ARMENIA

Energy Efficiency Project




                Report No. 135626
                      MARCH 28, 2019
© 2019 International Bank for Reconstruction     This work is a product of the staff of The World    RIGHTS AND PERMISSIONS
and Development / The World Bank                 Bank with external contributions. The findings,     The material in this work is subject to copyright.
1818 H Street NW                                 interpretations, and conclusions expressed in       Because The World Bank encourages
Washington DC 20433                              this work do not necessarily reflect the views of   dissemination of its knowledge, this work may be
Telephone: 202-473-1000                          The World Bank, its Board of Executive              reproduced, in whole or in part, for
Internet: www.worldbank.org                      Directors, or the governments they represent.       noncommercial purposes as long as full
                                                                                                     attribution to this work is given.
Attribution—Please cite the work as follows:     The World Bank does not guarantee the
World Bank. 2019. Armenia—Energy Efficiency      accuracy of the data included in this work. The     Any queries on rights and licenses, including
Project. Independent Evaluation Group, Project   boundaries, colors, denominations, and other        subsidiary rights, should be addressed to
Performance Assessment Report 135626.            information shown on any map in this work do        World Bank Publications, The World Bank
Washington, DC: World Bank.                      not imply any judgment on the part of The           Group, 1818 H Street NW, Washington, DC
                                                 World Bank concerning the legal status of any       20433, USA; fax: 202-522-2625; e-mail:
                                                 territory or the endorsement or acceptance of       pubrights@worldbank.org.
                                                 such boundaries.
                                           

                                           


                                                          Report No.: 135626  

                                                                             

                                                                             




                PROJECT PERFORMANCE ASSESSMENT REPORT
                                ARMENIA
                       ENERGY EFFICIENCY PROJECT
                               (TF-12163)

                                   March 28, 2019 




 

Financial, Private Sector, and Sustainable Development 

Independent Evaluation Group 

 



                                          i
                                                         


    Abbreviations  

    ESCO            energy service company 

    EBRD            European Bank for Reconstruction and Development 

    ESA             energy service agreement 

    GEF             Global Environment Facility 

    GHG             greenhouse gas 

    ICR             Implementation Completion and Results Report 

    IEG             Independent Evaluation Group 

    KWh             kilowatt‐hour 

    NEEAP           National Energy Efficiency Action Plan 

    NPV             net present value 

    PPAR            Project Performance Assessment Report 

    R2E2 Fund       Renewable Resources and Energy Efficiency Fund 

    UNDP            United Nations Development Programme 




Director‐General, Independent Evaluation                               :    Ms. Alison Evans 
Director, IEG Financial, Private Sector and Sustainable Development    :    Mr. José Candido Carbajo Martinez 
Manager, IEG Sustainable Development                                   :    Ms. Midori Makino 
Task Manager                                                           :    Ms. Victoria Alexeeva 




                                                       ii
                                                                                              




Contents
Preface .......................................................................................................................................................................... v
Summary .................................................................................................................................................................... vi
1. Project Background and Context .................................................................................................................1
     Sectoral and Institutional Context .................................................................................................................. 1
         Energy Efficiency Policy, Legal and Regulatory Framework ............................................................................... 1
         Energy Efficiency Financing ........................................................................................................................................ 2
         World Bank Group and Donor Support in Energy Efficiency ........................................................................... 2
2. Results.....................................................................................................................................................................6
3. What Worked, and Why?.................................................................................................................................9
     Design and Preparation ....................................................................................................................................9
     Implementation and Supervision ................................................................................................................. 10
4. What Didn’t Work, and Why? ..................................................................................................................... 11
     Design and Preparation ...................................................................................................................................11
     Implementation and Supervision ................................................................................................................. 12
5. Lessons ................................................................................................................................................................ 14
Appendix A. Project Ratings.............................................................................................................................. 19
Appendix B. Project Data and Other Issues ................................................................................................ 28
Appendix C. R2E2 Fund Energy Efficiency Investments, Financial Data, and Estimated Energy
  Savings................................................................................................................................................................. 30
Appendix D. Overview of Main Donors and International Financial Institution Funds Available for
  Energy Efficiency in Armenia ....................................................................................................................... 32
Appendix E. List of Existing Energy Efficiency Legal, Regulatory, and Normative-Technical
  Documents in Armenia.................................................................................................................................. 33
Appendix F. Project Performance Assessment Report Overview ........................................................ 38
Appendix G. Methods and Evidence.............................................................................................................. 39
Appendix H. List of Persons Interviewed ...................................................................................................... 40
Appendix I. Bibliography .................................................................................................................................... 44
Appendix J. Borrower Comments ................................................................................................................... 45
 




                                                                                            iii
                                                                       


Tables
Table 1.1. Energy Efficiency Project Financing by Source and Component ($, millions) ................... 4
Table 2.1. Energy Efficiency Onlending of R2E2 Fund and Estimated Energy Savings ....................... 7
 


Figure
Figure 1.1. Energy Efficiency Project Theory of Change ................................................................................5




This report was prepared by Victoria Alexeeva who assessed the project in November 2018. Vahe 
Odabashian and Artak Eloghlyan provided technical assistance as local consultants. The report was peer 
reviewed by Istvan Dobozi and panel reviewed by Christopher David Nelson. Romayne Pereira provided 
administrative support. 




                                                                     iv
                                                     v 



Preface
This Project Performance Assessment Report (PPAR) of the Independent Evaluation Group (IEG) of the 
World Bank Group evaluates the development effectiveness of the Energy Efficiency Project in Armenia 
(P116680). The project was selected for a PPAR to learn from an innovative pilot project that influenced 
the design and experience of other energy efficiency projects and interventions. Energy efficiency is of 
strategic importance for the World Bank given its role in supporting climate change mitigation, which is a 
major corporate priority. 

The project development objective was to reduce energy consumption of social and other public facilities 
in Armenia and decrease greenhouse gas emissions through the removal of barriers to the 
implementation of energy efficiency investments in the public sector. The project was financed through a 
Global Environment Facility (GEF) grant and government funds totaling $10.7 million. The project was 
implemented in 2012–16.  

This PPAR presents its findings and conclusions based on a review of the World Bank’s project 
documentation, combined with a field mission to Yerevan, Armenia conducted jointly with the GEF’s 
Independent Evaluation Office (IEO) in November 2018. IEG and IEO conducted interviews with a range 
of different stakeholders linked to the project, including government officials, the implementing agency, 
World Bank staff, other development partners, academia, beneficiaries, and the private sector.  

This report is a pilot effort to reform the structure of the PPAR. The pilot simplifies the main text by 
focusing on what worked and what did not, by covering other issues in the main text only if they were 
significant in this project, and by emphasizing the learning function of the report rather than project 
ratings. However, accountability elements are retained: project ratings and their justification are still 
present in appendix A, and these ratings are still based on the IEG‐Operations Policy and Country 
Services harmonized project evaluation guidelines, based on assessment against project objectives. 

The PPAR mission was conducted together with Anna Birgitta Viggh, GEF IEO senior evaluation officer. 
Artak Eloghlyan and Vahe Odabashian were local consultants who supported the mission in Armenia 
and provided technical assistance. The PPAR team is grateful to Sylvie K. Bossoutrot, country manager, 
and the World Bank Country Management Unit in Armenia for the IEG mission support. Emil Zalinyan 
provided invaluable technical inputs, and Irina Tevosyan assisted with the most efficient mission 
organization and logistics. The PPAR team appreciates the generous time and attention given by the 
government institutions and all concerned parties (see appendix H for a complete list of stakeholders 
who provided inputs for this project assessment). 

Following standard IEG procedure, copies of the draft PPAR was shared with relevant government 
officials for their review and comment. All comments are included in appendix J of this report. 




                                                     v
                                                 




Summary
Project Background and Description
The project development objective was “To reduce energy consumption of social and other 
public facilities, and its global environmental objective was “To decrease greenhouse gas 
emissions through the removal of barriers to the implementation of energy efficiency 
investments in the public sector.” The project was appraised for $10.7 million financed 
through a Global Environment Facility (GEF) grant of $1.82 million, $8.3 million from 
government funding, and cofinancing from the implementing agency, the Renewable 
Resources and Energy Efficiency (R2E2) Fund, estimated at $0.54 million. The GEF‐financed 
project was carried out in 2012–16. 

This was a pilot project designed to demonstrate a replicable and sustainable model for 
energy efficiency investments in Armenia’s public sector. The project was to finance energy 
efficiency upgrades and retrofits in public and social facilities and remove barriers that 
hampered the wide penetration of energy efficiency investments in Armenia’s public sector. 
Through public sector energy efficiency investments, the project intended to demonstrate 
the viability of energy efficiency investments and their economic benefits. Technical 
assistance was geared to help remove the existing barriers to the realization of energy 
efficiency potential and create an enabling environment for energy efficiency in Armenia’s 
public sector. These interventions were to lead to reduced energy consumption in public 
and social facilities and a decrease in greenhouse gas (GHG) emissions in Armenia. 


Results
The energy consumption of selected public and social facilities whose improvements 
were funded by the project was reduced significantly. The project financed energy 
efficiency retrofits and upgrades in eligible public and social buildings in Armenia. Sixty‐
three subprojects were completed at project closure, estimated to result in lifetime energy 
savings of about 540.2 million kilowatt‐hours and CO2 emission reduction of about 145,700 
tons. The results were almost three times the original targets set at appraisal: 216 million 
kilowatt‐hours and 50,500 tons equivalent of CO2. The project invested in 124 public 
buildings, exceeding its target, though this represented only a small fraction of the overall 
needs. This was about 2 percent of more than 5,800 public buildings in Armenia, and 
according to the government’s National Energy Efficiency Action Plan (NEEAP‐2), the 




                                               vi
                                                




commercial and public service sector has recorded a steady increase of energy consumption 
since 2010. 

The project contributed substantially to removing energy efficiency policy, 
informational, and knowledge barriers. The government adopted the second National 
Energy Efficiency Action Plan (NEEAP‐2) after technical support under the project. 
Extensive support geared toward raising awareness helped address informational and 
knowledge barriers to energy efficiency development, in addition to crowding in other 
donor funds for energy efficiency investments. The GEF project served as a reference point 
and source of knowledge to initiate energy efficiency activities in the public and private 
sectors. All stakeholders interviewed during the evaluation mission acknowledged the R2E2 
Fund’s role in energy efficiency information initiatives and in raising awareness of potential 
energy efficiency economic and environmental benefits. The government adopted energy 
service agreements (ESAs) developed under the project as sample agreements for energy 
efficiency procurement (Decree No. 728N, dated 25 June 2015). This was an important legal 
milestone to enable public entities to implement energy efficiency retrofits under the project. 
However, ESAs cannot be applied after project closure as they were adopted only for the 
project’s duration.  

The project was not successful in addressing financing barriers that constrain the 
implementation of energy efficiency investments at scale in the public sector. The project 
introduced a new financing model for energy efficiency retrofits in public and social 
facilities based on a repayment scheme from energy savings. An energy saving agreement 
was developed to facilitate financing of energy efficiency investments in public and social 
buildings without public budget support. However, the model has not become sustainable 
because the barriers to financing were not removed. Under the project, the R2E2 Fund 
provided turnkey services (energy audit, procurement, detailed design, financing, 
construction, and monitoring) for energy efficiency upgrades in public buildings. It put 
significant effort into the capacity building of construction firms, introducing them to 
performance‐based contracting, a new procurement concept, and measurement and 
verification of energy savings. Despite these efforts, the acquired capacity is largely 
contained within the fund, which cannot make large investments in energy efficiency in the 
public sector due to limited funds. Most important, the R2E2 Fund did not partner with a 
sizable number of commercial banks in a cofinancing mode. There was no spillover effect 
and continuity in the project’s results and no development impact beyond the project 
interventions. 




                                              vii
                                                 




What Worked, and Why?
Several features in the project design and implementation facilitated successful 
operationalization of the new concept for energy efficiency financing in the public sector. 
The project was equipped from the start with necessary technical and financial data to target 
public buildings with the highest energy‐saving potential. The R2E2 Fund did an extensive 
stocktaking exercise collecting the information on key technical parameters of buildings, 
energy consumption, and location to correctly identify the specific needs. The project 
effectively targeted public facilities with the highest potential for energy savings factoring 
both investment cost and energy savings. Unlike traditional procurement, which is based on 
the lowest cost, the R2E2 Fund used a net present value (NPV)–based procurement that 
specified minimum energy savings, but allowed bidders to propose their best technical 
solutions to maximize energy savings. Bidder selection was based on the highest NPV 
rather than the lowest cost. 

In addition, project implementation benefited greatly from a semiautonomous, highly 
professional project implementation unit, the R2E2 Fund, which had considerable 
experience, capacity, and effective management. Many stakeholders identified the R2E2 
Fund’s performance as a major driver of the successful implementation of subprojects 
because of its effective leadership and staff performance. 


What Did Not Work, and Why?
The project design focused on facilitating the implementation of subprojects in the public 
sector and building energy efficiency capacity for a range of stakeholders, but it failed to 
identify the essential characteristics of a sustainable energy efficiency investment model. 
Energy specialists note that it is important for an energy efficiency revolving fund to model 
partnership agreements for financial institutions to involve them in cofinancing or partial 
credit guarantee arrangements. Because the model introduced by the project is not being 
replicated and taken up at scale, it represents a missed opportunity to leverage cofinancing 
from local commercial banks and other private financiers in support of a learning‐by‐doing 
approach to build sustained, market‐based capacity to develop and finance energy 
efficiency projects.  

To increase the demonstration effects and development impact of similar projects, the R2E2 
Fund should have focused on promoting the energy efficiency agenda on a sustainable basis 
by partnering with different energy efficiency players. There was no concerted effort to 




                                              viii
                                                 




engage and build the capacity of a wider network of energy efficiency players outsourcing 
various functions to government entities, municipalities, financial institutions, and 
commercial entities. Besides subcontracting private companies for design and construction, 
no other entities had a role in the market, for example, identifying energy efficiency projects, 
preparing economic and financial appraisals, and conducting procurement. Greater efforts 
might have been necessary to partner with donor organizations. Given that there are 
numerous donors in Armenia with significant flows of grants and loans in energy efficiency, 
the R2E2 Fund might have been more active in securing additional financing to build a 
stronger capital base and ensure the flow of energy efficiency benefits in the public sector. 
This might have required a coordinated, donor‐supported effort that the government should 
lead. 

IEG project ratings are described in appendix A. 


Lessons
      Energy efficiency revolving funds can be market enablers by partnering with 
       commercial and financial institutions, but there are few prospects for scale up and 
       energy efficiency market transformation without the commitment of private 
       businesses. Ultimately, the domestic financial sector is the key source of sustainable 
       energy efficiency finance. Piloting new models for energy efficiency service 
       provision needs to create suitable local conditions and develop the capacity of 
       commercial financiers through initial cofinancing and risk mitigation. The R2E2 
       Fund in Armenia did not make systematic efforts to work and partner with financial 
       institutions and other commercial players in the implementation of energy efficiency 
       subprojects. The approach of creating a model of energy services provision for which 
       the R2E2 Fund is the main agent and construction companies are largely passive 
       implementing subcontractors limits longer‐term market impacts. In such a setting, 
       the risks of continuity of energy‐saving services become the risks of the continuity of 
       the revolving fund itself.  

      Practical demonstration of the technical and financial feasibility of an innovative 
       energy efficiency transaction program can only influence positive systemic change 
       in the legal and regulatory framework if there is government commitment to the 
       approach and long‐term funding. A new financing agreement was piloted under 
       this GEF project to enable public entities to implement energy efficiency retrofits 
       without affecting the budget of the subproject entities. As a result, public 




                                               ix
                                             




    organizations were able to enter into financing agreements that paid for the 
    investment through future monetized energy savings. However, without sufficient 
    government oversight and commitment to these approaches, the sustainability of the 
    model is impossible. The government adopted ESAs as sample agreements for 
    energy efficiency procurement only for the project’s duration, and ESAs cannot be 
    applied after the project closure. The project demonstrated the actual energy 
    efficiency improvements have the capacity to repay the investment, but this requires 
    legal support, access to capital and a system for the application of savings to future 
    investment.  

   Appropriate legislation and regulation can provide incentives to undertake energy 
    efficiency measures, but they are not sufficient without a strong government 
    energy efficiency agency in place that is responsible for monitoring and 
    enforcement. The energy efficiency regulatory and legal framework has advanced 
    significantly (attributable to the project in part), but enforcement and actual 
    implementation are still lagging in several dimensions. Although the government 
    enacted a new modality of energy efficiency delivery in the public sector that was 
    operationalized successfully under the project, it has not followed up with measures 
    to ensure a wider replication and scale‐up. A market transformative policy function 
    cannot be farmed out to a revolving fund or a public energy service company 
    lacking authority. The government of Armenia has no effective institutional focal 
    point for energy efficiency implementation support, though this is critical for the 
    wider diffusion of the successful energy efficiency delivery mechanisms in the public 
    sector. As a result, international donors largely set and implement Armenia’s energy 
    efficiency agenda. 

   The design of a pilot project needs to go beyond demonstration effects and lay the 
    foundation for sustainable operations over time. Although this energy efficiency 
    project effectively targeted public facilities with the highest potential for energy 
    savings, essentially harvesting low‐hanging fruit, the broader project experience
    revealed that many public buildings in Armenia did not comply with the eligibility 
    criteria. They are in a poor state of maintenance and repair that would require 
    substantial investments in structural rehabilitation, not just energy efficiency 
    retrofits. Energy cost savings alone supported by the project will not be sufficient to 
    cover the required investments in these buildings unless supplemented by 
    concessionary budgetary funds or grants. Instead of being developed as a direct 




                                           x
                                       




payment agent to finance the retrofits, the R2E2 Fund could have focused on 
enabling commercial financing by acting as an intermediary guarantee fund. As a 
guarantee fund, it could have fully de‐risked principal payments to commercial 
banks on a rolling basis, thereby attracting commercial financing. However, because 
the R2E2 Fund made direct payments, it largely decapitalized itself without 
leveraging its initial funding to attract commercial financing.  

                                           
                                           
                                           

                                                               José Carbajo Martínez   
                                              Director, Financial, Private Sector, and  
                                                           Sustainable Development 
                                                      Independent Evaluation Group




                                     xi
                                              



1.     Project Background and Context
Sectoral and Institutional Context
1.1     Three key challenges were identified in the energy sector at the time of project 
appraisal in 2011: emerging power supply gap, threatened energy security, and 
increasingly unaffordable energy tariffs (World Bank 2012). Energy efficiency 
represented a large untapped energy resource to Armenia. The Readiness for Investment 
in Sustainable Energy survey conducted by the World Bank in 2013–14 scored Armenia’s 
energy efficiency at only 37 out of 100. A World Bank study found that Armenia could 
save about 5 percent of its gross domestic product by investing in energy efficiency and 
estimated that public sector investments had the highest return on investment overall 
(World Bank 2008). The report noted that energy efficiency potential was not being 
realized because of informational, financing, regulatory, and institutional barriers. 

Energy Efficiency Policy, Legal and Regulatory Framework

1.2     The Armenian government prioritized the realization of economically viable 
energy efficiency potential as one way to solve key challenges in the energy sector. In 
2004, the National Parliament passed the Law on Energy Savings and Renewable 
Energy, creating the legal basis for energy efficiency in Armenia. However, the law was 
largely declarative and had no provisions for mandatory energy efficiency measures or 
enforcement. In 2011, the law was amended to add the concept of energy labeling for 
equipment and clarifications about energy audits. In 2016, amendments and addendums 
were made to the law, which defined a number of mandatory requirements, such as 
energy efficiency requirements for buildings; energy balance requirement; labeling 
requirements for energy consuming devices; disposal requirement for life‐threatening 
and environmental hazardous devices; and energy expertise requirement. The Law on 
Energy Saving and Renewable Energy was an important milestone that defined many 
concepts necessary for energy efficiency, serving as the basis to kick‐start energy 
efficiency regulatory measures and as the genesis for an energy framework. 

1.3      At the policy making and implementation levels, the most important documents 
at the time were the National Program on Energy Efficiency and Renewable Energy of the 
Republic of Armenia (2007) and the Action Plan of the Government of Republic of Armenia 
Aimed at the Implementation of the National Program on Energy Efficiency and Renewable 
Energy of Republic of Armenia (that is, the first phase of the National Energy Efficiency 
Action Plan (NEEAP‐1), adopted in 2010). The system of codes and standards related to 
energy efficiency of buildings was already well developed at project appraisal.1 
However, the construction norms (though mandatory) were neither checked for 
compliance by the licensed entities nor enforced by the relevant government bodies, 
                                            1
                                               


while application of the standards was completely voluntary. There was also no definite 
policy in place for public procurement of energy efficient products. Article 13 of 2011 
Amendment of the Republic of Armenia Law on Energy Saving and Renewable Energy 
referred to energy assessment of procured products and services to be implemented “in 
case if necessary.”  

1.4    At the institutional level, there were capacity gaps in policy‐making and 
regulatory bodies, and there was no dedicated energy efficiency agency in Armenia that 
could anchor and provide leadership on the implementation of energy programs by 
coordinating government policies in energy efficiency, serving as a clearinghouse for 
information on energy efficiency, and coordinating various donor‐funded programs.  

Energy Efficiency Financing
1.5      The government lacked sufficient resources for budget financing of energy 
efficiency investments in the public sector. Although the banking sector and capital 
markets were relatively developed in the country, local financial institutions were not 
lending for energy efficiency projects because of perceived high credit risks, high 
transaction costs, lack of experience with energy efficiency project finance, and lack of 
skills to prepare bankable energy efficiency investment projects. Awareness among 
financial institutions, private entities, public institutions, and energy consumers about 
the potential financial gains from energy efficiency investments was limited. Most 
importantly, there was limited borrowing capacity of public sector entities.   

1.6     In the local energy efficiency service market, about 30 private firms provided 
engineering or consulting services for energy efficiency investments in Armenia. 
However, these firms did not participate as performance contractors or energy service 
companies (ESCOs) that specialize in energy efficiency project development and 
implementation and are considered an important market‐based mechanism involved in 
the delivery of energy efficiency investments (World Bank 2008). ESCOs are broadly 
defined to include any company using energy performance contracting as part of energy 
efficiency investment transactions.2 There are many benefits in using ESCOs to help 
scale up energy efficiency projects through offering specialized technical and financial 
services for project design and implementation (Hofer, Limaye, and Singh 2016); they 
are also dependent on access to finance from financial institutions because of their small 
capital base.  

World Bank Group and Donor Support in Energy Efficiency
1.7    An extensive number of donor activities support energy efficiency in Armenia, 
and that number has increased over time. At project preparation, the World Bank Group 
had several operations in the energy sector,3 including a development policy loan, under 

                                             2
                                             


which the government adopted the Energy Efficiency Action Plan for 2010–13 that 
prioritized energy efficiency measures for various sectors. The International Finance 
Corporation supported the banking sector in developing energy efficiency lending and 
raising awareness on sustainable energy finance. The European Bank for Reconstruction 
and Development and the U.S. Agency for International Development (USAID) also 
supported the banking sector to increase the availability of bank financing for energy 
efficiency projects. The Global Environment Facility (GEF) administered by the United 
Nations Development Programme (UNDP) led the external support for policy 
improvements in the energy efficiency area, including energy efficiency in buildings, 
appliances, and equipment. It had a parallel project that was complementary in many 
aspects to the World Bank–implemented GEF energy efficiency project in technical 
support. 

Project Design and Financing

1.8     The project development objective was “To reduce energy consumption of social 
and other public facilities” (GEF grant agreement dated April 20, 2012, page 7). The 
global environmental objective was “To decrease greenhouse gas emissions through the 
removal of barriers to the implementation of energy efficiency investments in the public 
sector” (World Bank 2012, 4). 

1.9     Project preparation was originally initiated in April 2009 under the World Bank’s 
Electricity Supply Reliability and Energy Efficiency Project. In 2011, the project’s 
transmission component required more financing than originally budgeted; resources 
were reallocated from the energy efficiency component to make up for the shortfall, so 
the energy efficiency component was dropped. In late 2011, the government and the 
World Bank decided to implement the energy efficiency component as a stand‐alone 
GEF project, with cofinancing from reflows from earlier World Bank investment projects 
with the implementing agency, the Renewable Resources and Energy Efficiency Fund 
(R2E2). The government established the R2E2 Fund in 2005 as a nonprofit organization 
with a mandate to promote the development of renewable energy and energy efficiency 
markets in Armenia, and to facilitate investments in these sectors.4  

1.10   The project was financed through a GEF grant of $1.82 million, $8.3 million from 
government funding that consisted of repayments of the revolving funds under the two 
closed World Bank projects (Urban Heating Project and Renewable Energy Project), and 
cofinancing from the R2E2 Fund originating from service fees and interest under the 
proposed energy service agreements (ESAs) estimated at $0.54 million.5 The project was 
appraised for $10.66 million (table 1.1). The project implementation period was planned 
for about three years, from March 27, 2012 to June 30, 2015; the closing date was 


                                            3
                                                          


subsequently extended for another year to June 30, 2016 because of a slower‐than‐
expected start. 

Table 1.1. Energy Efficiency Project Financing by Source and Component ($, millions)

                                                                         Actual
                                                                         Costb
                                                         Appraisal                Percentage of
     Components                                       Estimatea (2012)   (2016)    Appraisal
     Component 1: Energy efficiency                         8.7           9.83        113 
     investments
     Component 2: Technical assistance                       1.96         1.49         76 

     Total                                                   10.66       11.32        106 

Source: a. From World Bank 2012.b. World Bank 2016.


1.11    The project’s theory of change was premised on demonstrating replicable and 
sustainable models for energy efficiency service provision and related cobenefits. 
Through energy efficiency investments in public and social facilities, the project 
intended to demonstrate the viability of energy efficiency investments, thus building the 
demand for energy efficiency financing. Technical assistance was geared to help remove 
the existing barriers to the realization of energy efficiency potential and create an 
enabling environment for energy efficiency in the public sector. These interventions 
were to lead to reduced energy consumption by public and social facilities and 
decreased greenhouse gas (GHG) emissions (figure 1.1). 




                                                        4
                                                            


Figure 1.1. Energy Efficiency Project Theory of Change




Note: EE = energy efficiency; GHG = greenhouse gas emissions.

The project included two components: 

        Component 1: Energy efficiency investments in public facilities—supported 
         energy efficiency investments in social and other public facilities, for example, 
         schools, kindergartens, hospitals, administrative buildings, and street lighting. 
         The target facilities were selected from more than 5,000 public and social facilities 
         in Armenia, for which the R2E2 Fund had collected information on key technical 
         parameters of buildings, energy consumption, and location.  

        Component 2: Technical assistance—supported (i) training and technical 
         assistance to build the technical and financial capacity of the R2E2 Fund; (ii) 
         program marketing and capacity building to target public sector entities to 
         address energy efficiency information and knowledge gaps, build demand for 
         financing, and improve the sustainability of energy savings; (iii) energy 
         efficiency policy development; (iv) capacity building for energy service providers 
         and other market actors to screen, design, appraise, finance, implement, and 
         measure energy efficiency investments in the public sector; and (v) project 
         management. 


                                                          5
                                               



2.     Results
2.1    The energy consumption of selected public and social facilities whose 
improvements were funded by the project was reduced significantly. The project 
financed energy efficiency retrofits and upgrades in eligible public buildings. Sixty‐three 
subprojects were completed at project closure, estimated to result in lifetime energy 
savings of about 540.2 million kilowatt‐hours and CO2 emission reduction of about 
145,700 tons. The results were almost three times the original targets set at appraisal: 216 
million kilowatt hours and 50,500 tons equivalent of CO2.6  

2.2     The project invested in 124 public buildings, exceeding its target, though this 
represented only a small fraction of the overall needs. This was about 2 percent of the 
more than 5,800 public buildings in Armenia. According to NEEAP‐2, the commercial 
and public service sector has recorded a steady increase in energy consumption since 
2010. Project‐financed facilities included schools and universities, hospitals and medical 
centers, penitentiary institutions, street lighting, kindergartens, and theaters. The project 
primarily financed insulation of walls, basements, and attics; repair or replacement of 
external doors and windows; window optimization; reflective surfacing of walls behind 
radiators; improvements or replacement of boilers and heating systems; and 
replacement of mercury vapor lamps with high‐pressure sodium vapor lamps (or light‐
emitting diodes) and incandescent bulbs with compact fluorescent lamps.  

2.3    No energy efficiency subprojects were implemented after project closure, 
despite a vast potential for energy efficiency investments in buildings. The R2E2 Fund 
did not make investments in energy efficiency retrofits in the public sector because of 
limited funds. Even though repayments from energy savings under subprojects were 
received in a timely manner, these were not sufficient to continue the same model of 
investments without additional flow of financial resources. The average payback period 
for subprojects was eight years,7 and the fund had about $1 million of funds. No 
additional financing was secured from other sources, including the government or 
donors. 

2.4      The R2E2 Fund resorted to onlending to deal with the challenge to its own 
sustainability. Toward the project closure, the fund started to explore opportunities to 
onlend its remaining capital through financial institutions at a higher interest rate. It 
reached agreements with one bank and two credit organizations to onlend to non‐
gasified communities and individuals to support energy efficiency solutions, including 
street lighting, insulation works for kindergartens and other community buildings, 
acquisition and installation of solar panels for water heaters, and photovoltaic stations in 
households (table 2.1).8 The disbursement of funds started at the end of 2017, 18 months 

                                              6
                                                            


after the project. However, this is a temporary solution for the fund because its 
onlending operations raise questions in the context of the existing legislation, which 
allows lending operations only to licensed financial organizations.  

Table 2.1. Energy Efficiency Onlending of R2E2 Fund and Estimated Energy Savings
                                                                                                       Annual Energy
       Financial Institutions                   Type of Projects                Beneficiaries
                                                                                                       Savings (kWh)
                                          Energy efficiency for
 ACBA-Credit Agricole Bank CJSC                                              6 communities          549,170
                                          communities
                                          Energy efficiency for non-         394 households
 ACBA Leasing CJSC                                                                                  n.a.
                                          gasified communities               and 1 LLC
                                          Energy efficiency for non-
 Global Credit UCO CJSC                                                      509 households         2,612,200
                                          gasified communities
Source: Renewable Resources and Energy Efficiency Fund, Armenia.
Note: kWh = kilowatt-hour; LLC = limited liability company; R2E2 Fund = Renewable Resources and Energy Efficiency
Fund.


2.5     The project contribution to energy efficiency policy development in Armenia 
is notable. The R2E2 Fund completed an assessment of the implementation progress 
under the first National Energy Efficiency Action Plan (NEEAP‐1), which described a set 
of programmatic and policy measures for energy efficiency improvement for all 
economic sectors of the country. It became the basis for developing and approving the 
second phase of the Republic of Armenia NEEAP‐2 on February 2, 2017 (2017–18) that 
assessed the effectiveness of ongoing efforts by the government, donors, international 
financial institutions, and the private sector to improve the efficiency of energy use since 
2010, when Armenia’s first NEEAP was developed.9 NEEAP‐2 identified important 
barriers to accelerating the implementation of energy efficiency measures and proposed 
measures to help overcome them. It is one of Armenia’s most important documents in 
the energy efficiency field that sets the policy environment.  

2.6      Extensive support geared toward raising awareness helped address 
informational and knowledge barriers to energy efficiency development. The GEF 
project served as a reference point and source of knowledge to initiate energy efficiency 
activities in the public and private sectors. All stakeholders interviewed during the 
evaluation mission acknowledged the R2E2 Fund’s role in energy efficiency information 
initiatives and raising awareness of energy efficiency cobenefits. Local officials, 
particularly the Municipality of Yerevan, confirmed their knowledge of the R2E2 Fund 
model of energy efficiency investments in the public sector that increased awareness of 
the economic potential for improving energy efficiency in municipal public buildings. 
Yerevan Municipality is initiating an energy efficiency project with financing from other 
donors (a loan from the European Investment Bank, grants from the Eastern Europe 
Energy Efficiency and Environment Partnership‐E5P, and the Green Climate Fund 
                                                          7
                                               


administered by the UNDP and GEF). This project will implement both seismic 
resilience strengthening (48 buildings) and energy efficiency measures (147 buildings) in 
public facilities of Yerevan, including kindergartens, and medical, cultural, and athletic 
buildings. The R2E2 Fund is also known for organizing workshops and an annual event 
(Energy Week) that brings together a wide range of stakeholders in the energy sector, 
including the government, the financial and private sectors, nongovernmental 
organizations, academia, and donors. The R2E2 Fund was incorporated in a Covenant of 
Mayors as a Supporter and is assisting the communities in preparation of Sustainable 
Energy Plan, and development of energy efficiency measures for community facilities.   

2.7     The project attribution is unclear regarding the removal of regulatory barriers 
for the implementation of energy efficiency investments in the public sector. The 
government made changes to 13 provisions of the Law on Energy Savings and 
Renewable Energy during the project implementation period,10 but these resulted from 
the concerted effort of other energy efficiency players in Armenia, particularly the 
UNDP‐GEF that provided support in equipment labeling, certification, and 
establishment of building codes, among others. The UNDP office in Armenia confirmed 
close collaboration with the R2E2 Fund in the technical area during project 
implementation. The government adopted ESAs developed under the project as sample 
agreements for energy efficiency procurement (Decree No. 728N, dated 25 June 2015). 
This was an important legal milestone to enable public entities to implement energy 
efficiency retrofits under the project. The legal adoption of ESAs opened the potential to 
be used in contracts that would pay for investment through future savings, however, 
ESAs could not be applied after the project closure.  

2.8     The net present value (NPV)–based procurement approach developed under 
the project has not been adopted formally. The current Law of the Republic of Armenia 
on Procurement (adopted December 16, 2016, last amended March 23, 2018) includes 
provisions for “non‐price” conditions and criteria (for example, stipulating minimum 
savings and maximum consumption) for the procured object (article 13), bidding (article 
30), and selection of the winner (article 34). This means there are no legal barriers to use 
NPV (or any other method, for that matter) in public procurement. The Procurement 
Law specifies that a public facility itself should proceed with tender to select a company 
to perform energy service in its building. The R2E2 Fund can be selected by a public 
entity via tender to proceed with an NPV‐based procurement, however it needs to be 
registered in the Anti‐Monopole Committee as a unique fund to proceed with energy 
saving measures in the facilities. Alternatively, a new draft degree could facilitate this, 
and the fund prepared a draft decree in 2017, but no progress has been made. At the 
time, the R2E2 Fund is negotiating with the government to accelerate the approval 
process. 

                                             8
                                               


2.9     Capacity and training activities had a positive effect, but there was no scale‐up 
in application of the acquired knowledge and skills for energy efficiency solutions in 
the public sector. The R2E2 Fund put significant effort into capacity building of 
construction firms, introducing them to performance‐based contracting, a new 
procurement concept, and measurement and verification of energy savings. The R2E2 
Fund developed its own internal capacity and technical skills to identify, assess, and 
implement energy efficiency projects. Under the project, the R2E2 Fund provided 
turnkey services (energy audit, procurement, detailed design, financing, construction 
and monitoring) for energy efficiency upgrades in public buildings. Project stakeholders 
praised its technical expertise, particularly energy auditing, as confirmed through the 
interviews. Despite these efforts and positive feedback, the acquired capacity is largely 
contained within the R2E2 Fund, which no longer invests in energy efficiency in the 
public sector because of lack of funds. The evaluation team found that none of the 
construction firms supported under the project developed specialized ESCO‐type 
services similar to those carried out by the R2E2 Fund. Construction firms still search for 
tenders and opportunities to continue business as usual, though some expressed interest 
in this business model provided the availability of concessional financing and long‐term 
funds. 

2.10     The project piloted, tested, and demonstrated an innovative concept for 
financing of energy efficiency investments in the public sector, but these have not 
been replicated to date. The project built a demand for energy efficiency financing in the 
public sector,11 but the model has not become sustainable. In practice, the R2E2 Fund 
acted as a public ESCO.12 It was a self‐contained entity that performed an ESCO‐type 
function providing ESAs. Besides the subcontracting of private firms for design and 
construction, no other entities had a role in the market, for example, identifying projects, 
preparing financial appraisals, and conducting procurement. There was no concerted 
effort to engage and build the capacity of a wider net of energy efficiency players 
outsourcing various functions to government entities, municipalities, financial 
institutions, and commercial entities. Most important, the R2E2 Fund did not partner 
with a sizable number of commercial banks in a cofinancing mode. Therefore, there was 
no spillover effects and continuity, and no development impact beyond the project 
interventions.  


3.     What Worked, and Why?
Design and Preparation
3.1     This pilot initiative was built on extensive analytical work and experience in 
the sector. A technical analysis was performed for Energy Efficiency Armenia (2008), 

                                             9
                                               


which estimated that about 5 percent of the country’s gross domestic product could be 
saved through energy efficiency investments, and investments in public facilities had the 
highest returns with paybacks of two to 10 years. A subproject pipeline was identified 
during project preparation. The R2E2 Fund did an extensive stocktaking exercise 
collecting the information on key technical parameters of buildings, energy 
consumption, and location (World Bank 2012). The fund built on the experience of 
working with the World Bank and the information and data collected under earlier 
operations in the public sector, including energy savings from the implementation of 
energy efficiency measures and financial viability of energy efficiency subprojects.13 This 
facilitated a solid basis for the project initiation.  

3.2     The effective analysis correctly identified the specific needs. The project was 
well prepared and equipped from the start with necessary technical and financial data to 
target public buildings with the highest energy‐saving potential. Financing of facilities 
was demand‐driven, but subject to some basic screening criteria and secondary technical 
and financial eligibility criteria. The project put an effective monitoring and evaluation 
system in place to assess the impact of energy efficiency improvements. An energy‐
saving agreement was developed to facilitate financing of energy efficiency investments 
in public and social buildings without budget support to demonstrate a new financing 
model and the economic benefits of energy savings.14  


Implementation and Supervision
3.3     Implementation benefited greatly from a semiautonomous, highly 
professional project implementation unit, the R2E2 Fund. The R2E2 Fund had 
considerable experience, capacity, and effective management. Many stakeholders 
identified the R2E2 Fund’s performance as a major driver of the successful 
implementation of subprojects because of its effective leadership and staff performance. 
From its functions as a project implementation unit under the World Bank projects, the 
R2E2 Fund evolved into an established commercial service provider and is marketing its 
services, taking on repayment and performance risks, and charging fees during the 
project implementation. The dedicated leadership and strong staff performance helped 
the project to carry out energy efficiency investments effectively in the public sector.  

3.4     Marketing efforts were essential for supporting effective implementation. The 
R2E2 Fund had to work around barriers that included a lack of incentives to implement 
energy efficiency projects, and a lack of capacity of public sector entities and design and 
construction firms. Potential clients were not interested in energy efficiency investments 
at the beginning of the project, or they preferred grant or budget support for energy 
efficiency. Implementation progress was very slow during the first 18 months, with 
delays in the finalization and signing of ESAs and setbacks on procurement—the first 
                                            10
                                                


five tenders failed, with one or fewer responsive bids (World Bank 2016). The R2E2 
Fund intensified its public awareness campaign, including in focused marketing to 
target clients, lobbying through line ministries, and advertisements on television, radio, 
and other media outlets. With awareness increasing about energy efficiency and 
increased energy tariffs, the demand for energy efficiency investments grew once the 
initial subprojects were disseminated, accelerating the pace of implementation under the 
project.  

3.5      Accurate targeting and the applied financial model facilitated the project 
achievement of its development objective of energy consumption reduction in public 
facilities. The selection criteria for public buildings and a choice of procurement method 
helped ensure the highest level of energy savings, thus maximizing financial returns 
under the project.15 The project effectively targeted buildings with the highest potential 
for energy savings, factoring both investment cost and energy savings. The application 
of an NPV‐based procurement resulted in more savings per dollar invested and 
significant overachievement of the project targets. Unlike traditional procurement, 
which is based on the lowest cost, the R2E2 Fund used an NPV‐based procurement that 
specified minimum energy savings but allowed bidders to propose their best technical 
solutions to maximize energy savings. Selection was based on the highest NPV rather 
than the lowest cost. All bids were required to meet or exceed the minimum energy 
savings level, which was about 30 percent. Overall, the project experience revealed that 
many public and social buildings in Armenia did not comply with the selection criteria 
and are in a poor state of maintenance and repair that would require substantial 
investments in rehabilitation and structural retrofits. Unless some budgetary funds or 
grants are offered, energy cost savings alone will not be sufficient to cover the required 
investments in these buildings. For example, of the 326 applications the R2E2 Fund 
received, 64 percent were rejected because they did not meet the eligibility criteria, 
mostly in relation to low‐baseline energy use (that is, underheating). 


4.     What Didn’t Work, and Why?
Design and Preparation
4.1     A shortcoming at project design was not factoring in cofinancing from 
financial or commercial entities. The project design focused on facilitating the 
implementation of subprojects in the public sector and building energy efficiency 
capacity for a range of stakeholders, but it failed to identify the essential characteristics 
of a sustainable energy efficiency investment model. Energy specialists note that it is 
important for an energy efficiency revolving fund to model partnership agreements for 
financial institutions to involve them in cofinancing or partial credit guarantee 
                                              11
                                              


arrangements, indicating that a minimum level (5–10 percent) of own financing by 
project sponsors is a good practice in energy efficiency funding. Given the legal 
constraints imposed on budget entities, the fund could have acted as a commercial 
banks’ co‐financing/guarantee partner. Financing could have been outsourced to a bank 
in a co‐financing mode or a guarantee form if co‐financing partners were not 
comfortable with the risk profile of the sub‐projects or sub‐project entities. Evidence 
from other countries suggests that ultimately, the local banking sector is the key source 
of sustainable and sizable flows of finance for energy efficiency in most countries. 
Because the model introduced by the project is not being replicated and taken up at 
scale, it becomes apparent that this was a missed opportunity to leverage cofinancing 
from local commercial banks and other private financiers in support of a learning‐by‐
doing approach and for building a sustained market‐based capacity to develop and 
finance energy efficiency projects. The project has not addressed a financing gap 
constraining the implementation of energy efficiency investments in the public sector at 
scale. The energy efficiency public sector niche remains the least developed in Armenia. 
Public buildings accounted for only 0.3 percent of energy efficiency investments 
channeled by international financial institutions for energy efficiency financing through 
local financial institutions in 2010–15.16 


Implementation and Supervision
4.2     The project had only modest spillover effects beyond the works under the 
project, despite intensive engagement and capacity building of construction firms. 
The NPV‐based procurement used under the project prompted construction companies 
to seek more modern and energy‐effective design solutions and technologies, bringing 
the business‐like mindset and sense of ownership to both beneficiaries and contractors. 
Many construction companies learned about opportunities in the field of energy 
efficiency, received trainings from the R2E2 Fund, and developed their capacities in 
procurement and monitoring of energy savings, but have remained classical 
construction companies. None of the companies that dealt with the R2E2 Fund’s energy 
efficiency initiatives assumed ESCO‐type activities similar to those performed by the 
fund. Based on the insights gained from interviews with the construction companies,17 
the fund has not propagated the establishment of ESCO companies with relevant 
guidance and technical help on how to become ESCOs. The fund assumed all of the 
business risks, leaving bidders with only the task of proposing energy‐saving solutions, 
completing the construction works, and ensuring energy savings.18 For increasing the 
demonstration effects and development impact of similar projects, the fund should have 
focused on promoting the energy efficiency agenda on a sustainable basis by partnering 
with different energy efficiency players instead of focusing on the fund’s sustainability. 
Preparation of feasibility studies and implementation supervision could have been 

                                            12
                                              


outsourced to qualified engineering firms. Energy specialists agree that partnering on 
the identification, financial and economic appraisal, and implementation of the energy 
efficiency subprojects could have generated a broader market demonstration effect and 
emergence of independent players that could ensure sustainable and continuous energy 
efficiency services in the market. 

4.3     Activities that sought to maximize energy savings did little to address 
building structural norms. The project applied the financial model using an NPV‐based 
procurement program that maximized energy savings with minimum investment in 
public and social buildings. The emphasis was on energy efficiency retrofits and 
upgrades that could ensure high energy savings and returns on investment. The project 
design did not allow to include measures that would not ensure cost recovery. The 
NPV‐based procurement developed and used during the project was widely acclaimed 
as a method that contributed to factoring in the future benefits of energy efficiency 
measures, prompting market players to seek and use more modern and effective energy 
efficiency solutions and technologies. Although NPV‐based procurement could be more 
effective and efficient than the least‐cost criteria traditionally used for public 
procurement that generally specify design, technical experts on the building codes 
raised concerns that this model that emphasized financial performance might make 
contractors attribute lower priority to meeting technical requirements of the energy 
efficiency‐related codes and standards in the country. This particularly applies to the 
relatively new codes: the Republic of Armenia Construction Norms (building codes) 
RACN 24‐01‐2016 “Thermal Protection of Buildings” (Ministry of Urban Development 
Order No. 120‐N of June 16, 2016) and RACN 22‐03‐2017 “Artificial and Natural 
Lighting” (Urban Development Committee Order No. 56‐N of April 13, 2017). In the 
design, bidding, and implementation processes, construction firms might tend to focus 
on NPV and have little incentive to follow the energy efficiency codes strictly. The major 
issue that adds complexity is that the codes (norms) in Armenia, though mandatory, are 
not always enforced vigorously, especially relative to energy efficiency refurbishing of 
buildings versus new construction.  

4.4     Greater efforts might have been needed to partner with financial institutions 
and donor organizations. Failure to include relevant activities and to plan for 
cofinancing from financial institutions in design does not preclude the project team from 
being flexible and proactive to explore these opportunities during the project 
implementation to ensure continuity of energy efficiency investments in the public 
sector. In addition, because there are numerous donors in Armenia with significant 
flows of grants and loans in energy efficiency, the R2E2 Fund might have been more 
active in securing additional financing to build a stronger capital base.19 Based on the 
feedback from various stakeholders and the mission’s own analysis, energy efficiency 

                                            13
                                              


donor efforts are not coordinated in Armenia, and there is competition for donor 
funding among academia, nongovernmental organizations, and financial institutions in 
Armenia—each is trying to highlight its own efforts and visibility in the energy field. 
The government of Armenia is supportive of developing the energy efficiency–enabling 
environment, but in the implementation of energy efficiency, it relies on significant 
funding from donors and international financial institutions.20 There is no strong 
institutional focal point in Armenia to coordinate various donor‐sponsored programs on 
energy efficiency to ensure a broader systemic impact. This might have required a 
coordinated, donor‐supported effort that the government should lead. 


5.     Lessons
5.1     Energy efficiency revolving funds can be market enablers by partnering with 
commercial and financial institutions, but there are few prospects for scale up and 
energy efficiency market transformation without the commitment of private 
businesses. Ultimately, the domestic financial sector is the key source of sustainable 
energy efficiency finance. Piloting new models for energy efficiency service provision 
needs to create suitable local conditions and develop the capacity of commercial 
financiers through initial cofinancing and risk mitigation. The R2E2 Fund in Armenia 
did not make systematic efforts to work and partner with financial institutions and other 
commercial players in the implementation of energy efficiency subprojects. The 
approach of creating a model of energy services provision for which the R2E2 Fund is 
the main agent and construction companies are largely passive implementing 
subcontractors limits longer‐term market impacts. In such a setting, the risks of 
continuity of energy‐saving services become the risks of the continuity of the revolving 
fund itself.  

5.2     Practical demonstration of the technical and financial feasibility of an 
innovative energy efficiency transaction program can only influence positive systemic 
change in the legal and regulatory framework if there is government commitment to 
the approach and long‐term funding. A new financing agreement was piloted under 
this GEF project to enable public entities to implement energy efficiency retrofits 
without affecting the budget of the subproject entities. As a result, public organizations 
were able to enter into financing agreements that paid for the investment through future 
monetized energy savings. However, without sufficient government oversight and 
commitment to these approaches, the sustainability of the model is impossible. The 
government adopted ESAs as sample agreements for energy efficiency procurement 
only for the project’s duration, and ESAs cannot be applied after project closure. The 
project demonstrated the actual energy efficiency improvements have the capacity to 

                                            14
                                                          


repay the investment, but this requires legal support, access to capital and a system for 
the application of savings to future investment.  

5.3     Appropriate legislation and regulation can provide incentives to undertake 
energy efficiency measures, but they are not sufficient without a strong government 
energy efficiency agency in place that is responsible for monitoring and enforcement. 
The energy efficiency regulatory and legal framework has advanced significantly 
(attributable to the project in part), but enforcement and actual implementation are still 
lagging in several dimensions. Although the government enacted a new modality of 
energy efficiency delivery in the public sector that was operationalized successfully 
under the project, it has not followed up with measures to ensure a wider replication 
and scale‐up. A market transformative policy function cannot be farmed out to a 
revolving fund or a public energy service company lacking authority. The government 
of Armenia has no effective institutional focal point for energy efficiency 
implementation support, though this is critical for the wider diffusion of the successful 
energy efficiency delivery mechanisms in the public sector. As a result, international 
donors largely set and implement Armenia’s energy efficiency agenda. 

5.4     The design of a pilot project needs to go beyond demonstration effects and lay 
the foundation for sustainable operations over time. Although this energy efficiency 
project effectively targeted public facilities with the highest potential for energy savings, 
essentially harvesting low‐hanging fruit, the broader project experience revealed that 
many public buildings in Armenia did not comply with the eligibility criteria. They are 
in a poor state of maintenance and repair that would require substantial investments in 
structural rehabilitation, not just energy efficiency retrofits. Energy cost savings alone 
supported by the project will not be sufficient to cover the required investments in these 
buildings unless supplemented by concessionary budgetary funds or grants. Instead of 
being developed as a direct payment agent to finance the retrofits, the R2E2 Fund could 
have focused on enabling commercial financing by acting as an intermediary guarantee 
fund. As a guarantee fund, it could have fully de‐risked principal payments to 
commercial banks on a rolling basis, thereby attracting commercial financing. However, 
because the R2E2 Fund made direct payments, it largely decapitalized itself without 
leveraging its initial funding to attract commercial financing.  

                                                      
1 The following construction norms (codes) were in place: RACN II‐7.02‐95 Construction 
Thermophysics of the Building Envelopes: Design Standards; CNM II‐7.102‐98 Construction 
Thermophysics of the Building Envelopes; RACN II‐7.01‐2011 Construction Climatology, CNM 
Construction of Settlements, Buildings, and Structures under Climatic Conditions of the Republic 
of Armenia; RACN IV‐12.02.01‐04 Heating, Ventilation, and Air Conditioning. There are many 
 

                                                         15
                                                                               


                                                                                                                                                              

energy efficiency standards relating to thermal insulation materials and elements in construction, 
including some that were approximated or harmonized with the European and ISO standards.  
2 Energy service companies (ESCOs) normally sign performance‐based energy contracts, design 
the project, install the required equipment, track savings, and receive compensation in the form 
of materialized energy savings and respective financial savings. In some cases, ESCOs might 
structure their projects in a way that might transfer the burden of initial investment in required 
equipment and components to clients, and in other cases, they might finance the whole project. In 
any case, energy savings represent the main source of income for an ESCO (Taylor et al. 2008). 
 Operations in the sector included the following: Urban Heating Project, International 
3

Development Association–Global Environment Facility (GEF) Renewable Energy Project, GEF 
GeoFund 2: Geothermal Project, and Electricity Supply Reliability Project. 
4 The Renewable Resources and Energy Efficiency Fund (R2E2 Fund) is governed by a board of 
trustees chaired by the Minister of Energy Infrastructures and Natural Resources, and includes 
Ministry of Finance, Ministry of Nature Protection, Urban Development Committee, Territorial 
Administration and Development, Central Bank of Armenia, and two nongovernmental 
organizations.  

5 Under energy service agreements (ESAs), an energy efficiency revolving fund, ESCO, or other 
energy efficiency service provider offers a full package of services to identify, finance, implement, 
and monitor energy efficiency projects for clients. The client is usually required to pay all of their 
baseline energy bill or a portion of it to cover the investment cost and associated fees until the 
contract period ends. ESA payments can also be bundled with a client’s energy bills (World Bank 
2014). 
6 This significant overachievement of the targets was a result of the application of a procurement 
based on net present value (NPV) under the project that maximized energy savings with 
minimum investments. The targets were based on conventional estimates at appraisal using the 
least‐cost criteria traditionally applied in Armenia. The NPV‐based procurement resulted in more 
savings per dollar invested. As the ICR (page 17) specifies, the focus was on repayable 
investments, and less funding was allocated to structural improvements. 
7 R2E2 Fund project data. 


 The R2E2 Fund reached agreements with ACBA‐Credit Agricole Bank CJSC, ACBA Leasing 
8

CJSC, and Global Credit Universal Credit Organization CJSC. 
9 The  progress  analysis  of  the  first  National  Energy  Efficiency  Action  Plan  (NEEAP‐1)  and 
development  of  the  second  plan  (NEEAP‐2)  were  delayed  because  of  difficulties  related  to 
availability, completeness, consistency, and reliability of energy efficiency and energy‐related data 
in the country. The lack of statistical data limiting the ability to properly assess the energy efficiency 
potential and set targets is cited in the implementation progress reports on NEEAP‐1 and NEEAP‐
2.  Despite  the  progress  made  in  2015–16  in  enabling  legislative  amendments  and  practical 
arrangements  made  between  the  Ministry  of  Energy  Infrastructures  and  Natural  Resources  and 
 


                                                                            16
                                                                               


                                                                                                                                                              

the  National  Statistical  Service  of  Armenia,  there  were  still  hindrances  for  the  development  of 
NEEAP‐2 caused by lack of data or its reliability.  

  The changes included development of energy efficiency and renewable energy standardization 
10

documents, labeling of energy efficiency equipment, energy audit regulatory framework, 
renewable energy net metering, tariffs, and so on. 
  The project received applications for project funding from 327 buildings, though 64 percent of 
11

the applications received in the first two years were deemed ineligible, mostly because of low 
baseline comfort or heating levels, thus requiring additional structural investments beyond 
energy efficiency interventions (World Bank 2016).  
  A public ESCO is usually a government‐owned company that provides financing and technical 
12

assistance for energy efficiency projects in the public sector, with repayments based on energy 
cost savings (Hofer, Limaye, and Singh 2016). 

  Energy audits conducted for eight public facilities and energy efficiency investments in 11 
13

schools under the World Bank–financed Urban Heating Project confirmed the financial viability 
of energy efficiency investments and indicated the reduction of energy consumption by 30–40 
percent. 

  For public clients, ESAs were not classified as debt, but rather long‐term service contracts, 
14

thereby allowing financing of government entities that are typically not allowed to borrow and 
municipalities that may have already reached their debt limits or otherwise have borrowing 
restrictions. 
15 The screening criteria included (i) confirmation of public ownership of facility; (ii) structural 
soundness of the facility (absence of major structural damages that may jeopardize integral 
stability of the building); (iii) absence of plans for closure, downsizing, or privatization of the 
facility; and (iv) comfort level of more than 50 percent (the comfort level ratio is defined as the 
actual energy consumption over the estimated energy consumption required to meet all heating 
and lighting national norms).  
   Most energy efficiency loans in 2010–15 totaling $87.96 million were provided to the industry 
16

(more than 35 percent), about 22 percent to the electricity sector and power generation, and 18 
percent to small and medium‐size enterprises. Approximately 14 percent was invested in 
municipal infrastructure projects. 
  IEG met with 12 construction firms, or about half of the energy efficiency and renewable energy 
17

private companies that dealt with the R2E2 Fund. 
  The project introduced a performance‐based approach, performing a commissioning test that 
18

was linked to the contractor payment. Payments were then made based on both milestones and 
performance. An indicative payment schedule was as follows: 10 percent advance payment, 10 
percent after approved final design, 50 percent approved after delivery of project per design, 20 
percent after a commissioning test to verify the actual energy savings (against the promised 
savings and NPV in the contractor bid), and 10 percent after a 12‐month defects and liability 
period (to allow for performance monitoring over one full heating season). 
 
                                                                            17
                                                                               


                                                                                                                                                              

  These donors include the World Bank Group, the European Bank for Reconstruction and 
19

Development, United Nations Development Programme, European Union, European Investment 
Bank, AFD, U.S. Agency for International Development, KfW, Green Climate Fun, GEF, Eastern 
Europe Energy Efficiency and Environment Partnership. 
20 This is also evidenced in NEEAP‐2 stating that significant additional funding necessary for the 
implementation of the energy efficiency investments will be required from donors and 
international financial institutions. 




                                                                            18
                                                             



Appendix A. Project Ratings
                                       ICR                         ICR Review                         PPAR
Outcome                        Highly satisfactory              Highly satisfactory         Moderately satisfactory 

Risk to development                Negligible                        Modest                        Substantial 
outcome 

Bank performance                   Satisfactory                    Satisfactory             Moderately satisfactory 

Borrower performance               Satisfactory                    Satisfactory             Moderately satisfactory 
Note: The Implementation Completion and Results Report (ICR) is a self-evaluation by the responsible Global Practice. The
ICR Review is an intermediate Independent Evaluation Group product that seeks to independently validate the findings of
the ICR. PPAR = Project Performance Assessment Report.




Relevance
Based on the overview provided in section 1, the relevance of objectives is rated high, 
and the design is rated modest. 

Relevance of Objectives
The project development objectives were highly relevant to the challenges in Armenia’s 
energy sector and the government priorities (discussed in sections 2.1–2.4). The World 
Bank Group’s 2014–17 Country Partnership Strategy specifically mentioned the 
continuation of support to energy efficiency measures and reduction in the energy 
consumption of public buildings (World Bank 2013). The Bank Group’s Systematic 
Country Diagnostic discusses the priority to scale up the development of energy 
efficiency measures and states that the government could consider scaling up existing 
successful models for financing public energy efficiency investments to include other 
social, public, and residential buildings (World Bank 2017).  

The global environment objective was consistent with the Global Environment Facility’s 
(GEF) climate change focal area, particularly GEF Operational Program 5 (Energy 
Efficiency), and strategic programs under GEF‐4: SP1 “Promoting Energy Efficiency 
Technologies and Practices in Appliances and Buildings.” 

Relevance of Design
The links between outputs, outcomes, and the project development objectives were 
clear. 

The project aimed to reduce energy consumption and decrease greenhouse gas (GHG) 
emissions through energy efficiency retrofits in public and social buildings. Technical 
assistance and capacity building were geared to remove barriers to the implementation 
of energy efficiency investments in the public sector, thus further decreasing GHG 
                                                           19
                                               


emissions. However, the project design failed to factor in cofinancing from financial 
institutions or commercial entities. In retrospect, this reduced the chances for the project 
energy efficiency financing model to be replicated at scale. According to energy experts, 
a minimum level of own financing by project sponsors (5–10 percent) is a good practice 
in energy efficiency funding. 

 The relevance of design is rated modest. 


Efficacy
The project development objective was “To reduce energy consumption of social and 
other public facilities” (GEF grant agreement dated April 20, 2012, page 7). The global 
environmental objective was “To decrease greenhouse gas emissions through the 
removal of barriers to the implementation of energy efficiency investments in the public 
sector” (World Bank 2012, 4). 

Objective 1: Reduction in energy consumption of social and other public facilities 

Outputs 

      Cumulative investments in public facilities: target $8.7 million, achieved $10.2 
       million 

      Number of public sector buildings commissioned: target 121,1 achieved 124 

Outcome 

      The project achieved 250 percent of the original target for energy savings in 
       retrofitted social and other public facilities. The original target was 216 million 
       kilowatt hours saved, and the actual achievement was 540 million kilowatt hours 
       saved. Original estimates were based on previous projects that used conventional 
       procurement. Because the project used a net present value (NPV)–based 
       procurement that maximized energy savings with a minimum level of 
       investments, the results were significantly overachieved.  
      The project achieved a reduction of 145,739 tons CO2 equivalent, almost three 
       times its target of 50,549 tons. 

The achievement of objective 1 is rated substantial. Although the outcomes were 
significantly overachieved by project closure, the downgrade from high (as assessed in 
the ICR and IEG ICR Review) reflects the lack of sustainability of the project outcomes. 
The longer‐term outcome failed to illustrate the ongoing impact on reduction of energy 
consumption and related CO2 emissions in the public sector. There was no continuity in 



                                             20
                                              


the project’s outcomes, and no development impact beyond the project interventions 
(see section 2, Results).  

Objective 2: Removal of barriers to the implementation of energy efficiency 
investments in the public sector 

Outputs 

      The analysis was conducted for the implementation progress of NEEAP 1 that 
       became the basis for the Second National Program on Energy Savings and 
       Renewable Energy (NEEAP 2), which the government adopted. 

      The government adopted an energy services agreement (ESA) in 2015 that the 
       Renewable Resources and Energy Efficiency Fund (R2E2 Fund) developed to 
       facilitate the implementation of energy efficiency investments in the public 
       sector.  

      The project introduced an NPV‐based procurement that was not mainstreamed 
       in the national procurement.  

      The R2E2 Fund organized a range of energy efficiency public awareness events, 
       including workshops, conferences, seminars, and training for potential bidders 
       and construction firms on procurement and the measurement and verification 
       process. The most widely known is an annual Energy Week conference led by 
       the R2E2 Fund that brings together a wide range of stakeholders in the energy 
       sector and energy efficiency. 

Outcome 

The R2E2 Fund contributed substantially to removing policy, informational, and 
knowledge barriers to energy efficiency implementation. The government adopted a 
sample agreement for energy efficiency investments, but it has not yet been used in 
practice. The legal adoption of ESAs opened the potential to be used in contracts that 
pay for investment through future savings; however, this measure on its own has not 
been able to institute an environment in which investment is under way in Armenia’s 
public sector. The project failed to address financing barriers that constrain the 
implementation of energy efficiency investments at scale in the public sector. Piloting 
new models for energy efficiency service provision needed to create local conditions and 
develop the capacity of financial entities through cofinancing and risk mitigation that 
could ensure their sustainability. The project did not sufficiently address the barriers to 
the implementation of energy efficiency investments in Armenia’s public sector that 
could facilitate the continued flow of energy savings (see section 2, Results).  

                                            21
                                              


The achievement of objective 2 is rated modest. 

Efficiency

Economic and Financial Analyses
At appraisal, a cost‐benefit analysis was conducted for each type of public facility 
(hospital, school, kindergarten, municipality building, and street lighting) that might be 
financed under the project. Ex ante estimated economic internal rates of return (EIRRs) 
ranged from 31 percent for kindergartens to 77 percent for street lighting. The average 
payback period ranged from 2.5 years for municipality buildings to 3.8 years for 
hospitals. The main quantifiable economic benefit from energy efficiency investments in 
public facilities was the economic value of saved energy. Energy savings were valued at 
the estimated long‐run marginal cost of electricity or gas supply, depending on the 
facility and the heating option used before implementation of energy efficiency 
measures. Other benefits, such as emission reduction, were not quantified.  

The ex ante financial internal rates of return (FIRRs) ranged from 14 percent for hospitals 
and schools to 32 percent of municipality buildings. Energy bill reduction was the main 
estimated benefit, valued at then‐current effective electricity and gas tariffs, depending 
on the type of facility and the heating option the facility used before energy efficiency 
investments. The estimated financial payback periods ranged from 4.2 to 7.7 years. 

At closure, ex post EIRRs were estimated for 47 completed and commissioned 
subprojects. The payback period for all of these subprojects ranged from 2.6 to 8.8 years, 
and energy savings ranged from 27 percent to 80 percent, with an average of 50.9 
percent. Because of the requirement for full repayment and NPV‐based procurement, 
the investment cost required to achieve these savings was low at only about $24.40 per 
square meter (in the buildings sector, about one‐half the investment required for World 
Bank projects in other countries) and at an impressively low cost of only $0.19 per 
kilowatt (for all subprojects). However, because of the relatively low grid emission factor 
in Armenia (0.234 kilograms CO2 per kilowatt‐hour) and baseline heating fuel (natural 
gas), the cost per ton of CO2 emissions reduction was higher than in other projects 
($72.20 per ton CO2), though the cost per ton of CO2 for the GEF grant was lower at only 
$29.80 per ton CO2.  

The ex post FIRRs ranged from 10 percent for schools to 38 percent for street lighting. 
Tariff increases during the project period and local currency devaluation by 26 percent 
affected FIRRs. The realized financial payback periods ranged from three to seven years. 




                                            22
                                                


Administrative and Operational Efficiency
In the early stage of project implementation, the uptake of subprojects was very slow 
because of a low demand for energy efficiency investments. This required a one‐year 
extension of the project closing date to complete the planned activities.  

Efficiency of the project is rated substantial. 

Outcome
Relevance of objectives is rated high, and relevance of design is modest. The first 
objective of reducing energy consumption of social and other public facilities was 
substantially achieved. The outcome targets were significantly overachieved by project 
closure—the stated energy and GHG savings appear significant only in relation to the 
very modest original targets. However, the longer‐term outcome failed to illustrate the 
ongoing impact on reduction of energy consumption and related CO2 emissions in the 
public sector. The second objective of reducing barriers to the implementation of energy 
efficiency investments in the public sector was modestly achieved. A financing barrier to 
the implementation of energy efficiency investments in the public sector remains. There 
was no continuity in the project’s outcomes and no development impact beyond the 
project interventions. Efficiency is rated substantial.  

Overall, the outcome rating is moderately satisfactory. 

Risk to Development Outcome
The energy savings from the investments in building retrofits are likely be maintained. 
The fund receives 100 percent of financial returns from these investments. At the 
institutional level, at project closure the R2E2 Fund was expected to be sustainable at 
least over the following three to five years, even without additional capital because the 
R2E2 Fund could support investments of $1.3 million to 1.5 million per year (according 
to the ICR). In fact, the fund is in a financial survival mode—additional donor support 
has not been secured, and there is no government support for energy efficiency 
financing. Onlending of the remaining capital of $1 million was a survival response and 
could not be continued under the fund’s legal status.  

In addition, the government is restructuring the sector by liquidating project 
implementation units of various international organizations and transferring their 
functions to ministries. Therefore, the fund’s future is highly uncertain because the 
government (which is completing the implementation of the World Bank projects) 
considers it a project implementation unit (based on the IEG interviews).  

Risk to development outcome is rated substantial. 

                                              23
                                              


Bank Performance

Quality at Entry
The project was based on extensive analytical work and the World Bank’s long‐standing 
engagement in Armenia’s energy sector. The implementing agency, the R2E2 Fund, had 
sufficient experience with implementation of World Bank projects.  

This project was originally designed as an energy efficiency component of the 2009 
Electricity Supply Reliability and Energy Efficiency Project. It was dropped from this 
project because of insufficient funds and later resurrected as a stand‐alone GEF project 
with the concept of using resources in the R2E2 Fund that had accumulated as 
International Development Association loan repayments of earlier World Bank projects.  

Overall, a significant shortcoming in the project design was not factoring in cofinancing 
from financial institutions, which lowered the project’s chances for replication and scale 
up of energy efficiency investments in Armenia’s public sector. In addition, the 
monitoring and evaluation (M&E) design had moderate weaknesses. 

Quality at entry is rated moderately satisfactory. 

Supervision
The World Bank team worked closely with the government and the R2E2 Fund in 
support of the energy efficiency project implementation and in training the staff in NPV 
evaluations and World Bank procurement methodology. It conducted periodic 
implementation support missions and provided operational advice and technical 
support when needed. The project complied with fiduciary and safeguard policies (ICR, 
page 23), and no related issues were raised during the IEG evaluation mission after 
project closure. 

In retrospect, because the pilot for energy efficiency financing has not been replicated, 
the World Bank might have provided direction and support to the R2E2 Fund to ensure 
a broader energy efficiency impact by, for example, engaging and partnering with 
financial institutions and commercial entities to ensure sustainability of the energy 
efficiency financing agenda (see section 4).  

Quality of supervision is rated moderately satisfactory. 

The overall Bank performance rating is moderately satisfactory. 

 



                                            24
                                                


Borrower Performance

Government
The government of Armenia initially demonstrated strong commitment to the project 
during implementation by (i) pledging reflows from the investments of two closed 
World Bank projects as cofinancing to the GEF grant; (ii) supporting line ministries and 
other public facilities that participated in the project; and (iii) strengthening the energy 
efficiency regulatory and legal framework. 

On balance, although the government supports the energy efficiency enabling 
environment, enforcement is lagging, and there is a lack of coordination of significant 
donor fund flows into energy efficiency without much development impact in energy 
efficiency in the public sector. The government has not provided support to the R2E2 
Fund to ensure scale up and continuation of the energy efficiency financing model in the 
public sector, which is the only existing program currently in Armenia for these types of 
investments. Thus, there is a lack of government commitment in investing in energy 
efficiency in the public sector and supporting the mechanisms to facilitate such 
investments. In addition, the fund’s director under the project was replaced, and there 
was no further continuity in the appointment of directors, who changed three times 
within two years after project closure. 

The government performance rating is moderately satisfactory. 

Implementing Agency
The R2E2 Fund has motivated and professionally competent personnel under strong 
and effective leadership who implemented the project and introduced several 
innovations to facilitate the energy efficiency implementation in the public sector. These 
innovations include (i) the introduction and implementation of ESAs, (ii) the use of 
NPV‐based procurement in an industry accustomed to least‐cost procurement, (iii) 
introduction of repayment obligations among clients accustomed to grant‐based 
financing and ensuring full and timely repayment, and (iv) establishment of 
performance‐based payments for contractors who were used to output‐based payments. 
It also provided support to contractors to strengthen their capacity to implement their 
subprojects, maximize the project’s NPV, and act in accordance with the World Bank’s 
procurement guidelines. It provided support to the government for upgrading its 
institutional and regulatory framework. The R2E2 Fund also implemented aggressive 
marketing campaigns and an accelerated implementation timeframe, which enabled it to 
exceed the targeted indicators. 




                                             25
                                               


The R2E2 Fund has resorted to on‐lending for energy efficiency projects after project 
closure. It is actively seeking to secure additional financing to continue its operation 
model and replenish the revolving fund.  

Implementing agency performance is rated satisfactory. 

Borrower performance rating is moderately satisfactory. 

Quality of Monitoring and Evaluation

Design
Two outcome indicators were identified to measure the achievement of the project 
development objectives: (i) energy savings in selected buildings, and (ii) related CO2 
emission reduction. A third indicator, the introduction of regulations, legislative 
amendments, and guidelines to further promote energy efficiency, was considered 
intermediate and should have been upgraded to a primary outcome indicator because it 
would affect all expected energy efficiency investments after the project finishes. 

The M&E design was highly simplistic and did not reflect the broad nature of activities 
planned under the technical assistance component. The types of barriers were not 
specified, and no clear outputs or targets were identified for the institutional outcomes. 
In addition, the targets of the outcome indicators were based on conventional 
procurement while the project intended to introduce a new NPV‐based procurement.  

Implementation
During project preparation and throughout implementation, the R2E2 Fund established 
its internal M&E capacity and systems for tracking subproject screening results, the 
pipeline of accepted subprojects, and the commitment and invested amounts for 
accepted projects. 

In addition, the fund developed a measurement and verification system for proper 
baseline determination of energy consumption, investment repayments (under ESA), 
NPV assessments, and payments to contractors. The R2E2 Fund, beneficiary, and 
contractor all monitored subproject performance indicators (indoor temperature, 
lighting intensity, energy bills, and so on), which helped minimize disputes among the 
stakeholders. The R2E2 Fund also conducted a beneficiary survey at the end of the 
project to document social impacts and client satisfaction with the investments.2  

Utilization
The R2E2 Fund used the M&E tracking system for reporting project progress and 
outcomes to the World Bank and the government, including the identification of 

                                             26
                                                          


subproject delays, repayment progress, and defaults. At the completion of each 
subproject, the M&E tracking system was used to evaluate energy savings and CO2 
reductions. 

The M&E quality is rated modest because of moderate weaknesses in the project M&E 
design.  

 

                                                      
1  The Implementation Completion and Results Report and ICR Review indicate the target as 85, 
considering that several subprojects included multiple buildings.  
 
2 The focus of the Independent Evaluation Group (IEG) assessment was on transformational 
impact of the pilot project on the energy efficiency enabling environment and market. The 
assessment methodology did not include follow‐up surveys with beneficiaries. During the IEG 
mission, there were two meetings held with the project’s beneficiaries for the overall insights. The 
findings are not reported because they are not representative.  




                                                         27
                                              



Appendix B. Project Data and Other Issues
Fiduciary and Safeguard Aspects

Financial Management
The Renewable Resources and Energy Efficiency Fund’s semiannual interim financial 
reports were generally submitted on time and approved by the World Bank. Auditors 
issued unmodified (clean) opinions on the project’s annual financial reports. The fund 
also complied with public disclosure requirement of the audited financial statements. 

Procurement
There were no major procurement issues during implementation. Procurement was 
rated satisfactory in all of the Implementation Status Reports (ISRs) throughout the 
project. Reviews were conducted during the life of the project. 

Environmental and Social Safeguards
The project was classified as an environmental category B at appraisal and triggered 
OP/BP 4.01 Environmental Assessment. An environmental management plan was 
developed during project preparation, as required, and site‐specific plans were shared 
with the World Bank for approval and publicly disclosed for each individual 
investment. Stakeholders were given sufficient time and opportunity to share their 
comments on these plans. 

The project retained a satisfactory rating on safeguards performance throughout its life. 
All agreements and permits required for specific works were obtained from the national 
authorities. Mitigation measures were confined to the proper handling of construction 
waste and adherence to workplace safety rules. Field supervision of works was 
performed regularly, and a good record on environmental monitoring outcomes was 
kept. No damage to the natural environment has been recorded. Streetlight bulbs 
containing mercury hat were replaced with energy‐efficient and nontoxic bulbs were 
sent to adequate municipal storage until relevant facilities for safe destruction or 
disposal of such waste becomes available in the country. Based on the information 
obtained during the Project Performance Assessment Report mission, they remain in the 
municipal storage.  

                               




                                           28
                                                     


Basic Project Information

Energy Efficiency Project (Global Environment Facility Grant TF12163)
 

Table B.1. Key Project Data 

                                   Appraisal Estimate            Actual Estimate     Actual as Percent of
          Financing                  ($, millions)                ($, millions)      Appraisal Estimate
Total project costs                      10.66                       11.32                     106
Loan amount                              1.82                         1.81                 99.45




Table B.2. Cumulative Estimated and Actual Disbursements 

          Disbursements                 FY12              FY13           FY14      FY15          FY16
Appraisal estimate ($, millions)        0.30              0.70           1.20      1.70          1.82
Actual ($, millions)                      0               0.15           0.75      1.28          1.81
Actual as percent of appraisal            0               21.42          62.5      75.29         99.45


 

Table B.3. Project Dates 

                Event                            Original                             Actual
Concept review                                     n.a                             02/18/2010
Board approval                                     n.a.                            03/27/2012
Signing                                            n.a.                            04/20/2012
Effectiveness                                      n.a.                            08/10/2012
Closing date                                    06/30/2015                         06/30/2016
 




                                                   29
                                                



Appendix C. R2E2 Fund Energy Efficiency
Investments, Financial Data, and Estimated Energy
Savings
             Indicators                       03/2012–06/2016    07/2016–   08/2017–
                                                                 07/2017    10/2018 

Process      Cumulative energy                10,197,863                      
             efficiency investments in 
             social and other public 
             buildings ($)                                        
             Number of public                 5,800                           
             buildings in Armenia                                 
             Public facilities retrofitted    124                             
             (number)                                             
             Applications for                 326                             
             retrofitting of public 
             buildings (number) 

             Number of construction           20                              
             companies contracted 
             under the project  

Results      Cumulative energy                540,240,000                     
             savings over 20‐year 
             useful life of energy 
             efficiency investments 
             (kilowatt‐hours) 

             Cumulative CO2 emission          145,739                         
             reduction over 20‐year 
             useful life of energy 
             efficiency investments 
             (tons of CO2 equivalent) 

Revolving    Cash flow from energy            550,147            855,028    1,473,770 
fund         efficiency investments 

             Repayments                       98,495             113,158    126,280 

             Complaints (number)a             0                  0          0 




                                              30
                                                    


Energy             Total energy efficiency–                                      1,098,324 
efficiency         related onlending through 
commercial         commercial banks ($)  
financiers and 
                   ACBA‐Credit Agricole                                          222,880 
financial 
                   Bank CJSC ($) 
institutions 
engaged after      ACBA Leasing CJSC ($)                                         347,033 
project closure 
                   Global Credit UCO CJSC                                        528,411 
                   ($) 

                   Cash flow from onlending                                      31,713 
                   to banks 

Types of           ACBA‐Credit Agricole                                          Energy 
projects           Bank CJSC                                                     efficiency for 
(description)                                                                    communities  

                   ACBA Leasing CJSC                                             Energy 
                                                                                 efficiency for 
                                                                                 non‐gasified 
                                                                                 communities 

                   Global Credit UCO CJSC                                        Energy 
                                                                                 efficiency for 
                                                                                 non‐gasified 
                                                                                 communities 

Results            ACBA‐Credit Agricole                                          6 
reported by        Bank CJSC                                                     communities 
banks (energy 
                   Annual energy savings                                         549,170 
savings, 
                   (kilowatt‐hours) 
number, and 
types of           ACBA Leasing CJSC                                             394 
beneficiaries)                                                                   households 
                                                                                 and 1 LLC 

                   Global Credit UCO CJSC                                        509 
                                                                                 households 

                   Annual energy savings                                         2,612,200 
                   (kilowatt
                            ‐hours)                                               


Note:  

a. All issues arising during the bidding or construction process are resolved immediately. 



                                               31
                                              



Appendix D. Overview of Main Donors and
International Financial Institution Funds Available
for Energy Efficiency in Armenia




                                                       
Source: International Energy Charter 2017.




                                             32
                                                           



           Appendix E. List of Existing Energy Efficiency
           Legal, Regulatory, and Normative-Technical
           Documents in Armenia
           Table E.1.  List of the legal, regulatory, and normative technical documents in the Republic
           of Armenia related to energy saving and energy efficiency of buildings (2018)

I. Legal Acts 

       AL‐122‐N, 09.11.2014              The Law of the RA on Energy Saving and Renewable Energy                         
 1. 
                                          

                                         Resolution of the Government of the Republic of Armenia on  

 2.    25.12.2014, 1504‐N                Implementation of Energy Saving and Energy Efficiency Improvement 
                                         Measures in Facilities Constructed (Reconstructed, Renovated) under the 
        
                                         State Funding 

                                         A resolution on “Establishing technical regulations on energy saving and 
                                         energy efficiency in new residential apartment buildings, as well as in 
 3. 
                                         facilities under construction (reconstructed) at the expense of state 
                                         funds”, to come into force in October 2019. 

II. Construction Norms (mandatory building codes) 

 1.    RACN II‐7.01‐2011                 Construction Climatology  

 2.    RACN 24‐01‐2016                   Thermal Protection of the Buildings 

 3.    RACN 22‐03‐2017                   Artificial and Natural Lighting 

III. National Standards (voluntary standards, unless referred to in government‐adopted technical regulations) 

 1.    AST 240‐2005                      Energy saving; terms and definitions 

                                         Energy conservation: Regulatory and procedural guidelines: Basic 
 2.                                      concepts 
       AST 246‐2006 

       AST 247‐2006                      Energy  conservation,  energy  efficiency,  composition  of  indicators,  basic 
 3. 
                                         concepts 

                                         Energy conservation. Energy consuming general industrial equipment. 
 4.                                      Types, groups, and indicators of energy efficiency; identification 
       AST 248‐2006 




                                                         33
                                               


                             Energy conservation; assurance for energy consuming products energy 
5.                           efficiency indexes to their normative values. methods of verification. 
       AST 249‐2006 
                             general requirements 

                             Energy conservation; informing the consumers about the energy 
6.                           efficiency of appliances and residential utility equipment; general 
       AST 250‐2006 
                             requirements 

       AST 254‐2006          Energy conservation; energy certificate of the consumer of fuel and 
7. 
                             energy resources; basic rules; standard forms 

       AST 255‐2006          Energy conservation; methods of determining the economic effectiveness 
8. 
                             of the energy efficiency measures  

       AST 256‐2006          Energy conservation; secondary energy resources; terms and definitions 
9. 

10.    AST ISO 16818‐2008    Building environment design; energy efficiency; terminology 

11.    AST 1434‐1‐2010       Heat meters, part 1: general requirements 

                             Heat meters, part 6: installation, commissioning, operational monitoring 
12.                          and maintenance 
       AST 1434‐6‐2010 

       GOST EN 822‐2011      Thermal insulating products for building applications: determination of 
13. 
                             length and width 

       GOST EN 823‐2011      Thermal insulating products for building applications: Determination of 
                             thickness 
14. 

  

       GOST EN 824‐2011      Thermal insulating products for building applications: determination of 
15. 
                             squareness 

       GOST EN 825‐2011      Thermal insulating products for building applications: determination of 
16. 
                             flatness 

       GOST EN 826‐2011      Thermal insulating products for building applications: determination of 
17. 
                             compression behavior 

       GOST EN 1602‐2011     Thermal insulating products for building applications: determination of 
18. 
                             the apparent density 

       GOST EN 1604‐2011     Thermal insulating products for building applications: determination of 
19.                          dimensional stability under specified temperature and humidity 
                             conditions 

                                             34
                                                     


       GOST EN 1605‐2011         Thermal insulating products for building applications: determination of 
20.                              deformation under specified compressive load and temperature 
                                 conditions 

       GOST EN 1606‐2011         Thermal insulating products in building applications: determination of 
21. 
                                 compressive creep 

       GOST EN 1607‐2011         Thermal insulating products for building applications: determination of 
22. 
                                 tensile strength perpendicular to faces 

       GOST EN 1608‐2011         Thermal insulating products for building applications: determination of 
23. 
                                 tensile strength parallel to faces 

       GOST EN 1609‐2011         Thermal insulating products for building applications: determination of 
24. 
                                 short term water absorption by partial immersion                             

       GOST EN 12085‐2011        Thermal insulating products for applications in building: determination 
25. 
                                 of linear dimensions of test specimens 

       GOST EN 12086‐2011        Thermal insulating products in building applications: determination of 
26.                              water vapor transmission properties 
        

       GOST EN 12087‐2011        Thermal insulating products in building applications: determination of 
27.                              long term water absorption by immersion 
        

       GOST EN 12088‐2011        Thermal insulating products in building applications: determination of 
28. 
                                 long‐term moisture absorption by diffusion 

       GOST EN 12089‐2011        Thermal insulating products in building applications: determination of 
29.                              bending behavior 
        

       GOST EN 12090‐2011        Thermal insulating products in building applications: determination of 
30. 
                                 shear behavior 

       GOST EN 12091‐2011        Thermal insulating products in building applications: determination of 
31. 
                                 freeze‐thaw resistance 

       GOST EN 12430‐2011        Thermal insulating products for building applications: determination of 
32. 
                                 behavior under point load 

       GOST EN 12431‐2011        Thermal insulating products used in building for floating floors: 
33. 
                                 determination of thickness 




                                                  35
                                                   


       GOST 31924‐2011          Thick building materials and products of high and medium thermal 
34.                             resistance: determination of thermal resistance by means of guarded hot 
                                plate and heat flow meter  
       AST EN 15217‐2012        Energy performance of buildings: methods for expressing energy 
35. 
                                performance and for energy certification of buildings 

       AST EN 15316‐1‐2012      Heating systems in buildings: method for calculation of system energy 
36.                             requirements and system efficiencies, part 1: general provisions 

       AST EN 15603‐2012        Energy performance of buildings: overall energy use and definition of 
37. 
                                energy ratings 

       AST ISO 23045‐2012       Building environment design: guidelines to assess energy efficiency of 
38. 
                                new buildings 

       GOST 32025‐2012          Thermal insulation: determination of steady‐state thermal transmission 
39.                             properties of thermal insulation for circular pipes 
       (EN ISO 8497:1996)   

       AST 362‐2013             Energy conservation: energy passport of the building. Basic rules. 
40. 
                                Standard form 

       AST EN 15242‐2014        Ventilation for buildings ‐ Calculation methods for the determination of 
41. 
                                air flow rates in buildings including infiltration 

       AST ISO 9251‐2014        Thermal insulation ‐ Heat transfer conditions and properties of materials 
42. 
                                – Vocabulary 

       AST ISO 10211‐2014       Thermal bridges in building construction ‐ Heat flows and surface 
43. 
                                temperatures ‐ Detailed calculations 

       AST ISO 13789‐2014       Thermal performance of buildings ‐ Transmission and ventilation heat 
44. 
                                transfer coefficients ‐ Calculation method 

       AST ISO 13790‐2014       Energy performance of buildings ‐ Calculation of energy use for space 
45. 
                                heating and cooling 

       AST ISO 14683‐2014       Thermal bridges in building construction ‐ Linear thermal transmittance ‐ 
46. 
                                Simplified methods and default values 

       AST EN 15316‐3‐3‐2015    Heating systems in buildings ‐ Method for calculation of system energy 
47.                             requirements and system efficiencies ‐ part 3‐3: Domestic hot water 
                                systems, generation 

       AST 371‐2016             Methodology for performing energy audit in residential and public 
48. 
                                buildings 


                                                  36
                                                          


IV. Advisory Handbooks 

      06.11.2013 N343                   Technical solutions for thermal insulation of envelopes of residential, 
1.                                      public and industrial buildings in construction and reconstruction in the 
      Order of the Minister of Urban 
                                        RA 
      Development of the RA 

      23.12.2013 N394                    
2.    Order of the Minister of Urban    Catalogue of Replicable Energy Efficient Individual Residential Houses in 
      Development of the RA             Communities of the RA 

        




                                                       37
                                                                    



Appendix F. Project Performance Assessment
Report Overview
About This Report
The Independent Evaluation Group (IEG) assesses the programs and activities of the World Bank for two purposes: first, to ensure
the integrity of the World Bank’s self-evaluation process and to verify that the World Bank’s work is producing the expected
results, and second, to help develop improved directions, policies, and procedures through the dissemination of lessons drawn
from experience. As part of this work, IEG annually assesses 20–25 percent of the World Bank’s lending operations through
fieldwork. In selecting operations for assessment, preference is given to those that are innovative, large, or complex; those that
are relevant to upcoming studies or country evaluations; those for which Executive Directors or World Bank management have
requested assessments; and those that are likely to generate important lessons.
     To prepare a Project Performance Assessment Report (PPAR), IEG staff examine project files and other documents, visit the
borrowing country to discuss the operation with the government, and other in-country stakeholders, interview World Bank staff
and other donor agency staff both at headquarters and in local offices as appropriate, and apply other evaluative methods as
needed.
     Each PPAR is subject to technical peer review, internal IEG panel review, and management approval. Once cleared internally,
the PPAR is commented on by the responsible World Bank Country Management Unit. The PPAR is also sent to the borrower for
review. IEG incorporates both World Bank and borrower comments as appropriate, and the borrowers’ comments are attached to
the document that is sent to the World Bank’s Board of Executive Directors. After an assessment report has been sent to the
Board, it is disclosed to the public.


About the IEG Rating System for Public Sector Evaluations
IEG’s use of multiple evaluation methods offers both rigor and a necessary level of flexibility to adapt to lending instrument,
project design, or sectoral approach. IEG evaluators all apply the same basic method to arrive at their project ratings. Following is
the definition and rating scale used for each evaluation criterion (additional information is available on the IEG website:
http://ieg.worldbankgroup.org).
       Outcome: The extent to which the operation’s major relevant objectives were achieved, or are expected to be achieved,
efficiently. The rating has three dimensions: relevance, efficacy, and efficiency. Relevance includes relevance of objectives and
relevance of design. Relevance of objectives is the extent to which the project’s objectives are consistent with the country’s
current development priorities and with current World Bank country and sectoral assistance strategies and corporate goals
(expressed in Poverty Reduction Strategy Papers, country assistance strategies, sector strategy papers, and operational policies).
Relevance of design is the extent to which the project’s design is consistent with the stated objectives. Efficacy is the extent to
which the project’s objectives were achieved, or are expected to be achieved, taking into account their relative importance.
Efficiency is the extent to which the project achieved, or is expected to achieve, a return higher than the opportunity cost of
capital and benefits at least cost compared with alternatives. The efficiency dimension is not applied to development policy
operations, which provide general budget support. Possible ratings for outcome: highly satisfactory, satisfactory, moderately
satisfactory, moderately unsatisfactory, unsatisfactory, highly unsatisfactory.
      Risk to development outcome: The risk, at the time of evaluation, that development outcomes (or expected outcomes)
will not be maintained (or realized). Possible ratings for risk to development outcome: high, significant, moderate, negligible to low,
and not evaluable.
      Bank performance: The extent to which services provided by the World Bank ensured quality at entry of the operation and
supported effective implementation through appropriate supervision (including ensuring adequate transition arrangements for
regular operation of supported activities after loan or credit closing, toward the achievement of development outcomes). The
rating has two dimensions: quality at entry and quality of supervision. Possible ratings for Bank performance: highly satisfactory,
satisfactory, moderately satisfactory, moderately unsatisfactory, unsatisfactory, and highly unsatisfactory.
     Borrower performance: The extent to which the borrower (including the government and implementing agency or
agencies) ensured quality of preparation and implementation, and complied with covenants and agreements, toward the
achievement of development outcomes. The rating has two dimensions: government performance and implementing agency(ies)
performance. Possible ratings for borrower performance: highly satisfactory, satisfactory, moderately satisfactory, moderately
unsatisfactory, unsatisfactory, and highly unsatisfactory.


                                                                  38
 




Appendix G. Methods and Evidence
This evaluation is based on (i) interviews with project stakeholders in Yerevan, Armenia in 
November 2018, (ii) interviews with World Bank staff, (iii) a review of project documents, 
and (iv) a review of reports published by the World Bank or other development partners. 

The Project Performance Assessment Report (PPAR) evaluation questions focus on the 
project’s catalytic effect in addressing barriers to energy efficiency (energy efficiency) 
development in Armenia’s public sector. This includes looking at demonstration effects and 
engagement of financial institutions and private companies, market transformation, and the 
effects on policy and legal and regulatory frameworks. These goals are implicit in the 
project, based on the project development objective used in the project appraisal document 
and the Implementation Completion and Results Report. The PPAR aims to determine the 
effectiveness and causes of the project in affecting the energy efficiency sector development.  

Stakeholder interviews focused on generating lessons from the pilot project and on specific 
questions regarding the following: (i) the project implementation model, (ii) the reason for 
not continuing the project model, (iii) the project’s effects on energy efficiency market 
development, (iv) the effects of capacity‐building activities, (v) effects on energy efficiency 
awareness, and (vi) effects on energy efficiency policy development. 

Project stakeholders included (i) national and local government representatives, (ii) 
Renewable Resources and Energy Efficiency Fund, (iii) nongovernmental organizations, (iv) 
financial institutions, (v) construction companies, (vi) academia, (vii) project beneficiaries 
(directors of public facilities), (viii) development partners in Armenia, and (ix) World Bank 
staff (see appendix H).  




                                               39
                                            




Appendix H. List of Persons Interviewed
Armenia Renewable Resources and Energy Efficiency Fund (R2E2)  
Mr. Karen Asatryan, Director 
Ms. Zaruhi Gharagyozyan, head of procurement group 
Ms. Siranush Gorgyan, Financial Manager 
Mr. Hrant Ter‐Gabrielyan, Head of Engineering, technical group 
 
Former Directors of R2E2 Fund 
Ms. Tamara Babayan, Sustainable Energy Practice Lead, Energy Saving Foundation 
Mr. Armen Melkikyan, Country Director for Armenia, Eurasian Development Bank 
 
Ministry of Energy Infrastructures and Natural Resources  
Mr. Vahagn Atayan, Head of Energy Efficiency and Technical Normative Division 
 
Urban Development Committee 
Ms. Tanya Arzumanyan, Head of the Housing Stock Management and Communal 
Infrastructures Department 
Ms. Yevgenya Atayan, Advisor to the Chairman 
 
Yerevan Municipality 
Mr. Tigran Sargsyan, Head of Development and Investment Programs Department 
 
Energy Saving Foundation NGO  
Ms. Astghine Pasoyan, Executive Director 
 
Scientific Research Institute of Energy 
Mr. Ruben Yeghoyan, General Director 
 
Financial Institutions 
 
ACBA‐Credit Agricole Bank 
Mr. Hakob Andreasyan, CEO 
Mr. Norik Nazaryan, Deputy CEO, Sales Promotion and Regional Management 
Mr. Styopa Zakinyan, Deputy CEO, Chief Financial Officer 
Mr. Mikhail Amirkhanyan, SME and Corporate Business Department 
 
ACBA Leasing CJSC 



                                          40
                                              




Mr. Arsen Bazikyan, General Manager 
Mr. Vahagn Shmavonyan, Consumer Attraction and Marketing Division 
 
Global Credit UCO CJSC 
Mr. Aram Ghukasyan, Deputy Executive Director 
 
AMERIABANK CJSC 
Mr. Karen Hakobjanyan, Head, SME Lending 
 
 
Private Sector 
 
Renewable Energy Producers Association 
Mr. Roman Melikyan, Executive Director 
 
Redinet CJSC  
Mr. Andranik Karamyan, CEO 
 
Gevorgyan & Nersisyan Ltd. 
Mr. E. Gevorgyan 
 
Zet‐Profil Ltd. 
Mr. Robert Zakaryan, Director  
Gevorg Zaqaryan 
 
Arpi Solar 
Mr. Ruben Gevorgyan, CEO 
 
Freenergy    
Mr. Hayk Chobanyan, CEO 
 
AR & AR Design Construction 
Mr. Ara Petrosyan, President 
 
Arjermek LLC 
Mr. Hrant Arabyan, Director 
 
SolarOn 




                                        41
                                                 




Mr. Arthur Alaverdyan, Founder 
 
Contour Global Hydro Cascade 
Mr. Ara Hovsepyan, General Manager 
 
Amber Capital 
Mr. Karen Arabyan, COO 
 
Solar Power Station Investor  
Mr. Karen Kazaryan 
 
Academia 
 
American University of Armenia   
Mr. Alen Amirkhanian, Director, Acopian Center for the Environment 
Mr. Artak Hambarian, Associate Director of the Engineering Research Center 
 
Institute of Molecular Biology of the National Academy of Sciences (project beneficiary) 
Mr. Arsen Arakelyan, Director, Head of Bioinformatics Group 
 
Kanaker‐Zeytun Medical Center (project beneficiary) 
Mr. Hayk Petrosyan, Director 
 
Development Partners 
 
United Nations Development Programme/Global Environment Facility  
Ms. Diana Harutyunyan, Programme Coordinator 
Mr. Vahram Jalalyan, Project Task Leader 
 
United Nations Industrial Development Program  
Ms. Anahit Simonyan, Country Representative 
 
Green Economy Financing Facility  
Mr. Mikhail Gevorgyan, PFI Relationship Manager 
 
European Bank for Reconstruction and Development  
Ms. Anna Khachatryan, Associate Director 
KfW 




                                           42
                                                




Ms. Bella Andreasyan, Senior Project Coordinator 
 
Habitat for Humanity Armenia 
Ms. Luisa Vardanyan, Executive Director 
 
 
World Bank Group 
Ms. Sylvie Bossoutrot, Country Manager for Armenia, Europe and Central Asia Region 
Mr. Emil Zalinyan, Energy Specialist 
Ms. Ani Balabanyan (Lead Energy Specialist, project Task Team Leader) 
Mr. Jasneet Singh (Lead Energy Specialist, project co‐Task Team Leader) 
 
.




                                          43
                                                    44 



Appendix I. Bibliography
Energy Charter Secretariat. 2015. In‐Depth Review of the Energy Efficiency Policy of Armenia. Brussels: 
       Energy Charter Secretariat.  

Hofer, Kathrin, Dilip Limaye, and Jas Singh. 2016. “Fostering the Development of ESCO Markets for 
        Energy Efficiency.” Live Wire: A Knowledge Note Series for the Energy and Extractives Global 
        Practice, 2016/54, World Bank, Washington, DC.  

Singh, Jas, Dilip R. Limaye, Brian Henderson, and Xiaoyu Shi. 2010. Public Procurement of Energy 
        Efficiency Services: Lessons from International Experience. Washington, DC: World Bank. 

Taylor, Robert P., Chandrasekar Govindarajalu, Jeremy Levin, Anke S. Meyer, and William A. Ward. 
        2008. Financing Energy Efficiency: Lessons from Brazil, China, India, and Beyond. Washington, 
        DC: World Bank.  

World Bank. 2008. “The Other Renewable Resource: The Potential for Improving Energy Efficiency in 
       Armenia.”  

———. 2012. “Armenia—Energy Efficiency Project.” Project Appraisal Document 67035‐AM, World 
     Bank, Washington, DC. 

———. 2013. Armenia—Country Partnership Strategy, FY14–17. Washington, DC: World Bank.  
     ———. 2014. “Western Balkans: Scaling Up Energy Efficiency in Buildings.” World Bank, 
     Washington, DC.  

———. 2016. “Armenia—Energy Efficiency Project.” Implementation Completion and Results 
     Report, World Bank, Washington, DC. 

———. 2017. Armenia—Future Armenia: Connect, Compete, Prosper. Systematic Country 
     Diagnostic. Washington, DC: World Bank.  

 




                                                    44
 



Appendix J. Borrower Comments
     I.      Comments from the Government:  




                                                              

№ ____________________________ 

____________20      թ.г.y. 

 

Mrs. MIDORI MAKINO 

MANAGER, SUSTAINABLE DEVELOPMENT DEPARTMENT  

INDEPENDENT EVALUATION GROUP  

Dear Mrs. Makino  

Taking the opportunity I would like to thank you for elaboration of the Draft Performance 
Assessment Report of Energy Efficiency Project. The Ministry of Energy Infrastructures and 
Natural Resources have the following  

comments on this matter: in the Report.   

1. Add in the 1.2 of Project Background and Context; 

“Amendments and addendums made to the 2016 Law on Energy Saving and Renewable 
Energy which define a number of mandatory requirements, such as:  

‐         energy efficiency requirements for buildings; 

‐         energy balance requirement; 

‐         labeling requirements for energy consuming devices; 

‐         disposal requirement for life‐threatening and environmental hazardous devices; 

‐         energy expertising requirement”. 



                                                45
                                                        


2.          Add in Legal Acts of Appendix E: List of EE existing legal, regulatory and 
normative‐technical documents in Armenia: 

 



                                                                                                

      II.      Comments from the implementing agency, the R2E2 Fund: 

Unfortunately, the Government adopted ESAs as a sample agreement for energy efficiency 
procurement for the WB‐ Financed Energy Efficiency Project only, thus after the project 
closing it was impossible to apply it.  

The R2E2 Fund tried to continue applying the same model of procurement. It revised the 
“Open Bidding” Public Procurement document to adjust to NPV‐ based procurement, but it 
faced barriers, i.e. the Procurement Law says that a public facility itself should proceed with 
a tender to select a company to perform energy service in its building. The R2E2 Fund 
should be selected by the relevant public entity via a tender process to proceed with NPV 
Procurement. In fact, the R2E2 Fund might be approached directly by a public facility, but 
only in cases where it is registered with the Anti‐Monopoly Committee as a unique fund to 
proceed with energy service in their facilities, or where there is a new Government Decree 
adopted. Registration in the Anti ‐Monopoly Committee is expensive and there is no 
guarantee of success.  With regard to the Government Decree, the R2E2 Fund prepared the 
Draft Decree with all enclosed documents in the end of 2017, but still, perhaps because of 
the government changes, the progress is difficult to see. Currently, the R2E2 Fund is 
negotiating with the new government to accelerate the approval process. 

The R2E2 Fund approached Banks for co‐financing but given the fact that the majority of 
public entities have no right for taking out a loan, the Banks preferred working with the 
private sector.  

It is important to note that the R2E2 Fund has not de‐capitalized itself and continues making 
investments in Energy Efficiency and Renewable Energy and is actively seeking financing 
for replenishment of the revolving fund. 

After the project closure, the R2E2 Fund has been working actively in creating the EE 
environment in Armenia: the Fund organized a series of workshops and Energy Weeks, 
where priority was given to energy efficiency; it initiated the implementation of energy 
efficiency projects in cooperation with the financial institutions (i.e., ACBA Credit, ACBA 
Leasing, Global Credit); it conducted an energy audit of Yerevan Metropolitan; and it 
cooperated and assisted with the Health PIU and Ministry of Defense of the Republic of 
Armenia in finding energy efficiency solutions.  
                                                  46
                                                    


Another important achievement is that the R2E2 Fund was incorporated in a Covenant of 
Mayors as a supporter and is assisting the communities in preparation of a Sustainable 
Energy Plan, and the development of energy saving measures for community facilities.  
Also, the R2E2 Fund has successfully passed the first stage of accreditation to Green Climate 
Fund (GCF) and has already issued documents for the second stage. As soon as the R2E2 
Fund becomes eligible for GCF financing, it may get considerable (about 10 million USD) 
financing for replenishment of the revolving fund.  

In the case of a grant, like the UNDP/GEF project, it is easier to meet EE‐related codes and 
standards, but the scheme of our project did not allow us to include measures that would 
not ensure cost recovery, i.e., insultation of tuff‐stone walls.




                                              47
     


 




    48