Strengthening the National Rural Transport Program (P132750)


Since this is an ongoing project, that started in April 2014, submission of a separate summary
procurement plan is irrelevant at this stage.
PROCUREMENT
                                 Nepal : Project for Strengthening the National Rural Transport Program
PLAN
General Information
Country:                         Nepal                                        Bank’s Approval Date of the Original Procurement Plan:                    2017-10-18
                                                                                                                                         2019-10-25
                                                                              Revised Plan Date(s): (comma delineated, leave blank if none)
Project ID:                      P132750                                      GPN Date:
Project Name:                    Project for Strengthening the National Rural Transport Program
Loan / Credit No:                IDA / 53360, IDA / H8990
Executing Agency(ies): Department of Local Infrastructure



WORKS
                                                                                                                                                                                                                                                                                                                                                   Bid Evaluation
Activity Reference No.                                                                                                                                                                                       Draft Pre-                                      Draft Bidding
                                 Loan / Credit                                                                       Market          Procurement        Prequalification      Actual           Process                                Prequalification                         Specific Procurement   Bidding Documents   Proposal Submission        Report and
       / Description                                    Component               Review Type       Method                                                                                                    qualification                                     Document /                                                                                                Signed Contract     Contract Completion
                                      No.                                                                           Approach            Process              (Y/N)         Amount (US$)         Status                               Evaluation Report                          Notice / Invitation       as Issued       / Opening / Minutes   Recommendation for
                                                                                                                                                                                                            Documents                                        Justification
                                                                                                                                                                                                                                                                                                                                                        Award
                                                                                                                                                                                                         Planned     Actual          Planned    Actual   Planned      Actual   Planned      Actual    Planned    Actual   Planned      Actual   Planned      Actual   Planned      Actual   Planned      Actual


 SNRTP-KAN-W-NCB-10.04-
                                                 Component A: Institutional
UG-070-71 / Kanchanpur:                                                                                                            Single Stage - One
                                 IDA / 53360     Strengthening, T.A., and     Prior           Request for Bids   Open - National                                               181,111.90     Signed
Rajmarg-Budha- Jhaipura-                                                                                                           Envelope
                                                 Monitoring
Gauji-Bridhasharam Road




 SNRTP-ARG-W-NCB-1-16-
                                                 Component B:
PM-074-75 / Periodic                                                                                                               Single Stage - One
                                 IDA / 53360     Maintenance, upgrading,      Post            Request for Bids   Open - National                                                45,793.00     Signed                                                     2017-11-26            2017-11-30                                 2017-12-30            2018-01-29            2018-02-20            2019-02-20
Maintenance of Amarai                                                                                                              Envelope
                                                 and rehabilitation
Jukena Road (8 Km)




 SNRTP-DHA-W-NCB-6-04-
PM-074-75 / Periodic                             Component B:
                                                                                                                                   Single Stage - One
Maintenance of                   IDA / 53360     Maintenance, upgrading,      Post            Request for Bids   Open - National                                                70,357.35     Signed                                                     2017-11-26            2017-11-30                                 2017-12-30            2018-01-29            2018-02-20            2019-02-20
                                                                                                                                   Envelope
Bhimdhunga-Lamidanda-                            and rehabilitation
Galchi (11 Km)




 SNRTP-GUL-W-NCB-8-08 -
PM-074-75 / Periodic                             Component B:
                                                                                                                                   Single Stage - One
Maintenance of      Shantipur-   IDA / 53360     Maintenance, upgrading,      Post            Request for Bids   Open - National                                                90,548.37     Signed                                                     2017-11-26            2017-11-30                                 2017-12-30            2018-01-29            2018-02-20            2019-02-20
                                                                                                                                   Envelope
Harrachaur-Olibang-                              and rehabilitation
Sindurghanse Road(12      Km)




 SNRTP-KAN-W-NCB-10-08-
PM-073-74 / Periodic                             Component B:
                                                                                                                                   Single Stage - One
Maintenance of      Bansamiti-   IDA / 53360     Maintenance, upgrading,      Post            Request for Bids   Open - National                                                       0.00   Canceled                                                   2017-11-26            2017-11-30                                 2017-12-30            2018-01-29            2018-02-20            2019-02-20
                                                                                                                                   Envelope
Pipalladi-Jonpuri-Ranipur                        and rehabilitation
Road     ( 10 KM)




 SNRTP-KAI-W-NCB-9-08-
                                                 Component B:
PM-074-75 / Periodic                                                                                                               Single Stage - One
                                 IDA / 53360     Maintenance, upgrading,      Post            Request for Bids   Open - National                                               126,039.36     Signed                                                     2017-11-26            2017-11-30                                 2017-12-30            2018-01-29            2018-02-20            2019-02-20
Maintenance of Geta-                                                                                                               Envelope
                                                 and rehabilitation
Murkatti Road (12.60 KM)




 SNRTP-NAW-W-NCB-15-14-
                                                 Component B:
PM-074-75 / Periodic                                                                                                               Single Stage - One
                                 IDA / 53360     Maintenance, upgrading,      Post            Request for Bids   Open - National                                                       0.00   Canceled                                                   2017-11-26            2017-11-30                                 2017-12-30            2018-01-29            2018-02-20            2019-02-20
Maintenance of Manjariya-                                                                                                          Envelope
                                                 and rehabilitation
Jamuniya Road (9.00 km)




 SNRTP-KAP-W-NCB-11-10-
PM-074-75 / Periodic
                                                 Component B:
Maintenance of                                                                                                                     Single Stage - One
                                 IDA / 53360     Maintenance, upgrading,      Post            Request for Bids   Open - National                                               253,899.85     Signed                                                     2017-11-26            2017-11-30                                 2017-12-30            2018-01-29            2018-02-20            2019-02-20
Krishnanagar- Shisirwa -                                                                                                           Envelope
                                                 and rehabilitation
Gugauli -Shivgadi Road
(25Km)




 SNRTP-NAW-W-NCB-15-15-
PM-074-75 / Periodic                             Component B:
                                                                                                                                   Single Stage - One
Maintenance of Arunkhola-        IDA / 53360     Maintenance, upgrading,      Post            Request for Bids   Open - National                                                11,643.24     Signed                                                     2017-11-26            2017-11-30                                 2017-12-30            2018-01-29            2018-02-20            2019-02-20
                                                                                                                                   Envelope
Rakachuli-Mityal Road                            and rehabilitation
(11.50 km)




 SNRTP-PAR-W-NCB-18-09-
PM-074-75 / Periodic                             Component B:
                                                                                                                                   Single Stage - One
Maintenance of Ramghadwa-        IDA / 53360     Maintenance, upgrading,      Post            Request for Bids   Open - National                                                       0.00   Canceled                                                   2017-11-26            2017-11-30                                 2017-12-30            2018-01-29            2018-02-20            2019-02-20
                                                                                                                                   Envelope
Jagarnathpur-Milanchowk                          and rehabilitation
Road     (9 Km)




 SNRTP-PAR-W-NCB-18-13-
PM-074-75 / Periodic
Maintenance of Mudli -Tulsi
barwa-Road (6 Km), Muldi
                                                 Component B:
tindubiya-sabithawa road(6                                                                                                         Single Stage - One
                                 IDA / 53360     Maintenance, upgrading,      Post            Request for Bids   Open - National                                                       0.00   Canceled                                                   2017-11-26            2017-11-30                                 2017-12-30            2018-01-29            2018-02-20            2019-02-20
km), bedhihari birta                                                                                                               Envelope
                                                 and rehabilitation
basantapur road (6 km)
padamsadak-bahuwari (6km)
and baghi patelchok road (9
km)




 SNRTP-RAS-W-NCB-20-06-
                                                 Component B:
PM-074-75 / Periodic                                                                                                               Single Stage - One
                                 IDA / 53360     Maintenance, upgrading,      Post            Request for Bids   Open - National                                                       0.00   Canceled                                                   2017-11-26            2017-11-30                                 2017-12-30            2018-01-29            2018-02-20            2019-02-20
Maintenance of Sole-Bhimali-                                                                                                       Envelope
                                                 and rehabilitation
Hakubesi Road (5 Km)




 SNRTP-RAS-W-NCB-20-08-
PM-074-75 / Periodic                             Component B:
                                                                                                                                   Single Stage - One
Maintenance of Dasmure           IDA / 53360     Maintenance, upgrading,      Post            Request for Bids   Open - National                                                       0.00   Canceled                                                   2017-11-26            2017-11-30                                 2017-12-30            2018-01-29            2018-02-20            2019-02-20
                                                                                                                                   Envelope
Seti-Devi Ma Vi. Dhuseni                         and rehabilitation
Road (5 Km)




 SNRTP-RAU-W-NCB-21-14-
                                                 Component B:
PM-074-75 / Periodic                                                                                                               Single Stage - One
                                 IDA / 53360     Maintenance, upgrading,      Post            Request for Bids   Open - National                                                       0.00   Canceled                                                   2017-11-26            2017-11-30                                 2017-12-30            2018-01-29            2018-02-20            2019-02-20
Maintenance of Prempur                                                                                                             Envelope
                                                 and rehabilitation
Gonahi MHW Road (22Km)




 SNRTP-RAU-W-NCB-21-15-
PM-074-75 / Periodic                             Component B:
                                                                                                                                   Single Stage - One
Maintenance of Gamhariya         IDA / 53360     Maintenance, upgrading,      Post            Request for Bids   Open - National                                                61,964.29     Signed                                                     2017-11-26            2017-11-30                                 2017-12-30            2018-01-29            2018-02-20            2019-02-20
                                                                                                                                   Envelope
Birta(BHW) Ragnapur Road                         and rehabilitation
(12Km)




 SNRTP-RAU-W-NCB-21-16-
PM-074-75 / Periodic
                                                 Component B:
Maintenance of                                                                                                                     Single Stage - One
                                 IDA / 53360     Maintenance, upgrading,      Post            Request for Bids   Open - National                                                49,759.00     Signed                                                     2017-11-26            2017-11-30                                 2017-12-30            2018-01-29            2018-02-20            2019-02-20
Sukdevchowk Khesaraiya                                                                                                             Envelope
                                                 and rehabilitation
Shivnagar Road (9Km) and
nahar bridge 30m,
Rautahat




                                                                                                                                                                                                                            Page 1
 SNRTP-SAR-W-NCB-25-08-
PM-074-75 / Periodic
Maintenance of Baghchaur-                       Component B:
                                                                                                                      Single Stage - One
Kotmaula-Patihalna Rural          IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                         79,114.86   Signed              2017-11-26   2017-11-30   2017-12-30   2018-01-29   2018-02-20   2019-02-20
                                                                                                                      Envelope
Road( Phulparasi-Simara-                        and rehabilitation
India Border Road)
Maintenance      (8 Km)




 SNRTP-SAR-W-NCB-25-11-
PM-074-75 / Periodic
                                                Component B:
Maintenance of Raniganj                                                                                               Single Stage - One
                                  IDA / H8990   Maintenance, upgrading,   Post   Request for Bids   Open - National                        153,128.41   Signed              2017-11-26   2017-11-30   2017-12-30   2018-01-29   2018-02-20   2019-02-20
Parwanipur Road (10 Km)                                                                                               Envelope
                                                and rehabilitation
Parsa Riterchor (13 km)
Sarlahi




 SNRTP-SIR-W-NCB-26-16-
PM-074-75 / Periodic                            Component B:
                                                                                                                      Single Stage - One
Maintenance of Mirchaiya          IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                        130,853.73   Signed              2017-11-26   2017-11-30   2017-12-30   2018-01-29   2018-02-20   2019-02-20
                                                                                                                      Envelope
Kalyanpur Siraha Road (23                       and rehabilitation
km):




 SNRTP-TAN-W-NCB-29-15-
PM-074-75 / Periodic
                                                Component B:
Maintenance of      Bhagwati                                                                                          Single Stage - One
                                  IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                        119,202.66   Signed              2017-11-26   2017-11-30   2017-12-30   2018-01-29   2018-02-20   2019-02-20
Rangapath (Chhirken-                                                                                                  Envelope
                                                and rehabilitation
Maiwal-Nabrung-Tanahunsur-
Barbhanjyang ) (13 Km)




 SNRTP-UDA-W-NCB-30-14-
PM-074-75 / Periodic                            Component B:
                                                                                                                      Single Stage - One
Maintenance of Basaha             IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                        207,377.59   Signed              2017-11-26   2017-11-30   2017-12-30   2018-01-29   2018-02-20   2019-02-20
                                                                                                                      Envelope
Chaudani Ranitar Road (24                       and rehabilitation
Km)




 SNRTP-BHOJ-W-NCB-31-
08-PM-074-75 / Periodic
                                                Component B:
Maintenance of Taksar-                                                                                                Single Stage - One
                                  IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                        149,210.76   Signed              2017-11-26   2017-11-30   2017-12-30   2018-01-29   2018-02-20   2019-02-20
Gumba -Dalgaun- Okhare -                                                                                              Envelope
                                                and rehabilitation
Dodhalekhani Rd II Pkg
(15 Km)




 SNRTP-BHOJ-W-NCB-31-
09-PM-074-75 / Periodic
                                                Component B:
Maintenance of Tiwari-                                                                                                Single Stage - One
                                  IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                        159,652.90   Signed              2017-11-26   2017-11-30   2017-12-30   2018-01-29   2018-02-20   2019-02-20
Bhanjyang-Chyangre-Bastim                                                                                             Envelope
                                                and rehabilitation
Thulogaon Duma Sano
Duma Road Rd II Pkg         (16
Km)


 SNRTP-SANK-W-NCB-32-
01-PM-074-75 / Periodic                         Component B:
                                                                                                                      Single Stage - One
Maintenance of Khadbari-          IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                        195,019.99   Signed              2017-11-26   2017-11-30   2017-12-30   2018-01-29   2018-02-20   2019-02-20
                                                                                                                      Envelope
Ramche-Lebrang-Dake-                            and rehabilitation
Bharabise Rd     (16 Km)




 SNRTP-TER-W-NCB-33-02-
                                                Component B:
PM-074-75 / Periodic                                                                                                  Single Stage - One
                                  IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                        208,807.79   Signed              2017-11-26   2017-11-30   2017-12-30   2018-01-29   2018-02-20   2019-02-20
Maintenance of Serma-                                                                                                 Envelope
                                                and rehabilitation
jaljale-Isibu Sadak Rd     (19
Km)


 SNRTP-SIND-W-NCB-34-03-
PM-074-75 / Periodic                            Component B:
                                                                                                                      Single Stage - One
Maintenance of Dauchet-           IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                        148,968.33   Signed              2017-11-26   2017-11-30   2017-12-30   2018-01-29   2018-02-20   2019-02-20
                                                                                                                      Envelope
Keureni-Banskharka-Jatatn-                      and rehabilitation
Baruwa Rd      (19 Km)




 SNRTP-GOR-W-NCB-35-04-
PM-074-75 / Periodic                            Component B:
                                                                                                                      Single Stage - One
Maintenance of Abuwa -B           IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                              0.00   Canceled            2017-11-26   2017-11-30   2017-12-30   2018-01-29   2018-02-20   2019-02-20
                                                                                                                      Envelope
irdi-Pauwatar-Kalamata-                         and rehabilitation
Airport Road (8 Km)




 SNRTP-UDA-W-NCB-30-15-
PM-074-75 / Periodic                            Component B:
                                                                                                                      Single Stage - One
Maintenance of Murkuchi           IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                        188,476.80   Signed              2017-11-26   2017-12-01   2017-12-31   2018-01-30   2018-02-21   2019-02-21
                                                                                                                      Envelope
Puwarebhanjyang Bhutar                          and rehabilitation
Road 23 Km




 SNRTP-BAR-W-NCB-3-07-
PM-074-75 / Periodic
Maintenance of Bridge                           Component B:
                                                                                                                      Single Stage - One
along Kalaiya-                    IDA / H8990   Maintenance, upgrading,   Post   Request for Bids   Open - National                         90,724.43   Signed              2017-11-27   2017-12-02   2018-01-01   2018-01-31   2018-02-22   2018-08-21
                                                                                                                      Envelope
Ganjbhabanipur (Bridge                          and rehabilitation
Maintenance) and Kholbi
Maduwa Road 9km, Bara




 SNRTP-MAK-W-NCB-14-07-
PM-074-75 / Pulkomukh-
Indrayanichaur - Chalti                         Component B:
                                                                                                                      Single Stage - One
(Agrakhola Road) 25 km            IDA / H8990   Maintenance, upgrading,   Post   Request for Bids   Open - National                        370,953.95   Signed              2017-11-26   2017-12-01   2017-12-31   2018-01-15   2018-02-06   2019-02-06
                                                                                                                      Envelope
and GAirigaon pakani                            and rehabilitation
manahari road (20 km),
Makwanpur




 SNRTP-SIR-W-NCB-26-14-
PM-074-75 / Periodic                            Component B:
                                                                                                                      Single Stage - One
Maintenance of Dhangadi           IDA / H8990   Maintenance, upgrading,   Post   Request for Bids   Open - National                         95,679.16   Signed              2017-11-26   2017-12-01   2017-12-31   2018-01-30   2018-02-21   2019-02-21
                                                                                                                      Envelope
Patari-Jijhaul Road (25                         and rehabilitation
KM), Siraha




 SNRTP-SIND-W-NCB-34-04-
PM-074-75 / Periodic                            Component B:
                                                                                                                      Single Stage - One
maintenance of Naubise            IDA / H8990   Maintenance, upgrading,   Post   Request for Bids   Open - National                        382,179.93   Signed              2017-12-03   2017-12-08   2018-01-07   2018-02-06   2018-02-28   2019-02-28
                                                                                                                      Envelope
Chautara Melamchi,                              and rehabilitation
Sindhupalchok




 SNRTP-NCB-W-25-12-PM-
074-75 / Periodic
                                                Component B:
Maintenance of                                                                                                        Single Stage - One
                                  IDA / H8990   Maintenance, upgrading,   Post   Request for Bids   Open - National                              0.00   Canceled            2017-11-26   2017-12-01   2017-12-31   2018-01-30   2018-02-21   2019-02-21
Dangrakhola Bridge and                                                                                                Envelope
                                                and rehabilitation
causeway along
salanpurhirapur Road (30
m bridge, 10 m causeway)


 SNRTP-LAM-W-NCB-36-02-
UG-074-75 / Karputar-                           Component B:
                                                                                                                      Single Stage - One
Daduwa-Gilung-                    IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                              0.00   Canceled            2017-12-25   2017-12-30   2018-01-29   2018-02-28   2018-03-22   2019-06-25
                                                                                                                      Envelope
Salmebhanjyang (23.4km),                        and rehabilitation
Lamjung




                                                                                                                                                                   Page 2
 SNRTP-UDA-W-NCB-30-07-
                                            Component B:
BRI-074-75 / Babiya Khola                                                                                         Single Stage - One
                              IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                              0.00   Canceled               2018-01-15   2018-01-30   2018-03-01   2018-03-31   2018-04-22   2019-04-22
Bridge at gaighat fattepur                                                                                        Envelope
                                            and rehabilitation
Road 28 Km (50 m)




 SNRTP-SAP-W-NCB-24-08-
                                            Component B:
BRI-074-75 / Jita Khola-I                                                                                         Single Stage - One
                              IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                        256,685.60   Signed                 2018-01-15   2018-01-30   2018-03-01   2018-03-31   2018-04-22   2019-04-22
Bridge at ch23+000                                                                                                Envelope
                                            and rehabilitation
(Jandaul-Kushaha Road,
24.55 km)


 SNRTP-BHOJ-W-NCB-31-
06-BRI-074-75 / Pikhuwa                     Component B:
                                                                                                                  Single Stage - One
Khola Bridge at Bhojpur-      IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                              0.00   Canceled               2018-01-15   2018-02-04   2018-03-06   2018-04-05   2018-04-27   2019-05-02
                                                                                                                  Envelope
Manebhanjyang-Ranibas-                      and rehabilitation
Ghoretar Road, (77.6 m)




 SNRTP-BAN-W-NCB-2-06-
                                            Component B:
BRI-074-75 / Duduwa Nala                                                                                          Single Stage - One
                              IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                              0.00   Canceled               2018-01-15   2018-02-09   2018-03-11   2018-04-10   2018-05-02   2019-05-02
Bridge at ch     0+500                                                                                            Envelope
                                            and rehabilitation
(Betahani road),(51 m)




 SNRTP-GUL-W-NCB-8-13-                      Component B:
                                                                                                                  Single Stage - One
BRI-074-75 / Tribeni Khola    IDA / H8990   Maintenance, upgrading,   Post   Request for Bids   Open - National                              0.00   Canceled               2018-01-15   2018-01-30   2018-03-01   2018-03-31   2018-04-22   2019-04-22
                                                                                                                  Envelope
Bridge,26 m Gulmi                           and rehabilitation




 SNRTP-GUL-W-NCB-8-14-                      Component B:
                                                                                                                  Single Stage - One
BRI-074-75 / Lung Khola       IDA / H8990   Maintenance, upgrading,   Post   Request for Bids   Open - National                              0.00   Canceled               2018-01-15   2018-01-30   2018-03-01   2018-03-31   2018-04-22   2019-04-22
                                                                                                                  Envelope
Bridge, 16 m, Gulmi                         and rehabilitation




 SNRTP-TER-W-NCB-33-03-
PM-074-75 / Periodic
                                            Component B:
Maintenance of Fakchamara-                                                                                        Single Stage - One
                              IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                         81,112.89   Signed                 2018-01-15   2018-02-19   2018-03-21   2018-04-20   2018-05-12   2019-05-12
Panchkanya-Pokari Road                                                                                            Envelope
                                            and rehabilitation
and Chaparichowk Angdim
Sadak,9 km , Terathum




 SNRTP-DHAN-W-NCB-7-18-
PM-074-75 / Periodic                        Component B:
                                                                                                                  Single Stage - One
maintenance of Nunapatti      IDA / H8990   Maintenance, upgrading,   Post   Request for Bids   Open - National                         93,948.58   Signed                 2017-11-26   2017-12-01   2017-12-31   2018-01-30   2018-02-20   2019-02-20
                                                                                                                  Envelope
Barfi Duhabi Road (13.5)                    and rehabilitation
km




 SNRTP-DHAN-W-NCB-7-20-
PM-074-75 / Periodic                        Component B:
                                                                                                                  Single Stage - One
Maintenance of Bisharbohar    IDA / H8990   Maintenance, upgrading,   Post   Request for Bids   Open - National                         70,045.85   Signed                 2018-03-05   2018-03-10   2018-04-09   2018-04-24   2018-05-15   2019-05-15
                                                                                                                  Envelope
Durbakot thadi road (13                     and rehabilitation
Km)




 SNRTP-RUP-W-NCB-22-12-
BRI-074-75 / Ghamaha                        Component B:
                                                                                                                  Single Stage - One
Khola Bridge (Buddhanagar-    IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                        628,246.39   Signed                 2018-03-05   2018-03-10   2018-04-09   2018-05-09   2018-05-31   2019-05-31
                                                                                                                  Envelope
Serawa-Kisauli-Suryapura                    and rehabilitation
Road)(51m), Rupandehi




 SNRTP-PAL-W-NCB-17-05-
BRI-074-75 / Amlihan                        Component B:
                                                                                                                  Single Stage - One
Bridge at 5+560 (Bastari-     IDA / H8990   Maintenance, upgrading,   Post   Request for Bids   Open - National                        583,673.90   Signed                 2018-03-05   2018-03-15   2018-04-14   2018-04-29   2018-05-21   2019-05-21
                                                                                                                  Envelope
Jhadewa-Gothadi Road,                       and rehabilitation
24.940 km) (32 m)




 SNRTP-GOR-W-NCB-35-05-
BRI-074-75 / Ludi Khola
                                            Component B:
Bridge at 3+00 (Laxmibazar-                                                                                       Single Stage - One
                              IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                        305,003.42   Signed                 2018-03-05   2018-03-20   2018-04-19   2018-05-19   2018-06-10   2019-06-10
Tinmane-Jumlichautara-                                                                                            Envelope
                                            and rehabilitation
Rainas-Butar Road, (22 m)
Gorkha




 SNRTP-SYA-W-NCB-28-09-
BRI-074-75 / Jugle Khola
                                            Component B:
Bridge at 9+100 of                                                                                                Single Stage - One
                              IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                        200,114.92   Signed                 2018-03-05   2018-03-10   2018-05-11   2018-06-10   2018-07-02   2019-07-02
Naudanda-Bicharichautara-                                                                                         Envelope
                                            and rehabilitation
Karkineta Rural Road,
(23m), Syangja




 SNRTP-PYU-W-NCB-19-07-                     Component B:
                                                                                                                  Single Stage - One
BRI-074-75 / Hariya Khola     IDA / H8990   Maintenance, upgrading,   Post   Request for Bids   Open - National                        206,460.90   Signed                 2018-01-15   2018-01-30   2018-03-01   2018-03-31   2018-04-22   2019-04-22
                                                                                                                  Envelope
Bridge,26 m, Pyuthan                        and rehabilitation




 SNRTP-SIR-W-NCB-26-09-
BRI-074-75 / Mainawati                      Component B:                                                                                            Under
                                                                                                                  Single Stage - One
Khola Bridge at ch 2+700      IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                              0.00   Implementat            2018-03-05   2018-03-10   2018-04-09   2018-04-24   2018-05-16   2019-05-16
                                                                                                                  Envelope
Siraha-Sukhipur Road,18.96                  and rehabilitation                                                                                      ion
km (35 m)




 SNRTP-GUL-W-NCB-8-12-
BRI-074-75 / Harewa Khola                   Component B:
                                                                                                                  Single Stage - One
Bridge at 13+500 (            IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                        323,645.34   Signed                 2018-03-05   2018-03-10   2018-04-09   2018-04-24   2018-05-16   2019-05-16
                                                                                                                  Envelope
Chorkate-Shantipur Road)                    and rehabilitation
(26 m), Gulmi




 SNRTP-RAU-W-NCB-21-09-
BRI-074-75 / Aduwa
(Aruwa) Khola                               Component B:
                                                                                                                  Single Stage - One
Bridge,Malahi ghat at         IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                        233,424.99   Signed                 2018-03-05   2018-03-10   2018-04-09   2018-04-24   2018-05-16   2019-05-16
                                                                                                                  Envelope
7+530 (Gaur-Kathariya-                      and rehabilitation
Santapur-Dostiya-
Petbharwa(bara border)
Road 25 m, Rautahat


 SNRTP-KAN-W-NCB-10-05-
BRI-074-75 / Construction
                                            Component B:
of   Malaria Khola Bridge.(                                                                                       Single Stage - One
                              IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                        222,122.98   Signed                 2018-01-15   2018-02-14   2018-03-16   2018-04-15   2018-05-07   2019-05-07
25 m span) across Dadthan-                                                                                        Envelope
                                            and rehabilitation
Baliban Road,
KANCHANPUR




 SNRTP-SANK-W-NCB-32-
06-BRI-074-75 / Pangma
                                            Component B:
Khola Bridge at 7+120                                                                                             Single Stage - One
                              IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                        224,079.00   Signed                 2018-03-05   2018-03-10   2018-04-09   2018-04-24   2018-05-16   2019-05-16
(Khandbari-Kalchebesi-                                                                                            Envelope
                                            and rehabilitation
Pangtha-Dake-Sabhapokhar
Road) (26m),
Sankhuwasabha


 SNRTP-ARG-W-NCB-01-11-
BRI-074-75 / Samne Khola                    Component B:
                                                                                                                  Single Stage - One
Bridge at Sandhikhark-        IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                        155,320.27   Signed                 2018-01-15   2018-01-30   2018-03-01   2018-03-31   2018-04-21   2019-04-21
                                                                                                                  Envelope
Pakale-Dharapani-                           and rehabilitation
Chujathanti Road,(11
m),Argakhachi




                                                                                                                                                                  Page 3
 SNRTP-SANK-W-NCB-32-
                                            Component B:
07-BRI-074-75 / Malta                                                                                             Single Stage - One
                              IDA / H8990   Maintenance, upgrading,   Post   Request for Bids   Open - National                        238,431.92   Signed              2018-03-05   2018-03-10   2018-04-09   2018-04-24   2018-05-16   2019-05-16
Khola Bridge, 26 m ,                                                                                              Envelope
                                            and rehabilitation
Sankhuwasabha,




 SNRTP-MAK-W-NCB-14-08-
BRI-074-075 / Dubu Khola,                   Component B:
                                                                                                                  Single Stage - One
Ch 9+800 along Chuniya-       IDA / H8990   Maintenance, upgrading,   Post   Request for Bids   Open - National                        223,624.77   Signed              2018-03-05   2018-03-10   2018-04-09   2018-04-24   2018-05-16   2019-05-16
                                                                                                                  Envelope
Namtar-Bharta-Khairang                      and rehabilitation
Road, 20 m Makwanpur




 SNRTP-PAR-W-NCB-18-08-
                                            Component B:
BRI-074-075 / Dharar Khola                                                                                        Single Stage - One
                              IDA / H8990   Maintenance, upgrading,   Post   Request for Bids   Open - National                              0.00   Canceled            2018-03-05   2018-03-10   2018-04-09   2018-04-24   2018-05-16   2019-05-16
Bridge,CH 13+130 along                                                                                            Envelope
                                            and rehabilitation
Janata Road, 20 m , Parsa




 SNRTP-SAR-W-NCB-25-09-
BRI-074-075 /                               Component B:
                                                                                                                  Single Stage - One
Gadauli(Godar) Bridge,Ch      IDA / H8990   Maintenance, upgrading,   Post   Request for Bids   Open - National                        240,919.11   Signed              2018-03-05   2018-03-10   2018-04-09   2018-04-24   2018-05-16   2019-05-16
                                                                                                                  Envelope
2+190 along Karmaiya-                       and rehabilitation
Hathiyol Road, 25 m
Sarlahi


 SNRTP-SAR-W-NCB-25-12-
PM-074-75 / Periodic
                                            Component B:
Maintenance of                                                                                                    Single Stage - One
                              IDA / H8990   Maintenance, upgrading,   Post   Request for Bids   Open - National                         30,930.46   Signed              2018-03-05   2018-03-10   2018-04-09   2018-04-26   2018-05-18   2019-05-18
Dangrakhola Bridge and                                                                                            Envelope
                                            and rehabilitation
causeway along
salanpurhirapur Road (30
m bridge, 10 m causeway)


 SNRTP-BRD-W-NCB-4-08-
PM-074-75 / Periodic                        Component B:
                                                                                                                  Single Stage - One
Maintenance of Ghorpitta -    IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                              0.00   Canceled            2017-11-26   2017-11-30   2017-12-30   2018-01-29   2018-02-20   2019-02-20
                                                                                                                  Envelope
Baniyabhar - MRM Road (9                    and rehabilitation
km)




 SNRTP-KAS-W-NCB-12-19-
PM-074-75 / Periodic
                                            Component B:
Maintenance of Rakhi-                                                                                             Single Stage - One
                              IDA / H8990   Maintenance, upgrading,   Post   Request for Bids   Open - National                        243,124.96   Signed              2018-05-08   2018-05-13   2018-06-12   2018-06-27   2018-07-11   2019-07-11
Mijauri - Gahate -Toshi                                                                                           Envelope
                                            and rehabilitation
Road (27.1 Km.) including
causeway, Kaski




 SNRTP-BAR-W-NCB-3-08-
PM-074-75 / Periodic
                                            Component B:
Maintenance of Kuduwa-                                                                                            Single Stage - One
                              IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                        113,664.06   Signed              2018-05-08   2018-05-13   2018-06-12   2018-06-27   2018-07-11   2019-07-11
Langada Chowk-Bazar                                                                                               Envelope
                                            and rehabilitation
(Bargadhi), Bara ( 0+000 to
13+326, Length- 13.326 km)




 SNRTP-KAP-W-NCB-11-11-
PM-074-75 / Periodic
                                            Component B:
Maintenance of Jahadi-                                                                                            Single Stage - One
                              IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                         85,190.93   Signed              2018-05-08   2018-05-13   2018-06-12   2018-06-27   2018-07-11   2019-07-11
Bikuli-Bugchi Road,                                                                                               Envelope
                                            and rehabilitation
Kapilvastu ( 0+000 to
9+500,    Lenght 9.5km)




 SNRTP-KAP-W-NCB-11-13-
PM-074-75 / Periodic
                                            Component B:
Maintenance of Jhanda-                                                                                            Single Stage - One
                              IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                        102,074.76   Signed              2018-05-08   2018-05-13   2018-06-12   2018-06-27   2018-07-11   2019-07-11
Bangai-Motipur-Dohate                                                                                             Envelope
                                            and rehabilitation
Road, Kapilvastu (0+000 to
14+400, Length 11.05 km)




 SNRTP-DHAN-W-NCB-7-21-
PM-074-75 / Periodic
Maintenance of
                                            Component B:
Dhanushadham-Sarsa-                                                                                               Single Stage - One
                              IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                         32,005.09   Signed              2018-05-08   2018-05-13   2018-06-12   2018-06-27   2018-07-11   2019-07-11
Laxmipur-Kesharpatti-                                                                                             Envelope
                                            and rehabilitation
Bhimanchowk- Road,
Dhanusha(0+000 to 7+500,
Length-7.50 km)




 SNRTP-KAP-W-NCB-11-14-
PM-074-75 / Periodic
Maintenance of
                                            Component B:
Mahendrakot Bhelai-Kapasi-                                                                                        Single Stage - One
                              IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                         97,341.86   Signed              2018-05-08   2018-05-13   2018-06-12   2018-06-27   2018-07-11   2019-07-11
Purena-Gorusinghe-                                                                                                Envelope
                                            and rehabilitation
Bakadariya-Chetradehi-
Tilaurakot Road, Kapilvastu
(0+000 to 20+000, Length
13.9 km)


 SNRTP-SYA-W-NCB-28-01-
                                            Component B:
PM-074-75 / Periodic                                                                                              Single Stage - One
                              IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                         49,057.94   Signed              2018-05-08   2018-05-13   2018-06-12   2018-06-27   2018-07-11   2019-07-11
Maintenance of PUtalikhet-                                                                                        Envelope
                                            and rehabilitation
Pachamul-Aruchour Road




 SNRTP-BRD-W-NCB-4-09-
PM-074-75 / Periodic
Maintenance of    PCO                       Component B:
                                                                                                                  Single Stage - One
Chouk (Kakoura)-Damouli-      IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                              0.00   Canceled            2018-05-08   2018-05-13   2018-06-12   2018-06-27   2018-07-11   2019-07-11
                                                                                                                  Envelope
Juraina-Pachasa Road,                       and rehabilitation
Bardiya (0+000 to 11+1000,
Length 11.1 km)




 SNRTP-DHAN-W-NCB-7-22-
PM-074-75 / Periodic
Maintenance of Laxmipur-
                                            Component B:
Bagewa-Gopalpur-Baniniya-                                                                                         Single Stage - One
                              IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                        104,108.61   Signed              2018-05-08   2018-05-13   2018-06-12   2018-06-27   2018-07-11   2019-07-11
Ramdaiya-Bhabadi-Tarapati-                                                                                        Envelope
                                            and rehabilitation
Sirsiya-Road, Dhanusha
(0+000 to 13+440, Length
13.44 km)




 SNRTP-BRD-W-NCB-4-10-
PM-074-75 / Periodic
                                            Component B:
Maintenance of Puspachouk-                                                                                        Single Stage - One
                              IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                              0.00   Canceled            2018-05-08   2018-05-13   2018-06-12   2018-06-27   2018-07-11   2019-07-11
Bholagoudi-Danfe Raod,                                                                                            Envelope
                                            and rehabilitation
Bardiya (0+000 to 22+851,
Length 22.85km)




 SNRTP-DHAN-W-NCB-7-23-
PM-074-75 / Periodic
Maintenance of Hariharpur-                  Component B:
                                                                                                                  Single Stage - One
Bateshwar-Bhuchakrapur-       IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                         43,800.83   Signed              2018-05-08   2018-05-13   2018-06-12   2018-06-27   2018-07-11   2019-07-11
                                                                                                                  Envelope
Laxminibas-Road, Dhanusha                   and rehabilitation
(0+000 to 10+030, Length-
10.03)




                                                                                                                                                               Page 4
 SNRTP-GOR-W-NCB-35-05-
PM-074-75 / Periodic
                                             Component B:
Maintenance of Nayapul-                                                                                            Single Stage - One
                               IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                         75,016.07   Signed                 2018-05-08   2018-05-13   2018-06-12   2018-06-27   2018-07-11   2019-07-11
Biruwarat-Pauwatar Road,                                                                                           Envelope
                                             and rehabilitation
Gorkha (0+000 to 8+790,
Length 8.79km)




 SNRTP-SAR-W-NCB-25-13-
PM-074-75 / Periodic                         Component B:
                                                                                                                   Single Stage - One
Maintenance of Salempur-       IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                         95,238.76   Signed                 2018-05-08   2018-05-13   2018-06-12   2018-06-27   2018-07-11   2019-07-11
                                                                                                                   Envelope
Hirapur-Road, Sarlahi                        and rehabilitation
(0+000 to 15+000, Length-
15 km)


 SNRTP-KAS-W-NCB-12-21-
PM-074-75 / Periodic
Maintenance of Baidam                        Component B:
                                                                                                                   Single Stage - One
Pame Raod including            IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                        111,182.86   Signed                 2018-05-08   2018-05-13   2018-06-12   2018-06-27   2018-07-11   2019-07-11
                                                                                                                   Envelope
crossing structures, Kaski                   and rehabilitation
(3+000 to 12+064, Length
9.06km and 100m)




 SNRTP-SIR-W-NCB-26-17-
PM-074-75 / Periodic
                                             Component B:
Maintenance of Lahan-                                                                                              Single Stage - One
                               IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                         40,912.81   Signed                 2018-05-08   2018-05-13   2018-06-12   2018-06-27   2018-07-11   2019-07-11
Tarengana Road, Siraha                                                                                             Envelope
                                             and rehabilitation
(1+500 to 0+100, Length-7.6
km)




 SNRTP-KAS-W-NCB-12-22-
PM-074-75 / Periodic
Maintenance of Kaure-                        Component B:
                                                                                                                   Single Stage - One
Jyamdung-Tanting Road          IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                        128,715.90   Signed                 2018-05-08   2018-05-13   2018-06-12   2018-06-27   2018-07-11   2019-07-11
                                                                                                                   Envelope
along with causeway, Kaski                   and rehabilitation
(0+000 to 17+320, Length
17.32 km and 40m)




 SNRTP-SIR-W-NCB-26-18-
PM-074-75 / Periodic
                                             Component B:
Maintenance of Lahan-                                                                                              Single Stage - One
                               IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                        125,049.63   Signed                 2018-05-08   2018-05-13   2018-06-12   2018-06-27   2018-07-11   2019-07-11
Rameshchowk-Jhajpatti-                                                                                             Envelope
                                             and rehabilitation
Road, Siraha (0+000 to
19+000, Length-19km)




 SNRTP-KAS-W-NCB-12-23-
PM-074-75 / Periodic
                                             Component B:
Maintenance of Ghattekhola                                                                                         Single Stage - One
                               IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                         64,698.80   Signed                 2018-05-08   2018-05-13   2018-06-12   2018-06-27   2018-07-11   2019-07-11
Dhampush Khanigaun Raod,                                                                                           Envelope
                                             and rehabilitation
Kaski (0+000 to 7+500),
Length 7.5km




 SNRTP-SAP-W-NCB-24-15-
PM-074-75 / Periodic
                                             Component B:
Maintenance of Chapin-                                                                                             Single Stage - One
                               IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                         30,930.76   Signed                 2018-05-08   2018-05-13   2018-06-12   2018-06-27   2018-07-11   2019-07-11
Khola Bridge (Kharchuiya                                                                                           Envelope
                                             and rehabilitation
Kachan Road), Saptari
(3+450 to 3+477, Length-
27.35m)


 SNRTP-DAN-W-NCB-5-14-
PM-074-75 / Periodic
                                             Component B:
Maintenance of Simthana-                                                                                           Single Stage - One
                               IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                         60,844.77   Signed                 2018-05-08   2018-05-13   2018-06-12   2018-06-27   2018-07-11   2019-07-11
Khaireni Jumlekula Road,                                                                                           Envelope
                                             and rehabilitation
Dang (0+000 to 8+5000,
Length 8.5km)




 SNRTP-SAP-W-NCB-24-16-
PM-074-75 / Periodic
                                             Component B:
Maintenance of Hariharpur-                                                                                         Single Stage - One
                               IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                         74,298.62   Signed                 2018-05-08   2018-05-13   2018-06-12   2018-06-27   2018-07-11   2019-07-11
Pakari-Bishahariya-Tilanthi-                                                                                       Envelope
                                             and rehabilitation
Road, Saptari (0+000 to
10+000, Length-10 km)




 SNRTP-DAN-W-NCB-5-15-
PM-074-75 / Periodic
                                             Component B:
Maintenance of Tarigaun-                                                                                           Single Stage - One
                               IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                         48,785.18   Signed                 2018-05-08   2018-05-13   2018-06-12   2018-06-27   2018-07-11   2019-07-11
Bhojpur-Khausapur Rural                                                                                            Envelope
                                             and rehabilitation
Road, Dang (0+000 to
5+000, Length 5km)




 SNRTP-DAN-W-NCB-5-16-
PM-074-75 / Periodic
                                             Component B:
Maintenance of Sarra-                                                                                              Single Stage - One
                               IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                        103,072.62   Signed                 2018-05-08   2018-05-13   2018-06-12   2018-06-27   2018-07-11   2019-07-11
Saudiyar-Dharna-Duruwa                                                                                             Envelope
                                             and rehabilitation
Raod, Dang (0+000 to
15+5000),Length 15.5km




 SNRTP-BAR-W-NCB-3-09-
PM-074-75 / Periodic
                                             Component B:
Maintenance of Kolbi-                                                                                              Single Stage - One
                               IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                        100,543.90   Signed                 2018-05-08   2018-05-13   2018-06-12   2018-06-27   2018-07-11   2019-07-11
Baragadhi-Lautan- Road ,                                                                                           Envelope
                                             and rehabilitation
Bara (0+000 to 11+571,
Length-11.571 km)




 SNRTP-ARG-W-NCB-1-17-
PM-074-75 / Periodic
Maintenance of Chutrabesi-                   Component B:
                                                                                                                   Single Stage - One
Pakle-DharapanipRajame-        IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                        132,387.54   Signed                 2018-05-08   2018-05-13   2018-06-12   2018-06-27   2018-07-11   2019-07-11
                                                                                                                   Envelope
Pyutha Road, Arghakhanchi                    and rehabilitation
(0+250 to 25+500, Length
25.25km)




 SNRTP-DHA-W-NCB-6-06-
UG-074-75 / Upgrading of                     Component B:                                                                                            Pending
                                                                                                                   Single Stage - One
Dhadingbeshi-Sankosh-          IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                              0.00   Implementat            2018-05-08   2018-05-13   2018-06-12   2018-06-27   2018-07-11   2019-07-11
                                                                                                                   Envelope
Tipling Road, Dhading                        and rehabilitation                                                                                      ion
(Length 2 km)




 SNRTP-SUR-W-NCB-27-16-
PM-074-75 / Periodic
Maintenance of Baddichaur-
Guthu-Bijaura-Benighat-Doti-                 Component B:
                                                                                                                   Single Stage - One
Road (Babiyachaur-Guthu-       IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                              0.00   Canceled               2018-05-08   2018-05-13   2018-06-12   2018-06-27   2018-07-11   2019-07-11
                                                                                                                   Envelope
Section), Surkhet (17+600                    and rehabilitation
to 29+657, Length-
12.057km, Crossing
Structure-1+100 to 9+900,
Length-69 m)


 SNRTP-BAN-W-NCB-2-09-
PM-074-75 / Periodic
Maintenance of Chaulika                      Component B:
                                                                                                                   Single Stage - One
Chowk (RRM)-                   IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                              0.00   Canceled               2017-11-26   2017-11-30   2017-12-30   2018-01-29   2018-02-20   2019-02-20
                                                                                                                   Envelope
Mahendranagar-Hirminiya-                     and rehabilitation
Holiya (Nayabasti Border)
Road (6km)




                                                                                                                                                                   Page 5
 SNRTP-BAN-W-NCB-2-09-
PM-074-75-2 / Periodic
Maintenance of Chaulika                     Component B:
                                                                                                                  Single Stage - One
Chowk (RRM)-                  IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                              0.00   Canceled            2018-06-05   2018-06-09   2018-07-09   2018-08-08   2018-08-22   2019-06-18
                                                                                                                  Envelope
Mahendranagar-Hirminiya-                    and rehabilitation
Holiya (Nayabasti Border)
Road (6km)




 SNRTP-BAN-W-NCB-2-10-
PM-074-75 / Periodic
Maintenance of Chandani
                                            Component B:
Chowk(MRM)-Titihiriya-                                                                                            Single Stage - One
                              IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                              0.00   Canceled            2017-11-26   2017-11-30   2017-12-30   2018-01-29   2018-02-20   2019-02-20
Simalghari(Sonpur)-                                                                                               Envelope
                                            and rehabilitation
Udharapur-Gaughat Road
(12km) SNRTP-BAN-W-NCB-
2-10-PM-074-75




 SNRTP-BAN-W-NCB-2-10-
PM-074-75-2 / Periodic
Maintenance of Chandani                     Component B:
                                                                                                                  Single Stage - One
Chowk(MRM)-Titihiriya-        IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                        114,532.98   Signed              2018-06-06   2018-06-10   2018-07-10   2018-08-09   2018-08-23   2019-06-19
                                                                                                                  Envelope
Simalghari(Sonpur)-                         and rehabilitation
Udharapur-Gaughat Road
(12km)




 SNRTP-PYU-W-NCB-19-09-
PM-074-75 / Periodic                        Component B:
                                                                                                                  Single Stage - One
Maintenance of Kumaltar-      IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                              0.00   Canceled            2017-11-26   2017-11-30   2017-12-30   2018-01-29   2018-02-20   2019-02-20
                                                                                                                  Envelope
Kondrachaur-Ratapani                        and rehabilitation
Road(10 Km)




 SNRTP-PYU-W-NCB-19-09-
PM-074-75-2 / Periodic                      Component B:
                                                                                                                  Single Stage - One
Maintenance of Kumaltar-      IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                        119,292.69   Signed              2018-06-06   2018-06-10   2018-07-10   2018-08-09   2018-08-23   2019-06-19
                                                                                                                  Envelope
Kondrachaur-Ratapani                        and rehabilitation
Road(10 Km)




 SNRTP-RUP-W-NCB-22-13-
PM-074-75 / Periodic
                                            Component B:
Maintenance of Patkhouli-                                                                                         Single Stage - One
                              IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                              0.00   Canceled            2017-11-26   2017-11-30   2017-12-30   2018-01-29   2018-02-20   2019-02-20
Lothpura-Gauri-                                                                                                   Envelope
                                            and rehabilitation
S shaniya-PartitoIe-
Ramnagar Road (12 km)




 SNRTP-RUP-W-NCB-22-13-
PM-074-75-2 / Periodic
                                            Component B:
Maintenance of Patkhouli-                                                                                         Single Stage - One
                              IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                         60,964.57   Signed              2018-06-06   2018-06-10   2018-07-10   2018-08-09   2018-08-23   2019-06-19
Lothpura-Gauri-                                                                                                   Envelope
                                            and rehabilitation
Sisaniya-PartitoIe-Ramnagar
Road (12 km)




 SNRTP-RUP-W-NCB-22-14-
PM-074-75 / Periodic                        Component B:
                                                                                                                  Single Stage - One
Maintenance of Bansghadi-     IDA / H8990   Maintenance, upgrading,   Post   Request for Bids   Open - National                              0.00   Canceled            2017-11-26   2017-11-30   2017-12-30   2018-01-29   2018-02-20   2019-02-20
                                                                                                                  Envelope
Gaj edi- Suryapura Road                     and rehabilitation
(11 km), Rupendehi




 SNRTP-RUP-W-NCB-22-14-
PM-074-75-2 / Maintenance                   Component B:
                                                                                                                  Single Stage - One
of Bansghadi-Gajedi-          IDA / H8990   Maintenance, upgrading,   Post   Request for Bids   Open - National                         92,883.60   Signed              2018-06-06   2018-06-10   2018-07-10   2018-08-09   2018-08-23   2019-06-19
                                                                                                                  Envelope
Suryapura Road (11 km),                     and rehabilitation
Rupendehi




 SNRTP-RUP-W-NCB-22-15-
PM-074-75 / Periodic                        Component B:
                                                                                                                  Single Stage - One
Maintenance of Bhangaiya      IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                              0.00   Canceled            2017-11-26   2017-11-30   2017-12-30   2018-01-29   2018-02-20   2019-02-20
                                                                                                                  Envelope
Thu. Piprahawa Karauta                      and rehabilitation
Semara Road (20km)




 SNRTP-RUP-W-NCB-22-15-
PM-074-75-2 / Periodic                      Component B:
                                                                                                                  Single Stage - One
Maintenance of Bhangaiya      IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                        168,570.30   Signed              2018-06-06   2018-06-10   2018-07-10   2018-08-09   2018-08-23   2019-06-19
                                                                                                                  Envelope
Thu- Piprahawa Karauta                      and rehabilitation
Semara Road (20km)




 SNRTP-RUP-W-NCB-22-16-
PM-074-75 / Periodic
                                            Component B:
Maintenance of Tunihawa                                                                                           Single Stage - One
                              IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                              0.00   Canceled            2017-11-26   2017-11-30   2017-12-30   2018-01-29   2018-02-20   2019-02-20
Mukundagadh                                                                                                       Envelope
                                            and rehabilitation
Rayapur(semara) Road
(19km)




 SNRTP-RUP-W-NCB-22-16-
PM-074-75-2 / Periodic
                                            Component B:
Maintenance of Tunihawa                                                                                           Single Stage - One
                              IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                        159,854.20   Signed              2018-06-06   2018-06-10   2018-07-10   2018-08-09   2018-08-23   2019-06-19
Mukundagadh                                                                                                       Envelope
                                            and rehabilitation
Rayapur(semara) Road
(19km)




 SNRTP-BAN-W-NCB-2-07-
                                            Component B:
BRI-074-75 / Gandhiyanala                                                                                         Single Stage - One
                              IDA / H8990   Maintenance, upgrading,   Post   Request for Bids   Open - National                              0.00   Canceled            2018-03-05   2018-03-10   2018-04-09   2018-04-24   2018-05-16   2019-05-16
Bridge at puraina,11 m                                                                                            Envelope
                                            and rehabilitation
Banke




 SNRTP-BAN-W-NCB-2-07-
                                            Component B:
BRI-074-75-2 / Gandhaila                                                                                          Single Stage - One
                              IDA / H8990   Maintenance, upgrading,   Post   Request for Bids   Open - National                        100,631.40   Signed              2018-06-06   2018-06-11   2018-07-11   2018-08-10   2018-08-24   2019-07-15
Nala Bridge at Puraina,11                                                                                         Envelope
                                            and rehabilitation
m Banke




 SNRTP-PYU-W-NCB-19-07-
UG-074-75 / Upgrading of                    Component B:
                                                                                                                  Single Stage - One
Cherneta-Puranthanti-         IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                              0.00   Canceled            2018-05-08   2018-05-13   2018-06-12   2018-06-27   2018-07-11   2019-07-11
                                                                                                                  Envelope
Jogitari Road,Pyuthan (                     and rehabilitation
Length 2.45km )




 SNRTP-PYU-W-NCB-19-08-
UG-074-75 / Upgrading of                    Component B:
                                                                                                                  Single Stage - One
Chujathati- Argakhachi        IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                        224,146.95   Signed              2018-06-25   2018-06-30   2018-07-30   2018-08-14   2018-08-28   2019-07-09
                                                                                                                  Envelope
Road,Pyuthan ( Length                       and rehabilitation
2.45km )




 SNRTP-KAP-W-NCB-11-12-
PM-074-75 / Periodic
Maintenence of                              Component B:
                                                                                                                  Single Stage - One
Chakarchauda-Siswa-           IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                         90,580.12   Signed              2018-06-25   2018-06-30   2018-07-30   2018-08-14   2018-08-28   2019-07-09
                                                                                                                  Envelope
Autkoniya-Dohani Road                       and rehabilitation
(0+000 to 10+500, Length
10.5km)




                                                                                                                                                               Page 6
 SNRTP-UDA-W-NCB-30-16-
PM-074-75 / Periodic
                                                Component B:
Maintenance of Nepaltar-                                                                                              Single Stage - One
                                  IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                        113,802.79   Signed                 2018-06-25   2018-06-30   2018-07-30   2018-08-14   2018-08-28   2019-07-09
Udayapur-Gadhi- Road ,                                                                                                Envelope
                                                and rehabilitation
Udayapur (0+000 to
15+000, Length- 15 km)




 SNRTP-KAS-W-NCB-12-20-
PM-074-75 / Periodic
                                                Component B:
Maintenance of Lamachaur-                                                                                             Single Stage - One
                                  IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                         76,344.94   Signed                 2018-06-25   2018-06-30   2018-07-30   2018-08-14   2018-08-28   2019-07-09
Machhapuchhre Road, Kaski                                                                                             Envelope
                                                and rehabilitation
(8+5000 to 18+000, Length
9.5km)




 SNRTP-TER-W-NCB-33-02-
UG-074-75 / Upgrading of                        Component B:                                                                                            Pending
                                                                                                                      Single Stage - One
Myanglung-Okhre-Sukrabare-        IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                              0.00   Implementat            2018-06-25   2018-06-30   2018-07-30   2018-08-14   2018-08-28   2019-07-09
                                                                                                                      Envelope
Chaparichowk-Dagappa                            and rehabilitation                                                                                      ion
Road , Length 12 km




 SNRTP-PAR-W-NCB-18-09-
PM-074-75-2 / Periodic                          Component B:
                                                                                                                      Single Stage - One
Maintenance of Ramghadwa-         IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                         54,881.73   Signed                 2018-12-05   2018-12-09   2019-01-08   2019-01-23   2019-02-14   2019-07-14
                                                                                                                      Envelope
Jagarnathpur-Milanchowk                         and rehabilitation
Road     (9 Km)




 SNRTP-PAR-W-NCB-18-13-
PM-074-75-2 / Periodic
Maintenance of Mudli -Tulsi
barwa-Road (6 Km), Muldi
                                                Component B:
tindubiya-sabithawa road(6                                                                                            Single Stage - One
                                  IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                        245,760.63   Signed                 2018-12-05   2018-12-09   2019-01-08   2019-01-23   2019-02-14   2019-07-14
km), bedhihari birta                                                                                                  Envelope
                                                and rehabilitation
basantapur road (6 km)
padamsadak-bahuwari (6km)
and baghi patelchok road (9
km)




 SNRTP-PAR-W-NCB-18-08-
BRI-074-075-2 / Dharar                          Component B:                                                                                            Pending
                                                                                                                      Single Stage - One
Khola Bridge,CH 13+130            IDA / H8990   Maintenance, upgrading,   Post   Request for Bids   Open - National                              0.00   Implementat            2018-12-05   2018-12-10   2019-01-09   2019-01-24   2019-02-15   2019-07-15
                                                                                                                      Envelope
along Janata Road, 20 m ,                       and rehabilitation                                                                                      ion
Parsa




 SNRTP-GOR-W-NCB-35-04-
PM-074-75-2 / Periodic                          Component B:
                                                                                                                      Single Stage - One
Maintenance of Abuwa -            IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                         75,016.07   Signed                 2018-12-12   2018-12-16   2019-01-15   2019-01-30   2019-02-21   2019-07-15
                                                                                                                      Envelope
Birdi-Pauwatar-Kalamata-                        and rehabilitation
Airport Road (8 Km)




 SNRTP-BAN-W-NCB-2-09-
PM-074-75-2-2 / Periodic
Maintenance of Chaulika                         Component B:
                                                                                                                      Single Stage - One
Chowk (RRM)-                      IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                         51,311.77   Signed                 2018-12-12   2018-12-16   2019-01-15   2019-01-30   2019-02-13   2019-07-13
                                                                                                                      Envelope
Mahendranagar-Hirminiya-                        and rehabilitation
Holiya (Nayabasti Border)
Road (6 km)




 SNRTP-KAN-W-NCB-10-08-
PM-073-74-2 / Periodic                          Component B:
                                                                                                                      Single Stage - One
Maintenance of       Bansamiti-   IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                         78,313.32   Signed                 2018-12-12   2018-12-16   2019-01-15   2019-01-30   2019-02-21   2019-07-15
                                                                                                                      Envelope
Pipalladi-Jonpuri-Ranipur                       and rehabilitation
Road     ( 10 KM)




 SNRTP-NAW-W-NCB-15-14-
                                                Component B:
PM-074-75-2 / Periodic                                                                                                Single Stage - One
                                  IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                              0.00   Canceled               2018-12-12   2018-12-16   2019-01-15   2019-01-30   2019-02-21   2019-07-15
Maintenance of Manjariya-                                                                                             Envelope
                                                and rehabilitation
Jamuniya Road (9.00 km)




 SNRTP-RAU-W-NCB-21-14-
                                                Component B:
PM-074-75-2 / Periodic                                                                                                Single Stage - One
                                  IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                        188,456.93   Signed                 2018-12-12   2018-12-16   2019-01-15   2019-01-30   2019-02-21   2019-07-15
Maintenance of Prempur                                                                                                Envelope
                                                and rehabilitation
Gonahi MHW Road (22Km)




 SNRTP-RAU-W-NCB-21-16-
BRI-075-76 / Ajagaili Box                       Component B:                                                                                            Pending
                                                                                                                      Single Stage - One
Bridge along Gaur-Banjarha-       IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                              0.00   Implementat            2018-12-20   2018-12-25   2019-01-24   2019-02-08   2019-03-02   2019-07-15
                                                                                                                      Envelope
Auriya-Dumariya-Bishanpatti-                    and rehabilitation                                                                                      ion
Inerwari     Road




 SNRTP-RAS-W-NCB-20-06-
                                                Component B:
PM-074-75-2 / Periodic                                                                                                Single Stage - One
                                  IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                         36,200.53   Signed                 2018-12-16   2018-12-20   2019-01-19   2019-02-03   2019-02-25   2019-07-15
Maintenance of Sole-Bhimali-                                                                                          Envelope
                                                and rehabilitation
Hakubesi Road (5 Km)




 SNRTP-BHOJ-W-NCB-31-
10-PM-075-76 / Periodic
                                                Component B:
Maintenance of Kulung-                                                                                                Single Stage - One
                                  IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                        107,924.97   Signed                 2019-02-24   2019-02-28   2019-03-30   2019-04-14   2019-04-28   2019-10-25
Chaukidanda-Khattamma                                                                                                 Envelope
                                                and rehabilitation
Road, Bhojpur (0+000 to
7+500, Length 7.50 km)




 SNRTP-BHOJ-W-NCB-31-
11-PM-075-76 / Periodic
                                                Component B:
maintenance of Khairang                                                                                               Single Stage - One
                                  IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                        109,375.07   Signed                 2019-02-24   2019-02-28   2019-03-30   2019-04-14   2019-04-28   2019-10-25
Patalepani Hasanpur Road,                                                                                             Envelope
                                                and rehabilitation
Bhojpur (0+000 to 8+780,
Length 8.78 km)




 SNRTP-SANK-W-NCB-32-
09-PM-075-76 / Periodic
maintenance of Khandbari                        Component B:
                                                                                                                      Single Stage - One
Badrebi Wana Liglig               IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                        395,758.17   Signed                 2019-02-24   2019-03-01   2019-03-31   2019-04-15   2019-04-29   2019-10-26
                                                                                                                      Envelope
Chainpur     Road,                              and rehabilitation
Shankhuwasabha (0+000 to
28+000, Length 28.00 km)




 SNRTP-SANK-W-NCB-32-
10-PM-075-76 / Periodic
maintenance of Khadabari                        Component B:
                                                                                                                      Single Stage - One
Kalchebesi Pangtha Dake           IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                        196,535.53   Signed                 2019-02-24   2019-03-01   2019-03-31   2019-04-15   2019-04-29   2019-10-26
                                                                                                                      Envelope
Barhabise,                                      and rehabilitation
Shankhuwasabha(0+000 to
17+000, Length 17.00 km)




 SNRTP-MAH-W-NCB-13-08-
PM-075-76 / Periodic
                                                Component B:
Maintenance of Highway -                                                                                              Single Stage - One
                                  IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                              0.00   Canceled               2019-02-24   2019-03-01   2019-03-31   2019-04-15   2019-04-29   2019-10-26
Khairmara Road, Mahottari                                                                                             Envelope
                                                and rehabilitation
(0+000 to 4+622, Length
4.62 km)




                                                                                                                                                                      Page 7
 SNRTP-MAH-W-NCB-13-09-
PM-075-76 / Periodic
Maintenance of Bagada-                       Component B:
                                                                                                                   Single Stage - One
Anaharban-dharampur-           IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                         46,851.67   Signed                 2019-02-24   2019-03-01   2019-03-31   2019-04-15   2019-04-29   2019-10-26
                                                                                                                   Envelope
Singyahi Road, Mahottari                     and rehabilitation
(0+000 to 7+703, Length
7.71 km)




 SNRTP-SAR-W-NCB-25-13-
PM-075-76 / Periodic                         Component B:                                                                                            Under
                                                                                                                   Single Stage - One
Maintenance of Phuljhor        IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                              0.00   Implementat            2019-02-24   2019-03-01   2019-03-31   2019-04-15   2019-04-29   2019-10-26
                                                                                                                   Envelope
KalinjorRoad, Sarlahi                        and rehabilitation                                                                                      ion
(0+000 to 9+000, Length-
9.00 km)


 SNRTP-SAR-W-NCB-25-14-
PM-075-76 / Periodic
                                             Component B:                                                                                            Under
Maintenance of Sirsiya                                                                                             Single Stage - One
                               IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                              0.00   Implementat            2019-02-24   2019-03-01   2019-03-31   2019-04-15   2019-04-29   2019-10-26
Hempur Barahthaya Road,                                                                                            Envelope
                                             and rehabilitation                                                                                      ion
Sarlahi (0+000 to 6+360,
Length- 6.36 km)




 SNRTP-SAP-W-NCB-24-17-
PM-075-76 / Periodic
                                             Component B:                                                                                            Under
Maintenance of Mahuli                                                                                              Single Stage - One
                               IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                              0.00   Implementat            2019-02-24   2019-03-01   2019-03-31   2019-04-15   2019-04-29   2019-10-26
khola Bridge     of Bhardaha                                                                                       Envelope
                                             and rehabilitation                                                                                      ion
Danada Pakari Road,
Saptari ( Length- 13.5 m)




 SNRTP-ARG-W-NCB-1-18-
PM-075-76 / Periodic
                                             Component B:
maintenance of Gachchhe-                                                                                           Single Stage - One
                               IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                              0.00   Canceled               2019-02-24   2019-02-28   2019-03-30   2019-04-14   2019-04-28   2019-10-25
Dhikura-Dhanchaur-Tamatal                                                                                          Envelope
                                             and rehabilitation
road (length 19.50 km)
Arghakhanchi district




 SNRTP-ARG-W-NCB-1-19-
PM-075-76 / Periodic
                                             Component B:
maintenance of Ghumti-                                                                                             Single Stage - One
                               IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                              0.00   Canceled               2019-02-24   2019-02-28   2019-03-30   2019-04-14   2019-04-28   2019-10-25
Tingire-palpa road (length                                                                                         Envelope
                                             and rehabilitation
26.96 km), Arghakhanchi
district




 SNRTP-ARG-W-NCB-1-20-
PM-075-76 / Periodic
maintenance of Chutrabeshi-                  Component B:
                                                                                                                   Single Stage - One
Kura-Nuwakot-jinji-Asurkot-    IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                              0.00   Canceled               2019-02-24   2019-02-28   2019-03-30   2019-04-14   2019-04-28   2019-10-25
                                                                                                                   Envelope
Jogitari-Pyuthan                             and rehabilitation
road (length 24.39 km)
Arghakhanchi district




 SNRTP-ARG-W-NCB-1-21-
PM-075-71 / Periodic
maintenance of
Sandhikharka - Arga -                        Component B:
                                                                                                                   Single Stage - One
Maidan - Dharampani -          IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                         84,392.45   Signed                 2019-02-24   2019-02-28   2019-03-30   2019-04-14   2019-04-28   2019-10-25
                                                                                                                   Envelope
Hile    (Chutrabeshi-                        and rehabilitation
Dharampani-Maidan-
Raikhande )Road (length
9.80 km) Arghakhanchi
district


 SNRTP-ARG-W-NCB-1-22-
PM-075-71 / Periodic
maintenance of                               Component B:
                                                                                                                   Single Stage - One
Chyandanada-Dirvan-Khana-      IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                              0.00   Canceled               2019-02-24   2019-02-28   2019-03-30   2019-04-14   2019-04-28   2019-10-25
                                                                                                                   Envelope
Khandaha-Sabdanda-                           and rehabilitation
Dadakatari (length 23.52
km) Arghakhanchi district




 SNRTP-PYU-W-NCB-19-10-
PM-075-76 / Periodic                         Component B:
                                                                                                                   Single Stage - One
maintenance of Bijuwa-         IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                         70,196.05   Signed                 2019-02-24   2019-02-28   2019-03-30   2019-04-14   2019-04-28   2019-10-25
                                                                                                                   Envelope
Dungethani road (length                      and rehabilitation
6.90 km) Pythan district




 SNRTP-SAL-W-NCB-23-08-
PM-075-76 / Periodic                         Component B:                                                                                            Pending
                                                                                                                   Single Stage - One
maintenance of Luham-          IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                              0.00   Implementat            2019-02-24   2019-02-28   2019-03-30   2019-04-14   2019-04-28   2019-10-25
                                                                                                                   Envelope
Kavre-Rampur road (length                    and rehabilitation                                                                                      ion
14.77 km) Salyan district.




 SNRTP-PAL-W-NCB-17-08-
PM-075-76 / Periodic                         Component B:
                                                                                                                   Single Stage - One
Maintenance of Mumin           IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                         84,158.91   Signed                 2019-02-24   2019-02-28   2019-03-30   2019-04-14   2019-04-28   2019-10-25
                                                                                                                   Envelope
Devinagar Japla Road,                        and rehabilitation
Palpa      ( Length-10 km)




 SNRTP-KAS-W-NCB-12-09-
UG-075-76 /
                                             Component B:                                                                                            Pending
Upgrading/Rehabilitation of                                                                                        Single Stage - One
                               IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                              0.00   Implementat            2019-04-26   2019-05-03   2019-06-02   2019-06-17   2019-07-01   2019-11-30
Chhorepatan-Kirsti-                                                                                                Envelope
                                             and rehabilitation                                                                                      ion
Nirmalpokhari-Bhartpokhari
Road (Pkg II)




 SNRTP-BRD-W-NCB-4-09-
PM-074-75 -2 / Periodic
Maintenance of     PCO                       Component B:
                                                                                                                   Single Stage - One
Chouk (Kakoura)-Damouli-       IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                        102,528.73   Signed                 2019-04-23   2019-04-28   2019-05-28   2019-06-12   2019-06-26   2019-11-30
                                                                                                                   Envelope
Juraina-Pachasa Road,                        and rehabilitation
Bardiya (0+000 to 11+1000,
Length 11.1 km)




 SNRTP-NAW-W-NCB-15-14-
                                             Component B:
PM-074-75-2-2 / Periodic                                                                                           Single Stage - One
                               IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                         81,258.40   Signed                 2019-04-23   2019-04-27   2019-05-27   2019-06-11   2019-07-03   2019-11-30
Maintenance of Manjariya-                                                                                          Envelope
                                             and rehabilitation
Jamuniya Road (9.00 km)




 SNRTP-ARG-W-NCB-1-18-
PM-075-76-2 / Periodic
                                             Component B:                                                                                            Pending
maintenance of Gachchhe-                                                                                           Single Stage - One
                               IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                              0.00   Implementat            2019-07-09   2019-07-10   2019-08-09   2019-08-24   2019-09-07   2019-12-31
Dhikura-Dhanchaur-Tamatal                                                                                          Envelope
                                             and rehabilitation                                                                                      ion
road (length 19.50 km)
Arghakhanchi district




 SNRTP-ARG-W-NCB-1-19-
PM-075-76-2 / Periodic
                                             Component B:                                                                                            Pending
maintenance of Ghumti-                                                                                             Single Stage - One
                               IDA / 53360   Maintenance, upgrading,   Post   Request for Bids   Open - National                              0.00   Implementat            2019-07-09   2019-07-10   2019-08-09   2019-08-24   2019-09-07   2019-12-31
Tingire-palpa road (length                                                                                         Envelope
                                             and rehabilitation                                                                                      ion
26.96 km), Arghakhanchi
district




                                                                                                                                                                   Page 8
 SNRTP-ARG-W-NCB-1-20-
PM-075-76-2 / Periodic
maintenance of Chutrabeshi-                     Component B:                                                                                                                                 Pending
                                                                                                                                  Single Stage - One
Kura-Nuwakot-jinji-Asurkot-     IDA / 53360     Maintenance, upgrading,      Post            Request for Bids   Open - National                                                       0.00   Implementat                                                   2019-07-09            2019-07-10                                 2019-08-09            2019-08-24            2019-09-07            2019-12-31
                                                                                                                                  Envelope
Jogitari-Pyuthan road                           and rehabilitation                                                                                                                           ion
(length 24.39 km)
Arghakhanchi district




 SNRTP-ARG-W-NCB-1-22-
PM-075-71-2 / Periodic
maintenance of                                  Component B:                                                                                                                                 Pending
                                                                                                                                  Single Stage - One
Chyandanada-Dirvan-Khana-       IDA / 53360     Maintenance, upgrading,      Post            Request for Bids   Open - National                                                       0.00   Implementat                                                   2019-07-09            2019-07-10                                 2019-08-09            2019-08-24            2019-09-07            2019-12-31
                                                                                                                                  Envelope
Khandaha-Sabdanda-                              and rehabilitation                                                                                                                           ion
Dadakatari (length 23.52
km) Arghakhanchi district




 SNRTP-MAH-W-NCB-13-08-
PM-075-76-2 / Periodic
                                                Component B:                                                                                                                                 Under
Maintenance of Highway -                                                                                                          Single Stage - One
                                IDA / 53360     Maintenance, upgrading,      Post            Request for Bids   Open - National                                                       0.00   Implementat                                                   2019-07-12            2019-07-14                                 2019-08-13            2019-08-28            2019-09-11            2019-12-31
Khairmara Road, Mahottari                                                                                                         Envelope
                                                and rehabilitation                                                                                                                           ion
(0+000 to 4+622, Length
4.62 km)




 SNRTP-SAP-W-NCB-24-18-
PM-075-76 / Periodic
                                                Component B:
Maintenance of Rupnagar                                                                                                           Single Stage - One
                                IDA / 53360     Maintenance, upgrading,      Post            Request for Bids   Open - National                                                       0.00   Canceled                                                      2019-02-24            2019-03-01                                 2019-03-31            2019-04-15            2019-04-29            2019-10-26
Sarwanpur Goghanpur                                                                                                               Envelope
                                                and rehabilitation
Road, Saptari (0+000 to
9+760, Length-9.76km)




 SNRTP-MAH-W-NCB-13-07-
PM-075-76 / Periodic
Maintenance of
                                                Component B:
Ragunathpur - Sonama -                                                                                                            Single Stage - One
                                IDA / 53360     Maintenance, upgrading,      Post            Request for Bids   Open - National                                                       0.00   Canceled                                                      2019-02-24            2019-03-01                                 2019-03-31            2019-04-15            2019-04-29            2019-10-26
Sundarpur - Bharatpur -                                                                                                           Envelope
                                                and rehabilitation
Laksminiya(Highway),
Mahottari (0+000 to
18+980, Length 18.98 km)




 SNRTP-SANK-W-NCB-32-
08-PM-075-076 / Periodic
Maintenance of                                  Component B:
                                                                                                                                  Single Stage - One
Manebhanjyang-Sitalpati-        IDA / 53360     Maintenance, upgrading,      Post            Request for Bids   Open - National                                                       0.00   Canceled                                                      2019-02-24            2019-03-01                                 2019-03-31            2019-04-15            2019-04-29            2019-10-26
                                                                                                                                  Envelope
Heluwabeshi Road,                               and rehabilitation
Shankhuwasabha (0+000 to
14+000, Length 14.00 km)




 SNRTP-SIND-W-NCB-34-06-
PM-075-76 / Periodic
                                                Component B:
Maintenance of Sunkoshi                                                                                                           Single Stage - One
                                IDA / 53360     Maintenance, upgrading,      Post            Request for Bids   Open - National                                                       0.00   Canceled                                                      2019-02-24            2019-02-28                                 2019-03-30            2019-04-14            2019-04-28            2019-10-25
Dhuskun Piskar Road,                                                                                                              Envelope
                                                and rehabilitation
Sindhupalchwok      (0+000 to
14+750, Length-14.75 km)




 SNRTP-SIND-W-NCB-34-05-
PM-075-76 / Periodic
                                                Component B:
Maintenance of Okhreni                                                                                                            Single Stage - One
                                IDA / 53360     Maintenance, upgrading,      Post            Request for Bids   Open - National                                                       0.00   Canceled                                                      2019-02-24            2019-02-28                                 2019-03-30            2019-04-14            2019-04-28            2019-10-25
Selang Golchhe Road,                                                                                                              Envelope
                                                and rehabilitation
Sindhupalchwok      (0+000 to
10+000, Length-10 km)




 SNRTP-RAS-W-NCB-20-08-
PM-074-75-2 / Periodic                          Component B:
                                                                                                                                  Single Stage - One
Maintenance of Dasmure          IDA / 53360     Maintenance, upgrading,      Post            Request for Bids   Open - National                                                       0.00   Canceled                                                      2018-12-16            2018-12-20                                 2019-01-19            2019-02-03            2019-02-25            2019-07-15
                                                                                                                                  Envelope
Seti-Devi Ma Vi. Dhuseni                        and rehabilitation
Road (5 Km)




 SNRTP-SAP-W-NCB-24-14-
PM-074-75 / Periodic                            Component B:
                                                                                                                                  Single Stage - One
Maintenance of kalyanpur-       IDA / H8990     Maintenance, upgrading,      Post            Request for Bids   Open - National                                                       0.00   Canceled                                                      2017-11-27            2017-12-02                                 2018-01-01            2018-01-31            2018-02-21            2019-02-21
                                                                                                                                  Envelope
Phulbariya-Banaula Banauli                      and rehabilitation
Kushaha Road, Saptari




GOODS
                                                                                                                                                                                                                                                                                                                                                     Bid Evaluation
Activity Reference No.                                                                                                                                                                                         Draft Pre-                                      Draft Bidding
                                Loan / Credit                                                                        Market         Procurement        Prequalification      Actual            Process                                  Prequalification                         Specific Procurement   Bidding Documents   Proposal Submission        Report and
         / Description                                 Component               Review Type       Method                                                                                                       qualification                                     Document /                                                                                                Signed Contract     Contract Completion
                                     No.                                                                            Approach           Process              (Y/N)         Amount (US$)         Status                                  Evaluation Report                          Notice / Invitation       as Issued       / Opening / Minutes   Recommendation for
                                                                                                                                                                                                              Documents                                        Justification
                                                                                                                                                                                                                                                                                                                                                          Award
                                                                                                                                                                                                           Planned     Actual          Planned    Actual   Planned      Actual   Planned      Actual    Planned    Actual   Planned      Actual   Planned      Actual   Planned      Actual   Planned      Actual


 SNRTP-CPCU-G-DP-17-074-
                                                Component A: Institutional
75 / Purchase of Laptop,
                                IDA / H8990     Strengthening, T.A., and     Post            Direct Selection   Direct                                                         3,760.65      Completed                                                     2018-01-15            2018-01-30                                                                             2018-02-02            2018-03-04
Tablet and Desktop set
                                                Monitoring
(one nos Each)




 SNRTP-CPCU-G-DP-18-074-                        Component A: Institutional
75 / Purchase of Smart TV       IDA / H8990     Strengthening, T.A., and     Post            Direct Selection   Direct                                                         1,678.17      Completed                                                     2018-01-15            2018-01-20                                                                             2018-01-23            2018-02-22
for meeting HAll                                Monitoring




                                                Component A: Institutional
 SNRTP-CPCU-U-DP-16-074-
                                IDA / H8990     Strengthening, T.A., and     Post            Direct Selection   Direct                                                         4,362.08      Completed                                                     2018-01-15            2018-01-20                                                                             2018-02-10            2018-04-11
75 / Purchase of AC 4 Nos
                                                Monitoring




 SNRTP-CPCU-G-RFQ-19-
075-76 / Purchase of                            Component A: Institutional
                                                                                             Request for                          Single Stage - One
Desktop Computer : 2 set;       IDA / H8990     Strengthening, T.A., and     Post                               Limited                                                        3,096.73      Completed                                                                           2019-06-25                                                                             2019-08-20            2019-12-31
                                                                                             Quotations                           Envelope
Laser Printer: 2 set and                        Monitoring
Photocopy machine 1 set




 SNRTP-CPCU-G-RFQ-20-                           Component A: Institutional
                                                                                             Request for                          Single Stage - One
075-76 / Purchase of            IDA / H8990     Strengthening, T.A., and     Post                               Limited                                                        3,590.65      Completed                                                                           2019-06-25                                                                             2019-08-20            2019-12-31
                                                                                             Quotations                           Envelope
Laptop : 3 sets                                 Monitoring




 SNRTP-CPCU-G-RFQ-21-                           Component A: Institutional
                                                                                             Request for                          Single Stage - One
075-76 / Purchase of Sofa       IDA / H8990     Strengthening, T.A., and     Post                               Limited                                                        2,114.90      Completed                                                                           2019-06-25                                                                             2019-08-13            2019-12-31
                                                                                             Quotations                           Envelope
set, Carpet and Revolving                       Monitoring
chair.


 SNRTP-CPCU-G-RFQ-22-
                                                Component A: Institutional
075-76 / Purchase of Digital                                                                 Request for                          Single Stage - One
                                IDA / H8990     Strengthening, T.A., and     Post                               Limited                                                          624.83      Completed                                                                           2019-06-25                                                                             2019-08-20            2019-12-31
Camera : 2 nos. and                                                                          Quotations                           Envelope
                                                Monitoring
Scanner: 2 nos.




 SNRTP-CPCU-G-RFQ-22-                           Component A: Institutional                                                                                                                   Pending
                                                                                             Request for                          Single Stage - One
076-77 / Purchase of one        IDA / H8990     Strengthening, T.A., and     Post                               Limited                                                               0.00   Implementat                                                                         2019-10-29                                                                             2019-11-18            2019-11-25
                                                                                             Quotations                           Envelope
laptop and one ipad for                         Monitoring                                                                                                                                   ion
CPCU.




                                                                                                                                                                                                                              Page 9
NON CONSULTING SERVICES
                                                                                                                                                                                                                                                                                                                                                                            Bid Evaluation
Activity Reference No.                                                                                                                                                                                            Draft Pre-                                           Draft Bidding
                               Loan / Credit                                                                         Market         Procurement        Prequalification        Actual             Process                                   Prequalification                                  Specific Procurement      Bidding Documents      Proposal Submission            Report and
        / Description                                 Component               Review Type       Method                                                                                                           qualification                                          Document /                                                                                                                   Signed Contract         Contract Completion
                                    No.                                                                             Approach           Process              (Y/N)          Amount (US$)           Status                                   Evaluation Report                                   Notice / Invitation          as Issued          / Opening / Minutes       Recommendation for
                                                                                                                                                                                                                 Documents                                              Justification
                                                                                                                                                                                                                                                                                                                                                                                 Award
                                                                                                                                                                                                              Planned     Actual           Planned    Actual      Planned        Actual        Planned      Actual      Planned    Actual      Planned       Actual      Planned       Actual      Planned       Actual      Planned      Actual


 SNRTP-CPCU-S-SSS-45-072-
073 / NOL to Minutes of
Negotiations and Draft
                                               Component A: Institutional
Negotiated Contract with
                               IDA / H8990     Strengthening, T.A., and     Prior           Direct Selection    Direct                                                         2,572,163.00     Signed
ILO for three(03) new
                                               Monitoring
districts( Lamjung, Gorkha
and Sindhupalchowk),
Single Source Selection




 SNRTP-CPCU-S-SSS-25-070-
071 / Contract variation -
Consultancy Services for                       Component A: Institutional
Providing Technical Support    IDA / H8990     Strengthening, T.A., and     Prior           Direct Selection    Direct                                                         7,400,265.00     Canceled
to Routine Maintenance                         Monitoring
System of Rural Roads and
Bridges




 SNRTP-CPCU-S-DS-60-074-                       Component A: Institutional
75 / Financial Management      IDA / H8990     Strengthening, T.A., and     Post            Direct Selection    Direct                                                               8,918.78   Signed                                                            2017-11-26                  2017-12-01                                                                                           2017-12-12                2019-12-12
Assistant for 2 years:                         Monitoring




 SNRTP-CPCU-NC-DP-13-
074-75 / Safeguard Training
                                               Component A: Institutional
for Safeguard
                               IDA / H8990     Strengthening, T.A., and     Post            Direct Selection    Direct                                                              15,334.40   Completed                                                         2018-01-15                  2018-02-14                                                                                           2018-03-17                2018-04-16
team(Logistic,Meal and
                                               Monitoring
Residency), one training to
be organized in at each
PMU cluster.


 SNRTP-CPCU-NC-RFQ-12-                         Component A: Institutional
                                                                                            Request for                           Single Stage - One
074-75 / Bio- engineering      IDA / 53360     Strengthening, T.A., and     Post                                Limited                                                             20,938.54   Completed                                                                                     2018-05-14                                                                                           2018-06-19                2018-08-18
                                                                                            Quotations                            Envelope
Training to District Team                      Monitoring




 SNRTP-CPCU-NC-DP-12-                          Component A: Institutional
074-75 / Soil/bio              IDA / H8990     Strengthening, T.A., and     Post            Direct Selection    Direct                                                                   0.00   Canceled                                                          2018-01-15                  2018-02-14                                                                                           2018-04-01                2018-05-31
Engineering Training to                        Monitoring
District Team



 SNRTP-CPCU-NCS-RFB-70-                        Component A: Institutional
                                                                                                                                  Single Stage - One
07 / VCDP and GAP              IDA / H8990     Strengthening, T.A., and     Post            Request for Bids    Open - National                                                          0.00   Canceled                                                          2018-05-11                  2018-05-18                                       2018-06-17                2018-07-02                2018-07-16                2019-03-18
                                                                                                                                  Envelope
training for Eastern Cluster                   Monitoring




 SNRTP-CPCU-NCS-IFB-71-
                                               Component A: Institutional
074-75 / VCDP and GAP                                                                                                             Single Stage - One
                               IDA / 53360     Strengthening, T.A., and     Post            Request for Bids    Open - National                                                          0.00   Canceled                                                          2018-05-11                  2018-05-18                                       2018-06-17                2018-07-02                2018-07-16                2019-03-18
Training for western                                                                                                              Envelope
                                               Monitoring
Cluster




 SNRTP-CPCU-NCS-RFB-70-                        Component A: Institutional
                                                                                                                                  Single Stage - One
07-2 / VCDP and GAP            IDA / H8990     Strengthening, T.A., and     Post            Request for Bids    Open - National                                                    147,623.96   Signed                                                            2018-10-12                  2018-10-19                                       2018-11-18                2018-12-03                2018-12-17                2019-07-15
                                                                                                                                  Envelope
training for Eastern Cluster                   Monitoring




 SNRTP-CPCU-NCS-IFB-71-
                                               Component A: Institutional
074-75-2 / VCDP and GAP                                                                                                           Single Stage - One
                               IDA / 53360     Strengthening, T.A., and     Post            Request for Bids    Open - National                                                    167,982.12   Signed                                                            2018-10-12                  2018-10-19                                       2018-11-18                2018-12-03                2018-12-17                2019-07-15
Training for western                                                                                                              Envelope
                                               Monitoring
Cluster




 SNRTP-CPCU-S-DS-61-
FMA-076-77 / Hiring of                         Component A: Institutional                                                                                                                       Pending
Financial Management           IDA / H8990     Strengthening, T.A., and     Post            Direct Selection    Direct                                                                   0.00   Implementat                                                       2019-10-20                  2019-10-27                                                                                           2019-11-07                2020-01-06
Assistant (FMA) for CPCU                       Monitoring                                                                                                                                       ion
by Direct Selection Method.




CONSULTING FIRMS
Activity Reference No.                                                                                                                                                                                                                               Short List and Draft                                                                                   Combined Evaluation
                               Loan / Credit                                                                         Market        Contract Type       Actual Amount           Process                                       Expression of                                              Request for        Opening of Technical         Evaluation of
        / Description                                 Component               Review Type        Method                                                                                          Terms of Reference                                       Request for                                                                                        Report and Draft            Signed Contract        Contract Completion
                                    No.                                                                             Approach                                (US$)              Status                                       Interest Notice                                     Proposals as Issued        Proposals / Minutes     Technical Proposal
                                                                                                                                                                                                                                                           Proposals                                                                                        Negotiated Contract
                                                                                                                                                                                                 Planned      Actual     Planned           Actual     Planned      Actual       Planned         Actual     Planned      Actual    Planned       Actual      Planned       Actual      Planned       Actual      Planned       Actual


 SNRTP-CPCU-CS-CQS-36-
074-75 / Procurement of                        Component A: Institutional                   Consultant
Consulting Firm for Market     IDA / H8990     Strengthening, T.A., and     Post            Qualification       Open - National                                     0.00   Canceled              2018-06-28              2018-07-13                  2018-08-27                                                                                             2018-09-11                2018-10-03                2019-04-01
infrastructure investment                      Monitoring                                   Selection
study




 SNRTP-CPCU-CS-QCBS-47-
                                               Component A: Institutional
074-75 / Procurement of                                                                     Quality And Cost-
                               IDA / H8990     Strengthening, T.A., and     Prior                               Open - National                                     0.00   Canceled              2017-12-03              2017-12-18                  2018-02-01                                            2018-03-03             2018-03-18                2018-04-16                2018-05-08                2019-11-09
NGO for Beneficiary                                                                         Based Selection
                                               Monitoring
Monitoring for PMU West




 SNRTP-CPCU-CS-QCBS-46-
                                               Component A: Institutional
074-75 / Procurement of                                                                     Quality And Cost-
                               IDA / H8990     Strengthening, T.A., and     Prior                               Open - National                                     0.00   Canceled              2017-12-03              2017-12-18                  2018-02-01                                            2018-03-03             2018-03-18                2018-04-17                2018-05-09                2019-11-10
NGO for Beneficiary                                                                         Based Selection
                                               Monitoring
Monitoring for PMU East




 SNRTP-CPCU-CS-QCBS-48-
                                               Component A: Institutional
074-75 / Procurement of                                                                     Quality And Cost-
                               IDA / H8990     Strengthening, T.A., and     Post                                Open - National                                     0.00   Canceled              2018-08-24              2018-08-27                  2018-09-20                                            2018-10-21             2018-11-04                2018-11-14                2018-12-06                2019-07-14
NGO for Beneficiary                                                                         Based Selection
                                               Monitoring
Monitoring for PMU West




 SNRTP-CPCU-CS-QCBS-49-
                                               Component A: Institutional
074-75 / Procurement of                                                                     Quality And Cost-
                               IDA / H8990     Strengthening, T.A., and     Post                                Open - National                                     0.00   Canceled              2018-08-24              2018-08-27                  2018-09-20                                            2018-10-21             2018-11-04                2018-11-14                2018-12-06                2019-07-14
NGO for Beneficiary                                                                         Based Selection
                                               Monitoring
Monitoring for PMU East




 SNRTP-CPCU-CS-CQS-35-
                                               Component A: Institutional                   Consultant
074-75 / Procurement of
                               IDA / H8990     Strengthening, T.A., and     Post            Qualification       Open - National                                     0.00   Canceled              2017-11-30              2017-12-15                  2018-01-29                                                                                             2018-02-13                2018-03-07                2018-09-03
Consulting Firm for
                                               Monitoring                                   Selection
Baseline Study




 SNRTP-CPCU-CS-QCBS-50-
                                               Component A: Institutional
075/76 / Pocurement of                                                                      Quality And Cost-                                                              Under
                               IDA / 53360     Strengthening, T.A., and     Post                                Open - National                                     0.00                         2018-09-17              2018-09-21                  2018-10-15                                            2018-11-15             2018-11-29                2018-12-11                2019-01-02                2019-07-16
Consulting firm for Impact                                                                  Based Selection                                                                Implementation
                                               Monitoring
Study




 SNRTP-CPCU-CS-CQS-37-
075-76 / Hiring of                             Component A: Institutional                   Consultant
                                                                                                                                                                           Under
Consulting Firm for            IDA / H8990     Strengthening, T.A., and     Post            Qualification       Open - National                                     0.00                         2019-07-14              2019-07-28                  2019-08-03                                                                                             2019-08-31                2019-09-17                2020-01-15
                                                                                                                                                                           Implementation
Beneficiary Engagement                         Monitoring                                   Selection
Study




                                                                                                                                                                                                                                 Page 10
INDIVIDUAL CONSULTANTS
 Activity Reference No.                                                                                                                                                                                      Invitation to
                               Loan / Credit                                                                          Market                   Actual Amount          Process                                                      Draft Negotiated
         / Description                                Component               Review Type       Method                         Contract Type                                       Teams of Reference     Identified/Selected                            Signed Contract     Contract Completion
                                    No.                                                                            Approach                        (US$)              Status                                                           Contract
                                                                                                                                                                                                              Consultant
                                                                                                                                                                                   Planned      Actual   Planned        Actual   Planned      Actual   Planned      Actual   Planned      Actual


 SNRTP-CPCU-S-IC-25-070-
71 / Consulting Services for
                                               Component A: Institutional
Providing Technical Support
                               IDA / 53360     Strengthening, T.A., and     Prior           Direct Selection   Direct                             7,400,265.00    Signed
to Routine Maintenance
                                               Monitoring
System of Rural Roads and
Bridges




 SNRTP-CPCU-S-SSS-28 /                         Component A: Institutional                   Individual
Hiriing of Procurement         IDA / 53360     Strengthening, T.A., and     Prior           Consultant         Open                                 16,312.70     Signed
Management Expert                              Monitoring                                   Selection




 SNRTP-CPCU-CS-IND-73-
074-75 / Procurement of                        Component A: Institutional                   Individual
Environmental Safeguard        IDA / H8990     Strengthening, T.A., and     Post            Consultant         Open                                   4,118.47    Signed           2017-12-03            2018-01-21              2018-02-05            2018-02-27            2018-04-28
Expert for Environmental                       Monitoring                                   Selection
Safeguard Audit




 SNRTP-CPCU-CS-IND-74-
                                               Component A: Institutional                   Individual
074-75 / Procurement of
                               IDA / H8990     Strengthening, T.A., and     Post            Consultant         Open                                   6,533.81    Completed        2017-12-03            2018-01-21              2018-02-05            2018-02-27            2018-04-28
Socail Safeguard Expert for
                                               Monitoring                                   Selection
Social Safeguard Audit




 SNRTP-CPCU-S-SSS-75-074-                      Component A: Institutional
75 / Social Development        IDA / H8990     Strengthening, T.A., and     Post            Direct Selection   Direct                               12,433.72     Completed        2017-12-20            2017-12-30                                    2018-01-20            2018-07-19
Expert for 6 months                            Monitoring




 SNRTP-CPCU-S-SSS-74-074-
                                               Component A: Institutional
75 / Environment
                               IDA / H8990     Strengthening, T.A., and     Post            Direct Selection   Direct                               12,433.72     Completed        2017-12-20            2017-12-30                                    2018-01-20            2018-07-19
Management Expert for 6
                                               Monitoring
months




 SNRTP-CPCU-S-IC-61-074-
                                               Component A: Institutional                   Individual
75 / Procurement
                               IDA / H8990     Strengthening, T.A., and     Prior           Consultant         Open                                 15,840.78     Signed           2017-11-20            2018-01-03              2018-01-24            2018-02-15            2019-08-09
Management Expert For
                                               Monitoring                                   Selection
intermittent input of 6
Month.


 SNRTP-CPCU-S-IC-67-074-
75 / Hiring of Inspector of                    Component A: Institutional                   Individual
Works for     Project          IDA / H8990     Strengthening, T.A., and     Post            Consultant         Open                                        0.00   Canceled         2017-11-26            2018-01-15              2018-01-20            2018-01-30            2019-08-03
Districts for 2 years (40                      Monitoring                                   Selection
Nos)




 SNRTP-CPCU-CS-IND-77/1-
8-074-75 / Procurement of 8
                                               Component A: Institutional                   Individual
(Eight) Project Support
                               IDA / 53360     Strengthening, T.A., and     Post            Consultant         Open                                 70,804.52     Signed           2018-04-24            2018-05-28              2018-06-04            2018-06-18            2019-07-15
Engineers for 14 months
                                               Monitoring                                   Selection
input 1 each at individual
district.




 SNRTP-CPCU-IND-75/1-5-
074-75 / Procurement of                        Component A: Institutional                   Individual
Social Safeguard Consultant    IDA / 53360     Strengthening, T.A., and     Post            Consultant         Open                                 33,543.22     Signed           2018-04-24            2018-05-28              2018-06-04            2018-06-18            2019-07-15
SSC 5 numbers for 14                           Monitoring                                   Selection
months 1-1 each at districts




 SNRTP-CPCU-CS-IND-76/1-
2-074-75 / Procurement of 2
                                               Component A: Institutional                   Individual
(Two) Environment
                               IDA / 53360     Strengthening, T.A., and     Post            Consultant         Open                                   7,418.21    Signed           2018-04-24            2018-05-28              2018-06-04            2018-06-18            2019-07-15
safeguard Consultant for 14
                                               Monitoring                                   Selection
months input 1-1 each at
individual district.




 SNRTP-CPCU-CS-IND-78-
074-75 / Procurement of 1                      Component A: Institutional                   Individual
(one) Bridge Design            IDA / 53360     Strengthening, T.A., and     Post            Consultant         Open                                 18,389.23     Signed           2018-04-24            2018-05-28              2018-06-04            2018-06-18            2019-07-15
Consultant at CPCU for 14                      Monitoring                                   Selection
months.




 SNRTP-PMU-CS-IND-79-
                                               Component A: Institutional                   Individual
074-75 / Procurement of
                               IDA / 53360     Strengthening, T.A., and     Post            Consultant         Open                                 18,160.98     Signed           2018-04-24            2018-05-28              2018-06-04            2018-06-18            2019-07-15
Quality Monitoring
                                               Monitoring                                   Selection
Specialist for 14 months at
PMU


 SNRTP-CPCU-CS-IND-80-
                                               Component A: Institutional                   Individual
074-75 / Procurement of
                               IDA / 53360     Strengthening, T.A., and     Post            Consultant         Open                                 24,174.94     Signed           2018-04-24            2018-05-28              2018-06-04            2018-06-18            2019-07-15
Quality Management Expert
                                               Monitoring                                   Selection
at CPCU for 14 months




 SNRTP-CPCU-S-IC-65-074-
                                               Component A: Institutional                   Individual
75 / Social Safeguard
                               IDA / H8990     Strengthening, T.A., and     Post            Consultant         Open                                        0.00   Canceled         2018-04-26            2018-05-28              2018-06-04            2018-06-18            2019-07-15
Expert for 14 months
                                               Monitoring                                   Selection
regular     input at CPCU




 SNRTP-CPCU-S-IC-64-074-
                                               Component A: Institutional                   Individual
75 / Environmental
                               IDA / H8990     Strengthening, T.A., and     Post            Consultant         Open                                 23,594.39     Signed           2018-04-26            2018-05-28              2018-06-04            2018-06-18            2019-07-15
Safeguard     Expert for 14
                                               Monitoring                                   Selection
months regular input at
CPCU


 SNRTP-CPCU-S-SSS-61-074-
75 / Hiring Softwel Pvt.
                                               Component A: Institutional
Ltd., New Baneshwor for                                                                                                                                           Under
                               IDA / 53360     Strengthening, T.A., and     Post            Direct Selection   Direct                                      0.00                    2018-05-16            2018-05-26                                    2018-07-01            2019-07-01
upgraing and system                                                                                                                                               Implementation
                                               Monitoring
support services for
RuTIMS software.




 SNRTP-CPCU-CS-SSS-81-
075/76 / Hiring      Mr.
                                               Component A: Institutional                   Individual
Jamuna Bahadur Shrestha
                               IDA / 53360     Strengthening, T.A., and     Post            Consultant         Direct                               12,921.09     Signed           2018-10-22            2018-11-01              2018-11-22            2018-12-27            2019-06-25
as     Procurement
                                               Monitoring                                   Selection
Management Expert for
Six months regular input.




 SNRTP-CPCU-CS-IND-81-                         Component A: Institutional                   Individual
075/76 / Procurement of        IDA / 53360     Strengthening, T.A., and     Post            Consultant         Limited                              17,739.21     Signed           2018-09-25            2018-09-30              2018-10-14            2018-11-05            2019-07-16
Social Development Expert                      Monitoring                                   Selection




 SNRTP-CPCU-S-SSS-77-075-
                                               Component A: Institutional
76 / Hiring Environment
                               IDA / H8990     Strengthening, T.A., and     Post            Direct Selection   Direct                               16,481.04     Signed           2018-12-16            2018-12-26                                    2019-01-16            2019-07-15
Specialist for PMU, East
                                               Monitoring
for 6 months




                                                                                                                                                                                                              Page 11
 SNRTP-CPCU-CS-SSS-78-
                                                Component A: Institutional
075-76 / Hiring of Social
                                  IDA / H8990   Strengthening, T.A., and     Post    Direct Selection   Direct       0.00   Canceled   2018-12-16   2018-12-26                  2019-01-16   2019-07-15
Development Expert for
                                                Monitoring
PMU West for 6 months




 SNRTP-CPCU-CS-SSS-78-
                                                Component A: Institutional
075-76 -2 / Hiring of Social
                                  IDA / H8990   Strengthening, T.A., and     Post    Direct Selection   Direct   9,119.51   Signed     2018-12-25   2018-12-31                  2019-01-16   2019-07-15
Development Specialist       at
                                                Monitoring
PMU for Six months.




 SNRTP-CPCU-S-IC-66-074-
75 / Procurement and                            Component A: Institutional           Individual
Contract Management               IDA / H8990   Strengthening, T.A., and     Prior   Consultant         Open         0.00   Canceled   2018-02-01   2018-02-26     2018-03-03   2018-03-13   2019-03-08
Specialist for 1.5   years at                   Monitoring                           Selection
cluster   PMU 2:




 SNRTP-CPCU-S-IC-63-074-
                                                Component A: Institutional           Individual
75 / Environmental
                                  IDA / H8990   Strengthening, T.A., and     Post    Consultant         Open         0.00   Canceled   2017-11-26   2018-01-15     2018-01-20   2018-02-10   2019-08-14
Safeguard   Specialist for
                                                Monitoring                           Selection
1.5 years regular input at
CPCU


 SNRTP-CPCU-S-SSS-76-074-
                                                Component A: Institutional
75 / Procurement of an
                                  IDA / H8990   Strengthening, T.A., and     Prior   Direct Selection   Direct       0.00   Canceled   2017-12-20   2017-12-30                  2018-02-20   2019-07-05
Independent Procurement
                                                Monitoring
Specialist (IPS)




 SNRTP-CPCU-CS-SSS-82-1-
SSC-075-76 / Hiring of                          Component A: Institutional
Mr.Bipul Pokharel as Social       IDA / H8990   Strengthening, T.A., and     Post    Direct Selection   Direct   5,858.75   Signed     2019-02-24   2019-02-27                  2019-03-14   2019-09-10
Safeguard Consultant      for 6                 Monitoring
months.




 SNRTP-CPCU-CS-SSS-82-2-
SSC-075-76 / Hiring of Ms.                      Component A: Institutional
Sirjana Rijal as Social           IDA / H8990   Strengthening, T.A., and     Post    Direct Selection   Direct   5,858.75   Signed     2019-02-24   2019-03-02                  2019-03-23   2019-09-19
Safeguard Consultant for 6                      Monitoring
months.




 SNRTP-CPCU-CS-SSS-82-3-
SSC-075-76 / Hiring of Mr.                      Component A: Institutional
Diganta Adhikari as Social        IDA / H8990   Strengthening, T.A., and     Post    Direct Selection   Direct   5,858.75   Signed     2019-02-24   2019-02-27                  2019-03-14   2019-09-10
Safeguard Consultant for 6                      Monitoring
months.




 SNRTP-CPCU-CS-SSS-82-4-
SSC-075-76 / Hiring of Mr.                      Component A: Institutional
Santosh Bhandari as Social        IDA / H8990   Strengthening, T.A., and     Post    Direct Selection   Direct   5,858.75   Signed     2019-02-24   2019-03-02                  2019-03-23   2019-09-19
Safeguard Consultant for 6                      Monitoring
months.




 SNRTP-CPCU-CS-SSS-82-5-
SSC-075-76 / Hiring of Mr.                      Component A: Institutional
Gopal Basel as Social             IDA / H8990   Strengthening, T.A., and     Post    Direct Selection   Direct   5,858.75   Signed     2019-02-24   2019-02-27                  2019-03-14   2019-09-10
Safeguard Consultant for 6                      Monitoring
months.




 SNRTP-CPCU-CS-SSS-82-6-
SSC-075-76 / Hiring of Ms.                      Component A: Institutional
Laxmi Pokhrel as Social           IDA / H8990   Strengthening, T.A., and     Post    Direct Selection   Direct   5,858.75   Signed     2019-02-24   2019-02-27                  2019-03-14   2019-09-10
Safeguard Consultant for 6                      Monitoring
months.




 SNRTP-CPCU-CS-SSS-82-7-
SSC-075-76 / Hiring of Mr.                      Component A: Institutional
Krishna Prasad Adhikari as        IDA / H8990   Strengthening, T.A., and     Post    Direct Selection   Direct   5,858.75   Signed     2019-02-24   2019-02-27                  2019-03-14   2019-09-10
Social Safeguard Consultant                     Monitoring
for 6 months.




 SNRTP-CPCU-CS-SSS-82-8-
SSC-075-76 / Hiring of Mr.                      Component A: Institutional
Dinesh Khanal as Social           IDA / H8990   Strengthening, T.A., and     Post    Direct Selection   Direct   5,858.75   Signed     2019-02-24   2019-02-28                  2019-03-16   2019-09-12
Safeguard Consultant for 6                      Monitoring
months




 SNRTP-CPCU-CS-SSS-82-9-
SSC-075-76 / Hiring of Mr.                      Component A: Institutional
Yam Lal Khatri as Social          IDA / H8990   Strengthening, T.A., and     Post    Direct Selection   Direct   5,858.75   Signed     2019-02-24   2019-03-02                  2019-03-23   2019-09-19
Safeguard Consultant for 6                      Monitoring
months




 SNRTP-CPCU-CS-SSS-82-
10-SSC-075-76 / Hiring of                       Component A: Institutional
Mr. Subarna Chand as              IDA / H8990   Strengthening, T.A., and     Post    Direct Selection   Direct   5,858.75   Signed     2019-02-24   2019-03-02                  2019-03-23   2019-09-19
Social Safeguard Consultant                     Monitoring
for 6 months




 SNRTP-CPCU-CS-SSS-82-
11-SSC-075-76 / Hiring of                       Component A: Institutional
Mr. Hark Singh Dhami as           IDA / H8990   Strengthening, T.A., and     Post    Direct Selection   Direct   5,835.86   Signed     2019-02-24   2019-02-27                  2019-03-14   2019-09-10
Social Safeguard Consultant                     Monitoring
for 6 months




 SNRTP-CPCU-CS-SSS-83-
075-76 / Hiring of Aviyaan                      Component A: Institutional
Consulting (p) Ltd. for GIS       IDA / H8990   Strengthening, T.A., and     Post    Direct Selection   Direct       0.00   Canceled   2019-04-22   2019-04-25                  2019-05-16   2019-09-13
based Road Accessibility                        Monitoring
study of SNRTP project .




 SNRTP-CPCU-CS-SSS-84-
075-76 / Hiring of Aviyaan                      Component A: Institutional
Consulting (p) Ltd. for           IDA / H8990   Strengthening, T.A., and     Post    Direct Selection   Direct       0.00   Canceled   2019-04-22   2019-04-25                  2019-05-16   2019-09-13
Road Condition Survey of                        Monitoring
SNRTP Roads




 SNRTP-CPCU-CS-SSS-85-1-
PSE-075-76 / Hiring of Mr.                      Component A: Institutional           Individual
Sulav Nepal as Project            IDA / H8990   Strengthening, T.A., and     Post    Consultant         Direct   5,844.06   Signed     2019-04-22   2019-04-25     2019-05-02   2019-05-16   2019-11-17
Support Engineer-1 for 6                        Monitoring                           Selection
months.




 SNRTP-CPCU-CS-SSS-85-2-
PSE-075-76 / Hiring of                          Component A: Institutional           Individual
Dinesh Prasad Mandal as           IDA / H8990   Strengthening, T.A., and     Post    Consultant         Direct   5,486.26   Signed     2019-04-22   2019-04-25     2019-05-02   2019-05-16   2019-11-17
Project Support Engineer                        Monitoring                           Selection
for 6 months




                                                                                                                                                         Page 12
 SNRTP-CPCU-CS-SSS-86-
PMQME-075-76 / Hiring of
                                            Component A: Institutional          Individual
Mr. Sujit Dhital as Project
                              IDA / H8990   Strengthening, T.A., and     Post   Consultant         Direct    14,267.01   Signed           2019-04-22   2019-04-25     2019-05-02   2019-05-16   2019-11-17
Management and Quality
                                            Monitoring                          Selection
Monitoring Expert for 6
months




 SNRTP-CPCU-CS-SSS-85-3-
PSE-075-76 / Hiring of Mr.                  Component A: Institutional          Individual
Prabin Basnet as Project      IDA / H8990   Strengthening, T.A., and     Post   Consultant         Direct     5,476.63   Signed           2019-04-22   2019-04-25     2019-05-02   2019-05-16   2019-11-17
Support Engineer (PSE I)                    Monitoring                          Selection
for 6 months




 SNRTP-CPCU-CS-SSS-87-
075-76 / Hiring of Aviyaan
                                            Component A: Institutional
Consulting (p) Ltd. for GIS
                              IDA / H8990   Strengthening, T.A., and     Post   Direct Selection   Direct         0.00   Under Review     2019-05-06   2019-05-09                  2019-05-30   2020-01-15
based Road Accessibility
                                            Monitoring
study and Road Condition
Survey of SNRTP project




 CPCU-CS-IND-SDS-87-075-
                                            Component A: Institutional          Individual
76 / Procurement of Social
                              IDA / 53360   Strengthening, T.A., and     Post   Consultant         Limited    5,903.25   Signed           2019-07-14   2019-07-17     2019-07-31   2019-08-22   2019-12-31
Development Specialist for
                                            Monitoring                          Selection
PMU




 SNRTP-CPCU-CS-SSS-88-1-
                                            Component A: Institutional          Individual
PSE-075-76 / Hiring of                                                                                                   Under
                              IDA / H8990   Strengthening, T.A., and     Post   Consultant         Direct         0.00                    2019-07-14   2019-07-17     2019-07-24   2019-08-07   2019-12-31
Dilip Upreti as Project                                                                                                  Implementation
                                            Monitoring                          Selection
Support Engineer I




 SNRTP-CPCU-CS-SSS-88-2-
                                            Component A: Institutional          Individual
PSE-075-76 / Hiring of                                                                                                   Under
                              IDA / H8990   Strengthening, T.A., and     Post   Consultant         Direct         0.00                    2019-07-14   2019-07-17     2019-07-24   2019-08-07   2019-12-31
Surendra Poudel as Project                                                                                               Implementation
                                            Monitoring                          Selection
Support Engineer- I




 SNRTP-CPCU-CS-SSS-89-
EME-076-77 / Hiring of Mr.                  Component A: Institutional          Individual
Sitaram Kandel as             IDA / H8990   Strengthening, T.A., and     Post   Consultant         Direct     8,656.44   Signed           2019-09-05   2019-09-09     2019-09-12   2019-09-20   2020-01-10
Environmental Management                    Monitoring                          Selection
Expert




 SNRTP-CPCU-CS-SSS-92-
BDC-076-77 / Hiring of Mr.                  Component A: Institutional          Individual
Suman Nakarmi as Bridge       IDA / H8990   Strengthening, T.A., and     Post   Consultant         Direct     7,697.31   Signed           2019-09-05   2019-09-09     2019-09-12   2019-09-20   2020-01-10
Design Consultant (BDC)                     Monitoring                          Selection
through SSS method.




 SNRTP-CPCU-CS-SSS-91-
QME-076-77 / Hiring of Mr.                  Component A: Institutional          Individual
Khilendra Karna as Quality    IDA / H8990   Strengthening, T.A., and     Post   Consultant         Direct     8,993.09   Signed           2019-09-05   2019-09-09     2019-09-12   2019-09-20   2020-01-10
Management Expert (QME)                     Monitoring                          Selection
for CPCU.




 SNRTP-CPCU-CS-SSS-94/2-
PSE I-076-77 / Hiring of                    Component A: Institutional          Individual
Mr. Suman Kumar               IDA / H8990   Strengthening, T.A., and     Post   Consultant         Direct     3,656.86   Signed           2019-09-05   2019-09-09     2019-09-12   2019-09-20   2020-01-10
Shrestha as Project Support                 Monitoring                          Selection
Engineer (PSE) Grade -I.




 SNRTP-CPCU-CS-SSS-94/3-
PSE I-076-77 / Hiring of
                                            Component A: Institutional          Individual
Mr. Dev Kant Baruwa as
                              IDA / H8990   Strengthening, T.A., and     Post   Consultant         Direct     3,896.04   Signed           2019-09-05   2019-09-09     2019-09-12   2019-09-20   2019-12-31
Project Support Engineer
                                            Monitoring                          Selection
(PSE) Grade -I by SSS
method.




 SNRTP-CPCU-CS-SSS-94/5-
PSE I-076-77 / Hiring of
                                            Component A: Institutional          Individual
Mr. Ashok Duwadi as
                              IDA / H8990   Strengthening, T.A., and     Post   Consultant         Direct     3,657.50   Signed           2019-09-05   2019-09-09     2019-09-12   2019-09-20   2020-01-10
Project Support Engineer
                                            Monitoring                          Selection
(PSE) Grade-I by SSS
method.




 SNRTP-PMU-CS-SSS-93-
QMS-076-77 / Hiring of Mr.                  Component A: Institutional          Individual
Bijendra Pasache as Quality   IDA / H8990   Strengthening, T.A., and     Post   Consultant         Direct     7,401.86   Signed           2019-09-05   2019-09-09     2019-09-12   2019-09-20   2020-01-10
Monitoring   Specialist for                 Monitoring                          Selection
PMU.




 SNRTP-CPCU-CS-SSS-95-
PSE-II-076-77 / Hiring of
                                            Component A: Institutional          Individual
Mr. Sandesh Adhikari as
                              IDA / H8990   Strengthening, T.A., and     Post   Consultant         Direct     2,782.88   Signed           2019-09-05   2019-09-09     2019-09-12   2019-09-20   2020-01-10
Project Support Engineer
                                            Monitoring                          Selection
(PSE) grade-II by SSS
method.




 SNRTP-CPCU-CS-SSS-90-
                                            Component A: Institutional          Individual
SDE-076-77 / Hiring of Mr.
                              IDA / H8990   Strengthening, T.A., and     Post   Consultant         Direct     8,269.39   Signed           2019-09-05   2019-09-09     2019-09-12   2019-09-20   2020-01-10
Binod Pant as Social
                                            Monitoring                          Selection
Development Expert




 SNRTP-CPCU-CS-SSS-94/1-
PSE I-076-77 / Hiring of
                                            Component A: Institutional          Individual
Mr. Sanjaya Subedi as
                              IDA / H8990   Strengthening, T.A., and     Post   Consultant         Direct     3,656.86   Signed           2019-09-05   2019-09-09     2019-09-12   2019-09-20   2020-01-10
Project Support Engineer
                                            Monitoring                          Selection
(PSE) Grade -I by SSS
method.




 SNRTP-CPCU-CS-SSS-94/4-
PSE I-076-77 / Hiring of
                                            Component A: Institutional          Individual
Mr. Prakash Adhikari as
                              IDA / H8990   Strengthening, T.A., and     Post   Consultant         Direct     3,657.50   Signed           2019-09-05   2019-09-13     2019-09-20   2019-09-22   2020-01-10
Project Support Engineer
                                            Monitoring                          Selection
(PSE) Grade -I by SSS
method.




 SNRTP-CPCU-CS-SSS-96-
FMC-076-77 / Hiring of Mr.                  Component A: Institutional          Individual
                                                                                                                         Under
Kulchandara Sharma as         IDA / H8990   Strengthening, T.A., and     Post   Consultant         Direct         0.00                    2019-09-13   2019-09-21     2019-09-22   2019-09-26   2020-01-15
                                                                                                                         Implementation
Financial Management                        Monitoring                          Selection
Consultant by SSS method




 SNRTP-CPCU-CS-SSS-97-1-
                                            Component A: Institutional          Individual
SSC-076-77 / Hiring of Mr.                                                                                               Pending
                              IDA / H8990   Strengthening, T.A., and     Post   Consultant         Direct         0.00                    2019-10-02   2019-10-07     2019-10-09   2019-10-17   2020-01-10
Gopal Basel as Social                                                                                                    Implementation
                                            Monitoring                          Selection
Safeguard Consultant




 SNRTP-CPCU-CS-SSS-97-2-
                                            Component A: Institutional          Individual
SSC-076-77 / Hiring of Mr.                                                                                               Pending
                              IDA / H8990   Strengthening, T.A., and     Post   Consultant         Direct         0.00                    2019-10-02   2019-10-07     2019-10-09   2019-10-17   2020-01-10
Krishna Prasad Adhikari as                                                                                               Implementation
                                            Monitoring                          Selection
Social Safeguard Consultant




                                                                                                                                                            Page 13
 SNRTP-CPCU-CS-SSS-97-3-
                                            Component A: Institutional          Individual
SSC-076-77 / Hiring of Mr.                                                                                   Pending
                              IDA / H8990   Strengthening, T.A., and     Post   Consultant   Direct   0.00                    2019-10-02   2019-10-07     2019-10-09   2019-10-17   2020-01-10
Ramesh Shrestha as Social                                                                                    Implementation
                                            Monitoring                          Selection
Safeguard Consultant




 SNRTP-CPCU-CS-SSS-97-4-
                                            Component A: Institutional          Individual
SSC-076-77 / Hiring of Mr.                                                                                   Pending
                              IDA / H8990   Strengthening, T.A., and     Post   Consultant   Direct   0.00                    2019-10-02   2019-10-07     2019-10-09   2019-10-17   2020-01-10
Ravindra Pathak as Social                                                                                    Implementation
                                            Monitoring                          Selection
Safeguard Consultant




 SNRTP-CPCU-CS-SSS-97-5-
                                            Component A: Institutional          Individual
SSC-076-77 / Hiring of Mr.                                                                                   Pending
                              IDA / H8990   Strengthening, T.A., and     Post   Consultant   Direct   0.00                    2019-10-02   2019-10-07     2019-10-09   2019-10-17   2020-01-10
Harak Singh Dhami as                                                                                         Implementation
                                            Monitoring                          Selection
Social Safeguard Consultant




 SNRTP-CPCU-CS-SSS-97-6-
                                            Component A: Institutional          Individual
SSC-076-77 / Hiring of Mr.                                                                                   Pending
                              IDA / H8990   Strengthening, T.A., and     Post   Consultant   Direct   0.00                    2019-10-02   2019-10-07     2019-10-09   2019-10-17   2020-01-10
Bipul Pokharel as Social                                                                                     Implementation
                                            Monitoring                          Selection
Safeguard Consultant




 SNRTP-CPCU-CS-SSS-102-
ES-076-77 / Hiring of
Mr.Ganesh Thangunna as                      Component A: Institutional          Individual
                                                                                                             Pending
Environmental Specialist      IDA / H8990   Strengthening, T.A., and     Post   Consultant   Direct   0.00                    2019-10-20   2019-10-30     2019-11-02   2019-11-10   2020-01-09
                                                                                                             Implementation
(ES) for PMU-East by                        Monitoring                          Selection
SIngle Source Selection
Method.




 SNRTP-CPCU-CS-SSS-
101/1-ESC-076-77 / Hiring
of Mr. Jham Bahadur                         Component A: Institutional          Individual
                                                                                                             Pending
Thapa as Environmental        IDA / H8990   Strengthening, T.A., and     Post   Consultant   Direct   0.00                    2019-10-20   2019-10-30     2019-11-02   2019-11-10   2020-01-09
                                                                                                             Implementation
Safeguard Consultant                        Monitoring                          Selection
(ESC) for PMU-West by
Single Source Selection
Method.


 SNRTP-CPCU-CS-SSS-
101/2-ESC-076-77 / Hiring
of Mr. Saroj Shrestha as                    Component A: Institutional          Individual
                                                                                                             Pending
Environmental Safeguard       IDA / H8990   Strengthening, T.A., and     Post   Consultant   Direct   0.00                    2019-10-20   2019-10-30     2019-11-02   2019-11-10   2020-01-09
                                                                                                             Implementation
Consultant (ESC) for PMU-                   Monitoring                          Selection
East by Single Source
Selection Method.




 SNRTP-CPCU-CS-SSS-100-
SDS-076-77 / Hiring of Mr.
Dipendra Raj Shahi as                       Component A: Institutional          Individual
                                                                                                             Pending
Social Development            IDA / H8990   Strengthening, T.A., and     Post   Consultant   Direct   0.00                    2019-10-20   2019-10-30     2019-11-02   2019-11-10   2020-01-09
                                                                                                             Implementation
Specialist (SDS) for PMU-                   Monitoring                          Selection
East by Single Source
Selection Method.




 SNRTP-CPCU-CS-SSS-99-
PMQME-076-77 / Hiring of
Mr. Sujit Dhital as Project
                                            Component A: Institutional          Individual
Management and Quality                                                                                       Pending
                              IDA / H8990   Strengthening, T.A., and     Post   Consultant   Direct   0.00                    2019-10-20   2019-10-30     2019-11-02   2019-11-10   2020-01-09
Monitoring Expert                                                                                            Implementation
                                            Monitoring                          Selection
(PMQME) for CPCU by
Single Source Selection
Method.




 SNRTP-CPCU-CS-SSS-98/1-
PSE-I-076-77 / Hiring of
                                            Component A: Institutional          Individual
Mr. Prabin Basnet as                                                                                         Pending
                              IDA / H8990   Strengthening, T.A., and     Post   Consultant   Direct   0.00                    2019-10-20   2019-10-30     2019-11-02   2019-11-10   2020-01-09
Project Support Engineer-                                                                                    Implementation
                                            Monitoring                          Selection
Grade I (PSE-I) by Single
Source Selection Method.




 SNRTP-CPCU-CS-SSS-103-
SSC-076-77 / Hiring of Mr.
                                            Component A: Institutional          Individual
Babu Ram Neupane as                                                                                          Pending
                              IDA / H8990   Strengthening, T.A., and     Post   Consultant   Direct   0.00                    2019-10-20   2019-10-30     2019-11-02   2019-11-10   2020-01-09
Social Safeguard Consultant                                                                                  Implementation
                                            Monitoring                          Selection
( SSC) by Single Source
Selection Method.




 SNRTP-CPCU-CS-SSS-98/2-
PSE I-076-77 / Hiring of
                                            Component A: Institutional          Individual
Mr. Navin Joshi as Project                                                                                   Pending
                              IDA / H8990   Strengthening, T.A., and     Post   Consultant   Direct   0.00                    2019-10-21   2019-10-31     2019-11-03   2019-11-11   2020-01-10
Support Engineer- Grade I                                                                                    Implementation
                                            Monitoring                          Selection
(PSE-I) by Single Source
Selection Method.




                                                                                                                                                Page 14