.':' ~;}h -~,·( •,:;- .~1m~:il;; ,;. ~-, ·>, ·~j;.:f' ~~:Z:f!j':J~" I_< • ;'*~·,.I".:~ ~-~ I INTERNATIONAL DEVELOPMENT ASSOCIATION MONTIILY OPERATIONAL SUMMARY OF BANK AND IDA PROPOSED PROJECTS RESTRICTED (as of June 27, 1972) SecM72-358 The Secretary June 30, 1972 r State, Amount 2/ wer, and Probable Stage of Processing and iciar A enc ')_/ Lender Project ]_/ Action on Procurement . !!_/ I. EASTERN AFRICA ANA 1.0 Mining - preliminary design and Awaiting project identification. (IDA) engineering of infrastructure to assist mining development. 1. 65 (R) Livestock - establishment of fattening Credit approved on June 22. (IDA) and breeding ranches, improvement of (Joint financing with Sweden.) stock routes, technical assistarice. Total cost $5.4 million of which for- eign exchange component is 45%. Goods to be financed would include fencing materials, water pumping equipment, breeding stock, farm machinery and vehicles. lDI 8.9 Road construction and maintenance - Negotiations substantially (IDA) reconstruction of the Bujumbura- completed. (Parallel finan- Nyanza LAG road, 121 km, and imple- cing with UNDP, Germany and mentation of a 4-year maintenance Belgium expected.) program. Total project cost $12.5 million of which $10.3 million is foreign exchange component. To be Hydroelectric power plant (9-12MH), UNDP-financed final feasibility determined south of Bujumbura on Mugere River. report being reviewed by (IDA) Government. To be Coffee improvement II - extension of Project identification under way. determined first coffee project financed by IDA (IDA) .... (Cr. 14 7) AFRICAN COMMUNITY 2,/ AFRICAN 8.0 (R) Development finance company I - to Loan approved on June 27. OPMENT. BANK) (Bank) meet part of foreign exchange require- ments of EADB's projected investments for two years· ending December 1973. Total foreign exchange requirements about $15 million of which remainder is expected to be covered by loans from AfDB and Sweden. The Government will usually be the borrower and in such cases if a "beneficiary agency" will in turn receive the loan or credit, proceeds and administer the project, the name of the "beneficiary agency" is given if available. If the Government is not the proposed borrower, the borrower's name is given in capital letters in parentheses. The amount is tn millions of U.S. dollars and is approximate and tentative. The letter (N) before the project means that the project is a new listing in the Summary; the letter (R) means that the !information about the project has been revised since the last issue of the Summary. Section VIII of the Summary contains a recapitulation of the new projects listed in this issue. This column contains available information, if any, about action with respect to procurement of goods and services expected to be financed by Bank and IDA. ·comprisini; Kenya, Tanzania and Uganda. ribution: Executive Directors and Alternates President President's Council Executive Vice President, IFC Vice President, IFC Department Heads, Bank and IFC .... - 2 - Member State, Amount 2/ I Borrower, and Probable Stage of Processing and Beneficiary Agency]./ Lender Project]/ Action on Procurement !!_/ EAST AFRICAN COMMUNITY (Cont'd) J_/ (EAST AFRICAN POST To be (R) Telecommunications Ill - further Appraisal report being pre- AND. TELECOMMUNICATIONS determined development of local and regional pared. CORPORATION - EAPTC) (Bank) telecommunications services. Procurement: Bid invitations issued for cables and accessories ($2.15 million). (EAST AFRICAN HARIIOURS 52.5 (R) Harbors III - improvements and addi- Appraisal report being con- CORPORATION) (Bank) tions at Dar es Salaam, Mombasa and sidered. Tanga, including construction of three new berths at Dar es Salaam and Procurement: Contract for new expansion and modernization of facil- berths at Dar es Salaam will ities and equipment at all ports. be awarded on basis of nego- Total project cost estimated at $70 tiations in progress with million, of which about $52.5 million contractors already on site would be foreign exchange. for works under second loan. Retroactive financing (up to $1.3 million) for expenditures on these berths and consul- tant's services and equipment to be recommended. (EAST AFRICAN RAIL- To be Railways IV - next phase of EARC Progress of 1969-1972 program WAYS CORPORATION - determined continuing program for development under ongoing project· (Ln.674) EARC) (Bank) of railway facilities serving East being reviewed. Africa. (EAST AFRICAN To be (R) Development finance company II Awaiting utilization of funds in DEVELOPMENT BANK) determined first loan. (Bank) ETHIOPIA To. be "Minimum Package" agriculture - Awaiting completion of project determined mainly to increase grain production preparation, pre-appraisal report (IDA) by peasant farmers through provision being studied. Appraisal ten- of credit for basic inputs, fertilizer, tatively scheduled for July. improved seeds, implements and exten- sion services to demonstrate their use. Awash Valley To be Melka Sadi-Amibara irrigation - Appraisal report being prepared. Authority determined development of about 15,000 hectares (IDA) in Middle Awash Valley; total project cost estimated at about $28 million including about $16 million in foreign exchange. Imperial Highway 17.0 (R) Roads V - construction of six feeder Credit approved on June 27. Authority (IDA) roads, research and training equipment, (USAID considering parallel technical assistance, and credit for financing of additional $9.3 local contractors; total cost of IDA million for surfacing three project is $22.0 million including roads and maintenance equipment) $14.0 million in foreign exchange. See P. 1 for footnotes. - 3 - '1ember State, Amount 2/ Borrower, and Probable Stage of Processing and lleneficiary Agency ]_I Lender Project]_/ Action on Procurement ~/ ETHIOPIA (Cont'd) 4.5 (R) Livestock II - construction of stock Appraisal report under review. (IDA) routes, markets, and slaughter facilities with associated hide sheds, purchase of cattle transporters, and technical assistance; Total project cost estimated at $6 million including about $2 million in foreign exchange. To be Domestic airports and tourism-proposed Consultants' feasibility determined program includes internal airports, study under review. (Uncertain) hotels along "Historic Route," res- toration of historic monuments, and possibly aircraft. Project for Bank Group financing not yet determined. To be (R) Education III Preparation/appraisal mission determined scheduled for end of June. (IMPERIAL BOARD OF To be Telecommunications IBTE preparing its program. TELECOMMUNICATIONS determined OF ETHIOPIA) (Uncertain) To be Grain storage and marketing Internal market studies being determined prepared by consultants. (IDA) To be Agricultural research Arrangements for project determined preparation under discussion. (IDA) Agricultural and To be Development finance company IV Awaiting results ·of third credit, Industrial Develop- determined approved on April 25. ment Bank (IDA) Imperial Highway To be (N) Roads VI Preparation under way by Authority determined Imperial Highway Authority. (IDA) KENYA 29.0 (R) Nairobi airport I - includes Loan signed on June 2, 1972. (Bank) construction of terminal and freight building, taxiway, apron, approach road, lighting, etc. Total cost $46 million of which foreign exchange component $29 million, (DEVELOPMENT FINANCE To be Development finance company Mission to discuss orgariization COHPANY) determined of DFC and scale of its pros- (Bank) pective operations scheduled for June/July. To be Crop development - cotton and wheat Government preparing project determined production in Eastern Province. with Bank assistance. (Bank/IDA) See P. 1 for footnotes. - 4 - ~ember State, Amount 2/ Borrower, and Probable Stage of Processing and Beneficiary Agency J./ Lender Project II Action on Procurement !!_/ KENYA (Cont'd) To be (R) Urban development - site and service Awaiting outline of project determined project - preparation and servicing proposal from Government. (Bank/lDA) of plots on which low income families would erect own housing. About 6 .0 (R) Agricultural credit II - credit and Appraisal report being considered. (IDA) technical assistance for about 8,000 smallholders for dairying and various crops. Total cost $9.2 million, of which foreign exchange component about $4 million. Kenya Tea Development To be Tea development III - extension of Government formulating proposals Authority determined support provided to Tea Authority with Bank assistance. (Bank/lDA) under two earlier credits; project likely to include additional planting and financing for tea factory development. To be Livestock development II - second Project proposals being determined phase of livestock program initiated formulated with Bank assistance. (Bank/lDA) under Cr. 129; project would include funds for development of individual, group and company ranches, range water facilities, marketing, veterinary services, etc. To be Tourism - development of Diani beach Government drawing up list of determined resort complex, part of Government consultants to submit proposals (Bank) program for development additional for feasibility study and is facilities at the Coast. considering institutional requirements for undertaking project. (TANA RIVER DEVELOP- 5.0 Kamburu hydroelectric II - addition Consultants to prepare MENT CO. LTD.) (Bank) of third generating unit for project updated report being financed under Ln. 745. To be Highways V - additional package of Government putting together determined roads, largely feeder and rural project with assistance of (Bank/lDA) access roads. consultants. About $5.0 (N) Family planning - assistance for im- Government preparing revised (IDA) plementing Kenya's five-year family program in light of discussions planning program which includes pro- with Bank reconnaissance mission. visions for training facilities, construction and equipping of health and family planning clinics. To be (N) Water supply for Mombasa and coastal Consultants retained by Govern- determined region - development of new water ment preparing feasibility study. (Bank/IDA) sources and additional distribution system. LESOTHO 3,5 Malibamatso River diversion engineer- Negotiations between Lesotho (IDA) ing. Total cost about $3.5 million. and South Africa have reached impasse on issue of water price. See P. 1 for footnotes. - 5 - 'f ber S ca te, Amount ]J l rower, and Probable Stage of Processing and 1eficiar 1 A<>enc J_/ Lender Project ll Action on Procurement !!._/ OTHO (Cont'd To be Malibamatso River Diversion scheme - Awaiting action on proposed en- determined construction of dam and 60 Km tunnel gineering credit, listed above. (Bank) for water exports to South Africa; (Funds from external sources total cost $130 million of which other than South Afr!ca and $120 million outside Lesotho. Bank Group required.) 4.0 Thaba Bosiu rural development - Appraisal report being prepared. (IDA) dryland farming; project would affect (Parallel financing expected by 80,000 people farming 120,000 acres US/\ID). and would provide agricultural inputs, credit, marketing, roads, extension services and soil conserva- tion. Total cost about $9.7 million with $5.8 million in foreign exchange. ,AGASY REPUBLIC 28.3 (R) Roads III - construction of about 417 Negotiations postponed at Govern- (Bank/IDA) km primary roads and detailed engineer- ment's request. ing of about 200 Km. Total project cost about $40 million, of which $28.3 Procurement: Pre-qualification million foreign exchange. of contractors for about one quarter of civil works completed. To be Agricultural credit - cotton and Government's new project proposal determined tobacco development in Baibohos area. unacceptable and further dis- (IDA) cussions being planned. DEMO) 15.3 (R) Morondava irrigation and rural develop- Executive Director considera- · (IDA) ment - development of about 10,000 ha tion scheduled on June 29. suitable for cotton, rice and tobacco cultivation; total project cost estimated Procurement: Retroactive finan- at $27.0 million with foreign exchange cing (up to $200,000) for con- component of $15.3 million. sulting services to be recom- mended. LAGASY RAILWAYS- 9.0 (R) ka~-!'.·'"Y rehabilitation - rolling stock, Appraisal mission planned for IFH) (Bank) locomotives, signal equipment. September/October. [AWI 7.5 Education II - improvement of educa- Project identification under way. (IDA) tional system and facilities. 7.0 Rural development (Lower Shire II) - Project preparation under way. (IDA) second phase of integrated rural development program in the Lower Shire area, emphasizing expansion of agricultural production and possibly including improvement of agricultural roads, marketing facilities, health facilities, fisheries and livestock development, and detailed engineer- ing of a related highway construction project. , P. 1 for footnotes. - 6 - Member State, Amount 2/ Borrower, and Probable Stage of Processing and Beneficiary Agency J../ Lender Project 11 Action on Procurement ~/ MAURITIUS Development Bank 3.5 (R) Development finance company - assist- Credit approved by Executive of Mauritius (IDA) ing development of industry in private Directors on June 20 and sector through provision of loans and signed on June 23. development of industrial estates. 4.0 Port development - deepening and Consultants' study under way. (IDA) expanding Port Louis harbor to improve passenger and freight services, pro- viding docks, quays, storage facilities and cargo handling equipment. Central Water 3.0 Water supply and sewerage - improve- Consultants' feasibility study Authority (IDA) ment and augmentation of three existing to begin shortly. domestic water supply schemes (Port Louis, Mare aux Vacoas and the Districts), and two sewerage schemes (Port Louis and Plain Wilhelms), to meet household and industrial demand. Development Bank 3.0 (N) Construction of industrial estate in- Arrangements being made by of Mauritius (IDA) cluding factory buildings and infra- Government to retain consultants structure at Coromandel near Port for feasibility study. Louis. Development Works 4.0 (N) Regional development with emphasis on Appraisal mission planned for Corporation (IDA) employment creation, possibly includ- September. ing land development, construction of public facilities in rural areas, forestry and orchard development, fisheries and community development. RWANDA To be Integrated agricultural development - ~roject identification under way. determined smallholder tea, rice and cotton (IDA) development. To be Highway II - reconstruction of Project preparation under way. determined Ruhengeri-Gesinyi Road. (IDA) 3.3 Mutara agricultural development After negotiations, Government (IDA) (Livestock and settlement). Project submitted revised proposals would provide for infrastructure (plot which are· being reviewed. and grazing area layout, road con- Awaiting full details of Gov- struction, water supply), technical and ernment proposals. marketing services, tse-tse fly eradica- tion. Total project cost $3.7 million of which $1.8 million in foreign exchange. SOMALIA Somali Ports To be Port of Mogadiscio - construction of Appraisal report being prepared Authority determined new port to replace lighterage but awaiting final cost estimates (IDA) facilities; will include 3 berths and from Consultants. (Joint finan- livestock loading facilities. cing with FED expected.) Total cost tentatively estimated at $23-25 million, of which 85% is for- Procurement: Prequalification eign exchange. of bidders expected to begin in June. See P. 1 for footnotes. - ----------------~---~ - - . -- -- - < ' r - - - - - - - - - - - - - - - - - - - - - - I her State, Amount 2/ rower, and Probable Stage of Processing and .eficiary Agency ]_I Lender Project'}__/ Action on Procurement !!_/ I LIA (Cont'd) To be Livestock - lower Jub.a region. Components of possible project determined being considered. (IDA) ad Corporation To be Rahad irrigation - pump irrigation Appraisal report being determined of 300,000 acres, mainly cotton and prepared. (Parallel financing (IDA) groundnuts, with water from Roseires expected.) Reservoir. Total cost, $82.5 million; foreign exchange $54.6 million. an Railways 25.0 Railway III - expansion of capacity and Preliminary preparation by (IDA) improvement of operations to meet grow- Sudan Railways under way. ing traffic demands. tral Electricity 15.0 Power II - expansion of generation Preliminary preparation by ater Corporation (IDA) and distribution facilities. CEWC under way. hanized 11 .25 (R) Mechanized farming II - land Credit signed on June 12. ing (IDA) clearance and provision of infra- poration structure, supporting services and credit for mechanized dry farming of sorghum and sesame on an area of 425,000 acres. Total cost, $19.5 million; foreign exchange $8.4 million. 7.0 (R) Highway maintenance - reorganization Negotiations substantially (IDA) and re-equipment of Roads Department completed. and technical assistance in planning for the Ministry of Transport. Total Procurement: Contract nego- cost $10.9 million; foreign exchange tiations with consultants $7.0 million. scheduled for early July. !LAND 3.0 Irrigation - development of approx. Awaiting Government's (IDA) 8,000 acres for smallholder settle- comments on feasibility ments and 2,000 acres for commercial report. farms in the Usutu River Basin. To be Highways II - improvements of second- Consultants selected for determined ary roads in the northeast primarily UNDP-financed design and (IDA) for sugar transport. engineering study. Scope of work under review. To be Thermal power - 1000 MW thermal Preliminary feasibility determined power station using Swazi coal to studies completed; Awaiting (Bank) produce electricity for export to further exploration of coal Escom in South Africa. Total cost field and study of markets for about $170 million. coal export. 3.0 (R) Navy beans - development of about Appraisal report being pre- (IDA) 40,000 acres for navy bean production pared. on state farms with an outgrower element. Total project cost estimated at $4.1 million, of which $2.7 million in foreign exchange. l P. 1 for footnotes. - 8 - Member State, Amount 2/ Borrower, an/ Probable Stage of Processing and Beneficiary Agency]_/ Lender Project ]/ Action on Procurement ./ !:. TANZANIA (Cont'd) 10.0 (R) Education IV - physic.al facilities and Appraisal mission in field. (IDA) equipment for secondary schools, teacher. training, and technical, vocational, and possibly health educ- ation facilities. Total project cost estimated at around $13,5 million. (TANZANIA INVESTMENT 3,0 Development finance company - assis- Awaiting Government's views l!ANK - TIB) (Bank) ance chiefly for development of on Bank's preliminary assess- manufacturing. ment. 10.0 Highways IV - general improvement in Pro.1ect preparation in (IDA) highway maintenance. early stages. (TANZANIA ELECTRIC To be Power III - transmission and distrib- Project proposal to be SUPPLY COMPANY) determined ution lines. prepared by TANESCO. 15.0-20.0 Livestock II - broadly based program Appraisal report being (IDA) including expansion of marketing and prepared. processing facilities and development of livestock production on commercial and ujamaa cooperative ranches. Total project cost estimated at around $23 million. To be Cotton I (formerly "Rural Development") Preparation of project being determined - expansion of cotton production chiefly completed by Government with (IDA) through increased use of facilities and PMEA assistance. other inputs and technical services to growers. To be Dairy development I - dairy production Project to be prepared by determined and processing for domestic consumption. Government with PMEA assis- (IDA) tance. UGANDA 6.6 Livestock development II - expansion Negotiations substantially (IDA) into new areas of livestock development completed. started under first project, Project would finance about 140 medium-sized breeding/fattening ranches, one large steer fattening ranch and program of mixed farm.development. Total cost $13,4 million of which foreign exchange component $4.6 million. Uganda Tea Growers 10.0 Smallholder tea II - continuation of Appraisal report being considered. Corporation (UTGC) (IDA) planting program started under phase I project. Additional planting of 6,800 ha by about 7,500 smallholders and construction and expansion of tea fac- tories, Total cost $14.9 million of which foreign exchange component $7.1 million. 7,0 Kampala/Jinja water supply and Awaiting draft legislation for (Bank) sewerage. creation of a national water and sewerage authority and feasibility studies. See P. 1 for footnotes. - 9 - 'fber State, Amount 2/ Iirower, and Probable Stage of Processing and \eficiary Agency]._/ Lender Project 11 Action on Procurement !:_/ , ~DA (Cont'd) To be Highways III - further road construc- Engineering and feasibility determined tion including tea feeder roads and reports under way, (IDA) technical assistance. To be Integrated rural development - Project identification under determined credit to farmers for inputs, im- way. (IDA) provements in infrastructure facil- ities (water and roads), strengthen- ing of marketing, processing and storage facilities. RE To be Rubber-plantation development and ) determined settlement. ) (IDA) ) Project possibilities to ) be reviewed in light of To be Cotton and food crops development ) agricultural sector study determined for smallholders, probably in ) now in progress. (IDA) Ubangui region. ) To be (R) Livestock--ranch development. Appraisal report being prepared. determined (IDA) To be Development finance company Ill Project preparation under determined way. (IDA) To be Railway and river transport - rehabil- Project identification determined itation of Kinshasa-Matadi railway under way. (IDA) and inland waterways and ports. To be Telecommunications - telephone system Awaiting receipt of project determined in Kinshasa and inter-city links. proposal from the Government. (IDA) To be Agriculture Project identification under determined way. (IDA) To be Water supply and sewerage in Kinshasa Project identification under determined and perhaps Hatadi. way. Reconnaisance mission (IDA) planned for September. To be Highways III - further road rehabili- Project identification under determined tation, construction and technical way. (IDA) assistance. 7,0 (R) Family farming - tobacco; planting Appraisal report being (Bank) 4900 ha tobacco and 6200 ha maize revised. (CDC may cover over 5 years by 5,000 new and 1,000 part of local currency existing growers; provision of requirements.) credit, seasonal and medium-term, and some infrastructure; only in Southern and Eastern Provinces but pilot schemes in other areas; total cost $15.S million of which $7.0 million in foreign exchange. ee P, 1 for footnotes. - 10 - Member State, Amount 2/ Borrower, and Probable Stage of Processing and Beneficiary Agency~/ Lender Project 1/ Action on Procurement !!._/ ZAMBIA (Cont'd) To be (R) Mixed farming - livestock and crops At Government's request, PMEA determined development. will help prepare revised proj- (Bank) ect proposal. Aspects proposed for review: maize supply and demand, role of large commer- cial farmers, credit channels, organization, existing subsidies on inputs and outputs, supply of extension staff. 10.0 (R) Education Ill - components of agri- Preparation mission in field. (Bank) cultural, technical and possibly health education expected. (KARlllA NORTH Up to 16.5 (R) Kariba North Bank (supplementary Tripartite discussions between BANK COMPANY) (Bank) financing) Governments of Zambia and UK, and Bank in progress on arrange- ments for guarantee of Bank loan. Procurement: Contract for civil works and major equipment awarded. ZAMBIA ELECTRICITY 105.0 Kafue II - hydroelectric power; dam Feasibility study under con- SUPPLY CORPORATION (Bank) construction at Jtezhitezhi to sideration. Ltd. provide storage for generatinc plant 250 km downstream at Kafue Gorge where four 150 MW units are installed; project will ensure better utilization these units and enable addition of two more 150 MW units; electricity to be fed into CAPC grid; total cost likely to exceed $150 million of which 67% would be in foreign exchange. 10.0 (R) Telecommunications Report of identification mission (Bank) . being considered. To be Highways III Possible scope of project being determined considered with government. (!lank) See P. 1 for footnotes. - 11 - ber State, Amount 2/ ·rower, and Probable Stage of Processing and eficiar A enc 1_/ Lender Project 11 Action on Procurement .!!/ II. WESTERN AFRICA EROON 15.0-20.0 (R) Ports II - dredging of channel and Feasibility study being con- (Bank/IDA) additionnl berths at Douala. sidered. (Joint financing probable.) 9.0 (R) Education II - Construction and Credit approved by Executive (IDA) extension of primary teacher Directors on June 20. training colleges, secondary teacher training college, upper secondary and technical secondary schools, adult vocational training center, as well as preinvestment studies of agricultural and rural training and of technical and voca- tional training requirements of Northern region; technical assis- tance for project implementation. Estimated project cost $11 .4 million, of which $7,9 million in foreign exchange. To be Cocoa - development of cocoa small- Feasibility study being determined holdings in Eastern Cameroon, new prepared by consultants. (Bank) plantings, farm equipment, extension services; upgrading of cocoa feeder roads; project size and components still being disc.ussed with Government. 18.0 Roads II - upgrading and paving, Feasibility studies being (Bank/IDA) Garoua to Mora, 250 km; Douala to prepared by consultants. Pont du Nkam, 180 km; Pont du Noun to Foumban, 54 km. To be (N) Livestock development - establishment Government selecting consultants determined of up to 10 ranches in the Adamaoua, for feasibility study. (IDA) Batouri and Bamenda regions; stock routes; cattle markets and abattoirs. Project cost tentatively estimated at $12 million. TRAL AFRICAN REPUBLIC 3.9 (R) Education - secondary and vocational. Credit signed on May 26. (IDA) To be Cotton development in Ouham and Awaiting Government's determined Ouham-Pende regions - provision further comments on (IDA) of extension services, fertilizers findings of preparation and insecticides to farmers; credit mission. to farmers; improvement of crop transport roads and increase of ginning capacity. To be Bangui-Bossembele road - upgrading Feasibility study received determined of 156 km road. and being considered. (IDA) ; l.~-------------------- 1 je P. 1 for footnotes. I - 12 - Member State, Borrower, Amount 2/ and Probable Stage of Processing and . ,/' Beneficiary Agency!_/ Lender Project 1_/ Action on Procurement !!._/ CHAD 2.0 Chari bridge - construction of a Awaiting Chad and Cameroon (IDA) bridge across the Chari River at Governments' agreement on or near Fort Lamy. Estimated site, and AfDB action on project cost about $3.0 million. financing feasibility and detailed engineering studies. 2.2 (R) Livestock I Credit signed on May 31. (IDA) CONG0 1 PEOPLE'S REPUBLIC OF 3.0 Livestock development - 30,000 ha Appraisal report being (IDA) ranching in Niari val\ey. Project prepared. cost up to $5 million.· Agence Trans- To be Realignment of Holle-Dolisie (110 km) Awaiting detailed engineering congolaise des determined section of Congo-Ocean Railway. study being financed by Cr. 297 Communications (ATC) (IDA) Estimated project cost up to $45 million. (expected to be completed early 1973). (Participation of other lenders expected). Agence Trans- Up to 4.0 (R) River transport - purchase of Report of project/preparation congolaise des (IDA) additional equipment such as barges mission being considered. Communications (ATC) and push-boats for timber transport. (Participation of AfDB possible.) Estimated project cost $5 to 6 million. DAHOMEY 6.1 (R) Cotton development - extension serv- Credit signed on May 24. (IDA) ices, credit and construction of two (Joint financing with FAC). ginneries. 8.0 Roads - construction of Parakou to Appraisal report being prepared. (IDA) Malanville road (320 km) and two small (Parallel financing with USAID, sections of other roads; extension of whose contribution is expected technical assistance for road mainte- to be $8.0 million). nance; feasibility studies for additional roads. To be Education - possibly rural and Project content to be determined determined vocational education following economic mission now (IDA) in field. EQUATORIAL QUINEA 2.0 (R) Roads - expert services for IDA agreed to Government's re- (IDA) program of technical assistance quest for change in project; in improving road administration IDA helping prepare request and maintenance; purchase of road to UNDP for financing for maintenance equipment; construction experts. or improvement of workshops, garages and warehouses; road betterment works. Estimated project cost $2.6 million. GABON To be (R) Owendo-Booue railway - about 337 km, Appraisal report being prepared. determined including ancillary road construction (Participation by FED and (Bank) and timber port facilities. Total other lenders expected.) project cost estimated up to $200 million. · See P. 1 for footnotes. - 13 - ber State, Amount 2/ rower, and Probable Stage of Processing and I .neficiary Agency 1/ Lender Project'}_/ Action on Procurement !!._/ ~ON (Cont'd) 11 ,ciete d'Energie 3.0 (R) Water supply in Libreville - expansion Appraisal report being prepared. d'Eau du Gabon (Bank) of pumping stations, pipelines, treat- (Participation by CCCE ment plant and storage. Total project expected). cost about $18 million. GAMBIA 1. 2 (R) Rice development - cultivation of Appraisal report being considered. (IDA) 3,000 acres of dry land for double cropping under irrigation, preparation of proposals and cost estimates for future development of swamp areas for rice production, field trials on alter- native crops for rice. Total project cost estimated at $2.0 million of which about $0.8 million foreign exchange. /\NA , ~ Sugar Estates 15.6 Rehabilitation of two sugar estates, Negotiations substantially com- , cl Agricultural (Bank/IDA) factories and plantations; replanting pleted. New cost estimates and I elopment Bank (ADB) 9,200 acres of estate cane; expansion financial analysis being developed. of estate acreage by 2,800 acres and I farmers' acreage by 3,800. Project Procurement: Retroactive financing also includes employment of management (up to $1.3 million) for factory team and technical assistance to ADB. and agricultural equipment under Total project cost about $22 million consideration. of which foreign exchange component is about $15.6 million. To be Agriculture - oil palm production on Awaiting completion of project determined combined nucleus estate and small- proposal. (IDA) holder project of 25,000 acres. To.be Highway - rehabilitation of up to 580 Appraisal report being prepared determined miles of main trunk roads. Project but further processing deferred (IDA) may also include studies of possible pending Government review of future feeder road project. project. (Parallel financing possible with Canada and AfDB). 10.0 Education - construction and equipment Negotiations substantially (IDA) of new institutions and extension to completed. Awaiting determina- existing institutions for teacher tion of Government's position vocational and agricultural training on project and on related and related technical assistance. Total educational reforms. (Parallel project cost about $13 million of which financing possible by UK, foreign ex.change component is about Canada and UNDP of part of $8 million. technical assistance component.) ter and Sewerage To be (R) Water supply II - construction of new Appraisal report being updated. rporation determined dam and improved treatment facilities (IDA) at Weija; expansion of piped water Procurement: Retroactive finan- supply in Greater Accra Region to serve cing of detailed engineering 50,000 - 70,000 people. Total cost about (up to $75,000) to be recom- $15.6 million of which foreign exchange mended. component is about $10 million. To be (R) Telecommunications - rehabilitation and Appraisal report being prepared. determined expansion of telecommunications network (Parallel or joint financing (Bank) over 4-year period. Includes increase under discussion). of 27,700 lines in exchange capacity and strengthening long-distance telephone and telex circu{ts, as well as services for improved management and engineering. e P. 1 for footnotes. - 14 - Mernber State, Amount 2/ Botrower, and Probable Stage of Processing and Beneficiary Agency ll Lender Project 1_/ Action on Procurement !!._/ GHANA (Cont'd) To be Agriculture - rice production on 23,000 Awaiting completion of project determined acres in northern region; to include preparation, expected in September. (IDA) extension services, agricultural inputs, (Possible parallel financing by machinery and equipment, processing private banks for rice mills). facilities and credit. To be Agriculture - cotton production with Awaiting revised feasibility determined groundnuts as off-season crop on report due in June. (IDA) 45,000 acres, mainly in upper region; to include agricultural inputs, ex- tension, credit and agricultural imple- ments. IVORY COAST (SATMACI) To be Cocoa - planting and rehabilitation in Awaiting feasibility studies by determined central and western regions, re-settle- Government consultants. (Bank) ment and feeder roads. About Road construction in south-west - studies Detailed engineering in progress. 10.0 and detailed engineering for following (Bank) roads, Yabayo-Gagnoa (79 km), Abidjan- Agboville (101 km) and Abidjan-Sikensi (68 km) will be available soon, but project content not yet determined. (SODERIZ) 4.0 Rice production - development in Awaiting outcome of experience (Bank) forest region between Gagnoa and Daloa with pilot project financed by to include terracing, irrigation works, CCCE. (Joint financing with extension services and agricultural CCCE expected). inputs. Total project cost about $10 · million. To be Urban tr,msport - East-West exptess- Government to prepare additional determined way and port road, and infrastructure feasibility studies identified by (Bank) for Banco residential area. project preparation mission. Procurement: Study contract awarded to BCEOM and BNETD. (SODHEVEA) 6.7 (R) 13,500 ha. rubber plantation development Negotiators being invited. (Bank) in south-west region; to include (Joint financing with CCCE and land clearing and transport equipment, FED expected.) technical assistance, plantation buildings, agricultural inputs. Total Procurement: Contract with cost about $26 million including $11 Michelin for management and million in foreign exchange. technical assistance being revised. Retroactive finan- cing of start up costs re- quested. 17. 5 (R) Highways - repaving and realignment of Loan approved by Executive (Bank) two main roads Sikensi-N'douci-Toumodi/ Directors on June 20, and Divo (110 km); bridge construction; road signed on June 23. maintenance and betterment program for 1600 km of secondary roads; and Abidjan urban development study. Total cost $29.0 million including $16 million in foreign exchange. 10.0 Telecommunications - interregional links Government preparing proposals for (!lank) new centrals in Abidjan and other major reorganization of administrative towns. Total cost about $16 million. agency. FAC financing technical · assistance for PTT and improvement of accounting procedures. See P. 1 for footnotes. - 15 - ber State,· Amount 2/ rower, and Probable Stage of Processing and eficiar A enc ).._/ Lender Project]_/ Action on Procurement !!_/ ERIA To be Highways - equipment and technical Draft of consultant's final report determined assistance for 4-year maintenance program; on highway study discussed with (IDA) feasibility studies for construction of Government. Project contents to 100 miles of roads; detailed engineering depend on parts of highway program of Monrovia port access roads and bridge. to be financed from ~ther sources. BERIAN BANK FOR 1.• 0 (R) Development finance company - first Bank Loan approved by Executive USTRIAL DEVELOPMENT (Bank) loan to cover part of foreign exchange Directors on June 13, and signed INVESTMENT) needs of projected industrial activities on June 26. in 1972-74, 1. 2 (R) Power - supplementary financing of Public Discussions completed success- (Bank) Utility Authority's generation program fully on reorgani~ation of (Loans 684 and 778), needed because of Public Utility Authority. requirements for larger gas-turbine units Arrears position improving; for Bushrod thermal power station, as contracts awarded. well as currency adjustments. 4.0 Highway-improving two major roads and Feasibility study being discussed (Bank) bridge in area of Port of Monrovia. with Government. I ice des Postes et 3.6 (R) Telecommunications - rehabilitation and Credit approved by Executive ecommunications (IDA) expansion of local networks and of local Directors on June 15. and long-distance switching facilities in principal towns; installation of micro-wave system on Bamako-Segou Mopti route. Total project cost $4.2 million, of which $2.9 million foreign exchange. ie du Chemin 5.0 (R) Railways II - track renewal; improvement Appraisal mission in field. Fer du Mali (IDA) and strengthening of bridges; replacement of small number of locomotives and about 70 freight cars. Total project cost about $6.0 million of which $5.0 million foreign exchange. 8.0 (R) Roads II rehabilitation of the Bamako Appraisal report being prepared. (IDA) to Segou (215 km) and Bamako to Bougouni (160 km) roads; supplemental equipment and technical assistance for highway maintenance and feeder roads. Total project cost about $12 million of which $8 million foreign exchange. 7.0 (R) Integrated groundnuts/food crops devel- Feasibility study under way. (IDA) opment - including provision of inputs, extension service, equipment, water sup- ply, feeder roads, technical assistance and research. Total project cost $9.4 million, To be Livestock development in Mopti region - Feasibility study under way. determined well construction, animal health, (IDA) firebreaks and technical assistance. To be Four-year cotton development program - Feasibility study under way. determined extension of ongoing FAG-financed proj- (IDA) ect, including inputs, equipment, tech- nical assistance and feeder roads. e P. 1 for footnotes. - 16 - Member State, Amount 2/ Borrower, and Probable Stage of Processing and lleneficia~y Agency]_/ Lender Project'}_/ Action on Procurement !!_I MALI (Cont'd) To be (R) Education - aecondary·, technical- Project preparation under way. determined industrial education; agricultural (IDA) training and out-of-school education. MAURITANIA 3.0 Extension of Nouadhibou fishing port - Feasibility study under way. (IDA) including wharf construction and storage facilities. 2.0 (R) Education - possibly regional secondary Project identification mission (IDA) schools and non-formal rural training. in field. 3.0 Irrigated rice development in Gorgol Feasibility study under way. (IDA) Valley - including construction of regulating and storage dams, dykes, irrigation and drainage systems. Total project cost estimated at about $10 million. NIGER To be Livestock development - project expected French experts completing determined to link livestock sector with agricul- general livestock studies (rDA) ture. before identifying project. To be Niamey airport - strengthening of run- Project preparation expected determined way. to be completed in July. (IDA) Ministere des To be Highways III - upgrading and paving Awaiting completion of Travaux Publics determined secondary roads, Niamey to Baleyara feasibility study, being (IDA) and Zinder to Bande, about 200 km. financed by Cr. 231. To be Rural development - integrated devel- Awaiting full project determined opment of Maradi area, including ex- description from Government. (IDA) tension services and provision of 1 farm inputs. I NIGERIA 26.3 (R) Roads V - Western State roads and Loan signed on June 26. (Bank) Federal bridges. 20.0 - 30.0 Roads VI - Federal roads, to be Awaiting further identifica- (Bank) selected, including Lagos-Ibadan ex- tion of project. pressway. National Electric 76.0 (R) Power IV - addition of two 100 MW gen- Executive Director consideration Power Authority (Bank) erating units at Kainji Dam, extension scheduled on June 29. of transmission lines and distribution to townships. Procurement: Contract signed for for Oshogbo-Akure transmission line ($1 million). Bank has approved proposed awards for two additional hydro units at Kainji ($12 million). Bidding documents issued for: Zaria- Funtua-Gusau transmission line ($2.3 million); power trans- formers ($0.6 million); switchgear ($0.9 million); and Asaba-Agbor transmission line ($0.S million). Retroactive financing up to $1 million to be recommended. See P. 1 for footnotes. - 17 - ber State, Amount 2/ rower, and Probable Stage of Processing_and eficiar A enc j_/ Lender Project 1/ Action on Procurement !!_/ ERIA Cont'd) . 6.0 {R) Livestock I - establishment.and re- Appraisal mission scheduled (Bank) habilitation of breeding and fattening for early July. ranches, pasture improvement, extension of credit and tse-tse control. Esti- mated total cost $12 million. Up to Tree c~ops I - rehabilitation and expan- Awaiting identification of 10.0 sion of tree crops, including oil palm, project. (Bank) in Eastern Nigeria. 30.0 (R) Education III - primary teacher train- Preparation/appraisal mission (Bank) ing and secondary schools in Northern in field. States. Total cost about $60 million of which foreign exchange about $25- 30 million. erian Ports Up to Ports II - expansion at Lagos port, Awaiting consultant's report and hority 30.0 equipment and technical assistance. advice from Government on reor- · (Bank) ganization of Ports Authority. erian Industrial 15.0 DFC III - to provide foreign exchange Appraisal report being elopment Bank (Bank) financing for industrial projects prepared. through 1974. Postes 6.0 Telecommunications - rehabilitation Appraisal report being prepared. elecommunications (IDA) _ and expansion of local networks in- cluding the city of nakar, improve- ment and development of microwave link and long-distance facilities between nakar and cities in north. Total project cost about $8.6 million, of which about $6.6 million in foreign exchange. x et Electricite 5.7 {R) Thermal power generation - 27.5 MW unit Re-appraisal deferred pending 'Ouest Africain (Bank) in nakar; total project cost about $9.0 settlement of financial issue million, of which about $5.4 million in with private company. foreign exchange. Procurement: Bidding documents approved by Bank. 4.0 Agricultural development - irrigation Appraisal report being (IDA) for rice and tomato production in prepared. Senegal river area. The project would include three sub-projects totalling 4.700 ha and would involve improvement of existing irrigation and drainage systems. Total project cost about $6.5 million, 5.0 Agricultural credit II - follow-up Pre-appraisal mission in (IDA) project to provide technical assis- field. tance to local management services; agricultural implements; reorganiza- tion of cooperative system. P. 1 for footnotes. - 18 - ~!ember State, Amount 2/ Borrower, and Probable Stage of Processing and Beneficiary Agency l/ Lender Project'}_/ Action on Procurement !!._/ SENEGAL (Cont'd) Office des 8.0 (R) Urban development - s-i te and services Credit approved by Executive Habitations a (IDA) project for Dakar and Thies, including Directors on June 22. Layers Moderes preparation of land, construction of (OHIM) streets·, water distribution and sanitary facilities, installation of public lighting and provision of schools and health clinics, Total project cost about $12,9 million, of which about $5,7 million foreign exchange. Regie des 6.4 (R) Railways II - 175 km track renewal and Loan and Credit approved by Chemins de Fer (Bank) equipment rehabilitation. Total proj- Executive Directors on June 15, Du Senegal 3,2 ect cost about $12,3 million, of which and signed on June 23. (IDA) about $6.8 million in foreign exchange. Up to Dakar airport - extension of runway and Appraisal report being 3.0 provision of two aircraft aprons. Total prepared. (Bank) project cost about $3.5 million of which about $2.1 million in foreign exchange. 5.0 (R) Education II - secondary schools. Awaiting Government's completion (IDA) of education reform plans. Up to (R) Highway maintenance - strengthening Appraisal mission in field, 6.0 existing roads and procurement of (IDA) highway maintenance equipment. SIERRA LEONE 4.3 Agriculture - lending to smallholders Credit approved by Executive (IDA) in the Eastern Province and their train- Directors on June 20. ing, mostly for rice, oil palm and cocoa production; planting 510 acres of oil palm to completed an estate; studies of possible projects in Northern Province and Central region, Total project cost estimated at $5.6 million of which $3 million in foreign exchange. TOGO 4.5 Road construction on central axis, Detailed engineering under way. (IDA) Lama Kara-Kande (82 Ian) and two auxil- iary roads Agou to Nuatja (57 km) and Sokode to Tchamba (35 km). Total cost would be about $7 million. (CIMENTS DE To be Cement mill - 1.2 million ton clinker Viability of project being L'AFRIQUE DE determined capacity for regional supply, infra- reviewed by Governments. L'OUEST) (Bank) structure including rail-spur, road (Joint financing with EIB and port facilities. Total cost about and AfDB expected; FED would $100 million of which project would finance infrastructure). cost $80 million, Awaiting conunents from Governments on Bank's pre- liminary views. 6.0 Planting and rehabilitation of 8,000 Studies by SEDES in progress; (IDA) ha of cocoa in Palime-Badou region, project preparation expected extension services, training and to be ready by end of 1973. agricultural inputs, Project cost about $8 million. See P. 1 for footnotes. -----------·- - - - - - 19 - ber State, Amount 2/ rower, and Probable Stage of Processing and eficiarl! Agenc)! ]..I Lender Project'}_/ Action on Procurement !!._/ ER VOLTA 2.8 (R) Roads - secondary roa~s, Hounde to Credit approved by Executive (IDA) Bereba and Koundougou to Solenzo Directors on June 8, and (100 km in total) for transport of signed on June 26. cotton products. que Nationale 2.2 (R) Rural development fund - for financing Credit approved by Executive Developpe111ent (IDA) of small projects in most of country, Directors on June 8, and such as village wells, village ware- signed on June 26. houses, land ·and water development schemes, small road improvements. ice des Postes et To be Telecommunications - telephone lines Project preparation under way. ecommunications determined in Ouagadougou and other cities; (IDA) national and international microwave links. To be (R) Education - improvement of rural Appraisal report being prepared. determined education centers; science labora- (IDA) tories. To be (R) Livestock development in southwest - Government's decision on project determined feedlots, transportation and marketing proposals received and under (IDA) facilities • review. To be Regional development - resettlement of Project preparation recently determined Volta Valleys after control of river- started by French experts. (IDA) blindness. To be Rice - irrigation for rice development Awaiting preparation of project. determined in Banfora area. (IDA) P. 1 for footnotes. - 20 - Member State, Amount 2/ Borrower, and Probable Stage of Processing and Beneficiary Agency l_/ Lender Pro1ect ]./ Action on Procurement !!_/ III. EAST ASIA AND PACIFIC AUSTRALIA Papua New Guinea Papua and New Guinea 9.2 Ports - improvement of ports at Port Credit approved by Executive Harbours Board (PNGHB) (IDA) Moresby, Lae and Kieta and construc- Directors on April 25. tion of new port of Alotau. Total project cost $11.1 million for which $9.2 million is off shore. Credit would be made to Papua New Guinea and relent to PNGHB. Department of Posts 10.0 Telecommunications II - additions during Loan approved by Executive and Telegraph (Bank) 1973-75 to automatic exchange and sub- Directors on April 25. scriber equipment, long distance tele- phone and telex circuits consultant services for tendering, planning and maintenance. Total project cost about $21 million of which about $13 million is off shore. Papua and New Guinea 5.0 Agriculture III - lending for three Appraisal report being Development Bank (IDA) years to indigenous smallholders, prepared. mostly for beef cattle development and for pig and poultry production. Total project cost about $9.5 mil- lion. To be (R) Education Project identification mission determined planned for early 1973. (IDA) 2.5 (R) Education II - specialized .education to Awaiting Government's views (Bank) support fishing industry. on specific project items before completing appraisal report. (DIRECTORATE GENERAL 22.5 Telecommunications II - sixth four-year Appraisal report being con- OF TELECOMMUNICATIONS) (Bank) development plan for telecommunications sidered. with estimated cost of $220 million. Proposed loan would finance foreign ex- Procurement: Bid specifica- change cost of various items of equip- tions approved for micro- ment for local telephone service, long wave air conditioning and distance facilities, telegraph, telex PCM equipment, estimated and data transmission, miscellaneous cost $6 million and some items and consultants ·services. smaller items, estimated cost about $3 million. 20.0 Taipei Sewerage Awaiting completion of project (Bank) preparation by Government. Procurement: Selection of consultants for detailed engineering and management being considered. See P. 1 for footnotes. - 21 - ber State, Amount 2/ rower, and Probable Stage of Processing and ,eficiar enc J_/ Lender Project ~./ Action on Procurement i/ NA Cont'd INA DEVELOPMENT 18.0 Development finance company V. Appraisal report being I.PoRATION) (Bank) prepared. 15.0 Agricuitural credit - major part of Appraisal report being (Bank) loan would finance foreign exchange prepared. cost of mechanization (power tillers and'tractors); also dairy development, feed milling and cold storage facilities. Total project cost about $30 million. About 33,000 small farmers (average farm size one ha) would participate. 34.0 Highways I - possibly sections of North- Project preparation in progress. (Bank) South Expressway from Fengshan to Tainan and engineering services. Procurement: Consultants for 1 detailed engineering selected. ' ~- IWAN POWER COMPANY) 25.0 Power IV - steam generation, some plants, Appraisal planned in FY 1973. (Bank) and engineering services for Hsiehho No. 1 thermal unit. Total cost esti- Procurement: Options for mated about $80 million. purchase of equipment re- ceived from suppliers who bid on equipment for third power loan (CHN 749). , lwan Railway 20.0 Railways V - composition depends on out- Railway electrification study 'rinis tr a tion (Bank) come of discussion on feasibility of being reviewed by Bank and railway electrification. Government. \!.!. 2.2 (R) Telecommunications~ four year (FY 1972- Loan approved by Executive (Bank) 75) program for expansion of telecommu- Directors on June 15, and nications facilities; expansion of local signed on June 23. exchanges by 5,650 lines; installations of microwave systems connecting major cities on two main islands; expansion of telegraph and telex facilities;· and consultants' services. Total cost $5.7 million, of which $4.0 million in foreign exchange. Of latter, only about $2.2 mil- lion of equipment suitable for Bank fi- nancing. 3.0 Tourism - probably infrastructure at Awaiting completion of UNDP- (Bank) Natandola site. financed feasibility study, under way with Bank as executing agency. DONES IA elopment Finance 10.0 (R) Development finance company Credit approved by Executive pany of Indonesia (IDA) Directors on May 30 and signed APINOO) on June 7. I e P. 1 for footnotes. - 22 - Member State, Amount 2/ Borrower, and Probable Stage of Processing and Beneficiary Agency J./ Lender Project'}__/ Action on Procurement !!_/ INDONESIA (Cont'd) Perusahaan Umum Listrik 40.0 (R) Electricity distribu~ion II - further Credit approved by Executive Negara (PLN) (IDA) rehabilitation of greater Djakarta Directors on June 22. network, including necessary consul- tants' ·services. Total cost of five-year program about $82 million, of which about $55 million foreign exchange. Government-owned 11.0 (R) Agricultural estates IV - planting of Credit approved by Executive plantation (IDA) oil palm and rubber in South Sumatra, Directors on June 22. enterprise rehabilitation and expansion of proc- essing plants, port facilities, trans- portation and buildings; and technical assistance. Total project cost about $25.6 million, of which about $13.0 million foreign exchange. 3.7 (R) Smallholder rubber and oil palm in Appraisal report being (IDA) North Sumatra - to assist smallholders prepared. in North Sumatra by provision of fi- nancing and agricultural inputs .and improvement of extension services and processing and marketing facilities. Total project cost about $7.4 million, of which $J.7 million foreign exchange. nevelopment Finance 8.5 (R) Rehabilitation of inter-island fleet - Credit approved by Executive Company of Indonesia (IDA) funds will be made available through Directors on June 27. ·· (BAPINDO) BAPINDO to shipowners for repair of ships. Total project cost up to $13.5 million, of which up to $8.5 million in foreign exchange. 20.0 (R) Highways III - bridge and road construc- Completion of appraisal report (IDA) tion in Sulawesi; pre-investment studies awaiting completion of detailed for preparation of future highway proj- engineering and cost estimates, ects. Total project cost up to $30 mil- probably in Fall 1972. lion, of which $20 million in foreign exchange. Up to Bali tourism - site development and Project preparation under way. 15.0 infrastructure in Nusa Dua beach area (IDA) at southern tip of island of Bali; first phase would provide infrastruc- ture for hotel accommodations with 2,000 to 2,500 rooms. Government Limited 3.5 Livestock - to develop six ranches in Appraisal report being prepared. to be (IDA) South Sulawesi and one in Sumba and established to establish a program to extend tech- nical assistance and credit to private cattle producers in these areas. Total project cost about $7 million with for- eign exchange component of about $2.8 million. See P. 1 for footnotes.- ------- --------------- -- ---------------- - 23 - r State, Amount 2/ wer, and Probable Stage of Processing and iciar enc ll Lender Project 1./ Action on Procurement !!_/ IESIA (Cont'd) l luhur rity 15.0 (IDA) Irrigation (Djatiluhur extension) Project preparation under way. 11.0 Sugar i.ndustry rehabilitation Project preparation under way. 10.0 {R) Education III - procurement of text- Appraisal report being prepared. (IDA) books for elementary and secondary schools, elementary school teacher upgrading. To be Teleconununications II Project preparation under way. determined (IDA) 30.0 Thermal power {West Java) Project preparation under way. (IDA) nment Limited Up to {R) Fisheries II Project identification/ llity Company to 20.0 preparation mission (FAO) 1 ;tablished (IDA) in field. 5.0 - 10.0 {R) Industrial estates Feasibility study being reviewed (IDA) with Government. To be Highways IV - Sumatra Feasibility study under review. determined (IDA) 10.0 Agricultural estates V Project preparation under way. (IDA) 5.0 - 10.0 Djakarta flood control, drainage and Project preparation under way. (IDA) wastes disposal 5.0 Water supply for seven towns Project preparation under way. (IDA) 15.0 Irrigation rehabilitation V Project preparation to start (IDA) in July. 5.0 Agricultural Extension and Research Project identification under (IDA) way. 10.0 Agricultural Processing I Project identification under (IDA) way . .A 4.0 (R) Seed production - support for breeding Final project preparation (IDA) and processing of HYV's of rice, barley., mission (FAO/IBRD) preparing wheat, corn and other crops. report; appraisal expected in second half 1972. anal Agricultural 10.5 Agricultural credit Credit approved by Executive erative Federation (IDA) Directors on ~lay 16. F) P. 1 for footnotes. - 24 - Member State, Amount 2/ Borrower, and Probable Stage of Processing and Beneficiary Agency]_/ Lender Project]./ Action on Procurement !!_/ KOREA (Cont'd) Korea National 35.0 Railways IV - includes electrification Appraisal report being RaHroad (Bank) of major trunk line; electrification of prepared, 5.0 Seoul suburban area; track renewals, (IDA) bridge ~trengthening; acquisition of rolling stock, signalling and sophis- ticated communication equipment; plant and machinery for workshops. Project is part of borrower's overall railway program for third five-year plan. Up to (R) Education II - secondary and higher Preparation appraisal mission 50.0 level vocational-technical teacher tentatively scheduled for (Bank training; and health and management October. and training. IDA) 40.0 Ports - improvements to Ports of Pusan Consultants report on first (Bank) and Mukho; improvements in operations, stage of UNDP Port Study organization and financial management. reviewed with Government. Estimated total cost $125 million of Final report expected in which foreign exchange $40 million. November. 10.0 (R) Tourism - tourist resort planning and Report of project review (Bank) development; access roads to historical mission indicates possible sites; and water and sewerage systems appraisal in November or for Kyongu city area. December 1972. (KDFC) 35.0 (R) Development finance company Appraisal mission tentatively (Bank) scheduled for second half of 1972, situation to be reviewed by supervision mission in July. 30.0 (N) Highways II Scope of project to be identi- (Bank) fied by consultants financed under first highways project (Ln. 769). MALAYSIA (BANK PERTANIAN) To be (R) Agricultural credit - medium and'long Project preparation mission determined term credit for rubber and oil palm, scheduled for late June. (Bank) poultry and cattle development and agri-business investment, 16.0 Federal highway - expansion and improve- Negotiations completed. (Bank) ment of urban highway from Kuala Lumpur through Petaling Jaya (6 miles). Total Procurement: Retroactive fi- project cost about $31,6 million of nancing for detailed engineer- which about $16 million in foreign· ing for this project to be re- exchange. commended. Federal Land Development 15.0 (R) Jengka land settlement III - further Appraisal report being prepared. Authority (FLDA) (Bank) forest clearing, planting and settle- ment in Jengka Triangle 10.0 Kuala Lumpur water supply II Project preparation under way, (Bank) See P. 1 for footnotes. - 25 - mber State, Amount 2/ rrower, and Probable Stage of Processing and [neficiary Agency ll Lender Project 1../ Action on Procurement !!_/ , LAYSIA (Cont'd 4.0 Population - to inclu~e, in addition Appraisal report being pre- (Bank) to construction and equipment, tech- pared. (Possible parallel nical assistance, advisory services financing with UN Fund for and fellowships. Population Activities.) ATlONAL ELECTRICITY 10.0 Power VI - expansion of transmission Project preparation under way. ARD) (Bank) and distribution (Temengor substations and distribution). To be (R) Highway R·oute I - improvement and up- Detailed engineering under way. determined grading of three different sections of Pre-·appraisal mission scheduled (Bank) ·the Main north-so~th highway known as for late July. Federal Route I. Portions to be im- proved are between Seremban - Kuala Procurement: Retroactive fi- Lumpur; Rawang - Taujong Malim and nancing ($400,000) for part upgrading of 17 miles north and south of detailed engineering to of Butterworth. be recommended. To be (R) Kuala Lumpur sewerage - additions to Awaiting preparation of determined and improvement of sewerage system. pro,iect. (Bank) , YSIAN INDUSTRIAL To be De.velopment finance company II Resource requirement to be I EVELOPMENT BERHAD) determined reviewed by a mission ten- (Bank) t.atively scheduled for July. EW ZEALAND DEVELOPMENT FINANCE To be Development finance company II Timing and amount dependent ORPORATION) determined on utilization of first loan. (Bank) HILIPPINES PHILIPPINE NATIONAL 20.0 (R) Development finance company IV Negotiations postponed at ANK) (Bank) Government's request. 12.3 (R) Education II - agriculture education Appraisal report being prepared. (IDA) and training technical education and vocational training curriculum de- velopment and teacher training. Total project cost will be about $17.0 mil- lion with foreign exchange component of about $11.9 million. 11 eevelopment Bank of 7.5 (R) Livestock - program of relending to Loan signed May 25. the Philippines (DBP) (Bank) private sector for pig, poultry and beef production and for development of slaughterhouses. Total project cost is $15.S million, of which $8.4 million would be for building, equip- ment and related facilities, $6.1 million for incremental working capital and $1.0 million for tech- nical services. !Development Bank of 10.0 (R) Fisheries - program of relending to the Project preparation under way. the Philippines (DBP) (Bank) private sector for coas.tal fisheries development and fishpond development. See P. 1 for footnotes. - 26 - :'!ember State, Amount 2/ Borrower, and Probable Stage of Processing and Beneficiary Agency]_/ Lender Project ]/ Action on Procurement !!_I PHILrPPINES (Cont'd) 40.0 (R) Highways II - construction of about 600 Draft feasibility studies (Bank) Ion of roads in Luzon. completed; detailed engineer- ing expected to start in late June or early July. 10.0 (R) 1 Port development - improving and expand UNDP-financed feasibility stud (IDA) ing port facilities at possibly two ports being prepared with Bank as E in Luzon and two in Mindanao. ting Agency. (METROPOLITAN WATER 20.0 Water Supply II - further expansion of Awaiting preappraisal of WORKS AND SEWERAGE (Bank) .water supply facilities for Manila area. MWSS's management and op- SYSTE:M (MWSS)) erations scheduled for late 1972. (CENTRAL BANK OF 15.0 Rural credit III - to assist in finan- CllP expected to submit THE PHILIPPINES (Bank) cing medium and long term loans by rural project preparation study (CBP)) banks for purchase of farm equipment. by mid-1973. (NATIONAL POWER 20.0 Power VI - hydro or thermal plant for Feasibility studies to be CORPORATION (NPC)) (Bank) further expansion of Luzon grid, undertaken by consultants unc!er Bank loan for Power 1 V project. (PHILIPPINE NATIONAL 20.0 Development finance company V Private Development Cor- BANK (PNB)) (Bank) poration of the Philippines expected to submit study of its foreign exchange needs by late 1973. Development Bank of I 10.0 Inter-island shipping - to assist in Basic data being collected. the Phi1lippines (DBP) (Bank) financing medium and long term loans Supervision mission for port or other su{table to private shipping companies for study scheduled for August/ intermediary replacement of existing fleet or September will review status purchase of new ships. of project preparation. 35.0 Irrigation II - Magat River Feasibility study under (Bank) way with USAID financial assistance; expected to be completed by mid-1973. 8.0 Population Bank mission visited Manila (IDA) in M:,rch and is preparing report identifying project components for discussions with Goverrunent. SINGAPORE (PORT OF SINGAPORE 13. 1 (R) Port development II - addition of third Loan request withdrawn by AUTHORITY) (Bank) container berth, extension of two gen- Government. eral cargo berths in East Wharf, pur- chase of land for inland container depot, hydrographic studies and ancillary equipment. Total project cost about $33.S million of which about $13.1 million in foreign exchange. See P. 1 for footnotes . -·~ - 27 - Member State, Amount 2/ Borrower, and Probable Stage of Processing and Beneficiary Agency 1_/ Lender Project]_/ Action on Procurement !!_/ SINGAPORE (Cont'd) (SINGAPORE TELEPHONE · 11.0 Telecommunications III Awaiting receipt of project BOARD (STB)) (Bank) prepared by STB. 5.0 (R) Sewerage II - additions and improve- Report of pre-appraisal mis- (Bank) ments to system. sion being prepared. To be Mass transit UNDP financed study to start determined shortly with Bank as Executing (Bank) Agency. Phase I will identify most desirable mass transit system for Singapore and Phase II will be detailed feasibility study of rec- orrunended system. THAILAND Kasetsart University 15.4 (R) Education II - improvement to existing Loan signed May 24. (Bank) campus at Bangkhen and construction and equipping of new rural campus at Khampaengsaen. Includes fellowships and technical assistance for curriculum development, campus planning and uni- versity administration. Total project cost $28.3 million. 32.0 (R) Highways V - construction of three Awaiting additional informa- (Bank) highway sections (about 280 km) and tion required to complete about 580 Ian of provincial roads; appraisal. procurement of some maintenance equipment; feasibility, engineering Procurement: Three contracts and highway maintenance studies. for two highway sections Total project cost estimated at awarded. Total cost of $67.0 million. contracts about $20 million of which about $9 million foreign exchange. Retro- active financing up to $4 million to be recommended. (ELECTRICITY GENERATING 25.0 (R) Quai Yai Dam - construction of dam and Consultants studying geo- AUTHORITY OF THAILAND) (Bank) power house (2 x 120 MW units) and logical conditions of transmission facilities. Project reservoir area. (Possible would also provide water for Stage II _joint financing with Japan.) of Mekong irrigation project. Total cost about $90 million. (TELEPHONE ORGANIZATION 30.0 (R) Telecommunications - project is first Appraisal report being pre- OF THAILAND) (Bank) stage of TOT's 1972-76 investment pro- pared. gram and includes additional automatic exchanges and replacement of old ex- changes in the Bangkok and provincial systems and erecting of new and expan- sion of long distance system. See P. 1 for footnotes. - 28 - Member State, Amount 2/ Borrower, and Probable Stage of Processing and Beneficiary Agency J__/ Lender Project ll Action on Procurement !!_/ THAILAND (Cont'd) (STATE RAILWAY OF 18.0 (R) Railways IV - project_ is part of Rail- Appraisal mission in field. THAILAND) (Bank) ways' 1972-76 dieselization and mod- ernization program and includes pro- Procurement: Bids for 54 curement of 54 diesel locomotives and diesel locomotives invited and spares. in February. (INDUSTRIAL FINANCE 10.0 (R) Development finance company II On basis of appraisal mis- CORPORATION OF (Bank) sion's findings consideration THAILAND) deferred until 1973/74. 12.0 (R) Education III - construction and im- Appraisal report being prepared. (IDA) provement of about 10 elementary teacher training colleges and related practice schools, additional facilities for about 32 secondary schools, a cur- riculum development and educational technology center, additional facil- ities for Faculty of Science at Songkhla University and possibly as- sistance for Faculty of Science and School of Nursing at Khon Kaen Uni- versity. Total project cost estimated at $28.3 million. Industrial Estates 6.0 Development of industrial estates. UNIIXl has offered to help Gov- Authority (Bank) ernment prepare preinvest- ment studies. Bank of Thailand 12.0 (R) Agricultural development fund - to Government considering sector (Bank) help finance wide range of agricul- mission's proposal. tural and related activities. 5.0 Seeds nultiplication - to strengthen Government considering pro- (IDA) and expand Government seed breeding posal. stations. 4.0 (R) Northeast regional crop improvement - Government reviewing project (IDA) completion and improvement of existing identified and formulated by irrigation schemes plus provision of Northeast Plan review mission. supporting services. 8.0 (R) Northeast urban infrastructure - to im- Pre-appraisal mission in field. (IDA) prove urban services and facilities in possibly four secondary cities in Northeast Thailand. 5.0 (R) Chao-Phya Irrigation development - im- Appraisal mission in field. (IDA) provements and extensions to existing distribution system to help facilitate introduction of second cropping plus necessary supporting services. Total project costs about $10 million. 20.0 (R) Pitsanuloke irrigation - structures to Pre-appraisal mission in field. (Bank) divert Nan River, main and secondary canals to irrigate about 145,000 ha plus on-farm development and support- ing services. Total project cost about $160 million, estimated foreign exchange cost of first stage about $20 million. See P. 1 for footnotes. -~-- - - ~ - - - - ------------------· - 29 - er State, Amount 2/ pwer, and Probable Stage of Processing and .ficiary Agency 1/ Lender Project 2/ Action on Procurement !!_/ jl..AND (Cont'd) To be Port development - project would comprise Project being studied by con- determined either construction of :1dditional facil- sultants financed by U.S. AID; (Bank) ities at Klong Toi in Bangkok or conver- report expected by end of 1972. sion of· existing facilities on Gulf of Thailand for civilian use or construc- tion of new facilities. opoli tan Water- To be (R) Bangkok water supply - improvement of Project ready for renewed 1 s Authority determined treatment, transmission and distribu- attention; appraisal mis- I) (Bank) tion of water in Bangkok, including sion in field. control of water waste nnd pilot sewer- age plant. -, P. 1 for footnotes. L - 30 - Member State, Amount 2/ Borrower, and Probable Stage of Processing and Beneficiary Agency 1/ Lender Project'}_/ Action on Procurement !!_/ IV. SOUTH ASIA AFGHANISTAN 2.0 (R) Airport·- relocation and modernization Government's preliminary (IDA) of flight information center plus an- plan for relocating FIC, cillary infrastructure; also engineer- based on !CAO technicians' ing and economic studies for proposed recommendations, under re- new airport at Logar to serve Kabul, view by IDA. Reappraisal and additional technical assistance mission scheduled for Jyly. for Afghan -Air Authority. Total cost about $3 million of which $2 million in foreign exchange. Herat Livestock 4.0 Livestock - farm development, a Appraisal mission in field. Development (IDA) slaughterhouse for meat exports, (Denmark (DANIDA) may participate Corporation ( to refrigerated vehicles, technical in financing slaughterhouse or be established) assistance and training, costing other project elements.) about $12 million, of which $6 million in foreign exchange. Industrial Development 3.0 Development finance company - to Project preparation under way. Bank of Afghanistan (IDA) be established by private Afghan shareholders with expected for- eign participation of approximate- ly 40%. Afghan Tourist 2.0 (R) Tourism - development of hotel and Project preparation under way. Organization/Afghan (IDA) ancillary facilities in Bamiyan, Air Authority North Afghanistan and possibly Kabul; technical assistance and training. Cost of total project, which may be implemented in stages, estimated at $11 million, of which about $8 mil- lion in foreign exchange. a.o Highways II - expansion beyond the Project under preparation by (IDA) Eastern Region of existing highway Government and consultants. maintenance project (158-AF), for Appraisal tentatively sched- maintenance of primary roads and uled for September/October. betterment of secondary roads, costing about $11 million over three years, including $8 million foreign exchange. Up to Agriculture-type of project still Report of Agricultural Sector s.o uncertain, but projects such as Survey Mission being prepared. (IDA) livestock development and irriga- tion to be discussed with Govern- ment in light of reconnnendations of sector mission. Ceylon Electricity 5.0 (R) Power - details not yet determined Appraisal mission scheduled Board (CEB) (IDA) but expected to consist largely of for July. transmission and distripution fa- cilities. See P. 1 for footnotes. '' - 31 - Amount 2/ and Probable Stage of Processing and Lender Project'}_/ Action on Procurement !!_/ A enc )_I 21. 2 (R) Population - financing of civil works, Credit approved by Executive (IDA) furniture, equipment, vehicles, tech- Directors on May 30 and signed nical nss istance, nutrition and other on June 14. (Sweden will clements of an experimental, resenrch- participate with grant of $10.6 oriented family planning project in million.) selected districts of ~tysore and Uttar Pradesh. TotaJ... pro_ject cost $31 .3 mil- lion, including about $ 2 mil lion in foreign exchange. 25.0 (R) Development finance company - initial Negotiations expected to ndus trial c,velopment B.~nk (IDA) IDA pro.Ject for a public sector DFC begin in July. f India supportinr, State Finance Corporations, which finance small and medium scale industry. Total IDBI lending to SFC's is esti;nated at $100 million· during 1972-74, of which $37 million for im- ported capital equipment. IDA financ- ing will cover foreign exchange costs of imported capital goods required by SFC-financed industries. cate 1,overnments 12.0 Agricultural Universities - construc- Appraisal report being prepared. (IDA) tion and equipment for main campuses in Bihar and Assam; technical assist- ance; equipment for Institute of Agri- cultural Research Sta tis tics. Total project cost about $18 million in- cluding about $5 ~illion in foreign exchange. ertilizer 45.0 (R) Nangal fertilizer plant - expansion Appraisal report being prepared. .orpora tion of (IDA) of capacity of plant from 80,000 ndia (FCI) nutrient tons of nitrogen to 230,000 Procurement: Three contractors tons. Total project cost estimated for ammonia plant prequalified. at about $100 million equivalent; FCI proceeding with final IDA financing would cover major part selection. of foreign exchange cost. Shipping Development 83.0 Four crude oil tankers (80,000 dwt Credit approved by Executive Fund Committee and (IDA) class) and two products tankers Directors on March 7; signing Shipping Corporation (20,000 dwt class). subject to IDA replenishment. of India 75.0 (R) Industrial imports VII - imported Credit approved by Executive (IDA) components and materials for selected Directors on June 3; signing groups of high priority industries; subject to IDA replenishment. namely, agricultural tractors and power tillers, fertilizers, pesti- cides, electric notors, transformers, switchgear and niagnetic steel stamp- ings, machine tools and small tools, aluminum smelting, commercial vehicles, and automotive ancillaries. Proposed credit would finance about JO% of im- ports expected for these industries in FY 1973. ·see r. 1 for footnotes. - 32 - ~ember State, Amount Jj Borrower, and Probable Stage of Processing and Beneficiary Agency~/ Lender Project }j Action on Procurement !!_/ INDIA (Cont'd) State Electricity 80.0 (R) Power transmission Ir'I - continuing Mission in field to complete Board (IDA) support for extension of transmission appraisal. facilit.ies to be undertaken during the remainder of the Fourth Five-Year Plan by six State Electricity Boards and three other power entities. ARC and State 35.0 Agricultural credit in Madhya Pradesh Appraisal report being prepare Land nevelopment (IDA) - groundwater development and land de- Bank veiopment. Total cost of 1973-75 pro- gram estimated at $50 million. IDA credit would cover foreign exchange cost of about $10 million and 50% of local cost. Bombay Municipal 25.0- Bombay water supply - 1972-76 expan- Appraisal mission scheduled fo Corporation (BMC) 30.0 sion program of water supply and sewer- June/July. (IDA) age system. Total cost estimated at $50 - $60 million. IDA financing to Procurement: Retroactive finat cover foreign exchange cost estimated cing of consultants' service at 5-15%, and about 50% of local costs. and possibly some preliminar) Project to include civil works, equip- works to be considered by ment supplies and consultants' services. appraisal mission. ARC and Stace 30.0 Agricultural credit in llihar - 1;round- Awaiting completion of project I~,nd Development (IDA) water development, 1nechanization and preparation. ~ank land development. State of Madhya 43.0 Tawa Irrigation - completion of an on- Further processing deferred Pradesh (IDA) going project involving an earth and pending resolution of civil masonry dam, construction of water dis- works procurement issue. tribution system, land shapinr, and sup- porting infrastructure. When complete, the project would irrigate 240,0IJO ha at an estimated cost of over $71 mil- lion including $17 million in foreign exchange. State of 20.0 Jayakwadi irrigation - co!Tinletion of on- Appraisal mission postponed '.-taharash tr a (IDA) going project involving an earth anrl pending resolution of civil masonry dam on the Godavari River; con- works procurement issue. struction of water distribution system and other infrastructure to support aP,ri- cultural development. Project would ir- rigate 350,000 ac. State of 15.0 Pamba irrigation - completion of on- Appraisal mission postponed Kerala (IDA) going project to develop irrir,ation pending resolution of civil potention of Kakkad River. works procurement issue. Fertilizer 20.0 Trombay fertilizer - n~dernization and Project preparation under way. Corporation of (IDA) expansion of existing plant to produce India (FCI) additional 130,000 tons of P 205 and 130,000 tons of N annually. Total project cost estimated at ahout $60 million equivalent. IDA financing would cover major part ·of the foreign exchange cost. Sec P. 1 for footnotes. - 33 - Amount 2/ and Probable Stage of Processing and Lender Project'}__/ Action on Procurement !!_/ Cate of Orissa 10.0 Lake Chilka fisheries (Orissa) - to re- Awaiting results of model (IDA) store a fishing industry which has de- tests. clined due to silting up of opening be- tween the lake and the sea. Project involves dredging of inlet, construc- tion of embankments and of a small fishing port and provision of credit to fishermen for acquisition of ves- sels. Total project cost estimated at about $18 million, of which IDA fi- nancing would cover foreign exchange costs and about 50% of local currency costs. 40.0 (R) Telecommunications V - 1974-75 invest- Project preparation under way. (IDA) ment program of P & T Department, in- cluding expansion of local exchanges and long distance network. 45.0 Railways XII - financing for part of Timing of appraisal will depend (IDA) the foreign exchange requirement of on progress under the on-going the 1974-75 investment program of project (Cr.280). Indian Railways, including motive power, rolling stock and track im- provement and expansion. ta te of llimachal 9.0 (R) Apple processing and marketing - to FAQ project preparation mission radesh (IDA) provide facilities for transport, in field. storage and packaging of apples. ICICI 55.0 (R) Development finance Company X - con- Appraisal tentatively scheduled (Bank) tinuation of support of industrial for June 1973 but may be sooner, finance. depending on rate of commitment of previous loan (Ln.789). Tata Chemical 30.0 Tata fertilizer - construction of a Awaiting feasibility study Co. (Bank) facility to produce ammonium chloride, before scheduling preappraisal urea, and sodium carbonate. Total mission. project cost estimated at about $60 million equivalent. Bank financing would cover foreign exchange cost of project. 75.0 Industrial imports VIII Appraisal tentatively scheduled (IDA) for November. 40.0 Kudremukh iron ore - extraction of Report of preappraisal mission (IDA) ore for export at rate of 7.5 million completed. Appraisal of project tons per year. Large open pit mining dependent on completion of proj- operation followed by upgrading of ore. ect plans, including transport Regrounds of this concentrate to be and marketing arrangements. pumped by pipeline to port of Panambur and via submarine pipeline to tankers anchored offshore for shipping to Europe and Japan. Total project cost estimated at $232 million, of which $80 million in foreign exchange. See P. 1 for footnotes. - 34 - Member State, Amount 2/ Borrower, and Probable Stage of Processing and Beneficiary Agency l_/ Lender Project 1/ Action on Procurement ii INDIA (Cont'd) Sta.te of 14.0 Uttar Pradesh forestry - includes plant- FAQ project preparation missio Uttar Pradesh (IDA) ing of 22,000 ha annually of quick grow- scheduled in field. ing and industrial species; construction and upgrading of about 2000 Km of forest roads and establishing cableway, logging units and sawmills. Total project cost estimated at $23.5 million. State of 30.0 (R) Wholesale markets in Uttar Pradesh - Five Appraisal report being prepared Uttar Pradesh (IDA) year development program for market fa- cilities and marketing cooperatives and training for market personnel - financing to be through Agricultural Refinance Cor- poration and nationalized banks to local market committee. State of 30.0 (R) Wholesale markets in Mysore - Five year Appraisal report being prepared '!ysore (IDA) development program for market facili- ties and marketing cooperatives and training for market personnel - financ- ing to be through Ar,ricultural Refinance Corporation and nationalized hanks to lo- cal market committee. State of 30.0 (N) Krishna irrigation - construction of State goverrunent carrying out !faharashtra (IDA) three ear thf ill dams, two on River preparatory studies. Krishna and one on River Vennar, to- gether with water distribution and related on-farm works and infrastruc- ture to support agricultural develop- ment. Project would irrigate 160,000 acres. Telecommunications 50.0 (R) Telecommunications II - expansion of lo- Project preparation under way. Company of Iran (TCI) (Bank) cal and long distance telephone, telex Appraisal mission tenatively and telegraph services in 1973-75. Hain planned for late July. items to be included are cables, long distance and local switching equipment, costing about $75 million (including $50 million in foreign exchange). Size of Bank project to be determined. Ports and Shipping 29.0 (R) Ports - construction of four new berths Executive Director considera- ·Organization (PSO) (Bank) at Bandar Shahpur, cargo handling and tion scheduled for June 29. floating equipment, a master plan study for Iran ports, and technical assistance Procurement: About $200,000 of and training. Total project cost about retroactive financing to be $42 million, including about $29 million recommended for earthworks in foreign exchange. The loan would be started in April 1972. Bids made to Iran and relent to PSO. for earthworks invited on basis of Bank-approved pro- cedures; award of contract approved by Bank. ·See P. 1 for footnotes. - 35 - r State, Amount 2/- wer, and Probable Stage of Processing and iciar A enc !/ Lender Project lf Action on Procurement !!_/ (Cont'd) IR (Generation 51.0 Power transmission - construction of Negotiations substantially istribution Co.) (Bank) 400 kV (845 km) and 230 kV (283 km) completed. lines in gouthwestern Iran plus en- gineering and training services. To- Procurement: International tal project cost $75.0 million (in- competitive bidding except cluding $51 million in foreign ex- for about $1 million for change). The loan would be made to components required to be Iran and relent to TAVANIR. compatible with existing equipment and other minor items. IR (Generation 50.0 Thermal power generation - construc- Feasibility studies to begin istribution Co.) (Bank) tion of thermal power station (capac- shortly. ity of 400 MW) and installation of gas turbines (200 ~). stan Water and 17.0 (R) Dez Irrigation II - to complete de- Negotiations suspended due to Authority (KWPA) ,,. (Bank) velopment of Dez Irrigation project lack of agreement on arrange- (DIP) and fully utilize irrigation ments for indigenous farmers. water available from Pahlavi dam. (Bank has made two loans for DIP - Procurement: International com- first for pilot project as part of petitive bidding for all con- LN.247 in 1960 and second for Stage struction except resettlement I in 1969 LN.594). Stage II proj- villages, which will be done ect would consist of irrigation and by force account or by local drainage systems, flood protection, contractors. on-farm development and roads and bridges to serve 27,000 ha, most of which is now dry-farmed, and sup- porting agricultural services, par- ticularly research and extension services for indigenous farmers. Total project cost about $55 mil- lion, including about $19 million in foreign exchange. Loan would be made to Iran to be relent to KWPA. trial Credit 10.0 Industrial credit - to open up a Appraisal report being prepared. of Iran (ICB) (Bank) second DFC channel in Iran by sup- porting a two-year lending program mainly for widely-dispersed medium- sized private sector industrial projects. 5.0 Birganj irrigation - related project Appraisal report being prepared. (IDA) elements as follows: (a) completion of distributary system and on-farm development of 28,700 ha to be irri- gated with water from the Gandak River. (The primary canal system being constructed by India); (b) pilot groundwater project consisting of rehabilitation of 14 existing tubewells and construct~on of 14 new tubewells to irrigate 2,700 ha; and (c) development of agricultural sup- porting activities. Total cost esti- mated at $10 million, including about $3.5 million in foreign exchange. P. 1 for footnotes. - 36 - Member State, Amount 2/ Borrower, and Probable Stage of Processing and Beneficiary Agency]_/ Lender Project'}_/ Action on Procurement !!_/ NEPAL (Cont'd) Timber Corporation 2.5 (R) Plywood factory (Hetaura) - improving Government carrying out tech- of Nepal (IDA) a sawmill and establishing a plywood nical tests before appraisal, mill (both at Hetaura), acquiring log- in order to determine suitabil- ging and road construction equipment, ity of local timber for manu- building and maintaining logging roads, facture of plywood aP.d veneer. and providing technical, managerial and Private financing of project marketing assistance. Total costs es- also being considered. timated roughly at $4 million, includ- ing about $2.8 million in foreign ex- change. Nepal Telecommunications Up to Telecommunications II - continuation of Awaiting NTB's development plan. Board (NTB) 5.0 NTB's development program. Four year (IDA) project costing about $6.5 million (in- cluding $4.5 million foreign exchange) and expected to consist of increasing capacity of existing exchanges and long distance routes plus extension of system to new areas in Western Nepal. J.O Forestry/land settlement in Western Nepal Awaiting Government's comments (IDA) (Bardia District) - Project estimated to on project preparation report cost about $5 million, including SJ mil- by FAO/IBRD Cooperative Program lion in foreign exchange, would provide: mission. facilities and equipment for clearing about 8,400 ha for the settlement of some 2,100 farm families; facilities and equipment for felling, extracting and sawmilling of timber from settle- ment area plus some 55,000 ha of per- manent forest managed on sustained yield basis; studies on irrigation in project area, Government has advised, however, that it may want to submit a substantially larger project for IDA consideration. Up to (R) Highways II - construction of secondary UNDP-financed feasibility study, 7,0 roads to open up new areas by connecting expected to be completed in (IDA) them to East/West Highway. Also, con- August, will be basis for selec- struction of porter-trail suspension tion of project elements. bridges. Total cost over three years, estimated at $10 million, including $7 million foreign exchange. Up to (R) Water supply - Project not yet determined Preparation mission scheduled J.O but mission that made mid-term review for July. (IDA) of ongoing UNDP-financed feasibility study identified possible water supply Procurement: Retroactive fi- and sewerage projects in Kathmandu nancing of consultants' serv- Valley and other major towns, which ices under consideration. may result in much larger project. PAKISTAN 50.0 (R) Industrial imports - to finance imports Credit approved by Executive (IDA) of components and materials needed to Directors on June 27. increase industrial proauction from ex- isting manufacturing capacity, and to finance imports of fertilizer, in sup- port of recently announced import liberalization measures. See P. 1 for· footnotes. - 37 - er State, Amount 2/ ower, and Probable Stage of Processing and ficiar enc l/ Lender Project ll Action on Procurement !!_/ STAN Cont'd)· re Improvement s.o Lahore water supply and sewerage II - Consideration of appraisal report ,t (LIT) (IDA) Stage I of project was financed under deferred, pending assessment of Cr.106, jointly with Sweden, in 1967 country development priorities. and is now virtually completed. Water (Joint lending with Sweden was supply works comprising tubewells, considered at earlier stage but chlorination plant, main grid and dis- now seems improbable). tribution pipelines; sewerage and drain- age works including pumping stations. Total cost about $16.6 million, of which $4.8 million, in foreign exchange. chi Electric To be Karachi power transmission and distribu- Requirements suitable for Bank/ ly Corporation determined tion. Original plan was for Bank to IDA finance will be considered C) (IDA) help finance foreign exchange costs, after ADB loan is approved. $10,5 million, of transmission and dis- tribution project, total cost of which is $24 million, comprising transformers, sub-stations, transmission and distribu- tion cables and equipment, and engineer- ing, and for ADB to finance about $18 million for a thermal power generation project. At present, ADB is considering an increase in financing to $21.3 mil- lion to include urgent portions of trans- mission and distribution project, origi- nally to be financed by Bank, including $750,000 retroactive financing. Total cost of expanded ADB project about $45 million. CIC) 30.0 Development finance company IX - for on- New appraisal needed. Consider- (Uncertain) lending in foreign currencies to various ation of project deferred, pend- private manufacturing industries. ing assessment of country de- velopment priorities. . Water and 15.0 Salinity control and reclamation - Consideration of project de- er Development (IDA) Panjnad-Abbasia first stage. Instal- ferred, pending assessment of hority (WAPDA) lation of tubewells for irrigation and country development priorities. drainage and construction of drains (Joint lending with Germany together with remodelling of irrigation possible). canals. Total cost of all stages of project would be about $94 million equivalent, including about $24 million in foreign exchange. At an earlier stage, Germany was considering credit of $6 million for joint financing. Size of first stage to be financed would depend on total local and for- eign funds available. stees of the 8.0 (R) Karachi port - construction of four Draft of final engineering and t of Karachi (IDA) new berths, remodelling of a railway economic feasibility report, T) yard, reconstruction of a bridge and financed with Cr.S-9, submitted. expansion of oil handling facilities Pre-appraisal report being at Karachi port. Total project cost prepared. estimated at about $25 million, in- cluding about $15 million in foreign exchange; first stage would require $8 million in foreign exchange. e P, 1 for footnotes. - 38 - Member State, Amount 2/ Borrower, and Probable Stage of Processing and Beneficiary Agency 1/ Lender Project]./ Action on Procurement !!_/ V. EUROPF. 1 MIDDLF F.AST AND NORTH AFRICA ALGERIA To be (P} Educati'on I - construction and equip- Project preparation determined ment for new technological university under way. (Bank) and equipl"ent for several technolor,ical institutes. Total project cost ahout $45 mUlion, of which about $3(1 mf llion in foreign exchange. To be Industry I - existing cement plant to Awaiting first draft of determined be expanded from 400,000 tons to 1 mil- feasibility study, and (Bank) lion tons per year. Total project cost results of geological ahout S40 million, of which ahout $25 studies. mf Ilion in foreign exchange. lip to (R) Highways I - partial improvement of F.conomic study in progress. 8.0 ahout 100 km of roada, includf.ng con- (Bank) nections, between Conatantine-Skikda- Annaha, consultant services for en- Procurement: Tenders in- gineering and feasihil:I. ty study for vited for parts of project possible future project. Total proj- located in r.onstantine- ect cost ahout $20 million, of which Skikda-Annaha triangle. ahout $8 million in foreign exchange. Up to Port of Arzew - breakwater, berth for Feasibility studies in 28.0 LNG transport, and dredging. Total prof?ress. (Bank) project cost about $55 million, of which ahout 50% in foreign exchange. To be (R) Agro-Industries I - expansion and Report of project identifica- determined modernization of Algeria's flour tion mission being prepared. (Bank) milling industry. 4.0 Nicosi11-~'orphou Road - construction of F.conomi.c justification of (!lank) new road (ahout 24 mfles); consulting project being examined. services for completion of final en- gineering and preparation of highway Procurement: Retroactive planning and organization study. financing (about $100,000) for consultants being considered. Government plans to issue prequalifi- cation notices for road work in July. (CYPRUS DEVELOPMENT 3.0 (R) Development finance company l.oan approved by Executive BANK) (Bank) Directors June 13 and signed on June 19. (ELECTRICITY AUTHORITY 9.0 (R) Power IV - sixth 30 }~,' thermal unit Loan approved by Executive OF CYPRUS (EAC)) (Bank) for ~oni generating station and Directors June 13 and signed related 132 and 66 KV transmission on June 19. line and distribution. Total project cost $12 m:lllion, of which $9 million in foreign exchange. 9.0 Paphos irrigation - dam and related Feasihility study being (Bank) facilities in Paphos District in prepared. Western Cyprus. See P. 1 for footnotes. - 39 - Member State, Amount 2/ Borrower, and Probable Stage of Processing and Beneficiary Agency]_/ Lender Project 11 Action on Procurement ~/ EGYPT, ARAB REPUBLIC OF s·upreme Council for 6.0 (R) Population - provision of facilities, Report of pre-appraisal mis- Family Planning (IDA) equipment and technical assistance to sion being reviewed. reinforce an effective national popula- tion planning program. 8.0 - 10.0 Soil improvement - improvement of soils Project being prepared with (IDA) by deep tillage and gypsum application assistance of IBRD/FAO co- and provision of necessary drainage in operative program. selected areas. Egyptian Cotton 10.0 - 15.0 Cotton ginning rehabilitation I - pro- Fieldwork for feasibility Organization (IDA) gram for renewal and rehabilitation of study under way. cotton ginning facilities. Egyptian Central 20.0 - 30.0 Upper ~gypt drainage - installation of Appraisal report being nrainage Authority (IDA) open and tile drainage, pumping station, prepared. and improvements to existing drains in about. 600,000 feddans in Upper F.gypt.· Bank of Alexandria 8.0 - 10.0 Development finance company Project being prepared. (IDA) FINLAND 20.0 (R) Forestry - reforestation, artificial Appraisal report being (Bank) regeneration, fertilization, drainage prepared. and road construction for private forests. in south and central Finland. 20.0 (R) Pollution control - abatement of water Report of mission being (Bank) pollution by pulp and paper industry. considered. GREECE To be (R) Highway maintenance - equipment and Report of pre-appraisal determined consulting services for highway main- mission·being prepared. tenance, and detailed engineering of 250 km of roads. 23.0 (R} Education II - Schools of Engineering Appraisal report being (Bank) and Natural Sciences at University of considered. Patras, vocational training schools and primary teacher training academies. Total project cost estimated at $43.7 million. 15.0 Irrigation II - surface irrigation in Project being pr~pared with (Bank) Aliakmon and Lake Yannitsa areas. assistance of FAO/IBRn co- operative program. To be Irrigation III - groundwater irriga- Project being prepared. determined tion in northern Greece as a follow- up to the ongoing program under Irriga- tion I. See P. 1 for footnotes. - 40 - Member State, Amount 2/ Borrower, and Probable Stage of Processing and Beneficiary Agency J../ Lender Project ]./ Action on Procurement ii !CF.LAND (NATIONAL POWER COMPANY) 6.0 Sigalda power - 1SO Ml-! hydroelectric Prospective market for (Bank) generating station on the Tungnaa. electricity under con- Total project cost eRtimated at $42 sideration by borrower. million. Procurement: Pre-quali- fication of contractors for civi.l works planned. 40.0 (R) I.o~•er Khalis - irrigation, drainage Ner,_otiations completed. (Bank) and on-farm development of 57,000 ha in the Lower Khalis area; consultant services and studies; total project cost estimated at $78 million, of which $40 million in foreign exchange. 25.0 (R) Grain storage - construction of ahout Appraisal report being (Bank) 17 additional grain storage end hen- prepared. ling fRcilities. Total project cost estimated at $60 million of which $30 million in foreign exchange. 12.9 (R) F.ducation - construction and additions Loan approved by Executive (Bank) to secondary schools, technical and Directors on June 20. vocational training institutes, agri- cultural institutes, and farmer train- ing, including substantial technical aRsistance and provision of eoucational television enuipment. Total project cost eRtimated at $20.0 million, of which $12.9 million in foreign exchange. 10.0 Shemamok agricultural development - Project preparation underway (Bank) irrigation, drainage and on-farm devel- with IBRD/FAO cooperative opment of 9600 ha of the Shemamok plains program assistance. in northern Iran. 20.0 - 25.0 Roads and bridges - construction of Awaiting preparation of (Bank) selected roads and bridges. detailed project and eco- nomic feasibility studies. IRELAND 25.0 Livestock - agricultural credit for pro- Apprais1ll report being (Bank) duction and processing of beef cattle. prepared. (INDUSTRIAL CREDIT -To be (R) T.leve lopmen t finance company II Awaiting further commitment COMPANY - ICC) determined of first loan to rc:c. (Bank) To be (R) Technical, vocational and agri.cultural Pre-appraisal mission ached- determined education. uled for July. (Bank) ISRAEL To be Seweraee - installati.on of sewerage Ap'f'raisRl re.port being pre- determineo systems in 80 communities. Total pared. (Bank) project cost estimated at $Rn million. I Procurement: SomP retroactive financing may be recommended See P. 1 for footnotes. - 41 - er State, Amount 2/ ower, and Probable Stage of Processing and ficiary Agency]_/ Lender Project 11 Action on Procurement !!_/ AN s.o (") Water supplv/iseweragf'- - Anm,,in Appraisal ischeduled for (InA) August. Prncurement: Retro,ictive financing for cci~sGltants services under consideration. (N) Zerna power project Project ftrst appraised in "· 5 (IDA) June 1°71 but fin,inclng con- sidered pre-mature. Re- appraisal scheduled for early 1973. (Joint financing with KU1,·ai t Fund envi,rnged.) ANC'N FICF. NATIONAL 12.0 South-Benaa irrir.ation - project Economic justification of UTAN!) (Bank) compo!':f.ti.on being defined. project heing examlned; further Ban~ consideration of project depends· on final feasibility study. 10.0 Education - improvement and expansion Appraisal report being (Ban Ir) in primary and secondary education. prepared. seil Executif 27.0 (R) Highway - construction of three sections Feasibility study and detailed Grands Pro.1ets (Rank) of t1'e Tahar.1a-Tripolf expressway (about englneerlng completed. Pre- 4 3 kr.s.) and cc-nsulting SP.rvl ces. Total appraisal miission scheduled project cost estimated at $50 m1llion. for July to review economlc data and appraisal scheduled for September. Procurement: Pre-qualification of bidders (gr one section has been completed. Tender documents, aftP.r revl.ew by Bank, are being amended by Government. Retroactive financing may be recommpnded. !SSE }1ATI0NALF. 24.0 (R) Agricultural credit II - to flnance Scheduled fo~ Fxecutive Director CREDIT AGRICOLE) (Bank) purchase of tractors, harvesting consideration on June 29. 10.0 machinery and attachments, pumping (IDA) equipment, planting material, live- stock procurement and fattenfng, stables, other farm buildings, materials for sorting, grading and packag-1.ng citrus and vegetables, electrification equipment, fertilizers, and pesticides. Total project cost $70 mill1.on, of which $34 million in foreign exchangP. .; e P. 1 for footnotes. - 42 - Member State, Amount 1/ Borrower, and Probable Stage of Processing and Beneficiary Agency J./ Lender Project 11 Action on Procurement !:./ 'MOROCCO (Cont'd) (OFFICF. NATIONAL DE 48.0 (P.) Casablanca-Rahat bulk water supply - Negotiations substantially L'F.AU P('ITABLE) (Bank) construction of large dam with intake completed. tunnel,. pumpinp: station, and treatment plant; 90 km of pipeline, improvement Procurement: Retroactive of existing facilities, consultant financing (totalling about services for engineering and manap:ement $4 million) for consultant assistance. Total project cost ahout sP.rvices, dam construction $97 mUli on, of which about $44 million and pumping equipment being in foreign exchange. considered. Contracts totalling about $35 million awarded for dam, specialized eauipment for dam, intake and tunnel. Tenders invited for treatment station, pumps and intake tunnP.l. (CRF.OIT I'MMOBILIF.R 15.(1 (R) DFC hotel financing II - to cover larger Scheduled for Executive nirec- F.T HOTF.f.IER) (Bank) part of CI~'s foreign exchange rP.r,uire- tor consideration on June 29. ments for hotel construction financing. Foreign exchanp:P. 30%-40r of hotel cost. (BANQUt NATIONALE Up to nevelopment finance company VI - to cover Appraisal report being POUR LE DEVELOPPE- 30.0 part of BNnE's foreign exchange require- prepared. MENT ECONO'MIQUE) (!lank) ments for financing investment projects in industry and other SP.ctors. (~AROC-PHOSPHORE) 30.0 Phosphoric acid plant - t\Jo or three Awaitinp: completion of project (Rank) sulfuric acid units, two phosphoric preparation and marketing ar- acid units and possibly one MAP linP.. rangements. (Joint or paral- lel Unancinp: will probably be necessary; Kredi. tans tal t fur Wiederaufhau and FrP.nch authoritieR have expressed tentative interest.) Procurement: Tender documents distrihuted to five pre- oualified bidders. (OFFICE NATIONAL DE l!p to Electric power transmission - new Feasihilitv study for part L'F.LECTRICITE - ONE) 19.0 power tram;mi ssion lines for 'F'es and of project completed; study (Bank) Rabat, corresponding extension of 7 of other parts being prepared main substations, addi ti.on A to existing hv nm:. lines and 2 15 Ml\' gas turhines. Total project cost about $42 million; foreig.n Procurement: Tender documents exchange component to be determined. for transformers and reactors prepared by ONF. and approved by Bank. Analysis of bids for transformers, reactors and conductors being reviewed by Bank. Up to Road Construction IT. - construction of netailed engineerinp: being 20.0 first stage of Casablanca-Pahat four- prepared hv consultants. (Bank) lane highway and construction of Kenitn1-Larache highway. Total pro.1ect cost ahout $35 million, of which about $20 million in foreip,n exchange. To be Irrigation - Oum er P. 'hia (J1echra El Consultants will he selected determined nued) d;im' and related canal"' and i.r- in Septemrer to prepare (uncertain) rigation eouipment. feasibility study. See P. 1 for footnotes. - 43 - Amount 2/ and Proiablc Stage of Processing and A enc j_/ Lender Project 1/ Action on Procurement !:./ OCCO (Cont'd) Up co· Water supply II - dis_trfhution facil- Feasihility studies being 10.0 ities in medium-size cities to he prepared by consultants. (Bank) selected. To he Tour.fsm infrastructure - Bav of Agadir. Government selecting con- detl!rmined sultants for pre-investment (Rank) study, To be trrhani.zation - site and service project Recent sector revie'W mission determined in cities to be selected. preparing report. (uncertain) To 1'e Ports A'Waiting Government decision determined on identification of project. (Bank) To be (II) Integrated development of ral.nfed agri- Bank/FAO cooperative program determined culture in ~eknes and Seltat. project identification mission (uncertain) in field. To be Fruits and vegetables. A'Waiting Government decision determined on consultants and project (uncertain) preparation. AN 5.0 - 6.0 (R) Power - generation and distri.hution Feasibilitv study being prepared (BanJ,) facilities in developed areas of Oman, by Consultants. plus consultant and en11ineering serv- ices. All\' 40.0 (R) Ports improvement II - additional Appraisal report being prepared. (Bank) facilities in Huelva and I.a Luz y I.as Palmas; additional dredges and cranes for general use in Spanish norts. Foreign exchange component estimated at $68 million. 50.n (R) Education JJ - secondary, vocational Loan approved hy Executive (Bank) teacher training, relocation of Directors on ~iay 30 and si.gned Barcelona Polytechni.c, and plannf.ng on June 21. of higher education. Total project cost $150 m:lllion, of 'Which $50 mu.- lion in foreign exchange. Up to (n) Drainage and irrigation in Ehro Delta - A'Waiting Government decision on 20.0 to increase vegetable and mill: produc- general pol:lcy questions and (Bank) tion. additional technical preparation. 't'J!IA sta!,J.:1.ssement Public 10.0 Damascus 'Water supply - to include Appraisal mission tentatively es Eaux de Figeh (EEF) (IDA) expansion of 'Water supplv sources, scheduled for October. transmission system, reservoirs and distri.buti.on system. Total project Procurement: Retroactive cost estimated at $18.6 million, of financing for project studies which ahout s1n.o in foreign exchange. to be recommended. Part of initial contract expenditures may also be recommended for retroactive financing. ee P. 1 for footnotes. - 44 - Member State, Amount 2/ Borrower, and Probable Stage of Processing and Beneficiary Agency]_/ Lender Project 1/ Action on Procurement !!_/ SYRIA (Cont'd) Fstahlissement Public To be Power - transmission -lines, electri- Consultants to prepare feasi- d'Eiectririte (EPE) determined fication of coastal rep.ion, changing bility studies to be engaged (Bank) voltap.e of distribution nett.7o.rks of by GovernJTient. mRjor t·owns, and possi1'ly increa,aing generating capacity. TIJNISIA Office National du 14.r (R) Tourism infrastructure - construction of Loan and Credit approvecl by Tourisme et du (1\ank) ronds, tJater supply, ,aewerage, power anrl Executive Directors on June 15 Thermalisme 1().0 telecommunications facili ti e,a in !lf.x (Co-financ:lnp. with Germany (IDA) major tourist zones along Me~iterranean envisaged _(l'M40 million)). coast. Total cost estimated at $55 mil- lion with foreign exchange component of $30.8 million. To be (R) Rural development (new name) - proposecl Report of FAO/IBRD ident:lf:fca-· determinecl project, still to be defined, involves tion mi!lsion being sent to (Bank) integrated rural development scheme in Government for comments. :Irrigated and r;,:lnfe.d area,a with creclit component for on-f;,rm improvement. (SOCIETE NATIONALF. 13.0 (R) nevelopment. f:l.nance companv V. AporatRal mi,asion planned n'TNVF.STISSEMFNTS) (Bani:) i.n July. Tl'RY.EY Agricultural Bank of 16.0 Livestock TT - two suh-pro.Jects: Credit approved by Executive Turkey (ABT) (TOA) (a) livestock development in a1'out Directors on April 4, subject 250 villages in remote N.E. Turkey to availabili.ty of InA funds. and (b) a"sistance to ahout 1,600 livestock f;,tteners, mainly in Anatolian Plateau. Total project cost $28.3 mill:1.on, of which $6.5 million in foreign costs. Credit Pould be l'lade to Turkey and relent to Al\T for sub-lending to farmers, cooper;,tiw!s, and fatteners. (ISTANBUL WATER 37.0 (R) Istanhul water supply - extension of Loan approved by Executive WORKS ADMINISTRATION) (Bank) transmission, treatment and distribu- Directors on June 27. tion systems for water supply. Total project cost estimated at SSS .1 million Procurement: Retroactive fi- of which ahout $26. 5 million in foreign nanc1ng for advance con- exchange. tracting of pumping equip- ment (up to $150,noo) will be recommended. Bid invita- tion documents for critical treat~ent plant to be issued shortly. 2.3 (P) Istanbul urhan development program - Credit approved by Executive (TnA) preparation of program to meet ur1'an Directors on June 27. clevelo~ment needs of Istanbul, inclucl- ing prepar;,tion of pro.1ects sui tahle for Bank/IDA Hnanci.ng. Total coRt of project estimated at $3.3 million of which $2. 3 million in foreign exchange. See P. 1 for footnotes. - 45 - er State, Amount 2/ ower, and Probable Stage of Processing and ~f~i~c~i~a::.,.._A=-=~en"-c~l/ Lender Project 11 Action on Procurement !!_/ EY (Cont'd ANP.l'L FLECTRICI'l'Y To be (R) Power ,U stribution in. Istanhul - expan- Appral s"l IT'lssl.on iri field. TRANSPORT determined sion and modernization of power distrlhu- ORITY) (Bank/IDA) t1on nett.•ork in Istanbul. ish Railways To be Railways modP.rnization and d1.eseli,:a- Appraisal report be1np n) determined t1on. prepared. (Bank) IYE SINAI KALK!NHA 45.0 'Development finance company - medium Appr,.isal mission tentativP.ly ASI - TSKB) (Bank) and long term flnancing for industrial planned in Octoher. projects. 1Cl.O Higher and possibly secondary level Awaiting Government's· decision (Bank) agricultural educatlon. on composition of project. 'ANBUL GUBRE 24.Cl Fertilizer plant - to·produce 274,000 Loan approved by Executive YII A.S.-IGSAS) (Bank) tons per year urea and 90,000 tons per Directors on May 16. year of other ammonia. Total project cost S5R million of which $32 million in forei.gn exchange. Loan would be made to IGSAS with Government guaran- tee and would cover foreign exchange costs of single stre"m ammonia and urea plants, auxiliary facilitl.es, spare parts and engineering consul- tant services. To be Ceyhan Aslantas - irrigation and on- Aporaisal report being determined farm development of about 108,000 net prepared. (Bank/IDA) ha and multi-purpose dam for water storage, flood control and hydro- electric power (138 MW). Total proj- ect co"t about S2f.5 mfllion, of which about $66 milllon in foreign exchange. cultural Bank To be Agricultural credit - medium and long Consultants bein~ engaged urkey deten:,ined te= credit f<'r lane. ar.d water develop- for credit survey being (IDA) r.ent, fart'\ building and machinery, financed under fruit and seeds, nurl'ery stock and re.lated agri- vegetable project (Loan 762/ cultural activities. Credl t 25 7). rowing entity To be (R) Antalya paper mill/forestry - utiliza- UNDP-financed feasibility be identified determined tion of forest resources in Antalya study under way. (Bank) region; possible construction of in- tegrated pulp and kraft paper complex and sawmill with tentative annual pro- duction targets of 132,000 tons of pulp and kraft paper (including an es- timated 35-40,000 tons for export) and 324,000 tons of.sawed wood. To be Tourism Discussions proceeding with determined Government on identification (Bank) of project. P. 1 for footnotes. - 46 - Member State, Amount 2/ Borrower, and Probable Stage of Processing and Beneficiary Agency]_/ Lender Project 1./ Action on Procurement !±_/ YEMAN ARAB REPUBLIC 5.0 - 6.0 (R) Tihama development --provision of sur- Appraisal mission in field. (IDA) face and groundwater i rrigati.on, on- farm development and techni.cal · assis- tance in Wadi Zahid and Wadi Hawr. 4.0 - 5.0 Sana'a water supply Project preparation under way (IDA) assisted by WH<'. 7.7 (R) Highway development - construction of C.redl.t approved by Executive (IDA) Tai.z Turba road (70 km), feasibility Directors on ·-June 20 and signed studies, engineering; procurement of on June 26. (Kuwait Fund to construction, maintenance and en- participa~e in financing.) gineering testing enuipmcnt with spares; technical assistance. Total project cost estimated at S8.6 million. Proposed credit would finance foreign exchange cost and more than 50 percent of local costs. 3.0 - 4.0 (N) Educition - secondary vocational teacher Unesco project preparation (IDA) training and agricultural education; mission in field. education administration and planning. YH1EN I PEOPLE'S DEMOCRATIC. REPUBLIC OF To be (R) Fisheries development Appraisal report being prepared. determined (IDA) YUGOSLAVIA (NATI0NAL BANK) 20.0 Development fi.nance company New proposals for Bank fi- (Bank) nancing being explored. (JAZ ENTERPRISE) 15.0 Jaz Tourism - 5,000-bed integrated Project p~eparation mission (Bank) tourism complex located near Budva. in Held. Procurement: Prequalification of engineering, architecture, and manage~ent consultants in proP,ress. (ELEVFN POWER 75.0 (R) Power transmission - construction of Loan approved by Executive ENTERPRISES, JOit:iTLY) ·(Bank) ahout 3,000 km single circuit 380 kv Directors on June 13 and lines and 12 substations with aggre- signed on June 23. gate ca])acitv of 7,qno !"VA for Hrst phase of country-~•ide networl,. Total project cost estimated at S225 million of which S65 million in foreign ex- change. (~UBROVNIK WATER AND 5.0 - 1().() Duhrovnik tourism infrastructure - Awaiting completion of SEWERAGE ENTERPRISE) (Bank) expansi.on of existing water and consultant's feasibility sewerar,e system, including treatment studies. facilities. (HARBOR BAR ENTERPRISE) Up to 30.0 Harbor Rar - expansion of port facil- Identification mission report (Bank) ities. being prepared. See P. 1 for footnotes. - 47 - ~er State, Amount 2/ fower, and Probable Stage of Processing and diciary Agency 1 / Lender Project 11 Action on Procurement !!_/ i - QSLAVIA (Cont'd) I ERPRISE CONCERNED) To be (P) Agro-industry in ~acedonia - construc- Appraisal mission scheduled detennined tion of facilities for fruit, vegetahle, for July. (Bank) oil and wine processing; on-farm devel- opment•· (including cattle breeding, dairy cattle production, pig production, bahy heef feeding, access roads, fann im- provements); training and technical assistance. CEL) To be (R) lncel, Banja Luka - pulp m:1.11 Market study being prepared detennined by sponsor; scope of project (Bank) under review. (Joint or parallel financing may be involved,.) Up to 30.0 ('R.) RiS?hways VI Identification mission in (Bank) Held. FTAGAS) To be ('R.) Naftagas pipeline - natural gas d1s~ Pre-apprai.sal missio·n scherluled determined rution pipeline. for July. (Bank) To be (N) Railways IV - r.ontinuation of ~'odem- Project preparation being determi.ned ization program. carried out by consultants. ~e P. 1 for footnotes. f - 48 - ~'ember State, Amount 2/ Borrower, and Probable Stage of Processing and I Beneficiary Agency!/ Lender Project)./ Action on Procurement !!._/ VI. CENTRAL AMERICA AND CARJBBF.AN COSTA RICA (llANCO CF.NTRAL) 9.0 (R) Agricultural cred:lt II - livestock, Loan signed on June 5. (Bani<) crops, forestry and agro-industries. Total project cost $16.5 m:lllion, of which S9 m:lllion in foreir.n exchange. (INSTITUTn COSTA- Up to Power V - hydro and thermal generation. Feasihiltty stu~y being PRICF.N~E DE ELF.CTRI- 2n.o prP.parecl. CITlAD) (Bani<) Up to (R) Hir,hways !JI - to meet cost overrun on Appraisal mission scheduled 3.0 Siqu:I. rres-Liff'on highway project. for August. (Bank) Up to (R) Educat:lon I - teacher training, agri- 1.lnesco project preparat:1.on 5.0 cultural schools, vocat:lonal centers, report received; appraisal (Bank) technical institutes. mission tentatively sched- uled for September. \ DOMINICAN REPUBLIC Up to Yaque del Norte Irrigation - construc- Appraisal report being 12.0 tion of headworks and canal system for prepared. (IDA) area of ahout 23,000 ha at present grow- :lng mainly sugarcane, rice, tobacco and Procurement: Retroactive vegetables. Total cost ePtimated at f:lnancinr, up to $200,000 $30-35 million. to cover consultants' serv:lces for detailed engtneering to be reco~- mended. Up to Road rehahil:l.tation and ma:l.ntenance UNDP cnnsider:l.ng Government's 5.0 program. application for financinp of (IDA) feasibility and organization study. (BAl\'CO CENTRAL) Up to Puerto Plata Tourism - develonment of Awaiting completion of fea- 5.0 new resort area on North coast. sibility study, now in pro- (IDA) gress with UNl)P financing. Et. SALVADOR 2.0 Access roads in northern region - con- Appraisal report in abeyance: (Bank) struction or reconstruct:l.on of 54 km of awaiting new Government's roads; pavement and strengthening of a views on priority and scope 36 km road; consultants' services for of project. supervision of construction and feasi- hilitv studies and detailed design of ahout 100 km of roads. Total project cost about $4 million, of which ar,out $2 million in foreign exchange. (COl'JSION EJECIJTIVA l'p to (R) Hydro-power generat:1.on and transmission Geo-thermal feasibility report ~IDROF.LF.CTRICA DEL 25.0 and poss:lhly geo-thermal power develop- being prepared. (IDB may fi- RIO LE"1'A) (Rank) ment. nance part of project.) l See P. 1 for footnotes. 'I - 49 - , !ember State, Amount 2/ and Proi,able Stage of Processing and ~orrower, ~eneficiarv A~ency )_/ Lender Project 11 Action on Procurement !:../ cL SALVADOR (Cont'd) l'p to (R) Education II - teacher training, voca- PrPparation appraisal mission 5.0 tional education, non-formal rural edu- planned for August; awaiting (Bank) cation and administration. new Government's views on priority of project. ,UATEMALA (INSTITUTO NACIONAL Up to (Tl) Power !TI - 2 x 50 ~'I·' thermal gPnera- Appraisal report being revised. OF ELF.CTRIPICACION) 21.0 tj on units, transmission facilities (Bank) and studies. Total pro.1ect cost about Procurement: Tenders issued ~29 m11Hon, of which ahout S21 mfllion for electro-mechanical equip- in foreir.n exchange. ment. (INSTITUTO NACIONAL Up to Power IV - hydroelectric power gPnerat- Awaiting.preparation of DE ELECTRIPICACION) 25.0 ing facUHies. feasjhility study. (Ban1') Up to Fducation II Unesco project identification 6.0 mission scheduled for July. (Bank) GlTYANA (GU':ANA ET.E:CTRICITY 6.0 (R) Power I - thermal generation, trans~is- Re-appraisal report being CORPORATIC1N) (Bank) sion and freouency conversion. prepared. (Parallel financing by U.K. and Canada.) Procurement: Retroactive financing for consultants' services (up to s5on,noo) to he recommended. 5.0 Sea defPnse III - third phase of Awaiting consultants' report. (Ban1'/IDA) twelve-year sea defense program (1968- 79). To be Fisheries - shrjmn and fishjng trawlers Awaiting final report of determined and port facilities. IRRD/FAO preparation (Bank) n>i.ssion. To be Forestry - access roads in upper Awaiting market study and determined Demerara River area and processing technical study on access (Bani<) plant. roRds. HAITI Up to 10.0 (R) Rehahilitation of northern road from Project identified; scope and (IDA) Port-au-Prince to r.ap Haitien. timing to be determined. HONDURAS 8.0 Highway VT - construction of Tegucigalpa AwRiting completion of (Bani<) - Talanga road and improvement of other detailed engineering, ex- roads. pected in late 1972. r See,. 1 fo, foo