GOVERNANCE, FOREST LANDSCAPES AND
   LIVELIHOODS – NORTHERN LAOS



              EGPF
 ETHNIC GROUP POLICY FRAMEWORK




                       October 2019
        REDD+ Division, Department of Forestry
         Ministry of Agriculture and Forestry
                 Vientiane, Lao PDR
EXECUTIVE SUMMARY

The project entitled Governance, Forest Landscapes and Livelihoods in Northern Lao PDR
(GFLL) aims to achieve emission reductions in the six Northern Provinces of Lao PDR and will
receive performance-based payments from the Forest Carbon Partnership Facility (FCPF).
GFLL is Lao PDR’s first sub-regional project that aims to achieve emission reductions in a
contiguous landscape that constitutes approximately one-third of both the country’s geographical
and its forested area, and represents 40 per cent of its total national deforestation and degradation.
The preparation and design of GFLL is based on parallel processes – the design of an
implementation grant proposal for the GCF and the design of the emission reductions proposal
for results-based finance from the FCPF. GFLL design and implementation is part of the ambition
of the Government of Lao PDR (GoL) to transform its forestry sector, and to take steps to
decouple its economic growth from its natural resource endowment. The most recent reflection
of this commitment is the GoL endorsement of the Green Growth Strategy up to 2030 that aims
to ensure environmentally friendly, sustainable and inclusive growth.
The proposed interventions of the ER Program correspond to each of the four main drivers and
are organised into four components, including: i) interventions for an enabling environment for
REDD+, ii) agriculture sector interventions, iii) forestry sector interventions, and iv) a program
management and monitoring component.
Objective of the EGPF
This EGPF is developed in accordance to OP 4.10., and the main objective of the EGPF is to
ensure that the development process fosters full respect for the dignity, human rights, cultural
uniqueness of ethnic groups in Lao PDR and that they do not suffer adverse impacts during the
development process and they receive culturally – compatible social and economic benefits.
Ethnic groups in the project area
The ethnic Lao account for slightly over half of the nation’s total population (53 per cent). When
combined with other ethnic groups in the Lao-Tai ethno-linguistic family, the ethnic Lao comprise
two-thirds of the population. The population of the non-Lao-Tai ethnic groups is greater in the
Northern provinces. The ethnic Lao-Tai groups dominate the country economically and
culturally. However, in some pockets of the country the number of non-Lao-Tai ethnic groups
exceeds that of the ethnic Lao. Khmu and Hmong are the second and third largest ethnic groups
respectively. Each of these two ethnic groups comprises more than half a million individuals.
Legal and policy framework
In Lao PDR, the Five-Year Plan from 2016-2020 aimed to eradicate poverty, and graduate Lao
PDR from Least Developed Country (LDC) status by 2025. To achieve this objective, a number
of policies, plans, and programs have been implemented and those related to ethnic communities
include: support for food security, commercial agriculture production, rural development,
infrastructural development, external economic relations, and improve access to services
The Constitution of Lao PDR (No 63/NA of 2015) defines that all "citizens of all ethnicity" have
rights to education, health, land use and ownership, domicile of choice, and economic



                                                  i
development regardless of sex, religion, social status, education, or ethnicity; as well as freedom
of religion, freedom of speech; freedom to peacefully assemble, and to protest.
Under components 2 and 3, some proposed Project activities may be involved in potential land
acquisition and/or resettlement impacts involving ethnic communities/social groups (such as
Hmong, Khmu, Mien, Makong, Bru and others), who are known in Lao PDR as Ethnic Groups
(EG) and meet WB eligibility criteria under OP/BP 4.10.
Potential impacts of ER-P
The activities under the four main components will be rolled out in the six ER Program provinces,
targeting over 70,000 ha for promoting improved agriculture interventions and 320,000 ha for
promoting sustainable forest management and FLR. The enabling environment related activities
under Component 1 will also generate impacts beyond the ER Program area. An estimated 42,000
rural households and ethnic groups (total approximately 254,000 people) are projected to benefit
from the ER Program at least 40 per cent of whom are women and ethnic group members. These
estimates are based on the estimates from the PRAPs.
On the basis of the consultations and the impact assessment referred to in the SESA, the main
negative impacts are expected to be related to the following:
   -   Restricted access to forest
   -   Insecurity of land tenure and ethnic groups in remote areas not having land title
   -   Loss of livelihood and income due to changes in land use planning
   -   Unequal distribution of benefit sharing
   -   Lack of meaningful consultation and engagement in ER Program implementation
   -   Gender inequality in land use rights, including forest land rights, has potential negative
       implications for women’s abilities to benefit under REDD+ on the same scale as men
   -   Potential loss of critical natural habitats
   -   Conversion of natural forests into plantation
   -   Loss of forest to infrastructure
   -   Invasive species, forest fires and soil erosion
   -   Health and safety issues due to the increased inappropriate use of dangerous pesticides
       and herbicides, and
   -   Soil and water contamination from dangerous pesticide-related wastes.

   Risk management will be addressed through the safeguards plans, the Environmental and
   Social Management Framework (ESMF), Ethnic Group Policy Framework (EGPF),
   Resettlement Policy Framework (RPF), and Process Framework (PF).
Consultation and information disclosure
The consultation framework aims to ensure that ethnic groups are well informed, consulted and
mobilised to participate in the subprojects so that clarity could be provided regarding the potential
benefits as well as potential negative impacts. Consultation with EG will be made during the
preliminary screening process and the development and implementation of an EGDP if needed.
Consultations with and participation of ethnic groups, their leaders and local government officials
will be an integral part of the EGDP. Scope of the EGDP should include preliminary screening,
social assessment, mitigation measures, development assistance, and monitoring


                                                 ii
Feedback and redress mechanism
Grievances related to environmental and social issues from ethnic groups that result from Project
activities will be resolved by the FGRCs. However, the complainant also retains the right to
bypass this procedure and can address a grievance directly to the DoF/MAF Office or the National
Assembly (NA), as provided for by law in Lao PDR. At each level grievance details, discussions,
and outcomes will be recorded in a grievance logbook. The status of grievances submitted and
grievance redress will be reported to DAFO management through the monthly report.
Monitoring and evaluation
Responsibility of overall monitoring of GFLL rests with an approach of measurement, monitoring
and reporting established under the supervision of the DoF/MAF. The implementation and results
of EGPF and integrated activities of ethnic group works would be monitored regularly and
internally by provincial and district committees. Regular reports will be compiled into quarterly
reports, would be submitted to DoF/MAF.
Implementing the EGPF will also be subjected to external independent monitoring by a qualified
consultant or a civil society organization (CSO).
Ethnic Group Development Plan (EGDP)
The EGDP will consist of a number of activities and will include mitigation measures of
potentially negative impacts, modification of subproject design, and development assistance.
Where there is land acquisition in ethnic minority communities, the Project will ensure that their
rights will not be violated and that they be compensated for the use of any part of their land in a
manner that is culturally acceptable to them.




                                                iii
ACRONYMS
                                                     FLEGT     Forest Law Enforcement,
                                                               Governance and Trade
ADB        Asian Development Bank                    FLM       Forest Landscape Management
           Biodiversity Conservation                 FLR       Forest Landscape Restoration
BCC
           Corridor
BSM        Benefit Sharing Mechanism                 FMP       Forest Management Plan
                                                     FPF       Forest Protection Fund
           Convention on the Elimination of                    Forestry Sub-Sector Working
                                                     FSSWG
CEDAW      All Forms of Discrimination                         Group
           Against Women                             FCZ       Fish Conservation Zones
                                                     GAP       Gender Action Plan
CF         Carbon Fund
           Community Engagement                      GCF       Green Climate Fund
CEF
           Framework                                 GDP       Gross Domestic Product
CFA        Conservation Forest Area                            Governance, Forest Landscapes
                                                     GFLL
CIF        Climate Investment Funds                            and Livelihoods
           Climate Protection through                GHG       Greenhouse Gas
CliPAD
           Avoided Deforestation                               Gender Integration and
                                                     GID
CSA        Climate Smart Agriculture                           Development
                                                               Deutsche Gesellschaft für
CSO        Civil Society Organization                          Internationale Zusammenarbeit --
                                                     GIZ
           District Agriculture and Forestry                   German Agency for International
DAFO                                                           Cooperation
           Office
           Department of Forest Resource             GoL
DFRM                                                           Government of Lao PDR
           Management
                                                     GRS
DoF        Department of Forestry
                                                               Feedback and Grievance Redress
DoFI       Department of Forest Inspection           FGRM
                                                               Mechanism
           District Office of Natural                FLR       Forest Landscape Restoration
DoNRE
           Resources and Environment
                                                     GRS       Grievance Redress Service
EG         Ethnic Group
                                                               Initial Environmental
EGDP       Ethnic Group Development Plan             IEE
                                                               Examination
EGPF       Ethnic Group Policy Framework             IFC       International Finance Corporation

EPF        Environmental Protection Fund             ILO       International Labour Organization
                                                               Intergovernmental Panel on
                                                     IPCC
ER         Emissions Reduction                                 Climate Change
ER-P       Emissions Reduction-Program               IPP       Indigenous Peoples Plan

ER-PIN     Programme Idea Note                       Lao FIP   Lao Forest Investment Program
           Emissions Reduction-Program                         Lao People’s Democratic
ER-PA                                                Lao PDR
           Agreement                                           Republic
           Emissions Reduction Program               LDC       Least Developed Country
ERPD
           Document                                            Second Lao Environment and
           Environmental and Social Impact           LENS2
ESIA                                                           Social project
           Assessment                                          Lao National Chamber of
           Environmental and Social                  LNCCI
ESMF                                                           Commerce and Industry
           Management Framework                                Lao National Front for
           Environmental and Social                  LNFD
ESMMP                                                          Development
           Management and Monitoring Plan                      Land Use Planning and Land
F-REDD     Forestry and REDD+ Project                LUP/LA
                                                               Allocation
FAO
           Food and Agriculture                      LWU       Lao Women’s Union
           Organization                                        Ministry of Agriculture and
FCPF       Forest Carbon Partnership Facility        MAF
                                                               Forestry
           Forest and Forest Resource                MoF       Ministry of Finance
FFRDF
           Development Fund                                    Ministry of Industry and
           Feedback Grievance Redress                MoIC
FGRC                                                           Commerce
           Committee
           Feedback Grievance Redress                MoJ       Ministry of Justice
FGRM
           Mechanism                                           Ministry of Natural Resources and
                                                     MoNRE
FIP        Forest Investment Program                           Environment
                                                               Ministry of Planning and
                                                     MPI
                                                               Investment


                                                iv
MRC     Mekong River Commission                 SIA
                                                           Social Impact Assessment
        Measurement, Reporting and                         Smallholder Tree Plantation
MRV                                             STP
        Verification                                       Project
NA      National Assembly                                  Sustainable Forestry for Rural
                                                SUFORD
        National Agriculture and Forestry                  Development Project
NAFRI
        Research Institute
        National Biodiversity Strategy                     Scaling Up Forest Management
NBSAP                                           SUPSFM
        and Action Plan                                    Project
        National Commission for the
NCAW                                            TWG        Technical Working Group
        Advancement of Women
        National Environment                               United Nations
NEC
        Commission                              UNDRIP     Declaration on the Rights
        National Forest Monitoring                         of Indigenous Peoples
NFMS
        System                                             United Nations Framework
                                                UNFCCC
NGO     Non-governmental organization                      Convention on Climate Change
        National Land Management                UN REDD+   United Nations REDD+
NLMA
        Authority                               USD        United States Dollars
        National Master Plan for Land
NMPLA                                                      Village Forest Management
        Allocation                              VFMG
                                                           Guidelines
NPA     National Protected Area                            Village Forestry Management
                                                VFMP/A
NpA     Non-profit association                             Plan and Agreement
                                                VMU        Village Mediation Unit
NRS     National REDD+ Strategy
                                                VPA        Voluntary Partnership Agreement
NRTF    National REDD+ Task Force
        National Socio-Economic                 WB         The World Bank
NSEDP
        Development Plan                        WCS        Wildlife Conservation Society
NTFP    Non Timber Forest Products
        Provincial Agriculture and
PAFO
        Forestry Office
PES     Payment for Ecosystem Services
PF      Process Framework
PFA     Production Forest Area
PLR     Policies, laws, and regulations
PLUP    Participatory Land Use Planning
PM      Prime Minister
PMO     Prime Ministerial Order
        Provincial Office for Forest
PoFI
        Inspection
        Provincial Office of Natural
PoNRE
        Resources and Environment
PRAP    Provincial REDD+ Action Plan
PRTF    Provincial REDD+ Task Force
        Participatory Sustainable Forest
PSFM
        Management

        Reducing Emissions from
        Deforestation and forest
        Degradation in developing
REDD+   countries; and the role of
        conservation, sustainable
        management of forests and
        enhancement of forest carbon
        stocks
REL     Reference Emission Level
RL      Reference Level
R-PP    REDD+ Preparation Proposal
RPF     Resettlement Policy Framework
        Strategic Environmental and
        Social Assessment
SESA




                                            v
TABLE OF CONTENTS

EXECUTIVE SUMMARY ........................................................................................................... i
ACRONYMS ................................................................................................................................ iv
TABLE OF CONTENTS ........................................................................................................... vii
1.     INTRODUCTION ................................................................................................................. 1
     1.1      PROGRAM OVERVIEW ................................................................................................................. 1
     1.2      PROGRAM OBJECTIVE AND COMPONENTS ................................................................................. 2
     1.3      ETHNIC GROUPS IN THE PROJECT AREA ...................................................................................... 5
     1.4      OBJECTIVE OF THE EGPF .............................................................................................................. 8
2.     POLICY, LEGAL AND INSTITUTIONAL SETTINGS .................................................. 8
     2.1      GOVERNMENT POLICY, PLAN, AND PROGRAM ........................................................................... 8
     2.1      WORLD BANK’S OPERATIONAL POLICY ON INDIGENOUS PEOPLES ) ........................................ 14
3.     PROGRAM POTENTIAL IMPACTS .............................................................................. 16
     3.1      POSITIVE SOCIAL IMPACTS ........................................................................................................ 16
     3.2      NEGATIVE SOCIAL AND ENVIRONMENTAL IMPACTS ................................................................ 17
     3.3      MITIGATION MEASURES ............................................................................................................ 17
4.     ETHNIC GROUP POLICY FRAMEWORK, PRINCIPLES AND PROCEDURES .. 18
     4.1      BASIC PRINCIPLES OF THE ETHNIC GROUP POLICY FRAMEWORK ............................................ 18
5.     CONSULTATION FRAMEWORK FOR ETHNIC GROUPS UNDER EGPF ........... 19
6.     FEEDBACK AND GRIEVANCE REDRESS MECHANISM ........................................ 28
     6.1      ETHNIC GROUP POLICY FRAMEWORK CONSULTATION AND INFORMATION DISCLOSURE ...... 29
7.     MONITORING AND EVALUATION .............................................................................. 30


ANNEXURES .............................................................................................................................. 36
     ANNEXURE1: GUIDELINES FOR ETHNIC GROUP DEVELOPMENT PLAN ................................................ 36




                                                                       vii
TABLES
Table 1 Ethnic group literacy rates ................................................................................................. 6
Table 2 Population growth in ER provinces .................................................................................. 7
Table 3 International treaties and conventions in Lao PDR ......................................................... 13


ANNEXURES
Annexure 1: Guidelines for ethnic group development plan ....................................................... 36




                                                                 viii
1. INTRODUCTION

   1.1 PROGRAM OVERVIEW

Lao PDR has been engaged with its REDD+ Readiness preparation since it was selected as one of
47 countries in the Forest Carbon Partnership Facility (FCPF) in 2007. The Department of Forestry
(DoF) under the Ministry of Agriculture and Forestry (MAF) was designated as the focal point for
REDD+ implementation on behalf of the GoL. DoF established the National REDD+ Task Force
(NRTF) consisting of representatives from line ministries and a National REDD+ Office under the
Planning Division of DoF in 2008 to serve as the NRTF Secretariat and to coordinate and
implement REDD+ readiness initiatives under the guidance of the MAF.
GoL received a grant of USD 200,000 from the FCPF through the World Bank to work on the R-
PP REDD+ Readiness Plan (R-PP) proposal made in 2009. The R-PP proposal was approved in
November 2010. Since 2008, many REDD+ activities have been ongoing with support from
various development partners.
Lao PDR was also accepted as one of the eight pilot countries of the Forest Investment Program
(FIP) in 2010, under the umbrella of the Climate Investment Fund (CIF). DoF, on behalf of the
GoL, jointly worked with the World Bank and the Asian Development Bank (ADB) to prepare a
Lao Forest Investment Program (Lao FIP) for submission and presentation to the FIP Sub-
Committee in 2011. The Lao FIP was endorsed in principle with conditions to revise the
investment plan, in response to comments made during the FIP Sub-Committee meeting. The
revised plan was submitted and officially approved by the FIP Sub-Committee in 2012.
A total of USD 30 million in grant was approved by CIF as co-financing for three projects: the
Scaling Up Participatory Sustainable Forest Management (SUPSFM, also known as SUFORD-
SU) with the World Bank and implemented by GoL; the Smallholder Tree Plantation Project (STP)
implemented by the International Finance Corporation (IFC) with the private sector; and
Protecting Forests for Ecosystem Services with ADB and implemented by GoL, which is an
additional financing for the Biodiversity Conservation Corridors (BCC) Initiative.
In 2014, the GoL received a USD 3.6 million grant from the FCPF through the World Bank to
implement R-PP activities including the preparation of a National REDD+ Strategy (NRS), benefit
sharing mechanism (BSM) and a Strategic Environmental and Social Assessment (SESA). Six
technical working group (TWGs) were formed to work on various elements of REDD+ readiness
on policy and legal framework, land issues, social and environmental safeguards, enforcement and
implementation of mitigation activities, MRV/REL, and benefit sharing.
In 2015, the GoL submitted a Emissions Reduction-Project Identification Note (ER-PIN), to the
FCPF Carbon Fund (CF). The CF accepted Lao PDR ER-PIN in 2016, DoF requested a second
REDD+ Readiness grant of up to USD 5.575 million, which received no objection from the FCPF
Participant Committee members. A project document for this second grant was prepared by the
WB and the GoL. The Emissions Reduction Program Document (ER-PD) was completed in 2017,
and accepted by the CF in 2018. Also, the country’s self-assessment of REDD+ readiness was
prepared, and accepted by the FCPF so that the ER-PD could be accepted by the Carbon Fund.

                                               1
Currently, the NRTF consists of 16 members with a Vice Minister of MAF as Chair; the Director
General of DoF is a Vice Chair; a Deputy Director General of DoF is an ordinary and a standing
member and also the national focal point of REDD+. Other members are Deputy Director Generals
of departments and Directors/or Deputy Directors of divisions from six ministries including MAF,
MoNRE, Ministry of Finance (MoF), Ministry of Planning and Investment (MPI), Ministry of
Justice (MoJ); National University of Laos; Lao Women’s Union and the Lao National Chamber
of Commerce and Industry (LNCCI). The NRTF role is to study, develop, propose and approve
policies, legislations, methods, and mechanisms. The role also includes regular reporting on the
progress of implementing REDD+ activities within the country to the NEC for update and further
actions.
Lao PDR also receives international support from bilateral donors, international non-governmental
organizations, research organizations, and other development partners. The two most important
bilateral programs are those supported by the Government of Germany, Climate Protection through
Avoided Deforestation (CliPAD) Program, and the Government of Japan, the Sustainable Forest
Management and REDD+ Program (F-REDD). Both are working at the national level, as well as
in selected provinces.

   1.2 PROGRAM OBJECTIVE AND COMPONENTS

The ER Program’s overall objective is “Reduced poverty, graduation from LDC status with
sustained and inclusive growth through promotion of national potential and comparative
advantages, effective management and utilization of natural resources and strong international
integration”.

The GFLL will be the first step in Lao PDR’s transition from REDD+ readiness to implementation
and subsequently results-based payments. The programme design sets the framework for
implementing the NRS in a decentralized manner at the sub-national level. While strategically
defined at the province level and executed at the district and village level, the project contributes
to improving the national institutional and regulatory systems in manners that facilitates its
replication and up-scaling. The impact of the project will lead to reduced emissions from land use,
deforestation, forest degradation, and increased ecosystem resilience and enhanced livelihoods of
forest-dependent people.

The Theory of Change (ToC) to achieve these impacts is designed around four inter-dependent
and complementary components.

Component 1: Strengthening enabling conditions for REDD+ (US$ 36.5 million of which
             GFLL US$ 13 million)

Component 1 covers interventions that lay the foundation for the implementation of sustainable
land use and develop the enabling conditions to address drivers of deforestation and forest
degradation in the key sectors, namely agriculture and forestry sector, but also in other land use
sectors such as infrastructure development. The underpinning strategy is to provide the necessary


                                                 2
tools and capacity for institutional and cross-sectoral planning, coordination and policy and
regulatory implementation. Activities target mainstreaming REDD+ into the national and
provincial level socioeconomic development planning and design of policies and regulations that
address the key drivers of deforestation and forest degradation and building capacity for its
implementation. Improved law enforcement and planning activities will be achieved through the
establishment and institutionalization of national and province level monitoring systems. The
strengthening of institutional capacities to monitor and sanction forest violations will strengthen
the enforcement of existing laws by national, province and district level authorities. The REDD+
readiness work has laid the foundation for strengthening already existing policies and regulations.
The Government is already in negotiations on a FLEGT VPA.

GFLL builds on this opportunity and will focus on building necessary capacity for both national
and sub-national level institutions as part of creating the enabling environment. Enabling
conditions will be further developed through consistent and aligned provincial, district and village
level land use planning and the necessary capacity development of staff to implement plans. This
will be integrated into the existing government planning processes and linked to actions for
securing land and resource tenure including land registration. Land use planning and land
registration will take into consideration existing forest landscapes and their protection and
sustainable use. Forests and forestland which for the most part is legally considered as State land
and not subject to titling are often managed as communal or collective and customary lands.
Strengthening their legal basis for tenure security will be pursued through developing a due
registration process and system of land use plans and village forest management agreements.

GFLL will engage with the ongoing work in promotion of Responsible Agricultural Investments
(RAI) under the agriculture sectors and with the Ministry of Planning and Investment (MPI). By
strengthening the enabling environment, the GFLL triggers transformative impact across sectors
towards developing a low carbon economy. Activities will aim for i) strengthening and
streamlining policies and the legal framework, ii) improved forest law enforcement and
monitoring, iii) improved provincial, district and village level land use planning, and iv) enhanced
land and resource tenure security through land registration and other processes. The activities
under this component are often important precursors for the success of further land-based
interventions. This being the case, interventions that require significant earlier progress are
planned for earlier implementation – while capacity building related activities will be continuous.
It is important to note that for many areas of work, related ground work is already underway
particularly at the central government level, and the GFLL interventions will build on these
developments.

Component 2: Climate smart agriculture and sustainable livelihoods for forest dependent
             people US$ 41 million of which GFLL US$ 12 million)

Component 2 aims to address the cumulative negative impact of unsustainable agricultural
practices and its transformation to high productivity with low impact on the environment. A range
of technical options have been successfully tested in the Northern Uplands of Lao PDR over the

                                                 3
last few decades to support transition from mainly subsistence to commercial agriculture.
Activities will focus on the promotion of Climate Smart Agriculture (CSA) investment and
improved soil conservation practices, crop diversification, agroforestry techniques such as
terracing, intercropping, among others.

The concept of CSA will also be integrated with the principles of RAI to embed broader social,
environmental and economic safeguards and perspectives together with climate related concerns
central to CSA. This component is designed to significantly curb expansion into forested
landscapes and increase household incomes and resilience to climate risks caused by drought,
floods, soil erosion etc. The investment will be supported through more effective extension
services to the target groups, strengthening their value chain integration through promotion of
processing, provision of marketing support and market information and stronger engagement with
the private sector. The activities will also focus on building cooperative structures to enhance
negotiation ability of these groups and improve access to rural finance. Women, ethnic groups and
other vulnerable groups will receive special attention.

Activities will aim for i) establishment of an enabling environment to promote responsible,
sustainable, deforestation-free and climate-smart agriculture, and, ii) implementation of CSA
models to address market demand, low productivity, lack of alternatives and address land and soil
degradation.

Component 3: Sustainable forest management (US$ 53 million of which GFLL US$ 17
             million)

Under Component 3, the GFLL will provide investments into sustainable forest management
(SFM) planning and the implementation of village forest management and sustainable
management of production forests. The GFLL is targeting implementing and scaling up forest
landscape restoration (FLR) and management on at least 70,000 ha including through assisted
natural forest regeneration, plantation development and agroforestry systems to enhance forest
carbon stocks. These activities will be supported by intensive capacity development and training
of government staff and communities with a strong focus on ethnic groups, women and the most
vulnerable groups. Through preparation and implementation of village forest management
planning and agreements (VFMP and VFMA), the underlying rationale is to strengthen tenure
security of land and forest resources, particularly those land and resources that are regarded as
communal/collective and customary assets. These activities will be complemented by value chain
integration of the rural population, identification and mobilization and creation of incentive
mechanisms to attract private sector investments into sustainable forest development and forest
landscape management.

Forestry sector interventions will focus on: i) establishing an enabling environment to implement
and scale up SFM and forest landscape restoration and management, ii) implementation and
scaling up of village forestry, and iii) implementation and scaling up of FLR and sustainable forest
plantations.

                                                 4
.

    1.3 ETHNIC GROUPS IN THE PROJECT AREA

Lao PDR has endorsed the International Labour Organization Convention 169 on Indigenous and
Tribal Peoples (ILO 169, 1989) and United Nations Declaration on the Rights of Indigenous
Peoples (UNDRIP). However, the GoL does not recognise the concept of indigenous peoples in
its policies and legislation. Instead, the term “ethnic group” is officially used to describe its people,
who are categorised into 50 broad ethnic groups. The GoL currently recognises 160 ethnic sub-
groups.
The ethnic Lao account for slightly over half of the nation’s total population (53 per cent). When
combined with other ethnic groups in the Lao-Tai ethno-linguistic family, the ethnic Lao comprise
two-thirds of the population. The population of the non-Lao-Tai ethnic groups is greater in the
Northern provinces. The ethnic Lao-Tai groups dominate the country economically and culturally.
However, in some pockets of the country the number of non-Lao-Tai ethnic groups exceeds that
of the ethnic Lao. Khmu and Hmong are the second and third largest ethnic groups respectively.
Each of these two ethnic groups comprises more than half a million individuals.
A 1999 map of Ethnic Groups of Laos showed the spatial distribution of ethnic groups throughout
the country, with the Hmong-Mien and Sino-Tibetan groups found primarily in the North. The Lao
ethnic group is dominant covering 53 per cent of the total national population, followed by Khmu
(11 per cent) and Hmong (9 per cent) and the rest are 3 percent or lower.




Ethnic group diversity is reflected in a rich diversity of ethnic languages. Each ethno-linguistic
family is divided into main ethnic groups and is further divided through sub-ethnic groups. Some
ethnic languages are only spoken languages and do not have written forms. While some ethnic
languages have enough similarities that make mutual understanding possible, for other groups it
is impossible to communicate. For example, the Lao-Tai and Tai-Kadai ethnic groups share
approximately 90 per cent of their vocabulary, so it is relatively easy for them to reach mutual
understanding. The communication situation is similar among ethnic groups within the Sino-
Tibetan linguistic family. However, the Mon-Khmer are Austro-Asiatic speakers are divided into
many sub-ethnic groups and they use languages that are not easily mutually comprehensible.
Education is strongly correlated with ethnicity. Non Lao-Tai ethnic groups make up a third of the
population, but constitute a disproportionate share of people in households headed by someone
with no formal education (64.4 per cent) or incomplete primary education (44.2 per cent).
Education among the various ethnic groups varies greatly. Mon-Khmer and Hmong-Mien, the
second and third largest groups, have similar literacy levels in the national language, which is Lao



                                                   5
(71.1 and 69.8 per cent, respectively). The lowest literacy rate was observed among the Sino-
Tibetan speaking group at 46.8 percent as illustrated by Table 1.

                                     Table 1 Ethnic group literacy rates
                                          Complet    Completed     Completed    Completed    Univer
 Ethnic         No formal    Some
                                          ed         lower         upper        vocational   sity     All
 group          education    primary
                                          primary    secondary     secondary    training     degree
 Column percentages-distribution of education attainment across ethnic groups
 Lao-Tai        35.7         55.8         71.4       78.3          89.9         87.0         84.7     66.4
 Mon-Khmer      34.4         33.0         20.5       12.6          4.9          8.3          6.9      22.3
 Sino-
                15.1         2.0          1.5        1.5           0.9          1.7          0.3      3.4
 Tibetan
 Hmong-Lu
                14.5         7.6          5.8        7.3           4.1          2.9          7.3      7.1
 Mien
 Other          0.2          1.5          0.8        0.2           0.2          0.1          0.9      0.8
 Total          100.0        100.0        100.0      100.0         100.0        100.0        100.0    100.0
 Row percentages-distribution of education attainment within ethnic groups
 Lao-Tai        7.1          16.9         49.7       6.3           11.0         6.8          2.1      100.0
 Mon-Khmer      20.5         29.8         42.4       3.0           1.8          1.9          0.5      100.0
 Sino-
                59.7         12.2         20.7       2.5           2.2          2.6          0.1      100.0
 Tibetan
 Hmong-Lu
                27.1         21.5         37.4       5.5           4.7          2.1          1.7      100.0
 Mien
 Other          3.2          39.0         51.3       1.5           2.4          0.7          1.9      100.0
 Total          13.3         20.1         46.2       5.4           8.2          5.2          1.6      100.0

Main ethnic groups of ER Program area are as follows:
    1. Lao-Tai Ethno Linguistic Family consisting of six groups:
        Lao and Tai groups are found in all six provinces.
        Nyoun group is found in four provinces, but not in Houaphan and Oudomxay
          provinces.
    2. Mon-Khmer Ethno Family has nine groups:
        Khmu group is found in all six provinces.
    3. Hmong –Mien Ethno Linguistic Family, have two ethnic groups:
        Hmong and Ew-mien groups are found in all six provinces.
    4. Sino-Tibet Ethno Linguistic Family consisting of five ethnic groups:
        Phou Noy and Ho groups are found in four provinces, but not in Huaphan and
          Sayabouri provinces.
Other groups are generally found in three or less provinces. Refer to Table 2 for population growth
in the project area/provinces.




                                                       6
                             Table 2 Population growth in ER provinces
                       Population in       Population in         Growth over 10         Urban population
                          2005*              2015**                years (%)              2015** (%)
        Bokeo            145,263             179,243                  1.23                   33%
      Huaphan             278,677             289,393                  1.04                   14%
   Luang Namtha           145,092             175,753                  1.21                   27%
   Luang Prabang          400,202             431,889                  1.08                   32%
     Oudomxay             264,582             307,622                  1.16                   24%
      Sayabouri           338,669             381,376                  1.13                   40%
        Total            1,574,490           1,767,291                 1.12
(Source: Population census 2005, from Lao Decide; Population and housing census 2015)

While cultural traits may explain some variations in literacy, socio-economic factors and
geographical location that affect access to education may also have an impact. For example, in
some ethnic groups the proportion of people who have never attended school reached more than
50 per cent in some cases, including Lahu (63 per cent), Akha (50 per cent), Tri (54 per cent), and
Katang (41 per cent).
As a result of differing education levels most government staff are ethnic Lao. In some locations,
government staff have difficulty working with local villagers, as they may not know the ethnic
languages. Communication with and community engagement of the non-Lao-Tai ethnic groups
(i.e. Mon-Khmer, Hmong-Mien and Sino-Tibetan ethnic groups) remains a challenge. The
inventory and recruitment of government staff members, including women from those ethnic
groups, or reliance of local interpreters, remains a prerequisite for the government staff to
communicate with different ethnic groups and to fully ensure local ownership and participation.
The Lao Front for National Development has staff throughout the country that can assist the
government’s district and provincial staff in communication and extension work with different
ethnic groups.
Poverty rates vary by ethnicity and are higher among ethnic minorities in general, with the non
Lao-Tai contributing to 55 per cent of all poor people (2013), despite being only one-third of the
population in Lao PDR (The Sino-Tibet ethnic group has been an exception and they have
experienced a rapid decline in poverty in recent years). The poverty rates were highest between
the Mon-Khmer and Hmong-Mien headed households; with poverty rates of 42.3 per cent and 39.8
per cent respectively, almost double the national poverty rate of 23 per cent.
Ethnicity in the six northern ER-P provinces of Huaphan, Luang Prabang, Xayaboury, Luang
Namtha, Bokeo and Oudomxay is quite diverse consisting of a total of 23 major ethnic groups
classified into four ethno-linguistic families: Lao-Tai (6 groups), Mon-Khmer (10), Hmong-Mien
(2) and Sino-Tibet (5). Lao, Tai, Khmu, Hmong and Ew-Mien ethnic groups can be found in all
the six provinces. Some other ethnic groups, such as Phounoy, Ho, Lamet and Akha are common
in Luang Namtha, Bokeo and Oudomxay provinces, but they are included as ethnic groups in
Houaphan, Luang Prabang and Xayaboury provinces.


                                                      7
   1.4 OBJECTIVE OF THE EGPF

This EGPF is developed in accordance to OP 4.10. The main objective of the EGPF is to ensure
that the development process fosters full respect for their dignity, human rights, cultural
uniqueness and that ethnic groups do not suffer adverse impact during the development process
and they will receive culturally – compatible social and economic benefits.
The EGPF provides a framework for not only mitigating negative impacts, but ensuring the
ethnic groups will benefit from the Program. This EGPF is also based on broad community
support consultations with affected ethnic groups. The EGPF ensures:
   (a) How to avoid potential adverse impacts on ethnic communities; or
   (b) When potential adverse impacts on ethnic communities are unavoidable, be minimised
       and mitigated or compensated; and
   (c) Ensure that ethnic groups receive social and economic benefits in a culturally appropriate
       manner that are inclusive in both gender and intergenerational terms, and obtain broad
       community support for the/any proposed sub-project.
This EGPF was prepared on the basis of a) the Strategic Environmental and Social Assessment
(SESA); b) qualitative and quantitative social assessment conducted for the GFLL provinces; c)
consultation with ethnic groups present in the GFLL areas; and d) consultation with key Program
stakeholders, including PAFO, DAFO, Lao Front for National Development, and Lao Women’s
Union.

2. POLICY, LEGAL AND INSTITUTIONAL SETTING

   2.1 GOVERNMENT POLICY AND PLAN FOR POVERTY REDUCTION

GoL policy and plan for poverty reduction: In Lao PDR, the Five-Year Plan from 2016-2020
aimed to eradicate the poverty, and graduate from Least Developed Country (LDC) status by 2025.
To achieve this objective, a number of policies, plans, and programs have been implemented and
those related to ethnic communities include: support for food security, commercial agriculture
production, rural development, infrastructural development, external economic relations, and
improve access to services. Since 2000, villages are responsible for data collection on the living
condition of families. Data suggested that Mon-Khmer and Hmong-Mien and Sino-Tibetan ethnic
communities are the poorest in the country and identifies several causes of poverty including
problems pertaining in land availability for food production and income generation. The National
Socioeconomic Development Plans (NSEDP) focused on poverty reduction in the poorest areas
and links poverty reduction to stop “pioneer shifting cultivation or slash and burn new forest area”,
however, the “rotational cultivation” may still be maintained.

The sustainable land and forestry development programs are promoted by the GoL. GoL Policy
and Legislative Framework on Ethnic Community: The Constitution defined Lao PDR as a multi-
ethnic state, with “equality among all ethnic communities” as described in the Constitution and
the party policy as follows: The Constitution of Lao PDR (No 63/NA, 2015) defines that all


                                                 8
"citizens of all ethnicity" have rights in education, health, land use and ownership, domicile of
choice, and economic development regardless of sex, religion, social status, education, or
ethnicity; as well as freedom of religion, freedom of speech; freedom to peacefully assemble and
to protest. All citizens have the right to work and carry out their chosen livelihoods. Articles 8
and 22, guarantee that there will be no discrimination on the basis of ethnicity or gender. Articles
in the Constitution where ethnic People are specifically mentioned are as follows: Article 1 – Lao
PDR is a nation unified and indivisible of all ethnic communities; Article 2 - all power is of people,
by people, and for the use of the multiethnic people; Article 3 - the right of a multi-ethnic people
to be owners of the nation is exercised and guaranteed by the political system; Article 7 - mass
organizations are the focal point for the solidarity and mobilisation for citizens of all backgrounds
and ethnicity as participating members in the safeguarding and edification of their rights and
interests; Article 8 - the State will carry out a policy of unity and equality among the various ethnic
communities.
All ethnic communities have the right to preserve and improve their own traditions and culture and
those of the nation. Discrimination between ethnic communities is forbidden. The state will carry
out every means in order to continue to improve and raise the economic and social level of all
ethnic communities; Article 13 - the economic system is for the purpose of improving the standard
of living, materially and spiritually, of a multi-ethnic people; Article 19 - the State and the people
will collaborate to build schools of all levels in order that a complete education system will be
available to all, especially areas inhabited by ethnic People; and Article 22 - all Lao citizens,
regardless of their sex, social position, education, beliefs or ethnicity, are equal before the law.
The 1992 ethnic policy, Resolution of the Party Central Organization concerning Ethnic Affairs in
the new Era, focuses on gradually improving the living conditions of the ethnic communities, while
promoting their ethnic identity and cultural heritage. The general policy of the Party concerning
the ethnic communities include: Build National Sentiment (national identity); Realise Equality
among ethnic communities; Increase the Solidarity Level among ethnic communities as members
of the greater Lao family; Resolve Problems of Inflexible and Harmful thinking, as well as
economic and cultural Inequality; Improve the living Conditions of the ethnic communities step
by step; Expand, to the greatest extent possible, the good and beautiful Heritage and ethnic Identity
of each group as well as their Capacity to participate in the affairs of the nation.
Other GoL related policy and legislation: Given that most of ethnic groups depends on subsistent
agriculture and natural resources, they are also affected by other polices, and legislation related to
land use and management of natural resources and the key ones are highlighted as follows:
Compensation and resettlement (Decree 84/PM) this decrees aims to protect the right of affected
peoples by investment projects include ethnic groups. The decree aims at ensuring that the losses
incurred by affected people are redressed such that Affected Persons share project benefits, are
assisted to develop their social and economic potential in order to improve or at least restore their
incomes and living standards to pre-project levels. The decree however being revised in line with
the current institutional arrangement and improve implementation effectiveness. The Project may
involve minor or temporary land acquisition for road maintenance work in some areas where ethnic
minority groups or communities reside. No major loss of land is anticipated because the work will


                                                  9
be carried out within existing roads and may involve minor realignments without expansion, which
may affect trees and other roadside private assets. A separate Resettlement Policy Framework
(RPF) designed and applied to ensure that the ethnic groups are not adversely affected and their
livelihood is not worst off as a result of project implementation.
The Lao PDR has been a member of the International Labour Organization (ILO) since 1964.
Though the country has ratified a total of eight ILO Conventions, including five of the eight ILO
core Conventions, Convention 169 on Indigenous Peoples has not been ratified. Table 1
International treaties and conventions in Lao PDR.
The 8th National Socioeconomic Development Plan (NSEDP - 2016-2020). The overall objective
of the NSEDP is to ensure that Lao PDR graduates from Least Development Country status. It is
designed with three outcomes, and each with a set of Performance Targets.
As part of the rural development and poverty reduction strategy, one focus of the 8th NSEDP is to
consolidate and convert villages in remote areas inhabited by ethnic groups into small towns, and
link these areas with roads and improved infrastructure. It states that tailored interventions are
needed for the poorest groups, where the lack of access to infrastructure, markets and services
remain barriers to growth and poverty reduction. Social welfare policy and poverty reduction must
be tailored to ethnic people’s specific needs and capabilities, and to address gender issues among
various ethnic groups in order to improve the human capital of future generations. The 8th NSEDP
emphasises the importance of continuing to improve and develop the information and culture
sector by actively enhancing heritage and cultural values on the basis of the cultural diversity of
the different ethnicities, and to share these traditions with the international forum. This five-year
plan also promotes equality among multi-ethnic people, by promoting a sense of pride of the
historical characteristics of various ethnic groups, and to rely on elders and leaders at the grassroots
level of various ethnic groups to promote unity among ethnic group members as a means to ensure
development.
Guideline on Ethnic Group Consultation (2012) A new national guideline on consultation with
ethnic groups launched by the Lao Front for National Development (LFND) in 2012, was largely
in line with the World Bank policy on Indigenous People (OP/BP 4.10). It aims to ensure that all
ethnic groups who benefit from or are adversely affected by a development project, without regard
to the source of funding, are fully engaged in a meaningful consultation process at all stages from
preparation into implementation. The guideline also aims to ensure that the potentially affected
ethnic groups are fully informed of project objectives, as well as their potential positive and
adverse impacts on their livelihood and their environment, and provided with opportunities to
articulate their concerns. The guidelines provide principles and processes to carry out meaningful
consultations with, and obtain free, prior and informed consent of, all ethnic groups affected by
developments projects in a culturally sensitive manner. The guidelines consist of a) objectives and
scope of the guidelines, b) consultation processes with ethnic groups at respective stages of
development projects, c) consultation approaches and methods for different ethnic groups in a
cultural sensitive manner, d) expected outcomes of consultation at each stage, and e)
implementation arrangement and responsibility.



                                                  10
Land Law (2013) The formal law governing land rights in Lao PDR includes the 2003
Constitution, the 1990 Law on Property, the 2004 Law on Protection and Development of Women
and the 2005 Law on Heritage and Basis of Inheritance, and the revised 2013 Land Law.
The Constitution guarantees that the State will protect property and inheritance rights of
individuals and organizations. It also declares all land to be a “national heritage” and that the State
will ensure use, transfer and inheritance rights to land as defined by law. The 1990 Law on Property
establishes and defines five forms of property, including: State property; collective property;
individual property; private property (property belonging to a private economic unit other than an
individual or collective); and personal property (items for personal use). It also establishes that
ownership of all land, underground resources, water, forests and wild animals is vested in the State,
though the State may grant rights of possession, use, transfer and inheritance to other entities (GoL
Constitution 2015; GoL Property Law 1990).
All land in Lao PDR belongs to the population as a whole, and the State must safeguard long-term
rights to land by ensuring protection, use, usufruct, transfer and inheritance rights. The Land Law
lays out categories of land (agricultural, forest, water area, industrial, communication, cultural,
national defense and security and construction) and defines the scope of use rights for each. It also
establishes the basic organization of land-use management authorities and framework for land
registration. The Land Law provides the basis for registering land rights and defines land
certificates and land titles. Individuals and organizations access land through land-use rights.
Recent land titling programs have formalised permanent land-use rights in urban and peri-urban
areas, and land allocation programs have formalised temporary land-use rights for agricultural and
forest land. Communal tenure, which is common in rural areas, has not been formalised.
The Land Law provides that land titles shall constitute evidence of permanent land use rights, and
establishes a system of temporary land use certificates for agricultural and forest land, allowing
rights to such land to be passed by inheritance, but not transferred, leased or used as collateral. The
Land Law also does the following: Lao citizens are allowed to lease land from the State for up to
30 years; allows the State to lease out land or grant land concessions to non-citizens; prohibits land
speculation; and guarantees compensation for State’s taking of land use rights. The Land Law
provides for settlement of land disputes before the local land-management authority or before the
People’s Court.
Many ethnic groups practice a system of land use and resource management which is uniquely
adapted for upland areas. This has developed over generations (i.e. is traditional), and is
underpinned through ritual and customary practices (Mann and Luangkhot 2008). These
customary systems of land management and allocation exist alongside the formal system, with
initiatives in recent years to integrate some traditional practices into the formal law. In many rural
areas of Lao PDR, communities control common property, such as forests or pastureland, and have
devised local customary rules for the management of land resources and allocation of land to group
members. The 1990 Property Law recognises cooperative or communal property rights generally.
The Prime Minister’s 2006 Decree 88 on Land Titling and the 7th NSEDP included provisions to
issue communal land titles for land allocated by the government to village communities (United
States Agency for International Development [USAID] 2013). Many ethnic communities have


                                                  11
traditionally recognised certain areas of forest as sacred forest sites, or spirit forests, and this is an
important cultural aspect which should be respected.
Under customary or informal rules in rural areas, local communities often control common
property, including upland areas, grazing land, village-use forests and sacred forests. All
community members are entitled to use communal land, and village authorities may grant similar
use rights to those from surrounding villages. Communal tenure systems have evolved over a long
period and vary from village to village. There is no formal registration process for communal
tenure, though it remains an important part of the cultural, political, social and economic
frameworks of rural communities (World Bank 2006; Mann and Luangkhot 2008).
Rural families may also hold land use rights under informal or customary rules. These land use
rights are usually attributed to family plots, paddy land or land for swidden agriculture. These land
use rights may be allocated by customary local authorities under local rules, and varies from village
to village. The village chief (i.e. Nai Ban) may issue a Village Heads Certificate on Land
Ownership, which while not valid on its own, may be used by local authorities to resolve disputes
or used by the family as additional proof of ownership when applying to the state for a land survey
certificate (World Bank 2006; Mann and Luangkhot 2008; GTZ 2009).
The Land Law also stipulates that, in case public infrastructure development projects cause
damages to trees, crops or buildings of the private owners, the land owners have the rights to be
compensated for the damages. 2.1.6 Law on Handling of Petitions (2015)
The revised Law on Handling of Petitions 012/NA approved by the National Assembly on
December 5, 2014 and the President in 2015 provides provisions of objectives, principles and
process of applying and handling different types of grievance, petition and complaints that may be
raised by citizens. The Grievance Redress Law divides grievances into three categories as follows:
1. Proposals is to be applied to and resolved by concerned authorities.
2. Grievance is to be applied to and resolved by judicial institutions and court
3. Petition is to be applied to and resolved by Provincial and National Assembly
The Law on Handling of Petitions 012/NA, 2015, which has superseded the old version of Law
on Grievance dated November 5, 2005 applies and protects rights and interest of all citizens and
entities, state organizations, community and individuals with the aim to ensure justice, social
security and order.


Relevant International Instruments
The Constitution of Lao PDR has been amended to incorporate human rights principles outlined
in the international treaties and conventions of which Lao PDR is a signatory party. Chapter four,
articles 34 to 51 explain the basic rights of Lao citizens. In addition, basic rights as delineated in
international instruments are included in many other national laws, such as the law on the
protection of the rights and the interests of children, 2006 (refer to Table 3). The GoL set up the
National Human Rights Research Centre in Vientiane, whose main objective is to support,


                                                   12
encourage, and implement human rights within the country. Its mandate also considers the carrying
out of research on ethnic groups. The Centre was approved by decree, No. 95, dated 11/07/06 and
by Prime Minister’s decree, No. 137, dated 24/07/2006. The Lao PDR has been a member of the
International Labour Organization (ILO) since 1964. Though the country has ratified a total of
eight ILO Conventions, including five of the eight ILO core Conventions, Convention 169 on
Indigenous Peoples has not been ratified.

                  Table 3 International treaties and conventions in Lao PDR

 No      Name of Convention                          Date of Signature   Date of Ratification

 1       Int. Convention on Civil and Political      7 Dec. 2000         29 Dec. 2009
         Rights

 2       Convention on the Rights of Persons         15 Jan. 2008        29 September 2009
         With Disabilities

 3       Int. Convention for the Protection of All 29 Sep. 2008          Not yet ratified
         Persons from Enforced Disappearance

 4       Int. Convention on the Protection of Not yet signed             Not yet ratified
         Rights of All Migrant Workers and
         Members of Their Families

 5       Int. Convention against Torture and 21 September 2010           26 Sep. 2012
         Other Cruel, Inhuman or Degrading
         Treatment or Punishment

 6       Convention on the Rights of the Child                           8 May 1991

 7       Convention on the Elimination of All 17 July 1980               14 Aug. 1981
         Forms of Discrimination against Women

 8       Int. Convention on Economic, Social and & Dec. 2000             13 Feb. 2007
         Cultural Rights

 9       Int. Convention on the Elimination of All                       22 Feb. 1974
         Forms of Racial Discrimination

 10      UN Convention Against Corruption            10 Dec. 2003        29 Sep. 2009

 11      UN Declaration on the Rights of                                     13 ep. 2007
         Indigenous Peoples




                                                  13
   2.2 WORLD BANK’S OPERATIONAL POLICY ON INDIGENOUS PEOPLES

Overview

The OP 4.10 aims to avoid potentially adverse impacts on indigenous people and increase activities
to bring to program benefits considering their cultural demands and needs. The Bank requires
indigenous peoples, (here refer as Ethnic Groups -EGs), to be fully informed and able to freely
participate in sub-projects under the program. The Program has to be widely supported by the
affected EGs. Besides, the Program is designed to ensure that the EGs are not affected by adverse
impacts of the development process, mitigation measure to be defined if required and that the EG
peoples to receive socio-economic benefits that should be culturally appropriate to them.
The Policy defines that EG can be identified in particular geographical areas by the presence in
varying degrees of the following characteristics:
a) Self-identification as members of a distinct indigenous cultural group and recognition of this
identity by others;
b) Collective attachment to geographically distinct habitats or ancestral territories in the program
area and to the natural resources in these habitats and territories;
c) Customary cultural, economic, social, or political institutions that are separate from those of the
dominant society and culture; and
d) Indigenous language, often different from the official language of the country or region.
As a prerequisite for an investment Programme approval, OP 4.10 requires the borrower to conduct
free, prior and informed consultations with potentially affected EG peoples and to establish a
pattern of broad community support for the Programme and its objectives. It is important to note
that the OP 4.10 refers to social groups and communities, and not to individuals. The primary
objectives of OP 4.10 are:
To ensure that such groups are afforded meaningful opportunities to participate in planning
Program activities that affects them;


To ensure that opportunities to provide such groups with culturally appropriate benefits are
considered; and
To ensure that any Program impacts that adversely affect them are avoided or otherwise minimized
and mitigated.
In the context of the sub-project, the EGs (equivalent to indigenous peoples) in the ER-P
jurisdiction (based on the existing ER-P Accounting Area and who either use or have used or seek
to use the forests or are involved with production forestry on which carbon emissions will also be
quantified) likely to receive long term benefits through a range of socio-economic, environmental
and governance non-carbon benefits as follows:
      Maintenance of sustainable livelihoods, cultural identity and community cohesiveness;


                                                 14
      Improved access to cultural services and strengthening of traditional knowledge resources;
      Valuation for forest resources, including and especially NTFPs using socio-cultural
       accounting methods rather than simply conventional resource economic methods;
      Modest income generation and employment opportunities;
      Promotion of climate smart agriculture;
      Conservation and protection of biodiversity;
      Protection and proliferation of medicinal plants and curative practices;
      Water use regulation and watershed management;
      Strengthening of village level socially inclusive governance;
      Improved forest governance and management; and
      Participatory land use planning.

Under Components 2 and 3, some proposed Project activities may be involved with potential land
acquisition and/or resettlement impacts and/or ethnic communities/social groups (such as Hmong,
Khmu, Mien, Makong, Bru and others), who are known in Lao PDR as Ethnic Groups (EG) and
meet WB eligibility criteria under OP/BP 4.10. Other donors may have their own eligibility
criteria. To mitigate these impacts, WB OP/BP 4.10 requires that special planning measures be
established to protect the interests of ethnic groups (i.e. social groups with a social and cultural
identity distinct from the dominant society that makes them vulnerable to being disadvantaged in
the development process). The EG are considered to be vulnerable ethnic communities in Lao PDR
as their livelihood is heavily based on subsistence agriculture and forest. The presence and
involvement of these EG triggers the WB operational policy on Indigenous Peoples (OP/BP 4.10).
As a prerequisite to WB support, the Project must meet the requirements of OP/BP 4.10.


The six target provinces are located in remote areas and mostly with limited road access, it is likely
that the project will be located in areas which are home to ethnic populations. Given that the
Project aims to improve quality, stability, and safety of existing provincial and district roads and
climate resilient all local population, including ethnic communities, will collectively benefit from
the Project. However minor impacts may also occur and need special mitigation measures. OP/BP
4.10 requires for screening of EG community in the project area and if they are present as a group
or community, preparation of an Ethnic Group Development Plan (EGDP) will be prepared and
applied (refer Annex 1). Free, prior, and informed consultation will be required during the planning
and implementation to establish ethnic community broad support for the project. Given that all the
project works and locations are not known before appraisal and thus ethnic people are still to be
identified, an Ethnic Groups Policy Framework (EGPF) has been developed describing the policy
and procedures for consultation for the projects to ensure that the EG can voice their concerns and
their opinions are heard throughout the project preparation and implementation process. Need for
preparation of an EGDP will be identified during the safeguard screening to be conducted (refer
Annex 1). The EGPF is an integral part of the Environment and Social Management Framework
(ESMF) prepared for the Project.



                                                 15
3. PROGRAM POTENTIAL IMPACTS

   3.1 POSITIVE SOCIAL IMPACTS

The ER-P interventions are designed to generate non-carbon benefits particularly in social and
governance benefits of participatory development. The ER Program also promotes pro-poor
development and enhanced food security impacts through strong engagement of the rural
population, with attention paid to ethnic groups and women along the entire process, and
corresponding in provisions within the benefit sharing regime. Other priority non-carbon benefits
which are expected include improved land tenure security, enhanced capacity in law enforcement,
monitoring and reporting; and increased watershed protection and forest and landscape restoration.
The activities under the four main components will be rolled out in the six ER Program provinces,
targeting over 70,000 ha for promoting improved agriculture interventions and 320,000 ha for
promoting sustainable forest management and FLR. The enabling environment related activities
under Component 1 will also generate impacts beyond the ER Program area. An estimated 42,000
rural households and ethnic groups (total approximately 254,000 people) are projected to benefit
from the ER Program at least 40 per cent of whom will be women and ethnic group members.
These estimates are based on the estimates from the PRAPs.
The ER Program envisages a budget of USD 136 million for its roll out (for the six years of 2019-
2024). This includes already committed finances from Government and international sources,
anticipated finances including a project under formulation for submission to the Green Climate
Fund, and reinvestments of a part of the anticipated results-based payments from the Carbon Fund.
The ER Program anticipates a potential income stream equivalent to 13.24 million ERs (USD 66.2
million based on USD 5/tCO2e). Such ex-ante estimation of emission reductions and removals are
based on the areas of interventions to be implemented and a co-efficient applied to reflect
efficiency rate for non-land-based interventions. This reflects net results of approximately 19.36
million tCO2e, against the 2005-2015 reference level (RL), to be achieved. Of this, 12.67 million
tCO2e are from reduced emissions, and 6.69 million tCO2e are from enhanced removals.

The Benefit Sharing Plan (GFLL-BSP) will be administered and managed by the Environment
Protection Fund (EPF) for the first two year of the ER implementation. There will be a transition
of fund management from EPF to Forest Protection Fund (FPF). The transition will include
capacity building for FPF staff to manage and disburse the fund to beneficiaries. Fund will be
disbursed with approval signatures from both The Head of DoF (MAF) and the Chairman of
National REDD+ Task Force (NRTF). The Approval will be done after Verification and Validation
of beneficiaries from PAFO and DAFO are confirmed. However, this arrangement is still being
discussed within Ministry of Agriculture and Forestry (MAF) whether to use EPF or FPF as fund
manager for the BSP. No decision has been made so far.

The GFLL-BSP articulates the principles of the Lao REDD+ approach to benefit sharing that
ensures over 85 per cent of gross ERPA Payment as of results-based payments are allocated to
communities in districts and provinces. The funds will be directly transferred to communities once
the result of reduced emissions has been measured and verified by DAFO and PAFO. The ethnic


                                               16
group through village committee fund will be eligible to receive the funds. The remaining 15% of
total gross ERPA Payment are allocated for fixed operational costs for the GoL to manage,
facilitate, and monitor the ER program. The operational costs include coordination and
communication between and within government agencies at national, provincial, and district
levels.



   3.2 NEGATIVE SOCIAL AND ENVIRONMENTAL IMPACTS

On the basis of the consultations and the impact assessment referred to in the SESA, the main
negative impacts are expected to be related to the following:
   -   Restricted access to forest
   -   Insecurity of land tenure and ethnic groups in remote areas not having land title
   -   Loss of livelihood and income due to changes in land use planning
   -   Unequal distribution of benefit sharing
   -   Lack of meaningful consultation and engagement in ER Program implementation
   -   Gender inequality in land use rights, including forest land rights, has potential negative
       implications for women’s abilities to benefit under REDD+ on the same scale as men
   -   Potential loss of critical natural habitats
   -   Conversion of natural forests into plantation
   -   Loss of forest to infrastructure
   -   Invasive species, forest fires and soil erosion
   -   Health and safety issues due to the increased inappropriate use of dangerous pesticides and
       herbicides, and
   -   Soil and water contamination from dangerous pesticide-related wastes.

   3.3 MITIGATION MEASURES

Risk management will be addressed through the safeguards plans, the Environmental and Social
Management Framework (ESMF), Ethnic Group Policy Framework (EGPF), Resettlement Policy
Framework (RPF), and Process Framework (PF).
In all cases, every effort will be made to avoid permanent land acquisition and physical
resettlement. However, where avoidance is not possible, compensation will be paid to the affected
households. For example, for local people who lose their land permanently compensation will be
made in accordance with this EGPF/RPF. Temporary environmental impact due to dust, noise, etc.
which affects the income generation activities of local people affecting shops, local businesses,
etc. will be duly compensated.




                                               17
4. ETHNIC GROUP POLICY FRAMEWORK, PRINCIPLES AND PROCEDURES

   4.1 BASIC PRINCIPLES OF THE ETHNIC GROUP POLICY FRAMEWORK

The basic principles of the EGPF to be applied to the ER-P will be as follows:
- Scope: Ethnic group peoples can be identified in particular geographical areas by the presence
in varying degrees of the following characteristics: (i) a close attachment to ancestral territories
and to the natural resources in these areas; (ii) self-identification and identification by others as
members of a distinct cultural group; (iii) an indigenous language, often different from the national
language; and (iv) presence of customary social and political institutions.
- Based on the above characteristics, there are many ethnic groups in Laos. According to Lao Front
for National Development (LFND) classification, four linguistic groups with 50 ethnic categories.
They are Lao-Tai, Mon-Khmer, Hmong-lomien, and Sino-Tibetan groups. The Bank has
determined that OP/BP 4.10 will apply to at least three linguistic groups except for Lao-Tai, who
still maintain cultural and socio-economic practices different than those practiced by the Lao
national majority.
- In the context of this Project, it is important to note that the OP/BP 4.10 refers to social groups
and not to individuals. The primary objectives of OP/BP 4.10 are: (a) to ensure that such groups
are afforded meaningful opportunities to participate in planning that affects them; (b) to ensure
that opportunities to provide such groups with culturally appropriate benefits are considered; and
(c) to ensure that any project impacts that adversely affect them are avoided or otherwise
minimised and mitigated.
To ensure that all communities are consulted properly, the following principles will be considered
during the data collection and FPIC process of the projects.
- All communities will be approached in the spirit of honest and constructive collaboration, and
clearly explained about the rational for emission reduction, and of the subproject’s purpose,
activities, potential benefits and potential losses.
- All communities, regardless of their ethnic group or social status, will be engaged in an inclusive
and culturally relevant manner on the basis of a free, prior and informed consultation aimed at
establishing broad-based and sustainable community support for the subproject.
- All communities will be informed by the responsible DoF throughout the project implementation
through appropriate means of information, education and communication. If needed,
communication throughout the project cycle will use appropriate information.
- The principles are similar to the EGPF being applied to the on-going projects.
- Education, and communication materials to respond to issues of language and ethnicity,
literacy/illiteracy, gender, and social vulnerability.
- All communities will have the opportunity to participate in and benefit from the project as well
as take on the responsibility to adhere to emission reduction.



                                                 18
- Projects will give sufficient attention to encourage women to play an active role in the
consultation process. During implementation, the women will be: (a) consulted and their concerns
addressed; (b) given the opportunity to participate in community group meetings, focus group
discussions, planning and implementation; and (c) represented equally in the Feedback and
Grievance and Redress Committees (FGRCs).

5. CONSULTATION FRAMEWORK FOR ETHNIC GROUPS UNDER EGPF

   5.1 Consultation and Information Disclosure

The GoL’s program design broadly consulted all six provinces (including targeted consultations
with ethnic groups (EGs)). Participatoty methods included village-level meetings with households,
focus group discussions, workshops, participatory forest transects, natural resource assessments
and interviews of key informants. Consultations have sought to identify local people’s views
regarding opportunities and constraints arising from forest and land resource access and use,
including possible land use conflicts, and the security of their livelihoods. Qualitative data
acquired through these processes has been used in the design of the overall program. Also, a
detailed stakeholder analysis was conducted as part of developing the consultation and
participation plan to identify the relevant stakeholders that might gain or lose from the program.
This section provides a framework for ensuring that the ethnic groups in the Program area
(equivalent to the indigenous peoples as defined in OP 4.10 of the WB) has equal opportunity to
share the Program benefits, that free, prior and informed consultation, and adequate information
dissemination will be conducted to ensure their broad-based community access and support to the
Program are obtained, and that any potential negative impacts are properly mitigated and EGPF
will be applied to all the sub-projects. It provides guidance on how to conduct preliminary
screening of ethnic groups, social assessments, EGDP establishment and identification of
mitigation measures given due consideration to consultation, grievance redress, gender awareness,
and monitoring. An outline of the EGDP report is provided in Annexure 1.
In terms of consultation and participation of ethnic groups, when the sub-projects have impacts on
EG, the affected EG peoples have to be consulted on the basis of free, prior, and informed
consultation, to assure:
      EG people and the community where they belong to are consulted at each stage of sub-
       project preparation and implementation;
      Socially and culturally appropriate consultation methods will be used when consulting EG
       communities. During the consultation, special attention will be given to the concerns of
       EG women, youth, and children and their access to development activities;
      Affected EG people and their communities are provided, in a culturally appropriate manner
       at each stage of preparation Program information (including information on potential
       adverse effects that the Program may have on them; and
      The free, prior and informed consultations with EG leads to a broad community support
       for the Program implementation.

                                               19
If necessary, a local person (of the same EG group) will be invited to join the consultation just in
case local EG language is required to promote the free exchange of information between the EG
peoples, and the consultant team.
Consultation is important to EGDP preparation since it provides ethnic groups (both potentially
affected and not affected by sub-projects) with opportunities to participate in planning and
implementation of sub-projects. More importantly, it helps identify potential adverse impact, if
any, as a result of sub-project, on EG’s income generation activities and their livelihoods, thereby
enabling devising of appropriate measures as to how adverse impacts could be avoided, minimized,
and mitigated.
Consultation also aims to ensure EG people have opportunities to articulate, on the basis of their
understanding of sub-projects/Program goal, their needs for support from the Program in relation
to the Program goal/Program activities.
Consultation with EG during program implementation

Free prior and informed culturally appropriate consultations will be conducted with all ethnic
people that are living in villages that will potentially be included in the sub-projects. Information
on what the ER-P hopes to achieve and how these ethnic group villagers will benefit but also the
possible negative impacts will be included in the consultative processes. Furthermore, as part of
the processes associated, it will be necessary to explain very carefully the objective of the ER-P
and enable all participants to understand the specific nature of the ER-P. Most importantly it is
necessary to explicitly state the expected results-based outcomes of the ER-P. The consultation
will take into consideration that in some of the villages of the ER-P only a single ethnic minority
group resides, but in villages with more than one ethnic group, all ethnic groups are given the same
treatment. The ER program will therefore ensure culturally appropriate consultations that are
consistent with the culture of EG, including their language, customs and traditions. The EGPF and
activities associated with the ER-P will be also be updated.
The Provincial Program Management Unit (PPMU) will be responsible for ensuring the
participation of the EG communities. The social scientist in the PPMU will support the PPMU in
carrying out culturally appropriate consultations with the targeted beneficiaries. Effective
communication strategy and documents will be prepared during the readiness and ERPD design,
these will be used to support the communication and outreach to ethnic groups. Community
groups/associations, local leaders and EG leaders, LWU and LFND, and local agencies will be
targeted as well during consultation process. It is essential to invite all local people to participate
in meetings, including separate meetings with women, to know their views on ER program
activities and identify the positive and negative impacts on their lives from the program and any
proposed sub-projects.
PPMUs will hold regular meetings with the local development committees, LWU and women's
associations, village chief and local communities to ensure that all involved persons are fully aware
of and understand the contents of the ER program. The purpose of the consultations is for all EGs
expected to be affected by the program to gain sufficient information about the component,
activities, the mitigation and compensation measures, and mechanisms established for redress of
grievances.

                                                  20
Through the consultation process, PPMUs will notify the EG people of their rights, the scale of
the sub-project, and the potential impacts on the livelihoods, environment and natural resources.
When there is a difference or a conflict between EGs and the project implementing agencies
emerge, PPMUs will need to put in place a mediation and negotiation approach to resolve those
differences. Negotiation includes mutual respect for cultural differences, discussion of the issue
with the legitimate representatives of the EGs, allowing sufficient time to make decisions, and
willingness to compromise and record results.

   5.2 Preparation prior to conducting free, prior, and informed consultations

      Before starting consultation with EGs, the objective of the EGDP should be set forth. This
       aims to ensure a) a project’s potential adverse impact on EG’s livelihood/ income
       generation activities, if any, could be avoided/ minimized/ mitigated and b) EG peoples (in
       the sub-project area) receive social and economic benefits (from the sub-project) that are
       culturally appropriate to them.
      The following information/ tools should be ready to assist the preparation of the EGDP:
      Key findings of the social assessment, including both positive and negative impacts of the
       sub-project, if any;
      Data collection tools (including a) guide questions - to facilitate the consultations, b)
       household questionnaire (if quantitative analysis is required, c) other utensils assisting data
       recording. Data collection tools should be pretested to ensure the way the questions are
       asked are understandable (local languages), and appropriate to consult EGs;
      Language: when pre-test/ experience indicates local EG language should be used for
       consultation, a good interpreter (i.e. a local EG person) should be arranged and available
       on the research team to ensure effective and convenient communication/ interaction during
       the consultation process;
      Program information: a set of documents summarizing key information related to the ER-
       P, such as a) Program goal, b) Program Components and Sub-Components; c) Suggested
       Activities; c) Potential ER-P impacts (from the social assessment), etc., should be carefully
       prepared beforehand, and provided to the facilitators; and
      Program information should however not rely solely on written documents/
       communications (e.g. for compensation, technical training, etc.). In most of the sub-project
       areas, particularly where target beneficiaries are located in relatively remote areas - making
       schooling difficult – the level of education is very low and there are relatively high levels
       of illiteracy, particularly amongst women. The content of documents and communications
       must be supplemented by face-to-face verbal communications.
Language barriers with ethnic groups at sub-project sites could be an issue. However, as with the
general community, literacy is a problem that affects ethnic groups.




                                                 21
      5.3 Conducting free, prior, and informed consultations

         The facilitators should ensure a free, prior, and informed consultation, and foster an
          informed participation of the EG peoples consulted. The consultation methods employed
          should be appropriate to the social and cultural values of the consulted EGs, and their local
          conditions. The purpose of FPIC exercise is expected to confirm whether there is a broad
          community support for the sub-project implementation.
         In case the outcomes result in adverse impacts for some households, it is important that the
          affected EG population understand clearly and sufficiently the potential impact, so as to be
          able to provide a meaningful feedback on how such impact could be
          avoided/minimized/mitigated, and how the compensation would be made in the event the
          adverse impact is unavoidable.
         It is also important for the facilitators understand clearly and assess the level of support
          from EG people they consult, particularly for those who are adversely affected and would
          expect appropriate mitigation or compensation measures.
         The research team should ensure a free, prior, and informed consultation, and foster an
          informed participation of the EGs consulted. The consultation methods employed should
          be appropriate to the social and cultural values of the consulted EG communities, and their
          local conditions. The purpose of FPIC exercise is expected to confirm whether there is a
          broad community support for the sub-project implementation.
         In case the sub-project results in adverse impact, it is important that the affected EG
          population understand clearly and sufficiently the potential impact, so as to be able to
          provide a meaningful feedback on how such impact could be avoided/ minimized/
          mitigated, and how the compensation would be made in the event the adverse impact is
          unavoidable.
         It is also important for the research team to understand clearly and assess the level of
          support from EGs consulted, particularly for those who are adversely affected and would
          expect appropriate mitigation or compensation measures.
         The results of consultation must be provided to the affected EG communities to enable
          both facilitators and EGs to validate the results of the consultation process, and ensure that
          EGs consulted agree to be part of the proposal.
5.4              Information disclosure
The WB requirement is that this EGPF should be disclosed prior to Program appraisal. Lao version
will be disclosed on the website of the DoF/ PMU, and locally at provincial, district, and village
levels. The English version of this EGPF will be disclosed on Bank’s website.
Site specific EGDP will be prepared during Program implementation by the PMU will be disclosed
locally prior to appraisal of respective activities but consistent with the broader systems approach
the WB will only appraise EGDPs selected at random. The EGDPs would be disclosed in an
accessible place and in a form and language understandable to the EGs as well as other Program


                                                   22
stakeholders. Overall the ER-P is classified as Category B since it mainly consists of actions and
measures aimed at reducing the rates of deforestation and degradation to protect and conserve
forests in the areas of intervention. Any potential environmental impacts and risks stemming from
the implementation of on the ground activities are expected to be moderate, localized, short-term,
and manageable.
5.5            Ensuring Broad Community Support
Ensuring broad community support will be made possible through using the culturally appropriate
medium of communication and consultations. There are quite definitive language barriers in many
of the ethnic groups, especially for older women and to a lesser extent older men and for some
ethnic groups. However, during all consultations for the SESA and in the preparation of this EGPF
all participants strongly preferred to be consulted in their own language. Thus, the EGPF clearly
stipulates that unless this is demonstrated there would be no basis for broad community support.
6 IDENTIFICATION AND PREPARATION OF AN EGDP
An EGDP will be prepared to ensure that ER program implementation will follow OP4.10 by fully
respecting the dignity, rights, cultural practices and economy of ethnic minorities. EGDP will be
prepared irrespective of whether one or more ethnic groups are involved. The Safeguards
specialists within the PPMU would assist prepare an EGDP. PMU/PPMU will be responsible for
ensuring that an EGDP was prepared consistent with OP4.10 with evidence of broad community
support from all ethnic groups impacted by the ER-P.
Where there is no broad community support, it will be required to develop additional measures to
ensure there is broad community support. For instance, it will be required to demonstrate that if
one of the ethnic group villages or even households within the same villages do not support the
ER-P for whatever reason, confidence-building measures via the EGDP will have to be explicitly
stated. The EGDP will ensure that EGs will be represented by both men and women responsible
for designing and implementing ER program activities, any negative impacts will be addressed
through the consideration of alternative options according to the outcomes of consultations
conducted.
The consultation framework aims to ensure that ethnic groups are well informed, consulted and
mobilised to participate in the subprojects so that clarity could be provided regarding the potential
benefits as well as potential negative impacts. Consultation with EG will be made during the
preliminary screening process and the development and implementation of an EGDP if needed.
Consultations with and participation of ethnic groups, their leaders and local government officials
will be an integral part of the EGDP. Scope of the EGDP should include preliminary screening,
social assessment, mitigation measures, development assistance, and monitoring
Preliminary Screening: As mentioned above (Step 1) that safeguard screening form being used is
provided in ESMF. Specific procedure for consultation during the preliminary screening is
highlighted as follows:




                                                 23
- All subproject areas which have ethnic group communities and are candidates for the Project
support will be visited (at the time of first consultation with community) by DoF and relevant local
authorities, and consultants (if any).
- Prior to the visit, respective DAFO and/or PAFO will send letters to the communities informing
their leaders that they will be visited by the respective DAFO and local authorities and
consultations will be conducted on the project. The letter will request that the communities invite
representatives of farmers, women associations and village leaders for discussion on the project.
During the visit, community leaders and other participants will present their views with regard to
the project.
- At this visit, the social scientists (PAFO and/or consultants) will undertake a screening for ethnic
group population with the help of ethnic group leaders and local authorities. The screening will
check for the following: (a) names of ethnic groups in the affected villages; (b) total number of
ethnic groups in the affected villages; (c) percentage of ethnic people in affected villages; (d)
number and percentage of ethnic households along the zone of influence of the proposed sub-
project.
If the results show that there are ethnic group communities in the zone of influence of the proposed
project, a social impact assessment (SIA) will be planned for those areas.
6.1 ETHNIC GROUP SCREENING
The triggering of the policy OP4.10 is the presence of ethnic groups influence, not whether they
are adversely affected or “not able to benefit from interventions proposed”; if ethnic groups are
beneficiaries of a Program – without direct adverse social impacts – an EGDP will be prepared
based on free, prior and informed consultation and social assessment to ensure that the
interventions proposed sub-project will provide culturally appropriate benefits to EGs.
       First, screening for EGs should be done within the sub-project area, and/or area of influence
        as determined by PMU/PPMU.
       Second, where it is identified that EG households are living in the jurisdiction area of the
        proposed sub-projects an EGDP will be prepared.. The basis for development of the EGDP
        will be based on the following criteria:
       Community with ethnic groups living is under extremely difficult situation;
       There is acquisition of production and/or residential land of ethnic groups;
       There are negative impacts on ethnic communities living in the area; and
       The need to assist the development of ethnic groups in the region through consultation.
Also, if the ethnic communities in the Program area are affected to the cultural identity or facing
difficulties that present any obstacle to their participation, potential to benefit from the sub-project,
there should be appropriate measures to resolve and mitigate this problem.




                                                   24
The EGDP should be developed on the basis of social assessment and consultation with ethnic
groups in the Program area.


6.2 SOCIAL ASSESSMENT
Purpose: The Social Assessment (SA) required by the WB as an essential component of the EGDP
preparation will be incorporated into the Socio-Economic and REDD+ Needs Assessment. This
will be facilitated by a social development specialist with expertise in natural resource
management issues in upland forest-dependent areas of the ER-P Accounting Area who will work
in conjunction with ethnic group households to identify key socio-economic issues and past and
existing deforestation and forest degradation activities that have led to the creation of hot-spots
exacerbating deforestation and forest degradation. In the context of Bank’s OP 4.10, this is a study
that aims to explore how planned Program activities under a Bank supported sub-project that might
affect the livelihoods of ethnic group households present in the proposed area of influence. The
purpose of the SA is to ensure if there is any potential adverse impacts as a result of the sub-project,
appropriate measures are in place to avoid, mitigate, minimize such potential adverse impact, or
to compensate for affected population, if unavoidable. For this Program a Strategic Environmental
and Social Assessment (SESA) was also prepared.
The overall objective of the SESA is to better understand the impacted communities in order to
improve community engagement in long-term investment planning processes to ensure long-term
sustainability and client ownership of the proposed investments.
Methods: A social assessment in brief is a series of activities that are carefully planned and
implemented to generate an outcome as outlined in the Purpose section above. Most important
with the SA exercise is the consultation process to be conducted with EG people in the sub-project
area. Consultation should be undertaken as a series of meetings with EGs carried out at different
times during the sub-project cycle to ensure potential impact is projected as accurate as possible.
As a good practice, EGDP will be prepared based on free, prior and informed consultation and
social assessment to ensure that the sub-project will provide culturally appropriate benefits to EG
people.
The EG consulted needs to be provided with accurate and sufficient information about the
proposed interventions before specific consultations take place. However, for the ER-P this should
not be a major issue because of the approach will mean all affected members. The problem will
arise for those households or villages who decide for whatever reason not to join the sub-project.
Hence, for this category of EG person, appropriate consultation methods, specific to each ethnic
groups, need to be adopted to obtain valid and reliable feedback from the EG being consulted.
When consulting EG, particular attention need to be given to vulnerable groups, particularly those
below the poverty line, the landless, the elderly, women and children. It is important that broad
community support for the sub-project intervention be obtained before such an intervention is
appraised for implementation.



                                                  25
Data collection: There are two types of data that need to be collected for a social assessment
undertaken for the proposed interventions. Data that are already available to the affected/target
EG population is secondary data. However, apart from the SESA and some statistical data there
is not much secondary data available. However, the point has already been made that the ER-P can
readily identify those ER-P areas which will involve more than one ethnic group. This was quite
easily undertaken during the SESA when ethnic group villages in different communes and districts
of the ER-P provinces were undertaken. The social assessment component also known as the social
screening component will need to rely on external experts because such capacity is not readily
available at the local level. Experience shows that data specific to the household level are typically
not readily available. Primary data, therefore, should be obtained from affected population through
household surveys/visits, through focus groups discussion using appropriate participatory
consultation processes and natural resource transects.
Type of data: When conducting a social assessment to develop an EGDP, the following
information should be collected from both secondary and primary sources:
      General socio-economic data of the potentially affected EG population specify key
       demographic data on household composition, gender-differentiated data on income streams
       and occupations, education, health status, etc.;
      Key cultural traits of EG groups;
      Types of income generation activities, including income sources, disaggregated by their
       household member, work season, include land and productive assets;
      Annual natural hazards, such as storms, floods and drought that may affect their livelihood
       and income earning capacity, including a focus on more recent climate change induced
       natural hazards;
      Common pool resources, production and livelihood systems, and whether such groups have
       access to production forest land and agricultural land;
      Potential (positive and adverse) impacts of sub-projects on their livelihoods; and
      Preferences of EG for support in development activities that are related to the ER-P.
   Data Analysis: This exercise is challenging, ranging from simple to complicated, depending
   on the type of data collected and the complexity of data, as well as data analysis skills available
   from the social assessment team. As a suggestion, qualitative data analysis should be obtained
   and analysis to support the findings of the social assessment. Quantitative analysis should be
   considered well before hand, and should only be adopted with the support from trained staff
   and support from an external consultant. The extant point is that the EGPF should not promote
   exercises in data analysis that are abstract.




                                                 26
Institutional Arrangements and Steps for preparation of an EGDP
PMU and PPMU and their safeguards specialists should follow these guidelines in order to prepare
an EGDP for a sub-project.
    Screening of EG peoples as stated above

6.3 Preparation of an EGDP report
An EGDP should contain elements and aspects as indicated in the World Bank’s OP 4.10. The
depth and breadth of the EGDP may vary depending on the nature of Program impacts, and the
proposed development activities – as agreed upon with the consulted EG peoples that are
consistent with the ER-P. The final version of the EGDP, incorporating final feedback from
consulted EG peoples has to be disclosed – as per OP 4.10 requirements.


6.4 Procedure for review and approval of an EGDP and reporting on implementation
Once preparation of an EGDP is completed for a sub-project, Provincial PMU needs to submit the
EGDP to the Central PMU for their review and comments. As part of the broader systems approach
adopted for the ER-P a degree of self-reporting is envisaged for the ER-P this includes review and
approval of an EGDP. The ERPA General Conditions already require that the Program Entity
(PMU) submits as a separate annex to each ER Monitoring Report “evidence satisfactory to the
Trustee that the ER Program Measure(s) are being implemented in accordance with the Safeguards
Plans.” This means the Program Entity (PMU) is required to self-report on compliance of ER
Program Measure(s) with WB safeguards. The FCPF Methodological Framework requires
(Criterion 25) that (i) the Safeguards Plans for an ER Program include “appropriate monitoring
arrangements” for safeguard information; and (ii) the (self- reported) information on the
implementation of the Safeguards Plans (provided as a separate annex to each ER Monitoring
Report) is regularly collected, reported and publicly disclosed. The Program Entity is encouraged
to make such information available to relevant stakeholders. General reporting and in particular
reporting on safeguards will occur annually (this will be based on internal quarterly and semi-
annually reporting).
6.5 Implementation arrangements of an EGDP
The Ministry of Agriculture and Forestry (MAF), on behalf of the GoL, is the Program owner. MAF
assumes an overall responsibility for the entire ER-Program. The PMU directly implements all ER-P
activities in the field with technical support from PPMU. Details of implementation arrangements are
provided in ESMF.
At the Central level: a PMU is established at DoF to coordinate the Programme implementation. PMU
will be responsible for the overall implementation of EGDPs prepared under the Program and ensuring that
all PPMUs understand the purpose of EGPF, and how EGDPs for each sub-project are prepared and
approved prior to implementation. PMU is also responsible for ensuring effective implementation of the
EGDP, including monitoring and evaluation of the implementation of the EGDP.




                                                  27
At the outset of the Program implementation, safeguards specialists in PMU will provide training to
specialists and staff at PPMUs to enable them undertake screening of ethnic group peoples in the sub-
project area. Where local capacity is insufficient to prepare an EGDP, qualified consultants may be
mobilized to assist PPMU in development of EGDP for the sub-projects. EGDP should be prepared in
accordance with the EGPF.
At provincial level: The PPMUs are responsible for preparing and implementing the EGDPs. Appropriate
staff and budget – sufficient to implement an EGDP, should be assured. In case where EG peoples are
affected as a result of land acquisition, to allow construction of sub-projects, compensation, assistance to
EG affected will be addressed through relevant RAP which is prepared for the establishment of sub-projects
in accordance with the program’s RPF.
Responsibilities for preparation and implementation of an EGDP are as follows:
a) The general responsibility of the elaboration and implementation of the EG policy framework belongs to
the Program Management Unit Office (PMU). The PMU shall employ safeguards consultants (placed in all
PPMUs) in close coordination with PAFO/DAFOs and other organizations involved in the ER-P and
affected communities to prepare the EGPF. This EGPF will be approved by the MAF and cleared by the
WB prior to the time of Agreement Negotiation.
b) The EGDP of each province will be prepared with the assistance of an external expert based on the
principles of the EGPF and the ER-P will cover the costs of this assistance.
c) The DoF/MAF, shall be responsible for ensuring effective implementation of the EGPF and the EGDPs
in close consultation with all provincial departments.
Relevant and involved provincial/district departments will be provided with capacity building experience
to prepare and implement the EGDPs in accordance with the EGPF.

7 FEEDBACK AND GRIEVANCE REDRESS MECHANISM

The ESMF describes the FGRM in detail. Grievances related to environmental and social issues
from ethnic groups that result from Project activities at the community level will be resolved by
the Village Mediation Unit (VMU). However, the complainant also retains the right to bypass this
procedure and can address a grievance directly to the DoF/MAF Office or the National Assembly
(NA), as provided for by law in Lao PDR. At each level grievance details, discussions, and
outcomes will be recorded in a grievance logbook. The status of grievances submitted and
grievance redress will be reported to DAFO management through the monthly report.
The communities and individuals who believe that they are adversely affected by a WB supported
project may submit complaints to existing project-level grievance redress mechanism or the WB’s
Grievance Redress Service (GRS). The GRS ensures that complaints received are promptly
reviewed in order to address project-related concerns. Project affected communities and
individuals may submit their complaints to the WB’s independent Inspection Panel which
determines whether harms occurred, or could occur, as a result of WB non-compliance with its
policies and procedures. Complaints may be submitted freely after concerns have been brought
directly to the WB’s attention, and Bank Management has been given an opportunity to respond.
For information on how to submit complaints to the World Bank’s corporate Grievance Redress



                                                    28
Service (GRS), please visit www.worldbank.org/grs. For information on how to submit complaints
to the World Bank Inspection Panel, please visit www.inspectionpanel.org.
There are several pieces of legislation in Laos that provide for consultations with local
communities. These include the Initial Environmental Examination (IEE) and Environmental and
Social Impact Assessment (ESIA) depending on the sizes of investment projects. In areas where
participatory land use planning (PLUP) is carried out, consultations with local communities also
take place, although PLUP and other types of participatory planning are not enshrined in legislation
FPIC is practiced in Laos as part of the requirements of development partners, especially the
international finance institutions such as the World Bank and ADB. Moreover, the sam sang
(literally, “three builds”) directive of the community development with significance of
participatory approach.
The 8th NSEDP emphasises agricultural development in a number of plains and plateau areas,
while upland and mountainous areas are given less mention. MONRE-sponsored regulations 8029
and 8030 on IEE and ESIA (2013). There is a PLUP Manual produced by MAF (2010). There is
also an MPI Participatory Planning Manual (2012). PM 59 on Participatory Sustainable Forest
Management (PSFM) in Production Forest Areas (PFAs) (2002) provides for community
participation.
 Of interest for this project, the Scaling Up Participatory Sustainable Forest Management project
(SUFORD-SU) had developed a Community Engagement Manual in 2015 which includes FPIC,
even if it may not completely reflect FPIC “best practice.” Apparently, the LFND has produced
guidelines on Ethnic Group Consultation in 2012.



   7.1     ETHNIC GROUP POLICY                   FRAMEWORK             CONSULTATION            AND
         INFORMATION DISCLOSURE

During 2016 to 2019, village/district/province level consultations were conducted, focusing on the
project scope and for finalization of the SESA, ESMF, and RPF. The data collected and results of
analyses were taken into consideration during the drafting of the ESMF, EGPF and RPF.
The SESA, ESMF including RPF and EGPF were disclosed on the MAF website and the World
Bank’s website. The final ESMF, EGPF and RPF will be re-disclosed in MAF/REDD+ website
and in the six target project provinces as well as on the World Bank’s website.
The Ethnic Group Consultation Guidelines launched by the LFND in 2012, which is in line with
the National Guideline on Public Involvement, 2012 were strictly followed. It aims to ensure that
all ethnic groups who benefit from or are adversely affected by a development project, without
regard to the source of funding, are fully engaged in a meaningful consultation process at all stages
from preparation into implementation.




                                                 29
   8 MONITORING AND EVALUATION

Overview
Responsibility of overall monitoring of GFLL rests with an approach of measurement, monitoring
and reporting established under the supervision of the DoF/MAF. The implementation and results
of EGPF and integrated activities of ethnic group works would be monitored regularly and
internally by provincial and district committees. Regular reports will be compiled into quarterly
reports, would be submitted to DoF/MAF.
Implementing the EGPF will also be subjected to external independent monitoring by a qualified
consultant or a civil society organization (CSO).
The WB will retain the responsibility to determine that safeguards system application to ER
Program. Monitoring and evaluation process is outlined in ESMF.
Additional monitoring would be introduced with the assistance of Thirty Party monitors.
To encourage broad-based participation and target the vulnerable and dis-advantaged participants,
disaggregated in terms of gender, ethnicity and socio-economic indicators would be identified.
The following guidelines will be considered in developing a monitoring and evaluation system:
   -   Involve villagers in designing the monitoring program, collecting data, and drawing
       conclusions, and
   -   Identify indicators and tools to measure the project’s impact on women, ethnic groups and
       vulnerable section of the village.
For external monitoring, Independent Third-Party monitors or an independent consultant should
be engaged. External monitoring should be a regular feature, as agreed by the DoF/MAF. Reports
of independent monitors should be submitted to the WB, as and when necessary.
8.1 Internal monitoring
Monitoring and evaluation will cover both program performance monitoring and effectiveness
monitoring. Program performance monitoring will determine the progress in program
implementation against established benchmarks and milestones indicated in the program document
and work plans.
The DoF/MAF will appoint adequate full-time staff to undertake the internal monitoring of EGPF
implementation. The staff will monitor the process of land acquisition or land donation in
collaboration with local village or district authorities. Specifically, this staff will conduct internal
monitoring with following key assignments:
   -   Coordinate with related agencies in process of EGPF implementation
   -   Collect necessary data, as required by the EGPF, to set up a database of implementation
       progress reports for internal monitoring purpose
   -   Identify any pending issues/non-compliance issues during implementation
   -   Work closely with the external monitoring consultant to oversee the implementation of


                                                  30
       EGPF, and
   - Receive and report complaint of affected people to competent authorities for resolution.
Depending on the nature and complexity of the EGDP, and implementation stages, the internal
monitoring could be maintained weekly, monthly, and quarterly. A quarterly report should be
prepared, as a minimum demand, to ensure DoF/MAF is aware of the a;,) EGPF implementation
progress, b;,) any issues that may arise so as to take timely and appropriate action.
Contents of the internal monitoring reports that will be issued on a monthly basis should include:
   - Payment and use of the funds for land acquisition compensation and restoration
   - Support to the vulnerable groups
   - Land readjustment and reallocation
   - Quality and quantity of newly reclaimed land
   - Schedule of the above activities
   - Implementation policies and rules in the resettlement plan
   - Participation and consultation of the affected people during the implementation, and
   - Staffing, training, work schedule and resettlement operation at various levels.
Quarterly monitoring visits will be undertaken as per specific activities, in order to:
   -    Improve environmental and social management practices
   -    Ensure the efficiency and quality of the consultation processes
   -    Establish evidence and performance-based environmental and social assessment for the
        project, and
     - Provide an opportunity to report the results of safeguards instrument impacts and proposed
        mitigation measures’ implementation.
With regard to the project implementation, the DoF/MAF will conduct monitoring activities during
the feasibility studies and EGPF to determine the extent to which mitigation measures are
successfully implemented. Monitoring will focus on three key areas: (i) compliance monitoring;
(ii) impact monitoring; and (iii) cumulative impact monitoring.
Monitoring carried out by staff of DoF/MAF should be coordinated with the external monitoring
consultant, when the external monitoring consultant is engaged.
To encourage broad-based participation and to particularly target the poor and vulnerable,
participation will be monitored and disaggregated in terms of gender, ethnicity, and household
socio-economic status. The following guidelines will be considered when developing the full M
and E system and for identifying potential indicators:
      Disaggregate information by gender, ethnic group, and household socio-economic status;
      Involve villagers in designing the monitoring program, collecting data, and drawing
       conclusions from the data compiled;
      Continue feedback meetings after fieldwork and incorporate recommendations into
       systems development;




                                                31
      Keep disaggregated records of involvement and participation in different activities at
       village level and also in the databases;
      Note successful and unsuccessful strategies for future reference in curriculum
       development, field implementation, and other project areas; and
      Identify indicators and tools to measure the project’s impacts on women, ethnic groups,
       and the poor.
As the implementation of the project may lead to a change in access to forest resources in areas as
a result of protection activities, building capacity for improved monitoring activities is essential.
Monitoring should be participatory and include the monitoring of beneficial and adverse impacts
on persons within project impact areas.
The EGPF will require that key performance indicators be developed in relation to related
activities. Indicators can be grouped as those that: (i) will demonstrate whether or not the EGPF is
meeting performance expectations; and (ii) demonstrate the status of livelihoods in communities
(through household-level indicators). The following indicator groups are suggested as a basis to
measure the success and weakness of activities related to affected groups.
Resettlement Policy
Framework Indicators to measure the effectiveness of the EGPF include:
Number of participants in consultation process
Number and types of vulnerable groups participating in consultation process
Number of affected communities included relative to total number of affected communities
Number of grievances or conflicts recorded
Number of remedial activities implemented in response to recorded grievances
Time taken to resolve grievances
Number of individuals with a positive perception over the level of empowerment in natural
resources management
Number of individuals with a positive perception over the level of empowerment in natural
resources management, disaggregated by vulnerable group and user sub-group categories
Community livelihood Indicators to measure status of households and changes in forest resource
use and access restriction:
Change in type of natural resources use, and substitute activities
Changes livelihood activities of households, by type of activity and amount
Change in livelihood activities of households, by type of activity and amount, disaggregated by
vulnerable group and user sub-group categories.




                                                 32
8.2 External Monitoring
An independent monitoring consultant or Independent Organization (IO)/Third Party monitors will
be contracted to monitor the implementation of social safeguards of the program, including the
EGPF/EGDP/sub-projects. The monitoring report will be submitted to the World Bank for review
and comments. External monitoring should be conducted at least twice a year during the
implementation of the Program to timely identify issues that might need immediate action from
PMU and PPMU.
Third Party/independent monitoring would involve a combination of independent verification of
self-reporting data provided by the Program Entity and annual audits of a sample of ER Program
activities to confirm procedural compliance as well as timely preparation of key documents, post-
review of the quality review of safeguards documentation which has been prepared, consultation
processes, effectiveness of management measures specified in the Safeguards Plans, and disclosure
of information, among other important aspects. Third Party monitoring can serve at least three
purposes. First, to provide timely information to the Program Entity on specific issues of non-
compliance or significant implementation problems so that the Program Entity can take corrective
actions, if needed. Second, Third Party monitors provide information to the PMU and the World
Bank on systemic safeguard performance issues which may require changes in management
approach and/or additional financial or human resources. Third, the disclosing the results of
monitoring will inform concerned stakeholders about implementation experience under the ERPA
Operation.
In practice, Third Party monitors will typically be private consulting firms, individuals or teams
recruited from universities or colleges, government institutes not affiliated with the operation, or
NGOs with knowledge and experience in safeguards. Third party monitoring is expected to be
undertaken at least twice per year, provision for this is included in the draft budget for supporting
the ESMF implementation (refer Section 8 of the ESMF).


In conjunction with internal monitoring by DoF/MAF staff, it will be important to include strict
procedures for external monitoring and evaluation. The external M&E function aims to provide
regular monitoring and evaluation of land acquisition and land donation for the project, to assess
whether objectives are achieved. The external monitoring will also provide an early alarm function
for the project management department and a complaint and grievance channel. External
monitoring indicators will include:
       -   Progress: including the preparation of the EGDP, and implementation of compensation
       -   Quality: including to what extent PAP and PAH are satisfied with compensation and
           restoration
       -   Compensation Fund: including the payment and use of the funds for land acquisition
           compensation
       -   Affected People: including PAP and PAH socio-economic situation before and after the
           project and economic restoration of the affected people.




                                                 33
8.3 INDEPENDENT MONITORING
   A qualified external monitoring entity will come from an independent organisation (IO), such
      as a civil society organisation, academic research institute or consultancy in Lao PDR. The
      major responsibilities of the external monitoring organisation will include:
       -   Develop the EGDP in conjunction with the internal monitoring team
       -   Observe all the aspects of the EGDP and its implementation; provide M&E reporting
           to the WB, and
       -   Provide technical consulting services in terms of information investigation and
           processing.

Objectives: The general objectives of independent monitoring are to periodically supply
independent monitoring and assessing results on the implementation of the resettlement objectives,
on the changes of living standard and jobs, APs income and social foundation restoration,
effectiveness, impacts and sustainability of APs’ entitlements, and on the necessity of mitigation
measures (if any) in an attempt to bring about strategic lessons for making policy and planning in
the future.

Responsible Agencies: In accordance with the WB requirements for consultant employment, the
PMU will hire an organization for the independent monitoring and evaluation of RAPs
implementation.
Monitoring and Evaluation Objectives: The following indicators will be monitored and evaluated,
including but not limited to:

  (i) Payment of compensation will be as follows: a) full payment to be made to all affected
      persons sufficiently before land acquisition; (b) adequacy of payment to replace affected
      assets;

                 (ii) Provision of assistance for APs who have to rebuild their houses on their
                      remaining land, or building their houses in new places as arranged by the
                      project, or on newly assigned plots;

                 (iii) Assistance for recovering livelihood/income sources;

                 (iv) Community consultation and public dissemination of compensation policy:
                      (a) APs should be fully informed and consulted about land acquisition,
                      leasing and relocation activities; (b) the independent organization (IO) should
                      attend at least one community consultation meeting to monitor community
                      consultation procedures, problems and issues that arise during the meetings,
                      and propose solutions; (c) public awareness of the compensation policy and
                      entitlements will be assessed among the APs; and (d) assessment of
                      awareness of various options available to APs as provided for in the RAP;

                 (v) Affected persons should be monitored regarding restoration of productive
                     activities;


                                                34
(vi) APs’ satisfaction on various aspects of the RAP will be monitoring and
     recorded. Operation of the complaint mechanism and speed of complaint
     settlement will be monitored; and

(vii) Through the implementation, trends on living standard will be observed and
      surveyed. Any potential issues in the recovering living standard are reported
      and suitable measures will be proposed to ensure the program objectives.




                              35
                                         ANNEXURES

   ANNEXURE 1: GUIDELINES FOR PREPARATION OF AN ETHNIC GROUP
     DEVELOPMENT PLAN

The EGDP will consist of a number of activities and will include mitigation measures of potentially
negative impacts, modification of subproject design, and development assistance. Where there is
land acquisition in ethnic group communities, the Project will ensure that their rights will not be
violated and that they be compensated for the use of any part of their land in a manner that is
culturally acceptable to them. The compensation and rehabilitation will follow the RPF of the
Project.
An EGDP will include:
   -    legal Framework
   -    baseline data
   -   land tenure information
   -    local participation
   -   technical identification of development or mitigation activities
   -   institutional arrangement
   -   grievance mechanism and disclosure arrangement
   -   implementation schedule
   -    monitoring and evaluation, and
   -   Cost and financing plan.
The EGDP will also provide evidence that the results of consultations have been taken into account
and consideration.