Project/Programme: NIGERIA/ONDO STATE HIV/AIDS PROG. DEV. PROJECT GOODS PROCUREMENT PLAN FOR 2015 Draft Bid Documents, If Post-Review, No-objection Dates are not needed including specs and Spec Proc Loan #: 4596 - NG BASIC DATA quantities, draft SPN Notice Bidding Period Bid Evaluation Contract finalization Contract Implementation Advert Prep & Pre-or Post Prior or No- On-line UNDB No- Date Date Date Package Lot Estimated Amount Procureme Plan vs. Submission Bid Invitation Bid Closing- Submission Plan vs. Contract Amount Opening of Inspection final Description* Qualificatio Post objection Gateway objection Contract Contract Contract Arrival of Goods Number Number in US $ nt Method Actual by Ex Date Opening Bid Eval Rpt Actual in US$'000 letter of credit acceptance n Review Date Nat Press Date Award Advert Signature Agency If Prequalification Plan 4 - 7 wks 1 - 1.5 wks 1.5 - 2 wks 6 to 12 wks 1.5 - 3 wks 1 - 1.5 wks Plan 1 wk 1.5-3 wks Norm Duration of Proc Steps add 7-13 wks Actual Actual List of Contracts Procurement of 1nos. CD4 machine,1nos. Chemistry machine, 1nos. centrifuge machine and Inos. hematology machine(incuding 12 labaoratory stool, 2nos 15kv inverter,4nos UPS OD/HPDP II/NCB 1/2014/001 4 135,283.13 NCB POST POST Plan N/A N/A N/A 16/07/14 15/8/14 29/8/14 N/A Plan 135.28 02/03/15 N/A 06/03/15 N/A 05/05/15 12/05/15 NCB POST POST Actual N/A N/A N/A 14/10/14 13/11/14 19/12/14 Actual Procurement of Test kits(2600packs of Ist OD/HPDPII/NCB 1/2015/001 1 254,117.65 NCB Post Post Plan N/A N/A N/A 04/03/15 03/04/15 17/04/15 N/A Plan 254.12 24/04/15 N/A 29/04/15 N/A 29/06/15 06/07/15 Line,300packs of 2nd Lines and 100 packs of 3rd Actual Lines) for HAF CSOs Actual Procument of 900 cartons of Condoms and 1300 bottles of lubricants OD/HPDP11/NS/2015/002 1 51,277.17 NS Post Post Plan N/A N/A N/A 02/02/15 16/02/15 N/A N/A Plan 51.28 23/02/15 N/A 26/02/15 N/A 28/03/15 31/03/15 Actual Actual Production of IEC materials; 2,500 Posters, 3,000 Handbills,2,500 stickers, 500 Advocacy OD/HPDP II/NS/2015/003 1 29,103.26 NS Post Post Plan N/A N/A N/A 02/02/15 16/02/15 N/A N/A Plan 29.13 23/02/15 N/A 26/02/15 N/A 28/03/15 31/03/15 bags, 5,000 table pad, 5,000 note pad, 3,000 wrist bands, 4,000 air freshner,5,000 pen and 5,000 Exercise book Actual Actual Procurement of Test Kits( 300 packs of 1st Line, 50 packs of 2nd Line and 40 packs of 3rd Line) for SACA, Line Ministries & Non-HAF CSOs OD/HPDP II/NS/2015/004 1 28,451.09 NS Post post Plan N/A N/A N/A 02/02/15 16/02/15 N/A N/A Plan 28.45 23/02/15 N/A 26/02/15 N/A 28/03/15 31/03/15 Actual Actual Procurement of 40 HCT Tents OD/HPDP II/NS /2015/005 1 6,521.74 NS Post Post Plan N/A N/A N/A 05/02/15 19/02/15 N/A N/A Plan 6.52 26/02/15 N/A 02/03/15 N/A 01/04/15 04/04/15 Actual Actual Procure and distribute medical commodities 2500 packets of hand gloves, 250 cartons(2L) of OD/HPDP II/NS /2015/006 1 16,168.48 NS Post Post Plan N/A N/A N/A 05/02/15 19/02/15 N/A N/A Plan 16.17 26/02/15 N/A 02/03/15 N/A 01/04/15 04/04/15 methylated spirit, 150 rolls of cotton wool(500g) for SACA,HAF CSOs,Line Ministries, Non-HALF CSOs Actual Actual Procurement of Airtime on radio station OD/HPDP11/NS/2014/007 1 8,124.34 NS Post Post Plan N/A N/A N/A 02/10/14 09/10/14 N/A N/A Plan 8.12 16/10/14 N/A 19/10/14 N/A 30/09/15 07/10/15 7,755.78 NS Post Post Actual N/A N/A N/A 4/11/14 24/11/14 N/A N/A Actual 7.76 17/12/14 N/A 07/01/15 N/A Produce and distribute news letters and OD/HPDP II/NS /2015/008 1 10,434.78 NS Post Post Plan N/A N/A N/A 05/02/15 19/02/15 N/A N/A Plan 10.43 26/02/15 N/A 02/03/15 N/A 01/04/15 04/04/15 factsheet quarterly (400 Copies/quarter) Actual Actual Procure and distribute 100units of injection needle destroyer OD/HPDP II/NS /2015/009 1 7,065.21 NS Post Post Plan N/A N/A N/A 09/02/15 23/02/15 N/A N/A Plan 7.07 02/03/15 N/A 05/03/15 N/A 06/04/15 09/04/15 Actual Actual Proure and distribute 14,500 units of biohazard bags OD/HPDP II/NS /2015/010 1 10,597.82 NS Post Post Plan N/A N/A N/A 09/02/15 23/02/15 N/A N/A Plan 10.60 02/03/15 N/A 05/03/15 N/A 06/04/15 09/04/15 Actual Actual Procurement and Installation of Generator(31KVA) OD/HPDP11/NS/2015/011 1 19,021.74 NS Post Post Plan N/A N/A N/A 09/02/15 23/02/15 N/A N/A Plan 19.02 02/03/15 N/A 05/03/15 N/A 06/04/15 09/04/15 Actual Actual Procurement of ARV for PMTCT prophylaxis OD/HPDP11/NS/2015/012 1 6,668.53 NS Post Post Plan N/A N/A N/A 05/02/15 19/02/15 N/A N/A Plan 6.67 26/02/15 N/A 02/03/15 N/A 01/04/15 04/04/15 Actual Actual Plan Plan Actual Actual TOTAL COST 582,834.94 Plan Plan 582,834.94 7,755.78 Actual Actual 7.76 CBN Exchange rate N184 : $1 Plan Plan Actual Actual Fill gray cells only! Plan Plan Actual Actual Plan Plan Actual Actual Plan Plan Actual Actual Country/Organisation: Project/Programme: Loan #: Basic Data Lumpsu Estimate Pre-or m or Bill Procure d Prior or Package Lot Post Description* of ment Amount Post Number Number Qualifica Quantitie Method in Review tion s US $ Norm Duration of If Prequalification Proc Steps add 7-13 wks List of Contracts Total Cost 0.00 0.00 Draft Bid If Post-Review, No-objection Dates are not needed Documents, Spec including specs and Proc Bidding Period Bid Evaluation quantities, draft Notice SPN Advert Prep & On-line Submissi Submissi No- Bid Bid No- Plan vs. UNDB on Plan vs. on objection Invitatio Closing- objection Actual Gateway Bid Eval Actual by Ex Date n Date Opening Date Nat Press Rpt Agency Plan 4 - 7 wks 1 - 1.5 wks1.5 - 2 wks1.5 - 2 wks 6 to 12 wks 1.5 - 3 wks Plan Actual Actual Plan Plan Actual Actual Plan Plan Actual Actual Plan Plan Actual Actual Plan Plan Actual Actual Plan Plan Actual Actual Plan Plan Actual Actual Plan Plan Actual Actual Plan Plan Actual Actual Plan Plan Actual Actual Plan Plan Actual Actual Contract Finalization Contract Implementation Contract Mobiliza Substant Date Date Date Final Amount tion ial Final Contract Contract Contract Accepta in US$ Advance Completi Cost Award Advert Signature nce '000 Payment on 1 wk 1.5-3 wks 0.00 0.00 0.00 0.00 CONSULTANCY 2015 Country/Organisation:NIGERIA/ODSACA For Contracts under projects approved before the May 2002 Guidelines Project/Programme: HPDP II If Post-Review, No-objection Dates are not needed Request for EOI Contract Preparation (where required) Short Consultant Proposal Evaluation and Negotiation for Projects Loan #:4596NG Draft Contract Contract Finalization Contract Implementation Type Request for Proposals List Proposals Technical (T) & Financial (F) and Negotions (N) On-line Submissio No- Preparatio Lumpsum Prep & Lead-time No- Submission/ Opening No- Contract Amount Date Mobilization Selection Estimated Amount Prior/Post Plan vs. No-objection UNDB Submission Plan vs. Invitation n objection n Negotiations Plan vs. Submission Contract Contract Plan vs. Draft Final Final Description* or Submission before objection Opening Financial objectio in Contract Advance Method in US$ '000 Review Actual Date Gateway Date Actual Date Evaluation Evaluation Eval Report (N) Actual Date Award Signature Actual Report Report Cost Time-Based by Ex Ag shortlist Date Date Proposals n Date US$ '000 Advert Payment Nat Press Report (T) Report (T) (T) (F) Plan 3 - 6 wks 1 - 2 wks 1 - 1.5 wks 2 wks 1 - 2 wks Plan 4 to 12 wks 2 - 3 wks 0.5 - 2 wks 2 wks 1 - 2 wks 2 wks Plan 1 - 2 wks 1 - 2 wks 1 wk 1 - 3 wks Plan Norm Duration of Proc Steps Actual Actual Actual Actual List of Contracts Procurement of Consultant to produce LUMP and air serial drama (SE JEJE) for SS SUM 59.27 POST Plan N/A N/A N/A N/A N/A N/A Plan 22/7/14 05/08/14 N/A N/A N/A N/A 15/8/14 Plan N/A N/A 59.27 22/8/14 N/A 29/8/14 Plan 12/1/15 5/10/15 12/10/15 demand creation for PMTCT services,condom use and HCT through LUMP Actua radio stations SS SUM 36.96 POST Actual N/A N/A N/A N/A N/A N/A Actual 26/11/14 28/11/14 N/A N/A N/A N/A 8/12/14 Actual N/A N/A 36.96 10/12/14 N/A 15/12/14 l Procurement of Consultant to LUMP develop,produce and disseminate IC SUM 21.57 POST Plan N/A N/A N/A N/A N/A N/A Plan 6/4/15 20/4/15 N/A N/A N/A N/A 27/4/15 Plan N/A N/A 21.57 4/5/15 N/A 11/5/15 Plan 25/5/15 24/7/15 31/7/15 resourse mobilisation strategy and plan Actua Actual Actual Actual l Procurement of consultant to map LUMP OVC, conduct needs assessment for IC SUM 13.59 POST Plan N/A N/A N/A N/A N/A N/A Plan 6/4/15 20/4/15 N/A N/A N/A N/A 4/5/15 Plan N/A N/A 13.59 11/5/15 N/A 18/5/15 Plan 25/5/15 24/7/115 7/8/15 OVC , Educational scholarship for OVCs , Linkage to Vocational institution and artisan,production and Actua dissemination of report Actual Actual Actual l Procure consultants to Produce jingles LUMP for radio and television stations daily IC SUM 59.59 POST Plan N/A N/A N/A N/A N/A N/A Plan 23/7/14 05/08/14 N/A N/A N/A N/A 19/8/14 Plan N/A N/A 59.59 26/8/14 N/A 2/9/14 Plan 29/1/15 2/3/15 9/3/15 for three quarters targetting MARPs LUMP Actua and their clients and the General IC SUM 5.18 POST Actual N/A N/A N/A N/A N/A N/A Actual 2/12/14 16/12/14 N/A N/A N/A N/A 22/12/14 Actual N/A N/A 5.18 24/12/14 N/A 31/12/14 l Procure consultants to procure airtime LUMP to air SACA, L/Ms and CSOs IC SUM 56.36 POST Plan N/A N/A N/A N/A N/A N/A Plan 23/7/14 05/08/14 N/A N/A N/A N/A 19/8/14 Plan N/A N/A 56.36 26/8/14 N/A 2/9/14 Plan 12/1/15 19/9/15 26/9/15 interventions on one TV LUMP Actua station(ODSACA HALF HOUR) . IC SUM 24.22 POST Actual N/A N/A N/A N/A N/A N/A Actual 12/11/14 27/11/14 N/A N/A N/A N/A 11/12/14 Actual N/A N/A 24.22 17/12/14 N/A 30/12/14 l PROCUREMENT OF M& E IC Time-Based 12.00 POST Plan N/A N/A N/A N/A 13/8/13 20/8/13 Plan 3/9/13 10/9/13 12/9/13 N/A N/A 16/9/13 18/9/13 Plan N/A N/A 12.00 25/9/13 N/A 30/9/13 Plan 27/9/13 23/2/15 2/3/15 CONSULTANT Time- Actua IC Based 13.30 POST Actual N/A N/A N/A N/A 19/11/1319/11/13 Actual 21/1/14 5/2/14 5/2/14 N/A 5/2/14 N/A 10/2/14 Actual 10/2/14 N/A 13.30 12/2/14 N/A 6/3/14 l 16/5/14 LUMP PROCUREMENT OF EXTERNAL SS SUM 8.15 POST Plan N/A N/A N/A N/A N/A N/A Plan Plan N/A N/A 8.15 18/5/15 N/A 21/5/15 Plan 28/5/15 Actua 11/6/15 18/5/15 AUDITOR Actual Actual Actual l LUMP HAF Grant QCBS SUM 1,700.00 Prior Plan 17/1/13 31/1/13 7/2/13 14/2/13 21/2/13 30/2/13 Plan 14/3/13 11/4/13 18/4/13 25/4/13 2/5/13 9/5/13 18/5/13 Plan 23/5/13 30/5/13 1,700.00 6/6/13 13/6/13 20/6/13 Plan 27/6/13 23/12/15 30/12/15 LUMP Actua QCBS SUM 491.33 Prior Actual 9/1/13 10/1/13 18/1/13 25/1/13 31/1/13 8/4/13 Actual 6/5/13 27/6/13 11/11.1312/11/13 Actual 15/1/14 21/1/14 12/9/13 12/9/13 11/11/13 491.33 24/1/14 24/1/14 28/1/14 l 27/3/14 Procurement of Consultant to develop,produce and disseminate guidelines for the management of LUMP Medical waste IC SUM 13.59 POST Plan N/A N/A N/A N/A N/A N/A Plan 2/3/15 16/03/15 N/A N/A N/A N/A 30/3/15 Plan N/A N/A 13.59 6/4/15 N/A 13/4/15 Plan 20/4/15 19/6/15 10/7/15 Actua Actual Actual Actual l Procurement of Consultant to LUMP develop,produce,print and disseminate IC LUMP SUM 16.11 POST Plan N/A N/A N/A N/A N/A N/A Plan 6/8/14 20/08/14 N/A N/A N/A N/A 3/9/14 Plan N/A N/A 16.11 10/9/14 N/A 17/9/14 Actua Plan 19/1/15 4/4/15 7/4/15 blood safety policy IC SUM 5.44 POST Actual N/A N/A N/A N/A N/A N/A Actual 12/11/14 26/11/14 N/A N/A N/A N/A 30/12/14 Actual N/A N/A 5.44 31/12/14 N/A 6/1/15 l LUMP Procurement of Consultant to conduct IC SUM 16.11 POST Plan N/A N/A N/A N/A N/A N/A Plan 8/8/14 22/08/14 N/A N/A N/A N/A 5/9/14 Plan N/A N/A 16.11 12/9/14 N/A 19/9/14 Plan 19/1/15 4/4/15 14/4/15 situation analysis and evaluation of PMTCT and ART services in the State and prevalence of HIV and Hepatitis B among donors at two Mother and child hospitals LUMP Actua IC SUM 9.24 POST Actual N/A N/A N/A N/A N/A N/A Actual 13/11/14 27/11/14 N/A N/A N/A N/A 12/12/14 Actual N/A N/A 9.24 23/12/14 N/A 29/12/14 l LUMP Procurement of social and IC SUM 9.24 Plan N/A N/A N/A N/A N/A N/A Plan 2/3/15 16/03/15 N/A N/A N/A N/A 30/3/15 Plan N/A N/A 9.24 6/4/15 N/A 13/4/15 Plan 20/4/15 19/6/15 10/7/15 Environmental safe guard consultant Actua Actual Actual Actual l 1,985.58 Plan Plan Plan 1,985.58 Plan Actua TOTAL 585.67 Actual Actual Actual 585.67 l Fill gray cells only! NOTE: EXTERNAL AUDITOR ARE PROCURED THROUGH THE PFMU OF THE STATE ONDO STATE AGENCY FOR THE CONTROL OF AIDS (ODSACA) HIV/AIDS PROGRAMME DEVELOPMENT PROJECT II CREDIT IDA 4596 NG 2015 WORKSHOP PLAN DURATION NO. OF OF WORKSHOP S/N. DESCRIPTION OF WORKSHOP OBJECTIVE PARTICIPANTS PARTICIPANTS WORKSHOP VENUE AMOUNT (N) AMOUNT ($) REMARK Conduct 3 days training for 20 CSOs(2 To ensure that PLHIV receive caregivers CSOs per LGA) to carry out quality care and support 1 home based care services services CSOs 20 2 Local 2,980,480.00 16,198.26 5 days capacity development on To ensure continuously Monitoring and Evaluation for 36 LACA improve data quality and 2 staff supportive supervision with LACA M&E officers To share experiences 36 5 Local 4,157,872.00 22,597.13 their colleagues around the world for effective capacity 3 International AIDS conference development Project staff 6 5 International 7,200,000.00 39,130.43 Conduct 5 day training for 35 To build capacity of M&E M&E officers of Line participants on eNNRIMSDHIS 2.0 data Officers on the use of Ministries, LACA and 4 reporting platform. eNNRIMS CSOs 35 5 Local 3,561,162.00 19,354.14 TOTAL 17,899,514.00 97,279.97 CBN Echange rate=N184 :$1 as at 16/1/15 ONDO STATE AGENCY FOR THE CONTROL OF AIDS (ODSACA) HIV/AIDS PROGRAMME DEVELOPMENT PROJECT II CREDIT IDA 4596 NG 2015 TRAINING PLAN DESCRIPTION OF TUITION S/N. DEPARTMENT TRAINING PARTICIPANTS DESIGNATION PERIOD FEE TRANSPORT DSA TOTAL COST ($) Capacity Building on program 1 ODSACA management 15 Participants SACA Staff 5 Days - 71,636.00 REMARK SUMMARY SHEET WORLD BANK COUNTRY OFFICE 2015 PROCUREMENT CLINIC DATA ONDO SACA PROCUREMENT PLAN CLEARED CONTRACT DATA SOFT WORKS GOODS CONSULTANCY HARDCOPY COPIES POST REVIEW PRIOR REVIEW POST REVIEW PRIOR REVIEW POST REVIEW PRIOR REVIEW HARDCOPY WORD OF TOTAL PROJECT EXCEL TABLE SUMMARY EXCEL NO OF TOTAL NO OF TOTAL NO OF VALUE ($000) NO OF TOTAL NO OF TOTAL VALUE NO OF TOTAL VALUE SN (PIU) SUBMITTED SUBMITTED SUBMITT CONTRACTS VALUE CONTRACTS VALUE CONTRACTS CONTRACTS VALUE CONTRACTS ($'000) CONTRACTS ($000) HPDP 11 ONDO 1 SACA 1 NA 1 NIL NIL NIL NIL 13.00 582.83 NIL NIL 11.00 284.58 1.00 1,700.00 TOTAL - - - - 13.00 582.83 - - 11.00 284.58 1.00 1,700.00 NO OF TOTAL CONTRACT VALUE Other (Prior Review) S ($'000) Workshop 13 201.37