Public Disclosure Copy The World Bank Implementation Status & Results Report Bihar Rural Roads Project (P155522) Bihar Rural Roads Project (P155522) SOUTH ASIA | India | Transport & Digital Development Global Practice | IBRD/IDA | Investment Project Financing | FY 2017 | Seq No: 3 | ARCHIVED on 22-May-2018 | ISR32493 | Implementing Agencies: Rural Works Department, Bihar, Republic of India Key Dates Key Project Dates Bank Approval Date:21-Dec-2016 Effectiveness Date:31-Aug-2017 Planned Mid Term Review Date:30-Apr-2020 Actual Mid-Term Review Date:-- Original Closing Date:31-Dec-2022 Revised Closing Date:31-Dec-2022 Project Development Objectives Project Development Objective (from Project Appraisal Document) The PDO is to improve rural road connectivity in project districts, and enhance management of rural roads in Bihar. Has the Project Development Objective been changed since Board Approval of the Project Objective? No PHRPDODEL Components Name Rural Roads Improvement:(Cost $320.00 M) Asset Management and Institutional Effectiveness:(Cost $15.00 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO  Satisfactory  Satisfactory Overall Implementation Progress (IP)  Satisfactory  Satisfactory Overall Risk Rating  Substantial  Substantial Implementation Status and Key Decisions All the 1,000 km of rural roads under Phase I are under implementation. Engineering designs for 500 km of Phase II roads have already been prepared 5/22/2018 Page 1 of 8 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report Bihar Rural Roads Project (P155522) and these are being field verified. BRRDA is hiring consultants to prepare engineering designs for the 1,000 km environmentally optimized road designs, 20 innovative bridges, and 100 km of demonstration corridors to retrofit climate resilience, road safety, and innovative designs on high traffic corridors. As a major initiative, RWD has taken a policy decision to introduce road safety engineering measures in all the rural roads and undertake road safety audits of the existing roads. RWD has also revised its maintenance policy to ensure adequate maintenance of about 75,000 km existing rural road network constructed under different programs. Under the technical assistance component, the draft of the Rural Roads Safety Action Plan, Asset Management Plan and Human Resource Professional Development Strategy has been prepared and is under the consideration of the state government for approval and adoption. Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance  Moderate  Moderate  Moderate Macroeconomic  Moderate  Moderate  Moderate Sector Strategies and Policies  Moderate  Moderate  Moderate Technical Design of Project or Program  Substantial  Substantial  Substantial Institutional Capacity for Implementation and Sustainability  Substantial  Substantial  Substantial Fiduciary  Moderate  Moderate  Moderate Environment and Social  Moderate  Moderate  Moderate Stakeholders  Moderate  Moderate  Moderate Other  Low  Low  Low Overall  Substantial  Substantial  Substantial Results Project Development Objective Indicators PHINDPDOTBL  Increased road connectivity to habitations (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 60,280.00 -- -- 62,000.00 Date 30-Sep-2016 -- -- 30-Sep-2022 Comments To be updated after the implementation support mission. 5/22/2018 Page 2 of 8 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report Bihar Rural Roads Project (P155522) PHINDPDOTBL  Roads in good and fair condition as a share of total classified roads (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 40.00 -- -- 50.00 Date 30-Sep-2016 -- -- 30-Sep-2022 Comments To be updated after the implementation support mission. PHINDPDOTBL  Improved effectiveness of project expenditure - Project roads designed using cost-effective measures. (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- -- 50.00 Date 30-Sep-2016 -- -- 30-Sep-2022 PHINDPDOTBL  Improved asset management - number of districts that have developed and are using asset management system (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- -- 10.00 Date 30-Sep-2016 -- -- 30-Sep-2022 Overall Comments 5/22/2018 Page 3 of 8 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report Bihar Rural Roads Project (P155522) Intermediate Results Indicators PHINDIRITBL  Roads constructed, Rural (Kilometers, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- -- 2,500.00 Date 30-Sep-2016 -- -- 30-Sep-2022 Comments To be updated after the implementation support mission. PHINDIRITBL  Improved quality of built Infrastructure - Project roads delivered with satisfactory quality certified through independent quality reviews (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- -- 85.00 Date 30-Sep-2016 -- -- 30-Sep-2022 PHINDIRITBL  Length of roads subject to planned maintenance contracting (Kilometers, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 4,600.00 -- -- 10,000.00 Date 30-Sep-2016 -- -- 30-Sep-2022 Comments To be updated after the implementation support mission. 5/22/2018 Page 4 of 8 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report Bihar Rural Roads Project (P155522) PHINDIRITBL  Effective Citizen Feedback Mechanism (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- -- 85.00 Date 30-Sep-2016 -- -- 30-Sep-2022 PHINDIRITBL  Road Safety improvement scheme related audits undertaken on priority roads (Kilometers, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- -- 2,000.00 Date 30-Sep-2016 -- -- 30-Sep-2022 PHINDIRITBL  GIS based road and bridge inventory and condition database (including videography) established in project districts (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- -- 50.00 Date 30-Sep-2016 -- -- 30-Sep-2022 PHINDIRITBL  Network level climate vulnerability assessment undertaken with special focus on floods (Kilometers, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- -- 2,000.00 Date 30-Sep-2016 -- -- 30-Sep-2022 5/22/2018 Page 5 of 8 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report Bihar Rural Roads Project (P155522) PHINDIRITBL  RWD staff received at least six (6) weeks of professional training during the entire project duration. (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- -- 400.00 Date 30-Sep-2016 -- -- 30-Sep-2022 PHINDIRITBL  Gender-based capacity enhancement (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- -- 30.00 Date 30-Sep-2016 -- -- 30-Sep-2022 PHINDIRITBL  Direct project beneficiaries (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- -- 1,200,000.00 Date 30-Sep-2016 -- -- 30-Sep-2022 PHINDIRITBL  Female beneficiaries (Percentage, Custom Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 -- -- 48.00 Overall Comments 5/22/2018 Page 6 of 8 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report Bihar Rural Roads Project (P155522) Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed Disbursed P155522 IDA-59380 Effective USD 235.00 235.00 0.00 38.77 196.23 16% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P155522 IDA-59380 Effective 21-Dec-2016 29-May-2017 31-Aug-2017 31-Dec-2022 31-Dec-2022 Cumulative Disbursements Restructuring History There has been no restructuring to date. Related Project(s) 5/22/2018 Page 7 of 8 Public Disclosure Copy Public Disclosure Copy The World Bank Implementation Status & Results Report Bihar Rural Roads Project (P155522) There are no related projects. 5/22/2018 Page 8 of 8 Public Disclosure Copy