KATSINA STATE GOVERNMENT NIGERIA EROSION AND WATERSHED MANAGEMENT PROJECT (NEWMAP) DRAFT - FINAL REPORT FOR: ENVIRONMENTAL SOCIAL MANAGMENT PLAN (ESMP) STORMWATER DRAINAGE REHABILITATION PROJECT FOR FUNTUA TOWN IN KATSINA STATE, NIGERIA. February 2020 Page 1 DRAFT - FINAL REPORT ENVIRONMENTAL & SOCIAL MANAGEMENT PLAN (ESMP) FOR STORMWATER DRAINAGE REHABILITATION PROJECT FOR FUNTUA TOWN IN KATSINA STATE Credit No.: IDA51050 Project ID: P124905 Submitted To: State Project Management Unit Katsina State Nigeria Erosion and Watershed Management Project (KTS-NEWMAP) No. 24C, Off Hassan Usman Road (WTC Road) Katsina. Nigeria. February 2020 Page 2 ESMP PREPARERS Dr. (Engr) Odili Ojukwu Team Leader; Environmental, Social & Institutional Expertise Mr. Nasiru Umar Community & Social Specialist Prof. Smart Uchegbu QA/QC Specialist Engr. Uche Umeokafor Engineering and Geotechnical Specialist Mr. Ali Samson GIS Specialist Ms. Adaeze Oba Environmental and Social Specialist Mr. Aminu Tukur Geologist Ms. Chinelo Umeokafor Crop Scientist With Environmental & Social Expertise Mr. Abdullahi Abdullahi Water Engineering Specialist Mr. Victor Chukwu Agricultural & Biodiversity Specialist Mr. ThankGod Oduehie Agricultural & Social Specialist Mrs. Grace Ibeneme Social Specialist Mr. Stephen Olusanya Project Engineer Mrs. Nancy O’Nwachukwu Bio-Remediation & Ecosystem Management Specialist Ms. Ngozi Okoro Social Specialist CLIENT TEAM MEMBERS Engr. Ashiru Mohammed State Project Coordinator SPMU Sanusi Muhamad Environmental Safeguards Officer SPMU Engr. Surajo Arzuka Project Engineer SPMU Aisha Mohammed Social/Livelihood Officer SPMU Salisu Dahiru National Project Coordinator FPMU Ajiboye Theresa Environmental Safeguards Specialist FPMU Ruth Peter Mshelia Social/Livelihood Specialist FPMU Page 3 LIST OF ACRONYMS ARAP Abbreviated Resettlement Action Plan CAI Community Administrative Institutions CBO Community Based Organization CIP Community Involvement Program EA Environmental Assessment E&S Environmental and Social ESHS Environmental, Social, Health and Safety ESIA Environmental and Social Impact Assessment ESMF Environmental and Social Management Framework ESMP Environmental and Social Management Plan FBO Faith-Based Organization FGD Focused Group Discussion FGN Federal Government of Nigeria FMEnV Federal Ministry of Environment FMKJ Funtua, Malumfashi, Katsina and Jibia FNGO Focal Non-Governmental Organization GBV Gender-Based Violence GEF Global Environmental Fund GIS Geographic Information System GRASS Gully Rapid Action and Slope Stabilization GPS Global Positioning System GRRM Grievance Referral and Redress Mechanism KTS-NEWMAP Katsina State Nigeria Erosion and Watershed Management Program KTSG Katsina State Government of Nigeria LGA Local Government Area MOE Ministry of Environment NEWMAP Nigeria Erosion and Watershed Management Program NGO Non-governmental Organization OP Operation Procedure of the World Bank OTG OTG Enviroengineering Nigeria Limited PAH Project-Affected Household PAP Project-Affected Person PC Project Coordinator PG President General PRS Government’s Poverty Reduction Strategy (PRS) RAP Resettlement Action Plan SCCF Special Climate Change Fund SEA Sexual Exploitation and Abuse Page 4 SMLS State Ministry of Lands and Survey SPMU State Project Management Unit ToR Terms of Reference UN United Nations WHO World Health Organization WB World Bank Page 5 Table of Contents ESMP PREPARERS _______________________________________________________ 3 LIST OF ACRONYMS ______________________________________________________ 4 EXECUTIVE SUMMARY __________________________________________________ 10 CHAPTER 1: INTRODUCTION ___________________________________________ 25 1.1 Background _____________________________________________________________ 25 1.2 Description of Proposed Intervention Areas ________________________________ 26 1.2.1 Project Area and Terrain Features: ________________________________________________ 26 1.2.2 General Field Observations ______________________________________________________ 27 1.3 Project Rationale: ________________________________________________________ 28 1.4 Project Description: ______________________________________________________ 28 1.4.1 Funtua Stormwater Drainage Intervention: _________________________________________ 29 1.5 Rationale for ESMP _______________________________________________________ 31 1.6 ESMP Objective: _________________________________________________________ 31 1.7 Phases of Intervention Works: ____________________________________________ 32 1.7.1 Pre-construction Phase __________________________________________________________ 32 1.7.2 Construction Phase _____________________________________________________________ 32 1.7.3 Post-Construction (Operations & Maintenance) Phase ______________________________ 33 CHAPTER 2: INSTITUTIONAL AND LEGAL FRAMEWORK___________________ 34 2.1 World Bank Environmental and Social Safeguard Policies ___________________ 34 2.1.1 Triggered WB Safeguard Policies _________________________________________________ 34 2.1.2 Environmental Assessment (EA) (OP 4.01): ________________________________________ 35 2.1.3 Physical Cultural Resources (OP 4.11): ____________________________________________ 35 2.1.4 Involuntary Resettlement (OP 4.12):_______________________________________________ 35 2.2 Federal Policy, Legal, Regulatory and Administrative Frameworks ___________ 35 2.2.1 National Policy on Environment ___________________________________________________ 36 2.2.2 National Environmental Impact Assessment Act 1992: ______________________________ 36 2.2.3 Nigerian Land Use Matters _______________________________________________________ 36 2.2.4 National Erosion and Flood Control Policy 2005: ____________________________________ 37 2.2.5 NESREA Establishment Act, 2007.________________________________________________ 37 2.2.6 National Guidelines and Standards for Environmental Pollution (March, 2001): _________ 37 2.2.7 National Waste Management Regulations of 1991 __________________________________ 37 2.2.8 Approved National Forestry Policy 2006 ___________________________________________ 37 2.3 Other Relevant Acts and Legislations at Federal Level ______________________ 38 2.3.1 The Basel Convention on the Control of Transboundary Movement of Hazardous Waste and Disposal, 1989 ___________________________________________________________________ 38 2.3.2 UN Framework Convention on Climate Change – Kyoto Protocol (1992)_______________ 38 2.3.3 Agenda 21 - UN Conference on Environment and Development ______________________ 38 2.3.4 Public Health Legislations and regulations _________________________________________ 39 2.3.5 WHO Health and Safety Component of EIA, 1987 __________________________________ 39 2.3.6 Convention on Conservation of Migratory Species of Wild Animals, Bonn, 1979 ________ 39 2.3.7 United Nations Guiding Principle on the Human Environmental _______________________ 39 2.3.8 The Rio Declaration on Environmental and Development ____________________________ 39 2.4 State Legislations ________________________________________________________ 40 2.4.1 Katsina State Waste Management Act ___________________________________________ 40 2.5 Gaps between Nigerian Legislation and World Bank Policies ________________ 40 CHAPTER 3: DESCRIPTION OF AREA OF INFLUENCE AND ENVIRONMENTAL Page 6 BASELINE CONDITIONS _________________________________________________ 42 3.1 Introduction _____________________________________________________________ 42 3.1.1 General Conditions______________________________________________________________ 42 3.2 Baseline Environmental Setting ___________________________________________ 42 3.2.1 Climate ________________________________________________________________________ 42 3.2.2 Geology and Hydrology __________________________________________________________ 44 3.2.3 Soil Types _____________________________________________________________________ 45 3.2.4 Biodiversity_____________________________________________________________________ 46 3.2.5 General Geomorphology _________________________________________________________ 50 3.2.5.1 Slope Instability and Subsidence ________________________________________________ 50 3.2.5.2 Natural Drainage Corridors _____________________________________________________ 50 3.2.6 Archaeology and Cultural Heritage: _______________________________________________ 50 3.2.7 Traffic and Transport Infrastructure: _______________________________________________ 50 3.2.8 Waste Management: ____________________________________________________________ 51 3.3 Site-Specific Baseline Environmental Setting_______________________________ 51 3.3.1 Funtua Town Baseline Setting ____________________________________________________ 51 3.3.5 Evaluation of Baseline Analytical Results __________________________________________ 56 CHAPTER 4: SOCIO-ECONOMIC CHARACTERISTICS AND CONSULTATION WITH STAKEHOLDERS __________________________________________________ 59 4.1 Description of Socioeconomic Environment________________________________ 59 4.1.1 Introduction: ____________________________________________________________________ 59 4.1.2 Socio-economic Study ___________________________________________________________ 59 4.1.3 Public/Stakeholder Consultation: __________________________________________________ 60 4.1.4 Use of Maps and GIS: ___________________________________________________________ 60 4.2 Description of Cultural Environment _______________________________________ 60 4.2.1 Population _____________________________________________________________________ 60 4.2.2 Ethnic Groups __________________________________________________________________ 60 4.2.3 Religion ________________________________________________________________________ 61 4.3 Land Use Pattern_________________________________________________________ 61 4.3.1 Cultural Resources ______________________________________________________________ 61 4.4 Analysis of Socioeconomic Survey ________________________________________ 61 4.4.1 Objectives of the Socioeconomic Survey ___________________________________________ 61 4.4.2 Funtua Socioeconomic Survey ___________________________________________________ 62 4.5 Public/Stakeholders’ Consultation and Participation ________________________ 65 4.5.1 Community Participation _________________________________________________________ 66 4.5.2 Objectives of the Community Consultations ________________________________________ 66 4.5.3 Public Consultation Methodology _________________________________________________ 66 4.5.4 Stakeholders’ Identification _______________________________________________________ 67 4.5.5 Funtua Community Meetings _____________________________________________________ 68 4.5.6 Participants’ Feedback and Comments ____________________________________________ 68 CHAPTER 5: ASSESSMENT OF POTENTIAL IMPACTS AND ANALYSIS OF ALTERNATIVES _________________________________________________________ 70 5.1 Introduction _____________________________________________________________ 70 5.2 Analysis of Potential Impacts Triggered by Funtua Project __________________ 73 5.3 Potential Impacts Significance Rating for Funtua Projects ___________________ 75 5.4 Identified Social and Environmental Impacts _______________________________ 76 5.5 Analysis of Alternatives __________________________________________________ 76 CHAPTER 6: ENVIRONMENTAL AND SOCIAL MANAGEMENT PLAN (ESMP) _ 79 Page 7 6.1 Mitigation Measures for Implementation ___________________________________ 79 6.2 Environmental and Social Impact Mitigation Measures ______________________ 80 6.3 Institutional Responsibilities and Accountabilities __________________________ 89 6.4 Capacity of Katsina NEWMAP to Implement the ESMP ______________________ 91 6.4.1 Capacity and Training Needs _____________________________________________________ 91 6.4.2 Capacity Building Cost __________________________________________________________ 92 6.5 E&S Obligations of the Construction Contractors ___________________________ 93 6.6 Required Environmental and Social Management Plans _____________________ 93 6.6.1 Resettlement Action Plans _______________________________________________________ 93 6.6.2 Public/Stakeholder Consultation Plan _____________________________________________ 94 6.6.3 Chance Finds/Cultural Heritage Management Plan (CHMP) __________________________ 94 6.6.4 Occupational/Public Health, Safety and Security Management Plan ___________________ 95 6.6.5 Gender Based Violence/Sexual Exploitation and Abuse Management Plan ____________ 96 6.6.6 Vegetation Clearing and Biomass Management Plan ________________________________ 96 6.6.7 Air Quality Management Plan ____________________________________________________ 97 6.6.8 Emergency Response and Incident Plan ___________________________________________ 97 6.6.9 Water Management Plan ________________________________________________________ 97 6.6.10 Erosion and Sedimentation Management Plan ____________________________________ 98 6.6.11 Traffic and Vehicle Management Plan ____________________________________________ 98 6.6.12 Waste Management Plan _______________________________________________________ 99 6.6.13 Chemical Management Plan ____________________________________________________ 99 6.7 ESMP Monitoring and Evaluation _________________________________________ 100 6.7.1 Monitoring and Reporting _______________________________________________________ 100 6.7.2 Post Construction Monitoring ____________________________________________________ 100 6.8 Grievance Mechanism and Procedures ___________________________________ 100 6.8.1 Formation of Grievance Redress Committee (GRC) _____________________________ 101 6.8.2 Training of the Grievance Redress Committee __________________________________ 103 6.9 ESMP Management Costs _______________________________________________ 111 6.10 Budget to Implement ESMP _____________________________________________ 112 6.11 ESMP Implementation Schedule_________________________________________ 113 CHAPTER 7: CONCLUSIONS AND RECOMMENDATIONS __________________ 115 7.1 Conclusions ____________________________________________________________ 115 7.2 Recommendations ______________________________________________________ 115 CHAPTER 8: DECOMMISSIONING/ABANDONEMENT ______________________ 117 REFERENCES __________________________________________________________ 122 ANNEXURES _____________________________________________________________ 124 ANNEXURE I: List of Contacted Stakeholders _______________________________________ 125 ANNEXURE II: Template of Socioeconomic/Census Data Forms ________________________ 127 ANNEXURE III: Summary of Applicable World Bank Safeguard Policies __________________ 129 ANNEXURE IV: General Environmental Management Conditions For Construction Contracts/Civil Works. _____________________________________________________________________ 131 ANNEXURE V: Minutes & Photos of Meetings with Funtua Project Communities __________ 134 Consultant Meetings with Various Strata of Funtua Community _______________________________ 134 Minutes of Consultant Meeting with Funtua District Head ____________________________________ 134 Attendees to the Consultant Meeting with Funtua District Head _______________________________ 136 Photos of Meeting with Funtua District Head ______________________________________________ 137 Page 8 Minutes of Funtua Community Meeting __________________________________________________ 138 Attendees to the Funtua Community Meeting _____________________________________________ 140 Photos of Funtua Community Meeting _________________________________________________ 141 Photos of Funtua Town Drainage System ______________________________________________ 142 ANNEXURE IX: Minutes & Photos of Meeting with FMKJ Projects’ Stakeholders ___________ 145 Minutes of Stakeholders Consultation Meeting for the FMKJ Projects __________________________ 145 Attendees to FMKJ Projects Stakeholders’ Meeting _____________________________________ 148 Photos of FMKJ Projects Stakeholders’ Meeting ________________________________________ 150 ANNEXURE X: Mapping of Sampling Locations & Coordinates Across the FMKJ Sites _______ 152 ANNEXURE XI: Study Sampling Methods and Locations ______________________________ 154 ANNEXURE XII: Baseline Noise Readings and Sampling Locations ______________________ 155 ANNEXURE XIII: Complete Plant Listing from Vegetative Study ________________________ 156 ANNEXURE XIV: Laboratory Analytical Results (Funtua Project Site) ____________________ 157 ANNEXURE XVIII: Summary of key ESHS Requirements for Procurement ________________ 169 ANNEXURE XIX: Quick Brief on ESHS______________________________________________ 172 ANNEXURE XX: Construction Daily Monitoring Checklist______________________________ 176 ANNEXURE XXI: Discussion Of Methods/Techniques Used In Assessing Impacts ___________ 180 Page 9 EXECUTIVE SUMMARY Background The Nigeria Erosion and Watershed Management Project (NEWMAP), initiated by the Federal Government of Nigeria (FGN) and funded by the WorldBank (WB) and International Development Fund (IDF), is being implemented in Katsina State, and other participating states to help reduce flood and soil erosion vulnerability in the States and to develop the States’ watersheds. Funtua town is one of the many towns and cities in Katsina State whose communities are perennially devastated by floods and soil erosion resulting from storm water flow. The flood and erosion hazards of these towns have caused major property losses to residents and remain a serious threat to lives in the communities. The stormwater drainage systems in Funtua have severely degraded over the years lacking adequacy and maintenance. These drainage systems have become corridors of most floods and erosion hazards in the town creating severe structural and environmental damages. The damages include destructions to homes, properties, and farmlands as well as causing unprecedented siltation of the community streams and low lands. The Katsina State NEWMAP is targeting to remedy and rehabilitate the Funtua Stormwater Drainage Corridors and reduce the impacts of the floods through the NEWMAP opportunity. This Environmental and Social Management Plan (ESMP) has been prepared in support of the proposed Funtua project in Katsina State. Description of Project Activities The location of the Funtua Project Site and the description of the target activities at the site are shown in the following table. Funtua Project General Descriptions Location Coordinates S/No Project Area Activity Description Easting Nothing Stormwater drainage 1 Funtua Town N11° 31.692ʻ E007° 17.257ʻ reconstruction; Access roads, and watershed rehabilitation The Funtua project consist of remedial structural and non-structural developments that include civil works and vegetative development. The proposed ground interventions will address, prevent and reverse the land degradation for the long- term and will involve rehabilitation and reconstruction of the stormwater conveyance systems in the project areas. The rehabilitation and reconstruction activities will involve civil works as well as bioengineering restoration and will result in disruptions in the physical environment, habitat, pests and cause inland river siltation as well as involuntary resettlement thereby triggering the relevant World Bank Safeguard Policies. Essentially, the proposed flood and erosion control measures for the drainage system comprise the following structures: • Drain inlet structures; • Lined canal for the total length; • Chute structures with stilling basins; • Drop structures; and, • Exit system/outlet structures. Page 10 Rationale for the ESMP The ESMP was designed to guard the process of the proposed intervention project with a view to enhancing project benefits and introduce standards of good environmental practice for sustainable development in the State. This ESMP as a site-specific safeguard instrument is required to provide necessary procedures and criteria that will guide the proposed Funtua intervention in accordance with the World Bank Safeguard Policies and the Nigerian national environmental policies, guidelines and assessment procedures as well as those of Katsina State and the local agencies. Objective for the ESMP The objective of this study is to prepare an environmental and social impact assessment (ESMP) for the Funtua project that specifically identifies the potential impacts, evaluates and documents the set of mitigation, monitoring and institutional actions to be taken before and during site construction and rehabilitation to eliminate adverse environmental and social impacts, offset the impacts or reduce the impacts to acceptable levels. The potential impacts associated with the phases of the designed site interventions consisting of pre-construction, construction, and operation and maintenance (O&M) are developed and appropriate mitigation measures established for the impacts. Policy, Legal and Administrative Framework This ESMP is guided by the requirements of the World Bank safeguard policies and the relevant applicable state, national and international regulation, guidelines, conventions, industrial best management practices that are triggered by the NEWMAP. The potentially triggered WB safeguard operational policies (OPs) include: • Environmental Assessment (OP/BP 4.01) • Involuntary Resettlement (OP/BP 4.12) • Cultural Physical Property (OP 4.11) The basic legal framework for the regulation of the environment in Nigeria is braced in the Environmental Impact Assessment (EIA) Act No. 86 of 1992; the National Guidelines and Standards for Environmental Pollution Control in Nigeria (March 1991); the National Environmental Standards and Regulations Enforcement Agency (establishment) Act 2007 (NESREA), as well as the Land Use Act 1978 (modified in 1990). The power to regulate all environmental matters in Nigeria is vested in the Federal Ministry of Environment (FMEnv). Existing Safeguard Instruments The implementation of projects under NEWMAP is guided by two existing safeguard documents - the Environmental and Social Management Framework (ESMF) and the Resettlement Policy Framework (RPF) prepared for NEWMAP. The ESMF indicates that NEWMAP is categorized by the WB as a Category A project whose impacts are sensitive, diverse, unprecedented, felt beyond the immediate project environment and are potentially irreversible over the long term. For the Funtua sub-project, the scale of the construction and development works will involve a significant disturbance of the environmental conditions, with both localized and regional impacts. Page 11 Biophysical Environment The topography of the project watershed shows a modest variation in elevation, with a maximum elevation change of 78.9m and an average elevation above sea level of 276.5m.The climatic condition of the project area is characterized by uniformly high temperatures and a short seasonal distribution of precipitations. The area falls within the Sahel savanna zone that receives about three months of rain and experiences up to nine months of dry season, which makes it very dry for most part of the year. The temperature in the area varies from 15°C to 42°C and is rarely below 14°C or above 44°C. The hot season in the area last for a little over two months from March to May, while the cool season lasts for about one and half months, usually from December to January of each year. The rainy season usually lasts from June to September, with a peak that occurs in August. The dry season begins from September to June. Funtua watersheds experience extreme seasonal variation in humidity. The muggier period of the year last for over six months, from April to October. Flora and fauna within and around the various project corridors and vicinity were surveyed and characterized to evaluate the health status of the vegetation and the general composition, diversity, and economic values, etc. of existing wildlife in each of the project areas. The project areas are urban communities that lie within the dry arid belt of northwestern Nigeria and evidences savannah type vegetation. The pressure on land for agriculture is largely diminished by the limitation imposed through the prevailing harsh climate and weather conditions within the Funtua project areas for most part of the year. A listing of plant species with frequent or abundant distribution in the various categories for each project area are shown in Chapter 3. Air quality assessment was carried out at several locations where active construction operations are anticipated and where human activities are expected to be high. The analytical results of the baseline air quality indicators within and around the Funtua project corridors show concentrations below the regulatory threshold limits. Field (in- situ) air sampling was carried out using the Dragner CMS Gas Analyzer. Ambient air was drawn into the calibrated equipment at the targeted locations and subsequently the digital readings for the various parameters were read off the instrument. The matrix of air sampling locations and coordinates across the project sites are included in Table 3.1. The parameters measured as part of the air quality assessment included carbon monoxide (CO), Ammonia (NH3), hydrogen sulphide (H2S), sulphur dioxide (SO2), nitrogen oxides (NOx), hydrogen cyanide (HCN), particulate matter (PM) as well as oxygen (O2). Analytical results obtained were reviewed against the appropriate regulatory limits to determine any potential health risk levels. The surface and groundwater conditions at the Funtua site were assessed through laboratory analysis of parameters that affect the quality of water in the environment. Physical properties of water quality include temperature and turbidity. Chemical characteristics involve parameters such as pH and dissolved oxygen. Biological indicators of water quality include algae and phytoplankton. The analytical results of the baseline water quality indicators within and around the project areas show concentrations that are either below the regulatory threshold limits or are considered not significant. Baseline soil parameters indicate the state of soil ecosystem characteristics, which especially reflect productive, buffering, filtering and other soil functions. Soil quality is significantly affected by physical, chemical, biological and biochemical properties Page 12 sensitive to changes in the environment and land management. The analytical results of the baseline soil quality indicators show concentrations of key soil quality below the regulatory threshold limits. Socio-Economic Characteristics Based on the 2006 national population census records and the 3.04% annual population growth factor recommended by the national population commission (NPC), the Funtua LGA of Katsina State has projected population of 322,518 for 2018. Funtua districts are made up of essentially urban communities whose residents are generally business and agro-traders. Funtua communities have male/female population distribution at the household level of about 53%/47%. The people of the project area are of the Hausa-Fulani ethnic group and generally, speak and write mainly the Arabic, Hausa/Fulani and English languages. Clanism and kinship are strong elements and driving forces in control of political and cultural institutions and service points. Residents of Funtua communities are predominantly of the Islamic religion (Muslims). Three major types of customary land tenure system exist in the project area, viz: – (1) individual land ownership; (2) family land ownership; and. (3) communal land ownership. Individual ownership may be for indigenes or for residents of the community. Family lands (as well as individual lands) are inherited from generational relatives. Communities retain family lands which may be sold and mostly used for developmental purposes. Based on field observations, over 85% of land within the project area is committed to agricultural production of food crops. The literacy level within the project area is relatively moderate with 23.1% of the surveyed population of schooling age having never attended school. The moderate literacy level within the project affected area is reflected in the number of existing educational infrastructure support within the areas. There is a relatively high rate of unemployment (9.6%) in the Funtua communities. This situation potentially could pose some serious social risks when not properly managed. The community must come together to address unemployment as a social risk within its fold. Solid wastes pose considerable hazards to human health due to the indiscriminate dumping of household wastes at illegal points or dumpsites. The continued and uncontrolled waste dumping in Funtua communities cause regular obstructions to the storm water drainage systems. The common diseases in project area include diarrhea, malaria, typhoid, pneumonia, cough, skin diseases, deficiency diseases, eye diseases, ear diseases, and waterborne diseases resulting mainly from malnutrition and lack of hygiene. The quality of the health services in the area is generally poor with most residents patronizing quacks and medicine shops for their medical treatment. The socioeconomic infrastructures (roads system, electric power and access to water) in the area are also generally in fair to poor state. Public access to potable water is non-existent and power is generally not steady. Market facilities are fairly developed complimented by numerous home-based commercial shops located throughout the community. Public Consultations and Concerns The stakeholders’ and public consultation methodology adopted in this study includes a qualitative and quantitative mixed method that offers an effective means to interact widely with the project area general public as well as stakeholder groups. Page 13 Five broad categories of stakeholders were identified for this project based on the degree to which the project activities affected or involved such persons or group of persons. Individual stakeholders and project affected persons (PAPs) were also engaged during the ESMP preparation. To ensure that the rights and interests of PAPs are considered seriously local level consultative forums serve as community voices and become part of the entire project process. The key environmental and social issues and concerns that were raised during the stakeholders’/community meetings include: 1) Community safety with the next cycle of the rainy season. The community was quite apprehensive of the intensities of the recurring floods and the continued advancement of soil erosion particularly in relation to safety risks posed to existing adjacent homes, human lives and farmlands; 2) Continued soil erosion and flooding in the area would lead to damages and loss of crops and livestock, personal possessions, spread of diseases such as typhoid, cholera, diarrhea, and malaria; 3) Loss of access to roadways, crop lands and pasture; 4) Physical displacement of vulnerable persons during project implementation. These issues and concerns raised were fully addressed during the community meetings. The specific mitigation measures are also included under the impacts mitigation measures of this ESMP. Impacts of the Project Potential Positive Impacts: This project will effectively: • Rehabilitate the degraded stormwater drainage corridors of Funtua; • Control the perennial flooding and soil erosion within Funtua district communities. • Improve the flow of traffic in and out of the communities • Reclaim useful land and expectedly will greatly appreciate the value of properties within the area as most erosion threatened properties have lost market value • Improved livelihoods for the area residents due to increase in agricultural productivity • Improved landscape vista of the project area • Provide temporary job opportunities for both skilled and un-skilled labors Potential Adverse Impacts Disturbance of flora and fauna: Movement of personnel and vehicles may result in trampling of flora and disturbance of fauna. Injuries and accidents: Workers may be exposed to injury from machines and equipment. Loss of vegetation and impacts on flora and fauna: Rehabilitation work will involve clearing of vegetation in and around the canals and drains. This may result in a potential disturbance and/or loss of fauna at the project site. Soil erosion and soil pollution: Excavation, vegetation clearance, leveling and other land preparation works will expose and loosen the soil making it susceptible to both wind and water erosion and subsequent loss of top soil. There is potential for compaction of soil from the use of heavy machinery and contamination of soil from fuels, oils and waste. Air quality deterioration: Loose soils exposed during land preparation work and movement of vehicles/trucks (including haulage trucks) to and from the project site Page 14 on the untarred surfaces may result in the increase of airborne particulates. Vibration and noise nuisance: Movement and operation of machines/equipment, trucks during construction is likely to increase noise levels intermittently in communities; May also experience temporary increase in noise levels from construction activities. Occupational accidents and risk of injury to workers: Workers’ exposure to noise, dust and vibrations and risk of accidents and injury from the use of machinery and equipment, materials management at the construction yards/workplace are concerns that need to be addressed. Risk of accidents and injury to the public: The movement of trucks and other vehicles and machinery to and from offsite sources to the project site will pose safety risks for the communities along and around the project site. Communities near the project site may also be at risk from unsecured excavations. Influx of workers and migrants: Migrants who move into the project area for job opportunities may not conform to the societal norms and cultural practices and may upset the social structure of these communities. Obstruction of access ways to communities: Construction works at the project site may render portions of access roads and existing foot paths inaccessible to users and/or temporarily closed. This may create inconvenience and increase travel time to and from the affected communities. Risk of spread of diseases: Poorly managed construction sites, site camps, indiscriminate disposal of waste and open defecation will create unsightly conditions and may result in the spread of disease (e.g. malaria, typhoid). HIV/AIDS and STIs Risks: Construction workers camp give rise to health risks associated with poor sexual practices and prostitution. Analysis of Project Options and Alternatives Consideration of alternatives related principally to ways of improving the proposed intervention activities and/or attempting to avoid or minimize potential significant negative impacts. Different options were evaluated consistent with the various components of the Funtua project intervention. For the proposed project, the options considered include: delayed project option; a do-nothing option; and the planned project option. The selection of the planned project alternative was premised on several considerations, including the long-term effectiveness of the technology, the implementability at the location under consideration, the desirability/acceptability by the community, the government’s position or inclinations to the project, the po tential environmental and social impacts of the project, the economic viability of the project and impact to human life. Identified Significant Adverse Impacts and Mitigation Measures The designed measures to mitigate identified significant adverse impacts are included in the table below: Summary of Impacts and Mitigation Measures Item Responsibility Impacts Receptor(s) Proposed Mitigation Measures No. Party PRE CONSTRUCTION 1 Impacts on Community and Grassland; • A stand-alone Resettlement Action SPMU-ESO; PAP Management (Loss of Shrubs; Plan (RAP) has been prepared for Focal NGO physical assets; Loss of Crop fields and the project addressing impacts on SMEnv.; means of livelihood) pastures; the community and the PAP SMLS.; Residential homes management. The SPMU shall be Community • Croplands and economic required to implement the RAP in Leaders; Page 15 Item Responsibility Impacts Receptor(s) Proposed Mitigation Measures No. Party trees along the gully setback accordance with the provisions Site Committee may be destroyed during gully therein wall stabilization. • Appropriate compensations shall • Construction activities may be paid for project acquired lands; affect persons with critical temporary use of lands; destroyed health conditions, including crops and economic trees. old persons, children and • Compensation to persons (PAPs) other vulnerable persons within project area who will need within project area may be to be temporarily relocated prior to temporarily relocated for beginning of construction construction phase. activities. • Possible disagreement over • Create awareness among siting of staging areas and community members and sensitize temporary facilities between the people to all project activities community and contractor • Seek the consent of the landowner to erect the site office for the specified duration of the project; 2 Public/Stakeholders Community • Build capacities within community SPMU-ESO; Participation members • Incorporate community feedback Focal NGO; • Non-involvement of project into project implementation SMOW; community and stakeholders process SMEnv; affects the project post- • Disseminate project study findings; SMOH; construction maintenance and • Ensure that period of Community sustainability inaccessibility to land is as short Leaders; as possible Site Committee • Awareness campaigns. • The Contractor shall be required to prepare and submit a Stakeholders’ Engagement Plan to the SPMU for approval and adoption for the contractor’s implementation 3 Vegetation and Biomass Grassland; • Mark out areas for clearance & SPMU-ESO; Removal Management Shrubs; where possible use manual Focal NGO; Crop fields and method of vegetation clearing; SMOW; • Damage to the natural and pastures; • Undertake selective clearance by SMEnv; planted vegetation on removing tall woody species SMOH; acquired gully setback lands leaving saplings for quick Community during site clearance, areas regeneration of vegetation; Leaders; for siting of temporary office • Prevent colonization by invasive Site Committee and workers camp. species- • Impact on flora and fauna. • Prevent damage to critical • Impact on wild life. ecosystems and habitats • Prevent destruction of flora and fauna. • The Contractor shall be required to prepare and submit a Vegetation and Biomass Management Plan to the SPMU for approval and adoption for the contractor’s implementation 4 Gender Based Construction • Contractor to submit an ESHS Contractor Violence/Sexual workers; Performance Security to PMU SPMU Exploitation & Abuse Community • Contractor to prepare and submit Management members. a GBV/SEA Management Plan to PMU for approval and adoption for the contractor’s implementation CONSTRUCTION PHASE 5 Dust and Air Quality Construction • Dust generation will be controlled SPMU-ESO; Management workers; mainly by the use of water, Focal NGO Vulnerable especially in the dry season. SMOH.; • Air pollution is expected from persons; • Use of water tanker for purposes Community dust and emissions from Community of water dousing to control dust Leaders; construction vehicles, plant members; emission. Site Committee Page 16 Item Responsibility Impacts Receptor(s) Proposed Mitigation Measures No. Party and equipment. Dust is Residential • Erection of speed control signals generated by excavation and homes; and ramps mounted in earth moving operations and communities; causes nuisance to residents • Covering of hauling trucks carrying and other sensitive receptors. sand and other aggregates; Exhaust emissions occur from • Covering of heaped material e.g. poor maintenance of plant sand will be covered; and equipment or over • Use of nose masks by all workers revving of engines. at road maintenance/works sites. • Surfaces of vegetation along the maintenance road will be monitored to verify the effectiveness of dust suppression method. • The Contractor shall be required to prepare and submit an Air Quality Management Plan to the SPMU for approval and adoption for the contractor’s implementation. 6 Water Resources, Erosion Streams; • Location for heaping construction SPMU-ESO; and Sedimentation, Run-off Ponds; material (e.g. sand and other Focal NGO; Control Management Groundwater; aggregates) not less than 50m SMOW; Drainage from water bodies and drainage Community corridors; channels (i.e. a separation Leaders; • Increased sedimentation and Roadways. distance of 50m will be observed); Site Committee runoff may result from • Site for fueling of machinery and activities during the servicing of equipment will be construction works. located at a minimum distance of • Earthworks release 100m from water bodies, wetlands suspended particles into and drainage channels; • Embankment erection around watercourses, which can have fueling and other liquid or spill-able temporary detrimental effects storage sites in order to limit or on water organisms. Spillages contain such material from escape of fuel and other petroleum to potentially pollute water products cause contamination resources; of the soil and water • Side drains (where appropriate) resources. will be provided with settling basins near water bodies to • Excavation at the borrow pits remove silt and debris from road may cause land degradation surface and construction site run- in the vicinity of the borrow off, before discharge to adjoining pits; may cause soil erosion streams or rivers; and siltation of nearby roads. • Adequate side drains provided to carry run-off into drainage channels to prevent erosion; • Culverts of suitable capacity constructed to contain and direct flow, especially at peak flow and run-off; • Road maintenance works to be carried out off peak rainy season; • Provision of toilets and urinal at locations not less than 50m away from water bodies; and • Adequate worker awareness on sanitation and measures to avoid water resource contamination. • The Contractor shall be required to prepare and submit a Water management Plan and an Erosion and Sedimentation Management Plan to the SPMU for approval and adoption for the contractor’s implementation. 7 Noise and Vibration Construction • Equipment servicing plan will be SPMU-ESO; workers; Focal NGO; Page 17 Item Responsibility Impacts Receptor(s) Proposed Mitigation Measures No. Party Exposure Management Vulnerable prepared and strictly followed to SMOW; persons; ensure efficient machinery SMOH; • Noise will emanate from Community performance and optimum noise Community members; generation. Leaders; moving vehicles, excavators, Residential • Stationary equipment shall be Site Committee generators, power tools (e.g. homes; sited at safe distances from for vegetation clearing), and sensitive areas to minimize noise compressors during impacts construction. Vibrations may • Workers operating noisy come from soil compaction equipment will not be exposed equipment and other continuously for more than 3 hours a day. vibroequipment to be used at • Workers will be provided with ear the gully heads. plugs. • Workers handling vibrating equipment or parts will be given pads to absorb the vibrations and will not be exposed continuously for longer than 3 hours a day. • Sanctions (ranging from a warning to dismissal) will be instituted by the contractor against workers who do not observe the use of appropriate PPEs 8 Occupational/Public Health Construction • Health, safety and environmental SPMU-ESO; and Safety Management workers; training and awareness will be Focal NGO; Vulnerable extended to community members SMOH; • Occupational accident during persons; and local residents; Community construction. Community • Erection of warning signals and Leaders; • Construction operations pose members; use of reflective tapes at Site Committee; hazards to people living or Residential approaches to excavations, working near construction homes; heaped materials, stationary areas or employed to work on equipment, etc. site. Excavations, • Posting of speed limits of 40km/hr construction traffic and at approaches to construction stockpiled materials pose sites; particular threats to children • Safety meetings held twice a week and livestock. Children may and documented accordingly; be inadvertently recruited to • Inductions and awareness work on construction sites. programmes held for all employees on occupational health and safety practices; • A First Aid team formed to provide first aid services to workers and where appropriate make referrals to the nearest Health Centre or hospital; • First Aid team to be trained by a medical team from the Health Centre; • Accident records at construction site and neighbourhoods to be maintained both for workers and the public; • Stocks of PPEs to be maintained and supplied to workers regularly as needed; and • Workers required to wear the appropriate PPEs e.g. helmets, ear plugs, nose masks, vibration pads, hand gloves, etc. • The Contractor shall be required to prepare and submit a Community/Occupational Health Management Plan to the SPMU for approval and adoption for the contractor’s implementation Page 18 Item Responsibility Impacts Receptor(s) Proposed Mitigation Measures No. Party 9 Gender Based Violence Construction • Inductions and awareness Focal NGO; /Sexual Exploitation and workers; programmes held for all SPMU-ESO; Abuse (GBV-SEA) Vulnerable employees on GBV-SEA issues; SMEnv; Management persons; • Contractor to comply with ESHS SMOH; Community provisions of the contract. Community members; • GBV-SEA awareness will be Leaders; Residential extended to Nodu and Umudocha Site Committee homes; community members and local residents; • GBV-SEA records at construction site and neighbourhoods to be maintained both for workers and the public; • Workers required to report any GBV-SEA issues to the construction management. • The Contractor to prepare and submit a GBV-SEA Management Plan to the SPMU for approval and adoption for the contractor’s implementation 10 HIV/AIDS and STIs Construction • Provide quarterly HIV/AIDS and Focal NGO; Management workers; STIs awareness programmes for SPMU-ESO; Vulnerable workers and nearby communities; SMEnv; • Construction workers camp persons; • Health and HIV awareness team SMOH; Community arranged from the State Health Community give rise to health risks members; Leaders; Ministry for the quarterly associated with poor sexual Residential programmes; Site Committee; practices and prostitution. homes; • Sponsored educational package put together by the team to be implemented to enlighten both workers and communities; • Training of peer educators within the work force and in communities by the team; and • The contractor to provide free condom supplies and encourage free discussions, counselling and testing. 11 Construction Operation and Vulnerable • Maximize local employment SPMU-ESO; Slope Stabilization persons; (including women) on construction Focal NGO; Community works (this should be a contractual SMOW; • Construction operations will members; requirement to hire a percentage SMEnv; result in topographic Residential of local workforce including Community alterations. homes; women) Leaders; • Construction operations may • Provide occupational health and Site Committee result in landslides, rock cave- safety awareness training and ins, and mudflow/flooding. workshops, • Construction operations can • Use of child labor shall be strictly pose earth movement prohibited hazards to people working • Monitor and maintain intervention near the construction areas work for continued stability and due to unstable soil profiles quality from site excavations. • Shortcomings in the control structures including the check dams (retention basins) along the gully corridor should be corrected before they develop into serious problems. • The Contractor shall be required to prepare and submit an ESMP and Emergency Response and Incident Plan to the SPMU for approval and adoption for the contractor’s implementation 12 Traffic and Transportation Construction • Traffic wardens to be posted at SPMU-ESO; Page 19 Item Responsibility Impacts Receptor(s) Proposed Mitigation Measures No. Party Hazards workers; positions 100m from the Focal NGO; Impedance to traffic flow and Community construction points on either side SMOW; movements. members; of the road to ensure orderly traffic SMEnv; Possible vehicular collisions Residential flow; Community and accidents. homes; • Actual working areas to be Leaders; Temporary diversions of traffic. secured with barricades; Site Committee • Adequate road warning signs to be posted at vantage points to warn and direct traffic; • Traffic and transport associated with project will adhere to existing roads or follow specified routes as established. • The Contractor shall be required to prepare and submit a Traffic and Vehicle Management Plan to the SPMU for approval and adoption for the contractor’s implementation OPERATIONS PHASE (POST CONSTRUCTION) 13 Waste Management (solid Streams; • Topsoil removed from the right of SPMU-ESO; and liquid wastes) Ponds; way for maintenance work to be Focal NGO; Groundwater; spread on the land to avoid SMOW; Drainage SMEnv; Proposed project will generate disrupting drainage network; and corridors; Community waste during construction Roadways. • Toilets and urinals to be sited at Leaders; including off specification least 100m from any stream or Site Committee materials such as wood, plastic, drainage channel and paper and domestic waste from decommissioned at the end of construction areas and worker project. camps. This could result in • The Contractor shall be required to increased pressure on local prepare and submit a Waste waste dump facilities as well as Management Plan to the SPMU potential for unauthorized for approval and adoption for the disposal and littering if not contractor’s implementation properly managed. • Waste bins to be provided for the disposal of waste generated; • Waste will be segregated into three at source - organic (food residues), recyclables (woods, metals) and non- recyclables (plastic and glass wastes); • Organic waste to be composted near the site office to enrich the soil, while plastics and glass are taken to the district dump-sites; 14 Land use restriction • Ensure periodic monitoring of SPMU-ESO; Community restricted areas SMEnv; Use of the acquired land members; • Continuous maintenance of Focal NGO; associated with gully setback Residential erosion control structures including Community will be altered and restricted to homes; concrete channels and check Leaders; limited community uses. dams, and bio-remediated areas Site Committee Structures may never be for continued effectiveness. erected on this portion of land but economic trees could be planted. • Create awareness among community members; • Build capacities within Page 20 Item Responsibility Impacts Receptor(s) Proposed Mitigation Measures No. Party community; • Incorporate community feedback mechanism into process 15 Closure of temporary office, Community • Enforce agreed measures to SPMU-ESO; staging areas and members; render the site safe and usable Focal NGO; decommissioning of project Residential post construction to the Community homes; Leaders; satisfaction of the community and Site Committee Damage to land forms and landowners. vegetation • Ensure that agreements with the community and landowners on post construction hand-over are kept. 16 Erosion control system • Ensure periodic monitoring of Community failure management Community erosion control structures Leaders; members; • Continuous maintenance of Site Committee erosion control structures including CBOs/CDOs • Check dams that are not concrete channels and check properly constructed may dams, and bio-remediated areas suffer damage that could for continued effectiveness. reduce the structural integrity of the erosion control structures during post- construction phase. • Structures built in the channelization for stabilization purposes should be observed for damage especially during rainy seasons and after heavy storms. Any damage observed should be repaired immediately to avoid further damage and the eventual collapse. Some of the occupational health issues/Hazards and mitigation measures S/N occupational health and Mitigation Measures Responsible safety issues party 1 The exclusion of Occupational health issues shall be SPMU occupational health and noted and included in FPMU safety issues in contract contract documents to make them Contractor documents obligatory/mandatory. 2 Use of defective, damaged Provide workers the appropriate and SPMU or inappropriate tools for a quality hand tools as are necessary for Contractor particular and specific task. the execution of specific activities or tasks. 3 Engagement of workers to Provide on-the-job training to workers SPMU use machines and tools for on how to handle and use available Contractor which they have not been tools and machinery before engaging trained. them. 4 Involvement of workers in Appropriate protective wear to workers SPMU activities without the for specific activities/tasks. Contractor provision of the appropriate (Gumboots, gloves, overalls, helmets, protective wear. etc.) 5 Non provision of First Aid FAKs and trained personnel in SPMU Page 21 Kits (FAKs), administering first-aid must always be Contractor available on the site for purposes of minor injuries. 6 The exposure of workers to Workers must wear the right protective SPMU dust during implementation gear. Contractor of works. Watering of dusty areas must be done with a water at least three times a day to reduce dust levels to the barest minimum. 7 Lack of informatory During execution of work especially at SPMU signposts indicating that a site open to traffic, informatory Contractor work is in progress. signposts must be posted so as to lessen the risks of accidents to workers. 8 Accidents involving Only properly trained men for Contractor plants/equipment operation. 9 Safety of and from traffic Providing adequate traffic signs and SPMU protection at locations where works Contractor are taking place. Where necessary, traffic should be stopped during the placement or removal of temporary signs. ESMP Implementation and Management The primary responsibility for the project execution and ESMP implementation is on the SPMU. The SPMU through its various officers, and may also employ the services of consultants and contractors, shall provide the necessary awareness, mobilization and facilitation, project appraisal, approval & disbursement, capacity building, monitoring & evaluation of all project activities and reporting to the FPMU and the World Bank. The key actors in the implementation of this ESMP include: • The contractor - to be awarded the rehabilitation contract and be required to implement the environmental and social safeguard measures; • SPMU - to ensure that environmental and social (E&S) safeguards and other mitigation measures are duly implemented; • FMEnv/FPMU - to ensure compliance with the ESMP and other relevant approval conditions; • SMEnv - to oversee the effective implementation of the flood control project and related E&S safeguards • PCC - to address complaints of any aggrieved parties on E&S safeguards • SMLS – to ensure appropriate disposition of land matters in accordance with the statutory requirements. Environmental and Social Monitoring Plan Monitoring programmes have been developed for all significant adverse environmental and social impacts identified. In addition to the significant adverse Page 22 impacts, monitoring plans have been developed for air quality, noise, public complaints/grievances, and environmental compliance. Provisional Environmental and Social Management Plan The programmes proposed to meet the mitigation measures and monitoring programmes will include the following: • Adoption of Environmental, Health and Safety Policies and Operational Procedures; • Environmental, health, safety and security management structuring; • Environmental, health, safety and security committee; • Environmental and social monitoring programmes; • Audits and reviews; • Public participation; • Grievance redress mechanism; and • Environmental and social management budgeting Budget and Schedule of Work The budget estimate for the E&S safeguards as determined under this ESMP, including cost for administration, monitoring and evaluation is N38,377,500.00 (Thirty Eight Million Three Hundred and Seventy Seven Thousand Five Hundred Naira) only. The proposed budget will facilitate the implementation of the various ESMP management, monitoring plan and capacity building measures to be executed by the SPMU and should be made an integral part of financing for the Funtua intervention and development project. The specific E&S safeguards obligations for the contractor should be incorporated into the contract specifications along with other contract provisions. The estimated mitigation cost for the environmental and social management Plan has been developed with due consideration in the three project phases (pre- construction, construction and post-construction) to the following factors: • The magnitude of the flood control problem; • The type of technology to be employed; • The volume of the project affected households and persons; and, • The area of coverage of the proposed project. Disclosures This ESMP will be to public review and it should be disclosed in the state to the general public for review and comment at designated locations in Katsina State and in World Bank Information Website. Display centers will include Katsina NEWMAP SPMU office, NEWMAP FPMU office, EA Department of FMEnv., Office of State Commissioner for Environment, LGA NEWMAP Liaison office, Project Community, and Office of the State Commissioner for Local Government matters. Contractor Responsibility for Implementation of ESMP The Contractor shall be responsible for implementing all impact mitigation measures as detailed in the ESMP provisions of the ESMP Report for the project. Prospective Construction Contractors are therefore required to competitively bid for the implementation of the Impact Mitigation Measures. The Mitigation Measures are contained in Tables 6.1 of this ESMP Report. Bidding Contractors are also required to include as part of their costs all elements Page 23 associated with (i) ESMP Management, (ii) Mitigation Monitoring, and (iii) Capacity Building & Trainings as provided in Table 6.9 of this ESMP Report. This shall be a one line item in the BEME to ensure adequate budget. Bidding Contractors are further required to provide Environmental, Social, Health and Safety (ESHS) Performance Guarantee to the tune of the SPMU-specified sum or percentage of the project cost in accordance with the new World Bank ESHS requirement. For purposes of clarity, ALL BIDDING CONTRACTORS shall obtain as part of the bidding process a full copy of the ESMP Report prepared for this project to fully understand the scope of the ESMP implementation and required mitigation actions. In the event that the ESMP Report is not provided, the contractor shall request for it from the SPMU as part of the bidding process requirements. Contractor’s Environmental and Social Management Plan (C-ESMP) The contractor is required to provide a C-ESMP to guide its operation during the project implementation – the provision of the project ESMP notwithstanding. This management plan is expected to address all that the contractor plans to do at different phases following the prepared ESMP. Page 24 CHAPTER 1: INTRODUCTION 1.1 Background The Government of Nigeria is implementing the multi-sectoral Nigeria Erosion and Watershed Management Project (NEWMAP), which is financed by World Bank (WB), Global Environment Facility (GEF), the Special Climate Change Fund (SCCF), and the Federal Government of Nigeria (FGN). NEWMAP was initiated by the FGN and is currently being implemented in 20 states, namely Anambra, Abia, Cross River, Edo, Enugu, Ebonyi, Imo, Delta, Sokoto, Akwa Ibom, Gombe, Plateau, Kogi, Kano, Ondo, Oyo, Katsina, Borno, Niger, and Nasarawa States. The project is designed to support participating States in reducing vulnerability to flood and erosion and to develop the states’ watershed. Katsina State is located in the Northwest geopolitical zone of Nigeria. The development objective of NEWMAP is to rehabilitate degraded lands and reduce long-term flood and erosion vulnerability in target areas. In Katsina State, NEWMAP activities involve medium-sized civil works such as construction of infrastructure and/or stabilization or rehabilitation of existing degraded stormwater drainage systems and flood plains as well as small works in the small watershed where erosion gullies develop and expand. The lead agency at the FGN level is the Federal Ministry of Environment (FMEnv.), Department of Erosion, Flood and Coastal Zone Management. The Katsina State Ministry of Environment through the State Project Management Unit (SPMU) is responsible for the implementation of NEWMAP activities at the State level. The location coordinates of Nigeria are latitude 9 o4’55.2”N and longitude 8o40’31”E. Katsina State is located in the Northwest geopolitical zone of Nigeria and takes the shape of a mushroom extending longitudinally from 7o03’E to 9o05’E in the northern part and from 6o52’E to 7o52’E in the southern part of the state. The State stretches between approximately latitude 11o10’N and 13o22’N. The State was carved out of old Kaduna State in 1987 and is bounded to the East by Kano State, to the West by Zamfara State, in the South by Kaduna State and in the North by the Niger Republic. The capital city of Katsina State is Katsina Town. Funtua town is one of the many towns and cities in Katsina State whose communities are perennially devastated by floods and soil erosion resulting from storm water flow. The flood and erosion hazards of the town has caused major property losses to residents and remain a serious threat to lives in the communities. The stormwater drainage systems in Funtua have severely degraded over the years lacking adequacy and maintenance. These drainage systems have become corridors of most floods and erosion hazards in the town creating severe structural and environmental damages to the communities and causing destruction to homes, properties, and farmlands as well as causing unprecedented siltation of the community stream and low lands. Along these degraded stormwater drainage corridors, several key access roadways have been either completely washed away or cut through making the roads unusable and vehicular movements very difficult or halted. It is anticipated that the damaging impacts of the floods and erosion resulting from the degraded stormwater drainages within and outside the various communities will increasingly be more devastating to the residents with each cycle of the rainy season. Urgent intervention is therefore Page 25 needed at the town to salvage the environment, save lives, property and infrastructure and to restore the people’s confidence in Government. In an effort to redress the impacts of flooding and erosion within and around the town of Funtua, the Katsina State Government (KTSG) has targeted to rehabilitate and reconstruct the various stormwater drainage systems through the NEWMAP opportunity. Figure 1.1 is the map of Nigeria showing the location of Katsina State while Fig. 1.2 shows Katsina State showing the Local Government Areas (LGAs) and the project locations. Fig. 1.1: Map of Nigeria Showing Location of Katsina State Fig. 1.2: Map of Katsina State Showing LGAs and Project Locations (Source: Von.gov.ng) 1.2 Description of Proposed Intervention Areas The project goal is to design and develop effective stormwater drainage systems for Funtua, town with proper channelization to appropriately convey stormwater from within them to safe locations at their outskirts. The safely discharged water is expected to flow into nearby natural rivers/streams. 1.2.1 Project Area and Terrain Features: A general description of the project activities for Funtua is as given in Table 1.1. The location coordinates of the town is also shown in the Table. The satellite imageries showing the general locations of the project area is shown in Figure 1.3. Table 1.1 Funtua Project - Activity Descriptions Location Coordinates S/No Project Area Activity Description Easting Nothing Stormwater drainage 1 Funtua Town N11° 31.692ʻ E007° 17.257ʻ reconstruction; Access roads, and watershed rehabilitation Source: Consultant Field Data (July 2019) 1.2.1.1 Funtua Stormwater Drainage Terrain Features: The existing Funtua Town Stormwater Drainage system is located between Tudun Wada and the Funtua Bye Pass drain system within the Funtua township and lies approximately within latitude 11° 31.345′, longitude 07° 19.018′, Height: 697.272m Page 26 and latitude 11°33.345′, longitude 07° 18.807′, Height: 666.348m. The town is fully built up and densely populated. The area covered by the built-up areas is about 7.50Km2 representing 65.7% of the Funtua Town Stormwater Catchment area. The land is used for various purposes such as residential, educational and health facilities, mosques and churches, and other socio-economic facilities such shops, fuel stations etc. Funtua is one of the major towns in Katsina State that experiences flooding during the rainy season, mainly due to non-effective storm water drainage systems passing through the towns and this has resulted in loss of properties, livestocks and even lives. The town has a major stream that runs through it fed by some minor tributaries and some of these tributaries are used as the main storm water drainage system. Most of the existing drainage structures in the town are either dilapidated or of inadequate drainage size and in some cases concrete structures surrounding culverts and bridges have been washed away. The proposed drainage works are approximately 6.83km in total length and generally pass through level terrains and some built up areas within Funtua. The stormwater drainage corridor can be seen from the satellite view of the project area shown in Figure 1.3. Fig. 1.3: General Satellite View of Funtua Stormwater Drainage Corridors (Source: OTG Graphic Designs) 1.2.2 General Field Observations From the Funtua field visits, the following factors were identified as generally being responsible for the flooding menace in the area: • Prolonged and intense rainfall; Page 27 • Disposal of wastes by the people into open drains and the blockage of culverts and drainage channels by these wastes; • Growth of vegetation in channels; • Encroachment of physical structures such as houses, schools, religious centres, and commercial enterprises into setbacks of rivers/streams; • Increased urbanization resulting in increased surface areas of impervious surfaces that produce runoff exceeding the capacity of the hydraulic structures. • Blockage of bridges, culverts and drainage channels due to high sediment yield from construction activities and several earth roads; • Transformation and sand-filling of areas that were initially floodplains for residential, commercial, and religious land use. 1.3 Project Rationale: Funtua Town is one of the major town in Katsina State which experience incessant flooding due to heavy rainfall in the communities. The flood and erosion hazards within this town have caused loss of properties to the residents and continue to pose serious threats to lives and properties to community members. Many community members have also lost their homes, lands and properties to the devastating floods and erosive actions of stormwater. It is highly envisaged that the damaging impacts of stormwater and floods will increasingly be more devastating with each passing raining season and as the density of settlements increase in the catchment area. There is a perpetual palpable fear of losing lives particularly children, to the floods among the residents of the area while economic activities are often disrupted with increased cost of movements. Involuntary resettlement can cause loss of income, assets, and community ties that, especially among the poor, can be essential for survival and well being. In extreme cases, involuntary resettlement can lead to the dissolution of families, impoverishment and health problems. Urgent intervention is therefore needed at the stormwater drainage corridors for the environment of these towns to be salvaged, save lives, property and government infrastructure and to restore the people’s confidence in Government. 1.4 Project Description: Based on the engineering design concepts developed by ENPLAN Group for the project sites, the proposed erosion control measures include the main structures for the drainage bed system and the bank stabilization measures. The designed drainage bed system comprise the following structures: • Drain Inlet Structure; • Lined canal for the total length; • Chute structure with stilling basins; • Drop structures; and, • Exit system/outlet structure The designed bank stabilization measures include: • Gabion retaining wall; • Slope cutting with geo-textile and grass; and, • Bio-remediation grass planting. Page 28 1.4.1 Funtua Stormwater Drainage Intervention: The town has a major stream that runs through it fed by some minor tributaries and some of these tributaries are used as the main storm water drainage system. The length of the proposed drainage intervention is approximately 6.83km and generally passes through level terrains and some built up areas. The drainage system consists of 7 main drains - the longest being about 4.84km long - running through the town and causing damage to existing lands and structures. These drains discharge storm waters within the town to Belan Gada - a location at the outskirts of the town. Table 1.2 shows the design dimensions of the proposed Funtua drainage works while Fig. 1.4 shows the Funtua drains and their catchment areas. The proposed Funtua drainage system layout design is shown in Fig. 1.5. Fig. 1.4: Funtua Drains and Their Catchment Areas Source: Enplan Group Engineering Design Report (Nov. 2018) Table 1.2: Dimensions of the Proposed Funtua Drainage Works Drain Length Maximum Channel Bed Top Channel Description Name (km) Depth (m) Width (m) Width (m) Drain 1 Major 4.84 1.595 6.00 10.785 Drain 2 Minor 1.13 1.020 2.25 5.310 Drain 3 Minor 0.15 0.112 2.25 2.586 Drain 4 Minor 0.11 0.696 2.25 4.338 Drain 5 Minor 0.30 0.100 2.25 2.550 Drain 6 Minor 0.14 0.100 2.25 2.550 Page 29 Drain Length Maximum Channel Bed Top Channel Description Name (km) Depth (m) Width (m) Width (m) Drain 7 Minor 0.16 0.100 2.25 2.550 TOTAL 6.83 Source: Enplan Group Engineering Design Report (Nov. 2018) Fig. 1.5: Funtua Drainage System Layout Source: Enplan Group Engineering Design Report (Nov. 2018) Based on the project engineering designs, the principal features of the proposed flood and erosion control measures for the Funtua project include: 1) The construction of concrete and Reno-mattress drainage canals, drainage bank protection works using stone pitching and grass, provision of toe protection, provision of box culverts, energy dissipaters, stilling basin for the main drainage corridors. 2) Stabilization of the existing components of the stormwater drainage using reinforced concrete canals, bio-remediation using grass; Civil Construction Works: • The key activities in putting up the civil works include: ➢ cutting and filling for percentage recovery ➢ concrete casting ➢ assembling of structures and, ➢ slope stabilization. Page 30 • The foundations of the lattice structures and concrete casting may be dug mechanically. The depth will be consistent with the geotechnical study and the engineering designs. • Vegetation clearing will be done manually. • A number of transport vehicles shall be employed in the project but there will be no on-site maintenance of vehicles. • Powered equipment is expected to be used in the construction (as required) as well as earth moving equipments such as excavators, compactors, bulldozers and pay loaders; • Skilled and unskilled labour shall be employed in the project. 1.5 Rationale for ESMP The World Bank safeguard policies are designed to ensure that projects proposed for financing by the Bank or its affiliate Agencies are environmentally and socially sustainable, and thus improve the decision-making process associated with the project. The NEWMAP project is being funded by the World Bank and other affiliate agencies. The ground interventions as proposed for the Funtua stormwater drainage projects will address, prevent and expectedly reverse the perennial flooding and land degradation within the project areas, and will involve construction of civil works and rehabilitation of the existing flood plain. These activities, according to the NEWMAP ESMF, trigger the WB Safeguard Policies that include Environmental Assessment (OP/BP 4.01), Involuntary Resettlement (OP/BP 4.12), Cultural Physical Property (OP 4.11). In fulfillment of the World Bank safeguard policy requirements, and considering the high magnitude and level of significance of the environmental and social impacts associated with the Funtua stormwater drainage interventions, the ESMP serves as a safeguard instrument that documents the necessary mitigation, monitoring and institutional actions to be carried out with the implementation of the subproject to eliminate adverse environmental and social impacts or reduce them to an acceptable level. The Funtua project consist of remedial structural and non-structural developments that include civil works and earth works, and vegetative protection to prevent further erosion and land degradation as well as provide aesthetic view along the stormwater drainage corridors.. These activities will result in several environmental and social impacts which must be considered and properly addressed to ensure that the environment is not further degraded unreasonably and the socioeconomic life of the people is not adversely disrupted. Consequent upon these, this ESMP is required to provide necessary procedures and criteria that will guide the proposed Funtua stormwater drainages interventions in accordance with the World Bank Safeguard Policies and the Nigerian national environmental policies, guidelines and assessment procedures as well as those of Katsina State and the local agencies. 1.6 ESMP Objective: The objective is to prepare an Environmental and Social Management Plan (ESMP) for the Funtua, stormwater drainage intervention project. This ESMP specifically identifies and assesses the environmental and social impacts that may be associated with the planned intervention projects as designed and all other activities aimed at rehabilitating the drainage corridors within the project watershed. The ESMP also identifies, evaluates and documents the set of mitigation, monitoring and institutional actions to be taken before, during and after remedial construction and Page 31 rehabilitation works to eliminate any identified adverse environmental and social impacts, offset the impacts or reduce the impacts to acceptable levels. The potential impacts associated with the phases of the designed site interventions consisting of pre-construction, construction, and operation and maintenance (O&M) are developed and appropriate mitigation measures established for the impacts. This Environmental and Social Management Plan (ESMP) includes measures needed to implement the identified actions, addressing the adequacy of the monitoring and institutional arrangements for the upper and lower watersheds on a sustainable basis. The ESMP provides necessary institutional framework and monitoring actions to be taken before, during and after the construction and development works. This ESMP also includes measures necessary to implement identified actions, addressing the adequacy of the monitoring and institutional arrangements for mitigation of all identified environmental and social impacts associated with the project on a sustainable basis. The mitigation measures adopted are guided by and consistent with recommendations in the updated Environmental and Social Management Framework (ESMF) for NEWMAP. The following project-specific background documents were reviewed and together with collected field-based information and data formed basis upon which analytical determinations were made for this ESMP: • Updated Environmental and Social Management Framework (ESMF) • NEWMAP Project Appraisal Document (PAD) • NEWMAP Project Implementation Manual (PIM) • World Bank Safeguards policies • Intervention design • ToR For ESMP 1.7 Phases of Intervention Works: The proposed project scope of work can generally be divided into three phases, namely: 1. Pre-construction phase; 2. Construction phase; and, 3. Post-construction (maintenance) phase. 1.7.1 Pre-construction Phase As part of the pre-construction stage, SMEnv/KTS-NEWMAP commissioned ENPLAN Group to develop the detailed engineering design for the remedial intervention and development of the stormwater drainage systems in Funtua town. The preparation of this ESMP and a separate Resettlement Action Plan (RAP) forms part of the pre-construction phase. The commencement of the remedial construction activities is expected to begin after the completion of the ESMP and RAP process. 1.7.2 Construction Phase The construction of the flood and erosion control infrastructure for the target town and the drainage systems development activities, will require the use of existing access roadways to reach sections of the project locations. Some of these access roadways will need to be rehabilitated as part of the construction works. The preparation of the construction staging areas will require some localized vegetation clearance along the stormwater drainage corridors and the removal of Page 32 incipient solid waste materials. Materials arising from excavations for the drainage corridors, foundations, stabilization walls (soil, rock etc.) and installation of gabions would be used to fill appropriate areas. The foundations will be in-filled with cement supplied via ready-mix-cement trucks or alternatively mixed on site. Vegetation clearing may be done manually or mechanically. A number of transport vehicles will be employed in the project but there will be no on-site maintenance of vehicles. The power equipment is expected to be used in the construction including power saws and compressors to break hard ground (if required). Earth moving equipment such as excavators, compactors, bulldozers and pay loaders will also be used at the site. Additionally, skilled and unskilled labor will be employed during the project implementation. 1.7.3 Post-Construction (Operations & Maintenance) Phase Routine visual inspection and maintenance of the rehabilitated stormwater drainage corridors are expected. Access rights may need to be retained through the community watershed association to allow for maintenance works in the future. The flood and erosion control corridor will require routine periodic maintenance of the site infrastructure (culverts, gabions, drainage channels, roadways etc) as well as necessary oversight of any economic trees associated with the project. Page 33 CHAPTER 2: INSTITUTIONAL AND LEGAL FRAMEWORK This ESMP is guided by the requirements of the relevant and applicable state, national and international regulation, guidelines, conventions, industrial best management practices including the World Bank safeguard policies that are triggered by the project. The relevant legal and institutional framework applicable to NEWMAP has been fully discussed in the ESMF. These legal requirements and regulations are summarized below: 2.1 World Bank Environmental and Social Safeguard Policies 2.1.1 Triggered WB Safeguard Policies The WB Integrated Safeguard Data Sheet (ISDS) for NEWMAP indicates that only three of the WB Safeguard Policies may be triggered by the project. These include OP 4.01 Environmental Assessment; OP 4.12 Involuntary Resettlement and OP 7.50 Projects on International Waterways. Based on the scope of construction and rehabilitation works required in the stormwater drainage rehabilitation interventions at Funtua, town as well as the specific rehabilitation activities proposed, Table 2.1 (Triggered Safeguard Policies for Funtua, Project) summarizes the World Bank Safeguard Policies determined to be triggered by the four Sub-projects. Table 2.1: Triggered Safeguard Policies Triggered by Triggered by How Project Funtua Rehab Applicable To WB Safeguard Policy NEWMAP? Addresses Policy Projects? Project Due To Requirements YES NO YES NO Environmental Assessment [x] [ ] [x] [ ] Civil works with site- ESMF prepared for (OP/BP4.01) specific impacts NEWMAP & site specific mitigation measures developed in this ESMP Natural Habitats [ ] [x] [ ] [x] NA* NA (OP/BP4.04) Pest Management (OP 4.09) [ ] [x] [ ] [x] NA NA Physical Cultural Resources [ ] [x] [x] [ ] This policy is not This ESMP spells (OP/BP 4.11) triggered by out appropriate site NEWMAP. However, specific mitigation the existence of measures in the cultural relics within event of existence the project areas may of any cultural relics be an issue for consideration Involuntary Resettlement [x] [ ] [x] [ ] Restriction of access RPF prepared for (OP/BP4.12) to sources of NEWMAP will livelihood. guide required resettlements at the Funtua project locations. A standalone RAP is necessary to spell out site specific issues to be addressed & how. Indigenous Peoples [ ] [x] [ ] [x] NA NA (OP/BP4.10) Forests (OP/BP4.36) [ ] [x] [ ] [x] NA NA Safety of Dams (OP/BP4.37) [ ] [x] [ ] [x] NA NA Projects in Disputed Areas [ ] [x] [ ] [x] NA NA (OP/BP7.60)* Page 34 Triggered by Triggered by How Project Funtua Rehab Applicable To WB Safeguard Policy NEWMAP? Addresses Policy Projects? Project Due To Requirements YES NO YES NO Projects on International [x] [ ] [ ] [x] Katsina state is not a NA Waterways (OP/BP7.50) coastline state in Nigeria. The subproject therefore does not trigger this policy NA* = Not Applicable The applicable World Bank safeguard policies identified for Funtua subproject include: OP 4.01 Environmental Assessment, OP 4.11 Physical Cultural Resources and OP 4.12 Involuntary Resettlements. These World Bank safeguard policies are summarized as follows: 2.1.2 Environmental Assessment (EA) (OP 4.01): An EA is conducted to ensure that Bank-financed projects are environmentally sound and sustainable, and that decision- making is improved through appropriate analysis of actions and of their likely environmental impacts. Any World Bank project that is likely to have potential adverse environmental risks and impacts in its area of influence requires an EA indicating the potential risks, mitigation measures and environmental management framework or plan. 2.1.3 Physical Cultural Resources (OP 4.11): This policy addresses physical cultural resources, which are defined as movable or immovable objects, sites, structures, groups of structures, and natural features and landscapes that have archaeological, paleontological, historical, architectural, religious, aesthetic, or other cultural significance. Physical cultural resources may be located in urban or rural settings, and may be above or below ground, or under water. Their cultural interest may be at the local, provincial or national level, or within the international community. 2.1.4 Involuntary Resettlement (OP 4.12): Key objectives of the World Bank’s policy on involuntary land acquisition are to avoid or minimize involuntary resettlement where feasible, exploring all viable alternative project designs; assist displaced persons in improving their former living standards, income earning capacity and production level, or at least in restoring them; encourage community participation in planning and implementing resettlement; and provide assistance to affected people regardless of the legality of land tenure. The policy covers not only physical relocation, but any loss of land or other assets resulting in relocation, or loss of shelter; loss of assets or access to assets; loss of income sources or means of livelihood whether or not the affected people must move to another location. When the policy is triggered, a Resettlement Action Plan (RAP) must be prepared. An abbreviated plan may be developed when less than 200 people are affected by the project. In situations, where all the precise impacts cannot be assessed during project preparation, provisions are made for preparing a Resettlement Policy Framework (RPF). The RAP/RPF must ensure that all Bank’s policy provisions detailed in OP 4.12 are addressed particularly the payment of compensation for affected assets at their replacement cost. 2.2 Federal Policy, Legal, Regulatory and Administrative Frameworks Pursuant to Section 20 of the Nigerian 1999 Constitution, the state is empowered to protect and improve the environment and safeguard the water, air, and land, forest, Page 35 and wildlife of Nigeria. The power to regulate all environmental matters in Nigeria is vested in the Federal Ministry of Environment (FMEnv) – a mandate that previously rested with the now defunct Federal Environmental Protection Agency (FEPA) set up by Federal Act 88, of 1988. The applicable environmental laws include the Environmental Impact Assessment Act No. 86 of 1992; the National Guidelines and Standards for Environmental Pollution Control in Nigeria (March 1991); the National Environmental Standards and Regulations Enforcement Agency (establishment) Act 2007 (NESREA), the Land Use Act 1978 (modified in 1990); the Forestry Act 1958; and the National Agricultural Policy 1988. 2.2.1 National Policy on Environment The national policy on environment, 1989 (revised 1999), provides for “a viable national mechanism for cooperation, coordination and regular consultation, as well as harmonious management of the policy formulation and implementation process which required the establishment of effective institutions and linkages within and among the various tiers of government – federal, state and local government”. The defined guideline and strategies provide for the effective management of the environment in the following 14 major areas: Human population; Land use and soil conservation; Water resource management; Forestry; Wildlife and protected areas; Marine and coastal area resources; Toxic and hazardous substances; Energy production and use; Air pollution; Noise pollution; Toxic and hazardous substances; Recreational space; Greenbelts movements; and, Cultural property. 2.2.2 National Environmental Impact Assessment Act 1992: National EIA Act 1992, Clause 2 provides that public or private sector of the economy shall not undertake or embark on or authorize projects or activities without prior consideration of the effects on the environment. The act makes an EIA mandatory for any development project, and prescribes the procedures for conducting and reporting EIA studies. As part of the effective utilization of the EIA tool, the ministry has produced sectarian guidelines. 2.2.3 Nigerian Land Use Matters The basic legal framework for the acquisition of land in Nigeria is the Land Use Act 1978 as amended under the Amended Land Use Act of 2004, Chapter L5 under the laws of the Federation of Nigeria. The Part 1 of the amended Act 2004 vests all land within the urban areas of any Nigerian State in the Executive Governor of that state. Land within the rural areas of the state is vested on the Local Government. The Part VI, Section 29 of the law provides for compensation to the holder of any land title when such land is to be acquired for public purposes. For developed land, the Governor (in the case of urban areas) or Local Government (in the case of rural areas) may, in lieu of compensation, offer resettlement in any other place as a reasonable alternative accommodation and in acceptance of resettlement, the holder’s right to compensation shall be deemed to have been duly satisfied. Although the Land Use Act is not strictly an Act for environmental protection, protection of the environment is one of the considerations which a holder of certificate of occupancy has to observe. Page 36 2.2.4 National Erosion and Flood Control Policy 2005: The general soil erosion & flood control guidelines provide necessary instructions for soil and water resources users to develop, implement and monitor plans that are to assure erosion and flood hazard mitigation. The maintenance of levees and other protective structures are also to be developed at areas with potential impacts. In addition to this, all requests for project plan approvals must include soil type and drainage pattern/structures in and around project area and the likely impact of the project on these duly certified. 2.2.5 NESREA Establishment Act, 2007. The National Environmental Standards and Regulations Enforcement Agency (NESREA) has responsibility for the enforcement of the environment regulations and biodiversity conservation, including coordination and liaison with relevant stakeholders within and outside Nigeria on matters of enforcement of environmental standards, regulations, rules, laws, policies and guidelines. The following NESREA National Environmental Regulations are considered relevant in this study: • National Environmental (Construction Sector) Regulations. 2011; • National Environmental (Soil Erosion and Flood Control) Regulations. 2011; • National Environmental (Desertification Control and Drought Mitigation) Regulations. 2011; • National Environmental (Surface and Ground Water Control) Regulations. 2011; • National Environmental (Watershed, Mountainous, Hilly and Catchment Areas) Regulations, 2009. 2.2.6 National Guidelines and Standards for Environmental Pollution (March, 2001): The National Guidelines and Standards for environmental pollution control in Nigeria (March, 2001) is the basic instrument for monitoring and controlling industrial and urban pollution. 2.2.7 National Waste Management Regulations of 1991 This regulation which is updated under the National Environmental (Sanitation and Waste Control) Regulations 2009, S.I. No. 28 mandates the collection, treatment, and disposal of solid and hazardous waste from municipal and industrial sources. It provides the legal framework for the adoption of sustainable and environment friendly practices in environmental sanitation and waste management to minimize pollution. 2.2.8 Approved National Forestry Policy 2006 The extant national forest policy which is included within the document “Agricultural Policy for Nigeria” published by the Federal Ministry of Agriculture in 1988 recognized forestry as the management and utilization of forests as renewable natural resources. The policy overall objective is to achieve sustainable forest management that would ensure sustainable increases in the economic, social and environmental benefits from forests and trees for the present and future generation including the poor and the vulnerable groups. The Forest Policy encourages and supports an aggressive establishment of plantations of economic trees of both exotic and indigenous species. It provides for the preservation of forest and the setting up of forest reserves, and also provides Page 37 goals, targets and implementation strategies for the management, development and use of forests and their resources and products. Nigeria is at present a wood deficit nation. The policy on forest resources management and sustainable use is aimed at achieving self-sufficiency in all aspects of forest product through the use of sound forest management techniques as well as the mobilization of human and material resources. The overall objectives of forest policy are to prevent further deforestation and to recreate forest cover, either for productive or for protective purposes, on already deforested fragile land. The national biodiversity conservation strategy continues to be based on a system of Protected Areas, including Forest Reserves, National Parks and Game Reserves. In recognition of the fact that the local communities must share from the benefits of these Protected Areas, there must be a meaningful participation of these communities in their management. Efforts to safeguard biodiversity in private forests and to improve agricultural biodiversity through farm forestry initiatives must be supported. Government has signed a number of international agreement and conservators that are relevant to the forestry development. It is obligatory that Government should honour these agreements and instruments through domestic legislation; and action. Intergovernmental, bilateral and multilateral cooperation will be upheld to promote sustainable development of forest resources. 2.3 Other Relevant Acts and Legislations at Federal Level Nigeria subscribes to a number of international regulations and convections relating to Environmental Protection. The assessments and management standards of these international development partners/agencies, such as World Bank and other financial organizations, must be compiled with by project proponents before these institutions will invest in the projects. These guidelines/conventions/treaties to which Nigeria is a signatory are summarized below. 2.3.1 The Basel Convention on the Control of Transboundary Movement of Hazardous Waste and Disposal, 1989 The convention focuses attention on the hazards of the generation and disposal of hazardous wastes. The convention defines the wastes to be regulated and controls their trans-boundary movement to protect human and environmental health against their adverse effects. 2.3.2 UN Framework Convention on Climate Change – Kyoto Protocol (1992) In order to achieve sustainable social and economic development, energy consumption for developing countries needs to grow taking into account the possibilities for achieving greater energy efficiency and for controlling greenhouse gas emissions in general. This also includes the application of new technologies on terms which make such an application economically and social beneficial, determined to protect the climate system for present and future generations. 2.3.3 Agenda 21 - UN Conference on Environment and Development At the United Nations Conference on Environment (also the Earth Summit) – held in Rio de Janeiro (1992), with recommendations from the WHO Commission, more than 150 member states adopted Agenda 21 - an action plan to guide future strategies for health and environment activities on a national and international level. This fact provided the background for FEPA’s EIA framework to ensure Page 38 environmental sustainability of all types of activities in the oil and gas industry (FEPA, 1995). 2.3.4 Public Health Legislations and regulations Several countries have legislation and regulations that stipulate the administrative and policy framework for conducting health impact assessment for a development project, whether as part of an EIA or a standalone study. In addition, a number of international agencies have endorsed this process, such as the World Banks, Asian Development Commission, and the World Health Organizations. In Nigeria, the Public Health Law (L.N47 of 1955, Cap 103) provides justification for the execution of developmental projects under guidelines that promote health by protecting the environment and safeguarding the health of humans. 2.3.5 WHO Health and Safety Component of EIA, 1987 WHO in its report on health and safety component of environment impact assessment (EIA) to protect human health indicates that: i. One of the fundamental considerations in the approval of projects, policies and plans should be the health of communities affected by them; greater consideration should be given to the consequence of development policies/programs for human health; ii. Environmental Impact Assessment should provide the best available factual information on the consequence for health of projects, policies and plan; and iii. Information on health impact should be available to the public. 2.3.6 Convention on Conservation of Migratory Species of Wild Animals, Bonn, 1979 The Bonn convention concerns the promotion of measures for the conservation (including habitat conservation especial for endangered species and management of migratory species.) 2.3.7 United Nations Guiding Principle on the Human Environmental The United Nation (UN) published the concept of guiding principles on the Human Environment in 1972. Ten of these Guiding Principles were defined as formal declarations that express the basis on which an environmental policy can be built and which provide a foundation for action. 2.3.8 The Rio Declaration on Environmental and Development The UN Conference on Environment and development met at Rio de Janeiro in June 1992, at which time it reaffirmed the 1972 declaration on the Human Environment, and sought to build upon it. This was done with the goal of establishing a new and equitable global partnership through the creation of new levels of cooperation among states, key sectors of societies and people. It was also to aid work towards international agreements, which respect the interest of all, protect the integrity of the global environmental development system, and recognize the integral and interdependent nature of the earth. Other relevant international conventions include: • Africa Convention on the Conservation of Natural Resources of 1969 • Convention on the Law of the Seas of 1982 • The Ramsar Convention on Wetlands of 1971 Page 39 2.4 State Legislations 2.4.1 Katsina State Waste Management Act This Acts provides for the effective development and maintenance of sanitation in all areas of the State. The law further provides for proper disposition of excavated silt or earth and other construction materials after any construction project or repair works. Open burning of wastes is prohibited with stipulated penalties. 2.5 Gaps between Nigerian Legislation and World Bank Policies The gaps between the triggered Nigerian current legislation and WB policies as they relate to this project are summarized in Table 2.2 below: Table 2.2: Gaps between Nigeria Legislation and WB Policies Project Triggered Nigerian Legislation World Bank Policy Gaps Between the Policies Policies OP 4.01 National EIA Act 1992, Clause 2 provides An EA is conducted to ensure that Bank- Nigeria currently has a Environmental that public or private sector of the economy financed projects are environmentally comprehensive framework for Assessment shall not undertake or embark on or sound and sustainable, and that decision- assessing and managing the authorize projects or activities without prior making is improved through appropriate environmental impacts of consideration of the effects on the analysis of actions and of their likely development projects. However, environment. The act makes an EIA environmental impacts. Any World Bank in comparison with the World mandatory for any development project, and project that is likely to have potential Bank Safeguard Policies, it would prescribes the procedures for conducting adverse environmental risks and impacts appear that the Nigeria and reporting EIA studies. As part of the in its area of influence requires an EA framework lacks the provision of effective utilization of the EIA tool, the indicating the potential risks, mitigation clear requirements or guidance in ministry has produced sectarian guidelines. measures and environmental the assessment of the impact of Responsibility for monitoring of EIA activities management framework or plan. an activity on public health. lies with the NESREA and State ministries In this case the policy of the bank of environment but these agencies lack the prevails. logistic capability to carry out the tasks assigned to it by the law OP 4.11 National Commission For Museums and The Bank seeks to assist countries to There is no difference in the Physical Monuments Act of 1990, Chapter 242 seeks manage their physical cultural resources frameworks of both policies. Both Cultural to protect and preserve any objects of and avoid or mitigate adverse impact of policies provide for discovery and Resources archaeological interest wherever they may development projects on these resources. documentation and management be found. Any person who discovers an This policy is triggered for any project that of physical cultural resources. object of archaeological interest in the requires an EA. However, responsibility for course of operations permitted under monitoring of activities and section 19 of this Act shall notify the enforcement under the Nigerian Commission. Regulations is effectively lacking. In this case the policy of the bank prevails. OP 4.12 The basic legal framework for the Key objectives of the World Bank’s policy Essentially, there is no difference Involuntary acquisition of land in Nigeria is the Land Use on involuntary land acquisition are to in the main framework of both Resettlement Act 1978 as amended under the Amended avoid or minimize involuntary resettlement policies. Both policies require Land Use Act of 2004, Chapter L5 under the where feasible, exploring all viable that compensation be paid for laws of the Federation of Nigeria. The Part 1 alternative project designs; assist land acquired for public benefit. of the amended Act 2004 vests all land displaced persons in improving their The Nigerian regulations within the urban areas of any Nigerian State former living standards, income earning however while lacking clear in the Executive Governor of that state. capacity and production level, or at least responsibility for monitoring of Land within the rural areas of the state is in restoring them; encourage community activities associated with vested on the Local Government. The Part participation in planning and implementing compensations further lack VI, Section 29 of the law provides for resettlement; and provide assistance to provisions of logistics to carry out compensation to the holder of any land title affected people regardless of the legality the tasks assigned to the legal when such land is to be acquired for public of land tenure. The policy covers not only enforcement agency. Lands that purposes. For developed land, the Governor physical relocation, but any loss of land or would be acquired for this project (in the case of urban areas) or Local other assets resulting in relocation, or loss shall be fully compensated for in Government (in the case of rural areas) of shelter; loss of assets or access to accordance with the World Bank may, in lieu of compensation, offer assets; loss of income sources or means policy and principles. resettlement in any other place as a of livelihood whether or not the affected reasonable alternative accommodation and people must move to LIDther location. in acceptance of resettlement, the holder’s When the policy is triggered, a right to compensation shall be deemed to Resettlement Action Plan (RAP), must be have been duly satisfied. prepared. An abbreviated plan may be Although the Land Use Act is not strictly an developed when less than 200 people are Act for environmental protection, protection affected by the project. In situations, of the environment is one of the where all the precise impacts cannot be considerations which a holder of certificate assessed during project preparation, of occupancy has to observe. provisions are made for preparing a Resettlement Policy Framework (RPF). Page 40 Project Triggered Nigerian Legislation World Bank Policy Gaps Between the Policies Policies The RAP/RPF must ensure that all Bank’s policy provisions detailed in OP 4.12 are addressed particularly the payment of compensation for affected assets at their replacement cost The summary descriptions of the WB Safeguard Policies are included as Annexure III. Page 41 CHAPTER 3: DESCRIPTION OF AREA OF INFLUENCE AND ENVIRONMENTAL BASELINE CONDITIONS 3.1 Introduction This Section discusses the project area of influence as well as the general and specific baseline conditions that characterize the project areas. The discussions are in three parts consisting of (i) the project area of influence; (ii) general environmental conditions; and, (iii) site specific environmental conditions focusing on the stormwater drainage rehabilitation site that make up the project area. 3.1.1 General Conditions The project area environmental characteristics which cut across the Funtua stormwater drainage corridors are discussed under Sections 3.2 through 3.7. The geologic and soil characteristics of the project area and the extent to which implementation of the proposed project could be affected by soil characteristics and other natural environmental factors are summarized below. The natural environmental factors include climate and vegetation, topography and landforms, hydrogeology and hydrologic patterns. Information sources for this evaluation include published literature, preparation of surface geologic map, geotechnical investigation conducted by ENPLAN Group – the engineering design Consultant for the projects, and the physical observations made during sites’ inspections in the course of the Consultancy. Prevailing climatic conditions were sourced from online and existing literature sources (see Section on References) complimenting field data to establish the project area rainfall, ambient temperature, wind direction and speed, atmospheric pressure and relative humidity. Information and data relating to the vegetation, topographic, geological, hydrogeological, hydrological and hydraulic nature of the area were used to fully characterize the sub-watershed. Road transect or quadrates method was used to sample flora/fauna. 3.2 Baseline Environmental Setting 3.2.1 Climate Katsina State falls within the dry sub-humid agro-climatological zone of Sudan and Guinea Savannah vegetation zone. Generally, the climate of the project area is semi-arid tropical climate with marked wet and dry seasons. Rainfall is concentrated mainly in the northern hemisphere in summer when the Inter Tropical Discontinuity (ITD) or the Inter Tropical Convergence Zone (ITCZ) which forms the boundary between the moist equatorial air and the drier tropical air is located over the state. During the mid-summer months of June – August, south-westerly winds predominate and the relative humidity ranges from about 95 percent in the morning to around 65 percent in the afternoon, cumuli formed clouds develop during the day and results in frequent afternoon showers and thunderstorms, some persisting into the night. The distribution of the summer rains is such that the average annual rainfall decreases fairly uniform from 1,500 – 1,600 mm at the southern edge of the state to 600mm at the northern edge. The state remains within the rain belt throughout the months of June – August and does not experience the inter-monsoon “little dry season” of southern Nigeria. Page 42 At the end of the Northern hemisphere summer, the ITD migrates southwards normally traversing Kaduna State in October and reaching its winter position south of the Benue/Niger confluence in November. During this transition period, the surface winds tend to vary from light south-westerly in the morning to north-easterly in the afternoon. Diurnal development of cumuli formed clouds results in little rain. Virtually no rain falls in the project area in the months of November through March of the year. The relative humidity generally ranges from 17 to 84 percent. During the months December to February, ‘harmattan’ dust associated with the low -level anticyclones centred Northeast of Nigeria, occurs when high level westerlies oscillate into low Latitudes. Air temperatures vary through the year with relative coldness between November to March, with daily maximum temperatures of 30°C to 42°C and minimum temperatures of 15°C to 29°C. During April and May, the temperature rises to the maximum. (Ibrahim, A 1990). Fig. 3.1: Temperature and Rainfall Distribution in Project Areas (Source: Climate-data.org) The latitudinal position of Katsina State and its interior location away from the sea determine its climate and therefore its two main seasons (dry season from November to May and Wet season from June to October). The dry and rainy seasons in Nigeria come into existence due to the movement of the north-east winds and the south-west winds, respectively. The south-westerly winds are full of moisture and blusters from the Atlantic Ocean whereas the north-easterlies are dry and dirt- laden winds that primarily blow from the deserts of Sahara. The hot and dry Harmattan (northeast) winds from the Sahara sweep across Katsina State and the project areas between November and February at wind speeds of between 2.3 mph and 6.15 mph, carrying a reddish dust from the desert while the southwest winds Page 43 bring cloudy rainy weather between late June and October of each year.The Katsina climate is mostly hot with maximum day temperature reaching 400C during the peak of the hot season (May). Typically, the area is affected by two the wind patterns, the harmattan wind from the Sahara which is responsible for the cool dry months of November to February (about 240C) and the Southwest Monsoon Trade Winds blowing across the Atlantic Ocean which is responsible for the rains of June to October as shown in Figure 3-1. Average relative humidity is put at 42%. The average rainfall is from about 800mm to 1000mm. (Tukur, A 2014). Figure 3-1 shows the plot of average monthly temperature and rainfall distribution through the year. 3.2.2 Geology and Hydrology The geologic and soil characteristics of the project area and the extent to which implementation of the proposed project could be affected by soil characteristics and other natural environment factors are summarized below. The natural environmental factors include climate and vegetation, topography and landforms, hydrogeology and hydrologic patterns. Information sources for this evaluation include published literature, geotechnical investigations conducted by Enplan Group - the engineering design Consultant for this project and the physical observations made during site visit in the course of the Consultancy. Geology of Katsina State Katsina State is underlain by three geological units with distinct hydrogeological conditions, namely the Basement Complex, Katsina-Daura Sediments and the Chad Formation. There are also surficial Quaternary deposits that cover the Basement Complex and other sedimentary formations to a large extent. These are thin but generally discontinuous deposits of aeolian sand, lateritic ironstone, loamy drift, swamp and river alluvium. The Basement Complex includes the oldest known rocks in Northern Nigeria and is composed of gneisis, migmatites and metasediments of Pre-cambrian age. Almost 90% of the entire landmass in Katsina State is composed of Basement Complex of Pre-Cambrian era which consists of metasediments that have been transformed into antactic migmatites and granites (Ayok, 1994). The mineral assemblages correspond to those of the amphibolite facies (Ibrahim, 2002). Generally, the summary of Geology of Katsina State can be grouped into: Cretaceous Gundumi Formation, undifferentiated Basement Complex, Quartenary Chad Formation, undifferentiated metasediments and Basement Complex-older granites. On the geochronology, the radiometric data on the geology of the area is scarse (Ayok, 1994). Those available cannot demarcate the real age relationship between the different schist belt and the adjacent migmatite-gneiss complex (Ibrahim, 1990). They consist of Archean rocks, deformed and modified several times by Pan Africa Orogeny. Outcrops consist almost entirely of resistant mignatites, quartzites, conglomerates and granitesm, although there are small exposure of softer gneisses and semi-pelitic rocks in some stream channels. Rocks of the migmatitic-gneiss Basement Complex constitute the majority in areal extent (McCurry, 1970). The younger metasediments are the second most abundant rock type (occupying about 33% of the state), while some most of the western part is underlain by the granites. Others include the Chad Formation and the Gundumi Formation which occupy about 11% of the total area of Katsina State. Page 44 Fig. 3.2: Geology of Katsina State Source: Enplan Group Engineering Design Report (Nov. 2018) 3.2.2.1 Funtua LGA Kankara (2018) shows that the Lithology, distribution and field relationship of this area have shown that part of the Funtua north east is underlain by grey to pink coloured granitoids, which occur as inselbergs and low lying whale-backs. The granitoids occur as massive fractured plutons irregular shapes, which roughly occupy two belts in the NW-SW parts of the area. The granites sharply intrude the metasediments and migmatite-gneiss unit, with the sharp contacts suggesting their younger age. There is a close contact between the granites and the gneiss (Bowden & Kinnaird, 1984; Kankara, 2014). Physical relations (example, sharp contacts) explain clearly that porphyritic biotite granites in some areas were emplaced as liquid melts, and that the once-medium grained varieties are older than the porphyritic varieties. In addition to that, structural grains that dip in north-south direction in the eastern neighboring sheets has influenced the surfacing of porphyritic granites. Medium grained granites and coarse granites are found to occur, but due to their limited exposure they do not constitute mappable units (mostly in a locality west of Dunfui inselberg). Biotite granites outcrop the SW parts of Funtua NE, bounded by migmatite-gniesses. 3.2.3 Soil Types The soil around Katsina Drains are predominantly silty sand and clayey sand due to the sandy nature of the wind-blown desert sand. However, there are some deposits of Aeolic sand along the inverts of the drains. Page 45 3.2.4 Biodiversity The ecological survey of the immediate project area provides necessary information about the wildlife (vegetation cover and fauna) of the area, which is a vital indicator of its ecological dynamics. It also provides baseline information that can be useful for monitoring and the assessment of project implementation effectiveness. 3.2.4.1 Vegetation Katsina state is predominantly Sudan Savanna which consists of scattered trees with sparse shrubs and grass. The trees here grow long tap roots and thick barks that make it possible for them to withstand the long dry season. The grass too has long durable roots which remain underground after stalks are burnt away or wilted in the dry season only to germinate with the first rains. This area has been subjected to many years of bush burning and over grazing. Trees such as Azadiracha indica (Neem) and Perkia biglobosa (Locust Been) are now being planted to check against desert encroachment and erosion. The vegetative cover of the project area is highly heterogeneous due to severe anthropogenic disturbance. Sampling of flora and fauna in the project area was conducted using quadrats in each of the identified land use categories and 100% enumeration of trees within each quadrate was carried out. Known species and others species of interest were identified and classified using standard taxonomic procedures. A listing of plant species with frequent or abundant distribution identified in the various categories are shown in Table 3-1 Table 3.1: Listing of Prominent and Indicator Plant Species within Funtua Project Area S/N Species Family Life Form Common Name Local Name Distribution 1 Butyrospermum Parkii Sapotaceae Tree Shea butter kadanya Common 2 Vitex doniana Verbanaceae Tree Black plum Dinya Common 3 Khaya senegalensis Meliaceae Tree Mahogany Madaci Common 4 Celtis integrifolia Ulmaceae Tree African Hackberry cuwo Common 5 Sclerocarya birrea Anacardiaceae Tree Marula dania Rare 6 Lannea schimperi Anacardaceae Tree Lannea Faru Rare 7 Adenium obesum Apocynaceae Tree Desert rose Gariya Rare 8 Borassus aethiopum Arecaceae Tree Fan palm Giginya Rare 9 Hyaphaene thebaica Arecaceae Tree Dum palm Goruba Rare 10 Calotropis procera Asclepiadaceae Shrub Swallow swort Tumfafiya Dan Common Leptadenia barawo 11 Leptadenia hastata Asclepiadaceae Shrub Leptadenia Dan Common barawo/yadiya 12 Asparagus Africana Asparagaceae Tree Asparagus Sarka Rare 13 Aspilia Africana Asteraceae Herb Haemorrhage plant Yunyun Common 14 Adansona digitata Bombacaea Tree Baobab Kuka Common 15 Cadaba farinosa Capparidaceae Shrub Cadaba Hanza Rare 16 Anogeissus leiocarpa Combretaceae Tree Axle wood Marke Common 17 Combretum micranthum Combretaceae Shrub Combreturn Geza Common 18 Combretum nigricans Combretaceae Shrub Combreturn Moshi Tsiriri Rare 19 Guiera senegalensis Combretaceae Tree Moshi medicine Sabara Rare 20 Ipomea asarifolia Convolvulacaea Tree Morning glory Duman kadda Rare 21 Diospyros mespiliformis Ebenaceae Tree Ebony tree Kaiwa Rare 22 Acacia macrostachya Fabaceae Tree Acacia Gardaye Common 23 Acacia nilotica Fabaceae Tree Acacia Bagaruwa Common Page 46 S/N Species Family Life Form Common Name Local Name Distribution 24 Acacia senegalensis Fabaceae Tree Acacia Farar Kaya Common 25 Bauhinia rufescens Fabaceae Tree Bauhinia Jirga Common 26 Cassia fistula Fabaceae Tree Golden shower Malga Common 27 Cassia singueana Fabaceae Shrub Winter cassia Runfu Common 28 Dichrostachys cinerea Fabaceae Shrub W. Afri. Sickle Dundu Common 29 Mimosa pigra Fabaceae Shrub Sensitve plant Gumbi Common 30 Piliostigma thonningii Fabaceae Shrub Camel’s foot Kalgo Common 31 Tamarindus indica Fabaceae Tree Tamarin Tsamiya Common 32 Azadirachta indica Meliaceae Tree Neem Dogon yaro Common 33 Moringa oleifera Moringaceae Tree Medicine tree Zogale Common 34 Psidium guajava Myrtaceae Tree Guava Gwava Rare 35 Rogeria adenophylla Pedaliaceae Tree Tanum Loda Rare 36 Ziziphus maurtaina Rhamnaceae Tree Jujub Magarya Rare 37 Feretia apodanthera Rubiaceae Tree Feretia Kurukuru Rare 38 Balanites aegyptiaca Zygophyllaceae Tree Desert date Aduwa Common 39 Pterocarpus erinaceus Fabaceae Tree Barwood Madobihia Common 40 Prosopis africana Fabaceae Tree Iron tree Kiriya Common 41 Commiphora Kerstingii Burseraceae Shrub Fula-Fulfulde Bazana Common 42 Ricinus communis Euphorbiaceae Shrub Castor Zurma Common 43 Aegilops cylindrica Poaceae Herb Goat weed katankahaya Common 44 Pennisetum purpureum Poaceac Herb Elephant grass Hatsi Common 45 Impereta cylindrica Poaceae Herb Spear grass jema Common 46 Digitarita sanglinalos Poaceae Herb Finger grass -yadi Common 47 Megathgisua madimeb Poaceae Herb Guinea grass -Gamba Common 48 Bromus catharticus Poaceae Herb Prairie grass Common 49 Arvena fatua Poaceae Herb Wild oats - Rare 50 Echinechloa crus-galli Poaceae Herb Crab grass -yaryadi Rare 51 Eleusine indica Poaceae Herb Wire grass -qiri qiri Rare 52 Elymus repens Poaceae Herb Quack grass -katankahaya Rare 53 Panicum capillare Poaceae Herb Panicgrass -tsintsiya Common 54 Setarua faberi Poaceae Herb Giant foxtail -bagyazama Rare 55 Panicum maximum Poaceae Herb Guinea grass -Balasaya Common 56 Cynodon dactglon Poaceae Herb Bermuda grass Sarkakiyar Common zomo 57 Cyperus esculentus Cyperaceae Herb Yellow nutgrass Jiji Rare 58 Bromus tectorum Poaceae Herb Drooping brome - Rare 59 Eriochloa villosa Poaceae Herb Hairy cupgrass -inna Rare 60 Hordeum jubatum Poaceae Herb Squirreltail - Common 61 Muhlenbergia frondosa Poaceae Herb Common satin -gadagi Common grass 62 Panicum Poaceae Herb Fall panicgrass - Rare dichotomiflorum 63 Setaria pumila Poaceae Herb Pigeon grass -kainuwa Common 64 Cymbogon citratus Poaceae Herb Lemon grass -balasaya Common Source: Field Survey, July, 2019. Page 47 Table 3.2: Major Cultivated/Agronomic Species Along the Funtua Project Site S/N Species Family Life Form Common Name Local names Distribution 1 Vigna Unguiculata Fabaceae Herb Cowpea Wake Common 2 Gossypium hirsutum Malvaceae Herb Cotton Auduga Rare 3 Mangifera indica Anacardiaceae Tree Mango Mangwaro Rare 4 Anacardium occidentale Anacardiaceae Tree Cashew Yazawa Rare 5 Citrus sinensis Rutaceae Tree Orange Lemo Rare 6 Zea mays Poaceae Shrub Maize Masara Common 7 Musa paradisiaca Musaceae Shrub Plantain Ayaba Rare 8 Manihot esculenta Euphobiaceae Shrub Cassava Rogo Common 9 Terminalia catapa Combretaceae Tree Umbrella Tree Bawshi Rare 10 Terminalia spp Combretaceae Tree Cameroon Tree Bawshi Rare 11 Ixora spp Rubiaceae Shrub Ixora -Dan miski Rare 12. Eucalyptus spp Myteraceae Tree Eucalyptus turare Rare 13. Oryza sativa Gramineae Herb Rice Shinkafa Common 14 Allium cepa Amaryllidaceae Herb Onion Albasa Common 15 Allium sativum Amaryllidaceae Herb Garlic tafarnuwa Common 16 Capsicum annuum Solanaceae Herb Pepper Tattasai/sham Common bo 17 Ipomoea batatas Convolvulaceae Herb Sweet potato Dankali common 18 Pennisetum glaucum Poaceae Shrub Millet Gero Common 19 Sorghum bicolour Poaceae Shrub Guinea corn Dawa Common 20 Zingiber Officinale Zingiberaceae Herb Ginger Citta Common 21 Saccharum officinarum Poaceae Shrub Sugarcane Rake Common 22 Sesamum indicum Pedaliaceae Herb Benniseed Ridi Common 23 Musa sapientum Musaceae Shrub Banana Ayaba Rare 24 Solanum melongena Solanaceae Shrub Egg plant Yalo Rare 25 Arachis hypogaea Fabaceae Herb Groundnut Gyada Common Source: Field Survey, July, 2019. 3.2.4.2 Animal Inventory of the Watershed Domestic Animals: These include mammal such as cattles, goats, sheep, ram, donkeys and dogs; and aves such as local fowls and agricultural fowls. Wild Animals: These terrestrial animals were observed to be present in the site: Thryonomys swinderianus (Grass cutter/giant rat), Cricetomys gambianus (Bush/giant rat), Xerus erythropus (Ground squirrel). Other animals seen include Milipedes, Centipedes, Snake, Ant, Butterflies and Birds. Of the above mentioned, Thryonomys swinderianus (Grass cutter) and Cricetomys gambianus (Bush/giant rat), were reported to be the most abundant species in the site. It was reported by the locals that these animals are gradually disappearing. This could be attributable to habitat loss due to urbanization and farming activities occurring at the site since some of these animals are burrowing animals. Another factor could be uncontrolled hunting. None of existing reported animals are listed on the International Union for the Conservation of Nature (IUCN) endangered red list. Page 48 Table 3.3: Animal Species at the Funtua Project Site IUCN Threat S/No Species Common/Local name Status 1 Bos Taurus Cattle/shanu Not listed 2 Capra aegagru Goat/awaki Not listed 3 Ovis aries Sheep/Tumaki Not listed 4 Eguus africanus Donkey/Jaki Not listed 5 Gallus gallus Chicken/Kaji Not listed 6 Meleagris spp Turkey/Tolotolo Not listed 7 Camelus dromedarius Camel/Rakumi Not listed 8 Rattus norvegicus Rat/ɓera Not listed 9 Thryonomys swinderianus Grasscutter/Burgu Not listed 10 Oryctolagus cuniculus Rabbit/Zomo Not listed 11 Serpentes spp Snake/Maciji Not listed 12 Alligator mississippiensis Aligator/Damo Not listed 13 Canis lupus Wolf/Kyarkeci Not listed 14 Hystricognathi spp Porcupine/Bushiya Not listed 15 Agama agama Lizard/Kadangare Not listed 16 Rana ridibunda Marsh frog/Kwado Not listed 17 Columba palumbus Woodpigeon/ Not listed 18 Columba livia Feral pigeon/rock dove Not listed 19 Columba oenas Stock dove Not listed 20 Apus apus Swift Not listed 21 Gavia stellate Red-throated diver Not listed 22 Ixobrychus minutes Little bittern Not listed 23 Nyctea scandiaca Snowy owl Not listed 24 Gallus gallus Chicken Not listed 25 Columba livia Pigeon Not listed 26 Numida meleagris guinea fowl Not listed 27 Accipiter striatus Hawk Not listed 28 Alcedo atthis Kingfisher Not listed 29 Upupa epops Hoopoe Not listed 30 Jynx torquilla Wryneck Not listed 31 Carassius auratus Goldfish Not listed 32 Cyprinus carpio Common carp Not listed 33 Synodontis spp Catfish/Kumgi Not listed 34 Heterobronchus bidosalis African catfish/Shambani Not listed 35 Gymnachus nilotica Aba/Youni Not listed 36 Clarias garipenus African sharp tooth Not listed catfish/Tarwarda 37 Tillapia nilotica Mango fish/Gargaza Not listed 38 Heterobronchus spp Air breathing Not listed Catfish/Ramboshi 39 Xenentodon cancila Needle fish/Kauwo Not listed 40 Tilapia zilli Redbelly tilapia/Buku Not listed 41 Anura dumeril Frog/Kwado Not listed 42 Typha angustifolia Bulrush/Shalla Not listed 43 Typha Latifolia Reedmace/Borugu Not listed 44 Lates anectus Nile perch/Rajia Not listed Page 49 IUCN Threat S/No Species Common/Local name Status 45 Lates niloticus Nile perch/ Giwa ruwa Not listed 46 Gygantactis gargantua Gygantactis/Kuma mai dogo Not listed baki 47 Cymbacephalus beauforti Crocodile/Kada Not listed Source: Field Survey, July, 2019. 3.2.5 General Geomorphology 3.2.5.1 Slope Instability and Subsidence The stability or instability of a slope is greatly dependent upon factors such as gradient, available water content, existing vegetation, and stresses (natural and anthropomorphic) affecting the slope. For example, a denuded, saturated slope could be further destabilized and fail if it was to be stressed by considerable earth moving activities. The terrain of the project area is relatively of undulating surfaces. Land subsidence is the loss of surface elevation due to removal of subsurface support. Subsidence has many causes, including seismically induced stresses and the extraction of mineral or liquid and gas deposits. Although mineral and gas can and do cause subsidence, it is more common for subsidence to occur as a result of groundwater extraction in excess of groundwater recharge. There are no known studies on subsidence in the project area or surrounding region. However, subsidence in the region as a whole may be limited because the various geologic and hydrologic conditions associated with subsidence are not known to occur in the area 3.2.5.2 Natural Drainage Corridors Major rivers which originate in or traverse Katsina state include Kozaa, Sabke, Tagwai, Gada, Karaduwa, Bunsuru, Gagare, Turami, Sokoto, etc. These rivers contain water only during the rainy season and have little or no water during the dry season. The rivers Gada, Karaduwa and Sabke have been dammed for irrigation purposes and the dams are known as Jibiya, Zobe and Dabiram Dams, respectively. Survey maps that included Satellite Imagery and Topographic profiles were used to guide interpretations of storm water flows throughout the project area. The watershed drainage features were identified through interpretation of 5-meter contour intervals topographic map. Drainage features within the scope of this investigation included any topographic feature that could potentially concentrate surface runoff, including convergent topography, swales and existing channels. 3.2.6 Archaeology and Cultural Heritage: There are no World Heritage Sites or areas of cultural importance that would be impacted by the proposed project, nor are there any archeologically sensitive areas. However, there is the existence of several burial grounds & other cultural relics within and inclose proximity to the project areas. This ESMP spells out appropriate site specific mitigation measures for any burial ground and other cultural relics that maybe found during the project implementation. 3.2.7 Traffic and Transport Infrastructure: The project area is served by several rural intra-linkage roads which are now Page 50 severely degraded by the floods and erosion. The access roads to the Funtua project area currently experience very low level of traffic flow due to developmental and flooding/erosion problems. This is envisaged to gradually improve once the flood and erosion control intervention project is completed, and as additional residential areas develop and the road surfacing is improved. 3.2.8 Waste Management: Waste management provision in the project area is generally lacking. Solid wastes are generally handled in individual homesteads and are either burnt or disposed of in small earth fills to rot. The major type of toilet facility owned by the households in the projects catchment areas and with which it disposes fecal wastes was covered pit latrines. Most of the people defecate in open spaces. In most cases, the wastes are indiscriminately disposed of in the environment. There are no structured waste collections within the Funtua catchment area resulting, to a large extent, in wastes being indiscriminately dumped in isolated places. There are also no effective sewerage works in the project areas. 3.3 Site-Specific Baseline Environmental Setting 3.3.1 Funtua Town Baseline Setting Soil, water and air samples were collected from various locations within the proposed Funtua drainage corridor. The matrix of sampling media and sampling locations for the drainage corridor are shown in Table 3.4. The collected samples were submitted to MGG Laboratory for analyses to assess the baseline environmental conditions within the project area. Table 3.4: Sampling Locations and Coordinates along the Drainage Corridor SAMPLING LOCATIONS AND COORDINATES ACROSS THE FUNTUA STORMWATER DRAINAGE CONTROL SITE SAMPLE MEDIA SAMPLE MODE SAMPLE LOCATION CODE COORDINATES FUNTUA CENTRAL TARGETED FNT/SW/01 N 11 31’41.5’’ E 0070 18’59.2 0 SURFACE WATER MOTOR PARK SAMPLE TUDUN MALAMI RANDOM FNT/SW/02 N 110 31’52.9’’ E 0070 18’59.9 AREA #2 TUDUN MALAMI TARGETED FNT/SS/01 N 110 31’41.5’’ E 0070 18’59.2 AREA #1 TARGETED BELANGADA AREA FNT/SS/02 N 110 31’11.4’’ E 0070 19’00.6’ UNGUWAR DAHIRU SOIL SAMPLE RANDOM FNT/SS/03 N 110 31’52.9’’ E 0070 18’59.9’ AREA FUNTUA CENTRAL TARGETED FNT/SS/04 N 110 33’19.1’’ E 0070 18’41.4 MOTOR PARK TUDUN MALAMI RANDOM FNT/SS/05 N 110 33’04.0’’ E 0070 17’15.5 AREA #2 TUDUN MALAMI TARGETED FNT/AS/01 N 110 31’41.5’’ E 0070 18’59.2 AREA #1 TARGETED BELANGADA AREA FNT/AS/02 N 110 31’11.4’’ E 0070 19’00.6 UNGUADAHIRU AIR QUALITY RANDOM FNT/AS/03 N 110 31’52.9’’ E 0070 18’59.9 AREA FUNTUA CENTRAL TARGETED FNT/AS/04. N 110 33’19.1’’ E 0070 18’41.4. MOTOR PARK TUDUN MALAMI RANDOM FNT/AS/05 N 110 33’04.0’’ E 0070 17’15.5 AREA #1 TARGETED BELANGADA AREA FNT/GWS/01 N 110 31’11.4’’ E 0070 19’00.6 GROUND WATER UNGUWAR DAHIRU RANDOM FNT/GWS/02 N 110 33’04.0’’ E 0070 17’15.5 AREA Page 51 3.3.1.1 Soil Analytical Conditions Representative near-surface soil samples for laboratory analysis were collected from five locations (targeted and random) points along the proposed Funtua drainage corridor. Three targeted locations were selected from areas with observed environmental conditions that suggest contamination while two locations were randomly selected to depict general conditions along the drainage corridor. The sample locations are shown in Table 3.4. Each near surface soil sample (0 - 6 inches depth) was collected using the Dutch hand auger and put in a properly labeled self- sealing plastic bag for shipment to the FMEnv-certified MGG Resources Laboratory at Nsukka for chemical analysis. The baseline analytical results of the soil samples are summarized in Table 3.5. Table 3.5: Baseline Soil Quality Analysis for Funtua Site NESREA/ ANALYTICAL RESULTS PARAMETERS S/N UNITS FMENV TESTED LIMITS SS1 SS2 SS3 SS4 SS5 1 pH (KCl) - - 7.90 7.60 8.30 7.00 8.30 pH (10% solution @ 2 - 6.5-9.0 8.60 8.50 9.80 7.70 9.70 25oC 3 Nitrate mg/kg - 4.20 1.66 1.20 6.42 3.20 4 Moisture % - 19.33 23.92 13.90 28.87 16.55 5 Electrical conductivity µS/Cm - 754.60 4336.20 345.40 217.80 220.60 Darkish Darkish Darkish 6 Soil Colour - - Brownish Brownish brown brown brown 7 Potassium (K+) mg/kg - 0.04 0.07 0.13 0.13 0.05 8 Magnesium (Mg2+) mg/kg - 2.00 2.40 8.00 1.60 1.00 9 Calcium (Ca2+) mg/kg - 5.20 5.60 5.60 4.00 5.60 10 Sodium (Na+) mg/kg - 0.02 0.04 0.08 0.08 0.02 11 Available Phosphorus mg/kg 5 0.93 15.86 9.33 0.93 2.80 12 Organic Matter % - 0.33 2.03 4.01 4.01 1.11 13 Nitrogen % - 0.14 0.14 0.06 0.15 0.07 14 Organic Carbon % - 0.19 1.18 2.32 2.32 0.64 15 Iron (Fe2+) mg/kg 0.03 2.22 2.20 4.20 4.22 2.52 16 Lead ( Pb2+) mg/kg 164 Bdl 0.50 3.00 Bdl 0.75 17 Copper (Cu2+) mg/kg 100 Bdl 0.03 5.73 0.07 0.03 18 Zinc (Zn2+) mg/kg - 0.16 2.17 3.18 0.36 0.31 Grain Size Distribution 19 % - 11.00 30.00 55.00 35.00 51.00 (Coarse Sand ) Grain Size Distribution 20 % - 8.00 6.00 4.00 6.00 4.00 (Clay ) Page 52 NESREA/ ANALYTICAL RESULTS PARAMETERS S/N UNITS FMENV TESTED LIMITS SS1 SS2 SS3 SS4 SS5 Grain Size Distribution 21 % - 22.00 18.00 10.00 16.00 4.00 (Silt ) Grain Size Distribution 22 % - 59.00 46.00 31.00 43.00 41.00 (Fine Sand) Sandy Sandy Loamy Loamy 23 Textural Class - - Sandy loamy loamy sandy sandy 3.3.1.2 Surface and Ground Water Condition To assess the surface and ground water conditions, two representative samples of surface water and two for groundwater were collected along the drainage corridor. Their locations are shown in Table 3.4. The water samples were collected in a clean sampling bottle for laboratory analysis. The water sample bottles were sealed, labeled and preserved in an ice-filled chest before shipping to the MGG Resources Laboratory at Nsukka for chemical analyses. The summary of baseline analytical results of the surface and ground water samples are as shown in Tables 3.6 and 3.7, respectively. Table 3.6: Baseline Surface Water Quality Analysis for Funtua Site NESREA/ ANALYTICAL RESULTS PARAMETERS S/N UNITS FMENV WHO LIMITS TESTED LIMITS SW1 SW2 0 1 Temperature C 40 32-34 20.70 20.80 2 pH - 6.5 - 8.0 6.5-8.5 8.2 7.6 3 Taste - NS Nil Has taste Has taste 4 Appearance - NS Nil Turbid Turbid 5 Odour - NS Nil Has odour Has odour 6 Total Dissolved Solids mg/L 2100 500 582.00 182.00 7 Conductivity µS/Cm 1000 µS/Cm 1500 1280.40 400.00 8 Total hardness mg/L NS 120-180 292.00 112.00 9 Chloride mg/L NS 250 251.34 44.02 10 Fluoride mg/L NS 2.0 2.61 0.13 11 Sodium mg/L 10 20 0.73 6.82 12 Potassium mg/L NS NS 0.08 8.89 13 Sulphate mg/L 250 250 265.62 54.99 14 Sulphide mg/L NS 0.2 2.56 0.26 15 Ammonia mg/L NS 1.5 2.32 0.15 16 Nitrate mg/L 50 10 53.00 52.00 17 Phosphate mg/L 5 5 8.20 5.44 18 DO mg/L 6 6 5.00 3.22 19 BOD mg/L 6 6 16.40 83.20 20 COD mg/L 30 NS 74.40 277.60 21 Chromium mg/L 0.1 0.03 Bdl 0.12 22 Copper mg/L 3 2 0.01 0.21 23 Iron mg/L 1 0.3 0.73 0.86 Page 53 NESREA/ ANALYTICAL RESULTS PARAMETERS S/N UNITS FMENV WHO LIMITS TESTED LIMITS SW1 SW2 24 Zinc mg/L <1 0.01 0.08 0.01 25 Lead mg/L 0.1 0.01 Bdl 0.25 26 Nickel mg/L 0.1 0.2 0.21 0.62 27 Manganese mg/L 0.01 0.02 Bdl 0.06 28 Silver (Ag+) mg/L <1 0.10 0.11 0.09 29 Calcium mg/L NS NS 174.00 82.00 30 Magnesium mg/L NS NS 18.00 30.00 31 Total Alkalinity mg/L NS NS 316.00 432.00 32 Hydroxide mg/L NS NS Nil Nil 33 Bicarbonate mg/L NS NS 62.00 32.00 Microbial Analysis 34 E-Coli cfu/mL 0 0 20.00 x10 20.00 x10 2.0 x106 22.0 x 104 35 Total Coliform cfu/mL 0 0 8.4x105 1.4 x105 36 Total viable counts cfu/mL NS NS Table 3.7: Baseline Groundwater Quality Analysis for Funtua Site NESREA/ ANALYTICAL RESULTS PARAMETERS WHO S/N UNITS FMENV TESTED LIMITS LIMITS GW1 GW2 0 1 Temperature C 40 32-34 20.80 20.80 2 pH - 6.5 - 8.0 6.5-8.5 7.5 7.5 3 Taste - NS Nil Has taste Has taste 4 Appearance - NS Nil Turbid Turbid 5 Odour - NS Nil Has odour Has odour 6 Total Dissolved Solids mg/l 2100 500 442.00 88.00 7 Conductivity µS/Cm 1000µS/Cm 1500 972.40 193.60 8 Total hardness mg/l NS 120-180 228.00 52.00 9 Chloride mg/l NS 250 183.18 26.98 10 Fluoride mg/l NS 2.0 0.12 0.11 11 Sodium mg/l 10 20 7.33 5.88 12 Potassium mg/l NS NS 15.39 5.03 13 Sulphate mg/l 250 250 26.19 46.86 14 Sulphide mg/l NS 0.2 0.21 0.16 15 Ammonia mg/l NS 1.5 0.12 0.09 16 Nitrate mg/l 50 10 4.22 0.06 17 Phosphate mg/l 5 5 1.20 0.04 18 DO mg/l 6 6 4.20 6.40 19 BOD mg/l 6 6 11.20 3.20 20 COD mg/l 30 NS 37.60 10.4 21 Chromium mg/l 0.1 0.03 0.12 Bdl 22 Copper mg/l 3 2 Bdl Bdl 23 Iron mg/l 1 0.3 0.98 0.73 24 Zinc mg/l <1 0.01 0.04 0.17 25 Lead mg/l 0.1 0.01 Bdl Bdl Page 54 NESREA/ ANALYTICAL RESULTS PARAMETERS WHO S/N UNITS FMENV TESTED LIMITS LIMITS GW1 GW2 26 Nickel mg/l 0.1 0.2 0.31 0.51 27 Manganese mg/l 0.01 0.02 0.06 0.13 + 28 Silver (Ag ) mg/l <1 0.10 0.09 0.09 29 Calcium mg/l NS NS 154.00 36.00 30 Magnesium mg/l NS NS 73.80 17.00 31 Total Alkalinity mg/l NS NS 792.00 64.00 32 Hydroxide mg/l NS NS Nil Nil 33 Bicarbonate mg/l NS NS 14.28 26.40 Microbial Analysis 34 E-Coli cfu/ml 0 0 1.00x100 0 35 Total Coliform M.agar cfu/ml 0 0 5.0 x 10 4.0 x 100 36 Total viable counts cfu/ml NS NS 1.9 x 101 2.2 x 101 3.3.1.3 Air Quality Air quality assessment was carried out at several locations along the Funtua drainage corridor where active construction operations are anticipated and where human activities are expected to be high. Samples were collected using the Dragner CMS Gas Analyzer. Ambient air was drawn into the calibrated equipment at the targeted locations and subsequently the digital readings for the various parameters were read off the instrument. The location coordinates for each sampling location are also given. The parameters measured as part of the air quality assessment included carbon monoxide (CO), Ammonia (NH3), Hydrogen Sulphide (H2S), Sulphur Dioxide (SO2), Nitrogen Oxides (NOx), Volatile Organic Carbon (VOC) as well as suspended particulate matter (SPM). The baseline analytical results of the air pollution indicators within and around the project corridor are shown in Table 3.8. Table 3.8: Baseline Air Quality Analysis for Funtua Site NESREA/ ANALYTICAL RESULTS PARAMETERS S/N UNITS FMENV TESTED LIMITS AS1 AS2 AS3 AS4 AS5 Hydrogen Sulphide 1 Mg/Nm3 5 0 0 1.00 0 0 (H2S) Carbon monoxide 2 Mg/Nm3 500 0 1.00 1.00 1.00 0 (CO) 3 Nitric Oxide (NO) Mg/Nm3 300 6.26 6.25 6.25 6.25 6.25 4 Nitric dioxide (NO2) Mg/Nm3 300 1.39 1.37 1.37 1.37 1.37 5 Sulphur dioxide Mg/Nm3 500 1.14 1.15 1.16 1.15 1.16 Hydrogen Cyanide 6 Mg/Nm3 NS 3.75 3.72 3.72 3.76 3.72 (HCN) 7 Ammonia (NH3) Mg/Nm3 NS 3.14 3.14 3.14 3.16 3.15 8 Oxygen Mg/Nm3 NS 20.80 20.80 20.80 20.80 20.80 Page 55 3.3.1.4 Noise and Vibration: The Funtua project area runs generally along several areas of high density residential neighborhoods. Noise levels were measured using the Digital Sound Level Meter (BAFX Products), Type BAFX3370. Ambient noise exposure levels were taken at four locations along the drainage corridor. The recorded minimum and maximum ambient levels ranged from 55.2dB to 88.2dB. These noise levels may be considered moderate ambient levels but are below the FMEnv regulatory standard of 90dB. The baseline noise levels are shown in Table 3.9. Table 3.9: Funtua Project Site Noise Readings MINIMUM MAXIMUM S/N NOISE READING LOCATIONS COORDINATES (dB) (dB) FUNTUA CENTRAL MOTOR PARK 1. 55.2 70.4 N110 31.692; E0070 18.989 BRIDGE AREA HAND DUG WELL AT TUDUN 2. 58.1 74.5 N110 31.186; E0070 19.012 MALAMI AREA 3. BELANGADA AREA 51.7 80.2 N110 33.319; E0070 18.667 4. UNGUWAR DAHIRU AREA 69.3 88.2 N110 33.169; E0070 17.257 3.3.5 Evaluation of Baseline Analytical Results Soil Condition Environmental contaminants in soil generally can be of concern to human health. Heavy metals are a class of elements that include lead, copper, arse-nic, and cadmium, and can be toxic to humans and plants if ingested in high enough quantities. Soils have often been the landing spot for heavy metals, chemicals, and wastes as byproducts of industrial and agricultural pollutants. Many of these metals are present in soils naturally, usually in small amounts, although the natural level may vary. (Saunders & Buob, 2018). Lead poses the greatest concern because it is the most common contaminant and is most likely to exceed health based guidance values in the United States (McBride et al., 2014). Lead does not degrade and can remain in the soil for thousands of years. Lead accumulates on the top 1-2 inches of the soil as it binds tightly to soil particles and organic matter. In addition to lead, cadmium and mercury are the most likely to pose the greatest health risk to humans. Elevated levels of copper, nickel, and zinc can cause plant toxicity, while cadmium and arsenic can be of concern to human health. The project location of Funtua is considered a high density population community. People, particularly children will likely to go to or wander into the construction zones thus increasing exposures to the health hazards associated with dusts and emissions from equipment and vehicles. It is envisaged that during project implementation, construction activities such as soil excavation, stockpiling and haulage of soil materials, equipment and vehicular movements will all result in site soil dusts. These activities will essentially increase exposure of and bring residents, workers, passersby in contact with soil as well as inhalation of dusts. Page 56 Baseline soil parameters indicate the state of soil ecosystem characteristics, which especially reflect productive, buffering, filtering and other soil functions. Soil quality is significantly affected by physical, chemical, biological and biochemical properties sensitive to changes in the environment and land management. The analytical results of the baseline soil quality indicators show concentrations of key soil quality below the regulatory threshold limits. Surface and Groundwater Quality Contaminants in surface or groundwater which are relied upon as drinking water source by communities pose serious health risks to the residents. People can suffer acute or chronic health effects from almost any contaminant if they are exposed to extraordinarily high levels (as in the case of a spill). In drinking water, microbes, such as bacteria and viruses, are the contaminants with the greatest chance of reaching levels high enough to cause acute health effects. The surface and groundwater conditions at the Funtua site was assessed through laboratory analysis of parameters that affect the quality of water in the environment. Physical properties of water quality include temperature and turbidity. Chemical characteristics involve parameters such as pH and dissolved oxygen. Biological indicators of water quality include algae and phytoplankton. The analytical results of the baseline water quality indicators within and around the project areas show concentrations that are either below the regulatory threshold limits or are considered not significant. Based on the results of the analytical results obtained for all the surface and groundwater samples collected from Funtua, the surface and groundwater conditions at the project site are within environmentally acceptable quality limits. All results are below the FMEnv. and NESREA regulatory guideline limits. Air Quality Air pollution is a major environmental risk to health. By reducing air pollution levels, people can reduce the burden of disease from stroke, heart disease, lung cancer, and both chronic and acute respiratory diseases, including asthma. The lower the levels of air pollution, the better the cardiovascular and respiratory health of the population will be, both long- and short-term. The WHO Air Quality Guidelines (Global Update 2005) provide an assessment of health effects of air pollution and thresholds for health-harmful pollution levels. The Guidelines apply worldwide and are based on expert evaluation of current scientific evidence. Air quality assessment was carried out at several locations where active construction operations are anticipated and where human activities are expected to be high. The analytical results of the baseline air quality indicators within and around the Funtua project corridors show concentrations below the regulatory threshold limits. Field (in- situ) air sampling was carried out using the Dragner CMS Gas Analyzer. Ambient air was drawn into the calibrated equipment at the targeted locations and subsequently the digital readings for the various parameters were read off the instrument. The parameters measured as part of the air quality assessment included carbon monoxide (CO), Ammonia (NH3), hydrogen sulphide (H2S), sulphur dioxide (SO2), nitrogen oxides (NOx), hydrogen cyanide (HCN) as well as oxygen (O 2). Analytical results obtained were reviewed against the appropriate regulatory limits to determine any potential health risk levels. Page 57 Noise and Vibration The regulatory threshold limit for noise is 90 dB. All noise readings obtained at the various Funtua locations are below this regulatory limit. During the project construction phase, it is typically expected that noise levels will increase from the use of heavy equipment and project vehicular movements at the sites. Page 58 CHAPTER 4: SOCIO-ECONOMIC CHARACTERISTICS AND CONSULTATION WITH STAKEHOLDERS 4.1 Description of Socioeconomic Environment 4.1.1 Introduction: The overall project study was based on both quantitative data and qualitative inputs collected through research of historical environmental and social data for the Funtua, project area, and the census/socio-economic survey data (the census questionnaire and socio-economic survey questionnaire was integrated into one basic document to enhance effectiveness). Qualitative inputs through consultations and discussions with potential project affected persons (PAPs), local community members and other stakeholders provided additional information for inclusion in the assessment. The affected communities within Funtua, , have been mobilized to contribute actively to project implementation and to sustainably maintain the works following implementation. The socioeconomic elements and characteristics of the subproject areas considered in this study include population, land use and tenure system, social setups, economic activities, education, vulnerability profile, gender, religion, settlement and migration patterns and health services system for Communities. Qualitative and quantitative mixed method of assessment was adopted in this project because it offered an effective means of interacting widely with the stakeholder groups, the Katsina NEWMAP team, as well as individual stakeholders and affected persons. Participatory community meetings, public discussions as well as discussions with key informants (Community elders, Local leadership, and Katsina NEWMAP Officers, among others) were held in the course of study. 4.1.2 Socio-economic Study An integrated census and socio-economic survey questionnaire was developed and administered to the project area communities in Funtuaparticularly households that may be affected directly or indirectly by the project. The questionnaire was administered to provide socio-economic profile of the community, particularly the areas that will potentially be impacted by the project. The census included data on age, gender, occupation, income, sources of livelihood of all persons who live on or derive a living from the area of land as well as information on houses, businesses and any structures in use in the affected areas. The specimen of the census/socio- economic survey forms adopted for the project areas is included as Annexure II. Besides the quantitative data collection method, a number of other tools were also used for eliciting information. These tools included Focused Group Discussion (FGD); Community meetings and Key informants’ interviews. Essentially, the comprehensive questionnaire for data collection that was used captured the following information: a) Household bio-data (demographic information); b) Livelihoods; c) Inventory of structural and nonstructural assets including land, common properties, houses, economic trees and cash crops. Page 59 4.1.3 Public/Stakeholder Consultation: This was conducted as part of the participatory approach aimed at gaining good knowledge of the social issues/risks associated with the projects as perceived by the communities. Public meetings were held at the respective community facilities located within the project immediate impact areas. Table 4.1 show a matrix of the meetings held with the Funtua communities and the locations where the meetings, socioeconomic/census documentations were held within the project communities. Minutes of and attendance to the meetings are included in Annexure V - VIII. Table 4.1: Schedule of Community/Stakeholder Meetings and Socioeconomic Documentation DISTRICT/ NO OF TYPE OF MEETING LOCATION DATE(S) COMMUNITY ATTENDEES HELD Community Leadership Funtua District Head July 29, 2019 16 Consultation Palace, Funtua FUNTUA District Head Palace DISTRICT Community Sensitization July 29, 2019 35 Compound COMMUNITIES Socioeconomic/Census Community Square July 30-31, 253 Documentation at Tudun Malamai 2019 COMBINED FMKJ State Secretariat Stakeholders Meeting Aug 7, 2019 70 DISTRICTS Chamber, Katsina 4.1.4 Use of Maps and GIS: Survey maps as well as high resolution Digitalglobe Quickbird imageries (2019) were used to identify and map out the project areas identifying any locations of structures relative to the project corridors. The qualitative analysis involved an assessment of information obtained during the stakeholders’ consultations and public participation forums and discussions. The socioeconomic study provided necessary primary quantitative data for each project assessment. This quantitative data included: • Household census of the people within the respective project areas; • Establishing the socioeconomic profile of each project area population including health related status of respondents; • Establishing the structural assets to be affected by each project; • Establishing the area of land to be affected by each project. 4.2 Description of Cultural Environment 4.2.1 Population Based on the 2006 national population census records and the 3.04% annual population growth factor recommended by the national population commission (NPC), Funtua LGA have projected population of 322,518 for 2018. 4.2.2 Ethnic Groups The people of Funtua consist of one of Nigeria’s major ethnic groups – the Hausa/Fulanis. The ethnic group has its unique culture, social organization and traditions. The social and cultural aspects in the project area are closely intertwined with the ethic groupings. The Fulanis have elaborate cultural practices that include strong kinship linkages with organizations spanning from localized social groups to Page 60 strong clan relations. The cultural associations and social interactions are epitomized during cultural and religious ceremonies and festivities. Funtua town is essentially an urban center whose residents are generally traders - commercial and agricultural men and women. The local dwellers rear domestic animals such as goats and sheep, and maintain farms lands most of which are cultivated with groundnut, maize, potato and millet. Each district village traces its origin from genealogical ties. Politics in the town are done within the framework of clanism. Clans are the basic point of cultural and political identity for the citizens. Clanism and kinship are the elemental forces in control of political and cultural institutions as well as service points. As previously stated, the project areas is significantly urban. 4.2.3 Religion The people of Funtua town are mostly of Islam religion (Muslims). A very small fraction of the population is of the Christian or other faith. 4.3 Land Use Pattern There are three major types of customary land tenure system in the project area – (1) individual land ownership; (2) family land ownership; and. (3) communal land ownership. Individual ownership may be for indigenes or for residents of the community. Family lands (as well as individual lands) are inherited from generational relatives. Communities retain family lands which may never be sold. Such family lands are generally retained for communal development and sometimes are rotationally shared among the members of the community for agricultural purposes but are not for sale. The Funtua project area can be characterized as a predominantly rural setting with residential and agricultural properties occupying most sections of the communities and land areas. Over 60% of the land use in project areas is committed to agricultural production of food crops. The crops include rice, onions, garlic, maize, millet, groundnuts, tomatoes, potatoes, wheat, sorghum, guineacorn, vegetables, etc. 4.3.1 Cultural Resources There are no known designated historical or archaeological resources within the project area. However, there may be the existence of several burial grounds & other cultural relics within and in close proximity to the project areas. This ESMP spells out appropriate site specific mitigation measures for any burial ground and other cultural relics that maybe found during the project implementation. 4.4 Analysis of Socioeconomic Survey The measurement of precise impacts of the project on persons living or earning their living within the project areas cannot be effectively established without appropriate and accurate social and economic baseline data. The socioeconomic study helps to assess the social and economic changes that may occur in the living conditions of the project area populations as a result of the project impacts. 4.4.1 Objectives of the Socioeconomic Survey The primary objectives of the socioeconomic survey are as follows: 1. To collect information regarding existing socioeconomic conditions of the Funtua project area population; Page 61 2. To use the collected socioeconomic information to develop baseline data for the assessment of the social and economic impacts of the projects; 3. To analyze the patterns of relationships that exist among various socioeconomic or demographic components of the project areas; 4. To obtain perceived views of respondents on the effects of the projects on the environment and their vulnerability to socioeconomic changes due to the projects; and, 5. To provide a benchmark for any further information needed to monitor and evaluate improvements in the future. The respondents to the socioeconomic survey included the following: (1) Owners of any buildings or structures located within 10 meters from the outermost edges of the Funtua drainage corridors; (2) Owners of any buildings or structures located in areas to be used as construction staging areas during the construction phase of the projects; (3) Residents/tenants of the buildings or structures identified in items (1) and (2) above whether the structures are permanent or temporary; residential or commercial; (4) Land owners within the proposed drainage rehabilitation areas whose lands would be required for the purpose of the projects; (5) Economic trees/crops owners within the drainage setbacks whose lands would be required for the rehabilitation purposes. The socioeconomic survey was conducted in conjunction with the census of the project affected persons to profile the impacted project area and provide baseline data against which mitigations measures and support will be measured. The analysis is based on respondents to the questionnaire administered to residents of Funtua communities who are most likely to be impacted by the project. On the basis of the responses obtained in the exercise, the following determinations are made. 4.4.2 Funtua Socioeconomic Survey 4.4.2.1 Respondent and Household Distribution in Project Area The following Sections show how the residents of the project area responded to the socioeconomic survey administered to them. A total of 253 questionnaires were administered to potential PAPs within the project communities with a 100% return. Based on the survey, the 253 respondents with 1574 household members were documented for Funtua Districts. 4.4.2.2 Gender, Age and Household Size Distribution The survey data indicated male/female distribution of 52.7/47.3% for households in Funtua. The household data is reflected in Figure 4-1. Men and women in the project area are generally mainly involved in farming. Both men and women are significantly involved in the general pursuits of livelihoods. Page 62 The age distribution data (Figure 4-2) indicated that the percentage of household members 21 years of age and below for Funtua project area is 53.2%. About 1.4% of the households are in their 60s and above. The survey further showed that 37.0% are within the youthful ages of between 22 and 45 years while 8.3% of the household members are between the ages of 46 and 60 years. There is strikingly a high percentage of children below 21 years in the households (Figure 4-2). The household size distribution from the survey ranged from a minimum of one person to a maximum of 19 persons in Funtua. The average size of households is 6 persons for the project area community. On the extreme household size ends, the project area has 8.3% of the households with one to two members and 27.3% of the households with more than 8 persons (Figure 4-3). About 16.6% of the households have sizes of 7 or 8 persons while 24.9% showed sizes of 5 or 6 persons. The data showed 22.9% households have sizes of between 3 and 4 persons. 4.4.2.3 Marital Status of Respondents The survey data showed that 39.1% of respondents in the project area are married, 30.0% are children of non- marriageable age, 30.0% are single and 0.9% widowed. (Figure 4-4) 4.4.2.4 Access to Education The survey responses indicated that in the project community, the population of schooling age who never attended school is 23.1%; 33.5% had basic primary school education (FSLC), 31.4% attended Secondary school (SSCE), 8.4% are Undergraduates, 3.3% are Graduates and 0.4% had a Post-Graduate degree. (Figure 4-5). The very low literacy level within the project affected area is reflected in the significantly low number of existing educational infrastructure support within the area. Page 63 4.4.2.5 Access to Health Infrastructure The common diseases in Funtua communities include diarrhea, malaria, typhoid, pneumonia, cough, skin diseases, deficiency diseases, eye diseases, ear diseases, and waterborne diseases resulting mainly from malnutrition and lack of hygiene. Due to poverty, the quality of the health care services in the areas is generally poor with most residents patronizing quacks and medicine shops for their medical treatment. It should be anticipated that there will be increased pressure in the demand for health facilities in the communities resulting from influx of persons during the implementation of this project. 4.4.2.6 Access to Socioeconomic Infrastructure The socioeconomic infrastructures (roads system, electric power and access to water) in the Funtua project area are generally in poor state. Public access to potable water is non-existent and power is generally not steady. Implementation of the Funtua project will result in an influx of persons seeking gainful employment with the project contractors or to gain any social previlages within the project communities. It should be anticipated that there will be increased pressure in the demand for social infrastructures and amenities in the communities resulting from influx of persons during the implementation of the project. The influx of persons will inevitably put pressures on existing social service resources like water, electricity, transportation, etc. in the communities. The use of existing facilities will be on the rise. 4.4.2.7 Occupational and Income Distribution of Respondents The occupational distribution data from the questionnaires indicated that of surveyed households in the Funtua project area, 4.4% are farmers, about 31.0% are employed in the private sector, 4.6% are civil servants, 50.4% are students and 9.6% are unemployed (Figure 4-6). The main source of income for the households surveyed came from farming and trading/business across the community. Based on the income data provided in Funtua, 26% earned less than N21,000 monthly, 17% earned between N21,000-30,000 monthly, 19% earned N31,000-45,000 monthly, 22% earned N46,000-60,000 monthly, 15% earned above N60,000 monthly (Figure 4-7). The margin of error in the information provided on incomes may be significant considering that some of the respondents may have grossly inflated data provided with the intent to receive compensations in accordance with incomes indicated in the survey. The data provided could not be independently verified. 4.4.2.8 Household Waste Disposal Most of the respondents in the Page 64 communities indicate that their household wastes are disposed of at convenient locations including crevices and drainage channels. In many areas, the wastes are also indiscriminately dumped inside the water canals or at illegal dumpsites created only as a matter of convenience. Solid waste management in the project areas is a considerable hazard to the health of the population and the effective functioning of the storm water drainage systems. The unmanaged refuse causes regular obstruction of the storm water drainage systems. Most residents in the project communities dispose their domestic refuse randomly outside their residential compounds and the flood-prone areas are also treated as de facto waste disposal sites. The situation in the communities are indeed a reflection of the poor waste management and waste disposal mechanisms in most part of the state. As with other parts of the country, majority of households typically dispose of their domestic refuse inappropriately outside their residences. During the wet season, solid waste is transported by flowing storm water through unplanned drainage paths leaving a trail of refuse. 4.4.2.9 Desirability of the Project All the respondents in the survey (100%) indicated immense desirability for the project to proceed. Many of them expressed a clear wish for the project to proceed before the next round of rainfall. 4.4.2.10 Potential Security Risk Challenges As severally indicated, implementation of the Funtua project will result in an influx of persons seeking gainful employment with the project contractors or providing social services of various types or to gain any social previlages within the project communities. Different types of persons, including criminals of sorts, may be expected to find their ways into the project communities within this time. Such movement of persons will inevitably increase the potential for criminal activities within the Funtua project communities. It should therefore be anticipated that there will be increased pressure in the demand for police services and other security issues in the project area. Additionally, the cumulative unemployment levels in Funtua town resulting from the influx of employment seeking persons to the area will pose its own security risks for both the communities and the security institutions. 4.4.2.11 Conflict Resolution All respondents in the survey (100%) prefer and find it most convenient to have conflicts resolved through informal traditional modes of conflict resolution which currently exist within the communities. The court system is seen as an alternative means to resolve issues but no respondent favored it as a means of resolving conflict. None of the respondents was indifferent to the preferred approach. 4.5 Public/Stakeholders’ Consultation and Participation The public participation process is a critical component of this ESMP development and required identifying and working with all stakeholders and the project communities, including potentially affected individuals or group of persons, from the beginning of the process. The direct involvement and active participation of relevant stakeholders and the local people in the planning and management processes of the project assures that any potential disharmonious issues within the community are resolved speedily. There will also be maximization of resource use and increased benefits and expanded opportunities for the communities in the project areas. Page 65 The consultation process with the people of Funtua was driven in a manner that encouraged active and sustained participation of the community members, particularly the project area communities. This was to promote community ownership of the project and to enhance sustainability. Consultations and stakeholder involvement in the project gave the villages and the potentially PAPs the opportunity to make contributions aimed at strengthening the project while avoiding any negative impacts and reducing possible conflicts. The consultations will remain an ongoing exercise throughout the entire project to minimize chances of possible conflicts. This phase also involved the administration of pre-defined socio-economic questionnaires at the household level for potentially affected areas along the drainage corridor. 4.5.1 Community Participation Community participation improves understanding of the project and communication between the SPMU, the consultants or contractors and the community. The decision- making process for the projects will also be enhanced by actively involving relevant stakeholders, especially the project affected persons and organizations with a stake in the projects. 4.5.2 Objectives of the Community Consultations The aims of the public participation and consultation process are: • Solicit inputs, views and concerns from the each affected community as they relate to the project and obtain local and traditional knowledge that may be useful for decision-making; • Facilitate consideration of alternatives, mitigation measures and trade-offs, and ensure that important impacts are not overlooked and that benefits are maximized; • Reduce conflict through the early identification of contentious issues; and increase public confidence in the project. • Provide opportunity for the public to influence the project designs and implementation in a positive manner and improve transparency and accountability in decision-making. 4.5.3 Public Consultation Methodology The methodology adopted in this ESMP for carrying out the consultation process include a qualitative and quantitative mixed method that offers an effective means to interact widely with the project communities and stakeholder groups. Essentially, the approach is based on a participatory approach that included community meetings, public discussions as well as discussions with key informants (District Heads, Village Heads, Council members, Local Authorities, and Katsina NEWMAP Officers among others). A brief description of these methods is as follows: 1. Rapid Assessment Technique: This involved a quick professional assessment of the project potential impacts based on nearness of residential/commercial assets to the drainage corridors, anticipated nature and intensity of impacts, and the significance of the impacts within the proposed project areas. Any affected property owner is directly engaged in discussions to create and gain better understanding between the parties. 2. Socioeconomic Survey: This involved the administration of structured questionnaire designed to provide socioeconomic profile of households/families resident or doing Page 66 business within the project area as well as formal and informal discussions with focus groups, including the community traditional and administrative leadership. 3. Public Meetings: This was conducted as part of the participatory approach aimed at gaining good knowledge of the social issues/risks associated with the project as perceived by the communities. Public meetings were held at different locations within the project immediate impact areas. 4.5.4 Stakeholders’ Identification Generally, five broad categories of stakeholders were identified by the study based on the degree to which the project activities affected or involved such persons or group of persons. The five groups of stakeholders were actively consulted and encouraged to participate in the project development process. These stakeholders are grouped as shown in Table 4-2. These individuals and groups of persons include those who live in close proximity to the drainage corridor; those who will hear, smell or see the development; those who may be forced to temporarily relocate because of the project; those who have interest either traditionally or administratively, over developmental activities or policy changes for the project area (they may or may not live in proximity of the project); and, those who infrequently use the land on which the project is located. The adopted process consists of: i) Identification of any parties whose line of duties whether officially, socially, economically or culturally have direct or indirect bearing on any aspects of project activities. These parties may include individuals, groups, institutions or organizations that may be affected by the stormwater drainage rehabilitation activities; ii) Establishment of the stakeholders list and identification of specific stakeholder interests in relation to the project. The issues considered include: (a) the project's benefit(s) to the stakeholders; (b) potential changes to the routine activities of the stakeholders that may occur due to the project; and, (c) the project activities that may cause damage or conflict for the stakeholder; Table 4-2: Identified Stakeholder Groups GROUP DESCRIPTION ROLE(S) IN COMMUNITY PROCESS Group-1 Individuals or group of persons whose day- The identified persons or group of to-day lives/livelihoods may be directly persons in this category will ultimately affected by project activities. These are represent the project potentially-affected people who either reside or carry out their persons (PAPs) or households (PAHs) day livelihood activities within the Drainage corridor plus 20meters from the drainage corridor. Group-2 Individuals or group of persons whose day- This category of persons serves as to-day traditional or administrative functions mobilization points around which the include oversight of developmental activities Consultant will reach out to the other within the project areas. members of the community. Group-3 Individuals or group of persons whose daily This category of persons may or may not activities (including farming) bring them in be affected by the project but may be close proximity to the project area. These are significant contributors to the long term people who either reside or carry out their sustainability of the project. daily livelihood activities outside the channelization corridor but within the Page 67 GROUP DESCRIPTION ROLE(S) IN COMMUNITY PROCESS communities in which the project is located. Group-4 CBOs, FBOs and NGOs who provide This group of organizations essentially frequent interface with the community provides on a continuous basis spiritual members who may be directly or indirectly and physical welfare as well as affected by the project activities. environmental health of the community. Group-5 Individuals or group of persons who are This group of individuals is collectively political office holders and have significant responsible for the political and general responsibilities toward community members socio-economic development of the and developments within the project areas. community, among others within their respective political zones. 4.5.5 Funtua Community Meetings The ESMP Consultant team met with Funtua community groups between July 28 and August 7, 2019 to gain knowledge of the community perspective on the issues associated with the stormwater drainage in their respective communities. The initial community meetings were facilitated by the SPMU and were held at the Palace of the District Heads. Attendance to the meetings included the District Heads as well as the various Village Heads. At each of the community meetings, the ESMP Principal Consultant explained the purpose of the meeting and formally introduced members of the study team to the communities. He further provided an overview of the ESMP as related to the Funtua project and also highlighted the objectives, activities, outputs and work schedule of the assignment. He called upon the community members to render sustained support by providing any necessary information/data to the Consultant and also to other Consultants or Contractors that may be associated with the project implementation. Thereafter, the Consultant called for questions, comments, observations or suggestions from the respective communities to which answers and necessary responses were provided. Summaries of the minutes of each of the community meetings and the list of participants are provided in Annex V - VIII. The meeting with the enlarged Funtua community was attended by persons from the project corridor villages and held within one of the community assembly grounds. The community meeting for was attended by 35 persons, including the principal community leaders. A wider stakeholders’ meeting for the Katsina projects was held on August 7, 2019. This meeting which held in Katsina involved the direct participation of all those Funtua individuals and groups of persons identified in Table 4.2. 4.5.6 Participants’ Feedback and Comments During the Funtua community meetings, the District Head expressed the appreciation and gratitude of the community to NEWMAP, the Katsina State Government, the Federal Government and the World Bank for the proposed intervention works. Several other participants expressed their views, and made comments and suggestions relative to the project. All the speakers promised to give full cooperation and support to the activities of the Consultant and their respective projects. Photos taken at the various community meetings are included in Annex V - VIII. Consultations and stakeholders’ involvement in the projects will continue in a manner that gives the communities and the project affected persons (PAPs) the opportunity Page 68 to make contributions aimed at strengthening the development project while avoiding negative impacts as well as reducing possible conflicts. The consultations will also remain an ongoing exercise throughout the entire project, particularly with the potentially affected individuals and households relating to resettlements and compensations to minimize chances of every possible conflict. Information and data gathering involved a broad spectrum of activities that included interviews and discussions with community members who have historical knowledge of the site and the history of flooding and erosion problems in the affected areas. It also involved other physical and intrusive study of the natural, social, economic and cultural environments of the project areas. Table 4-3 gives the list of identified stakeholders with their areas of interest and responsibilities in the project. The list includes government functionaries, NGOs, FBOs and CBOs among others. Table 4-3: List of Stakeholders and Their Responsibilities GROUPS IDENTIFIED STAKEHOLDER AREA OF INTEREST IN PROJECT Residents of Funtua PAPs/PAHs Group-1 Communities, particularly those that reside within the project corridors Office of the Community Association Chairmen for the Development and welfare of the respective Group-2 affected communities. Communities Persons who reside outside the project Communities, Individualized livelihood issues Group-3 but have businesses or means of livelihoods within the project areas Community-based Organizations Watershed protection and management Faith-based Organizations in the Communities Community spiritual and physical welfare Group-4 Non-governmental Organizations Protection of environmental health of communities Office of the Chairmen – Funtua LGA Development of the Funtua LGA Office of the Hon. Member – Katsina State House of Development of the Funtua LGA in the Assembly representing Funtua state constituencies Group-5 Office of the Hon. Member – Federal Constituencies Development of Funtua federal representing Funtua constituency Office of the Distinguished Senator – representing Development of Katsina South Senatoral Funtua Zones Page 69 CHAPTER 5: ASSESSMENT OF POTENTIAL IMPACTS AND ANALYSIS OF ALTERNATIVES 5.1 Introduction This chapter discusses the methods/techniques used in assessing and analyzing the potential social and environmental impacts of the Funtua project and, also discusses the alternatives to the proposed project and reasons for their rejection. The likely future scenario without the project was also considered. The details of methods used in arriving at the significant potential social and environmental impacts of the project are included in Annex XXI and the impact assessment process is depicted in Figure 5.1. The beneficial and adverse potential environmental, economic, social and cultural impacts are identified based on professional judgment and the use of unranked pair- wise comparison approach (Canter and Sadler, 1997). Other factors in predicting the potential impacts include the results of public consultations. The potentially significant environmental and social impacts of the project as well as the suitable mitigation measures are discussed. Ecosystem Value Social value Environmental value Degree of disturbance Extent (of impact) Intensity (of impact) Duration (of impact) Significance of impact Specific mitigation measures Significance of residual impact Figure 5-1 : Standard Flowchart for a Systematic Approach to Impact Assessment (Source: OTG Consultant, 2019) The assignment of responsibilities for implementation of the ESMP and the associated costs are presented in Chapter 6. As previously indicated under Chapter 1, the envisaged project activities will include: 1. Civil Construction Works: o cutting and filling for percentage recovery o compaction of soils Page 70 o concrete casting o assembling of structures o Slope stabilization o Digging of foundations of the lattice structures o Vegetation clearing o Deployment and movement of transport vehicles and power equipment o Use of earth moving equipment such as excavators, compactors, bulldozers and pay loaders; 2. Bio-Engineering Remedial Works: o Terracing; o Structured vegetation; o Specific trees planting with known root strength o Economic trees planting Overall, this project is aimed at halting or minimizing the environmental and social damages being caused by the incidence of flooding and soil erosion in the project area and beyond. This is, in the overall a positive impact. The envisaged areas of potential impacts (positive and negative) on the socioeconomic, cultural and biophysical environments which could result from the proposed project include: Environmental Impact Areas: 1) Air quality 2) Surface water quality 3) Groundwater quality 4) Noise and vibrations 5) Degradation of arable land in the project area. 6) Biodiversity conservation. 7) Siltation of stream. 8) Ecological diversity in stream watershed. 9) Public Health and safety 10) Visual effects. 11) Traffic and transportation 12) Earth movements 13) Solid and liquid wastes 14) Soil erosion and flooding vulnerability 15) Climate change 16) Landscape change Social Impact Areas: 1) Economic Activities: o Sources of livelihoods. o Employment generation 2) Damage to Infrastructure: o Residential & commercial buildings o Roads, drainages, utilities, etc. 3) Community Effects: o Displacement of persons. o Isolation of settlements. o Migration of communities. 4) Gender Based Violence (GBV) and Sexual Exploitation & Abuse (SEA) 5) Damage to archaeological and cultural resources 6) Land use restrictions Page 71 The evaluation of the social environment requires assessment of the need for land for the projects as proposed and the remedial alternatives by conducting the following: • Analysis of watershed to determine drainage corridors and the consequential storm water flow path resulting from anthropogenic activities within the project areas; • Development of conceptual remedial alternatives based on the field surveys and the analysis of the watershed; • Evaluation of the availability of land for proposed project or alternatives. Following the collection of primary socio-economic data on the communities, a qualitative and quantitative analysis of the data was conducted to assess direct impacts on project population. Existing environmental conditions that impact on human health and safety was evaluated to ascertain imminent risks that may be associated with the projects. Specifically, analytical data on the ambient air and surface water quality was used to assess potential health risk concerns to residents within the Funtua project corridor. Potential environmental impacts at the Funtua site were developed in accordance with the grouped and project-phased impact identifiers contained in the ESMF for NEWMAP. The project phases are pre-construction, construction, and operation and maintenance phases. The potential impacts that arise from all the information/data sources identified were developed and presented in matrix/table format. The evaluation of the level of significance of environmental impacts was done within the current value system. The tools which were used to define the boundaries for, or regulate every intervention activity and their impacts comprise relevant laws, policies, plans, standards, objectives, limits of acceptable change, performance targets or other environmental quality goals which have a bearing on the proposed activity and its associated impacts. In assessing the social impacts, the measureable changes in human population, communities and social relationships resulting from the intervention project were identified. The social variables were evaluated under the following general headings: 1. Population characteristics; 2. Community and institutional structures; 3. Political and social resources; 4. Individual and family changes; and, 5. Community resources. A matrix/table relating project changes to social impact assessment variables were developed. The affected communities (villages) associated with the respective project districts are shown in Table 5.5 Page 72 Table 5-5: Project Area Districts with Affected Communites/Villages PROJECT AFFECTED VILLAGES/COMMUNITIES TOWN/DISTRICT Tudun Bagari/Gada FUNTUA Bayan Tasha Nassarawa Malamai Bese 5.2 Analysis of Potential Impacts Triggered by Funtua Project The potential impacts as listed above are organized considering the critical phases of the projects from the construction phase to the operation (post-construction) phase and summarized based on whether the envisaged project impact areas will result in positive or negative impacts. Impact emphasis is placed particularly on the construction and operation phases of the project. These are summarized as shown in Table 5.6. Table 5.6: Summary of Potential Impact (Areas Triggered by Project) Potential Positive Impact Potential Negative Impact S/No Aspects of Project that Aspects of Project that Trigger Impact Impact Trigger Impact Impact PROJECT CONSTRUCTION PHASE Increased value Rehabilitation of degraded and usefulness of Displacement of Land acquisition for right of way, 1 drainage corridors and eroded Affected Lands people. etc. reasons lands within the project areas. and Drainages Flood and erosion control will Soil excavations for backfill Safety of Lives and Degradation of 2 provide needed safety to the materials at identified borrow Properties off-site land peoples’ lives and properties pits or off-site sources. Site clearance, excavation, loading and offloading of materials and delivery Loss of crop lands and economic Employment services; drivers, security Loss of means of 3 trees along the proposed project Generation services, provision of goods livelihoods. corridors. and services to construction workers e.g. food kiosks and other shops. Stabilization of existing Protection to buildings or structural assets Loss of 4 building Site clearances. within the project corridors vegetation structures. during construction. Construction worker selection Gender based or determination based on Damage to Presence of community burial violence & Sexual gender; Subjection of women archaeological grounds and other potential 5 exploitation and to general discrimination and and cultural cultural relics in the vicinity of Abuse work place abuse or violence resources project areas or sexual exploitation. Emissions from construction vehicles, plant and equipment. Excavation and earth moving PROJECT OPERATIONS PHASE (POST- Air quality/ 6 operations. Exhaust emissions CONSTRUCTION) pollution from poor maintenance of plant and equipment or over revving of engines. Page 73 Potential Positive Impact Potential Negative Impact S/No Aspects of Project that Aspects of Project that Trigger Impact Impact Trigger Impact Impact Active involvement of project communities in awareness Increased campaigns and capacity community Surface and Suspended particles releases building. Training of 7 awareness and ground water from earthworks. Spillages of fuel community members and enhancement of quality and other petroleum products. local residents in health, local capacity safety and environmental awareness Community knowledge of Improved causes of erosion and Noise and vibrations from knowledge on flooding, and capacity to Noise and moving vehicles, excavators, 8 erosion and flood prevent and control flooding vibrations generators, power tools, and control and erosion throughout the compressors during construction. watershed. Construction operations - Improved and excavations, construction traffic, Sustained Public and stockpiled materials Recruitment Maintenance of floods and infrastructure Occupational of children to work on 9 erosion control infrastructure (drainages, Health and construction sites. Life in for continued effectiveness. electric poles, safety construction workers camp. etc). Waste disposal practices, sanitation and prostitution. Rehabilitation of site access roads before and/or after Improved site General construction works and 10 construction to allow for Visual effects. access roadways activities movement of machinery and for the delivery of materials. Formation of various Traffic movements associated Enhanced community committees to Traffic and with site staff, delivery of 11 community facilitate sustainable post- transportation materials and the removal of leadership construction monitoring and waste during construction maintenance. Improved public Bio-remediation of erodable Construction operations due to recreation areas land and conversion for long Earth 12 unstable soil profiles from site through land use term use as community movements excavations. restrictions recreation areas. Generation of waste during construction including off Restoration of Replanting of vegetation specification materials such as Solid and liquid 13 vegetation and cleared during construction cement, wood, plastic, paper and wastes other vital trees activities domestic waste from construction areas and worker camps. Exhaust emissions from Improved flood Post-construction construction vehicles, plant and and erosion maintenance of flood and equipment. Emissions from 14 Climate change control structures erosion control structures and poorly maintained plants and post construction bio-remediated areas equipment or over revving of engines. Page 74 Potential Positive Impact Potential Negative Impact S/No Aspects of Project that Aspects of Project that Trigger Impact Impact Trigger Impact Impact Project cut and fill and soil Landscape 15 movement along the project change corridor. Sourcing of construction Pressures on materials such as sand from river 16 Off-site beds or burrow pits. Increased Resources demand for construction materials N/A = Not Applicable 5.3 Potential Impacts Significance Rating for Funtua Projects Table 5-7 summarizes the detailed analysis of the impact significance ratings for each of the potential project impact areas for the Funtua stormwater drainage intervention project. Table 5-7: Significance Ratings for Funtua Project Impact Area Consequence Probability S/No Potential Impact Area Impact Significance Rating Classification PROJECT CONSTRUCTION PHASE 1 Loss of means of livelihood Medium Definite Medium 2 Loss of physical assets High Definite High 3 Displacement of persons Medium Definite Medium 4 Degradation of land Medium Improbable Low 5 Vegetation loss Medium Definite Medium Loss of archaeological and 6 Medium Definite Medium cultural resources 7 Air Quality High Definite High 8 Surface/ground Water Medium Definite Medium 9 Noise and Vibrations High Definite High 10 Stream ecological diversity High Possiblee Medium 11 Safety and health High Definite High 12 Visual Effects Very Low Improbable Insignificant 13 Traffic and transportation Medium Definite Medium 14 Earth movements Very High Possible Medium 15 Solid wastes Medium Definite High 16 Liquid wastes Medium Definite Medium 17 Climate change Medium Possible Low 18 Landscape change Medium Definite Medium Gender Based Violence & 19 High Possible Medium Disparity 20 Off-site Resources High Probable Medium OPERATION & MAINTENANCE PHASE Damage to erosion control 1 Medium Possible Low structures Page 75 Consequence Probability S/No Potential Impact Area Impact Significance Rating Classification Site access roadways 2 High Definite High rehabilitation Erosion & flood control 3 High Improbable Low capacity Enhanced community 4 Medium Possible Low leadership 5 Land use restrictions High Definite High 5.4 Identified Social and Environmental Impacts The impact significance outcome of Table 5.7 indicating the social and environmental impact categories that will suffer medium to high impact levels during the Construction and Post-construction Phases of the project implementation is summarized below: The other environmental and social impact categories will suffer low to insignificant impact levels from the project as shown in the Table. Project Construction Phase: • Loss of means of livelihood • Loss of physical assets • Displacement of persons (temporary) • Vegetation loss • Loss of archaeological and cultural resources • Air quality and Dust • Surface and ground water quality • Noise and vibration • Stream ecological diversity • Public/Occupational Health and Safety • Traffic and Transport • Earth movement (during construction and post construction phases) • Solid wastes • Liquid wastes • Landscape change • Gender based violence/Sexual abuse and exploitation • Off-site Resources Operation & Maintenance (Post Construction) Phase: • Site access roadways rehabilitation • Land use restriction 5.5 Analysis of Alternatives The consideration of alternatives relates principally to ways of improving the proposed intervention activities and/or attempting to avoid or minimize potential significant negative impacts. Usually there are several alternatives to any project. This section discusses the alternatives to the proposed project and reasons for their rejection. For the proposed Funtua project, the alternatives considered include: delayed project alternative; a do-nothing alternative; and the planned project alternative. Under these alternatives, the various project component options were considered as they relate to each of the Funtua intervention project. The project component options were considered in terms of the potentially significant Page 76 impacts associated with each option to a point of clear emergence of optimum alternative. The selection of a particular alternative is premised on several considerations, including the desirability/acceptability of the project, the government’s position or inclinations to the project, the potential environmental and social impacts of the project, the economic viability of the project, etc. The consideration of the options intertwined with the mitigation measures for the identified E&S impacts are shown in Table 5.8. The “Delayed Project” Alternative implies that nothing will happen immediately or at best some palliative measures will be undertaken in the interim to ease the severe flooding and erosion occurring at the Funtua communities. Such palliative measures are unlikely to achieve effectiveness with the desired goals based on drawbacks associated with technical feasibility and costs. The disadvantages associated with this alternative far outweigh any advantages. Also, based on the social aspects of this study, the necessary intervention to ease the severe flooding and erosion at Funtua communities is needed urgently by the people (Section 4.5). Consequently, under this scenario a delayed alternative is therefore not a viable option. Table 5.8: Analysis of Alternatives Delayed Project Do-Nothing Planned Project Consideration Alternative Alternative Alternative Demand-based (community desirability/ Not Acceptable Not Acceptable Acceptable acceptability) Location-based Accessible but not Not Applicable Acceptable (accessibility) acceptable Process or Activity-based Viable but delat is Not Acceptable Acceptable (technical feasibility) not acceptable Material-based Available but not Not Applicable Acceptable (availability) acceptable Cost-based (economic Moderate cost but Low cost but Not High Cost viability/implementability) Not economic economic Not a viable Not a viable Finding Viable option option option The “Do-Nothing” or No-Project Alternative will worsen the present situation and worsen poverty at the same time. The disadvantages associated with this alternative far outweigh any advantages. In addition, most of the affected communities where agricultural activities dominate will still be cut off due to lack of effective road linkages. The “Do-Nothing” or No-Project Alternative is therefore not a viable option. The Funtua Intervention Project (Proposed Projects) Alternative The Funtua intervention project Alternative requires the rehabilitation of the existing primary stormwater drainage corridors, and improve (upgrading, rehabilitation and maintenance) the existing access roads and secondary drainage channels to an acceptable safety and environmental standard. The advantages associated with this alternative far outweigh the disadvantages. Although initial costs would be high; the accrued social, economic, political and cultural benefits far outweigh the no-project alternative. Additionally, based on the social aspects of this study, this intervention is 100% desired by the people (Section 4.5). The objective of the intervention projects is to eliminate floods and soil erosion in the project areas while salvaging the agricultural lands of the affected areas and also boost agricultural production through the provision of access roads for easy transportation of products. Moreover, hitherto Page 77 post-harvest losses will be reduced and thus creating more benefits to the farmers in particular and Katsina State in general. This alternative involves a lot of construction work, along with the associated positive and negative impacts. The essence of a project of this nature is to ensure that activities are undertaken in a way that minimizes the negative impacts of the project while enhancing the positive impacts. To this end, there is a need to ensure any activity that can result in negative impacts on the environment (biophysical and socio-economic) are identified and mitigating measures planned for each negative impact. Page 78 CHAPTER 6: ENVIRONMENTAL AND SOCIAL MANAGEMENT PLAN (ESMP) This Environmental and Social Management Plan (ESMP) is necessary to achieve the health, safety, and environmental regulatory compliance objectives of the project. The environmental and social management systems/procedures are developed to establish sound basis for mitigation, monitoring and management at the project level. The E&S requirements are integrated into existing procedures to ensure that project bottlenecks are not created. To this end, the Plan has focused on specific steps to be taken with respect to implementation of the mitigation measures and monitoring activities for the environmental and social impacts identified in Chapter 5. The plan highlights the specific mitigation measures that would be taken and the entities responsible for carrying out the mitigating measures. The ESMP also contains a monitoring plan indicating the responsible parties, the frequency of monitoring, key indicators and the reporting format, and provides for necessary capacity building to facilitate the ESMP implementation. Cost estimates for implementation of the various measures, monitoring plan and capacity building are also given. The projected implementation budget will enable the ESMP to be an integral part of financing for the construction and maintenance works in the project. 6.1 Mitigation Measures for Implementation Based on the environmental and social impact categories identified in Chapter 5 (see Section 5.4), the ESMP implementation for each of the Funtua project will address measures that cover the following impacts during the construction and the post construction (operation and maintenance) phases of the project implementation: Social Impacts: • Loss of means of livelihood • Loss of physical assets • Displacement of persons (temporary) • Loss of physical cultural resources • Land use restriction These impacts are addressed hereunder as Community and PAPs Issues Management. Environmental Impacts: • Air quality and dust • Surface and ground water quality • Noise and vibration • Vegetation loss • Public/Occupational Health and Safety • Traffic and Transportation • Earth movement • Solid and liquid wastes • Landscape change These impacts are addressed hereunder as: 1) Dust control and air quality management; 2) Water resources, erosion control and flood prevention management; 3) Noise and vibration exposure management; 4) Flora and fauna removal management; 5) Public and occupational health and safety management; 6) Construction operation and slope stabilization; 7) Road diversion and accident prevention; 8) Waste management; 9) Temporary project office site management; and, Page 79 10) Post construction management. The mitigation measures to address the above environmental and social impact categories as well as the monitoring and responsibility roles for the different phases of the project implementation are discussed under Section 6.2 below. 6.2 Environmental and Social Impact Mitigation Measures The environmental and social impacts mitigation measures to address the identified impact categories for the Funtua intervention project area are presented in Table .6-1. These mitigation measures will be implemented by the Contractor selected for the Funtua project who shall be solely responsible through the course of the project and shall be contractually required to develop all the necessary site-specific management plans associated with the mitigation of each impact area. The monitoring aspects of the project implementation shall be carried out by other identified Agencies and organizations including the SPMU-ESO/SLO, SMEnv., SMoW, SMLS, Community leaders, Site Committee, NGOs/CBOs, etc in accordance with the provisions and requirements of this ESMP. Table 6.1: Summary of Impacts and Mitigation Measures for Funtua Projects COLUMN 1 COLUMN 2 COLUMN 3 COLUMN 4 Item Environmental and No Mitigation Measures Monitoring Responsibility Social Impact Source PRE CONSTRUCTION 1 Impacts on • Appropriate compensations  No. of public SPMU-SLO ; Community and shall be paid for structural complaints recorded in Focal NGO PAP Management damages; project acquired the specific Funtua SMEnv.; (Loss of physical lands; temporary use of communities; SMLS.; assets; Loss of lands; destroyed crops and  Level of awareness Funtua means of economic trees. and understanding of Communities livelihood; • Compensation to persons Funtua Communities Leaders; Displacement of (PAPs) within Funtua members; Site Committee persons communities who will need  No of Funtua (temporary) to be temporarily relocated Community members prior to beginning of that attend trainings; • Possible damage to construction activities.  Level of satisfaction building structures • Create awareness among among Funtua PAPs; and other structural Funtua community  No of women gainfully elements within members and sensitize the employed by project; Funtua communities; people to all project  No of other businesses • Permanent activities induced by project in acquisition of land for • Seek the consent of Funtua the Communities; setback to be used Communities and  Questionnaires, direct for site stabilization; landowners to erect the site observations and • Temporary use of office for the specified interviews. land for project duration of the project; staging areas, • Sign Agreement with erection of workers’ Community and for the camp and temporary temporary acquisition of offices (Agreement land; between • Agree on other measures to Communnities and render the site safe and Contractor). usable to the satisfaction of • Croplands and the landowners at economic trees within completion of project. setback lands may • A stand-alone Resettlement be destroyed during Action Plan has been site stabilization. prepared for this project • Construction addressing impacts on activities may affect Funtua communities and persons with critical the PAP management. The Page 80 COLUMN 1 COLUMN 2 COLUMN 3 COLUMN 4 Item Environmental and No Mitigation Measures Monitoring Responsibility Social Impact Source health conditions, SPMU shall be required to including old implement the RAP in persons, children and accordance with the other vulnerable provisions therein. persons, such persons may be • To be resolved in temporarily relocated accordance with provisions for the construction in the Agreement by the phase. Funtua Communities and landowners and the • Possible Contractor. disagreement over siting of staging areas and temporary facilities between community and contractor 2 Community Cultural • Relocation of identified • Protection of all SPMU-SLO ; Heritage cultural relics; identified treasure Focal NGO • Compensation for any finds SMEnv.; • There may be damaged cultural relic or for SMLS.; cultural relics in the relocation issues. Funtua vicinity of some • The Contractor shall be Community project areas which required to prepare and Leaders; could be impacted submit a Cultural Heritage Project Site during construction Management Plan to the Committee activities. SPMU for approval and adoption for the contractor’s implementation 3 Public/Stakeholders • Build capacities within  No of active SPMU-SLO, Participation Funtua communities participants from ESO; • Non-involvement of • Incorporate community Funtua communities Focal NGO; project community and and other stakeholders SMOW; feedback into project stakeholders affects the implementation process SMEnv; project post- construction • Disseminate project ESMP SMOH; maintenance and findings to Funtua Funtua sustainability Communities; Community • Ensure that period of Leaders; inaccessibility to land is as Project Site short as possible Committee • Awareness campaigns and capacity building. • The Contractor shall be required to prepare and submit a Stakeholders’ Engagement Plan to the SPMU for approval and adoption for the contractor’s implementation 4 Vegetation and • Mark out areas for • Areas of stressed SPMU-ESO, Biomass Removal clearance & where possible vegetation; NRO; Management use manual method of Focal NGO; vegetation clearing; SMOW; • Damage to the • Size of cleared SMEnv; natural and planted • Undertake selective vegetation areas SMOH; vegetation on any clearance by removing tall Funtua acquired setback woody species leaving Community Page 81 COLUMN 1 COLUMN 2 COLUMN 3 COLUMN 4 Item Environmental and No Mitigation Measures Monitoring Responsibility Social Impact Source lands during site saplings for quick Leaders; clearance, areas for regeneration of vegetation; Project Site siting of temporary Committee office and workers • Prevent colonization by camp. invasive species. • Impact on flora and fauna. • Prevent damage to critical • Impact on wild life. ecosystems and habitats. • Prevent destruction of flora and fauna. • The Contractor shall be required to prepare and submit a Vegetation and Biomass Management Plan to the SPMU for approval and adoption for the contractor’s implementation CONSTRUCTION PHASE 5 Dust and Air Quality • Dust generation will be • No. of public SPMU-ESO; Management controlled mainly by the use complaints; Focal NGO of water, especially in the • Level of particulates SMOH.; • Air pollution is dry season. in air Funtua expected from dust • Use of water tanker for • Level of other air Communities and emissions from purposes of water dousing pollutants Leaders; construction vehicles, to control dust emission. • Vegetation surfaces Project Site plant and equipment. • Erection of speed control free of dusts Committee • Dust is generated by signals and ramps mounted • Ambient air excavation and earth in communities; monitoring using moving operations • Covering of hauling trucks standard methods and causes nuisance carrying sand and other to residents and aggregates; other sensitive • Covering of heaped receptors. material e.g. sand will be • Exhaust emissions covered; occur from poor • Use of nose masks by all maintenance of plant workers at road and equipment or maintenance/works sites. over revving of • Surfaces of vegetation engines. along the maintenance road will be monitored to verify the effectiveness of dust suppression method. • The Contractor shall be required to prepare and submit an Air Quality Management Plan to the SPMU for approval and adoption for the contractor’s implementation. 6 Water Resources, • Location for heaping • No of complaints from SPMU-ESO, PE; Erosion and construction material (e.g. Funtua Community Focal NGO; Sedimentation, sand and other aggregates) members; SMOW; Run-off Control not less than 50m from • Absence of sediment Funtua water bodies and drainage build up around project Communities Management Leaders; channels (i.e. a separation areas; Page 82 COLUMN 1 COLUMN 2 COLUMN 3 COLUMN 4 Item Environmental and No Mitigation Measures Monitoring Responsibility Social Impact Source distance of 50m will be • Absence of flooding in Project Site • Increased observed); construction areas; Committee sedimentation and • Site for fueling of machinery • No of spills & repairs and servicing of equipment made; runoff may result will be located at a • Use of standard from activities during minimum distance of 100m monitoring methods the construction from any water bodies, works. wetlands and drainage • Earthworks release channels; suspended particles • Embankment erection into watercourses, around fueling and other liquid or spill-able storage which can have sites in order to limit or temporary contain such material from detrimental effects on escape to potentially pollute water organisms. water resources; Spillages of fuel and • Side drains (where other petroleum appropriate) will be products cause provided with settling basins near water bodies to contamination of the remove silt and debris from soil and water road surface and resources. construction site run-off, • Excavation at the before discharge to borrow pits may adjoining streams or rivers; cause land • Adequate side drains degradation in the provided to carry run-off into drainage channels to vicinity of the borrow prevent erosion; pits; may cause soil • Culverts of suitable capacity erosion and siltation constructed to contain and of nearby roads. direct flow, especially at peak flow and run-off; • Road maintenance works to be carried out off peak rainy season; • Provision of toilets and urinal at locations not less than 50m away from water bodies; and • Adequate worker awareness on sanitation and measures to avoid water resource contamination. • The Contractor shall be required to prepare and submit a Water management Plan and an Erosion and Sedimentation Management Plan to the SPMU for approval and adoption for the contractor’s implementation. 7 Noise and Vibration • Equipment servicing plan • No of complaints from SPMU-ESO; Exposure will be prepared and strictly Funtua Community Local NGO; Management followed to ensure efficient members; SMOW; machinery performance and • Absence of structural SMOH; optimum noise generation. failures; Funtua Page 83 COLUMN 1 COLUMN 2 COLUMN 3 COLUMN 4 Item Environmental and No Mitigation Measures Monitoring Responsibility Social Impact Source • Noise will emanate • Stationary equipment shall • Absence of debris Communities from moving be sited at safe distances accumulation; Leaders; vehicles, excavators, from sensitive areas to • No of debris removals Project Site minimize noise impacts & repairs made; Committee generators, power • Workers operating noisy • Sensor tools (e.g. for equipment will not be measurements vegetation clearing), exposed continuously for around workplace and compressors more than 3 hours a day. during construction. • Workers will be provided • Vibrations may come with ear plugs. from soil compaction • Workers handling vibrating equipment and other equipment or parts will be given pads to absorb the vibroequipment to be vibrations and will not be used.. exposed continuously for longer than 3 hours a day. • Sanctions (ranging from a warning to dismissal) will be instituted by the contractor against workers who do not observe the use of appropriate PPEs 8 Occupational/Public • Health, safety and •No. of sanitary facilities SPMU-ESO; Health and Safety environmental training and provided at start of Focal NGO; Management awareness will be extended project; SMOH; to Funtua Community •Adherence to stipulated Funtua • Occupational members and local speed limit Community accident during residents; •Records and No of Leaders; construction. • Erection of warning signals incidents; Project Site • Construction and use of reflective tapes •Use of PPEs by Committee; operations pose at approaches to workers; hazards to people excavations, heaped •Records of appropriate living or working near materials, stationary workers’ training; construction areas or equipment, etc. •Record of reinstatement employed to work on • Posting of speed limits of plan for burrow pits; site. 25km/hr at approaches to •Record of health and • Excavations, construction sites; safety meetings construction traffic • Safety meetings held twice •Record of first aid and stockpiled a week and documented exercises materials pose accordingly; •Hazards assessment particular threats to • Inductions and awareness children and programmes held for all livestock. employees on occupational • Children may be health and safety practices; inadvertently • A First Aid team formed to recruited to work on provide first aid services to construction sites. workers and where appropriate make referrals to the nearest Health Centre or hospital; • First Aid team to be trained by a medical team from the Health Centre; • Accident records at construction site and neighbourhoods to be maintained both for workers and the public; • Stocks of PPEs to be Page 84 COLUMN 1 COLUMN 2 COLUMN 3 COLUMN 4 Item Environmental and No Mitigation Measures Monitoring Responsibility Social Impact Source maintained and supplied to workers regularly as needed; and • Workers required to wear the appropriate PPEs e.g. helmets, ear plugs, nose masks, vibration pads, hand gloves, etc. • The Contractor shall be required to prepare and submit a Community/Occupational Health Management Plan to the SPMU for approval and adoption for the contractor’s implementation 9 Gender Based • Inductions and awareness • No. of GBV/SEA Focal NGO; Violence programmes held for all awareness workshops SPMU-ESO; Management employees on GBV/SEA held; SLO; issues; • Level of GBV/SEA SMEnv; • GBV/SEA awareness will awareness of workers & SMOH; be extended to Funtua others; Funtua Communitiesmembers and • No. of reported GBV Communities local residents; cases Leaders; • GBV/SEA records at Project Site construction site and Committee neighbourhoods to be maintained both for workers and the public; • Workers required to report any GBV/SEA issues to the construction management. • The Contractor shall be required to prepare and submit a Gender Based Violence Management Plan to the SPMU for approval and adoption for the contractor’s implementation Contractor • Establishment and Labour Influx operation of an effective GRM accessible to • No of Greivances community members to recorded facilitate early identification • No of sensitization of problems and targeted workshops help for mitigating interventions. workers on cultural • Provision of information issues. regarding Worker Code of • Tracking and Conduct in local language recording the number and inclusion of a cultural of project workers sensitization training for recruited for the workers regarding project within and engagement with local from outside the community project area. • Sourcing of local workforce • No of Road safety against bringing more trainings held for people, introduction of workers. sanctions for workers Page 85 COLUMN 1 COLUMN 2 COLUMN 3 COLUMN 4 Item Environmental and No Mitigation Measures Monitoring Responsibility Social Impact Source involved in criminal behaviours and a provision of substance abuse prevention and management program. • Preparation and implementation of a traffic management plan; construction of additional or separate access roads to project and workers’ camp site, conduct road safety training for workers and inclusion of sanctions or fines for reckless driving by workers. 10 HIV/AIDS and STIs • Provide quarterly HIV/AIDS • No. of HIV/AIDS Focal NGO; Management and STIs awareness workshops held; SPMU-ESO; programmes for workers • Level of awareness of SMEnv; and nearby communities; workers & others; SMOH; • Construction workers • Health and HIV awareness • Records of peer Funtua camp give rise to Communities team arranged from the educators’ training; health risks State Health Ministry for the • Records of condoms Leaders; associated with poor quarterly programmes; distributed Project Site sexual practices and • Sponsored educational Committee prostitution. package put together by the team to be implemented to enlighten both workers and communities; • Training of peer educators within the work force and in communities by the team; and • The contractor to provide free condom supplies and encourage free discussions, counseling and testing. 11 Construction • Maximize local employment • No. of SPMU-ESO, PE; Operation and (including women) on accidents/incidents; Focal NGO; Slope Stabilization construction works (there • No. of visible warning SMOW; should be a contractual signs; SMEnv; • Construction requirement to hire a • Level of public Funtua operations will result percentage of local awareness; Communities in topographic workforce including women) • Record of safety Leaders; alterations. • Provide occupational health meetings held; Project Site • Construction and safety awareness Committee operations may result training and workshops, in landslides, rock • Use of child labor shall be cave-ins, and strictly prohibited mudflow/flooding. • Routinely Monitor and • Construction maintain construction work operations can pose for continued stability and earth movement quality hazards to people • Shortcomings in the control working near the structures including the construction areas check dams (retention due to unstable soil basins) should be corrected profiles from site before they develop into Page 86 COLUMN 1 COLUMN 2 COLUMN 3 COLUMN 4 Item Environmental and No Mitigation Measures Monitoring Responsibility Social Impact Source excavations. serious problems. • The Contractor shall be required to prepare and submit an Emergency Response and Incident Plan to the SPMU for approval and adoption for the contractor’s implementation 12 Traffic and • A temporary structure to be •Effective traffic flow with SPMU-ESO, PE; Transportation constructed on one lane to vehicular & worker Focal NGO; Hazards allow for traffic flow while safety; SMOW; • Traffic movements work is on-going on the •Appropriate positioning SMEnv; associated with site other lane; of road signs, reflectors, Funtua staff transportation, • Traffic wardens to be speed ramps, control Communities delivery of materials posted at positions 100m limits, traffic wardens; Leaders; and the removal of from the construction points •Records of accidents Project Site waste during the on either side of the road to and near misses Committee construction is likely. ensure orderly traffic flow; •No of public complaints. • Occasional • Actual working areas to be movement of secured with barricades; abnormal vehicular • Adequate road warning loads on local roads signs to be posted at may result in vantage points to warn and temporary diversions. direct traffic; • Traffic and transport associated with project will adhere to existing roads or follow specified routes as established. • All measures shall be effectively monitored by Contractor to ensure their implementation. • The Contractor shall be required to prepare and submit a Traffic and Vehicle Management Plan to the SPMU for approval and adoption for the contractor’s implementation 13 Waste Management • Waste bins to be provided •Waste segregation and SPMU-ESO; (solid and liquid for the disposal of waste littering; Focal NGO; wastes) generated; •Emptying of bins at SMOW; waste dump sites; SMEnv; • Waste will be segregated •Waste composting; Funtua • Proposed project will into three at source - •Indiscriminate Communities generate waste organic (food residues), defecation; Leaders; during construction recyclables (woods, metals) •Toilets Project Site including off and non-recyclables (plastic decommissioning Committee specification and glass wastes); materials such as • Organic waste to be cement, wood, composted near the site plastic, paper and office to enrich the soil, domestic waste from while plastics and glass are construction areas taken to the district dump- and worker camps. sites; This could result in Page 87 COLUMN 1 COLUMN 2 COLUMN 3 COLUMN 4 Item Environmental and No Mitigation Measures Monitoring Responsibility Social Impact Source • Topsoil removed from the increased pressure on local waste dump right of way for facilities as well as maintenance work to be potential for spread on the land to avoid unauthorized disrupting drainage disposal and littering network; and if not • Toilets and urinals to be properly managed. sited at least 100m from any stream or drainage channel and decommissioned at the end of project. • The Contractor shall be required to prepare and submit a Waste Management Plan to the SPMU for approval and adoption for the contractor’s implementation OPERATIONS & MAINTENANCE PHASE (POST CONSTRUCTION) 14 Land use restriction • Create awareness among • Sustained treated SPMU-ESO; flood and erosion SMEnv; community members; • Use of acquired land healing process Focal NGO; • Build capacities within Funtua associated with the community; Communities project setbacks will • Incorporate community Leaders; be altered and feedback mechanism into Project Site restricted to process Committee • Ensure periodic monitoring community of restricted areas recreational uses. • Continuous maintenance of Structures may never erosion control structures be erected on this including concrete channels portion of land but and check dams, and bio- economic trees could remediated areas for be planted. continued effectiveness. 15 Closure of • Ensure that agreements • Agreements entered SPMU-ESO, temporary office, with the community and with community and NRO; staging areas and landowners on post landowners for use of Focal NGO; land; Funtua decommissioning construction hand-over are • Terms of Agreement Communities of project kept. Leaders; fulfilled with • Enforce agreed measures community and Project Site • Damage to land to render the site safe and landowners; Committee forms and vegetation usable post construction to • Handover of office the satisfaction of the site as agreed community and landowners. 16 Erosion control • Any treated erosion areas • Sustained flood SPMU – PE system failure should be checked regularly healing process Funtua management and the healing process Communities Leaders; monitored closely. Project Site • Check dams that are • Structures built in the Committee not properly channelization for CBOs/CDOs Page 88 COLUMN 1 COLUMN 2 COLUMN 3 COLUMN 4 Item Environmental and No Mitigation Measures Monitoring Responsibility Social Impact Source constructed may stabilization purpose should suffer damage that be observed for damage could reduce the especially during rainy structural integrity of seasons and after heavy the erosion control storms. Any damage structures during observed should be post-construction repaired immediately to phase. avoid further damage and the eventual collapse. 6.3 Institutional Responsibilities and Accountabilities The structure and reporting arrangements for the implementation of the ESMP are integrated into the overall project monitoring and evaluation program for the Funtua stormwater drainage rehabilitation project. The key actors as well as the roles and responsibilities of the various institutions in the ESMP implementation are as shown in Table 6.2. The matrix includes listing of all entities (public and private) responsible for designing and implementing the various aspects of the plan. The need for additional capacity building for the involved institutions and actors, including long- term consultation and training program for the implementing agency are also built into the structure. Table 6.2: Institutional Responsibilities Project Institutional Category Implementation Roles & Responsibilities Phase Katsina State Ministry of All Phases • Lead role to ensure adherence to the ESMP and applicable standards, Environment (SMEnv) (Preconstruction, environmental and social liability investigations, Monitoring and evaluation Construction and process and criteria Post Construction) • Executing agency with overall responsibility for NEWMAP implementation in the State. • Ensure that sufficient funds are made available to the SPMU; • Ensure that SPMU, regardless of financing source, complies with the provisions of the ESMP and WB safeguard policy. • Ensure that SPMU complies with KTSG environmental policies and regulations. • Ensure that the SPMU retain dedicated Technical Support for the project duration including safeguard specialists to oversee ESMP implementation. • Ensure that SPMU monitor environmental protection and mitigation measures in the ESMP and those activities that are embodied in the detailed designs; • Ensure that SPMU has secured environmental clearances certification from FMENV and WB prior to award and/or commencement of civil works contracts; • Ensure that SPMU establishes and implements an environmental grievance redress mechanism, as described in the ESMP, to receive and facilitate resolution of affected peoples' concerns, complaints, and grievances about the project's environmental performance • Ensure that the bidding and contract documents include the ESMP; • Ensure that SPMU submits semi-annual monitoring reports on the ESMP implementation to WB and FPMU. SPMU (Safeguard Pre-Construction • Ensure that bidding and contract documents include the ESMP; Officers, PRO, Project Phase • Review and approve all required management plans necessary for the Engineer, M&E) pre-construction, construction and post construction phases of the project; • Undertake monitoring of the implementation of the ESMP (mitigation and monitoring measures) with support from the appointed Focal NGO, the Site Committee, the Contractor and other stakeholders. • Report to WB and FPMU on all aspects of social and environmental Page 89 Project Institutional Category Implementation Roles & Responsibilities Phase management and monitoring at required frequency; • Submit monthly and quarterly or semi-annual monitoring reports on ESMP implementation to FPMU and WB; • Participate in grievance redress mechanism, as described in the this document, to receive and facilitate resolution of affected peoples' concerns, complaints, and grievances about the sub-project's environmental performance • Based on the results of the ESMP monitoring, identify environmental corrective actions and prepare a corrective action plan • Maintain and manage all funds effectively and efficiently for the project; • Coordinate all policies, programmes and actions associated with the intervention construction works; • Ensure the smooth and efficient implementation of the preconstruction phase of project’s various programmes; • Have custody of a copy of the ESMP and disseminate information contained therein accordingly. Construction • Cooperate with the Steering/Technical Committees to provide guidance to Phase the technical aspects of all project activities; • Provide oversight of contractors work plan and E&S implementation schedule; • Conduct weekly or routine site inspection and monitor implementation of E&S safeguards; • Receive and review reports from the contractor; • Prepare and submit weekly/monthly and subsequent quarterly and annual reports to the SPMU Project Coordinator, FPMU and the WB. Post Construction • Ensure proper closures of all contractor’s temporary facilities; Phase • Ensure that the terms of Agreement between the Contractor and the community and land owners are fulfilled. FPMU All Phases (Pre-  Project assessment and monitoring of the ESMP implementation and the construction, construction activities. Construction and  Post Construction) World Bank All Phases (Pre- • Assessment of specific and general project implementation; Construction, • Recommend additional measures for strengthening the management Construction and framework and implementation performance. Post Construction) State Ministry of Works Pre-Construction  Provide necessary preconstruction and construction support to the SPMU and Construction  Site assessment and monitoring of construction works and engineering Phases activities; State Ministry of Lands & Pre-Construction  Compliance overseer at State Level, on matters of land acquisition, Survey (SMLS) Phase compensation and other resettlement issues FMEnv, NESREA, Other Pre-Construction  Intervene in areas under their jurisdiction as and when project demands MDAs and Construction Phases Contractor (Site Pre-Construction • Recruit qualified environmental safeguard specialist to ensure Manager, Site Engineers/ Phase compliance with environmental statutory and contractual obligations and Supervisors) proper implementation of the ESMP • Implement all the provisions of the ESMP in coordination with the SPMU and other relevant authorities • Develop and submit for SPMU and FPMU approvals specific management plans as provided in the ESMP. • Provide sufficient funding and human resources for proper and timely implementation of required mitigation measures in the ESMP • Implement additional environmental mitigation measures for unexpected impacts, as necessary • Develop a work plan which incorporates schedule for E&S safeguards implementation; • Submit the work plan and schedule of E&S safeguard implementation to the SPMU; • Train/create awareness of all personnel/workers on relevant E&S safeguard measures and their obligations; • Ensure land disturbance activities are conducted in accordance with relevant legislation and the ESMP; • Communicate content of ESMP to all employees and contractor agents; Page 90 Project Institutional Category Implementation Roles & Responsibilities Phase • Provide oversight function during mobilization to ensure adherence to good practice and the ESMP Construction  Implement all E&S safeguards and other mitigation measures as Phase planned;  Submit monthly and quarterly implementation reports on E&S safeguards to SPMU; • Comply with BEME specification in procurement of material and construction, and adherence to the ESMP and good construction practices; • Ensure land disturbance activities are conducted in accordance with relevant legislation and the ESMP;  Provide adequate onsite waste collection bins, ensure proper disposal, not to litter and not to create environmental nuisance;  Provide oversight function during construction to ensure adherence to good practice and the ESMP Post Construction  Provide oversight function during decommissioning to ensure adherence Phase to good practice and the ESMP Site Committee All Phases  Monitor and ensure compliance to ESMP provisions as well as contractor (Preconstruction, implementation quality Construction and Post Construction) Local government All Phases  Provide support in monitoring project execution within their domains to (Preconstruction, ensure compliance with the ESMP and other relevant requirements Construction and Post Construction) Local Community All Phases  Promote environmental awareness; (Preconstruction,  Assist and liaise with other stakeholders to ensure proper siting and Construction and provision of approval for such sites; Post Construction)  Support with provision of necessary infrastructures and engage/encourage carrying out comprehensive and practical awareness campaign for the proposed projects, amongst the various relevant grass roots interest groups. CDOs All Phases  Ensure community participation by mobilizing, sensitizing community (Preconstruction, members; Construction and Post Construction) Focal NGO All Phases  Assist to ensure effective response actions, to evolve and devise (Preconstruction, sustainable environmental strategies and rehabilitation techniques, Construction and organize, coordinate and ensure safe use of volunteers in a response Post Construction) action, & provide wide support in management planning, institutional/governance issues and other livelihood related matter, awareness campaigns General Public All Phases • Identify issues that could derail the project; (Preconstruction, • Support project impacts mitigation measures as well as awareness Construction and campaigns. Post Construction) 6.4 Capacity of Katsina NEWMAP to Implement the ESMP 6.4.1 Capacity and Training Needs In order to achieve effective ESMP implementation, there is need to strengthen relevant competencies on environmental and social management at primarily the State level and secondarily, the LGA and community levels including contractors. This will stimulate the required collaboration among the key actors. Experience has shown that strengthening capacity involves more than improving technical skills, developing new systems or establishing quality assurance and improvement standards. While these are important, strengthening capacity is however, essentially about changing behavior towards achieving desired goals. Page 91 The capacity building should include equipping individuals with the understanding, skills and access to information and training that enables them to perform effectively. Personnel of the erosion control intervention project need to understand the purpose of the ESMP and their expected roles during its implementation. The target groups for the training will include: • SPMU E&S Safeguard Officers and Project Engineers; • Contractor’s personnel; • Construction workers and site personnel; and, • Select members from the Funtua project communities. The SPMU E&S safeguard officers and contractors will require capacity building in the implementation of the projects’ environmental and social safeguards and general project planning and management interfaced with E&S components. Capacity requirements are also necessary in the areas of E&S monitoring and reporting, adherence to the required E&S principles, standards and commitments. The construction workers and select members of the project communities will undergo training on public awareness creation/educational techniques (on environmental, social and health issues) and first aid procedures. 6.4.2 Capacity Building Cost The capacity building plan for the ESMP with the associated cost implications is shown in Table 6.3 below. To enhance the respective roles and collaboration of the relevant stakeholders, the broad areas for capacity building and effective ESMP implementation are identified and shown in Table 6.3. Table 6.3: Summary of Institutional Capacity and Training Needs with Costs Estimated Cost Form of Programme Description Participants Duration Training Agency In (N) and Project Training Phase Understanding the Officials of SMEnv, Workshop 1 Day External Agency for 1,500,000.00 Environment: SEPA, SMOW, SMLS, capacity building or (Pre-Construction • Concepts, Regulations & SPMU, Contractor, Environmental & Phase) Statutory Requirements; Community Leaders, Social Specialist • Environmental Focal NGO, CBOs & Management; Other Relevant Groups • Flood and Erosion Prevention & Control; • Stakeholder & Community Participation Scope of Funtua Drainage Contractor, SPMU Workshop 1 Day External Agency for 1,500,000.00 Intervention Projects: Safeguard Officers and capacity building or (Pre-Construction • Environmental & Social Project Engineers, Environmental & Phase) Impacts; SMENV, SEPA & Social Specialist • Engineering Design and relevant MDAs, Associated ESMP; Community Leaders, • Coordination with Other CDOs, & NGOs MDAs and the Community Project Implementation: SPMU Project Lecture 1 Day External Agency for 2,000,000.00 • Civil Works with Bio- Engineers and and Site capacity building or (Construction remediation in the project; Safeguard Officers, Visit Environmental & Phase) • Roles and Responsibilities Contractors, SMEnv, Social Specialist of Key Actors; SEPA • Environmental Monitoring Monitoring and Evaluation Contractor, SPMU Workshop 1 Day Environmental & 1,000,000.00 and GRM: Safeguard Officers, Social Specialists; (Construction • ESMP Monitoring and Engineers, SMEnv, External Agency Phase) Reporting Strategy; SEPA & relevant MDAs, engaged for capacity • Stakeholder and Community Leaders, building Community Participation CDOs, & Focal NGO Page 92 Estimated Cost Form of Programme Description Participants Duration Training Agency In (N) and Project Training Phase Watershed Protection and Watershed Committee, Workshop 1 Day World Bank/External 1,000,000.00 Management: Community Leaders, Agency Engaged for (Post-Construction • Alternative income LGA Staff, Support Capacity Building/ Phase) generation programme for Professionals Environmental & stakeholders and skills Social Specialists requirements; • Promotion of Agricultural Methods and Technologies for Improving Farm Production and Erosion Prevention; TOTALS N7,000,000.00 The capacity building and trainings costs shown in Table 6-3 shall be included as part of the overall project construction cost to be funded by the Contractor as part of preparedness for ESMP implementation. The trainings are to be conducted preparatory to the contractor’s mobilization to site. All trainings shall therefore be completed prior to mobilization or latest two weeks after the contractor has mobilized to site. 6.5 E&S Obligations of the Construction Contractors It is the responsibility of the construction contractors to ensure compliance with all the Engineering Design provisions associated with this project. The SPMU shall not be responsible for any property (whether community, corporate or individual) damaged as a result of actions or activities undertaken or being undertaken by the contractor in the course of executing its contract. In the event of such damage, the contractor shall be fully liable for the cost of such damage. As part of the construction approval process for the project, a set of environmental and social management plans is needed to address the specific issues identified in this ESMP which may arise in the course of the project. The management plans will need to be developed by the Contractor to address the specific impacts as identified in this ESMP. These management plans are briefly described in the following sections and shall be implemented as part of the overall environmental and social management and monitoring plans for the Funtua Stormwater Drainage Project. 6.6 Required Environmental and Social Management Plans The construction Contractors for the projects shall be required to meet the specific E&S safeguard obligations as provided in this ESMP which shall be incorporated into the contract specifications for the projects as provided in Annex IV. The contractors shall also be required to develop work programmes for field work to guide and explain how the mitigation measures recommended in this ESMP will be implemented during the Funtua project execution. This is in addition to other contractual provisions for the projects. The required specific E&S management plans include the following: 6.6.1 Resettlement Action Plans The WB requires the preparation, in advance of project implementation, of a Resettlement Action Plan/Abbreviated Resettlement Action Plan (RAP/ARAP) where project impacts are known to displace persons within the project community or affect their social and economic well-being. The RAP/ARAP seeks to specifically identify, evaluate and document the set of mitigation, monitoring and institutional actions to be undertaken for the project to eliminate identified adverse community or individual social and livelihood impacts before commencing the remedial construction and rehabilitation works. Page 93 The Resettlement Action Plan for Funtua project is being prepared as stand-alone document and are incorporated accordingly into this Environmental and Social Management Plan by reference. 6.6.2 Public/Stakeholder Consultation Plan A key element of sustaining stakeholders’ support in the project is to sustain the consultations and communication process that has already been effectively established in the course of the preparation of this ESMP. Stakeholders’ engagement needs to be enhanced and managed through a well-defined strategy. Table 6.4 provides a summary of the stakeholder consultation activities to be considered in the engagement plan. Public sensitization and consultation will continue throughout the project execution. The Contractors shall be required to prepare and submit for approval of SPMU and FPMU, comprehensive Stakeholder Engagement Plans. The Plans will provide the Contractor’s specific engagement plan to ensure that all segments of the community and other stakeholders are fully and effectively involved in the project decision process. Table 6.4: Summary of Stakeholder Consultation Plan Activity Stakeholders / Community Timeline Pre-Construction / Prior to Project Commencement Project briefings, site tours, personal meetings, State Government , Local As required, subject to community sessions, consultation meetings Government, Site committee, project updates and Residents of affected areas/ feedback from the Community and interest groups community Development/dissemination of feedback and State Government , Local As required, subject to any complaints mechanism and communications Government, Site committee, updates on the project procedures Residents of affected areas/ Community and interest groups Briefings, Site Tours and Community Sessions Government authorities, Local Prior to Work Plan approval for flood control and intervention works communities, Key/ relevant stakeholders Construction and Operations Responding to issues and inquiries as per All stakeholders Ongoing / as required feedback and complaints mechanism Monthly/Quarterly reporting on status of All stakeholders Monthly/quarterly/as project required. Briefings, site tours and community sessions Government authorities, Local Prior to project completion for flood control and intervention works closure communities, Key/ relevant plan stakeholders Prior to Project Closeout/Post-Construction Project briefings, site tours, personal meetings, All stakeholders, State Govt , Local As required, subject to community sessions, consultation meetings Govt, Site committee, Affected approvals and feedback with stakeholders residents/ Community/ interest groups from the community 6.6.3 Chance Finds/Cultural Heritage Management Plan (CHMP) The Chance Finds/Cultural Heritage Management Plan (CHMP) is required to address the specific impacts that may occur as a result of any "Archaeological Chance Finds" or existence of cultural heritage resources during the planned construction works. It is anticipated that some of the construction activities associated with the project may impact cultural resources such as the grave yards. The grave yards identified within the project areas are considered only of local significance and may not be affected by construction. However, if the any grave yard needs to be relocated on account of the project, the local people, community leaders, NGOs and others should reach a consensus and the local people should be involved in the process of relocation. Alternatively, if the graveyard is considered of archaeological and historical value, then the Contractor shall develop a strategy for restoration, conservation and management which shall be implemented. Page 94 In the event of any "Archaeological Chance Finds", the construction contractor should comply with the following rules as well as the Federal or State archaeological laws: • notify relevant departments of such findings, • request a site inspection, • completely halt work until inspection results are received, and • decide whether or not to proceed with further work. The Contractor shall prepare and submit for approval of SPMU and FPMU, the necessary CHMP to be implemented for the project. The CHMP will set out a formal system by which the Contractor will carry out mitigation measures that will reduce any impacts to the Cultural Heritage. Specifically, the CHMP will provide details regarding the implementation of avoidance, mitigation and management measures for impacts related to the possibility of archaeological chance finds or any existing cultural heritage of significance. The scope of the CHMP will cover pre-construction, construction and post construction/closure phases of the Project. 6.6.4 Occupational/Public Health, Safety and Security Management Plan Selected Contractors shall be required to develop and implement an occupational and community health and safety plans that contributes to a healthy workforce and local community for each of the Funtua projects. The health and safety plan shall be submitted to the SPMU and FPMU for necessary approvals prior to implementation. In developing the Plans, the Contractors shall evaluate possible hazards that may be associated with the projects activities such as: (a) imported backfill material; (b) Hazards to the aquatic environment arising from toxic effects of imported material (pH, COD, salinity, dispersed material); (c) Flood hazards due to heavy downpour during the construction period; (d) Physical/mechanical hazards due to the movement of solid material in the event of an accident; (e) Hazards resulting from soil contamination. Selected Contractors shall also be required to identify who and what can be affected assuming possible scenarios (such as construction failures). Consideration should be given to issues relating to the environment (water, soil, and biota), humans (life, health and living conditions), and economic losses of the population (damage to infrastructure, property) in the event of the possible scenarios. Cooperation between the Contractor, the SPMU and the local community is recommended for emergency planning. Selected Contractors shall fully comply with ESHS standards and bear the cost of implementation. Community Health, Safety and Security assessment will identify potential negative risks related to the different phases of the project. Some of the significant risks to be considered include: • Possible pressure and/or additional demand on community health services associated with the influx of workers from outside the project area; • Possible pressure and/or additional demand on utility services including water and wastewater system associated with the influx of workers from outside the project area; • Possible pressure and/or additional demand for social services as a result of an increased family stress and violence; • Possible sexual harassment and gender based violence; • Possible illicit drug use and alcohol; • Possible crime and criminal activities; • Possible change in community wellness as a result of alcohol, and substance abuse associated with the influx of workers from outside the project area; • Possible change in Community Health as a result of sudden spread of communicable and non-communicable diseases including sexually transmitted diseases (STDs) associated with the influx of workers from outside the project area; Page 95 • Possible pressure on traffic and transportation network associated with construction and operations activities; and • Possible change in water and air quality associated with construction and operations activities. • In addition to the potential negative impacts which would require mitigation, the rehabilitation of the stormwater dranages also has the potential to improve community health safety and security through the following means:. o Improved access to medical facilities for communities due to the stormwater dranage rehabilitation and the restoration of connecting roadways; o Improved healthcare infrastructure; o Improved workforce health awareness; o Improved standards of living of direct and indirect employees due to better income in the employees households; and o Improved standards of living of vulnerable groups and their households, including support to the elderly within the respective households. 6.6.5 Gender Based Violence/Sexual Exploitation and Abuse Management Plan The Gender Based Violence/Sexual Exploitation and Abuse Management Plan (GBV/SEA MP) is required to identify and assess key risks, develop mitigation measures to prevent and respond to sexual exploitation, abuse and other forms of Gender Based Violence (GBV). Selected Contractors shall prepare and submit for approval of SPMU and FPMU, the necessary GBV/SEA MP to be implemented for the projects. The GBV/SEA MP will set out a formal system by which the Contractors will carry out mitigation measures that will reduce any impacts relating to Gender Based Violence matters. Specifically, the GBV/SEA MP will provide details regarding the implementation of avoidance mitigation and management measures for impacts related to the possibility of or any existing risks which may lead to GBV/SEA issues. The scope of the GBV/SEA MP will cover pre- construction, construction and post construction/closure phases of the Projects. The risk indicators to be considered shall include but not limited to: • Possible pressure and/or additional demand for social services as a result of an increased family stress and violence; • Possible sexual harassment (including rape, sexual assault and harassment in all public and private spheres of life); • Norms, attitudes and stereotypes around gender in general and violence against women in particular; • Various forms of structural inequality or institutional discrimination on any particular gender. 6.6.6 Vegetation Clearing and Biomass Management Plan The Contractors shall be required to prepare and submit for approval of SPMU and FPMU, a comprehensive Vegetation Clearing and Biomass Management Plan (VCBMP). Together with this ESMP, the VCBMP will provide the specific activities to be carried out to protect the natural biodiversity of the project area as well as maintain appropriate public access. The specific objectives of the Plan are to: • Identify appropriate, ecologically sustainable, and spatially-explicit management actions, such as re-vegetation with native plant species, based on biological and hydrological factors, as well as the reasonableness of costs, local community expectations, and other key considerations. • Develop monitoring methods to evaluate progress toward Plan objectives, to apply adaptive management to enhance the likelihood of achieving those objectives, and to increase understanding of water and ecosystem interactions. • Prepare for anticipated changes to the system, such as climate change and land-use changes. Page 96 • Prepare for implementation of rapid, active ecological restoration and other management strategies for threatened, endangered, and other native wildlife species potentially displaced by construction activities, and to enhance pollinator habitat. • Provide consideration of proper implementation techniques, implementation costs, short- and long-term maintenance needs, water use/savings, and wildfire control. The approved Plan shall form part of the construction documents and requirements for Contractors implementation through the project. 6.6.7 Air Quality Management Plan Air quality plans identify potential control measures and strategies, including rules and regulations that could be implemented to reduce air pollutant emissions from construction equipment, on and off road motor vehicles, and other sources. The Contractors shall be required to prepare and submit for approval of SPMU and FPMU, a comprehensive Air Quality Management Plan (AQMP). The Contractors shall implement these strategies through rules and regulations, public education and outreach, and partnerships with other agencies and stakeholders. 6.6.8 Emergency Response and Incident Plan The Contractors shall be required to prepare and submit for approval of SPMU and FPMU, a comprehensive Emergency Response and Incident Plan (ERIP). The Plan will describe the set of necessary actions to be taken in response to defined circumstances, across all hazards, and through the phases of mitigation, preparedness, response, and recovery during this project. The Plan will provide necessary guidance for how to organize assets to respond to an incident (system description) and processes to manage the response through its successive stages (concept of operations). The Plan will document the combination of facilities, equipment, personnel, procedures, and communications existing within the Contractor’s organizational structure and designed to help in the management of resources during incident response. The activities contained in the Plan will address the phases of mitigation, preparedness, response, and recovery and will identify potential hazards, assess their likelihood of occurrence, their potential impact and the organization's vulnerabilities to the impact, and also provide a basis for understanding how the hazard likelihood and organizational vulnerabilities can be addressed. For the Plan to be effective, the emergency incident must be formally defined so that there is clarity and consistency as to what is being managed. This may be best accomplished by defining the incident response through delineation of response goals and objectives, and by explaining response parameters through the Emergency Response and Incident Plan (ERIP). 6.6.9 Water Management Plan The Contractors shall be required to prepare and submit for approval of SPMU and FPMU, a Water Management Plan. The Plan will provide information about current water uses and charts a course for water efficiency improvements, conservation activities, and water- reduction goals. An important step in creating a water management plan is to establish a water balance for the project. It is necessary to ensure that water supply, wastewater, storm water issues, and water efficiency Best Management Practices (BMPs) are taken into account prior to commencement of the construction works. Water emergency and other contingency plans should describe how the construction facility will meet minimum water needs during emergency or other water shortages. Page 97 6.6.10 Erosion and Sedimentation Management Plan Selected Contractors shall prepare and submit for approval of SPMU and FPMU, a comprehensive Erosion and Sedimentation Management Plan. Together with this ESMP, the Plan will provide the specific activities to be carried out to protect the environment from erosion and sedimentation within the project area. It is important that an erosion and sediment control plan is effective in preventing illicit discharge. Appropriate consideration should be given to identify potential problems posed by the project area slopes, drainage patterns, and soil types in preparing an effective erosion and sediment control plan. The erosion and sediment control plan shall be overlaid on the project grading plan(s) or site plan if there is no grading plan. ▪ The plan shall show what Best Management Practices (BMPs) will be used, when, and where, specific to the project scope, along with the total disturbance area and installation details and notes for the proposed BMPs. Measures will include those necessary to delineate areas of work, prevent erosion of unstable or denuded areas, plan for construction staging and storage logistics, construction of stabilized access points, and proper containment measures for construction materials and waste. ▪ The name and contact information for the person responsible for maintaining erosion and sediment control measures throughout the construction work shall be included as Erosion Control Point of Contact. ▪ Location, width, direction of flow and approximate location of top and toes of banks of any watercourses. ▪ Location and types of existing vegetation on the site. Within 10 meter of any cut or fill, the plan shall identify the location, diameter, species and appropriate elevation at the base of all trees over 0.3 m in diameter measured at 1.5m above average ground level. ▪ Existing drainage patterns and direction of flow. ▪ Limits of disturbed areas. ▪ Areas not to be disturbed and off-limits to construction activity. ▪ Location of proposed vegetative erosion control measures (e.g., seeding, landscaping), including type, quantity, planting schedule, and irrigation. ▪ Location and details of all proposed drainage systems, walls, cribbing or other erosion protection devices to be constructed in connection with, or as a part of, the project. 6.6.11 Traffic and Vehicle Management Plan Managing traffic at a construction workplace is an important part of ensuring the workplace is without risks to health and safety. Vehicles including powered mobile plant moving in and around a workplace, reversing, loading and unloading are often linked with death and injuries to workers and members of the public. Traffic includes cars, trucks and powered mobile plant like excavators or graders, and pedestrians like workers and visitors. The most effective way to protect pedestrians is to eliminate traffic hazards. Selected Contractors shall be required to prepare and submit for approval of SPMU and FPMU, a comprehensive Traffic and Vehicle Management Plan (TVMP). Together with this ESMP, the TVMP will provide the specific and general guide to vehicular movements throughout the project area in order to protect the community and workforce from accident and safety hazards during construction. Key issues to consider for managing traffic at the construction workplace include: • Keeping pedestrians and vehicles apart including on site and when vehicles enter and exit the workplace; • Minimizing vehicle movements; • Eliminating reversing vehicles or minimizing the related risks; • Ensuring vehicles and pedestrians are visible to each other; Page 98 • Using traffic signs, and, • Developing and implementing a traffic management plan. Selected Contractors shall be required to provide appropriate information, training, instruction or supervision necessary to protect all persons from risks to their health and safety. The Contractors must also ensure construction induction training is provided to workers who carry out construction work. ➢ The Katsina State NEWMAP will place speed limits and appropriate road signage along all Project roads; ➢ The Katsina State NEWMAP will enforce speed limits for safety, air quality, and noise purposes both on the Project site and beyond; ➢ All Katsina State NEWMAP drivers should be trained by a road safety specialist; and, ➢ All vehicles should be properly maintained and undergo periodic safety inspections. ➢ Observance of speed limits by contractor’s vehicles / drivers should be part of the contractual agreements 6.6.12 Waste Management Plan A waste management plan (WMP) is required to achieve the goals set for managing construction waste. The construction Contractors shall prepare and submit for approval of SPMU and FPMU, a comprehensive Waste Management Plan (WMP). The WMP will provide the specific and general guide to the management of solid and liquid wastes throughout the project area and for the duration of the project. The Contractors shall have responsibility for the implementation of the Plan which will include procedures for salvage, reuse and recycling of materials. The implementation of the WMP will protect the community and workforce from the health hazards of indiscriminate waste disposal during construction. The waste management plan should cover the following: i. Specify who is responsible for managing waste on site. ii. Establish goals and objectives. iii. Estimate the waste types and amounts involved. iv. Set targets for reducing the amount of each waste sent to the waste disposal site; v. Describe recycling/reuse methods for each material. vi. Identify the waste destinations and transport modes, including what materials are being segregated on site for reuse or recycling. vii. Track progress. viii. Describe special measures for material use and handling. ix. Describe communication and training to support and encourage participation from everyone on site. 6.6.13 Chemical Management Plan Selected Contractors shall prepare and submit for approval of SPMU and FPMU, Chemical Management Plan (CMP) for the Funtua project. The CMP will provide specific and general guidance in the storage, use and disposal of any chemicals or chemical products associated with activities to be carried out as part of the project. Chemicals are an integral part of everyday life, essential to our economy, our communities and our homes. While chemical substances provide benefits, they may also have harmful effects on human health and the environment if not properly managed. The CMP is aimed at protecting human health and the environment by assessing chemicals used in the project and by taking action on the chemicals found to be harmful. The CMP Page 99 helps protect the project community and their environment from the harmful effects of chemical substances. The CMP will assess the environmental and human health risks posed by the chemical substances to be used in the project, and also develop measures to be implemented to prevent or manage those risks. 6.7 ESMP Monitoring and Evaluation The objectives of the monitoring and evaluation program are: • To ensure that the measures suggested herein are carried out accordingly during project implementation; • To evaluate the efficiency of the proposed mitigation and enhancement measures; • To investigate the adequacy of the ESMP as well as suggest improvements to it; • To generate data that could be incorporated in future ESMPs; • To evaluate what additional enforcement is required for the effective project implementation. For effective implementation of the ESMP, a monitoring programme has been designed. The monitoring plan indicates the operational links between the impacts identified, indicators to be measured, the methods to be used, frequency of measurements and definition of thresholds indicating the need for corrective actions. The necessary costs and the responsibilities for all aspects of the monitoring arrangements are also identified. 6.7.1 Monitoring and Reporting Project performance monitoring has the overall objective of achieving the desired outcomes through reporting of measurable events or parameters or aspects that can be monitored and verified. The following monitoring and reporting sequence is proposed for the ESMP implementation at the Funtua project. • The Contractor shall submit to SPMU a monthly monitoring report and the ESMP accomplishments during the project implementations, • The SPMU shall prepare monthly ESMP monitoring and accomplishment reports to be submitted to FPMU and the WB. This reporting cycle should be repeated as the feedback mechanism scheme to all key players consisting of the affected stakeholders, Site Committee, Focal NGO, CBOs/CDOs, Contractors, SPMU, etc. 6.7.2 Post Construction Monitoring In the post-construction phase of the project, the respective Site Committees shall be required to maintain continuous monitoring of the Funtua project beyond the decommissioning phase. This will ensure that each Funtua project rehabilitation/healing process and the associated livelihood programmes are sustained beyond the project closeout. Since the Site Committees will have a big role in sustaining the post construction (operations and maintenance) phase of the project, necessary capacity building trainings will be required to provide its officers/leaders the needed capabilities for formulating necessary policies, systems and procedures. The SPMU and the SMEnv will be required to ensure that the Site Committee and other CBOs/CDOs are institutionally strengthened. A summary of the impacts mitigation and monitoring plan for the preconstruction, construction, and post-construction phases with the associated monitoring frequencies, responsible parties and projected costs are presented in Table 6-5 through Table 6-5. 6.8 Grievance Mechanism and Procedures It is for the benefit of the MOE/KTSG, NEWMAP, Communities and the PAPs to devise a mechanism through which complaints and disagreements arising from the implementation of the Funtua drainage project can be resolved. A Grievance Redress Mechanism (GRM) is necessary in order to prevent and address community issues, reduce exposure to risks and Page 100 also provide the platform for the optimization of environmental and social benefits of the project. The grievance procedures consist of the steps that ensure proper documentation of all grievances, a discussion mechanism for hearing and resolving the grievances, and provisions for appeals in the event of dissatisfaction by any affected persons. The issues considered include: the project's benefit(s) to the stakeholders; potential changes to the routine activities of the stakeholders that might occur due to the project; and the project activities that might cause damage or conflict for the stakeholders. Any issues that may lead to grievances will be addressed through documented grievance mechanism that takes into consideration the cultural and traditional rights of people avoiding as much as possible potential for legal redress mechanism. The specific objective of the mechanism is to facilitate the process and ensure effective and timely grievance resolution thereby reducing the risk of escalation of conflicts and avoiding unnecessary delays. The grievances and remedial actions shall be carefully documented to enhance accountability and reduce liability. The community traditional land dispute resolution structure currently constitutes the nucleus of traditional resolution of disputes among community members on matters of land. It is therefore wise and advisable that this structure be necessarily retained in the event of any grievance or dispute relating to the ESMP implementation. Inputs from the leadership may also be limited to providing recommendations as to how a specific dispute is to be addressed. Aside from the traditional structure, Figure 6-1 provides a secondary mechanism for grievance resolution using the Grievance Redress Committee (GRC). The proposed GRM will also help to achieve the following: • To serve as the open channel for effective communication together with the identification of emerging environmental and social concerns due to the project; • To prevent and mitigate any adverse environmental and social impacts as a result of any phase of the project; • Promote harmonious relationship and respect among stakeholders; and, • Ensure community acceptance of the project. Figure 6-1: Grievance Redress Procedure AFFECTED PARTY Grievance Resolved DECLARES A SPMU GRIEVANCE Feedback Feedback Recommendations STEP-WISE COMMUNITY GRIEVANCE NO FURTHER TRADITIONAL Grievance Resolved STRUCTURE Grievance Not Resolved REDRESS ACTION COMMITTEE (GRC) LEGAL ACTION 6.8.1 Formation of Grievance Redress Committee (GRC) The objective of the GRC is to respond to the complaints relating to the project in a timely and transparent manner and to provide a mechanism to mediate conflict and cut down on lengthy litigation, which often delays projects. It will also provide people who might have objections or concerns about their assistance a public forum to raise their objections and Page 101 through conflict resolution, address these issues adequately. The committee will provide ample opportunity to redress complaints informally, in addition to the existing formal administrative and legal procedures. The major grievances that might require mitigation include: • PAPs not listed; • Use of local workforce; • GBV/SEA Issues • Losses not identified correctly; • Inadequate assistance; • Dispute about ownership; • Delay in disbursement of assistance and improper distribution of assistance. The NEWMAP SPMU shall establish necessary levels of Grievance Redress Committees (GRC) overseen by NEWMAP for each of the Funtua project to address complaints from this ESMP implementation. The GRC shall provide specific necessary support and resolution of the potential PAP related grievances in accordance with provisions of this ESMP. The Committee will be coordinated as provided for at each level with the compositions of each GRC level comprising of the following: FIRST LEVEL: COMMUNITY GRIEVANCE REDRESS COMMITTEE (COM-GRC) The first stage of the GRC in the grievance process shall be the community-based GRC (Community GRC) which shall be coordinated by the Focal NGO (FNGO) and shall be made up of the following: • 1 Representative from each of the Community Associations • 1 Representative from the traditional ruler of the Community • 1 Representative of the Local Government Area • 1 Representative of Ministry of Lands, Survey and Physical Planning. • 1 Representative of the Project Affected Persons (PAPs) • Social and Livelihood Officer (SLO) in SPMU as the Secretary • 1 Representative from the Focal NGO as coordinator This committee shall be the place of first recourse for anyone who has a grievance matter related to the site. The timeline for addressing/resolving the issues raised by a complainant by this GRC shall be at most 15 days from the last day allowable for grievance and complaints submission following the end of ESMP disclosure. SECOND LEVEL: PMU GRIEVANCE REDRESS COMMITTEE (PMU-GRC) Where the Com-GRC is unable to resolve the matter, the Complainant may seek redress from the Project Management Unit – Grievance Redress Committee (PMU-GRC). This Committee shall be coordinated by the Project Coordinator of the SPMU and made up of the following: • 1 Representative from the Ministry of Environment • 1 Representative from the Ministry of Lands and Survey • 1 Representatives of the Project Affected Persons (PAPs) • 1 Representative from the Focal NGO • Environmental Officer in SPMU as the Secretary • Project Accountant in the SPMU • Project Coordinator of the SPMU as the Coordinator This committee shall be the second place of recourse for anyone who has a grievance matter related to the site. The timeline for addressing/resolution of the issues raised by a complainant by this PMU-GRC shall be at most 15 days from the last day allowable for grievance and complaints submission following the inability of the Com-GRC to resolve the matter. THIRD LEVEL: NEWMAP STEERING/TECHNICAL COMMITTEE (STATE-GRC) Page 102 Where the PMU-GRC is unable to resolve the matter at this level, the Complainant may seek redress from the NEWMAP Steering and Technical Committee GRC (STATE-GRC). This Committee will be coordinated by the Chairman of the Steering Committee, who is the Honourable Commissioner of the Ministry of Environment. The composition of this Committee shall be as follows: • The Federal Environmental Safeguards Specialist • Representative of the Umbrella NGO • Environmental Officers from 2 neighboring NEWMAP states who have experience in handling grievance matters • Project Coordinator of the SPMU as the Secretary The timeline for addressing/resolving issues raised by a complainant by this STATE-GRC shall be at most 15 days from the last day allowable for grievance and complaints submission following the inability of the PMU- GRC to resolve the matter. FOURTH LEVEL: THE COURTS Where the Complainant is not satisfied with the decisions of the STATE-GRC, he/she may seek redress in the law Courts. All grievances will first of all be addressed at the First Level. It will only move on to Second Level if the first level agreement was not accepted by the party involved and then to third and forth under similar situations. If negotiated settlement of grievances cannot be achieved through the normal procedural steps outlined in the grievance mechanism, the complainant has the right to approach the courts. The GRM procedure will be included in the community engagement plan to ensure that all PAPs know and understand the process and are able to access it whenever they feel the need. The effectiveness of the GRM will be one of the crucial monitoring indicators. 6.8.2 Training of the Grievance Redress Committee The Grievance Redress Committee shall be provided with training to enable them adequately perform their responsibilities. The training shall be organized by the SPMU who shall provide logistics such as writing materials, per diem, transportation, training venue and time. The details of the training including time and date shall be adequately communicated to all members for their attendance. At the end of the training, members of the intervention community shall be adequately sensitized on the procedure for submission of complaints and grievances. Page 103 Table 6-5 E&S Impact Mitigation and Monitoring Plan for Funtua Stormwater Drainage Project Impact Mitigation Performance & Impact Monitoring E&S Impact Source of Objective Proposed Responsible Category Impact Mitigation Monitoring Responsible Monitoring Mitigation to Monitoring Indicator Cost (N) Frequency to Monitor Cost (N) Measures Implement PRE-CONSTRUCTION PHASE Safeguard Ensure that Environmental SMEnv & To be Approval of ESMP Monitoring FPMU & WB N/A Instrument (ESMP) identified and social SPMU included in Report by FMEnv & parameters E&S impacts management the overall WB; as indicated are measures as project Commencement of in this ESMP addressed spelled out in construction construction activities; and mitigation this document cost Availability of measures are (details are as completed & approved executed enumerated plans properly below) Impacts on All those To restore A SMEnv & To be  No. of public Continuous SPMU-ESO; Included in Community and impact persons Resettlement SPMU included in complaints recorded; Focal NGO total cost PAP Management sources that affected by Action Plan the total  Level of awareness Quarterly SMEnv.; provided in (Loss of physical are indicated the project to (RAP) has RAP cost and understanding of SMLS.; the RAP in Table 6.1, a condition been community members; Community assets; Loss of Item 1, equivalent to prepared as a  No of community Continuous Leaders; means of livelihood; Column 1 or better than stand-alone members that attend Site Displacement of the pre- document; trainings; Committee 350,000.00 persons project  Level of satisfaction Quarterly (temporary) situation among PAPs; All those  No of women gainfully Quarterly; impact employed by project; mitigation  No of other Six months measures that businesses induced intervals are indicated by project in Table 6.1,  Questionnaires, direct Every two Item 1, observations and years Column 2 interviews. Community Cultural All those Ensure that All those SMEnv & To be  Protection of all Continuously Heritage impact community’s impact SPMU included in identified treasure Focal NGO; sources that historical, mitigation the overall finds SPMU; 250,000.00 are indicated archeological, measures that project SMEnv; in Table 6.1, and cultural are indicated construction Community Item 2, treasures are in Table 6.1, cost Leaders; Column 1 not destroyed Item 2; Site during project Column 2 Committee execution Contractor Page 104 Impact Mitigation Performance & Impact Monitoring E&S Impact Source of Objective Proposed Responsible Category Impact Mitigation Monitoring Responsible Monitoring Mitigation to Monitoring Indicator Cost (N) Frequency to Monitor Cost (N) Measures Implement Develop and submit for SPMU approval a Cultural Heritage Management Plan; Possibility of chance archeological findings Public/Stakeholde All those Ensure Develop and Contractor To be  No of active Continuously rs Participation impact effective submit for included in participants from the Focal NGO; sources that community SPMU the overall community and other SPMU; 300,000.00 are indicated and approval a project stakeholders SMEnv; in Table 6.1, stakeholder Stakeholders construction Community Item 3, involvement Engagement cost Leaders; Column 1 in the project Plan; Site decision Contractor Committee process All those impact mitigation measures that are indicated in Table 6.1, Item 3, Column 2 Vegetation and All those Prevent Develop and Contractor To be Areas of stressed Monthly Biomass Removal impact damage to submit for included in vegetation; SPMU-ESO; Management sources that critical SPMU the overall Focal NGO; 450,000.00 are indicated ecosystems approval a project Size of cleared Monthly SMOW; in Table 6.1, and habitats Vegetation construction vegetation areas SMEnv; Item 4, and and Biomass cost SMOH; Column 1 destruction of Removal Contractor Community flora and Management Leaders; fauna Plan; Site Committee Page 105 Impact Mitigation Performance & Impact Monitoring E&S Impact Source of Objective Proposed Responsible Category Impact Mitigation Monitoring Responsible Monitoring Mitigation to Monitoring Indicator Cost (N) Frequency to Monitor Cost (N) Measures Implement All those impact mitigation measures that are indicated in Table 6.1, Item 4, Column 2 CONSTRUCTION PHASE Dust and Air Quality All those To minimize Develop and Contractor To be  No. of public Twice daily SPMU-ESO; Management impact emission of submit for included in complaints; Focal NGO sources that hydrocarbons SPMU the overall  Level of particulates Continuous SMOH.; are indicated and approval an Air project  Level of air pollutants as Community 550,000.00 in Table 6.1, generation of Quality construction  Vegetation surfaces necessary Leaders; Item 5, dust at the Management cost free of dusts Site Column 1 work site and Plan;  Ambient air Continuous Committee access roads monitoring using as All those Contractor standard methods necessary impact mitigation measures that Two month are indicated intervals or in Table 6.1, as required Item 5, Column 2 Water Resources, All those Ensure that Develop and Contractor To be • No of complaints from Daily Erosion & impact project area submit for included in community members; Sedimentation sources that is adequately SPMU the overall • Absence of sediment SPMU-ESO; Control Management are indicated protected approval a project build up; Daily Focal NGO; in Table 6.1, from Water construction • Absence of flooding in SMOW; 450,000.00 Item 6, development Management cost construction areas; Community Column 1 of erosion Plan and an • No of spills & repairs Daily Leaders; and Erosion and made; Site sedimentation Sedimentation • Use of standard Committee; hazards Management Contractor monitoring methods Plan; Daily Page 106 Impact Mitigation Performance & Impact Monitoring E&S Impact Source of Objective Proposed Responsible Category Impact Mitigation Monitoring Responsible Monitoring Mitigation to Monitoring Indicator Cost (N) Frequency to Monitor Cost (N) Measures Implement All those impact Three month mitigation intervals measures that are indicated in Table 6.1, Item 6, Column 2 Noise and Vibration All those Ensure • All those Contractor – To be • No of complaints from Daily Exposure impact adequate impact Site included in community members; SPMU-ESO; Management sources that protection of mitigation Engineer the overall • Absence of structural Daily Local NGO; are indicated the workforce measures project failures; SMOW; 500,000.00 in Table 6.1, and that are construction • Absence of debris Daily SMOH; Item 7, community indicated in cost accumulation; Community Column 1 members Table 6.1, • No of debris removals & Daily Leaders; from effects Item 7, repairs made; Site of noise and Column 2 • Sensor measurements Daily Committee vibrations around workplace Occupational & All those Ensure that Develop and Contractor To be • No. of sanitary facilities At start of Public Health and impact identified submit for included in provided at start of project; Safety Management sources that occupational SPMU the overall project; SPMU-ESO; are indicated & public approval an project • Adherence to Twice Focal NGO; 600,000.00 in Table 6.1, health, safety Occupational construction stipulated speed limit weekly; SMOH; Item 8, and security and Public cost • Record of incidents; Weekly; Community Column 1 impacts are Health, Safety • Use of PPEs by Daily; Leaders; addressed and Security Contractor workers; Site and mitigation Management • Records of appropriate Monthly; Committee; measures are Plan; workers’ training; executed • Record of properly All those reinstatement plan for At beginning impact burrow pits; of project mitigation • Record of health and measures that safety meetings Weekly; are indicated • Record of first aid in Table 6.1, Monthly exercises Item 8, At start of • Hazards assessment Column 2 project Page 107 Impact Mitigation Performance & Impact Monitoring E&S Impact Source of Objective Proposed Responsible Category Impact Mitigation Monitoring Responsible Monitoring Mitigation to Monitoring Indicator Cost (N) Frequency to Monitor Cost (N) Measures Implement HIV/AIDS and STIs All those Ensure • All those SPMU To be • No. of HIV/AIDS Quarterly Focal NGO; Management impact effective impact Safeguard included in workshops held; SPMU-ESO; 500,000.00 sources that HIV/AIDS and mitigation Officers; the overall • Level of awareness of Continuous SMEnv; are indicated STI measures MOH; project workers & others; SMOH; in Table 6.1, awareness that are NGO; construction • Records of peer Bi-monthly Community Item 9, among indicated in cost educators’ training; Leaders; Column 1 community Table 6.1, Contractor- • Records of condoms Site members Item 9, Health & distributed Monthly Committee; Column 2 Safety Personnel Construction All those To ensure Develop and Contractor To be • No of workshops for Daily; Operations & Slope impact that submit for included in Gender Based SPMU-ESO; Stabilization sources that construction SPMU the overall Violence and Child Focal NGO; are indicated activities are approval an project Labour held; Daily; SMOW; in Table 6.1, carried out Emergency construction • No. of SMEnv; 350,000.00 Item 10, without risks Response cost accidents/incidents; Continuous; Community Column 1 to health and and Incident • No. of visible warning Leaders; safety of the Plan; Contractor signs; Weekly. Site workforce • Level of public Committee and the All those awareness; community impact • Record of safety mitigation meetings held; measures that are indicated in Table 6.1, Item 10, Column 2 Traffic and All those To ensure Develop and Contractor To be • Effective traffic flow Daily; Transportation impact that traffic submit for included in with vehicular & worker SPMU-ESO; Hazards sources that within the SPMU the overall safety; Focal NGO; are indicated project area approval a project • Appropriate positioning SMOW; in Table 6.1, is managed Traffic and construction of road signs, SMEnv; 350,000.00 Item 11, so as to Vehicle cost reflectors, speed Daily; Community Column 1 assure the Management ramps, control limits, Leaders; workplace Plan; Contractor traffic wardens; Site and • Records of accidents Committee community All those and near misses are without impact risks to health mitigation and safety measures that Daily. are indicated in Page 108 Impact Mitigation Performance & Impact Monitoring E&S Impact Source of Objective Proposed Responsible Category Impact Mitigation Monitoring Responsible Monitoring Mitigation to Monitoring Indicator Cost (N) Frequency to Monitor Cost (N) Measures Implement Table 6.1, Item 11, Column 2 Waste Management All those To protect the Develop and Contractor To be • Waste segregation and Daily; (Solid and Liquid impact community submit for included in littering; SPMU-ESO; Wastes) sources that and the SPMU the overall • Emptying of bins at Focal NGO; are indicated workforce approval a project waste dump sites; SMOW; in Table 6.1, from health Waste construction • Waste composting; Weekly; SMEnv; 400,000.00 Item 12, hazards of Management cost • Indiscriminate Community Column 1 indiscriminate Plan; defecation; Weekly; Leaders; waste Contractor • Toilets Daily; Site disposal by All those decommissioning Committee proper impact At end of collection and mitigation project disposal of measures that liquid and are indicated in solid wastes Table 6.1, Item generated on- 12, Column 2, site during the project. • OPERATION AND MAINTENANCE (POST CONSTRUCTION) PHASE Land Use All those To ensure All those SPMU; Sustained treated flood Routine SPMU-ESO; Restriction impact that required impact SMEnv; and erosion healing monitoring of SMEnv; 500,000.00 sources that project areas mitigation Community process project Focal NGO; are indicated under measures that Leaders; corridor Community in Table 6.1, restricted use are indicated Site (6mos – Leaders; Item 13, remains as in Table 6.1, Committee 12mos) Site Column 1 designated Item 13, Committee Column 2 Closure of All those Ensure that • All those Contractor To be Agreements entered Prior to start SPMU-ESO; Temporary Office, impact agreements impact included in with community and of project; Focal NGO; 450,000.00 Staging Areas and sources that with the mitigation the overall landowners for use of Community Decommissioning of are indicated measures that project land; Quarterly; Leaders; Page 109 Impact Mitigation Performance & Impact Monitoring E&S Impact Source of Objective Proposed Responsible Category Impact Mitigation Monitoring Responsible Monitoring Mitigation to Monitoring Indicator Cost (N) Frequency to Monitor Cost (N) Measures Implement Project in Table 6.1, community are indicated Contractor construction Site Item 14, and in Table 6.1, cost Terms of Agreement Committee Column 1 landowners Item 14, fulfilled with community At Column 2 and landowners; completion on post Handover of office site of project construction as agreed hand-over are kept. System Control All those Ensure All those SPMU; Sustained treated flood Routine Community Failures impact sustainable impact Community and erosion healing monitoring of Leaders; Management sources that maintenance mitigation Leaders; process project Site 350,000.00 are indicated of erosion measures that Site corridor Committee in Table 6.1, prevention are indicated Committee (6mos – CBOs/CDOs Item 15, and control in Table 6.1, 12mos) Column 1 structures Item 15, Column 2 Page 110 A summary of the projected ESMP monitoring costs through the preconstruction, construction and post-construction phases of the project are presented in Table 6.6. Table 6.6: Summary of Monitoring Cost of Project Site and Activity Area Drainage Associated Monitoring Costs (N) Catchment Project Site Length Pre- Post Area (km2) Construction (km) Construction Construction Funtua Stormwater 13.778 6.83 350,000.00 3,700,000.00 1,300,000.00 Drainage Rehabilitation TOTAL 350,000.00 3,700,000.00 1,300,000.00 6.9 ESMP Management Costs A summary of the projected ESMP management costs through the preconstruction, construction and post-construction phases of the project are presented in Table 6.7. Table 6.7: ESMP Management Costs Associated Management Costs (N) Institutional Category Roles & Responsibilities Pre-Construction Construction Post Construction Katsina State Ministry • Overall oversight, assessment and of Environment monitoring of specific and general project 500,000.00 1,000,000.00 2,500,000.00 (SMEnv) implementation ; SPMU (Safeguard • Oversight of all specific activities associated Officers, Project. 1,500,000.00 3,200,000.00 1,200,000.00 with the ESMP implementation Engineer)  Project assessment and monitoring of this FPMU ESMP implementation and the construction N/A N/A N/A activities. • Overall assessment and monitoring of World Bank N/A N/A N/A specific and general project implementation; State Ministry of  Provide necessary preconstruction and N/A N/A N/A Works construction support to the SPMU  Provide necessary support to the SPMU on State Ministry of matters of land acquisition, compensation N/A N/A N/A Lands & Survey (SMLS) and other resettlement issues  Intervene in areas under their jurisdiction Other MDAs N/A N/A N/A as and when project demands Contractor (Site  Provide oversight function during Engineers/ decommissioning to ensure adherence to N/A N/A N/A Supervisors) good practice and the ESMP  Monitor and ensure compliance with Site Committee 500,000.00 2,000,000.00 1,000,000.00 ESMP, BEME and implementation quality  Provide support in monitoring project execution within their domains to ensure Local government N/A N/A N/A compliance with this ESMP and other relevant requirements  Support and promote environmental Local Community N/A N/A N/A awareness  Ensure community participation by CDOs/CBOs mobilizing, sensitizing community N/A N/A 300,000.00 members;  Assist to ensure effective response actions, to evolve and devise sustainable NGOs N/A N/A N/A environmental strategies and rehabilitation techniques, organize, Page 111 Associated Management Costs (N) Institutional Category Roles & Responsibilities Pre-Construction Construction Post Construction coordinate and ensure safe use of volunteers in a response action, & provide wide support in management planning, institutional/governance issues and other livelihood related matter, awareness campaigns • Identify issues that could derail the project General Public • Support project impacts and mitigation N/A N/A N/A measures as well as awareness campaigns TOTALs N2,500,000.00 N6,200,000.00 N5,000,000.00 6.10 Budget to Implement ESMP Cost projections for implementation of the various measures, monitoring plan and capacity building are given in Table 6.8. The projected implementation budget will enable the ESMP to be an integral part of financing for the rehabilitation/maintenance works in the project. An indicative budget of N27,352,500.00 (Twenty Seven Million Three Hundred and Fifty Two Thousand Five Hundred Naira) only, is shown for the implementation of the ESMP for the Funtua site bearing in mind the elements that make up the implementation process. The budget covers: 1. Routine E & S duties of the SPMU; 2. Capacity Building for the SPMU and other stakeholders; 3. Engagement of Environmental and Social Specialists 4. Environmental and Social Due Diligence investigations and/or Audits; 5. Monitoring and evaluation activities of the SPMU and other regulatory Agencies. Table 6.8: Breakdown of Cost Estimates COST BREAKDOWN IN (N) COST COST Pre- Post- S/No ITEM RESPONSIBILITY Construction ESTIMATE IN ESTIMATE IN Construction Construction Phase NAIRA (N) (US$) Phase Phase 1 MITIGATION SPMU/ Contractor (To be built into Contractor costs) 2 MANAGEMENT SPMU/ SMEnv 2,500,000.00 6,200,000.00 5,000,000.00 N13,700,000.00 $38,055.56 SPMU/ FPMU/ FMEnv/ SMEnv/ 3 MONITORING 350,000.00 3,700,000.00 1,300,000.00 N5,350,000.00 $14,861.11 Environmental Consultants/ NGOs CAPACITY SPMU/ MOH/ 4 BUILDING & Consultants/ 3,000,000.00 3,000,000.00 1,000,000.00 N7,000,000.00 $19,444.44 TRAININGS Contractor Sub-total N26,050,000.00 $72,361.11 5 CONTINGENCY (5%) N1,302,500.22 $3,618.06 GRAND TOTAL N27,352,500.00 $75,979.17 Assumed exchange rate: US$1.00 = N360.00 (Nigerian Naira) Page 112 6.11 ESMP Implementation Schedule The implementation and management of the ESMP schedule is designed to facilitate any necessary resettlement issues associated with the RAP. The ESMP activities also need to be implemented within an agreed timeframe and budget. Appropriate timing should be adhered to in order to avoid project delays especially if the situation arises where site clearing is to begin before the resettlement end date. Execution of the ESMP activities is recommended in accordance with the schedule shown in Table 6.9. The period of the first week will be used to develop and set up all structures necessary to support all aspects of the programmes. Page 113 Table 6.9: Proposed ESMP Implementation Schedule DURATION IN MONTHS DESCRIPTION OF ACTIVITY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Disclosure of ESMP Report Formation of Project Grievance Redress Committee (GRC) Review and Approval of Contractor’s ESMP and Health, & Safety Plan Hold Stakeholders Meetings and Consultations Execute Capacity Building Programmes Implementation of Mitigation Measures Supervision of ESMP Implementation Monitoring & Reporting on ESMP Implementation Conduct ESMP Implementation Audit Programme Administration CHAPTER 7: CONCLUSIONS AND RECOMMENDATIONS 7.1 Conclusions The proposed remediation/rehabilitation of Funtua stormwater drainage project is considered to be in line with the development and socio-economic needs of Katsina State as a whole. The project will greatly ease the perennial devastating floods and soil erosion within the project communities and facilitate redevelopment of the agriculturally degraded lands and once again allow unimpeded use of agricultural lands. Indeed, the project have many positive socio-economic impacts both locally and regionally. In view of positive and negative impacts identified, as well as public consultations conducted in the project area, it is unlikely that the proposed project will have overall significant adverse social and environmental impacts. Most adverse impacts will be temporary in nature during the construction phase and can be managed to acceptable levels. Implementation of the recommended mitigation measures for the projects will ensure that the overall benefits of the projects will greatly outweigh the few adverse impacts. The main social issues for the project will revolve around the temporary displacement and relocation of people within the project area and the permanent acquisition of setback lands for the rehabilitation of the major drainage corridors as well as the access roadways. Katsina State will compensate the PAPs with respect to the adverse impacts associated with temporary displacement and disturbance, loss of economic trees and crops and loss of lands. There is a pressing need to rehabilitate the Funtua stormwater drainage corridors and install effective flood control/management system to reduce the incidence of flooding and erosion during periods of heavy rainfall. The quality of life of residents in Funtua communities is significantly and negatively impacted by the frequent incidence of flooding and erosion phenomenon, long-term pools of standing water which encourages the spread of waterborne disease and incidence of malaria. The public consultations indicate a widespread support for the Funtua project as people desperately look forward to a relief from the emotional trauma arising from devastating impacts of the floods as well as the need to improve their quality of life. The most commonly expressed comment in meetings was that the key to success of the system would be the need to implement an effective maintenance programme to ensure that (a) the Funtua drainage system are effectively functional, and (b) the structural integrity of the Funtua systems as well as the proper functioning of the drains/culverts is maintained. It is concluded that the Funtua Project is, in essence, a group of mitigation measures that are gravely needed to improve the conditions of communities endangered and blighted by the hazards of floods and erosion, and living helplessly in the face of perennial threats to lives and severe losses of properties, ancestral and agricultural lands. 7.2 Recommendations The current lack of a formal solid waste management system is very apparent as waste and litter are indiscriminately abandoned throughout Funtua project communities. People use a variety of containers for waste disposal (e.g. plastic Page 115 bags, tins and baskets). However, these are make-shift solutions to a serious waste problem. No collection system means waste is left to rot throughout the project areas. The abandoned food waste attracts scavengers such as rats and cats. Once containers are opened by scavengers, waste is scattered widely by wind and animals. The ultimate litter and waste trap tends to be streams and water bodies which net result is a spiral of contamination of water and on-going environmental degradation that promotes the spread of disease. There is widespread public support for implementing an effective waste collection and disposal system. Many schemes have been instigated in the past but have failed due to a lack of resources including infrastructure. The most commonly made comment, during the public consultation process, was that a community awareness programme will be key to the success of the waste collection and disposal system. It is therefore imperative that waste collection and disposal system that works on a regular basis is required so that the current problem of waste accumulation in water courses can be eliminated. It is therefore strongly recommended that the volumes of wastes that currently collect in streams should not be allowed to continue as they inhibit the effective flow through water courses thereby reducing the overall capacity of the drainage systems. Page 116 CHAPTER 8: DECOMMISSIONING/ABANDONEMENT This section provides additional specific guidance on prevention and control of community health and safety impacts that may occur during project development and at the end of the project life-cycle. Many of the provisions here are adopted from the General EHS Guidelines of the World Bank. Noise and Vibration During decommissioning activities, noise and vibration may be caused by the earth moving and excavation equipment, the transportation of equipment, materials and people. It is recommended that noise reduction and control strategies be consider in areas close to community areas. These strategies include: • Planning activities in consultation with local communities so that activities with the greatest potential to generate noise are planned during periods of the day that will result in least disturbance; • Using noise control devices, such as temporary noise barriers and deflectors for impact and blasting activities, and exhaust muffling devices for combustion engines; and, • Avoiding or minimizing project transportation through community areas. Soil Erosion Soil erosion may be caused by exposure of soil surfaces to rain and wind during site clearing, earth moving, and excavation activities. The mobilization and transport of soil particles may, in turn, result in sedimentation of surface drainage networks, which may result in impacts to the quality of natural water systems and ultimately the biological systems that use these waters. Recommended soil erosion and water system management approaches include reducing or preventing erosion by: • Scheduling to avoid heavy rainfall periods (i.e., during the dry season) to the extent practical • Contouring and minimizing length and steepness of slopes • Mulching to stabilize exposed areas • Re-vegetating areas promptly • Designing channels and ditches for post-construction flows; • Lining steep channel and slopes (e.g. use jute matting). Air Quality Decommissioning activities may generate emission of fugitive dust caused by a combination of on-site excavation and movement of earth materials, contact of construction machinery with bare soil, and exposure of bare soil and soil piles to wind. A secondary source of emissions may include exhaust from diesel engines of earth moving equipment, as well as from open burning of solid waste on-site. Techniques to consider for the reduction and control of air emissions from construction and decommissioning sites include: • Minimizing dust from material handling sources, such as conveyors and bins, by using covers and/or control equipment (water suppression, bag house, or cyclone); • Minimizing dust from open area sources, including storage piles, by using control measures such as installing enclosures and covers, and increasing the moisture content; • Dust suppression techniques should be implemented, such as applying water or non-toxic chemicals to minimize dust from vehicle movements; Page 117 • Selectively removing potential hazardous air pollutants, such as asbestos, from existing infrastructure prior to demolition; • Managing emissions from mobile sources; • Avoiding open burning of solids. Solid Waste Non-hazardous solid waste generated at construction and decommissioning sites includes excess fill materials from grading and excavation activities, scrap wood and metals, and small concrete spills. Other non-hazardous solid wastes include office, kitchen, and dormitory wastes when these types of operations are part of construction project activities. Hazardous solid waste includes contaminated soils, which could potentially be encountered on-site due to previous land use activities, or small amounts of machinery maintenance materials, such as oily rags, used oil filters, and used oil, as well as spill cleanup materials from oil and fuel spills. Techniques for preventing and controlling nonhazardous and hazardous construction site solid waste include those already discussed in Section 1.6 of the EHS guidelines. Hazardous Materials Decommissioning activities may pose the potential for release of petroleum based products, such as lubricants, hydraulic fluids, or fuels during their storage, transfer, or use in equipment. These materials may also be encountered during decommissioning activities in building components or industrial process equipment. Techniques for prevention, minimization, and control of these impacts include: • Providing adequate secondary containment for fuel storage tanks and for the temporary storage of other fluids such as lubricating oils and hydraulic fluids; • Using impervious surfaces for refueling areas and other fluid transfer areas; • Training workers on the correct transfer and handling of fuels and chemicals and the response to spills; • Providing portable spill containment and cleanup equipment on site and training in the equipment deployment; • Assessing the contents of hazardous materials and petroleum-based products in building systems (e.g. PCB containing electrical equipment, asbestos- containing building materials) and process equipment and removing them prior to initiation of decommissioning activities. Wastewater Discharges Decommissioning activities may include the generation of sanitary wastewater discharges in varying quantities depending on the number of workers involved. Adequate portable or permanent sanitation facilities serving all workers should be provided at all construction sites. Sanitary wastewater in construction and other sites should be managed as prescribed in Section 1.3 of the EHS guidelines. Contaminated Land Land contamination may be encountered in sites under construction or decommissioning due to known or unknown historical releases of hazardous materials or oil, or due to the presence of abandoned infrastructure formerly used to store or handle these materials, including underground storage tanks. Actions necessary to manage the risk from contaminated land will depend on factors such as the level and location of contamination, the type and risks of the contaminated media, and the intended land use. However, a basic management strategy should Page 118 include: • Managing contaminated media with the objective of protecting the safety and health of occupants of the site, the surrounding community, and the environment post construction or post decommissioning; • Understanding the historical use of the land with regard to the potential presence of hazardous materials or oil prior to initiation of construction or decommissioning activities; • Preparing plans and procedures to respond to the discovery of contaminated media to minimize or reduce the risk to health, safety, and the environment consistent with the approach for Contaminated Land in Section 1.6 • Preparation of a management plan to manage obsolete, abandoned, hazardous materials or oil consistent with the approach to hazardous waste management described in Section 1.6 of the EHS guidelines. Slips and Falls Slips and falls on the same elevation associated with poor housekeeping, such as excessive waste debris, loose construction materials, liquid spills, and uncontrolled use of electrical cords and ropes on the ground, are also among the most frequent cause of lost time accidents at construction and decommissioning sites. Recommended methods for the prevention of slips and falls from, or on, the same elevation include: • Implementing good house-keeping practices, such as the sorting and placing loose construction materials or demolition debris in established areas away from foot paths; • Cleaning up excessive waste debris and liquid spills regularly; • Locating electrical cords and ropes in common areas and marked corridors; • Use of slip retardant footwear. Struck By Objects Construction and demolition activities may pose significant hazards related to the potential fall of materials or tools, as well as ejection of solid particles from abrasive or other types of power tools which can result in injury to the head, eyes, and extremities. Techniques for the prevention and control of these hazards include: • Using a designated and restricted waste drop or discharge zones, and/or a chute for safe movement of wastes from upper to lower levels; • Conducting sawing, cutting, grinding, sanding, chipping or chiseling with proper guards and anchoring as applicable; • Maintaining clear traffic ways to avoid driving of heavy equipment over loose scrap; • Use of temporary fall protection measures in scaffolds and out edges of elevated work surfaces, such as hand rails and toe boards to prevent materials from being dislodged; • Evacuating work areas during blasting operations, and using blast mats or other means of deflection to minimize fly rock or ejection of demolition debris if work is conducted in proximity to people or structures; • Wearing appropriate PPE, such as safety glasses with side shields, face shields, hard hats, and safety shoes Moving Machinery Vehicle traffic and use of lifting equipment in the movement of machinery and materials on a construction site may pose temporary hazards, such as physical Page 119 contact, spills, dust, emissions, and noise. Heavy equipment operators have limited fields of view close to their equipment and may not see pedestrians close to the vehicle. Center-articulated vehicles create a significant impact or crush hazard zone on the outboard side of a turn while moving. Techniques for the prevention and control of these impacts include: • Planning and segregating the location of vehicle traffic, machine operation, and walking areas, and controlling vehicle traffic through the use of one-way traffic routes, establishment of speed limits, and on-site trained flag-people wearing high-visibility vests or outer clothing covering to direct traffic; • Ensuring the visibility of personnel through their use of high visibility vests when working in or walking through heavy equipment operating areas, and training of workers to verify eye contact with equipment operators before approaching the operating vehicle; • Ensuring moving equipment is outfitted with audible back-up alarms; • Using inspected and well-maintained lifting devices that are appropriate for the load, such as cranes, and securing loads when lifting them to higher job- site elevations. Dust • Dust suppression techniques should be implemented, such as applying water or non-toxic chemicals to minimize dust from vehicle movements; • PPE, such as dusk masks, should be used where dust levels are excessive Other Site Hazards Construction and decommissioning sites may pose a risk of exposure to dust, chemicals, hazardous or flammable materials, and wastes in a combination of liquid, solid, or gaseous forms, which should be prevented through the implementation of projectspecific plans and other applicable management practices, including: • Use of specially trained personnel to identify and remove waste materials from tanks, vessels, processing equipment or contaminated land as a first step in decommissioning activities to allow for safe excavation, construction, dismantling or demolition; • Use of specially trained personnel to identify and selectively remove potentially hazardous materials in building elements prior to dismantling or demolition including, for example, insulation or structural elements containing asbestos and Polychlorinated Biphenyls (PCBs), electrical components containing mercury; • Use of waste-specific PPE based on the results of an occupational health and safety assessment, including respirators, clothing/protective suits, gloves and eye protection. General Site Hazards Projects should implement risk management strategies to protect the community from physical, chemical, or other hazards associated with sites under construction and decommissioning. Risks may arise from inadvertent or intentional trespassing, including potential contact with hazardous materials, contaminated soils and other environmental media, buildings that are vacant or under construction, or excavations and structures which may pose falling and entrapment hazards. Risk management strategies may include: • Restricting access to the site, through a combination of institutional and administrative controls, with a focus on high risk structures or areas Page 120 depending on site-specific situations, including fencing, signage, and communication of risks to the local community; • Removing hazardous conditions on construction sites that cannot be controlled affectively with site access restrictions, such as covering openings to small confined spaces, ensuring means of escape for larger openings such as trenches or excavations, or locked storage of hazardous materials Traffic Safety Construction activities may result in a significant increase in movement of heavy vehicles for the transport of construction materials and equipment increasing the risk of traffic-related accidents and injuries to workers and local communities. The incidence of road accidents involving project vehicles during construction should be minimized through a combination of education and awareness-raising, and the adoption of procedures prescribed for Traffic Safety. Page 121 REFERENCES Archibold, O.W. (1995). Ecology of World Vegetation: The Tropical Forest. Chapman and Hall xii 510 pp. Ayogu, C.N., Phil-Eze, P.O., Ayogu, N.O. et al. (2019). Morphometric analysis and the validity of Hortonian postulations in Sokoto drainage basin, Nigeria Journal of Spatial Information Research pp 1–16 https://en.climate-data.org/info/sources/ Brueing, E.F. (1998). Conservation and management of tropical rainforest: An integrated approach to sustainability. CAB International. Walling Ford Ox 108. Civil Contractors Federation (2011): Environmental Best Management Practice Guidelines Erosion & Sediment Control. Federal Ministry of Agriculture and Water Resources (2003): Third National Fadama Development Project (Fadama III), Rural Infrastructure, Manual No. 4, August Federal Ministry of Environment (2012): Environmental and Social Management Framework (ESMF) for Nigeria Erosion and Watershed Management Project (NEWMAP). Federal Ministry of Environment (2012): Resettlement Policy Framework (RPF) for Nigeria Erosion and Watershed Management Project (NEWMAP). Federal Republic of Nigeria (2013): Project Appraisal Document (PAD) for Nigeria Erosion and Watershed Management Project (NEWMAP). Federal Republic of Nigeria (2013): Project Implementation Manual (PIM) for Nigeria Erosion and Watershed Management Project (NEWMAP). Federal Republic of Nigeria (1999): Summary of the Environmental and Social Impact Assessment Study Second National Fadama Development Project (NFDP II) Ibrahim, A. (1990). Geology and Geochemistry of the Area around Kankara Kaolinitic Clay Deposits, Katsina State. An Unpublished Msc. Thesis, Ahmadu Bello University Zaria. Lochner, P. (2005): Guideline for Environmental Management Plans. CSIR Report No ENV-S-C 2005-053 H. Republic of South Africa, Provincial Government of the Western Cape, Department of Environmental Affairs & Development Planning, Cape Town. Messrs ENPLAN Group (December, 2018): Preliminary Engineering Design Drawings for Katsina Projects Page 122 Pickett, S.T.A. and White, P.S. (1985). Patch dynamics, a synthesis. In: The Ecology of Natural Disturbance and Patch Dynamics. (Eds. S.T.A. Pickett and P.S. White). Academic Press, Orlando, pp. 371-384. O.K. Agagu, E.A. Fayose, S.W. Petters; (1985); Stratigraphy and sedimentation in the Senonian Sokoto Basin of Eastern Nigeria; Journal of Mineralogy and Geology, 22, pp. 25–36 UNEP (1988): Environmental Impact Assessment, Basic procedures for developing Countries. World Bank Safeguards Policies (2005) World Bank Group; (2007); Environmental, Health, and Safety (EHS) Guidelines; General EHS Guidelines: Construction And Decommissioning; World Bank (1999): Environmental Management Plan, OP4.01 - Annex C January Saunders & Buob, (2018): Soil Testing for environmental contaminants. Spellerberg, I.F. (1991). Monitoring Ecological Change. Cambridge University Press, Cambridge, UK, pp. 113-141. https://weatherspark.com/y/55136/Average-Weather-in-Katsina-Nigeria-Year-Round https://www.who.int/news-room/fact-sheets/detail/ambient-(outdoor)-air-quality-and- health Page 123 ANNEXURES Page 124 ANNEXURE I: List of Contacted Stakeholders LIST OF STAKEHOLDERS FOR ESMP PROJECT UNDER KATSINA STATE NEWMAP FEDERAL GOVERNMENT: Federal Ministry of Environment, Abuja (1) The Hon. Minister Hon. Ibrahim Usman Jibril (2) Permanent Secretary Dr Shehu Mahmud (3) Director, Environment Assessment Department Usman Ahmed National Environmental Standards and Regulations Enforcement Agency (NESREA) (4) Director General/CEO - Dr. Lawrence Chidi Anukam (5) Katsina Zonal Controller, Zonal Comptroller, Katsina State. STATE GOVERNMENT (1) Permanent Secretary, Environment; Alhaji Isyaku Masari (2) Director, Ecology and Erosion Control Alh. Abubakar Muhammad Gege (3) Permanent Secretary, Land and survey; HAJIYA TALATU NASIR (4) Director Lands; ALHAJI SANI NADADA (5) Permanent Secretary, Water Resources; Alh. Ubale Aburrahman (6) Director, Water Resource; (7) Permanent Secretary, Works; Engr. HAFIZ WALI (8) Director Civil; Engr Yakubu Muhammad (9) Permanent Secretary, Agriculture; (10) Director, Agriculture; ALHAJI BELLO MUHAMMAD FUNTUA THE TRADITIONAL RULERS (1) SARKIN MASKA HAKIMIN FUNTUA ALHAJI IDRIS SAMBO (2) SARKIN AREWA HAKIMIN JIBIA (3) MAGAJIN GARIN KATSINA, HAKIMIN KATSINA ALHAJI AMINU ABDULMUMINI KABIR USMAN (4) GALADIMAN KATSINA, HAKIMIN MALUMFASHI ALH. JUSTICE SADIQ MAHUTA COMMUNITY PERSONS: (1) Katsina Community Members (2) Malumfashi Community Members (3) Funtua Community Members (4) Jibia Community Members NATIONAL ASSEMBLY MEMBERS, ABUJA Distinguished Senators (1) SENATOR BELLO MANDIYYA, FUNTUA ZONE (2) SENATOR KABIR BARKIYA, KATSINA ZONE Federal House of Representatives (1) ALHAJI MUNTARI DANDUTSE, FUNTUA/DANDUME (2) ALHAJI IRO ISANSI, KATSINA CONSTITUENCY (3) ALHAJI BABANGIDA IBRAHIM, MALUMFASHI/KAFUR Page 125 (4) ALHAJI SADA SOLI JIBIA, JIBIA/KAITA KATSINA STATE HOUSE OF ASSEMBLY 1. HON, ALHAJI IBRAHIM SAEED, MALUMFASHI 2.HON, ALHAJI ABUBAKAR MUHAMMAD, FUNTUA 3. HON, ALI ABU ALBABA, KATSINA. LOCAL GOVERNMENT AREAS: (1) ALHAJI LAWAL SANI FUNTUA, FUNTUA L.G.A. (2) ALHAJI AMINU WAZIRI, MALUMFASHI L.G.A. (3) ALHAJI ABUBAKAR BAKO, KATSINA L.G.A NON-GOVERNMENTAL ORGANIZATIONS: FAITH BASED ORGANISATIONS (FBO) JIBWIS, KATSINA STATE MUNAZZAMATU, KATSINA STATE FITYANUL ISLAM, KATSINA STATE CAN, KATSINA STATE HIGHER LEARNING INSTITUTIONS: 1) UMARU MUSA UNIVERSITY, KATSINA 2) FEDERAL UNIVERSITY, DUTSINMA 3)FEDERAL COLLEGE OF EDUCATION, KATSINA 4)ALQALAM UNIVERSITY, KATSINA 5) SCHOOL OF NURSING AND MIDWIFERY, KATSINA 6) HASAN USMAN KATSINA POLYTECHNIC, KATSINA Page 126 ANNEXURE II: Template of Socioeconomic/Census Data Forms ONE PASSPORT-SIZE PHOTO OF RESPONDENT QUESTIONNAIRE NUMBER REQUIRED KATSINA STATE NIGERIA EROSION & WATERSHED MANAGEMENT PROGRAMME (KTS-NEWMAP) FUNTUA, MALUMFASHI, KATSINA AND JIBIA STORMWATER DRAINAGE AND DAM INTERVENTION PROJECTS [Rehabilitation and Redevelopment of Stormwater Drainages & Dam NAME OF COMMUNITY: ______________________________ DATA COLLECTION CONSENT & SURVEY FORM CONSENT: We are conducting/preparing an Environmental and Social Management Plan (ESMP) for the above stormwater drainage and dam projects under the Katsina State Nigeria Erosion and Watershed Management Programme (NEWMAP). The data collected will help to assess the environmental and social impacts that may occur as a result of these drainage rehabilitation and redevelopment projects. To enable us achieve this objective, this socioeconomic survey and your voluntary consent for the survey are required. Respondent Name:________________________Signature:__________________ Gender Phone Number(s) No of years Do you desire to see this project Your Village/ happen? lived in Community area?: YES NO No. of Persons in Highest MALE FEMALE NS/F/S/UG/G/PG Your Household: Education What is your age range? 0-21 yrs 22-45 yrs 46-60 yrs 61-70 yrs Above 70 yrs Are you married? YES NO Your Occupation 0-21 yrs 22-45 yrs 46-60 yrs 61-70 yrs Above 70 yrs Household Age Distribution No Household Undergrad School FSLC (F) SSCE (S) Graduate (G) Post Grad (PG) Educational (NS) (UG) Distribution Household Marital Child Single Married Widowed Separated Divorced Status: Trader/ Industrial Household Student Farmers Daily Labor Civil Servant Unemployed Business Worker Occupational Distribution: Monthly Household Below N21,000- N31,000- N46,000- N60,000-120,000 Above N120,000 Income: N21,000 30,000 45,000 60,000 How will this project affect Improve Increase Improve Improve you, your household or your Others Movement Land Value Trading Communication community? What was the frequent illness(es) in your family in the past one year? Where does your family seek medical Pharmacy/ Hospital Native Drugs Self-Medication treatment from? Chemist Walking Outside How far is this facility from your place? Upto 2.0km Over 2.0km Distance Community Page 127 INTERVIEWER: PHONE NO. (Full Names) SIGNATURE DATE: D: M: 2018 Household Composition and Personal Information Household Relationship Educational Surname Other Names Gender Age Disability Occupation Members With H.H Level Head of Household Spouse Member 1 Member 2 Member 3 Member 4 Member 5 Member 6 Member 7 Disability = Blind-1; Crippled-2; Mentally Disabled-3; Physically Challenged-4, Other-5 Relationship = Self -1; Wife-2; Son/Daughter-3, Nephew/Niece-4, Son-in-law/Daughter-in-law-5, Grand Child-6, Parent-7, House Help-8, Others-9 Marital Status = Single-1, Married-2, Widow-3, Widower-4, Divorcee-5, Separated-6, Single Parent-7. Literacy Level = Illiterate-1, Primary School-2, Secondary School-3, Undergraduate-4, Graduate-5, Post Graduate-6, Others-7. Occupation = Crop Farming-1, Animal Husbandry-2, Service Provider-3, Civil Servant-4, Craftsmanship/Artisanship-5, Trade/Business-6, Industrial Worker-7, Daily Wage Labour-8, Other-9. WHAT IS LIKELY TO BE AFFECTED BY THE PROJECT? Structure-1; Land-2; Structure and Land-3; Cash Crop-4; Others-5 (specify)…………….. Years of Occupation of Affected Property (if applicable):………….Years STATUS OF PROPERTY USER: A) Title holder; B) Tenant; C) Non-Title Holder; D) Govt; E) Squatter Affected Structure Details: Distance Type of Construction Total Type of Monthly Utility to No of Floor Area Use Rent Connections Drainage Rooms Level Roof Wall Floor (m2) Edge (m) Type of Use = Residence-1; Commercial-2; Residential-cum-Commercial-3; Animal Shed/Poultry-4; Other (specify)-5……………… Type of Construction: Wall = Mud-1, Thatched-2, Brick-3, Plank-4, Zinc-5; Roof = Zinc/Asbestos-1; RCC-2; Thatched-3; Tiles-4 Floor = Cement-1; Mud-2; Tiles-3; Floor Level = Bungalow-1, Storey Building-2; Utility Connection = Electricity-1; Water-2; Phone-3 AFFECTED LAND DETAILS SIZE OF AFFECTED LAND………………………………….. TYPE OF LAND………. (Agriculture-1; Residential-2; Commercial-3; Barren-4; Grazing Land-5) If Agriculture, is land ……………………... Wet-1; Dry-2; Other-3 Crops grown on land? ......................................................................................................................................... Immovable assets likely to be affected: Trees………..; Orange……….; Mango……….; Apple………; Others…………………………………………………………………………………………………………….………… In your view, what is the yearly monetary benefit you gain from the land? .N................................ Page 128 ANNEXURE III: Summary of Applicable World Bank Safeguard Policies The World Bank safeguard policies are designed to help ensure that projects proposed for Bank financing are environmentally and socially sustainable, and thus improve decision-making. The Bank has ten safeguards policies as listed below: • OP 4.01 Environmental Assessment; • OP 4.04 Natural Habitats; • OP 4.09 Pest Management; • OP 4.11 Physical Cultural Heritage; • OP 4.12 Involuntary Resettlement; • OP 4.10 Indigenous People; • OP 4.36 Forests; • OP 4.37 Safety of Dams; • OP 7.50 Projects on International Waterways; • OP 7.60 Projects in Disputed Areas The environmental and social safeguard policies of World Bank triggered and applicable in this Funtua subproject include OP 4.01 and OP 4.12. These policies are summarized as follows: Environmental Assessment (EA) (OP 4.01): An EA is conducted to ensure that Bank-financed projects are environmentally sound and sustainable, and that decision- making is improved through appropriate analysis of actions and of their likely environmental impacts. Any World Bank project that is likely to have potential adverse environmental risks and impacts in its area of influence requires an EA indicating the potential risks, mitigation measures and environmental management framework or plan. Physical Cultural Resources (OP 4.11): The Bank seeks to assist countries to manage their physical cultural resources and avoid or mitigate adverse impact of development projects on these resources. Although this policy is not triggered for this subproject, there are possibilities for the existence of and other cultural relics within the project area. The requirements for chance finds of such relics shall apply during the construction works. Involuntary Resettlement (OP 4.12): Key objectives of the World Bank’s policy on involuntary land acquisition are to avoid or minimize involuntary resettlement where feasible, exploring all viable alternative project designs; assist displaced persons in improving their former living standards, income earning capacity and production level, or at least in restoring them; encourage community participation in planning and implementing resettlement; and provide assistance to affected people regardless of the legality of land tenure. The policy covers not only physical relocation, but any loss of land or other assets resulting in relocation, or loss of shelter; loss of assets or access to assets; loss of income sources or means of livelihood whether or not the affected people must move to another location. When the policy is triggered, a Resettlement Action Plan (RAP), must be prepared. An abbreviated plan may be developed when less than 200 people are affected by the project. In situations, where all the precise impacts cannot be assessed during project preparation, provisions are made for preparing a Page 129 Resettlement Policy Framework (RPF). The RAP/RPF must ensure that all Bank’s policy provisions detailed in OP 4.12 are addressed particularly the payment of compensation for affected assets at their replacement cost. Disclosure Policy (OP 17.50). This policy supports decision making by the Borrower and Bank by allowing the public access to information on environmental and social aspects of projects. Mandated by six safeguard policies that has specific requirements for disclosure in country (Before project appraisal in local language and in English) and the World Bank Website (Before project appraisal in English). Documents can be in draft but must meet WB standards. Page 130 ANNEXURE IV: General Environmental Management Conditions For Construction Contracts/Civil Works. Contract Specifications for Contractor 1.0 General a. All Environmental and Social (E&S) safeguards associated with the contract shall be complied with by the contractor. The Contractor shall also update himself about such issue in the ESMP, and prepare his work strategy and plan to fully take into account relevant provisions of the ESMP. b. The Contractor shall develop a plan of work indicating all Environmental and Social safeguards at the various stages and indicate the period within which site will be maintained to it’s original state after completion of works to ensure that significant E&S safeguards have been addressed appropriately. c. The Contractor shall adhere to the proposed plan implementation schedule and the monitoring plan to ensure effective feedback of monitoring information to the SPMU Project Engineer (PE). d. The Contractor shall implement all measures to avoid undesirable adverse environmental and social impacts wherever possible, restore site offices to acceptable standards, and abide by all environmental performance requirements specified in the ESMP 2.0 Dust Mitigation Measures a. The contractor shall minimize the effect of dust on the surrounding environment resulting from site clearing, vibrating equipment and temporary access roads. b. During the rehabilitation project, the contractor shall carry out proper and efficient measures, such as water dousing, whenever necessary to reduce the dust nuisance, and to prevent dust originating from the operations. 3.0 Noise Due to Construction Activities The contractor shall ensure the noise levels emanating from machinery, vehicles and noisy construction activities (e.g. excavation) are kept at a minimum for the safety, health and protection of workers within the vicinity of high noise levels and nearby communities. 4.0 Waste Management a) Construction waste shall not be left in stockpiles along the road, but removed and disposed of/or reused where needed. b) All waste shall be segregated into organic waste and plastic and glass. The organic waste will be composted near the site office to enrich the soil while plastics and glass will be taken to the district dump sites Page 131 c) All sanitary facilities (e.g. garbage collection and disposal, drinking water facilities, etc.) shall be provided by the contractor in site offices or project sites. 5.0 Water Resource Management a) No construction water containing spoils or site effluent, especially cement, oil and fuel, shall be allowed to flow into natural water drainage courses. b) The contractor shall take all possible steps to prevent pollution of streams and other water supplies. c) Entry of runoff water to the site shall be restricted by constructing diversion channels or culverts to reduce the potential of soil erosion and water pollution. d) Waste water from washing out of equipment shall not be discharged into water courses. 6.0 Material Excavation and Deposit Vegetation clearing shall be restricted to the area required for safe operation of the rehabilitation work. Vegetation clearing shall not be done more than two weeks in advance of rehabilitation. 7.0 Contractor's Environment and Social Management Plan (ESMP) a) Within 6 weeks of signing the Contract, the Contractor shall prepare a work plan to ensure the adequate management of E&S aspects of the works, including implementation of the requirements of these general conditions and any specific requirements of an E&S safeguards for the works. The Contractor's work plan will serve two main purposes: i. For the Contractor, for internal purposes, to ensure that all measures are in place for adequate E&S management, and as an operational manual for his staff. ii. For the Client, supported where necessary by SE, to ensure that the Contractor is fully prepared for the adequate management of all E&S safeguards issues. b) The Contractor's E&S document shall provide at least: • A description of procedures and methods for complying with these general environmental and social conditions, and any specific conditions specified in the ESMP; • A description of specific mitigation measures that will be implemented in order to minimize adverse impacts; • A description of all planned monitoring activities and the reporting thereof; and • The internal organizational, management and reporting mechanisms put in place. 8.0 Health and Safety Page 132 a) In advance of the construction work, the Contractor shall mount an awareness and hygiene campaign. Workers and local residents shall be sensitized on health risks particularly of HIV/AIDS. b) Adequate road signs to warn pedestrians and motorists of rehabilitation activities, diversions, etc. shall be provided at appropriate points. 9.0 Reporting The Contractor shall prepare monthly progress reports to the SPMU on E&S monitoring with these general conditions and the project E&S safeguards. It is expected that the Contractor's reports will include information on: • E&S management actions/measures taken, including approvals sought from SMENV, PE and FME • Problems encountered in relation to E&S aspects (incidents, including delays, cost consequences, etc. as a result thereof); • Lack of compliance with contract requirements on the part of the Contractor; • Changes of assumptions, conditions, measures, designs and actual works in relation to E&S aspects; and • Observations, concerns raised and/or decisions taken with regard to E&S management during site meetings. 10.0 Cost of Compliance It is expected that compliance with these conditions is already part of standard of good workmanship and state-of-the-art as generally required under this Contract. The item "Compliance with Environmental and Social Management Conditions" in the Bill of Quantities covers these costs. No other payments will be made to the Contractor for compliance with any request to avoid and/or mitigate an avoidable E&S impact. Page 133 ANNEXURE V: Minutes & Photos of Meetings with Funtua Project Communities Consultant Meetings with Various Strata of Funtua Community Minutes of Consultant Meeting with Funtua District Head SENSITIZATION MEETING HELD WITH THE FUNTUA DISTRICT HEAD AT THE PALACE OF THE DISTRICT HEAD (SARKIN MASKANA HAKIMU FUNTUA) ON TUESDAY JULY 28, 2019 ITEM DESCRIPTION 1. Project: Katsina State NEWMAP ESMP 2. Community: Funtua 3. Date: July 28, 2019. 4. Language of Hausa and English Communication: 5. Introductions and • The meeting commenced at about 11.50am with an opening Protocols: prayer by Engr. Surajo Arzuka the project Engr. who later introduced the team of consultants and the Katsina NEWMAP members of staff to the district head Alh. Sambo Idris Sambo. He went further to briefed Sarkin on the purpose of the visit by the team as it concerns ESMP of the proposed Funtua Storm Water Control project. This exercise will be done before the proper project will take place so as to look at the environmental and social effect of the project and proffer a management plan which will serve as part of contract terms for the contractor. 6. Remarks of • The principal consultant Dr. Odili Ojukwu introduced himself and Consultant acknowledged Sarkin for welcoming the team. The consultant continued by briefing the district head on the purpose of visiting to deliver an ESMP of the proposed storm water control project. He made the people to understand that there is need to bring the people closer to the project for a detailed and comprehensive project. He continued by saying that the project is a community owned project and so the people have to take full charge of the project from the beginning to the end for a successful and sustainable project. He thanked everyone and explained that his team of consultants has come to do ESMP for the proposed storm water channel in order to make sure that all the effect of the project are identified and documented. At the end of this exercise, the group will make sure that the project does not affect the people negatively instead it will improve the live and economy of the people he said. Dr. Odili Ojukwu briefed the district head that according to World Bank standard; a project of such involves the peoples view through what we call a Focal Group Discussion which will involve various groups like men, women and youths. • Dr. Odili Ojukwu informed the district head that the project will involve numerous data collection which ranges from water sample, soil sample and air samples for baseline information. Other data include geological data and socioeconomic data collection of the members of the communities among others. He made the district head to understand that five enumerators will be mobilized for at least two days to carry out the socioeconomic data collection in order to know how the project will affect the people while every Page 134 ITEM DESCRIPTION other forms of data collection like air sample, water sample and soil sample will be done at the field. He begged for cooperation of the community and support of the district head during the exercise. The principal consultant briefed the Sarkin and other attendees that there will be community meeting tomorrow which will involve the entire members of the community. 7 Remarks of the Sarkin • The Sarkin welcomed the team of consultants and expressed his Maskana Hakimu Funtua gratitude over the visit. He promises to give the group full support during the exercise. He reiterated that he will not only be personally involved in the project but, will mobilize his people to receive the project as community owned project. He said there are two villages involved in the project and so they have to be informed about the tomorrow’s meeting. 8. Vote of thanks • The NEWMAP communicator Mr. Zaharadeem Sani appreciated the Sarkin for his understanding. At this juncture, the team left for sit inspection to kick start the exercise. 9.Closing • The meeting rose at about 12:15pm. Page 135 Attendees to the Consultant Meeting with Funtua District Head Page 136 Photos of Meeting with Funtua District Head Page 137 Minutes of Funtua Community Meeting MINUTES OF CONSULTATION MEETING WITH FUNTUA COMMUNITY ITEMS DESCRIPTION 1. Project: Katsina State NEWMAP: ESMP 2. Name of Community: Funtua 3. Date: July 29, 2019 4. Language of English and Hausa Communication: 5. Protocols and • The sensitization meeting commenced at about 2:20pm with an Introductions: opening prayer by Yusuf Lawal. There was a brief introduction of the members of consulting firm OTG Enviroengineering Ltd led by Dr. Odili Ojukwu and staff of the SPMU by the Project Communicator to the community. The Project communicating officer explained in detail to the community while the team of consultants has decided to visit the community to sensitize the populace on the Funtua storm water control project. He said that the proposed Funtua storm water project is a World Bank assisted project that is gear into storm water control in Funtua. He intimated the community of the consultants visit to the district head yesterday where he briefed the district head about the project. The consultant and his team went through the corridor of the proposed Funtua storm water control project yesterday he affirmed. He urged the entire community members to give the team of consultant audience to deliver what they have to say. On the same vein, he called on the principal consultant to do the needful. 6. Remarks of the SPMU: • The communication officer (CO) spoke on behalf of the SPMU to formally inform the community members on the purpose of the meeting as it concerns the proposed Funtua storm water control project. He stated that the project is designed to bring solution to the storm water problem in the community and still better the live of the people. • He eminded the attendees that the reason why the team of consultants has come is to conduct an ESMP which will be done by the team before the actual project to better the peoples live. He reminded the community that SPMU is expecting the support and cooperation of an appreciative community in the on-going exercise for a successful, comprehensive and sustainable project. 7. Remarks of the Principal • The principal consultant Dr. Odili Ojukwu spoke on behalf of the Consultant: consultants. He first introduced the team of specialists and other support staff from OTG. • The attendees were informed that it is the challenges of the storm water in the Funtua community and its menace that gave rise to the meeting. • The consultant made the community to understand that the ravaging impacts of the storm water will be dealt with by the government under the NEWMAP, with funding assistance from the World Bank. Page 138 • People were informed by the consultant that the ESMP consultancy is aimed at finding out and documenting the impacts of the proposed storm water control project on the elements of the bio-physical and socio-economic environment of the Funtua storm water corridor, and to recommend appropriate remediation in line with the World Bank social safeguard policies. • On the same vein, the community were intimated that there will be a two-day socioeconomic data collection in the community which will start by tomorrow being July 30, 2019. He further informed the community to come out with their photocopy of their ID cards and one passport photograph for documentation exercise. He said that the exercise will be starting at 9am everyday to 3pm for at least two days. • The community where informed by the principal consultant that the exercise will involve both residents, non-residents and every other person who may be affected by the remedial measures. This also includes those who would be affected psychologically and health-wise owing to the effects of noise, fugitive dusts and other pollutants during the construction activities. • The community was further advised to take full ownership of their environment and the project. This means that they should participate fully in all the stages of the proposed Funtua storm water control project, and avoid unnecessary conflicts and disaffections to ensure a successful and sustainable storm water control project. • He informed the community that there will be a focus group discussion for elders, women and youths in the community. This would be held in due course to ascertain their specific perspectives and perceptions about the Funtua storm water control project. 8. Community Perceptions • Mallam Yusuf Lawal who spoke on behalf of the community about the Project: affirmed that the proposed storm water project is a good development base on the fact that the community will be better after the civil work. • He promises that the community will surely see the project as their own while they give full support to the consultants for a more successful and sustainable project. 9.Vote of Thanks/Closing: • Vote of thanks was formally given by Mr. Zaharadeen Sani after which the meeting ended at 3:33pm with a closing prayer said by Mallam Yusuf Lawal. 10. Attendees: • The meeting was attended by 35 attendees. Page 139 Attendees to the Funtua Community Meeting Page 140 Photos of Funtua Community Meeting FUNTUA COMMUNITY MEETING Page 141 Photos of Funtua Town Drainage System Page 142 Page 143 Page 144 ANNEXURE IX: Minutes & Photos of Meeting with FMKJ Projects’ Stakeholders Minutes of Stakeholders Consultation Meeting for the FMKJ Projects MINUTES OF STAKEHOLDERS’ CONSULTATION ON THE DEVELOPMENT OF ENVIRONMENTAL & SOCIAL MANAGEMENT PLAN (ESMP) ON THE REHABILITATION OF STORM WATER DRAINAGE PROJECTS IN KATSINA, FUNTUA, MALUMFASHI AND JIBIA TOWNS, ORGANIZED BY NEWMAP KATSINA STATE ON AUGUST 8, 2019 AT KATSINA STATE SECRETARIAT CHAMBER. ITEMS DESCRIPTION 1. Project: Katsina NEWMAP: ESMP 2. Title Stakeholders’ Consultation on ESMP for FMKJ Projects 3. Community: Funtua, Malumfashi, Katsina and Jibia (FMKJ) 4. Date: August 8, 2019. 5. Language of English and Hausa Communication: 6. Introductions: • The meeting started at about 1:00 pm and opened with a prayer by Engineer Abdullahi Sani from Rural Water Supply and Sanitation Agency (RUWASSA). Thereafter Engineer Sanusi from NEWMAP welcomed participants to the occasion and wished for a successful deliberation. He was followed by Halliru Muhammed the representative of the Project Coordinator NEWMAP. He welcomed participants and commended the efforts of the State Government in tackling the menace of erosion and floods in the state. He mentioned the cities where the storm water rehabilitation and reconstruction is scheduled to take place, that is, Katsina, Funtua, Malumfashi and Jibia which is an emergency site. • The permanent secretary ministry of environment represented by the Director Ecological, Abubakar Muhammad Gege conveyed his goodwill message and as chairman technical committee of NEWMAP directed all his technical staff to attend the occasion and make useful contributions for the success of the consultation. • The representative of the Federal Ministry of Environment and Adamu Muhammad Sale who represented the state coordinator NESREA welcomed participants and suggested that EIA be conducted in all projects to be executed. • The state focal NGO, Umar Danladi who spoke before the project engineering unit/ consultant explained that NEWMAP is a community driven development program, whose approach is to allow the community to decide where projects are sighted and be part and parcel of the project. He stresses the need for attitudinal change towards project implementation and ownership. He maintains that, that is why people are involved from the beginning to the end of the project to promote ownership and sustainability. He encouraged people to form community associations and community interest groups to monitor implementation and posited that with the current level of sensitization, Katsina state and the World Bank should be assured of the sustainability of the projects. • Isma’ila Hussaini the project engineering unit/consultant took the floor after the Focal NGO to present using slides a pictorial Page 145 evidence of affected corridors selected for intervention. These include Malumfashi, Katsina, Jibia and Funtua. He explained that the Ministry of Environment has already intervened in some areas of Malumfashi corridor. 7. Remarks of the • The ESMP consultant Dr. Odili Ojukwu discussed extensively Consultant: the role of the ESMP in the projects. He welcomed everyone and promised that the participants’ time is going to be well spent as he will give a thorough presentation on the ESMP’s role in the project. • He used one slide to paint the ugly picture of the scenario, depicting the nature and danger of floods and erosion in the community. The ESMP is in place to develop the safeguards instruments for the targeted World Bank supported Projects. The consultant narrated how government projects are generally constructed without involving the benefitting community leading to general apathetic attitude by communities towards the projects because of non-involvement. • The fundamental problem he says is sustainability and the missing component is community involvement. It is in line with this that the World Bank insists that the community must recognize and take full ownership of the project even though there is no financial requirement on the part of the community. The OTG is contracted to develop ESMP for Funtua, Katsina, Malumfashi and Jibia storm water drainage and Jibia dam rehabilitation projects. • In developing the ESMP for each of the FMKJ projects, the specific project activities that would impact the environment and the community life are identified and mitigation measures prescribed so as to eliminate such impacts or reduce them to insignificance. • As part of the first steps in the ESMP development process the District Heads and the administrative leadership of the project communities are consulted. The essence of these consultations is to ensure that all hierarchies of the community understand the purpose and scope of the projects and the need for them to take ownership of their respective projects. He pleaded with community members present not to allow contractors or consultants on the projects to cut corners because projects after being executed would become their projects and would become their problems if not properly executed. The success of the projects depends on the interest and commitment of the communities. Consequently, the more questions they ask the more they understand their project. • The consultant concluded by urging the communities to form community associations and site committees to monitor project implementation. He explained that NEWMAP conducts the ESMP and RAP to ensure that project communities are not adversely affected by the implementation of the projects. Any impacts that would affect the peoples’ assets and livelihoods would be appropriately compensated for. The bottom-line he says is that the communities should take ownership of projects. 9. Perceptions of the a) Adamu Muhammad Sale representing NESREA asked about Project and Questions compensation, relocation and whether EIA is conducted on by Stakeholders: corridors before commencement of project. b) Muntari Sani a community participant asked about how the Page 146 public would ensure quality control. c) Abdullahi Muhammad representing the Director Board for Science and Technical Education asked who would channel the grievances of the community in the absence of a representative in government and where the contractor does not employ youth and other community members what happens. d) Mustapha Lawal from the Ministry of Environment asked where uprooted trees would be replaced. e) Umar Ibrahim Darma representing the Member, National Assembly (Katsina Constituency) asked whether the media is going to be used to enlighten the public. f) Mukhtar Muhammad who stood in for the Director Katsina state Waste Management Agency asked about whether there is any provision for corporate social responsibility. g) Yusuf Umar suggested that NEWMAP should ensure people do not build on the corridor - Watershed based solution. h) Dr. Hashim D. Muhammad representing the Permanent Secretary, Katsina State Ministry of Agriculture asked how the community would maintain and sustain the project materially. 10. Response of the a) Compensation and relocation issues are typically addressed in Consultant: the RAP which is being separately prepared by a different consultant. The EIA, ESIA and ESMP are all safeguard instruments designed to be protective of the environment and the project population. The specific safeguard instrument to be developed for a project depends on the outcome of the creening and scoping process conducted for the project. For the FMKJ projects, it is determined that the ESMP is appropriate to assure the necessary protection of human health and the environment for the proposed projects. b) It is envisaged and anticipated that heightened interest, involvement and commitment on the part of the project communities will ensure quality control on the part of consultants and contractors on the projects. c) As part of the ESMP documention, a section is usually included on Grievance Redress Mechanism (GRM) which is normally very explicit on how grievances arising from the project are resolved. d) Provisions are made in the ESMP for mitigation of impacts arising from clearance of vegetation or falling of any trees. e) The activities of NEWMAP and the sub-projects are constantly in the media such as this Stakeholders’ forum. f) What is required most with the NEWMAP sub-projects is the commitment of communities to exercise ownership of their projects. g) Indeed, land use restrictions are placed in project areas that required the maintenance and care of the communities post project implementation. h) Maintenance and sustainance of the projects materially are addressed in the ESMP as part of the institutional roles of community responsibilities with the support of the appropriate MDAs. 11. Attendees: • The meeting was attended by 70 persons including attendees from the identified stakeholder groups. 12. Closing: • The meeting came to an end at about 3:25pm. Page 147 Attendees to FMKJ Projects Stakeholders’ Meeting Page 148 Page 149 Photos of FMKJ Projects Stakeholders’ Meeting STAKEHOLDERS’ CONSULTATIVE FORUM Page 150 Page 151 ANNEXURE X: Mapping of Sampling Locations & Coordinates Across the FMKJ Sites SAMPLING LOCATIONS AND COORDINATES ACROSS THE FMKJ PROJECT SITES FUNTUA PROJECT SITE SAMPLE MEDIA SAMPLING MODE SAMPLE LOCATION CODE COORDINATES FUNTUA CENTRAL MOTOR SURFACE WATER TARGETED FNT/SW/01 N 110 31’41.5’’ E 0070 18’59.2 PARK SAMPLE RANDOM TUDUN MALAMI AREA #2 FNT/SW/02 N 110 31’52.9’’ E 0070 18’59.9 TARGETED TUDUN MALAMI AREA #1 FNT/SS/01 N 110 31’41.5’’ E 0070 18’59.2 TARGETED BELANGADA AREA FNT/SS/02 N 110 31’11.4’’ E 0070 19’00.6’ SOIL SAMPLE RANDOM UNGUADAHIRU AREA FNT/SS/03 N 110 31’52.9’’ E 0070 18’59.9’ FUNTUA CENTRAL MOTOR TARGETED FNT/SS/04 N 110 33’19.1’’ E 0070 18’41.4 PARK RANDOM TUDUN MALAMI AREA #2 FNT/SS/05 N 110 33’04.0’’ E 0070 17’15.5 TARGETED TUDUN MALAMI AREA #1 FNT/AS/01 N 110 31’41.5’’ E 0070 18’59.2 AIR QUALITY TARGETED BELANGADA AREA FNT/AS/02 N 110 31’11.4’’ E 0070 19’00.6 RANDOM UNGUADAHIRU AREA FNT/AS/03 N 110 31’52.9’’ E 0070 18’59.9 FUNTUA CENTRAL MOTOR TARGETED FNT/AS/04. N 110 33’19.1’’ E 0070 18’41.4. PARK RANDOM TUDUN MALAMI AREA #1 FNT/AS/05 N 110 33’04.0’’ E 0070 17’15.5 GROUND WATER TARGETED BELANGADA AREA FNT/GWS/01 N 110 31’11.4’’ E 0070 19’00.6 RANDOM UNGUADAHIRU AREA FNT/GWS/02 N 110 33’04.0’’ E 0070 17’15.5 MALUMFASHI PROJECT SITE SAMPLE MEDIA SAMPLING MODE SAMPLE LOCATION CODE COORDINATES TARGETED MALUMFASHI BYPASS MLF/SWR/01 N 11 47’10.4’’ E 0070 38’08.9 0 UNGUWAR SODANJI BESIDE SURFACE WATER TARGETED LOLO DAKARE FUEL STATION MLF /SWR/02 N 110 46’27.8” E 0070 37’20’.3 SAMPLE TARGETED FAIMASA BRIDGE MLF /SWR/03 N 110 47’09.3’’ E 0070 36’57.2 RANDOM RAFIN DINYA MLF /SWR/04 N 110 47’16.9’ E 0070 36’49.2 TARGETED DANRIMI AREA BY BYPASS MLF /SS/01 N 110 47’10.4’’ E 0070 38’08.9 TARGETED MALUMFASHI BYPASS MLF /SS/02 N 110 46’27.5’’ E 0070 37’20.3 UNGUWAR SODANJI BESIDE SOIL SAMPLE TARGETED LOLO DAKARE FUEL STATION MLF /SS/03 N 110 47’0.93’’ E 0070 36’57.2 RANDOM FAIMASA BRIDGE MLF /SS/04 N 110 47’17.5’’ E0070 37’02.6 RANDOM RAFIN DINYA MLF /SS/05 N 110 47’16.9’ E 0070 36’49.2 TARGETED DANRIMI AREA BY BYPASS MLF /AS/01 N 110 47’10.4’’ E 0070 38’08.9 TARGETED MALUMFASHI BYPASS MLF /AS/02 N 110 46’27.8” E 0070 37’00.3 UNGUWAR SODANJI BESIDE AIR QUALITY TARGETED LOLO DAKARE FUEL STATION MLF /AS/03 N 110 47’09.3’’ E 0070 36’57.2 RANDOM FAIMASA BRIDGE MLF /AS/04 N 110 47’17.5’’ E 0070 37’02.6 RANDOM RAFIN DINYA MLF /AS/05 N 110 47’16.9’ E 0070 36’49.2 GROUND WATER TARGETED DANRIMI AREA BY BYPASS MLF /GWS/01 N 110 47’17.5’’ E 0070 37’02.6 KATSINA PROJECT SITE SAMPLE MEDIA SAMPLING MODE SAMPLE LOCATION CODE COORDINATES KOFAR GUGA CULVERT TARGETED KAT/SWR/01 N 130 06’00.5’’ E 0070 13’30.3’’ AREA SURFACE WATER RANDOM TUDUN BARAS AREA KAT/SWR/02 N 130 00’17.7’’ E 0070 35’49.8’’ SAMPLE RANDOM GADAR KUKAR GESA AREA KAT/SWR/03 N 130 00’40.9’’ E 0070 36’30.5’’ KORAMAR AMBASSADOR TARGETED KAT/SWR/04 N 130 01’59.5’’ E 0070 38’0.96’’ AREA KOFAR GUGA CULVERT TARGETED KAT/SS/01 N 13016’00.5’’ E 0070 13’30.2’’ SOIL SAMPLE AREA RANDOM TUDUN BARAS AREA KAT/SS/02 N 13000’17.7’’ E 0070 35’49.8’’ Page 152 SAMPLING LOCATIONS AND COORDINATES ACROSS THE FMKJ PROJECT SITES RANDOM GADAR KUKAR GESA AREA KAT/SS/03 N 13000’40.9’’ E 0070 36’30.5’’ KORAMAR AMBASSADOR RANDOM KAT/SS/04 N 13001’31.1’’ E 0070 37’31.5’’ AREA TARGETED POLICE QUARTERS AREA KAT/SS/05 N 13001’59.5’’ E 0070 38’09.6’’ KOFAR GUGA CULVERT TARGETED KAT/AS/01 N 150 06’00.5’’ E 0070 13’30.2’’ AREA RANDOM TUDUN BARAS AREA KAT/AS/02 N 130 00’17.7’’ E 0070 35’49.8’’ AIR QUALITY TARGETED GADAR KUKAR GESA AREA KAT/AS/03 N 130 00’40.9’’ E 0070 36’30.5’’ KORAMAR AMBASSADOR RANDOM KAT/AS/04 N 130 01’31.1’’ E 0070 37’31.5’’ AREA TARGETED POLICE QUARTERS AREA KAT/AS/05 N 130 01’59.5’’ E 0070 38’09.6’’ JIBIA PROJECT SITE SAMPLE MEDIA SAMPLING MODE SAMPLE LOCATION CODE COORDINATES TARGETED TUDUN WADA AREA JIB/SWR/01 N 13 05’25.4’’ E 0070 13’03.9 0 SURFACE WATER RANDOM MAIKWARI AREA #1 JIB/SWR/02 N 130 05’52.5’’ E 0070 13’02.8 SAMPLE TARGETED TASHAR GODI AREA JIB/SWR/03 N 130 06’10,1’’ E 0070 13’17.0 RANDOM TUDUN WADA AREA JIB/SS/01 N 130 05’25.4’’ E 0070 13’03.9 TARGETED MAIKWARI AREA #1 JIB/SS/02 N 130 05’33.4’’ E 0070 12’59.0 SOIL SAMPLE TARGETED FARU ROAD JIB/SS/03 N 130 05’52.5’’ E 0070 13’02.8 TARGETED MAIKWARI AREA #2 JIB/SS/04 N 130 06’10.1’’ E 0070 13’17.0 RANDOM TASHAR GODI AREA JIB/SS/05 N 130 06’00.4’’ E 0070 13’30.3 TARGETED FARU ROAD JIB/AS/01 N 130 05’25.4’’ E 0070 13’03.9 TARGETED MAIKWARI AREA #1 JIB/AS/02 N 130 05’33.4’’ E 0070 12’59.0 AIR QUALITY TARGETED TASHAR GODI AREA JIB/AS/03 N 130 05’52.5’’ E 0070 13’02.8 RANDOM MAIKWARI AREA #2 JIB/AS/04 N 130 06’10,1’’ E 0070 13’17.0 RANDOM TUDUN WADA AREA JIB/AS/05. N 130 06’00.4’’ E 0070 13’30.3 GROUND WATER TARGETED MAIKWARI AREA #2 JIB/GWS/01 N 130 05’33.4’’ E 0070 12’59.0 Page 153 ANNEXURE XI: Study Sampling Methods and Locations Representative soil samples for laboratory analysis were both randomly and targetedly collected from areas that show adverse environmental conditions within each of the FMKJ sites. Total of five soil samples were collected from each of the Funtua drainage corridor. Each near surface soil sample (0 - 6 inches depth) was collected using the Dutch hand auger and put in a properly labeled self-sealing plastic bag for shipment to the MGG Resources laboratory at Nsukka for chemical analysis. The matrix of soil sampling locations and coordinates across the Funtua site are included in Annex X. Soil parameters indicate the state of soil ecosystem characteristics, which especially reflect productive, buffering, filtering and other soil functions. The structure of soil profile (the soil class), soil type, soil depth, the chemical content and quality of humus substances, accessible nutrient supply, soil reaction, the content of foreign substances in soil, and soil edaphon is of highest importance. Soil quality is significantly affected by physical, chemical, biological and biochemical properties sensitive to changes in the environment and land management. With regard to physical properties, there are bulk density, porosity, water retention capacity, soil temperature, etc. In the group of chemical characteristics, total carbon and nitrogen content, soil reaction and content of available nutrients are observed. Evaluation of biological parameters focuses on microbial biomass and its activity, soil respiration, potentially mineralised nitrogen, the activity of soil enzymes, etc. Soil enzymatic activity can be used as a microbial indicator of soil quality, since the activity of soil enzymes is closely related to essential soil characteristics. It indicates changes sooner than other soil characteristics and can be an integrating soil-biological index reflecting soil use. Selected enzymatic activities can be suitable indicators for long-term soil monitoring and quality assessment of soils. A decrease in soil quality results from the load of risk substances such as heavy metals in the soil. Heavy metals as a large group of polluters are a serious problem in all components of the environment, including soil. A great number of these metals have considerable toxic effects and their highest allowable concentrations are defined for the soil system, similarly to those for air and water. However, it has been extremely difficult to define limit concentrations of heavy metals for soil, since, in contrast to air and water, soil is an extremely heterogeneous system and mobility of inorganic contaminants, closely related to the intake by plants, depends on several soil factors. The approaches towards the determination of metal concentration limits in soil vary significantly in individual countries. In some countries, the definition of limits for heavy metals concentrations is based on soil use (these are defined as so-called trigger and action values), or, possibly, on eco-toxicological data in so- called standard soil and limit values for the total and dissolvable concentration of heavy metals in soil (Barančíková, 1998; Makovníková et al., 2006). Soil may be considered a passive acceptor of heavy metals that becomes the source of polluting other components of the environment and the food chain. The analytical results of the baseline soil quality indicators within and around the project corridor show concentrations below the regulatory threshold limits as summarized in the Table 3.4. These results do not show concentrations that will pose any potential health risks to residents and project construction workers during the construction phase of the project. The complete analytical results are included in Annex XIV - XVII. Page 154 ANNEXURE XII: Baseline Noise Readings and Sampling Locations Funtua Project Site Noise Readings MINIMUM MAXIMUM S/N NOISE READING LOCATIONS COORDINATES (dB) (dB) FUNTUA CENTRAL MOTOR PARK 1. 55.2 70.4 N110 31.692; E0070 18.989 BRIDGE AREA HAND DUG WELL AT TUDUN 2. 58.1 74.5 N110 31.186; E0070 19.012 MALAMI AREA 3. BELANGADA AREA 51.7 80.2 N110 33.319; E0070 18.667 4. UNGUADAHIRU AREA 69.3 88.2 N110 33.169; E0070 17.257 Page 155 ANNEXURE XIII: Complete Plant Listing from Vegetative Study Table 3.5: Listing of Prominent and Indicator Plant Species Found at The Project Area Showing Life Forms, Families and Distribution of Species S/N Species Family Life Form Common Name Local Name 1 Lannea schimperi Anacardaceae Shrub/Tree Lannea Faru 2 Adenium obesum Apocynaceae Shrub Desert rose Gariya 3 Borassus aethiopium Arecaceae Tree Fan palm Giginya 4 Hyphaene thebaica Arecaceae Tree Dum palm Goruba 5 Calotropis procera Asclepiadaceae Tree Swallow swort, Tumfafiya 6 Leptadenia hastata Asclepiadaceae Herb Leptadenia Dan barawo 7 Asparagus Africana Asparagaceae Herb Asparagus Sarka 8 Aspilia Africana Asteraceae Herb Haemorrhage plant Yunyun 9 Adansonia digitata Bombacaea Tree Baobab Kukka 10 Cadaba farinose Capparidaceae Shrub Cadaba Hanza 11 Anogeissus leiocarpus Combretaceae Tree Axle wood Marke 12 Combretum micranthum Combretaceae Shrub Combreturn Geza 13 Combretum nigricans Combretaceae Shrub Combreturn Tsiriri 14 Gueira senegalensis Combretaceae Shrub/Tree Moshi medicine Sabara 15 Ipomea asarifolia Convolvulacaea Herb Morning glory Duman kadda 16 Diospyros mespiliformis Ebenaceae Tree Ebony tree Kaiwa 17 Acacia macrostachya Fabaceae Tree Acacia Gardaye 18 Acacia nilotica Fabaceae Tree Acacia Bagaruwa 19 Acacia senegalensis Fabaceae Tree Acacia Farar Kaya 20 Bauhinia rufescens Fabaceae Shrub Bauhinia Jirga 21 Cassia fistula Fabaceae Tree Golden shower Malga 22 Cassia singueana Fabaceae Tree Winter cassia Runfu 23 Dichrostachys cinerea Fabaceae Shrub West African sickle Dundu Sensitive plant/ touch 24 Mimosa pigra Fabaceae Herb Gumbi &die 25 Piliostigma thonningii Fabaceae Tree Camel’s foot Kalgo 26 Tamarindus indica Fabaceae Tree Tamarin tree Tsamiya 27 Azadirachta indica Meliaceae Tree Neem Dogon yaro 28 Moringa oleifera Moringaceae Tree Medicine tree Zogole 29 Psidium guajava Myrtaceae Tree Guava Gwava 30 Rogeria adenophylla Pedaliaceae Herb Tanum tree Loda 31 Ziziphus mauritiana Rhamnaceae Shrub Jujub tree Magarya 32 Feretia apodanthera Rubiaceae Shrub Feretia Kurukuru 33 Balanites aegyptiaca Zygophyllaceae Tree Desert date Aduwa Source: Field Survey; July, 2019. Page 156 ANNEXURE XIV: Laboratory Analytical Results (Funtua Project Site) MGG RESOURCES LTD (More Gain in God) Public Analysis, Industrial/Environmental Consultants, Water Treatment Specialist RC: 768166, FMENV ACCREDITATION NO. 002637, NESREA ACCREDITATION NO 423 21 University Road, Nsukka, Enugu State. 18th August, 2019. Dear sir, FNT (WATER (WS), SOIL (SS) AND AIR (AS)) SAMPLES ANALYSES RESULTS Please find attached the result of the analyses of the samples brought to our laboratory on the 7th August, 2019. Thanks for your patronage. Yours faithfully, Alum O. L (Mrs.) Page 157 FNT/SWR /1/ N 110 31’41.5’’ E 70 18’59.2’’ E689 m. AVERAGE NESREA/ PARAMETERS WHO S/N UNITS VALUE/ FMENV METHOD REMARK TESTED LIMITS RESULTS LIMITS 1 Temperature 0C 20.70 40 32-34 In-situ Satisfactory 2 pH - 8.2 6.5 - 8.0 6.5-8.5 In-situ Satisfactory 3 Taste - Has taste NS Nil Organoleptic Unsatisfactory 4 Appearance - Turbid NS Nil Organoleptic Unsatisfactory 5 Odour - Has odour NS Nil Organoleptic Unsatisfactory 6 Total Dissolved Solids mg/L 582.00 2100 500 ASTM, 2005. Unsatisfactory 1000 7 Conductivity µS/Cm 1280.40 1500 In-situ Unsatisfactory µS/Cm 120- 8 Total hardness mg/L 292.00 NS ASTM, 2005. Unsatisfactory 180 9 Chloride mg/L 251.34 NS 250 ASTM, 2005. Unsatisfactory 10 Fluoride mg/L 2.61 NS 2.0 ASTM, 2005. Unsatisfactory 11 Sodium mg/L 0.73 10 20 ASTM, 2005. Satisfactory 12 Potassium mg/L 0.08 NS NS ASTM, 2005. Satisfactory 13 Sulphate mg/L 265.62 250 250 ASTM, 2005. Unsatisfactory 14 Sulphide mg/L 2.56 NS 0.2 ASTM, 2005. Unsatisfactory 15 Ammonia mg/L 2.32 NS 1.5 ASTM, 2005. Unsatisfactory 16 Nitrate mg/L 53.00 50 10 ASTM, 2005. Unsatisfactory 17 Phosphate mg/L 8.20 5 5 ASTM, 2005. Unsatisfactory 18 DO mg/L 5.00 6 6 ASTM, 2005. Unsatisfactory 19 BOD mg/L 16.40 6 6 ASTM, 2005. Unsatisfactory 20 COD mg/L 74.40 30 NS ASTM, 2005. Unsatisfactory 21 Chromium mg/L Bdl 0.1 0.03 AAS Satisfactory 22 Copper mg/L 0.01 3 2 AAS Satisfactory 23 Iron mg/L 0.73 1 0.3 AAS Unsatisfactory 24 Zinc mg/L 0.08 <1 0.01 AAS Unsatisfactory 25 Lead mg/L Bdl 0.1 0.01 AAS Satisfactory 26 Nickel mg/L 0.21 0.1 0.2 AAS Unsatisfactory 27 Manganese mg/L Bdl 0.01 0.02 AAS Satisfactory 28 Silver (Ag+) mg/L 0.11 <1 0.10 AAS Unsatisfactory 29 Calcium mg/L 174.00 NS NS ASTM, 2005. Satisfactory 30 Magnesium mg/L 18.00 NS NS ASTM, 2005. Satisfactory 31 Total Alkalinity mg/L 316.00 NS NS ASTM, 2005. Satisfactory 32 Hydroxide mg/L Nil NS NS ASTM, 2005. Satisfactory 33 Bicarbonate mg/L 62.00 NS NS ASTM, 2005. Satisfactory Microbial Analysis 34 E-Coli cfu/mL 20.00 x10 0 0 ASTM, 2005. Unsatisfactory 35 Total Coliform cfu/mL 2.0 x106 0 0 ASTM, 2005. Unsatisfactory 36 Total viable counts cfu/mL 8.4x105 NS NS ASTM, 2005. Unsatisfactory Page 158 FNT/SW/2/ N 110 31’52.9’’ E 70 18’59.9’’ E 681 m. PARAMETERS AVE VALUE/ NESREA/ WHO S/N UNITS METHOD REMARK TESTED RESULTS FMENV LIMITS LIMITS 1 Temperature 0C 20.80 40 32-34 In-situ Satisfactory 2 pH - 7.6 6.5 - 8.0 6.5-8.5 In-situ Satisfactory 3 Taste - Has taste NS Nil Organoleptic Unsatisfactory 4 Appearance - Turbid NS Nil Organoleptic Unsatisfactory 5 Odour - Has odour NS Nil Organoleptic Unsatisfactory 6 Total Dissolved Solids mg/L 182.00 2100 500 ASTM, 2005. Satisfactory 7 Conductivity µS/Cm 400.00 1000 µS/Cm 1500 In-situ Satisfactory 120- 8 Total hardness mg/L 112.00 NS ASTM, 2005. Satisfactory 180 9 Chloride mg/L 44.02 NS 250 ASTM, 2005. Satisfactory 10 Fluoride mg/L 0.13 NS 2.0 ASTM, 2005. Satisfactory 11 Sodium mg/L 6.82 10 20 ASTM, 2005. Satisfactory 12 Potassium mg/L 8.89 NS NS ASTM, 2005. Satisfactory 13 Sulphate mg/L 54.99 250 250 ASTM, 2005. Satisfactory 14 Sulphide mg/L 0.26 NS 0.2 ASTM, 2005. Unsatisfactory 15 Ammonia mg/L 0.15 NS 1.5 ASTM, 2005. Satisfactory 16 Nitrate mg/L 52.00 50 10 ASTM, 2005. Unsatisfactory 17 Phosphate mg/L 5.44 5 5 ASTM, 2005. Unsatisfactory 18 DO mg/L 3.22 6 6 ASTM, 2005. Unsatisfactory 19 BOD mg/L 83.20 6 6 ASTM, 2005. Unsatisfactory 20 COD mg/L 277.60 30 NS ASTM, 2005. Unsatisfactory 21 Chromium mg/L 0.12 0.1 0.03 AAS Unsatisfactory 22 Copper mg/L 0.21 3 2 AAS Satisfactory 23 Iron mg/L 0.86 1 0.3 AAS Unsatisfactory 24 Zinc mg/L 0.01 <1 0.01 AAS Satisfactory 25 Lead mg/L 0.25 0.1 0.01 AAS Unsatisfactory 26 Nickel mg/L 0.62 0.1 0.2 AAS Unsatisfactory 27 Manganese mg/L 0.06 0.01 0.02 AAS Unsatisfactory 28 Silver (Ag+) mg/L 0.09 <1 0.10 AAS Satisfactory 29 Calcium mg/L 82.00 NS NS ASTM, 2005. Satisfactory 30 Magnesium mg/L 30.00 NS NS ASTM, 2005. Satisfactory 31 Total Alkalinity mg/L 432.00 NS NS ASTM, 2005. Satisfactory 32 Hydroxide mg/L Nil NS NS ASTM, 2005. Satisfactory 33 Bicarbonate mg/L 32.00 NS NS ASTM, 2005. Satisfactory Microbial Analysis 34 E-Coli cfu/mL 20.00 x10 0 0 ASTM, 2005. Unsatisfactory 35 Total Coliform cfu/mL 22.0 x 104 0 0 ASTM, 2005. Unsatisfactory 36 Total viable counts cfu/mL 1.4 x105 NS NS ASTM, 2005. Unsatisfactory Page 159 FNT/GWS/1/ N 110 31’11.4’’ E 70 19’00.6’’ E 699 m AVERAGE PARAMETERS NESREA/ WHO S/N UNITS VALUE/ METHOD REMARK TESTED FMENV LIMITS LIMITS RESULTS 1 Temperature 0C 20.80 40 32-34 In-situ Satisfactory 2 pH - 7.5 6.5 - 8.0 6.5-8.5 In-situ Satisfactory 3 Taste - Has taste NS Nil Organoleptic Unsatisfactory 4 Appearance - Turbid NS Nil Organoleptic Unsatisfactory 5 Odour - Has odour NS Nil Organoleptic Unsatisfactory Total Dissolved 6 mg/L 442.00 2100 500 ASTM, 2005. Satisfactory Solids 7 Conductivity µS/Cm 972.40 1000 µS/Cm 1500 In-situ Satisfactory 120- 8 Total hardness mg/L 228.00 NS ASTM, 2005. Satisfactory 180 9 Chloride mg/L 183.18 NS 250 ASTM, 2005. Satisfactory 10 Fluoride mg/L 0.12 NS 2.0 ASTM, 2005. Satisfactory 11 Sodium mg/L 7.33 10 20 ASTM, 2005. Satisfactory 12 Potassium mg/L 15.39 NS NS ASTM, 2005. Satisfactory 13 Sulphate mg/L 26.19 250 250 ASTM, 2005. Satisfactory 14 Sulphide mg/L 0.21 NS 0.2 ASTM, 2005. Satisfactory 15 Ammonia mg/L 0.12 NS 1.5 ASTM, 2005. Satisfactory 16 Nitrate mg/L 4.22 50 10 ASTM, 2005. Satisfactory 17 Phosphate mg/L 1.20 5 5 ASTM, 2005. Satisfactory 18 DO mg/L 4.20 6 6 ASTM, 2005. Unsatisfactory 19 BOD mg/L 11.20 6 6 ASTM, 2005. Unsatisfactory 20 COD mg/L 37.60 30 NS ASTM, 2005. Unsatisfactory 21 Chromium mg/L 0.12 0.1 0.03 AAS Unsatisfactory 22 Copper mg/L Bdl 3 2 AAS Satisfactory 23 Iron mg/L 0.98 1 0.3 AAS Unsatisfactory 24 Zinc mg/L 0.04 <1 0.01 AAS Unsatisfactory 25 Lead mg/L Bdl 0.1 0.01 AAS Satisfactory 26 Nickel mg/L 0.31 0.1 0.2 AAS Unsatisfactory 27 Manganese mg/L 0.06 0.01 0.02 AAS Unsatisfactory 28 Silver (Ag+) mg/L 0.09 <1 0.10 AAS Satisfactory 29 Calcium mg/L 154.00 NS NS ASTM, 2005. Satisfactory 30 Magnesium mg/L 73.80 NS NS ASTM, 2005. Satisfactory 31 Total Alkalinity mg/L 792.00 NS NS ASTM, 2005. Satisfactory 32 Hydroxide mg/L Nil NS NS ASTM, 2005. Satisfactory 33 Bicarbonate mg/L 14.28 NS NS ASTM, 2005. Satisfactory Microbial Analysis 34 E-Coli cfu/mL 1.00x100 0 0 ASTM, 2005. Unsatisfactory 35 Total Coliform cfu/mL 5.0 x 10 0 0 ASTM, 2005. Unsatisfactory Total viable 36 cfu/mL 1.9 x 101 NS NS ASTM, 2005. Unsatisfactory counts Page 160 FNT/GWS/2/ N 110 33’04.0’’ E 70 17’15.5’’ E 602 m AVERAGE PARAMETERS NESREA/ WHO S/N UNITS VALUE/ METHOD REMARK TESTED FMENV LIMITS LIMITS RESULTS 1 Temperature 0C 20.80 40 32-34 In-situ Satisfactory 2 pH - 7.5 6.5 - 8.0 6.5-8.5 In-situ Satisfactory 3 Taste - Has taste NS Nil Organoleptic Unsatisfactory 4 Appearance - Turbid NS Nil Organoleptic Unsatisfactory 5 Odour - Has odour NS Nil Organoleptic Unsatisfactory Total Dissolved 6 mg/L 88.00 2100 500 ASTM, 2005. Satisfactory Solids 7 Conductivity µS/Cm 193.60 1000 µS/Cm 1500 In-situ Satisfactory 120- 8 Total hardness mg/L 52.00 NS ASTM, 2005. Satisfactory 180 9 Chloride mg/L 26.98 NS 250 ASTM, 2005. Satisfactory 10 Fluoride mg/L 0.11 NS 2.0 ASTM, 2005. Satisfactory 11 Sodium mg/L 5.88 10 20 ASTM, 2005. Satisfactory 12 Potassium mg/L 5.03 NS NS ASTM, 2005. Satisfactory 13 Sulphate mg/L 46.86 250 250 ASTM, 2005. Satisfactory 14 Sulphide mg/L 0.16 NS 0.2 ASTM, 2005. Satisfactory 15 Ammonia mg/L 0.09 NS 1.5 ASTM, 2005. Satisfactory 16 Nitrate mg/L 0.06 50 10 ASTM, 2005. Satisfactory 17 Phosphate mg/L 0.04 5 5 ASTM, 2005. Satisfactory 18 DO mg/L 6.40 6 6 ASTM, 2005. Satisfactory 19 BOD mg/L 3.20 6 6 ASTM, 2005. Satisfactory 20 COD mg/L 10.4 30 NS ASTM, 2005. Satisfactory 21 Chromium mg/L Bdl 0.1 0.03 AAS Satisfactory 22 Copper mg/L Bdl 3 2 AAS Satisfactory 23 Iron mg/L 0.73 1 0.3 AAS Unsatisfactory 24 Zinc mg/L 0.17 <1 0.01 AAS Unsatisfactory 25 Lead mg/L Bdl 0.1 0.01 AAS Satisfactory 26 Nickel mg/L 0.51 0.1 0.2 AAS Unsatisfactory 27 Manganese mg/L 0.13 0.01 0.02 AAS Unsatisfactory 28 Silver (Ag+) mg/L 0.09 <1 0.10 AAS Satisfactory 29 Calcium mg/L 36.00 NS NS ASTM, 2005. Satisfactory 30 Magnesium mg/L 17.00 NS NS ASTM, 2005. Satisfactory 31 Total Alkalinity mg/L 64.00 NS NS ASTM, 2005. Satisfactory 32 Hydroxide mg/L Nil NS NS ASTM, 2005. Satisfactory 33 Bicarbonate mg/L 26.40 NS NS ASTM, 2005. Satisfactory Microbial Analysis 35 E-Coli cfu/mL 0 0 0 ASTM, 2005. Satisfactory 36 Total Coliform cfu/mL 4.0 x 100 0 0 ASTM, 2005. Unsatisfactory 37 Total viable counts cfu/mL 2.2 x 101 NS NS ASTM, 2005. Unsatisfactory Page 161 FNT/SS/1/ N 110 31’41.5’’ E 70 18’59.2.’’ E689 m. SAMPLE FMENV/ S/N PARAMETERS UNITS METHOD REMARKS RESULTS NESREA 1 pH (KCl) - 7.90 - pH meter Satisfactory 2 pH (10% solution @ 25oC - 8.60 6.5-9.0 pH meter Satisfactory 3 Nitrate mg/kg 4.20 - ASTM, 2005. Satisfactory 4 Moisture - 19.33 - ASTM, 2005. Satisfactory Conductivity 5 Electrical conductivity µS/Cm 754.60 - Satisfactory meter Visual 6 Soil colour % Brownish - Satisfactory Inspection 7 Potassium (K+) mg/kg 0.04 - ASTM, 2005. Satisfactory 8 Magnesium (Mg2+) mg/kg 2.00 - ASTM, 2005. Satisfactory 9 Calcium (Ca2+) mg/kg 5.20 - ASTM, 2005. Satisfactory 10 Sodium (Na+) mg/kg 0.02 - ASTM, 2005. Satisfactory 11 Available Phosphorus mg/kg 0.93 5 ASTM, 2005. Unsatisfactory 12 Organic Matter % 0.33 - ASTM, 2005. Satisfactory 13 Nitrogen % 0.14 - ASTM, 2005. Satisfactory 14 Organic Carbon % 0.19 - ASTM, 2005. Satisfactory 15 Iron (Fe2+) mg/kg 2.22 0.03 AAS Unsatisfactory 16 Lead (Pb2+) mg/kg Bdl 164 AAS Satisfactory 17 Copper (Cu2+) mg/kg Bdl 100 AAS Satisfactory 18 Zinc (Zn2+) mg/kg 0.16 - AAS Satisfactory Grain Size Distribution 19 % 11.00 - ASTM, 2005. Satisfactory (Coarse Sand) Grain Size Distribution 20 % 8.00 - ASTM, 2005. Satisfactory (Clay) Grain Size Distribution 21 % 22.00 - ASTM, 2005. Satisfactory (Silt) Grain Size Distribution 22 % 59.00 - ASTM, 2005. Satisfactory (Fine Sand) Sandy 23 Textural Class - - ASTM, 2005. Satisfactory loamy Page 162 FNT/SS/2/ N 110 31’11.4’’ E 70 19’00.6’’ E 699 m. SAMPLE FMENV/ S/N PARAMETERS UNITS METHOD REMARKS RESULTS NESREA 1 pH (KCl) - 7.60 - pH meter Satisfactory 2 pH (10% solution @ 25oC - 8.50 6.5-9.0 pH meter Satisfactory 3 Nitrate mg/kg 1.66 - ASTM, 2005. Satisfactory 4 Moisture - 23.92 - ASTM, 2005. Satisfactory Conductivity 5 Electrical conductivity µS/Cm 4336.20 - Satisfactory meter Darkish Visual 6 Soil colour % - Satisfactory brown Inspection 7 Potassium (K+) mg/kg 0.07 - ASTM, 2005. Satisfactory 8 Magnesium (Mg2+) mg/kg 2.40 - ASTM, 2005. Satisfactory 9 Calcium (Ca2+) mg/kg 5.60 - ASTM, 2005. Satisfactory 10 Sodium (Na+) mg/kg 0.04 - ASTM, 2005. Satisfactory 11 Available Phosphorus mg/kg 15.86 5 ASTM, 2005. Satisfactory 12 Organic Matter % 2.03 - ASTM, 2005. Satisfactory 13 Nitrogen % 0.14 - ASTM, 2005. Satisfactory 14 Organic Carbon % 1.18 - ASTM, 2005. Satisfactory 15 Iron (Fe2+) mg/kg 2.20 0.03 AAS Unsatisfactory 16 Lead (Pb2+) mg/kg 0.50 164 AAS Satisfactory 17 Copper (Cu2+) mg/kg 0.03 100 AAS Satisfactory 18 Zinc (Zn2+) mg/kg 2.17 - AAS Satisfactory Grain Size Distribution 19 % 30.00 - ASTM, 2005. Satisfactory (Coarse Sand) Grain Size Distribution 20 % 6.00 - ASTM, 2005. Satisfactory (Clay) Grain Size Distribution 21 % 18.00 - ASTM, 2005. Satisfactory (Silt) Grain Size Distribution 22 % 46.00 - ASTM, 2005. Satisfactory (Fine Sand) Sandy 23 Textural Class - - ASTM, 2005. Satisfactory loamy Page 163 FNT/SS/3/ N 110 31’52.9’’ E 70 18’59.9’’ E 681 m. SAMPLE FMENV/ S/N PARAMETERS UNITS METHOD REMARKS RESULTS NESREA 1 pH (KCl) - 8.30 - pH meter Satisfactory 2 pH (10% solution @ 25oC - 9.80 6.5-9.0 pH meter Satisfactory 3 Nitrate mg/kg 1.20 - ASTM, 2005. Satisfactory 4 Moisture - 13.90 - ASTM, 2005. Satisfactory Conductivity 5 Electrical conductivity µS/Cm 345.40 - Satisfactory meter Darkish Visual 6 Soil colour % - Satisfactory brown Inspection 7 Potassium (K+) mg/kg 0.13 - ASTM, 2005. Satisfactory 8 Magnesium (Mg2+) mg/kg 8.00 - ASTM, 2005. Satisfactory 9 Calcium (Ca2+) mg/kg 5.60 - ASTM, 2005. Satisfactory 10 Sodium (Na+) mg/kg 0.08 - ASTM, 2005. Satisfactory 11 Available Phosphorus mg/kg 9.33 5 ASTM, 2005. Satisfactory 12 Organic Matter % 4.01 - ASTM, 2005. Satisfactory 13 Nitrogen % 0.06 - ASTM, 2005. Satisfactory 14 Organic Carbon % 2.32 - ASTM, 2005. Satisfactory 15 Iron (Fe2+) mg/kg 4.20 0.03 AAS Unsatisfactory 16 Lead (Pb2+) mg/kg 3.00 164 AAS Satisfactory 17 Copper (Cu2+) mg/kg 5.73 100 AAS Satisfactory 18 Zinc (Zn2+) mg/kg 3.18 - AAS Satisfactory Grain Size Distribution 19 % 55.00 - ASTM, 2005. Satisfactory (Coarse Sand) Grain Size Distribution 20 % 4.00 - ASTM, 2005. Satisfactory (Clay) Grain Size Distribution 21 % 10.00 - ASTM, 2005. Satisfactory (Silt) Grain Size Distribution 22 % 31.00 - ASTM, 2005. Satisfactory (Fine Sand) Loamy 23 Textural Class - - ASTM, 2005. Satisfactory sandy Page 164 FNT/SS/4/ N 110 33’19.1’’ E 70 18’41.4’’ E 667 m. SAMPLE FMENV/ S/N PARAMETERS UNITS METHOD REMARKS RESULTS NESREA 1 pH (KCl) - 7.00 - pH meter Satisfactory 2 pH (10% solution @ 25oC - 7.70 6.5-9.0 pH meter Satisfactory 3 Nitrate mg/kg 6.42 - ASTM, 2005. Satisfactory 4 Moisture - 28.87 - ASTM, 2005. Satisfactory 5 Electrical conductivity µS/Cm 217.80 - Conductivity meter Satisfactory Darkish 6 Soil colour % - Visual Inspection Satisfactory brown 7 Potassium (K+) mg/kg 0.13 - ASTM, 2005. Satisfactory 8 Magnesium (Mg2+) mg/kg 1.60 - ASTM, 2005. Satisfactory 9 Calcium (Ca2+) mg/kg 4.00 - ASTM, 2005. Satisfactory 10 Sodium (Na+) mg/kg 0.08 - ASTM, 2005. Satisfactory 11 Available Phosphorus mg/kg 0.93 5 ASTM, 2005. Unsatisfactory 12 Organic Matter % 4.01 - ASTM, 2005. Satisfactory 13 Nitrogen % 0.15 - ASTM, 2005. Satisfactory 14 Organic Carbon % 2.32 - ASTM, 2005. Satisfactory 15 Iron (Fe2+) mg/kg 4.22 0.03 AAS Unsatisfactory 16 Lead (Pb2+) mg/kg Bdl 164 AAS Satisfactory 17 Copper (Cu2+) mg/kg 0.07 100 AAS Satisfactory 18 Zinc (Zn2+) mg/kg 0.36 - AAS Satisfactory Grain Size Distribution 19 % 35.00 - ASTM, 2005. Satisfactory (Coarse Sand) Grain Size Distribution 20 % 6.00 - ASTM, 2005. Satisfactory (Clay) Grain Size Distribution 21 % 16.00 - ASTM, 2005. Satisfactory (Silt) Grain Size Distribution 22 % 43.00 - ASTM, 2005. Satisfactory (Fine Sand) Loamy 23 Textural Class - - ASTM, 2005. Satisfactory sandy Page 165 FNT/SS/5/ N 110 33’04.0’’ E 70 17’15.5’’ E 602 m SAMPLE FMENV/ S/N PARAMETERS UNITS METHOD REMARKS RESULTS NESREA 1 pH (KCl) - 8.30 - pH meter Satisfactory pH (10% solution @ 2 - 9.70 6.5-9.0 pH meter Satisfactory 25oC 3 Nitrate mg/kg 3.20 - ASTM, 2005. Satisfactory 4 Moisture - 16.55 - ASTM, 2005. Satisfactory 5 Electrical conductivity µS/Cm 220.60 - Conductivity meter Satisfactory 6 Soil colour % Brownish - Visual Inspection Satisfactory 7 Potassium (K+) mg/kg 0.05 - ASTM, 2005. Satisfactory 8 Magnesium (Mg2+) mg/kg 1.00 - ASTM, 2005. Satisfactory 9 Calcium (Ca2+) mg/kg 5.60 - ASTM, 2005. Satisfactory 10 Sodium (Na+) mg/kg 0.02 - ASTM, 2005. Satisfactory 11 Available Phosphorus mg/kg 2.80 5 ASTM, 2005. Unsatisfactory 12 Organic Matter % 1.11 - ASTM, 2005. Satisfactory 13 Nitrogen % 0.07 - ASTM, 2005. Satisfactory 14 Organic Carbon % 0.64 - ASTM, 2005. Satisfactory 15 Iron (Fe2+) mg/kg 2.52 0.03 AAS Unsatisfactory 16 Lead (Pb2+) mg/kg 0.75 164 AAS Satisfactory 17 Copper (Cu2+) mg/kg 0.03 100 AAS Satisfactory 18 Zinc (Zn2+) mg/kg 0.31 - AAS Satisfactory Grain Size Distribution 19 % 51.00 - ASTM, 2005. Satisfactory (Coarse Sand) Grain Size Distribution 20 % 4.00 - ASTM, 2005. Satisfactory (Clay) Grain Size Distribution 21 % 4.00 - ASTM, 2005. Satisfactory (Silt) Grain Size Distribution 22 % 41.00 - ASTM, 2005. Satisfactory (Fine Sand) 23 Textural Class - Sandy - ASTM, 2005. Satisfactory Page 166 FNT/AS/1/ N 110 31’41.5’’ E 70 18’59.2.’’ E689 m BDL = Below detectable limit. MGA = M40 Gas Analyser Ppm = Parts per million. S/N PARAMETERS UNIT NESREA RESULT METHOD REMARK 1 Hydrogen Sulphide (H2S) Ppm 5 0 BDL 2 Carbon monoxide (CO) Ppm 500 0 BDL 3 Nitric Oxide (NO) Ppm 300 6.26 M40 Gas BDL Analyser 4 Nitric dioxide (NO2) Ppm 300 1.39 (direct BDL 5 Sulphur dioxide Ppm 500 1.14 reading BDL method) 6 Hydrogen Cyanide (HCN) Ppm NS 3.75 (MGA) BDL 7 Ammonia (NH3) Ppm NS 3.14 BDL 8 Oxygen Ppm NS 20.80 BDL FNT/AS/2/ N 110 31’11.4’’ E 70 19’00.6’’ E 699 m S/N PARAMETERS UNIT NESREA RESULT METHOD REMARK 1 Hydrogen Sulphide (H2S) Ppm 5 0 BDL 2 Carbon monoxide (CO) Ppm 500 1.00 BDL 3 Nitric Oxide (NO) Ppm 300 6.25 M40 Gas BDL Analyser 4 Nitric dioxide (NO2) Ppm 300 1.37 (direct BDL 5 Sulphur dioxide Ppm 500 1.15 reading BDL method) 6 Hydrogen Cyanide (HCN) Ppm NS 3.72 (MGA) BDL 7 Ammonia (NH3) Ppm NS 3.14 BDL 8 Oxygen Ppm NS 20.80 BDL FNT/AS/3/ N 110 31’52.9’’ E 70 18’59.9’’ E 681 m S/N PARAMETERS UNIT NESREA RESULT METHOD REMARK Hydrogen Sulphide (H2S) Ppm 5 1.00 BDL 2 Carbon monoxide (CO) Ppm 500 1.00 BDL 3 Nitric Oxide (NO) Ppm 300 6.25 M40 Gas BDL Analyser 4 Nitric dioxide (NO2) Ppm 300 1.37 (direct BDL 5 Sulphur dioxide Ppm 500 1.16 reading BDL method) 6 Hydrogen Cyanide (HCN) Ppm NS 3.72 (MGA) BDL 7 Ammonia (NH3) Ppm NS 3.14 BDL 8 Oxygen Ppm NS 20.80 BDL FNT/AS/4/ N 110 33’19.1’’ E 70 18’41.4’’ E 667 m. S/N PARAMETERS UNIT NESREA RESULT METHOD REMARK 1 Hydrogen Sulphide (H2S) Ppm 5 0 BDL 2 Carbon monoxide (CO) Ppm 500 1.00 BDL 3 Nitric Oxide (NO) Ppm 300 6.25 M40 Gas BDL Analyser 4 Nitric dioxide (NO2) Ppm 300 1.37 (direct BDL 5 Sulphur dioxide Ppm 500 1.15 reading BDL method) 6 Hydrogen Cyanide (HCN) Ppm NS 3.76 (MGA) BDL 7 Ammonia (NH3) Ppm NS 3.16 BDL 8 Oxygen Ppm NS 20.80 BDL Page 167 FNT/AS/5/ N 110 33’04.0’’ E 70 17’15.5’’ E 602 m BDL = Below detectable limit. MGA = M40 Gas Analyser Ppm = Parts per million. S/N PARAMETERS UNIT NESREA RESULT METHOD REMARK 1 Hydrogen Sulphide (H2S) Ppm 5 0 BDL 2 Carbon monoxide (CO) Ppm 500 0 BDL 3 Nitric Oxide (NO) Ppm 300 6.25 BDL M40 Gas 4 Nitric dioxide (NO2) Ppm 300 1.37 Analyser BDL (direct reading 5 Sulphur dioxide Ppm 500 1.16 method) BDL (MGA) 6 Hydrogen Cyanide (HCN) Ppm NS 3.72 BDL 7 Ammonia (NH3) Ppm NS 3.15 BDL 8 Oxygen Ppm NS 20.80 BDL Page 168 ANNEXURE XVIII: Summary of key ESHS Requirements for Procurement Summary of Environmental, Social, Health and Safety (ESHS) Enhancements Standard Procurement Documents (SPDs) & Standard Bidding Documents (SBDs) Note: The following ESHS enhancements shall be applicable for all new works contracts for which the relevant SBD/SPD listed below are used. “New contracts” in this context means contracts for which the bidding documents/request for proposal documents have not yet been issued. Page 169 Summary of Environmental, Social, Health and Safety (ESHS) Enhancements ESHS Enhancements have been made to the following procurement documents: Standard Procurement Documents (SPD) Works 1. Prequalification Document - Works 2. Request for Bids - After Prequalification 3. Request for Bids - Without Prequalification 4. Request for Bids - Small Works One-Envelope Bidding Process 5. Request for Bids - Small Works Two-Envelope Bidding Process 6. Request for Bids - Output and Performance-Based Road Contracts Standard Bidding Documents (SBD) Works 7. Prequalification Document - Works 8. SBD Small Works 9. SBD Works 10. SBD Output and Performance-Based Road Contracts Consulting Services 11. Request for Proposals (RFP) Consulting Services 2015 (for supervising engineer) 12. RFP Consulting Services 2016 (for supervising engineer) Summary of key enhancements The following table summarizes the key enhancements that have been reflected in the SBDs and SPDs listed above. # Subject Enhancement/s 1 Declaration of contract • Applicants/Bidders/Proposers are now required to make a declaration suspension or listing any civil works contracts that have been suspended or terminated termination by an employer and/or performance security called by an employer, for ESHS reason/s. This information will be used to inform enhanced due diligence. 2 Strengthened • The Employer is required to set out clearly the minimum expectations of specifications/ employer’s ESHS performance from the outset, to ensure that all Bidders/Proposers requirements are aware of the ESHS requirements. 3 Workers’ ESHS Code of • Bidders/Proposers are now required to submit, as part of their Conduct Bid/Proposal, an ESHS Code of Conduct that will apply to their employees and sub-contractors, and details of how it will be enforced. • The suitability of the Code of Conduct can be assessed and discussed as part of the Bid/Proposal evaluation and negotiations. • The successful Bidder/Proposer is required to implement the agreed Code of Conduct upon contract award. 4 Contractor’s ESHS • Bidders/Proposers are now required to submit, as part of their Management Strategy and Bid/Proposal, ESHS Management Strategies and Implementation Plans Implementation Plans required to manage the key ESHS risks of the project. • The suitability of these strategies and plans can be assessed as part of the Bid/Proposal evaluation, and discussed during pre-contract # Subject Enhancement/s discussions, as appropriate. • These strategies and plans will become part of the Contractor’s Environmental and Social Management Plan (C-ESMP). • Particular Conditions of Contract now include provisions relating to the (C-ESMP), e.g.: - a requirement that the Contractor shall not commence any Works unless the Engineer is satisfied that appropriate measures are in place to address ESHS risks and impacts; - at a minimum, the Contractor shall apply the plans and ESHS Code of Conduct, submitted as part of the Bid/Proposal, from contract award onwards. 5 ESHS Performance • The successful Bidder/Proposer is now required to provide, in addition to Security the standard Performance Security, an ESHS Performance Security (the sum of the two “demand” bank guarantees, normally not to exceed 10% of the contract price). • The ESHS performance security is in the form of a “demand” bank guarantee.” • The application of this provision is at the Borrower’s discretion. It is recommended for contracts where there is significant ESHS risks as advised by Social/Environmental specialist/s. 6 ESHS Provisional Sum • An additional provisional sum, specifically for ESHS outcomes, may be included in the Request for Bids/Proposals documents, and eventual contract. Normally, the payment for the delivery of ESHS requirements shall be a subsidiary obligation of the Contractor covered under the prices quoted for other Bill of Quantity/price items. 7 Key ESHS Personnel • Bidders/Proposers are now required to demonstrate that they have suitably qualified ESHS specialists among their Key Personnel. • Key Personnel must be named in the Bid/Proposal, and in the contract. • The quality of the proposed Key Personnel (including ESHS specialists) will be assessed during the evaluation of Bids/Proposals. • The Contractor shall require the Employer’s consent to substitute or replace any Key Personnel. • The Engineer may require the removal of Personnel if they undertake behaviour which breaches the ESHS Code of Conduct, e.g. spreading communicable diseases, sexual harassment, gender-based violence, illicit activity, or crime. 8 ESHS Reporting • Contracts now contain specific ESHS reporting requirements. These relate to: - ESHS incidents requiring immediate notification - ESHS metrics in regular progress reports. 9 ESHS considerations • As part of variation procedures, the Contractor shall provide relevant during contract variation ESHS information to enable the Engineer to evaluate the ESHS risks and impacts. 10 Ability to withhold interim • Contracts now contain provisions allowing interim payments to be payment withheld where there is a failure to perform an ESHS obligation. 11 ESHS considerations • The standard Request for Proposals for consulting services now include included in civil works ESHS considerations to apply to the supervision of civil works. Consulting Services Page | 171 ANNEXURE XIX: Quick Brief on ESHS Brief on ESHS Code of Conduct (ESHS) The Bidder shall submit its Code of Conduct that will apply to contractor’s personnel to ensure compliance with its Environmental, Social, Health and Safety (ESHS) obligations under this contract to include the following; a. Community and PAPs Issues Management b. HIV/AIDS and Health Awareness Management c. Public and Occupational Health and Safety Management d. Sexual Harassment and Gender Based Violence e. Illicit Drug and Alcohol Use and Behaviors f. Crime and Criminal Activities g. Grievance Redress Mechanisms (GRM) h. Labour Relations, Fair Compensation and Child Labour In addition, the Bidder shall detail how this Code of Conduct will be implemented. This will include: how it will be introduced into conditions of employment/engagement, what training will be provided, how it will be monitored and how the Contractor proposes to deal with any breaches. The Contractor shall be required to implement the agreed Code of Conduct and which will be strictly supervised by the SPMU and/or its agent(s). Management Strategies and Implementation Plans (MSIP) to manage the (ESHS) risks The Bidder shall submit Management Strategies and Implementation Plans (MSIP) to manage the following key Environmental, Social, Health and Safety (ESHS) risks. 1. Community and PAPs Issues Management 2. Public and Occupational Health and Safety Management 3. Dust Control and Air Quality Management 4. Noise and Vibration Exposure Management 5. Waste Management and Debris from Construction Operations 6. Flora and Fauna Removal Management 7. Grievance Redress Mechanisms (GRM) In addition to the Code of Conduct and MSIP outlined above, the contractor shall be required to address and implement the ESHS as identified in the Environmental and Social Management Plan (ESMP) and Resettlement Action Plan (RAP) provided by the SPMU/WB. Environmental, Social, Health and Safety (ESHS) Metrics for Progress Reports The Construction Contractor shall maintain strict compliance with the following regular reporting: a. environmental incidents or non-compliances with contract requirements, including contamination, pollution or damage to ground or water supplies; Page | 172 b. health and safety incidents, accidents, injuries and all fatalities that require treatment; c. interactions with regulators: identify agency, dates, subjects, outcomes (report the negative if none); d. status of all permits and agreements: i. work permits: number required, number received, actions taken for those not received; ii. status of permits and consents: • list areas with landowner agreements required (borrow and spoil areas, camp sites), dates of agreements, dates submitted to resident engineer (or equivalent); • identify major activities undertaken in each area for each month and highlights of environmental and social protection (land clearing, boundary marking, topsoil salvage, traffic management, decommissioning planning, decommissioning implementation); e. health and safety supervision: i) safety officer: number days worked, number of full inspections & partial inspections, reports to construction/project management; ii) number of workers, work hours, use of PPE (percentage of workers with full personal protection equipment (PPE), partial, etc.), worker violations observed (by type of violation, PPE or otherwise), warnings given, repeat warnings given, follow-up actions taken (if any); f. worker accommodations: i) number of expatriates housed in accommodations, number of locals; ii) date of last inspection, and highlights of inspection including status of accommodations’ compliance with national and local law and good practice, including sanitation, space, etc.; iii) actions taken to recommend/require improved conditions, or to improve conditions. g. HIV/AIDS: provider of health services, information and/or training, location of clinic, number of non-safety disease or illness treatments and diagnoses (no names to be provided); h. gender (for expatriates and locals separately): number of female workers, percentage of workforce, gender issues raised and dealt with (cross- reference grievances or other sections as needed); i. training: i) number of new workers, number receiving induction training, dates of induction training; ii) number and dates of toolbox talks, number of workers receiving Occupational Health and Safety (OHS), environmental and social training; Page | 173 iii) number and dates of HIV/AIDS sensitization training, no. workers receiving training (monthly); same questions for gender sensitization, flaglady/flagman training. j. environmental and social supervision: i) environmentalist: days worked, areas inspected and numbers of inspections of each work sections, work camp, accommodations, borrow areas, spoil areas, etc.; highlights of activities/findings (including violations of environmental and/or social best practices, actions taken), reports to SPMU/FPMU environmental and/or social safeguards officers and construction/site management; ii) sociologist: days worked, number of partial and full site inspections (by area: work sections, work camp, accommodations, borrow areas, spoil areas, clinic, HIV/AIDS center, community centers, etc.), highlights of activities (including violations of environmental and/or social requirements observed, actions taken), reports to environmental and/or social safeguards officers and construction/site management; and iii) community liaison person(s): days worked (hours community center open), number of people met, highlights of activities (issues raised, etc.), reports to environmental and/or social safeguards officers and construction/site management. k. Grievances: list for each month unresolved grievances by date received, complainant, how received, to whom referred for action, resolution and date (if completed), date resolution reported to complainant, any required follow-up (Cross-reference other sections as needed): i) Worker grievances; ii) Community grievances l. Traffic and vehicles/equipment: i) traffic accidents involving project vehicles & equipment: provide date, location, damage, cause, follow-up; ii) accidents involving non-project vehicles or property (also reported under immediate metrics): provide date, location, damage, cause, follow-up; iii) overall condition of vehicles/equipment (subjective judgment by environmentalist); non-routine repairs and maintenance needed to improve safety and/or environmental performance (to control emissions, etc.). m. Environmental mitigations and issues (what has been done): i) dust: number of working bowsers, number of waterings/day, number of complaints, warnings given by environmentalist, actions taken to resolve; highlights of construction dust control (covers, sprays, operational status); % of soil/spoil/waste lorries with covers, actions taken for uncovered vehicles; ii) erosion control: controls implemented by location, status of water crossings, environmentalist inspections and results, actions taken to Page | 174 resolve issues, emergency repairs needed to control erosion/sedimentation; iii) borrow areas, spoil areas: identify major activities undertaken each month, and highlights of environmental and social protection: land clearing, boundary marking, topsoil salvage, traffic management, decommissioning planning, decommissioning implementation; iv) spill cleanups, if any: material spilled, location, amount, actions taken, material disposal (report all spills that result in water or soil contamination; v) waste management: types and quantities generated and managed, including amount taken offsite (and by whom) or reused/recycled/disposed on-site; vi) details of tree plantings and other mitigations required and undertaken each month; vii) details of water protection mitigations required and undertaken each month. n. compliance: i) compliance status of ESMP/ESIP requirements: statement of compliance or listing of issues and actions taken (or to be taken) to reach compliance ii) other unresolved issues from month to month related to environmental and social: continued violations, continued failure of equipment, continued lack of vehicle covers, spills not dealt with, continued compensation or borrowing issues, etc. Cross-reference other sections as needed. Page | 175 ANNEXURE XX: Construction Daily Monitoring Checklist The following checklists from Occupational Safety and Health Administration (OSHA) provide necessary steps to avoid hazards that cause injuries, illnesses and fatalities. OSHA states, “As always, be cautious and seek help if you are concerned about a potential hazard.” Personal Protective Equipment (PPE) Eye and Face Protection • Safety glasses or face shields are worn anytime work operations can cause foreign objects getting into the eye such as during welding, cutting, grinding, nailing (or when working with concrete and/or harmful chemicals or when exposed to flying particles). • Eye and face protectors are selected based on anticipated hazards. • Safety glasses or face shields are worn when exposed to any electrical hazards including work on energized electrical systems. Foot Protection • Construction workers should wear work shoes or boots with slip-resistant and puncture-resistant soles. • Safety-toed footwear is worn to prevent crushed toes when working around heavy equipment or falling objects. Hand Protection • Gloves should fit snugly. • Workers wear the right gloves for the job (for example, heavy-duty rubber gloves for concrete work, welding gloves for welding, insulated gloves and sleeves when exposed to electrical hazards). Head Protection • Workers shall wear hard hats where there is a potential for objects falling from above, bumps to their heads from fixed objects, or of accidental head contact with electrical hazards. • Hard hats are routinely inspected for dents, cracks or deterioration. • Hard hats are replaced after a heavy blow or electrical shock. • Hard hats are maintained in good condition. Scaffolding • Scaffolds should be set on sound footing. • Damaged parts that affect the strength of the scaffold are taken out of service. • Scaffolds are not altered. • All scaffolds should be fully planked. • Scaffolds are not moved horizontally while workers are on them unless they are designed to be mobile and workers have been trained in the proper procedures. • Employees are not permitted to work on scaffolds when covered with snow, ice, or other slippery materials. • Scaffolds are not erected or moved within 10 feet of power lines. • Employees are not permitted to work on scaffolds in bad weather or high winds unless a competent person has determined that it is safe to do so. • Ladders, boxes, barrels, buckets or other makeshift platforms are not used to raise work height. • Extra material is not allowed to build up on scaffold platforms. • Scaffolds should not be loaded with more weight than they were designed to support. Page | 176 Electrical Safety • Work on new and existing energized (hot) electrical circuits is prohibited until all power is shut off and grounds are attached. • An effective Lockout/Tagout system is in place. • Frayed, damaged or worn electrical cords or cables are promptly replaced. • All extension cords have grounding prongs. • Protect flexible cords and cables from damage. Sharp corners and projections should be avoided. • Use extension cord sets used with portable electric tools and appliances that are the three-wire type and designed for hard or extra-hard service. (Look for some of the following letters imprinted on the casing: S, ST, SO, STO.) • All electrical tools and equipment are maintained in safe condition and checked regularly for defects and taken out of service if a defect is found. • Do not bypass any protective system or device designed to protect employees from contact with electrical energy. • Overhead electrical power lines are located and identified. • Ensure that ladders, scaffolds, equipment or materials never come within 10 feet of electrical power lines. • All electrical tools must be properly grounded unless they are of the double insulated type. • Multiple plug adapters are prohibited. Floor and Wall Openings • Floor openings (12 inches or more) are guarded by a secured cover, a guardrail or equivalent on all sides (except at entrances to stairways). • Toeboards are installed around the edges of permanent floor openings (where persons may pass below the opening). • Elevated Surfaces • Signs are posted, when appropriate, showing the elevated surface load capacity. • Surfaces elevated more than 48 inches above the floor or ground have standard guardrails. • All elevated surfaces (beneath which people or machinery could be exposed to falling objects) have standard 4-inch toeboards. • A permanent means of entry and exit with handrails is provided to elevated storage and work surfaces. • Material is piled, stacked or racked in a way that prevents it from tipping, falling, collapsing, rolling or spreading. Hazard Communication • A list of hazardous substances used in the workplace is maintained and readily available at the worksite. • There is a written hazard communication program addressing Safety Data Sheets (SDS), labeling and employee training. • Each container of a hazardous substance (vats, bottles, storage tanks) is labeled with product identity and a hazard warning(s) (communicating the specific health hazards and physical hazards). • Safety Data Sheets are readily available at all times for each hazardous substance used. • There is an effective employee training program for hazardous substances. Crane Safety • Cranes and derricks are restricted from operating within 10 feet of any electrical power line. Page | 177 • The upper rotating structure supporting the boom and materials being handled is provided with an electrical ground while working near energized transmitter towers. • Rated load capacities, operating speed and instructions are posted and visible to the operator. • Cranes are equipped with a load chart. • The operator understands and uses the load chart. • The operator can determine the angle and length of the crane boom at all times. • Crane machinery and other rigging equipment is inspected daily prior to use to make sure that it is in good condition. • Accessible areas within the crane's swing radius are barricaded. • Tag lines are used to prevent dangerous swing or spin of materials when raised or lowered by a crane or derrick. • Illustrations of hand signals to crane and derrick operators are posted on the job site. • The signal person uses correct signals for the crane operator to follow. • Crane outriggers are extended when required. • Crane platforms and walkways have antiskid surfaces. • Broken, worn or damaged wire rope is removed from service. • Guardrails, hand holds and steps are provided for safe and easy access to and from all areas of the crane. • Load testing reports/certifications are available. • Tower crane mast bolts are properly torqued to the manufacturer's specifications. • Overload limits are tested and correctly set. • The maximum acceptable load and the last test results are posted on the crane. • Initial and annual inspections of all hoisting and rigging equipment are performed and reports are maintained. • Only properly trained and qualified operators are allowed to work with hoisting and rigging equipment. Forklifts • Forklift truck operators are competent to operate these vehicles safely as demonstrated by their successful completion of training and evaluation. • No employee under 18 years old is allowed to operate a forklift. • Forklifts are inspected daily for proper condition of brakes, horns, steering, forks and tires. • Powered industrial trucks (forklifts) meet the design and construction requirements established in American National Standards Institute (ANSI) for Powered Industrial Trucks, Part II ANSI B56.1-1969. • Written approval from the truck manufacturer is obtained for any modification or additions which affect capacity and safe operation of the vehicle. • Capacity, operation and maintenance instruction plates, tags or decals are changed to indicate any modifications or additions to the vehicle. • Battery charging is conducted in areas specifically designated for that purpose. • Material handling equipment is provided for handling batteries, including conveyors, overhead hoists or equivalent devices. • Reinstalled batteries are properly positioned and secured in the truck. • Smoking is prohibited in battery charging areas. • Precautions are taken to prevent open flames, sparks or electric arcs in battery charging areas. Page | 178 • Refresher training is provided and an evaluation is conducted whenever a forklift operator has been observed operating the vehicle in an unsafe manner and when an operator is assigned to drive a different type of truck. • Load and forks are fully lowered, controls neutralized, power shut off and brakes set when a powered industrial truck is left unattended. • There is sufficient headroom for the forklift and operator under overhead installations, lights, pipes, sprinkler systems, etc. • Overhead guards are in place to protect the operator against falling objects. • Trucks are operated at a safe speed. • All loads are kept stable, safely arranged and fit within the rated capacity of the truck. • Unsafe and defective trucks are removed from service. Source: OSHA Page | 179 ANNEXURE XXI: Discussion Of Methods/Techniques Used In Assessing Impacts Impact Rating Methodology The assessment of the potential impacts of the project was based on specialists’ expertise, Consultant’s professional judgment, field observations and desk-top analysis. The significance of potential impacts that may result from the proposed project was determined to assist decision making. Generally, the envisaged areas of potential impacts which could result from the activities of the project are evaluated for impact significance based on the comparative consequential effects of the potential impact on the social and biophysical environments. The significance of an impact may be defined as a combination of the consequence of the impact occurring and the probability that it will occur. The criteria used to determine impact consequence are shown in the Table 5-1. Table 5.1: Criteria for Determining Impact Consequence RATING DESCRIPTION OF RATING SCORE A. Extent – the area over which the impact will be experienced Localized Confined to specific project activity area or part thereof 1 Entire Watershed The entire watershed 2 Regional Beyond the watershed 3 B. Intensity – the magnitude of the impact in relation to the sensitivity of the receiving environment, taking into account the degree to which the impact may cause irreplaceable loss of resources Low Site-specific and wider natural and/or social functions and 1 processes are negligibly altered Medium Site-specific and wider natural and/or social functions and 2 processes continue albeit in a modified way High Site-specific and wider natural and/or social functions and 3 processes are severely altered C. Duration – the timeframe over which the impact will be experienced and its reversibility Short-term Up to 6 months 1 Medium-term 6 months to 1 year 2 Long-term More than 1 year 3 The numerical scores in Table 5-1 are positive or negative depending on whether the impact is adverse or beneficial. If impact is adverse, the numerical score is positive and if the impact is beneficial, the numerical score is negative. The combined score of the three criteria (extent, intensity and duration) corresponds to a Consequence Rating, as shown in Table 5-2: Table 5-2: Method used to determine Consequence Score Combined Score (A+B+C) 3 – 4 5 6 7 8–9 Consequence Rating Very low Low Medium High Very high Page | 180 The probability of the impact occurring is determined using the probability classifications presented in the Table 5-3 below: Table 5-3: Probability Classification Probability – the likelihood of impact occurring Improbable < 40% chance of occurring Possible 40% – 70% chance of occurring Probable > 70% - 90% chance of occurring Definite > 90% chance of occurring The overall significance of impacts was determined by considering consequence and probability using the rating system prescribed in the Table 5-4 below: Table 5-4: Impact Significance Ratings Probability Improbable Possible Probable Definite Very Low INSIGNIFICANT INSIGNIFICANT VERY LOW VERY LOW Consequence Low VERY LOW VERY LOW LOW LOW Medium LOW LOW MEDIUM MEDIUM High MEDIUM MEDIUM HIGH HIGH Very HIGH HIGH VERY HIGH VERY HIGH High Page | 181