E-202 VOL. 24 HAD EXPORT PROJECT VOLUME 6 * Environmental Line List * Environmental Alignment Sheets ENVIRONMENTAL: MANAGEMENT PLAN' CHAD PORTION, ENVIRONMENTAL ASSESSMENT EXECUTIVE SUMMARY AND UPDATE I ~~Environmental Supotng Environmentall Management Plan - Documents Management Plan - Chad Portion Cameroon Portion VOLUME 1 VOLUME 1 VOLUME 1 * Base Document - Project Description * Base Document * Management Plan for Cultural Properties * Decommissioning * Induced Access Management Plan * Handbook for Site-Specific * List of Studies/Reports * Management Plan for Cultural Properties Environmental Mitigation Actions * List of Consultants/Experts * Handbook for Site-Specific Environmental * Environmental Monitoring Plan VOLUME 2 Mitigation Actions VOLUME 2 * Alternatives Analysis * Environmental Monitoring Plan * Biophysical/Socioeconomic/Health VOLUME 3 VOLUME 2 Technical Requirements and * Consultation and Public Review Program * Biophysical/Socioeconomic/Health Specifications Technical Requirements and Specifications VOLUME 3 * Oil Spill Response: Preliminary VOLUME 3 * Compensation & Resettlement Plan Approach * Compensation Plan VOLUME 4 VOLUME 5 VOLUME 4 * Regional Development Plan: * Chad Biological Studies * Environmental Foundation Plan Near Term Measures * Cameroon Biological Studies * Offsite Environmental Enhancement Program * Revenue Management Plan * Indigenous Peoples Plan * Institutional Capacity Building VOLUME 6 *Chad Public Health VOLUME 5 VOLUME 5 * Cameroon Public Health * Waste Management Plan * Waste Management Plan , VOLUME 6 _________________________ ~~~~~~VOLUME 6 VOLUME 6 * Environmental Line List * Environmental Line List * Environmental Alignment Sheets • Environmental Alignment Sheets REFERENCE DOCUMENTS 4/29/99 ONLY THE OVERVIEW IS AVAILABLE IN FRENCH AND ENGLISH ENVIRONMENTAL MANAGEMENT PLAN CHAD PORTION VOLUME 6 ENVIRONMENTAL LINE LIST ENVIRONMENTAL ALIGNMENT SHEETS May 1999 06-99 ENVIRONMENTAL LINE LIST ENVIRONMENTAL ALIGNMENT SHEETS ENVIRONMENTAL MANAGEMENT PLAN CHAD EXPORTPROJECT CHAD PORTION - VOLUME 6 ENVIRONMENTAL LINE LIST ENVIRONMENTAL ALIGNMENT SHEETS Environmental mapping at a 1:200,000 scale based primarily on terrain maps, satellite imagery, and associated environmental assessment field studies was used in the process to define the path of the TOTCO Transportation System's pipeline and the locations of the oil field area facilities. This level of mapping was sufficient for initial engineering and planning purposes. Data gathered via recent biological resource surveys (e.g., botanical studies, fisheries studies, and studies of birds and mammals) and the recently-completed Transportation System Centerline Survey have allowed for a more thorough understanding of the biological features along the TOTCO Transportation System's pipeline easement and in the oil field development area. After being mapped, these data were superimposed on analyzed and interpreted 1:10,000 to 1:50,000 scale aerial and satellite images that were acquired by the Project to produce 26 Environmental Alignment Sheets (EASs) for the easement of the TOTCO Transportation System and 12 Environmental Alignment Sheets for the oil field development area. In addition to allowing for a site-specific depiction of important biological resource information, these Environmental Alignment Sheets also function as a tool for highlighting the locations along the TOTCO Transportation System and in the oil field development area where site-specific environmental management requirements are to be implemented prior to, during, and/or after construction of the pipeline and the oil field area facilities. The categories of biological resources and environmental management requirements appearing in the Project's Environmental Alignment Sheets are: * Vegetation/Land use classifications; * Vegetation and wildlife resources; * Vegetation and wildlife protection measures; * Monitoring and surveys; * Fisheries protection measures; * Erosion and sediment control measures; and * Soil handling and special area reclamation measures. The environmental management requirements appearing in the Project's Environmental Alignment Sheets have been designed to reduce construction- and operations-related impacts to acceptable levels and are consistent with this EMP, most notably the Project's Biophysical/Socioeconomic/Health Requirements and Specifications (see Volume 2 of this EMP). LineList CHAD English 05-04.DOC 1 May 1999 ENVIRONMENTAL LINE UST ENVIRONMENTAL ALIGNMENT SHEETS ENVIRONMENTAL MANAGEMENT PLAN CHAD PORTION- VOLUME 6 CHAD EXPORT PROJECT Locations of sensitive biological resources and habitats as well as the Project's site-specific environmental management requirements are represented on the Environmental Alignment Sheets by codes (for example, WPM-1 is the code for an Environmental Awareness/Education Program in sensitive habitats). A complete listing of the codes for the biological resources and environmental management requirements that appear in the Project's Environmental Alignment Sheets can be found in the Handbook that constitutes Appendix D of Volume I of this EMP. The biological resource and environmental management requirement codes appearing in each Environmental Alignment Sheet's legend are summarized in tabular format by pipeline kilometer (km) post for the pipeline and grid block for the oil field area facilities in an accompanying document referred to as the Environmental Line List. Construction personnel will, therefore, be able to determine environmental management requirements at any point along the TOTCO Transportation System's easement or in the oil field development area by referring to the appropriate Environmental Alignment Sheet and/or the Environmental Line List. The Project's Environmental Line List and Environmental Alignment Sheets will be updated and expanded to include site-specific erosion and sediment control measures once detailed construction planning is completed. New information and processes also may result in changes to existing environmental management requirements and/or the definition of new ones, therefore, further revisions to the Environmental Alignment Sheets, the Environmental Line List, and their associated Handbook may be necessary. The Project's Environmental Line List and Environmental Alignment Sheets constitute Volume 6 of this EMP. Please note that the Environmental Line List and the Environmental Alignment Sheets will not be translated into French. The Environmental Alignment Sheets are bound separately and due to their size and number will not be distributed as part of the overall environmental documentation package for the Chad Export Project. May 1999 2 LineList CHAD English 05-04.DOC ENVIRONMENTAL LINE LIST OIL FIELD DEVELOPMENT AREA VEGETATION AND WILDLIFE RESOURCES CHAD EXPORT PROJECT CHAD PORTION Vegetation and Wildlife Resources EAS From To Distance Sheet # EAS Code Grid Pt Grid Pt (km) Specific Information Remarks Al WR-2/M-G 662.30 662.60 0.3 Seasonally inundated grassland Al WR-2/M-G 663.12 663.77 0.65 Seasonally inundated grassland Al WR-2/M-G 664.05 664.73 0.68 Seasonally inundated grassland Al WR-2/M-G 665.08 665.54 0.46 Seasonally inundated grassland A2 WR-2N1W, M-G 681.06 690.00 8.94 Nya River, streamside woodland, wildlife corridor, seasonally inundated grassland A2 WR-3/Wl, M-G 681.06 690.00 8.94 Fishery resource A3 WR-2/W1,M-G 701.25 702.28 1.03 Streamside woodland, seasonally inundated grassland A3 WR-2/W1,M-G,R 690.00 697.51 7.51 Nya River, streamside woodland, seasonally inundated grassland, gallery forest, wildlife corridor A3 WR-31W1 701.25 702.28 1.03 Fishery resource A3 WR-3N1,R 690.00 697.51 7.51 Fishery resource B1 WR-2/M-G 662.32 662.58 0.26 Seasonally inundated grassland B2 WR-2/W1 688.30 688.53 0.23 Streamside woodland, wildlife corridor B2 WR-2/Wl,M-G 680.77 686.92 6.15 Nya River, streamside woodland, wildlife corridor, seasonally inundated grassland B2 WR-3/W1,M-G 680.77 686.92 6.15 Fishery resource B3 WR-2/W1 690.45 696.30 5.85 Loule River, streamside woodland, wildlife corridor B3 WR-2/W1 701.51 702.30 0.79 Streamside woodland, wildlife corridor B3 WR-3/W1 690.45 696.30 5.85 Fishery resource Cl WR-2/Wl 670.55 672.28 1.73 Streamside woodland, wildlife corridor, rehabilitation of topography along trenchline Cl WR-2/W1 672.40 673.15 0.75 Streamside woodland, wildlife corridor, rehabilitation of topography along trenchline Oil Field Development Area April 27, 1999, Rev. 0 Chad Vegetation and Wildlife Resources, Page 1 of 2 EAS From To Distance Sheet # EAS Code Grid Pt Grid Pt (km) Specific Information Remarks Ci WR-2/W1 673.27 675.11 1.84 Streamside woodland, wildlife corridor, rehabilitation of topography along trenchline C1 WR-2/W1 675.23 676.00 0.77 Streamside woodland, wildlife corridor, rehabilitation of topography along trenchline C2 WR-2/W1 676.00 681.21 5.21 Nya River, streamside woodland, wildlife corridor C2 WR-21WI 681.97 683.80 1.83 Nya River, streamside woodland Wildlife corridor C2 WR-3NW1 676.00 681.21 5.21 Fishery resource C2 WR-3/W1 681.97 683.80 1.83 Fishery resource C3 WR-21W1 693.20 696.28 3.08 Loule River, fishery resource, wildlife corridor C3 WR-3/W1 693.20 696.28 3.08 Fishery resource Di WR-2/W1,M-G 670.18 676.00 5.82 Nya River, seasonally inundated grassland, streamside woodland, wildlife corridor DI WR-31W1, M-G 670.18 676.00 5.82 Fishery resource D2 WR-21W1 682.02 682.24 0.22 Streamside woodland D2 WR-2/W1 683.88 690.00 6.12 Loule River, streamside woodland; wildlife corridor D2 WR-21W1,M-G 676.00 676.82 0.82 Nya River, streamside woodland, seasonally inundated grassland, wildlife corridor D2 WR-31W1 683.88 690.00 6.12 Fishery resource D3 WR-2/W1 690.00 694.27 4.27 Loule River, streamside woodland D3 WR-3/W1 690.00 694.27 4.27 Loule River, fishery resource Oil Field Development Area April 27,1999, Rev. 0 Chad Vegetation and Wildlife Resources, Page 2 of 2 ENVIRONMENTAL LINE LIST OIL FIELD DEVELOPMENT AREA VEGETATION AND WILDLIFE PROTECTION MEASURES CHAD EXPORT PROJECT CHAD PORTION Vegetation and Wildlife Protection Measures EAS From To Distance Sheet # EAS Code Grid Pt Grid Pt (km) Specific Information Remarks Al WPM-1/M-G 662.30 662.60 0.3 Environmental Awareness Program Focus on sensitive species, seasonally inundated grassland Al WPM-1/M-G 663.12 663.77 0.65 Environmental Awareness Program Focus on sensitive species, seasonally inundated grassland Al WPM-1/M-G 664.05 664.73 0.68 Environmental Awareness Program Focus on sensitive species, seasonally inundated grassland Al WPM-l/M-G 665.08 665.54 0.46 Environmental Awareness Program Focus on sensitive species, seasonally inundated grassland A2 WPM-1/W1,M-G 681.06 690.00 8.94 Environmental Awareness Program Focus on stream crossing, seasonally inundated grassland, sensitive species A2 WPM-2NW1,M-G 681.06 690.00 8.94 Reduce impacts to wildlife corridors At stream crossings, implement 1 of 3 options in EAS handbook A2 WPM-3/W1,M-G 681.06 690.00 8.94 Construction management Focus on stream crossings, rehabilitation of topography along trenchline A3 WPM-1IWl,M-G 701.25 702.28 1.03 Environmental Awareness Program Focus on streams, seasonally inundated grassland, sensitive species A3 WPM-l/W1,M-G,R 690.00 697.51 7.51 Environmental Awareness Program Focus on stream crossing, seasonally inundated grassland, sensitive species A3 WPM-2tW1 701.25 702.28 1.03 Reduce impacts to wildlife corridors At stream crossings, implement 1 of 3 options in EAS handbook A3 WPM-2/W1,R 690.00 697.51 7.51 Reduce impacts to wildlife corridors At stream crossings, implement I of 3 options in EAS handbook A3 WPM-3/W1,M-G 701.25 702.28 1.03 Construction management Focus on stream crossing, seasonally inundated grassland, rehabilitate topography along trenchline Oil Field Development Area April 27, 1999, Rev. 0 Chad Vegetation and Wildlife Protection Measures, Page 1 of 4 EAS From To Distance Sheet # EAS Code Grid Pt Grid Pt (km) Specific Information Remarks A3 WPM-3/Wl,M-G,R 690.00 697.51 7.51 Construction management Focus on stream crossing, seasonally inundated grassland, rehabilitate topography along trenchline B1 WPM-1/M-G 662.32 662.58 0.26 Environmental Awareness Program Focus on sensitive species, seasonally inundated grassland B1 WPM-3/M-G 662.32 662.58 0.26 Construction management Focus on rehabilitation of topography along trenchline B2 WPM-1/W1 688.30 688.53 0.23 Environmental Awareness Program Focus on streamside woodland, sensitive species B2 WPM-1IW1,M-G 680.77 686.92 6.15 Environmental Awareness Program Focus on stream crossing, seasonally inundated grassland, sensitive species B2 WPM-2/M-G 680.77 686.92 6.15 Reduce impacts to wildlife corridors At stream crossings, implement 1 of 3 options in EAS handbook B2 WPM-3/W1 688.30 688.53 0.23 Construction management Focus on stream crossing B2 WPM-3/W1,M-G 680.77 686.92 6.15 Construction management Focus on stream crossings, rehabilitation of topography along trenchfine B3 WPM-1/W1 690.45 696.30 5.85 Environmental Awareness Program Focus on stream, seasonally inundated grassland, sensitive species B3 WPM-1/W1 701.51 702.30 0.79 Environmental Awareness Program Focus on stream, seasonally inundated grassland, sensitive species B3 WPM-21W1 690.45 696.30 5.85 Reduce impacts to wildlife corridors At stream crossings, implement 1 of 3 options in EAS handbook B3 WPM-3/W1 690.45 696.30 5.85 Construction management Focus on stream crossing C1 WPM-1/W1 670.55 672.28 1.73 Environmental Awareness Program Focus on stream crossing, sensitive species C1 WPM-1/W1 672.40 673.15 0.75 Environmental Awareness Program Focus on stream crossing, sensitive species C1 WPM-1/W1 673.27 675.11 1.84 Environmental Awareness Program Focus on stream crossing, sensitive species Oil Field Development Area April 27,1999, Rev. 0 Chad Vegetation and Wildlife Protection Measures, Page 2 of 4 EAS From To Distance Sheet # EAS Code Grid Pt Grid Pt (km) Specific Information Remarks C1 WPM-1/WI 675.23 676.00 0.77 Environmental Awareness Program Focus on stream crossing, sensitive species C1 WPM-3/W1 670.55 672.28 1.73 Construction management Focus on stream crossing, rehabilitation of topography along trenchline C1 WPM-31W1 672.40 673.15 0.75 Construction management Focus on stream crossing, rehabilitation of topography along trenchline C1 WPM-3/W1 673.27 675.11 1.84 Construction management Focus on stream crossing, rehabilitation of topography along trenchline C1 WPM-3/W1 675.23 676.00 0.77 Construction management Focus on stream crossing, rehabilitation of topography along trenchline C2 WPM-lNV1,M-G 676.00 683.80 7.8 Environmental Awareness Program Focus on stream crossing, sensitive species C2 WPM-2NV1,M-G 676.00 683.00 7 Reduce impacts to wildlife corridors At stream crossings, implement I of 3 options in EAS handbook C2 WPM-3/W1,M-G 676.00 683.80 7.8 Construction management Focus on stream crossing C3 WPM-1/W1 693.20 696.28 3.08 Environmental Awareness Program Focus on stream crossing, sensitive species C3 WPM-2/W1 693.20 696.28 3.08 Reduce impacts to wildlife corridors At stream crossings, implement I of 3 options in EAS handbook C3 WPM-3/W1 693.20 696.28 3.08 Construction management Focus on stream crossing Dl WPM-1/W1,M-G 670.18 676.00 5.82 Environmental Awareness Program Focus on streams, seasonally inundated grassland, sensitive species DI WPM-2AW1,M-G 670.18 676.00 5.82 Reduce impacts to wildlife corridors At stream crossings, implement 1 of 3 options in EAS handbook Dl WPM-3/W1,M-G 670.18 676.00 5.82 Construction management Focus on stream crossings, rehabilitation of topography along trenchline D2 WPM-1/W1 682.02 682.24 0.22 Environmental Awareness Program Focus on stream crossing, sensitive species Oil Field Development Area April 27, 1999, Rev. 0 Chad Vegetation and Wildlife Protection Measures, Page 3 of 4 EAS From To Distance Sheet # EAS Code Grid Pt Grid Pt (km) Specific Information Remarks D2 WPM-1/W1 683.88 690.00 6.12 Environmental Awareness Program Focus on stream crossing, sensitive species D2 WPM-1/W1,M-G 676.00 676.82 0.82 Environmental Awareness Program Focus on stream crossing, seasonally Inundated grassland, sensitive species D2 WPM-2NW1 683.88 690.00 6.12 Reduce impacts to wildlife corridors At stream crossings, implement 1 of 3 options in EAS handbook D2 WPM-2NV1,M-G 676.00 676.82 0.82 Reduce impacts to wildlife corridors At stream crossings, implement 1 of 3 options in EAS handbook D2 WPM-3/W1 682.02 682.24 0.22 Construction management Focus on stream crossings, rehabilitation of topography along trenchline D2 WPM-3/W1 683.88 690.00 6.12 Construction management Focus on stream crossing D2 WPM-3/V1,M-G 676.00 676.82 0.82 Construction management Focus on stream crossings, rehabilitation of topography along trenchline D3 WPM-1N1W 690.00 694.27 4.27 Environmental Awareness Program Focus on stream crossing, sensitive species D3 WPM-2NW1 690.00 694.27 4.27 Reduce impacts to wildlife corridors At stream crossings, implement I of 3 options in EAS handbook D3 WPM-31W1 690.00 694.27 4.27 Construction management Focus on stream crossing Oil Field Development Area April 27,1999, Rev. 0 Chad Vegetation and Wildlife Protection Measures, Page 4 of 4 ENVIRONMENTAL LINE LIST OIL FIELD DEVELOPMENT AREA MONITORING, SURVEYS AND SEASONAL RESTRICTIONS CHAD EXPORT PROJECT CHAD PORTION Monitoring, Surveys and Seasonal Restrictions EAS From To Distance Sheet # EAS Code Grid Pt Grid Pt (km) Specific Information Remarks Al WPM-5/M-G 662.30 662.60 0.3 Construction management Focus on sensitive species Al WPM-5/M-G 663.12 663.77 0.65 Construction management Focus on sensitive species Al WPM-5/M-G 664.05 664.73 0.68 Construction management Focus on sensitive species Al WPM-5/M-G 665.08 665.54 0.46 Construction management Focus on sensitive species Al WPM-7/M-G 662.30 662.60 0.3 Post-construction monitoring Only in areas with sensitive species Al WPM-7/M-G 663.12 663.77 0.65 Post-construction monitoring Only in areas with sensitive species Al WPM-7/M-G 664.05 664.73 0.68 Post-construction monitoring Only in areas with sensitive species Al WPM-7/M-G 665.08 665.54 0.46 Post-construction monitoring Only in areas with sensitive species A2 WPM-5/W1,M-G 681.06 690.00 8.94 Construction monitoring Focus on sensitive species A2 WPM-6/W1,M-G 681.06 690.00 8.94 Fisheries monitoring Note presence of water, fish at time of construction A2 WPM-7N1W,M-G 681.06 690.00 8.94 Post-construction monitoring Only at stream crossings, areas with sensitive species A3 WPM-5/M-G 662.32 662.58 0.26 Construction monitoring Focus on sensitive species A3 WPM-5N1W,M-G 701.25 702.28 1.03 Construction monitoring Focus on sensitive species, seasonally inundated grassland A3 WPM-5N1W,M-G,R 690.00 697.51 7.51 Construction monitoring Focus on sensitive species, seasonally inundated grassland A3 WPM-6NVI,M-G 701.25 702.28 1.03 Fisheries monitoring Note presence of water, fish at time of construction A3 WPM-6/Wl,M-G,R 690.00 697.51 7.51 Fisheries monitoring Note presence of water, fish at time of construction A3 WPM-7/M-G 662.32 662.58 0.26 Post-construction monitoring Only in areas with water or sensitive species Oil Field Development Area April 27, 1999, Rev. 0 Chad Monitoring, Surveys and Seasonal Restrictions, Page 1 of 4 EAS From To Distance Sheet # EAS Code Grid Pt Grid Pt (km) Specific Information Remarks A3 WPM-7/N1,M-G 701.25 702.28 1.03 Post-construction monitoring Only at stream crossings, areas with sensitive species A3 WPM-7/Wl,M-G,R 690.00 697.51 7.51 Post-construction monitoring Only at stream crossings, areas with sensitive species B1 WPM-5/M-G 662.32 662.58 0.26 Construction monitoring Focus on sensitive species B1 WPM-7/M-G 662.32 662.58 0.26 Post-construction monitoring Only at stream crossings, areas with sensitive species B2 WPM-5NV1 688.30 688.53 0.23 Construction monitoring Focus on sensitive species B2 WPM-5N1W,M-G 680.77 686.92 6.15 Construction monitoring Focus on sensitive species B2 WPM-6/M-G 680.77 686.92 6.15 Fisheries monitoring Note presence of water, fish at time of construction B2 WPM-7/W1 688.30 688.53 0.23 Post-construction monitoring Only at stream crossings, areas with sensitive species B2 WPM-7NV1,M-G 680.77 686.92 6.15 Post-construction monitoring Only at stream crossings, areas with sensitive species B3 WPM-5NV1 690.45 696.30 5.85 Construction monitoring Focus on sensitive species, seasonally inundated grassland B3 WPM-5N1l 701.51 702.30 0.79 Construction monitoring Focus on sensitive species, seasonally inundated grassland B3 WPM-6/W1 690.45 696.30 5.85 Fisheries monitoring Note presence of water, fish at time of construction B3 WPM-7/W1 690.45 696.30 5.85 Post-construction monitoring Only at stream crossings, areas with sensitive species B3 WPM-7/W1 701.51 702.30 0.79 Post-construction monitoring Only at stream crossings, areas with sensitive species Ci WPM-5/W1 670.55 672.28 1.73 Construction monitoring Focus on sensitive species Cl WPM-5N1W 672.40 673.15 0.75 Construction monitoring Focus on sensitive species C1 WPM-5/W1 673.27 675.11 1.84 Construction monitoring Focus on sensitive species C1 WPM-5/W1 675.23 676.00 0.77 Construction monitoring Focus on sensitive species C1 WPM-7/Wl 670.55 672.28 1.73 Post-construction monitoring Only at stream crossings, areas with sensitive species Oil Field Development Area April 27,1999, Rev. 0 Chad Monitoring, Surveys and Seasonal Restrictions, Page 2 of 4 EAS From To Distance Sheet # EAS Code Grid Pt Grid Pt (km) Specific Information Remarks C1 WPM-7/W1 672.40 673.15 0.75 Post-construction monitoring Only at stream crossings, areas with sensitive species C1 WPM-7/W1 673.27 675.11 1.84 Post-construction monitoring Only at stream crossings, areas with sensitive species C1 WPM-7/W1 675.23 676.00 0.77 Post-construction monitoring Only at stream crossings, areas with sensitive species C2 WPM-5N1W,M-G 676.00 683.80 7.8 Construction monitoring Focus on sensitive species C2 WPM-61Wl,M-G 676.00 683.80 7.8 Fisheries monitoring Note presence of water, fish at time of construction C2 WPM-7/W1,M-G 676.00 683.80 7.8 Post-construction monitoring Only at stream crossings, areas with sensitive species C3 WPM-5/W1 693.20 696.28 3.08 Construction monitoring Focus on sensitive species C3 WPM-6/W1 693.20 696.28 3.08 Fisheries monitoring Note presence of water, fish at time of construction C3 WPM-7/W1 693.20 696.28 3.08 Post-construction monitoring Only at stream crossings, areas with sensitive species Dl WPM-5/W1,M-G 670.18 676.00 5.82 Construction monitoring Focus on sensitive species Dl WPM-6/W1,M-G 670.18 676.00 5.82 Fisheries monitoring Note presence of water, fish at time of construction Dl WPM-7A1W,M-G 670.18 676.00 5.82 Post-construction monitoring Only at stream crossings, areas with sensitive species D2 WPM-51W1 683.88 690.00 6.12 Construction monitoring Focus on sensitive species D2 WPM-51Wl1,M-G 676.00 676.82 0.82 Construction monitoring Focus on sensitive species D2 WPM-6/W1 683.88 690.00 6.12 Fisheries monitoring Note presence of water, fish at time of construction D2 WPM-6N1W,M-G 676.00 676.82 0.82 Fisheries monitoring Note presence of water, fish at time of construction D2 WPM-7/W1 682.02 682.24 0.22 Post-construction monitoring Only at stream crossings, areas with sensitive species D2 WPM-7/W1 683.88 690.00 6.12 Post-construction monitoring Only at stream crossings, areas with sensitive species Oil Field Development Area April 27, 1999, Rev. 0 Chad Monitoring, Surveys and Seasonal Restrictions, Page 3 of 4 EAS From To Distance Sheet # EAS Code Grid Pt Grid Pt (km) Specific Information Remarks D2 WPM-7WVI,M-G 676.00 676.82 0.82 Post-construction monitoring Only at stream crossings, areas with sensitive species D2 WPM5NV1 682.02 682.24 0.22 Construction monitoring Focus on sensitive species D3 WPM-5/W1 690.00 694.27 4.27 Construction monitoring Focus on sensitive species D3 WPM-6NV1 690.00 694.27 4.27 Fisheries monitoring Note presence of water, fish at time of construction D3 WPM-7/W1 690.00 694.27 4.27 Post-construction monitoring Only at stream crossings, areas with sensitive species Oil Field Development Area April 27,1999, Rev. 0 Chad Monitoring, Surveys and Seasonal Restrictions, Page 4 of 4 ENVIRONMENTAL LINE LIST OIL FIELD DEVELOPMENT AREA FISHERIES PROTECTION MEASURES CHAD EXPORT PROJECT CHAD PORTION Fisheries Protection Measures EAS From To Distance Sheet # EAS Code Grid Pt Grid Pt (km) Specific Information Remarks A2 FPM-1/Wl,M-G 685.35 690.00 4.65 Village consultation Consult with local officials prior to construction, as explained in EAS handbook A2 FPM-2N1W,M-G 681.06 690.00 8.94 Streambank rehabilitation Salvage all topsoil or native material A3 FPM-1/W1 701.25 702.28 1.03 Village consultation Consult with local officials prior to construction, as explained in EAS handbook A3 FPM-1/W1W,R 690.00 697.51 7.51 Village consultation Consult with local officials prior to construction, as explained in EAS handbook A3 FPM-2/W1 701.25 702.28 1.03 Streambank rehabilitation Salvage all topsoil or native material A3 FPM-2AWl,R 690.00 697.51 7.51 Streambank rehabilitation Salvage all topsoil or native material B2 FPM-1/M-G 680.77 686.92 6.15 Village consultation Consult with local officials prior to construction, as explained in EAS handbook B2 FPM-2/M-G 680.77 686.92 6.15 Streambank rehabilitation Salvage all topsoil or native material B3 FPM-1/W1 695.00 696.30 1.3 Village consultation Consult with local officials prior to construction, as explained in EAS handbook B3 FPM-21W1 690.45 696.30 5.85 Streambank rehabilitation Salvage all topsoil or native material C2 FPM-IIWl,M-G 676.00 683.00 7 Village consultation Consult with local officials prior to construction, as explained in EAS handbook C2 FPM-2/WI,M-G 676.00 683.80 7.8 Streambank rehabilitation Salvage all topsoil or native material C3 FPM-1/W1 693.20 696.28 3.08 Village consultation Consult with local officials prior to construction, as explained in EAS handbook Oil Field Development Area April 27, 1999, Rev. 0 Chad Fisheries Protection Measures, Page 1 of 2 EAS From To Distance Sheet # EAS Code Grid Pt Grid Pt (km) Specific Information Remarks C3 FPM-2/W1 693.20 696.28 3.08 Streambank rehabilitation Salvage all topsoil or native material Dl FPM-1/Wl,M-G 670.18 676.00 5.82 Village consultation Consult with local officials prior to construction, as explained in EAS handbook Dl FPM-2/W1,M-G 670.18 676.00 5.82 Streambank rehabilitation Salvage all topsoil or native material D2 FPM-1/W1 683.88 690.00 6.12 Village consultation Consult with local officials prior to construction, as explained in EAS handbook D2 FPM-1/WI,M-G 676.00 676.82 0.82 Village consultation Consult with local officials prior to construction, as explained in EAS handbook D2 FPM-2Nv1 683.88 690.00 6.12 Streambank rehabilitation Salvage all topsoil or native material D2 FPM-2A1l,M-G 676.00 676.82 0.82 Streambank rehabilitation Salvage all topsoil or native material D3 FPM-1/W1 690.00 694.27 4.27 Village consultation Consult with local officials prior to construction, as explained in EAS handbook D3 FPM-2NW1 690.00 694.27 4.27 Streambank rehabilitation Salvage all topsoil or native material Oil Field Development Area April 27,1999, Rev. 0 Chad Fisheries Protection Measures, Page 2 of 2 ENVIRONMENTAL LINE LIST OIL FIELD DEVELOPMENT AREA EROSION AND SEDIMENT CONTROL MEASURES (to be developed) CHAD EXPORT PROJECT CHAD PORTION ENVIRONMENTAL LINE LIST OIL FIELD DEVELOPMENT AREA SOIL HANDLING AND SPECIAL AREA RECLAMATION CHAD EXPORT PROJECT CHAD PORTION Soil Handling and Special Area Reclamation EAS From To Distance Sheet # EAS Code Grid Pt Grid Pt (km) Specific Information Remarks Al RECL-1/A 662.30 671.18 8.88 Topsoil salvage Salvage all topsoil Al RECL-1/A 672.00 676.00 4 Topsoil salvage Salvage all topsoil Al RECL-2/Al 662.30 665.80 3.5 Limited topsoil salvage Active agricultural areas only Al RECL-2/A1 665.88 676.00 10.12 Limited topsoil salvage Active agricultural areas only A2 RECL-l/A 676.00 682.85 6.85 Topsoil salvage Salvage all topsoil A2 RECL-i/A 682.90 690.00 7.1 Topsoil salvage Salvage all topsoil A2 RECL-2/A1 676.00 679.00 3 Limited topsoil salvage Active agricultural areas only A2 RECL-2/A1 679.18 685.45 6.27 Limited topsoil salvage Active agricultural areas only A2 RECL-2/Al 685.80 690.00 4.2 Limited topsoil salvage Active agricultural areas only A3 RECL-1/A 690.00 694.00 4 Topsoil salvage Salvage all topsoil A3 RECL-1/A 696.50 698.38 1.88 Topsoil salvage Salvage all topsoil A3 RECL-1/A 700.92 702.08 1.16 Topsoil salvage Salvage all topsoil A3 RECL-2/A1 690.00 692.43 2.43 Limited topsoil salvage Active agricultural areas only A3 RECL-2/A1 693.26 695.02 1.76 Limited topsoil salvage Active agricultural areas only A3 RECL-2/Al 695.14 695.52 0.38 Limited topsoil salvage Active agricultural areas only A3 RECL-2/A1 695.87 696.15 0.28 Limited topsoil salvage Active agricultural areas only A3 RECL-2/A1 696.38 702.07 5.69 Limited topsoil salvage Active agricultural areas only B1 RECL-1/A 662.32 675.80 13.48 Topsoil salvage Salvage all topsoil B1 RECL-2/Al 662.32 668.84 6.52 Limited topsoil salvage Active agricultural areas only B1 RECL-2/A1 669.27 669.72 0.45 Limited topsoil salvage Active agricultural areas only B1 RECL-2/A1 670.60 672.53 1.93 Limited topsoil salvage Active agricultural areas only B1 RECL-2/A1 673.00 676.00 3 Limited topsoil salvage Active agricultural areas only Oil Field Development Area April 27, 1999, Rev. 0 Chad Soil Handling and Special Area Reclamation, Page 1 of 3 EAS From To Distance Sheet # EAS Code Grid Pt Grid Pt (km) Specific Information Remarks B2 RECL-1/A 676.08 685.29 9.21 Topsoil salvage Salvage all topsoil B2 RECL-1/A 685.50 686.20 0.7 Topsoil salvage Salvage all topsoil B2 RECL-1/A 687.50 689.35 1.85 Topsoil salvage Salvage all topsoil B2 RECL-2/Al 676.00 690.00 14 Limited topsoil salvage Active agricultural areas only B3 RECL-1/A 694,37 695.93 1.56 Topsoil salvage Salvage all topsoil B3 RECL-1/A 696.19 698.88 2.69 Topsoil salvage Salvage all topsoil B3 RECL-1/A 700.13 702.30 2.17 Topsoil salvage Salvage all topsoil B3 RECL-2/A1 690.00 696.41 6.41 Limited topsoil salvage Active agricultural areas only B3 RECL-2/A1 696.80 702.30 5.5 Limited topsoil salvage Active agricultural areas only C1 RECL-1/A 662.38 673.35 10.97 Topsoil salvage Salvage all topsoil C1 RECL-1/A 673.81 676.00 2.19 Topsoil salvage Salvage all topsoil C1 RECL-2/A1 662.38 676.00 13.62 Limited topsoil salvage Active agricultural areas only C2 RECL-1/A 676.00 683.78 7.78 Topsoil salvage Salvage all topsoil C2 RECL-I/A 684.80 686.17 1.37 Topsoil salvage Salvage all topsoil C2 RECL-1/A 688.45 690.00 1.55 Topsoil salvage Salvage all topsoil C2 RECL-2/A1 676.00 685.80 9.8 Limited topsoil salvage Active agricultural areas only C2 RECL-2/A1 686.07 689.75 3.68 Limited topsoil salvage Active agricultural areas only C3 RECL-1/A 690.00 692.08 2.08 Topsoil salvage Salvage all topsoil C3 RECL-1/A 694.20 696.82 2.62 Topsoil salvage Salvage all topsoil C3 RECL-1/A 697.68 699.20 1.52 Topsoil salvage Salvage all topsoil C3 RECL-1/A 700.49 702.35 1.86 Topsoil salvage Salvage all topsoil C3 RECL-2/A1 690.00 702.35 12.35 Limited topsoil salvage Active agricultural areas only DI RECL-1/A 662.43 663.07 0.64 Topsoil salvage Salvage all topsoil Dl RECL-1/A 664.22 668.40 4.18 Topsoil salvage Salvage all topsoil Oil Field Development Area April 27, 1999, Rev. 0 Chad Soil Handling and Special Area Reclamation, Page 2 of 3 EAS From To Distance Sheet # EAS Code Grid Pt Grid Pt (km) Specific Information Remarks Dl RECL-1/A 669.00 669.38 0.38 Topsoil salvage Salvage all topsoil Dl RECL-1/A 669.80 672.13 2.33 Topsoil salvage Salvage all topsoil Dl RECL-1/A 673.05 675.10 2.05 Topsoil salvage Salvage all topsoil DI RECL-1/A 675.20 675.90 0.7 Topsoil salvage Salvage all topsoil Dl RECL-2/Al 662.43 676.00 13.57 Limited topsoil salvage Active agricultural areas only D2 RECL-1/A 676.00 677.80 0.8 Topsoil salvage Salvage all topsoil D2 RECL-I/A 680.16 683.72 3.56 Topsoil salvage Salvage all topsoil D2 RECL-1/A 684.73 686.28 1.55 Topsoil salvage Salvage all topsoil D2 RECL-1/A 686.50 688.81 2.31 Topsoil salvage Salvage all topsoil D2 RECL-1/A 689.01 690.00 0.99 Topsoil salvage Salvage all topsoil D2 RECL-2/A1 676.00 683.17 7.17 Limited topsoil salvage Active agricultural areas only D2 RECL-2/Al 683.22 684.18 0.96 Limited topsoil salvage Active agricultural areas only D2 RECL-2/A1 684.24 687.80 3.56 Limited topsoil salvage Active agricultural areas only D2 RECL-2/A1 687.87 688.14 0.27 Limited topsoil salvage Active agricultural areas only D2 RECL-2/Al 688.58 689.10 0.52 Limited topsoil salvage Active agricultural areas only D2 RECL-2/A1 689.23 690.00 0.77 Limited topsoil salvage Active agricultural areas only D3 RECL-1/A 690.14 691.13 0.99 Topsoil salvage Salvage all topsoil D3 RECL-1/A 692.17 293.00 0.83 Topsoil salvage Salvage all topsoil D3 RECL-1/A 693.20 698.49 5.29 Topsoil salvage Salvage all topsoil D3 RECL-1/A 699.58 702.15 2.57 Topsoil salvage Salvage all topsoil D3 RECL-2/A1 690.00 698.30 8.3 Limited topsoil salvage Active agricultural areas only D3 RECL-2/Al 698.42 702.40 3.98 Limited topsoil salvage Active agricultural areas only Oil Field Development Area April 27, 1999, Rev. 0 Oil Field Chad Soil Handling and Special Area Reclamation, Page 3 of 3 THIS PAGE INTENTIONALLY LEFT BLANK ENVIRONMENTAL LINE LIST TRANSPORTATION SYSTEM VEGETATION AND WILDLIFE RESOURCES CHAD EXPORT PROJECT CHAD PORTION Vegetation and Wildlife Resources EAS EAS From To Distance Sheet# Code Km Post Km Post (km) Specific Information Remarks 1 WR-2 1.50 2.10 0.6 Loule River 1 WR-3 1.50 2.10 0.6 Fishery resource 2 WR-2 7.35 7.60 0.25 Seasonally inundated grassland, gallery forest 2 WR-3 7.35 7.60 0.25 Fishery resource 6 WR-2 36.15 36.50 0.35 Marshland 6 WR-2 40.30 40.45 0.15 Marshland 6 WR-3 36.15 36.50 0.35 Possible fishery resource 6 WR-3 40.30 40.45 0.15 Possible fishery resource 8 WR-2 54.75 55.00 0.25 Streamside wooded savanna 8 WR-3 54.75 55.00 0.25 Fishery resource 10 WR-2 67.00 67.10 0.1 Gallery forest 10 WR-3 62.95 63.10 0.15 Possible fishery resource 10 WR-3 67.00 67.10 0.1 Fishery resource 12 WR-2 79.70 79.85 0.15 Streamside wooded savanna 12 WR-3 79.70 79.85 0.15 Fishery resource 13 WR-2 83.85 83.95 0.1 Streamside wooded savanna 13 WR-3 83.85 83.95 0.1 Possible fishery resource 14 WR-3 91.75 91.90 0.15 Possible fishery resource 18 WR-3 119.40 119.50 0.1 Possible fishery resource 20 WR-1 131.29 138.02 6.73 Seasonal elephant occurrence Known elephant migration corridor during the dry season 21 WR-1 138.02 144.75 6.73 Seasonal hippopotamus occurrence Known hippopotamus use of Lim River and vicinity during wet season Transportation System April 27, 1999, Rev. 0 Chad Vegetation and Wildlife Resources, Page 1 of 2 EAS EAS From To Distance Sheet # Code Km Post Km Post (km) Specific Information Remarks 21 WR-1 138.02 144.75 6.73 Seasonal elephant occurrence Known elephant migration corridor during the dry season 21 WR-2 139.80 139.95 0.15 Lim River, riparian vegetation 21 WR-3 139.95 140.40 0.45 Fishery resource 26 WR-1 177.00 178.48 1.48 Potential for hippopotamus 26 WR-2 178.10 178.20 0.1 Mbere River, riparian vegetation 26 WR-3 178.10 178.20 0.1 Fishery resource Transportation System April 27,1999, Rev. 0 Chad Vegetation and Wildlife Resources, Page 2 of 2 ENVIRONMENTAL LINE LIST TRANSPORTATION SYSTEM VEGETATION AND WILDLIFE PROTECTION MEASURES CHAD EXPORT PROJECT CHAD PORTION Vegetation and Wildlife Protection Measures EAS EAS From To Distance Sheet # Code Km Post Km Post (km) Specific Information Remarks I WPM-1 1.50 2.10 0.6 Environmental awareness program Focus on river crossing, limiting disturbance, prohibition on hunting 1 WPM-2 1.50 2.10 0.6 Reduce impacts to wildlife corridors Consider implementing 1 of 3 options explained in EAS handbook 1 WPM-3 1.50 2.10 0.6 Construction management Focus on stream crossings, prohibition on hunting 2 WPM-1 7.35 7.60 0.25 Environmental awareness program Focus on river crossing, limiting disturbance, prohibition on hunting 2 WPM-2 7.35 7.60 0.25 Reduce impacts to wildlife corridors Consider implementing 1 of 3 options explained in EAS handbook 2 WPM-3 7.35 7.60 0.25 Construction management Focus on stream crossings, prohibition on hunting 6 WPM-1 36.15 36.50 0.35 Environmental awareness program Focus on wetland habitat 6 WPM-1 40.30 40.45 0.15 Environmental awareness program Focus on wetland habitat 6 WPM-3 36.15 36.50 0.35 Construction management Focus on marshlands 6 WPM-3 40.30 40.45 0.15 Construction management Focus on marshlands 8 WPM-1 54.75 55.00 0.25 Environmental awareness program Focus on stream crossings, sensitive species 8 WPM-2 54.75 55.00 0.25 Reduce impacts to wildlife corridors Consider implementing 1 of 3 options explained in EAS handbook 8 WPM-3 54.75 55.00 0.25 Construction management Focus on stream crossings 10 WPM-1 62.95 63.10 0.15 Environmental awareness program Focus on stream crossings 10 WPM-1 67.00 67.10 0.1 Environmental awareness program Focus on stream crossings 10 WPM-2 67.00 67.10 0.1 Reduce impacts to wildlife corridors Consider implementing 1 of 3 options explained in EAS handbook 10 WPM-3 62.95 63.10 0.15 Construction management Focus on stream crossings 10 WPM-3 67.00 67.10 0.1 Construction management Focus on stream crossings 12 WPM-1 79.70 79.85 0.15 Environmental awareness program Focus on stream crossings, sensitive species Transportation System April 27, 1999, Rev. 0 Chad Vegetation and Wildlife Protection Measures, Page 1 of 2 EAS EAS From To Distance Sheet # Code Km Post Km Post (km) Specific Information Remarks 12 WPM-2 79.70 79.85 0.15 Reduce impacts to wildlife corridors Consider implementing 1 of 3 options explained in EAS handbook 12 WPM-3 79.70 79.85 0.15 Construction management Focus on stream crossings 13 WPM-1 83.85 83.95 0.1 Environmental awareness program Focus on stream crossings, sensitive species 13 WPM-3 83.85 83.95 0.1 Construction management Focus on stream crossings 14 WPM-1 91.75 91.90 0.15 Environmental awareness program Focus on stream crossings 14 WPM-3 91.75 91.90 0.15 Construction management Focus on stream crossings 18 WPM-1 119.40 119.50 0.1 Environmental awareness program Focus on stream crossings 18 WPM-3 119.40 119.50 0.1 Construction management Focus on stream crossings 20 WPM-1 131.29 138.02 6.73 Environmental awareness program Focus on elephants, hippopotamus, protection of Lim River, prohibition on hunting 21 WPM1 138.02 144.75 6.73 Environmental awareness program Focus on elephants, hippopotamus, protection of Lim River, prohibition on hunting 21 WPM-2 139.95 140.40 0.45 Reduce impacts to wildlife corridors Consider implementing I of 3 options explained in EAS handbook 21 WPM-3 139.95 140.40 0.45 Construction management Focus on stream crossing, protection of gallery forest 26 WPM-1 177.00 178.48 1.48 Environmental awareness program Focus on hippopotamus, stream crossings, river fisheries 26 WPM-2 178.10 178,20 0.1 Reduce impacts to wildlife corridors Consider implementing 1 of 3 options explained in EAS handbook 26 WPM-3 178.10 178.20 0.1 Construction management Focus on stream crossings Transportation System April 27, 1999, Rev. 0 Chad Vegetation and Wildlife Protection Measures, Page 2 of 2 ENVIRONMENTAL LINE LIST TRANSPORTATION SYSTEM MONITORING, SURVEYS AND SEASONAL RESTRICTIONS CHAD EXPORT PROJECT CHAD PORTION Monitoring, Surveys and Seasonal Restrictions EAS EAS From To Distance Sheet # Code Km Post Km Post (km) Specific Information Remarks 1 WPM-5 1.50 2.10 0.6 Construction monitoring Document occurrence of sensitive species 1 WPM-6 1.50 2.10 0.6 Fisheries monitoring Note presence of water, fish at time of construction 1 WPM-7 1.50 2.10 0.6 Post-construction monitoring Only at stream crossings, areas with sensitive species 2 WPM-5 7.35 7.60 0.25 Construction monitoring Document occurrence of sensitive species 2 WPM-6 7.35 7.60 0.25 Fisheries monitoring Note presence of water, fish at time of construction 2 WPM-7 7.35 7.60 0.25 Post-construction monitoring Only at stream crossings, areas with sensitive species 6 WPM-5 36.15 36.50 0.15 Construction monitoring Document occurrence of sensitive species 6 WPM-5 40.30 40.45 0.15 Construction monitoring Document occurrence of sensitive species 6 WPM-6 36.15 36.50 0.35 Fisheries monitoring Note presence of water, fish at time of construction 6 WPM-6 40.30 40.45 0.15 Fisheries monitoring Note presence of water, fish at time of construction 6 WPM-7 36.15 36.50 0.35 Post-construction monitoring Only at stream crossings, areas with sensitive species 6 WPM-7 40.30 40.45 0.15 Post-construction monitoring Only at stream crossings, areas with sensitive species 8 WPM-5 54.75 55.00 0.25 Construction monitoring Document occurrence of sensitive species 8 WPM-6 54.75 55.00 0.25 Fisheries monitoring Note presence of water, fish at time of construction 8 WPM-7 54.75 55.00 0.25 Post-construction monitoring Only at stream crossings, areas with sensitive species 10 WPM-5 67.00 67.10 0.1 Construction monitoring Document occurrence of sensitive species 10 WPM-6 62.95 63.10 0.15 Fisheries monitoring Note presence of water, fish at time of construction Transportation System April 27,1999, Rev. 0 Chad Monitoring, Surveys and Seasonal Restrictions, Page 1 of 3 EAS EAS From To Distance Sheet # Code Km Post Km Post (km) Specific Information Remarks 10 WPM-6 67.00 67.10 0.1 Fisheries monitoring Note presence of water, fish at time of construction 10 WPM-7 62.95 63.10 0.15 Post-construction monitoring Only at stream crossings, areas with sensitive species 10 WPM-7 67.00 67.10 0.1 Post-construction monitoring Only at stream crossings, areas with sensitive species 12 WPM-5 79.70 79.85 0.15 Construction monitoring Document occurrence of sensitive species 12 WPM-6 79.70 79.85 0.15 Fisheries monitoring Note presence of water, fish at time of construction 12 WPM-7 79.70 79.85 0.15 Post-construction monitoring Only at stream crossings, areas with sensitive species 13 WPM-5 83.85 83.95 0.1 Construction monitoring Document occurrence of sensitive species 13 WPM-6 83.85 83.95 0.1 Fisheries monitoring Note presence of water, fish at time of construction 13 WPM-7 83.85 83.95 0.1 Post-construction monitoring Only at stream crossings, areas with sensitive species 14 WPM-6 91.75 91.90 0.15 Fisheries monitoring Note presence of water, fish at time of construction 14 WPM-7 91.75 91.90 0.15 Post-construction monitoring Only at stream crossings, areas with sensitive species 18 WPM-6 119.40 119.50 0.1 Fisheries monitoring Note presence of water, fish at time of construction 18 WPM-7 119.40 119.50 0.1 Post-construction monitoring Only at stream crossings, areas with sensitive species 20 WPM-4 131.29 138.02 6.73 Pre-construction surveys Document occurrence of elephants, hippopotamus 20 WPM-5 131.29 138.02 6.73 Construction monitoring Focus on elephants, hippopotamus 20 WPM-7 131.29 138.02 6.73 Post-construction monitoring Only at stream crossings, areas with sensitive species 21 WPM-4 138.02 144.75 6.73 Pre-construction surveys Document occurrence of elephants, hippopotamus 21 WPM-5 138.02 144.75 6.73 Construction monitoring Focus on elephants, hippopotamus Transportation System April 27, 1999, Rev. 0 Chad Monitoring, Surveys and Seasonal Restrictions, Page 2 of 3 EAS EAS From To Distance Sheet # Code Km Post Km Post (km) Specific Information Remarks 21 WPM-6 139.95 140.40 0.45 Fisheries monitoring Note presence of water, fish at time of construction 21 WPM-7 138.02 144.75 6.73 Post-construction monitoring Only at stream crossings, areas with sensitive species 26 WPM-4 177.00 178.48 1.48 Pre-construction surveys Document occurrence of hippopotamus 26 WPM-5 177.00 178.48 1.48 Construction monitoring Focus on hippopotamus 26 WPM-6 178.10 178.20 0.1 Fisheries monitoring Note presence of water, fish at time of construction 26 WPM-7 177.00 178.48 1.48 Post-construction monitoring Only at stream crossings, areas with sensitive species Transportation System April 27, 1999, Rev. 0 Chad Monitoring, Surveys and Seasonal Restrictions, Page 3 of 3 THIS PAGE INTENTIONALLY LEFT BLANK ENVIRONMENTAL LINE LIST TRANSPORTATION SYSTEM FISHERIES PROTECTION MEASURES CHAD EXPORT PROJECT CHAD PORTION Fisheries Protection Measures EAS EAS From To Distance Sheet # Code Km Post Km Post (km) Specific Information Remarks 1 FPM-1 1.50 2.10 0.6 Village consultation Consult with village officials regarding disturbance and river access on the Loule River. In conjunction with general village consultation process 1 FPM-2 1.50 2.10 0.6 Streambank rehabilitation Salvage topsoil or native material 2 FPM-1 7.35 7.60 0.25 Village consultation Consult with village officials regarding disturbance and river access on the Loule River. In conjunction with general village consultation process 2 FPM-2 7.35 7.60 0.25 Streambank rehabilitation Salvage topsoil or native material 8 FPM-1 54.75 55.00 0.25 Village consultation Consult with village officials regarding disturbance and river access. In conjunction with general village consultation process 8 FPM-2 54.75 55.00 0.25 Streambank rehabilitation Salvage topsoil or native material 10 FPM-1 67.00 67.10 0.1 Village consultation Consultwith village officials regarding disturbance and river access. In conjunction with general village consultation process 10 FPM-2 62.95 63.10 0.15 Streambank rehabilitation Salvage topsoil or native material 10 FPM-2 67.00 67.10 0.1 Streambank rehabilitation Salvage topsoil or native material 12 FPM-1 79.70 79.85 0.15 Village consultation Consult with village officials regarding disturbance and river access. In conjunction with general village consultation process 12 FPM-2 79.70 79.85 0.15 Streambank rehabilitation Salvage topsoil or native material 13 FPM-2 83.85 83.95 0.1 Streambank rehabilitation Salvage topsoil or native material 14 FPM-2 91.75 91.90 0.15 Streambank rehabilitation Salvage topsoil or native material 18 FPM-2 119.40 119.50 0.1 Streambank rehabilitation Salvage topsoil or native material 21 FPM-1 139.95 140.40 0.45 Village consultation Consult with village officials regarding disturbance and river access on the Lim River. In conjunction with general village consultation process Transportation System April 27,1999, Rev. 0 Chad Fisheries Protection Measures, Page 1 of 2 EAS EAS From To Distance Sheet # Code Km Post Km Post (km) Specific Information Remarks 21 FPM-2 139.95 140.40 0.45 Streambank rehabilitation Salvage topsoil or native material 26 FPM-1 178.10 178.20 0.1 Village consultation Consult with village officials regarding disturbance and river access on the Mbere River. In conjunction with general village consultation process 26 FPM-2 178.10 178.20 0.1 Streambank rehabilitation Salvage topsoil or native material Transportation System April 27,1999, Rev. 0 Chad Fisheries Protection Measures, Page 2 of 2 ENVIRONMENTAL LINE LIST TRANSPORTATION SYSTEM SOIL EROSION AND SEDIMENT CONTROL MEASURES (to be developed) CHAD EXPORT PROJECT CHAD PORTION ENVIRONMENTAL LINE LIST TRANSPORTATION SYSTEM SOIL HANDLING AND SPECIAL AREA RECLAMATION CHAD EXPORT PROJECT CHAD PORTION Soil Handling and Special Area Reclamation EAS EAS From To Distance Sheet # Code Km Post Km Post (km) Specific Information Remarks I RECL-1 2.50 3.15 0.65 Topsoil salvage Salvage all topsoil 1 RECL-2 0.00 0.85 0.85 Limited topsoil salvage Active agricultural areas only 1 RECL-2 2.10 2.50 0.4 Limited topsoil salvage Active agricultural areas only 1 RECL-2 3.15 5.35 2.2 Limited topsoil salvage Active agricultural areas only 2 RECL-2 6.60 7.35 0.75 Limited topsoil salvage Active agricultural areas only 2 RECL-2 7.60 7.95 0.35 Limited topsoil salvage Active agricultural areas only 2 RECL-2 8.15 8.75 0.6 Limited topsoil salvage Active agricultural areas only 2 RECL-2 10.35 10.95 0.6 Limited topsoil salvage Active agricultural areas only 3 RECL-1 19.50 19.65 0.15 Topsoil salvage Salvage all topsoil 3 RECL-1 19.80 20.06 0.26 Topsoil salvage Salvage all topsoil 4 RECL-1 20.05 21.20 0.15 Topsoil salvage Salvage all topsoil 4 RECL-1 26.65 27.06 0.41 Topsoil salvage Salvage all topsoil 4 RECL-2 21.20 22.70 0.5 Limited topsoil salvage Active agricultural areas only 4 RECL-2 24.60 24.80 0.2 Limited topsoil salvage Active agricultural areas only 4 RECL-2 25.05 25.15 0.1 Limited topsoil salvage Active agricultural areas only 5 RECL-1 27.35 27.65 0.3 Topsoil salvage Salvage all topsoil 5 RECL-1 28.00 28.40 0.4 Topsoil salvage Salvage all topsoil 5 RECL-1 31.80 32.50 0.7 Topsoil salvage Salvage all topsoil 5 RECL-2 27.65 28.00 0.35 Limited topsoil salvage Active agricultural areas only 5 RECL-2 28.40 29.00 0.6 Limited topsoil salvage Active agricultural areas only 6 RECL-1 38.40 39.05 0.65 Topsoil salvage Salvage all topsoil 6 RECL-1 40.55 41.16 0.61 Topsoil salvage Salvage all topsoil 6 RECL-2 39.80 40.30 0.5 Limited topsoil salvage Active agricultural areas only Transportation System April 27, 1999, Rev. 0 Chad Soil Handling and Special Area Reclamation, Page 1 of 5 EAS EAS From To Distance Sheet # Code Km Post Km Post (km) Specific Information Remarks 7 RECL-1 41.16 41.35 0.19 Topsoil salvage Salvage all topsoil 7 RECL-1 43.70 45.20 1.5 Topsoil salvage Salvage all topsoil 7 RECL-2 41.35 41.50 0.15 Limited topsoil salvage Active agricultural areas only 8 RECL-1 53.70 54.20 0.5 Topsoil salvage Salvage all topsoil 8 RECL-1 55.00 55.16 0.16 Topsoil salvage Salvage all topsoil 8 RECL-2 53.30 53.70 0.4 Limited topsoil salvage Active agricultural areas only 8 RECL-2 54.20 54.75 0.55 Limited topsoil salvage Active agricultural areas only 9 RECL-1 55.16 55.80 0.64 Topsoil salvage Salvage all topsoil 9 RECL-1 59.65 60.05 0.4 Topsoil salvage Salvage all topsoil 9 RECL-2 58.90 59.65 0.75 Limited topsoil salvage Active agricultural areas only 9 RECL-2 60.05 61.95 1.9 Limited topsoil salvage Active agricultural areas only 10 RECL-1 62.60 62.95 0.35 Topsoil salvage Salvage all topsoil 10 RECL-1 68.15 69.16 1.01 Topsoil salvage Salvage all topsoil 10 RECL-2 62.95 63.40 0.45 Limited topsoil salvage Active agricultural areas only 10 RECL-2 65.70 67.00 1.3 Limited topsoil salvage Active agricultural areas only 10 RECL-2 67.10 68.15 1.05 Limited topsoil salvage Active agricultural areas only 11 RECL-1 69.15 69.75 0.6 Topsoil salvage Salvage all topsoil 11 RECL-1 71.85 72.90 1.15 Topsoil salvage Salvage all topsoil 11 RECL-1 74.30 75.20 0.9 Topsoil salvage Salvage all topsoil 11 RECL-2 69.75 71.00 1.25 Limited topsoil salvage Active agricultural areas only 12 RECL-1 81.95 82.65 0.7 Topsoil salvage Salvage all topsoil 12 RECL-1 82.80 83.20 0.4 Topsoil salvage Salvage all topsoil 12 RECL-2 76.20 77.20 1 Limited topsoil salvage Active agricultural areas only 12 RECL-2 77.90 78.70 0.8 Limited topsoil salvage Active agricultural areas only Transportation System April 27, 1999, Rev. 0 Chad Soil Handling and Special Area Reclamation, Page 2 of 5 EAS EAS From To Distance Sheet # Code Km Post Km Post (km) Specific Information Remarks 12 RECL-2 81.00 81.45 0.45 Limited topsoil salvage Active agricultural areas only 13 RECL-1 83.20 83.70 0.5 Topsoil salvage Salvage all topsoil 13 RECL-1 87.10 87.75 0.65 Topsoil salvage Salvage all topsoil 13 RECL-2 83.70 83.85 0.15 Limited topsoil salvage Active agricultural areas only 13 RECL-2 83.95 84.85 0.9 Limited topsoil salvage Active agricultural areas only 13 RECL-2 85.70 86.75 1.05 Limited topsoil salvage Active agricultural areas only 13 RECL-2 87.75 88.85 1.1 Limited topsoil salvage Active agricultural areas only 14 RECL-2 91.75 91.90 0.15 Limited topsoil salvage Active agricultural areas only 14 RECL-2 92.30 93.05 0.75 Limited topsoil salvage Active agricultural areas only 14 RECL-2 93.40 93.85 0.45 Limited topsoil salvage Active agricultural areas only 14 RECL-2 94.45 95.60 1.25 Limited topsoil salvage Active agricultural areas only 14 RECL-2 96.50 96.95 0.45 Limited topsoil salvage Active agricultural areas only 14 RECL-2 97.10 97.20 0.1 Limited topsoil salvage Active agricultural areas only 15 RECL-1 101.85 102.80 0.95 Topsoil salvage Salvage all topsoil 15 RECL-2 97.21 97.60 0.39 Limited topsoil salvage Active agricultural areas only 15 RECL-2 102.80 104.04 1.24 Limited topsoil salvage Active agricultural areas only 16 RECL-1 107.00 107.25 0.25 Topsoil salvage Salvage all topsoil 16 RECL-1 108.25 109.15 0.9 Topsoil salvage Salvage all topsoil 16 RECL-1 109.90 110.45 0.55 Topsoil salvage Salvage all topsoil 16 RECL-2 104.40 104.85 0.45 Limited topsoil salvage Active agricultural areas only 16 RECL-2 106.60 106.80 0.2 Limited topsoil salvage Active agricultural areas only 17 RECL-1 110.43 111.25 0.82 Topsoil salvage Salvage all topsoil 17 RECL-1 113.15 113.40 0.25 Topsoil salvage Salvage all topsoil 17 RECL-1 116.70 116.90 0.2 Topsoil salvage Salvage all topsoil Transportation System April 27, 1999, Rev. 0 Chad Soil Handling and Special Area Reclamation, Page 3 of 5 EAS EAS From To Distance Sheet # Code Km Post Km Post (km) Specific Information Remarks 17 RECL-2 111.25 113.15 1.9 Limited topsoil salvage Active agricultural areas only 17 RECL-2 113.75 116.70 2.95 Limited topsoil salvage Active agricultural areas only 18 RECL-1 118.70 118.90 0.2 Topsoil salvage Salvage all topsoil 18 RECL-2 118.00 118.15 0.15 Limited topsoil salvage Active agricultural areas only 18 RECL-2 118.90 120.70 1.8 Limited topsoil salvage Active agricultural areas only 18 RECL-2 121.30 122.20 0.9 Limited topsoil salvage Active agricultural areas only 18 RECL-2 123.55 124.23 0.68 Limited topsoil salvage Active agricultural areas only 19 RECL-2 124.25 124.85 0.6 Limited topsoil salvage Active agricultural areas only 19 RECL-2 125.55 126.20 0.65 Limited topsoil salvage Active agricultural areas only 20 RECL-1 135.00 136.45 1.45 Topsoil salvage Salvage all topsoil 20 RECL-2 134.40 135.00 0.6 Limited topsoil salvage Active agricultural areas only 21 RECL-2 139.95 140.40 0.45 Limited topsoil salvage Active agricultural areas only 23 RECL-1 156.40 157.75 0.35 Topsoil salvage Salvage all topsoil 23 RECL-2 152.00 153.25 1.25 Limited topsoil salvage Active agricultural areas only 23 RECL-2 154.70 155.55 0.85 Limited topsoil salvage Active agricultural areas only 23 RECL-2 155.80 156.40 0.6 Limited topsoil salvage Active agricultural areas only 23 RECL-2 157.75 158.21 0.46 Limited topsoil salvage Active agricultural areas only 24 RECL-1 158.30 158.95 0.65 Topsoil salvage Salvage all topsoil 24 RECL-2 158.20 158.30 0.1 Limited topsoil salvage Active agricultural areas only 24 RECL-2 158.95 160.00 1.05 Limited topsoil salvage Active agricultural areas only 24 RECL-2 160.55 160.75 0.2 Limited topsoil salvage Active agricultural areas only 24 RECL-2 161.00 164.95 3.95 Limited topsoil salvage Active agricultural areas only 25 RECL-1 170.60 170.90 0.3 Topsoil salvage Salvage all topsoil 25 RECL-2 165.15 165.60 0.45 Limited topsoil salvage Active agricultural areas only Transportation System April 27, 1999, Rev. 0 Chad Soil Handling and Special Area Reclamation, Page 4 of 5 EAS EAS From To Distance Sheet # Code Km Post Km Post (km) Specific Information Remarks 25 RECL-2 166.15 167.15 1 Limited topsoil salvage Active agricultural areas only 25 RECL-2 168.25 168.60 0.35 Limited topsoil salvage Active agricultural areas only 26 RECL-1 176.20 176.90 0.7 Topsoil salvage Salvage all topsoil 26 RECL-1 177.25 178.10 0.85 Topsoil salvage Salvage all topsoil 26 RECL-2 174.00 174.85 0.85 Limited topsoil salvage Active agricultural areas only 26 RECL-2 175.70 176.20 0.5 Limited topsoil salvage Active agricultural areas only 26 RECL-2 176.90 177.25 0.35 Limited topsoil salvage Active agricultural areas only Transportation System April 27, 1999, Rev. 0 Chad Soil Handling and Special Area Reclamation, Page 5 of 5 THIS PAGE INTENTIONALLY LEFT BLANK