Procurement Plan

I. General

1.     Bank’s approval Date of the procurement Plan: 22 August 2017
2.     Date of General Procurement Notice:
3.     Period covered by this procurement plan: The procurement period of project covered
       from 15 September 2017 to 30 December 2022

II. Goods and Works and non-consulting services.

1.     Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as
       stated in Appendix 1 to the Guidelines for Procurement:

                                                      Contract Value       Contracts Subject to
                     Procurement Method
                                                      Threshold US$           Prior Review
         1    ICB (Works)                              ≥ 10,000,000                All
         2    NCB (Works)                              ˂ 10,000,000               None
         3    Shopping (Works)                           ˂ 200,000                None
         4    ICB (Goods and Non-Consultant            ≥ 2,000,000                 All
              Services)
         5    NCB (Goods and Non-Consultant            < 2,000,000                None
              Services)
         6    Shopping (Goods and Non-Consultant        < 100,000                 None
              Services)
         7    SSS (Goods)                             Not Applicable               All


2.     Prequalification. Bidders for Not applicable shall be prequalified in accordance with the
       provisions of paragraphs 2.9 and 2.10 of the Guidelines.

3.     Proposed Procedures for CDD Components (as per paragraph. 3.17 of the
       Guidelines: Not applicable.

4.     Reference to (if any) Project Operational/Procurement Manual: Project Operations
       Manual to be prepared and adopted by EDM before effectiveness of the Financing
       Agreement

5.     Any Other Special Procurement Arrangements: Not applicable.

6.     Summary of the Procurement Packages planned during the first 18 months after
       project effectiveness:




August 22, 2017
         1                2                   3                 4          5               6                 7

     Ref.            Description         Estimated          Packages    Domestic        Review          Comments
     No.                                    Cost                        Preferen       by Bank
                                         US$ million                       ce        (Prior / Post)
                                                                        (yes/no)

     1             Summary of the          118.19               2         Yes           Prior
                   ICB (Works)

     2             Summary of the           11.35               6         Yes           Prior
                   ICB (Goods and
                   Equipment)
     3             Summary of the            2.47               2         No            Prior
                   SSS (Goods and
                   Equipment)
     4             Summary of the            3.5                1         No            Prior
                   ICB (Non-
                   Consultant
                   Services)
     5             Summary of the            0.45               1         No              Post
                   NCB (Works)

     6             Summary of the            0.6                2         No              Post
                   NCB (Goods and
                   Equipment)
     7             SSS (Capacity             0.15               1         No              Post
                   Building under
                   Non-Consultant
                   Services)



III. Selection of Consultants

1.           Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated
             in Appendix 1 to the Guidelines Selection and Employment of Consultants:

                                Selection Method                    Contract Value             Contracts Subject to
                                                                    Threshold US$                 Prior Review
               1      QCBS (Consulting Services –Firms)               ≥ 1,000,000                      All
               2       QCBS (Consulting Services –Firms)        ≥ 300,000 - < 1,000,000               None
               3      CQS/Other (QCBS/LCS) (Consulting                 < 300,000                      None
                              Services –Firms)
               4      Individual Consultant (                          ≥ 300,000                       All
                      Consulting Services – Individuals (IC))
               5      Individual Consultant (                          < 300,000                      None
                      Consulting Services – Individuals (IC))
                      SSS (Consulting Services –Firms and           Not Applicable                     All
                      Individuals (IC))


August 22, 2017
2.    Short list comprising entirely of national consultants: Short list of consultants for
      services, estimated to cost less than $ 300,000 equivalent per contract, may comprise entirely
      of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant
      Guidelines.

3.    Any Other Special Selection Arrangements: Not Applicable

4.    Consultancy Assignments with Selection Methods and Time Schedule

          1                 2                   3            4              5              6

      Ref.    Description of               Estimated   Packages       Review         Comments
      No.     Assignment                   Cost                       by Bank
                                           US$                        (Prior /
                                           million                    Post)
      1       Summary of number of             2.9           2            Prior
              contracts that will be let
              under QCBS
      2       Summary of number of            0.53           1            Prior
              contracts that will be let
              under IC
      3       Summary of number of            1.45           6            Post
              contracts that will be let
              under QCBS

      4       Summary of number of             1.5          13            Post
              contracts that will be let
              under IC
      5       Summary of number of             0.1           1            Prior
              contracts that will be let
              under SSS




August 22, 2017
PROCUREMENT
                                 Mozambique : Power Efficiency and Reliability Improvement Project (PERIP)
PLAN
General Information
Country:                         Mozambique                                    Bank’s Approval Date of the Original Procurement Plan:                    2016-07-26
                                                                                                                                          2020-04-15
                                                                               Revised Plan Date(s): (comma delineated, leave blank if none)
Project ID:                      P158249                                       GPN Date:
Project Name:                    Power Efficiency and Reliability Improvement Project (PERIP)
Loan / Credit No:                IDA / V0250,      / , IDA / D2380
Executing Agency(ies): Electricity of Mozambique




WORKS
                                                                                                                                                                                                                                                                                                                                                                                   Bid Evaluation
Activity Reference No. /                                                                                                                                                                                                                                                          Draft Bidding
                                 Loan / Credit                                                                         Market         Procurement        Prequalification    Estimated        Actual Amount           Process   Draft Pre-qualification    Prequalification                             Specific Procurement      Bidding Documents   Proposal Submission /          Report and
          Description                                    Component               Review Type       Method                                                                                                                                                                          Document /                                                                                                               Signed Contract         Contract Completion
                                       No.                                                                            Approach           Process              (Y/N)         Amount (US$)          (US$)               Status         Documents            Evaluation Report                              Notice / Invitation          as Issued        Opening / Minutes        Recommendation for
                                                                                                                                                                                                                                                                                  Justification
                                                                                                                                                                                                                                                                                                                                                                                        Award
                                                                                                                                                                                                                                 Planned      Actual      Planned    Actual   Planned       Actual      Planned       Actual      Planned    Actual    Planned      Actual      Planned       Actual      Planned       Actual      Planned      Actual


 IV3 / Installation of                           Component 2: Enhancement
                                                                                                                                    Single Stage - One
Nationalwide Network             IDA / V0250     of EDM Operational and        Post            Request for Bids   Open - National                                               450,000.00                0.00   Canceled                                                     2018-02-28                2018-03-21                                    2018-05-07                2018-06-21                2018-11-12                2019-12-12
                                                                                                                                    Envelope
Redesign/WAN                                     Commercial Operations




 IV2 / Supply and
Installation of 10,000 AMR
                                                 Component 2: Enhancement
Meters for EDM Large                                                                                              Open -            Single Stage - One
                                 IDA / V0250     of EDM Operational and        Post            Request for Bids                                                                5,600,000.00               0.00   Canceled                                                     2017-10-31   2018-04-19   2017-11-21   2018-04-23                       2018-01-05                2018-02-19                2018-07-12                2019-07-12
Customers to improve                                                                                              International     Envelope
                                                 Commercial Operations
performance of AMR
infrastructure




 IV1 / Supply and
Installation on Redundancy
in EDM substations,
Reinforcement of
Transmission Lines, Power
                                                 Component 1: Rehabilitation
Compensation &                                                                                                    Open -            Single Stage - One
                                 IDA / D2380     and Upgrade of Network        Prior           Request for Bids                                                              114,590,000.00               0.00   Canceled                                                     2018-01-09                2018-01-30                                    2018-04-02                2018-05-17                2018-10-05                2020-10-07
Primary/Secundary System                                                                                          International     Envelope
                                                 Infrastructure
Protection/Control in
Substations of Central
Northern System,
Rehabilitation of Distribution
Systems




 IV4 / Redundancy in EdM
Substations in Lichinga and
Maputo under Lot 1 as well
as Power Compensation                            Component 1: Rehabilitation                                                                                                                                     Under
                                                                                                                  Open -            Single Stage - One
System Protection and            IDA / D2380     and Upgrade of Network        Prior           Request for Bids                                                               40,000,000.00       6,256,477.53   Implementati                                                 2018-05-31   2019-04-16   2018-06-11   2019-04-25                       2018-09-10   2019-10-01   2018-11-09   2019-12-23   2019-03-11                2023-03-14
                                                                                                                  International     Envelope
Control in Substation of                         Infrastructure                                                                                                                                                  on
Central and Northern Region
under Lot 3, both from
Component 1 of the Project




 IV5 / Reinforcement of
Transmission Lines in                            Component 1: Rehabilitation
                                                                                                                  Open -            Single Stage - One
Maputo and Matola as Lot         IDA / D2380     and Upgrade of Network        Prior           Request for Bids                                                               38,000,000.00      15,647,303.13   Signed                                                       2018-05-31   2018-07-19   2018-06-11   2018-07-25                       2018-09-10   2018-12-21   2018-11-09   2019-07-25   2019-03-11   2020-01-02   2023-03-14
                                                                                                                  International     Envelope
2 under Component 1 of the                       Infrastructure
Project




 IV6 / Rehabilitation of
Distribution Network at
Maputo and Matola as Lot                         Component 1: Rehabilitation                                                                                                                                     Under
                                                                                                                  Open -            Single Stage - One
4 and Rehabilitation of          IDA / D2380     and Upgrade of Network        Prior           Request for Bids                                                               20,000,000.00               0.00   Implementati                                                 2018-05-31   2020-01-02   2018-06-11   2020-01-16                       2018-09-10                2018-11-09                2019-03-11                2022-02-04
                                                                                                                  International     Envelope
Distribution Network at                          Infrastructure                                                                                                                                                  on
Nacala as Lot 5 both under
Component 1 of the Project




 IV / Supply , Installation
and Commissioning of 10,000                      Component 2: Enhancement
                                                                                                                  Open -            Single Stage - One
AMR Meters under the             IDA / D2380     of EDM Operational and        Post            Request for Bids                                                                5,600,000.00       5,994,176.28   Signed                                                       2018-06-19   2018-04-18   2018-06-24                                    2018-06-29   2018-06-18   2018-09-12   2018-10-22   2019-01-11   2019-03-19   2020-04-07
                                                                                                                  International     Envelope
Revenue Protection Strategy                      Commercial Operations
for EDM




                                                                                                                                                                                                                                     Page 1
GOODS
                                                                                                                                                                                                                                                                                                                                                                               Bid Evaluation
Activity Reference No. /                                                                                                                                                                                                                                                      Draft Bidding
                                Loan / Credit                                                                      Market         Procurement        Prequalification    Estimated        Actual Amount           Process   Draft Pre-qualification    Prequalification                             Specific Procurement      Bidding Documents   Proposal Submission /          Report and
        Description                                    Component             Review Type        Method                                                                                                                                                                         Document /                                                                                                               Signed Contract         Contract Completion
                                      No.                                                                         Approach           Process              (Y/N)         Amount (US$)          (US$)               Status         Documents            Evaluation Report                              Notice / Invitation          as Issued        Opening / Minutes        Recommendation for
                                                                                                                                                                                                                                                                              Justification
                                                                                                                                                                                                                                                                                                                                                                                    Award
                                                                                                                                                                                                                             Planned      Actual      Planned    Actual   Planned       Actual      Planned       Actual      Planned    Actual    Planned      Actual      Planned       Actual      Planned       Actual      Planned       Actual


 G1 / Acquisition on Office                     Component 3: Capacity
                                                                                           Request for                          Single Stage - One
Equipment for the PIU           IDA / V0250     Building and               Post                               Open - National                                                10,000.00          10,777.03    Completed                                                                              2016-11-24                                                                                        2017-03-28   2017-04-13   2017-05-29   2017-04-28
                                                                                           Quotations                           Envelope
Team                                            Implementation Support




                                                Component 3: Capacity
 G1-1 / Laptop computers                                                                   Request for                          Single Stage - One
                                IDA / V0250     Building and               Post                               Open - National                                                  9,000.00               0.00   Canceled                                                                               2016-11-14                                                                                        2017-01-19                2017-02-21
for the Project PIU members                                                                Quotations                           Envelope
                                                Implementation Support




                                                Component 3: Capacity
 G1-2 / Office Furniture for                                                               Request for                          Single Stage - One
                                IDA / V0250     Building and               Post                               Open - National                                                  1,000.00               0.00   Canceled                                                                               2016-11-19                                                                                        2017-02-14                2017-03-29
the Project PIU Members                                                                    Quotations                           Envelope
                                                Implementation Support




 III1 / Supply of Maputo                        Component 2: Enhancement
                                                                                                              Open -            Single Stage - One
and Matola Network              IDA / V0250     of EDM Operational and     Prior           Request for Bids                                                                1,200,000.00       2,240,099.66   Signed                                                       2017-09-29   2017-11-09   2017-10-20   2017-11-09                       2017-12-04   2018-01-22   2018-01-03   2019-04-25   2018-04-17   2019-07-31   2018-12-17
                                                                                                              International     Envelope
Redesign                                        Commercial Operations




 III2 / Supply of National
wide Network Redesign/WAN                       Component 2: Enhancement                                                                                                                                     Under
                                                                                                              Open -            Single Stage - One
and Supply & Installation of IDA / V0250        of EDM Operational and     Prior           Request for Bids                                                                4,450,000.00               0.00   Implementati                                                 2018-03-23   2020-01-23   2018-04-13   2020-02-27                       2018-05-28                2018-06-27                2018-11-12                2020-01-31
                                                                                                              International     Envelope
Data Center Network                             Commercial Operations                                                                                                                                        on
Redesign




 III3 / Supply and                              Component 2: Enhancement                                                                                                                                     Pending
                                                                                                                                Single Stage - One
Installation of the EDM         IDA / V0250     of EDM Operational and     Post            Request for Bids   Open - National                                               200,000.00                0.00   Implementati                                                 2017-10-10                2017-10-31                                    2017-12-15                2018-01-14                2018-05-28                2018-11-19
                                                                                                                                Envelope
Infosec Baseline Assessment                     Commercial Operations                                                                                                                                        on




 III4 / Supply and
Installation of the EDM                         Component 2: Enhancement                                                                                                                                     Pending
                                                                                                              Open -            Single Stage - One
Operational Portal (Corporate IDA / V0250       of EDM Operational and     Post            Request for Bids                                                                 600,000.00                0.00   Implementati                                                 2017-11-30                2017-12-21                                    2018-02-05                2018-03-07                2018-07-27                2018-12-28
                                                                                                              International     Envelope
Service Center) and E-                          Commercial Operations                                                                                                                                        on
Learning Platform




 III5 / Supply and
Installation of the DIGITAL                     Component 2: Enhancement
                                                                                                                                Single Stage - One
Board and Supply &              IDA / V0250     of EDM Operational and     Post            Request for Bids   Open - National                                               400,000.00         743,482.35    Signed                                                       2018-07-27   2018-02-07   2018-08-17   2018-02-07                       2018-10-01   2018-03-15   2018-10-31   2018-06-04   2019-03-14   2018-11-07   2019-12-13
                                                                                                                                Envelope
Installation of the Business                    Commercial Operations
Continuity (Email continuity)




 III6 / Supply and
                                                Component 2: Enhancement                                                                                                                                     Pending
Installation of the Data                                                                                      Open -            Single Stage - One
                                IDA / V0250     of EDM Operational and     Post            Request for Bids                                                                 600,000.00                0.00   Implementati                                                 2017-10-27                2017-11-17                                    2018-01-01                2018-01-31                2018-06-14                2019-06-14
Architecture and Application                                                                                  International     Envelope
                                                Commercial Operations                                                                                                                                        on
Integration




 III9 / Supply and
Installation of an Asset
Management System (MAS),
                                                Component 2: Enhancement                                                                                                                                     Pending
Maintenance management                                                                                        Open -            Single Stage - One
                                IDA / V0250     of EDM Operational and     Prior           Request for Bids                                                                4,000,000.00               0.00   Implementati                                                 2018-06-29                2018-07-20                                    2018-09-03                2018-10-03                2019-02-18                2020-02-18
system (MMS), Worforce                                                                                        International     Envelope
                                                Commercial Operations                                                                                                                                        on
management (WFM),
Processes Design and
Training of EDM Staff




 III7 / Implementation of
System Stabilization & End
                                                Component 2: Enhancement                                                                                                                                     Pending
to End Business Process
                                IDA / V0250     of EDM Operational and     Prior           Direct Selection   Direct                                                       1,970,000.00               0.00   Implementati                                                 2018-07-20                2018-08-10                                                                                        2019-01-11                2020-01-13
Review by the system
                                                Commercial Operations                                                                                                                                        on
supplier: ERP GIAF, CMS
and OMS




                                                                                                                                                                                                                                 Page 2
 III8 / Implementation of
Transfer prepaid
                                                 Component 2: Enhancement                                                                                                                                     Pending
functionality to   Comercial
                                 IDA / V0250     of EDM Operational and     Post            Direct Selection   Direct                                                        500,000.00                0.00   Implementati                                                 2017-10-25                2017-11-15                                                                                        2018-04-30                2019-04-03
Management System (CMS)
                                                 Commercial Operations                                                                                                                                        on
as well a new appliance to
tokens generation




 III12 / Supply and
installation of hardware to
                                                 Component 2: Enhancement
deploy the already existing                                                                                                      Single Stage - One
                                 IDA / D2380     of EDM Operational and     Post            Request for Bids   Open - National                                               200,000.00                0.00   Canceled                                                     2018-06-13                2018-06-28                                    2018-08-13                2018-10-12                2019-01-24                2019-09-23
Customer Survey system to                                                                                                        Envelope
                                                 Commercial Operations
be used in all EDM Vending
Stations




 III11 / Supply &                                Component 2: Enhancement                                                                                                                                     Under
                                                                                                               Open -            Single Stage - One
installation of Data Center      IDA / D2380     of EDM Operational and     Prior           Request for Bids                                                                1,500,000.00               0.00   Implementati                                                 2018-05-30                2018-06-29                                    2018-08-13                2018-10-12                2019-03-04                2019-09-30
                                                                                                               International     Envelope
Network Redesign for EDM                         Commercial Operations                                                                                                                                        on




 III13 / Cromobook
Computors to ensure
realization of the G Suite
                                                 Component 2: Enhancement
training under Activity "III5                                                               Request for                          Single Stage - One
                                 IDA / D2380     of EDM Operational and     Post                               Limited                                                        17,000.00          13,098.15    Completed                                                                              2019-03-30   2019-03-19                                                                           2019-05-20   2019-04-22   2019-07-19   2019-11-13
- Supply and Installation of                                                                Quotations                           Envelope
                                                 Commercial Operations
the DIGITAL Board and
Business Continuity (Email
continuity)




 III10 / Supply and
Installation of 3 benches of
20 meter capacity, a Meter                       Component 2: Enhancement                                                                                                                                     Under
                                                                                                               Open -            Single Stage - One
Calibration Lab, 02 CT/VT        IDA / D2380     of EDM Operational and     Post            Request for Bids                                                                 500,000.00         358,250.00    Implementati                                                 2019-03-27   2019-04-05   2019-04-19   2019-04-09                       2019-06-18   2019-06-11   2019-08-16   2019-08-08   2019-12-05                2021-02-05
                                                                                                               International     Envelope
Verification Device, a Special                   Commercial Operations                                                                                                                                        on
Store and 50 portable meter
testers




NON CONSULTING SERVICES
                                                                                                                                                                                                                                                                                                                                                                                Bid Evaluation
Activity Reference No. /                                                                                                                                                                                                                                                       Draft Bidding
                                 Loan / Credit                                                                      Market         Procurement        Prequalification    Estimated        Actual Amount           Process   Draft Pre-qualification    Prequalification                             Specific Procurement      Bidding Documents   Proposal Submission /          Report and
           Description                                  Component             Review Type        Method                                                                                                                                                                         Document /                                                                                                               Signed Contract         Contract Completion
                                       No.                                                                         Approach           Process              (Y/N)         Amount (US$)          (US$)               Status         Documents            Evaluation Report                              Notice / Invitation          as Issued        Opening / Minutes        Recommendation for
                                                                                                                                                                                                                                                                               Justification
                                                                                                                                                                                                                                                                                                                                                                                     Award
                                                                                                                                                                                                                              Planned      Actual      Planned    Actual   Planned       Actual      Planned       Actual      Planned    Actual    Planned      Actual      Planned       Actual      Planned       Actual      Planned       Actual


 CS6 / Support from the
current Service Provider to                      Component 2: Enhancement
conclude implementation of        /              of EDM Operational and     Prior           Direct Selection   Direct                                                        100,000.00                0.00   Canceled                                                     2016-10-31                2016-11-30                                                                                        2017-02-10                2017-10-13
the current Phase 1 of the                       Commercial Operations
SIGEM Project




 CS7-1 / Technical Audit to
approximately 6,000 Meters                       Component 2: Enhancement
                                                                                                               Open -            Single Stage - One
from HV, MV and Big LV           IDA / V0250     of EDM Operational and     Post            Request for Bids                                                                  80,000.00                0.00   Canceled                                                     2017-03-17   2017-03-29   2017-03-29   2017-03-29                       2017-05-15   2017-05-10   2017-06-14   2017-06-14   2017-08-29                2018-08-29
                                                                                                               International     Envelope
Customers across 16 EDM                          Commercial Operations
Area Service Centers




 CS7-2 / Technical Audit to
approximately 4,500 Energy
Meters from HV, MV and
Big LV Customers across                          Component 2: Enhancement
                                                                                                               Open -            Single Stage - One
the 16 EDM Area Service          IDA / V0250     of EDM Operational and     Post            Request for Bids                                                                 300,000.00         313,465.62    Signed                                                       2017-08-25   2017-08-30   2017-08-30   2017-08-30                       2017-10-24   2017-10-05   2017-12-13   2017-11-30   2018-02-15   2018-05-15   2019-02-15
                                                                                                               International     Envelope
Centers for Rebidding                            Commercial Operations
subsequent to reduction of
Scope of Services to fit
within Available Budget




 II1 / Supply of GIS
software including                               Component 2: Enhancement                                                                                                                                     Pending
                                                                                                               Open -            Single Stage - One
Survey/Data Gathering            IDA / D2380     of EDM Operational and     Prior           Request for Bids                                                                3,500,000.00               0.00   Implementati                                                 2018-07-27                2018-08-17                                    2018-10-16                2018-11-15                2019-03-06                2020-05-06
                                                                                                               International     Envelope
Campaign as well as                              Commercial Operations                                                                                                                                        on
Training of the EDM Staff




                                                                                                                                                                                                                                  Page 3
CONSULTING FIRMS
Activity Reference No. /                                                                                                                                                                                                                                                                                                                                      Combined Evaluation
                                 Loan / Credit                                                                        Market     Contract Type    Estimated           Actual                                                      Expression of Interest Short List and Draft Request for Proposals Opening of Technical                Evaluation of
        Description                                      Component               Review Type        Method                                                                            Process Status   Terms of Reference                                                                                                                                      Report and Draft           Signed Contract         Contract Completion
                                       No.                                                                           Approach                    Amount (US$)      Amount (US$)                                                           Notice            Request for Proposals         as Issued       Proposals / Minutes        Technical Proposal
                                                                                                                                                                                                                                                                                                                                                              Negotiated Contract
                                                                                                                                                                                                       Planned       Actual        Planned      Actual       Planned      Actual      Planned    Actual   Planned       Actual      Planned       Actual      Planned       Actual      Planned       Actual      Planned       Actual


 CS1/PERIP/PPA /
Engineering design and                           Component 1: Rehabilitation
                                                                                               Quality And Cost- Open -
supervision for rehabilitation   IDA / V0250     and Upgrade of Network        Prior                                                                3,000,000.00      3,738,053.54    Signed           2016-07-27   2016-08-02    2016-08-17   2016-08-03   2016-09-30   2016-08-10                       2016-11-14   2016-09-23   2016-12-14   2016-10-28   2017-01-18   2016-12-12   2017-03-15   2017-03-01   2022-01-16
                                                                                               Based Selection   International
and upgrading transmission                       Infrastructure
and distribution networks




 CS8 / Review of Feasibility
Study for a National Control                     Component 1: Rehabilitation                   Consultant
                                                                                                                 Open -
Center, Review Grid Code         IDA / V0250     and Upgrade of Network        Prior           Qualification                                          150,000.00       234,624.13     Completed        2016-10-19   2016-10-10    2016-11-09   2016-10-11   2017-01-06   2016-12-21                                                                           2017-02-20   2017-05-23   2017-04-21   2017-08-01   2017-10-27   2018-11-23
                                                                                                                 International
and Preparation of Bidding                       Infrastructure                                Selection
Documents




                                                 Component 3: Capacity
 CS11 / Financial Audit for                                                                    Least Cost        Open -
                                  /              Building and                  Post                                                                    30,000.00               0.00   Canceled         2016-10-31                 2016-11-30                2017-02-13                                    2017-03-31                2017-04-30                2017-06-04                2017-07-28                2018-02-28
the Project PPA funding                                                                        Selection         International
                                                 Implementation Support




 I19 / Implementation of                         Component 2: Enhancement
                                                                                               Quality And Cost- Open -
Inventory and Valuation of       IDA / V0250     of EDM Operational and        Prior                                                                1,600,000.00      1,833,712.46    Signed           2017-08-25   2017-09-11    2017-08-31   2017-09-12   2017-10-14   2017-12-08                       2017-11-30   2018-02-27   2017-12-15   2018-04-26   2018-01-18   2018-07-25   2018-03-05   2018-08-06   2018-07-05
                                                                                               Based Selection   International
the EDM Assets                                   Commercial Operations




 CS2 / Engineering Studies
                                                 Component 1: Rehabilitation
for Preparation of                                                                             Quality And Cost- Open -
                                 IDA / V0250     and Upgrade of Network        Prior                                                                  220,000.00               0.00   Canceled         2016-08-26   2016-11-08    2016-09-16   2016-11-11   2016-10-30                                    2016-12-14                2017-01-13                2017-02-17                2017-04-05                2020-04-30
reinforcement of Power                                                                         Based Selection   International
                                                 Infrastructure
Generation at Temane




                                                 Component 2: Enhancement
 I20 / Realization of                                                                          Quality And Cost- Open -                                                               Under
                                 IDA / V0250     of EDM Operational and        Post                                                                   200,000.00               0.00                    2018-02-28   2019-07-31    2018-03-28   2019-08-21   2018-05-11   2019-11-28                       2018-06-26                2018-07-26                2018-09-10                2019-01-18                2019-07-18
Customer Services                                                                              Based Selection   International                                                        Implementation
                                                 Commercial Operations




                                                 Component 2: Enhancement
 I24 / Development of                                                                          Quality And Cost- Open -                                                               Pending
                                 IDA / V0250     of EDM Operational and        Post                                                                   200,000.00               0.00                    2017-11-30                 2017-12-21                2018-02-03                                    2018-03-20                2018-04-19                2018-05-31                2018-10-15                2019-12-16
Review of the Grid Code                                                                        Based Selection   International                                                        Implementation
                                                 Commercial Operations




                                                 Component 2: Enhancement
 I25 / Development of Power                                                                    Quality And Cost- Open -                                                               Pending
                                 IDA / V0250     of EDM Operational and        Post                                                                   200,000.00               0.00                    2017-11-29                 2017-12-20                2018-02-02                                    2018-03-19                2018-04-18                2018-05-24                2018-10-08                2019-10-08
System Protection Study                                                                        Based Selection   International                                                        Implementation
                                                 Commercial Operations




                                                 Component 2: Enhancement
 I18 / Development of the                                                                      Quality And Cost- Open -
                                 IDA / V0250     of EDM Operational and        Post                                                                   300,000.00               0.00   Canceled         2018-01-15                 2018-02-05                2018-04-06                                    2018-05-21                2018-06-20                2018-07-25                2018-12-10                2019-12-10
Ten Year Strategy for EDM                                                                      Based Selection   International
                                                 Commercial Operations




 MZ-EDM-48798-CS-CQS /
Implementation of Risk
Assessment and preparation                       Component 2: Enhancement                      Consultant
                                                                                                                 Open -
of Action Plans to provide       IDA / D2380     of EDM Operational and        Post            Qualification                                           30,000.00       105,800.00     Completed        2018-03-02   2018-02-15    2018-03-23   2018-02-15   2018-05-06   2018-03-21                                                                           2018-06-05   2018-05-22   2018-08-20   2018-09-18   2018-12-17   2019-03-26
                                                                                                                 International
Risk Matrix and Annual                           Commercial Operations                         Selection
Audit Plan for 2018 for
EDM




 I26 / Updating Technical
                                                 Component 2: Enhancement                      Consultant
Standards for Design and                                                                                         Open -
                                 IDA / D2380     of EDM Operational and        Post            Qualification                                          300,000.00       504,605.00     Signed           2018-05-18   2018-03-30    2018-06-08   2018-05-14   2018-07-30   2018-08-02                                                                           2018-09-28   2018-10-29   2019-01-10   2019-02-13   2019-06-10
Construction of Electricity                                                                                      International
                                                 Commercial Operations                         Selection
Distribution Infrastructure




                                                 Component 2: Enhancement
 I29 / Financial Audit of                                                                      Least Cost        Open -
                                 IDA / D2380     of EDM Operational and        Post                                                                    50,000.00        16,380.00     Signed           2018-05-30   2018-05-30    2018-06-20   2018-05-30   2018-08-27   2018-08-16                       2018-10-04   2018-09-18   2018-11-19   2018-12-04   2018-12-31   2018-12-19   2019-04-22   2019-05-06   2020-12-31
the Project                                                                                    Selection         International
                                                 Commercial Operations




 I23 / Designing a Strategic
                                                 Component 2: Enhancement                      Consultant
Note on Gas-To-Power:                                                                                            Open -                                                               Under
                                 IDA / D2380     of EDM Operational and        Post            Qualification                                          300,000.00               0.00                    2018-08-21   2018-08-01    2018-09-11                2018-11-26                                                                                        2019-01-25                2019-05-16                2019-10-03
Monetization and Strategic                                                                                       International                                                        Implementation
                                                 Commercial Operations                         Selection
Option for Mozambique




                                                                                                                                                                                                                         Page 4
 I35 / Support to EEDM in
the Stabilization and
                                              Component 2: Enhancement                   Consultant
Consolidation of the Use of                                                                                Open -                                                               Under
                              IDA / D2380     of EDM Operational and     Post            Qualification                                          200,000.00       683,841.87                      2019-05-15   2019-05-15    2019-06-05   2019-06-18   2019-08-10   2019-08-16                                                                    2019-09-25   2019-11-12   2019-12-08   2021-11-27
GIAF-ERP for Management                                                                                    International                                                        Implementation
                                              Commercial Operations                      Selection
of Corporate Resources of
the Company




 I21 / Development of Store                   Component 2: Enhancement
                                                                                         Quality And Cost- Open -                                                               Under
Management Design and         IDA / D2380     of EDM Operational and     Post                                                                   300,000.00               0.00                    2019-05-24   2019-06-10    2019-07-08                2019-09-06                                          2019-11-05                2019-12-20   2020-02-03                2020-05-17   2021-11-08
                                                                                         Based Selection   International                                                        Implementation
Refurbishment Plan                            Commercial Operations




                                              Component 2: Enhancement
 I22 / Pension and Health                                                                Quality And Cost- Open -                                                               Under
                              IDA / D2380     of EDM Operational and     Post                                                                   200,000.00               0.00                    2019-05-31   2019-06-10    2019-06-21                2019-08-19                                          2019-10-03                2019-11-18   2019-12-23                2020-04-06   2020-12-04
Insurance System                                                                         Based Selection   International                                                        Implementation
                                              Commercial Operations




INDIVIDUAL CONSULTANTS
Activity Reference No. /                                                                                                                                                                                                        Invitation to
                              Loan / Credit                                                                     Market     Contract Type    Estimated           Actual                                                                                  Draft Negotiated
          Description                                Component             Review Type        Method                                                                            Process Status   Terms of Reference          Identified/Selected                                  Signed Contract         Contract Completion
                                    No.                                                                        Approach                    Amount (US$)      Amount (US$)                                                                                   Contract
                                                                                                                                                                                                                                 Consultant
                                                                                                                                                                                                 Planned       Actual       Planned       Actual      Planned       Actual      Planned       Actual      Planned       Actual


 CS3 / Transformation Team                    Component 2: Enhancement                   Individual
for EDM Restructuring          /              of EDM Operational and     Prior           Consultant        Direct                               100,000.00               0.00   Canceled         2016-09-30                 2016-11-15                2016-12-30                2017-02-24                2017-08-23
Process                                       Commercial Operations                      Selection




                                              Component 3: Capacity                      Individual
 CS10 / Preparation of
                              IDA / V0250     Building and               Post            Consultant        Direct                                10,000.00        18,750.00     Completed        2016-10-28   2017-06-16    2016-12-22                2017-02-06   2017-08-10   2017-03-27   2017-12-28   2017-04-27   2018-03-26
Project Manual
                                              Implementation Support                     Selection




 CS4-2 / Post
                                              Component 2: Enhancement                   Individual
Implementation Review of
                               /              of EDM Operational and     Post            Consultant        Direct                                25,000.00               0.00   Canceled         2016-09-08                 2016-10-26                2016-12-09                2017-02-08                2017-08-07
SIGEM Project for ERP
                                              Commercial Operations                      Selection
Component




 CS4-22 / Post
                                              Component 2: Enhancement                   Individual
Implementation Review of
                              IDA / V0250     of EDM Operational and     Post            Consultant        Limited                               25,000.00        18,950.00     Completed        2016-09-01   2016-09-06    2016-09-30   2016-09-21   2016-11-15   2016-10-21   2017-01-09   2016-12-20   2017-01-09   2017-03-09
the ERP Component under
                                              Commercial Operations                      Selection
SIGEM Project




 CS4-1 / Post
                                              Component 2: Enhancement                   Individual
Implementation Review of
                               /              of EDM Operational and     Post            Consultant        Direct                                25,000.00               0.00   Canceled         2016-09-08                 2016-10-07                2016-11-21                2017-01-20                2017-07-20
SIGEM Project for CMS
                                              Commercial Operations                      Selection
Component




 CS4-3 / Post
                                              Component 2: Enhancement                   Individual
Implementation Review of
                               /              of EDM Operational and     Post            Consultant        Direct                                25,000.00               0.00   Canceled         2016-09-09                 2016-10-25                2016-12-09                2017-02-10                2017-08-09
SIGEM Project for OMS &
                                              Commercial Operations                      Selection
ICS Component




 CS4-4 / Post
                                              Component 2: Enhancement                   Individual
Implementation Review of
                               /              of EDM Operational and     Post            Consultant        Direct                                25,000.00               0.00   Canceled         2016-09-09                 2016-10-26                2016-12-11                2017-02-10                2017-08-09
SIGEM Project for PM
                                              Commercial Operations                      Selection
Component




 CS4-11 / Post
                                              Component 2: Enhancement                   Individual
Implementation Review for
                              IDA / V0250     of EDM Operational and     Post            Consultant        Limited                               25,000.00        22,250.00     Completed        2016-09-02   2016-09-06    2016-09-22   2016-09-21   2016-11-07   2016-10-21   2017-01-09   2016-12-20   2017-01-09   2017-03-09
the CMS Component under
                                              Commercial Operations                      Selection
the SIGEM Project




 CS4-33 / Post
                                              Component 2: Enhancement                   Individual
Implementation Review of
                              IDA / V0250     of EDM Operational and     Post            Consultant        Limited                               25,000.00        23,950.00     Completed        2016-09-02   2016-09-06    2016-09-22   2016-09-21   2016-11-07   2016-10-21   2017-01-09   2016-12-20   2017-01-09   2017-04-13
the OMS & ICS Component
                                              Commercial Operations                      Selection
under the SIGEM Project




                                                                                                                                                                                                                   Page 5
 CS4-44 / Post
                                              Component 2: Enhancement           Individual
Implementation Review of
                                IDA / V0250   of EDM Operational and     Post    Consultant   Limited    25,000.00    24,250.00   Completed        2016-09-01   2016-09-06    2016-09-23   2016-09-21   2016-11-08   2016-10-21   2017-01-09   2016-12-20   2017-01-09   2017-02-17
the PM Component under
                                              Commercial Operations              Selection
the SIGEM Project




 CS5 / Bidding Documents
                                              Component 2: Enhancement           Individual
and procurement of
                                 /            of EDM Operational and     Post    Consultant   Direct     50,000.00         0.00   Canceled         2016-10-09                 2016-11-23                2017-01-09                2017-02-28                2017-08-27
Contractors for SIGEM
                                              Commercial Operations              Selection
phase 2




 CS9-1 / ESIA and ESMP
Study covering all
                                              Component 3: Capacity              Individual
Investment Components
                                IDA / V0250   Building and               Post    Consultant   Limited    80,000.00    98,190.00   Completed        2017-03-07   2016-04-01    2017-03-12   2016-05-03   2017-03-17   2016-06-01   2017-03-29   2016-10-18   2017-05-31   2017-08-31
planned to be implemented
                                              Implementation Support             Selection
in eight provinces to be
covered by the Project




 CS9-2 / RPF Study to be
carried out for all
                                              Component 3: Capacity              Individual
Investment Components
                                IDA / V0250   Building and               Post    Consultant   Limited    70,000.00    68,796.00   Completed        2017-03-07   2016-04-01    2017-03-10   2016-04-01   2017-03-15   2016-06-06   2017-03-24   2016-12-06   2017-05-31   2017-09-15
planned to be implemented
                                              Implementation Support             Selection
in all the eight provinces to
be covered by the Project.




 CS7 / Audit of MV & HV                       Component 2: Enhancement           Individual
Metering and Preparation of      /            of EDM Operational and     Post    Consultant   Limited    80,000.00         0.00   Canceled         2016-09-30                 2016-10-31                2016-11-30                2017-02-14                2017-07-14
Metering Policy                               Commercial Operations              Selection




 I14 / Operationalization of
a Meter Calibration Lab,
                                              Component 2: Enhancement           Individual
Special Store and Redesign
                                IDA / V0250   of EDM Operational and     Post    Consultant   Open      150,000.00   188,050.00   Signed           2017-08-21   2017-08-01    2017-09-29   2017-09-29   2017-10-20   2017-12-04   2018-01-19   2018-01-23   2018-08-20
of Meter Inspection as well
                                              Commercial Operations              Selection
as Establishing Testing
Procedures on the field




 I6 / Design and Supervision
on Supply and
Implementation of Asset                       Component 2: Enhancement           Individual
                                                                                                                                  Under
Management System (AMS)         IDA / V0250   of EDM Operational and     Prior   Consultant   Open      300,000.00         0.00                    2017-09-13                 2017-11-23                2017-12-29                2018-02-28                2020-02-28
                                                                                                                                  Implementation
as well as of the                             Commercial Operations              Selection
Maintenance Management
System (MMS)




 C12 / Delegation of                          Component 3: Capacity              Individual
Accountability and Authority    IDA / V0250   Building and               Post    Consultant   Limited    80,000.00    93,875.00   Completed        2017-08-31   2017-06-16    2017-09-11   2017-10-06   2017-10-11   2017-10-31   2017-12-11   2017-12-29   2018-03-12   2018-07-16
Matrix (DAAM) for EDM                         Implementation Support             Selection




 I15 / Consulting services
for supervision on                            Component 2: Enhancement           Individual
Implementation of Maputo & IDA / V0250        of EDM Operational and     Prior   Consultant   Open      330,000.00   257,950.00   Signed           2017-09-29   2018-03-02    2017-12-04                2017-12-25   2019-06-06   2018-03-16   2019-06-10   2019-11-18
National wide Network                         Commercial Operations              Selection
Redesign & WAN




 I16 / Consulting services
for supervision on
implementation of Data                        Component 2: Enhancement           Individual
Center Network Redesign         IDA / V0250   of EDM Operational and     Post    Consultant   Open       50,000.00    84,500.00   Signed           2017-09-28   2018-03-02    2017-11-24                2017-12-15   2018-12-12   2018-03-29   2019-03-04   2020-03-27
(Redundancy, High                             Commercial Operations              Selection
availability, High
Performance)




 I17 / Consulting services
for design and supervision                    Component 2: Enhancement           Individual
on implementation of            IDA / V0250   of EDM Operational and     Post    Consultant   Open      100,000.00         0.00   Canceled         2017-11-29                 2018-02-09                2018-03-02                2018-07-23                2019-07-23
DIGITAL Board - EDM                           Commercial Operations              Selection
Management Portal




                                                                                                                                                                     Page 6
 I3 / Consulting Services for
Preparation of Compensation                   Component 1: Rehabilitation          Individual
Plan for Infrastructure         IDA / V0250   and Upgrade of Network        Post   Consultant         Direct    100,000.00    68,640.00   Signed      2017-09-22   2018-02-06    2017-10-09   2017-09-22   2017-10-30   2017-12-12   2018-01-08   2018-05-14   2018-06-20
Investment components of                      Infrastructure                       Selection
the Project




 I5 / Technical Assistance to
EDM on Implementation of                      Component 2: Enhancement             Individual
Revenue Protection Initiave     IDA / D2380   of EDM Operational and        Post   Consultant         Open      100,000.00         0.00   Canceled    2018-04-30                 2018-06-26                2018-07-17                2018-11-30                2019-12-30
for supply & Installation of                  Commercial Operations                Selection
10,000 AMR




 I12 / Implementation of the
                                              Component 2: Enhancement             Individual
System Stabilization and
                                IDA / D2380   of EDM Operational and        Post   Consultant         Open      100,000.00    56,000.00   Signed      2018-05-08   2019-05-15    2018-07-13   2019-07-01   2018-08-13   2019-07-11   2019-01-01   2019-09-10   2020-01-30
End-to-End Business Process
                                              Commercial Operations                Selection
Review - CMS




 I27 / Technical Program
Manager for EDM ICT
                                              Component 3: Capacity                Individual
Infrastructure Programs as
                                IDA / D2380   Building and                  Post   Consultant         Open      100,000.00   125,000.00   Signed      2018-04-26   2018-05-14    2018-07-13   2018-07-24   2018-08-13   2018-12-26   2018-12-25   2019-04-25   2020-01-23
part of EDM ICT
                                              Implementation Support               Selection
Infrastructure Improvement
and redesign program




 I28 / ENVIRONMENTAL
AND SOCIAL
MANAGEMENT
                                              Component 1: Rehabilitation
FRAMEWORK (ESMF) for
                                IDA / D2380   and Upgrade of Network        Post   Direct Selection   Direct    100,000.00    91,545.00   Completed   2018-08-15   2018-08-09    2018-08-25                                          2018-10-10   2018-08-30   2019-03-09   2019-01-25
Preparation of the upcoming
                                              Infrastructure
Mozambique Lighting and
Grid Access Project (Moza-
LIGA) Project




 I30 / RESETTLEMENT
POLICY FRAMEWORK
                                              Component 1: Rehabilitation
(RPF)   for Preparation of
                                IDA / D2380   and Upgrade of Network        Post   Direct Selection   Direct    100,000.00    66,685.00   Signed      2018-08-17   2018-08-09    2018-08-27                                          2018-10-12   2018-08-30   2019-02-11
the Mozambique Lighting
                                              Infrastructure
and Grid Access Project
(Moza-LIGA)




 I31 / Consulting Services to
assist EDM at Technical and
                                              Component 2: Enhancement             Individual
Functional Specifications and
                                IDA / D2380   of EDM Operational and        Post   Consultant         Open      150,000.00   198,025.00   Signed      2019-01-30   2019-03-19    2019-04-30   2019-06-21   2019-05-30   2019-07-09   2019-08-19   2019-09-10   2021-12-20
Other Technical
                                              Commercial Operations                Selection
Requirements for Supply and
Installation of GIS




 I32 / Technical Assistance
to EDM in Technical and
Functional Specifications and                 Component 2: Enhancement             Individual
other Technical                 IDA / D2380   of EDM Operational and        Post   Consultant         Open      150,000.00   154,689.47   Signed      2019-01-31   2019-06-11    2019-05-03   2019-06-27   2019-06-17   2019-07-05   2019-10-01   2019-09-09   2020-12-31
Requirements for Incorporate                  Commercial Operations                Selection
a Prepayment Module at
CMS




 I33 / Elaboration of the
Project Implementation                        Component 2: Enhancement             Individual
Manual for                      IDA / D2380   of EDM Operational and        Post   Consultant         Limited    25,000.00    30,000.00   Completed   2019-02-15   2019-02-15    2019-03-04                2019-04-03   2019-03-14   2019-06-17   2019-05-02   2019-10-15   2019-10-31
Mozambique Energy for All                     Commercial Operations                Selection
Project (ProEnergia)




 I34 / Consultancy Services
to Assist EDM at
                                              Component 2: Enhancement             Individual
Consolidation of the Revenue
                                IDA / D2380   of EDM Operational and        Post   Consultant         Limited    50,000.00    83,500.00   Signed      2019-04-12   2019-04-04    2019-04-26   2019-06-10   2019-06-10   2019-07-08   2019-08-23   2019-09-10   2020-02-19
Protection Project and
                                              Commercial Operations                Selection
Setting up a Metering
Control Centre (MCC)




                                                                                                                                                                        Page 7
 I9 / Consulting services to
support EDM on supply,                        Component 2: Enhancement             Individual
                                                                                                                                          Pending
Implementation and              IDA / D2380   of EDM Operational and        Post   Consultant         Open      200,000.00         0.00                    2019-12-20                 2020-02-29                2020-03-30                2020-06-12                2021-09-10
                                                                                                                                          Implementation
supervision on the Worforce                   Commercial Operations                Selection
management (WFM)




 I8 / Preparation of
Technical & Functional
Specifications and other
Technical Requirements for                    Component 2: Enhancement             Individual
Supply and Installation of      IDA / V0250   of EDM Operational and        Post   Consultant         Open      250,000.00         0.00   Canceled         2017-09-15   2018-11-21    2017-11-24                2017-12-15                2018-02-27                2020-02-28
Geographical Information                      Commercial Operations                Selection
System (GIS) as well as
Worforce Management
(WFM)




 I11 / Implementation of the
System Stabilization and
                                              Component 2: Enhancement             Individual
End-to-End Business Process
                                IDA / D2380   of EDM Operational and        Post   Consultant         Open      100,000.00         0.00   Canceled         2018-04-30                 2018-06-27                2018-08-10                2018-12-24                2020-01-22
review under the EDM ERP
                                              Commercial Operations                Selection
System for the GIAF
Component




 I13 / Consulting services to
support EDM on Diagnosis
                                              Component 2: Enhancement             Individual
and Implementation of the
                                IDA / D2380   of EDM Operational and        Post   Consultant         Open      100,000.00   110,376.25   Signed           2019-04-30   2019-05-15    2019-07-15   2019-07-04   2019-08-29   2019-07-17   2019-11-11   2019-09-13   2021-11-01
System Stabilization and
                                              Commercial Operations                Selection
End to End business process
review - OMS




 I10 / Consulting Services
for Auditing the execution of                 Component 1: Rehabilitation          Individual
                                                                                                                                          Under
the ESMP on Infrastructure      IDA / D2380   and Upgrade of Network        Post   Consultant         Open      150,000.00         0.00                    2019-05-22   2019-06-11    2019-08-08                2019-09-23                2019-12-06                2021-11-25
                                                                                                                                          Implementation
Investment components of                      Infrastructure                       Selection
the Project




 I4 / Consulting Services for
Monitoring and Auditing the                   Component 1: Rehabilitation          Individual
execution of the ESMP on        IDA / V0250   and Upgrade of Network        Post   Consultant         Limited   200,000.00         0.00   Canceled         2018-02-07   2019-01-18    2018-02-19                2018-03-21                2018-06-11                2020-07-30
Infrastructure Investment                     Infrastructure                       Selection
components of the Project




 I38 / Elaboration of Project
Registration Document (PRD)
                                              Component 2: Enhancement
and Preliminary
                                IDA / D2380   of EDM Operational and        Post   Direct Selection   Direct     50,000.00    57,844.00   Signed           2019-06-21   2019-06-17    2019-07-02   2019-04-17                             2019-08-15   2019-07-22   2020-01-13
Environmental Information
                                              Commercial Operations
Sheet (PEIS) for the
ProEnergy Project




 I41 / Consulting Services to
support EDM on preparation
of technical specifications,                  Component 2: Enhancement             Individual
                                                                                                                                          Under
Procurement and Supervision IDA / D2380       of EDM Operational and        Post   Consultant         Open      130,000.00         0.00                    2020-01-09   2019-12-18    2020-03-15                2020-04-05                2020-07-18                2021-09-16
                                                                                                                                          Implementation
on the Implementation of                      Commercial Operations                Selection
Information Security
(infoSec) Project




 I40 / Consulting Services to
support EDM on preparation
of technical specifications,
                                              Component 2: Enhancement             Individual
procurement and supervision                                                                                                               Under
                                IDA / D2380   of EDM Operational and        Post   Consultant         Open      190,000.00         0.00                    2020-01-15   2019-12-28    2020-03-21                2020-04-11                2020-07-24                2021-09-22
on the implementation of                                                                                                                  Implementation
                                              Commercial Operations                Selection
Enterprise Achitecture and
application integration plan
project




                                                                                                                                                                             Page 8
 I39 / Consulting services to
support EDM on preparation
of technical specifications,
                                              Component 2: Enhancement             Individual
procurement and supervision                                                                                                  Under
                                IDA / D2380   of EDM Operational and        Post   Consultant   Open     170,000.00   0.00                    2020-01-20   2019-12-28    2020-03-26   2020-04-16   2020-07-29   2021-09-27
on the implementation of                                                                                                     Implementation
                                              Commercial Operations                Selection
Operational Portal, Corporate
Service Center and E-
Learning Platform Project




 I42 / Consultancy Services
for Preparation of RPF and                    Component 1: Rehabilitation          Individual
                                                                                                                             Pending
RAP Preparation for             IDA / D2380   and Upgrade of Network        Post   Consultant   Direct   140,000.00   0.00                    2020-04-14                 2020-04-23   2020-04-30   2020-06-11   2021-04-07
                                                                                                                             Implementation
Additional Funding Under                      Infrastructure                       Selection
Project (PERIP)




 I43 / Consultancy Services
for Preparation of ESIA                       Component 1: Rehabilitation          Individual
                                                                                                                             Pending
Study and Update of ESMF        IDA / D2380   and Upgrade of Network        Post   Consultant   Direct   100,000.00   0.00                    2020-04-14                 2020-04-23   2020-04-30   2020-06-11   2021-04-07
                                                                                                                             Implementation
for Additional Funding                        Infrastructure                       Selection
Under Project (PERIP)




 I44 / Consultancy Services
                                              Component 1: Rehabilitation          Individual
for RAP Implementation for                                                                                                   Pending
                                IDA / D2380   and Upgrade of Network        Post   Consultant   Direct    65,000.00   0.00                    2020-04-17                 2020-04-27   2020-05-27   2020-08-09   2021-09-13
Lot 2 of Component 1 of                                                                                                      Implementation
                                              Infrastructure                       Selection
PERIP Project