The World Bank Implementation Status & Results Report Timor-Leste Branch Roads Project (P155203) Timor-Leste Branch Roads Project (P155203) EAST ASIA AND PACIFIC | Timor-Leste | Transport Global Practice | IBRD/IDA | Investment Project Financing | FY 2020 | Seq No: 4 | ARCHIVED on 30-Aug-2021 | ISR47970 | Implementing Agencies: Democratic Republic of Timor-Leste, Ministry of Public Works Key Dates Key Project Dates Bank Approval Date: 26-Nov-2019 Effectiveness Date: 26-Jan-2021 Planned Mid Term Review Date: 25-Oct-2023 Actual Mid-Term Review Date: Original Closing Date: 31-Dec-2025 Revised Closing Date: 31-Dec-2025 pdoTable Project Development Objectives Project Development Objective (from Project Appraisal Document) Improve road access, safety, and climate resilience on the Gleno–Maubisse Corridor and, in the event of an Eligible Crisis or Emergency, to provide an immediate response to the Eligible Crisis or Emergency Has the Project Development Objective been changed since Board Approval of the Project Objective? No Components Table Name Component 1: Gleno–Maubisse Corridor Upgrading and Road Safety Improvement:(Cost $65.81 M) Component 2: Institutional Strengthening and Project Management:(Cost $5.00 M) Component 3: Contingent Emergency Response Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Satisfactory Satisfactory Overall Risk Rating Substantial Substantial Implementation Status and Key Decisions As the project was declared effective on February 26, 2021, it is too early to report on the progress towards achieving the project development objectives (PDO) or on overall implementation progress. However, progress was made on some key activities under the ongoing Road Climate Resilience Project, specifically with the completion of the feasibility study, detailed design and bidding documents for the civil works under TLBRP, and the preparation of draft TORs for the Advisors to be recruited under the project. There are several activities which need to be undertaken to start project implementation, including: (ii) the selection of surveyors/assistants for Land Acquisition and Resettlement Survey Updates and Compensation Processing for Hatubuilico–Letefoho; (ii) the completion of the selection process of the Construction Supervision Consultant (CSC) for Hatubuilico–Letefoho–Gleno (including design upgrade for Letefoho–Gleno); (ii) the procurement of the road upgrading and maintenance contractor for Hatubuilico–Letefoho; and (iv) the selection of the Geotechnical Advisor (International) and the Road Safety Advisor (International); and (iii) the start the procurement process for the road network condition and traffic survey and the pilot roar maintenance contract. 8/30/2021 Page 1 of 6 The World Bank Implementation Status & Results Report Timor-Leste Branch Roads Project (P155203) Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance Substantial Substantial Substantial Macroeconomic Substantial Substantial Substantial Sector Strategies and Policies Substantial Substantial Substantial Technical Design of Project or Program Substantial Substantial Substantial Institutional Capacity for Implementation and High High High Sustainability Fiduciary High High High Environment and Social Substantial Substantial Substantial Stakeholders Moderate Moderate Moderate Other -- -- -- Overall Substantial Substantial Substantial Results PDO Indicators by Objectives / Outcomes Improve road access on the Gleno–Maubisse corridor IN01031359 ►Passenger car travel time on the project roads (Minutes, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 130.00 130.00 130.00 75.00 Date 01-Mar-2019 14-Aug-2020 14-Aug-2020 30-Jun-2025 Comments: Passenger car travel time as a result of upgrading the project roads Improve safety on the Gleno–Maubisse corridor IN01031360 ►Number of villages with road safety measures (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target 8/30/2021 Page 2 of 6 The World Bank Implementation Status & Results Report Timor-Leste Branch Roads Project (P155203) Value 0.00 0.00 0.00 6.00 Date 01-Mar-2019 14-Aug-2020 14-Aug-2020 30-Jun-2025 Comments: Implementation of road safety improvements Improve climate resilience on the Gleno–Maubisse corridor IN01031426 ►Roads upgraded with climate resilience measures (Kilometers, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 44.30 Date 01-Mar-2019 14-Aug-2020 14-Aug-2020 30-Jun-2025 Upgrading of Gleno–Letefoho and Letefoho–Hatubuilico Junction road sections with climate resilience Comments: measures. Intermediate Results Indicators by Components Component 1: Gleno–Maubisse Corridor Upgrading and Road Safety Improvement IN01031429 ►Roads rehablitated (Kilometers, Corporate) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 44.30 Date 01-Mar-2019 14-Aug-2020 14-Aug-2020 30-Jun-2025 IN01031432 Roads rehabilitated - rural (Kilometers, Corporate Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 44.30 IN01031433 Roads rehabilitated - non-rural (Kilometers, Corporate Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 0.00 IN01031434 ►Number of people with enhanced access to transportation services (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 189,000.00 Date 01-Mar-2019 14-Aug-2020 14-Aug-2020 30-Jun-2025 8/30/2021 Page 3 of 6 The World Bank Implementation Status & Results Report Timor-Leste Branch Roads Project (P155203) Comments: This is a new IDA19 indicator for the Transport GP IN01031435 ►Design and construction stages technical audits on the project road including road safety and climate resilient aspects (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 01-Mar-2019 14-Aug-2020 14-Aug-2020 30-Jun-2025 Design and construction stages technical audits to confirm road safety and climate resilient issues Comments: properly addressed IN01031436 ►National and district roads with updated road condition and traffic survey (Kilometers, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 2,240.00 Date 01-Mar-2019 14-Aug-2020 14-Aug-2020 30-Jun-2025 Comments: Data collection on road inventory, traffic and condition on national and district roads Component 2: Institutional Strengthening and Project Management IN01031430 ►National Roads under multi-year maintenance contracts supported by the project (Kilometers, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 60.00 Date 01-Mar-2019 14-Aug-2020 14-Aug-2020 30-Jun-2025 Comments: Implementation of multi-year maintenance contracts with project support IN01031431 ►Percentage of women working on routine maintenance activities of multi-year maintenance contracts supported by the project (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 30.00 Date 01-Mar-2019 14-Aug-2020 14-Aug-2020 30-Jun-2025 Comments: The percentage of women performing routine maintenance work Component 3: Contingent Emergency Response IN01031427 ►Adoption of CERC manual (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target 8/30/2021 Page 4 of 6 The World Bank Implementation Status & Results Report Timor-Leste Branch Roads Project (P155203) Value No No No Yes Date 01-Mar-2019 14-Aug-2020 14-Aug-2020 30-Jun-2025 Comments: A manual is prepared and formally adopted on how to trigger and implement the CERC of the project. Citizen Engagement IN01031428 ►Grievances responded and/or resolved within the stipulated service standards (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 75.00 Date 01-Mar-2019 14-Aug-2020 14-Aug-2020 30-Jun-2025 The project's grievance redress mechanism (GRM) defines services standards for responding to and Comments: ideally resolving complaints (High/Medium/Low priority 5/10/30 working days respectively) Performance-Based Conditions Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P155203 IDA-64880 Effective USD 59.00 59.00 0.00 0.00 61.25 0% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P155203 IDA-64880 Effective 26-Nov-2019 30-Dec-2019 26-Jan-2021 31-Dec-2025 31-Dec-2025 Cumulative Disbursements 8/30/2021 Page 5 of 6 The World Bank Implementation Status & Results Report Timor-Leste Branch Roads Project (P155203) PBC Disbursement Achievement Disbursed amount in Disbursement % PBC ID PBC Type Description Coc PBC Amount Status Coc for PBC Restructuring History There has been no restructuring to date. Related Project(s) There are no related projects. 8/30/2021 Page 6 of 6