.... INTERNATIONAL BANK FOi< Rf.CONS'l"RUCflON AND DEV",;LOP,\1ENT INTERNATIONAL DEVELOPMENT ASSOCIATION RESTRICTED MONTHLY OPERATIOML SUMMARY OF BANK AND IDA PROPOSED PROJECTS (as of November 11, 1971) SecH71-527 I: The Deputy Secretary November 15, 1971 i'er State, ·ower, J.mount and Probable Available information t cficiary A~};/ Lender'};/_ _ _ __ Project }_/ Stage of Processing on Procurement~'~~ I. EASTERN AFRICA lW~A 1.4 (IDA) Livestock Appraisal report under consideration (joint No action. financing planned with SIDA), 2.0 (R) Gaborone-Lobatse Appraisal report under Retroactive financing (t (IDA) road consideration (joint to $220,000) of con- financing planned with sultants' services for SIDA). engineering to be rP.commended. To be determined (R) Road construct- Appraisal report being No action. (IDA) ion and main- prepared. tenance To be determined Power U~'DP-financed feasibility No a·ction. (IDA) report to be revised by consultants. · r AFRICAN f!uNITY 5/ lT AFRI~AN To be determined Development Appraisal report being No action. fLOPMENT BANK) (Bank) finance company prepared. ,lOPIA To be determined Agriculture Project being prepared No action. (IDA) with PMEA assistance. l ISABABA WATER 9.5 Addis Ababa Negotiations temporarily Retroactive financing SEWERAGE (Bank). water and suspended, pending a (up to $100,000) for IORITY) sewerage revised financial plan for engineering and design the Water and Sewerage f Authority. to be recommended. lne Goverru:ient will usually be. the borrower and in such cases ·when a "beneficiary agency" will in turn receive the loan >r credit proceeds and administer the project, the name of the "beneficiary agency" is given if available, If the ;overnment is not the proposed borrower, the borrower's name is given in capital letters in parentheses, rhe amount is in millions of U.S. dollars and is approximate and is tentative. c'he letter (N) before the project means that the project is a new listing in the Summary; the letter (R) means that the ,nfot"mation about the project has been revised since the last issue of the Summary. :onfined to goods and services to be financed by Bank and IDA, :omprising Kenya, Tanzania and Uganda. :ribution: ,ecutive Directors and Alternates ·esident :esident's Council :ecutive Vice President, IFC .~e President, IFC :partment Heads, Bank and IFC - 2 - ember State, orrower, Amount and Probable Available Information eneficiar A enc l_/ ~1.1 Project 1/ Stage of Processing on Procurement ii__ _ 'HIOPIA (CONT'D) 5,5 (R) Coffee processing Revised loan documents Retroactive financing (up (IDA) sent to Government for to $100,000) for detailed comments. project planning to be recommended. wash Valley To be determined (R) Melka Sadi-Amibara Supplementary studies No action. uthority (Bank/IDA) irrigation on soils and water received and being reviewed. Updating mission in field. AGRICULTURAL AND To be determined (R) Development finance Appraisal report being No action. 1NDUSTRIAl. DEVELOPMENT (IDA) company III prepared. ANK) mper ial l!ighway To be determined (R) Roads V Appraisal mission in No action. uthority (ll)A) field. 'To be determined (R) Livestock II Appraisal mission scheduled No action. (IDA) for mid-November. ENYA 27.7 Airport develop- Appraisal report being Prequalification of (Bank) ment prepared. bidders for structural steel invited, 22.0 Highway IV Negotiations substantially Retroactive financing (IDA) completed. (Sweden has up to $170,000 to be offered co participate up recommended. to $6 million). SOTHO 3.5 (R) Malibamatso River Completion of appraisal No action. (IDA) diversion report for engineering engineering project suspended pending discussions with Government of South Africa. Draft feasibility report received. 1 LAGASY REPUBLIC To be determined (R) Agricultural Government plans to submit No action, (IDA) · credit new proposal. To be determined (R) Irrigation - Appraisal mission in field. No action. (IDA) Morondava To be determined (R) Roads Ill Appraisal mission in field No action. (Uncertain) IALAWI To be determined (R) Karonga agri- Negotiators being invited. No action. (IDA) cultural develop- ment To be determined Development Under preliminary No action. (IDA) finance company consideration. 4.0 Road maintenance Appraisal report being No action, (IDA) prepared. 4.0 Livestock Appraisal report being No action, (IDA) prepared, ;QHALIA ;omal1a Port 7.5 Port of Appraisal mission planned No action. ,uthority (IDA) Mogadiscio for Novemher. (Joint financing with FED expected). 8.7 Hargeisa-Berbera Negotiations substantially Contractors have been (IDA) highway completed. Awaiting receipt prequalified. lnvitati.ons of bics for civil works to to bid issued. Retroactive assure validity of cost financing (up to $20,000) estimates. (Joint financing of consultants' services planned with AfDB). to be recommended. ee P.l for footnotes lf, :/;./, 17.and !!_f. - J - r ber State, lf rower, !_i_':}~~__f\gency Y Amount and Prohahle Lender JJ _____ _ StacP. of Proc.Pss1p~ Aval lahle lnforr,,ati.on on Procurement _':/ ___ _ (COST'D) To be determined Livestock PossiblP rr.vlslnn of l,o action. ( IIJA) project bciu~ discussed with Coven:n,cnt. To be determined {R) Irrigation of f.overnnient's revised tlo act ion. (Uank/IllA) Rahad areas with proposals helng Roseires water consiclcrecl. f ,ni,ed '""'"' po ration To be determined (Hank/IDA) (R) :·lechani zed Fanninc II Appraisal report being prepared. No action. To be determined Highway Appraisal mission in t;o action. (IDA) maintenance field. J,0 llsutu irrigation rreappraisal mission t:o action. (IVA) planned for t,ovemher. 10.5 Smallholder tea t:egot1at1ons sub- Retroactive financing up (ll)A) stantially completed. to $580,000 to be (Norway may provide recommended. additional $1.9 million). To be detennined Rural develop- Preparation of project No action. (IDA) ment which will he based on cotton, heing completed hy Government with PMEA assistance. 1,iDA 6.6 (R) Livestock II Negotiations substantially No action. (IDA) completed. To be determined (R) Smallholder Tea Appraisal report being . No action. (IllA) II prepared. i [E To be determined Rubber ) No action. (IDA) ) Project possibilities to ) be reviewed in light of To be determined Cotton and food ) agricultural sector study No action. (IDA) crors ) now in progress, To be determined (R) Highway Appraisal report heing Retroactive financing (up (IDA) transport considered. (Parallel to $400,000) of consultan financing expected with services under considera- several multilateral and tion, bilateral sources.) 6.45 (R) Education ~egotiations substantially No action. (IDA) completed. IA 10.0 Telecommuni- Identification mission No action. (Bank) cations planned for February. 10.0 Education III FAQ identification mission No action. (Bank) preparing report. IBA NORTH 10.5 Kariba North Awaiting discussions with Contracts for civil workE COMPANY) (Bank) Bank supple- Government. and major equipment mentary financing awarded. To be determined (N) Family farming Project proposal being No action. (Bank) tobacco reviewed. I r·l I for footnotes}:/,~/,}_/ and!!_/. I I I - 4- mber State, prrower, Amount and Probable Available Information pneficiary Agency)./ ~ y____ Stage of Processing on Procurement !:./__ II. WESTERN AFRICA I \MIBOON 1 ~ciete Experimentale r Modernisation 3,0 (R) SEMRY rice Appraisal report being con- No action, Lzicole de Yagoua 1 (IDA) sidered. (joint financing 5EMRY) un:ler discussion) To be determined Port II Feasibility study being prepared No action, (IDA) (joint financing possible), To be determined (R) Eiucation II Project preparation and No action. (IDA) appraisal mission in field, ~ L AFRICAN 3,6 Eiucation Negotiations substantially No action, ~PUBLIC (IDA) completed. To be detennined Cotton development Government's comments on No action, (IDA) findings of preparation mission being reviewed, To be determined Bangui-Bossembele Feasibility study under No action, (IDA) Road way, !AD 2.0 Livestock I Negotiations substantially Retroactive financing l- (IDA) completed. Appraisal of consultants• service report being updated. (about $5,000) to be recommended, Bidding documents being reviewe (R) Telecommunications Government arranging other source of financing. Pro- ject no longer under con- sideration, To be determined Cotton development Discussions on repcrt of No action. (IDA) FED preparation mission under way (possible joint financing), To be determined Chari Bridge Awai ting completion of No action. (IDA) feasibility study and detailed engineering, •NGO, PEJJPLE 1 S To be determined (R) Livestock Appraisal mission scheduled No action. ~PUBLIC OF (IDA) development for January, 5.6 Railway engineer- Appraisal re~ort being No action, (IDA) ing and rolling prepared. stock renewal, egie Na tionale ~s Transports et 3,4 Road maintenance Negotiations substantially Consultants selected, ~s Tra,aux Publics (IDA) completed. lHOMEY 5,1 Cotton development Negotiations completed, No action. (IDA) (Joint financing with FAC). To be determined Road construction Feasibility studies and No action, (IDA) detailed engineering un:ler way. ~UATORIAL To be determined Road maintenarx:e Appraisal report being No action. JINEA (IDA) prepared. vi P. 1 for footnotes )./, 'ij, 'JI and !!./, - 5- ember State, orrower, Amount and Probable Available In.formation ene.ficiary Agency ]./ Lender?/_ _ _ __ Project 'JI Stage of Processing on Procurement~--- BON. To be determined Railway Results of final nego- No action. (Bank) tiation of contracts between Government and companies on logging concessions being reviewed. Awaiting completion of additional engineering studies. (Participation of other lenders expected) HE GAMBIA To be determined (R) Rice Appraisal mission scheduled No action. (IDA) Development for February. HANA To be determined (R) Road rehabili- Appraisal report being No action. (IDA) tation and prepared. (Parallel maintenance financing possible with United Kingdom, Canada, and AIDB) To be determined Etlucation Appraisal report under No action. (IDA) consideration. 8.0 (Bank) Sugar Appraisal report being No action. 8.0 (IDA) development considered. To be determined Oil palm Awaiting completion of No action. (IDA) project proposal. ter and Sewerage To be determined (R) Water supply II Appraisal mission in field. No action. rporation (IDA) To be det~rmined (R) Telecommunications Appraisal mission tenta- No action. (Bank) tively scheduled for February/March. (Parallel or joint financing under discussion. ) , ORY COAST To be determined Urban transport Government preparing No action. (Bank) and infrastruc- additional feasibility ture studies identified by project preparation mission. SODHEIJEA) To be determined (R) Rubber Government completing No action. (Bank) development organizational arrangements. Appraisal mission in field. (Joint financing with CCCE and FED expected) To be determined (R) Road construction Detailed engineering un:ier No action. (Bank) and maintenance way. Appraisal mission in field. CBERIA To be d€termined Agricultural Appraisal report being No action. (IDA) Development prepared. (Rubber) To be determined Etlucation Appraisal report being No action. (IDA) prepared. 2.5 Road engineering Project preparation under Consultants• feasibili' (Uncertain) and maintenance way. study being financed under previous loan (LI-617). ~ ~fice des Postes To be dete~mined (R) Teleccmmunications Appraisal mission tenta- No action. 'Telecommunications (IDA) tively scheduled for late November. ;e P.1 for footnotes~.'?;/, 'JI and~. lr rower, . S~k,~ Amount and Probable - 6 - Available Information jficiary Agency!/ ~ y_____ Project'}/ Stage of Processing on Procurement !y'_·_ · [,(cont 1 d.) 1.0 (R) Rice Negotiations substan- No action. (IDA) · Development tially completed. To be determined (R) Railway n Supervisory mission No action. (IDA) report being reviewed. JITANIA 4.1.5 (R) Livestock Credit approved by Consultants to draft (IDA) Executive Directors bidding documents. on November 8. To be determined (R) Port extension Feasibility study No action. (IDA) expected to be started in December. To be determined Livestock Project preparation under No action. (IDA) Development way. To be determined (R) Fl:lucation Awaiting Government's No action. (IDA) agreement on content of project. '~ To be determined Tree crop Awaiting identification No action. (Bank) development of definite project. (Midwestern State) 1.5 •.5 (R) Roads V Negotiations substan- Retroactive financing (Bank) tially completed. ($300,000) for consul- tants• services to be recommended. 3.5.0 (R) Expansion of Appraisal mission Qualification of bidders (Bank) power generation, tentatively scheduled for Kainji generation transmission, and for January. units completed. Tender distribution received for supply and facilities. erection of Oshogko-Akur, transmission line. 16.0 E:l.ucation II Negotiations substan- Retroactive financing (Bank) tially completed. of consultants• services (about $100,000) to be recommended. To be determined (R) Livestock Discussions planned for No action. (Bank) December with Government on project identification report. 20.0 Roads VI Project preparation No action. (Bank) mission planned for December. !l}AL (ces des Postes 1. .5 Teleconununications Awaiting completion of No action. l'elecommunications (IDA) feasibility study. [gie Electrique To be determined (R) Power Re-appraisal required; Bidding docum3nts being ouest Africain , (Bank) consultants assisting received. Government on institu- 1 tional matters •. To be determined (R) Urban Appraisal mission in No action. (IDA) Development field, To be determined Railway II Appraisal report being No action. (Bank) prepared. To be determined (R) Airport Pre-appraisal mission No action. (Bank) in field. P.1 for footnotes !/, y, '}/ and!!/• - 7 - ber State, ~v ____ 1 rrower, Amount and Probable Available Information 1eficiary Agency 1/ Project '}/ Stage of Processing on Procurement !!/__ l'EGAL (cont•d.) - To be determined (R) Highway Awaiting selection by Bids for maintenance (IDA) maintenance consultants of road equipment under review. sections to be improved. To be determined Delta Rice Awaiting_completion of No action. (IDA) Development feasibility study. rnRA LIDNE 5,1 Agricultural Appraisal report being No action •. (IDA) Development considered. ( Eastern Province) ! lO To be determined (R) Road construction Detailed engineering to No action. (IDA) start shortly. rENW DE To be determined (R) Cement factory Viability of project being discussed with Prel:iJninary proposals i..FRIQUE DE (Bank) from manufacturers for UEST) Goverrunent. turnkey clinker plant presented to promoters but bidding would follc Bank guidelines, r °ER 1 VOLTA To be determined (R) Feeder roads Detailed engineering in No action. (IDA) progress. Appraisal mission scheduled for December, que Nationale To be determined (R) Rural development Appraisal report being No action. ,Developpement (IDA) fund prepared. P.1 for footnotes y, ?/, '}/ and W• - 8 - ~er State, Amount and Probable · · .ower, ~ficiary Agency!/ ~v. ____ Project y Stage of Processing Available Information on Procurement !!/__ III. EAST ASIA AND Pl1CIFIC I i'RALIA ~ !Guinea l:~ricity Supply To be detennined Power II Project preparation under No action. )ussion (Bank) way. \~urs Board To be determined Ports Appraisal report being · No action. (IDA) prepared, To be determined (R) Telecommunications Appraisal mission in field. No action,· (Bank) II To be determined (R) Highways II Preappraisal mission pre- No.action. (Bank) paring report. [A 2.5 Fducation II Appraisal report being pre- No action, (Bank) pared; awaiting Government's views on project items. .EX:TORATE 22.5 (R) Telecommunications Appraisal report being pre- No action • ;:RAL OF TELE- (Bank) II pared. fUNICATIONS) 20.0 (R) Taipei sewerage Mission in field to discuss No.action, (Bank) project with Governmant. NA DE.VELOPMENT 18.0 Development Appraisal mission scheduled No action. ORATION) (Bank) finance company V for November. 15.0 (R) Agricultural Appraisal report being No action. (Bank) Credit prepared. 34.0 Highways I Project preparation in Consultants for detailec (Bank) progress. engineering selected. WAN POWER 25.0 (R) Power IV Appraisal planned in first Options for purchase of I . (Bank) quarter 1972, equipment re~eived from suppliers who bid on eqt [~1- nistration 20.0 (Bank) Railways V Railway electrification study being reviewed by Bank and Government. ment for thirct 'pdl,ier ·-it, (CHN 749), No action, 3,5 (R) Telecommunications Appraisal mission in field, No action. (Bank) 4.0 Technical assistance Requirements under consider- No action. (IDA) III ation by Resident Staff. 11. 5 (R) Irrigation Appraisal report being No action. (IDA) rehabilitation IV prepared, 12.6 (R) Population Appraisal report being No action. (IDA) considered, (Joint financing with UNFPA being arr~nged,) 7.0 El:iuca tion - Appraisal report being No action. (IDA) agricultural prepared. P.1 for footnotes!/,~, Y ~nd 1/, - 9 - •rnber State, rrower, neficiary Agency J../ ~v ____ Amount and Probable Project'}/ Stage of Processing Available Information on Procurement 1±/__ 'IDONE.5IA (Cont 1 d) velopment Finance 1o.o (R) Development finance Additional appraisal No action, mpany of Indonesia (IDA} company scheduled for February•. APINDO) To be detennined Bali tourism Project preparation under No action. (IDA) way. To be determined Agricultural Appraisal mission scheduled No action. (IDA) Estates IV for November/December. To be determined Smallholder Appraisal mission rescheduled No action. (IDA} rubber for November. To be determined (R) Marine transport Appraisal mission No action. (IDA) scheduled for November. To be determined (R) Highways III Project being prepared by No action. (IDA) consultants. Appraisal mission scheduled for December. ate-owned To be detennined (R) Electricity Appraisal mission scheduled No action. ectricity (IDA} distribution II for November. rporation (PLN) To be determined Industrial estates Awaiting further discussions. No action. (IDA} with Goverrunent on nature o-r. project. To be determined (N) Agricultural Project preparation wrler way No action. states V REA barcULTURAL 33.0 (Bank) (R) Irrigation--Yong Appraisal report under No action. VEI.OPXENT 1 15.0 (IDA) San Gang consideration. RPORA TION) 4,0 Seed production Feasibility study to be No action. (IDA) revised. tional 11.0 (R) Agricultural credit Appraisal report being pre- . No action. ~icultural (IDA). pared. bperative ~era.tion (NACF) ~ea National 20.0 (R) Railways IV Appraisalmission tentatively No action. Inroad (Bank} scheduled for Dee~mber. ~TIONAL AGRICUL- 5.0 . Warehouses Awaiting additional informa- No action, itAL COOPERATIVE (Bank} . tion from Government. DERATION (NACF)) 15.0 F.ducation II Project identification report No action. (IDA) being prepared. · 20.0 Ports._ Port master plan being pre- No action. (Bank) pared. · 10.0 Tourism Preappraisal mission No action. (Bank) scheduled for January, lP.1 for footnotes !/, 'ij, JI ani Y, - 10 - r State, •wer, Amount and Probable Available Information riciarv Agency};_/ Lender ]:/ _ _ _ __ Project 1/ Stage of Processing on Procurement~/~~ rSIA. ( PERTANIAN) 'l'o be determined Agricultural Project being prepared No action. (Bank) credit by Bank Pertanian and consultants. To be determined Federal Awaiting completion of No actic;,;, (Bank) highway detailed engineering. ran Railw.ay 16.0 (Bank) (R) Railways Negotiations completed. No action. To be determined (R) Education II Appraisal report being No action. (Bank) I,, prepared. Land Develop- To be determined Jengka land Project being prepared No action. Authority (FI.DA) (Bank) settlement III by FLDA, To be determined Kuala Lumpur Project preparation under No action. (Bank) water supply II way. To be determined (N) Population Project preparati~n mission No action. (Bank) in field. EALAND ILOPMENT FINANCE To be determined Development Appraisal report being No action. /RATION) (Bank) finance company prepareN To be determined Agriculture Project identification No action. (IDA) mi.ssion in field. Llizer Corporation 20.0 Expansion of Appraisal report being No action. 1dia (IDA) Nangal fertilizer prepared. plant llizer Corporation 9.0 (R) Expansion of Negotiations began on No action. dia (IDA) Gorakhpur November 8. fertilizer plant 12.0 (R) Population Mission in field to Ko action. (IDA) discuss project. 30.0 (R) Highways II Awaiting further discuss- No action. (IDA) ions on procurement issues. [ of Madhya 43.0 (R) Tawa irrigation Appraisal report being No action. (Il>A) considered. 1·h Electricity 60.0 - 70.0 (R) Power trans- Additional information No action. (IDA) mission III from Government being studied; appraisal mission to arrive on November 18. (n Railways 75.0 (R) Railways XI Negotiations expected Retroactive financing (IDA) to start on November 12. (up to $5.5 million) fron September, 1971 for equipment to be recommenc '.l for footnotes I l./, ]:./,}_/and!!_/. - 12 - nber State, rrower, neficiary Agency Y. ~v _____ Amount and Probable Project y Stage of Processing Available Information on Procurement ~ - - )IA (cont 1 d,) nbay Municipal 25.0 - 30.0 (R) Bombay water Appraisal mission Retroactive financing rporation (IDA) supply scheduled for late of consultants• service: November. and possibly some pre- liminary h".,rks being considered. ~ and State Land 40;0 (R) Agricultural Appraisal report being No action. rtgage Bank (IDA) credit in Mysore considered, ~ and state Land 30.0 (R) Agricultural Appraisal report being · No action, ~tgage Bank (IDA) credit in prepared, i· Maharashtra ite of Maharashtra 20,0 (R) Jayakwadi Appraisal mission post- No action. (IDA) irrigation poned pending .further discussion of procur~nt issues. fto Go""rnment, 20.0 (IDA) (R) Agricultural universities Appraisal mission in field. No action. lian Shipping 80.0 Shipping Appraisal report being No action, \panies (IDA) prepared. IICI) 60.0 {Bank) (R) Development finance compaey IX Credit signed on October 27, No action. land State Land 25.0 (R) Agricultural Awaiting completion of No action. elopment Bank (IDA) credit in Bihar project preparation. and State Land (R) Agricultural credit Project postponed by Govern- elopment Bank in Uttar Pradesh ment; reporting will be discontinued. te of Kerala 15.0 (R) Pamba irrigation Appraisal mission scheduled No acticn, (IDA) for January subject to resolution of procurement issues. te of Bihar 13,5 (R) Wholesale markets Appraisal report being No action. {IDA) prepared. 75,0 (R) Industrial Appraisal mission in field. No action. (IDA) Imports VII ustrial Develop- 20.0 (R) Development finance Appraisal mission in field. No action. it Bank of India (IDA) company rl 1- IBI) so.o (Bank) Development finance company VII Negotiations completed. No action. ~I) 14.0 (R) Agricultural At request of borrower No action. (Bank) credit II negotiations to begin in December. l,nal ICompaey Iranian 32."o (Bank) (R) Oil pipelines I Awaiting approval of loan documents by borrower. Specifications received arrl reviewed. ;estan Water and 20.0 (R) Dez irrigation II Appraisal mission in field. No action. l[r Authority (Bank) nir (Generation so.o (R) Power transmission Appraisal report being No action. !Distribution Co.) (Bank) prepared. \strial Credit 1 o.o (N) Industrial·credit Appraisal mission No action. f of Ira,. (Bank) scheduled in January. Ip, 1 for footnotes y, y, JI and l/, - 13 - (ber State, Available Information rower, . Amount and Probable · eficiary Agency l/ Lender 'ij Project -y Stage of Processing on Procurement!!/~- 5.0 (R) Irrigation Appraisal mission No action. AL (IDA) scheduled for November/ December. 4,0 (R) Tourism Appraisal report being No action. (IDA) considered, (H) Plywood Appraisal mission scheduled No action. (al Timber 2.5 poration (IDA) f:ictory for November/December, To be determined Dev0lopmcnt finance Awaiting further informa- No action. al Industrial elopment (IDA) company tion before scheduling poration (NIDC) reconnaissance mission. r.:: al Telecommuni- Bo~d (NTB) To be determined (IDA) Telecorrurrunications II Awai ting NTB 1 s new development plan. No action. Negotiations substantially No action. 11 .o East Pakistan comoleted. (Sweden may join (IDA) foodgrain storage II in financing.) ( 2.5 East Pakistan con- Negotiations deferred, No action. ( (IDA) sultant services II ( Joint fimncing with ( UNDP likely. ) ( P. Water an:i ( 30.0 Dacca Southwest Appraisal report being No action, r Development ( (IDA) irrigation an:i revised. ority ( flood control ( ( 9.0 EP\vAPDA tubewells Consideration of appraisal No action. ( (IDA) (Thakurgao Extension) report deferred. (Possibilities ( of joint financing will be ( explored.) pre Improvement 5.0 Lahore water supply Consideration of appraisal report No action. st (IDA) an:i sewerage II deferred. (Sweden may join in financing. ) CHI EL~TRIC 10.5 Karachi power trans- Negotiations substantially Retroactive financing for PLY CORPORATION) (Uncertain) mission and distri- completed. consultants up to bution $750,000 may be recommended. ~re) 30.0 Development finance Consideration of appraisal No action. (Uncertain) company IX report deferred. Agricultural 5.0 East Pakistan seed Appraisal report being No action. lopment (IDA) multiplication and prepared. oration distribution 10.0 East Pakistan rural Appraisal report being No action. (IDA) infrastructure prepared. • \.ater and 14.0 Karnaphuli Feasibility study being Nq action. r Development (IDA) irrigation reviewed. ority 10.0·· East Pakistan Project preparation No action. (IDA) education mission deferred. stan 10.0 East Pakistan Appraisal mission deferred. No action. ern Railways (IDA) railways II . Water and 15.0 W. P. Salinity control Awai ting Government's No action. r Development (IDA) and reclamation - decision on scope of project. .ority Panjnad-Abbasia chi Port Trust 8.0 Karachi port Awaiting completion of No action. (ID~) construction detailed engine~ring. ;p. 1 ·for footnotes 1/, 'ij, y and !JI. - 14 - . ,r State, wer, Amount and Probable Available Infor~ation iciary A ency]/ ~v. Project'}/ Stage of Processing on Procurement ~ - - v. EUROPE, MIDDLE EAST AND NORTH AFRICA 2.0 Roads Awaiting completion of Retroactive financing (Bank) detailed engineering and (about $100,000) for con- highway planning study. sultants beL·,"'. considered ).0 (R) Development finance Appraisal mission in No action. (Bank) company field. "IRICITY 5.0 (R) Power IV Awaiting additional infor- Tenders for boiler and RITY OF (Bank) mation from consultants )OMW turbo generator JS) required for appraisal. and options for second of each received. Pro- posed award for turbo- generator approved by Bank. ~, ARAB REPUBLIC OF ian Railway )0.0 (R) Railway Negotiations completed. Bids invited for signalil'l{ i (IDA) improvement and telecommunications equipment. To be determined (R) Population Project preparation pre- No action. (IDA) appraisal mission tenta- tively planned for early January. To be determined (R) Upper f€Ypt Appraisal mission scheduled No action. (IDA) drainage for January/Feb!"1ary. To be determined (N) Soil Project preparation in No action. (IDA) Improvement progress. ND 20.0 Forestry Awaiting submission of No action. (Bank) definite proposal by Government. E 3,5 Roads Road maintenance study No action. (Bank) being prepared by consultants. To be determined (R) Education II Appraisal report being No action. (Bank) prepared. NAL INVESTMENT 25.0 (R) Development finance Approved by Executive No action. FOR INDUSTRIAL (Bank) company III Directors on October 26. PMENT) ~ ,AND ~ONAL R)WER 6.o Power Ill Prospective market for No action. ANY) (Bank) electricity under con- sideration by borrower. 27.5 (R) Telecommunications Loan signed on October 27. (Bank) To be determined (R) Irrigation (Lower Appraisal mission in field. No action. (Bank) Khalis) To be determined (R) Grain Storage Appraisal mission scheduled (Bank) for January, subject to receipt of additional informa- tion from Government. To be determined (R) El:iucation Appraisal mission in field. No action. (Bank) ~.1 for footnotes JI, y, '}/ and. '!:f. - 15 - ber State, Amount and Probable Available Information ~ y____ Project'}/ Stage of Processing on Procurement !/__ 15.0 Power III Appraisal report being Letters of intent is~uel (Bank) (1hermal) prepared. for boiler ($6.0) and turbo-gencr~tor ($8.7) against options obtained in purchase of identical equipment for second power project. To be determined Livestock Project being prepared. No action. (Bank) EL To be determined (R) Sewerage Preappraisal mission in No action. (Bank) field. AN 6.o Education Appraisal report being Retroactive financing (IDA) considered. for consultants service8 under consideration. an Electricity 6.5 (R) Power generation Postponement of project No action. ority (IDA) agreed with Government. 5.0 (R) Water supply/ Preappraisal mission in No action. (IDA) sewerage field. NON To be detennined Expressway con- Project in abeyance No action. (Bank) struction and pending Governnent engineering decision to proceed. ICE HATIONAL 12.0 (R) South Beqaa &:onomic justification of No action. ITANI) (Bank) irrigation project being examined. Further Bank consideration of project contingent upon final feasibility study. To be determined (R) F.ducation Unesco project preparation No action. (Bank) mission in field. co r Authorities 40.0 (R) Rabat/Casablanca Appraisal report being Retroactive financing for (Uncertain) water supply prepared. Follow-up consulting services and mission necessary at dam construction being end 01' November. considered. Contract for dam awarded. !CE NATIONALE To be determined Power Project preparation in Tender documents for •ELECTRICITE) (Bank) transmission progress. transformers and reactors prepared by ONE approved by Bank. SE llATIONALE 26.0 Agricultural Project issues un:ier No action. 'EDIT AGRICOLE) (Bank) credit II discussion with Government. IT IMMOBILIER 15.0 (R) Tourism II Awaiting measures to No action. TELIER) (Bank) (hotel projects) strengthen organization, to be taken by CIH. To be determined Oumer R1 bia Awai ting feasibility No action. (Uncertain) multipurpose study (expected October 1972) To be determined Highways II Project preparation under No action. (Uncertain) way, 27.5· (R) Industry- Project preparation under Submissions for pre- (Bank) phosphoric acid way. qualification of bidders were due by October 15. '.1 for footnotes]./, y, '}/and!!/', - 16 - ember State, orrower, Amount am Probable Available Information eneficiary Agen~ l/ ~ y____ Project· "JI Stage of Processing on Procurement y __ PAIN 40.0 (R) Ports II Pre-appraisal mission No action. (Bank) scheduled for December, 25.0 (R) Eliucation II Appraisal report being Ho action. (Bank) prepareq.. 15.0 Drainage/ Awaiting feasibility No action. (Bank) Irrigation study. IA E:I'ABLISSEMENT PUBLIC To be determined (R) Power generation Awaiting appointment of No action. 'EL:&:TRICITE) (Bank) and transmission consultants for feasibility study. Short project pre- paration mission scheduled for November. 12.8 (R) Highways II Negotiations postponed to No action. (IDA) end of November. 'ENER.AL PETROL&JM To be determined (N) Oil Pipeline Project preparation mission No action. MPANY) , • ___ 1 NISIA (Bank) To be determined (R) Tourism infra- structure scheduled for mid-November. Appraisal mission scheduled for November 15, No action. ,OCIEI'E· NA TIONALE 10.0 (R) Development finance Negotiators being invited. No action. INVT!STISSEMENTS) (Bank) company IV 'OCIEI'E TUNISIENNE To be detennined (R) Power generation Appraisal report being pre- No action. ~ 1 1 EL:&:TRICITE (Bank) and transmission pared. (Joint/parallel . DU FAZ) financing being considered.) KEY 5.0 Tourism Discussions proceeding with No action. (Bank) Government, possible foreign partners and consultants, 25.0 (R) Istanbul urban Appraisal missions for Calls to be issued for (IDA) development water supply and urban prequalification of studies in field. Await- bidders for critical ing feasibility study water treatment plants; for power component. bidding according to Ba guidelines expected to take place befor·~ luan is considered by Executive Directors, T-ANBUL GUBRE 23,0 (R) Fertilizer Re-appraisal mission No action. NAYII A.S.) (Bank) in field. To be detennined Ceyhan Aslantas Feasibility studies No action, (Bank) irrigation, power being prepared (expected multi-purpose in February). 20.0 (R) Irrigation Negotiations began on No .action. (Bank) rehabilitation November 3, ricultural Bank 15.0 Livestock II Appraisal report being No action, (IDA) prepared, RIDLI IRON AND To be determined Erdemir steel Appraisal report being No action. EEL WORKS, INC , ) (Bank) mill expansion considered (Parallel financing planned.) URKISH RAILWAYS) To be determined (R) Railways Project preparation mission No action. (Bank) in field, 10.0 Agricultural Awaiting Government's deci- No action, (Bank} education sion on composition of project. b P.1 for footnotes 1/, 'ij, "JI and l/, l . . - 17 - ember State, orrower, neficiary Agency!/ ~v. ____ Amo1.U1t and Probable Project'}/ Stage of Processi~ Available Information on Procurell'ent !!/__ I ;I'URKEY (cont•d.) I( TURKIYE SINAI To be determined Development finance Timing of loan contineent No action. µ1KINMA BANKASI - (Bank) company upon rate of commitment of rSKB) last loan. ~EMEN ARAB REPUBLIC To be determined Roads Appraisal report being No action. (IDA) · prepared. To be determined (R) Wadi Zabid Feasibility study nearing No action. (IDA) irrigation completion; project pre- paration mission scheduled for November. fEMEN, PEDPLE 1 S To be determined Fisheries Project preparation mission No action. PEMOCRATIC REPUBLIC OF (IDA) development scheduled for November, boosLAVIA To be determined Development finance New proposals for Bank No action. (Bank) company financing being explored, To be determined Jaz Tourism Awai ting completion of No action. (Bank) project preparation. To be determined Power transmission Appraisal report being No action. (Bank) prepared. To be determined Industry Awaiting Government No action. (Bank) decision on project selection. To be determined (R) Dubrovnik sewerage Awaiting completion of No action. (Bank) consultant's studies. ~ee P.1 for footnotes!/,~.'}/, and I '!:J. - 18 - VI. cn:TRAL AMERICA A}!D f.AP.lllllEM! ber State, rower, Amount and Probable· Available Information eficiary Agency!/ Lender]_/~~~~~ Project '}_/ Stage of Processing on Procurement·!!_/~~- ~~ ~TITlITO ( 16.0 (R) Telecommuni- Appraisal report No action. fARRICENSE ( (Bank) cations III under revieu. LECTRICIDAD) ( { 6.0 (R) Power IV Appraisal report Bids invited for two 15 ( (Bank) under review, gas turbine units. Retrc ( active financing of up t ( $0.6 million for these ( units and consultants ( ~nder consideration. ( (Tobe determined Power V Feasibility study No action. ( (Bank) being prepared, ICO CENTRAL) 9.0 (R) Agricultural Appraisal report No action. (Bank) credit being prepared, 'NICAN REPUBLIC To be determined Irrigation (Yaque Consultants' study No action, (IDA) del Norte) being reviewed. o Central To be determined (R) Tourism (Puerto Awaiting completion of No action. (IDA) Plata) feasibility studf, now in progress. ALVADOR INISTRACION 9.3 (R) Telecommuni- Negotiations expected to No action. ONAL DE TELE- (Bank) cations II begin in November. ICACIONES) 2.0 Access Roads in Detailed engineering under No action. (Bank) Northern region way. ISION EJECUTIVA 15.0 (R) Power generation Feasibility study under No action. OELECTRICA DEL (Bank) and transmission way. LEMPA) I EMALA 1 ~ITUTO NACIONAL To be determined Power generation, Awaiting feasibility No action. \LECTRIFICACION) (Bank) transmission and report, distribution. RESA GUATEMALTECA 16.0 (R) Telecommunications Negotiations completed. Bids invited for microwa·, (Bank) expansion program equipment and mobile [ECOMUNICACIONES) exchanges. Small amount c retroactive financing fot consultants may be recommended. 5.0 (R) Roads I Appraisal report being No action. I- f'NA ELECTRICITY . (IDA) 8.0 (R) Power I prepared. Appraisal mission Retroactive financing for ORATION) (Bank) scheduled for late consultants' services November. (Government may be recommended. considering parallel financing.) To be determined Fisheries IBRD/FAO project. identi- No action. (Bank) fication report being reviewed, To be determined Forestry IBRD/FAO project identi- No action. (Bank) fication mission preparing report. t, l for footnotes }j, ]_I, }_/ and y, - 19 - ber State, !rower, Amount and Probable Available information ~.!_ciary Agency};_/ Lender ']J !'._roject ]_I Stage of Processing on Procurement!!_/~~ buRAS · 8.0 (R) Highway Awaiting completion of No action. (Bank) (Tegucigalpa- detailed engineering Talanga) (expected late in 1972). [RES~ NACIONAL 8.0 (R) Power expansion Appraisal report being Small amount of· retro- ENERGIA ELECTRICA) (Bank) prepared. Interconnection active financing for with Kicaraeua under engineering services consideration. may be recommended. co Central To be determined (R) Livestock II Awaiting completion of No action. · (IDA) feasibility study, expected in early 1972. tICA 5.0 (R) Sewerage Project preparation No action. ~i~G~~:~SSION (Bank) (Kingston) under way. IIAICA DEVELOPMENT To be determined Development In agreement with pros- No action. 0 (Bank) finance company pective borrower, project deferred until 1972. 6.5 (R) Highway main- UNDP agreed to finance Mo action. (Bank) tenance study of highway maintenance, consultants being selected. ~ I rO DE MEXICO) To be determined (Bank) (R) Industrial finance Preparation mission in field. No action. ''CO DE MEXICO) 22.0 (R) Tourism on Negotiators being No action. (Bank) Pacific Coast invited. To be determined Forest Awaiting preparation of No action. (Bank) industries project. ISION FF.DERAL To be determined (R) Power XI Appraisal mission scheduled No action. LECTRIC IDAD) (Bank) for November (possible parallel or joint financing.) OCARRILES To be determined (R) Railways II Appraisal report being No action. ONALES DE MEXICO) (Bank) prepared. To be determined (R) Ports Appraisal report being Some retroactive finan~i1 (Bank) expansion prepared, for consulting services under consideration. To be determined Water supply Awaiting preparation of Ko action. (Bank) project. ERURGICA LAZARO To be determined (R) Kew steel plant Project preparation No action ENAS LAS (Bank) mission scheduled for S S,A,) l,ovember. ,- I MGUA ~ESA NACIONAL UZ Y FUERZA) 18.0 (Bank) (R) Power expansion Appraisal report being prepared. Interconnection Retroactive financing for consultants' services with Honduras urider and initial equipment consideration. under consideration. IRESA AGUADOR 6.9 (R) Managua water Appraisal report being Retroactive financing ~AGUA) (Bank) supply II considered. of about $100,000 for consultants' services to be recommended. f~fot footnotes li, ,f, 11 and ',_I, - 20 - ir Si:ate, 1 ?wer, Amount and Probable Available Information rj,ciarx._A_gency y ~ ]J Pro1ect ll Stage of Processing on Procurement~'~~- lAcuA. (CONT ."I>) l~~~NTRAL) 3. 0 (R) Fisheries Appraisal mission No action. (Bank) scheduled for !·larch. RIDAD PORTUARIA 5.0 (N) Port of C:orinto Appraisal mission No action. RINTO) (Bank) tentatively scheduled for !-larch. To be determined Fishinp; port Feasibility studies being No action. (Bank) prepared. To be determined (R) Livestock Project identification No action. (Bank) mission in field. IJAD AND 12----- ]LOPMENT FINA.'ICE 2.0 (R) Development Negotiators being No action. jNY OF TRINIDAD (Bank) finance company invited. 01\AGO) AUTHORITY) 5.0 (R) Port of Port-of- Appraisal mission No action. (Bank) Spain scheduled for late t;ovember. 3.0 (R) Fisheries Report of Rank/FAO ?lo action. (Bank) project identification mission sent to Government. 8.0 Education II Unesco project preparation No action. (Bank) mission scheduled for mid-J-:ovember. 'ELA 6~ ROLLO 11.0 (Bank) Livestock credit Appraisal report being considered. A,-,aiting No action. ~CUARIO) congressional action. 17.0 (R) Naiquetia Appraisal report being Earth work contract (Bank) airport I considered. awarded. Retroactive financing of about $1.5 million being considered. To be determined (R) Caracas Awaiting Government action No action. (Bank) metro on institutional legis- lation. (Parallel financ- ing being considered.) To be determined Education Appraisal report being No action. (Bank) prepared. To be determined Maiquetia Scope of project being No action. (Bank) airport II revised. To be determined (R) Power V Project identification No action. (Bank) mission planned for late November. r fl for footnotes):__/,]:_/, }_I and!!_/. I I - 21 - I' State, er, ciary A enc :./ ~v ____ Amount and Probable Project y Stage of Processing Available Information on Procurement 1:/__ VII. SOUTH AMERICA 1'INA To be determined Meat Packing Project being prepared. No action. (Banlc) ld Nacional 50.0 Roads IV Feasibility studies by No action. (Bank) consultants in progress. To be determined E):iucation Urrler preliminary No action. (Bank) consideration. To be dete:-mined Livestock II Under preliminary No action. (Banlc) consideration. To be determined Power Awaiting Government No action. (IDA) action on tariffs. a Nacional To be determined (R) Railways Appraisal report being No action. arriles (IDA) prepared. l Bank ,2.5 Capital market Appraisal report being No action. (Bank) development prepared. 80.0 Highways III Appraisal report being No action. (Bank) prepared. To be determined Agricultural Appraisal mission in No action. (Banlc) storage field. To be determined (R) Land settlement Appraisal mission No action. (Banlc) (Maranhao) scheduled for late ~:ovember. TIAMENTO To be determined (R) Ports Project preparation mission No action. AL DE PORTOS (Bank) development scheduled for January. NAVESAVEIS) IS ELE.'I'RICAS 60.0 (R) Sao Simao Appraisal report being No action. AS GERAIS) (Banlc) hydropower prepared. AULO STATE) To be determined Sao Paulo beltway Additional project prepa- No action. (Bank) ration mission scheduled for March. NHIA 65.0 Steel manufacture ) Invitations to bid being 1RGICA (Bank) ) issued. Retroactive !AL) ) Appraisal report being financing for engineering ) prepared. (Parallel to be recommended. ) financing being arranged). S SIDERUGICAS 63.0 (R) Steel manufacture ) Invitations to bid being. S GERAIS) (Bank} ) issued. 58.0 Steel manufacture Awaiting revised expansion Notice of call for bids (Bank) project. (Parallel finan- advertised. cing being arranged) for footnotes:./, y, '}./ and W• - 22 - fr State, ·ower, ~v____ l,ficiary Agency ]/ Amount and Probable Project Y Stage of Processing Available Information on Procurement )/__ I (IL (Contd.) -~ FERROVIARIA To be determined Railways II Additional project prepara- No action. . (Bank) tion mission planned for loL~S~:~TE IRAsn) To be determined (Bank} . Development finance company January. Further action dependent on rate of commitments No action. under existing loan. To be detennined ID:iucati.on II Awaiting completion of No action. (Bank) Goverrurent survey of educa- tional system of two north- eastern states (scheduled for completion by mid 1972). HT-SERVICOS DE To be determined Power Awaiting project No action. 1TRICIDADE, S. A.) (Bank} distribution preparation. I! JnORAC ION DE 9.0 Livestock II Further action dependant on No action. l~O DE LA (Bank} rate of commitment of existing IUCCION) loan. 1 RESA NACIONAL so.o (R) Power Awaiting further increase No action. EX:: TRIC !DAD) (Bank} in tariffs. [ PORACION DE 1.0 (R) Fruit development Appraisal report being No action. INTO DE LA (Bank} reviewed. bccroN) 1 s.o (R) Irrigation Government has decided to No action. (Bank} (Aconcagua) f:l.nance project entirely from own resources. :MBIA 1--- :ITITUTO DE 1 s.o {R) Development finance Awaiting revised project No action. bo INDUSTRIAL) (Bank) institute proposal. IPORACION DE 6.0 Bucaramanga sewerage Awaiting new proposal from No action. iNSE DE IJ. (Bank) and erosion control Government on financing plan. 1TA DE -RAMANGA) lituto 5.0 Atlantico irrigation Negotiations substantially No action. 1\nbiano ,1 de la (Bank) II completed. Awaiting Govern- ',rma Agraria ment1 s approval of loan documents. .I j~OCARRILES To be determined Railways Appraisal report being No action. l'.:NES DE (Bank) prepared, !MBIA) To be determined Highways VII Awaiting further preparation No action. (Bank) of project. ituto 10.0 Cesar irrigation Feasibility study being No action. biano de (Bank) prepared. eforma ia f!~ I ipal 20.0 (Bank) (R) Medium-sized cities water supply, Group I Appraisal mission in field. No action. To be determined (R) Development Project preparation No action. (Bank) finance companies V mission in field. P.1 for footnotes!/,~. y, and !Y'· I ......flt •• ) · ~ ~ - 2J ,I,;ii •• r State, wer, Amount and Probable J· Available Information f.!_s_iar_y_A_sency Y _!.ender ]j It Project '}_/ on Procurement !!_/ __ !BIA (CONT'D) To be determined Cerro Hat.oso Awaiting receipt of No action. (Bank) Nickel project proposal from Government, To be determined Interconnection Awai ting feasibility No action. (Bank) hydropower studies. ~R To be determined Forestry Awaiting feasibility No action. (Bank) study. (R) Irrigation Project preparation suspended indefinitely by Government; reporting will be discontinued. lESA ELECTRICA 6.8 Nayon hydro- Negotiations substantially Contract for civil works O" S,A,) (IDA) power completed. Awaiting awarded after bidding. Government's approval of Total cost of contract credit documents and about $3.1 million of completion of arrangements which $0.8 million is with other lenders before foreign exchange. presenting to Executive Contract ($1.2 million) Directors for 9 MW Diesel units has also been awarded, Retroactive financing of $1.4 million may be recommended. To be determined Airport Awaiting feasibility No action, (Bank) study. Nacional To be determined (R) Agricultural Project report being No action, ,mento (Bank) credit prepared. :UAY '-- 8.5 (R) Road improve- Appraisal mission in No action. (Bank) ment field. 5.0 Education I Appraisal report being No action. (IDA) prepared. 3.0 (R) Tourism Appraisal mission No action. (IDA~ in field. '0 AGROPECUARIO) 25.0 Agricultural Awaiting project No action. (Bank) credit preparation. ESAS ELECTRICAS 20.0 Power Awaiting feasibility No action. AS) (Bank) distribution report and Government action on tariffs. nal Port To be determined Ports Various studies leading to No action. rity (Bank) project identification are_ planned. 20.0 (R) Highways VI Project preparation No action, (Bank) mission in field. AY 10.0 Livestock IV Appraisal report under No action. (Bank) consideration. istracion To be determined Power Awaiting UTE planning No action. al de Las (Bank) study. s Electricas Telefonos stado (UTE) .1 for footnotes!/, ±I,'}_/ and!!_/,