Page 1 CONFORMED COPY LOAN NUMBER 3876 RU Loan Agreement (Energy Efficiency Project) between RUSSIAN FEDERATION and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Dated September 29, 1996 LOAN NUMBER 3876 RU LOAN AGREEMENT AGREEMENT, dated September 29, 1996, between RUSSIAN FEDERATION (the Borrower) and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT (the Bank). WHEREAS the Borrower, having satisfied itself as to the feasibility and priority of the Project described in Schedule 2 to this Agreement, has requested the Bank to assist in the financing of the Project; and WHEREAS the Bank has agreed, on the basis, inter alia, of the fore- going, to extend the Loan to the Borrower upon the terms and conditions set forth in this Agreement. NOW THEREFORE the parties hereto hereby agree as follows: ARTICLE I General Conditions; Definitions Section 1.01. The "General Conditions Applicable to Loan and Guarantee Agreements" of the Bank, dated January 1, 1985, with the modifications set forth below (the General Conditions) constitute an integral part of this Agreement: (a) The last sentence of Section 3.02 is deleted. (b) The second sentence of Section 5.01 is modified to read: Page 2 "Except as the Bank and the Borrower shall otherwise agree, no withdrawals shall be made: (a) on account of expenditures in the territories of any country which is not a member of the Bank or for goods produced in, or services supplied from, such territories; or (b) for the purpose of any payment to persons or entities, or for any import of goods, if such payment or import, to the knowledge of the Bank, is pro- hibited by a decision of the United Nations Security Council taken under Chapter VII of the charter of the United Nations." (c) In Section 6.02, subparagraph (k) is relettered as subpara- graph (l) and a new subparagraph (k) is added to read: "(k) An extraordinary situation shall have arisen under which any further withdrawals under the Loan would be inconsistent with the provisions of Article III, Section 3 of the Bank's Articles of Agreement." Section 1.02. Unless the context otherwise requires, the several terms defined in the General Conditions and in the Preamble to this Agreement have the respective meanings therein set forth and the following additional terms have the following meanings: (a) "Energy Efficiency Sub-project" means a specific energy efficiency program of an Executing Agency intended to be carried out by such Executing Agency utilizing the proceeds of a Subsidiary Loan; (b) "Executing Agency" means any system of district heating or combined heat and power plants or other enterprises as may be agreed with the Bank, in the territory of the Borrower in accordance with the criteria set forth in Schedule 6 to this Agreement, which shall have been accepted for participation in accordance with Section 3.02 of this Agreement; (c) "MFE" means the Ministry of Fuel and Energy of the Borrower; (d) "RESF" means the Russian Energy Saving Foundation; (e) "Special Accounts" mean the accounts referred to in Section 2.02 (b) of this Agreement; (f) "Subsidiary Loan" means any loan provided to an Executing Agency for Energy Efficiency Sub-project, pursuant to Section 3.02 of this Agreement; and (g) "Subsidiary Loan Agreement" means any agreement which shall have been entered into by the Borrower, pursuant to Section 3.02 of this Agreement with an Executing Agency, in respect of an Energy Efficiency Sub-project involving such an Executing Agency, as the same agreement may be amended from time to time, and such term includes all schedules to Subsidiary Loan Agreement. ARTICLE II The Loan Section 2.01. The Bank agrees to lend to the Borrower, on the terms and conditions set forth or referred to in the Loan Agreement, various currencies that shall have an aggregate value equivalent to the amount of seventy million dollars ($70,000,000), being the sum of withdrawals of the proceeds of the Loan, with each withdrawal valued by the Bank as of the date of such withdrawal. Section 2.02. (a) The amount of the Loan may be withdrawn from the Loan Account in accordance with the provisions of Schedule 1 to this Agreement for expenditures made (or, if the Bank shall so agree, to be made) in respect of the reasonable cost of goods and services required for the Project described in Schedule 2 to this Agreement and to be financed out of the proceeds of the Loan and in respect of interest and other charges on the Loan. (b) The Borrower may, for the purposes of Parts A and B of the Page 3 Project, respectively, open and maintain in dollars a special deposit account in a bank on terms and conditions satisfactory to the Bank, including appropriate protection against set-off, seizure or attach- ment. Deposits into, and payments out of, the respective Special Account shall be made in accordance with the provisions of Schedule 7 to this Agreement. Section 2.03. The Closing Date shall be June 30, 2001 or such later date as the Bank shall establish. The Bank shall promptly notify the Borrower of such later date. Section 2.04. The Borrower shall pay to the Bank a commitment charge at the rate of three-fourths of one percent (3/4 of 1%) per annum on the principal amount of the Loan not withdrawn from time to time. Section 2.05. (a) The Borrower shall pay interest on the principal amount of the Loan withdrawn and outstanding from time to time, at a rate for each Interest Period equal to the Cost of Qualified Borrowings determined in respect of the preceding Semester, plus one-half of one percent (1/2 of 1%). On each of the dates specified in Section 2.06 of this Agreement, the Borrower shall pay interest accrued on the principal amount outstanding during the preceding Interest Period, calculated at the rate applicable during such Interest Period. (b) As soon as practicable after the end of each Semester, the Bank shall notify the Borrower of the Cost of Qualified Borrowings determined in respect of such Semester. (c) For the purposes of this Section: (i) "Interest Period" means a six-month period ending on the date immediately preceding each date specified in Section 2.06 of this Agreement, beginning with the Interest Period in which this Agreement is signed. (ii) "Cost of Qualified Borrowings" means the cost, as reason- ably determined by the Bank and expressed as a percentage per annum, of the outstanding borrowings of the Bank drawn down after June 30, 1982, excluding such borrowings or portions thereof as the Bank has allocated to fund: (A) the Bank's investments; and (B) loans which may be made by the Bank after July 1, 1989 bearing interest rates determined otherwise than as provided in para- graph (a) of this Section. (iii) "Semester" means the first six months or the second six months of a calendar year. (d) On such date as the Bank may specify by no less than six months' notice to the Borrower, paragraphs (a), (b) and (c) (iii) of this Section shall be amended to read as follows: "(a) The Borrower shall pay interest on the principal amount of the Loan withdrawn and outstanding from time to time, at a rate for each Quarter equal to the Cost of Qualified Borrowings determined in respect of the preceding Quarter, plus one-half of one percent (1/2 of 1%). On each of the dates specified in Section 2.06 of this Agreement, the Borrower shall pay interest accrued on the principal amount outstanding during the preceding Interest Period, calculated at the rates applicable during such Interest Period." "(b) As soon as practicable after the end of each Quarter, the Bank shall notify the Borrower of the Cost of Qualified Borrowings determined in respect of such Quarter." "(c) (iii) `Quarter' means a three-month period com- mencing on January 1, April 1, July 1 or October 1 in a calendar year." Page 4 Section 2.06. Interest and other charges shall be payable semi- annually on March 15 and September 15 in each year. Section 2.07. The Borrower shall repay the principal amount of the Loan in accordance with the amortization schedule set forth in Schedule 3 to this Agreement. ARTICLE III Execution of the Project Section 3.01. The Borrower declares its commitment to the objectives of the Project as set forth in Schedule 2 to this Agreement, and, to this end, shall carry out Part A of the Project through MFE and Part B of the Project through RESF with due diligence and efficiency and in conformity with appropriate administrative and financial practices and shall provide, promptly as needed, the funds, facilities, services and other resources required for such Parts of the Project. Section 3.02. Without limitation or restriction upon any of its other obligations under this Agreement, the Borrower shall, for the purposes of carrying out Part B of the Project, and unless the Bank shall otherwise agree: (a) solicit and approve proposals from candidate agencies in accordance with the eligibility criteria and procedures for approval for Energy Efficiency Sub-projects set forth or referred to in Schedules 5 and 6 to this Agreement; (b) cause the Executing Agencies to carry out their respective Energy Efficiency Sub-projects in accordance with the same eligibility criteria and the terms of respective Subsidiary Loan Agreements, and shall not take or permit to be taken any action which would prevent or interfere with the carrying out by such Executing Agencies of their respective activities under the Energy Efficiency Sub-projects; (c) make available to each such Executing Agency the amount of financing required for such Energy Efficiency Sub-projects, under the Subsidiary Loan Agreement to be entered into between the Borrower and such Executing Agency, under terms and conditions which shall have been approved by the Bank, and which shall include, without limitation, those set forth in Schedule 5 to this Agreement; and (d) exercise its rights under the Subsidiary Loan Agreements in such manner as to protect the interests of the Borrower and the Bank and to accomplish the purposes of the Loan, the Borrower shall not assign, amend, abrogate or waive any such Subsidiary Loan Agreement or any provision thereafter. Section 3.03. For the purposes of the efficient carrying out of the Project and ensuring the effective supervision of the execution of the Energy Efficiency Sub-projects, and without limitation on the provisions of Sections 3.01 and 3.02 of this Agreement, the Borrower shall cause an agreement to be entered between MFE and RESF concerning the carrying out of their respective responsibilities connected with the carrying out of Part B of the Project. Section 3.04. Without limitation upon the provisions of Article IX of the General Conditions, the Borrower shall: (a) prepare and furnish to the Bank not later than six (6) months after the Closing Date or such later date as may be agreed for this purpose between the Borrower and the Bank, a plan, of such scope and in such detail as the Bank shall reasonably request, for the future operation of the Project; (b) afford the Bank a reasonable opportunity to exchange views with the Borrower on said plan; and (c) thereafter, carry out said plan with due diligence and efficiency and in accordance with appropriate practices, taking into Page 5 account the Bank's comments thereon. Section 3.05. Except as the Bank shall otherwise agree, procurement of the goods and consultants' services required for Parts A and B of the Project and to be financed out of the proceeds of the Loan shall be governed by the provisions of Schedule 4 to this Agreement. Section 3.06. The Borrower shall: (a) by June 30, 1997, carry out a study of the appropriate legal and regulatory framework for the gas distribution sub-sector; and (b) by December 31, 1997, prepare a satisfactory action plan, in consultation with the Bank, to improve the regulatory framework for the gas distribution sub-sector. ARTICLE IV Financial Covenants Section 4.01. (a) The Borrower shall maintain or cause to be maintained records and accounts adequate to reflect in accordance with sound accounting practices the operations, resources and expenditures in respect of the Project of the departments or agencies of the Borrower responsible for carrying out Parts A and B of the Project or any part thereof. (b) The Borrower shall: (i) have the records and accounts referred to in paragraph (a) of this Section including those for the Special Account for each fiscal year audited, in accordance with appropriate auditing principles consistently applied, by independent auditors acceptable to the Bank; (ii) furnish to the Bank as soon as available, but in any case not later than six months after the end of each such year, the report of such audit by said auditors, of such scope and in such detail as the Bank shall have reasonably requested; and (iii) furnish to the Bank such other information concerning said records and accounts and the audit thereof as the Bank shall from time to time reasonably request. (c) For all expenditures with respect to which withdrawals from the Loan Account were made on the basis of statements of expenditure, the Borrower shall: (i) maintain or cause to be maintained, in accordance with paragraph (a) of this Section, records and accounts reflecting such expenditures; (ii) retain, until at least one year after the Bank has received the audit report for the fiscal year in which the last withdrawal from the Loan Account or payment out of the Special Account was made, all records (contracts, orders, invoices, bills, receipts and other documents) evidencing such expenditures; (iii) enable the Bank's representative to examine such records; and (iv) ensure that such records and accounts are included in the annual audit referred to in paragraph (b) of this Section and that the report of such audit contains a separate opinion by said auditors as to whether the statement of expenditure submitted during such fiscal year, together with the procedures and internal controls involved in their preparation, can be relied upon to support the related withdrawals. Section 4.02. (a) The Borrower shall cause the Executing Agencies to maintain records and accounts adequate to reflect in accordance with Page 6 sound accounting practices the operations and financial condition of the Executing Agencies. (b) The Borrower shall cause Executing Agencies to: (i) have their records, accounts and financial statements (balance sheets, statements of income and expenses and related statements) and the records and accounts for the Special Account for each fiscal year audited, in accordance with appropriate auditing principles con- sistently applied, by independent auditors acceptable to the Bank; (ii) furnish to the Bank as soon as available, but in any case not later than six (6) months after the end of each such year: (A) certified copies of their financial statements for such year as so audited; and (B) the report of such audit by said auditors, of such scope and in such detail as the Bank shall have reasonably requested; and (iii) furnish to the Bank such other information concerning such records, accounts and financial statements and the audit thereof as the Bank shall from time to time reasonably request. Section 4.03. For the purpose of administering Part B of the Project, the Borrower shall ensure payment of one-half of one percent (1/2 of 1%) of the amounts disbursed and outstanding for energy efficiency investements under Part B.1 of the Project to RESF under arrangements satisfactory to the Bank. Section 4.04. Once the number of Subsidiary Loans exceeds ten, the Borrower shall select a bank satisfactory to the Bank and enter into an arrangement, containing terms and conditions satisfactory to the Bank, with such a bank to manage and administer the repayment of the Subsidiary Loans. ARTICLE V Remedies of the Bank Section 5.01. Pursuant to Section 6.02 (l) of the General Conditions, the following additional events are specified: (a) Subject to paragraph (b) of this Section: (i) the right of the Borrower to withdraw the proceeds of any loan or grant made to the Borrower for the financing of the Project shall have been suspended, canceled or terminated in whole or in part, pursuant to the terms of the agreement providing therefor; or (ii) any such loan shall have become due and payable prior to the agreed maturity thereof. (b) Paragraph (a) of this Section shall not apply if the Borrower establishes to the satisfaction of the Bank that: (i) such suspension, cancellation, termination or prematuring is not caused by the failure of the Borrower to perform any of its obligations under such agreement; and (ii) adequate funds for the Project are available to the Borrower from other sources on terms and conditions consistent with the obligations of the Borrower under this Agreement. Section 5.02. Pursuant to Section 7.01 (h) of the General Condi- tions, the following additional event is specified, namely, that the event specified in Section 5.01 (a) (ii) of this Agreement shall occur, Page 7 subject to the proviso of paragraph (b) of that Section. ARTICLE VI Effective Date; Termination Section 6.01. The date ninety (90) days after the date of this Agreement is hereby specified for the purposes of Section 12.04 of the General Conditions. ARTICLE VII Representatives of the Borrower; Addresses Section 7.01. The Minister or the Deputy Minister of Finance of the Borrower is designated as representative of the Borrower for the purposes of Section 11.03 of the General Conditions. Section 7.02. The following addresses are specified for the purposes of Section 11.01 of the General Conditions: For the Borrower: Ministry of Finance 103097 Moscow Ilyinka Street 9 Russian Federation Telex: 112008 For the Bank: International Bank for Reconstruction and Development 1818 H Street, N.W. Washington, D.C. 20433 United States of America Cable address: Telex: INTBAFRAD 248423 (RCA) Washington, D.C. 82987 (FTCC) 64145 (WUI) or 197688 (TRT) IN WITNESS WHEREOF, the parties hereto, acting through their duly authorized representatives, have caused this Agreement to be signed in their respective names in the District of Columbia, United States of America, as of the day and year first above written. RUSSIAN FEDERATION By /s/ Vladimir Potanin Authorized Representative INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT By /s/ Johannes Linn Authorized Representative SCHEDULE 1 Page 8 Withdrawal of the Proceeds of the Loan 1. The table below sets forth the Categories of items to be financed out of the proceeds of the Loan, the allocation of the amounts of the Loan to each Category and the percentage of expenditures for items so to be financed in each Category: Amount of the Loan Allocated % of (Expressed in Expenditures Category Dollar Equivalent) to be Financed Part A of the Project (1) Technical assistance 10,000,000 100% Part B of the Project (2) Goods 47,500,000 100% of foreign expenditures, 100% of local expenditures (ex-factory cost) and 70% of local expen- ditures for other items procured locally (3) Technical 2,000,000 100% assistance (4) Unallocated 10,500,000 __________ TOTAL 70,000,000 ========== 2. For the purposes of this Schedule: (a) the term "foreign expenditures" means expenditures in the currency of any country other than that of the Borrower for goods or services supplied from the territory of any country other than that of the Borrower; and (b) the term "local expenditures" means expenditures in the currency of the Borrower or for goods or services supplied from the territory of the Borrower; provided, however, that if the currency of the Borrower is also that of another country from the territory of which the goods and services are supplied, expenditure in such currency for such goods or services shall deemed to be "foreign expenditures". 3. Notwithstanding the provisions of paragraph 1 above, no withdrawals shall be made in respect of: (a) payments made for expenditures prior to the date of this Agreement; and (b) payments for expenditures under Category (2) of this Schedule to finance an Energy Efficiency Sub-project under any Subsidiary Loan, until the Bank shall have communicated its acceptance to the Borrower of evidence that a Subsidiary Loan Agreement has been duly executed on behalf of, and is legally binding upon, the Borrower and the Executing Agency concerned in respect of such Subsidiary Loan. 4. The Bank may require withdrawals from the Loan Account to be made on the basis of statements of expenditure for expenditures under con- tracts for goods and services not exceeding $50,000 equivalent, under such terms and conditions as the Bank shall specify by notice to the Borrower. Page 9 SCHEDULE 2 Description of the Project The objectives of the Project are to increase the efficiency of energy use in Russia and to support policy reform in the gas distri- bution sub-sector. The Project consists of the following parts, subject to such modifications thereof as the Borrower and the Bank may agree upon from time to time to achieve such objectives: Part A: Borrower's MFE 1. Technical assistance in support of institutional strengthening and policy development. 2. Technical assistance to identify investments projects and changes in procedures in the natural gas supply and utilization system. Part B: Borrower's RESF 1. Energy efficiency investments to be carried out by the Executing Agencies. 2. Technical assistance in support of Project implementation. * * * The Project is expected to be completed by December 31, 2000. SCHEDULE 3 Amortization Schedule Payment of Principal Date Payment Due (expressed in dollars)* On each March 15 and September 15 beginning September 15, 2001 through September 15, 2012 2,915,000 And on March 15, 2013 2,955,000 __________________________ Page 10 * The figures in this column represent dollar equivalents determined as of the respective dates of withdrawal. See General Conditions, Sections 3.04 and 4.03. Premiums on Prepayment Pursuant to Section 3.04 (b) of the General Conditions, the premium payable on the principal amount of any maturity of the Loan to be prepaid shall be the percentage specified for the applicable time of prepayment below: Time of Prepayment Premium The interest rate (expressed as a percentage per annum) applicable to the Loan on the day of prepay- ment multiplied by: Not more than three years 0.18 before maturity More than three years but 0.35 not more than six years before maturity More than six years but 0.65 not more than 11 years before maturity More than 11 years but not 0.88 more than 15 years before maturity More than 15 years before 1.00 maturity SCHEDULE 4 Procurement and Consultants' Services Section I. Procurement of Goods Part A: General Goods shall be procured in accordance with the provisions of Section 1 of the "Guidelines for Procurement Under IBRD Loans and IDA Credits" published by the Bank in January 1995, revised in January 1996 (the Guidelines) and the following provisions of this Section, as applicable. Part B: International Competitive Bidding 1. Except as otherwise provided in Part C of this Section, goods shall be procured under contracts awarded in accordance with the provisions of Section II of the Guidelines and paragraph 5 of Appendix 1 thereto. 2. The following provisions shall apply to goods to be procured under contracts awarded in accordance with the provisions of paragraph 1 of this Part B, namely, that the provisions of paragraphs 2.54 and 2.55 of the Guidelines and Appendix 2 thereto shall apply to goods manufactured in the territory of the Borrower. Part C: Other Procurement Procedures International Shopping Goods estimated to cost less than $500,000 equivalent per contract may be procured under contracts awarded on the basis of international shopping procedures in accordance with the provisions of paragraphs 3.5 and 3.6 of the Guidelines. Page 11 National Shopping Goods estimated to cost less than $100,000 equivalent per contract may be procured under contracts awarded on the basis of national shopping procedures in accordance with the provisions of paragraphs 3.5 and 3.6 of the Guidelines. Part D: Review by the Bank of Procurement Decisions With respect to each contract for goods, the procedures set forth in paragraphs 2 and 3 of Appendix 1 to the Guidelines shall apply. Where payments for such contract are to be made out of the Special Account, such procedures shall be modified to ensure that the two conformed copies of the contract required to be furnished to the Bank pursuant to said para- graph 2 (d) shall be furnished to the Bank prior to the making of the first payment out of the Special Account in respect of such contract. Section II. Employment of Consultants 1. In order to assist the Borrower in carrying out Parts A and B of the Project, the Borrower shall employ consultants whose qualifications, experience and terms and conditions of employment shall be satisfactory to the Bank. Such consultants shall be selected in accordance with principles and procedures satisfactory to the Bank on the basis of the "Guidelines for the Use of Consultants by World Bank Borrowers and by The World Bank as Executing Agency" published by the Bank in August 1981 (the Consultant Guidelines). For complex, time-based assignments, the Borrower shall employ such consultants under contracts using the standard form of contract for consultants' services issued by the Bank, with such modifications as shall have been agreed by the Bank. Where no relevant standard contract documents have been issued by the Bank, the Borrower shall use other standard forms agreed with the Bank. 2. Notwithstanding the provisions of paragraph 1 of this Section, the provisions of the Consultant Guidelines requiring prior Bank review or approval of budgets, short lists, selection procedures, letters of invitation, proposals, evaluation reports and contracts shall not apply to: (a) contracts for the employment of consulting firms estimated to cost less than $100,000 equivalent each; or (b) contracts for the employment of individuals estimated to cost less than $50,000 equivalent each. However, said exceptions to prior Bank review shall not apply to: (a) the terms of reference for such contracts; (b) single-source selection of consulting firms; (c) assignments of a critical nature, as reasonably determined by the Bank; (d) amendments to contracts for the employment of consulting firms raising the contract value to $100,000 equivalent or above; or (e) amendments to contracts for the employment of individual consultants raising the contract value to $50,000 equi- valent or above. SCHEDULE 5 Eligibility, Appraisal Procedures of Energy Efficiency Sub-project and Principal Terms and Conditions of Subsidiary Loan Agreements (A) Sub-projects shall meet the following eligibility criteria for financing under Part B of the Project: (1) 20% Economic Rate of Return; (2) 10% Financial Rate of Return; (3) Technical feasibility; (4) Satisfactory implementation plan; (5) Demonstrated financial ability of the Executing Agency to: (i) finance local costs of the Sub-project from internally generated funds; and (ii) provide debt service coverage of not less than 1.2; and Page 12 (6) An environmental assessment which meets Russian requirements. (B) Subsidiary Loans shall have the following terms: (1) Interest rate of 3 percent above Bank's rate, of which 0.5 percent will cover the fee payable to RESF under Section 4.03; (2) Maturity of 10 year inclusive of 3 years grace period; and (3) Executing Agency bears foreign exchange risk. SCHEDULE 6 Executing Agencies that are located in any of the following cities: (1) Saratov (2) Voronezh (3) Cherepovets (4) Ryazan (5) St. Petersburg (6) Stavropol (7) Rostov-on-Don (8) Samara (9) Nizhny-Novgorod (10) Vladimir SCHEDULE 7 Special Account 1. For the purposes of this Schedule: (a) the term "eligible Categories" means Category (1) in respect of the Special Account for Part A of the Project, and Categories (2), (3) and (4) in respect of the Special Account for Part B of the Project, set forth in the table in paragraph 1 of Schedule 1 to this Agreement; (b) the term "eligible expenditures" means expenditures in respect of the reasonable cost of goods and services required for the Project and to be financed out of the proceeds of the Loan allocated from time to time to the eligible Category in accordance with the provisions of Schedule 1 to this Agreement; and (c) the term "Authorized Allocation" means an amount equivalent to $300,000 in respect of each of the respective Special Accounts to be withdrawn from the Loan Account and deposited in the Special Accounts pursuant to paragraph 3 (a) of this Schedule, provided, however, that unless the Bank shall otherwise agree, the Authorized Allocation shall be limited to an amount equivalent to $100,000 in respect of each of the respective Special Accounts until the aggregate amount of withdrawals from the respective Categories of the Loan Account plus the total amounts of all outstanding special commitments entered into by the Bank pursuant to Section 5.02 of the General Conditions shall be equal to or exceed the equivalent of $1,000,000. 2. (a) Payments out of the respective Special Account shall be made exclusively for eligible expenditures in accordance with the provisions of this Schedule. (b) Each payment (including a payment under a letter of credit) for an eligible expenditure in an amount equal to or less than the equivalent of $30,000 shall be made exclusively out of the respective Page 13 Special Account. The Bank may from time to time, by notice to the Borrower, revise the threshold amount specified in the preceding sentence. 3. After the Bank has received evidence satisfactory to it that the Special Accounts have been duly opened, withdrawals of the Authorized Allocation and subsequent withdrawals to replenish the respective Special Account shall be made as follows: (a) For withdrawals of the Authorized Allocation, the Borrower shall furnish to the Bank a request or requests for deposit into the respective Special Account of an amount or amounts determined by the Bank to be required to pay for eligible expenditures during the four months following the date of each such request, which amount shall not exceed the aggregate amount of the Authorized Allocation. On the basis of such request or requests, the Bank shall, on behalf of the Borrower, withdraw from the Loan Account and deposit into the Special Account such amount or amounts as the Bank shall have determined to be so required. (b) (i) For replenishment of the respective Special Account, the Borrower shall furnish to the Bank requests for deposits into the respective Special Account at such intervals as the Bank shall specify. (ii) Prior to or at the time of each such request, the Borrower shall furnish to the Bank the documents and other evidence required pursuant to paragraph 4 of this Schedule for the payment or payments in respect of which replenishment is requested. On the basis of each such request, the Bank shall, on behalf of the Borrower, withdraw from the Loan Account and deposit into the respective Special Account such amount as the Borrower shall have requested and as shall have been shown by said documents and other evidence to have been paid out of the Special Account for eligible expenditures. All such deposits shall be withdrawn by the Bank from the Loan Account under the respective eligible Categories, and in the respective equi- valent amounts, as shall have been justified by said documents and other evidence. 4. For each payment made by the Borrower out of the respective Special Account, the Borrower shall, at such time as the Bank shall reasonably request, furnish to the Bank such documents and other evidence showing that such payment was made exclusively for eligible expenditures. 5. Notwithstanding the provisions of paragraph 3 of this Schedule, the Bank shall not be required to make further deposits into the Special Accounts: (a) if, at any time, the Bank shall have determined that all further withdrawals should be made by the Borrower directly from the Loan Account in accordance with the provisions of Article V of the General Conditions and paragraph (a) of Section 2.02 of this Agreement; (b) if the Borrower shall have failed to furnish to the Bank, within the period of time specified in Section 4.02 (b) (ii) of this Agreement, any of the audit reports required to be furnished to the Bank pursuant to said Section in respect of the audit of the records and accounts for the respective Special Account; (c) if, at any time, the Bank shall have notified the Borrower of its intention to suspend in whole or in part the right of the Borrower to make withdrawals from the Loan Account pursuant to the provisions of Section 6.02 of the General Conditions; or (d) once the total unwithdrawn amount of the Loan allocated to the respective eligible Category for such Account, minus the total amount of all outstanding special commitments entered into by the Bank pursuant to Section 5.02 of the General Conditions with respect Page 14 to said part of the Project, shall equal the equivalent of twice the amount of the Authorized Allocation. Thereafter, withdrawal from the Loan Account of the remaining unwith- drawn amount of the Loan allocated to the eligible Category shall follow such procedures as the Bank shall specify by notice to the Borrower. Such further withdrawals shall be made only after and to the extent that the Bank shall have been satisfied that all such amounts remaining on deposit in the respective Special Account as of the date of such notice will be utilized in making payments for eligible expenditures. 6. (a) If the Bank shall have determined at any time that any pay- ment out of the respective Special Account: (i) was made for an expenditure or in an amount not eligible pursuant to paragraph 2 of this Schedule; or (ii) was not justified by the evidence furnished to the Bank, the Borrower shall, promptly upon notice from the Bank: (A) provide such additional evidence as the Bank may request; or (B) deposit into the respective Special Account (or, if the Bank shall so request, refund to the Bank) an amount equal to the amount of such payment or the portion thereof not so eligible or justified. Unless the Bank shall otherwise agree, no further deposit by the Bank into the respective Special Account shall be made until the Borrower has provided such evidence or made such deposit or refund, as the case may be. (b) If the Bank shall have determined at any time that any amount outstanding in the Special Accounts will not be required to cover further payments for eligible expenditures, the Borrower shall, promptly upon notice from the Bank, refund to the Bank such outstanding amount. (c) The Borrower may, upon notice to the Bank, refund to the Bank all or any portion of the funds on deposit in the Special Accounts. (d) Refunds to the Bank made pursuant to paragraphs 6 (a), (b) and (c) of this Schedule shall be credited to the Loan Account for subsequent withdrawal or for cancellation in accordance with the relevant provisions of this Agreement, including the General Conditions.