The World Bank Implementation Status & Results Report Bihar Rural Roads Project (P155522) Bihar Rural Roads Project (P155522) SOUTH ASIA | India | Transport Global Practice | IBRD/IDA | Investment Project Financing | FY 2017 | Seq No: 4 | ARCHIVED on 10-Dec-2018 | ISR34683 | Implementing Agencies: Rural Works Department, Bihar, Republic of India Key Dates Key Project Dates Bank Approval Date: 21-Dec-2016 Effectiveness Date: 31-Aug-2017 Planned Mid Term Review Date: 30-Apr-2020 Actual Mid-Term Review Date: -- Original Closing Date: 31-Dec-2022 Revised Closing Date: 31-Dec-2022 pdoTable Project Development Objectives Project Development Objective (from Project Appraisal Document) The PDO is to improve rural road connectivity in project districts, and enhance management of rural roads in Bihar. Has the Project Development Objective been changed since Board Approval of the Project Objective? No Components Table Name Rural Roads Improvement:(Cost $320.00 M) Asset Management and Institutional Effectiveness:(Cost $15.00 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Satisfactory Moderately Satisfactory Overall Risk Rating Substantial Substantial Implementation Status and Key Decisions Out of 1,052 km rural roads under Batch 1, works are already under progress on 1,033 km, out of which 322 km roads have been completed and opened to traffic (providing connectivity to 231 habitations and benefitting 1,29,315 rural population). These roads have been constructed using surface dressing as a low-cost surfacing option. However, the balance of the 1,500 km roads have undergone long delays in preparation of the engineering designs. RWD has agreed to finalize the engineering designs of the about 200 km roads and start the procurement after getting these field verified from the identified pool of state quality monitors by December 15, 2018. As a major initiative, RWD has decided to integrate road safety engineering measures in the design of new roads and conduct road safety audit for its existing road network. Under the technical assistance component, the draft of the Rural Roads Safety Action Plan, Asset Management Plan and Human Resource Professional Development Strategy has been prepared and RWD has agreed to finalise and adopt these for implementation at the earliest. 12/10/2018 Page 1 of 6 The World Bank Implementation Status & Results Report Bihar Rural Roads Project (P155522) Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance Moderate Moderate Moderate Macroeconomic Moderate Moderate Moderate Sector Strategies and Policies Moderate Moderate Moderate Technical Design of Project or Program Substantial Substantial Moderate Institutional Capacity for Implementation and Sustainability Substantial Substantial Moderate Fiduciary Moderate Moderate Moderate Environment and Social Moderate Moderate Moderate Stakeholders Moderate Moderate Moderate Other Low Low Low Overall Substantial Substantial Substantial Results PDO Indicators by Objectives / Outcomes Increased road connectivity to Habitations IN00596029 ►Increased road connectivity to habitations (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 60,280.00 -- 231.00 62,000.00 Date 30-Sep-2016 -- 31-Aug-2018 30-Sep-2022 To be updated after the implementation support mission. Comments: IN00645211 ►Roads constructed (Kilometers, Corporate) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 322.00 2,500.00 Date 20-Dec-2016 -- 05-Oct-2018 29-Dec-2023 IN00645212 12/10/2018 Page 2 of 6 The World Bank Implementation Status & Results Report Bihar Rural Roads Project (P155522) Roads constructed - rural (Kilometers, Corporate Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 322.00 2,500.00 IN00645213 Roads constructed - non-rural (Kilometers, Corporate Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 0.00 IN00596056 ►Improved effectiveness of project expenditure - Project roads designed using cost-effective measures. (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 50.00 Date 30-Sep-2016 -- 31-Aug-2018 30-Sep-2022 IN00596028 ►Roads in good and fair condition as a share of total classified roads (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 40.00 -- 0.00 50.00 Date 30-Sep-2016 -- 31-Aug-2018 30-Sep-2022 To be updated after the implementation support mission. Comments: IN00596030 ►Improved asset management - number of districts that have developed and are using asset management system (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 10.00 Date 30-Sep-2016 -- 31-Aug-2018 30-Sep-2022 Intermediate Results Indicators by Components Rural Roads Improvement IN00596027 ►Roads constructed, Rural (Kilometers, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 322.00 2,500.00 Date 30-Sep-2016 -- 06-Oct-2018 30-Sep-2022 To be updated after the implementation support mission. Comments: IN00596051 ►Improved quality of built Infrastructure - Project roads delivered with satisfactory quality certified through independent quality reviews (Percentage, Custom) 12/10/2018 Page 3 of 6 The World Bank Implementation Status & Results Report Bihar Rural Roads Project (P155522) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 85.00 Date 30-Sep-2016 -- 31-Aug-2018 30-Sep-2022 IN00596060 ►Direct project beneficiaries (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 129,315.00 1,200,000.00 Date 30-Sep-2016 -- 31-Aug-2018 30-Sep-2022 IN00596061 Female beneficiaries (Percentage, Custom Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 48.00 IN00596054 ►Road Safety improvement scheme related audits undertaken on priority roads (Kilometers, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 2,000.00 Date 30-Sep-2016 -- 31-Aug-2018 30-Sep-2022 Asset Management and Institutional Effectiveness IN00596052 ►Length of roads subject to planned maintenance contracting (Kilometers, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 4,600.00 -- 100.00 10,000.00 Date 30-Sep-2016 -- 31-Aug-2018 30-Sep-2022 To be updated after the implementation support mission. Comments: IN00596057 ►RWD staff received at least six (6) weeks of professional training during the entire project duration. (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 100.00 400.00 Date 30-Sep-2016 -- 31-Aug-2018 30-Sep-2022 IN00596053 ►Effective Citizen Feedback Mechanism (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 85.00 12/10/2018 Page 4 of 6 The World Bank Implementation Status & Results Report Bihar Rural Roads Project (P155522) Date 30-Sep-2016 -- 31-Aug-2018 30-Sep-2022 IN00596059 ►Network level climate vulnerability assessment undertaken with special focus on floods (Kilometers, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 2,000.00 Date 30-Sep-2016 -- 31-Aug-2018 30-Sep-2022 IN00596058 ►Gender-based capacity enhancement (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 30.00 Date 30-Sep-2016 -- 31-Oct-2018 30-Sep-2022 IN00596055 ►GIS based road and bridge inventory and condition database (including videography) established in project districts (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 50.00 Date 30-Sep-2016 -- 31-Aug-2018 30-Sep-2022 Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P155522 IDA-59380 Effective USD 235.00 235.00 0.00 49.72 185.28 21% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P155522 IDA-59380 Effective 21-Dec-2016 29-May-2017 31-Aug-2017 31-Dec-2022 31-Dec-2022 Cumulative Disbursements 12/10/2018 Page 5 of 6 The World Bank Implementation Status & Results Report Bihar Rural Roads Project (P155522) Restructuring History There has been no restructuring to date. Related Project(s) There are no related projects. 12/10/2018 Page 6 of 6