MINISTRY OF HEALTH




EAST AFRICA PUBLIC HEALTH LABORATORY NETWORKING PROJECT-
                    ADDITIONAL FINANCING



    FINANCIAL STATEMENTS FOR THE FINANCIAL YEAR ENDED

                      30 JUNE 2020




                        JUNE 2020
                                                              East Africa Public Health Laboratories Networking Project
                                                                Financial Statements for the Year ended 30 June 2020




                                                Table of Contents


List of Tables .............................................................................................................. II
List of Acronyms ........................................................................................................ III
Project Information .................................................................................................... IV
1.0      Introduction .......................................................................................................1
   1.1 Project Development Objective (PDO) ..................................................................1
   1.2 The project has 3 components ............................................................................1
   1.3 The East African Project Sites .............................................................................2
   1.4 Management’s Responsibility for the Financial Statements .................................3
2.0 Progress Report and Performance for the Period Ended 30 June 2020 ...................4
   2.1 Civil Works Contract Variations ..........................................................................6
   2.2 Grand Summary of the Contract Variations extracted from the Supervising
   Consultant Report. ...................................................................................................6
      2.2.2 Lacor- Gulu Hospital ....................................................................................7
      2.2.3 Mulago National Referral Hospital ................................................................7
      2.2.4 Arua Regional Referral Hospital ....................................................................8
      2.2.5 Mbale Regional Referral Hospital ..................................................................9
      2.2.6 Mbarara Regional Referral Hospital ............................................................ 10
3.0      Financial Statements ....................................................................................... 11
   3.1 Statement of Income and Expenditure .............................................................. 11
   3.2 Designated Account Activity Statement............................................................. 12
   3.3 Statement of Fund Balance ..............................................................................13
4.0 Notes to the Financial Statements .......................................................................14
5.0 Annex ..................................................................................................................19
   5.1 Bank Reconciliation Statement - Designated Account .......................................19
   5.2 Bank Reconciliation Statement - Operational Account ......................................21
   5.3 Civil Work Financial Performance .....................................................................23




                                                                                                                               I
                                                   Year 4 of the Project
                                                    East Africa Public Health Laboratories Networking Project
                                                      Financial Statements for the Year ended 30 June 2020


                                            List of Tables
Table 1: Showing the summary of proposed variations for the civil works ....................6

Table 2: Contract Variations for Pan Modern Consult Limited......................................6

Table 3: Contract Variations for Lacor Hospital............................................................7

Table 4: Contract Variations for Mulago NRH ..............................................................7

Table 5: Contract Variations for Arua RRH ..................................................................8

Table 6: Contract Variations for Mbale RRH.................................................................9

Table 7: Contract Variations for Mbarara RRH ........................................................... 10




                                                                                                           II
                                           Year 4 of the Project
                                           East Africa Public Health Laboratories Networking Project
                                             Financial Statements for the Year ended 30 June 2020


                                   List of Acronyms
AC/A        Assistant Commissioner Accounts
BoU         Bank of Uganda
CERC        Contingency Emergency Response Component
COVID       Corona Virus Disease 2019
CPHL        Central Public Health Laboratories
EAPHLNP-AF East African Public Health Laboratories Networking Project Additional
           Financing
ECSA-HC      East, Central and Southern Africa Health Community
EPR         Epidemic Preparedness and Response
EVD         Ebola Virus Disease
FMS          Financial Management Specialist
FY          Financial Year
GBV         Gender Based Violence
GoU         Government of Uganda
ICT         Information Communication Technology
IDA         International Development Association
IPSAS       International Public Sector Accounting Standards
IRB         International Research Board
MoFPED      Ministry of Finance, Planning and Economic Development
MoH         Ministry of Health
MoU         Memorandum of Understanding
NTF         National Task Force
OR          Operational Research
PDO         Project Development Objective
PoE         Points of Entry
RRH         Regional Referral Hospital
SANAS       South African National Accreditation System
ToT         Training of Trainers
TWG         Technical Working Group
UCI         Uganda Cancer Institute
UGX         Uganda Shillings
USD         United States Dollars
VHF         Viral Hemorrhagic Fever


                                                                                                 III
                                   Year 4 of the Project
                                           East Africa Public Health Laboratories Networking Project
                                             Financial Statements for the Year ended 30 June 2020


Project Information
Project Implementer

Ministry of Health

Funding Source

World Bank-IDA

Project Number:             IDA Credit No: 56150-UG

Counterpart Fund

Government of the Republic of Uganda

Bankers

Bank of Uganda

P.O. Box 7120

Kampala Road

Account Name: East Africa Public Health Laboratories Networking Project

Account No:      000140088400022

USD Account

Account No:     000140088000073

UShs Account

Auditors

Office of Auditor General

Plot 2/4 Apollo Kaggwa Road

P.O. Box 7083

Kampala – Uganda.

Tel: +254 414 344 340

Email: info@oag.go.ug




                                                                                                 IV
                                   Year 4 of the Project
                                           East Africa Public Health Laboratories Networking Project
                                             Financial Statements for the Year ended 30 June 2020


1.0 Introduction

On February 11, 2016, a Financing Agreement of USD: 15 Million was entered into
between the Republic of Uganda and the International Development Association of the
World Bank for the purpose of providing Additional financing for activities related to the
East Africa Public Health Laboratories Networking Project. It became effective on March
31, 2016 for a period of 4 years to March 30, 2020. The World Bank was requested by
Ministry of Finance, Planning and Economic Development (MoFPED) to extend the
project by one year. The request was granted and the project was extended to 31st of
May 2021.

The Additional Financing consolidates the achievements attained in the first phase and
also facilitates the strengthening of the capacity of the country for Epidemic
Preparedness and Response (EPR) especially to highly infectious pathogens like viral
hemorrhagic fevers. A strong health system enables an efficient and effective system for
EPR and enhances coordination of the epidemic response, disease surveillance,
laboratory diagnosis, case management, infection prevention and control and social
mobilization.
The project will support the strengthening of 7 public health laboratories to improve on
their diagnostic capacity by providing critical laboratory equipment and training of
personnel. The other areas include supporting cancer diagnostics and Anti-Microbial
Resistance. The new sites the project is supporting are Moroto and Fort Portal Regional
Referral Hospital Laboratories. The original sites include National Tuberculosis
Reference laboratory, Mulago National Referral Hospital, St Mary’s Hospital Lacor and
the Arua, Mbale, Mbarara Regional Referral Hospitals.

1.1 Project Development Objective (PDO)
The project aims at establishing a network of efficient, high quality, accessible public
health laboratories for the diagnosis of Tuberculosis and other communicable diseases.

1.2 The project has 3 components
Component 1: Strengthening Regional diagnostic and surveillance capacity.
Component 2: Joint Training and capacity building
Component 3: Joint operational research, knowledge sharing, regional coordination and
program management.


                                                                                                  1
                                   Year 4 of the Project
                                     East Africa Public Health Laboratories Networking Project
                                       Financial Statements for the Year ended 30 June 2020


1.3 The East African Project Sites




                                                                                            2
                             Year 4 of the Project
                                              East Africa Public Health Laboratories Networking Project
                                                Financial Statements for the Year ended 30 June 2020


2.0 Progress Report and Performance for the Period Ended 30 June 2020
No.     Component/Activity          Description                       Financial %age          Physical   %age
                                                                      Performance as          Performance as
                                                                      at 30 June 2020         at 30 June 2020
1.0     Component
1.1     Civil works: Outputs
1.1.1   Construction of VHF         The      construction     was     30%                     30%
        isolation unit at Mulago    awarded       to     Zhongmei
        National RH                 Engineering Group Ltd at a
                                    contract       price      Ugx:
                                    8,913,336,496
1.1.2   Construction of MDR         The      construction     was     60%                     71%
        treatment   Centre at       awarded to BMK Ltd at a
        Moroto RRH                  contract       price      Ugx:
                                    942,627,840
1.1.3   Making           Entebbe    The      construction     was     60%                     59%
        Isolation Unit functional   awarded        to     Synergy
                                    Enterprises Limited at a
                                    contract       price      Ugx:
                                    2,071,737,783
1.1.4   Construction of Mbale ,     Construction      of    Mbale     95%                     90%
        Mbarara , Arua, and         Laboratory was awarded to
        remodeling Lacor Labs       EGISS              Engineering
                                    Contractors Ltd at a contract
                                    price Ugx: 1,935,225,818

                                    Construction   of  Mbarara        90%                     67%
                                    Laboratory was awarded to
                                    Muga Services Ltd at a
                                    contract     price    Ugx:
                                    1,925,992,914

                                    The remodeling of Lacor           100%                    52%
                                    Laboratory was awarded to
                                    the in-house engineering team
                                    at a cost price of Ugx:
                                    369,027,298

                                Construction     of    Arua           85%                     43%
                                Laboratory was awarded to
                                Alliance Technical Services
                                Limited at a contract price
                                Ugx: 2,168,700,348
1.1.5   Civil works supervising Design review of all sites            88%                     N/A
        consultant and defect completed.             Actively
        liability period        supervising all civil works
                                sites.
No.     Component/Activity      Description                           Progress status as at 30 June 2020
1.2     Surveillance and case management:
1.2.1   Support to mentors to Mentorship provided to lab              Quarterly laboratory mentorship done
        conduct mentorship of personnel at the 7 satellite            to the 8 project sites of; Mbale,
        lab personnel in the 7 sites                                  Mbarara, Fort Portal, Arua, Moroto,
        satellite sites

                                                                                                     4
                                      Year 4 of the Project
                                                East Africa Public Health Laboratories Networking Project
                                                  Financial Statements for the Year ended 30 June 2020


                                                                        Lacor, Mulago, Histopathology lab and
                                                                        UCI Lab.
                                                                        Moroto and Mulago hospital labs
                                                                        gained       SANAS   international
                                                                        accreditation.
1.2.2   Provide     support      to   Hold cross     border     zonal   Carried out regional Ebola Viral
        Regional              level   meetings.                         Disease (EVD)
        surveillance activities
1.2.3   Support National Task         Support NTF      in  Project partly supported the NTF on
                                                            epidemic
        force     on     epidemic     response             EVD & Covid-19 on contact tracing,
        response                                           Point of Entry (PoE) screening and
                                                           national support supervision
1.3     Procurement of medical equipment, consumables and supplies:
1.3.1   Procurement              of   Equipment     and     supplies    The Temporally Isolation units were
        equipment and supplies        procured in last FY               used in EVD suspect isolation and
        for 5 temporally isolation                                      currently used in Covid-19
        units
1.3.2   Procurement of Medical        Medical equipment procured         Contract signed. Equipment delivered
        equipment      for    VHF                                       awaiting verification
        isolation units
1.3.3   Procurement        of    2    2   temperature       scanners    Procured and installed the Thermal
        temperature      scanners     procured                          Scanners at State House
        for State House

1.3.4   Procurement            ofCalibration        equipment           Contract signed
        laboratory   calibration procured for 7 laboratory
        equipment for CPHL       maintenance        equipment
                                 centers in the country
1.3.5   Procurement of furniture Furniture for Mbale, Mbarara,          Contract signed and awaiting delivery
        for    new    labs  and Arua, Lacor, Moroto, Mulago             of furniture to the sites
        isolation centers        and Entebbe
2.0     Component 2: Training and capacity building
2.1     Satellite lab mentorship                            Fort
                                      Lab personnel mentored. All 7Portal    assessed    is   now
        training                                            internationally accredited laboratory.
                                      laboratories apply to SANAS
                                      for                   Passed the 6-month surveillance
                                                      International
                                      Accreditation.        assessment.
                                                            Mbale and Lacor applied for SANAS
                                                            assessment for accreditation
3.0     Component 3: Operational research, knowledge sharing and project management

3.1     Operational research           Off-shoot        operational     Five other protocols approved by the
                                      research studies Conducted        OR TWG. Four have received IRB
                                                                        approval and have started data
                                                                        collection. Three are compiling reports
3.3     Program    management         Project Staff, contribution to    11      project    staff  maintained,
        and personnel                 ECSA-HC, support supervisor       transferred project contribution to
                                      and project management            ECSA-HC and carried out support
                                                                        supervision.




                                                                                                       5
                                        Year 4 of the Project
                                              East Africa Public Health Laboratories Networking Project
                                                Financial Statements for the Year ended 30 June 2020


2.1 Civil Works Contract Variations
In the course of the design review for Mbarara, Mbale, Arua and Lacor sites, it
necessitated undertaking changes of specifications on a number of items and
also introduction of some extra works in order for the designs to meet the
strength and functional requirements and address the current standards of the
Laboratory.

Table 1: Showing the summary of proposed variations for the civil works
                                            ORIGINAL                                                      %
                                            CONTRACT             NEW CONTRACT                             VARIA
No.   CONTRACTOR            SITE            AMOUNT               AMOUNT                VARIATION          TION

  1   MUGA SERVICES LTD     MBARARA             1,925,992,914        2,718,010,431         792,017,517    41%
      EGISS ENGINEERING
  2   CONTRACTORS LTD       MBALE               1,935,225,818        2,766,984,417         831,758,599    43%
      ST MARY'S HOSPITAL
  3   LACOR                 LACOR                 369,027,298          456,727,298          87,700,000    24%
      ALLIANCE TECHNICAL
  4   SERVICES LIMITED      ARUA                2,168,700,348        3,028,619,679         859,919,331    40%
      ZHONGMEI
      ENGINEERING
  5   GROUP LTD             MULAGO              8,913,336,496       10,206,466,169       1,293,129,673    15%
      PAN MODERN
  6   CONSULT               SUPERVISION         1,207,830,000        1,557,161,000         349,331,000    29%

      TOTAL                                   16,520,112,874       20,733,968,994       4,213,856,120



2.2 Grand Summary of the Contract Variations extracted from the
Supervising Consultant Report.
2.2.1 Pan Modern Consult Limited


 Pan Modern Consult Ltd (Consultancy Time Extension Variations)                       AMOUNT (UGX)

 Construction Supervision - Post contract and Defect Liability Monitoring             260,544,000

 Reimbursement Expenses                                                               27,000,000

 Miscellaneous Expenses                                                               8,500,000

                                                                                      296,044,000

 VAT (18%)                                                                            53,287,920

 Total Lumpsum/ Cost Estimate                                                         349,331,920
 As a percentage of the original contract sum                                                     28.9%

Table 2: Contract Variations for Pan Modern Consult Limited


                                                                                                     6
                                      Year 4 of the Project
                                                East Africa Public Health Laboratories Networking Project
                                                  Financial Statements for the Year ended 30 June 2020



2.2.2 Lacor- Gulu Hospital
                                                      ORIGINAL
                                                      CONTRACT            CONTRACTOR'S             NEGOTIATED
                                                       AMOUNT               VARIATION                AMOUNT
No.                DESCRIPTION                          (UGX)             AMOUNT (UGX)                (UGX)
  1    Change for Specifications
       Upgrade of worktop finish to Synthetic
 1.1   Marble                                           37,778,000                129,178,000         81,400,000

       Inclusion of earlier Omissions to
  2    Complete the Design
       Allowance for Connection to Utilities
 2.6   (Power, Water and Sewer)
   a   Power Connection                                                                     N/A              N/A

  b    Water Connection                                                              6,300,000          6,300,000
  c    Sewer Connection                                                                    N/A                N/A

       TOTAL                                                                     135,478,000         87,700,000
       As a percentage of the original
       contract sum                                                                      36.7%              23.8%

Table 3: Contract Variations for Lacor Hospital

2.2.3 Mulago National Referral Hospital

                                                          ORIGINAL
                                                          CONTRACT           CONTRACTOR'S          NEGOTIATED
                                                           AMOUNT              VARIATION             AMOUNT
No.                     DESCRIPTION                         (UGX)            AMOUNT (UGX)             (UGX)

  1    Retaining Wall                                        75,746,000           470,433,198        241,723,536

  2    Re-routing of Public Sewer Line                                             62,363,333         46,200,730

  3    Roads and Parking                                                          171,128,980        106,719,291

  4    Stores and Power House                                                     431,501,748        117,108,136

  5    Oxygen Plant Building at Mulago NRH                                        300,000,000        300,000,000

                        TOTAL                                                  1,435,427,259        811,751,693
        As a percentage of the original contract
                         sum                                                             19.6%              11.1%

Table 4: Contract Variations for Mulago NRH




                                                                                                       7
                                      Year 4 of the Project
                                                                                        East Africa Public Health Laboratories Networking Project
                                                                                          Financial Statements for the Year ended 30 June 2020


2.2.4 Arua Regional Referral Hospital
Table 5: Contract Variations for Arua RRH
                                                             CONTRACTOR'S APPRAISAL                 NEGOTIATED POSITION
                                             (1)               (2)            (3)                    (4)             (5)
 Bill
                 DESCRIPTION              ORIGINAL                                                              DEVIATION                    REMARKS
 No.
                                         CONTRACT          APPRAISED        DEVIATION            NEGOTIATED        (UGX)
                                        AMOUNT (UGX)      AMOUNT (UGX)      (UGX) (2-1)         AMOUNT (UGX)        (4-1)
  1     PRELIMINARIES                       49,780,000       49,780,000                     -       49,780,000                    -

                                                                                                                                      Introduction of basement
  2     BUILDING & CIVIL WORKS           1,304,250,340      1,938,435,139         634,184,799     1,424,715,147        120,464,807    and backfilling

                                                                                                                                      Change in quantities and
  3     EXTERNAL WORKS                      55,566,400        74,064,345           18,497,945        74,064,345         18,497,945    introduction of benches

                                                                                                                                      Change of specification
  4     ELECTRICAL WORKS                   223,825,600       270,050,400           46,224,800      255,063,200          31,237,600    and additional lighting

  5     MECHANICAL WORKS                   238,862,500       513,779,950          274,917,450      272,652,500          33,790,000    Extra Plumbing Items

        Provision sum for Additional
                                            10,000,000        10,000,000                    -        10,000,000
        ESHS Outcomes                                                                                                             -

        Provisional sum for Sexual
        Exploitation and Abuse (SEA)/
        Gender Based Violence (GBV)         10,000,000        10,000,000                    -        10,000,000
        awareness and sensitization
        training                                                                                                                  -

  6     EXTRA ITEMS                                          327,861,000          327,861,000      524,754,844         524,754,844

        SUB-TOTAL -I                     1,892,284,840     3,193,970,834    1,301,685,994        2,621,030,036         728,745,196
  7     ADD 5% CONTIGENCY                    94,614,242        94,614,242               -            94,614,242                  -

        SUB-TOTAL -II                    1,986,899,082     3,288,585,076    1,301,685,994        2,715,644,278         728,745,196
  8     ADD 18% VAT                         357,641,835       591,945,314      234,303,479          488,815,970         131,174,135

        TOTAL                            2,344,540,917     3,880,530,390    1,535,989,473        3,204,460,248         859,919,331
  9     DEDUCT 7.5% DISCOUNT                175,840,569

  10    GRAND TOTAL                      2,168,700,348     3,880,530,390    1,535,989,473        3,204,460,248         859,919,331
  11    PERCENTAGE (%)                                                               71%                                      40%




                                                                                                                                                8
                                                          Year 4 of the Project
                                                                                    East Africa Public Health Laboratories Networking Project
                                                                                      Financial Statements for the Year ended 30 June 2020


2.2.5 Mbale Regional Referral Hospital

Table 6: Contract Variations for Mbale RRH

                                                    CONTRACTOR'S APPRAISAL                  NEGOTIATED POSITION
                                      (1)              (2)              (3)                  (4)                (5)
 Bill
                DESCRIPTION                                                                                                         REMARKS
 No.
                                   ORIGINAL                                                                DEVIATION
                                  CONTRACT         APPRAISED         DEVIATION           NEGOTIATED          (UGX)
                                 AMOUNT (UGX)     AMOUNT (UGX)     (UGX)    (2-1)       AMOUNT (UGX)          (4-1)

  1     PRELIMINARIES               72,600,000       72,600,000                     -       72,600,000                  -


                                                                                                                            Introduction of basement
  2     BUILDING & CIVIL WORKS    1,017,991,850    1,359,300,559      341,308,709        1,049,618,830         31,626,980   and backfilling


                                                                                                                            Introduction of waiting
  3     EXTERNAL WORKS              19,483,500       29,483,500        10,000,000           29,483,500         10,000,000   benches


                                                                                                                            Change of specification and
  4     ELECTRICAL WORKS           206,588,500      215,818,000         9,229,500         224,517,145          17,928,645   additional lighting


  5     MECHANICAL WORKS           245,261,750      249,275,877         4,014,127         267,223,575          21,961,825   Extra Plumbing Items


  6     EXTRA ITEMS                                 589,913,338       589,913,338         623,362,718        623,362,718

        SUB-TOTAL -I             1,561,925,600    2,516,391,274      954,465,674        2,266,805,768        704,880,168

  7     ADD 5% CONTIGENCY           78,096,280       78,096,280                     -       78,096,280                  -

        SUB-TOTAL -II            1,640,021,880    2,594,487,554      954,465,674        2,344,902,048        704,880,168

  8     ADD 18% VAT                295,203,938      467,007,760       171,803,821         422,082,369        126,878,430

  9     GRAND TOTAL              1,935,225,818    3,061,495,314    1,126,269,495        2,766,984,417        831,758,598
  10    PERCENTAGE (%)                                                        58%                                     43%




                                                                                                                                            9
                                                    Year 4 of the Project
                                                                                East Africa Public Health Laboratories Networking Project
                                                                                  Financial Statements for the Year ended 30 June 2020


2.2.6 Mbarara Regional Referral Hospital

Table 7: Contract Variations for Mbarara RRH

                                                    CONTRACTOR'S APPRAISAL                  NEGOTIATED POSITION
                                      (1)              (2)              (3)                  (4)             (5)
 Bill
                DESCRIPTION                                                                                                        REMARKS
 No.
                                   ORIGINAL                                                              DEVIATION
                                  CONTRACT         APPRAISED         DEVIATION           NEGOTIATED        (UGX)
                                 AMOUNT (UGX)     AMOUNT (UGX)     (UGX)    (2-1)       AMOUNT (UGX)        (4-1)

  1     PRELIMINARIES              140,990,000      140,990,000                     -     140,990,000                 -

                                                                                                                     -
  2     BUILDING & CIVIL WORKS    1,194,757,000    1,446,242,094      251,485,094        1,112,423,450      82,333,550


                                                                                                                          Change in quantities and
  3     EXTERNAL WORKS              19,632,000       33,132,000        13,500,000          33,132,000       13,500,000    addition of waiting benches


  4     ELECTRICAL WORKS           152,608,000      168,760,000        16,152,000         153,791,000        1,183,000    Additional lighting fittings


  5     MECHANICAL WORKS           219,206,000      241,374,000        22,168,000         274,584,000       55,378,000    Extra Plumbing Items


  6     EXTRA ITEMS                                 966,492,564       966,492,564         683,473,836      683,473,836

        SUB-TOTAL -I             1,727,193,000    2,996,990,658    1,269,797,658        2,398,394,286     671,201,286

        Less: 10% Discount         172,719,300

        SUB-TOTAL -II            1,554,473,700    2,996,990,658    1,269,797,658        2,398,394,286     671,201,286

  7     ADD 5% CONTIGENCY           77,723,685       77,723,685                     -      77,723,685                 -

        SUB-TOTAL -III           1,632,197,385    3,074,714,343    1,269,797,658        2,476,117,971     671,201,286

  8     ADD 18% VAT                293,795,529      553,448,582       228,563,578         445,701,235      120,816,231

  9     GRAND TOTAL              1,925,992,914    3,628,162,925    1,498,361,236        2,921,819,206     792,017,517
  10    PERCENTAGE(%)                                                         78%                                  41%




                                                                                                                                        10
                                                   Year 4 of the Project
                                                    East Africa Public Health Laboratories Networking Project
                                                      Financial Statements for the Year ended 30 June 2020




3.0     Financial Statements
3.1 Statement of Income and Expenditure
 EAST AFRICAN PUBLIC HEALTH LABORATORIES NETWORKING PROJECT AF
 STATEMENT OF INCOME AND EXPENDITURE
 FOR THE PERIOD OF 12 MONTHS ENDED 30 JUNE 2020
                                   Project              Actual                        Cumulative             Available
                                  Budget        Income/Expenditure               Income/Expenditure         Balance in
                                  USD:(A)       for 12 Months ended                for period ended         USD (A-C)
                                                    30 June 2020                    30 June 2020
                                                      USD: (B)                          USD:(C)
 RECEIPTS                 Notes
 Balance B/F from prior year                                  5,491,038.64                          -
 Remittances from IDA           3(a)            -              3,150,000.00            14,695,930.07                   -
 Other Incomes                  3(b)            -                          -                        -
 Total Income for the Year                                    8,641,038.64            14,695,930.07

 Less: EXPENDITURES
 Regional Diagnostic and
                                  4     9,930,000              2,940,987.13             6,726,733.78
 Surveillance Capacity                                                                                      3,203,266.22
 Training and Capacity
                                  5     1,350,930                638,260.16             1,298,360.68             52,569.32
 Building
 Joint Operational research,
 Knowledge management,
                                  6     3,415,000                956,763.57             2,565,807.84
 Project Management & ECSA-                                                                                     849,192.16
 HC

                                       14,695,930             4,536,010.87            10,590,902.30         4,105,027.77

 Surplus/(Deficite) of Income
 over Expenditure for the                                     4,105,027.77             4,105,027.77
 period



The notes and Accounting policies set out on 14 to 18 forms an integral part of the Receipts and
Expenditure Statement above for the East African Public Health Networking Project for the period
of 12 months ended 30 June 2020. Ministry of Health approved the Statement on 31/07/2020
and signed on its behalf by:




                                                                                                          11
                                         Year 4 of the Project
                                              East Africa Public Health Laboratories Networking Project
                                                Financial Statements for the Year ended 30 June 2020


4.0 Notes to the Financial Statements
1.0 Accounting Entity

Basis of Preparation

1.1 The Fund Accountability Statement has been prepared in accordance with the Cash Basis
IPSAS Financial Reporting under Cash Basis of Accounting and presents the transactions for the
12 months period ended 30 June 2020.

1.2 Reporting Entity

The Fund Accountability Statement is for The East African Public Health Networking Project.

1.3 Payments to Third Parties and Direct Payments

1.4 The Government benefits from goods and services purchased on its behalf by third parties.
The mode of transaction is by Letters of Credit and Direct Transfers from the World Bank.


1.5 Reporting Currency
The Reporting currency is US Dollars and the functional currency is UG Shillings

1.6 Bank Details
Project funds are maintained on a Bank of Uganda EAPHLNP specific account with 2 signatories
that include Head Accounts Department and Permanent Secretary of Ministry of Health.

Bank       : Bank of Uganda

Account Title: East African Public Health Laboratory Networking Project

Account No: 000140088400022

Nature of Account: US Dollars

1.7 Original and Approved Budget/ Work Plan

The approved budget was developed on a cash basis of accounting and same classification as
the Fund Accountability Statement for a period of 4 years.

1.8 Cash and cash equivalents

Cash and cash equivalents comprise cash at call on account in BoU.




                                                                                                    14
                                     Year 4 of the Project
                                                    East Africa Public Health Laboratories Networking Project
                                                      Financial Statements for the Year ended 30 June 2020



       2     Cash at Hand & Bank
                                                    Amount in USD             Amount in USD
                                                             as at                     as at
                                                     30 June 2020              30 June 2019

              Reconciled Cash Book Balance as at
             30 June (Designated Account)              3,010,888.85              4,577,027.24


              Reconciled Cash Book Balance as at
             30 June ( Operations Account)             1,094,138.92                914,011.40


             Advance to Staff

                                                      4,105,027.77              5,491,038.64


             Note: See Annex 1-Bank Reconciliation Statement for the month of June 2020


3(a)       Remitances from IDA

                                                       Actual Income               Cumulative            Available
                                                      Received for  12          Income Received         Balance in
                                          Project       Months ended            for period ended       USD C=(A-B)
                                          Budget        30 June 2020              30 June 2020
                                          USD:(A)           USD:                     USD:(B)

           Approved Loan Amount        15,000,000                                                         15,000,000
           Disbursement on 28 Sept
           2016                                                                       1,767,000.00     13,233,000.00
           Disbursement on 05-April-
           2017                                                                         142,242.02     13,090,757.98
           Disbursement on 20-Oct-
           2017                                                                         613,921.77     12,476,836.21
           Disbursement on 24-Oct-
           2017                                                                         628,026.28     11,848,809.93
           Disbursement on 12-June-
           2018                                                                         554,740.00     11,294,069.93
           Disbursement on 27-Aug-
           2018                                                                       1,190,000.00     10,104,069.93
           Disbursement on 21-Feb-
           2019                                                                       1,430,000.00       8,674,069.93
           Disbursement on 04-April-
           2019                                                                       3,400,000.00       5,274,069.93
           Disbursement on 10-June-
           2019                                                                       1,820,000.00       3,454,069.93
           Disbursement on 14-Oct-
           2019                                             3,150,000.00              3,150,000.00         304,069.93

                                                           3,150,000.00             14,695,930.07




                                                                                                          15
                                            Year 4 of the Project
                                                                                                    East Africa Public Health Laboratories Networking Project
                                                                                                      Financial Statements for the Year ended 30 June 2020



 4.0    Regional Diagnostic and Surveillance Capacity


                                                                                                                                     Cumulative
                                                                                                            Current Year         Expenditure for           Available
                                                                                                       Expenditure ended        the Period ended       Balance as at
                                                                                   Project Budget          30 June 2020            30 June 2020        30 June 2020
                                                                                         USD: (A)                USD: (B)                USD: (C)         USD: (A-C)
4.1     Civil Works                                                                     5,750,000               1,865,172              2,764,602
                                                                                                                                                           2,985,398
4.2     Surveillance & Case Management                                                  2,330,000                 657,965              2,288,621              41,379
        Procument of Medical Equipment, Consumebles and Other
4.3                                                                                     1,850,000                 417,851              1,673,511                176,489
        Medical Supplies


                                                                                        9,930,000               2,940,987              6,726,734           3,203,266

  4.1   Civil Works
                                                                                                                                     Cumulative
                                                                                                            Current Year         Expenditure for           Available
                                                                                                       Expenditure ended        the Period ended       Balance as at
                                                                                   Project Budget          30 June 2020            30 June 2020        30 June 2020
                                                                                         USD: (A)                USD: (B)                USD: (C)         USD: (A-C)
        Construction of a VHF Islotaion Unit at Mulago National
4.1.1                                                                                   2,100,000                 594,383                594,383           1,505,617
        Referral Hospital & Staff Houses
        Remodelling & Equiping MDR TB treatment center at Moroto
4.1.2                                                                                     200,000                 160,855                160,855                 39,145
        RRH

4.1.3   Making the Entebbe VHF Isolation Unit functional                                  420,000                 284,717                284,717                135,283

        Refurbish laboratories 4 SAttellite sites (Arua, Mbale, Lacor
4.1.4                                                                                   2,000,000                 410,196              1,007,364                992,636
        and Mbarara)
        Works related to the operationalisation of the National TB
4.1.5                                                                                     200,000                  86,672                132,424                 67,576
        Reference Lab

4.1.6   Procurement of Medical Equipment and Supplies for NTRL                            300,000                  86,698                122,215                177,785

        Civil Works Supervising Consultant & Defect Liability Period for
4.1.7                                                                                     500,000                 241,651                441,474                 58,526
        NTRL

4.1.8   Environmental and Social Impact Assessment (ESIA)                                  30,000                        -                21,170                  8,830

                                                                                       5,750,000                1,865,172             2,764,602            2,985,398




                                                                                                                                                          16
                                                                        Year 4 of the Project
                                                                                                     East Africa Public Health Laboratories Networking Project
                                                                                                       Financial Statements for the Year ended 30 June 2020


4.2     Surveillance & Case Management
                                                                                                                                      Cumulative
                                                                                                             Current Year         Expenditure for           Available
                                                                                                        Expenditure ended        the Period ended       Balance as at
                                                                                    Project Budget          30 June 2020            30 June 2020        30 June 2020
                                                                                          USD: (A)                USD: (B)                USD: (C)         USD: (A-C)
        Annual rolling funds to support rapid response to VHF
4.2.1                                                                                      900,000                 193,641                899,821                   179
        outbreak
        Provide support to Mentors to carry out mentorship of
4.2.2                                                                                      400,000                 170,168                399,446                   554
        laboratory personnel
4.2.3   Provide support for the regional level surveillance activities                     250,000                 115,374                248,098                  1,902

        Support the Coordination and planning functions of the
4.2.4                                                                                      150,000                  65,487                111,317                 38,683
        National Task Force for Epiemic Preparedness and Response
        Provide technical and logistical support for surveillance and
4.2.5                                                                                      630,000                 113,295                629,939                    61
        epidemic response to 112 disrticts
                                                                                        2,330,000                 657,965              2,288,621                 41,379


4.3     Procument of Medical Equipment, Consumebles and Other Medical Supplies
                                                                                                                                      Cumulative
                                                                                                             Current Year         Expenditure for           Available
                                                                                                        Expenditure ended        the Period ended       Balance as at
                                                                                    Project Budget          30 June 2020            30 June 2020        30 June 2020
                                                                                          USD: (A)                USD: (B)                USD: (C)         USD: (A-C)
        Procurement of Equipmemts & Supplies for setting up 5
4.3.1                                                                                      290,000                  43,222                281,978                  8,022
        regional level temporary isolation units for VHF cases
        Procurement of 4 Double Cabin pick up Motor Vehicles to
4.3.2                                                                                      370,000                 206,261                368,426                  1,574
        support project Coordination
        Procurement of laboratory equipments for Moroto and Fort
4.3.3                                                                                      410,000                        -               281,636                128,364
        Portal RRH
4.3.4   Procurement of Medical Equipments for VHF Isolation Unit                           260,000                        -               255,653                  4,347
        Procurement of VHF case management and infection prevention
4.3.5                                                                                      100,000                  91,097                 91,097                  8,903
        & control supplies
        Procurement of IT equipments for the newly refurbished
4.3.6                                                                                       90,000                        -                74,821                 15,179
        laboratories at Moroto and Fort Portal RRH
        Procurement of 3 Temperature Scanners for Entebbe
4.3.7                                                                                      210,000                  77,271                204,619                  5,381
        International Airport
        Procurement of 2 Ambulance for Entebbe VHF Isolation Unit &
4.3.8                                                                                      120,000                        -               115,282                  4,718
        Mulago VHF Isolation Unit
                                                                                        1,850,000                 417,851              1,673,511             176,489




                                                                                                                                                           17
                                                                         Year 4 of the Project
                                                                                      East Africa Public Health Laboratories Networking Project
                                                                                        Financial Statements for the Year ended 30 June 2020


5.0   Training and Capacity Building


                                                                                                                       Cumulative
                                                                                              Current Year         Expenditure for           Available
                                                                                         Expenditure ended        the Period ended       Balance as at
                                                                     Project Budget          30 June 2020            30 June 2020        30 June 2020
                                                                           USD: (A)                USD: (B)                USD: (C)         USD: (A-C)
5.1   Training on health workers on different aspects                       430,930                 273,923                425,175                  5,755

5.2   Training of Trainers                                                  200,000                  85,570                181,087                 18,913

5.3   Satellite Laboratory Mentorship                                       720,000                 278,767                692,099                 27,901

                                                                         1,350,930                 638,260              1,298,361                 52,569




6.0   Joint Operational research, Knowledge management, Project Management and ECSA-HC


                                                                                                                       Cumulative
                                                                                              Current Year         Expenditure for           Available
                                                                                         Expenditure ended        the Period ended       Balance as at
                                                                     Project Budget          30 June 2020            30 June 2020        30 June 2020
                                                                           USD: (A)                USD: (B)                USD: (C)         USD: (A-C)
6.1   Operational research on VHF                                         1,000,000                 394,816                394,816                605,184
6.2   Knowledge sharing at scientific conferences                           200,000                  84,861                159,287                 40,713

6.3   ECSA Contribution (Annal contribution to ECSA-HC)                     375,000                 102,535                352,535                 22,465

6.4   Project office operational costs                                      150,000                  22,308                 97,247                 52,753
6.5   Programme coordination                                                200,000                  64,781                109,208                 90,792

6.6   Programme management and personnel                                  1,490,000                 287,463              1,452,715                 37,285

                                                                         3,415,000                 956,764              2,565,808             849,192




                                                                                                                                            18
                                                          Year 4 of the Project
        East Africa Public Health Laboratories Networking Project
          Financial Statements for the Year ended 30 June 2020




                                                              20
Year 4 of the Project
        East Africa Public Health Laboratories Networking Project
          Financial Statements for the Year ended 30 June 2020




                                                              22
Year 4 of the Project
                                                        East Africa Public Health Laboratories Networking Project
                                                          Financial Statements for the Year ended 30 June 2020


5.3 Civil Work Financial Performance

EAST AFRICAN PUBLIC HEALTH LABORATORIES NETWORKING PROJECT (EAPHLNP)

CONTRACTOR: MUGA SERVICES LTD

CONTRACT NUMBER: MoH-EAPHLNP/Wrks/2017-18/00008/1

CONSTRUCTION OF SATELLITE LABORATORIES AT MBARARA REGIONAL REFERRAL HOSPITAL

CONTRACT DURATION: 18 CALENDAR MONTHS

CONTRACT SUM: UGX 1,925,992,914

Date            Details                          Amount UGX            Amount USD             Balance UGX

                Contract Amount                                                                   1,925,992,914

   11-Sep-18    20% Advance Payment                   385,198,583              106,152            1,540,794,331

  14-Mar-19     Interim Certificate No.1              232,544,450               63,706            1,308,249,881

  19-Jun-19     Interim Certificate No.2              307,811,259               81,751            1,000,438,622

   13-Nov-19    Interim Certificate No.3              127,611,289               34,711             872,827,333

   13-Feb-20    Interim Certificate No.4              116,179,368               31,602             756,647,965

  22-Jun-20     Interim Certificate No.5              111,551,379               30,343             645,096,586



                Total                              1,280,896,328               348,265                 172,273




EAST AFRICAN PUBLIC HEALTH LABORATORIES NETWORKING PROJECT (EAPHLNP)

CONTRACTOR: EGISS ENGINEERING CONTRACTORS LTD

CONTRACT NUMBER: MoH-EAPHLNP/Wrks/2017-18/00008/2

Construction of Satellite Laboratories at Mbale Regional Referral Hospital

CONTRACT DURATION: 18 CALENDAR MONTHS

CONTRACT SUM: UGX 1,935,225,818
Date             Details                      Amount UGX                Amount USD             Balance UGX
                 Contract Amount                                                                  1,935,225,818
   11-Sep-18     20% Advance Payment                     387,045,164                106,661       1,548,180,654
   27-Jun-19     Interim Certificate No.1                331,503,210                 88,043       1,216,677,444
   13-Nov-19     Interim Certificate No.2                302,250,365                 80,274        914,427,079
   18-Feb-20     Interim Certificate No.3                398,968,985                108,522        515,458,094
    4-Jun-20     Interim Certificate No.4                326,440,645                 88,794        189,017,449



                                                      1,746,208,369                 472,294             50,741




                                                                                                                  23
                                              Year 4 of the Project
                                                         East Africa Public Health Laboratories Networking Project
                                                           Financial Statements for the Year ended 30 June 2020



EAST AFRICAN PUBLIC HEALTH LABORATORIES NETWORKING PROJECT (EAPHLNP)

CONTRACTOR: ST MARY'S HOSPITAL LACOR

CONTRACT NUMBER: MoH-EAPHLNP/Wrks/2017-18/000046

Remodelling of Satellite Laboratories at St Mary's Hospital Lacor

CONTRACT DURATION: 12 CALENDAR MONTHS

CONTRACT SUM: UGX 369,027,298

Date            Details                           Amount UGX        Amount USD             Balance UGX

                Contract Amount                                                                   369,027,298

  27-May-19     20% Advance Payment                  190,861,246                 51,422           178,166,052



                Total                               190,861,246                 51,422                   48,315




EAST AFRICAN PUBLIC HEALTH LABORATORIES NETWORKING PROJECT (EAPHLNP)
CONTRACTOR: ALLIANCE TECHNICAL SERVICES LIMITED
CONTRACT NUMBER: MoH-EAPHLNP/Wrks/2017-18/000039
Construction of Satellite Laboratories at Arua Regional Referral Hospital
CONTRACT DURATION: 18 CALENDAR MONTHS
CONTRACT SUM: UGX 2,168,700,348
Date       Details                              Amount UGX                   Amount USD       Balance UGX
              Contract Amount                                                                   2,168,700,348
 13-Jun-19    20% Advance Payment                           433,740,069            115,196      1,734,960,279
 18-Feb-20    Interim Certificate No.1                      488,354,571            132,836      1,246,605,708


              Total                                        922,094,640            248,032            338,103




EAST AFRICAN PUBLIC HEALTH LABORATORIES NETWORKING PROJECT (EAPHLNP)

CONTRACTOR: BMK

CONTRACT NUMBER: MOH/EAPHLNP/Wrks/2018-19/00118 Lot 1

Remodelling of MDR TB Ward at Moroto Regional Referral Hospital

CONTRACT DURATION: 18 CALENDAR MONTHS

CONTRACT SUM: UGX 942,627,840
Date                Details                         Amount UGX              Amount USD       Balance UGX
                    Contract Amount                                                              942,627,840
       25-Oct-19    20% Advance Payment                  188,525,568              50,070         754,102,272
       18-Feb-20    Interim Certificate No.1             248,866,956              67,693         505,235,316
       25-Jun-20    Interim Certificate No.2             233,892,896              63,033         271,342,420


                    Total                                671,285,420             180,796              73,204




                                                                                                                  24
                                               Year 4 of the Project
                                                        East Africa Public Health Laboratories Networking Project
                                                          Financial Statements for the Year ended 30 June 2020


EAST AFRICAN PUBLIC HEALTH LABORATORIES NETWORKING PROJECT (EAPHLNP)
CONTRACTOR: SYNERGY ENTERPRISES LIMITED
CONTRACT NUMBER: MOH/EAPHLNP/Wrks/2018-19/00118 lot 2
Remodelling of MDR TB Ward at Entebbe
CONTRACT DURATION: 18 CALENDAR MONTHS
CONTRACT SUM: UGX 2,071,737,783
Date       Details                                 Amount UGX         Amount USD       Balance UGX
               Contract Amount                                                              2,071,737,783
 12-Sep-19     20% Advance Payment                    351,141,997            93,259         1,720,595,786

  18-Feb-20    Interim Certificate No.1               383,545,867           104,327         1,337,049,919

 11-Jun-20     Interim Certificate No.2               399,455,288           108,655           937,594,631
 21-Jun-20     Interim Certificate No.2 topup          90,226,637            24,542           847,367,994



               Total                                1,224,369,789          330,783               228,217



EAST AFRICAN PUBLIC HEALTH LABORATORIES NETWORKING PROJECT (EAPHLNP)
CONTRACTOR: ZHONGMEI ENGINEERING GROUP LTD
CONTRACT NUMBER: MOH/EAPHLNP/WORKS/2018-19/00118(a)
CONSTRUCTION OF ISOLATION CENTRE AT MULAGO NRH LOT 3
CONTRACT DURATION: 12 CALENDAR MONTHS
CONTRACT SUM: UGX 8,913,336,496
Date       Details                          Amount UGX                Amount USD        Balance UGX
              Contract Amount                                                               8,913,336,496
 20-Dec-19    20% Advance Payment                   1,782,667,299            484,897        7,130,669,197
 24-Jun-20    Interim Certificate No.1                802,230,915            216,474        6,328,438,282



              Total                                 2,584,898,214            701,371           1,698,629



EAST AFRICAN PUBLIC HEALTH LABORATORIES NETWORKING PROJECT (EAPHLNP)
CONTRACTOR: PAN MODERN CONSULT
CONTRACT NUMBER: MOH/EAPHLNP/SVCS/2017-18/00241
CONSTRUCTION SUPERVISION
CONTRACT DURATION: 18 CALENDAR MONTHS
CONTRACT SUM: UGX 1,207,830,300

Date          Details                       Amount UGX                  Amount USD       Balance UGX
              Contract Amount                                                               1,207,830,000
  9-Nov-19    Interim Certificate No.1                  303,767,400            80,677         904,062,600
  3-Dec-19    Interim Certificate No.2                  326,980,360            88,941         577,082,240
24-Jun-20     Interim Certificate No.3                  428,694,000           115,531         148,388,240

              Total                                  1,059,441,760            285,149                41,291




                                                                                                              25
                                                Year 4 of the Project