Procurement Plan Details of the Procurement Arrangements Involving International Competition 1. Goods, Works, and Non Consulting Services (i) List of contract packages to be procured: Prior review thresholds: Method Levels Comments 1. Goods >=US$2,000,000 Prior review 3. Works >= US$10,000,000 Prior review 5. Direct Contracting All contracts Prior review 1 2 3 4 5 6 7 8 9 Revi Estimat Domest ew Expecte Ref Contract ed Procurem ic by d P- Comme . (Descripti Cost ent Prefere Bank Bid- Q nts No. on) (USD Method nce (Prio Opening Million) (yes/no) r/ Date Post) Transmission Line ICB/ Kayes- 83.60 ICB No No Prior 06/30/20 Nr Tambacoun 17 da Transmissi on Line and associated Substations at Kayes and Tambacoun da Common Infrastructure ICB/ SCADA 10.4 ICB No No Prior 02/28/201 Nr System 7 (ii) ICB contracts estimated to cost above US$ 10,000,000 per contract for civil works and US$ 2,000,000 for goods and non-consultancy services and all direct contracting will be subject to prior review by the Bank. 2. Consulting Services Prior review thresholds: Selection method Prior review Comments level 1. Selection of firms >= Prior review US$1,000,000 2. Selection of individual consultants >= US$300,000 Prior review 3. Single source for firms and individual All contracts Prior review consultants 1 2 3 4 5 6 7 Expecte Estimate Review d d Selectio by Proposal Ref. Description of Comme Cost n Bank s No. Assignment nts (USD Method (Prior / Submissi Million) Post) on Date 01/C Owner’s Engineer 6.00 QCBS Prior 09/30/201 S 7 PROCUREMENT Western Africa : OMVS - TRANSMISSION EXPANSION PROJECT PLAN General Information Country: Western Africa Bank’s Approval Date of the Original Procurement Plan: 2017-03-08 2021-07-12 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P147921 GPN Date: Project Name: OMVS - TRANSMISSION EXPANSION PROJECT Loan / Credit No: IDA / 60330, / SOGEM Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned 01 - TVX/SOGEM 2017 / Travaux de renforcement du RIMA Reinforcement and Single Stage - One 83,600,000.0 59,558,428. 2019-04- réseau des lignes Kayes- IDA / 60330 A priori Appel d'offres Open - International Achevé 2017-07-14 2018-01-26 2017-07-19 2018-04-18 2017-08-30 2018-05-16 2017-09-19 2018-09-04 2017-10-24 2018-12-12 Expansion Envelope 0 54 17 Tambacounda et poste associé (Manantali II) CRM2-T2 / Exécution des travaux de renforcement du RIMA Reinforcement and Single Stage - One En attente 2021-10- IDA / 60330 A posteriori Appel d'offres Open - National 5,880,000.00 0.00 2020-08-10 2020-08-15 2020-09-14 2020-09-24 2020-10-18 réseau Câble de garde à fibre Expansion Envelope d'exécution 18 optique (CGFO) du RIMA GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ML-SOGEM-64877-GO-RFQ / Acquisition d'un véhicule RIMA Reinforcement and Single Stage - One tout terrain 4x4 pour la IDA / 60330 A posteriori Demande de prix Limited 100,000.00 68,477.81 Achevé 2018-06-07 2019-08-24 2018-07-08 2018-11-12 2018-08-07 2019-01-25 Expansion Envelope Coordination Régionale du Projet CRM2-F1 / Fourniture et livraison d'un groupe Single Stage - One En attente électrogène 33 KVA avec IDA / 60330 Technical Assistance A posteriori Demande de prix Limited 18,000.00 0.00 2019-12-08 2020-01-03 2020-01-13 Envelope d'exécution inverseur automatique et forfait installation CRM2-F2 / Fourniture, installation essais et mise en service de transformateurs RIMA Reinforcement and Single Stage - One En cours IDA / 60330 A priori Appel d'offres Open - International 10,500,000.00 0.00 2020-03-10 2020-11-03 2020-03-15 2020-12-08 2020-04-26 2021-03-02 2020-05-10 2021-04-12 2020-06-03 2021-06-03 225/30 KV; 20 et 40 MVA Expansion Envelope d'exécution dans les postes de Matam, Bakel et Dagana CRM2-F3 / Fourniture et essais d'une station mobile de RIMA Reinforcement and Single Stage - One 225/90/30 KV-30MVA au IDA / 60330 A priori Appel d'offres Open - International 2,520,000.00 2,680,000.00 Signé 2019-12-10 2020-02-17 2019-12-15 2020-03-17 2020-01-26 2020-07-15 2020-02-09 2021-02-13 2020-03-04 2021-04-06 2020-12-29 Expansion Envelope poste HT OMVS /SOGEM de Dagana CRM2-F4 / Fourniture, livraison et essais d'un camion RIMA Reinforcement and Single Stage - One de lavage de ligne HT sous IDA / 60330 A priori Appel d'offres Open - International 2,000,000.00 1,803,709.60 Signé 2019-12-10 2020-02-17 2019-12-15 2020-03-17 2020-01-26 2020-07-15 2020-02-09 2021-02-13 2020-03-04 2021-04-06 2020-12-29 Expansion Envelope tension au poste HT/OMVS/SOGEM de Sakal. 01 SOGEM 2017 / Fourniture et installation du système de RIMA Reinforcement and Single Stage - One / A priori Appel d'offres Open - International 10,400,000.00 0.00 Annulé 2017-04-23 2017-04-25 2017-06-06 2017-06-26 2017-07-24 2018-07-24 communication et Expansion Envelope télécommande SCADA ML-SOGEM-64696-GO-RFQ / Acquisition d'un véhicule RIMA Reinforcement and Single Stage - One tout terrain 4x4 pour la IDA / 60330 A posteriori Demande de prix Limited 100,000.00 0.00 Annulé 2018-06-07 2018-07-12 2018-08-11 Expansion Envelope Coordination Régionale du Projet ML-SOGEM-64885-GO-RFB / Acquisition de matériel roulant pour le suivi du projet RIMA Reinforcement and Single Stage - One En attente (Véhicules tout -terrain 4x4) IDA / 60330 A posteriori Appel d'offres Open - International 500,000.00 0.00 2018-06-10 2018-06-15 2018-07-27 2018-08-11 2018-08-25 2018-09-24 Expansion Envelope d'exécution (Coordination Régionale du Projet/Cellules Nationales OMVS actionnaires) NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 02 CONSOGEM/2017 / Sélection d'un consultant pour les études et le suivi des Sélection fondée RIMA Reinforcement and travaux de renforcement du IDA / 60330 A priori sur la qualité et le Open - International 6,000,000.00 2,476,173.00 Achevé 2017-03-03 2017-04-19 2017-04-11 2017-04-19 2017-04-28 2017-08-03 2017-06-09 2017-10-09 2017-06-19 2018-01-16 2017-07-17 2018-08-02 2017-08-06 2018-09-04 2019-04-28 2021-04-16 Expansion réseau des lignes Kayes- coût Tambacounda et poste associé (Manantali II) Page 1 ML-SOGEM-54053-CS-CQS / Consultant pour l'élaboration Sélection fondée et la mise en œuvre des Plans sur les d'Action de Réinstallation IDA / 60330 Technical Assistance A posteriori Open - International 100,000.00 562,006.96 Achevé 2018-03-20 2018-04-09 2018-04-10 2018-05-04 2019-06-19 2018-05-14 2019-09-23 2018-06-18 2019-09-27 2018-12-15 2019-10-27 qualifications des (PAR) des populations consultants impactées par la ligne Kayes- Tamba CRM2-C8 / Sélection d'un consultant pour l'étude et le Sélection fondée En attente suivi des travaux relatifs au IDA / 60330 Technical Assistance A posteriori sur la qualité et le Open - International 1,000,000.00 0.00 2020-02-28 2020-03-13 2020-04-02 2020-05-02 2020-05-15 2020-06-08 2020-06-25 2021-06-25 d'exécution renforcement du réseau CGFO coût du RIMA CRM2-C10 / Sélection d'un consultant pour l'appui à Sélection fondée l'identification de projet et sur les En attente l'assistance à la mise en IDA / 60330 Technical Assistance A posteriori Open - National 100,000.00 0.00 2020-03-16 2020-03-21 2020-04-18 2020-05-02 2020-05-19 2020-09-16 qualifications des d'exécution oeuvre de projet de consultants développement local et d'autonomisation des femmes Sélection fondée ML-SOGEM-32310-CS-CQS / sur les sélection d'un expert pour la IDA / 60330 Technical Assistance A posteriori Open - International 125,000.00 0.00 Annulé 2017-10-16 2018-04-09 2017-10-26 2017-11-15 2017-11-20 2019-11-15 2019-11-15 qualifications des sauvegarde environnementale consultants CRM2-C11 / Sélection d'un consultant pour la supervision du marché de fourniture, Sélection fondée installation, essais et mise en IDA / 60330 Technical Assistance A posteriori sur la qualité et le Open - National 504,000.00 0.00 En cours d'examen 2020-02-27 2021-03-30 2020-03-05 2020-04-02 2020-05-02 2020-05-12 2020-06-05 2020-06-25 2021-09-18 service des transformateurs coût 225/30 kV, 20 et 40 MVA pour les postes HT de Bakel, Matam et Dagana CRM2-C14 / Sélection d'un consultant pour les études et Sélection fondée contrôle des travaux du RIMA Reinforcement and IDA / 60330 A priori sur la qualité et le Open - International 800,000.00 0.00 En cours d'examen 2020-07-20 2020-07-25 2020-09-03 2020-10-03 2020-10-13 2020-11-07 2020-12-05 2021-05-04 remplacement du câble Expansion coût optique OP6W du RIMA/SOGEM CRM2-C16 / Sélection d'un consultant pour la formulation Sélection fondée RIMA Reinforcement and En attente de projets individuels pour les IDA / 60330 A posteriori sur la qualité et le Open - International 131,000.00 0.00 2021-05-25 2021-06-09 2021-07-01 2021-07-31 2021-08-07 2021-08-28 2021-09-12 2022-05-10 Expansion d'exécution PAP et l'assistance technique coût dans la mise en œuvre CRM2-C17 / Sélection d'un Sélection fondée consultant pour l'Audit RIMA Reinforcement and En attente IDA / 60330 A posteriori sur la qualité et le Open - International 24,000.00 0.00 2021-06-10 2021-06-24 2021-08-08 2021-08-18 2021-09-01 2021-09-25 2021-10-16 2023-12-05 externe SOGEM/Manantali II- Expansion d'exécution coût Exercice 2021-2022 CRM2-C20 / Sélection d'un Sélection fondée consultant pour l'audit RIMA Reinforcement and En attente IDA / 60330 A posteriori sur la qualité et le Open - National 131,000.00 0.00 2021-05-31 2021-06-14 2021-07-09 2021-08-08 2021-08-13 2021-08-29 2021-09-16 2022-01-14 environnemental à la fin des Expansion d'exécution coût travaux CRM2-C21 / Sélection d'un Sélection fondée consultant pour la RIMA Reinforcement and En attente IDA / 60330 A posteriori sur la qualité et le Open - International 131,000.00 0.00 2021-06-07 2021-06-14 2021-07-05 2021-07-15 2021-07-22 2021-08-08 2021-09-01 2021-12-30 Capitalisation/Communication Expansion d'exécution coût /Visibilité du projet CRM2-C22 / Sélection d'un consultant pour la supervision Sélection fondée des travaux d'extension des RIMA Reinforcement and sur les En attente IDA / 60330 A posteriori Open - International 300,000.00 0.00 2021-05-31 2021-06-14 2021-07-29 2021-08-12 2021-09-01 2022-08-27 postes OMVS/SOGEM de Expansion qualifications des d'exécution Bakel, Matam et Dagana consultants (Sénégal) CRM2-C24 / Sélection d'un consultant pour l'assistance technique dans la mise en Sélection fondée RIMA Reinforcement and En attente œuvre des programmes IDA / 60330 A posteriori sur la qualité et le Open - International 60,000.00 0.00 2021-05-17 2021-05-31 2021-06-10 2021-06-17 2021-06-27 2021-07-16 2021-08-07 2022-02-23 Expansion d'exécution d'appui à l'autonomisation des coût femmes et au développement local INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CRM2-C7 / Sélection d'un consultant individuel pour l'évaluation technique et En attente financière des propositions IDA / 60330 Technical Assistance A posteriori Individuel Open 67,200.00 0.00 2019-12-05 2020-01-07 2020-01-17 2020-01-27 2020-05-26 d'exécution d'activités supplémentaires dans le cadre de financement de l'IDA. CRM2-C9 / Sélection d'un consultant individuel pour En attente IDA / 60330 Technical Assistance A posteriori Individuel Limited 30,000.00 0.00 2020-02-13 2020-02-23 2020-03-15 2020-03-23 2020-03-25 l'assistance technique dans la d'exécution mise en oeuvre du PAR CRM2-C12 / sélection d'un consultant individuel pour la supervision des marchés de fourniture du camion de En attente IDA / 60330 Technical Assistance A posteriori Individuel Open 85,000.00 0.00 2020-02-27 2020-03-31 2020-04-10 2020-04-26 2020-07-25 lavage de ligne HT sous d'exécution tension et la station mobile 225/90/30 kV-30 MVA à Sakal et Dagana CRM2-C15 / Sélection d'un consultant pour l'élaboration Sélection de En cours et la mise en oeuvre du PAR IDA / 60330 Technical Assistance A priori consultants par Direct 240,000.00 0.00 2020-07-20 2020-12-21 2020-07-30 2020-12-22 2020-09-03 2020-11-02 d'exécution de la ligne Kayes entente directe Tambacounda Page 2