* ENVIRONMENTAL ACTION PLAN (EAP) Of the - XIAOSHANGYUAN - LANTIAN CLASS 11 MOTOR VEHICLE HIGHWAY SHAANXI 1I HIGHWAY PROJECT SHAANXI PROVINCE, PEOPLE'S REPUBLIC OF CHINA Shaanxi Provincial Transportation Department May 1995 CONTENTS 1. INTRODUCTION I 1.1 General Description 1 1.2 Significant Environmental Inpacts 1 1.3 Consideration or Project Alternatives 1 2. ENVIRONMENTAL IMPACTS AND PROPOSED MITIGATION MEASURES 4 2.1 Signiricant Envirounmental Impacts 4 2.1.1 Location Issues 4 2.1.2 Construction Phase 4 2.1.3 Operation Phase 5 2.2 Proposed Mitigation Concepts and Measures 5 2.2.1 Design Phase 6 2.2.2 Construction Phase 9 2.2.3 Operation Phase 13 3. ENVIRONMENTAL MONITORING PLAN 14 3.1 Introduction 14 3.2 Monitoring Plan: Schedule, Parameters and Locations 14 3.3.1 Construction Phase 15 3.3.2 Operation Phase 16 3.3 Monitoring Organizations and Personnel 16 4. INSTITUTIONAL ARRANGEMENTS 18 4.1 Project Environmental Management and Supervision 18 4.2 Envirom-nental Training 19 4.3 Environmental Equipment 24 5. IMPLEMENTATION SCHEDULE AND COSTS 26 5.1 Inplementation Schedule 26 5.2 Summary or Costs 26 APPENDIX Key Elements or the EAP/EMP for the Proposed Xiaoshangyuan-Lantian Class II Auto-only Highway MAP I Locations or Sensitive Sites, Excavation Sites and Monitoring Sites This document was prepared in English by ERM-Environomics, Beijing, under supervision of the Shaanxi Provincial Highway Survey and Design Institute, Xi'an, Shaanxi Province. ENVIRONMENTAL ACTION PLAN (EAP) XIAOSHANGYUAN -LANTIAN CLASS II MOTOR VEHICLE HIGHWAY 1. INTRODUCTION 1.1 Geneml Description 1. The proposed Xiaoshangyuan - Lantian Highway project (XLH) is an integral component of National Highway No. 312 from Shanghai to Yining. It is also a key section of the Shaanxi province highway network. The highway links Shangzhou city in Shangluo district to Luolicun in Lantian county (see Fgure 1.la). 2. The objective of the proposed XLH project is to provide a connecting link between the existing Shangzhou-Xiaoshangyuan and Lantian-Xi'an Class II roads, increase transport capacity and promote the economic development of Shangluo district. It is anticipated that the project will strengthen economic ties in the region, by facilitating transport of commodities and the transfer of technology. 3. The physical components of the project include construction of a 48.28km long Class II motor vehicle highway, including: six tunnels with a total length of 2470m, the longest of which will be 1,670m; 7 large bridges, 22 medium bridges and 12 small bridges. The project will entail acquiring 1575 mu (105 ha) of land, 880.3 mu (58.7 ha) of which is agricultural, and demolishing 8923.3 me of building area. 1.2 Significant Envis onmental impacts 4. Significant environmental impacts during project construction include temporary agricultural land disruption, soil erosion, and impacts on water and air qua;kty. Major anticipated operational impacts includeairquality degradation, increase n background noise-levels and lead pollution to crops along the proposed alignment. 1.3 Consideration of Project Alternatives 5. The proposed alignment was selected from four alternatives (See Figure 1.3a) on the basis of minimizing both soejo-econoinic and environmental impacts. The proposed alignment minimizes land acquisition, population displacement and elogical disturbance through, where possible, avoiding large land cuts. 1 N X > 4 t ' :' 7 04' / 'nS, l~~~~~~~~~~~~~~~~~~ - Yongji ( *ii >iws a~. laan TWiWn - - X i .,-- Z i-rt Ato)zhshui ~~~~~~~~~~~~- Gild uah , l;\ ttA X of f; eS ytiaA- /o xigp~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~i J~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ . , _ .~~7- LEGEND 9t etg.,,.. .-;: d,- _ i t >$ ~ O Villa_eoTown f._ 0XIAOSILAMUIAN-LANIYTANISE3GHWiAY PROJECT ; l _ Proposed Expressxvay ............. _ ) _~_-> ............. _-i ENVIRONOM9fIlCS |Figure 1.1a L r $S>4 Railway ERMu li-4-mian Puhu/ 0 ~~~~~~~~sqia XiTngdianzi < ?;AL rt / 7E Wangchuan o X L D LTALrERATIVE IVe 11 uzi O V TownMtihuguan -PhuedRiapineuH A < ~~~~~~~~~~~~~~~~Xiaosha.gyun LEGEND ALTERNAJeVE IV O Villne or T... _Mcihe ~ = ~~~Pr~opsed Roeue _ ~~~~Alterrtattve Route --- Tunnel (L67 hin) XIAOSHFANGYIJAN-LANTIAN HIGHWAY PROJECT '