite chez le fournisseur TOMATE. NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 14-TRAVAUX-ED-UN / UNOPS-Recrutement de Passation de l'UNOPS comme pour exécuter Rural Roads Rehabilitation marchés auprès les travaux de route Ndele- IDA / D2230 A priori Direct 22,000,000.00 21,986,207.00 Signé 2018-02-28 2018-03-12 2018-03-05 2018-04-09 2018-04-06 2018-10-06 and Maintenance des agences de BIRAO (441) et travaux l'ONU d'amélioration de la route Kaga Bandoro-MBRES-Ndélé 04-ETECTH-UN-UNOPS / Recrutement d'un consultant Passation de pour la collecte des données Project Implementation, marchés auprès techniques du Projet de IDA / V0540 A posteriori Direct 120,000.00 120,946.80 Signé 2017-05-11 2018-02-13 2017-05-16 2018-05-15 2017-06-20 2017-05-24 2017-12-17 Management and Monitoring des agences de Connectivité Rurale de la zone l'ONU Nord Est sur la route nationale 8 Ndele Birao Passation de 11-MOD-UNOPS-ED / UNOPS- Project Implementation, marchés auprès Recrutement d'une maîtrise IDA / V0540 A posteriori Direct 1,400,000.00 0.00 Annulé 2018-02-15 2018-02-20 2018-03-27 2018-09-23 Management and Monitoring des agences de d'œuvre des travaux HIMO l'ONU CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 01-ET-TECH-SFQC / Etudes Techniques-Recrutement d'un consultant pour la réalisation Sélection fondée Project Implementation, des études techniques et IDA / V0540 A priori sur la qualité et le Open - International 1,400,000.00 2,913,370.04 Signé 2017-09-15 2019-09-16 2017-10-06 2017-11-19 2019-04-02 2017-12-17 2019-05-09 2018-01-16 2019-06-22 2018-02-20 2019-12-18 2018-03-27 2020-01-25 2019-03-27 Management and Monitoring économiques des travaux des coût pistes rurales dans la zone nord 02-EIES-CS-CQS / Recrutement d'un consultant Sélection fondée pour la réalisation des études Project Implementation, sur les IDA / V0540 A priori Open - International 500,000.00 172,760.42 Signé 2017-09-20 2017-10-11 2017-11-24 2017-12-24 2019-04-02 2018-01-28 2019-08-09 2018-07-27 environnementales des Management and Monitoring qualifications des travaux des pistes rurales de consultants la zone Nord 09-AUDITEXT-CS-SMC / Audit Externe - Recrutement Project Implementation, Sélection au En cours IDA / V0540 A priori Open - International 100,000.00 0.00 2018-10-31 2021-06-24 2018-11-21 2019-01-04 2019-02-01 2019-03-03 2019-04-07 2019-05-12 2019-11-08 d'un auditeur externe des Management and Monitoring moindre coût d'exécution comptes du projet PCR/09BIS/SC/SQC/19 / Sélection fondée Recrutement d'un Auditeur Project Implementation, sur les Externe pour l'audit de IDA / D2230 A priori Open - International 100,000.00 11,596.28 Signé 2019-04-10 2019-04-09 2019-05-01 2019-06-14 2019-04-19 2019-07-14 2019-06-06 2019-08-18 2019-06-11 2020-02-14 Management and Monitoring qualifications des comptes du Projet de consultants Connectivité Rurale PCR/024/SC/SFQC/19 / Recrutement d'un Cabinet Sélection fondée pour l'Audit comptable et Project Implementation, En cours IDA / D2230 A priori sur la qualité et le Open - International 120,000.00 0.00 2019-10-04 2019-10-11 2019-10-25 2020-02-05 2019-12-08 2020-04-20 2020-01-05 2020-06-04 2020-02-04 2020-06-16 2020-03-10 2020-08-21 2020-04-14 2021-04-14 financier du Projet de Management and Monitoring d'exécution coût Connectivité Rurale pour les exercices 2019, 2020 et 2021. PCR-29/SC/SFQC/21 / Etudes AM-DAFOK - Recrutement d'un cabinet pour la réalisation des études techniques, socio - Sélection fondée Rural Roads Rehabilitation économiques et IDA / D2230 A posteriori sur la qualité et le Open - International 450,000.00 0.00 Annulé 2021-04-30 2021-05-21 2021-07-04 2021-08-01 2021-08-31 2021-10-05 2021-11-09 2022-11-09 and Maintenance environnementales de la RN8 coût (Birao - AM-DAFOK) et des pistes dans la préfecture de la Vakaga en RCA et en assurer le contrôle des travaux. INDIVIDUAL CONSULTANTS Page 2 Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 06-SPM-CS-INDV / Project Implementation, Recrutement d'un Expert en IDA / V0540 A priori Individuel Limited 100,000.00 1,886.18 Signé 2017-11-05 2017-11-10 2017-12-01 2018-03-21 2018-01-05 2018-04-05 2018-07-04 Management and Monitoring Passation des Marchés 07-SGF-CS-INDV / SGF- Project Implementation, Recrutement d'un comptable IDA / V0540 A priori Individuel Limited 100,000.00 0.00 Annulé 2017-11-05 2017-11-13 2018-11-21 2017-12-04 2018-01-08 2018-07-07 Management and Monitoring du Projet 08-SUIVI-EV-CS-INDV / Expert SE-Recrutement d'un Project Implementation, IDA / V0540 A priori Individuel Open 100,000.00 33,815.42 Signé 2018-04-10 2019-04-02 2018-05-29 2019-12-19 2018-06-19 2020-02-14 2018-07-24 2020-03-12 2019-01-20 consultant individuel, Expert Management and Monitoring en Suivi Evaluation du Projet. 05-ETECH-CS-INDV / Individuel-Recrutement d'un consultant pour la collecte des données sommaires pour les Sélection de Project Implementation, En cours études techniques et socio- IDA / V0540 A posteriori consultants par Direct 80,000.00 0.00 2017-05-11 2017-03-15 2017-05-21 2017-07-25 2018-01-21 Management and Monitoring d'exécution économiques des pistes entente directe rurales de la zone Nord-Ouest dans les préfectures de l'Ouham et l'Ouham Péndé PCR/020/SC/IND/18 / Expert Environnement-Recrutement Project Implementation, d'un Expert en Sauvegardes IDA / V0540 A posteriori Individuel Open 100,000.00 20,337.36 Signé 2018-11-30 2018-09-27 2019-01-18 2020-03-02 2019-02-08 2020-03-02 2019-03-15 2019-07-16 2019-09-11 Management and Monitoring Environnementales du Projet de Connectivité Rurale PCR/022/CS/ED/18 / Contrat SPM - Renouvellement du Sélection de contrat de l'Expert en Project Implementation, IDA / D2230 A posteriori consultants par Direct 30,000.00 105,492.73 Signé 2019-03-26 2019-04-08 2019-04-05 2019-06-09 2019-04-30 2019-12-06 Passation des Marchés du Management and Monitoring entente directe Projet de Connectivité Rurale pour un an. PCR/021/SC/IND/18 / Expert Social-Recrutement d'un Project Implementation, IDA / V0540 A posteriori Individuel Open 100,000.00 0.00 Annulé 2018-11-30 2018-04-11 2019-01-18 2019-02-08 2019-03-15 2019-09-11 Expert en Sauvegardes Management and Monitoring Sociales du PCR PCR/027/SC/IND/20 / Contrat Expert en Sauvegardes Sélection de Project Implementation, Environnementales- IDA / D2230 A priori consultants par Direct 33,600.00 14,197.80 Signé 2020-07-31 2020-09-08 2020-08-10 2020-08-28 2020-10-14 2020-08-27 2021-04-12 Management and Monitoring Renouvellement du Contrat entente directe de l'Expert en Sauvegardes Environnementales du Projet de Connectivité Rurale PCR/025/SC/IND/20 / Contrat Comptable - Project Implementation, En cours Renouvellement de Contrat du IDA / D2230 A priori Individuel Direct 26,400.00 0.00 2020-07-31 2021-03-24 2020-08-10 2020-08-31 2020-10-05 2021-04-03 Management and Monitoring d'exécution Comptable du Projet de Connectivité Rurale PCR/021/SC/IND/20 / Contrat Expert en Sauvegardes Sociales- Rural Roads Rehabilitation IDA / D2230 A priori Individuel Direct 33,600.00 0.00 Annulé 2020-04-10 2020-07-08 2020-04-20 2020-05-11 2020-06-15 2020-12-12 Recrutement de l'Expert en and Maintenance Sauvegardes Sociales du Projet de Connectivité Rurale. PCR/021BIS/SC/IND/ES/20 / Recrutement d'un Expert en Project Implementation, IDA / D2230 A posteriori Individuel Open 32,000.00 3,314.84 Signé 2020-09-21 2020-09-23 2020-11-09 2021-01-07 2020-11-30 2021-01-07 2021-01-04 2021-03-18 2021-07-03 Sauvegardes Sociales du Management and Monitoring Projet de Connectivité Rurale PCR/028/SC/IND/21 / Comptable PCR21 - Renouvellement du contrat du Project Implementation, Comptable du Projet de IDA / D2230 A posteriori Individuel Direct 28,000.00 26,829.15 Signé 2021-03-11 2021-03-15 2021-03-21 2021-02-16 2021-04-11 2021-03-15 2021-05-16 2021-03-26 2021-11-12 Management and Monitoring Connectivité Rurale pour 12 mois à compter du mois de mars 2021. PCR-32/SC/SED/21 / Contrôle Tx Baoro - Bouar - Recrutement d'un cabinet Sélection de pour assurer la mission de Rural Roads Rehabilitation En cours IDA / D2230 A posteriori consultants par Direct 300,000.00 0.00 2021-04-12 2021-05-07 2021-04-22 2021-06-26 2021-12-23 contrôle des travaux de and Maintenance d'exécution entente directe drainage et travaux de signalisation de la section de route Baoro - Bouar. PCR-30/SC/SED/21 / Expert Contentieux - Recrutement Sélection de d'une assistance technique en Project Implementation, IDA / D2230 A posteriori consultants par Direct 500,000.00 134,517.83 Signé 2021-04-30 2021-05-17 2021-05-10 2021-06-16 2021-07-14 2021-07-28 2022-01-10 matière des contentieux Management and Monitoring entente directe auprès de la Coordination du Projet. PCR-31/SC/IND/21 / Conseiller Juridique - Sélection de Project Implementation, Recrutement d'un Conseiller IDA / D2230 A posteriori consultants par Direct 175,000.00 0.00 En cours d'examen 2021-04-22 2021-05-07 2021-05-02 2021-07-06 2022-01-02 Management and Monitoring Juridique auprès de la entente directe Coordination du Projet. PCR-33/SC/SED/21 / Contrôle point à temps - Sélection de Recrutement d'un cabinet Rural Roads Rehabilitation IDA / D2230 A posteriori consultants par Direct 175,000.00 0.00 Annulé 2021-04-12 2021-04-22 2021-06-26 2021-12-23 pour assurer la mission de and Maintenance entente directe surveillance et de contrôle des travaux de point à temps. PCR-34/SC/SED/21 / Contrôle Tx pèse essieux - Recrutement d'un cabinet Sélection de Rural Roads Rehabilitation pour la surveillance et le IDA / D2230 A posteriori consultants par Direct 55,000.00 0.00 Annulé 2021-04-15 2021-04-25 2021-06-29 2021-12-26 and Maintenance contrôle des travaux de entente directe construction des infrastructures de pèse esssieux au PK30 Page 3 PCR/07BIS/CS/IND/19 / Comptable - Recrutement Project Implementation, IDA / V0540 A posteriori Individuel Open 100,000.00 0.00 Annulé 2019-08-15 2019-10-03 2019-10-24 2019-11-28 2020-05-26 d'un comptable du Projet de Management and Monitoring Connectivité Rurale. 10-AGETIPCAF-CS-ED / Sélection de AGETIPCAF-Recrutement de Project Implementation, IDA / V0540 A posteriori consultants par Direct 500,000.00 0.00 Annulé 2018-01-30 2018-02-09 2018-04-15 2018-10-12 l'AGETIP-CAF pour la Management and Monitoring entente directe supervision des travaux HIMO PCR-46/SC/SED/IND/21 / Sélection de Coordonnateur - Project Implementation, IDA / D2230 A posteriori consultants par Direct 30,000.00 27,029.25 Signé 2021-06-14 2021-06-10 2021-06-21 2021-06-15 2021-06-29 2021-06-25 2021-12-31 Renouvellement du contrat du Management and Monitoring entente directe Coordonnateur du PCR. PCR-47/SC/SED/IND/21 / SPM-Renouvellement du Sélection de Project Implementation, contrat de l'Expert en IDA / D2230 A posteriori consultants par Direct 26,000.00 23,785.74 Signé 2021-06-14 2021-06-10 2021-06-21 2021-06-28 2021-06-29 2021-06-30 2021-12-31 Management and Monitoring Passation des Marchés du entente directe Projet. PCR-48/SC/SED/IND/21 / Sélection de SGF - Renouvellement du Project Implementation, IDA / D2230 A posteriori consultants par Direct 15,000.00 20,578.71 Signé 2021-06-14 2021-06-10 2021-06-21 2021-05-25 2021-06-29 2021-06-30 2021-12-31 contrat du Spécialiste en Management and Monitoring entente directe Gestion Financière du Projet. PCR-49/SC/SED/IND/21 / Expert Tech - Renouvellement Sélection de Project Implementation, du contrat de l'Expert IDA / D2230 A posteriori consultants par Direct 15,500.00 14,405.10 Signé 2021-06-14 2021-06-10 2021-06-21 2021-06-28 2021-06-29 2021-06-30 2021-12-31 Management and Monitoring Technique à la Coordination entente directe du Projet. PCR-50/SC/IND/AD/21 / Assistante - Administrative - Sélection de Project Implementation, Renouvellement du contrat de IDA / D2230 A posteriori consultants par Direct 7,700.00 7,040.09 Signé 2021-06-14 2021-06-10 2021-06-21 2021-06-28 2021-06-29 2021-06-30 2021-12-31 Management and Monitoring l'Assistante Administrative à entente directe la Coordination du Projet. PCR-51/SC/ED/21 / MEP- Recrutement d'un consultant pour l'élaboration du Manuel Sélection de Project Implementation, d'Exécution du Projet IDA / D2230 A posteriori consultants par Direct 50,000.00 31,071.35 Signé 2021-06-14 2021-06-10 2021-06-21 2021-07-23 2021-06-29 2021-08-19 2021-08-20 Management and Monitoring d'Urgane de Rétablissement entente directe des Infrastrucutures en Centrafrique. PCR-52/SC/ED/21 / Normes sauvegardes - Recrutement Sélection de Project Implementation, d'u consultant pour la IDA / D2230 A posteriori consultants par Direct 50,000.00 178,526.36 Signé 2021-06-14 2021-06-11 2021-06-21 2021-07-14 2021-06-29 2021-09-16 2021-08-20 Management and Monitoring révision des instruments de entente directe sauvegardes. Page 4