Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Agricultural Productivity Program 2A (P129565) West Africa Agricultural Productivity Program 2A (P129565) AFRICA | Western Africa | Agriculture Global Practice | IBRD/IDA | Adaptable Program Loan | FY 2012 | Seq No: 6 | ARCHIVED on 11-Jan-2016 | ISR21796 | Implementing Agencies: Technical and Fiduciary Coordination Unit (TFCU) Key Dates Key Project Dates Bank Approval Date:22-May-2012 Effectiveness Date:12-Dec-2012 Planned Mid Term Review Date:22-Jun-2015 Actual Mid-Term Review Date:26-Oct-2015 Original Closing Date:31-Dec-2017 Revised Closing Date:31-Dec-2018 Project Development Objectives Project Development Objective (from Project Appraisal Document) The development objective of WAAPP-2A is to scale-up the generation, dissemination and adoption of improved technologies in the participating countries’ priority agricultural commodity areas. Has the Project Development Objective been changed since Board Approval of the Project Objective? No PHRPDODEL Components Name Component 1: Enabling conditions for Sub-Regional Cooperation in the Generation, Dissemination and Adoption of Agricultural Technolo gies:(Cost $7.20 M) Component 2: National Centers of Specialisation (NCOS):(Cost $27.40 M) Component 3: Support to Demand-driven Technology Generation, Dissemination and Adoption:(Cost $75.10 M) Component 4: Project Coordination, Management and Monitoring and Evaluation:(Cost $10.30 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO  Satisfactory  Satisfactory Overall Implementation Progress (IP)  Moderately Satisfactory  Moderately Satisfactory Overall Risk Rating  Moderate  Moderate 1/11/2016 Page 1 of 31 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Agricultural Productivity Program 2A (P129565) Implementation Status and Key Decisions Overall the MTR concluded that the PDO, components and result framework are still relevant and should be maintained. Evaluation of the results also showed that WAAPP-2A is making good progress towards achieving the project’s targets and hence meet the PDO. As of November 2015, the Project has reached 1.35 million direct beneficiaries (against a target of 1.05 million for 2015). A total of 79 technologies have been generated by the NCOs in the three countries (against a target of 51 for the period). More than 700,000 ha are now covered by the new technologies (which represents 88% of the set target for 2015) and more than 700,000 producers (117% of the target) have adopted the new technologies. The areas where the project’s needs to focus on include: increased adoption of technologies generated by the other WAAPP participating countries (right now only 55% of the beneficiaries out of the out of the 210,000 set target for 2015, are using such technologies); improved targeting of women beneficiaries for WAAPP Mali (currently women beneficiaries for Mali account for 28%, whereas it is at 39% each for both Ghana and Senegal. The set target is of 40% for each country); and accelerating the procurements of civil works. Evaluation of implementation at country level showed that while in Senegal and Ghana project implementation is progressing well, Mali has to continue to make effort to catch up with the other two countries. Going forward the MTR proposed in all the three countries that a focus should be made: i) to better target women beneficiaries, especially in Mali (through close follow up of the implementation of their respective gender action plan); ii) to improve the procurement of civil works, iii) to address in a more comprehensive way the issue of mechanization and post-harvest technologies, iv) to develop an action plan to scale up dissemination of technologies generated by the other countries, and v) to speed up the process of the transformation from center of specialization (NCoS) to regional center of excellence (RCoE). 1/11/2016 Page 2 of 31 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Agricultural Productivity Program 2A (P129565) 1/11/2016 Page 3 of 31 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Agricultural Productivity Program 2A (P129565) Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance  --  Moderate  Moderate Macroeconomic  --  Moderate  Moderate Sector Strategies and Policies  --  Moderate  Moderate Technical Design of Project or Program  --  Low  Low 1/11/2016 Page 4 of 31 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Agricultural Productivity Program 2A (P129565) Institutional Capacity for Implementation and Sustainability  --  Moderate  Moderate Fiduciary  --  Low  Low Environment and Social  --  Low  Low Stakeholders  --  Low  Low Other  --  --  -- Overall  --  Moderate  Moderate Results Project Development Objective Indicators PHINDPDOTBL  Direct project beneficiaries (Number, Core) Baseline Actual (Previous) Actual (Current) End Target Value 236000.00 928937.00 1349838.00 2100000.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDPDOTBL  Direct project beneficiaries - Senegal (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 80000.00 320199.00 432752.00 700000.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDPDOTBL  Female beneficiaries (Percentage, Custom Supplement) Baseline Actual (Previous) Actual (Current) End Target Value -- -- 38.00 40.00 PHINDPDOTBL  Direct project beneficiaries - Ghana (Number, Custom Breakdown) 1/11/2016 Baseline Actual (Previous) Actual (Current) End Target Page 5 of 31 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Agricultural Productivity Program 2A (P129565) Value 100000.00 402897.00 508511.00 700000.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDPDOTBL  Female beneficiaries (Percentage, Core Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 40.00 31.90 39.00 40.00 PHINDPDOTBL  Direct Project Beneficiaries - Mali (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 56000.00 205841.00 408575.00 70000.00 Date 19-Mar-2014 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDPDOTBL  Female beneficiaries (Percentage, Custom Supplement) Baseline Actual (Previous) Actual (Current) End Target Value -- -- 25.00 40.00 PHINDPDOTBL  Beneficiairies who are using technologies generated by other countries - disaggregated by country (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 92211.00 115282.00 420000.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 1/11/2016 Page 6 of 31 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Agricultural Productivity Program 2A (P129565) PHINDPDOTBL  Beneficiairies who are using technologies generated by other countries - Senegal (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 38000.00 38867.00 140000.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDPDOTBL  Beneficiairies who are using technologies generated by other countries - Ghana (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 53997.00 62198.00 140000.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDPDOTBL  Beneficiairies who are using technologies generated by other countries - Mali (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 214.00 14217.00 140000.00 Date 22-May-2012 21-Nov-2014 20-Nov-2015 31-Dec-2018 PHINDPDOTBL  Generated/released technologies by the Project with at least 15% productivity increase over the control – disaggregated by country (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 36.00 46.00 79.00 59.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDPDOTBL  Generated/released technologies by the Project with at least 15% productivity increase over the control for SENEGAL (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 18.00 17.00 38.00 26.00 1/11/2016 Page 7 of 31 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Agricultural Productivity Program 2A (P129565) Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDPDOTBL  Generated/released technologies by the Project with at least 15% productivity increase over the control for GHANA (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 10.00 21.00 30.00 17.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDPDOTBL  Generated/released technologies by the Project with at least 15% productivity increase over the control for MALI (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 8.00 8.00 11.00 16.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDPDOTBL  Producers with knowledge of generated/released technologies by the Project (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 13.00 44.00 55.00 80.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDPDOTBL  Producers with knowledge of generated/released technologies by the Project for SENEGAL (Percentage, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 10.00 71.00 71.00 80.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 1/11/2016 Page 8 of 31 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Agricultural Productivity Program 2A (P129565) PHINDPDOTBL  Producers with knowledge of generated/released technologies by the Project for Ghana (Percentage, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 20.00 50.00 60.00 80.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDPDOTBL  Producers with knowledge of generated/released technologies by the Project for MALI (Percentage, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 10.00 10.00 33.00 80.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDPDOTBL  Area under new technologies - Disaggregated by country (Hectare(Ha), Custom) Baseline Actual (Previous) Actual (Current) End Target Value 135000.00 446299.00 702079.00 1700000.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDPDOTBL  Area under new technologies for SENEGAL (Hectare(Ha), Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 40000.00 204494.00 319109.00 500000.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDPDOTBL  Area under new technologies for GHANA (Hectare(Ha), Custom Breakdown) 1/11/2016 Page 9 of 31 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Agricultural Productivity Program 2A (P129565) Baseline Actual (Previous) Actual (Current) End Target Value 50000.00 188555.00 257605.00 600000.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDPDOTBL  Area under new technologies for MALI (Hectare(Ha), Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 45000.00 53250.00 125365.00 600000.00 Date 18-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDPDOTBL  Processors/ producers who have adopted at least one new technology -disaggregated by country (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 105000.00 581908.00 747988.00 1240000.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDPDOTBL  Processors/ producers who have adopted at least one new technology - Senegal (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 30000.00 256859.00 343047.00 420000.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDPDOTBL  Processors/ producers who have adopted at least one new technology - Ghana (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 25000.00 181303.00 228206.00 400000.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 1/11/2016 Page 10 of 31 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Agricultural Productivity Program 2A (P129565) PHINDPDOTBL  Processors/ producers who have adopted at least one new technology - MALI (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 50000.00 143746.00 176735.00 360000.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 Overall Comments Intermediate Results Indicators PHINDIRITBL  Pesticide products/genetic materials registered by national committees (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 409.00 680.00 974.00 810.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  Pesticide products/genetic materials registered by national committees for SENEGAL (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 205.00 292.00 263.00 370.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  Pesticide products/genetic materials registered by national committees for GHANA (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 204.00 388.00 701.00 465.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 1/11/2016 Page 11 of 31 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Agricultural Productivity Program 2A (P129565) PHINDIRITBL  Pesticide products/genetic materials registered by national committees for MALI (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 75.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  Laboratories with ISTA/ISO certification (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 2.00 2.00 12.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  Laboratories with ISTA/ISO certification for SENEGAL (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 5.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2017 PHINDIRITBL  Laboratories with ISTA/ISO certification for GHANA (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 2.00 2.00 3.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2017 1/11/2016 Page 12 of 31 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Agricultural Productivity Program 2A (P129565) PHINDIRITBL  Laboratories with ISTA/ISO certification for MALI (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 4.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  Technologies with International Property Rights (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 53.00 67.00 115.00 78.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  Technologies with International Property Rights for SENEGAL (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 4.00 4.00 8.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  Technologies with International Property Rights for GHANA (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 48.00 5.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 1/11/2016 Page 13 of 31 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Agricultural Productivity Program 2A (P129565) PHINDIRITBL  Technologies with International Property Rights for MALI (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 63.00 63.00 65.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  Varieties generated by NCOS registered in the Regional Catalogue (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 25.00 47.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 Comments Intermediate Indicator "Varieties generated by NCOS/RCOE registered in Regional catalogue": The regional catalogue that is managed at CORAF/WECARD level has just been launched in September 2015. So far only the varieties from WAAPP Ghana have been uploaded; those for Mali and Senegal will also be uploaded soon. All WAAPP participating countries (including Ghana, Senegal and Mali) have established their national varieties catalogue and the latter are updated regularly. PHINDIRITBL  Varieties generated by NCOS registered in the Regional Catalogue for SENEGAL (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 12.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  Varieties generated by NCOS registered in the Regional Catalogue for GHANA (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 25.00 15.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 1/11/2016 Page 14 of 31 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Agricultural Productivity Program 2A (P129565) PHINDIRITBL  Varieties generated by NCOS registered in the Regional Catalogue for MALI (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 20.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  Hits for the regional/national Web-based information system on agricultural technologies and research skills (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 466817.00 305448.00 350000.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  Hits for the regional/national Web-based information system on agricultural technologies and research skills for CORAF (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 234500.00 234500.00 200000.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  Hits for the regional/national Web-based information system on agricultural technologies and research skills for SENEGAL (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 50000.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 1/11/2016 Page 15 of 31 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Agricultural Productivity Program 2A (P129565) PHINDIRITBL  Hits for the regional/national Web-based information system on agricultural technologies and research skills for GHANA (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 10000.00 228288.00 298288.00 50000.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL Hits for the regional/national Web-based information system on agricultural technologies and research skills for MALI (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 4029.00 7160.00 50000.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  National action plans developed on gender, communication and climate change-disaggregated by country (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 3.00 8.00 8.00 9.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  National action plans developed on gender, communication and climate change - Ghana (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 1.00 3.00 3.00 3.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 1/11/2016 Page 16 of 31 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Agricultural Productivity Program 2A (P129565) PHINDIRITBL  National action plans developed on gender, communication and climate change - Senegal (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 1.00 2.00 2.00 3.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  National action plans developed on gender, communication and climate change - MALI (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 1.00 3.00 3.00 3.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  Qualifying criteria met by the NCoS to become RCoE - disaggregated by country (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 17.00 27.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 Comments The evaluation of the nine (9) NCoS (covered by WAAPP) against the RCoEs criteria revealed that the NCoS in Mali, Senegal and Ghana are closer to satisfying these criteria. A road map has been developed in October 2015 to enable each NCoS to speed up the satisfaction of these criteria and thus be declared by ECOWAS as a Regional Center of Excellence for agriculture research. PHINDIRITBL  Qualifying criteria met by the NCoS to become RCoE - GHANA (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 5.00 9.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 1/11/2016 Page 17 of 31 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Agricultural Productivity Program 2A (P129565) PHINDIRITBL  Qualifying criteria met by the NCoS to become RCoE - MALI (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 6.00 9.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  Qualifying criteria met by the NCoS to become RCoE - SENEGAL (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 6.00 9.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  NCoS/RCoE with ISO certificate - disaggregated by country (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value N N N Y Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  NCoS/RCoE with ISO certificate - GHANA (Yes/No, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value N N N Y Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 1/11/2016 Page 18 of 31 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Agricultural Productivity Program 2A (P129565) PHINDIRITBL  NCoS/RCoE with ISO certificate - MALI (Yes/No, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value N N N Y Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  NCoS/RCoE with ISO certificate - SENEGAL (Yes/No, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value N N N Y Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  Technologies generated by NCoS and demonstrated in at least three ECOWAS countries outside the country of origin - disaggregated by country (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 2.00 11.00 20.00 17.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  Technologies generated by NCoS and demonstrated in at least three ECOWAS countries outside the country of origin - Ghana (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 4.00 6.00 6.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 1/11/2016 Page 19 of 31 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Agricultural Productivity Program 2A (P129565) PHINDIRITBL  Technologies generated by NCoS and demonstrated in at least three ECOWAS countries outside the country of origin - Senegal (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 4.00 4.00 6.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  Technologies generated by NCoS and demonstrated in at least three ECOWAS countries outside the country of origin - Mali (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 2.00 3.00 10.00 6.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  Study sponsorship- desegregated by country and MSc and PHD (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 31.00 332.00 380.00 213.00 Date 22-May-2012 21-Nov-2014 20-Nov-2015 31-Dec-2018 PHINDIRITBL  Study sponsorship - Ghana (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 16.00 100.00 107.00 73.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 1/11/2016 Page 20 of 31 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Agricultural Productivity Program 2A (P129565) PHINDIRITBL  Study sponsorship - Senegal (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 9.00 117.00 168.00 70.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  Study sponsorship - MALI (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 6.00 115.00 105.00 70.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  Scientific exchange visits - disaggregated by country (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 18.00 76.00 90.00 86.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  Scientific exchange visits - Ghana (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 12.00 48.00 56.00 32.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 1/11/2016 Page 21 of 31 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Agricultural Productivity Program 2A (P129565) PHINDIRITBL  Scientific exchange visits - Senegal (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 4.00 18.00 18.00 32.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  Scientific exchange visits - MALI (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 2.00 10.00 16.00 22.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  Multi-country research proposals financed by the regional CARGS - disaggregated by country - CORAF (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 4.00 2.00 7.00 5.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  National demand-driven research projects financed by the national CARGS - disaggregated by country (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 97.00 179.00 208.00 197.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 1/11/2016 Page 22 of 31 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Agricultural Productivity Program 2A (P129565) PHINDIRITBL  National demand-driven research projects financed by the national CARGS - Ghana (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 30.00 62.00 62.00 65.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  National demand-driven research projects financed by the national CARGS - Senegal (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 37.00 63.00 75.00 62.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  National demand-driven research projects financed by the national CARGS - Mali (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 30.00 52.00 75.00 70.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  Demonstration plots established – disaggregated by country (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 8100.00 32163.00 34350.00 80000.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 1/11/2016 Page 23 of 31 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Agricultural Productivity Program 2A (P129565) PHINDIRITBL  Demonstration plots established - Ghana (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 400.00 6509.00 7049.00 25000.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  Demonstration plots established - Senegal (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 700.00 1082.00 1629.00 20000.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  Demonstration plots established - Mali (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 7000.00 24572.00 25672.00 35000.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  Number of technologies demonstrated – disaggregated by country (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 23.00 79.00 93.00 55.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 1/11/2016 Page 24 of 31 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Agricultural Productivity Program 2A (P129565) PHINDIRITBL  Number of technologies demonstrated - Ghana (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 10.00 25.00 37.00 22.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  Number of technologies demonstrated - Senegal (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 5.00 31.00 31.00 15.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  Number of technologies demonstrated - Mali (Number, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 8.00 23.00 25.00 18.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  Targeted clients (male and female farmers or businesses) satisfied with extension services – disaggregated by country (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 13.00 60.00 70.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 1/11/2016 Page 25 of 31 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Agricultural Productivity Program 2A (P129565) PHINDIRITBL  Targeted clients (male and female farmers or businesses) satisfied with extension services – Ghana (Percentage, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 40.00 60.00 70.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  Targeted clients (male and female farmers or businesses) satisfied with extension services – Mali (Percentage, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 70.00 Date 22-May-2012 31-May-2015 31-May-2015 31-Dec-2018 PHINDIRITBL  Targeted clients (male and female farmers or businesses) satisfied with extension services – Senegal (Percentage, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 70.00 Date 22-May-2012 31-May-2015 31-May-2015 31-Dec-2018 PHINDIRITBL  Certified foundation seeds and improved breed stock produced - Rice (Metric ton, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 736.00 736.00 4600.00 3500.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 1/11/2016 Page 26 of 31 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Agricultural Productivity Program 2A (P129565) PHINDIRITBL  Certified foundation seeds and improved breed stock produced - Maize (Metric ton, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 385.00 2601.00 2601.00 5350.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  Certified foundation seeds and improved breed stock produced - Cassava (Hectare(Ha), Custom) Baseline Actual (Previous) Actual (Current) End Target Value 400.00 2976.80 2976.80 3000.00 Date 22-May-2012 31-May-2015 31-May-2015 31-Dec-2018 PHINDIRITBL  Certified foundation seeds and improved breed stock produced - Millet (Metric ton, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 170.00 602.00 822.00 2800.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  Certified foundation seeds and improved breed stock produced - Sorghum (Metric ton, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 165.00 257.00 497.00 2800.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 1/11/2016 Page 27 of 31 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Agricultural Productivity Program 2A (P129565) PHINDIRITBL  Procurement activities executed in conformity with the timing of the procurement plan - disaggregated by country (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 63.00 71.00 80.00 Date 22-May-2012 31-May-2015 20-Nov-2015 -- PHINDIRITBL  Procurement activities executed in conformity with the timing of procurement plan - Ghana (Percentage, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 90.00 90.00 80.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  Procurement activities executed in conformity with the timing of the procurement plan - Senegal (Percentage, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 21.00 45.00 80.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  Procurement activities executed in conformity with the timing of procurement plan - Mali (Percentage, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 79.00 79.00 80.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 1/11/2016 Page 28 of 31 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Agricultural Productivity Program 2A (P129565) PHINDIRITBL  Disbursement rate of IDA funds - disaggregated by country (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 29.00 50.00 100.00 Date 22-May-2012 21-Nov-2014 20-Nov-2015 31-Dec-2018 PHINDIRITBL  Disbursement rate of IDA funds -Ghana (Percentage, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 60.00 76.00 100.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  Disbursement rate of IDA funds - Senegal (Percentage, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 44.00 53.00 100.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 PHINDIRITBL  Disbursement rate of IDA funds - MALI (Percentage, Custom Breakdown) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 13.00 25.00 80.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 1/11/2016 Page 29 of 31 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Agricultural Productivity Program 2A (P129565) PHINDIRITBL  Subproject granted with environmental management plan that have been implemented effectively - disaggregated by country (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 100.00 100.00 Date 22-May-2012 31-May-2015 20-Nov-2015 31-Dec-2018 Overall Comments Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed Disbursed P129565 IDA-51350 Effective XDR 38.70 38.70 0.00 21.56 17.14 56% P129565 IDA-51360 Effective XDR 38.70 38.70 0.00 29.44 9.26 76% P129565 IDA-52860 Effective XDR 39.80 39.80 0.00 12.58 27.22 32% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P129565 IDA-51350 Effective 22-May-2012 24-Aug-2012 20-Dec-2012 31-Dec-2017 31-Dec-2017 P129565 IDA-51360 Effective 22-May-2012 25-Sep-2012 12-Dec-2012 31-Dec-2017 31-Dec-2017 P129565 IDA-52860 Effective 28-Jun-2013 08-Oct-2013 19-Mar-2014 31-Dec-2018 31-Dec-2018 Cumulative Disbursements 1/11/2016 Page 30 of 31 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report West Africa Agricultural Productivity Program 2A (P129565) Restructuring History There has been no restructuring to date. Related Project(s) P145160-Additional Financing-West Africa Agricultural Productivity Program 2A ,P158265-WAAPP -2A - Support to Groundnut Value Chain in Senegal 1/11/2016 Page 31 of 31 Public Disclosure Copy