The World Bank Report No: ISR5158 Implementation Status & Results Ukraine Urban Infrastructure Project (P095337) Public Disclosure Copy Operation Name: Urban Infrastructure Project (P095337) Project Stage: Implementation Seq.No: 8 Status: ARCHIVED Archive Date: 17-Aug-2011 Country: Ukraine Approval FY: 2008 Product Line: IBRD/IDA Region: EUROPE AND CENTRAL ASIA Lending Instrument: Specific Investment Loan Implementing Agency(ies): Ministry of Construction, Architecture and Housing and Communal Services Key Dates Board Approval Date 28-Aug-2007 Original Closing Date 31-Dec-2012 Planned Mid Term Review Date 01-Jun-2011 Last Archived ISR Date 17-Aug-2011 Effectiveness Date 10-Nov-2008 Revised Closing Date 31-Dec-2012 Actual Mid Term Review Date 31-May-2011 Project Development Objectives Project Development Objective (from Project Appraisal Document) The Project's objective is to assist participating utilities in moving towards higher quality and reliability of services and reducing the costs of service through a series of institutional improvements and selective investments in rehabilitation and replacement of deteriorated water supply, wastewater and solid waste systems. Has the Project Development Objective been changed since Board Approval of the Project? Yes No Component(s) Component Name Component Cost INSTITUTIONAL CAPACITY 1.15 REHABILITATION INVESTMENTS 61.53 ENERGY EFFICIENCY 76.47 PROJECT MANAGEMENT 2.00 Overall Ratings Public Disclosure Copy Previous Rating Current Rating Progress towards achievement of PDO Moderately Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Satisfactory Overall Risk Rating Implementation Status Overview Three years and half years after effectiveness (November 10, 2008), the project continues making implementation progress, with total commitments (104 signed contracts ) totaling USD 77,8 million. As of March 20, contractual commitments amount to 56% of loan amount. All participating cities have their procurement processes ongoing for the total amount of the project, at different stages. Finally, the two cities with substantial delays (Odessa and Kremenchuk), made substantial progress with 3 contracts awarded (one with two lots) for a total of USD 41.2 million during this fiscal year, and 2 other ongoing procurement processes in advanced stage. Page 1 of 5 The World Bank Report No: ISR5158 The project has disbursed USD 17 million in fiscal year 2012 of which USD 4.6 million in calendar year 2012. As of March 20 the project had disbursed a total of USD 32 million (23% of the project total amount). Public Disclosure Copy Locations Country First Administrative Division Location Planned Actual Ukraine Not Entered Ukraine Ukraine Not Entered Odessa Not Entered Not Entered Odessa ✔ ✔ Ukraine Not Entered Ivano-Frankivs'k Not Entered Not Entered Ivano-Frankivs'k ✔ ✔ Ukraine Not Entered Donets'k Ukraine Not Entered Chernihiv Not Entered Not Entered Chernihiv ✔ ✔ Results Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target Improved quality of water supply and other Text Value O: 50% of international water Quality of water supply and services (O=Odessa; C=Chernihiv; IF=Ivano- quality standards C: 60% IF: other services improved: Frankivsk). 50% O=80%; C=75%; IF=65%. Date 06-Jul-2007 30-Mar-2012 31-Dec-2012 Comments This indicator will be revised (there are no water investments in O and IF) Public Disclosure Copy Rehabilitation of Investments (O=Odessa; Text Value O: 2.1 km interceptor O= completed: main C=Chernihiv; D=Donetsk; IF=Ivano-Frankivsk). constructed; Solid waste collectors, pump stations, landfill (80 ha) C: sludge treatment fac., 2.1 km Replacement pumps, water intercep. C= pumps & pipes mains, WW collection pipes repl., 2.3 km water mains. D= D: 60% h-holds meters;35% 75% h-h metered; losses water losses IF: chlorination 30%. IF= 5 km sewer coll., disinfection 13.5 ww pipes Date 06-Jul-2007 30-Mar-2012 31-Dec-2012 Page 2 of 5 The World Bank Report No: ISR5158 Comments This indicator will be revised. there are no investments in Solid waste. Public Disclosure Copy Improved institutional capacity within the Text Value No investments are done as a Cap. build. compl: 1. prep. Ministry of Housing & Communal Services. baseline quality design packages; 2. tendering packages; 3. proj impl. in compl. with procurement & FM requirements. Training: finan. appraisal & manag., CBA, & HR. Date 06-Jul-2007 30-Mar-2012 31-Dec-2012 Comments This indicator will be revised Intermediate Results Indicators Indicator Name Core Unit of Measure Baseline Current End Target (1) Business Plans (BPs) for utilities; (2) Text Value Completion of satisfactory 1. BPs to be completed for Institutional strengthening of the Ministry of BPs and increase capacity of 1st year and annually revised. Housing & Communal Services (MHCS) and staff in MHCS through yearly 2. Capacity building municipal utilities. training programs. completed. Date 06-Jul-2007 30-Mar-2012 31-Dec-2008 Comments this indicator will be revised. Reaching financial viability (O=Odessa; Text Value % of billing not collected: IF: Viability reached 2% of billing. C=Chernihiv; D=Donetsk; IF=Ivano-Frankivsk). 38%; C: 18.4%; D: 48.9%. Not collected reduced to: IF=19%; C=11%; D=19%. Date 06-Jul-2007 30-Mar-2012 31-Dec-2012 Comments This indicator will be revised. Cannot be archived with the proposed components Rehabilitation Investment carried out Text Value No investments are done as a Bidding and/or construction Rehabilitation completed. satisfactorily. baseline ongoing Public Disclosure Copy Date 06-Jul-2007 30-Mar-2012 31-Dec-2012 Comments Energy Efficiency investments measures Text Value No investments are done as a Bidding and/or construction Investment completed and 1. resulting in reduction of energy consumption. baseline ongoing Energy consumption (reduced 3-5% per year) and 2. Cost per cubic meter of water supplied reduced. Page 3 of 5 The World Bank Report No: ISR5158 Date 06-Jul-2007 30-Mar-2012 31-Dec-2012 Comments Institutional strengthening of Ministry of Text Value Est. annual training programs, Capacity building within Public Disclosure Copy Housing and Communal Services. quality of training, #s trained MHCS completed. & #s retained. Date 06-Jul-2007 30-Mar-2012 31-Dec-2012 Comments Will be revised Data on Financial Performance (as of 30-Mar-2012) Financial Agreement(s) Key Dates Project Loan No. Status Approval Date Signing Date Effectiveness Date Closing Date P095337 IBRD-48690 Effective 28-Aug-2007 26-May-2008 10-Nov-2008 31-Dec-2012 P095337 TF-91769 Effective 22-Oct-2008 22-Oct-2008 22-Oct-2008 30-Jun-2012 Disbursements (in Millions) Project Loan No. Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P095337 IBRD-48690 Effective USD 140.00 140.00 0.00 32.10 107.90 23.00 P095337 TF-91769 Effective USD 5.86 5.86 0.00 0.70 4.90 12.00 Disbursement Graph Public Disclosure Copy Page 4 of 5 The World Bank Report No: ISR5158 Key Decisions Regarding Implementation The Bank will continue to monitor closely the project implementation and the activities in the procurement plan to avoid any further delays. Public Disclosure Copy Restructuring History There has been no restructuring to date. Related Projects There are no related projects. Public Disclosure Copy Page 5 of 5