ANNEX J
                                                                     ANNEX   3-1 3-1
                                                                          ANNEX
 PRO-FORMA PROPONENT COMPLIANCE MONITORING REPORT (CMR): Semi-annual Module 5 of SMR

                                        ___________________________
                                                    PROPONENT’S NAME



   MONITORING PERIOD COVERED:                                  ___________________________

   I.    BASIC PROJECT INFORMATION AND UPDATES

         ECC Control No/REFERENCE Code No: _______________________
         Project Title: __________________________
         Project Type: __________________________
         Location:             __________________________
         Project Coordinates: __________________________
         Project Stage/Phase: (i.e. construction; commissioning, etc.) ____________________
         Contact Person:       _____________________________
         EMP Approval:  During ECC Application Stage
                           Updated after ECC Issuance; approved on __________________
         Changes in Project Design (if any): _________________________________________
         ______________________________________________________________________
         ______________________________________________________________________
         ______________________________________________________________________
         ______________________________________________________________________

    II. EXECUTIVE SUMMARY

   This section should include a summary of the major findings for the monitoring period. For example, a
   statement that there were no major activities that influenced the monitoring parameters during the
   monitoring period can be made if there were really no activities by the proponent that affected the
   monitored parameters.

                     Table II-1. Summary of Major Findings for the Monitoring Period
                                                                  Compliance Status &      Recommendation/Commitme
            Condition / Requirement / Commitment
                                                                Summary of Actions taken     nt for the next reporting
   Compliance with ECC
   Compliance with EMP
   Implementation of appropriate & effective env’tal impact
   remedial actions in case of exceedances
   Complaints Management
   Realistic and sufficient budget for conducting the
   environmental monitoring and audit activities
   Accountability - qualified personnel are charged with the
   routine monitoring of the project activities in terms of
   education, training, knowledge and experience of the
   environmental team
   Others . . .


  III. RESULTS AND DISCUSSIONS

   A. Compliance Monitoring
   The status of compliance to the ECC conditionalities and the attainment of EMP commitments should be
   elaborated in this section. Reasons for noncompliance or unmet commitment should be explained and
   solutions and measures to attain full compliance of ECC terms and conditions as well as satisfactory
   attainment of EMP commitments should be discussed as renewed efforts for the next monitoring period.
   Table 1 may be used to summarize the status of compliance.
                                                                                                              ANNEX 3-1


                        Table 1. Summary Status of ECC & EMP Compliance
                                                       Relevant ECC Condition/s (if any)      Status of
       ECC/EMP Condition/Requirement
                                                                                            Compliance
              Categorization                           #/s      Requirement Description                        REMARKS
                                                                                           ( if complying)
1)    Project coverage/limits/
2)    Components
3)    Other sectoral requirements mandated by
      other agencies to be complied with
4)    EMP and updates as deemed required
5)    Conduct of baseline, compliance and
      impact self-monitoring
6)    Multi-sectoral Monitoring (as may be required)
7)    Regular reporting
8)    Institutional arrangements necessary for
      implementation of environmental
      management measures
9)    Standard DENR requirement on transfer of
      ownership
10)   Standard DENR requirement on
      abandonment
11)   Impact Mitigation Plan or Construction/
      Contractor’s Environmental Program
12)   Social Development Plan (SDP)
13)   IEC Plan
14)   Contingency/Emergency Response Plan or
      equivalent Risk Management Plan
15)   Abandonment Plan (when applicable)
16)   Environmental Monitoring Plan (EMoP)
17)   (Others)

B.    Impact Monitoring

This section shall contain relevant graphical presentation of quantitative and semi-quantitative impact
monitoring results showing trends, comparing past monitoring results with the current. Relevant
monitoring results in the other SMR modules shall be referred to. The latest monitoring findings and
conclusion should be discussed in text form.

Qualitative impact monitoring results may be presented in text form or in terms of pictorial coverage, if
applicable. Examples of qualitative impacts are those relating to quality of life, degree of happiness, and
sense of environmental cleanliness.

i.   Summary of Previous Monitoring
The key findings, recommendations, and action plan from the previous monitoring and outstanding
issues from earlier monitoring periods (if applicable) should be highlighted in this section.

ii. Current Monitoring Results and Findings
The data collected and related expenses from the various sampling and measurement events done
under the Environmental Monitoring Plan (EMoP) or a Sampling and Measurement Plan (SAMP) for the
current monitoring period shall be summarized in a tabular form, preferably using the prescribed format in
Tables 2 and 3 below, and discussed under this section. Only processed and summarized data must be
presented here.

The current monitoring results must be related to the historical trend for each parameter. Any deviation
from this trend must be explained. More, importantly, the discussion must focus on point-by-point
comparison of the gathered values with Environmental Quality Performance Levels (EQPLs), if EQPLs
have been committed by the Proponent or established with the Multi-partite Monitoring Team. The
monitoring results could also be used to determine the action and limit levels for the specific project.
These should all be presented here in detail and summarized in the conclusions and recommendations
section.
                                                                                                                     ANNEX 3-1


Compliances, non-compliances and exceedances must all be thoroughly explained. In cases of
compliances, success factors must be cited. For non-compliances and exceedances, the proponent’s
response should be explained. Moreover, causative factors must be identified and additional solutions
and mitigation measures proposed, if needed.

It should also cite the weather conditions and other factors which may affect the results of the sampling
activities.

The status of compliance to recommendations from previous monitoring and measures included in the
action plan should be described and any unmet commitment must be rationalized and alternative, if
needed, presented.


  Table 2. Summary Status of Environmental Impact Management and Monitoring Plan Implementation
                                                                 Sampling & Measurement          Stand                  Remarks
                                                                                                            Envt’l
                                                                             Results              ard/                   (EQPL*
 Monitoring        Envt’l         Envt’l      Monitoring                                                    Mgmt.
                                                               Stn/                               EIS                   commitm
 Objective         Aspect        Impact       Parameter                                                     Mea-
                                                               Locn    Previous     Current      Predict                  ent, if
                                                                                                             sure
                                                                                                   ion                     any)



    *EQPL-Environmental Quality Performance Level
       o      Alert or Red Flag - early warning
       o      Action Level-point where management measures must be employed so as not to reach the regulated threshold or
              limit level, or to reduce deterioration of affected environmental component to pre-impact or optimum environmental
              quality
       o      Limit Level-regulated threshold of pollutant (standard that must not be exceeded); point where emergency response
              measures must be employed to reduce pollutants to lower than standard limit.
       o      NOTE: Section on EQPLs may be filled out as a Proponent’s draft commitment or after these have been
              established and mutually agreed upon among Proponent, EMB and other MMT members. Otherwise, only the
              LIMIT Level shall be the reference for regulatory compliance. This means that environmental management
              measures are formulated at the “ACTION level” so as not to exceed this regulated threshold.

                  Table 3. Report on Status of Environmental Budget Allocations and Expenses
                                                               Budget                                 Actual Expenses
              Expense Item*
                                                                                              Direct Co.
                                                  Direct from Co.   Budget for MMT                              MMT expenses
                                                                                              Expense
A. Implementation of Management Plans & Programs
1) Environmental Impact Mitigation Plan                 √                                         √
2) Social Development Plan                              √                                         √
3) IEC Plan                                             √                                         √
4) Enhancement Programs (if any)                        √                                         √
B. Implementation of Monitoring Plans
1) Self-Monitoring                                    √                                           √
2) Environmental Monitoring Fund (with
                                                      √                   √                       √                     √
   MMT)
3) Environmental Guarantee Fund                       √                   √                       √                     √
                               TOTALS
*For mining projects, equivalent cost items shall be adopted, e.g. SDMP in lieu of SDP.


IV. CONCLUSIONS AND RECOMMENDATIONS
This section should present the conclusions and recommendations of the current SMR based on the
results and discussion of the previous sections. It should also explain if the previous monitoring
recommendations should continue (if implemented).           On the other hand, if warranted, the
recommendation may be the cessation of specific or all monitoring activities.
                                                                                            ANNEX 3-1


The conclusions and recommendations should preferably be in a bulleted format and as much as
possible grouped according to coherent themes, such as the following headings.

A.   Compliance Status
     Only the key conclusions about the status of compliance to ECC and EMP are included in this
     section. The status of non-compliances should be particularly tracked throughout all SMRs even if
     compliance has been already attained. Recommended additional measures or amendments to the
     EMP should be presented here.

B.   Environmental Quality Status (applicable only if EQPLs have been set by the Proponent as its
     commitment or if opted to be mutually agreed upon by Proponent with the EMB and other members
     of the MMT)
     Only the key conclusions on meeting the set EQPLs are included in this section.

C.   Environmental Management Plan Status
     Only the key conclusions about the status of EMP implementation and recommended additional
     measures or amendments should be presented here.

D.   ENVIRONMENTAL RISK CATEGORIZATION
     The proponent should fill-up or update the project’s environmental risk categorization questionnaire
     (presented in Annex 2-7d of the Revised Procedural Manual of DAO 2003-30) – applicable on the
     Second Semi-annual ECC Compliance Monitoring Report.


E.   WORK PLAN FOR NEXT MONITORING PERIOD
     The specific actions for the next monitoring period, including carry-overs from previous monitoring
     periods, should be detailed in this section.


V. ATTACHMENTS

Please have the following documents attached:
a) Laboratory Results of Analysis from DENR-EMB recognized laboratory;
b) Approved Impact Mitigation Plan in the EIS/other EIS Update Documents; and
c) Approved Environmental Monitoring Plan in the EIS/other EIS Update Documents


PREPARED BY:                                                     NOTED BY:

_________________________                                        _________________________
      Name/Position                                                     Name/Position

_________________________                                        _________________________
 Proponent/Company Name                                            Proponent/Company Name

_________________________                                        _________________________
           Date                                                             Date