The World Bank Implementation Status & Results Report China: Jiangxi Eco-industrial Parks Project (P158079) China: Jiangxi Eco-industrial Parks Project (P158079) EAST ASIA AND PACIFIC | China | Urban, Resilience and Land Global Practice | IBRD/IDA | Investment Project Financing | FY 2020 | Seq No: 1 | ARCHIVED on 24-Sep-2020 | ISR43531 | Implementing Agencies: People's Republic of China, Fuzhou New Industries Zone, Jiangxi Development and Reform Commission Key Dates Key Project Dates Bank Approval Date: 18-Jun-2020 Effectiveness Date: -- Planned Mid Term Review Date: 01-Jul-2024 Actual Mid-Term Review Date: Original Closing Date: 31-Dec-2026 Revised Closing Date: 31-Dec-2026 pdoTable Project Development Objectives Project Development Objective (from Project Appraisal Document) To strengthen Jiangxi’s institutional and regulatory framework for eco-industrial parks (EIP) to be consistent with the International EIP Framework and demonstrate its implementation in the Fuzhou New Industries Zone. Has the Project Development Objective been changed since Board Approval of the Project Objective? No Components Table Name Provincial-level EIP Standard, Monitoring Platform and Regulatory Framework:(Cost $2.00 M) EIP Demonstration and Zero-waste Initiatives:(Cost $184.88 M) Nature Based Solutions and Eco-system Services Restoration:(Cost $9.00 M) Technical Assistance, Capacity Building and Project Management:(Cost $4.12 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO -- Satisfactory Overall Implementation Progress (IP) -- Satisfactory Overall Risk Rating -- Substantial Implementation Status and Key Decisions The legal documents of this project have been signed on July 23, 2020. The loan is not yet effective. 9/24/2020 Page 1 of 7 The World Bank Implementation Status & Results Report China: Jiangxi Eco-industrial Parks Project (P158079) Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance Moderate -- Moderate Macroeconomic Substantial -- Substantial Sector Strategies and Policies Moderate -- Moderate Technical Design of Project or Program Substantial -- Substantial Institutional Capacity for Implementation and Substantial -- Substantial Sustainability Fiduciary Moderate -- Moderate Environment and Social Moderate -- Moderate Stakeholders Moderate -- Moderate Other -- -- -- Overall Substantial -- Substantial Results PDO Indicators by Objectives / Outcomes Jiangxi Province strengthens its institutional and regulatory framework for EIPs IN00894658 ►Share of industrial parks in Jiangxi regularly reporting data under the new provincial EIP performance monitoring system (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 75.00 Date 30-Jun-2020 -- 17-Sep-2020 31-Dec-2026 This applies to 107 existing IPs in Jiangxi as well as the new IPs to be established during the project Comments: implementation period. Fuzhou NIZ demonstrates implementation of the new provincial EIP standard IN00894659 ►Beneficiaries' aggregated satisfaction rate of the FNIZ (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 70.00 Date 30-Jun-2020 -- 17-Sep-2020 31-Dec-2026 The weighed average satisfaction rate among different aspects of the survey. The beneficiary rate is Comments: independently determined by the results of the surveys conducted for that particular year/period. 9/24/2020 Page 2 of 7 The World Bank Implementation Status & Results Report China: Jiangxi Eco-industrial Parks Project (P158079) IN00894660 Satisfaction rate of environmental quality (Percentage, Custom Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 70.00 IN00894666 Satisfaction rate of social inclusiveness (Percentage, Custom Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 70.00 IN00894667 Satisfaction rate of doing business environment (Percentage, Custom Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 70.00 IN00894668 ►Amount of attracted investment meeting the green industries screening criteria developed under this project (Amount(USD), Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 100,000,000.00 Date 30-Jun-2020 -- 17-Sep-2020 31-Dec-2026 This number refers to the yearly aggregated amount as indicated by the investment agreements signed Comments: between the tenant companies and the Fuzhou NIZ. The green industries criteria is to be developed under the TA of the project. IN00894669 ►Companies in the FNIZ become eligible for greening financing (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No -- No Yes Date 30-Jun-2020 -- 17-Sep-2020 31-Dec-2026 To measure if companies in the FNIZ is qualified for access to green financing (i.e., obtaining green Comments: credits or issuing green bonds, etc.) Intermediate Results Indicators by Components Provincial-level EIP Standard, Monitoring Platform and Regulatory Framework IN00894670 ►Number of capacity building events for the industrial parks to contribute to and deploy the new provincial EIP framework (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 10.00 Date 30-Jun-2020 -- 17-Sep-2020 31-Dec-2026 9/24/2020 Page 3 of 7 The World Bank Implementation Status & Results Report China: Jiangxi Eco-industrial Parks Project (P158079) Comments: Capacity building events refer to workshops, training modules and study tours funded by this project. IN00894674 ►Number of industrial parks that develop comprehensive action plans to adopt the new EIP framework (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 4.00 Date 30-Jun-2020 -- 17-Sep-2020 31-Dec-2026 Detailed assessment for the FNIZ and at least 3 other IPs in Jiangxi to identify the investments and Comments: reforms needed to improve resource efficiency, reduce pollution and meet the new provincial EIP standard to be developed under the project. EIP Demonstration and Zero-waste Initiatives IN00894671 ►Floor area of buildings receiving EDGE certificate (Square Meter(m2), Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 362,000.00 Date 30-Jun-2020 -- 17-Sep-2020 31-Dec-2026 EDGE refers to Excellence in Design for Greater Efficiencies. EDGE is an online platform, a green Comments: building standard and a certification system developed by the IFC. https://www.edgebuildings.com/marketing/edge/ IN00894675 ►Percentage of project-financed public buildings with dedicated nursing rooms meeting national standard (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 80.00 Date 30-Jun-2020 -- 17-Sep-2020 31-Dec-2026 This indicator will monitor the progress of closing the gender-gap in provision of public facilities. The Comments: scope of measurement is all new public buildings funded under this project. IN00894678 ►Number of firms receiving clean production certificate (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 40.00 -- 0.00 60.00 Date 30-Jun-2020 -- 17-Sep-2020 31-Dec-2026 Clean production standard refers to the Guideline of Evaluation and Acceptance of Clean Production Comments: issued by Ministry of Ecology and Environment in 2018. http://www.mee.gov.cn/gkml/hbb/bgth/201706/W020170609360267704583.pdf Nature Based Solutions and Eco-system Services Restoration IN00894672 ►Increase in area of green open space (Square Meter(m2), Custom) 9/24/2020 Page 4 of 7 The World Bank Implementation Status & Results Report China: Jiangxi Eco-industrial Parks Project (P158079) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 281,000.00 Date 30-Jun-2020 -- 17-Sep-2020 31-Dec-2026 Comments: Total area of open space covered by greenery for recreational or landscape purposes. IN00894676 ►Water quality of the two lakes (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Value Class IV -- Class IV Class III Date 30-Jun-2020 -- 17-Sep-2020 31-Dec-2026 Use water quality standard as described in China's Environmental Quality Standards for Surface Water Comments: (GB 3838-2002) issued by Ministry of Ecology and Environment. http://kjs.mee.gov.cn/hjbhbz/bzwb/shjbh/shjzlbz/200206/t20020601_66497.htm IN00894679 ►Increase in area of storm-water management facilities (i.e., green rooftop, permeable pavement and retention pond) (Square Meter(m2), Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 70,000.00 Date 30-Jun-2020 -- 17-Sep-2020 31-Dec-2026 Storm-water management facilities refers to green rooftop, permeable pavement and retention pond that Comments: are technical options for low impact development. The scope of measurement covers all civil works components under this project. Technical Assistance, Capacity Building and Project Management IN00894673 ►Number of citizen engagement events organized (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 10.00 Date 30-Jun-2020 -- 17-Sep-2020 31-Dec-2026 The purpose of citizen engagement events is to seek inputs to improve park management, quality of planning and design or overall satisfaction of public services, etc. Format of citizen engagement can Comments: include the following: interviews, focused group discussions, online survey, onsite exhibition for public disclosure, etc. IN00894677 ►Number of people trained to help the zone narrow its gaps against the international EIP framework (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 500.00 Date 30-Jun-2020 -- 17-Sep-2020 31-Dec-2026 9/24/2020 Page 5 of 7 The World Bank Implementation Status & Results Report China: Jiangxi Eco-industrial Parks Project (P158079) The same person can be trained for multiple times and will be counted separately. Topics of training could Comments: be on EIP standards, green buildings, solid waste management, occupational health, industrial competitiveness and so on. IN00894680 Percentage of female participants (Percentage, Custom Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 55.00 IN00894681 ►Number of technical assistance (TA) activities completed (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- 0.00 4.00 Date 30-Jun-2020 -- 17-Sep-2020 31-Dec-2026 This indicators monitors the progress of the four TA activities to be conducted at the zone level in the following order: screening criteria for green industries; zero-waste initiative study and the action plan; Comments: survey on public buildings and identify potential for retrofitting to meet EDGE standard and Establish zone-level energy consumption and GHG emissions accounting system Performance-Based Conditions Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed Not P158079 IBRD-91190 USD 200.00 200.00 0.00 0.00 200.00 0% Effective Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date Not P158079 IBRD-91190 18-Jun-2020 -- -- 31-Dec-2026 31-Dec-2026 Effective Cumulative Disbursements 9/24/2020 Page 6 of 7 The World Bank Implementation Status & Results Report China: Jiangxi Eco-industrial Parks Project (P158079) PBC Disbursement Achievement Disbursed amount in Disbursement % PBC ID PBC Type Description Coc PBC Amount Status Coc for PBC Restructuring History There has been no restructuring to date. Related Project(s) There are no related projects. 9/24/2020 Page 7 of 7