PROCUREMENT PLAN (Textual Part) Project information: Democratic Republic Democratic of Congo: Strengthening PFM And Accountability Project (P145747) Project Implementation Agency : Ministry of Finances, Comité d’Orientation des Réformes des Finances Publiques (COREF) Date of the Procurement Plan: January 25, 2018 Period covered by this Procurement Plan: January – December 2018 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Borrower’s Procurement Code of April 27, 2010, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. (a) Standard Bidding Documents: All standard bidding documents to be used for the Project under NCB shall be found acceptable to the World Bank before their use during the implementation of Project; (b) Eligibility: Eligibility of bidders and acceptability of their goods and services shall not be based on their nationality and/or their origin; and association with a national firm shall not be a condition for participation in a bidding process. Therefore, except for the ineligibility situations referred to in paragraphs 1.10(a) (i) and 1.10(a) (ii) of the Procurement Guidelines, the eligibility of bidders must be based solely on their qualification, experience and capacity to carry out the contract related to the specific bidding process; (c) Advertising and Bid Preparation Time: Bidding opportunities shall be advertised at least in a national newspaper of wide circulation and on the website of the Recipient’s Procurement Regulator (Autorité de Régulation des Marchés Publics) and bidders should be given at least 30 days from the date of invitation to bid or the date of availability of the bidding documents, whichever is later; (d) Criteria for Qualification of Bidders: Qualification criteria shall only concern the bidder’s capability and resources to perform the contract taking into account objective and measurable factors. Such criteria for qualification of bidders shall be clearly specified in the bidding documents; (e) Bid Evaluation and Contract Award: A contract shall be awarded to the substantially responsive and lowest evaluated bidder provided that such bidder meets the qualification criteria specified in the bidding documents. No scoring system shall be allowed for the evaluation of bids, and no “blanket” limitation to the number of lots which can be awarded to a bidder shall apply. The criteria for bid evaluation and the contract award conditions shall be clearly specified in the bidding documents; (f) Preferences: No preference shall be given to domestic/regional bidders; to domestically/regionally manufactured goods; and to bidders forming a joint venture with a national firm or proposing national sub-contractors or carrying out economic activities in the territory of the Recipient; (g) Publication of Contract Award: Information on all contract awards shall be published in at least a national newspaper of wide circulation or in the Recipient’s Procurement Regulator (Autorité de Régulation des Marchés Publics) web-site; (h) Fraud and Corruption: In accordance with the Procurement Guidelines, each bidding document and contract shall include provisions stating the World Bank’s policy to sanction firms or individuals found to have engaged in fraud and corruption as set forth in the Procurement Guidelines; (i) Inspection and Audit Rights: In accordance with the Procurement Guidelines, each bidding document and contract shall include provisions stating the World Bank’s policy with respect to inspection and audit of accounts, records and other documents relating to the bid submission and contract performance; (j) Requirement for administrative documents and/or tax clearance certificate: The bidding documents shall not require foreign bidders to produce any administrative or tax related certificates prior to confirmation of awarding a contract; and (k) Modifications of a Signed Contract: Any change in the contract amount which, singly or combined with all previous changes, increases the original contract amount by fifteen (15) percent or more must be done through an amendment to the signed contract instead of signing a new contract. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is applicable for those contracts identified in the Procurement Plan tables; Other Relevant Procurement Information. “Not Applicable” PROCUREMENT Congo, Democratic Republic of : DRC: Strengthening PFM and Accountability PLAN General Information Country: Congo, Democratic Republic of Bank’s Approval Date of the Original Procurement Plan: 2018-02-07 2021-04-14 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P145747 GPN Date: Project Name: DRC: Strengthening PFM and Accountability Loan / Credit No: IDA / D1650, IDA / H9070 Comité d'Orientation de la Reforme des Finances Publiques Executing Agency(ies): WORKS Activity Reference No. / Procurement Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification High SEA/SH Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Document Amount Amount Document / and Recommendation Signed Contract No. Approach Process (Y/N) Risk Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion Type (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned ZR-COREF-42839-CW-RFQ / Component 3 - Petits travaux de Strengthening public Single Stage - One 2018-04- 2018-06- 2018-12- réhabilitation légère des IDA / D1650 A posteriori Demande de prix Limited 70,000.00 0.00 Annulé financial management Envelope 25 20 17 bâtiments abritant les systems at provincial level bureaux de la DGRPEQ dans la province de l'Equateur ZR-COREF-42851-CW-RFQ / Petits travaux de Component 3 - Réhabilitation des bâtiments Strengthening public Single Stage - One 2018-04- 2018-06- 2018-12- IDA / D1650 A posteriori Demande de prix Limited 20,000.00 0.00 Annulé abritant les buraux des financial management Envelope 21 16 13 Coordinations provinciales de systems at provincial level PROFIT cONGO KWILU ZR-COREF-42866-CW-RFQ / Component 3 - Réhabilitation des bâtiments Strengthening public Single Stage - One 2018-02- 2018-04- 2018-10- abritant les buraux des IDA / D1650 A posteriori Demande de prix Limited 80,000.00 0.00 Annulé financial management Envelope 15 12 09 Coordinations provinciales de systems at provincial level PROFIT CONGO Kasai Or ZR-COREF-42873-CW-RFQ / Petits travaux de Component 3 - Réhabilitation des bâtiments Strengthening public Single Stage - One 2018-03- 2018-05- 2018-11- abritant les bureaux des IDA / D1650 A posteriori Demande de prix Limited 100,000.00 0.00 Annulé financial management Envelope 20 15 11 Coordinations provinciales de systems at provincial level PROFIT cONGO dans la province de l'Equateur ZR-COREF-42694-CW-RFQ / Travaux de Réhabilitation du Component 4- Project Single Stage - One 2018-01- 2018-05- 2018-03- 2018-06- 2018-09- bâtiment abritant les bureaux IDA / D1650 A posteriori Demande de prix Limited 300,000.00 330,696.81 Achevé management Envelope 30 19 27 12 23 de la Coordination Nationale du projet ZR-COREF-141957-CW-RFQ / Travaux de Component 4- Project Single Stage - One 2019-11- 2019-10- 2020-01- 2019-11- 2020-03- Rafraîchissement des Murs de IDA / D1650 A posteriori Demande de prix Limited 75,000.00 74,974.26 Achevé management Envelope 21 30 29 16 14 l'Aile Centrale de la Coordination Nationale du PROFIT-CONGO ZR-COREF-96640-CW-RFQ / Petits travaux d'installation de + 450 Panneaux solaires, par les structures métalliques, dans les Directions Component 1- Improving Single Stage - One 2019-05- 2019-07- 2020-01- IDA / D1650 A posteriori Demande de prix Limited 290,000.00 0.00 Annulé Provinciales de la DGRAD à budget execution processes Envelope 13 08 04 Matadi, Lubumbashi, Kisangani, Goma, Bukavu, Kananga, Mbuji-Mayi, Bandundu, Kindu, Mbandaka ZR-COREF-141961-CW-RFQ / Travaux d'Aménagement de deux Locaux Devant Servir Component 4- Project Single Stage - One 2019-11- 2019-12- 2020-01- IDA / D1650 A posteriori Demande de prix Limited 50,000.00 0.00 Annulé d'Archivage des Dossiers de la management Envelope 08 12 26 Coordination Nationale du PROFIT-CONGO ZR-COREF-155174-CW-RFQ / Petits travaux de Component 4- Project Single Stage - One 2020-04- 2020-08- 2020-05- 2020-09- 2020-07- Réhabilitation du mur mitoyen IDA / D1650 A posteriori Demande de prix Limited 25,000.00 24,875.00 Achevé management Envelope 23 10 25 03 09 de la Coordination Nationale du projet GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Document / and Recommendation Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZR-COREF-42637-GO-RFQ / Acquisition des équipements usuels pour le besoin Component 1- Improving Single Stage - One 2018-03- 2018-03- 2018-05- 2018-04- 2018-06- 2018-08- IDA / D1650 A posteriori Demande de prix Limited 30,000.00 29,450.00 Achevé d'archivage de la DGDP budget execution processes Envelope 20 15 04 05 18 29 (armoires ignifuges (15), classeurs, ...etc. ZR-COREF-42638-GO-RFQ / Component 2 - "Acquisition des matériels et Single Stage - One 2018-03- 2018-04- 2018-05- IDA / D1650 Strengthening budget A posteriori Demande de prix Limited 100,000.00 0.00 Annulé outils informatiques en faveur Envelope 06 13 28 oversight des ECOFIN du Parlement ZR-COREF-42688-GO-RFQ / Acquisition des matériels Component 4- Project Single Stage - One 2018-02- 2018-02- 2018-03- 2018-03- 2018-04- IDA / D1650 A posteriori Demande de prix Limited 30,000.00 29,789.26 Signé spécialisés pour le service de management Envelope 04 24 11 27 25 communication du Projet ZR-COREF-42689-GO-RFQ / Component 4- Project Single Stage - One 2018-09- 2018-10- 2018-12- Impression et diffusion du IDA / D1650 A posteriori Demande de prix Limited 30,000.00 0.00 Annulé management Envelope 04 30 14 rapport annuel du projet ZR-COREF-42691-GO-RFQ / Acquisition de 2 véhicules de service pour renforcer la Component 4- Project Single Stage - One 2018-01- 2018-02- 2018-03- 2018-04- 2018-05- 2018-10- IDA / D1650 A posteriori Demande de prix Limited 120,000.00 106,700.00 Achevé mobilité du personnel du management Envelope 30 24 13 20 12 12 projet dans l'exercice de leurs tâches quotidiennes ZR-COREF-42692-GO-RFQ / Acquisition des mobiliers de Component 4- Project Single Stage - One 2018-02- 2018-04- 2018-10- bureaux et accessoires pour IDA / D1650 A posteriori Demande de prix Limited 15,000.00 0.00 Annulé management Envelope 10 07 04 la coordination nationale du projet ZR-COREF-42693-GO-RFQ / Acquisition des équipements Component 4- Project Single Stage - One 2018-02- 2018-04- 2018-03- 2018-05- 2018-05- 2018-06- informatiques pour la IDA / D1650 A posteriori Demande de prix Limited 85,000.00 88,305.00 Achevé management Envelope 10 23 27 18 11 19 coordination nationale du projet ZR-COREF-42812-GO-RFQ / Component 3 - Acquisition des matériels Strengthening public Single Stage - One 2018-03- 2018-03- 2018-05- 2018-04- 2018-07- 2019-01- informatiques de 6 Centres IDA / D1650 A posteriori Demande de prix Limited 150,000.00 149,992.20 Achevé financial management Envelope 20 12 02 05 01 23 opérationnels de la DGRK systems at provincial level Kinshasa ZR-COREF-42815-GO-RFQ / Component 3 - Acquisition des matériels Strengthening public Single Stage - One 2018-03- 2018-04- 2018-05- 2018-05- 2018-11- 2018-05- IDA / H9070 A posteriori Demande de prix Limited 31,400.00 31,320.00 Achevé informatiques pour les 24 financial management Envelope 20 23 15 16 11 31 ETD de la ville Kinshasa systems at provincial level ZR-COREF-42817-GO-RFQ / Component 3 - Acquisition de 10 motos pour Strengthening public Single Stage - One 2018-02- 2018-04- 2018-10- le contrôle des services IDA / D1650 A posteriori Demande de prix Limited 30,000.00 0.00 Annulé financial management Envelope 20 17 14 d'assiettes et la DPMER au Sud systems at provincial level Kivu Page 1 ZR-COREF-42820-GO-RFQ / Acquisition des équipements Component 3 - des services de la chaîne de la Strengthening public Single Stage - One 2018-03- 2018-05- 2018-11- IDA / D1650 A posteriori Demande de prix Limited 36,000.00 0.00 Annulé dépense (6 Kits pour la chaine financial management Envelope 20 15 11 des dépenses de la province systems at provincial level du Kasaï-Central) ZR-COREF-42821-GO-RFQ / Acquisition d'un serveur et Component 1- Improving Single Stage - One 2018-03- 2019-06- 2018-05- 2019-06- 2018-11- 2019-08- IDA / D1650 A posteriori Demande de prix Limited 250,000.00 99,835.00 Achevé des matériels informatiques budget execution processes Envelope 10 03 05 28 01 09 pour la centrale de Bilan ZR-COREF-42823-GO-RFQ / Component 1- Improving Single Stage - One 2018-02- 2018-04- 2018-10- Acquisition des équipements IDA / D1650 A posteriori Demande de prix Limited 50,000.00 0.00 Annulé budget execution processes Envelope 25 22 19 pour le SYGMAP ZR-COREF-42826-GO-RFQ / Component 3 - Acquisition des imprimés de Strengthening public Single Stage - One 2018-03- 2018-05- 2018-11- IDA / D1650 A posteriori Demande de prix Limited 70,000.00 0.00 Annulé valeur sécurisés (2 provinces financial management Envelope 25 20 16 Kwilu et Kwango) systems at provincial level ZR-COREF-42830-GO-RFQ / Acquisition des équipements Component 2 - pour le renouvellement du Single Stage - One 2018-04- 2018-06- 2019-04- 2018-12- 2019-05- IDA / D1650 Strengthening budget A posteriori Demande de prix Limited 100,000.00 89,050.00 Achevé parc informatique de l'IGF (en Envelope 25 20 05 17 03 oversight faveur des inspecteurs généraux) ZR-COREF-43023-GO-RFQ / Acquisition des équipements Component 3 - informatiques en faveur des 5 Strengthening public Single Stage - One 2018-02- 2018-03- 2018-04- 2018-04- 2018-07- 2019-03- IDA / D1650 A posteriori Demande de prix Limited 300,000.00 299,800.00 Achevé régies provinciales Equateur, financial management Envelope 20 12 17 05 16 30 Mongala, Sud Ubangui, Nord systems at provincial level Ubangui et Tshuapa ZR-COREF-43024-GO-RFQ / Acquisition des mobiliers de Component 3 - bureaux en faveur des 5 Strengthening public Single Stage - One 2018-02- 2018-03- 2018-04- 2018-04- 2018-07- 2019-03- IDA / D1650 A posteriori Demande de prix Limited 200,000.00 199,898.11 Achevé régies provinciales Equateur, financial management Envelope 20 12 17 05 16 29 Mongala, Sud Ubangui, Nord systems at provincial level Ubangui et Tshuapa ZR-COREF-43045-GO-RFQ / Acquisition des mobiliers de Component 3 - bureaux en faveur de 3 régies Strengthening public Single Stage - One 2018-02- 2018-03- 2018-04- 2018-04- 2018-07- 2019-03- IDA / D1650 A posteriori Demande de prix Limited 150,000.00 149,925.00 Achevé provinciales (de l'ex- KOR: financial management Envelope 20 12 17 05 16 21 Lomami, Sankuru et Kasai systems at provincial level Oriental) ZR-COREF-43065-GO-RFQ / Acquisition des petites fournitures de bureau en Component 3 - faveur des Directions Strengthening public Single Stage - One 2018-02- 2018-03- 2018-04- 2018-04- 2018-07- 2019-03- provinciales des recettes des IDA / D1650 A posteriori Demande de prix Limited 200,000.00 198,377.41 Achevé financial management Envelope 20 12 17 05 16 21 provinces: Nord Kivu, Kasai systems at provincial level Oriental, Sankuru, Lomami, Equateur, Sud Ubangui, Nord Ubangui, Tsuapa et Mongala ZR-COREF-43087-GO-RFQ / Reproduction, impression et Component 1- Improving Single Stage - One 2018-04- 2018-06- 2018-12- IDA / D1650 A posteriori Demande de prix Limited 70,000.00 0.00 Annulé diffusion des guides PEB et budget execution processes Envelope 25 20 17 PTR ZR-COREF-43089-GO-RFQ / Reproduction, impression et Component 1- Improving Single Stage - One 2018-06- 2018-02- 2018-08- 2018-03- 2018-10- IDA / D1650 A posteriori Demande de prix Limited 70,000.00 69,600.00 Signé diffusion des guides PEB et budget execution processes Envelope 20 24 15 27 14 PTR ZR-COREF-43090-GO-RFQ / Production et impression de 500 exemplaires du Guide technique relatif à la Component 2 - méthodologie et outils de Single Stage - One 2018-03- 2018-02- 2018-05- 2018-03- 2018-07- IDA / D1650 Strengthening budget A posteriori Demande de prix Limited 20,000.00 19,700.00 Signé conduite d'une mission Envelope 20 24 15 30 14 oversight d'audit basé sur les risques selon les normes d'exercice professionnelles de l'IIA (160 pages NB) ZR-COREF-43091-GO-RFQ / Production et impression de 500 exemplaires du Guide Component 2 - Single Stage - One 2018-03- 2018-02- 2018-05- 2018-03- 2018-07- méthodologique d'élaboration IDA / D1650 Strengthening budget A posteriori Demande de prix Limited 20,000.00 19,700.00 Signé Envelope 20 24 15 30 14 de la cartographie et du plan oversight d'audit basé sur les risques (128 pages NB) ZR-COREF-43093-GO-RFQ / Impression et reproduction Component 2 - des 1000 exemplaires des Single Stage - One 2018-03- 2018-02- 2018-05- 2018-03- 2018-07- IDA / D1650 Strengthening budget A posteriori Demande de prix Limited 30,000.00 29,980.00 Signé manuels des procédures Envelope 25 24 20 28 19 oversight d'examen des lois de finances (90 pages NB) ZR-COREF-43094-GO-RFQ / Production, Impression et Component 3 - diffusion de 250 exemplaires Strengthening public Single Stage - One 2018-04- 2018-06- 2018-08- IDA / D1650 A posteriori Demande de prix Limited 10,000.00 0.00 Annulé des projets d'Edits portant financial management Envelope 25 20 19 reddition des comptes dans systems at provincial level les 5 nouvelles provinces ZR-COREF-43096-GO-RFQ / Component 3 - Impression, reproduction, et Strengthening public Single Stage - One 2018-04- 2018-06- 2018-08- diffusion de 200 copies de IDA / D1650 A posteriori Demande de prix Limited 10,000.00 0.00 Annulé financial management Envelope 25 20 19 l'édit budgétaire 2018 NKV en systems at provincial level format simplifié ZR-COREF-43103-GO-RFQ / Component 3 - Impression, reproduction et à Strengthening public Single Stage - One 2018-03- 2018-04- 2018-06- la diffusion de 200 copies de IDA / D1650 A posteriori Demande de prix Limited 15,000.00 0.00 Annulé financial management Envelope 05 30 29 l'édit budgétaire 2018 HKTGA systems at provincial level en format simplifié ZR-COREF-43109-GO-RFQ / Component 3 - Impresssion, Reproduction, et Strengthening public Single Stage - One 2018-03- 2018-04- 2018-06- diffusion de 100 copies de IDA / D1650 A posteriori Demande de prix Limited 10,000.00 0.00 Annulé financial management Envelope 05 30 29 l'édit budgétaire 2018 KWILU systems at provincial level en format simplifié ZR-COREF-43112-GO-RFQ / Component 3 - Impression, Reproduction, et Strengthening public Single Stage - One 2018-03- 2018-05- 2018-07- diffusion de 100 copies de IDA / D1650 A posteriori Demande de prix Limited 10,000.00 0.00 Annulé financial management Envelope 15 10 09 l'édit budgétaire 2018 SKV en systems at provincial level format simplifié ZR-COREF-45312-GO-RFQ / Acquisition des consommables informatiques Component 4- Project Single Stage - One 2018-02- 2018-06- 2018-04- 2018-07- 2018-10- 2018-07- IDA / D1650 A posteriori Demande de prix Limited 70,000.00 24,860.00 Achevé pour le bureau de la management Envelope 24 22 21 11 18 19 coordination nationale de PROFIT CONGO ZR-COREF-45311-GO-RFQ / Acquisition des fournitures de Component 4- Project Single Stage - One 2018-02- 2018-02- 2018-04- 2018-02- 2018-10- 2018-04- IDA / D1650 A posteriori Demande de prix Limited 50,000.00 30,000.00 Achevé bureau pour la Coordination management Envelope 24 08 21 23 18 09 Nationale du PROFIT-CONGO ZR-COREF-45330-GO-RFB / Acquisition des équipements Component 3 - pour l'installation de l'énergie Strengthening public Single Stage - One 2018-06- 2018-06- 2018-07- 2018-08- 2018-09- 2019-03- photovoltaïque dans le cadre IDA / D1650 A posteriori Appel d'offres Open - National 500,000.00 0.00 Annulé financial management Envelope 01 06 18 17 21 20 de la mise en place du systems at provincial level système intégré dans les provinces. ZR-COREF-45334-GO-RFQ / Acquisition des mobiliers de Component 1- Improving Single Stage - One 2018-02- 2018-03- 2018-04- 2018-11- 2018-10- 2019-01- IDA / D1650 A posteriori Demande de prix Limited 300,000.00 299,992.00 Achevé bureau pour l'ARMP, la budget execution processes Envelope 20 12 17 05 14 23 DGCMP et les CGPMP. Page 2 ZR-COREF-43155-GO-RFB / Acquisition des matériels Component 1- Improving Single Stage - One 2018-02- 2017-10- 2018-04- 2018-04- 2018-10- 2018-09- IDA / D1650 A posteriori Demande de prix Limited 450,000.00 176,196.00 Achevé informatiques en faveur de budget execution processes Envelope 20 28 17 09 14 22 l’ARMP et de la DGCMP ZR-COREF-69877-GO-RFQ / FOURNITURE DE LA Component 4- Project Single Stage - One 2018-10- 2018-07- 2018-11- 2018-08- 2019-11- 2019-05- CONNEXION INTERNET DE LA IDA / D1650 A posteriori Demande de prix Limited 40,000.00 38,325.00 Achevé management Envelope 11 09 07 03 07 20 COORDINATION NATIONALE DU PROFIT CONGO ZR-COREF-80320-GO-RFQ / Impression des rapports Component 2 - Passation de 2018-10- 2018-10- 2018-11- 2018-10- 2018-12- 2018-10- 2019-06- publics de la cour des IDA / D1650 Strengthening budget A posteriori marché de gré à Direct 50,000.00 25,000.00 Signé 30 31 04 31 09 31 07 comptes et du rapport de oversight gré l'exécution du budget ZR-COREF-80322-GO-RFQ / Acquisition des équipements informatiques en faveur des commissions ECOFIN du Component 2 - Single Stage - One 2018-11- 2018-11- 2019-05- Parlement dont 4 Ordinateurs IDA / D1650 Strengthening budget A posteriori Demande de prix Limited 100,000.00 0.00 Annulé Envelope 02 24 23 fixes , 27 Ordinateurs , 4 oversight Imprimantes , 2 Photocopieuses à grand tirage et 2 Scanners, etc. ZR-COREF-80325-GO-RFQ / Production, impression et Component 4- Project Single Stage - One 2018-10- 2018-09- 2018-11- 2018-11- 2019-01- diffusion de la Revue IDA / D1650 A posteriori Demande de prix Limited 45,000.00 7,500.00 Signé management Envelope 25 01 20 05 04 trimestrielle « Echos des Finances Publiques »  ZR-COREF-80711-GO-RFQ / Component 3 - Acquisition des équipements Strengthening public Single Stage - One 2018-10- 2018-11- 2019-05- IDA / D1650 A posteriori Demande de prix Limited 130,000.00 0.00 Annulé informatiques de 3 régies financial management Envelope 26 16 15 provinciales (de l'ex- KOR) systems at provincial level ZR-COREF-80713-GO-RFQ / Acquisition de 2 véhicules Component 4- Project Single Stage - One 2018-10- 2018-03- 2018-11- 2018-04- 2019-03- 2018-09- utilitaires pour la Cellule de IDA / D1650 A posteriori Demande de prix Limited 45,000.00 45,000.00 Achevé management Envelope 15 26 07 30 07 21 Suivi des Projets et Programmes (CSPP) ZR-COREF-81031-GO-RFQ / Marché de production et Component 1- Improving Single Stage - One 2018-11- 2019-11- 2018-12- 2019-12- 2019-12- IDA / D1650 A posteriori Demande de prix Limited 12,000.00 59,200.00 Signé diffusion du magazine des budget execution processes Envelope 15 11 11 09 06 marchés publics ZR-COREF-96253-GO-RFQ / Acquisition des imprimés de Component 3 - valeur sécurisés en faveur des Strengthening public Single Stage - One 2019-04- 2019-07- 2019-06- 2019-07- 2019-12- 2019-12- IDA / D1650 A posteriori Demande de prix Limited 150,000.00 146,351.80 Achevé régies provinciales de ces 2 financial management Envelope 25 09 20 31 17 24 provinces de l'ex province du systems at provincial level Kasai Occidental ZR-COREF-96411-GO-DIR / Component 2 - Passation de Fourniture de l'abonnement 2019-02- 2019-03- 2019-02- 2019-03- 2019-02- 2019-03- 2020-02- 2019-04- IDA / D1650 Strengthening budget A posteriori marché de gré à Direct 30,000.00 29,982.00 Achevé internet de la Cour des 15 06 17 11 26 29 26 10 oversight gré comptes (12 mois) ZR-COREF-96619-GO-RFQ / Acquisition des équipements informatiques pour renforcer Component 1- Improving Single Stage - One 2019-04- 2019-06- 2019-06- 2019-07- 2019-12- 2019-08- IDA / D1650 A posteriori Demande de prix Limited 100,000.00 99,800.00 Achevé le SYGECPAF (Système de budget execution processes Envelope 15 20 10 09 07 21 Gestion Centralisée de la Paie des Agents et Fonctionnaires) ZR-COREF-96743-GO-RFQ / Acquisition des fournitures de Component 4- Project Single Stage - One 2019-02- 2019-03- 2019-02- 2019-03- 2019-03- 2019-04- IDA / D1650 A posteriori Demande de prix Limited 12,000.00 10,119.00 Achevé bureau pour la Coordination management Envelope 08 05 28 30 07 15 Nationale du PROFIT-CONGO ZR-COREF-96752-GO-RFQ / Acquisition des Component 4- Project Single Stage - One 2019-02- 2019-03- 2019-02- 2019-03- 2019-03- 2019-04- consommables informatiques IDA / D1650 A posteriori Demande de prix Limited 18,000.00 16,160.00 Achevé management Envelope 08 05 28 30 07 12 pour la Coordination Nationale du PROFIT-CONGO ZR-COREF-96761-GO-RFQ / Acquisition des mobiliers de bureau et équipements Component 4- Project Single Stage - One 2019-07- 2019-09- 2019-07- 2019-10- 2019-08- IDA / D1650 A posteriori Demande de prix Limited 120,000.00 119,895.04 Signé informatiques pour la management Envelope 06 26 28 17 04 Coordination Nationale du PROFIT-CONGO ZR-COREF-103214-GO-RFQ / Acquisition de la connexion Component 4- Project Single Stage - One 2019-07- 2019-08- 2019-07- 2020-08- 2019-12- internet de 3MB pour la IDA / D1650 A posteriori Demande de prix Open - National 50,000.00 66,630.00 Achevé management Envelope 06 10 31 09 03 Coordination Nationale du PROFIT-CONGO ZR-COREF-107927-GO-RFQ / Acquisition des matériels informatiques (6 ordinateurs Component 1- Improving Single Stage - One 2019-04- 2019-03- 2019-05- 2019-04- 2019-06- 2019-04- IDA / D1650 A posteriori Demande de prix Limited 8,400.00 8,400.00 Achevé portables et disques durs budget execution processes Envelope 03 14 02 05 01 12 externes) en faveur des équipes d'évaluation MAPS II ZR-COREF-141993-GO-RFQ / Acquisition des Component 3 - équipements informatiques Strengthening public Single Stage - One 2019-11- 2019-10- 2019-12- 2019-11- 2020-01- 2020-02- (lap top, tablette, IDA / D1650 A posteriori Demande de prix Limited 150,000.00 156,000.00 Achevé financial management Envelope 09 28 13 20 27 02 rétroprojecteur...) en faveur systems at provincial level du Projet E Tax de la Province du Sud-Kivu. ZR-COREF-96385-GO-RFQ / Acquisition des équipements, matériels informatiques, matériels et logiciels Component 3 - informatiques pour le guichet Strengthening public Single Stage - One 2019-07- 2019-09- 2020-03- IDA / D1650 A posteriori Demande de prix Limited 100,000.00 0.00 Annulé unique spécial d'encaissement financial management Envelope 20 14 12 des droits dus par les petits systems at provincial level commerçants et les personnes physiques de la ville province de Kinshasa ZR-COREF-96622-GO-RFQ / Impression et duplication du Component 1- Improving Single Stage - One 2019-04- 2019-06- 2019-09- manuel des procédures IDA / D1650 A posteriori Demande de prix Limited 30,000.00 0.00 Annulé budget execution processes Envelope 15 03 01 administratives et financières des DAF (220 pages) ZR-COREF-43084-GO-RFQ / Marché de Production des 300 exemplaires du plan de la mise en place de la Component 1- Improving Single Stage - One 2018-06- 2018-08- 2018-09- IDA / D1650 A posteriori Demande de prix Limited 60,000.00 0.00 Annulé déconcentration de budget execution processes Envelope 20 06 20 l'ordonnancement et de la Direction Générale du Trésor et de la Comptabilité publique ZR-COREF-42639-GO-RFQ / Component 3 - Acquisition des imprimés de Strengthening public Single Stage - One 2018-03- 2018-05- 2018-06- valeur en faveur des 2 régies IDA / D1650 A posteriori Demande de prix Limited 100,000.00 0.00 Annulé financial management Envelope 06 01 30 provinciales de l'ex- Equateur systems at provincial level (Nord - Ubangi et Equateur) ZR-COREF-56444-GO-RFQ / Component 3 - Acquisition des équipements Strengthening public Single Stage - One 2018-04- 2018-06- 2018-12- informatiques, des mobiliers IDA / D1650 A posteriori Demande de prix Limited 100,000.00 0.00 Annulé financial management Envelope 15 10 07 de bureaux et de petites systems at provincial level fournitures de la DGR - NK ZR-COREF-80319-GO-RFQ / Renouvellement du parc Component 1- Improving Single Stage - One 2018-11- 2018-11- 2019-05- IDA / D1650 A posteriori Demande de prix Limited 60,000.00 0.00 Annulé informatique de la Direction budget execution processes Envelope 05 25 24 de la Paie Page 3 ZR-COREF-96380-GO-RFQ / Component 3 - Acquisition des équipements Strengthening public Single Stage - One 2019-05- 2019-07- 2020-01- informatiques pour la IDA / D1650 A posteriori Demande de prix Limited 130,000.00 0.00 Annulé financial management Envelope 20 15 11 Direction des recettes du systems at provincial level Maïndombe ZR-COREF-96425-GO-DIR / Fourniture et Impression de 1000 exemplaires de la loi Component 2 - Passation de organique de la Cour des 2019-05- 2019-05- 2019-05- 2019-08- IDA / D1650 Strengthening budget A posteriori marché de gré à Direct 60,000.00 0.00 Annulé comptes au journal officiel 15 20 30 28 oversight gré et de 1000 exemplaires du rapport public de la Cour des comptes exercice 2018 ZR-COREF-153955-GO-RFQ / Acquisition des ordinateurs en faveur de la DGCMP pour Component 1- Improving Single Stage - One 2020-03- 2020-07- 2020-05- 2020-07- 2020-06- 2020-08- IDA / D1650 A posteriori Demande de prix Limited 35,000.00 34,500.00 Achevé finaliser la dématérialisation budget execution processes Envelope 20 01 04 16 18 13 du contrôle a priori des marchés publics ZR-COREF-153961-GO-RFQ / Acquisition des matériels Component 1- Improving Single Stage - One 2020-02- 2020-01- 2020-03- 2020-02- 2020-03- 2020-03- informatiques en vue des IDA / D1650 A posteriori Demande de prix Limited 15,000.00 14,745.00 Achevé budget execution processes Envelope 15 25 22 15 23 11 tests du Logiciel SIGMAP en vue de sa réception définitive ZR-COREF-154928-GO-DIR / Impression de 500 Component 2 - Passation de 2020-06- 2020-03- 2020-06- 2020-03- 2020-07- 2020-03- 2020-08- 2020-03- exemplaires du rapport public IDA / D1650 Strengthening budget A posteriori marché de gré à Direct 30,000.00 10,000.00 Achevé 15 14 20 14 01 20 15 25 de la Cour des comptes des oversight gré exercices 2016-2017 et 2018 ZR-COREF-154963-GO-RFQ Component 3 - / Acquisition des matériels Strengthening public Single Stage - One 2020-03- 2020-01- 2020-04- 2020-02- 2020-07- 2020-03- informatiques et en mobiliers IDA / D1650 A posteriori Demande de prix Limited 12,000.00 11,920.00 Achevé financial management Envelope 25 25 24 15 23 05 de bureau à la coordination systems at provincial level provinciale de l’Equateur ZR-COREF-155178-GO-RFQ / Acquisition des extincteurs Component 4- Project Single Stage - One 2020-04- 2020-01- 2020-06- 2020-02- 2020-06- 2020-02- IDA / D1650 A posteriori Demande de prix Limited 5,000.00 4,874.00 Achevé à CO² pour la sécurisation des management Envelope 25 25 05 15 08 28 biens et documents ZR-COREF-155180-GO-RFQ / Acquisition mobilier de Component 4- Project Single Stage - One 2020-04- 2020-09- 2020-06- 2020-09- 2020-12- 2020-10- bureaux et équipements IDA / D1650 A posteriori Demande de prix Limited 90,000.00 69,840.00 Achevé management Envelope 25 08 06 28 03 02 informatiques de la Coordination nationale ZR-COREF-155188-GO-RFQ Component 4- Project Single Stage - One 2020-03- 2020-01- 2020-05- 2020-02- 2020-05- 2020-02- / Achat de 25 tablettes pour IDA / D1650 A posteriori Demande de prix Limited 10,000.00 7,850.00 Achevé management Envelope 30 25 04 15 10 28 l'utilisation du logiciel KOBO ZR-COREF-155190-GO-RFQ / Acquisition de petites Component 4- Project Single Stage - One 2020-03- 2020-02- 2020-04- 2020-02- 2020-05- 2020-03- IDA / D1650 A posteriori Demande de prix Limited 18,000.00 9,713.00 Achevé Fournitures de bureau de la management Envelope 15 25 13 29 13 12 Coordination nationale ZR-COREF-155195-GO-RFQ Component 4- Project Single Stage - One 2020-03- 2020-01- 2020-05- 2020-02- 2020-05- 2020-02- / Acquisition des IDA / D1650 A posteriori Demande de prix Limited 24,000.00 12,250.00 Achevé management Envelope 27 25 13 15 16 25 Consommables informatiques ZR-COREF-156534-GO-RFQ / Acquisition des mobiliers de bureaux et des matériels informatiques ainsi que de Component 1- Improving Single Stage - One 2020-04- 2020-08- 2020-06- 2020-09- 2020-08- 2020-10- IDA / D1650 A posteriori Demande de prix Limited 100,000.00 84,726.00 Achevé petites fournitures de budget execution processes Envelope 25 20 07 11 06 06 bureaux en vue de l'opérationnalisation des structures d'audit interne dans 5 ministères ZR-COREF-156551-GO-RFQ / Acquisition de petits Component 4- Project Single Stage - One 2020-03- 2020-04- 2020-04- matériels et outils de IDA / D1650 A posteriori Demande de prix Limited 3,000.00 0.00 Annulé management Envelope 04 02 23 dépannage pour la Coordination nationale ZR-COREF-157764-GO-RFQ Component 3 - / Acquisition des imprimés de Strengthening public Single Stage - One 2020-03- 2020-04- 2020-06- IDA / D1650 A posteriori Demande de prix Limited 60,000.00 0.00 Annulé valeurs sécurisés et cachets financial management Envelope 05 03 02 secs en faveur de la DPMER systems at provincial level ZR-COREF-188221-GO-RFQ / Acquisition de 17 laptop et 17 modems home box en Component 1- Improving Single Stage - One 2020-09- 2020-09- 2020-10- 2020-09- 2020-11- 2020-10- IDA / D1650 A posteriori Demande de prix Limited 30,000.00 29,840.00 Achevé faveur de l'ARMP pour assurer budget execution processes Envelope 06 07 09 25 23 05 la gestion informatisée de contrôle ZR-COREF-188228-GO-RFQ / Acquisition de produits, matériels et kits médicaux dans le cadre de la riposte au COVID19 (structure de Component 4- Project Single Stage - One 2020-09- 2020-09- 2020-10- 2020-09- 2020-11- 2020-09- IDA / D1650 A posteriori Demande de prix Limited 10,000.00 9,997.00 Achevé désinfectation, masques, management Envelope 06 01 14 21 13 25 solutions hydroalcooliques, gants, thérmomètres électroniques et les désinfectants pour les locaux) ZR-COREF-188229-GO-RFQ / Acquisition matériels et logiciel pour la gestion électronique des documents Component 4- Project Single Stage - One 2020-09- 2020-08- 2020-10- 2020-09- 2020-12- 2020-09- au regard des mesures IDA / D1650 A posteriori Demande de prix Limited 30,000.00 29,855.00 Achevé management Envelope 06 26 11 21 10 29 barrières de lutte contre la pandémie de la COVID-19 à la Coordination nationale de PROFIT CONGO/COREF ZR-COREF-154935-GO-RFQ / Acquisition en faveur de la Component 2 - commission ECOFIN de Single Stage - One 2020-09- 2020-08- 2020-10- 2020-09- 2020-12- 2020-11- IDA / D1650 Strengthening budget A posteriori Demande de prix Limited 130,000.00 129,180.00 Achevé l'Assemblée Nationale et du Envelope 06 11 17 15 16 21 oversight Sénat des équipements informatiques et accessoires ZR-COREF-154938-GO-RFQ / Acquisition des équipements de bureaux et matériels informatiques en vue de l’installation du centre Component 2 - Single Stage - One 2020-04- 2020-06- 2020-09- de documentation du IDA / D1650 Strengthening budget A posteriori Demande de prix Limited 80,000.00 0.00 Annulé Envelope 25 03 01 Parlement (Serveur, moteur de oversight recherche, procédures, alimentation et entretien de la base ; bibliothèque, internet, intranet) ZR-COREF-157765-GO-DIR / Acquisition des imprimés de Component 3 - valeurs sécurisés Passation de Strengthening public 2020-04- 2020-04- 2020-05- 2020-06- (complément) en faveur de la IDA / D1650 A posteriori marché de gré à Direct 40,000.00 0.00 Annulé financial management 10 15 09 23 Direction des recettes du gré systems at provincial level Kasai Central (Entreprise MIRAK) ZR-COREF-155150-GO-RFQ / Acquisition des imprimés de Component 3 - valeur en faveur de la DGRLO, Strengthening public Single Stage - One 2020-04- 2020-05- 2020-07- IDA / D1650 A posteriori Demande de prix Limited 120,000.00 0.00 Annulé DPMER et DGREM dans les financial management Envelope 25 24 23 Provinces de LOMAMI et Mai systems at provincial level Ndombe ZR-COREF-188909-GO-DIR / Renouvellement contrat du Passation de service internet de la Component 4- Project En attente 2020-09- 2020-09- 2020-09- 2021-09- IDA / D1650 A posteriori marché de gré à Direct 53,760.00 0.00 Coordination Nationale de management d'exécution 01 03 09 09 gré COREF/PROFIT CONGO (XIT SARL) Page 4 ZR-COREF-212348-GO-RFQ / Acquisition et déploiement Component 1- Improving Single Stage - One En attente 2021-02- 2021-03- 2021-05- IDA / D1650 A posteriori Demande de prix Limited 180,000.00 0.00 des matériels auprès des budget execution processes Envelope d'exécution 13 12 11 utilisateurs de SIGMAP ZR-COREF-212362-GO-RFQ / Acquisition des 85 Component 1- Improving Single Stage - One 2021-03- 2021-01- 2021-04- 2021-02- 2021-05- IDA / D1650 A posteriori Demande de prix Limited 130,000.00 129,625.00 Signé ordinateurs portables pour les budget execution processes Envelope 02 15 04 08 19 nouveaux Inspecteurs ZR-COREF-212374-GO-RFQ / Acquisition des Component 2 - Single Stage - One 2021-03- 2021-02- 2021-04- 2021-03- 2021-06- équipements de IDA / D1650 Strengthening budget A posteriori Demande de prix Limited 30,000.00 29,880.00 Signé Envelope 20 23 27 20 26 vidéoconférence en faveur de oversight la cour des comptes ZR-COREF-212463-GO-RFQ / Acquisition de Kits informatiques et mobiliers de Component 3 - bureaux pour Strengthening public Single Stage - One En attente 2021-04- 2021-05- 2021-08- l'opérationnalisation des IDA / D1650 A posteriori Demande de prix Limited 300,000.00 0.00 financial management Envelope d'exécution 25 24 22 services créés ("services du systems at provincial level trésor et de la comptabilité ainsi que du budget) dans 3 provinces pilotes ZR-COREF-212473-GO-RFQ / Acquisition des imprimés de Component 3 - valeurs sécurisés et/ou Strengthening public Single Stage - One 2021-03- 2021-02- 2021-04- 2021-03- 2021-07- IDA / D1650 A posteriori Demande de prix Limited 50,000.00 49,970.31 Signé cachets secs en faveur du financial management Envelope 02 25 27 19 26 Gouvernement provincial du systems at provincial level Sud-kivu ZR-COREF-212490-GO-RFQ / Acquisition des mobiliers de bureaux et des matériels informatiques ainsi que de Component 1- Improving Single Stage - One En attente 2021-03- 2021-05- 2021-07- IDA / D1650 A posteriori Demande de prix Limited 75,000.00 0.00 petites fournitures de budget execution processes Envelope d'exécution 30 25 24 bureaux en vue de l'opérationnalisation des structures d'audit interne dans 4 ministères ZR-COREF-212687-GO-RFQ / Acquisition des logiciels en faveur de la DGPPB, de la Component 2 - DGRC et de la Cour des Single Stage - One En attente 2021-03- 2021-05- 2021-06- IDA / D1650 Strengthening budget A posteriori Demande de prix Limited 8,000.00 0.00 Comptes en vue de la Envelope d'exécution 20 01 30 oversight production et publication des documents en version citoyenne (DPSB) ZR-COREF-215887-GO-RFQ / Acquisition des Component 4- Project Single Stage - One 2021-02- 2021-02- 2021-04- 2021-03- 2021-04- consommables informatiques IDA / D1650 A posteriori Demande de prix Limited 25,200.00 15,090.00 Signé management Envelope 20 17 06 11 09 à la coordination nationale de Profit Congo ZR-COREF-215892-GO-RFQ / Acquisition des petites fournitures de bureau de la Component 4- Project Single Stage - One 2021-02- 2021-02- 2021-03- 2021-03- 2021-04- IDA / D1650 A posteriori Demande de prix Limited 25,200.00 13,505.00 Signé Coordination nationale de management Envelope 27 17 28 11 27 PROFIT CONGO et Papier entête Coref ZR-COREF-188219-GO-RFQ / Acquisition des produits, matériels et kits médicaux, en faveur de la DGI, DGDA et DGRAD, dans le cadre de la Component 1- Improving Single Stage - One 2020-09- 2020-11- 2021-01- IDA / D1650 A posteriori Demande de prix Limited 50,000.00 0.00 Annulé riposte au COVID19 budget execution processes Envelope 06 01 30 (masques, solutions hydroalcooliques, gants, thérmomètres électroniques et les désinfectants pour les locaux) NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Document / and Recommendation Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZR-COREF-43153-NC-DIR / Recrutement des Consultants Passation de Component 4- Project 2018-01- 2018-01- 2018-03- 2018-08- pour les missions de mise à IDA / D1650 A posteriori marché de gré à Direct 30,000.00 0.00 Annulé management 23 28 04 31 niveau et du paramétrage du gré logiciel TOM²PRO (TOMATE) ZR-COREF-45326-NC-RFQ / Sélection d'une firme Component 4- Project Single Stage - One 2018-02- 2018-03- 2018-04- 2018-03- 2018-10- d'entretien des bureaux de la IDA / D1650 A posteriori Demande de prix Limited 14,400.00 19,200.00 Signé management Envelope 20 01 17 30 14 Coordination Nationale du PROFIT-CONGO ZR-COREF-103079-NC-DIR / Renouvellement contrat de Passation de Service d'entretien des Component 4- Project 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2020-03- IDA / D1650 A posteriori marché de gré à Direct 19,200.00 19,200.00 Signé bureaux de la Coordination management 12 30 14 31 30 31 gré Nationale du PROFIT-CONGO (BAM'S CLEAN) ZR-COREF-103210-NC-DIR / Renouvellement contrat du Passation de service de gardiennage et Component 4- Project 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2020-03- IDA / D1650 A posteriori marché de gré à Direct 24,000.00 24,000.00 Signé sécurité des bureaux de la management 11 30 13 30 30 30 gré Coordination Nationale du PROFIT-CONGO ZR-COREF-96247-NC-RFQ / Prestataire de service d'Audit et des inventaires des Immobilisations et Component 4- Project Single Stage - One 2019-02- 2019-03- 2021-02- IDA / D1650 A posteriori Demande de prix Limited 60,000.00 0.00 Annulé acquisitions du PROJET au management Envelope 06 04 21 profit des bénéficiaires et pour son fonctionnement (2ans) ZR-COREF-43123-NC-DIR / Component 2 - Passation de 2018-11- 2018-11- 2018-12- 2019-11- Service de maintenance des IDA / D1650 Strengthening budget A posteriori marché de gré à Direct 92,000.00 0.00 Annulé 15 20 05 30 logiciels IDEA et TeamMate oversight gré ZR-COREF-154931-NC-DIR Component 2 - Passation de / Abonnement internet pour 2020-03- 2020-02- 2020-03- 2020-03- 2020-04- 2020-03- 2021-04- 2020-04- IDA / D1650 Strengthening budget A posteriori marché de gré à Direct 30,000.00 29,997.00 Achevé l’utilisation du site internet de 20 25 25 18 04 31 04 24 oversight gré la Cour des comptes ZR-COREF-155182-NC-DIR Passation de Component 4- Project 2020-03- 2020-03- 2020-03- 2020-03- 2020-04- 2020-03- 2021-04- / Service d'entretien bureaux IDA / D1650 A posteriori marché de gré à Direct 36,000.00 28,800.00 Signé management 25 26 27 26 02 30 02 de la Coordination nationale gré ZR-COREF-155185-NC-DIR Passation de / Service de Gardiennage er Component 4- Project 2020-03- 2020-03- 2020-03- 2020-03- 2020-04- 2020-03- 2021-04- IDA / D1650 A posteriori marché de gré à Direct 24,000.00 24,000.00 Signé sécurité des bureaux de la management 20 26 25 26 04 30 04 gré Coordination nationale ZR-COREF-212372-NC-DIR / Abonnement internet pour Component 2 - Passation de En attente 2021-02- 2021-02- 2021-02- 2021-12- l’utilisation du site internet et IDA / D1650 Strengthening budget A posteriori marché de gré à Direct 30,000.00 0.00 d'exécution 01 06 16 31 hébergement du site web de oversight gré la Cour des comptes ZR-COREF-215882-NC-DIR / Renouvellement du Contrat de Service de Gardiennage et Passation de Component 4- Project 2021-02- 2021-03- 2021-02- 2021-03- 2021-03- 2021-03- 2021-12- Sécurité des Bureaux de la IDA / D1650 A posteriori marché de gré à Direct 18,000.00 18,000.00 Signé management 20 18 22 18 01 30 31 Coordination Nationale du gré PROFIT-CONGO (ATALANTE GROUP) Page 5 ZR-COREF-215891-NC-DIR / Renouvellement de contrat Passation de Component 4- Project 2021-02- 2021-03- 2021-02- 2021-03- 2021-03- 2021-03- 2021-12- du service d'entretien des IDA / D1650 A posteriori marché de gré à Direct 21,600.00 21,600.00 Signé management 20 18 22 18 01 30 31 bureau de la Coordination gré Nationale du PROFIT CONGO (BAM'S) CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZR-COREF-42674-CS-CQS / Sélection d'un consultant Sélection fondée cabinet pour la réalisation Component 1- Improving sur les Open - 2018-04- 2018-06- 2018-07- 2018-08- 2019-02- IDA / D1650 A posteriori 120,000.00 0.00 Annulé 2018-03-30 d'une étude sur l'extension de budget execution processes qualifications des International 20 03 03 07 03 la chaîne des dépenses vers consultants les services dépensiers ZR-COREF-42680-CS-QCBS / Sélection d'un Consultant Sélection fondée cabinet d'audit en faveur de Component 1- Improving Open - 2018-03- 2018-03- 2018-04- 2018-07- 2018-05- 2018-08- 2018-06- 2018-09- 2018-07- 2018-10- 2018-09- 2019-03- 2019-09- 2020-05- IDA / D1650 A posteriori sur la qualité et le 250,000.00 219,370.00 Achevé 2018-02-20 l'ARMP pour les mission budget execution processes International 12 13 26 13 24 15 23 04 28 31 01 09 01 11 coût d'audit des marchés publics exercice 2014, 2015 et 2016 ZR-COREF-45939-CS-QBS / Sélection d'un consultant (cabinet) chargé de Component 3 - Sélection fondée recrutement et de la Strengthening public sur les 2018-03- 2018-05- 2018-06- 2018-07- 2019-01- IDA / D1650 A posteriori Open - National 100,000.00 0.00 Annulé 2018-03-01 formation des agents et financial management qualifications des 22 05 04 09 05 cadres de la Direction systems at provincial level consultants Générale des Recettes de la province du Kwilu (DGREK) ZR-COREF-45328-CS-CQS / Selection Consultant Cabinet chargé de l'étude de Component 3 - Sélection fondée faisabilité et de Strengthening public sur les 2018-03- 2018-04- 2018-05- 2018-07- 2018-06- 2018-08- 2018-07- 2018-08- 2019-01- dimensionnement des IDA / D1650 A posteriori Open - National 300,000.00 294,042.00 Signé 2018-03-20 financial management qualifications des 12 10 24 13 23 06 28 29 24 systèmes de production systems at provincial level consultants d'énergie photovoltaïque pour l'alimentation du système intégré des Finances Publiques dans les provinces ZR-COREF-83914-CS-FBS / Consultant firme pour assurer l'audit financier et comptable Sélection fondée du Projet de Renforcement de Component 4- Project Open - 2019-02- 2018-11- 2018-12- 2019-02- 2018-12- 2019-03- 2018-12- 2019-04- 2019-01- 2019-05- 2019-01- 2019-05- 2021-06- 2019-07- IDA / D1650 A posteriori sur la qualité et le 90,000.00 72,565.00 Achevé 2018-11-20 la Redevabilité et de la management International 07 27 09 15 16 18 23 24 11 04 20 11 30 12 coût Gestion des Finances Publiques (PROFIT-CONGO) pour les exercices 2018, 2019 et 2020. ZR-COREF-156253-CS-QCBS / Sélection d'un Consultant Cabinet pour accompagner la Sélection fondée mise en service effectif des Component 1- Improving Open - 2020-04- 2020-05- 2020-06- 2020-06- 2020-07- 2020-08- 2021-07- IDA / D1650 A posteriori sur la qualité et le 400,000.00 0.00 Annulé 2020-03-31 structures de la DGTCP budget execution processes International 21 05 02 12 16 05 31 coût (Direction Générale du Trésor, de la Comptabilité et de la Paie) ZR-COREF-155157-CS-CQS / Sélection d'un cabinet Component 3 - Sélection fondée chargé du recrutement du Strengthening public sur les 2020-05- 2020-06- 2020-06- 2020-07- 2020-11- personnel de la régie IDA / D1650 A posteriori Open - National 120,000.00 0.00 Annulé 2020-04-20 financial management qualifications des 11 10 30 20 17 provinciale de Mai - Ndombé systems at provincial level consultants et de la DGRKAC au kasai central ZR-COREF-212499-CS-CQS Sélection fondée / Sélection d'un consultant Component 1- Improving sur les Open - 2021-03- 2021-04- 2021-05- 2021-05- 2021-07- cabinet pour la formation des IDA / D1650 A posteriori 130,000.00 0.00 Annulé 2021-02-25 budget execution processes qualifications des International 18 16 07 27 26 comptables publics consultants sélectionnés ZR-COREF-212685-CS-CQS / Sélection d'un consultant Sélection fondée cabinet pour la formation Component 1- Improving sur les Open - En attente 2021-03- 2021-05- 2021-06- 2021-07- 2021-10- pratique d'une masse critique IDA / D1650 A posteriori 150,000.00 0.00 2021-03-08 budget execution processes qualifications des International d'exécution 29 12 11 16 14 des formateurs sur consultants l'élaboration et l'exécution du budget en mode programme INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZR-COREF-42700-CS-CDS / Sélection de Renouvellement contrat Component 4- Project 2018-11- 2018-12- 2018-10- 2019-12- IDA / D1650 A posteriori consultants par Direct 34,200.00 34,200.00 Signé 2018-11-01 Coordonnateur Provincial du management 03 01 17 01 entente directe Kasaï-Oriental (Alfred KAMBA) ZR-COREF-43120-CS-INDV / Recrutement chauffeur de la Component 4- Project 2018-01- 2018-02- 2018-02- 2019-02- IDA / D1650 A posteriori Individuel Limited 8,400.00 0.00 Annulé 2018-01-20 Coordination Provinciale de management 25 04 28 28 l'Equateur ZR-COREF-43151-CS-INDV / Sélection 2ème Assistant Component 4- Project 2017-09- 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- 2018-01- 2019-02- IDA / D1650 A posteriori Individuel Open 54,000.00 54,000.00 Signé 2017-10-02 Technique chargé de la management 29 15 15 25 24 01 29 01 Décentralisation Financière ZR-COREF-44312-CS-CDS / Renouvellement Contrat Sélection de Component 4- Project 2017-12- 2018-02- 2018-10- 2018-08- Coordonnateur Provincial IDA / D1650 A posteriori consultants par Direct 34,200.00 34,200.00 Signé 2017-12-01 management 11 14 17 13 Kasaï-Central (Jean Claude entente directe MUSAS) ZR-COREF-42707-CS-INDV / Renouvellement Contrat Component 4- Project 2018-10- 2018-10- 2018-10- 2018-10- 2018-10- 2019-10- Assistant Administratif et IDA / D1650 A posteriori Individuel Direct 18,000.00 18,000.00 Signé 2018-10-01 management 10 20 30 31 30 30 Financier du Katanga (Cedrick KAPANGA) ZR-COREF-42640-CS-CQS / Sélection d'un consultant cabinet pour la mise en place d'un dispositif de gestion des Component 2 - Sélection de risques et d'optimisation de la 2018-03- 2018-03- 2018-05- 2018-05- 2018-06- 2018-11- 2018-12- IDA / D1650 Strengthening budget A posteriori consultants par Direct 330,000.00 372,600.00 Achevé 2018-02-28 mobilisation des recettes 19 10 24 14 29 10 14 oversight entente directe publiques au sein des régies financières (DGI, DGDA, DGRAD) avec le cabinet PANAUDIT BURKINA ZR-COREF-42641-CS-INDV / Sélection d'un Consultant Component 1- Improving 2018-02- 2018-03- 2018-04- 2020-04- international pour appuyer le IDA / D1650 A priori Individuel Limited 240,000.00 0.00 Annulé 2018-02-20 budget execution processes 25 18 22 11 pilier de la mise en œuvre des réformes fiscales ZR-COREF-42676-CS-INDV / Sélection d'un Consultant International chargé de Component 1- Improving 2018-02- 2018-03- 2018-04- 2018-10- IDA / D1650 A posteriori Individuel Limited 80,000.00 0.00 Annulé 2018-02-12 mettre en place un système budget execution processes 17 10 14 11 fiscal de référence des administrations fiscales ZR-COREF-42677-CS-INDV / Sélection d'un Consultant international pour la Component 1- Improving 2018-04- 2018-05- 2018-06- 2018-12- réalisation d'une étude sur la IDA / D1650 A posteriori Individuel Limited 90,000.00 0.00 Annulé 2018-04-10 budget execution processes 15 06 10 07 gestion de la paie dans le cadre de la déconcentration de l'ordonnancement Page 6 ZR-COREF-42678-CS-INDV / Sélection d'un consultant international chargé de Component 1- Improving 2018-03- 2018-02- 2018-08- 2018-02- 2018-08- 2018-04- 2018-08- 2018-09- 2019-10- l'assistance technique à la IDA / D1650 A posteriori Individuel Limited 120,000.00 180,000.00 Achevé 2018-01-30 budget execution processes 19 04 03 25 03 01 06 28 24 Direction Générale du Contrôle des Marchés Publics « DGCMP » ZR-COREF-42679-CS-INDV / Sélection d'un consultant international pour le Component 1- Improving 2018-03- 2018-02- 2018-03- 2018-02- 2018-11- 2018-04- 2018-11- 2018-09- IDA / D1650 A posteriori Individuel Limited 100,000.00 104,145.00 Signé 2018-01-30 développement du système budget execution processes 19 04 26 25 20 01 24 28 intégré de gestion des marchés publics « SIGMAP » ZR-COREF-42681-CS-INDV / Sélection d'un consultant Component 1- Improving 2018-02- 2018-03- 2018-04- 2018-10- individuel pour la rédaction IDA / D1650 A posteriori Individuel Limited 50,000.00 0.00 Annulé 2018-02-20 budget execution processes 25 18 22 19 du guide d'élaboration du TOFE ZR-COREF-42683-CS-INDV / Sélection d' un consultant pour produire les modèles Component 2 - des Budgets Citoyen pour 2018-03- 2018-02- 2018-03- 2018-03- 2018-05- 2018-04- 2018-05- 2018-10- IDA / D1650 Strengthening budget A posteriori Individuel Limited 60,000.00 40,000.00 Signé 2018-02-20 chacun des documents 31 25 31 18 11 22 11 19 oversight budgétaires clés du pouvoir central et des provinces dans toutes les langues ZR-COREF-42684-CS-INDV / Recrutement des Consultants Component 2 - 2018-03- 2018-03- 2018-05- 2018-11- pour la formation des IDA / D1650 Strengthening budget A posteriori Individuel Limited 50,000.00 0.00 Annulé 2018-03-05 10 31 05 01 formateurs sur le processus oversight et l'analyse budgétaires ZR-COREF-42686-CS-INDV / Sélection d'un Consultant individuel international chargé du suivi des DAF, de la Component 2 - Sélection de 2018-11- 2018-03- 2018-05- 2018-11- déconcentration de IDA / D1650 Strengthening budget A posteriori consultants par Direct 45,000.00 0.00 Annulé 2018-02-19 28 01 05 01 l'ordonnancement et d'appui oversight entente directe aux AT (2ème phase de 3 mois de contrat avec Ibrahima NDIAYE) ZR-COREF-42690-CS-INDV / Recrutement d' un web designer (web master) pour le Component 4- Project 2018-02- 2018-02- 2018-03- 2018-02- 2018-04- 2018-04- 2018-04- 2018-05- développement et la mise à IDA / D1650 A posteriori Individuel Limited 30,000.00 6,000.00 Signé 2018-01-30 management 26 04 31 25 05 01 09 01 jour quotidienne d'un site web interactif à grande capacité du COREF ZR-COREF-42695-CS-INDV / Sélection d'un consultant international devant mener Component 4- Project 2018-02- 2018-03- 2018-04- 2018-10- IDA / D1650 A posteriori Individuel Limited 80,000.00 0.00 Annulé 2018-02-20 conjointement au COREF une management 25 18 22 19 évaluation à mi - parcours du projet ZR-COREF-42709-CS-CDS / Sélection de Renouvellement contrat de Component 4- Project 2018-03- 2018-04- 2018-03- 2019-04- IDA / D1650 A posteriori consultants par Direct 18,000.00 18,000.00 Signé 2018-03-01 l'Assistante en PM (Gisèle management 09 01 31 01 entente directe MUAHUKA) ZR-COREF-42710-CS-CDS / Sélection de Component 4- Project 2018-02- 2018-03- 2018-02- 2019-03- Renouvellement contrat de la IDA / D1650 A posteriori consultants par Direct 18,000.00 18,000.00 Signé 2018-02-01 management 10 01 22 01 trésorière (Sylvie NGEVESISE) entente directe ZR-COREF-42711-CS-CDS / Sélection de Component 4- Project 2018-11- 2018-12- 2018-10- 2019-12- Renouvellement contrat du IDA / D1650 A posteriori consultants par Direct 30,000.00 30,000.00 Signé 2018-11-01 management 10 01 30 01 Comptable (Déo MUGARUKA) entente directe ZR-COREF-42854-CS-INDV / Component 3 - Sélection d'un consultant pour Strengthening public 2018-04- 2018-05- 2018-06- 2018-12- la réalisation de l'audit de la IDA / D1650 A posteriori Individuel Limited 50,000.00 0.00 Annulé 2018-04-10 financial management 15 06 10 07 chaîne de la dépense installée systems at provincial level au KWILU ZR-COREF-42685-CS-INDV / Renouvellement Contrat Consultant National pour Component 2 - appuyer et superviser la mise 2018-04- 2018-03- 2018-04- 2018-03- 2018-04- 2018-04- 2018-04- 2019-04- IDA / D1650 Strengthening budget A posteriori Individuel Direct 24,000.00 24,000.00 Signé 2018-03-01 en œuvre du Budget 10 05 10 10 10 01 10 01 oversight Participatif au niveau provincial (Florence MOGBEKUMA) ZR-COREF-42706-CS-INDV / Renouvellement contrat Component 4- Project 2018-11- 2018-11- 2018-10- 2018-12- 2018-10- 2019-12- IDA / D1650 A posteriori Individuel Direct 34,200.00 34,200.00 Signé 2018-11-01 Coordonnateur Provincial du management 06 10 31 01 31 01 Nord-Kivu (David KAMUHA) ZR-COREF-42704-CS-INDV / Renouvellement contrat du Component 4- Project 2018-11- 2018-11- 2018-11- 2018-12- 2018-10- 2019-11- IDA / D1650 A posteriori Individuel Direct 51,600.00 51,600.00 Signé 2018-11-01 Responsable Administratif et management 06 10 17 01 30 26 Financier(Emile ASELE) ZR-COREF-42705-CS-INDV / Component 4- Project 2018-02- 2018-02- 2018-02- 2018-03- 2018-02- 2019-03- Renouvellement contrat du IDA / D1650 A posteriori Individuel Direct 51,600.00 51,600.00 Signé 2018-02-01 management 07 10 22 01 22 01 SPM (Luc MBAYO SUKADI) ZR-COREF-42708-CS-CDS / Renouvellement contrat Component 4- Project 2019-11- 2019-11- 2018-10- 2019-12- 2018-10- 2020-11- IDA / D1650 A posteriori Individuel Direct 34,200.00 34,200.00 Signé 2019-11-05 Coordonnateur Provincial de management 15 20 12 01 17 30 l'équateur(Boenga EFONGE) ZR-COREF-42696-CS-CDS / Renouvellement contrat de Component 4- Project 2018-08- 2018-07- 2018-08- 2018-07- 2018-09- 2018-07- 2019-09- l’Assistante du IDA / D1650 A posteriori Individuel Direct 34,200.00 34,200.00 Signé 2018-08-02 management 05 16 09 16 01 16 01 Coordonnateur National du PROFIT-CONGO Véronique MANYA ZR-COREF-42701-CS-CDS / Renouvellement contrat du Component 4- Project 2018-11- 2018-11- 2018-10- 2018-12- 2018-10- 2019-12- IDA / D1650 A posteriori Individuel Direct 51,600.00 51,600.00 Signé 2018-11-06 Chargé de Suivi et Evaluation management 16 21 30 01 30 01 (Jule KWILU) ZR-COREF-42702-CS-CDS / Renouvellement contrat de la Component 4- Project 2018-08- 2018-08- 2018-07- 2018-09- 2018-07- 2019-09- IDA / D1650 A posteriori Individuel Direct 30,000.00 30,000.00 Signé 2018-08-06 Chargée de management 11 14 13 01 25 01 Communication(Flora DILU) ZR-COREF-42699-CS-INDV / Renouvellement Contrat Component 4- Project 2018-10- 2018-10- 2018-10- 2018-11- 2018-10- 2019-11- IDA / D1650 A posteriori Individuel Direct 34,200.00 34,200.00 Signé 2018-10-01 Coordonnateur Provincial Sud- management 04 07 12 01 17 01 Kivu (Sylvie MALIONA) ZR-COREF-42697-CS-INDV / Renouvellement Contrat Component 4- Project 2018-10- 2018-10- 2018-10- 2018-10- 2018-10- 2018-11- 2018-10- 2019-11- IDA / D1650 A posteriori Individuel Direct 34,200.00 34,200.00 Signé 2018-10-01 Coordonnateur Provincial management 12 04 12 07 12 01 17 01 Bandundu (Thierry BETU) ZR-COREF-42698-CS-INDV / Renouvellment Contrat Component 4- Project 2018-10- 2018-10- 2018-10- 2018-11- 2018-10- 2019-11- IDA / D1650 A posteriori Individuel Direct 34,200.00 34,200.00 Signé 2018-10-01 Coordonnateur Provincial management 04 07 12 01 17 01 Katanga (José MWANIA) ZR-COREF-42634-CS-INDV / Renouvellement Contrat Component 4- Project 2018-10- 2018-10- 2018-10- 2018-10- 2018-10- 2019-10- Assistant Administratif et IDA / D1650 A posteriori Individuel Direct 18,000.00 18,000.00 Signé 2018-10-01 management 10 20 30 31 30 31 Financier du Bandundu (Bonny Longala) Page 7 ZR-COREF-42632-CS-INDV / Renouvellement contrat Component 4- Project 2018-10- 2018-10- 2018-10- 2018-11- 2018-10- 2018-10- 2019-10- Assistant Administratif IDA / D1650 A posteriori Individuel Direct 18,000.00 18,000.00 Signé 2018-10-01 management 10 30 20 30 31 30 31 Financier Kasaï-Central (Léandre KIBONGE) ZR-COREF-42635-CS-INDV / Renouvellement Contrat Component 4- Project 2018-10- 2018-10- 2018-10- 2018-10- 2018-10- 2019-10- Assistant Administratif et IDA / D1650 A posteriori Individuel Direct 18,000.00 18,000.00 Signé 2018-10-01 management 10 20 30 31 30 30 Financier du Sud-Kivu (Faray ASSUMANI) ZR-COREF-43030-CS-CDS / Renouvellement contrat Component 4- Project 2018-10- 2018-10- 2018-10- 2018-11- 2018-10- 2019-11- IDA / D1650 A posteriori Individuel Direct 12,000.00 12,000.00 Signé 2018-10-01 secrétaire-logisticienne/NK management 11 16 21 05 22 05 (Thérèse MWENGE MBAMBU) ZR-COREF-43032-CS-CDS / Renouvellement contrat Component 4- Project 2018-11- 2018-11- 2018-10- 2018-12- 2018-10- 2019-12- IDA / D1650 A posteriori Individuel Direct 8,400.00 8,400.00 Signé 2018-11-01 chauffeur-coursier/KWILU management 10 13 30 01 30 01 (JIRESSE KAKANA) ZR-COREF-43034-CS-CDS / Renouvellement contrat Component 4- Project 2018-10- 2018-10- 2018-10- 2018-11- 2018-10- 2019-11- IDA / D1650 A posteriori Individuel Direct 8,400.00 8,400.00 Signé 2018-10-01 chauffeur-coursier/NK management 11 16 21 01 22 01 (Jeannot KAMBALE VASIKANIA) ZR-COREF-42888-CS-CDS / Renouvellement contrat du Component 4- Project 2018-09- 2018-09- 2018-09- 2018-10- 2018-09- 2019-10- IDA / D1650 A posteriori Individuel Direct 60,000.00 60,000.00 Signé 2018-09-01 Coordonnateur Adjoint du management 07 10 25 01 25 01 COREF (Babi VANGU) ZR-COREF-42892-CS-CDS / Renouvellement contrat du Component 4- Project 2018-02- 2018-02- 2018-02- 2018-02- 2018-03- 2018-02- 2019-03- chauffeur-coursier de la IDA / D1650 A posteriori Individuel Direct 9,000.00 9,000.00 Signé 2018-02-15 management 20 17 19 22 01 22 01 Coordination Nationale (Claude ISEKUSU) ZR-COREF-42898-CS-CDS / Renouvellement contrat Component 4- Project 2018-02- 2018-02- 2018-02- 2018-03- 2018-02- 2019-03- AT/Renforcement dispositif IDA / D1650 A posteriori Individuel Direct 54,000.00 54,000.00 Signé 2018-02-15 management 18 20 28 01 22 01 de contrôle des FP (Etienne MAFWENI) ZR-COREF-42903-CS-CDS / Renouvellement contrat de Component 4- Project 2018-02- 2018-02- 2018-02- 2018-03- 2018-02- 2019-03- l'AT/Réforme de la Gestion de IDA / D1650 A posteriori Individuel Direct 54,000.00 54,000.00 Signé 2018-02-15 management 17 19 22 01 22 01 la dépense publique (Jean- Baptiste VEKO) ZR-COREF-42906-CS-CDS / Renouvellement contrat Component 4- Project 2018-02- 2018-02- 2018-02- 2018-03- 2018-02- 2019-03- AT/Réforme comptabilité et IDA / D1650 A posteriori Individuel Direct 54,000.00 54,000.00 Signé 2018-02-15 management 17 20 28 01 22 01 gestion de la trésorerie (Robert BAMBA) ZR-COREF-42909-CS-CDS / Renouvellement contrat de l'expert en FP en charge du Component 4- Project 2018-02- 2018-02- 2018-02- 2018-03- 2018-02- 2019-03- IDA / D1650 A posteriori Individuel Direct 54,000.00 54,000.00 Signé 2018-02-15 suivi de la société civile et du management 16 18 28 01 28 01 budget participatif (Georges TSHIONZA MATA) ZR-COREF-42910-CS-CDS / Renouvellement contrat Component 4- Project 2018-06- 2018-06- 2018-06- 2018-07- 2018-06- 2019-07- IDA / D1650 A posteriori Individuel Direct 54,000.00 54,000.00 Signé 2018-06-01 AT/Réforme Budgétaire management 11 16 21 01 27 01 (SASSE KEMBE) ZR-COREF-42912-CS-CDS / Renouvellement contrat de Component 4- Project 2018-08- 2018-08- 2018-07- 2018-09- 2018-07- 2019-09- l'AT/Décentralisation IDA / D1650 A posteriori Individuel Direct 54,000.00 54,000.00 Signé 2018-08-02 management 08 12 13 01 16 01 Financière (Moïse ASSANI SENGI) ZR-COREF-42916-CS-CDS / Component 4- Project 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2019-07- Renouvellement Contrat AAF IDA / D1650 A posteriori Individuel Direct 18,000.00 18,000.00 Signé 2018-06-01 management 04 07 14 01 16 01 Equateur (Bruno BAKANSEKA) ZR-COREF-42918-CS-CDS / Component 4- Project 2018-06- 2018-06- 2018-07- 2018-07- 2018-07- 2019-07- Renouvellement Contrat AAF IDA / D1650 A posteriori Individuel Direct 18,000.00 18,000.00 Signé 2018-06-01 management 11 16 14 01 16 01 NKV (Jean Claude SIMPENZE) ZR-COREF-42920-CS-CDS / Component 4- Project 2018-06- 2018-06- 2018-11- 2018-12- Renouvellement Contrat AAF IDA / D1650 A posteriori Individuel Direct 18,000.00 0.00 Annulé 2018-06-01 management 11 15 18 24 Kasaï-Or (Willy MAKIADI) ZR-COREF-42894-CS-CDS / Renouvellement contrat Component 4- Project 2018-02- 2018-02- 2018-02- 2018-03- 2018-02- 2019-03- IDA / D1650 A posteriori Individuel Direct 54,000.00 54,000.00 Signé 2018-02-15 AT/Réforme et Administration management 18 19 28 01 22 01 Fiscale (Jean-Pierre SAMOLIA) ZR-COREF-50018-CS-INDV / Selection d'un consultant individuel chargé des études et surveillance des petits Component 4- Project 2018-03- 2018-03- 2018-03- 2018-03- 2018-05- 2019-04- 2018-11- 2020-02- IDA / D1650 A posteriori Individuel Limited 90,000.00 180,000.00 Signé 2018-03-05 travaux de rehabilitation des management 31 10 31 31 05 05 01 21 bâtiments abritant la coordination nationale du Projet PROFIT CONGO ZR-COREF-42703-CS-CDS / Renouvellement contrat Component 4- Project 2018-08- 2018-09- 2018-09- 2018-09- 2018-09- 2019-09- secrétaire de la Coordination IDA / D1650 A posteriori Individuel Direct 12,000.00 12,000.00 Signé 2018-08-02 management 12 02 25 30 25 30 Provinciale de l'Equateur (Lisette ITOMA) ZR-COREF-56368-CS-INDV / Consultant Individuel d'assurer le coaching des Component 4- Project 2018-03- 2018-03- 2018-03- 2018-04- 2018-06- 2018-04- 2018-06- 2018-10- 2018-11- inspecteurs des finances qui IDA / D1650 A posteriori Individuel Limited 30,000.00 15,000.00 Achevé 2018-03-28 management 20 30 20 04 08 10 08 07 13 assument la fonction d'audit interne au sein du PROFIT CONGO ZR-COREF-80879-CS-INDV / CONSULTANT POUR L'APPUI A Component 2 - 2018-10- 2018-10- 2018-11- 2019-01- L'ANALYSE DES RAPPORTS IDA / D1650 Strengthening budget A posteriori Individuel Limited 25,000.00 0.00 Annulé 2018-10-25 27 31 08 07 D'EXECUTION DES MARCHES oversight PUBLICS PAR LES OSC ZR-COREF-80908-CS-INDV / CONSULTANT POUR L'APPUI A Component 2 - L'ANALYSE DE L'EXECUTION 2018-11- 2018-11- 2018-11- 2019-01- IDA / D1650 Strengthening budget A posteriori Individuel Limited 40,000.00 0.00 Annulé 2018-11-10 DE LA LOI DE FINANCES 2017 12 16 22 21 oversight PAR LES ORGANISATIONS DE LA SOCIETE CIVILE ZR-COREF-80917-CS-INDV / Recrutement de 2 chauffeurs Component 4- Project 2018-11- 2018-11- 2018-11- 2019-02- IDA / D1650 A posteriori Individuel Limited 3,000.00 0.00 Annulé 2018-11-05 temporaires pour le Projet management 07 09 14 12 PROFIT CONGO ZR-COREF-96389-CS-INDV / Recrutement d'une Assistante Nationale pour appuyer la Component 2 - 2019-03- 2019-03- 2019-03- 2019-03- 2019-04- 2019-03- 2020-03- mise en œuvre du Budget IDA / D1650 Strengthening budget A posteriori Individuel Direct 24,000.00 24,000.00 Signé 2019-03-03 14 07 09 14 01 17 31 Participatif au niveau oversight provincial (Florence MOGBEKUMA) ZR-COREF-96392-CS-INDV / Recrutement d'un(e) Component 4- Project 2019-03- 2019-03- 2019-03- 2019-03- 2019-03- 2019-04- 2019-03- 2020-03- 2019-11- IDA / D1650 A posteriori Individuel Limited 12,000.00 9,000.00 Achevé 2019-03-03 Assistant(e) pour le suivi du management 17 06 23 19 29 01 30 31 06 Budget Participatif (6 mois) ZR-COREF-96399-CS-INDV / Component 4- Project 2019-03- 2019-03- 2019-02- 2019-03- 2019-03- 2020-03- Renouvellement contrat du IDA / D1650 A posteriori Individuel Direct 84,000.00 168,000.00 Signé 2019-03-04 management 08 11 27 31 01 30 Coordonnateur National Page 8 ZR-COREF-96404-CS-INDV / Component 4- Project 2019-09- 2019-09- 2019-09- 2019-09- 2019-09- 2019-10- 2019-09- 2020-09- Renouvellement contrat du IDA / D1650 A posteriori Individuel Direct 60,000.00 60,000.00 Signé 2019-09-02 management 12 06 12 13 18 01 20 30 Coordonnateur Adjoint ZR-COREF-96407-CS-INDV / Component 4- Project 2019-11- 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2019-12- 2020-11- Renouvellement contrat du IDA / D1650 A posteriori Individuel Direct 51,600.00 51,600.00 Signé 2019-11-01 management 28 06 28 13 28 01 09 30 Responsable Administratif ZR-COREF-96413-CS-INDV / Renouvellement contrat du Component 4- Project 2019-02- 2019-02- 2019-02- 2019-02- 2019-03- 2020-02- IDA / D1650 A posteriori Individuel Direct 51,600.00 51,600.00 Signé 2019-02-01 Spécialiste en Passation des management 06 13 27 28 01 28 Marchés ZR-COREF-96415-CS-INDV / Component 4- Project 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2019-12- 2019-12- 2020-11- Renouvellement contrat du IDA / D1650 A posteriori Individuel Direct 51,600.00 51,600.00 Signé 2019-11-01 management 28 06 28 11 05 01 08 30 Chargé de Suivi et Evaluation ZR-COREF-96417-CS-INDV / Component 4- Project 2019-11- 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2020-01- 2020-11- Renouvellement contrat du IDA / D1650 A posteriori Individuel Direct 30,000.00 30,000.00 Signé 2019-11-01 management 28 06 28 13 28 01 09 30 comptable ZR-COREF-96421-CS-INDV / Renouvellement contrat de l'Assistant Technique en Component 4- Project 2019-02- 2019-02- 2019-02- 2019-03- 2019-03- 2020-03- IDA / D1650 A posteriori Individuel Direct 54,000.00 54,000.00 Signé 2019-02-01 charge de la réforme de la management 06 11 27 31 01 30 comptabilité et de la gestion de la trésorerie ZR-COREF-96423-CS-INDV / Renouvellement contrat de Component 4- Project 2019-02- 2019-02- 2019-02- 2019-03- 2019-03- 2020-03- l'assistant technique en IDA / D1650 A posteriori Individuel Direct 54,000.00 54,000.00 Signé 2019-02-01 management 06 11 27 31 01 30 charge de la réforme fiscale et de l'administration fiscale ZR-COREF-96428-CS-INDV / Renouvellement contrat de l'Assistant Technique chargé Component 4- Project 2019-02- 2019-02- 2019-02- 2019-02- 2019-03- 2020-02- IDA / D1650 A posteriori Individuel Direct 54,000.00 54,000.00 Signé 2019-02-02 de Renforcement du Dispositif management 07 12 27 28 01 28 de Contrôle des Finances Publiques ZR-COREF-96433-CS-INDV / Renouvellement contrat de Component 4- Project 2019-02- 2019-02- 2019-02- 2019-02- 2019-03- 2020-02- l'Assistant Technique chargé IDA / D1650 A posteriori Individuel Direct 54,000.00 54,000.00 Signé 2019-02-01 management 06 11 27 28 01 28 de la Réforme de la Gestion de la Dépense Publique ZR-COREF-96431-CS-CDS / Recrutement d'un Consultant international cabinet pour la cartographie des risques dans Component 2 - Sélection de 5 nouveaux ministères, faire 2019-06- 2019-03- 2019-07- 2019-05- 2019-07- 2019-11- 2019-12- IDA / D1650 Strengthening budget A posteriori consultants par Direct 380,000.00 377,000.00 Achevé 2019-03-15 la revue qualité des guides 26 25 02 29 30 25 14 oversight entente directe d'audit sectoriel de l'IGF et du manuel des procédures, proposer un cadre organique, etc ZR-COREF-96438-CS-INDV / Renouvellement contrat de l'Assistant Technique en Component 4- Project 2019-02- 2019-02- 2019-02- 2019-02- 2019-03- 2020-02- charge de la Transparence IDA / D1650 A posteriori Individuel Direct 54,000.00 54,000.00 Signé 2019-02-01 management 06 11 27 28 01 28 des Finances Publiques et du suivi de la société civile (TSHIONZA MATA) ZR-COREF-96623-CS-INDV / Renouvellement contrat de Component 4- Project 2019-07- 2019-08- 2019-07- 2019-08- 2019-07- 2019-09- 2019-08- 2020-08- l'Assistant Technique Chargé IDA / D1650 A posteriori Individuel Direct 54,000.00 54,000.00 Signé 2019-08-01 management 30 05 30 06 30 01 30 31 de la Décentralisation Financière ZR-COREF-96627-CS-INDV / Renouvellement contrat de Component 4- Project 2019-07- 2019-08- 2019-07- 2019-08- 2019-08- 2019-09- 2019-08- 2020-08- IDA / D1650 A posteriori Individuel Direct 34,200.00 34,200.00 Signé 2019-08-01 l'Assistante du Coordonnateur management 30 05 30 06 05 01 30 31 National ZR-COREF-96629-CS-INDV / Component 4- Project 2019-07- 2019-08- 2019-07- 2019-08- 2019-07- 2019-09- 2019-08- 2020-08- Renouvellement contrat de la IDA / D1650 A posteriori Individuel Direct 30,000.00 30,000.00 Signé 2019-08-01 management 30 05 31 06 31 01 30 31 Chargée de Communication ZR-COREF-96631-CS-INDV / Renouvellement contrat de Component 4- Project 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-07- 2019-06- 2020-06- l'Assistant Technique en IDA / D1650 A posteriori Individuel Direct 54,000.00 54,000.00 Signé 2019-06-01 management 24 04 24 22 24 01 27 30 charge de la Réforme Budgétaire ZR-COREF-96634-CS-INDV / Selection consultant individuel pour élaborer le manuel des procédures de paiement des impôts, droits, Component 1- Improving 2019-04- 2019-05- 2019-04- 2019-06- 2019-04- 2019-07- 2019-04- 2020-01- 2020-02- IDA / D1650 A posteriori Individuel Limited 40,000.00 39,500.00 Achevé 2019-05-15 taxes et redevances des budget execution processes 01 20 02 10 05 15 06 11 10 provinces ainsi que droits, taxes et redevances du pouvoir central par secteur d'activités ZR-COREF-96635-CS-INDV / Renouvellement contrat de Component 4- Project 2019-01- 2019-01- 2019-02- 2019-01- 2019-03- 2020-01- l'assistant technique chargé IDA / D1650 A posteriori Individuel Direct 54,000.00 54,000.00 Signé 2019-01-25 management 28 29 27 31 01 31 de la Décentralisation Financière ZR-COREF-96643-CS-INDV / Renouvellement contrat du Component 4- Project 2019-01- 2019-01- 2019-02- 2019-01- 2019-02- 2020-01- IDA / D1650 A posteriori Individuel Direct 12,000.00 12,000.00 Signé 2019-01-25 secrétaire logisticien du Kasaï- management 28 29 01 31 13 31 Oriental ZR-COREF-96646-CS-INDV / Renouvellement contrat de la Component 4- Project 2019-01- 2019-01- 2019-01- 2019-01- 2019-02- 2020-01- IDA / D1650 A posteriori Individuel Direct 12,000.00 12,000.00 Signé 2019-01-25 secrétaire logisticienne du management 28 29 31 31 13 31 Sud-Kivu ZR-COREF-96647-CS-INDV / Renouvellement contrat du Component 4- Project 2019-01- 2019-01- 2019-01- 2019-01- 2019-02- 2020-01- chauffeur coursier de la IDA / D1650 A posteriori Individuel Direct 8,400.00 8,400.00 Signé 2019-01-25 management 28 29 31 31 05 31 Coordination Provinciale du Kasaï-Oriental ZR-COREF-96650-CS-INDV / Renouvellement contrat du Component 4- Project 2019-01- 2019-01- 2019-01- 2019-01- 2019-02- 2020-01- chauffeur-coursier de la IDA / D1650 A posteriori Individuel Direct 8,400.00 8,400.00 Signé 2019-01-25 management 28 29 31 31 13 31 coordination provinciale du Sud-Kivu ZR-COREF-96651-CS-INDV / Component 4- Project 2019-02- 2019-02- 2019-02- 2019-02- 2019-03- 2020-02- Renouvellement contrat IDA / D1650 A posteriori Individuel Direct 18,000.00 18,000.00 Signé 2019-02-01 management 05 11 27 28 01 28 trésorière ZR-COREF-96658-CS-INDV / Renouvellement contrat du Component 4- Project 2019-02- 2019-02- 2019-02- 2019-02- 2019-03- 2020-02- chauffeur-coursier de la IDA / D1650 A posteriori Individuel Direct 9,000.00 9,000.00 Signé 2019-02-01 management 05 11 27 28 01 28 Coordination nationale du PROFIT-CONGO ZR-COREF-96662-CS-INDV / Renouvellement contrat de Component 4- Project 2019-03- 2019-03- 2019-02- 2019-04- 2019-03- 2020-03- IDA / D1650 A posteriori Individuel Direct 18,000.00 18,000.00 Signé 2019-03-01 l'Assistante en Passation des management 05 08 27 01 01 31 Marchés ZR-COREF-96664-CS-INDV / Component 4- Project 2019-02- 2019-02- 2019-02- 2019-03- 2019-03- 2020-03- Renouvellement contrat de la IDA / D1650 A posteriori Individuel Direct 12,000.00 12,000.00 Signé 2019-02-01 management 05 08 27 04 01 03 Réceptionniste Page 9 ZR-COREF-96666-CS-INDV / Renouvellement contrat de la Component 4- Project 2019-03- 2019-03- 2019-02- 2019-04- 2019-03- 2020-03- secrétaire logisticienne de la IDA / D1650 A posteriori Individuel Direct 12,000.00 12,000.00 Signé 2019-03-01 management 05 08 26 01 01 31 Coordination Provinciale du Kwilu ZR-COREF-96668-CS-INDV / Renouvellement contrat du Component 4- Project 2019-02- 2019-02- 2019-02- 2019-02- 2019-03- 2020-02- chauffeur-coursier de la IDA / D1650 A posteriori Individuel Direct 8,400.00 8,400.00 Signé 2019-02-01 management 05 11 26 28 01 28 coordination provinciale du Kasaî-Central ZR-COREF-96669-CS-INDV / Renouvellement contrat du Component 4- Project 2019-02- 2019-02- 2019-02- 2019-02- 2019-03- 2020-02- secrétaire-logisticien de la IDA / D1650 A posteriori Individuel Direct 12,000.00 12,000.00 Signé 2019-02-01 management 05 11 27 28 01 28 coordination provinciale du Kasaï-Central ZR-COREF-96670-CS-INDV / Renouvellement contrat de la Component 4- Project 2019-09- 2019-09- 2019-09- 2019-09- 2019-09- 2019-10- 2019-09- 2020-09- secrétaire-logisticienne de la IDA / D1650 A posteriori Individuel Direct 12,000.00 12,000.00 Signé 2019-09-02 management 12 06 12 13 12 01 20 30 Coordination Provinciale de l'Equateur ZR-COREF-96673-CS-INDV / Renouvellement contrat du Component 4- Project 2019-11- 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2019-12- 2020-11- IDA / D1650 A posteriori Individuel Direct 34,200.00 34,200.00 Signé 2019-11-01 coordonnateur provincial de management 28 06 28 11 28 01 09 30 l'Equateur ZR-COREF-96675-CS-INDV / Renouvellement contrat du Component 4- Project 2019-11- 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2019-12- 2020-11- IDA / D1650 A posteriori Individuel Direct 34,200.00 34,200.00 Signé 2019-11-01 coordonnateur provincial du management 28 06 28 11 28 01 08 30 Kasaï-Oriental ZR-COREF-96678-CS-INDV / Renouvellement contrat du Component 4- Project 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2020-10- IDA / D1650 A posteriori Individuel Direct 34,200.00 34,200.00 Signé 2019-10-01 Coordonnateur Provincial de management 30 03 30 11 30 31 30 30 Kwilu ZR-COREF-96681-CS-INDV / Renouvellement contrat du Component 4- Project 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2020-10- IDA / D1650 A posteriori Individuel Direct 34,200.00 34,200.00 Signé 2019-10-01 coordonnateur provincial du management 30 03 30 11 30 31 30 30 Haut Katanga ZR-COREF-96682-CS-INDV / Renouvellement contrat de la Component 4- Project 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2020-10- IDA / D1650 A posteriori Individuel Direct 34,200.00 34,200.00 Signé 2019-10-01 coordonnatrice provinciale du management 30 03 30 11 30 31 30 30 Sud-Kivu ZR-COREF-96684-CS-INDV / Renouvellement contrat du Component 4- Project 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2020-10- IDA / D1650 A posteriori Individuel Direct 34,200.00 34,200.00 Signé 2019-10-01 coordonnateur provincial du management 30 03 30 11 30 31 30 30 Kasaï-Central ZR-COREF-96687-CS-INDV / Renouvellement contrat de Component 4- Project 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-07- 2019-06- 2020-06- l'assistant administratif et IDA / D1650 A posteriori Individuel Direct 18,000.00 18,000.00 Signé 2019-06-01 management 24 04 24 22 24 01 27 30 financier de la coordination provinciale de l'Equateur ZR-COREF-96690-CS-INDV / Renouvellement contrat de Component 4- Project 2019-06- 2019-06- 2019-06- 2019-06- 2019-06- 2019-07- 2019-06- 2020-06- l'assistant administratif et IDA / D1650 A posteriori Individuel Direct 18,000.00 18,000.00 Signé 2019-06-01 management 24 04 24 22 24 01 27 30 financier de la coordination provinciale du Nord-Kivu ZR-COREF-96691-CS-INDV / Renouvellement contrat de la Component 4- Project 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2020-10- secrétaire-logisticienne de la IDA / D1650 A posteriori Individuel Direct 12,000.00 12,000.00 Signé 2019-10-01 management 30 03 30 11 30 31 30 30 Coordination provinciale du Nord-Kivu ZR-COREF-96692-CS-INDV / Renouvellement contrat du Component 4- Project 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2020-10- chauffeur-coursier de la IDA / D1650 A posteriori Individuel Direct 8,400.00 8,400.00 Signé 2019-10-01 management 30 03 30 11 30 31 30 30 coordination provinciale du Nord-Kivu ZR-COREF-96693-CS-INDV / Renouvellement contrat du Component 4- Project 2019-11- 2019-11- 2019-11- 2019-11- 2019-11- 2019-12- 2019-12- 2020-11- chauffeur-coursier de la IDA / D1650 A posteriori Individuel Direct 8,400.00 8,400.00 Signé 2019-11-01 management 28 06 28 11 28 01 09 30 coordination provinciale de Kwilu ZR-COREF-96712-CS-INDV / Renouvellement contrat de Component 4- Project 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2020-10- l'Assistant Administratif et IDA / D1650 A posteriori Individuel Direct 18,000.00 18,000.00 Signé 2019-10-01 management 30 03 30 11 30 31 30 30 Financier de la Coordination Provinciale du Sud-Kivu ZR-COREF-96713-CS-INDV / Renouvellement contrat de Component 4- Project 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-11- 2020-10- l'assistant Administratif et IDA / D1650 A posteriori Individuel Direct 18,000.00 18,000.00 Signé 2019-10-01 management 30 03 30 11 30 31 21 30 Financier de la Coordination Provinciale du Haut-Katanga ZR-COREF-96714-CS-INDV / Renouvellement contrat de Component 4- Project 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2020-10- l'Assistant Administratif et IDA / D1650 A posteriori Individuel Direct 18,000.00 18,000.00 Signé 2019-10-01 management 30 03 30 11 30 31 30 30 Financier de la coordination provinciale du Kasaï-Central ZR-COREF-96715-CS-INDV / Renouvellement de l'Assistant Component 4- Project 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2019-10- 2020-10- Administratif et Financier de IDA / D1650 A posteriori Individuel Direct 18,000.00 34,200.00 Signé 2019-10-01 management 30 03 30 11 30 31 30 30 la Coordination Provinciale de KWILU ZR-COREF-96716-CS-INDV / Renouvellement contrat de Component 4- Project 2019-09- 2019-09- 2019-09- 2019-09- 2019-09- 2019-10- 2019-09- 2020-09- l'Assistant Administratif et IDA / D1650 A posteriori Individuel Direct 18,000.00 9,000.00 Signé 2019-09-02 management 12 05 12 06 12 01 20 30 Financier de la Coordination Provinciale du Kasaï-Oriental ZR-COREF-96717-CS-INDV / Component 4- Project 2019-03- 2019-02- 2019-03- 2019-02- 2019-03- 2019-02- 2019-03- 2020-02- Recrutement d'un second IDA / D1650 A posteriori Individuel Limited 30,000.00 30,000.00 Signé 2019-02-01 management 21 06 23 20 25 28 25 28 comptable ZR-COREF-96720-CS-INDV / Recrutement de deux Component 4- Project 2019-03- 2019-02- 2019-03- 2019-02- 2019-03- 2019-02- 2019-03- 2020-02- chauffeur-coursiers pour la IDA / D1650 A posteriori Individuel Limited 18,000.00 16,800.00 Signé 2019-02-01 management 15 06 19 20 19 28 20 28 Coordination Nationale du PROFIT-CONGO ZR-COREF-98996-CS-CDS / sélection d'un consultant en vue d'élaborer le plan de Component 2 - Sélection de 2019-03- 2019-04- 2019-03- 2019-08- 2019-08- formation et de mettre en IDA / D1650 Strengthening budget A posteriori consultants par Direct 60,000.00 60,000.00 Achevé 2019-03-15 25 21 11 19 21 œuvre le programme de oversight entente directe formation des DAF (IBrahima Ndiaye) ZR-COREF-96439-CS-INDV / Sélection d'un consultant chargé d'accompagner la mise Component 1- Improving 2019-07- 2019-03- 2019-08- 2019-04- 2019-09- 2019-04- 2019-09- 2020-04- en place des services de la IDA / D1650 A priori Individuel Limited 200,000.00 124,000.00 Signé 2019-03-11 budget execution processes 18 25 08 04 10 10 13 09 Direction Générale du Tresor, de la Comptabilité et de la Paie ZR-COREF-107885-CS-CDS / Sélection d'un Consultant Sélection de Component 1- Improving 2019-04- 2019-04- 2019-04- 2019-06- 2019-07- Evaluateur (01) de l'équipe IDA / D1650 A posteriori consultants par Direct 3,000.00 3,000.00 Achevé 2019-03-31 budget execution processes 03 09 03 08 24 d'évaluation MAPS II entente directe (KALUKIKA KABIONA Désiré) Page 10 ZR-COREF-107890-CS-CDS / Sélection d'un Consultant Sélection de Component 1- Improving 2019-04- 2019-04- 2019-04- 2019-06- 2019-07- Evaluateur (02) dans le cadre IDA / D1650 A posteriori consultants par Direct 3,000.00 3,000.00 Achevé 2019-03-31 budget execution processes 03 09 03 08 24 de l'Evaluation MAPS II entente directe (LUSALEMVO TUTALA Big) ZR-COREF-107892-CS-CDS / Sélection d'un Consultant Sélection de Component 1- Improving 2019-04- 2019-04- 2019-04- 2019-06- 2019-07- Evaluateur (03) dans le cadre IDA / D1650 A posteriori consultants par Direct 3,000.00 3,000.00 Achevé 2019-03-31 budget execution processes 03 09 03 08 24 de l'Evaluation MAPS II entente directe (BUABUA ILUNGA Georges) ZR-COREF-107893-CS-CDS / Sélection d'un Consultant Sélection de Component 1- Improving 2019-04- 2019-04- 2019-04- 2019-06- 2019-07- Expert Evaluateur (04) dans le IDA / D1650 A posteriori consultants par Direct 3,000.00 3,000.00 Achevé 2019-03-31 budget execution processes 03 09 03 08 24 cadre de l'Evaluation MAPS II entente directe (MEKE A SOLOKO Jean Clair) ZR-COREF-107895-CS-CDS / Sélection d'un Consultant Sélection de Expert Evaluateur (05) dans le Component 1- Improving 2019-04- 2019-04- 2019-04- 2019-06- 2019-04- IDA / D1650 A posteriori consultants par Direct 3,000.00 3,000.00 Achevé 2019-03-31 cadre de l'évaluation MAPS II budget execution processes 03 09 03 08 18 entente directe (KABUNDA WA KABUNDA Jonas) ZR-COREF-107897-CS-CDS / Sélection d'un Consultant Sélection de Component 1- Improving 2019-04- 2019-04- 2019-04- 2019-06- 2019-07- Expert Evaluateur (06) dans le IDA / D1650 A posteriori consultants par Direct 3,000.00 3,000.00 Achevé 2019-03-31 budget execution processes 03 09 03 08 24 cadre de l'évaluation MAPS II entente directe (BARUTI LISUNGI Don de Dieu) ZR-COREF-107899-CS-CDS / Sélection d'un Consultant Sélection de Component 1- Improving 2019-04- 2019-04- 2019-04- 2019-06- 2019-08- Expert Evaluateur (07) dans le IDA / D1650 A posteriori consultants par Direct 3,000.00 3,000.00 Achevé 2019-03-31 budget execution processes 03 09 03 08 06 cadre de l'Evaluation MAPS II entente directe (MANGOMBE MAKENGO Paola) ZR-COREF-107901-CS-CDS / Sélection d'un Consultant Sélection de Component 1- Improving 2019-04- 2019-04- 2019-04- 2019-06- 2019-07- Expert Evaluateur (08) dans le IDA / D1650 A posteriori consultants par Direct 3,000.00 3,000.00 Achevé 2019-03-31 budget execution processes 03 09 03 08 25 cadre de l'évaluation MAPS II entente directe (GBETELE MOKULONGO Aimé) ZR-COREF-107903-CS-CDS / Sélection d'un Consultant Sélection de Component 1- Improving 2019-04- 2019-04- 2019-04- 2019-06- 2019-07- Expert Evaluateur (09) dans le IDA / D1650 A posteriori consultants par Direct 3,000.00 3,000.00 Achevé 2019-03-31 budget execution processes 03 09 03 08 25 cadre de l'évaluation MAPS II entente directe (PERO NGWAMASHI Alain) ZR-COREF-107906-CS-CDS / Sélection d'un Consultant Sélection de Component 1- Improving 2019-04- 2019-04- 2019-04- 2019-06- 2019-08- Expert Evaluateur (10) dans le IDA / D1650 A posteriori consultants par Direct 3,000.00 3,000.00 Achevé 2019-03-31 budget execution processes 03 09 03 08 22 cadre de l'évaluation MAPS II entente directe (NKULI MBALI Basile) ZR-COREF-107909-CS-CDS / Sélection d'un Consultant Sélection de Component 1- Improving 2019-04- 2019-04- 2019-04- 2019-06- 2019-07- Expert Evaluateur (11) dans le IDA / D1650 A posteriori consultants par Direct 3,000.00 3,000.00 Achevé 2019-03-31 budget execution processes 03 09 03 08 02 cadre de l'évaluation MAPS II entente directe (KALUME KAYEMBE Christian) ZR-COREF-107912-CS-CDS / Sélection d'un Consultant Sélection de Component 1- Improving 2019-04- 2019-04- 2019-04- 2019-06- 2019-07- Expert Evaluateur (12) dans le IDA / D1650 A posteriori consultants par Direct 3,000.00 3,000.00 Achevé 2019-03-31 budget execution processes 03 09 03 08 24 cadre de l'évaluation MAPS II entente directe (KIBUAKA KILUSAMBO Willy) ZR-COREF-107914-CS-CDS / Sélection d'un Consultant Expert Evaluateur et membre Sélection de Component 1- Improving 2019-04- 2019-04- 2019-04- 2019-06- 2019-07- du secrétariat technique (01) IDA / D1650 A posteriori consultants par Direct 5,000.00 4,320.00 Achevé 2019-03-31 budget execution processes 03 09 03 08 25 dans le cadre de l'évaluation entente directe MAPS II (SENGABO BAKUNZI Patrick) ZR-COREF-107918-CS-CDS / Sélection d'un Consultant Expert évaluateur et membre Sélection de Component 1- Improving 2019-04- 2019-04- 2019-04- 2019-06- 2019-07- du secrétariat technique (02) IDA / D1650 A posteriori consultants par Direct 5,000.00 4,320.00 Achevé 2019-03-31 budget execution processes 03 09 03 08 24 dans le cadre de l'évaluation entente directe MAPS II ( MUKAMBA KIZOGU Patrick) ZR-COREF-107919-CS-CDS / Sélection d'un Consultant expert évaluateur et membre Sélection de Component 1- Improving 2019-04- 2019-04- 2019-04- 2019-06- 2019-07- du secrétariat technique (03) IDA / D1650 A posteriori consultants par Direct 5,000.00 4,320.00 Achevé 2019-03-31 budget execution processes 03 09 03 08 24 dans le cadre de l'évaluation entente directe MAPS II (KALONJI KAMBWA Roger) ZR-COREF-107920-CS-CDS / Sélection d'un Consultant Expert Evaluateur et membre Sélection de Component 1- Improving 2019-04- 2019-04- 2019-04- 2019-07- 2019-07- du Secrétariat technique (04) IDA / D1650 A posteriori consultants par Direct 5,000.00 4,320.00 Achevé 2019-03-31 budget execution processes 03 09 03 08 24 dans le cadre de l'évaluation entente directe MAPS II (YUMBA NGOY Raymond) ZR-COREF-107921-CS-CDS / Sélection d'un Consultant Expert Evaluateur et Sélection de Component 1- Improving 2019-04- 2019-04- 2019-04- 2019-07- 2019-07- superviseur du secrétariat IDA / D1650 A posteriori consultants par Direct 5,500.00 4,680.00 Achevé 2019-03-31 budget execution processes 03 09 03 08 24 technique dans le cadre de entente directe l'évaluation MAPS II (KUZIKESA KASWENGI Céleste) ZR-COREF-107923-CS-CDS / Sélection d'un Consultant expert Evaluateur et Sélection de Coordonnateur du Secrétariat Component 1- Improving 2019-04- 2019-04- 2019-04- 2019-07- 2019-08- IDA / D1650 A posteriori consultants par Direct 5,500.00 4,680.00 Achevé 2019-03-31 technique dans le cadre de la budget execution processes 03 09 03 08 06 entente directe mission d'évaluation MAPS II (NGUNZA BENGA SAKA Magloire) ZR-COREF-42682-CS-INDV / Sélection d'un Consultant international pour la revue Component 1- Improving 2018-09- 2018-09- 2018-11- 2019-05- IDA / D1650 A posteriori Individuel Limited 50,000.00 0.00 Annulé 2018-09-03 qualité des cartographies budget execution processes 08 29 03 02 produites dans les 5 Ministères cibles ZR-COREF-96632-CS-INDV / Sélection d'un consultant national chargé de la formation sur les techniques documentaires et la mise en Component 1- Improving 2019-04- 2019-04- 2019-05- 2019-09- place du système d'archivage IDA / D1650 A posteriori Individuel Limited 50,000.00 0.00 Annulé 2019-04-10 budget execution processes 15 22 09 06 en vue d'améliorer l'organisation, la conservation, la gestion et la traçabilité de l'information au sein de la DGDP ZR-COREF-96644-CS-INDV / Sélection d'un consultant en vue de réaliser la formation au bénéfice des agents sur Component 1- Improving 2019-04- 2019-05- 2019-06- 2019-12- IDA / D1650 A posteriori Individuel Limited 30,000.00 0.00 Annulé 2019-04-25 l'inspection et le contrôle des budget execution processes 30 21 25 22 télécommunications et l'évaluation des produits Miniers ZR-COREF-96408-CS-INDV / Sélection Consultant Individuel pour appuyer le Component 2 - suivi de l'exécution 2019-06- 2019-06- 2019-07- 2019-11- IDA / D1650 Strengthening budget A posteriori Individuel Limited 25,000.00 0.00 Annulé 2019-06-10 trimestrielle et annuelle des 15 22 06 03 oversight dépenses publiques dans les ministères pro-pauvres : collecte des données, analyse, Page 11 ZR-COREF-96401-CS-INDV / Selection Consultant Individuel pour appuyer la Component 2 - production d'un rapport sur 2019-06- 2019-06- 2019-07- 2019-11- IDA / D1650 Strengthening budget A posteriori Individuel Limited 25,000.00 0.00 Annulé 2019-06-10 l'exécution de la loi des 15 22 06 03 oversight finances : collecte des données, analyse, atelier de validation, plaidoyer ZR-COREF-80870-CS-INDV / CONSULTANT POUR REALISER LA MISSION DE SUIVI DE L'EXECUTION TRIMESTRIELLE Component 2 - 2018-11- 2018-11- 2018-12- 2019-06- ET ANNUELLE DES DEPENSES IDA / D1650 Strengthening budget A posteriori Individuel Limited 50,000.00 0.00 Annulé 2018-11-10 12 26 15 13 DANS LES MINISTERES PRO- oversight PAUVRES 2018 PAR LES ORGANISATIONS DE LA SOCIETE CIVILE ZR-COREF-96676-CS-INDV / Renouvellement contrat du Component 4- Project 2019-11- 2019-11- 2019-12- 2020-11- IDA / D1650 A posteriori Individuel Direct 34,200.00 0.00 Annulé 2019-11-01 Coordonnateur Provincial du management 06 11 01 30 Nord-Kivu ZR-COREF-96710-CS-INDV / Recrutement d'un chauffeur- Component 4- Project 2019-01- 2019-01- 2019-01- 2020-01- IDA / D1650 A posteriori Individuel Limited 8,400.00 0.00 Annulé 2019-01-25 coursier pour la coordination management 28 29 31 31 provincial du Haut-Katanga ZR-COREF-96711-CS-INDV / Recrutement d'un chauffeur- Component 4- Project 2019-01- 2019-01- 2019-01- 2020-01- IDA / D1650 A posteriori Individuel Limited 8,400.00 0.00 Annulé 2019-01-25 coursier pour la coordination management 28 29 31 31 provinciale de l'Equateur ZR-COREF-96708-CS-INDV / Recrutement d'un(e) Component 4- Project 2019-01- 2019-01- 2019-01- 2020-01- Secrétaire-Logisticien(ne) IDA / D1650 A posteriori Individuel Limited 12,000.00 0.00 Annulé 2019-01-25 management 28 29 31 31 pour la coordination provinciale du Haut-Katanga ZR-COREF-153965-CS-INDV / Sélection d’un consultant en vue de développer en faveur Component 1- Improving 2020-08- 2020-04- 2020-05- 2020-06- 2020-09- du Secrétariat technique du IDA / D1650 A posteriori Individuel Limited 60,000.00 0.00 Annulé 2020-04-15 budget execution processes 04 20 11 09 07 Comité PTR, un logiciel de traitement des données de la gestion de trésorerie ZR-COREF-154947-CS-INDV / sélection de consultants Component 3 - individuels pour produire un Strengthening public En cours 2021-01- 2020-06- 2020-07- 2020-08- 2021-02- modèle d'édit budgétaire type IDA / D1650 A posteriori Individuel Limited 40,000.00 0.00 2020-06-15 financial management d'exécution 06 20 11 15 11 conforme à la nomenclature systems at provincial level budgétaire et présentation dans les provinces ZR-COREF-156231-CS-INDV / Sélection d'un Consultant international pour assurer l’actualisation du plan Component 1- Improving 2020-05- 2020-04- 2020-12- 2020-05- 2021-03- 2020-05- 2021-03- 2020-08- d’orientation globale de IDA / D1650 A posteriori Individuel Limited 90,000.00 117,750.00 Signé 2020-04-20 budget execution processes 27 25 11 09 22 29 26 27 l’informatisation du système de gestion des Finances Publiques et de l'Administration Publique(POG) ZR-COREF-156243-CS-INDV / Sélection d'un Premier Consultant national pour assurer l’actualisation du plan Component 1- Improving 2020-03- 2020-04- 2020-07- 2020-05- 2021-03- 2020-05- 2021-03- 2020-08- d’orientation globale de IDA / D1650 A posteriori Individuel Limited 30,000.00 50,000.00 Signé 2020-04-20 budget execution processes 23 25 21 09 23 29 26 27 l’informatisation du système de gestion des finances publiques et de l'administration publique(POG) ZR-COREF-156245-CS-INDV / Sélection d'un Deuxième Consultant national pour assurer l’actualisation du plan Component 1- Improving 2020-03- 2020-04- 2020-07- 2020-05- 2021-03- 2020-05- 2021-03- 2020-08- d’orientation globale de IDA / D1650 A posteriori Individuel Limited 30,000.00 50,000.00 Signé 2020-04-20 budget execution processes 23 25 01 09 23 29 26 27 l’informatisation du système de gestion des finances publiques et de l'administration publique(POG) ZR-COREF-156293-CS-INDV / Sélection du Consultant Component 2 - 2020-06- 2020-06- 2020-07- 2021-01- National pour appuyer la mise IDA / D1650 Strengthening budget A posteriori Individuel Direct 9,000.00 0.00 Annulé 2020-06-15 25 30 10 06 en œuvre du Budget oversight Participatif au niveau national ZR-COREF-156541-CS-INDV Component 3 - / Sélection d'un consultant Strengthening public 2020-03- 2020-03- 2020-12- 2020-04- 2021-01- 2020-04- 2021-01- 2020-06- IDA / D1650 A posteriori Individuel Limited 20,000.00 20,000.00 Signé 2020-03-15 pour produire un modèle type financial management 23 20 02 03 25 18 26 17 du PEB systems at provincial level ZR-COREF-156542-CS-INDV Component 3 - / Sélection d'un consultant Strengthening public 2020-12- 2020-03- 2020-12- 2020-04- 2021-01- 2020-04- 2021-01- 2020-06- IDA / D1650 A posteriori Individuel Limited 20,000.00 20,000.00 Signé 2020-03-15 pour produire un modèle type financial management 03 20 04 03 25 18 26 17 du PTR (Plan de Trésorerie) systems at provincial level ZR-COREF-156544-CS-INDV / Sélection d'un consultant individuel international Component 3 - Spécialiste en Strengthening public 2020-03- 2020-03- 2020-03- 2020-06- IDA / D1650 A posteriori Individuel Limited 90,000.00 0.00 Annulé 2020-02-25 Décentralisation Financière financial management 01 15 30 14 pour élaborer la stratégie des systems at provincial level réformes des finances publiques en provinces ZR-COREF-156546-CS-INDV / Sélection d'un consultant Component 3 - national Spécialiste en Strengthening public 2020-03- 2020-03- 2020-03- 2020-05- Gestion Budgétaire pour IDA / D1650 A posteriori Individuel Limited 30,000.00 0.00 Annulé 2020-02-25 financial management 01 15 30 29 élaborer la stratégie des systems at provincial level réformes des finances publiques en provinces ZR-COREF-156547-CS-INDV / Sélection d'un consultant national Spécialiste en Component 3 - Système d'information des Strengthening public 2020-03- 2020-03- 2020-03- 2020-05- IDA / D1650 A posteriori Individuel Limited 30,000.00 0.00 Annulé 2020-02-25 Finances Publiques pour financial management 01 15 30 29 élaborer la stratégie des systems at provincial level réformes des finances publiques en provinces ZR-COREF-168730-CS-CDS / SELECTION D'UN CONSULTANT INTERNATIONAL CHARGE Sélection de Component 1- Improving 2020-04- 2020-04- 2020-04- 2020-05- 2020-04- 2020-08- D’ACCOMPAGNER LA MISE EN IDA / D1650 A posteriori consultants par Direct 60,000.00 60,000.00 Signé 2020-04-20 budget execution processes 21 24 24 04 23 02 PLACE DE LA DIRECTION entente directe GENERALE DU TRESOR ET DE LA COMPTABILITE PUBLIQUE (DGTCP) ZR-COREF-184208-CS-CDS / Consultant Expert Superviseur en charge du pilier 4 Évaluation du système Sélection de Component 1- Improving 2020-09- 2020-09- 2020-09- 2020-09- 2020-09- 2020-09- 2020-10- de passation des marchés IDA / D1650 A posteriori consultants par Direct 1,045.00 1,045.00 Achevé 2020-09-01 budget execution processes 21 04 22 10 22 30 05 publics et des délégations de entente directe service public de la RDC- MAPS II/ NGUNZA MBENGA SAKA Magloire Page 12 ZR-COREF-188212-CS-CDS / Consultant Expert Superviseur en charge des piliers 3 et 4 Évaluation du Sélection de Component 1- Improving 2020-09- 2020-09- 2020-09- 2020-09- 2020-09- 2020-09- 2020-10- système de passation des IDA / D1650 A posteriori consultants par Direct 770.00 770.00 Achevé 2020-09-01 budget execution processes 21 04 22 10 22 30 02 marchés publics et des entente directe délégations de service public de la RDC- MAPS II/ YUMBA NGOY Raymond ZR-COREF-188215-CS-CDS / Consultant Expert Superviseur en charge des piliers 1 et 2 Évaluation du Sélection de Component 1- Improving 2020-09- 2020-09- 2020-09- 2020-09- 2020-09- 2020-09- 2020-10- système de passation des IDA / D1650 A posteriori consultants par Direct 770.00 770.00 Achevé 2020-09-01 budget execution processes 21 04 22 10 22 30 05 marchés publics et des entente directe délégations de service public de la RDC- MAPS II/ KALULIKA KABIONA Desiré ZR-COREF-188216-CS-CDS / Consultant Expert Superviseur en charge des piliers 1 et 2 Évaluation du Sélection de Component 1- Improving 2020-09- 2020-09- 2020-09- 2020-09- 2020-09- 2020-09- 2020-10- système de passation des IDA / D1650 A posteriori consultants par Direct 770.00 770.00 Achevé 2020-09-01 budget execution processes 21 04 22 10 22 30 02 marchés publics et des entente directe délégations de service public de la RDC- MAPS II/ GBETELE MUKOLONGO Aimé ZR-COREF-188217-CS-CDS / Consultant Expert Superviseur en charge du pilier 3 Évaluation du système Sélection de Component 1- Improving 2020-09- 2020-09- 2020-09- 2020-09- 2020-09- 2020-09- 2020-10- de passation des marchés IDA / D1650 A posteriori consultants par Direct 550.00 550.00 Achevé 2020-09-01 budget execution processes 21 04 22 10 22 30 02 publics et des délégations de entente directe service public de la RDC- MAPS II/ MUKAMBA KIZOGO Patrick ZR-COREF-188218-CS-CDS / Consultant Expert Superviseur en charge du pilier 4 Évaluation du système Sélection de Component 1- Improving 2020-09- 2020-09- 2020-09- 2020-09- 2020-09- 2020-09- 2020-10- de passation des marchés IDA / D1650 A posteriori consultants par Direct 550.00 550.00 Achevé 2020-09-01 budget execution processes 21 04 22 10 22 30 02 publics et des délégations de entente directe service public de la RDC- MAPS II/ MANGOMBE MAKENGO Paola ZR-COREF-188223-CS-CDS / Selection d’un consultant en vue de la présentation et validation du manuel de Sélection de Component 1- Improving 2020-10- 2020-09- 2020-11- 2020-11- 2020-12- 2020-11- contrôle des marchés publics IDA / D1650 A posteriori consultants par Direct 30,000.00 23,120.00 Signé 2020-09-01 budget execution processes 20 11 10 15 04 30 et de ses annexes (Outils du entente directe contrôle a priori) pour la DGCMP/ Guy JOseph MALEMBETI ZR-COREF-188224-CS-INDV / Selection d'un consultant international chargé de l'évaluation des institutions Component 1- Improving 2020-09- 2020-10- 2020-12- 2020-10- 2021-01- 2020-11- 2021-01- 2021-01- IDA / D1650 A posteriori Individuel Open 50,000.00 49,733.00 Signé 2020-09-01 ARMP, DGCMP,CGPMP et budget execution processes 16 04 29 18 14 11 22 10 autorités approbatrices dans le cadre de l'évaluation MAPS II ZR-COREF-188232-CS-INDV / Petit contrat de consultant Component 4- Project 2020-09- 2020-09- 2020-11- 2021-01- pour la maintenance IDA / D1650 A posteriori Individuel Limited 5,000.00 0.00 Annulé 2020-09-01 management 06 27 01 30 technique du site web du COREF ZR-COREF-188233-CS-INDV / Petit contrat de consultant Component 4- Project 2020-09- 2020-09- 2020-10- 2020-12- pour la maintenance IDA / D1650 A posteriori Individuel Limited 5,000.00 0.00 Annulé 2020-09-01 management 06 16 10 09 technique du logiciel TOMPRO de la comptabilité ZR-COREF-188234-CS-INDV / Petits contrat de consultants Component 4- Project 2020-09- 2020-09- 2020-10- 2020-12- pour la production du logiciel IDA / D1650 A posteriori Individuel Limited 5,000.00 0.00 Annulé 2020-09-01 management 06 20 05 04 de gestion électronique des documents ZR-COREF-155169-CS-INDV / Sélection d'un Consultant chargé d'appuyer l'élaboration Component 4- Project 2020-06- 2020-07- 2020-08- 2021-02- de la stratégie de IDA / D1650 A posteriori Individuel Limited 30,000.00 0.00 Annulé 2020-06-15 management 20 11 15 11 communication de la stratégie de la réforme des finances publiques ZR-COREF-156532-CS-INDV / Sélection d'un consultant international pour la revue qualité de la feuille de route Component 1- Improving 2020-04- 2020-05- 2020-05- 2020-07- IDA / D1650 A posteriori Individuel Limited 30,000.00 0.00 Annulé 2020-04-06 pour la migration vers le budget execution processes 11 02 22 06 budget-programme et du plan de formation sur la mise en œuvre du Budget- Proramme ZR-COREF-191452-CS-INDV / Selection d'un consultant Component 1- Improving 2020-10- 2020-11- 2020-11- 2021-01- individuel pour l'appui IDA / D1650 A posteriori Individuel Limited 50,000.00 0.00 Annulé 2020-10-15 budget execution processes 20 03 20 19 technique à l'adhesion de l'ONEC à l'IFAC ZR-COREF-208174-CS-INDV / Sélection d'un Consultant international pour assurer l’actualisation du plan Component 1- Improving 2020-12- 2020-12- 2020-12- 2021-01- 2021-01- 2021-04- d’orientation globale de IDA / D1650 A posteriori Individuel Limited 90,000.00 0.00 Annulé 2020-12-15 budget execution processes 09 29 11 01 05 05 l’informatisation du système de gestion des Finances Publiques et de l'Administration Publique(POG) ZR-COREF-212332-CS-CDS / Sélection d'un consultant en vue de la présentation et de la validation du manuel des Sélection de procédures de paiements des Component 1- Improving En attente 2021-02- 2021-02- 2021-03- IDA / D1650 A posteriori consultants par Direct 10,000.00 0.00 2021-01-30 impôts, droits, taxes et budget execution processes d'exécution 03 14 16 entente directe redevances des provinces ainsi que droits, taxes et redevances du pouvoir central (NDUMBI NDUMBI) ZR-COREF-212337-CS-INDV / Sélection d'un consultant Component 2 - En cours 2021-03- 2021-02- 2021-03- 2021-03- 2021-05- individuel pour élaborer le IDA / D1650 Strengthening budget A posteriori Individuel Limited 30,000.00 0.00 2021-02-15 d'exécution 26 20 02 26 25 programme de formation des oversight DAF ZR-COREF-212341-CS-INDV / Sélection d’un consultant individuel pour : (i) la préparation du Règlement d'Administration; (ii) la Component 1- Improving En attente 2021-03- 2021-03- 2021-03- 2021-05- IDA / D1650 A posteriori Individuel Limited 50,000.00 0.00 2021-02-15 production du guide du budget execution processes d'exécution 01 06 26 25 contrôle budgétaire et (iii) l’élaboration du plan de formation des contrôleurs budgétaires ZR-COREF-212342-CS-CDS / Sélection d'un consultant Sélection de Component 1- Improving En attente 2021-03- 2021-03- 2021-04- pour appuyer la phase pilote IDA / D1650 A posteriori consultants par Direct 50,000.00 0.00 2021-02-20 budget execution processes d'exécution 02 22 09 de la mise en place de SIGMAP entente directe (Pierre Tshiyombo) Page 13 ZR-COREF-212349-CS-CDS / Sélection d'un consultant cabinet chargé de la Sélection de Component 1- Improving En attente 2021-02- 2021-03- 2021-04- restitution des conclusions IDA / D1650 A posteriori consultants par Direct 7,500.00 0.00 2021-02-15 budget execution processes d'exécution 25 26 25 des rapports d'audit des entente directe marchés publics 2014, 2015 et 2016 ZR-COREF-212351-CS-CDS / Sélection d'un consultant Sélection de cabinet (ENA/RDC) pour Component 1- Improving 2021-03- 2021-03- 2021-03- 2021-03- 2021-03- 2021-09- IDA / D1650 A posteriori consultants par Direct 250,000.00 75,555.00 Signé 2021-02-25 renforcer les capacités budget execution processes 02 07 03 27 05 23 entente directe techniques de 85 nouveaux inspecteurs des finances ZR-COREF-212462-CS-INDV / Sélection d'un consultant individuel pour évaluer et Component 3 - appuyer la mise en place des Strengthening public En cours 2021-03- 2021-03- 2021-04- 2021-04- 2021-07- IDA / D1650 A posteriori Individuel Limited 40,000.00 0.00 2021-03-15 services provinciaux du trésor financial management d'exécution 29 20 03 17 16 et de la comptabilité ainsi que systems at provincial level du budget dans 2 ou 3 provinces ZR-COREF-212464-CS-INDV Component 3 - / Sélection d'un Consultant Strengthening public En cours 2021-03- 2021-02- 2021-03- 2021-04- 2021-06- individuel pour produire l'édit IDA / D1650 A posteriori Individuel Limited 20,000.00 0.00 2021-02-10 financial management d'exécution 29 15 08 12 11 budgétaire type pour la systems at provincial level reddition des comptes ZR-COREF-212466-CS-INDV / Sélection d'un consultant Component 3 - pour évaluer la chaîne de la Strengthening public En attente 2021-02- 2021-03- 2021-04- 2021-07- IDA / D1650 A posteriori Individuel Limited 40,000.00 0.00 2021-02-15 dépense dans les provinces financial management d'exécution 20 13 17 16 du Sud-Kivu, Kasai Central et systems at provincial level du Lualaba ZR-COREF-212470-CS-INDV / Sélection d'un consultant Component 3 - individuel pour évaluer le Strengthening public En cours 2021-03- 2021-03- 2021-04- 2021-05- 2021-08- IDA / D1650 A posteriori Individuel Limited 90,000.00 0.00 2021-03-15 système digital de collecte financial management d'exécution 29 20 10 15 13 des impôts provinciaux et systems at provincial level locaux ZR-COREF-212472-CS-INDV Component 3 - / Sélection d'un consultant Strengthening public En cours 2021-03- 2021-03- 2021-04- 2021-05- 2021-08- national pour évaluer les IDA / D1650 A posteriori Individuel Limited 35,000.00 0.00 2021-03-15 financial management d'exécution 29 20 10 15 13 capacités d'administration systems at provincial level fiscale en provinces ZR-COREF-212479-CS-INDV Component 3 - / Sélection d'un Consultant Strengthening public En attente 2021-03- 2021-04- 2021-05- 2021-07- Facilitateur en vue de IDA / D1650 A posteriori Individuel Limited 30,000.00 0.00 2021-03-15 financial management d'exécution 20 10 15 14 l'organisation du dialogue systems at provincial level fiscal ZR-COREF-212494-CS-INDV / Sélection d’un consultant chargé d’appuyer l’Ordre Component 1- Improving En cours 2021-02- 2021-03- 2021-04- 2021-05- 2021-07- IDA / D1650 A posteriori Individuel Limited 50,000.00 0.00 2021-03-15 National des Experts budget execution processes d'examen 26 20 10 15 14 Comptables (ONEC) pour faciliter son adhésion à l’IFAC ZR-COREF-212686-CS-INDV / Sélection d'un Consultant national pour l’accompagnement technique de la DGPPB, de la DGRC et de Component 2 - En cours 2021-04- 2021-03- 2021-03- 2021-04- 2021-06- la Cour des Comptes dans IDA / D1650 Strengthening budget A posteriori Individuel Limited 10,000.00 0.00 2021-02-25 d'exécution 02 02 16 06 05 l'amélioration de la oversight production et de la publication des documents budgétaires-clés du Pouvoir central et leurs "budgets citoyens". ZR-COREF-228112-CS-CDS / Sélection d'un Consultant Sélection de Cabinet pour la formation des Component 1- Improving En attente 2021-05- 2021-05- 2021-08- IDA / D1650 A posteriori consultants par Direct 130,000.00 0.00 2021-04-26 comptables sélectionnés budget execution processes d'exécution 01 21 19 entente directe (Ecole Nationale des Finances/ENF) ZR-COREF-212480-CS-CDS / Sélection d'un consultant Sélection de Component 4- Project En attente 2021-05- 2021-07- 2022-06- cabinet pour l'audit des états IDA / D1650 A posteriori consultants par Direct 35,000.00 0.00 2021-04-30 management d'exécution 06 01 30 financiers du projet exercice entente directe 2021 ZR-COREF-212496-CS-CDS / Sélection d’un Consultant pour assurer la formation en Sélection de Component 1- Improving En attente 2021-04- 2021-05- 2021-07- MS SQL SERVER (M 20466) IDA / D1650 A posteriori consultants par Direct 42,000.00 0.00 2021-04-15 budget execution processes d'exécution 25 22 21 dans le cadre de la production entente directe de la Centrale des bilans par le CPCC (Cabinet ADVANCIA) Page 14