RP202 VOL 19 Xilang AC -18.1.11.3AC -18.1.2.4.3AC -18.1.2.7.1.1.3AC -18.1.2.7.1.2.3AC -18.1.2.7.1.3AC -18.1.2.8.3AC -18.1.3AC -18.3.2.10.1.3AC-1 - 18.3.2.10.1.3AC-2 -18.3.2.10.2.3AC -18.3.2.13.3AC -18.3.2.7.2.3AC -18.3.2.9.3AC -Xilang BD -1 8.1.11.313D -18.1.2.4.3BD -18.1.2.7.1.1.3BD -18.1.2.7.1.2.3BD -18.1.2.7.1.3BD -18.1.2.8.3BD -1 8.1.3131D -18.3.2.10.1.3BD-1 -18.3.2.10.1.3BD-2 -18.3.2.10.2.3BD -18.3.2.13.3BD -1 8.3.2.7.2.3BD Cost estimate of cost for house demolition shared by this project fo n~~~~~~~~~~~~~s est se odeoomooo ofooo F] F] F F] F] F] F] F] F]F] Li F] F El F] Frame structure Composite structure Brick and timber structure Quantity Demolised area Unit price Total Quantity Demolised area Unit price Total Quantity Demolised area Unit price Total Grade I O F] F F] F] O] O] O F] O n] on F]1 Grade 2 O F F] El El O OII F] Grade 3 O O ] O O O O O O O 0 E n Dashadi Grade 4 O El F] F] 0] El O] O] O O O O O n] Grade 5 F] O O] F] O O O] O 1.00 22.77 36.00 819.65 F] Grade 6 O OI F] F] O- 0] O] F] O OI El. n] Subtotal F]OFE IO F E lO O] I O 1.00 22.77 36.00 819.65 page 1 of 2 r Xi lang proje(ppe network) n7 F] [1 F] ] Attachedtable:18.1.11.3AC Simple structure | Total Quantity Demolised area Unit price Total Quantity Demolised area Unit price Total F] F] F] F] F]F]F] El F] o o l o o O] O F] F] 1.00 22.77 36.00 819.65 OE I O] O 1.00 22.77 36.00 819.65 page 2 of 2 Cost estimate of compenstion for historically used house shared by this projec project area ------ Frame structure Composite structure Brick and timber structure _______ ara Quantit Floor area Unit price Total price Quantity Floor area Unit price Total price Quantity Floor area Unit price Total pfice Grade I Grade 2 Grade 3 historically Grade 4 X used house Grade 5 Grade 6 Subtotal I_ I page 1 of 2 t for Xilang project (pipe network) ~~~~~~~~~~~~~~~~~~~Attaclied table. 18. 1 !.24.3AC ______ Simple structure Total Quanti Floor area Unit price Total price Quantit Floor area Unit price Total price page 2 of 2 Cost estimate of compenstion for temporary relocation shared by this project for Xilang project (pipe network) - E_El_ z . Attached table:18.1.2.7.1.1.3AC project purpose area tpye Quantity Floor area Unit price Monthly Relocation Total compensation period (month) Toa Grade I Partially demolished - - - - 6.00 t _ Grade 2 Partially demolished - - - - 6.00 _ l Housing Grade 3 Partially demolished - - - - 6.00 Grade 4 Partially demolished - - - - 6.00 Grade 5 Partially demolished 1.00 15.64 12.00 187.72 6.00 1,126 34 Grade 6 Partially demolished - - - - 6.00 _ Subtotal 1.00 15.64 12.00 187.72 6.00 1, 126.34 Grade I Partially demolished - - - - 6.00 _ Grade 2 Partially demolished - - - - 6.00 _ Grade 3 Partially demolished - - - - 6.00 _ Shop Grade 4 Partially demolished - - - - 6.00 _ Grade 5 Partially demolished - - - - 6.00 _ Grade 6 Partially demolished - - - - 6.00 - Subtotal 6.00 Grade I Partially demolished - - - -6.00 Grade 2 Partially demolished - - - -6.00 Office Grade 3 Partially demolished - - -6.00 Grade 4 Partially demolished - - - - 6.00 House Grade 5 Partially demolished - - - - Propert Grade 6 Partially demolished - - - - y right Subtotal - - - - 6.00 _ and on Grade I Partially demolished - - - - 6.00 - residen Grade 2 Partially demolished - - - - 6.00 _ tial plot Factory Grade 3 Partially demolished - - - -6.00 building Grade 4 Partially demolished - - - - 6.00 _ Grade 5 Partially demolished - - - - 6.00 Grade 6 Partially demolished - - - - 6.00 _ Subtotal - - - - 6.00 _ Grade I Partially demolished - - - - 6.00 _ Grade 2 Partially demolished - - - - 6.00 _ other Grade 3 Partially demolished - - - - 6.00 _ use Grade 4 Partially demolished - - - - 6.00 _ Grade 5 Partially demolished - - - - 6.00 _ Grade 6 Partially demolished - - - - 6.00 - Subtotal - - - .. 6.00 - Grade 1 Partially demolished - - - - 6.00 - Grade 2 Partially demolished - - - - 6.00 - Grade 3 Partially demolished - - 6.00 - Total__ _ _ Grade 4 Partially demolished - - - - 6.00 - Grade 5 Partially demolished 1.00 15.64 12.00 187.72 6.00 1,126. Grade 6 Partially demolished - - - - 6.00 - Subtotal 1.00 15.64 12.00 187.72 6.00 1,126.34 Cost estimate of compenstion for temporary relocation shared by this project for Xilang project (pipe network) 2 E I 2 O22 Attached table:18.1.2.7.1.2.3AC project purpose area type quantity Floor area cni p Montiy Relocation Total pnce compensaton penod(month) Grade I temporary demolished - 6.00 Grade 2 temporary demolished = - 6.00 Housing Grade 3 temporary demolished - - 6.00 Grade 4 temporary demolished - - - - 6.00 Grade 5 temporary demolished - 7.12 12.00 85.49 6.00 512.96 Grade 6 temporary demolished - - - - 6.00 _ Subtotal - 7.12 12.00 85.49 6.00 512.96 Grade temporary demolished - - - - 6.00 _ Grade 2 temporary demolished - - 6.00 _ Grade 3 temporary demolished - - 6.00 ._ . Shop Grade 3 temporary demolished = 6.00 Grade 4 temporary demolished - - 6.00 ._ . Grade 5 temporary demolished - - 6.00 . Grade 6 temporary demolished 6.00-- 6.0 Subtotal - - 6.00 Grade I temporary demolished - - 6.00 Grade 2 Area of land borrowed - - - - 6.00 Office Grade 3 Area of land borrowed - - - - 6.00 Grade 4 Area of land borrowed - - - - 6.00 House Grade 5 Area of land borrowed - - - - 6.00 withl Propert Grade 6 Area of land borrowed - - - - 6.00 y right Subtotal -- - 6.00 and on Grade 1 Area of land borrowed - - - - 6.00 residen Grade 2 Area of land borrowed - - - - 6.00 tial plot Factory Grade 3 Area of land borrowed - - - - 6.00 _ building Grade 4 Area of land borrowed - - - - 6.00 _ Grade 5 Area of land borrowed - - - - 6.00 _ Grade 6 Area of land bofrowed - - - - 6.00 Subtotal - - - - 6.00 Grade I Area of land borrowed - - - 6.00 Grade 2 Area of land bofrowed - - - 6.00 other Grade 3 Area of land borrowed - - 6.00 use Grade 4 Area of land borrowed - - 6.00 Grade 5 Area of land borrowed - - 6.00 Grade 6 Area of land borrowed - - 6.00 Subtotal - - 6.00 _ Grade I Area of land borrowed - - 6.00 Grade 2 Area of land borrowed - - 6.00 Total Grade 3 Area of land borrowed - - 6.00 _ Grade 4 Area of land borrowed - --6.00 _ Grade 5 Area of land borrowed _ 7.12 12.00 85.49 6.00 512.296 Grade 6 Area of land borrowed - - 6.00 - Total 7.12 12.00 85.49 6.00 512.96 Cost estimate of compenstioni for temporary structure before expiration shared by 1 _______ Frame structure _____ Cornposite structure Brick and timber stru quantity Floor area Unit price Total price quantity Floor Unit price Total quantity Floor Unit price I I ~~~~~~~~area price area Grade 3 temporary demolished L 250.00 Li Li Li 250.00 Li Li L 250.00 Grade 2 temporary demolished Oi Oi 250.00 FO Li El 250.00 ni Li F] 250.00 Grade 3 temporary demolished Oi ni 250.00 ni oi Li 250.00 Oi O FL 250.00 Commerc ial Grade 4 temporary demol ished O O1 250.00 n o] o 250.00 O- O1 n 250.00 Grade 5 temporary demolished Oi Li 250.00 El El Oi 250.00 O O O 250.00 Grade 6 temporary demol ished O 20.0 250.00 O 1 O 500 Subtotal O O 250.00 n o o 250.00 = O O 250.00 Frame structure | Composite structure Brick and timber stru Floor Total . Floor quantity Floor area Unit price Total price quantity Unit price quantity Unit price Grade I temporar demolishd OO 25000O O|area pnce area Grade 1 temporary demoli shed O Li 250.00 ni o L 250.00 =i Li L 250.00 Grade 2 temporary demolished Li L 250.00 Oi O O 250.00 Oi Oi L 250.00 Grade 3 temporary demolished Li Li 250.00 Li Li Li 250.00 Li Li Li 250.00 Other Grade 4 temporary demolished O Li 250.00 n oi L 250.00 Li El Oi 250.00 uses Grade 5 temporary demolished Oi n 250.00 n L Li 250.00 ni Li L 250.00 Gae 6 temporary demolished El Li 250.00 Li Li El 250.00 Li Li Li 250.00, Subtotal O Oi 250.00 Li Li ni 250.00 l E l 250.00 pgae 1 of 2 ~this project for Xilang project (pipe network n o o n ElAttached table:18.1.2.7.1.3AC-l icture Simple structure Total Total -Floor price quantity area Unit price Total price quantity Floor area Unit price Total price pnce area El Oi Oi 250.00 O O ] 250.00 0i 0i Oi O] 250.00 Oi Oi O 250.00 El o] o i [] 250.00 i El 0Ln 250.00 El oi n o 250.00 El LI n 250.00 0 O] ] F] 250.00 Oi ] Li 250.00 O 0 Oi O 250.00 O n 250.00 Li 3i Li O i 250.00 O n o 250.00 0 Attached table: 18.1.2.7.1.3AC-2 icture Simple structure Total prnce quantity Flea Unit price Total price quantit Floorarea Unitprice Total price O Li °L 250.00 Li ° i El 250.00 Li o Li Li 250.00 ° oT ol 250.00 El oi Li Li 250.00 [1 ol El 250.00 °i Li Li Li 250.00 Oi Li O 250.00 O 0 El L 250.00 0I O 0 250.00 nE pgae 2 of 2 Costesti ate fcottProperty right (pipe network) Frame structure Composite structure Brick and timber structure Quant Floor area Floor area Unit Floor area Unit Unit price Total pnce Quantity Total price Quantity F Total price Quantity ity repaired repaired price repaired price Grade I U U 100.00 U] U] U 120.00 U] U] O 150.00 U U] house Grade 2 El U] 100.00 O O 0 120.00 U] U] U 150.00 U] O with Grade 3 El U] 100.00 0 U] U 120.00 U U 150.00 U] ] Propert Grade 4 O] n 100.00 o n U 120.00 UO [0 Ul 150.00 U] O y right Grade5 S U] 100.00 U] O ] U] 120.00 ] n ] 7.12 150.00 1,068.67 U0 Grade 6 E U 100.00 U U] U] 120.00 U] U] U] 150.00 U U Subtotal O 0 100.00 U U] 120.00 U] U] 7.12 150.00 1,068.67 O page 1 of 2 __t-sharedbythisproject fr Xilg project O O O Attached table:18.1.2.8.3AC Simple structure Total Floor area Unit Total price Quantity Floor area Unit price Total price repaired price repaired 0 T_O 60.00 _ [ O _ _ _ n_ 6 .0 0 O0 _ _ _O 60.00 O O O O O 60.00 O O 7.12 1,068.67 n 60.000 O0 0 o o O 60.00 0 0 7.12 0 1,068.67 page 2 of 2 Cost estimate of coppenstion for permently affected house with Property right,heuse on residential plot,hi expiration, shared by this project for Xilang project (pipe net, [n LI o i LI Li Li LI FuU oi oi n ni ui Li LI Frame structure Composite structure Brick and timber structure quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price Wholly demolished O ni L l LI oi Li o Li o Li oo Partially demolished ni LI Li o Li Li LI [i oi Li Grade 1 Temporarily demolished Li n o Li o o oi Li Li Li Wholly demnolished Li0 Li L Li 0 oL El LI El Li Li Partially demolished LI Li Li Li L LI LI L] L L LI Ei Grade 2 Temporarily demolished LI Li O [0 O Li L [ O Wholly demolished O Oi Li El Li Li L L Li El Oi O Hous Partially demolished DI LI LI Li Li El LI L El DI Li Li oeus Grade 3 Temporarily demolished U l LI Li 0 O Li Li Li El Li Li with Wholly demolished Oi El O L Li Ei LI LI Li El Li Li Prop ing Partially demolished Li LI L Li Li Li Li El LI Li L L i ng erty Grade 4 Temporarily demolished O LI LI Li LD Li Li LI righ Wholly demolished O O_ O_ O_ O_ O_ O_ OUO Partially demolished Li O Li L O O El LI 1.00 15.64 2,130.00 33,320.75 Grade 5 Temporarily demolished 0 Li Li El Li O Li Li Li 7.12 450.00 3,206.01 Wholly demolished El O Li Li Li Li Li Li LI O LI L Partially demolished Li Oi Oi Li El Li i Li Li O n Li Grade 6 Temporarily demolished LI Li Li Li Oi Li 0 Li Li 0 O Oi Wholly demolished LI O Li Li Li LI Li LI Li o o El Partially demolished Li Li L L Li L El LI 1.00 15.64 2,130.00 33,320.75 subtotal Temporarily demolished Li Li Li LI 0 Li o o El 7.12 450.00 3,206.01 Wholly demolished LI Li Li L LI El Li LI Li El L L Partially demolished O LI L Li O Li L Li El Li Li Grade I Temporarily demolished UL i Li Li O C L [] Li Li 0i Wholly demolished DI [1 O Li O O nL Li Li Li o Partially demolished Li Li LI El Li oi Li Li o Li oi Li Grade 2 Temporarily demolished El LI Li Li n Li DI Li Li DI LI Li Wholly demolished Li Li Li Li El Li LI Li LI Li Li Li Partially demolished Li Li El Li LI Li El L LI O Li LI Hoeus Grade 3 Temporarily demolished LI Li L LI L i L Li Li 0 [ e with Wholly demolished U n L] O n c r o o n n n page 1 of 50 Cost estimate of compenstion for permaxnently affected house with Property right,house on residential plot,hi expiration, shared by this project for Xilang project (pipe nets [l LI Li Li L Lu LInl ui ni Li o Li oi oo Frame structure Composite structure Brick and timber structure quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price Prop Shop Partially demolished II Li Oi Li Oi Li [IL O n Li o Li erty Grade 4 Temporarily demolished Li o oI oi o Li n Li Li o El El righ Wholly demolished O Li O O Li LI O Li O Oi Li Oi Partially demolished LI L LI El Li L L Li LI LI LI Li Grade 5 Temporarily demolished Li LiO O Oi Li Li Oi Oi O LI Oi Wholly demolished Li LI LI LI L LI Di LI LI El Li Li Partially demolished El Li Li LI Li LI O LI I I O LI LI Grade 6 Temporarily demolished LI O Li l Li LI Oi LI Li Li Li Li Wholly demolished Li L Li LI Li Li O LI LI ULI LI L Partially demolished Li L El LI Li Li Li L Li L Li Li I Isubtotal Temporarily demolished O O Li Li Li LI Li LI Li LI L Li . Wholly demolished O Li Li L El Li L Li L Li Partially demolished O Li Li Li O O U Li El Li O Grade 1 Temporarily demolished Li Li LI Li Li Li L Li Li L L Li Wholly demolished Li El LI Li O O L] O Li LI Li O Partially demolished Li Li Li LiI I Li Li Li Li Li Li Grade 2 Temporarily demolished Li Li Li Li Li Li Li L Li El Li Li . Wholly demolished Li L Li Li LI Li Li Li Li oi Li Li Partially demolished LI O O [O Li Li Li O El O El Li Hous Grade 3 Temporarily demolished LI Li Li Li Li Li El O Li LI L Li e with Offi Wholly demolished OL LI Li Li Li Prop Partially demolished O L L i LL Li Li O O L ce erty Grade 4 Temporarily demolished El O O Li O ° U Li Oi Li l Li righ Wholly demolished i i i i i i O L Li i O t Partially demolished L Li L i i i L L Grade 5 Temporarily demolished i i O i O O O O L O U O Wholly demolished LI Li Li O Li Li Li Li Li Li LI LI Partially demolished El El Li Li Li Li Li Li o o Grade 6 Temporarily demolished i Li Li Li LI i i i Li Li n L Wholly demolished i L l Li L O Li Li El Partially demolished OLi Oi Li Li Li i u L page 2 of 50 Cost estimate-of-Gompenstion forh hi expiration, shared by this project for Xilang project (pipe nets [O [] Li Li oi Li [ 9 [ii oi [u [uo Li Li r u - Frame structure Composite structure Brick and timber structure quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price subtotal Temporarily demolished [] Li Li Li Li LI Li Li Li Li Li L Wholly demolished LI LO i LI El OI Oi Oi Oi Li Li O Partially demolished Li Li Li Li Li Li Li Li Li Oi El Li Grade 1 Temporarily demolished El Oi L Oi Li L L LI Oi El oi oo Wholly demolished Oi l Li L LI Oi Oi El LI LI Li Li Partially demolished Li Li Li Li LI L El ° Li Oi L Li Grade 2 Temporarily demolished U El Li L Li Li Li Li LI L Wholly demolished LI El O Oi Oi Li O O LI Oi l LI Partially demolished Li L Oi Li IOI O O LI Oi Oi Li Hoeus Grade 3 Temporarily demolished LiOIi Li O O U OI Oi Li w Foct Wholly demolished ________ _ _LI _ __ __ _I withLi LLiLLiLLiL LiLLii Prop bur Partially demolished El i Li i Li i i L L erty dilg Grade 4 Temporarily demolished O O LI O O O O O O ritgh Wholly demolished El Oi El O Li Li O Li O O Oi Partially demolished O O OL LI O Oi Oi Li Li Li O Grade 5 Temporarily demolished Ci LI L L Li Li Li Li Li Li L O Wholly demolished Ci Li L Li Li i Li L L Li Li Li Partially demolished Li L El L Li Li Li LI Li L El Li Grade 6 Temporarily demolished L Li El Li LA L] Li Li LI O Li Wholly demolished Li Oi LI L i LI rL L Li LI L Li Partially demolished C l LI n Li oi Li Li Li Li Li Li subtotal Temporarily demolished Ci LL Li Li L El Li LI Li Li Li Wholly demolished LI El LI L] Li Li Li ID L L Oi Partially demolished Li OL Li O Li U El Li Li Li Fl Grade 1 Temporarily demolished LI Li Li Li Li L lI LI L LI Li LI Wholly demolished Li _ Li Li Li Li L L Li Li Li Li Partially demolished Ci Li L L Li L LI LI L L Li Li Grade 2 Temporarily demolished O Li Li Li LI n oi Li El El o oo Wholly demolished Li OL LI i Li Li Li Li Partially demolished Di OL LI OL LI OI O Li L Li L Hous Grade 3 Temporarily demolished C l [O Li ElE Lio Li El El I oo page 3 of 50 Cost estimate of compenstion for ermanent affectedi expiration, shared by this project for Xilang project (pipe neti o oi LI Li o o Li o oi no Li El 0i Frame structure Composite structure Brick and timber structure quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price with Othe Wholly demolished Li Li Li 0 0L LI Li n Li Li Li El Prop r Partially demolished LI n o Li Li Li Li Li ui Li o LI erty uses Grade 4 Temporarily demolished i O U O Li O Oi LI El O ritgh Wholly demolished 0 Li LI El ui El o Li El o Partially demolished LI 0i E. Li O O E Li Li L Grade 5 Temporarily demolished Li O O Li LI Li Li O Li Wholly demolished El E Li E o Li E E El El Li Partially demolished Li OL OL Li Li Li Li El Grade 6 Temporarily demolished O OL O E Li E Li Li Whollydemolished O OL OL Li Li Li Li Li Li Li Partially demolished 'E LI Li Li Li Li Li Li Li Li Li Li subtotal Temporarily demolished Li O Li Li Li Li Li O Li E Li o Wholly demolished El El O El Li Li Li Li Li Li Li El Partially demolished O Li LI 0 0 ULi n Li LI DI Li Li Grade 1 Temporarily demolished Li E LI El LI E Li E Li Li Li L Wholly demolished l . OL Li O Li L 0 0 O El El Partially demolished Li Li Li 0 Li IiL Li E LI LI 0 Grade 2 Temporarily demolished Oi O OI Li Li Li Li Li O Li O O Wholly demolished LI L LI LI Li O Li O El Li 0 Partially demolished OL 0 0 0L El Li 0 Li Li 0 Hoeus Grade 3 Temporarily demolished Li E Li Li Li E E Li Li o e with Wholly demolished 0L 0i Li Li Li n Li Prop tota Patially demolished E l i E 0 OL i i 0 0 erty Grade 4 Temporarily demolished Li Oi El Li Li Li O Li DI i O L righ Wholly demolished El Li LI [L U El O O O0 t Partially demolished 0i Li LI El Li Li Li L 1.00 15.64 2,130.00 33,320.75 Grade 5 Temporarily demolished l Li Li O i Li L O 7.12 450.00 3,206.01 Wholly demolished El Li iI Li OL 0 i O 0 0 L Partially demolished Li Li LI Li Li Li Oi Li Li L Grade 6 Temporarily demolished L Li Li OLi [OI LiOI Li Li Li Wholly demolished DI L Li °L El ° Eli LI Li page 4 of 50 Cost estimate of compenstion for Dermanently aff-cted house with Property right, house on residential plot, hi expiration, shared by this project for Xilang project (pipe neti L] Oi Li Li Li Li 0 niLi oi oi o oi oi oi oo _______ Frame structure _ Composite structure Brick and timber structure quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price Partially demolished Oi Oi 0 LI 0i O [O El 1.00 15.64 2,130.00 33,320.75 subtotal Temporarily demolished [O Oi Oi O Oi O Li L LI 7.12 450.00 3,206.01 Wholly demolished Oi Li Li L LI El El ni oi oi oi oo Partially demolished Li Li Li 0 Oi L I Li O O 0I El Li Grade 1 Temporarily demolished i O LI LI O Li El Li Li Wholly demolished Li LI Li LI LI LI LI Li Li LI O Li Partially demolished 0 LI Li t 0i LI LI Li L Grade 2 Temporarily demolished Li El LI Li Li t] LI 0 Li O Li O Wholly demolished Li Li Li o El El Li o Li El Li o Partially demolished Li Li El i Li Li Li Li l Li Li L I hous Grade 3 Temporarily demolished Li Li i n i o i o l o o o e on Wholly demolished LI Li Li LI El Li Li O El Li 0 El dent Honugs Partially demolished O 0 O___ O _ O _ LI Li OO 0 O_ 0 ial Grade 4 Temporarily demolished Li O Li Li L Li Li Li Li LL L plot Wholly demolished Li Li DI [i Li 0 O Li O 0 i O Partially demolished Li Li Li Li Li Li Li El LI O Li 0 Grade 5 Temporarily demolished Li L L Li Li Li L Li Li LI L Li Wholly demolished Li Li Li El O El Li 0 Li LI Li Li Partially demolished 0 Li 0i Li Li Li 0I O 0 DI Li El Grade 6 Temporarily demolished Li L Li LI Li L L Li Li LI L O Wholly demolished Li Li O Li LI 0 Li O Li Li Li O Partially demolished El Li Li Li Li O Li 0 Li Li Li Li subtotal Temporarily demolished Li Li Li LI i i i i i i O L Wholly demolished L Li 11 Li L L LI Li O Li O Partially demolished Li Li Li Li L 0 Li Li Li O Li Grade 1 Temporarily demolished OL PI l Li El Li El Li Li Li LI Wholly demolished i L Li Li LI i Li O O Li LI El Partially demolished 0i Li Li LI Li 0 El i i O ] I Grade 2 Temporarily demolished Li 1] Li Oi i i i Li Li L L L Wholly demolished []I L El Li [I O Li LI Li 0 Li LI Partially demolished PI DI o L L Li Li Li L Li page 5 of 50 Cost estimate of cor enstion for hi expiration, shared by this project for Xilang project (pipe net, oi ni ni Lo Li O . OL OL El o oi ui o o o Frame structure Composit structure Brick and timber structure quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price hous Grade 3 Temporarily demolished Oi O O Oi Li oi o Li L i LI no e on Wholly demolished b Li O Li Li Li LI Oi Li L Li El resi dent Shop Partially demolished Li L L El Li Li Li El L El L El ial Grade 4 Temporarily demolished O Li O Li Li Oi El Li Li Li El Li plot Wholly demolished El Li LI Oi O LI LiL Li L L Li Partially demolished Oi O L LI O O i LiL L Li Grade 5 Temporarily demolished i Li Li L Li L LI LI Li LI El Wholly demolished Li Li Li Li LL Li Li Li Partially demolished Li Lii Li Li Li El L Li Grade 6 Temporarily demolished Li Li LI Li Li Li L Li Wholly demolished Li Li L Li Li Li LI El LI Partially demolished L Li El [i L L L Li Li subtotal Temporarily demolished O O Li U L LI Li Li Li Wholly demolished Li L Li L Li L Li Li L Li Partially demolished L L Li L Li Li Li Li L Li Grade 1 Temporarily demolished Li L L El L Li Li Li L L Wholly demolished LI L El L L Li Li Li L Li El Li Partially demolished O Li O Oi Li Li LI El Ui L Li L Grade 2 Temporarily demolished n Li Li Li LI o Li Li ni Li. Li Li Wholly demolished O Li Li Li L L Li Li Li L L O Partially demolished O l Li Li L Li o oi Li Li L Li hous Grade 3 Temporarily demolished Li Li Li Li L Li Li Li Li Li O e on Wholly demolished LI El El Li El Li LI L Li Li L Li resi Offi Partially demolished nL El Li Li o Li o Li Li LI oo dent ce ____ ial Grade 4 Temporarily demolished El LL LI Ci O L Li LI L Li Li plot Wholly demolished Oi Li C Li El Li L El LI Oi OO LI Partially demolished O Li Li Li i Li L Li L Li Li Grade 5 Temporarily demolished O Li Li OL O El O LI1 LiO O Li Wholly demolished I I Li [L El El Li Li El Li Partially demolished LI O L Li U Li Li Li L Li Li Oi Grade 6 Temporarily demolished Oi Li Li Li U Li 1 [O n o E page 6 of 50 Cost estimate of compenstion for permanentlyhaffectedhouse withi expiration, shared by this project for Xilang project (pipe net, U] Oi Oi L G [1 L [1L Gi Oi O Oi ni u nQ Frame structure Composit structure Brick and timber structure ._______ ____________________________ quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price Wholly demolished Ci L oi Li i LI ci ci o El L Li ,Partiallydemolished Li Li UC LI Li Li L I El LI Li L r_ subtotal Temporarily demolished L1 L Li LI L LI o i Li L El Wholly demolished Li G DI Li LI Ui LI ri L Li LI Li Partially demolished i O i i i i O L LI OL Li O Grade 1 Temporarily demolished OL LI Li Li Li Wholly demolished O Li O [] G 11 LI O El Li Li Partially demolished O Li Li L1 Li El LI G El Li El El Grade 2 Temporarily demolished Li L L L Li L Li Li [I LI Li L Wholly demolished Li Li Li O Li Partially demolished Li Li Li n Li hous Grade 3 Temporarily demolished O Li LI Li L Li Li Li L Li Li Li e on Foc t Wholly demolished LiO____L O _ _ Li Li Li Li Li dent bouriyl Partially demolished LLi El Li O Li ial ding Grade 4 Temporarily demolished L LI LI L LI Li L L Li LI Li plot Wholly demolished L_______ O_ El U Li Li Li Partially demolished fI Li Li 11 O Oi O O O Li L Li Grade 5 Temporarily demolished Li O O LI Li Li Li Li O nL Li El Wholly demolished L Li L Li L Li Li El El El Li El Partially demolished Li Li O Li El L L LI O Li Li L Grade 6 Temporarily demolished Li C Li i i i i L L O Wholly demolished [l C O I C L L L L L L O Partially demolished El c [ o Li Li Li Li Li o Li subtotal Temporarily demolished LI Li L L l LI [ L1 Li Wholly demolished Li LI LI C LI i i Li L O Partially demolished Li Li LI O Li Li Li Li Li LI Li Grade 1 Temporarily demolished O El Li OI Li Li LI Li El Wholly demolished Li El El Li Li L Li Li Li Partially demolished fI Li El OI Li Li Li L Li LI i L Grade 2 Temporarily demolished 1I LI Cl I LiOi Li Li O L Wholly demolished f 1 O [ O O O O L . Li page 7 of 50 __ Cost estimate of compenstion for permanentIly affected house with Property right,house on residential plot,hi expiration, shared by this project for Xilang project (pipe neti [o [7 [ [ [o [n [o[ [o [o [ [o LI [o [O Frame structure Composite structure Brick and timber structure quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price Partially demolished [ [7 [7 O [ [ [O [7 [ [ [I [ hous Grade 3 Temporarily demolished [7 O [I [7 [7 [7 [7 [] [I [7 [7 [7 e on Othe Wholly demolished [7 [7 [ [7 [7 [ [7 [7 [ [7 [7 [ dent r Partially demolished [7 [7 [7 [ [7 [7 [7 [7 [7 [ [O O ial uses Grade 4 Temporarily demolished [7 [ [7 [ [7 [ [ [7 [7 [7 [7 plot Wholly demolished [7 [7 [ [7 [7 [7 [7 [ [7 [7 [7 [ Partially demolished [7 [7 [ [7 [7 [7 [7 [7 [7 [7 [7 [ Grade 5 Temporarily demolished [ [7 [7 [7 [7 [7 [ 7O 0 [ [ [7 [7 Wholly demolished [7 [7 [ [7 [7 [ [ [ [ [7 [ Partially demolished [ [7 [ [7 [7 [ LI [ [7O[7 [7 [ Grade 6 Temporarily demolished [7 [7 [7 [7 [7 [7 El [7 [7 [7 [ [ Wholly demolished [7 [ [7 [7 [7 [O [7 [7 [7 [7 [ [7 Partially demolished [7 [I [7 [7 [7 [ [7 [ [7 [ [7 O7 subtotal Temporarily demolished [7 [7 [ [7 [7 [7 [ [ [ [ [ [7 Wholly demolished [ [7 [ [7 [ [7 [7 [ [ [7 [ [7 Partially demolished [7 [ [ [7 [7 [I [ [7 [[ 17 Grade 1 Temporarily demolished [7 [ [ [7 [ [ [7 [ [7 Wholly demolished [7 [7 [7 [ [7 [ [ [7 [ [ [ [ Partially demolished [7 [ [7 [7 [ [7 [ [7 [7 [7 [7 [ Grade 2 Temporarily demolished [7 [ [ [7 [7 [7 [7 [ [7 [7 [ [ Wholly demolished [ [7 [7 [7 [7 [ [7 [7 [7 [7 [7 [7 Partially demolished [7 [7 [7 [ [ [7 [7 [ [7 [7 [7 O hous Grade 3 Temporarily demolished [7 [ [7 [ [7 [ [ [ [ [ [7 [7 e on Wholly demolished [ [7 [7 [7 [7 [ E7 [ [7 [ [ [ resi tota Partially demolished [7 [7 [7 [7 [7 [ [7 [ [7 [7 [ [ dent 1 ial Grade 4 Temporarily demolished [ [7 Li [ [7 [7 [7 [7 [ plot Wholly demolished [ [7 [ [I [ [l [ [7 [ [7 [7 7 Partially demolished [7 [7 [7 [7 [7 [7 [7 [ [ [ [ [7 Grade 5 Temporarily demolished O [7 [ [ [7 [7 [ [7 [7 [ [7 [7 Wholly demolished [7 [7 [ [7 [ [7 [ [7 [ [ [ [ Partially demolished [ 7 7 7 7 [1 7 7 [ 7 O page 8 of 50 Cost estimate of cor enstion fora&-house with-Property-right,house on-residential-plot,hi expiration, shared by this project for Xilang project (pipe neti nl El E L El Elnl El El El El [1 E El Frame structure Composite structure Brick and timber structure _____________________________ quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price Grade 6 Temporarily demolished E El El El El El El [O E O El Wholly demolished El EL El El El E El El El El El E Partially demolished El El El El El El El El El El E E subtotal Temporarily demolished El El El El El El El El [I E El El Wholly demolished L E E El El E El EL El El EL E Partially demolished El El EL E El E E El El El El El Grade 1 Temporarily demolished l El El El E El El El E El El E Wholly demolished l El El El El El l E Partially demolished E l l l l l E E El E E Grade 2 Temporarily demolished E EL El El E El El El EL E EL E Wholly demolished El El El El EL E El El El Partially demolished E ElOEl ElE E El El E El El hist Grade 3 Temporarily demolished El E El El El El El E El El E El oric Wholly demolished El El E E El El EL El E E El El ally Hious Partially demolished E El l El E E El, E El El E E used ing hous Grade 4 Temporarily demolished E El El El L E El E El E E El e Wholly demolished El El E El El E El El E El El El Partially demolished E El El E El El El El El El El Grade 5 Temporarily demolished El El E E El El El El El E E EL Wholly demolished El El E El E E El El El El E E Partially demolished E El El El El El E El El El EL E Grade 6 Temporarily demolished E El E El E E EL EL E El El E Wholly demolished El EE El El El El E E El E E Partially demolished El El El El, El E E El E subtotal Temporarily demolished l El El El El El El E E Wholly demolished l El El E El El E E E E Partiallydemolished l EL El El E El El El E E Grade 1 Temporarily demolished El E EL EL El El El E EL El EL El Wholly demolished El El E El El E E EL EL El El E Partially demolished EL El El E El E E EL El Grade 2 Temporarily demolished Ell El El El El El El El page 9 of 50 . 1 1 1 , , r , Cost estimate of co enstion f r expiration, shared by this project for Xilang project (pipe net, o ui [o LI o o [ u [I oi oi LI Li LI ni El Frame structure Composite structure Brick and timber structure quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price Wholly demolished LI Li Li Li Li Li Li Li LI L L Li Partially demolished Oi Oi Oi Oi Oi O Oi Oi Oi Oi G O hist -Grade 3 Temporarily demolished UI Oi O L L LI LI O Ui Li Li L oric Wholly demolished El O O O Oi Oi LI 0 1]i UI O Oi ally Shop Partially demolished Oi Li Li LI Oi O LI El Oi LI O O used hous Grade 4 Temporarily demolished L L Li Li L Li El LI Li Li Li Li e Wholly demolished Li LI n . El o El o o LI o Li Partially demolished Li LI Li LI O Ui Li LI Li L Li L Grade 5 Temporarily demolished Li LI El Li Li Li LI LI Li El El Li Wholly demolished Li Li Li Li LI O ri LI n Li Li oo Partially demolished Li Li Li Li Li Li LII Li Li Li Li Li Grade 6 Temporarily demolished El Li Li Li LI L Li Li oi o El Wholly demolished L El Li Li Li Li L Li L Li LI Partially demolished Li Li Oi O Li O Li El O Oi Oi O subtotal Temporarily demolished Of Li Oi O Oi Oi n Li LI o o o Wholly demolished Li Li LI L El Li LI Li Li L Li Li Partially demolished LI O Li O Li Li Li L Li LI O Li Grade 1 Temporarily demolished El Li O El Li Li LI n Li o Li o Wholly demolished Li L Li DI L Li Li El Li Li El O Partially demolished Li El LI Li LI L Li Li El L Li L Grade 2 Temporarily demolished O Li Li Li Li n o o oi El Li o Wholly demolished Oi LI LI Li o Li Li o o El Li LI Partially demolished Li L Li Li L Li Li Li Li Li Li Li hist Grade 3 Temporarily demolished L El L El Li LI L Li Li LI LI L oric Wholly demolished OL Li Li L Li L Li Li l L LI El ally Offi Partially demolished OI L L LI El Li L Li Li Li El L hous Grade 4 Temporarily demolished II Li EJ Li Li LI El El Li OI Li O e Wholly demolished Li Li Li El Li O LI U Li L L Li Partially demolished Li El OL Li El LI El u o o Li Grade Temporarily demolished li Li UL Li L Li Li L Li LO Wholly demolished El i i i Li ID n o o o page 10 of 50 7' - Cost estimate- of compcnstion for permanently affected house wilh ruperty right,house on-residenttil plo", hi expiration, shared by this project for Xilang project (pipe netv o LI oi PI oi oi oi u L Li LI o oi Li El Frame structure Composite structure Brick and timber structure quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price Partially demolished L L O Li Li i Li Li o ui Li Li Grade 6 Temporarily demolished Oi Oi O El El Li Ci O D L El Wholly demolished Li LO Oi Oi Oi Li OC Partially demolished ni oI oi Li nI Li uo subtotal Temporarily demolished Oi LO Li Li O Li El Wholly demolished O Oi Oi El Li I Li LI O Oi Ui Li Partially demolished O Li Li El O Li Li Ui Li Oi Ci O Grade 1 Temporarily demolished Ci Li Li Li Li LI O Li Oi C Li Li Wholly demolished LI Li OL Oi Li l LI ui oI co LI Partially demolished Ci Li O O Oi Li Li El O Oi C OI Grade 2 Temporarily demolished Oi O El Li El El Li Li El Fl CL Wholly demolished Ci Li O Oi Oi Li O Oi Oi LI C El Partially demolished Li El O El Oi Oi O Oi O Ci Li O hist Grade 3 Temporarily demolished Li O C Li O Oi LI U El OL Li El oric Foct Wholly demolished Oi i L IOI C Li El Ci Oi Li El useYd bourly Partially demolished El .i Fl °i L CO hous ding Grade 4 Temporarily demolished Li O O O O Li Li O El El Eo o e Wholly demolished O n o o o o o u o o c o Partially demolished D Oi Ol Ui Oi ni Li Li oi Li Li Li Grade 5 Temporarily demolished L L L Li Li Li Li Li Li El Li Li Wholly demolished Li DI El El L El O O El El Ci O Partially demolished O Li O Li n o o o oi o Li El Grade 6 Temporarily demolished Oi [] Li LI Li Li Li Li El LI Oi OC Wholly demolished O Oi Li Li O El OI Oi O Li Li El Partially demolished LI O O Oi O El O Li El DI Ci El I isubtotal Temporarily demolished Li I o o o oi Li El El i c L Wholly demolished n Li LI LI LI u Li El ol o oo Partially demolished nLi LicI I L u Li oo LI c o Grade 1 Temporarily demolished Li L LI C Li El El Li Ui El Ci Li Wholly demolished LI Li LI Li Li oL oI oi Li cc Partially demolished LI I io]I DI Li o o LIo l Li page 11 of 50 Cost e-stimate of commestion forDrne*yafce os ri rpryrgthweo-eietn lt hi expiration, shared by this project for Xilang project (pipe netv _______ Frame structure | Composite structure | Brick and timber structure quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price Grade 2 Temporarily demolished Oi Oi I I Li Li El Oi O i Li Oi Li Wholly demolished Li ti Li Li L Li Li Li] Li Li El O Partially demolished L Li O i O i I Ii LI Li LI O L O i hist Grade 3 Temporarily demolished Oi Li DI Li Li Li i L LI OI Oi OO ori c Othe Wholly demolished ______L I_I__ _ _El LI El____ uased r Partially demolished O L Li Li Li Li El _ _ _ _ El _ _ O hous uses Grade 4 Temporarily demolished Li LiC LiLi L Li Li O OOOO e Wholly demolished Li LiOL LiOLi LinLi o o o ooo Partially demolished i Li Li Li Li Li Li O Grade 5 Temporarily demolished Li L L L Li Ol Li O O O OEOlOO Wholly demolished Li . LI ° ° El ° ° ° _ ° ° °° Partially demolished El i Li LiOLi LiOi O O El OOO Grade 6 Temporarily demolished O O O O Oi Li Li O_ O_ O O O_ Wholly demolished Li LI Li o Li o o LI o o_ I o o_ Partially demolished Li Li L Li L I Li _ _ _ El _ _ _ O subtotal Temporarily demolished Li Li Li Li Oi O O O O_ O_ O__El Wholly demolished L Li Li Li Li L Li _ _ E _ _O Partially demolished Li Li L [] LI IiL _ _ _ E _ _ ___ Grade 1 Temporarily demolished LI Li LI L LI OL Li O O_ O O OOO Wholly demolished L _ _ _ Li _ _ _ __ El _ Partially demolished OL El O Li O O O O OO Grade 2 Temporarily demolished O[ Li L LI TO O O El OOO Wholly demolished Li Li Li Eli IiO O O _ _ ° LI °°° Partially demolished Li IiIiOL LiOI ElUEl _ ]I E __ hist Grade 3 Temporarily demolished n LI o Li Li Li Li o_ o_ o __ o_ oric Wholly demolished Li Li ni o Li LI O _ _ _ O El OO ally tota Partially demolished Li Oi O L Li Li LI O_ U_ _ __ __ used 1 hous Grade 4 Temporarily demolished Li Li Li Li O O O O O LI O_ O e Wholly demolished Ui L Li Li O Li n_ o_ o_ooo Partially demolished Li Li Li n Li oL o o_ o ooo Grade 5 Temporarily demolished Li LI O [] ]O OEOOl_On_ page 12 of 50 Cost estimate of compenstion for permancntly affected house with Property xight,house on residential plot,hi expiration, shared by this project for Xilang project (pipe neti [1 LI LI LI [] LI. LI LInI [u [n o [o I oI on Frame structure Composite structure Brick and timber structure quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price Wholly demolished O I O L LI LI L n o o L LI Partially demolished L LI L LI LI L LI LI LI L Grade 6 Temporarily demolished LI El LI LI LI L L L LI LI L LI Wholly demolished LI LI LI LI El LI LI LI LI LI LI LI Partially demolished L El LI LI LI Li LI LI L LI El L subtotal Temporarily demolished LI LI L LI LI LI LI LI LI LI L L Wholly demolished El L LI El El LI LI LI LI LI LI L Partially demolished LI LI L LI LI LI LI LI LI L LI LI Grade 1 Temporarily demolished LI LI LI LI L LI I L LI L Wholly demolished L LI LI LI LI LI LI L LI El LI LI Partially demolished LI LI O L LI [] LI LI LI LI LI LI Grade 2 Temporarily demolished LI LI L LI L LI LI L LI L L LI Temp Wholly demolished El LI L LI LI LI I LI LI LI LI LI orar Partially demolished L LI El LI LI LI LI LI L LI LI L stru Grade 3 Temporarily demolished LI L El LI L LL I L L ctur Hous Wholly demolished LI L LI LI Li L LI LI L L Li L e ing Partially demolished LI LI L El L LI LI LI LI LI LI L befo Grade 4 Temporarily demolished LI LI LI L El LI L L LI L LI El expi Wholly demolished O ____Li_E C _ __I O__ O_ O n__ooo rati Partially demolished L LI LI LI LI L LI LI LI LI L El on Grade 5 Temporarily demolished LI LI LI LI L LI LI LI LI LI LI LI Wholly demolished LI LI LI El LI LI LI LI LI El LI L Partially demolished LI L LI LI LI LI LI L LI Li L L Grade 6 Temporarily demolished L LI L LI LI LI LI Wholly demolished El LIL L LI Li L LI Partially demolished L L L LI L L L L L L subtotal Temporarily demolished L El LI L LI LI LI LI L ILI LI LI Wholly demolished L LI LI Li LI LI L L LI L LI LI Partially demolished L LI Li E LI LI LL LI L LI L Grade 1 Temporarily demolished LI El El LI LI LI LL LI LI Li LI Wholly demolished L LI LI LI LI L LI LI LI LI LI LI I page 13 of 50 F - Cost estimate of con enstion for-permanea y-affecte& hi expiration, shared by this project for Xilang project (pipe netv [7 ni 0] 17 0i 0i n] L7] 0i 0i 0i L7 Li oi L7 _ Frame structure Composite structure Brick and timber structure .________ _____________________________ quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price Partially demolished O O O [7 _ i O O O n i LI oo Grade 2 Temporarily demolished Li n C7 ai o oi oi L Li l Temp Wholly demolished El LI Li O Oi O l Li LI ao LI Li orar Partially demolished O n L7 O Li Li o oi Li L7 Oi L y Grade 3 Temporarily demolished O L7 O i O i O a LI Oi L Oi stru _ __ _ ctur Wholly demolished El O Oi L L L LI ai o oi ai Li e Shop Partially demolished O Oi Li ai El o a El ai El oi El befo Grade 4 Temporarily demolished Oi Li O L Li El Oi Li Oi _ i ° Oi re Wholly demolished O LI LI o o o L, o rati Partially demolished O O El LI Oi [ L7 ai i LI LI ° on Grade 5 Temporarily demolished O O Li Li El o oi Li L LI Li LI Wholly demolished O El Oi O O Li Li ai o oi o oi Partially demolished Li El Li Li Li Li L LI LI Li L L Grade 6 Temporarily demolished Li LL LI LI Oi LI Li Oi DI Li L Wholly demolished O [I LI OL O O n o c oo Partially demolished O LI o o o o o a a o o subtotal Temporarily demolished Oi Oi El O O Oi O Li L L Wholly demolished Li [ LI O Oi Oi Oi Oi C] U] Li U] Partially demolished O O OI LI L L Li Oi El LI oi oi Grade 1 Temporarily demolished Oi Oi O n o] o o] a] U U] oi o Wholly demolished LI LI O Oi Li El O Li Li Li LI Oa Partially demolished O[ ni D i LI o El oi oL co Grade 2 Temporarily demolished OL LI El O Li o Li Li El El Temp Wholly demolished LI El O OI El Li I L Li orar Partially demolished El [ ] 17 ni ai oi El 7i y Grade 3 Temporarily demolished Li Oi Li Oi Oi Oi Li i LI L] Li O stru _ _ _ _ _ _ _ _ _ _ ctur Offi Wholly demolished O I Oi O Oi Li O Li Oi ai oi Li e ce Partially demolished Oi LI OO LI Oi Ci Li Li Li O befo Grade 4 Temporarily demolished O Li O O LI Oi El Li L El El El re expi Wholly demolished O O _El__ ____ iO__ O El oL rati Partially demolished C7 ]i O O El [o El c [o Li page 14 of 50 I ! - Cost estimate of compenstion for permanently affected house with Property right,house on xesid Lial plot,hi expiration, shared by this project for Xilang project (pipe nets El L L L] L] 1 LI C] C n El El c c cc Frame structure Composite structure Brick and timber structure quantity Floor area Unit price Total price quantity Floor area Unit price |Total price quantity Floor area Unit price Total price on Grade 5 Temporarily demolished i Li U 1 El nL [ | E LI [| Li LI L Wholly demolished [C Ci Ci C Ci E LI CC Partially demolished CL LI Oi Ci OO LI Ci Ci Grade 6 Temporarily demolished ni Li Li LI o Li L L Li LI Li Li Wholly demolished Ci Ci n El oi ci Li c o oi l LI Partially demolished Ci n ci Li Ci O C L] Ci C] Oi C subtotal Temporarily demolished C] El C El Cl LI ni Li ID Li L c Wholly demolished L Li Li Li Li L Li Li Li Li O L Partially demolished El O Li C Oi C Li Grade 1 Temporarily demolished Li Oi LLi C Li Li Li L Li Wholly demolished Oi Li LI Li LI Ci Li O Li Li LI Li Partially demolished Li Oi O l L Li LI Oi LI L Li Li Grade 2 Temporarily demolished L El Li Li Li Li LI L Li Li L L Temp Wholly demolished Li L Li 0 °i O Li Li El Li 0 L O orar Partially demolished Li Li Li Li Li Li Li L Li Li Li Li stru Grade 3 Temporarily demolished Oi El U Li L Li LI O Oi DI L Li ctur ory Wholly demolished Li L Li L LI L Li El El DI L Li e bouriyl Partially demolished Li i El Li Li Li El befo buil __ _ _ __ _ __ __ _ iLiL iL ding Grade 4 Temporarily demolished O Li DI Li Li Li Li O O_ O____ re Wholly demolished O O O Li O O El Li O L L Li rati Partially demolished Li Li Li Li L L Li LI O O U Li on Grade 5 Temporarily demolished Li Li Li Li Li Li Li L oL LI VI Wholly demolished OL I LiOL O Li Li Partially demolished El Li E l Oi Li LI Grade 6 Temporarily demolished O O Li UL O Li O i LI Oo Wholly demolished LI Oi Li OL OL Oi LI Li Partially demolished LI Li Oi L]i Li L I Li subtotal Temporarily demolished LI Oi OL O Li Wholly demolished O O O O O LI O Li Li Partially demolished . OI O i n LI Li o Li Grade 1 Temporarily demolished OL Ol DI O O O O O O Li page 15 of 50 Cost estimate-ofrcompenstion-for permanently affected house with Propcrty right,house on residential ploL,hi expiration, shared by this project for Xilang project (pipe neti n U [1 U LI u LI [I o o n o oon Frame structure Composite structure Brick and timber structure quantity Floor area Unit price Total price quantity Floor area Unit price ,Total price quantity Floor area Unit price Total price Wholly demolished O O O El [O L] O [O LI U L1 O Partially demolished O El U O U U U U O[ U Grade 2 Temporarily demolished U U U U U U LI U U U U U Temp Wholly demolished U UU U O U U U U OU U U orar Partially demolished U U U U C U1 []U U UO U U stru Grade 3 Temporarily demolished U U U U U U U U n U U U ctur Othe Wholly demolished U U U U U U U U UL U U e r Partially demolished U U U U U U U U UO U U befo uses Grade 4 Temporarily demolished U U U U U U U U U U] U expi Wholly demolished U U U U U U U U LU U U rat i Partially demolished U U U U U U U U LU U U on Grade 5 Temporarily demolished U U U U U U U U U U U U Wholly demolished U U U U U U U U U U U U Partially demolished U UOU U U U U U U1 U U U Grade 6 Temporarily demolished U U U U U U U U U U U U Wholly demolished Ul U U U U U U U U U U Partially demolished UO U U U U U U U U U U subtotal Temporarily demolished U U U U U U U U U U U U Wholly demolished UO U U U U U U Ui U U UI Partially demolished UU U U U U U] U U UO Grade I Temporarily demolished U UU U U U U U U U UO Wholly demolished U U U U U U U U U UC Partially demolished U U U U U U U LU U U U U Grade 2 Temporarily demolished U U U U U U U U LU U U U Temp Wholly demolished U U U U U U U U U U U U orar Partially demolished UI U U U U U U U U U U stru Grade 3 Temporarily demolished U U U U U U U U U U U U ctur Wholly demolished U U U U U U U U U U U U e tota Partially demolished U U U U LU U U U U U U befo I Grade 4 Temporarily demolished U UC U U U U U U U U U re Whollydemolished UUU U U U C O U U U page 16 of 50 I * . Cost estimate of1Lcompenstion- hi expiration, shared by this project for Xilang project (pipe neti oI u nI n n Lo LLI1 0I 0I Ui O LI LI OI Frame structure Composite structure Brick and timber structure quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price rati Partially demolished O OI O OI CI LI LI LI LI El LI LI on Grade 5 Temporarily demolished El O OI OI CI L L LI LI LI LI Ol Wholly demolished UI Q O O LI OI OI LI OI LI i LI Partially demolished OI CI OI OI r LI oI 0 LI LI Grade 6 Temporarily demolished OI L L L L LI LI CI LI LI Wholly demolished O LI El I LI LI CO L1 O UI nI o Partially demolished OI L LI O OI r oI LI oI oI oo subtotal Temporarily demolished OI O OI OI CI OI OI n I o oI oI Wholly demolished OI UI O OI DI LI LI DI L LI Partially demolished OI OI OI LI L LI CI L]I LI LI Grade 1 Temporarily demolished El LI LI LI LI LI LI oI cI oI o cI Wholly demolished OI OL O OI LI L LI L LI Temp Partially demolished O OL LI O CI El El L LI orar Grade 2 Temporarily demolished El LI LI LI lI LI El LI LI LI stru Wholly demolished O O O O C LI OI L PI nI oo ctur Partially demolished OL n o l l LI c o o r oo e Grade 3 Temporarily demolished OI OI .I O O CI OI OO afte Wholly demolished OI U El O LI LI LI L LI L r Hous Partially demolished O OI OL []I El L LI El L expi ing rati Grade 4 Temporarily demolished LI OI OI OL C LI L LI L LI on/i Wholly demolished LI O O O CI El LI D El LI LI LI Ileg Partially demolished O O LI LI LI LI LI L LI LI OI sau Grade 5 Temporarily demolished OI OI LI LI Li LI OI CI LI LI LI El ctur Wholly demolished LI 11 OI OC LI LI O O OI OI e Partially demolished OI OI O O LI L L L L LI Grade 6 Temporarily demolished LI LI o oI cI o oI u L LI o o Wholly demolished LI LI L LI LI LI LI LI El LI LI LI Partially demolished El LI LI L LI LI CI OI OI OI OI OI subtotal Temporarily demolished OI LI DI O OI OI El L1 O OI O El Wholly demolished LI L1 LOI O [' O E [l O no Partially demolished n]I n oI u cI o LI no page 17 of 50 r F Cost estimate of cor enstion for tly-affeated-hous i Po rig dential-plot,hi expiration, shared by this project for Xilang project (pipe net, o] n] L] O O] ]F nF El o] El El O] [I UQ Frame structure Composite structure Brick and timber structure quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price Grade I Temporarily demolished a o o Fo 11 o] o] El o] o] o] Wholly demolished O] F] L] F] O] DI O_F L] O LO Temp Partially demolished El C O O] O O] F] El F F] F] orar Grade 2 Temporarily demolished O O F] O F] LI O] O LI DI o F stro Wholly demolished El LI F] F F El LI F F El F O] ctur Partially demolished F] F] F] O F] F] F F] F El F] e Grade 3 Temporarily demolished O L F] O] L] L] F] F] F] LI F O afte Wholly demolished LI F] F] F] F] F] ,] F El El F FO r Shop Partially demolished F F F F F F F F F F F O rati Grade 4 Temporarily demolished O O] LI F] O O O F] on/i Wholly demolished _______ _____ F F F] F F 1leg Partially demolished LIOLI O F] LI F] Salru Grade 5 Temporarily demolished F] F F F] F] F] stru ctur Wholly demolished O___ _ El O O] F] E L] F O e Partially demolished O_ LI F] O L ] O O O D Grade 6 Temporarily demolished O . ] O O F] F] O] O] n F] El F Wholly demolished O EJ F] O O] F] F] LI El F F] Partially demolished FF F] LI F] F F] F] O F] VI F subtotal Temporarily demolished O] LI El F] F] O O O O O O Wholly demolished O O] O F] F] ] F F LI Partially demolished F] O ] O ] O F] ] ] O F O Grade I Temporarily demolished El F] LF] I F] F F F F F] O] F Wholly demolished O] F] L F F] O O] L] El F] F] O Temp Partially demolished El F] F] F Li F F] F] F] F F] F] orar Grade 2 Temporarily demolished O] O C El F] L I O El O O O F] y Wholly demolished El O] O C] El El F F] st ru ctur Partially demolished O] O] O F] L] O] O] OL e Grade 3 Temporarily demolished Li El F] nF Li F] El LI F] n] afte Wholly demolished I O F] LI F l O i O O r Offi Partially demolished ] ] ] ] O O O O expi ce rati Grade 4 Temporarily demolished I F1 i ] EL . l O O O O page 18 of 50 __ Cost estimate of compenstion for permanently affected house with Property right,housc on residential plot,hi expiration, shared by this project for Xilang project (pipe neti F] F] F] F] F] F] I] nlU o o] n] o] [o u] oo Frame structure Composite structure Brick and timber structure quantity Floor area Unit price |Total price quantity Floor area Unit price |Total price quantity Floor area |Unit price Total price on/i Wholly demolished O___ O F O] F] O] El O] O] L] lleg Partially demolished O] O O O] F] F] F] F] F F] F Fl al Grade 5 Temporarily demolished F] El LI F F] FF LI F F] F] F ctur Wholly demolished F] F] F F F] ]F LI F] F] F e Partially demolished ] LI F LI [] F] F F F Grade 6 Temporarily demolished F] O O F] O El F F] O] O] F] Wholly demolished O O F] LI ] O] F] F] O O] F] ° Partially demolished El LI F] F] F F F] FO O F] n F] subtotal Temporarily demolished F] El O L] ] ] ] F] F] FO Wholly demolished F] F] O] ]] O] O LI O] F] F] Partially demolished F] . F F] F F F] El___ _ _ _O Grade 1 Temporarily demolished F F F F El I] F] _ _ El _ _ _ O Wholly demolished O O El O F] O F] ° O O Temp Partially demolished F ] F] F F] F F _ _ _ _O orar Grade 2 Temporarily demolished FF F F] F] [] F] _ _ _ El _O stru Wholly demolished FF F] F F] F] Fl El _ [_ I _ _ _O ctur Partially demolished F F] FF F] F] _ _ _ _ __ e Grade 3 Temporarily demolished OF F] El F] O_ O O_ _ _O afte Foct Wholly demolished El F] F F]O]F LIO O OOOO r ory PartiaLly demolished O O O O O O O O expi buil rati ding Grade 4 Temporarily demolished El F F F F F F _ _ _ _O on/i Wholly demolished __ _ LI _ _ _E l _ _ -O_ _O 1leg Partially demolished _ _ _ _ _ El ___ _ _ _ _ ___ al Grade 5 Temporarily demolished F] F F] F E] LI F _ LI _ _ __ _O ctur Wholly demolished O_ LI O_ ______ _ _ _ _ _ e Partially demolished O_ O_ O_ O_ L_ O LII __ O _ LI _O Grade 6 Temporarily demolished F] F] F] o o] LI o El o [oI o_ o Wholly demolished O O O_ LI LI O_ O O OEO_l1 Partially demolished O LI l O O O O O O O O subtotal Temporarily demolished L1 ] ] ] ] ] ] ] ] ] O F Wholly demolished ] ] ] ] ] ] ] O n ] o F page 19 of 50 __ _ Cost estimate of r.ompenrtion for permanently affected house with Property right, house on residential plot, hi expiration, shared by this project for Xilang project (pipe neti Frame structure Composite structure Brick and timber structure quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price Partially demolished O LI O O O O O] O [il O] OU Grade 1 Temporarily demolished n o U o o o o o o U U U Wholly demolished U U U U U U U U U U U U Temp Partially demolished U U U U U U U U U U U U orar Grade 2 Temporarily demolished U U U U U U U U U U U U stru Wholly demolished O U U U U U o U U U U U ctur Partially demolished U U U U U U U U U U U U e Grade 3 Temporarily demolished U U U U U U U U U] U U U afte Othe Wholly demolished U U U U U U U U U U U U rxpi r Partially demolished U U U U U U U U U U U U rati uses Grade 4 Temporarily demolished U U U U U U U U U U U U on/i Wholly demolished U U U U U U U U U U U U Ileg Partially demolished U UIU UIU UlU U U U U U al Grade 5 Temporarily demolished U U U U U U U U U U U U st ru ctur Wholly demolished U U U U U U O] U U U U U e Partially demolished U U U U U U U U U U U U Grade 6 Temporarily demolished U U U U U LU U U U U U Wholly demolished U U U U U U U U U U U U Partially demolished U U U U U U U U U U U U subtotal Temporarily demolished U U U U U U U U U U U U Wholly demolished U U U U U U U U U U U U Partially demolished U U U Li U U U U U U U 0 Grade 1 Temporarily demolished U U U U U U U U U U U U Wholly demolished U U U U U U U U U U U U Temp Partially demolished U U U U U U U U U U U U orar Grade 2 Temporarily demolished U U U O U U U U U U U U y Wholly demolished U U U Ub U U U U U U U= st ru ctur Partially demolished U U U U U U U U U U U U e Grade 3 Temporarily demolished U U U Li U U U U U U U U afte Wholly demolished U U U U U U U U U ayrn; tolta Partially demolished U U U r U U U U U U U Li page 20 of 50 Cost estimate of com enstion for permanently affe.te house with Property right,house on residential plot,hi expiration, shared by this project for Xilang project (pipe net, Li Li Li Li Li Li Li uI oi u oi ui oi u El Frame structure Composite structure Brick and timber structure quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price rati Grade 4 Temporarily demolished El Li LI 0 Li i Li L LI LI Li L on/i Wholly demolished El Li Li Li O O Li O n Li L Li lleg Partially demolished Li O El Li O Li Li Li El L Li Li al Grade 5 Temporarily demolished Li Li 0 El El Li O [I LI Li 00 ctur Wholly demolished I I LO LI U Li Li Li O e Partially demolished i i i o i i n Grade 6 Temporarily demolished i L i Li i O L L O O i Wholly demolished Li El Li O Li L LI oi [I El L Li Partially demolished L Li O Li O Lii LI Li subtotal Temporarily demolished O O Li 0 O i Li 0 i 0 Wholly demolished Li Li Li El Li o Li o oi o Li El Partially demolished O Li Li Li LI O Li Li L1 O L Li Grade 1 Temporarily demolished Li Li Li Li 0 El El Li O Li 0 Oi Wholly demolished Li OL Oi Li Li nL El Li Partially demolished O i O L L O Li L LL L Li Grade 2 Temporarily demolished II Li Li Li El Li LI LI o Li o oo Wholly demolished El L El Li Li LI o Li o Li Li oo Partially demolished Cl El El El O Oi Li Li Grade 3 Temporarily demolished Oi Li LI Li n oi o Li Wholly demolished i O O O O Li L L El L Tota Hous Partiallydemolished L O O LL L Li L Li El I ing Grade 4 Temporarily demolished Li I I U i 0 i Li Li o o Wholly demolished IiI Li Li L El Li n o Li u El Partially demolished n DI Li Li o Li L 1.00 15.64 2,130.00 33,320.75 Grade 5 Temporarily demolished Li LI Li Li 0 El Li 0 El 7.12 450.00 3,206.01 Wholly demolished Li L Li L i Li L Li L L Li Li Partially demolished Li L Li Li Li L Li Li Li Li Li Li Grade 6 Temporarily demolished Oi Li 0 Li O Li n i El o o Li Wholly demolished OL Ui Li Li U Li Li Partially demolished L O Li C O Li Li 1.00 15.64 2,130.00 33,320.75 subtotal Temporarily demolished L1 O 0 C O 0 C n n 7.12 450.00 3,206.01 page 21 of 50 r , ,- Cost estimate of compenst ion for permanentIy i ffBeted house-withrYxoperty-right-,-house-on-resi-dential-plot, hi expiration, shared by this project for Xilang project (pipe neti o LIo lLI LI[c E oU U LI oli o oo Frame structure Composite structure Brick and timber structure quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price Whollydemolished E E° U [ O] El ° El [ EO U ElO Partially demolished U U U L El E] El U E U U I] Grade 1 Temporarily demolished O Ol O O LI O EL O O O O n Wholly demolished O O O O O O U L E El U Partially demolished U El U U I LI I l U E U O Grade 2 Temporarily demolished O U U U l U El U E U lI O Wholly demolished O U El O Ci LI El E] El I Partially demolished Ol El Ol E Cl U U U U Eli Grade 3 Temporarily demolished E O E O U EC E E El E U O Wholly demolished Eli U l ] l LI El El] I] E U El ota Shop Partially demolished O O O O C U U U L U E O Grade 4 Temporarily demolished E E Ell E] Eli Wholly demolished O O O El O O E LI O O Partially demolished O O l O C O O O OI [ O Grade 5 Temporarily demolished O O U U ElO E EC U U U O Wholly demolished E O Ol LI E O LI El E El O Partially demolished [ E E [ E E E U E E LI Grade 6 Temporarily demolished l E U O ] E E U E U U O Wholly demolished O Oi O O l O LI O E O O Partially demolished O O O O C ElO ElO O O E subtotal Temporarily demolished Ol EO O Ol C U El U U E Wholly demolished El O El O C U l U E O Partially demolished U U E U EC l El l El Grade 1 Temporarily demolished LI Oi Oi O [Ci Eli E E] Wholly demolished O O U l l E O O O ElO Partially demolished U U U U U U L1 U U U U O Grade 2 Temporarily demolished U U UU U U U U U Wholly demolished O U LU U U U U U U U Partially demolished UU U U Cl U U U U U Grade 3 Temporarily demolished U U U E C U U U U U U Wholly demolished U El UI Li U U L1 U U U U page 22 of 50 ,- ,. ..~~~~~~~~~~~~~~~~~~~- Cost estimate of coTnpenstion- £or Dernanently affected house with Property right, house-on--residential-plo-t, hi expiration, shared by this project for Xilang project (pipe neti o oi ui ni oo LI1 LI 0i 0i ni oi ni ni Frame structure Composite structure Brick and timber structure quantity Floor area Unit price Total price quantity Floor area |Unit price Total price quantity Floor area Unit price Total price O L a VTTT Partially demolished Oi O Oi Oi Oi Oi Li Li LI El n oo ce Grade 4 Temporarily demolished Li LI Li n oi n] o o o Li o oI Wholly demolished O Ci Li Li [] Li Li Li [i Li Oi L Partially demolished OI Li L LI Li L LI Oi L l Li Li Grade 5 Temporarily demolished Oi Li Li LI Li Li Li Li L L Li Li Wholly demolished Li Li L Li Li El Li Li El El Li O Partially demolished Li L L Li L L Li O LL L O Grade 6 Temporarily demolished LI L Li Li Oi OLL O O O OO Wholly demolished Oi C Li Li Li LI L L O Partially demolished O O O L1 O O L]L L L L Li subtotal Temporarily demolished O El n L LI ou1 l Li o Wholly demolished El Oi Li Li o Li oI i o o o Partially demolished O O O i i C O O [I O C Grade 1 Temporarily demolished O El Li Li o o o o o o Wholly demolished OE LL Li ni o El o c oo Partially demolished O O n i o Li El o o o Grade 2 Temporarily demolished Li Oi Oi Li LI C El Li L El L L Wholly demolished El O 1[1 O i O O OL O O Partially demolished i O i n l o i i El o o Grade 3 Temporarily demolished O Li LI LI Li i Li Li O Foct Wholly demolished i Li LI O Li L L L O Tota ouril Partially demolished O L LI L i Li Li o o o ding Grade 4 Temporarily demolished Oi O O [1 n o oi o o Li oi c Wholly demolished Li oi o rL Li Li Li L L LI o El Partially demolished Li Li O n oi Li El oi o El Li o Grade 5 Temporarily demolished Li Li Li LI O O El O O El L Li Wholly demolished El O LI LI 1 L Li Li L Li Li Li Partially demolished II Li Li Li C Oi Li Oi O Li Oi C Grade 6 Temporarily demolished LI n LI [I ni c Li oi LI Li o oo Wholly demolished O O Li C El L Li Li Partially demolished Ll LI El [i DI El DI LO page 23 of 50 r - _ Cost estimate of compenstion for permanently affccted house with Property right,house on resideial ploL,hi expiration, shared by this project for Xilang project (pipe netu [ ] L[ [[ OOlO LIU El LI oU n u El Frame structure | Composite structure Brick and timber structure quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price subtotal Temporarily demolished LU El LU El LU L L] OU OU L LU LU Wholly demolished L El LU LU LU LU LU LU LU LU LU L Partially demolished L L LU L LU L L LU L L Grade 1 Temporarily demolished L L LU LU L El OL L LU LU L LU Wholly demolished LL El LU LU LU LU LlU L L L U Partially demolished L L LU L LU LU LU LU L LU L Grade 2 Temporarily demolished L LU L El LU L LU L L LU L L Wholly demolished LU LU L LU LU L LU LU LU L n L Partially demolished L LU L LU L LU LU L L L L L Grade 3 Temporarily demolished L LU Ol L L L LU L LU LU L L Tota Othe Wholly demolished El___E_ LI______ _ LI __ LI_ r Partially demolished LU LU LU [21 O LU LU El LU LU L LU uses Grade 4 Temporarily demolished LU LU L L LU LU LU LU LU LU L LU Wholly demolished LLUUL LlU L L L L LU LU Partially demolished LU LU LU lU El LU LU L LU Grade 5 Temporarily demolished U L L 0 L LU LU L LU L L Wholly demolished El LU LU El El LU LU LU L LU L L Partially demolished LU LU LU L LL LU LU L L LU L Grade 6 Temporarily demolished L L LU LL LU LU L LU LU LU L Wholly demolished LL OL LU LU L iL LU LU iL L LU Partially demolished Ll LU L LU LU L L LU L L subtotal Temporarily demolished L LU LU L L L LU L L L L Wholly demolished L L LU L LU LU L LU L L L El Partially demolished El El L L L L LU L L LU L L Grade I Temporarily demolished LU El Ol LU LUL L LU L LU LU LU Wholly demolished LU LU L LU L LU LU L LU L L LU Partially demolished LU L L LU L LU LU LU L L LU L Grade 2 Temporarily demolished L LU L El L L OL LU LU L L LU Wholly demolished El LU L LU LU L LU LU L LU L L Partially demolished nL L L [l L LU LU L L ol L oL Grade 3 Temporarily demolished [l El [I1UL LU LU LU LL El page 24 of 50 Cost estimate of compenstion-for-permanently-alieuted-house witl Property righf,house-Gnur r e pot,hi expiration, shared by this project for Xilang project (pipe nets [ [n [ [o [ [u [o o [o [o [2 [2 [o [2 [ Frame structure Composite structure Brick and timber structure quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity |Floor area Unit price Total price Wholly demolished [[ [ [O [2 [I [2 [2 [2 [2 L[ [2 Tota tota Parially demolished [ [2 [2 [ [2 [2 [2 [2 [2 [2 [ Grade 4 Temporarily demolished [ [2 0 [20 [ 0 0 [2 [ [ [ Wholly demolished [[ [2 [U [2 [2 [2 [2 [2 [2 [ [2 Partially demolished [[ [2 [ [2 [2 [2 [2 1.00 15.64 2,130.00 33,320.75 Grade 5 Temporarily demolished [ 0 [2 [2 [ [2 [2 [2 [2 7.12 450.00 3,206.01 Wholly demolished [2 [ [2 [[ [ [2 [2 [2 [2 [ [2 Partially demolished [2 [2O[2 [2O[ [2[ [2 [2 [2 [2 2 Grade 6 Temporarily demolished [2 [2 [2 [2 [2 [2 [2 0 [2 [2 [ [2 Wholly demolished [2 [2 [2 [ [ [ [ [2 Partially demolished [ [2 [ [ 1.00 15.64 2,130.00 33,320.75 subtotal Temporarily demolished [ O O [ O [ [ [ [2 7.12 450.00 3,206.01 page 25 of 50 -stor-i c r used house,temporary strutur befGre- rork) Oi Li Oi L1 Attached table:R40Wf 18.1.3AC Simple structure Total quantity Floor area Unit price Total price quantity Floor area Unit price Total price Li L Li LI Li LI Li Li o o o ~~~~~~~u o1 El n o oi Li oi oi oi o o o oi oi Li = L LI L oi -i oi Li El o LI oi oi oi oi Li o oi El oi Li oi Li oi Li L LI oi Li o L i L i L i L i L i o L i o L i o Li Li Li o L i o i L i , Lo L Li o Li o Li Li Oi Li 0 1.00 15.64 2,130.00 33,320.75 o LI o Li LI 7.12 450.00 3,206.01 i Eli El Li El LI Li LI Li Oi LI Lri El O O Oi Li Li Li Li L Li l i- L LiOLi El Li 1.00 15.64 2,130.00 33,320.75 Oi Li Li Li Li 7.12 450.00 3,206.01 Oi Li O L Li Li Li O Li Li L Li LI L]I .Li L ij Li LI Li Li Li Li Li Li Oi OI LI ICI Li Li Oi LI LI Oi Li LI Li Li El El LiL Li Li Li LI Eli Li LL Li LI LI El Li Li Li LI ____ Li LI page 26 of 50 0S jo LZ aBud Li LI LI Li Li Li Li D Di LI El LI Li LI LI Li Li LI EJ LI LI Li Di L Li 1 LI LI LI Li LI LI Li El Li LI Li Li LI Li Li Di Di Di Di Li Li Li LI LI Li Li Li Li Li Li LI Li Li Li Li LI Li Li Li Li LI Li Li Li Li Li Li LI Li Li Li Li LI Li i Li Li Li Li LI Li Li LI LI Li LI Li L Li D LI LI Li LI o Li n LiLI Li Li Li LI Li LI LiLI Li Li LI Li Li LI LiL Li Li Li D LI Di Li Li Li LI Li Li Li Li Li Li L Li LI Li Li L Li Li Li Li Li L LI Li Li Li El Li LiL LI Li Lii LILi ILi DiL LI Li LI Li EJ LI i Li Li D Li Li Li Di LI Li Li LI Li Li LI Li Li LI Di L Li Li Li Li LI Li Li Li Li LI Li Di i Li El I ajud juloj aaud J!UHl uaze jooLI Xrnauinb aoud juiojL oj!d ! Ufl .az iooia !un Iulo1 aini nrs 8UlUwis o Li o Li o o o C o o o o~~~~~~~(JO __~ ~ -o Xaoe oIl3fI1 AiIdo J.'os -p9Sfl-- o 1 storically used housetemporary structure--bef-r- rork) LI O O Oi Attached table: PftfI5ftf18.1.3AC Simple tructure Total quantity Floor area Unit price Total price quantity Floor area Unit price Total price O ,0 O O1 C O El O O Li El L]I L LIE LI i Li i Li Li Li L LI Li Li oi Li LI L LI LI Li o Li Li Li~ ~~ Li LI Li, Li Li El El Li Li LI o Li Li Li Li L Li LI LI Li Li Li Li Li LI Li Li Li Li Li Li LiL i El []IL o~ ~ ~~pg o2o of oo Li o Li Li Li Li o Li Li o Li Li LiLiL Li o~ ~ ~~pg 28o of 50o 7storically usemrusetumomrw tructretnwF rork) O [O OI Ol Attached table:If tA 18.l.3AC Simple structure _ _ Total quantity Floor area Unit price Total price quantity Floor area Unit price Total price LI L] I] [] LI El L] E C] El O] Ol EL L] O [- El El El El El El El El El El El El El El El I] El El ElI El El El El El El El El El El El EL El El El El ELI El ELI El El El ElElE El El El El El El El El EI El ELI El El El El El El El El ELI El El El E El0 El.6 El300 El32 7 ELI El El ELI El El El.0 El060 El E El El El El El El ElE ELI El El El El El o~~~~~~pg o2o of n n o El El El El [o EL El El El El El El [o El El El o ~ ~ ~ ~ pg 29o of 50on _ --storically u-lsed house, temporary-structure-before------- ---- - rork) U O O] O Attached table:e4 W 18.1.3AC Simple structure Total quantity Floor aea Unit price Total price quantity Floor area Unit price Total price O O O O 1.00 15.64 2,130.00 33,320.75 o o o o n 7.12 450.00 3,206.01 UO LU U U L] U U] U0 O1 LI O El LI O Li O1 0~~~~~~1 o LI L 1 o f ] o Eol U U U U [1 U U U o 0 o Lg o1 o Fl X o El o []I o Li El o o o .D o LI LI o o o o1 LI o o2 o ] o1 o LI L1 o o LI o1 o1 o 0~~~~~~~~pg 30o of o o0 U1 U U U [1 U U U U U U U US U U U U UJ U U U U U U U~ ~ ~~pg U0 Uf U 50U U storically iuse4 house, temporary structure before--- rork) [O Li Li LI Attached table:ItWt1l8.1.3AC Simple structure Total Floor area Unit price |Total price quantity Floor area Unit price Total price Li LI Li~~1 [] Li El Li Li Li LI Li, El L i Eli LI O LI I] I Li LI Li LI LI I L Li Li Li LI Li LI LI Li LI Li Li Li Li Li i Li Li LI Li1 Li Li oi LI oL ni Li Li Li Li oL LI Li L Li Li Li, PI oi LI o E LI o o Li E c Li oL b Li Li o1 o o c DI n Elo LI LI ij El Li Li Li Li El Li []I Li ij LI Li Li Li Li Li Li Li Li1 Li LI Li Li O Li Li n Li o Oi Li Oi O Li Li L O Li Li El L O E l Li Li EJ Li Li i Li Li Eli Li Liol o ul Li i Li, Li LioLi l LI Li Li o LI bi I Li OLO LI LI I Li Li Li Lp 3 1 o Lf oi oi Li o Li Li Li u o oi o Li o L ni oi u Lio oii L L Li Li o page 31 of 50 _ ~storically used house, temporary structure beforce rork) El LI LI U Attached table:I IWWl8..3AC Simple structure Total quantity Floor area Unit price Total price quantity Floor area Unit price Total price LI Li Li Li L LI Li Li Li Li Li Li LI LI El Li Li Li Li Li Li Li Li ~~~~~~~~~~~~~~~~~~~~~~Li Li Li Li Li~~~~1 Li Li Li LI O~~~~~~~~~ O1 O1 O O O O Li LI Li Li Li Li LI Li Li Li Li Li i [LI LI Li Li Li Li Li Li Li Li~~~~~~~~~~1 LI Li Li Li Li Li Li Li Li Li Li [LI LI Li Li Li Li Li Li Li Li Li~~~~~~1 LI Li L LI Li Li i Li Li LI LI LI Li Li El Li Li Li El Li L El Li Li El Li Li o~ ~ ~~pg 32 of u o o o Li o Li o Li Li Li o Li Li Li Li Li Li o Li Li Li Li Li Li n o Li Li Li o Li u o Li o ~ ~ ~~pg 32o of 50g o ~storically used-housc-temporary structure before-- - - rork) Oi Oi Oi OI Attached table:NWARM18.1.3AC Simple structure Total quantity Floor area Unit price Total price quantity Floor area Unit price Total price Li Li Li Li ~~ ~ ~~~Li Li Li Li Oi O GI Li Li LI On El LiL Li Li Li Li Li LI LI Li Eli LI i El Li LI Li LI Li Li Li Li El Li i O Li Li Li Li Li Li El Li Li Li Li L O Li L Li Li LI [LI LI Li Li Li Li ~~ ~ ~~Li Li Li Li Li Li Li Li L Li Li Li Gi Li Oi OL Li Li Li G~ ~ ~~pg n3o of o o o Li Li Li o Li Li LiL n ~ ~ ~~pg 33o of 50o o storically used house temporary strmetiure before rork) oi Li a n Attached table:Ifff*t*18.1.3AC Simple structure _ Total quantity Floor area Unit price Total price quantity Floor area Unit price Total price O L LI Q O] L1 Li O] Oi LI Oi O 11 Oi OI LI LiL L2 Li Li IJ Li Li i o X o 0 LI Lo LI LI i L]I LI oi o oi oi Li Li Li Li Li Li LI Li Li El Li Li Li Li LI Li Oi O OL Li Li L1 Oi Li Li Oi O L1- O Li Li O Li Li Li Li o i Li n i Li X Li Li Li Li~~~~~1 Li Li LI Li Li LI Li El Li Li Li Li [il Lit L ll. LII Li Li o~ ~ ~~pg o3o of o o o oi oi oi o o o Li o oi oi ni oi o o o o o~ ~ ~~pg 34o of 50o o £ torically l d-AL house,-temporary--structure- before--- rork) L O O O Attached table:[Rtl8.1.3AC Simple structure Total quantity Floor area Unit price Total price quantity Floor area Unit price Total price I] [i ] [I Li1 [i F] Li I] Eil Li Li L1 I] Li Fl LiL L LIi I I i Oi Li Li L- LI l LI ci rL ri ri LI rLi Li Ci Li Li ~~ ~~li Li LI Li Li L LI Li Li L] Oi LI Li O Li Li LI Oi Li D Li Li LiL El Li Li Li LI Li LiL Eli Li LI Li Li Li El Li ri r Li Li Li Li Li ij Li LI Li Li LI Li Li Li L]I Li L LI LI ILi El Li Li L Li LI Li LI Li Li Li Li Li~~~~~~~~1 LI Li Li o ~ ~ ~ ~ pg 35 of n rr Li Li Li Li Li Li Li Li Li Li Li Li Li Li oLi r u Li Li Li Li o Li o Li Li Li Li Li Li Li o Li Li o Li Li o n Li Li Li o~ ~~~pg 35o of 50o storically used house,temporarystruture-before---- rork) o U o U Attached table: Pf4If4fAl8.1.3AC Simple structure | Total _ quantity Floor area Unit price Total price quantity Floor area Unit price Total price O~~~~1 C O O1 O O O O U U U U U U U O1 O1 OI O O LI El O O U U U U: U U U U U U U U U U [] 0 1 11 El 11 11 O U U U U U U U U Uo U U U U U U U Uo U U U U U U Uo Uo U U U U U U U Uo U UoU U U U U Uo U U U U U U U U U U U U U U U o o o o o~~~~~L ol o1 o DI LI o1 LI o o o o~ ~~ ~pg c3o of o o o U U U U U U U U U U U U U] U U U U U U U U U U U u U U U U U U U U ~ ~ ~~pg U6 Uf U 50U U .~~~~~~~~ U U; - -~~ -stor-ical-ly--u-sed- house, temporary strLucture -before - rork) LI El Oi Oi Attached table:WA M18.1.3AC _Sim_le structure Total quantity Floor area Unit price Total price quantity Floor area Unit price Total price Li LI Li Li Li Li Li Li oi Li Li LI oi ui o un LI ci ci ci ri ci o oi Li Li Li Li Li L LI Li Li L LI Li Li pi LI Eli Li Li Li Li~~~~1 Li Li LI Eli Li Li Li Li Li~~~~~~~1 Li LI Li Li L Li Eli Li Li LI Li Li LI LI Li Li LI Li Li LI Li Li Li Li LI Li LI LI Li LI, Li Eli Li Li Li Li Li Li Li Li L LI Li i Eli Li Li ij []I Li LI c ~ ~ ~ ~ ~~~ o El El c1 n Li LI Li Li LI LI LI Li Li Li Li Li LI LI Li Li Li Li Li Li Li LI Li Li Li El LI LI Li Eil Li page 37 of 50 storically used house,ttemporary lIuctur- before- rork) Oi O] Li L] Attached table:Rft IWtfI18.1.3AC Simple structure T otal quantity Floor area Unit price Total price quantity Floor area Unit price Total price El n El n o] ] L[ Eo O t] LL i LI Oi LI L oi oi Qi O O Li O Li oi ni oi o] o o o Li Oi L] L Oi Li Li OL Li O L] Oi Li Oi Oi Oi Li Li El L LI LI L Eli Li Li El Li Li LI Li El Li Oi El LI 1- Li O O L LI El Li LI I Li Li Li Li Li~~~~~1 U] Li Li Li Li LI Li Eli LI Li L Li Li Li L LI Li Li Li Li Li LI i Eli Li LI Li i Li Li LI i Eli Li Li Li LI Li Li U] Li LI LI Li Li i Li Li pi Li Eli Li i Li Li LI Li Li Li Li Li L Li LI Li LI Li LI Li LI, Li Li L E] Li page 38 of 50 .stor-icall-y-u-sed-house, temporary -stnictulre before- rork) LI [1 Oi Oi Attached table:I t5fIt 18.1.3AC Simple structure Total quantity Floor area Unit price Total price quantity Floor area Unit price Total price Li Li Li Li~ ~~ ~ ~ El LI LI Li Oi O O Li OI LI L Oi Li El Li Li LI Li El Li Li Li Li Li Li Li Li LI Li Li Li L LI []I Li Li o oElooo o Li Li Li L o Li Li El El El oi Li L] o oi o Li Li Li oi o o L oi o Li n Li Li o Li 11 o] DI o1 o DI o o LI Li LI, Li Li LI, Li [ Li Li Li Li Li Li El LI Li L LI Li Li Li L Li LiLiL El Li LLi ILi El El DI o o o o1 o o~~~~ ~pg o3o of o o0 oi Li L Li oi o Li o oi Li oi o o o Li o Li Li o L Li Li o Li o Li Li Li L Li Li Li Qi Li o o L Li Li Li o ~ ~ ~ ~ pg 39o of 50oa storcaly usd hus e,temporary structure--before~ rork) oi oi oi ni Attached table:IW At 18.1.3AC Simple structure Total quantity Floor area Unit price Total price quantity Floor area Unit price Total price Oi Li Li LI OO LI Oi O Oi [] Li Oi Ui 1 LI O Oi O O l LI Ui LI LI Li Li LI Li Li El Li Li El Oi LI O O 0 i OO oi Li Li n Li o Li LI Li El O Li Li Li LI Li O Li Li [L O Oi LI O~~~~~~~~~~~~~E ,1 - 11 O OO Li L Li Li L [i Li LI Li L Li Li El Li Li LI Li Li Li~~~1 Li Li Li Li LI Li L Li El El Li LI Li Li L RI Li LI El LI Li Li Li Li Li Li LI Li LI Li Li Li Li Li Li Li~~~~~~~~~~~~1 LI Li Li Li Li Li Li LI Li Li El Li LI Li Li LI Li LiL El I Li El LI Li page 40 of 50 ~stxrica1-1y-used house, temporary structure -before---- rork) o L u n Attached table: [ 13fItl8.l.3AC Simple structure Total quantity Floor area Unit price Total price quantity Floor area Unit price Total price O LI Oi O O O LI Oi Oi Oi Oi I] L] LE O LI ni oi oi oi u o o Li LiOLi LI Li PA LI Li LI LI O LI O Li DI Li Li Li Li Li LI n Li Li L Li Li Li LE LL LI Li Li Li Li L O O Li Li Li Li Li Li LI Eli i Li LI Li Li El Li LI Li Li o Li Li Li Li Li Li Li Li OLO L n Li Li Li Li Li Li Li Li Li Li Li Li Li O Li Li i Li Li Li Li Li Li Li LI O Li O Li Li Li Li Li Li O Li Li Li O Li L Li Li Li Li Li O Li L Li Li Li Li Li Li OL Li page 41 of 50 4 ~~~~~~~~storically used house, temporary structure before rork) n El oi oi Attached table:RI Ptt 18.1.3AC H z Simple structure Total quantity Floor area Unit price Total price quantity Floor area Unit price Total price Li L 1i LI Li LI Li L-I Li L ni Li Li Li Li LI Li L LI Li Li Li Li Li Oi Oi Oi Oi O O O Li Li Li Li O Li Li Li O Li Li Li O Li O Li Li ni Li o Li o o Li Li Li LI Li Li Li Li LI LI Li LI LI Li LI o n o Li Li Li Li Li Li LI Li ED Li Li EJ LI Li i Eli Li L [LI Li Li LII Li Li Li L Eli ] Li Li Li Li Li Li Li LI Li Li Li Li Li Li El Li Li LI Li Li Li Li Li Li Li Li Li LI oi Li oi LI n Li Li LI page 42 of 50 stoicaly uzA huse teporrystructure before - ork) U I1 0 0 Attached table: lWAR 18.1.3AC Simple structure Total quantity Floor area Unit price Total price quantity Floor area Unit price Total price U __ LI El I LI U1 [ o 1 o LI n o o n o El o u 0 El 1 0 0 c1 U U U U~~~~~~~1 U Ul U U U U U U~~~~~~~L U1 U UI U o o1 o n o1 LI o o o LI o o1 o c1 o 1 LI o o< E o LI LI n Do o I n o o o o ~ ~ ~ ~ pg o4o of o c o U U U U U U U U c U U U U U U] U U U U U U U U U~~ n U o U U U U U o U U U U U U U o U U U U U u U U U U U U U U U U U U u U U U U O_ O U U1 U U U U U U U U U U U U U U U U U U U U O U U U U U U U U U U U U U U U U U U U U U U U U ~ ~ ~ ~ pg U3 Uf U 50U U to-rically used house,temporary struicture before rork) o n] o Attached table:Rtl18.1.3AC Simple structure Total quantity Floor area Unit price Total price quantity Floor area Unit price Total price O] O] C O U] O] U U] O Li C O L] L UL [] O] O] = C O U] O] U] L o1 n1 o1 u LI In U] O] Li U] U] UL U] Ln U] U] U~ ~ ~~] U]U ] ]U o~~~~~~L o cLo I E o o] UL LI U] o U] U O] U 1- °] °] ° U] C O] U] UL LI O O] U[ O] L] [] U] U] UE L IO O] U] U] ]O El UEl LI U] U] U] U]~~~~~1 LI []I El o~~~~ ~pg 44 of o o c U] O] U] L] O] O C U] U] U] Upage 44 of 50 _storically used- house, temporary structurc bcfore rork) U] Oi Ui Oi Attached table:RIAtRM18.1.3AC Simple structure Total Floor area Unit price Total price quantity Floor area Unit price Total price El O O El O U1 U O Li Li Li Li ~~ ~ ~~~ ~~LI Li LI Li ui oi o o L oi oi o LiL El Li Li Li Li Li Li Li Li ~~ ~ ~~~LI LI I I L LI Li Li Li Li Li~ ~~ ~ ~~ ~ Li Li LI Li LI Li Li Li Li Li Li Li Li Li Li Li1 i Li LI Li Li Li L Li Li Li Li i LiLiL LI Li Li Li LI LiLi Li Li LiI L Li Li Li Li, Li Li Li Eli Li El Li Li Li LiLiL Li Li Li Li Li o o Li Li Li Li oi o u Li o Li Li Oi Li O Li Li Li El O Li L] Li Li L Li Li Li Li Li O Li Li page 45 of 50 _ v~storical-ly--used--house, temporary -struc-ture -before-- rork) oi Li ui r Attached table:PffW A I 18.1.3AC Simple structure | Total quantity Floor area Unit price Total price quantity Floor area Unit price Total price Li [i Li Li Li []~~~~~~~~~~1 Li LI U Oi Oi OI OI [O IO Ui Li Li Li Li Li Li Li L Li Li ED LI Li LI Li L Li Li Li Li LI f] Li Li o oi o o o El LI LiL i Li Li L LI Li Li Li Li LI ij Li LI Li i Li Li Eli LI []I Li Li Li Li LI 1 LI LI Li Li Li Li Li Li o Li Li Li Li Li~~~1 Li LI Li El Li Li Li o Li [] Li oi o Li o Li o Li o Li o Li L Eli [ [i i Eli Li i Eli Li LI Li Li Li El o1 o o1 o3 o n o n Li L Li Li Li Li Li Li -i El Li Li LiL Li LI El Li DI Li 1.00 15.64 2,130.00 33,320.75 Li El Li LI Li 7.12 450.00 3,206.01 Eli LI Eli Li Eli Eli Li Li Li ~~ ~~LI Li 1.00 15.64 2,130.00 33,320.75 LI Li Li L Li 7.12 450.00 3,206.01 page 46 of 50 OS jo Lb a2pd Li Li Li[ Li L El L Li i Ii LI EiLili El Li Li El Li Li Li Li Li Li El Li LI El Li LI LI Li El Li LI Di Li El LI LI El LI Li LI Li L Li Li Li El Li LI Li El LI Li LI Li El El LI LI Li Ii Li Li LI Li El LI Eli LI Li Li LI El Li Li Li i Li Li Li Li LI Li LI Eli LI Li Li LI LI Li Eli L: Li LI LI Li Li LI o L L LI Li LI LI LI Li L Li LI Li o oi Li LI Li LI Li Li Li Li LI Li Li LI LI LI Li LI Eli Li LI Li Li LI Li El Li Li Li LI Li Li El Eli Li EJ LI Li Li El LI Li LI El Li LI Li El Li Li Li Li Li Li Li~~~~~1 Li Li Li L Li Li -i Li L El Li LI Li LI L Li LI Li LI LI Li LI LI Li LI LI El Li Li LI Li LI Li Li FL Li LI Li El Li LI Li LI El Li Li Li LI El Li Li Li i Li Li Li LI LI El LI j,ud juoj azud iiun ra'u -iool4 Apuu~nb aoud pJjoj aoud )!ufl ea 1jOLj Apunb O_ LI L1 El Li -- aOjQqj-At-aInIDThjIIs- A.imiodme~i'so pA-~tI~-- storicall-y-used house,-temporary structure- before rork) V] o cL n Attached table:ftMKft*18.1.3AC Simple structure Total quantity Floor area Unit price Total price quantity Floor area Unit price Total price o V V V V V1 Li V Li V1 LI [i V1 1 V1 V 1 El LI V1 V LI [ LI V LI V VVL LI LI Li V~~~1 I V1 V VI V V V V~~~~1 LI V1 V1 II LI Vl V LI V1 V1 V Li LI V V~ ~~ VI V *V V Li ElV ID 1 V1 Li V1 V V ~~~li Li L LI L V V Li~~1 V V V1 Li o~ ~ ~~ 1 o1 El o] c1 El o Li o V LI oi o o Li Li El Li V Li Li L Li V L1 1Di [IV Li V1 oi oi o o L oi oi o V V V. V V LI V~~~~~~~~~L Li Li Vi Vi El 1 El V1 L Li DI V11 V Li LI V LI page 48 of 50 OS JO 6V aBud LI LI ~~~LI Li L Li LIL LI LI LI LI LI L Li LI LI El IL LI LI LI LI I LILIL LI LI LI LI El FI LLLI IEl LI LI LI LI FL LI LIL LI LI El LI LI LI El El LI LI Li ElI Li ElI LI El 1 LI LI LI LI El LI El LI LI LI L LI Li LI LI El LI LI L LI LI El LI LI LI L1 LI LI LI LI LI LI [I LI El LI LI LI LI LI Li LI LI LIL LI LI LI ElI LIoLI LI LI L O] LL LI LI LI LI LI LI LI El LI LI LI El L LI El LI L o LI L L El LI LI n LI LI LI LI LI LI LI LI ElI Li LI El LI LI LI El LI LI LI LI LI ElI Li LI El LI LI Li LI El LI LI LI LI El El LI Li Li LI LI LI EIl LI LI LI LI [1 LI LI El LI LI El El LI LI LI LI LI LIL LI LI L LI LI LILIL ElI ElI LI I LI LI LIL LI ao!d po oaud ~Iufl ua iool d Apuunolld a ud )!ufl a JO nF Io -I otn1onons oa cwiS ~~~~~~~~azul LI LI 1I LI _____ ajoJaQ eJni~onI1ls Ali~.odMai. 'snog psn AjJoTJoisŽ ___ storically used house, temporary structure -before rork) oI LI nI oI Attached table:I1f4 A 18.1.3AC Simple structure Total quantity Floor area Unit price Total price quantity Floor area Unit price Total price LI L'I El ' o ° L El Lo LI [] Li El i D L Li 0I Oi i0 0 1.00 15.64 2,130.00 33,320.75 0i Li Li OO LI 7.12 450.00 3,206.01 OI Li U] LI Oi O OI Li Li Li Li~~~1 Li L Li Li LI O] Oi Oi Oi Oi Ci Oi Oi Oi Oi Oi Oi Oi Ci Oi Ol 0i Li Li Li 1.00 15.64 2,130.00 33,320.75 0l 0 O0 7.12 450.00 3,206.01 page 50 of 50 I Cost estimate of compenstion for stop-loss shared by this project for Xilang project (pipe network) Attached table 18.3.2.10.1.3AC-1 project area Use Type Total floor area Unit price Total price Grade 1 Shop Partially but permanently affected 168.00 - Grade 2 Shop Partially but permanently affected 120.00 Grade 3 Shop Partially but permanently affected 80.00 Grade 4 Shop Partially but permanently affected 50.00 Grade 5 Shop Partially but permanently affected 25.00 Grade 6 Shop Partially but permanently affected 15.00 Subtotal .__ Grade 1 Office Partially but permanently affected 96.00 Grade 2 Office Partially but permanently affected 70.00 Grade 3 Office Partially but permanently affected 50.00 - Grade 4 Office Partially but permanently affected 32.00 - Grade 5 Office Partially but permanently affected 20.00 Grade 6 Office Partially but permanently affected 12.00 Xilang project Grade Subtotal Grade 1 Factory building Partially but permanently affected 60.00 Grade 2 Factory building Partially but permanently affected 48.00 Grade 3 Factory building Partially but permanently affected 36.00 Grade 4 Factory building Partially but permanently affected 24.00 Grade 5 Factory building Partially but permanently affected 14.00 - Grade 6 Factory building Partially but permanently affected 7.00 Grd I _otheruse ParSubtotal Grade I other use Partially but permanently affected 60.00 - Grade 2 other use Partially but permanently affected 48.00 Grade 3 other use Partially but permanently affected 36.00 - Grade 4 other use Partially but permanently affected 24.00 ' Grade 5 other use Partially but permanently affected 14.00 Grade 6 other use Partially but permanently affected 7.00 ______________ ~~~~Subtotal _ _ _ _ _ _ _ Total I~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Cost estimate of compenstion for stop-loss shared by this project for Xilang project (pipe network) Attached table: 18.3.2.10.1.3AC-2 project area Use Type Total floor area Unit price Total price Grade 1 Shop Temporarily affected 168.00 - Grade 2 Shop Temporarily affected 120.00 - Grade 3 Shop Temporarily affected 80.00 - Grade 4 Shop Temporarily affected 50.00 - Grade 5 Shop Temporarily affected 25.00 - Grade 6 Shop Temporarily affected 15.00 - Subtotal _ Grade 1 Office Temporarily affected . 96.00 - Grade 2 Office Temporarily affected 70.00 - Grade 3 Office Temporarily affected . 50.00 - Grade 4 Office Temporarily affected 32.00 - Grade 5 Office Temporarily affected 20.00 - Xilang Grade 6 Office Temporarily affected 12.00 - project Subtotal Grade 1 Factory building or warehouse Temporarily affected 60.00 - Grade 2 Factory building or warehouse Temporarily affected 48.00 - Grade 3 Factory building or warehouse Temporarily affected 36.00 - Grade 4 Factory building or warehouse Temporarily affected 24.00 - Grade 5 Factory building or warehouse Temporarily affected 14.00 - Grade 6 Factory building or warehouse Temporarily affected 7.00 - Subtotal Grade 1 others Partially demolished 60.00 Grade 2 others Partially demolished 48.00 Grade 3 others Partially demolished 36.00 Grade 4 others Partially demolished 24.00 Grade 5 others Partially demolished 14.00 Grade 6 others Partially demolished 7.00 Subtotal Total Cost estimate of compenstion for business loss due to relocation shared by this project for Xilang project (pipe network) Attached table:18.3.2.10.2. 3AC project area Use Type Total floor area Unit price Total price Grade I Shop Wholly and permanently affected 840.00 Grade 2 Shop Wholly and permanently affected 690.00 xilang Grade 3 Shop Wholly and permanently affected 560.00 l Grade 4 Shop Wholly and permanently affected 450.00 X__ Grade 5 Shop Wholly and permanently affected 350.00 _ Grade 6 Shop Wholly and pernanently affected 270.00 _ Subtotal ___ ** l*M WT*188. 3.2.13AC _dAf-AP M-m _ -#P[ f-t -4_ AC -gm PM7J(AuAl)) %c 200 1 AC q Pj7j(49Aj) V 300 1 AC -9M *A(RR) 100 l 1 0.88 480.00 AC i _ _ _ 200 1 7.72 660.00 0tVJ'it 4 8.60 AC-iF = 4 8.60 flX A2 ~~~~~~~~~~~ ~~~~~~~~~~~~~~~~~~~k2~~~~~~~~~~~~~~~~~~~~~~~~~~~~ 422.49 5,093.83 5,516.33 5,516.33 i2 2 ~~~~ _ Cost estimate of compenstion for temporary land borrowing shared by this project for Xilang project (pipe network) attached table:18.3.2.7.2.3AC Grade I Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Subtotal Area of land borrowed 965.80 1,310.04 2,275.84 Area of cultivated land 96.58 131.00 - 227.58 Unit price for cultivated 6.50 6.00 5.50 5.00 4.50 4.00 31.50 land borrowed Average time of 6.00 6.00 6.00 6.00 6.00 6.00 36.00 borrowing Cost of borrowing - - - 2,897.41 3,537.10 - 6,434.51 Cost of rehabilitation 579.48 786.02 1,365.50 Compensation of Compenstinrop o 482.90 655.02 1,137.92 standing crop ________ Area of land for - - - 869.22 1,179.03 - 2,048.26 construction Unit price for 8.50 8.00 7.50 7.00 6.50 6.00 43.50 construction land Average time of 6.00 6.00 6.00 6.00 6.00 6.00 36.00 borrow ing__ _ _ __ _ _ _ _ _ __ _ _ _ _ _ _ __ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Cost of construction lan - - 36,507.40 45,982.29 82,489.69 page 1 of 1 Cost estimate of compenstion for structures shared by this project for Xilang project (pipe network) Attached tablel8. 1. 2. 8. 3AC unit: m2 project Name of structure Quantity Unit price Total price xilang Step 10.74 60.00 644.52 xilang Step 18.68 60.00 1,120.60 xilang Enclosure wall 1,202.80 80.00 96,224.18 xilang Fence 333.78 120.00 40,053.04 xilang Enclosure wall 2,272.08 80.00 181,766.61 xilang Fence 362.81 120.00 43,537.51 xilang Colonnade 24.82 200.00 4,963.22 xilang Vertical anti-flood wall 260.42 250.00 65,104.14 xilang Vertical anti-flood wall 133.45 250.00 33,362.51 Total 466,776.32 nave I of 1 YfL1A &i Cost estimate of cost for house demolition shared by other municipal g~~~~~~~~~~1 n n) n o o n o o] o nn Frame structure Composite structure Brick and timber struci Quantity | remolsed Unit price Total Quantity Dea Unit price Total Quantity aemoa Unit price Grade I U U U U U U U U 0 Grade 2 8.00 1,684.80 67.00 112,881.29 20.00 884.30 57.00 50,405.20 35.00 3,465.81 43.00 U Xilang Grade 3 5.00 180.52 63.00 11,372.72 1.00 7.27 54.00 392.47 6.00 655.44 41.00 U project Grade4 6.00 1,330.03 60.00 79,801.76 5.00 108.12 51.00 5,514.07 7.00 333.81 38.00 U Grade 5 28.00 5,613.92 56.00 314,379.48 37.00 1,890.22 48.00 90,730.63 31.00 1,122.98 36.00 El Grade 6 U U U U U U U U U U U [1 Subtotal 47.00 8,809.26. 58.85 518,435.24 63.00 2,889.91 50.88 147,042.36 79.00 5,578.04 41.06 page 1 of 2 I for Xilang project (pipe network) |__o _ n_o n o Attached table: 18.1.11.3BD Lure Simple structure Total Total Quantity Demolised Unit price Total area area 149,029.93 8.00 222.70 33.00 7,349.08 71.00 6,257.61 51.08 319,665.49 26,872.89 1.00 12.63 32.00 404.15 13.00 855.85 45.62 39,042.22 12,684.70 7.00 807.89 30.00 24,236.64 25.00 2,579.84 47.38 122,237.17 40,427.38 6.00 71.76 28.00 2,009.23 102.00 8,698.88 51.45 447,546.73 [l [7 [7 [1 [O [7 [ [ [7 229,014.90 22.00 1,114.98 30.49 33,999.10 211.00 18,392.19 50.48 928,491.61 page 2 of 2 Cost estimate of compenstion for historically used house shared by other mu n] F] n] F] F] o] [] F] F] n F] Fn nn Frame structure Composite structure Brick and timber stri Unit Unit Unit Quantity Floor area pnic Total price Quantity Floor area pnce Total price Quantity Floor area prc Grade I Total F] F] F] O O O] O El O] F] ° F] Grade 2 Total 5.00 482.97 750.00 362,228.88 7.00 414.81 700.00 290,369.60 12.00 2,532.37 600.00 F] Grade 3 Total 5.00 180.52 700.00 126,363.51 1.00 7.27 650.00 4,724.19 3.00 473.99 550.00 shietdonall Grade 4 Total 1.00 18.73 650.00 12,171.69 5.00 108.12 600.00 64,871.38 2.00 50.08 500.00 O] Grade 5 Total 5.00 1,411.93 600.00 847,160.17 22.00 841.47 550.00 462,805.94 1.00 18.89 450.00 O] Grade 6 Total O F] F] F] O O] F] F] F] o F] n] Subtotal Total 16.00 2,094.15 643.66 1,347,924.25 35.00 1,371.67 599.83 822,771.11 18.00 3,075.33 589.74 page 1 of 2 nicipal for Xilang project (pipe network) [n El ] F] [] F] Attached table:18.1.2.4.3BD ucture Simple structure Total Unit Total price Quantity Floor area prit Total price Quantity Floor area Unit price Total price 1,519,423.75 24.00 3,430.16 2,050.00 2,172,022.24 260,691.86 9.00 661.77 1,900.00 391,779.56 25,040.49 8.00 176.93 1,750.00 102,083.56 8,500.27 28.00 2,272.29 1,600.00 1,318,466.38 n n n n _ 1,813,656.38 69.00 6,541.15 609.12 3,984,351.74 page 2 of 2 Cost estimate of compenstion for temporary relocation shared by other L, -El OE Quantity Floor area Unit price Grade I Partially demolished - - - Grade 2 Partially demolished 30.00 2,074.14 18.00 Housing Grade 3 Partially demolished 6.00 200.61 16.00 Grade 4 Partially demolished 12.00 1,275.27 14.00 Grade 5 Partially demolished 40.00 2,383.58 12.00 Grade 6 Partially demolished - - - LI .Subtotal 88.00 5,933.60 14.59 Grade I Partially demolished - - - Grade 2 Partially demolished 3.00 89.14 110.00 Grade 3 Partially demolished Shop E Grade 4 Partially demolished - - - Grade 5 Partially demolished - - - Grade 6 Partially demolished 8 10 Subtotal 3.00 89.14 110.00 Grade I Partially demolished - - - Grade 2 Partially demolished - - - Office Grade 3 Partially demolished 1.00 22.28 48.00 Grade 4 Partially demolished - - - O House with Grade 5 Partially demolished House with Grade 6 Partially demolished - - - n, Property Subtotal 1.00 22.28 48.00 right and on residential Grade 1 Partially demolished .. plot Grade 2 Partially demolished 8.00 1,559.39 40.00 Factory Grade 3 Partially demolished 2.00 300.24 30.00 building Grade 4 Partially demolished 2.00 50.08 20.00 Grade 5 Partially demolished 5.00 383.78 10.00 L Grade 6 Partially demolished - - - Subtotal 17.00 2,293.49 27.65 Grade I Partially demolished - - - r Grade 2 Partially demolished O other Grade 3 Partially demolished - - - use Grade 4 Partially demolished 2.00 150.27 20.00 Grade 5 Partially demolished - - - r- Grade 6 Partially demolished - - - Subtotal 2.00 150.27 20.00 Grade I Partially demolished page 1 of 4 Grade 2 Partially demolished 41.00 3,722.67 29.02 L oa Grade 3 Partially demolished 9.00 523.13 22.67 Grade 4 Partially demolished 16.00 1,475.61 15.50 Grade 5 Partially demolished 45.00 2,767.36 11.78 ._______ Grade 6 Partially demolished - - Subtotal 111.00 8,488.78 19.57 page 2 of 4 municipal for Xilang project (pipe network) Attached table:18. 1.2. 7. 1. 1. 3BD O Monthly compensation Relocation period (month) Total G 6.00 - 0 37,334.60 6.00 224,007.61 O 3,209.76 6.00 19,258.54 Z 17,853.71 6.00 107,122.27 F 28,603.00 6.00 171,617.99 E 6.00 - C 87,001.07 6.00 522,006.41 O 6.00 - E 9,805.00 6.00 58,830.01 O 6.00 - 6.00 - 6.00 - 6.00 - 9,805.00 6.00 58,830.01 O 6.00 - O 6.00 - K 1,069.67 6.00 6,418.03 n 6.00 - 6.00 . O _ _ _ _ 6.00 O 1,069.67 6.00 6,418.03 G 6.00 - C 62,375.68 6.00 374,254.06 K 9,007.13 6.00 54,042.75 5 1,001.62 6.00 6,009.72 G 3,837.79 6.00 23,026.76 O - ~6.00 n L '76,222.22 6.00 457,333.29 - 6.00 1 K 6.00 m _ _ _ _ _ 6.00 G 3,005.31 6.00 18,031.84 K _ _ _ _ _ 6.00 - m pae6.00 O3I 3,005.31 6.00 18,031.84 O 6.00 O 1 page 3 of 4 109,515.28 6.00 657,091.68 G 13,286.55 6.00 79,719.32 L 21,860.64 6.00 131,163.83 m 32,440.79 6.00 194,644.75 OII 6.00 5 177,103.26 6.00 1,062,619.58 G page 4 of 4 Cost estimate of compenstion for temporary relocation shared by other mu quantity Floor area Unit price Grade I temporary demolished - - - Grade 2 temporary demolished 13.00 1,261.19 18.00 Grade 3 temporary demolished - 40.42 16.00 Housing L Grade 4 temporary demolished - 589.55 14.00 Grade 5 temporary demolished 13.00 1,715.21 12.00 C Grade 6 temporary demolished - - - C Subtotal 26.00 3,606.38 15.10 C Grade I temporary demolished - - - E Grade 2 temporary demolished - 70.58 110.00 r Shop Grade 3 temporary demolished - - - Shop C Grade 4 temporary demolished - - - Grade 5 temporary demolished 1.00 0.00 22.00 b Grade 6 temporary demolished - - - Subtotal 1.00 70.58 88.00 Grade I temporary demolished - - - t Grade 2 Area of land borrowed - - - t Office Grade 3 Area of land borrowed - - - D Grade 4 Area of land borrowed - - - CGrade 5 Areaoflandborrowed 1.00 0.00 18.00 House with Grade 6 Areaoflandborrowed - - Property Subtotal 1.00 0.00 18.00 right and on residential Grade 1 Areaoflandborrowed V plot Grade 2 Areaoflandborrowed - 683.20 40.00 £ Factory Grade 3 Area of land borrowed - 105.28 30.00 building Grade 4 Area of land borrowed - - - Grade 5 Area of land borrowed 1.00 185.95 10.00 Grade 6 Area of land borrowed - - - C______ _______ Subtotal 1.00 974.43 27.86 Fri Grade I Area of land borrowed - - - Grade 2 Area of land borrowed 2.00 12.71 20.00 T other Grade 3 Area of land borrowed - - - -1 use Grade 4 Areaoflandborrowed 61.53 20.00 Grade 5 Area of land borrowed - - - V Grade 6 Area of land borrowed - - [' Subtotal 2.00 74.25 20.00 Grade II Area of land borrowed page 1 of4 Grade 2 Area of land borrowed 15.00 2,027.68 26.68 Grade 3 Area of land borrowed - 145.71 23.00 Total 651_08_15_09 Grade 4 Area of land borrowed - 651.08 15.09 Grade 5 Area of land borrowed 16.00 1,901.17 12.15 Grade 6 Area of land borrowed - - C- Total 31.00 4,725.64 19.79 page 2 of 4 nicipal for Xilang project (pipe network) Attached table:18.1.2.7.1.2.3BD Monthly compensation Relocation period Total (month) Total ____ ___ ___ ___ 6.00 - 22,701.49 6.00 136,208.93 646.78 6.00 3,880.65 8,253.67 6.00 49,522.02 20,582.53 6.00 123,495.16 _____ _____ ____ 6.00 - 52,184.46 6.00 313,106.76 6.00 - 7,763.63 6.00 46,581.77 ___ __ __ __ __ __ 6.00 - 6.00 - 0.08 6.00 0.46 __________________ 6.00 - 7,763.70 6.00 46,582.23 __ __ __ __ _ _ 6.00 - ____ ____ ____ ___ 6.00 - 6.00 - _____ _____ _____ 6.00 - 0.04 6.00 0.25 6.00 - 0.04 6.00 0.25 _ _ _ _ _ _ _ _ _ _ _ _ _ 6.00 - 27,327.90 6.00 163,967.39 3,158.51 6.00 18,951.08 _ _ _ _ _ _ _ _ _ _ _ _ _ 6.00 - 1,859.50 6.00 11,156.99 _ _ _ _ _ _ _ _ _ _ _ _ _ 6.00 - 32,345.91 6.00 194,075.46 _ _ _ _ _ _ _ _ _ _ _ _ _ 6.00 - 254.30 6 00 1,525.80 - ~~6.00 - 1,230.65 6 00 7,383.93 _ _ _ _ _ _ _ _ _ _ _ _ _ _ 6.00 - ____ ____ ____ ___ 6.00 - 1,484.95 6.00 8,909.72 6.00 page 3 of 4 58,047.31 6.00 348,283.89 3,805.29 6.00 22,831.74 9,484.32 6.00 56,905.95 22,442.14 6.00 134,652.86 6.00 - 93,779.07 6.00 562,674.43 page 4 of 4 Cost estimate of compenstion for temporary structure before expiration shared by other mur Frame structure Composite structure Brick and timber struc quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Grade I temporary demolished U O 250.00 O E O 250.00 O O O 250.00 Grade 2 temporary demolished O U 250.00 U O U 250.00 O O_ El 250.00 Grade 3 temporary demolished U U 250.00 O U U 250.00 U 250.00 Commercial Grade4 temporary demolished O U 250.00 O U U 250.00 U U U 250.00 E Grade 5 temporary demolished U Ul 250.00 U1 U U 250.00 Ul U U 250.00 Grade 6 temporary demolished U U 250.00 U U U 250.00 U U U 250.00 Subtotal U Ul 250.00 U U U 250.00 U U U 250.00 Frame structure Composite structure Brick and timber struc quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Grade I temporary demolished U U 250.00 U O U 250.00 U U Ul 250.00 C Grade 2 temporary demolished U U 250.00 U U U 250.00 U U U 250.00 Grade 3 temporary demolished U U 250.00 U U U 250.00 U U U 250.00 tuses Grade 4 temporary demolished U U 250.00 U U U 250.00 U U Ul 250.00 C Grade 5 temporary demolished U U 250.00 U U U 250.00 U U U 250.00 Grade 6 temporary demolished U 250.00 U U U 250.00 U U U 250.00 Subtotal U U 250.00 U U U 250.00 U U U 250.00 O1if 2 -2 r. iicipal for Xilang project (pipe network) n n o n o n Attached table:18.1.2.7.1.3BD-I ture Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price = o ol 250.00 n ol o 250.00 ol o ol El 250.00 ° ol o 250.00 - O H H1 250.00 1O H1 H 250.00 [1 o ]l o 250.00 ° ol El 250.00 o1 o ol F 250.00 ° Fol ol 250.00 ol o ol El 250.00 °] ol E 250.00 F] o F] F] 250.00, °] - ol F 250. oo Attached table: 18.1.2.7.1 .3BD-2 ture Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price o] ol ol 250.00 [o ol [l 250.00 o] o] o- F] 250.00 o] ol ol 250.00 o] F] ol F 250.00 ° °T El 250.00 F] o ol ol 250.00 o °T F] 250.00 o o] ol F] 250.00 o °T F] 250.00 El o] F] Fl 250.00 o °T F] 250.00 o H F]~ ~ F] 250.00, El ] F] 250.00 F]0 M2 ,f Cost estimate of cost for rehabilitation of partially affected house with Property right shared by o] F] F] F] F] F] F F] F]F] F] F] F] n] on Frame structure Composite structure Brick and timber structure Quantity Floor area Unit price Total price Quantity Floor area Unit price Total price Quantity Floor area Unit price Total price ___________ ~~~~~repaired _ _ _ _ _ _ _ _ _ _ _ _ _ __ repaired _ _ _ _ _ _ _ _ _ __ repaired _ _ _ _ Grade I O] | O 100.00 |] n] T° 120.00 |] 01 F] 150.00 |] O] Grade 2 F] 348.83 100.00 34,882.99 4.00 60.10 120.00 7,212.51 3.00 240.35 150.00 36,052.39 O house with Grade 3 0] | O 100.00 | El nn 120.00 F] 0 | O 150.00 |0 O Property right Grade 4 F] 248.43 100.00 24,842.69 F] F] 120.00 F] 0 F] 150.00 |0 O Grade 5 O F] 100.00 F] 5.00 264.12 120.00 31,694.18 1.00 122.78 150.00 18,416.53 F] Grade 6 El F] 100.00 F] El F] 120.00 F] F] F 150.00 O O Subtotal F] 597.26 100.00 59,725.68 9.00 324.22 120.00 38,906.70 4.00 363.13 150.00 54,468.92 page 1 of 2 other municipal for Xilang project (pipe network) o] F] F] F] F] Attached table:18.1.2.8.3BD Simple structure Total Floor area Floor area Quantity repaired Unit price Total price Quantity reared Unit price Total pnce n] o] 60.00 o] o n o n o Fo 60.00 El 7.00 649.28 o 78,147.89 o] o] 60.00 o] o o] El o] o F] 60.00 El F] 248.43 F] 24,842.69 F. °] 60.00 o] 6.00 386.90 F] 50,110.72 El F] 60.00 F] o o El F] F] Fo 60.00 F] 13.00 1,284.61 F] 153,101.30 page 2 of 2 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Xilang project (pipe network) n] n n ] n ] r] - -U [c c - n - c -o o Frame structure | Composite structure Brick and timber struci quantity Floor area Unit price |Total price quantity Floor area Unit price Total price quantity Floor area Unit price Wholly demolished C] F] ii F] l] El T F r ° T1 n . Grade Partially demolished C] | n1 c I F T F r °r F] El 1 Temporarily n] demolished L] O F F F FO O] El Fo O - h holly demolished G] O] O] 0 El 0 El O 3.00 143.16 2,640.00 C] Grade Partially demolished 2.00 496.77 3,210.00 1,594,628.09 1.00 23.28 2,920.00 67,989.49 4.00 59.04 2,640.00 2 Temporarily F] demolished O 204.4052564 750 153303.9423 3 38.99076676 700 27293.53673 3 40.75719845 600 F] Wholly demolished O F] F] F] F] El O] El 1.00 15.93 2,360.00 F] Grade Partially demolished El O F] 0 0 OF F] F] F] F] F] 3 Temporarily O] demolished O] O O] F F] F] F] n] F] El F] ° House Wholly demolished F] o F] o F] F F] F] F] El El P hroper Housin Grade Partially demolished 3.00 649.99 2,720.00 1,767,963.02 O F] F] El 1.00 4.76 2,340.00 ty g 4 Temporarily O right - demolished F 248.426925 650 161477.5013 F] F] c F] o El El F] Wholly demolished F]0 0 El F] 1.00 93.86 2,310.00 216,805.97 10.00 315.25 2,130.00 F] Grade Partially demolished 2.00 239.21 2,500.00 598,019.56 3.00 99.15 2,310.00 229,034.50 9.00 202.02 2,130.00 5 Temporarily F] demolished F] F] O OF 3 158.8540502 550 87369.72759 1 71.0132333 450 F] Wholly demolished F ] 0 l 0 F O ] ] O F F] .Grade Partially demolished l ] l ] 0 ] o o o o o 6 Temporarily O] _ demolished F F F F F F F F F F O F] Wholly demolished ] ] O F 1.00 93.86 2,310.00 216,805.97 14.00 474.34 2,291.64 F] subtot Partially demolished 7.00 1,385.96 2,857.66 3,960,610.67 4.00 122.43 2,426.01 297,023.99 14.00 265.82 2,247.04 al Temporarily El demolished F 452.8321814 695.1392955 314781.4435 6 197.8448169 579.5616287 114663.2643 4 111.7704318 504.6976483 O Wholly demolished F] ElOI O F] o F] F] F] F] F] F] Grade Partially demolished El 0 0 OF F] O O F 1 Temporarily F] demolished O FnF F] n I I El F] o F F] Whollydemolished ] F FF El F] 0 O O 0 page I of 64 r - . Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Xilang project (pipe network) HH n o o r o o] o n H H H H n Frame structure Composite structure Brick and timber struct _ quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price H Grade Partially demolished 0 HH n |H Ho H 1.00 7.40 6,520.00 2 Temporarily HI_____ demolished H HH H H H H H 3.187308371 600 H Wholly demolished H H H H H H H H H H H H Grade Partially demolished H H H H H H H H HH 3 Temporarily H __ demolished H H H H H H H H H H H O House Wholly demolished H H H H H H H H H H H with Grade Partially demolished H H H H H H H H H H H HProper Shop 4 eprrl ty Temporarily right demolished HO H H H H H H H Hl 0 H Wholly demolished H H H H H H H H H 0 H n Grade Partially demolished HH H H H H H H Ho 5 Temporarily F] demolished H H H H 1 0.003488195 550 1.918507218 H H H H Wholly demolished H H H H H H H H 0 H H O Grade Partially demolished H H H H H H H H H H H 6 Temporarily H _ demolished H H] H H H H H H H H H Wholly demolished H H H H H H H H H H H subtot Partially demolished H Hl H H H 0 Hl 1.00 7.40 6,520.00 al Temporarily O ______ demolished H H H H 1 0.003488195 550 1.918507218 0 3.187308371 600 H Wholly demolished H H H H H H H 0 0 H H H Grade Partially demolished Hl H H H H H H H 1 Temporarily H _ demolished H H H H 0 H 0 H H H H H Wholly demolished H H H HH H H H H H Grade Partially demolished H H H H H H O 0 Hl H 2 Temporarily H demolished Hl H H 0 H 0 H H 0 H H Wholly demolished H HOH H H H H H n Grade Partially demolished H0HHI H H H H H H Hl page 2 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Xilang project (pipe network) [7F n ] n] o U - E- U- F] -fIU Jv F o ] n ] F] Frame structure Composite structure Brick and timber strucI quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Temporarily n] demolished O O O O O O ] n n o o O House Wholly demolished O] O O O El O [O El El n] F with P Grade Partially demolished OF O O] O OO Proper Office 4____ ty 4 Temporarily n right demolished F El F] El El El F F] F] Wholly demolished O] O_ O O n] o] El o] El o o Grade Partially demolished F] F F] El F F] 5 Temporarily O] demolished O O 10.002325463 550 1.279004812 O] El O O] Wholly demolished O F] O El F] F] F] O F] F] F] F] Grade Partially demolished El F] El F] El F] F] El F F] F] 6 Temporarily F] __ demolished F] El F] F] F] F [] El F] F] O] F] . Wholly demolished O El F O F E O F O O LI subtot Partially demolished El F F] F F] F] F F F] F O al Temporarily F] ______ demolished El El O O 1 0.002325463 550 1.279004812 O 0 O F] Wholly demolished F] F]OF F]OF] F]F El O F] F] Grade Partially demolished F] F] El F] El F F]F F F] F 1 Temporarily El demolished O O O O O O O C O C] Fn Wholly demolished O F] F] El F] El F] F] 2.00 57.44 2,740.00 F] Grade Partially demolished 1.00 356.22 3,320.00 1,182,666.08 2.00 190.10 3,030.00 575,995.86 3.00 231.86 2,740.00 2 Temporarily F] ______ demolished F 144.4246473 750 108318.4855 F] 11.23924559 700 7867.471915 El 196.4047467 600 F] Wholly demolished F] F] F] F] El o El o o F] F] F] Grade Partially demolished O El F] n o F] F] F] El F] F] 3 Temporarily F] demolished F F El F _ _ _ _ O F] House Foctor Wholly demolished IF F El F F F] El F with ___Grade nProner y Grade Partially demolished J E F] F] F] F F F] F] _ _ F] page 3 of 64 F, Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicalld municipal for Xilang project (pipe network) flEl ElI El IT El FEE El El El F] El E] _________ Frame structure | Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price ty bulldl ---r-- Temporarily O right ng demolished O O C n o [ ] o o c o Ol Wholly demolished O OO 1.00 274.95 2,400.00 659,875.32 4.00 290.19 2,200.00 El Grade Partially demolished Oi OO 1.00 247.51 2,400.00 594,027.65 2.00 97.51 2,200.00 5 Temporarily nl demolished Ol El Cl Ol ] 105.258329 550 57892.08097 El 51.76364785 450 Ol Wholly demolished Ol El Ol El El 0l O El O EO O El Grade Partially demolished O O 0 O O O 0 0 O O O 6 Temporarily Ol demolished E E E E E ] E E E E O Ol Wholly demolished 0 O E E 1.00 274.95 2,400.00 659,875.32 6.00 347.63 2,289.22 Ol subtot Partially demolished 1.00 356.22 3,320.00 I,182,666.08 3.00 437.61 2,673.67 1,170,023.51 5.00 329.37 2,580.13 a] Temporarily El ______ demolished E 144.4246473 750 108318.4855 El 116.4975746 564.4714329 65759.55288 El 248.1683945 568.7125865 El .Wholly demolished El E E E El E El El El E El Ol Grade Partially demolished El C E El E El El E El El 1 Temporarily El demolished E E E El E El E El El El Wholly demolished E E E E E E E E E E E El Grade Partially demolished E l l l l l l l l 0 E 2 Temporarily El ______ demolished E E E E 1 9.874253988 700 6911.977792 El E E El Wholly demolished E El El El El 0 El El E El El Grade Partially demolished E El E El E El El 3 Temporarily El __ demolished l l l l l l E El O House Wholly demolished El El 0 0 l E E 0 0 E with _ _ _ _ E Proper Other Grade Partially demolished E E E E E E E E E E E ty uses 4 Temporarily El right demolished E E E E E E E E E E E El Wholly demolished E l 0 E l l l l l E E El Grade Partially demolished El El El El El El El El El E E page 4 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicall3 municipal for Xilang project (pipe network) F]F] F] F] o ] oF c D ol [oEl F] o] n] f] Frame structure - _ _ Composite structure Brick and timber struct Temporarily_____ quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price bTemporarily El demolished O 00 El O 0 Elno F] Wholly demolished CF] F] F] F] F] F F] F] F] F] n Grade Partially demolished CD n F] o o F] F] F] F] F] o 6 Temporarily n] __ demolished O n o F] o F] F] F] o o F] F] Wholly demolished F] O F] F] O F] El F] F] F] F] C1 subtot Partially demolished F] F] O El F] F] F] o o F] o al Temporarily n] ______ demolished ] ] 0 1 9.874253988 700 6911.977792 n F] F] n] . Wholly demolished F F F F] F] F] F] F] El Grade Partially demolished F] F] F] F] l F] F] F] F F T emporarily O demolished El El El F] F] o c F] F] Wholly demolished FO F] F] El O O O] O 5.00 200.59 2,668.63 F] Grade Partially demolished 3.00 852.99 3,255.94 2,777,294.17 3.00 213.38 3,018.00 643,985.35 8.00 298.30 2,814.01 2 Temporarily F] ______ demolished F] 348.8299037 750 261622.4278 4 60.10426635 700 42072.98644 3 240.3492535 600 F] Wholly demolished F] El F] F F] O F] F 1.00 15.93 2,360.00 F] Grade Partially demolished F] F] C F] F] F] F I F F] F] 3 Temporarily F] i_ demolished El El F] I0 El 0 O] 0] 0 0 O O House Wholly demolished El F F] F F] F] F] F] F F] F] with Grade Partially demolished 3.00 649.99 2,720.00 1.767,963.02 ] ] O F 1.00 4.76 2,340.00 y Proper total 4 Temporarily ty n right demolished F] 248.426925 650 161477.5013 OF] O El F] El Wholly demolished F] F] El F] 2.00 368.80 2,377.10 876,681.29 14.00 605.44 2,163.55 F] Grade Partiallydemolished 2.00 239.21 2,500.00 598,019.56 4.00 346.66 2,374.26 823,062.15 11.00 299.53 2,152.79 5 Temporarily F] demolished O F] F] O 5 264.1181929 550 145265.0061 1 122.7768812 450 F] Wholly demolished F F] F] F F] F] F] F] F] F] F] F]1 Grade Partially demolished L ]El F] F] F] o F] o El F] DJ page 5 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicall] municipal for Xilang project (pipe network) Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Temporarily O] demolished O O O O O O F] n o o o O] Wholly demolished O 0l O 0] 2.00 368.80 2,377.10 876,681.29 20.00 821.97 2,290.62 n subtot Partially demolished 8.00 1,742.19 2,952.19 5,143.276.75 7.00 560.04 2,619.53 1,467,047.50 20.00 602.60 2,481.59 al Temporarily O] ______ demolished El 597.2568287 708.4053437 423099.929 9 324.2224592 577.8069569 187337.9925 4 363.1261346 549.2833745 F] Wholly demolished O O F] 0 0] O F] F] F F] O] F Grade Partially demolished O] Fl O] O] O O ] o] F] F] o] 1 Temporarily O] __ demolished 0 El O El F 0 El F] OO 0 .F] F] .Wholly demolished O O F] 0 2.00 140.14 2,450.00 343,338.59 3.00 72.43 2,250.00 O Grade Partially demolished O ] O F 1.00 17.62 2,450.00 43,169.39 3.00 76.36 2,250.00 2 Temporarily O demolished O] ] O 0 3 38.24364519 700 26770.55163 1 45.40717173 600 O Wholly demolished O] F] F] 0 F O] F] F] F] F] F] F] Grade Partially demolished O O] 0 F] El 0 O O O O F] 3 Temporarily F] __ demolished O] O O O O] El [l O] 0 O O F] house Wholly demolished 0 El F F] 0] F] O 0 O] F] F] Oreside Housin Grade Partially demolished 2.00 218.79 2,450.00 536,035.11 O O El El O F] ntial g 4 Temporarily npotial demolished O 194.1004484 650 126165.2914 O ] ] ] O O O F] Wholly demolished 7.00 1,915.00 2,350.00 4,500,252.46 1.00 23.39 2,150.00 50,295.06 1.00 13.22 1,950.00 F] . Grade Partially demolished 10.00 1,133.81 2,350.00 2,664,441.99 n o o o o o o S Temporarily O] demolished 4 913.9717528 600 548383.0517 O O 0 O O O n F] Wholly demolished O F 0 Ol O O 0 O O] O F F] Grade Partially demolished O F] EF F] 0 O F] Fl O] F] 6 Temporarily O] demolished 0] 0] O_ _ _ _ _ F] ElO_ El nooo F] Wholly demolished 7.00 1,915.00 2,350.00 4,500,252.46 3.00 163.53 2,407.09 393,633.65 4.00 85.65 2,203.70 l subtot Partially demolished 12.00 1,352.59 2,366.18 3,200,477.09 1.00 17.62 2,450.00 43,169.39 3.00 76.36 _2,250.00 page 6 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicall] municipal for Xilang project (pipe network) Frame structure Composite structure Brick and timber struci quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price - - al Temporarily OD ______ demolished 4 1108.072201 608.7584748 674548.3431 3 38.24364519 700 26770.55163 1 45.40717173 600 El Wholly demolished OD E ED E OD O E ° °O 0 D O OD Grade Partially demolished OD EDOE EDOE E E EO EO ED 1 Temporarily nD demolished OD OD 0 OD ED ED 0 E ED E E ED Wholly demolished ED E E ED ED El O ED E ED E OD Grade Partially demolished O E ED E ED ED E EDI ED E E 2 Temporarily ED demolished E E ED E ED ED E E E E E ED Wholly demolished O ED E ED E E E E E E E ED Grade Partially demolished E E E E E D ED E ED D 3 Temporarily ED demolished E E 0 E E E E E E E E O house Wholly demolished D E D D E E E E E E E OE reside Shop Partially demolished ED E ED ED E E ED E E ntial 4 Temporarily 0 plot demolished ED ED ED E E ED ED ED E ED 0 ED Wholly demolished E ED E ED 1.00 34.53 2,150.00 74,238.31 E ED ED ED Grade Partially demolished E E ED E E E ED ED ED E 5 Temporarily ED demolished ED E 0 0 E 0 ED ED 0 ED E E Wholly demolished E E ED E ED ED ED D E E ED ED Grade Partially demolished E E E ED ED E E E E E E 6 Temporarily ED demolished ED E E E ED E ED ED E E ED ED Wholly demolished E ED E ED 1.00 34.53 2,150.00 74,238.31 D ED E ED subtot Partially demolished E E E E E O E E E E ED al Temporarily 0D __ demolished E E ED ED. D E E ED 0 ED ED Wholly demolished OE ED EE E ED E ED ED ED E ED Grade Partially demolished E E E E E E E E E E E page 7 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Xilang project (pipe network) n] o ] n ] n ] o E E ofT F B-- 1 E ] Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price 1 Temporarily n] .demolished O] O] 0 O] n] o o] f o E] n Wholly demolished n] o] El o o] o o] o] El El Grade Partially demolished O 0] El O 0 O] O O] O] O El 2 Temporarily O] demolished O O O O O O O O O O O O] Wholly demolished ElO O- F] O] El O OO O] Grade Partially demolished F] 0 F F] OO 1.00 22.28 2,150.00 3 Temporarily n] __ demolished O 0] O O] O F F] n house Wholly demolished OF O F] F] OF F] F] F] . Grade Partially demolished F 0 O F] O] O F F F 11reside Office 4 eprrl ntial Temporarily O plot demolished 0 0 O O O O O 0 0 O _ O F] Wholly demolished O 0 O O 0 O O O O O O F] . Grade Partially demolished O O O O O O O O O 0 O 5 Temporarily F] demolished O F] F] O l O 0 0F 0 O O F] Wholly demolished ] 0 F] 0 F] F] F] F] O F] O F] Grade Partially demolished ] 0 O O ] 0 OF O El O 6 Temporarily F] .demolished OF 0 O F] 0 0 0F F] 0 F F] Wholly demolished OF El F] 0 0 O El F] 0 El F] ssubtot Partially demolished OF F] 0 F] 0 OF 1.00 22.28 2,150.00 al Temporarily F] __ __ demolished O 0 O 0 ] ] F] F] O F F] Wholly demolished F ] ] ] ] ] F] F] O F O] Grade Partially demolished OF O F] El F] F] o o El F 1 Temporarily n] demolished n l o o o o o o o o o O] Wholly demolished F] F] F] El F] 0 El F] F] 0F F] F] Grade Partially demolished O O O El F] F] F] O F page 8 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Xilang project (pipe network) c Fn n F] F] -] -] F- -T i-TT o] o] - ] n] - [In Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Z Temporarily O] __ demolished l O 0 O 0 O O O 0 n o El Wholly demolished O] O O] O] O] O 0] O 0] O] O] El Grade Partially demolished O F] O F] n F] F] o F 3 Temporarily El demolished O] O O O O F] F] 0 F] ] house Foctor Wholly demolished l O F] O F] F F] O O Oreide y Grade Partially demolished O O F] El F] F] OO 0 0 F] resial buildi 4~ Temporarily O plot ng demolished O O O OOO O hWholly demolished F] O O] 0 n o ] F 1.00 24.56 1,950.00 n] Grade Partially demolished O0 El F] F] F] El 0 O S Temporarily F] demolished O El El F] El F] F] 0 1 2.159560561 450 El Wholly demolished F] F El F] O F] O F] F] F] F F] Grade Partially demolished F] F] F] F] F] o o o F] o El 6 Temporarily F] _ demolished O] O 0 O F] 0 OF F] 0 0 0 F] Wholly demolished O F] F] F] F] 0 0 F] 1.00 24.56 1,950.00 O] subtot Partially demolished O 0 F] O F] El O F] 0 0F El al Temporarily ] _ demolished O O O] 0 0F F] O] 12.159560561 450 F] Wholly demolished F] O 0 0 O F 0 O F] F] 0 El Grade Partially demolished F] F] 0 O] O _ O . F ° F] 1 Temporarily F] demol ished O] O] F] F] O] O_ 0 _ C _ O 00 n Wholly ~~~~demolished O1 O 0 0 O1 O O O 0 F] ~~~~~~~Wholly demolished F] F] F] F]F]F F] F] F]F]F El Grade Partially demolished O F] F] F] O O O O 0 O 2 Temporarily F] demolished El 0 ] O O 0 F] Wholly demolished I F] O 0 F] F] El El O] OO n] Grade Partially demolished F]OF F]OEl E] O O F ] page 9 of 64 ,- . Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Xilang project (pipe network) n] o L n L o L oFL L.FL F FL FL F FL Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Temporarily FL demolished F F F F F F F F F F F F house Wholly demolished F Fl FL FL FL F F F 2.00 67.17 2,050.00 on reside Other Grade Partially demolished L FL F F FL F F FL 2.00 150.27 2,050.00 ntial uses 4 Temporarily O plot demolished FL FL F Fl FL FL F F F 61.53272212 500 FL Wholly demolished F F F F 1.00 6.74 2,150.00 14,497.88 F FL F F Grade Partially demolished L F FL FL FL FL F FL FL F F 5 Temporarily F demolished L L L F FL FL F FL FL .Wholly demolished F FL FL F F FL Fl Grade Partially demolished F FL F FF FL 6 Temporarily FO demolished FL FL F Fl FL FL Wholly demolished F FL FL F 1.00 6.74 2,150.00 14,497.88 2.00 67.17 2,050.00 FL .subtot Partially demolished FL FL Fl FL F F 2.00 150.27 2,050.00 al Temporarily FO demolished L F FL FL FL F FL 61.53272212 500 Fl Wholly demolished FL Fl Fl Fl F F FL FL FL FL El nF Grade Partially demolished F F F F FL F F FL Fl F FL 1 Temporarily OL __ demolished L L L L L L L L L F F nL Wholly demolished FL FL FL F 2.00 140.14 2,450.00 343,338.59 3.00 72.43 2,250.00 Fl Grade Partially demolished F FL F FL 1.00 17.62 2,450.00 43,169.39 3.00 76.36 2,250.00 2 Temporarily FL demolished L L F F 3 38.24364519 700 26770.55163 1 45.40717173 600 FL Wholly demolished FL FL F FL F F FL FL FL Grade Partially demolished F L L L L L F F 1.00 22.28 2,150.00 3 Temporarily O] ___ demolished F F L L L L FL FL F F El house Whollydemolished F FF F Fl Fl FL FL 2.00 67.17 2,050.00 onGrdI F reside total Grade Partially demolished 2.00 218.79 2,450.00 536,035.11 FL FL FL Fl| 2.00 | 150.27 | 2,050.00 page 10 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicall] municipal for Xilang project (pipe network) LnF] [o LI c F F o o] o] o noo Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price ntial 4 Temporarily n pl ot demolished O 194.1004484 650 126165.2914 n ] c ] o ] c ] o ] 61.53272212 500 n] Wholly demolished 7.00 1,915.00 2,350.00 4,500,252.46 3.00 64.67 2,150.00 139,031.25 2.00 37.78 1,950.00 F] . Grade Partially demolished 10.00 1,133.81 2,350.00 2,664,441.99 O F] El El n F] o 5 Temporarily F] ______ demolished 4 913.9717528 600 548383.0517 ] ] O F 1 2.159560561 450 F] Wholly demolished F F] O] F] ] ] ] ] O O O n] Grade Partially demolished O O O O O O O 0_0_O_ 6 Temporarily F] __ demolished O] O] C ] O O O 0 O O 0] Wholly demolished 7.00 1,915.00 2,350.00 4,500,252.46 5.00 204.80 2,355.28 482,369.84 7.00 177.37 2,110.37 El subtot Partially demolished 12.00 1,352.59 2,366.18 3,200,477.09 1.00 17.62 2,450.00 43,169.39 6.00 248.91 2,120.31 al Temporarily F] ______ demolished 4 1108.072201 608.7584748 674548.3431 3 38.24364519 700 26770.55163 2 109.0994544 540.6302595 0] .Wholly demolished a F] o El El El F] F] o] F] F] F] Grade Partially demolished O ] ] O O O O O O O O 1 Temporarily n] demolished O F] C F] F] 0 0F F] F] 0 El F] Wholly demolished 2.00 32.58 750.00 24,431.89 O 0 O 0 F] F] 0 n] Grade Partially demolished 2.00 209.98 750.00 157,486.57 4.00 129.70 700.00 90,787.36 10.00 948.99 600.00 2 Temporarily F] demolished 0 196.0208037 750 147015.6028 F 94.28182602 700 65997.27821 1 536.870684 600 F] Wholly demolished 1.00 15.22 700.00 10,652.53 O F] 0 ]0 El F] Grade Partially demolished 4.00 124.88 700.00 87,414.54 1.00 7.27 650.00 4,724.19 1.00 68.46 550.00 3 Temporarily F] demolished F] 40.42347986 700 28296.4359 ] El O F] O] 0 F] histor Wholly demolished F] O El 0 1.00 5.96 600.00 3,574.80 F] El O O ically Housin Grade Partially demolished 1.00 18.73 650.00 12,171.69 1.00 25.28 600.00 15,168.07 O F F used g 4 Temporarily F] house demolished El F] C n F] c F] 0] Wholly demolished 1.00 493.10 600.00 295,860.60 7.00 377.66 550.00 207,715.31 F] 0 O 0] Grade Partially demolished 3.00 488.12 600.00 292,872.05 9.00 1 71.84 550.00 94,513.84 1.00 18.89 450.00 page 11 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicall3 municipal for Xilang project (pipe network) E E l El El U; El El El El D El nl Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price b Temporarily Ol demolished 1 430.7125342 600 258427.5205 3 127.2220451 550 69972.12482 O O Ol Ol Wholly demolished OE El Ol Ol Ol O O 0O nl Grade Partially demolished O El [O O O O OO 6 Temporarily [n demolished 0 [ o o o o o o o E E nl Wholly demolished 4.00 540.89 611.85 330,945.02 8.00 383.62 550.78 211,290.11 El El El El subtot Partially demolished 10.00 841.71 653.37 549,944.85 15.00 334.09 614.19 205,193.46 12.00 1,036.35 593.96 al Temporarily El ______ demolished 1 667.1568177 650.1313449 433739.5592 3 221.5038711 613.8466219 135969.403 1 536.870684 600 Ol . Wholly demolished El El Ol E El Ol El E El El E nl Grade Partially demolished El 0l El E El El El 0 El O El 1 Temporarily El ___ demolished El 0 El El E El El El El El El nL Wholly demolished E E El El El El El E El E E El Grade Partially demolished 1.00 29.78 750.00 22,338.16 1.00 51.95 700.00 36,364.84 El El El 2 Temporarily El demolished El 14.60888475 750 10956.66356 El 52.78223979 700 36947.56786 E E El El Wholly demolished El El E El El El El E El E 0 EL Grade Partially demolished El El 0 El El El EE El El El 3 Temporarily El demolished El El El El El El El El E El histor Wholly demolished E E El E E 0 El E l 0 E ically Shop Grade Partially demolished l 0 0 0 El El El 0 E El used 4 Temporarily n house demolished E E E E E E E E E E E El Wholly demolished EEl El El El El El El 0 EE E El Grade Partially demolished E 0l 0 EL 0 EE El El E EL 5 Temporarily El demolished El El 0 EE El El El El El El El El Wholly demolished l El El El E ElO 0 O El El E El | Grade Partiallydemolished E El El El El El El El El El El page 12 of64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Xilang project (pipe network) O]l n ] o ] o ]- r - Ct- F]F] F] IT -] 7F O] -n _ Frame structure Composite structure Brick and timber strucl quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price b Temporarily n] _ _ demolished F F F] F C] F F L ] LI Wholly demolished F F F] F] F] El El F F] F] O] n] subtot Partially demolished 1.00 29.78 750.00 22,338.16 1.00 51.95 700.00 36,364.84 n o] o] al Temporarily O] ______ demolished O 14.60888475 750 10956.66356 O 52.78223979 700 36947.56786 O O F n] Wholly demolished F El F- El F F F] 0 F F] O] In Grade Partially demolished ] El F ] F F F F O 1 Temporarily El demolished C F F F F F F F F El Fn Wholly demolished F F F F F F F F F F O n] Grade Partially demolished O El O ] ] ] O F] F] O F 2 Temporarily F] demolished F El F] F F] F] F F] Fn Wholly demolished F F F F F] El F F F El El Grade Partially demolished F F F F F F F F E 3 Temporarily F] demolished C El F] F El El F F F F] F] histor Wholly demolished ] El F] F] F] F F F F F] F] O ically Office Grade Partially demolished F El F F F F F F] used 4 Temporarily O]house demolished El F] F] El F] F F] El F F F] Fn Wholly demolished F] F] F] El F] F El F F] F] F F] Grade Partially demolished OF El O F] F] F] F] El O F 5 Temporarily n] _demolished CF F] F] F] O F] O n o F F] Wholly demolished F] F] F F] F F] El F F] F] Grade Partially demolished F F [] ] El E] F] F F] ] O 6 Temporarily n] demolished C] F F F F F F F F O F] Wholly demolished F] [l F] O El I O F F] subtotrPartially demolished E] ]] F] E] r_ _ _ _ _ page 13 of 64 f7 ,' I Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Xilang project (pipe network) I ] LI o n El --E TT --- --- -a T rr I a- n1 on Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price a Temporarily H _ demolished HO El 0 H o El H H H H Wholly demolished H H H H O H H H H H H H Grade Partially demolished H H H H H 0 H H H H H 1 Temporarily H demolished H H H H H H H H H H H Wholly demolished H 0 H H H H H H H H H H Grade Partially demolished H0 H H 1.00 36.88 700.00 25,815.64 1.00 744.33 600.00 2 Temporarily Hl demolished H H H H 28.94856685 700 20263.9968 0 302.1802669 600 H . Wholly demolished H 0 H H H H H H H H H H Grade Partially demolished H H H H H H H H 2.00 300.24 550.00 3 Temporarily H _____ demolished HO HO H H H H H 0105.2837876 550 H histor Foctor Wholly demolished H H H 1.00 49.51 600.00 29,707.11 H H H H ically y Grade Partially demolished H H H H H H H H 2.00 50.08 500.00 used buildi 4 Temporarily H house ng demolished O_ O_ O_ El O_ 0 0O00 H Wholly demolished 0 H H H 1.00 99.21 550.00 54,564.70 H H H H Grade Partially demolished H H H H 2.00 38.76 550.00 21,317.42 H 0 H 5 Temporarily n demolished H H H H H 26.76826692 550 14722.5468 H H H H Wholly demolished 0 H H H H H H H H H H H Grade Partially demolished H H H H H H H 0 H 0 6 Temporarily H demolished O__El_El 0_ __ _ O_ El LI I COO0 0 H Wholly demolished H H H H 2.00 148.72 566.65 84,271.81 H H H H subtot Partially demolished H H H H 3.00 75.64. 623.14 47,133.05 5.00 1,094.65 581.71 al Temporarily H ______ demolished H H H H H 55.71683377 627.9348849 34986.5436 H 407.4640545 587.0806042 H Wholly demolished H H H H Hl 0 H H H H H Grade Partially demolished HO H0 H H H H H H HO page 14 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicalII municipal for Xilang project (pipe network) nl r n o U DI LU - f1 L o nU n o o o Frame structure . Composite structure Brick and timber struct 1 _______________ quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Temporarily n demolished O U U U U U U U U U U U Wholly demolished Un U oU 1.00 20.28 700.00 14,192.92 O n o U Grade Partially demolished O . U O U U U U U U Ul 2 Temporarily U demolished U O U U . U U U U U U U Wholly demolished U U U U U U U U U U U U Grade Partially demolished U U U U U U U U U U U 3 Temporarily U demolished U U U U U U U U U U U U histor Wholly demolished U U U U 2.00 27.37 600.00 16,421.40 U U U U ically Other Grade Partially demolished U U U U UU U U U U used uses 4 Temporarily U house demolished U U U U U U U U U U U U Wholly demolished U U U U U U U U U U U U Grade Partially demolished UU U U U U U U U Uo 5 Temporarily O demolished U U U U U U U U U U U n7 Wholly demolished U U U U U UU U U U_ U Grade Partially demolished U U U U U U U U U U U 6 Temporarily U demolished U U U U U U U U U U U U Wholly demolished U U U U 3.00 47.64 642.56 30,614.32 U U U U subtot Partially demolished U U U U U U U U U Ul al Temporarily U __ demolished U Ul, U U U U U U n Wholly demolished U U U U U U U U U U U Grade Partially demolished U U U U U U U U U U U 1 Temporarily U demolished U U U U U U U U U U U U Wholly demolished 2.00 32.58 750.00 24,431.89 1.00 20.28 700.00 14,192.92 U U U ] Grade Partially demolished 3.00 239.77 750.00 179,824.73 6.00 218.53 700.00 152,967.84 11.00 1,693.32 600.00 page 15 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Xilang project (pipe network) F]F] F] 1] V V U Ufl Li F] ~~ ~ ~~ ~ ~~ ~ ~~~~~~~~~~~~~~F] F] F] F Frame structure Composite structure Brick and timber struci quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price 2 Temporarily n] ______ demolished O 210.6296884 750 157972.2663 O] 176.0126327 700 123208.8429 1 839.0509509 600 O] Wholly demolished 1.00 15.22 700.00 10,652.53 O] O]F I O] O O] O] Grade Partially demolished 4.00 124.88 700.00 87,414.54 1.00 7.27 650.00 4,724.19 3.00 368.70 550.00 3 Temporarily O] demolished n 40.42347986 700 28296.4359 El O] 0 O] El 105.2837876 550 n] histor Wholly demolished O F] F] O 4.00 82.84 600.00 49,703.31 O] F F] n ically 1 Grade Partiallydemolished 1.00 18.73 650.00 12,171.69 1.00 25.28 600.00 15,168.07 2.00 50.08 500.00 used 4 Temporarily O house demolished O] ElOI O O n] n El F] El F Fn Wholly demolished 1.00 493.10 600.00 295,860.60 8.00 476.87 550.00 262,280.01 O] O O O] Grade Partially demolished 3.00 488.12 600.00 292,872.05 11.00 210.60 550.00 115,831.26 1.00 18.89 450.00 5 Temporarily n] _ demolished 1 430.7125342 600 258427.5205 3 153.990312 550 84694.67162 O] F] o F] Wholly demolished El 0 F] F] O O F] O F] 0 O F] Grade Partially demolished O F] O F F F] F F F 0 0) 6 Temporarily n] demolished O O O O O O O O O b O F] Wholly demolished 4.00 540.89 611.85 330,945.02 13.00 579.99 562.39 326,176.24 F] 0 O F] subtot Partially demolished 11.00 871.49 656.67 572,283.01 19.00 461.68 625.31 288,691.36 17.00 2,130.99 587.67 al Temporarily F] demolished 1 681.7657025 652.2713318 444696.2227 3 330.0029447 630.0050282 207903.5145 1 944.3347386 594.4255049 F] Wholly demolished O] El 0] O El F] Grade Partially demolished 0 ] ] ] 0 F F] El 0 1 Temporarily F] demolished ] O O ] n o ] ] o o F nF Wholly demolished O 0 0 O 0 . 0 O O 0 O n] Grade Partially demolished OF l O O 0 F] O F] 2 Temporarily n] demolished OF F] F] F] F] O O F] n] Wholly demolished OF E lO 0 l O E l n] Grade Partially demolished O ] ] ] ] ] ] o ] o F page 16 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicall~ municipal for Xilang project (pipe network) [[ [ [l [[ [7 n7 [[ [n [n Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Temporarily [7Tempor demolished [7 [7 [ [1 [7 [ [O [ [ [ [7 O ary Wholly demolished n [7 7 l 7 l 7 7 7 n [ s truc t _ _ _ _ _ _ _ _ _ _ _ _ _ _ ure Housin Grade Partially demolished [ I 7 l O [ [ [ [ [ [ before g 4 Temporarily O expira demolished [7 [ [7 [7 [ [7 [ [ [7 [ [ O tion Wholly demolished [ [[ [7 1.00 4.51 [7 7 1.00 36.41 7 E7 Grade Partially demolished [ [ [ [7 [7 [7 [7 [7 [7 [7 5 Temporarily O7 demolished [ [7 [ [ [7 [7 [ [7 [7 [7 [ O7 Wholly demolished [ [ [7 [ [ [7 [7 [7 [ [ [ O7 Grade Partially demolished [ [7 [ [ [7 [ [7 [ [7 [ 7 6 Temporarily [n __ demolished 7 [ [7 [7 [7 [7 [7 [7 [ [ [7 Wholly demolished [7 [ [7 [7 1.00 4.51 [7 [7 1.00 36.41 [7 [7 .subtot Partially demolished [ E7 [ [ [ [ [7 [7 o7 [[ al Temporarily [7 __ demolished [ [ [7 [ [ [7 [7 [7 [7 [7 [ [7 Wholly demolished [ [7 [7 [ [ [ [7 [7 [7 [7 [ [7 Grade Partially demolished [ [7 [ [ [7 [ [7 [ [7 [7 [7 1 Temporarily 7 demolished 7 [ 7 [ 7 o ° [l [7 [ [ n7 Wholly demolished [7 [7 [7 [ [ n7 o7 o7 [ [7 [ O7 Grade Partially demolished [7 [7 [7 [7 [7 7 2 Temporarily [7 demolished 7 7 [ [ [7 7 7 7 7 [ [ [ Wholly demolished 7 [7 [[ [7 [7 [7 [7 [7 [7 [7 [7 Grade Partially demolished 7 7 7 7 7 7 7 [ [ [ 7 3 Temporarily O Tempor demolished [7 [O [I [7 [O [ [O [ [7 [7 [ n ary Wholly demolished [7 [7 [7 [7 [7 [ [ [7 struct Grade Partially demolished [7 [ [[ [7 [7 [ [7 ure ShoD del___ page 17 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicall] municipal for Xilang project (pipe network) Int D In Inn Inn[ In Cn o Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price before 4 Temporarily p expira demolished O ElO P. F] P I n El In o Fn tion Wholly demolished En on on o F] E El o El n In nI Grade Partially demolished O In n El El I E I I 5 Temporarily In demolished O n Eo E Elo c El] On Wholly demolished El G On In On In O In El In o n-I Grade Partially demolished El I I I E In FI In In In In 6 Temporarily nli demolished n F In o o I I o oI F] Wholly demolished I In El In In In E In In I O F] subtot Partially demolished In F] I In El El E I In I [L al Temporarily In ___ __ demolished ElO On G] O In O] E In In I El O Wholly demolished G I i E In In I In In I I P Grade Partially demolished In o I G I I I 1 Temporarily Oli demolished ] O O n O O C O O O [ Oli Wholly demolished El O] F] O ] In O El In o In On Grade Partially demolished El On O In [1 El O O El O On 2 Temporarily Eln demolished In O IO DI Ol n co In Wholly demolished I ] El In [ El ]E F] El El In Grade Partially demolished In E F] E El In O] In O El On 3 Temporarily F Tempor demolished I ElO O F] O El In O n o In ary Wholly demolished In I F] Oli F] n E on Elo ] uruct Office Grade Partially demolished O El O] F] F] On In o on on oI before 4 Temporarily P expira demolished On On E Ol O El OI in O On In In tion Wholly demolished On In n In El n o on In I E] n Grade Partially demolished On El] on on El on In o El o I page 18 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Xilang project (pipe network) nF n ] n n] n1 o _n -F- -- L rr - rrTT Frame structure | Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Temporarily O] __ demolished O] El n] F] o] F] o El o] o] o O Wholly demolished O] F] F F] F F] O] F] n] F] o n] Grade Partially demolished F] F] F] o El o] F] o F] o o 6 Temporarily O] demolished _ F] l El o El F] F] o O] . Wholly demolished OF El F] F F] F] F] n F] F] subtot Partially demolished OF F] O F] El o o o F] o al Temporarily O] demolished ] O ] ] ] ] ] ] ] o o F] Wholly demolished F] O O] O n F] El F] o] El F] O] Grade Partially demolished O F] F] F] O O] O] O] O O O 1 Temporarily F] demolished F F F F F F F F F F O F] Wholly demolished F] F] F] ] F F] F El F O] Grade Partially demolished F F] F] F F O F F] F] F] F 2 Temporarily O] demolished O . El F] O El n F] F] o F F] Wholly demolished O F.] n El o El o F] o F F] Grade Partially demolished F F] F El F F F F] F F 3 Temporarily O Tempor demolished O O O O O O O O O n o ] ary Foctor Wholly demolished O F] F] F] F] El F] F] o o F] sturuect y Grade Partially demolished Li F] El El F F El F F] El _ O before buildi 4 Temporarily O expira ng demolished O F] F] El F] o o o o o F F tion Wholly demolished F F] F F] El F] F] F F] El E O] Grade Partially demolished F] El F F F F] _ _ _ ElO 5 Temporarily F] . demolished I E F El F] El El F F] F] F] O] Wholly demolished F ] ] F] F] El F] F F O] Grade Partially demolished F] F] El El o _ o o o o oo page 19 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicall] municipal for Xilang project (pipe network) n] 11 F n ] o1 ooft -- fL c L -1 L Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Temporarily F] Idemolished n o o o o o n o o o o n] Wholly demolished n o c o c o o = no El subtot Partially demolished 0 O] EL El 0L F] 0 F] O n F] al Temporarily LI demolished O O O C O O C O O O O n] Wholly demolished 0 O C O n o o o o o o n] Grade Partially demolished ] El 00 1 Temporarily OL demolished OL Ol O Ol O] O [o OI Wholly demolished O O O] El O] O] El O] El [ OL El Grade Partially demolished O O] [7 I O O CL O C O 0 El LI 2 Temporarily El demolished O] OL O OL O_ [O FO O OO OL Wholly demolished O OL El E E EO OL OC 1.00 143.24 El Grade Partially demolished El El O] F] F] F] O O OL [l O] 3 Temporarily O Tempor demolished O OL [] EO O] El O C O EO O n ary Wholly demolished LI 0 O] El F] El C O] O] F] °] urr e Other Grade Partially demolished O C O O 0 O O O 0 O 0 before uses 4 Temporarily O expira demolished nF] El oo F] c] o] oo n] tion Wholly demolished 0] E F] E El n] Eo o El o] oo O Grade Partially demolished OL F] 0 [O OL OL O] El .] 0L FC 5 Temporarily O] _ demolished El O El O O El El O LI [ n] Wholly demolished El OL F] O O O O l 0 O O C1 Grade Partially demolished OL F] EL EO OL El nL oL o] El 6 Temporarily OL demolished O] O] O O C O C El O] O7 Wholly demolished 0I OL O OL _I l El OO 1.00 143.24 OL O subtot Partially demolished O El 0 nL oL nL El o] o] o page 20 of 64 r~~~~ ~ ~ 1 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicalld municipal for Xilang project (pipe network) - ] ni ni oi o ni ii rV - Li Li Tiono Frame structure Composite structure Brick and timber struc1 quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price a' Temporarily ni ___ __ demolished O b O O [ n n o o o o n] Wholly demolished L Oi 0i Oi O Oi [l o oi o El n Grade Partially demolished [O 0 n o o o o o oi oi 1 Temporarily ni __ demolished Oi Oi 0 LLi 0i Oi Oi Oi Oi El O Wholly demolished Li Li Li O Li n o El Li Li Li Li Grade Partially demolished O Li O n o o o Li Li Li o 2 Temporarily ni __ demolished i i i n i i i i i o L Li Wholly demolished Li El 0 OL El Oi Li L 1.00 143.24 O Li Grade Partially demolished O 0 Ei L Li Li El Li O Li 0 3 Temporarily OiTempor demolished O El 0 i 0 l El O i O nL ary Wholly demolished O 0 0 i l l El O O O st ruc t Li ure total Grade Partially demolished Li 0 i Li 0 Li Li Li O before 4 Temporarily L expira demolished Li Li 0 El El Li o Li Li El o Li tion Wholly demolished O El Li Li 1.00 4.51 Li Oi 1.00 36.41 Li nL Grade Partially demolished O 0 0 O 0 O O n El o 5 Temporarily Li __ demolished Li Li El O Li i o Li Li o L [L Wholly demolished O n o o oL o i o o o F] Grade Partially demolished El Li Li Oi O L o i i o L 6 Temporarily Oi demolished l O Li El L . O El i i Li Wholly demolished O Li O El 1.00 4.51 El El 2.00 179.64 Li Li1 subtot Partially demolished O Li l Li OL LI Li Li o Li Li al Temporarily ni ___ demolished Li El El O Li O ri Li El o Li Li Wholly demolished _ LL i ° i i i ° ° Li Oi Grade Partially demolished Ol 0 i Li OL Li Li O page 21 of 64 . Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicall~ municipal for Xilang project (pipe network) n n o n o U r3 fLE E U fU UI Oa Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price _ *l Temporarily n . __ demolished O n U U U U U U U U U U Wholly demolished O E . U U U U O U U Ul U Grade Partially demolished [i U U U U U U El U U U 2 Temporarily n demolished U U O n . U U U U U U n Wholly demolished U U U U U U U U U U U U Tempor Grade Partially demolished U U U U U U U U U U U ary 3 Temporarily Ustruct demolished U U U U U U U U U U U U ure Wholly demolished U U U U U U U Ul U U U after Housin Grade Partially demolished U U U U U U U U U expira g 4 Temporarily ntion/i demolished U U U U U U U U U U U Ilegal Wholly demolished U U U U U U U U U U U sturuect Grade Partially demolished U U U U U U U U U U U 5 Temporarily U demolished U U U U U U U U U U n Wholly demolished U U U U U U U U U U U U Grade Partially demolished U U U U U U U U 6 Temporarily U demolished UU U U U U U U U U Wholly demolished U U U U U] U U U U U U U subtot Partially demolished U U U U U U U U U U U al Temporarily U __ demolished U U U U U U U U U U U U Wholly demolished U U U U U U U U U U U U Grade Partially demolished U U U U U U U U U U U 1 Temporarily U demolished U U U U U U U Ul U U U Wholly demolished U U U U U U U U U U U Grade Partially demolished U Ul U U U Uo U U Un page 22 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Xilang project (pipe network) nF o ] n ] n ] a - -n inn n F] in U TT Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Z Temporarily O] __ demolished F_ O El, O O O [O O n o n] Wholly demolished O F] ° O [] F] O] [O E] ° no 1 Tempor Grade Partially demolished [11 O O O] O] O] O] O] F F] F ary 3 Temporarily Ostruct demolished O O O O n El n] oo O ure Wholly demolished F F] F] F] F] F] F] F] F] O after Shop Grade Partially demolished F F] El F] F F F] F] O F F] expira 4 Temporarily O tion/i demolished F] F] F El F] F] F] F] F] F] O Ilegal Wholly demolished F F] F] F] F] O F] F F F F O struct Grade Partially demolished F] F F] F] F El F F] F F] F] ure 5 Temporarily F] __ demolished F]. F] F] O] O O] O O F O O F] Wholly demolished F F El F] F F El F] F] F] F] F] Grade Partially demolished F] F] F] F] F] El n F] El F F 6 Temporarily F] __ demolished F] F F F F F F F F F F] Wholly demolished El F F F] El F F F F] F] F] F] subtot Partially demolished F] F o] El F] F F] F] F] al Temporarily F] __ __ demolished F F F] F F] F] F] F] Wholly demolished F] F] F F] F F] F] F] Grade Partially demolished El F F] F] F F El F F] F F] Temporarily F] __ demolished El O El o] o F F o F] El o F] Wholly demolished F F F] F] El F] F El F F] F F] Grade Partially demolished . F] F] E] F] F] F El F] F] F 2 Temporarily n] __ demolished I] F F F] F] F F El F F] F F] Wholly demolished F] F F] F] F] F] o El F] F] F] O Temnor Grade Partially demolished F] El F] F] o F] page 23 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicall3 municipal for Xilang project (pipe network) [1n Eloi r, o F] n n on n n Fn El n Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price ary Temporarily . struct demolished O H H H H H H H H H H H ure Wholly demolished H H H H H HO H H n H H after Office Grade Partially demolished H H H H H H H H H H H expira 4 Temporarily ntion/i demolished H H H H H H H H H n llegal Wholly demolished H H H H HH H H H H struct Grade Partially demolished H H H H H H H H H H H H ure 5 Temporarily H __ demolished H H H H H H H H H H H H Wholly demolished H H H H H H H H H H H H Grade Partially demolished H H H H H H H H H H H 6 Temporarily H demolished H H H H H H H H H H H H Wholly demolished H H H H H H H H H H H H subtot Partially demolished Hl H H H H H H H H H al Temporarily HO demolished H H H H H H H H H H H H Wholly demolished H H H H H H H H H H H H . Grade Partially demolished H H H H H1 H H H H H H 1 Temporarily H demolished H H H H H H H H H H H H Wholly demolished H H H H H H H H H H H H Grade Partially demolished H H H H H H H H H H H 2 Temporarily H demolished H H H H H H H H H H H H Wholly demolished H H H H H H H H H H H H Tempor Grade Partially demolished H H H H HH H H H ary 3 Temporarily O struct demolished H H H H H H H H H H H H ure Foctor Wholly demolished H HOH H H H H H H H H H after y Grade Partially demolished H H H H H H H H H H H page 24 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Xilang project (pipe network) Frame structure Composite structure Brick and timber struci quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price expira bu d1 4 Temporarily F]tion/i ng demolished O O O O O O O O n c o Ilegal Wholly demolished F] F] F O O O n FI F F] F] struct Grade Partially demolished nF El o F F F] o oo ure__ _ _ _ _ _ _ 5 Temporarily O] _ demolished F] F] OF F] O El F] F] F] F F] Wholly demolished F F] F] F F] F] F F] F] O El F] Grade Partially demolished FO O F] O ] O 6 Temporarily O] demolished F] El F] O F] El El El F] F] F] F] Wholly demolished F] El O O] F] F] El F] F F] F]O O] subtot Partially demolished O O F] F] O El F] O O] O F] al Temporarily O] ___ demolished ] O ] ] ] ] ] ] ] O F F] Wholly demolished ] F] F] O F] O F F] O n] Grade Partially demolished El El F] F] O O O F] Temporarily F] demolished ] F] El F] O F] O O F F] Wholly demolished O F] El F] O F F] F] F] O O n Grade Partially demolished F] O El O F] O El F] El F] F 2 Temporarily F] demolished l F] F] F] ] O ] F n Wholly demolished OF] O F] El El F] El El F] F Tempor Grade Partially demolished OF O O F] O F] O O F] [L ary 3 Temporarily O struct demolished ] ] ] ] ] ] ] ] ] O F F] ure Wholly demolished O F] F] F] F] O O] F] n after Other Grade Partially demolished O F] O F] O F] O O F] F expira uses 4 Temporarily O tion/i demolished O O O O O O O O O O F O l1egal Wholly demolished l O O O O O O O O O E struct Grade Partially demolished F] F] F] o o o] El o o tire 2 of 64 page 25 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Xilang project (pipe network) []El ,] o] n oE oF FT El F o] Fo F] o n Frame structure Composite structure Brick and timber struci b_____ ._______________ quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Temporarily n] demolished El O] C O] O] O] O] n [o o] O] Wholly demolished OF F] F] El F] o] El o F] F] F] Grade Partially demolished F F El F] F] F F] F] n F] 6 Temporarily O] demolished OF] O] ] FO O F] F] O El OO F] Wholly demolished O F] O F] F F F] F] F] El no F] subtot Partially demolished F F . F] F F] F] F] F F] al Temporarily F] demolished O n o o o o o o o o o F] Wholly demolished El F] F] F] F F F] F] F F] F] Grade Partially demolished F] . El O] El O] F] El F] El o 1 Temporarily O] . __ demolished F El El F] El F] n F] F] o F] Wholly demolished O El F] F] n El F] F F F O] Grade Partially demolished nF F] o F] El oF o F] o 2 Temporarily F] ___ demolished I F F F F F F F F F O El Wholly demolished OF O El O F] El O n o o ] Tempor Grade Partially demolished FF F] F] F F] F] F F] F ary 3 Temporarily O struct demolished n o o o o o o o o o o F ure Wholly demolished [1 F] F] O] O F] F] O O n after total Grade Partially demolished F] El FF F] F El El El expira 4 Temporarily n tion/i demolished O O] O] O El O O] F] O F] O Ilegal Wholly demolished F El F F F F El [ F F] El struct Grade Partially demolished F F F F] F] El El F El F] ure 5 Temporarily n] _ _ demolished F] _ _Li I_ _ _ __ _ F F _ n] Wholly demolished I ] F F] F] F F] F F F] F] F] O Grade Partially demolished F] F] F] F] F] O page 26 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Xilang project (pipe network) nU U o n ~ n - o nU n o [n n o o Frame structure Composite structure Brick and timber struct quantity Floor area Unit price |Total price quantity Floor area Unit price Total price quantity Floor area Unit price Temporarily U demolished n U U U o o o o [ o o Wholly demolished 0 O 0 U U U O U O O O O subtot Partially demolished 0 O O U U U [o o E U U al Temporarily U ___ demolished O U O O O O O n U U U U Wholly demolished 0 UO U U U U U U U o O Grade Partially demolished O U U U U U U U U U 1 Temporarily O demolished U U U U U U U U U U Wholly demolished 2.00 32.58 750.00 24,431.89 2.00 140.14 2,450.00 343,338.59 6.00 215.58 2,508.97 O Grade Partially demolished 4.00 706.75 2,479.11 1,752,114.66 6.00 170.60 1,183.74 201,946.24 17.00 1,084.39 827.26 2 Temporarily U demolished U 400.4260601 750 300319.5451 6 171.516238 700 120061.3666 5 623.0350542 600 U Wholly demolished 1.00 15.22 700.00 10,652.53 U U U U 1.00 15.93 2,360.00 U Grade Partially demolished 4.00 124.88 700.00 87,414.54 1.00 7.27 650.00 4,724.19 1.00 68.46 550.00 3 Temporarily U demolished U 40.42347986 700 28296.4359 U U U U U U U U Wholly demolished U U U U 1.00 5.96 600.00 3,574.80 U U U U Total Housin Grade Partially demolished 6.00 887.50 2,609.76 2,316,169.82 1.00 25.28 600.00 15,168.07 1.00 4.76 2,340.00 g 4 Temporarily U71 demolished U 442.5273734 650 287642.7927 U U U U U U U U Wholly demolished 8.00 2,408.10 1,991.66 4,796,113.06 10.00 499.42 950.73 474,816.34 12.00 364.88 1,910.95 U Grade Partially demolished 15.00 1,861.13 1,910.31 3,555,333.60 12.00 270.99 1,193.94 323,548.34 10.00 220.91 1,986.35 5 Temporarily U demolished 5 1344.684287 600 806810.5722 6 286.0760953 550 157341.8524 1 71.0132333 450 U Wholly demolished 0 U U U U U U U U U U U Grade Partially demolished U U U U U U U U U 0 U 6 Temporarily U demolished U U U U U U U U U U Wholly demolished 11.00 2,455.90 1,967.18 4,831,197.48 13.00 645.52 1,272.98 821,729.73 19.00 596.39 2,139.12 U subtot Partially demolished 29.00 3,580.26 2,153.76 7,711,032.62 20.00 474.14 1,150.26 545,386.84 29.00 1,378.53 1,004.46 page 27 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicall3 municipal for Xilang project (pipe network) nnF n] o] o] ] F] o] oF n F] o n] o nn Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price - Temporarily F] ______ ______ demolished 5 2228.0612 638.7029879 1423069.346 12 457.5923333 606.223485 277403.219 6 694.0482875 584.6523863 F] Wholly demolished El F] O] O O] O O O O O O n] Grade Partially demolished O O O F F F F] F] F] 1 Temporarily F] __ demolished F] 0 O n o o n o o o F] Wholly demolished F] O F] O O O O O O n o 0] Grade Partially demolished 1.00 29.78 750.00 22,338.16 1.00 51.95 700.00 36,364.84 1.00 7.40 6,520.00 2 Temporarily F] demolished 0 14.60888475 750 10956.66356 F] 52.78223979 700 36947.56786 F 3.187308371 600 F] Wholly demolished O F] O F] O O F] OO El Grade Partially demolished F] O F] F] OF F] O F] 3 Temporarily F] __ demolished ] O 0 O O O 0 O 0 O 0 F] Wholly demolished El F] F] F] o] o F] F] Total Shop Grade Partially demolished O O O El O O F] 4 Temporarily n] __ demolished 0F F]I 0 0 OF El F] F] 0 O] F] Wholly demolished O F] F] 1.00 34.53 2,150.00 74,238.31 F] O 0 F] Grade Partially demolished O F] F] F] F] F] F] El El F 5 Temporarily n] _____ demolished OF O F] 1 0.003488195 550 1.918507218 O O F] F] Wholly demolished F]OF] F]OF] F]OF] F]F F] O OO n] Grade Partially demolished OF O F] O O O O O O F 6 Temporarily O] __ demolished O O O ] ] O O O 0 F F] Wholly demolished O] El 1.00 34.53 2,150.00 74,238.31 F] F] [L n] subtot Partially demolished 1.00 29.78 750.00 22,338.16 1.00 51.95. 700.00 36,364.84 1.00 7.40 6,520.00 al Temporarily O] ______ demolished F] 14.60888475 750 10956.66356 1 52.78572799 699.9900877 36949.48636 F] 3.187308371 600 F] Wholly demolished O F ] F] F] F] o o Fo n] Grade Partiallydemolished O n o o o o o o o o o page 28 of 64 r . Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicalld municipal for Xilang project (pipe network) - F] nn n o o n o r F F] Frame structure Composite structure Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Temporarily n] . demolished F] F] F] F] Wholly demolished F] F F] 0 0 F F F F F F] Grade Partially demolished F F F] F] F] F] F] o F 2 Temporarily n] _ _ demolished ] 0 F F] .F] F F F O F F] Wholly demolished F] F F F 0 F] F 0 0 F F] F] Grade Partially demolished F F] F] F] F] F F] F] 1.00 22.28 2,150.00 3 Temporarily F] __ demolished F] F O] F] F] O O] O] O O F F] Wholly demolished O] F] El F] r F] F] o El F o] Total Office Grade Partially demolished F F ] O 0 0 ] ] ] ] F 4 Temporarily F] demolished ] o ] ] ] o o o o o o F] Wholly demolished ] F ] ] ] ] F] F] O F F] . Grade Partially demolished F F] F] F] F] F] F] F] F] F] F] 5 Temporarily El demolished O F F 0 1 0.002325463 550 1.279004812 El F] O F] Wholly demolished O F O F]0 F F 0 O F] F] Grade Partially demolished l F] F] F] 0 OF F] 0 ] 0 0 6 Temporarily F] .demolished O_El_ OO0 0 O__] I 0_ O _ 0 0_ F] Wholly demolished F] F] F] F] F] F] F] O El F] 0 F subtot Partially demolished F] F] F] F F] F FF 1.00 22.28 2,150.00 al Temporarily Fl demolished F F] F F] 1 0.002325463 550 1.279004812 F] Pi F] F] Wholly demolished F] F] O F] F 0 F F] F] F F] H Grade Partially demolished F] FO F] ° F] El F 0 ] O0 1 Temporarily F] demolished O F F] 0 F] 0O F] Wholly demolished F F] . ° 0 FI F F 0 2.00 57.44 2,740.00 F] Grade Partially demolished 1.00 356.22 3,320.00 1,182,666.08 3.00 226.98 2,651.42 601,811.50 4.00 976.19 1,108.28 page 29 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Xilang project (pipe network) .________ Frame structure Composite structure Brick and timber struci .___Z_ quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price Temporarily ni demolished 0 144.4246473 750 108318.4855 Oi 40.18781245 700 28131.46871 Oi 498.5850136 600 n1 Whollydemolished Oi O Li Oi Oi Oi Oi Oi Oi Oi El ni Grade Partially demolished El Oi O n ] oi oi o 2.00 300.24 550.00 3 Temporarily Oi demolished 0i O Oi [l El Oi El El Oi 105.2837876 550 O Foctor Wholly demolished Oi El O Oi 1.00 49.51 600.00 29,707.11 Oi O El Total y Grade Partially demolished Oi . i °i Oi El El Oi Oi 2.00 50.08 500.00 buildi 4 Temporarily Li ng demolished l O i O OL i L O O O Li Wholly demolished O O O Li 2.00 374.16 1,909.47 714,440.02 5.00 314.75 2,180.49 ni Grade Partially demolished El Li El Li 3.00 286.27 2,149.52 615,345.06 2.00 97.51 2,200.00 5 Temporarily Li demolished Li . O Li El Li 132.026596 550 72614.62777 1 53.92320842 450 ni Wholly demolished O Li O El El Li Li O El O Li 0i Grade Partially demolished El Li O O Li Oi Li Oi Li 6 Temporarily El demolished Oi 0L0 0 El El n El o L Li Wholly demolished El Li Li O 3.00 423.67 1,756.44 744,147.13 7.00 372.19 2,266.84 Oi subtot Partially demolished 1.00 356.22 3,320.00 1,182,666.08 6.00 513.25 2,371.48 1,217,156.56 10.00 1,424.02 1,043.94 al Temporarily 0i ______ ______ demolished Li 144.4246473 750 108318.4855 L 172.2144084 585.0038764 100746.0965 1 657.7920096 579.700771 Oi Wholly demolished OL Li O O Li Li Grade Partially demolished El Oi Li Li Li El Li Li El Li Li 1 Temporarily Li __ demolished Li Li Li Li O O O Li El El Oi El Wholly demolished El Li LI Li 1.00 20.28 700.00 14,192.92 ni Li oi Fn Grade Partially demolished O Li O El Li O n El o Li El 2 Temporarily ni ______ demolished Ol Oi El Li 1 9.874253988 700 6911.977792 El Li Li Wholly demolished Li Oi Li LiOI O O L i 1.00 143.24 Li Oi Grade Partially demolished O Li O LI El Li [L El lI O page 30 of 64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicallI municipal for Xilang project (pipe network) nF] El ] F] F El~{]F f]Df] n1 F] F F]U] ________ .Frame structure Composite structure Brick and timber struct _______ ______ quantity Floor area Unit price iTotal price quantity Floor area Unit price |Total price quantity Floor area Unit price Temporarily F] demolished El O] El fO O] O] DI O] O O] O O] Wholly demolished O 0] El El 2.00 27.37 600.00 16,421.40 2.00 67.17 2,050.00 Total Other Grade Partially demolished 0] O O] O O] F 0 O 2.00 150.27 2,050.00 uses 4 Temporarily n] _____ demolished ] ] O O O O O O F 61.53272212 500 F] Wholly demolished 0 O O El 1.00 6.74 2,150.00 14,497.88 O 0 O O] Grade Partially demolished 0] O] O El 0 l F] Fn o o o 5 Temporarily F] demolished O ] O O ] O O O O n F El Wholly demolished O 0 El 0 O F] F] O] O F] F] F] Grade Partially demolished O F] O O El O O 0 O 0 O 6 Temporarily O] __ demolished O O O O O O n o o o o F] .Wholly demolished 0 O 0 O 4.00 54.39 829.45 45,112.20 3.00 210.40 654.41 F] subtot Partially demolished 0F El O O El 2.00 150.27 2,050.00 al Temporarily O] ______ ______ demolished O O O O 1 9.874253988 700 6911.977792 O] 61.53272212 500 F] Wholly demolished El El O F] F] El 0 0 El Grade Partially demolished O 0 ] 0 0 F] 0 El O F] Temporarily F] demolished O O O O F] O El O O_ O O O] Wholly demolished 2.00 32.58 750.00 24,431.89 3.00 160.41 2,228.81 357,531.51 8.00 273.02 2,557.58 F] Grade Partially demolished 6.00 1,092.76 2,706.10 2,957,118.90 10.00 449.53 1,868.90 840,122.58 22.00 2,067.98 980.29 2 Temporarily F] demolished O 559.4595922 750 419594.6941 7 274.3605442 700 192052.3809 5 1124.807376 600 O] Wholly demolished 1.00 15.22 700.00 10,652.53 O F] El F] 2.00 159.17 236.20 O] Grade Partially demolished 4.00 124.88 700.00 87,414.54 1.00 7.27 650.00 4,724.19 4.00 390.99 641.19 3 Temporarily O] demolished F 40.42347986 700 28296.4359 F] O F] F] F 105.2837876 550 F] Wholly demolished O] n o] o 4.00 82.84 600.00 49,703.31 2.00 67.17 2,050.00 n Total total Grade Partially demolished 6.00 887.50 2,609.76 2,316,169.82 1.00 25.28 600.00 15,168.07 5.00 205.11 1,678.28 page 31 of64 Cost estimate of compenstion for permanently affected house with Property right,house on residential plot,historicall] municipal for Xilang project (pipe network) rU n n i r. rU Ul ol n n n n ooon r Frame structure Composite structure | Brick and timber struct quantity Floor area Unit price Total price quantity Floor area Unit price Total price quantity Floor area Unit price 4 Temporarily n ______ demolished O 442.5273734 650 287642.7927 O O 0 nI U 61.53272212 500 O Wholly demolished 8.00 2,408.10 1,991.66 4,796,113.06 14.00 914.85 1,396.94 1,277,992.56 17.00 679.63 2,035.78 O Grade Partially demolished 15.00 1,861.13 1,910.31 3,555,333.60 15.00 557.26 1,684.83 938,893.40 12.00 318.42 2,051.77 5 Temporarily O demolished 5 1344.684287 600 806810.5722 8 418.1085049 550 229959.6777 2 124.9364417 450 n Wholly demolished OU U U U U U U U O Grade Partially demolished U UO 0 U U U Ul 6 Temporarily U demolished U U U U U U U U U U U U Wholly demolished 1 1.00 2,455.90 1,967.18 4,831,197.48 21.00 1,158.10 1,455.16 1,685,227.38 29.00 1,178.98 1,914.48 U subtot Partially demolished 31.00 3,966.27 2,247.96 8,916,036.85 27.00 1,039.34 1,730.82 1,798,908.25 43.00 2,982.50 1,098.23 al Temporarily U__ demolished 5 2387.094732 646.1178411 1542344.495 15 692.4690491 609.430933 422012.0586 7 1416.560328 578.7104529 page 32 of 64 v used house,temporary structure before expiration, shared by other Ol El O tEl- -- E 1 Awache -tablIe7 &. l.3BD - ,ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price El E El E El El El El El El El El E l El E I El El E 377,929.33 E El El El 3.00 143.16 2,640.00 377,929.33 155,865.50 El El El El 7.00 579.09 3,140.23 1,818,483.08 24454.31907 bl nl r rl 6.00 284.15 721.62 205,051.80 37,594.92 0 O Ol Ol 1.00 15.93 2,360.00 37,594.92 El El El El El El El El El E . El El O E El O O] O El Ol El 11,146.09 Ol O El 4.00 654.75 2,717.24 1,779,109.12 O O O Ol E O 248.43 650.00 161,477.50 671,489.95 Ol E El El 11.00 409.11 2,171.29 888,295.93 430,303.36 El E F] E 14.00 540.38 2,326.81 1,257,357.43 31955.95499 3 3 Ol nl 4.00 229.87 519.11 119,325.68 El El El El El El El El El El El El El El El El El El LI El El Ol El El El 0 EE 1,087,014.20 E El El El 15.00 568.19 2,294.67 1,303,820.18 597,314.96 El Ol El El 25.00 1,774.22 2,736.39 4,854,949.62 56410.27406 E El El 10.00 762.45 637.23 485,854.98 El El El~~~1 El E E El] l El El El E~ ~ ~~El l E El El El1 El El n oE El El E El El E ElElEElEEll page 33 of 64 v used house,temporary structure before expiration, shared by other Gi 0 D El El FT Attached table:18.1.3BD :ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price 48,263.59 El El El El 1.00 7.40 6,520.00 48,263.59 1912.385023 El El El l El 3.19 600.00 1,912.39 El El El El ElE lE El El El El El El El El El El l El El El El El El El El ElE lE lE lE El El El El El El El El El El El El El El El El El El El El El El El El 1.00 0.00, 550.00 1.92 El El ElElEElEEll El El ElE lElE lE El El ElElEElEEll El El El El El El El El El 48,263.59 El El El El 1.00 7.40 6,520.00 48,263.59 1912.385023 El El El El 1.00 3.19 599.95 1,914.30 El ElE El El El ElEll ElEl E lE lE lE El El El El El El El~~~~~~~~~~~1 El El El El El~~~1 El El El El El El El El El~~~1 El El El El E El El ElE ElI ElE El El El] page 34 of 64 v used house,temporary structure before expiration, shared by other o El El El - B L - 3 Attachctale:I8.I.3 ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price El El El El El El El El El El El El El El El El El El El1 El El El El El El El El El El El El El El El El El El El El El El El El El El El El El El El ELI El El El El El El El El 1.00 0.00 550.00 1.28 El El El El El El El El El El El ElI El El El El El El ElE El El El El El El El ElE El El El . E El El El ElE El El El El El El El El El El [] El 1.00 0.00 550.00 1.28 El El El El El El El El El El El El El El El El El El El El El El El El El El El 157,377.24 El El El El 2.00 57.44 2,740.00 157,377.24 635,299.33 El El El El 6.00 778.18 13,076.35 2,393,961.27 117842.848 El El El El El 352.07 664.72 234,028.81 El El El El El El El El El El El El El El El ElE El] El El El El El El ElE El ElI El El El El [] El ElE page 35 of 64 _ . o o, | used house,temporary structure before expiration, shared by other n n P P - 3 - - Attahed table 18.1.3RD ;ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price P - P P P P P P P P 638,417.78 P P P P 5.00 565.14 2,297.30 1,298,293.10 214,519.67 P P P D 3.00 345.02 2,343.48 808,547.31 23293.64153 P P P P P 157.02 517.03 81,185.72 795,795.02 P P P 0 7.00 622.57 2,338.14 1,455,670.34 849,819.00 P P P P 9.00 1,123.20 2,851.23 3,202,508.58 141136.4895 P P P P P 509.09 619.17 315,214.53 P . P P P P P P P P P P1 P P P 100 9.87 700.00 6,911 98 P P P P P P1 P P P P P= P P= P = P. P P P P P P P P page 36of 64 y used house,temporary structure before expiration, shared by other O O 0 L3 B O Attached table: I 1.3BD ;ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price El ol oT oT no lo o1 ol El oT °1 o El oT _ ° El O1 O O O 1.00 9.87 700.00 6,911.98 535,306.57 O O1 0 El 5.00 200.59 2,668.63 535,306.57 839,428.42 O1 0 O1 n 14.00 1,364.68 3,122.13 4,260,707.94 144209.5521 El o El El 7.00 649.28 689.85 447,904.97 37,594.92 O - 0 O 01 1.00 15.93 12,360.00 37,594.92 11,146.09 O1 O O 0 4.00 654.75 2,717.24 1,779,109.12 O1 El O O 0 O 248.43 650.00 161,477.50 I1,309,907.73 0 0 0 01 16.00 974.25 2,244.39 2,186,589.03 644,823.03 O OO 1 7.00 885.40 2,333.31 2,065,904.74 55249.59652 O OO 6.00 386.9 518.27 200,514.60 page 37 of 64 U . U U U U v used house,temporary structure before expiration, shared by other aI n FLI 7 a7 ET Attachcltable 18.1.3BD .ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price . n oI El _i == ] nI L 1,882,809.23 0I n oI o 22.00 1,190.77 2,317.40 2,759,490.52 1,495,397.55 0I Fn nI o 35.00 2,904.83 2,790.43 8,105,721.80 199459.1486 0I Fl [n oI 13.00 1,284.61 630.46 809,897.07 El Fl El LI LI LI LI LI L 162,963.34 L LI LI LI 5.00 212.57 2,381.85 506,301.93 171,808.55 El LI 0I aI 4.00 93.98 2,287.50 214,977.94 27244.30304 0I LI O n 4.00 83.65 645.72 54,014.85 o1 - o1 o] n o oo n o I LI LI Li LI LI -I El El LI ElI LI LI L LI Fl LI ILI o o El o El 2.00 218.79 2,450.00 536,035.11 El L LI El L oI 194.10 650.00 126,165.29 25,775.03 LI OI OI LI 9.00 1,951.61 2,344.89 4,576,322.55 O 1.00 16.72 1,650.00 27,590.56 11.00 1,150.53 2,339.83 2,692,032.55 o o L n LI 4.00 913.97 600.00 548,383.05 LI El LI El LI LI LI LI LI LI LI L~~~~DI Fl LI LI LI LI L 188,738.37 LI LI L nI 14.00 2,164.18 2,348.52 5,082,624.48 171,808.55 1.00 16.72 1,650.00 27,590.56 17.00 1,463.30 2,352.94 3,443,045.59 page 38 of 64 v used house,temporary structure before expiration, shared by other . U U o n IT AUacbed tae 1. I.3BD .ure ________ Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price 27244.30304 U U r- I 8.00 1,191.72 611.35 728,563.20 o1 o El o n o El El o o El o El n El o El n1 o n = = o = o n n o o U U U U U U U UoU U U U U U U U r U U U r U o U U U. U U U U U U U U U U U U U 1.00 34.53 2,150.00 74,238.31 U Uo U U 1.00 34.53 2,150.00 74,238.31 page 39 of 64 V used house,temporary structure before expiration, shared by other n o n o o o] Attached table: 18.1.3BD ;ure | Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price 47,912.38 0 O O O 1.00 22.28 2,150.00 47,912.38 O O O O O U U U U O U UO U U U U UO O U UO El U U UO _ U U- U Un _ U U o U U U U o Ul Uo o U U U U U U U U 47,912.38 U U 0 U 1.00 22.28 2,150.00 47,912.38 o El El El o n o oEn page 40 of 64 v used house-temporary structure before expiration, shared by other O___ l O O El O Attached table:18.1.3BD :ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price LI LI LI ~~ ~ ~~~lI El LI LI El El LI L] LI ~~ ~ ~~~lI LI I LI LI I LI [l El LI LI LI LI LI F] 47,891.22 LI I] LI L 1.00 24.56 1,950.00 47,891.22 971.8022525 LI LI LI LI 1.00 2.16 450.00 971.80 47,891.22 LI LI LI LI 1.00 24.56 1,950.00 47,891.22 971.8022525 L1 LI El El 1.00 2.16 450.00 971.80 LI0 LI El LI LI LI II LI LI El LI LI El El LI ElI L-I page 41 of 64 v used house,temporary structure before expiration, shared by other - O O O U] Attached table: 18.1.3BD ;ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price O] O [O O] O] O] O] O] O] 137,689.48 O] El O O] 2.00 67.17 2,050.00 137,689.48 308,043.93 O] O] 0] El 2.00 150.27 2,050.00 308,043.93 30766.36106 O 0] O El O 61.53 500.00 30,766.36 O] 0 UI 0 O] 1.00 6.74 2,150.00 14,497.88 U1 El U1 U] U] El n U] U] 137,689.48 O U] 0 U] U 3.00 73.91 2,059.12 152,187.36 308,043.93 U] 0 0 OU 2.00 150.27 2,050.00 308,043.93 30766.36106 O 0 O O 0 61.53 500.00 30,766.36 0 O1 _ 0 O1 OElO O 162,963.34 U] O 0 El 5.00 212.57 2,381.85 506,301.93 171,808.55 0 U] 0 U] U 4.00 93.98 2,287.50 214,977.94 27244.30304 = El U1 U] 4.00 83.65 645.72 54,014.85 ] l o o o n o o U 47,912.38 0 U] U] El 1.00 22.28 2,150.00 47,912.38 U] [ _ = r U] n U U] U] 137,689.48 O El U] U] 2.00 67.17 2,050.00 137,689.48 308,043.93 0 ] O O 4.00 369.06 2,287.14 844,079.04 page 42 of 64 y used house,temporary structure before expiration, shared by other O -O Of] El Attachedtabhe:I8.I.3BD ;ure _________ Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total pnce 30766.36106 O O O] F] F] 255.63 613.89 156,931.65 73,666.25 n] El o] El 12.00 2,017.44 2,336.10 4,712,949.96 F] 1.00 16.72 1 ,650.00 27,590.56 11.00 1,150.53 2,339.83 2,692,032.55 971.8022525 O O O 0 5.00 916.13 599.65 549,354.85. O~~~~~~~1 El O1 O O1 O X 0 374,319.07 El ] F 19.00 2,297.18 2,331.97 5,356,941.37 527,764.86 1.00 16.72 1,650.00 27,590.56 20.00 1,635.85 2,322.35 3,799,001.90 58982.46635 O] O O] El 9.00 1,255.42 605.62 760,301.36 o] . o] F] F] El [1 Fo . o F] F] FE O OO 2.00 32.58 750.00 24,431.89 569,395.79 F] F] El 0 16.00 1,288.67 634.51 817,669.72 322122.4104 0 O n F] 1.00 827.17 646.94 535,135.29 El El 0 0 F 1.00 15.22 700.00 10,652.53 37,655.14 F] 0 F O 6.00 200.61 647.00 129,793.87 O] O] El F El F] 40.42 700.00 28,296.44 El El F] 0 O] 1.00 5.96 600.00 3,574.80 O O 0 O 0 2.00 44.01 621.28 27,339.76 F]OF] F] O] 0O 8.00 870.77 578.31 503,575.91 8,500.27 OFI F] 13.00 678.85 583.17 395,886.16 page 43 of 64 V used house,temporary structure before expiration, shared by other n o o o L f Attached table:Ig.I.3BD .ure ________ Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price U U U U U 4.00 557.93 588.60 328,399.65 11 E l n I 1 n I1 nl Elnl 0 U UO 0 U 0 12.00 924.52 586.51 542,235.13 615,551.20 U U U U 37.00 2,212.14 619.62 1,370,689.52 322122.4104 U U U U 5.00 1,425.53 625.61 891,831.37 o1 o El o n o o1 o o U U U U U 2.00 81.73 718.22 58,703.00 U U U U U U 67.39 710.84 47,904.23 o~~~~~~~~~~~~~~~~~~pg o44o o of 64 U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U -o U U U U U~ ~ ~~~~~~~~~~~~~~~~pg U4 Uf U64U U U U U U U U U U U~~~~~~ v used house,temporary structure before expiration, shared by other °7 [° O [[ [7 Attached table:18.I.3BD .ure | Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price [o [ 1] El o 2.00 81.73 718.22 58,703.00 [o [o [o [o [7 [7 67.39 710.84 47,904.23 [7 [ [7 [7 [77 7 7[ o~~~~~~~~~~~~~~~~~~pg o45o o of 64 [7 [7 [7 [7 [7 [7 [7 [7 [o [7 [7 [7 [7 [7 [7 [o [7 [o [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [o [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7 [7o [7 [7 [7 [7 [7 [7 [7 [7 [oo [7 [7 [7 [7 [7 [7= [7[7[ [7 [7 [7 [7 [7 [7 [7 o7 [n [7 [7 [7 [7[7[7 [7=7= [7 [7 [7 [7 [7 [7 [7 [7 [7o page 45 of 64 V used house,temporary structure before expiration, shared by other o] F] F] n o i ET - Attacheitabe:I8.1.3BD ,ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price 446,597.39 0 0 O O 2.00 781.21 604.72 472,413.03 181308.1602 ] ] O F F 331.13 608.74 201,572.16 F] ] F] E] F] [] 165,130.64 F] 2.00 300.24 550.00 165,130.64 57906.08318 F] El n ] = ] F 105.28 550.00 57,906.08 F] F] F] F] F] 1.00 49.51 600.00 29,707.11 25,040.49 0 F] 0 F 2.00 50.08 500.00 25,040.49 El 0 0 0] O 1.00 99.21 550.00 54,564.70 O O El O F] 2.00 38.76 550.00 21,317.42 F] F F] F] F] F 26.77 550.00 14,722.55 o] F] a] ] F]0 2.00 148.72 566.65 84,271.81 636,768.52 F] LI F] F 8.00 1,170.29 584.39 683,901.57 239214.2433 _F F] 463.18 592.00 274,200.79 page 46 of 64 v used house,temporary structure before expiration, shared by other oi ni oi Li oi Li Attachecletable:i1.I.3BD ,ure _ Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price r1 5 5 El = El o| o- = Oi O Oi 0i O 1.00 20.28 700.00 14,192.92 Oi Oi Oi Oi El 2.00 27.37 600.00 16,421.40 OEl 0 El _ 0 0 ,1 O1 O O Eli Li L Li Li El El Li L Li=Li Li Li *Li Li 5 El Li El Li O O El El Li -O Li O El Li Li 3.00 47.64 642.56 30,614.32 Li . Li Li Li Li Li Li oLo El O Li Li 3.00 52.85 730.82 38,624.81 1,015,993.18 Li El O El 20.00 2,151.61 626.87 1,348,785.75 page 47 of 64 v used house,temporary structure before expiration, shared by other ni oi Li U L- U} Attached-tablelS.tl.3BD ,ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price 503430.5706 °i L °i °i 1.00 1,225.69 640.14 784,611.68 L oi T i °i Io 1.00 15.22 700.00 10,652.53 202,785.78 Li Li L1 n 8.00 500.85 588.85 294,924.51 57906.08318 Oi El 0i Oi 0i 145.71 591.61 86,202.52 Oi Oi O El O 4.00 82.84 600.00 49,703.31 25,040.49 El 0 Oi O 4.00 94.09 556.72 52,380.25 El O Li Li Li 9.00 969.97 575.42 558,140.61 8,500.27 Li O Li O 15.00 717.61 581.38 417,203.58 Li Li O Li O 4.00 584.70 586.83 343,122.19 O El O Li 0 17.00 1,120.88 586.25 657,121.26 1,252,319.72 El O 0 L 47.00 3,464.16 610.05 2,113,294.09 561336.6538 El I Li O 5.00 1,956.10 620.59 1,213,936.39 El El Li O Li O Li Li LiOLi Li El Li Li O Li Li o El Li Li El Li Li n Li page 48 of 64 y used house,temporary structure before expiration, shared by other I i oi ni o __ oi ni E] Atahadtable,18 1I3B)D .ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price Li Li Li Li Li Li~ ~~ ~ ~~~~ LI Li Li 0 0 Oi Oi O 2.00 40.91 O 0 oi LioI oi Li 2.00 40.91 O Li Li Li Li EJ Li LI Li Li Li Oi Li Li Li O O O El El Oi Li El O Li Li El Li Li Li Li Li Li Li Li Li Li Ol LiOLi Li Li O Li Li Li El o~~~~~~~~~~~~~~~~~~pg o49n o of 64 Li LiL iL iL iL page 49 of 64 I . , 8 r~~~F - y used house,temporary structure before expiration, shared by other Fn El o] Ft F El Atwachedtable:18.I.3BD ;ure _________ Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price El n_ _ El _ = n == o] F] F] I] FE o [ o] oo El o] °] Fo o 0 o] El °] n F1 El F] F o] F F1 = ] ° ~~ ~~ o o o1 o o E 0 El F]F F] F] F] El F] F] F F] F F] F] El F] F] F] F] F] F] F] F] F] F] ] F] El F] F] F] F] F] F] F]1 F] El o~~~~~~~~~~~~~~~~~~pg o o o of 64 o F] F] F] F] o F] F] F] o~~~~~~~~~~~~~~~~~~pg 50 o o of 64 v used house,temporary structure before expiration, shared by other o E El o U r AttacYed tabe:I 8.9.3BD :ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price El El El El El El~~~~~~~~~1 El El [l El El [I El El ~~~ ~~~~~~~El El El El El El ElEl El ElEl El El El El El ElE l lE E El El El El El El El E El El El El El El El El El~~~~~~~~~~~~~~1 El [] El E lE lE ]E El El El El~~~~~r El El E El El El E El lE lEE l Ol El El El El. El El El El El El El El []~~~~~~~1 El El El El El El El El El~~~~~~~1 El El El El ElE El E El El El El El El El El El El El El El ~~~~~~~~~~~~~~~~~~~~~~~~~El El El El El El El~~~~~~~~~1 El El El El E El El ElE El El El El El El ElE El El El El ElElE El El El El El El1 Ol El El El El El El Oe EO o~~~~~~~~~~~~~~~~~pg 51 o o of 64 v used house,temporary structure before expiration, shared by other ni El D LI - - L AttachedtableS1g..3ED ;ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price El Li Li Li Li Li L Li El Li Li Li Li Li Li Li L~ ~ ~~~~~~~~~~~~~~~i Li Li Li Li Li Li~ ~~~~~~~ 1.00 143.24 El Li Li 1.001 10.79 Li Li 1.00 10.791 Li Li Li oi oi Li El Li Li El ni Li Li n n Li Li Li Li o l 1. 0 .O O 2.00 14.3. L El El O O El O O E O O El 1.00 10.79 01 01 2.00 154079 O O page 52 of 64 V used house,temporary structure before expiration, shared by other I Li El o oI on Attached table:18.1.3BD .ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price 3 n oi ni El 3i ni 3i ni Li Li Li Li Li LiLI El Li Li Li Li Li Li 1.00 143.24 Li Li Eli LI Li Li i Li Li Li Li Li 1.00 10.79 Li Li 1.00 110.79 Li Li Li Li Eli Li Li Li Li LI Li Li Li Eli Li 2.00 40.91 Li1 Li Li Li Li Li L~ ~ ~~~ ~~i Li LiLiL Li 1.00 10.79 Li Li 4.00 194.94 Li Li page 53 of 64 v used house,temporary structure before expiration, shared by other Ol Ol El 5 0-) AttaTlhed t-ae; lS7I8.l.3 ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price I] El El El 3] El El El El 0l 2.00 41.24 O E 2.00 41.24 El O El 3.00 112.40 El OL 3.00 112.40 El El El 2.00 66.22 400.00 26,486.57 2.00 66.22 400.00 26,486.57 OlEl El El0 El El El El OO El El El El El El E~ ~ ~~~ ~~~~~~l El E l 1.00 257.53 Ol 0 1.00 257.53 El El 0l 4.00 357.72 El El 4.00 357.72 El E E El 147.02 300.00 44,106.15 El 147.02 300.00 44,106.15 El 2.00 27.77 E E 2.00 27.77 E El El 2.00 13.83 l El 2.00 13.83 El El El 1.00 13.44 250.00 3,359.23 1:00 13.44 250.00 3,359.23 El0 El El E El El El El El E1 E El El E E El El 5.00 326.54 E E 5.00 326.54 El El El 9.00 483.95 El El 9.00 483.95 El 0 E 3.00 226.67 326.25 73,951.95 3.00 226.67 326.25 73,951.95 El El El El El El El El El El El El El El El El El ~~~~~~~~~~~~~~~~~~~~~~~~~El El El El El El El El El ELi El El El El El El El El ELi page 54 of 64 v used house,temporary structure before expiration, shared by other . l O O Fl Ef - V Atmt "eable:1.3BID .ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price nl] El El El El I] l] ol nno El El [I El ~~~~~~~~El El] El El ElE E]E EiE El] El E El El El El El [El El] ~~~~~~~~~~~~~El El El El El El El [El El E El __~~~~~~~~~~E [E El [I [El El El El El El El El El] El ~~ ~ ~~~~El [E El El El] El [E El] [I El F] El E E El] El ~~~F] El El EliE El El El El El~~~1 El El] El U]El El o~~~~~~~~~~~~~~~~~~pg o o o of 64 ol [o nl ol ol o o o] El oE ol nl ol ol ol nl o o ol ol ol nl ol o [n El o ol [E nl ol ol o] o El n oE - l ol ol ol o] [o El E ol [o o o o o El El Elo TT o o n of T=00 X n E n X o~~~~age55 f 6 v used house,temporary structure before expiration, shared by other o] n ] O F] Attached table:18.1.3BD ;ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price F] D] D] D] F] D] F] F] F D] F] D] F F] F] F] F] F] F]~ ~~ ~ F] D] F] F] FF F] F] F] F] F] F] F] F] F] F] D F] F] F] F] D] D F] D F] F] F] F] F] F] El D E D EJ D D DI .] .F El F] F] F] F]. El .] F] F] F] 1.00 12.63 F] F] 1.00 12.63 F] F] El F] F] El F] F] F] F] F ] D]F F] F] D] F]] F] F] F] F] F F F] F] F] El F] ] ] F] I,] F] F] El F page 56 of 64 v used house,temporary structure before expiration, shared by other O 1 - E - - - Attached tale7e:8.1.3BD ;ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price El - l oT El El ol El El El H HEl l H Hl H H H O 1.00 12.63 O 1 O 1.00 12.63 El El H H H H H H H H H H 1.00 12.63 H0.0 H362 1.00 12.63 H0.0 1362 H H H H H H H H1 H O 1.00 34.83 El.0 1,362 1.00 34.83 40.0E,362 El 1.0I0 348 O1 0 1.0 348 [1 O page 57 of 64 H H H H | used house,temporary structure before expiration, shared by other oZ n o Fl [ fT Attached table:18.1.3BD .ure | Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price H H H H F] H~~~~~~~~~~~E H H H H 1.00 34.83 H H 1.00 34.83 E H H 1.00 2.84 400.00 1,136.29 1.00 2.84 400.00 1,136.29 H 2.00 41.24 H n 2.00 41.24 H H H 3.00 112.40 H H 3.00 112.40 H H H 3.00 69.06 400.00 27,622.86 3.00 69.06 400.00 27,622.86 H 1.00 12.63 H H 1.00 12.63 H O] H H H H H H H H H H 2.00 292.36 H H 2.00 292.36 H H H 4.00 357.72 H H 4.00 357.72 H 0 H H 147.02 300.00 44,106.15 H 147.02 300.00 44,106.15 H 2.00 27.77 H H 2.00 27.77 H H H 2.00 13.83 H H 2.00 13.83 H H H 1.00 13.44 250.00 3,359.23 1.00 13.44 250.00 3,359.23 page 58 of 64 v used house,temporary structure before expiration, shared by other O O L - - -i Attadchdtable . 18.3BD -ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price El 7.00 374.00 0 El 7.00 374.00 0 Oi O 9.00 483.95 Oi Oi 9.00 483.95 Oi Oi Li 4.00 229.51 327.16 75,088.24 4.00 229.51 327.16 75,088.24 Eili Li El El i Li I] Li 540,892.67 2.00 41.24 O Oi 12.00 429.54 2,115.44 908,663.15 897,069.83 3.00 112.40 El L 30.00 2,074.14 1,374.61 2,851,130.73 373821.0325 2.00 66.22 400.00 26,486.57 13.00 1,261.19 650.72 820,688.52 37,594.92 El O Li Li 2.00 31.15 1,548.98 48,247.45 37,655.14 El O Oi Li 6.00 200.61 647.00 129,793.87 Li Li O O O L 40.42 700.00 28,296.44 0L 1.00 257.53 O Li 2.00 263.49 13.57 3,574.80 11,146.09 .4.00 357.72 O O 12.00 1,275.27 1,836.86 2,342,483.99 Li Li 147.02 300.00 44,106.15 = I 589.55 562.72 331,748.94 697,264.99 2.00 27.77 0 l 32.00 3,300.17 1,808.45 5,968,194.39 438,803.64 3.00 30.55 903.19 27,590.56 40.00 2,383.58 1,823.00 4,345,276.13 31955.95499 1.00 13.44 250.00 3,359.23 13.00 1,715.21 582.71 999,467.61 1,275,752.57 5.00 326.54 Li El 48.00 4,024.35 1,721.69 6,928,679.78 1,384,674.71 10.00 500.67 55.11 27,590.56 88.00 5,933.60 1,629.48 9,668,684.73 page 59 of 64 I _ v used house,temporary structure before expiration, shared by other I l El El El El 0l Attached table:18.1.3BD ;ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price 405776.9875 3.00 226.67 326.25 73,951.95 26.00 3,606.38 604.54 2,180,201.51 El El El~~~1 El El ElI El El El Gl . El El El El On OI n El El ~~~~El El El El El El El El El El~~~1 El El El El El El 48,263.59 El El E Ol 3.00 89.14 1,200.03 106,966.59 1912.385023 El El 0 E El 70.58 705.83 49,816.62 El E El El El El El El El El E El El El El El El El ElOEl E E El El El E El El El El El El El El El El l El l El l 1.00 34.53 2,150.00 74,238.31 El E El El El El El E El El E El El El 1.00 0.00 550.00 1.92 ol 0 El0 E E El El El El ElE lE lEl El El El G 0 O1 O1 O1 O O O G El El El E El 1.00 34.53 2,150.00 74,238.31 48,263.59 El El E E 3.00 89.14 1,200.03 106,966.59 1912.385023 OlE El EL 1.00 70.58 705.83 49,818.53 O El El El E 0 E El E El El El El ElF] El ElE page 60 of 64 Y used house,temporary structure before expiration, shared by other [1 0 0 Q 111 l Attached table:18.1.3BD ure Simple strure re Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price n1 o1 El 0 o n 1 o O O O [O O] O O [1 47,912.38 U U U U 1.00 22.28 2,150.00 47,912.38 o U U U U U U U U U U U U U 1.00 0.00 550.00 1.28 47,912.38 U U U U 1.00 22.28 2,150.00 47,912.38 UoU U U U 1.00 0.00 550.00 1.28 X ~~~~~~~ El X zz onT = n 0 o~~~E E 11 11 El Fl El C 157,377.24 U U U U 2.00 57.44 2,740.00 157,377.24 1,081,896.72 U U U 8.00 1 ,559.39 1,838.14 2,866,374.30 page 61 of 64 y used house,temporary structure before expiration, shared by other ol El LI En nl Er Attached table:18.1.3BD .ure ________ Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price 299151.0081 En n [ n 683.20 637.59 435,600.96 O 1.00 12.63 0 Ol 1.00 12.63 O] nl 165,130.64 Ol E0 Er 2.00 300.24 550.00 165,130.64 57906.08318 El [ nl E El 105.28 550.00 57,906.08 ol El l Eo El 1.00 49.51 600.00 29,707.11 25,040.49 El El El El 2.00 50.08 500.00 25,040.49 Ol El El El E Ol El El [O 686,309.00 . E E E 7.00 688.91 2,033.29 1,400,749.02 214,519.67 El El E E 5.00 383.78 2,162.35 829,864.73 24265.44379 0 EE El 1.00 185.95 521.00 96,880.07 843,686.24 1.00 12.63 El El 11.00 808.48 1,963.96 1,587,833.38 1,486,587.51 E El El El 17.00 2,293.49 1,694.54 3,886,410.16 381322.5351 El El El El 1.00 974.43 605.88 590,387.12 E E El El 1.00 20.28 700.00 14,192.92 El El El El El El El El El El 1.00 2.84 400.00 1,136.29 2.00 12.71 632.98 8,048.27 0 El El El El 1.00 143.24 El El El El ElElE El El E ElF page 62 of 64 v used house,temporary structure before expiration, shared by other ol o o 17 0 n ttachedtalie:18.1.3BD .ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price cl El El E El El E E E 137,689.48 2.00 45.62 El El 6.00 140.15 1,099.59 154,110.88 308,043.93 E El El 2.00 150.27 2,050.00 308,043.93 30766.36106 O E El 61.53 500.00 30,766.36 El El El El El 1.00 6.74 2,150.00 14,497.88 ElEl[E El ElElElE El ElE lE lE lE 137,689.48 2.00 45.62 El ElI 9.00 310.41 588.91 182,801.68 308,043.93 El El El El 2.00 150.27 2,050.00 308,043.93 30766.36106 1.00 2.84 400.00 1,136.29- 2.00 74.25 522.77 38,814.63 El El El El El ElElE El El El El El El El ElE El El El El El El ElElE El 698,269.91 1 2.00 41.24 El El 15.00 507.25 2,129.58 1,080,233.31 2,027,230.15 3.00 112.40 ElI El 41.00 3,722.67 1,564.59 5,824,471.63 674884.4257 3.00 69.06 400.00 27,622.86 15.00 2,027.68 648.11 1,314.154.36 37,594.92 1.00 12.63 El El 4.00 187.01 257.99 48,247.45 250,698.16 El El El El 9.00 523.13 655.35 342,836.89 57906.08318 El El El El El 145.71 591.61 86,202.52 1137,689.48 3.00 303.15 El1 El 9.00 453.15 413.53 1187,392.79 344,230.52 1 4.00 357.72 ElE 16.00 1,4~75.61 1,813.19 12,675,568.4 page 63 of 64 V used house,temporary structure before expiration, shared by other n nl oI Li L Fl Attached table:18.1.3BD .ure Simple structure Total Total price quantity Floor area Unit price Total price quantity Floor area Unit price Total price 30766.36106 O 147.02 300.00 44,106.15 0I 651.08 556.79 362,515.30 1,383,573.99 2.00 27.77 [1 EJ 41.00 4,030.35 1,850.38 7,457,679.60 653,323.30 3.00 30.55 903.19 27,590.56 45.00 2,767.36 1,870.06 5,175,140.86 56221.39877 1.00 13.44 250.00 3,359.23 16.00 1,901.17 576.67 1,096,350.88 El Fl [] LI LI L LI LI L 2,257,128.30 8.00 384.79 LI El 69.00 5,177.77 1,694.47 8,773,553.15 3,275,482.13 10.00 500.67 55.11 27,590.56 111.00 8,488.78 1,651.36 14,018,017.79 819778.2687 4.00 229.51 327.16 75,088.24 31.00 4,725.64 605.04 2,859,223.06 page 64 of 64 Cost estimate of compenstion for stop-loss shared by other municipal for Xilang project (pipe network) Attached table 18.3.2.10.1 .2BD- 1 Use Type Total floor Unit price Total price area Grade 1 Shop Partially but permanently affected 7.40 168.00 - Grade 2 Shop Partially but permanently affected 7.40 120.00 888.29 Grade 3 Shop Partially but pernanently affected 80.00 - Grade 4 Shop Partially but permanently affected 50.00 - Grade 5 Shop Partially but permanently affected 25.00 - Grade 6 Shop Partially but permanently affected 15.00 - Grade___ _ 1 fc PSubtotal 7.40 permanentl 888.29 Grade I Office Partially but permanently affected . 96.00 - Grade 2 Office Partially but permanently affected 7 70.00 - pilang Grade 3 Office Partially but permanently affected 22.28 50.00 1,114.24 roject Grade 4 Office Partially but permanently affected 32.00 Grade 5 Office Partially but permanently affected 20.00 Grade 6 Office Partially but permanently affected 12.00 - Grade 1 Factorybuilding rSubtotal 22.28 1,114.24 Grade 1 Factory building Partially but permanently affected 60.00 - Grade 2 Factory building Partially but permanently affected 778.18 48.00 37,352.80 Grade 3 Factory building Partially but permanently affected 36.00 - Grade 4 Factory building Partially but permanently affected 150.27 24.00 3,606.37 Grade 5 Factory building Partially but permanently affected 345.02 14.00 4,830.29 Grade 6 Factory building Partially but permanently affected 7.00 - Subtotal 1,273.47 ______45,789.46 Total 1,303.16 47,791.99 Cost estimate of compenstion for stop-loss shared by other municipal for Xilang project (pipe network) Attached table: 18.3.2.10.1.3BD-2 Use Type Total floor Unit price Total price area Grade 1 Shop Temporarily affected 168.00 _ Grade 2 Shop Temporarily affected 3.19 120.00 382.48 Grade 3 Shop Temporarily affected 80.00 Grade 4 Shop Temporarily affected 50.00 Grade 5 Shop Temporarily affected 0.00 25.00 0.09 Grade 6 Shop Temporarily affected 15.00 Subtotal 3.19 382.56 Grade 1 Office Temporarily affected 96.00 Grade 2 Office Temporarily affected _ 70.00 Xilang Grade 3 Office Temporarily affected 50.00 project Grade 4 Office Temporarily affected 32.00 Grade 5 Office Temporarily affected 0.00 20.00 0.05 Grade 6 Office Temporarily affected 12.00 Subtotal 0.00 0.05 Grade I Factory building or warehouse Temporarily affected 60.00 _ Grade 2 Factory building or warehouse Temporarily affected 361.94 48.00 17,373.26 Grade 3 Factory building or warehouse Temporarily affected 36.00 Grade 4 Factory building or warehouse Temporarily affected 61.53 24.00 1,476.79 Grade 5 Factory building or warehouse Temporarily affected 159.18 14.00 2,228.54 Grade 6 Factory building or warehouse Temporarily affected 7.00 __________ Subtotal 582.66 _ 21,078.59 Total 585.85 21,461.20 Coot estimate of compenstion for business loss due to relocation shared by other municipal for Xilang project (pipe network) Attached table:18.3.2.10.2.3BD Use Type Total floor area Unit price Total price Grade I Shop Wholly and permanently affected 840.00 Grade 2 Shop Wholly and permanently affected 690.00 Xilan, Grade 3 Shop Wholly and permanently affected 560.00 project Grade 4 Shop Wholly and permanently affected 450.00 _ Grade 5 Shop Wholly and permanently affected 34.53 350.00 12,085.31 Grade 6 Shop Wholly and permanently affected 270.00 _ Subtotal 34.53 12,085.31 Cost estimate of cost for pipe relocation shared by other municipal for Xi network) Attached tablel 18.3.2.13.3BD Cost shre* Projec Type of pipe Materal of Diameter/sec cores/sze Quantity Total length Unit 1 Unit 2 BD _ 1 P*M(tLff) 41n 200x1002KL 2 2 BD IN P_____0_A)_ 600x300 7 2 661.83 59.26 BD Vq M P______ _______ Zi 3 BD bi l P*M(NJ,A) I 600x5oo 7 2 BD PEM(12(0T M'JL) M 3O0x200 62L 5 1 - BD M(ff) YI{ 220x110 El 1 98.61 167.12 91.81 BD1 | IN t( ) 1J 0 El 2 464.25 BD pi ______ _ _) 200xlO0 G 2 8.52 167.12 59.26 BD 9 _______ _ t i) 200x200 G 4 212.10 214.17 59.26 BD 11 ____(_ff_) _ 250x250 . 1 92.48 214.17 59.26 BD A IN (3 (e) 300x200 _ 4 171.12 289.11 59.26 BD A ____ __(__) 300x400 3 179.80 446.97 59.26 BD R q___) 400x300 n 1 60.28 446.97 59.26 BD A _________ 400x600 El 1 121.18 779.94 59.26 BD A PA __________ _ _(I) 5OOx200 G 1 35.92 417.73 59.26 BD 9f 1____ON __ __)_ 600x300 3 182.87 661.83 59.26 BD f PA ___f__ _(___) G 600x400 G 2 8.30 BD r ___(_____ 600x50o G 4 174.11 tqrAtJjt 39 1,809.54 BD P*01(±f) 2 - BD A _IN P_ _(_) E G G 1 BD A IN P__)__(___ _) _ 400x400 G 1I BD1 iPq)j(WflqA) I O I n,Ol 5 - BD -f _______) _ _ 0 7 143.05 1,557.38 679.14 BD A ___________ 400x400 O 2 155.32 343.28 679.14 BD Rq qi tt(9j ) 650x350 1 30.66 343.28 679.14 BD M)j 1___(___) 800x400 2 241.05 625.42 679.14 BD tq(m) 900x500 O 1 29.21 625.42 679.14 Ft,jJIJ =. 22 599.28 BD -i f Pe7,((- 7 ) _____ 400 O I -1 BD - PPe*7O((j) 9 400-150 I 1 BD r P____A __ _ ___ 100 LI 1 - BD PU Pe7K (S l ) _ _ 100 1 5 - BD \ _i_ A_______) ___VA,_ _ 1200 1 3 - 5,600.00 BD P 7j(N(0Ai) 0 150 O 3 - BD | IN f P A*(N 1 t) 200 1 1 - BD pU Pk7J((K9) Vf 300 O 2 - BD 1 Pe7k((4r,) 400-150 C 1 - BD 1 iPe71(t ) 100 2 BD A m P**( fl ) 100 1 1 BD #i f Pi7J((#) fA 100 El 1 BD M Pj7g((*) A 150 3 2 - I I BD i l7J(;R) 400 * 3 5.75 1,550.00 _ page 1 of 4 Cost sh4re* Projec Type of pipe Material of Diameter/sec Nuber of Quantity Total length Unit 1 Unit 2 t pie tion cores/size______ BD -R PA e__ _ _ 800 1 33.02 3,100.00 BD 0 97JQ* ) _ _ _ 150 1 21.12 530.00 BDF i _ _ _ _ __) _ _ 100 El 1 37.29 480.00 BD PA e__(la __) _ 150 2 136.88 570.00 BDr PA_ e____ __ _ 300 O 1 16.72 890.00 BD P @7 kA)_ 100 Do 10 325.60 480.00 BD m 7*(V) _ _ 1200 l 3 455.22 5,600.00 BDr i PA e_ _(_) _ 150 El_ 10 518.78 570.00 BD Rq PA (Qt ) ______ 200 4 267.62 660.00 BD1 gff __(___) __ 300 El 5 711.99 890.00 BD 9i« _______k ) _ ___ 800 C 2 387.69 3,100.00 BD e 7j(T i-t) ___ 400 D 2 233.03 1,550.00 BD T __ _ e ___ __) _ _ 400 _ _ 1 133.12 1,550.00 BD 9i PA ____7___( _ __) __ 800 1 51.55 3,100.00 BD I__\_l___) _ __ _ _ _ 200 2 2 379.56 800.00 } 1lk'JIift ________________ ________ __________ ________ 73 3,714.955 BD_ _134 6,123.77 page 2 of 4 lang project (pipe Unit 3 Total Rke l ___ _ 25,532.21 _ 2,433.03 95,700.63 25,286.81 90,037.34 112,328.18 30,517.87 101,696.02 17,133.48 153,540.64 654,206.20 902,848.69 = 264,285.87 31,343.92 _ 478,166.92 = 38,102.15 1,714,747.56 _________ 8,916.82 page 3 of 4 Unit 3 Total Rema 102,362.00 11,192.59 17,899.20 78,022.80 __________ 14,883.65 - 156,287.41 2,549,245.44 295,703.19 176,628.67 633,668.63 1,201,853.57 361,200.69 206,333.37 159,805.00 303,649.04 6,277,652.06 8,646,605.82 page 4 of 4 Cost estimate of compenstion for temporary land borrowing shared by other municipal for Xilang project (pipe network) attached table 18.3.2.7.2.3BD Grade I Grade 2 Grade 3 Grade 4 Grade 5 Grade 6 Subtotal Area of land borrowed 8,405.56 73,652.65 39,359.61 49,744.96 171,162.77 Area of cultivated land - 840.56 7,365.27 3,935.96 4,974.50 - 17,116.28 Unit price for cultivated land 6.50 6.00 5.50 5.00 4.50 4.00 31.50 borrowed Average time of borrowing 6.00 6.00 6.00 6.00 6.00 6.00 36.00 Cost of borrowing - 30,260.00 243,053.75 118,078.82 134,311.38 - 525,703.96 Cost of rehabilitation - 5,043.33 44,191.59 23,615.76 29,846.97 102,697.66 Compensation of standing crop - 4,202.78 36,826.33 19,679.80 24,872.48 85,581.39 Area of land for construction - 7,565.00 66,287.39 35,423.65 44,770.46 - 154,046.50 Unit price for construction land 8.50 8.00 7.50 7.00 6.50 6.00 43.50 Average time of borrowing 6.00 6.00 6.00 6.00 6.00 6.00 36.00 Cost of construction land - 363,120.03 2,982,932.40 1,487,793.19 1,746,047.97 - 6,579,893.57 borrowing page I of I