PROCUREMENT PLAN (Textual Part) Project information: Mauritania – INAYA – P156165 Project Implementation agency: Ministère de la Santé Date of the Procurement Plan: 1 June 2017 Period covered by this Procurement Plan: 1 June 2017-31 December 2018 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the National Procurement Code Law 2010- 044 of 22 July 2010 and its subsequent implementation decrees., such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. The use of the World Bank standard bidding documents with the amendments indicated for use under the national procurement guidelines. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – Not Applicable. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Specify for each Goods: is not applicable. Works: is not applicable. Other Relevant Procurement Information. None. PROCUREMENT Mauritania : Health System Support PLAN General Information Country: Mauritania Bank’s Approval Date of the Original Procurement Plan: 2017-06-06 2021-11-03 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P156165 GPN Date: 2017-06-07 Project Name: Health System Support Loan / Credit No: IDA / D1890, / INAYA Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned 01/T/INAYA/2018 / travaux de réaménagement et Capacity Building and Project Single Stage - One 2018-08- IDA / D1890 A posteriori Appel d'offres Open - National 22,535.00 22,819.71 Achevé 2018-06-01 2018-07-03 2018-06-06 2018-06-16 2018-07-16 2018-06-23 2018-07-31 2018-07-11 2018-08-15 d'adaptation des bureaux de Management Envelope 10 l'UT-FBR 01/T/INAYA/2017 / Capacity Building and Project Single Stage - One 2017-12- Extension et réaménagement IDA / D1890 A posteriori Demande de prix Open - National 27,000.00 0.00 Annulé 2017-10-23 2017-11-28 Management Envelope 28 d'une salle d'archives 01/T/2018 / Extension et Capacity Building and Project Single Stage - One 2019-03- aménagement de la salle IDA / D1890 A posteriori Demande de prix Open - National 27,000.00 13,685.83 Achevé 2018-11-23 2018-12-05 2019-01-20 2019-03-11 Management Envelope 21 d'archive pour la Daf. 19/T/2018 / Réalisation des travaux de réaménagement et Capacity Building and Project Single Stage - One 2018-05- IDA / D1890 A posteriori Demande de prix Limited 3,239.00 0.00 Annulé 2018-03-10 2018-04-05 2018-04-29 d'adaptation des bureaux de Management Envelope 29 l'UT-FBR 1/T/2019 / réhabilitation des Capacity Building and Project Single Stage - One 2019-07- IDA / D1890 A posteriori Demande de prix Limited 21,700.00 21,413.68 Achevé 2019-04-06 2019-06-12 2019-06-01 2019-07-22 locaux UT-FBR et ERV Management Envelope 01 02/T/INAYA/2020 / Construction d'une salle de Capacity Building and Project Single Stage - One 2021-01- réunion en préfabriqué pour IDA / D1890 A posteriori Demande de prix Limited 16,752.00 0.00 Annulé 2020-10-31 2020-12-20 Management Envelope 19 l'UT-FBR avec son équipement bureautiques et audiovisuels 01/T/INAYA/2020 / Réhabilitation d'une partie de l'ex CH Néma , du poste de Capacity Building and Project Single Stage - One 2021-09- IDA / D1890 A posteriori Appel d'offres Open - National 101,804.00 0.00 Annulé 2020-11-23 2020-11-28 2021-01-09 2021-02-08 2021-03-15 santé de tintane ,ex Centre de Management Envelope 11 sante de Bassiknou ainsi que du local de la DRAS du HEC 23/T/2018 / Construction d'infrastructures Capacity Building and Project Single Stage - One 2019-10- IDA / D1890 A posteriori Appel d'offres Open - National 44,394.00 0.00 Annulé 2019-03-10 2019-03-15 2019-04-14 2019-04-29 2019-06-19 d'entreposage pour les 2 Management Envelope 17 hôpitaux régionaux et 4 CS 01/T/INAYA/2021 / National Construction en préfabriqué Procurement Capacity Building and Project Single Stage - One En attente 2022-02- d'une salle de réunion pour IDA / D1890 A posteriori Demande de prix Open - National Document - 1 75,000.00 0.00 2021-07-05 2021-08-30 Management Envelope d'exécution 26 l'UT-FBR et de 4 bureaux Envelope process pour la DRH et la DIMM . (Non Bank-SPD) National 03/T/INAYA/2021 / Procurement Construction d'infrastructures Capacity Building and Project Single Stage - One En attente 2022-02- IDA / D1890 A posteriori Demande de prix Open - National Document - 1 114,504.00 0.00 2021-07-05 2021-08-30 d'entreposage pour les 2 Management Envelope d'exécution 26 Envelope process hôpitaux régionaux et 4 CS (Non Bank-SPD) National 04/T/INAYA/2021 / Procurement Capacity Building and Project Single Stage - One En attente 2022-02- Réhabilitation CAMEC de IDA / D1890 A posteriori Demande de prix Open - National Document - 2 166,000.00 0.00 2021-06-29 2021-08-24 Management Envelope d'exécution 20 Tintane et Nema Envelope process (Non Bank-SPD) National 05/T/INAYA/2021 / Procurement Extension et réhabilitation Capacity Building and Project Single Stage - One En attente 2022-03- IDA / D1890 A posteriori Demande de prix Open - National Document - 1 164,000.00 0.00 2021-07-28 2021-09-22 DRASS du HEC et le CS Management Envelope d'exécution 21 Envelope process Bassiknou (Non Bank-SPD) GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 02/F/INAYA/2017 / Acquisition de 4 véhicules Capacity Building and Project Single Stage - One IDA / D1890 A posteriori Appel d'offres Open - National 220,000.00 149,169.56 Achevé 2017-10-19 2018-05-15 2017-11-02 2017-12-07 2018-06-20 2017-12-28 2018-07-11 2018-01-25 2018-08-15 2018-02-24 2018-11-06 tout terrain et deux véhicules Management Envelope légers 18/F/2018 / Acquisition des Capacity Building and Project Single Stage - One IDA / D1890 A posteriori Appel d'offres Open - National 10,141.00 2,078.89 Signé 2018-03-19 2018-03-31 2018-03-24 2018-04-23 2018-04-11 2018-05-08 2018-04-26 2018-06-12 2018-06-13 2019-06-12 consommables bureautiques Management Envelope 20/F/2018 / Acquisition de Capacity Building and Project Single Stage - One matériels et produits IDA / D1890 A posteriori Appel d'offres Open - National 6,479.00 527.72 Signé 2018-03-19 2018-03-30 2018-03-24 2018-04-23 2018-04-11 2018-05-08 2018-04-26 2018-06-12 2018-05-21 2018-07-12 Management Envelope d'hygiène et d'entretien 21/F/2018 / Acquisition Capacity Building and Project Single Stage - One IDA / D1890 A posteriori Appel d'offres Open - National 26,634.00 26,329.83 Résilié 2018-03-12 2018-03-30 2018-03-17 2018-04-16 2018-04-11 2018-05-01 2018-05-21 2018-06-05 2018-06-12 2018-07-05 d'équipements informatiques Management Envelope 26/F/2018 / Acquisition Capacity Building and Project Single Stage - One d'équipements et matériels de IDA / D1890 A posteriori Appel d'offres Open - National 8,752.00 16,857.53 Résilié 2018-05-02 2018-05-07 2018-08-17 2018-06-06 2018-08-27 2018-06-21 2018-09-28 2018-07-26 2018-10-25 2018-08-25 Management Envelope gestion des DBM 16/F/2018 / Acquisition Capacity Building and Project Single Stage - One d'équipements bureautiques IDA / D1890 A posteriori Appel d'offres Open - National 27,000.00 16,862.35 Résilié 2018-03-05 2018-03-31 2018-03-10 2018-04-09 2018-04-11 2018-04-24 2018-04-26 2018-05-29 2018-05-16 2018-06-13 Management Envelope pour l'UT-FBR Page 1 03/F/INAYA/2017 / Acquisition d'un Système de Capacity Building and Project Single Stage - One gestion financière (TOMPRO - / A posteriori Demande de prix Open - National 26,000.00 0.00 Annulé 2017-06-07 2017-08-02 2017-10-01 Management Envelope version complète ou équivalent). 28/F/2018 / Impression et vulgarisation des protocoles Capacity Building and Project Single Stage - One IDA / D1890 A posteriori Appel d'offres Open - National 14,648.00 0.00 Annulé 2018-05-21 2018-05-26 2018-06-25 2018-07-10 2018-08-14 2018-09-13 thérapeutiques et documents Management Envelope normatifs 05/F/INAYA/2017 / Acquisition d'équipements Capacity Building and Project Single Stage - One IDA / D1890 A posteriori Demande de prix Open - National 25,000.00 0.00 Annulé 2017-11-20 2017-12-28 2018-01-11 informatiques et de matériel Management Envelope de la salle d'archive 04/F/INAYA/2017 / Acquisition d'un système de Capacity Building and Project Single Stage - One IDA / D1890 A posteriori Demande de prix Open - National 23,000.00 0.00 Annulé 2017-11-02 2017-12-15 2017-12-28 gestion électronique des Management Envelope documents (GED) 29/F/2018 / Acquisition d'équipements bureautiques et informatiques destinés aux Increasing Demand for Health Single Stage - One IDA / D1890 A posteriori Appel d'offres Open - National 210,480.00 121,886.10 Signé 2018-11-15 2018-10-15 2018-11-20 2018-10-24 2018-12-20 2018-11-22 2019-01-04 2018-12-10 2019-02-08 2019-02-25 2019-03-10 comités de santé, ERV, DRAS Services Envelope et Moughataa,CIMAC et pour le portail FBR 18/F/INAYA/2017 / Acquisition de consommables Capacity Building and Project Single Stage - One IDA / D1890 A posteriori Demande de prix Limited 2,900.00 0.00 Annulé 2017-10-20 2017-11-23 2017-11-28 de bureau et de produits Management Envelope d'hygiène 16/F/INAYA/2017 / Capacity Building and Project Single Stage - One Acquisition de matériel de IDA / D1890 A posteriori Demande de prix Limited 25,500.00 0.00 Annulé 2017-10-20 2017-11-24 2017-11-30 Management Envelope bureau 22/F/2018 / Acquisition des Capacity Building and Project Single Stage - One services d'assurance maladie IDA / D1890 A posteriori Appel d'offres Open - National 15,211.00 0.00 Annulé 2018-03-18 2018-03-23 2018-04-22 2018-05-07 2018-06-11 2019-06-11 Management Envelope pour les contractuels 31/F/2018 / Consommables bureautiques et produits Capacity Building and Project Single Stage - One phrygienne et d'entretien pour IDA / D1890 A posteriori Appel d'offres Open - National 11,549.00 2,962.74 Signé 2018-10-01 2018-10-08 2018-10-06 2018-10-11 2018-11-05 2018-10-22 2018-11-20 2018-10-26 2018-12-25 2018-11-27 2019-01-24 Management Envelope l'équipe régional de vérification 33/F/2018 / Acquisition d'un Capacity Building and Project Single Stage - One lot du matériel bureautique IDA / D1890 A posteriori Appel d'offres Open - National 27,746.00 2,205.88 Achevé 2018-08-29 2018-09-13 2018-09-28 2018-09-27 2018-10-13 2018-10-16 2018-11-17 2018-11-02 2018-12-02 2018-12-04 Management Envelope pour l'UT-FBR 39/F/2018 / Organisation des ateliers programmes Capacity Building and Project Single Stage - One IDA / D1890 A posteriori Appel d'offres Open - National 17,900.00 17,683.56 Signé 2018-09-30 2018-10-08 2018-10-05 2018-10-15 2018-11-04 2018-10-22 2018-12-04 2018-10-26 2019-01-08 2018-10-29 2020-01-03 dans le cadre de la mise en Management Envelope oeuvre du Projet 27/F/2018 / Organisation d'un atelier de validation et Capacity Building and Project Single Stage - One IDA / D1890 A posteriori Demande de prix Limited 2,343.00 0.00 Annulé 2018-03-17 2018-05-06 2018-05-13 vulgarisation des documents Management Envelope MPT- FBR et décrets sur le SRC 24/F/2018 / Impression des Capacity Building and Project Single Stage - One IDA / D1890 A posteriori Appel d'offres Open - National 138,648.00 86,674.78 Signé 2018-10-15 2018-11-08 2018-10-20 2018-11-14 2018-11-19 2019-02-07 2018-12-04 2019-02-27 2019-01-08 2019-04-23 2019-02-07 documents clefs pour le Management Envelope projet 25/F/2018 / Acquisition des Capacity Building and Project Single Stage - One supports de collecte et de IDA / D1890 A posteriori Appel d'offres Open - National 23,662.00 0.00 Annulé 2018-12-10 2018-12-15 2019-01-14 2019-01-29 2019-03-05 2019-04-04 Management Envelope rapportage des données 23/F/2018 / Acquisition Capacity Building and Project Single Stage - One IDA / D1890 A posteriori Demande de prix Open - National 26,634.00 35,545.90 Signé 2018-12-05 2018-12-05 2019-01-24 2019-02-18 2019-02-13 d'équipements informatiques Management Envelope 04/F/2018 / Acquisition d'un système de gestion Capacity Building and Project Single Stage - One IDA / D1890 A posteriori Appel d'offres Open - National 23,000.00 0.00 Annulé 2018-11-14 2018-11-19 2018-12-19 2019-01-03 2019-02-07 2019-03-09 électronique des documents Management Envelope (GED). 01/F/2019 / Acquisition d'un lot de matériel informatique (hard et sowft) et Increasing Demand for Health Single Stage - One En attente IDA / D1890 A posteriori Appel d'offres Open - National 69,700.00 0.00 2019-03-15 2019-03-20 2019-04-19 2019-05-04 2019-06-08 2019-07-08 équipements de maintenance Services Envelope d'exécution informatique destinés aux différents niveaux du SS 03/F/2019 / Acquisition d'équipements informatiques Capacity Building and Project Single Stage - One IDA / D1890 A posteriori Demande de prix Limited 25,000.00 13,404.48 Signé 2019-04-06 2019-09-11 2019-06-01 2019-11-13 2019-11-28 et de matériel de la salle Management Envelope d'archive 04/F/2019 / Acquisition Capacity Building and Project Single Stage - One d'équipements et matériels de IDA / D1890 A posteriori Demande de prix Limited 36,500.00 38,367.66 Signé 2019-04-30 2019-07-09 2019-07-02 2019-08-05 2019-12-29 Management Envelope gestion des DBM 03.F.219 / Consommables bureautiques et informatique Capacity Building and Project Single Stage - One En cours IDA / D1890 A posteriori Appel d'offres Open - National 100,418.00 0.00 2019-09-15 2019-11-12 2019-09-20 2019-11-01 2019-12-01 2020-01-05 2021-01-04 pour l'UT-FBR, la DAF et les Management Envelope d'exécution ERV 08/F/2019 / Acquisition des Capacity Building and Project Single Stage - One IDA / D1890 A posteriori Demande de prix Limited 523.00 0.00 Annulé 2019-04-05 2019-05-31 2019-11-27 produits d'hygiène Management Envelope 05/F/2018 / Acquisition de Capacity Building and Project Single Stage - One matériels pour la salle IDA / D1890 A posteriori Appel d'offres Open - National 25,000.00 0.00 Annulé 2018-12-03 2018-12-08 2019-01-07 2019-01-22 2019-02-20 2019-03-22 Management Envelope d'archive 05/F/2019 / Acquisition de 5 versicules 4x4 destinés à la Capacity Building and Project Single Stage - One En attente région du Hodh charghy et IDA / D1890 A posteriori Appel d'offres Open - National 188,285.00 0.00 2020-01-07 2020-01-14 2020-02-13 2020-03-05 2020-04-02 2020-05-02 Management Envelope d'exécution aux missions de supervision inter région Page 2 01/F/INAYA/2020 / Capacity Building and Project Single Stage - One En attente Impression du carnet mère & IDA / D1890 A posteriori Demande de prix Limited 39,460.00 0.00 2020-05-09 2020-06-09 2020-06-24 Management Envelope d'exécution enfant 02/F/INAYA/2020 / Acquisition des pièces de Capacity Building and Project Single Stage - One En attente IDA / D1890 A posteriori Demande de prix Limited 4,000.00 0.00 2020-05-25 2020-06-25 2021-06-25 rechanges pour les véhicules Management Envelope d'exécution du projet 10/F/INAYA/2020 / Capacity Building and Project Single Stage - One En attente Acquisition d'un lot des IDA / D1890 A posteriori Demande de prix Limited 6,460.00 0.00 2020-10-31 2020-12-01 2020-12-21 Management Envelope d'exécution Matériels de manutention 12/F/INAYA/2020 / Acquisition du Contrôle Capacity Building and Project Single Stage - One En attente IDA / D1890 A posteriori Demande de prix Limited 46,400.00 0.00 2020-11-07 2020-12-19 2021-01-03 d'accès et complément de la Management Envelope d'exécution sécurité d'incendie de la DGR 13/F/INAYA/2020 / Capacity Building and Project Single Stage - One En attente Equipements Audiovisuels de IDA / D1890 A posteriori Demande de prix Limited 36,082.00 0.00 2020-11-07 2020-12-19 2021-01-03 Management Envelope d'exécution la Salle de réunion de la DGR 14/F/INAYA/2020 / Capacity Building and Project Single Stage - One En attente Impression normes SR et IDA / D1890 A posteriori Appel d'offres Open - National 95,618.00 0.00 2020-12-15 2020-12-20 2021-01-19 2021-02-03 2021-03-10 2021-04-15 Management Envelope d'exécution guide thérapeutique 16/F/INAYA/2020 / Capacity Building and Project Single Stage - One En attente Acquisition des matériels de IDA / D1890 A posteriori Demande de prix Limited 5,132.00 0.00 2020-12-15 2021-01-15 2021-02-04 Management Envelope d'exécution protection tablettes 17/F/INAYA/2020 / Capacity Building and Project Single Stage - One En attente Réparation des véhicules du IDA / D1890 A posteriori Demande de prix Limited 10,000.00 0.00 2020-12-15 2021-01-15 2022-01-15 Management Envelope d'exécution Projet 07/S/INAYA/2020 / Acquisition des services Capacity Building and Project Single Stage - One En cours hôteliers dans le cadre de la IDA / D1890 A posteriori Demande de prix Limited 52,000.00 0.00 2021-01-09 2021-03-06 2022-03-01 Management Envelope d'exécution mise en œuvre des activités du Projet. 02/F/INAYA/2021 / Impression outils (registres, Capacity Building and Project Single Stage - One En attente IDA / D1890 A priori Demande de prix Limited 44,600.00 0.00 2021-04-04 2021-05-30 2021-11-26 cartes fiches et guides) pour Management Envelope d'exécution la vaccination anti- covid 19 01/F/INAYA/2021 / Impression des registres Capacity Building and Project Single Stage - One En cours IDA / D1890 A posteriori Demande de prix Open - National 11,600.00 0.00 2021-03-27 2021-05-22 2021-11-18 FOSA, AC et ceux de la Management Envelope d'exécution gestion des plaintes 03/F/INAYA/2021 / Achat des tablettes et accessoires Capacity Building and Project Single Stage - One En attente IDA / D1890 A priori Demande de prix Limited 52,000.00 0.00 2021-04-02 2021-05-28 2021-11-24 pour la vaccination anti- Management Envelope d'exécution Covid19 09/F/INAYA/2020 / Acquisition de 10 Capacity Building and Project Single Stage - One IDA / D1890 A posteriori Appel d'offres Open - National 196,382.00 0.00 Annulé 2020-11-02 2020-11-09 2020-12-09 2020-12-30 2021-01-27 2021-03-13 Laboratoires pour 10 CS Management Envelope prioritaires de la zone pilote 15/F/INAYA/2020 / ACQUISITION D4UN CAMION ET VEHICUL FRIGORIFIQUE, Passation de Capacity Building and Project D4UN LABORATOIR COMPLET IDA / D1890 A posteriori marché de gré à Direct 288,566.00 0.00 Annulé 2020-10-26 2020-10-31 2020-12-20 2021-06-18 Management ET DE 2 VEHICULES DE gré TRANSPORTS DES EQUIPES MEDICALES 08/F/INAYA/2020 / Capacity Building and Project Single Stage - One acquisition de 2 Chambres IDA / D1890 A posteriori Demande de prix Limited 30,025.00 0.00 Annulé 2020-10-20 2020-11-20 2020-12-10 Management Envelope froides taille moyenne 05/F/INAYA/2020 / Acquisition de 3 véhicules pour Appuyer les 3 DRAS Capacity Building and Project Single Stage - One IDA / D1890 A posteriori Appel d'offres Open - National 118,009.00 0.00 Annulé 2020-10-20 2020-10-27 2020-11-26 2020-12-17 2021-01-14 2021-02-28 dans Les régions pilotes ainsi Management Envelope que un d'un Camion frigorifique 07/F/INAYA/2020 / Capacity Building and Project Single Stage - One Acquisition de 16 Groupes IDA / D1890 A posteriori Appel d'offres Open - National 267,170.00 0.00 Annulé 2020-10-20 2020-10-27 2020-11-26 2020-12-17 2021-01-14 2021-02-28 Management Envelope électrogènes 04/F/INAYA/2020 / Doter les formations sanitaires d'un kit Capacity Building and Project Single Stage - One IDA / D1890 A posteriori Appel d'offres Open - National 101,104.00 0.00 Annulé 2020-10-15 2020-10-20 2020-11-19 2020-12-04 2021-01-08 2021-02-07 d’équipements et matériels de Management Envelope gestion des DBM 11/F/INAYA/2020 / Acquisition des matériels Capacity Building and Project Single Stage - One IDA / D1890 A posteriori Demande de prix Limited 34,800.00 0.00 Annulé 2020-11-07 2021-01-02 2021-02-01 bureautiques et informatiques Management Envelope destinés à la nouvelle région 08/F/INAYA/2021 / Capacity Building and Project Single Stage - One En attente Consommables bureautiques IDA / D1890 A posteriori Demande de prix Limited 47,200.00 0.00 2021-06-30 2021-08-25 2022-02-21 Management Envelope d'exécution (UT-FBR DAF et ERV) 06/F/INAYA/2021 / Doter les formations sanitaires d'un kit Capacity Building and Project Single Stage - One En attente IDA / D1890 A posteriori Demande de prix Open - National 101,104.00 0.00 2021-06-30 2021-08-25 2022-02-21 d’équipements et matériels de Management Envelope d'exécution gestion des DBM 07/F/INAYA/2021 / Acquisition du Mobilier de Capacity Building and Project Single Stage - One En attente bureau et du matériel IDA / D1890 A posteriori Demande de prix Open - National 52,777.00 0.00 2021-06-12 2021-08-07 2022-02-03 Management Envelope d'exécution informatique pour la nouvelle région Page 3 04/F/ INAYA/2021 / Capacity Building and Project Single Stage - One En attente Acquisition des groupes pour IDA / D1890 A posteriori Demande de prix Open - National 198,000.00 0.00 2021-07-05 2021-08-30 2022-02-26 Management Envelope d'exécution les deux wilaya du hodh ch 10/F/INAYA/2021 / l’Acquisition des logistiques Passation de Capacity Building and Project En cours et équipements pour la prise IDA / D1890 A posteriori marché de gré à Direct 1,390,858.55 0.00 2021-06-21 2021-06-15 2021-06-26 2021-06-15 2021-07-31 2022-01-27 Management d'exécution en charge médicale des gré population du HEC 11/F/INAYA/2021 / Acquisition d'un véhicule Capacity Building and Project Single Stage - One En attente IDA / D1890 A posteriori Demande de prix Limited 44,600.00 0.00 2021-12-06 2022-01-31 2022-07-30 destiné à la supervision des Management Envelope d'exécution activités TMC NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 01/S/2019 / Entretien des Capacity Building and Project Single Stage - One IDA / D1890 A posteriori Demande de prix Limited 6,700.00 10,206.14 Signé 2019-05-10 2019-07-09 2019-07-05 2019-08-06 2020-07-04 véhicules du Projet INAYA Management Envelope 02/S/2019 / Maintenance Capacity Building and Project Single Stage - One IDA / D1890 A posteriori Demande de prix Limited 15,900.00 14,955.54 Signé 2019-05-10 2019-06-13 2019-07-05 2019-08-06 2020-07-04 des locaux de l'UT-FBR Management Envelope 02/S/2020 / entretien des Capacity Building and Project Single Stage - One En attente véhicules du Projet INAYA l'UT- IDA / D1890 A posteriori Demande de prix Limited 14,500.00 0.00 2020-10-20 2020-11-17 2021-11-17 Management Envelope d'exécution FBR 03/S/INAYA/2020 / Capacity Building and Project Single Stage - One En attente maintenance pour les locaux IDA / D1890 A posteriori Demande de prix Limited 14,473.00 0.00 2020-10-17 2020-11-06 2021-11-06 Management Envelope d'exécution de l'UT-FBR 4/S/INAYA/2020 / Assistance technique de Improving Utilization of Passation de En attente TOMPRO et apprentissage de IDA / D1890 Quality RMNCH Health A posteriori marché de gré à Direct 19,521.00 0.00 2020-12-14 2020-12-19 2021-01-23 2021-07-22 d'exécution l'équipe de la gestion Services through PBF gré financière 06/S/INAYA/2020 / LOCATION DES VEHICULES Capacity Building and Project Single Stage - One En attente DANS LE CADRE DE LA MISE IDA / D1890 A posteriori Demande de prix Limited 37,000.00 0.00 2020-12-19 2021-01-16 2022-01-16 Management Envelope d'exécution EN OAUVRE DES ACTIVITES DU PROJET 04/S/INAYA/2021 / Acquisition des services Capacity Building and Project Single Stage - One IDA / D1890 A posteriori Demande de prix Limited 44,900.00 0.00 Annulé 2021-04-04 2021-05-30 2021-11-26 hôteliers pour la Formation Management Envelope de formateurs locaux 05/S/INAYA/2021 / Acquisition des services Capacity Building and Project Single Stage - One En attente IDA / D1890 A posteriori Demande de prix Open - National 165,728.00 0.00 2021-08-05 2021-09-30 2022-03-29 hôteliers pour les ateliers et Management Envelope d'exécution réunions du projet CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 14/PI/INAYA/2017 / Agence Improving Utilization of Sélection fondée internationale chargée de IDA / D1890 Quality RMNCH Health A priori sur la qualité et le Open - International 1,000,000.00 300,757.72 Signé 2017-07-17 2017-09-19 2017-08-07 2017-11-24 2017-09-20 2018-07-24 2017-10-18 2018-09-05 2017-11-17 2018-11-06 2017-12-22 2019-04-09 2018-01-26 2019-07-13 2018-07-25 formation sur le FBR et le Services through PBF coût coaching 15/PI/INAYA/2017 / Capacity Building and Project Sélection au Auditeur externe pour une IDA / D1890 A priori Open - National 27,000.00 8,630.14 Signé 2017-10-16 2017-11-07 2017-10-25 2017-11-24 2017-11-30 2018-07-31 2018-01-02 2018-09-12 2018-01-16 2018-11-28 2018-02-07 2019-01-15 2018-02-27 2019-02-04 2021-02-26 Management moindre coût période de trois ans Sélection fondée 35/PI/2018 / ONG nationales Improving Utilization of sur les En cours de vérification IDA / D1890 Quality RMNCH Health A posteriori Open - National 160,000.00 0.00 2018-03-01 2018-03-16 2018-04-14 2018-04-29 2018-06-03 2019-06-03 qualifications des d'exécution communautaire. Services through PBF consultants 37/PI/2018 / Agence Improving Utilization of Sélection fondée internationale de contre- IDA / D1890 Quality RMNCH Health A posteriori sur la qualité et le Open - International 300,000.00 198,256.63 Signé 2018-02-22 2018-06-11 2018-04-15 2018-06-21 2018-05-14 2018-10-25 2018-06-25 2018-12-18 2018-07-16 2019-01-22 2018-08-13 2019-03-22 2018-09-17 2019-06-12 2019-09-17 vérification Services through PBF coût 06/PI/INAYA/2017 / ONG Improving Utilization of Sélection fondée nationales de vérification IDA / D1890 Quality RMNCH Health A posteriori sur la qualité et le Open - National 160,000.00 0.00 Annulé 2017-11-22 2017-12-06 2018-01-11 2018-02-15 2018-02-28 2018-03-29 2018-04-26 2019-04-26 communautaire Services through PBF coût 34/PI/2018 / Etude et suivi Sélection fondée des travaux de construction Capacity Building and Project sur les En attente d'infrastructures IDA / D1890 A posteriori Open - National 25,000.00 0.00 2018-10-15 2018-10-22 2018-12-05 2018-12-12 2019-01-09 2019-07-08 Management qualifications des d'exécution d'entreposage pour les 2 consultants hôpitaux régionaux et 4 CS 08/PI/INAYA/2017 / Recrutement d'un cabinet Sélection fondée international pour la Capacity Building and Project IDA / D1890 A posteriori sur la qualité et le Open - International 100,000.00 0.00 Annulé 2017-11-01 2017-11-02 2017-11-15 2017-11-24 2017-12-21 2018-03-05 2018-02-08 2018-04-16 2018-02-20 2018-07-23 2018-03-22 2018-08-15 2018-04-19 2018-06-18 fourniture, installation et Management coût paramétrage du portail et du système FBR 01/PI/2019 / Mise en place Sélection fondée d'un système intégré Capacity Building and Project sur les En cours IDA / D1890 A posteriori Open - International 35,000.00 0.00 2019-01-29 2019-01-27 2019-02-19 2019-03-07 2019-04-04 2019-05-30 2019-05-04 2019-06-08 2019-12-05 GEC/GED (ECM)au profit du Management qualifications des d'exécution projet INAYA. consultants Page 4 06/PI/INAYA/2020 / Mise en place d'une base de données Sélection fondée pour la gestion des RH au Capacity Building and Project sur les En cours niveau de la DRH (acquisition IDA / D1890 A posteriori Limited 16,216.00 0.00 2020-06-15 2021-03-30 2020-06-22 2020-07-22 2020-08-12 2020-11-10 Management qualifications des d'exécution d'un logiciel et assurer son consultants paramétrage et son renseignement) 02/PI/INAYA/2020 / Elaboration et le renseignement d’un logiciel d’inventaire des Sélection fondée infrastructures, et des Capacity Building and Project sur les En attente IDA / D1890 A posteriori Limited 39,000.00 0.00 2021-01-28 2021-02-11 2021-03-03 2021-03-24 2021-05-23 équipements médicaux, ainsi Management qualifications des d'exécution que l’encadrement et la consultants supervision des équipes chargées de l’opération de l’inventaire. Sélection fondée 01/PI/INAYA/2021 / AUDIT Capacity Building and Project sur les En cours EXTERNE pour les exercice IDA / D1890 A posteriori Open - National 15,621.00 0.00 2021-02-16 2021-02-22 2021-03-09 2021-04-22 2021-05-22 2021-06-26 2023-02-16 Management qualifications des d'exécution 2020 , 2021, 2022, 2023 consultants 02/PI/INAYA/2021 / Sélection fondée Recrutement d'une Agence Capacity Building and Project sur les En cours IDA / D1890 A posteriori Open - International 250,000.00 0.00 2021-03-15 2021-03-30 2021-04-05 2021-08-06 2021-05-19 2021-06-18 2021-07-23 2022-01-19 internationale de contre Management qualifications des d'exécution vérification. consultants INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 11/PI/INAYA/2017 / Capacity Building and Project Spécialiste en gestion IDA / D1890 A priori Individuel Open 24,000.00 16,901.40 Résilié 2017-07-17 2017-07-14 2017-08-19 2017-10-09 2017-09-09 2017-10-19 2017-10-14 2017-11-08 2018-10-14 Management financière 12/PI/INAYA/2017 / Capacity Building and Project Spécialiste en passation des IDA / D1890 A priori Individuel Open 24,000.00 23,641.97 Signé 2017-07-24 2017-07-25 2017-08-26 2017-11-29 2017-09-16 2018-01-16 2017-10-21 2018-02-01 2018-10-21 Management marchés 13/PI/INAYA/2017 / Capacity Building and Project IDA / D1890 A posteriori Individuel Open 24,000.00 23,013.70 Signé 2017-10-18 2017-11-27 2017-11-27 2018-08-03 2017-12-11 2018-08-07 2018-01-08 2019-01-10 2019-01-08 Auditeur interne national Management 09/PI/INAYA/2017 / Improving Utilization of Consultant individuel IDA / D1890 Quality RMNCH Health A posteriori Individuel Open 90,000.00 148,890.00 Signé 2017-10-19 2017-11-07 2017-12-22 2018-02-21 2017-12-29 2018-03-15 2018-01-29 2018-04-17 2019-01-29 international en FBP pour le Services through PBF niveau central 30/PI/2018 / Informaticien Capacity Building and Project IDA / D1890 A posteriori Individuel Open 12,676.00 1,519.84 Signé 2018-02-26 2018-03-30 2018-04-19 2018-06-11 2018-04-26 2018-06-12 2018-05-22 2018-07-26 2019-05-22 pour le Projet Management 31/PI/2018 / Capacity Building and Project Statisticien/épidémiologiste IDA / D1890 A posteriori Individuel Open 15,211.00 15,198.41 Signé 2018-03-19 2018-03-20 2018-05-10 2018-06-11 2018-05-17 2018-06-12 2018-06-14 2018-07-19 2019-06-14 Management pour le Projet 32/PI/2018 / Traduction des Capacity Building and Project IDA / D1890 A posteriori Individuel Limited 2,515.00 26,914.28 Signé 2018-04-02 2018-12-25 2018-04-07 2019-01-28 2018-04-17 2019-04-08 2018-05-09 2019-05-24 2018-05-24 textes du projet Management 33/PI/2018 / Consultant pour réviser, adapter et Capacity Building and Project IDA / D1890 A posteriori Individuel Open 19,155.00 14,072.60 Achevé 2018-04-23 2018-04-06 2018-06-04 2018-06-24 2018-06-19 2018-07-07 2018-07-24 2018-08-06 2018-09-22 2018-12-20 compléter les supports de Management recueils des données 36/PI/2018 / Consultant individuel international Improving Utilization of spécialiste en FBP pour la IDA / D1890 Quality RMNCH Health A posteriori Individuel Open 120,000.00 60,000.00 Signé 2018-02-13 2018-05-05 2018-04-11 2018-06-13 2018-04-25 2018-07-16 2018-05-23 2018-08-15 2019-05-23 mise en œuvre des activités Services through PBF sur le terrain. 38/PI/2018 / CONSULTANCE POUR LA DÉTERMINATION DES Capacity Building and Project IDA / D1890 A posteriori Individuel Limited 15,380.00 15,380.00 Achevé 2018-03-27 2018-04-15 2018-04-03 2018-05-08 2018-04-10 2018-05-16 2018-05-03 2018-05-30 2018-06-02 2018-06-18 COÛTS DE LA MISE EN ŒUVRE Management DU FBR 34/PI/INAYA/2018 / accompagner et encadrer le Capacity Building and Project IDA / D1890 A posteriori Individuel Limited 30,000.00 23,000.00 Achevé 2018-05-16 2018-07-09 2018-06-05 2018-08-13 2018-06-19 2018-08-30 2018-07-06 2018-11-05 2018-08-05 2018-12-05 processus de formation en Management masse des acteurs en FBP 10/PI/INAYA/2017 / Consultant individuel Improving Utilization of international en FBP pour la IDA / D1890 Quality RMNCH Health A posteriori Individuel Open 90,000.00 0.00 Annulé 2017-10-19 2018-05-15 2017-12-22 2018-06-13 2017-12-29 2018-07-16 2018-01-29 2019-01-29 mise en œuvre des activités Services through PBF sur le terrain 39/PI/2018 / Improving Utilization of Accompagnement la mise en IDA / D1890 Quality RMNCH Health A posteriori Individuel Open 30,000.00 14,269.00 Achevé 2018-08-29 2018-10-23 2018-12-04 2018-10-30 2019-01-31 2018-11-30 2019-02-18 2018-12-15 2019-03-04 place du projet pilote FBR Services through PBF 23/PI/2018 / Recrutement d'un consultant individuel Improving Utilization of permanent spécialiste en IDA / D1890 Quality RMNCH Health A posteriori Individuel Open 1,972.00 22,617.13 Signé 2018-12-10 2019-02-21 2019-02-13 2019-05-10 2019-02-28 2019-05-20 2019-03-31 2019-06-17 2020-03-30 sauvegarde environnementale Services through PBF et sociale pour appui à la DHP 02/PI/2019 / Assurer la Improving Utilization of coordination INAYA- IDA / D1890 Quality RMNCH Health A posteriori Individuel Open 23,400.00 0.00 Annulé 2019-03-17 2019-05-09 2019-05-21 2019-07-18 2019-06-05 2019-07-06 2020-07-05 TEKAFOUL et appuey la mise Services through PBF en œuvre de la composante 2 Improving Utilization of 40/PI/2018 / Assistance IDA / D1890 Quality RMNCH Health A posteriori Individuel Limited 17,225.00 0.00 Annulé 2018-10-15 2018-11-04 2018-11-27 2018-11-25 2018-12-16 2019-01-05 technique pour l'UT-FBR Services through PBF Page 5 04/PI/2019 / assurer la coordination INAYA- Improving Utilization of TEKAFOUL et appuer la mise IDA / D1890 Quality RMNCH Health A posteriori Individuel Open 23,431.00 24,000.00 Signé 2019-09-03 2019-06-20 2019-10-22 2019-11-08 2019-11-12 2019-11-14 2019-12-17 2019-12-24 2020-12-16 en œuvre de la composante 2 Services through PBF du Projet 05/PI/2019 / Comptable du Capacity Building and Project IDA / D1890 A priori Individuel Open 16,900.00 21,696.80 Signé 2019-10-22 2020-02-17 2019-12-28 2020-06-02 2020-01-12 2021-03-08 2020-01-30 2020-07-16 2021-01-29 Projet Management 01/PI/2020 / Assistance Improving Utilization of En attente technique courte durée pour IDA / D1890 Quality RMNCH Health A posteriori Individuel Limited 13,500.00 0.00 2020-03-15 2020-03-20 2020-04-10 2020-05-15 2020-11-11 d'exécution appui institutionnel PBF Services through PBF Improving Utilization of 02/PI/2020 / spécialistes PBF En cours IDA / D1890 Quality RMNCH Health A posteriori Individuel Open 60,000.00 0.00 2020-03-15 2021-04-18 2020-05-11 2020-06-01 2020-07-06 2021-07-01 pour le niveau central d'exécution Services through PBF Improving Utilization of 03/PI/2020 / spécialistes PBF En cours IDA / D1890 Quality RMNCH Health A posteriori Individuel Open 60,000.00 0.00 2020-03-02 2021-04-18 2020-04-28 2020-05-19 2020-06-23 2021-06-18 pour la zone d'extension d'exécution Services through PBF Improving Utilization of 04/PI/2020 / chargé de En attente IDA / D1890 Quality RMNCH Health A posteriori Individuel Open 20,084.00 0.00 2020-03-30 2020-05-28 2020-06-12 2020-07-13 2021-07-13 communication du Projet d'exécution Services through PBF 06/PI/2019 / spécialiste en Capacity Building and Project En cours passation des marches pour le IDA / D1890 A posteriori Individuel Open 24,000.00 0.00 2019-12-16 2020-04-01 2020-02-14 2020-09-22 2020-02-29 2020-12-14 2020-03-21 2021-03-21 Management d'exécution Projet 05/PI/INAYA2020 / Recrutement d’un consultant International pour Improving Utilization of l’élaboration du Plan de En cours IDA / D1890 Quality RMNCH Health A posteriori Individuel Limited 13,620.00 0.00 2020-05-03 2020-04-29 2020-05-08 2020-05-15 2020-06-02 2020-07-02 Gestion de la Main d’œuvre d'exécution Services through PBF et du Plan de Mobilisation des Parties Prenantes /projet COVID19 08/PI/INAYA/2020 / Improving Utilization of consultants spécialistes PBF En cours IDA / D1890 Quality RMNCH Health A priori Individuel Direct 360,000.00 0.00 2020-10-19 2020-12-29 2020-10-29 2020-07-06 2020-11-03 2021-05-19 2020-11-13 2021-05-12 pour appuyer le niveau d'exécution Services through PBF régional 08/PI/2020 / Recrutement Capacity Building and Project En cours IDA / D1890 A posteriori Individuel Open 16,737.00 0.00 2020-11-09 2021-02-02 2020-12-28 2021-05-04 2021-01-18 2021-05-05 2021-02-22 2022-02-22 d'un aide comptable Management d'exécution 03/PI/INAYA/2021 / Improving Utilization of En cours Conception et installation de IDA / D1890 Quality RMNCH Health A posteriori Individuel Limited 25,100.00 0.00 2021-03-30 2021-03-27 2021-04-04 2021-04-25 2021-05-30 2021-11-26 d'exécution la plateforme Services through PBF 04/PI/INAYA/2021 / Recrutement d’un spécialiste Capacity Building and Project En cours IDA / D1890 A posteriori Individuel Open 24,000.00 0.00 2021-03-31 2021-03-29 2021-05-19 2021-06-09 2021-07-14 2022-01-10 de la sauvegarde sociale et Management d'exécution communication pour INAYA 06/INAYA/PI/2021 / Improving Utilization of En cours Recrutement du Consultant IDA / D1890 Quality RMNCH Health A posteriori Individuel Open 25,000.00 0.00 2021-05-03 2021-05-08 2021-06-21 2021-07-12 2021-08-16 2022-02-12 d'exécution tekavoul INAYA Services through PBF 07/PI/INAYA/2021 / Recrutement d'un consultant Improving Utilization of En attente pour la mise ajour de la IDA / D1890 Quality RMNCH Health A posteriori Individuel Open 17,200.00 0.00 2021-05-25 2021-07-13 2021-08-03 2021-09-07 2022-03-06 d'exécution stratégie communautaire de la Services through PBF santé communautaire 08/PI/INAYA/2021 / Recrutement d'un consultant Improving Utilization of En cours international pour évaluer et IDA / D1890 Quality RMNCH Health A posteriori Individuel Limited 14,000.00 0.00 2021-05-25 2021-05-08 2021-05-30 2021-06-20 2021-07-25 2022-01-21 d'exécution améliorer le dispositif PBF en Services through PBF Mauritanie Page 6