The World Bank Implementation Status & Results Report Zhejiang Rural Water Supply and Sanitation Project (P133018) Zhejiang Rural Water Supply and Sanitation Project (P133018) EAST ASIA AND PACIFIC | China | Water Global Practice | IBRD/IDA | Investment Project Financing | FY 2015 | Seq No: 13 | ARCHIVED on 07-Sep-2020 | ISR43188 | Implementing Agencies: People's Republic of China, Zhejiang Provincial Economic Information Center Key Dates Key Project Dates Bank Approval Date: 25-Sep-2014 Effectiveness Date: 02-Feb-2015 Planned Mid Term Review Date: 01-Dec-2017 Actual Mid-Term Review Date: 20-Nov-2017 Original Closing Date: 31-Dec-2020 Revised Closing Date: 30-Jun-2021 pdoTable Project Development Objectives Project Development Objective (from Project Appraisal Document) The proposed Project Development Objective (PDO) is to improve access to sustainable water supply and sanitation services in selected villages and towns in rural areas of Zhejiang Province. Has the Project Development Objective been changed since Board Approval of the Project Objective? No Components Table Name Improving Water Supply and Sanitation:(Cost $301.07 M) Training and Capacity Building:(Cost $1.00 M) Project Management and Supervision:(Cost $1.50 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Satisfactory Satisfactory Overall Risk Rating Moderate Moderate Implementation Status and Key Decisions The progress towards achieving the Project Development Objective (PDO) has been satisfactory. A project restructuring was approved by the Bank to (1) extend the project closing date from December 31, 2020 to June 30, 2021, and (2) add a new project implementation unit, namely Longquan Rural Water Affairs Co., ltd to look after master planning, construction management and operation of rural water supply and sanitation schemes in Longquan City. A total of 139 rural sewerage treatment schemes were built and put into operation. The project has already started to provide improved wastewater collection and treatment services to the residents of the participating small towns and villages. 9/7/2020 Page 1 of 8 The World Bank Implementation Status & Results Report Zhejiang Rural Water Supply and Sanitation Project (P133018) Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance -- Moderate Moderate Macroeconomic -- Moderate Moderate Sector Strategies and Policies -- Low Low Technical Design of Project or Program -- Low Low Institutional Capacity for Implementation and -- Moderate Low Sustainability Fiduciary -- Moderate Moderate Environment and Social -- Low Low Stakeholders -- Moderate Low Other -- -- -- Overall -- Moderate Moderate Results PDO Indicators by Objectives / Outcomes To improve access to sustainable water supply and sanitation services in selected villages and towns IN00883935 ►Number of people in rural areas provided with access to Improved Water Sources under the project (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 312,078.00 377,057.00 450,000.00 Date 22-Aug-2014 31-Dec-2019 30-Jun-2020 30-Jun-2021 IN00883936 Female population (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 156,039.00 192,896.00 225,000.00 Date 22-Aug-2014 31-Dec-2019 30-Jun-2020 30-Jun-2021 IN00883937 ►People provided with access to ‘improved sanitation facilities” under the proj. (Number, Corporate) Baseline Actual (Previous) Actual (Current) End Target 9/7/2020 Page 2 of 8 The World Bank Implementation Status & Results Report Zhejiang Rural Water Supply and Sanitation Project (P133018) Value 0.00 611,160.00 623,785.00 630,000.00 Date 22-Aug-2014 31-Dec-2019 30-Jun-2020 30-Jun-2021 IN00883938 People provided with access to "improved sanitation facilities" - rural (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 611,160.00 623,785.00 630,000.00 Date 22-Aug-2014 31-Dec-2019 30-Jun-2020 30-Jun-2021 IN00883939 Female population (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 305,580.00 309,328.00 315,000.00 Date 22-Aug-2014 31-Dec-2019 30-Jun-2020 30-Jun-2021 Intermediate Results Indicators by Components Improving Water Supply and Sanitation IN00883940 ►Piped household water connections that are benefiting from rehabilitation works undertaken by the project (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 17,444.00 96,699.00 130,000.00 Date 22-Aug-2014 31-Dec-2019 30-Jun-2020 30-Jun-2021 IN00883943 ►New household sewer connections constructed under the project (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 87,794.00 72,564.00 85,000.00 Date 22-Aug-2014 31-Dec-2019 30-Jun-2020 30-Jun-2021 The previous figure of "87,794" in the last ISR has some errors; the current figure of "72.564" in this ISR Comments: has corrected the last errors, as outlined in the restructuring paper. IN00883944 ►Volume(mass) of BOD pollution load removed by treatment plant under the project (Tones/year, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 2,937.00 1,475.00 2,796.00 Date 22-Aug-2014 31-May-2019 30-Jun-2020 30-Jun-2021 9/7/2020 Page 3 of 8 The World Bank Implementation Status & Results Report Zhejiang Rural Water Supply and Sanitation Project (P133018) The previous figure of "2,937" for total BOD load reduction and "2,675" for Fuyang WWTP in the last ISR have some errors. In this ISR, the current figure of "1,475" for total and "1362" for Fuyang WWTP in this ISR have corrected these errors, as outlined in the restructuring paper. In this ISR, total BOD load reduction as of June 30, 2020 is 1,475t. Target for 2020 (as of December 31, 2020) is 2,777t. The breakdown of half-year result and target for 2020 are: Fuyang 1362 and 2500, Anren 7 and 8, Meixi 106 and 250. The load reduction for Badu, Xiaomei, Chatian and Lanju WWTPs are still zero as of June 30, 2020. Their sewer networks are being completed and commissioning are planed for the second half of 2020. Their Comments: BOD load reduction targets are expected to be achieved in the next ISR and/or ICR. The BOD load reduction for Meixi WWTP in this ISR is lower than the last ISR. This is because Meixi WWTP receives industrial wastewater as well as domestic sewerage. The business of industries were affected by Covid-19 over the first half of 2020, but is expected to be resumed over the second half of the year so that the volume of influent BOD load is expected to be resumed and, consequently, the reduction of BOD load in the next ISR and/or ICR is expected to be increased. IN00883945 Fuyang WWTP (Phase 4) (Tones/year, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 2,675.00 1,362.00 2,500.00 Date 22-Aug-2014 31-Dec-2019 30-Jun-2020 30-Jun-2021 IN00883946 Anren WWTP (Tones/year, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 6.90 7.00 15.00 Date 22-Aug-2014 31-Dec-2019 30-Jun-2020 30-Jun-2021 IN00883947 Badu WWTP (Tones/year, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 11.00 Date 22-Aug-2014 31-Dec-2019 30-Jun-2020 30-Jun-2021 IN00883948 Xiaomei WWTP (Tones/year, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 4.00 Date 22-Aug-2014 31-Dec-2019 30-Jun-2020 30-Jun-2021 IN00883949 Chatian WWTP (Tones/year, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 4.00 Date 22-Aug-2014 31-May-2019 30-Jun-2020 30-Jun-2021 IN00883950 9/7/2020 Page 4 of 8 The World Bank Implementation Status & Results Report Zhejiang Rural Water Supply and Sanitation Project (P133018) Lanju WWTP (Tones/year, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 4.00 Date 22-Aug-2014 31-Dec-2019 30-Jun-2020 30-Jun-2021 IN00883951 Jinxi WWTP (Tones/year, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 3.00 Date 22-Aug-2014 31-Dec-2019 30-Jun-2020 30-Jun-2021 IN00883952 Meixi WWTP (Tones/year, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 255.00 106.00 255.00 Date 22-Aug-2014 31-Dec-2019 31-Dec-2019 30-Jun-2021 IN00883953 ►Ratio of production cost of water supply per cubic meter over the tariff charge per cubic meter (Anji Guoyuan Water Company) (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Value NA less than 1 less than 1 less than 1 Date 22-Aug-2014 31-Dec-2019 30-Jun-2020 30-Jun-2021 IN00883954 ►Ratio of production cost of water supply per cubic meter over the tariff charge per cubic meter (Fuyang Water Company) (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Value Less than 1 less than 1 less than 1 Less than 1 Date 22-Aug-2014 31-Dec-2019 30-Jun-2020 30-Jun-2021 IN00883955 ►Ratio of production cost of water supply per cubic meter over the tariff charge per cubic meter (Tiantai Water Company) (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Value less than 1 less than 1 less than 1 less than 1 Date 22-Aug-2014 31-Dec-2019 30-Jun-2020 30-Jun-2021 IN00883956 ►Ratio of production cost of water supply per cubic meter over the tariff charge per cubic meter (Longquan Water Company) (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Value less than 1 less than 1 less than 1 less than 1 9/7/2020 Page 5 of 8 The World Bank Implementation Status & Results Report Zhejiang Rural Water Supply and Sanitation Project (P133018) Date 22-Aug-2014 31-Dec-2019 30-Jun-2020 30-Jun-2021 IN00883957 ►Ratio of production cost of water supply per cubic meter over the tariff charge per cubic meter (Longquan Rural Water Supply Station) (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Value less than 1 less than 1 less than 1 less than 1 Date 22-Aug-2014 31-Dec-2019 30-Jun-2020 30-Jun-2021 IN00883958 ►Ratio of production cost of water supply per cubic meter over the tariff charge per cubic meter (Longquan Rural Water Affairs Co., ltd)) (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Value NA NA NA less than 1 Date 17-Jun-2020 17-Jun-2020 17-Jun-2020 30-Jun-2021 Training and Capacity Building IN00883941 ►Number of staff training days in project financed training and TA activities (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 2,814.00 2,865.00 2,800.00 Date 22-Aug-2014 31-Dec-2019 30-Jun-2020 30-Jun-2021 Project Management and Supervision IN00883942 ►Number of O&M management plans prepared and implemented (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 5.00 5.00 6.00 Date 22-Aug-2014 31-Dec-2019 30-Jun-2020 30-Jun-2021 The new PIU approved by the Bank in July 2020 is expected to submit its O&M plan to the Bank before Comments: end October 2020. Performance-Based Conditions Data on Financial Performance Disbursements (by loan) 9/7/2020 Page 6 of 8 The World Bank Implementation Status & Results Report Zhejiang Rural Water Supply and Sanitation Project (P133018) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P133018 IBRD-84240 Effective USD 200.00 200.00 0.00 170.54 29.46 85% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P133018 IBRD-84240 Effective 25-Sep-2014 25-Nov-2014 02-Feb-2015 31-Dec-2020 30-Jun-2021 Cumulative Disbursements PBC Disbursement Achievement Disbursed amount in Disbursement % PBC ID PBC Type Description Coc PBC Amount Status Coc for PBC Restructuring History Level 2 Approved on 24-Jul-2020 Related Project(s) 9/7/2020 Page 7 of 8 The World Bank Implementation Status & Results Report Zhejiang Rural Water Supply and Sanitation Project (P133018) There are no related projects. 9/7/2020 Page 8 of 8