Procurement Plan (Jal Marg Vikas Project)


     I.       General

1. Project information: [Country: India, Borrower: Ministry of Shipping,
Government of India, Project Name: Capacity Augmentation of National Waterway – 1
(Jal Marg Vikas Project), Loan No.:……..; Project ID: P-149460, Project Implementing
Agency (PIA): Inland Waterways Authority of India (IWAI), Ministry of Shipping]

2.        Bank’s approval Date of the procurement Plan : March 15, 2017

3.        Date of General Procurement Notice: 15-September-2014
4.        Period covered by this procurement plan: First 18 months of the project,
           including retroactive financing.


II. Goods and Works and non-consulting services.

1.         Prior Review Threshold: Procurement Decisions subject to Prior Review
           by the Bank as stated in Appendix 1 to the Guidelines for Procurement:

 Category               Method of Procurement           Threshold (US$ Equivalent)
Works            International Competitive Bidding
                                                        > 40,000,000
                 (ICB)
                                                        Up to 40,000,000 (with NCB
                 National Competitive Bidding (NCB)
                                                        conditions)
                 Shopping                               Up to 100,000
                                                        As per paragraph 3.7 of
                 Direct Contracting (DC)
                                                        Guidelines
                 Public-Private Partnership (PPP) for   As per paragraph 3.14 of
                 Works                                  Guidelines
                                                        As per paragraph 3.9 of
                 Force Account
                                                        Guidelines
                                                        As per paragraph 3.6 of
                 Framework Agreement (FA)
                                                        Guidelines
Goods            International Competitive Bidding      > 3,000,000
and non-         (ICB)
consultan        Limited International Bidding (LIB)    wherever agreed by Bank
t services       National Competitive Bidding (NCB)     Up to 3,000,000 (with NCB
(NCS)                                                   conditions)
                 Shopping                               Up to 100,000
                 Direct Contracting (DC)                As per paragraph 3.7 of
                                                        Guidelines
                 Public-Private Partnership (PPP)       As per paragraph 3.14 of
                 Services                               Guidelines
                  Force Account (only for NCS)                      As per paragraph 3.9 of
                                                                    Guidelines
                  Framework Agreement (FA)1                         As per paragraph 3.6 of
                                                                    Guidelines
                  Procurement from United Nations                   As per paragraph 3.10 of
                  (UN) Agencies                                     Guidelines

World Bank review of procurement: The World Bank will prior review
(thresholds are based on “Substantial” risk rating, which may be modified if risk
rating is changed after assessment by Bank during implementation of the
project) the following contracts:

      a) Works (Including turnkey, supply & installation of plant and equipment
      and PPP) : All contracts more than US$ 10 million equivalent
      b) Goods, Information Technology and non-consulting services : All
      contracts more than US$ 2 million equivalent


First contract issued by implementing agency [IA] will be subject to prior review
irrespective of their value. In addition, the justifications for all contracts to be
issued on the basis of LIB, single-source or direct contracting, will be subject to
prior review. The above thresholds are for the initial 18 month implementation
period; based on the procurement performance of the project these thresholds
may be subsequently modified. Even for Post Review cases, the inputs of
Bank on Technical Specifications will be obtained by project. The
procurement plan will be updated annually (or at any other time if required) and
will reflect any change in prior review thresholds. The World Bank will carry out
an annual ex-post procurement review of the procurement falling below the
prior review thresholds provided above. To avoid any doubts, the Bank may
conduct at any time Independent Procurement Reviews (IPRs) of all the contracts
financed under the grant.


2.        Prequalification. Bidders for Least Available Depth tender for the first
          contract and any other contract, as per requirement, shall be prequalified
          in accordance with the provisions of paragraphs 2.9 and 2.10 of the
          Guidelines.

1   DGS&D rate contracts may be used as framework agreement (FA) provided:
      • Use of DGS&D rate contracts as FA must be reflected on the procurement plan agreed by the Bank
         for particular goods.
      • Before issuing the purchasing order, the implementing agency will carry out a price analysis on the
         specific good that is intended to be purchased. If after this due diligence the implementing agency
         concludes (and Bank agrees) that the DGS&D rate contracts are more advantageous, DGS&D rate
         contracts may be used as FA.
      • To meet the Bank's requirements for right to audit and F&C, these clauses may be included in the
         Purchase Orders (in case the purchasers are directly placing the purchase orders to DGS&D rate
         contract holders). On the other hand, if indent is placed through DGS&D, the Purchaser has the
         option to sign a separate undertaking with DGS&D rate contract holder, where Bank’s right to
         audit and F&C clauses could be mentioned.
3.       Proposed Procedures for CDD Components (as per paragraph. 3.17 of
         the Guidelines: Not Applicable

4.       Reference to (if any) Project Operational/Procurement Manual: N/A

5.       Any Other Special Procurement Arrangements: Retroactive Financing
         as per Legal Agreement.

6.       Procurement Packages with Methods and Time Schedule


     1            2               3            4             5             6          7           8           9

 Ref.         Contract         Estimated   Procureme   Prequalificati   Domesti    Review     Expected    Comment
 No.        (Description)         Cost         nt       on (yes/no)         c      by Bank      Bid-         s
                                  (Rs.      Method                      Preferen   (Prior /   Opening
                                Million)                                   ce       Post)       Date
                                                                        (yes/no)
CANW-     Interior Works for      7.9      Shopping         No             No       Post       24-Apr-    The value
1/IWAI       Office of the                                                                       15           of
/JMV/4           Project                                                                                   contract
   A      Management Unit                                                                                    was
           of Jal Marg Vikas                                                                              increased
                 Project                                                                                  to Rs. 9.1
                                                                                                            Million
CANW-      Furniture and          6.6      Shopping         No            No        Post       24-Apr-    The value
1/IWAI    other equipment                                                                        15           of
/JMV/4    for Office of the                                                                                contract
   B            Project                                                                                      was
          Management Unit                                                                                 increased
          of Jal Marg Vikas                                                                               to Rs. 7.4
                Project                                                                                     Million
CANW-     Office Interiors 2      2.5      Shopping         No            No        Post       24-Apr-
1/IWAI         for PMU                                                                           15
/JMV/4
   C
CANW-     Laptops (6 Nos.)       0.46      Shopping         No            No        Post      26-Sept-
1/IWAI                                                                                        14
/JMV/5
CANW-      Self Propelled        600          ICB           No            No        Prior      May-16
1/IWAI     Cutter Suction
/JMV/7    Dredger (2 Nos.)
CANW-     Inspection cum         100          ICB           No            Yes       Prior     22-Jan-15       The
1/IWAI    Survey Vessel (2                                                                                 contract
/JMV/8          Nos.)                                                                                          is
                                                                                                           awarded
                                                                                                             at Rs.
                                                                                                            139.94
                                                                                                            Million
CANW-    Performance based     2,034.9        ICB           Yes           No        Prior      15-Feb-    Contracto
1/IWAI      Maintenance                                                                          16             r
/JMV/9       contract for                                                                                 finalized,
         Navigation on Part                                                                               Contract
             of National                                                                                     to be
            Waterway – 1                                                                                    signed
              (Farakka –                                                                                    for Rs.
             Bhagalpur)                                                                                     1589.1
                                                                                                            Million
CANW-     Procurement of        2,018         ICB           No            No        Prior     28-Sept-    Contracto
1/IWAI    EPC Contract for                                                                       15             r
/JMV/1    Construction of                                                                                 finalized,
   0        Terminal at                                                                                   Contract
             Varanasi                                                                                       signed
                                                                                                            for Rs.
                                                                                                            1695.9
                                                                                                            Million
CANW-     Procurement of       2,921       ICB      No    No   Prior   14-Mar-    Contracto
1/IWAI    EPC Contract for                                               16            r
/JMV/1    Construction of                                                         finalized,
   1      IWT Terminal at                                                         Contract
             Sahibganj,                                                             signed
             Jharkhand                                                              for Rs.
                                                                                     2809
                                                                                    Million
CANW-     Procurement of       4,650       ICB      No    No   Prior    18-Apr-   Contracto
1/IWAI    EPC Contract for                                                16           r
/JMV/1    Construction of                                                         finalized,
   5      Multimodal IWT                                                          Contract
         Terminal at Haldia,                                                         to be
            West Bengal                                                             signed
                                                                                    for Rs.
                                                                                   5173.62
                                                                                    Million
CANW-     Procurement of       3,520       ICB      No    No   Prior    May-16    Contracto
1/IWAI    EPC Contract for                                                             r
/JMV/1    Construction of                                                         finalized,
   6     Navigation Lock at                                                       Contract
              Farakka,                                                              signed
            West Bengal                                                             for Rs.
                                                                                    3591.9
                                                                                    Million
CANW-      Laptop (1 No.)       0.16     Shopping   No    No   Post    03-Dec-    Through
1/IWAI        (Apple)                                                    15         DGS&D
/JMV/1                                                                                Rate
   7                                                                              Contract
CANW-    B&W Printer (1 No.)    0.27     Shopping   No    No   Post    03-Dec-    Through
1/IWAI                                                                   15         DGS&D
/JMV/1                                                                                Rate
   8                                                                              Contract
CANW-     Color Printer (1      0.19     Shopping   No    No   Post    03-Dec-    Through
1/IWAI         No.)                                                      15         DGS&D
/JMV/1                                                                                Rate
   9                                                                              Contract
CANW-     Desktop (8 Nos.)      0.37     Shopping   No    No   Post    03-Dec-    Through
1/IWAI                                                                 15           DGS&D
/JMV/2                                                                                Rate
   0                                                                              Contract
CANW-     Laptop (10 Nos.)      0.62     Shopping   No    No   Post    03-Dec-    Through
1/IWAI                                                                 15           DGS&D
/JMV/2                                                                                Rate
   1                                                                              Contract
CANW-      UPS (10 Nos.)        0.24     Shopping   No    No   Post    03-Dec-    Through
1/IWAI                                                                 15           DGS&D
/JMV/2                                                                                Rate
   2                                                                              Contract
CANW-    Performance based     6,925       ICB      Yes   No   Prior    15-Apr-
1/IWAI       Maintenance                                                  17
/JMV/2       contract for
   8     Navigation on Part
              of National
         Waterway – 1 (Barh
             – Ghazipur)
CANW-    Performance based     2,346.6     ICB      Yes   No   Prior    15-Apr-
1/IWAI       Maintenance                                                  17
/JMV/2       contract for
   9     Navigation on Part
              of National
             Waterway – 1
             (Ghazipur –
               Varanasi)
CANW-      Procurement of       600        ICB      No    No   Prior   18-Mar-
1/IWAI    EPC Contract for                                               17
/JMV/3     Construction of
   0      IWT Terminal at
            third Location
CANW-      Procurement of       800        ICB      No    No   Prior    18-Feb-
1/IWAI    EPC Contract for                                                18
/JMV/3    Construction of
   1      IWT Terminal at
             Kalughat,
                Bihar
CANW-     Procurement of         600       ICB    No      No      Prior   18-Jan-17
1/IWAI   EPC Contract for
/JMV/3    Construction of
   2      IWT Terminal at
             Ghazipur,
           Uttar Pradesh
CANW-     Procurement of         375       ICB    No      No      Prior   18-Jul-17
1/IWAI   EPC Contract for
/JMV/3    Construction of
   3     Vessel Repair and
            Maintenance
           Facility, Site 1
CANW-     Procurement of         375       ICB    No      No      Prior   18-Aug-
1/IWAI   EPC Contract for                                                   17
/JMV/3    Construction of
   4     Vessel Repair and
            Maintenance
           Facility, Site 2

               Total           2,7857.81                                                 Rs.
                                                                                      15,015.9
                                                                                      6 Million
                                                                                      worth of
                                                                                      contract
                                                                                      awarded


III. Selection of Consultants

1.    Prior Review Threshold: Selection decisions subject to Prior Review by
      Bank as stated in Appendix 1 to the Guidelines Selection and Employment
      of Consultants:

                                                               Threshold (US$
     Category                 Method of Procurement
                                                                 Equivalent)
 Consultants’ Selection Based on Consultants’           Up to 300,000
 Services     Qualifications (CQS)/Least-Cost
              Selection (LCS)
              Single-Source Selection (SSS)              As per paragraphs 3.9-
                                                         3.11 of Guidelines
                       Individuals                       As per Section V of
                                                         Guidelines
                       Particular Types of Consultants   As per paragraphs 3.15-
                                                         3.21 of Guidelines
                       Quality- and Cost-Based Selection for all other cases
                       (QCBS)/ Quality-Based Selection
                       (QBS)/ Selection under a Fixed
                       Budget (FBS)
                       (i) International shortlist       > 800,000
                       (ii) Shortlist may comprise       Up to 800,000
                       national consultants only
a)    Consulting Services (firms) : All contracts more than US$ 1 million
equivalent;
   b) Individual Consultants : All contracts above US$ 300,000.

First Consultancy contract issued by implementing agency [IA] will be subject to
prior review irrespective of their value. In addition, the justifications for all
contracts to be issued on the basis of single-source, will be subject to prior
review. The above thresholds are for the initial 18 month implementation
period; based on the procurement performance of the project these thresholds
may be subsequently modified. Even for Post Review cases, the inputs of
Bank on TORs will be obtained by project. The procurement plan will be
updated annually (or at any other time if required) and will reflect any change in
prior review thresholds. The World Bank will carry out an annual ex-post
procurement review of the procurement falling below the prior review
thresholds provided above. To avoid any doubts, the Bank may conduct at any
time Independent Procurement Reviews (IPRs) of all the contracts financed
under the grant.


NCB Condition: National competition for the procurement of goods and works
according to the established thresholds will be conducted in accordance with
paragraphs 3.3 & 3.4 of Section III of the Guidelines and the following
provisions:
   a) Only the model bidding documents for NCB agreed with the GOI Task
      Force (and as amended for time to time), shall be used for bidding;
   b) Invitations to bid shall be advertised in at least one widely circulated
      national daily newspaper (or on a widely used website or electronic portal
      with free national and international access along with an abridged version
      of the said advertisement published in a widely circulated national daily
      inter-alia giving the website/electronic portal details from which the
      details of the invitation to bid can be downloaded), at least 30 days prior
      to the deadline for the submission of bids;
   c) No special preference will be accorded to any bidder either for price or
      for other terms and conditions when competing with foreign bidders,
      state-owned enterprises, small-scale enterprises or enterprises from any
      given State;
   d) Except with the prior concurrence of the Bank, there shall be no
      negotiation of price with the bidders, even with the lowest evaluated
      bidder;
   e) Extension of bid validity shall not be allowed with reference to Contracts
      subject to Bank prior review without the prior concurrence of the Bank (i)
      for the first request for extension if it is longer than four weeks; and (ii)
      for all subsequent requests for extension irrespective of the period (such
      concurrence will be considered by Bank only in cases of Force Majeure
      and circumstances beyond the control of the Purchaser/Employer);
   f) Re-bidding shall not be carried out with reference to contracts subject to
      Bank prior review without the prior concurrence of the Bank. The system
        of rejecting bids outside a pre-determined margin or "bracket" of prices
        shall not be used in the project;
     g) Rate contracts entered into by Directorate General of Supplies and
        Disposals (DGS&D) will not be acceptable as a substitute for NCB
        procedures unless agreed with the Bank on case to case basis. Such
        contracts will be acceptable however for any procurement under the
        Shopping procedures;
     h) Two or three envelope system will not be used (except when using e-
        procurement system assessed and agreed by the Bank).

2.    Short list comprising entirely of national consultants: Short list of
      consultants for services, estimated to cost less than $ 800,000 equivalent
      per contract, may comprise entirely of national consultants in accordance
      with the provisions of paragraph 2.7 of the Consultant Guidelines.

3.    Any Other Special Selection Arrangements: Retroactive Financing as per
      Legal Agreement

4.    Consultancy Assignments with Selection Methods and Time Schedule

            1               2                  3                4            5        6              7

      Ref. No.       Description of      Estimated       Selection   Review      Expected     Comments
                     Assignment          Cost            Method      by Bank     Proposals
                                         (Rs. Million)               (Prior /    Submission
                                                                     Post)       Date
      CANW-          Detailed            454.34          QCBS        Prior       22-Apr-15    Contract
      1/IWAI/JMV/1   Feasibility Study                                                        awarded at Rs.
                     for Capacity                                                             188.1 Million
                     Augmentation of                                                          + GBP 0.74
                     National                                                                 Million
                     Waterway-1 and                                                           (excluding
                     Detailed                                                                 applicable
                     Engineering for                                                          taxes)
                     its Ancillary
                     Works and
                     processes
      CANW-          Consultancy for     57.57           QCBS        Prior       30-Jan-15    Contract
      1/JMV/IWAI/2   Environmental                                                            awarded at Rs.
                     and Social                                                               28.61 Million
                     Impact                                                                   (excluding
                     Assessment                                                               applicable
                     (ESIA),                                                                  taxes)
                     Environmental
                     Management
                     Plan (EMP) and
                     Resettlement
                     Action Plan
                     (RAP) for
                     Capacity
                     Augmentation of
                     National
                     Waterway-1 (Jal
                     Marg Vikas)
      CANW-          Consultant for      66.79           QCBS        Prior       13-Mar-15    Contract
      1/JMV/IWAI/4   IWT Sector                                                               awarded at
                     Development                                                              Euro 0.84
                     Strategy and                                                             Million + Rs.
                     Market                                                                   0.62 Million
                     Development                                                              (excluding all
                     Study for                                                                applicable
                     Capacity                                                                 taxes)
               Augmentation of
               National
               Waterway-1
CANW-          Supporting          23.84    QCBS   Prior   04-Apr-16   Contract
1/JMV/IWAI/1   Services for                                            awarded at
2              Design of Inland                                        Euro 0.28
               Vessels for                                             Million
               Capacity                                                (excluding all
               Augmentation of                                         applicable
               National                                                taxes)
               Waterway – 1 (Jal
               Marg Vikas
               Project)
CANW-          Consultancy for     6.5      QCBS   Post    21-Mar-16   Contract
1/JMV/IWAI/1   Communications                                          awarded at Rs.
3              Needs                                                   2.16 Million
               Assessment,                                             (excluding all
               Development                                             applicable
               and                                                     taxes)
               Implementation
               of
               Communications
               Strategy and
               Strategic
               Communications
               Support for
               ‘Capacity
               augmentation of
               navigational
               infrastructure of
               National
               Waterway-1’
               between Haldia
               to Allahabad (Jal
               Marg Vikas
               Project)
CANW-          Implementation      3.34     QCBS   Post    04-Apr-16
1/JMV/IWAI/1   of Resettlement
4              Action Plan
               (RAP) for Jal
               Marg Vikas
               Project for the
               Capacity
               Augmentation of
               Navigation on
               National
               Waterway -1
CANW-          Consultancy for     42.49    QCBS   Post    May-16
1/JMV/IWAI/2   Inland
3              Waterways
               Transport
               Institutional
               Strengthening
               and Capacity
               Building
CANW-          Technical           97.22    QCBS   Prior   Jun-16
1/JMV/IWAI/2   Support Services
4              Consultancy –
               Cluster 1 for
               MMT at Varanasi
               and Sahibganj
               (located at
               Patna)
CANW-          Technical           117.96   QCBS   Prior   Jun-16
1/JMV/IWAI/2   Support Services
5              Consultancy –
               Cluster 2 for
               MMT at Haldia
               and Navigation
               Lock at Farakka
               (located at
               Kolkata)
CANW-          Consultancy         37.41    QCBS   Prior   Jun-16   Contract
1/JMV/IWAI/2   Services for                                         awarded at Rs.
6              Project                                              14.31 Million
               Preparatory and                                      + USD 0.47
               Definition Study                                     Million
               for Development                                      (excluding all
               of Ferry services                                    applicable
               on NW-1                                              taxes)
CANW-          Consultancy         34.42    QCBS   Prior   Jun-16   Contract
1/JMV/IWAI/2   Services for Plan                                    awarded at
7              and                                                  Euro 0.5
               Implementation                                       Million
               support for                                          (excluding all
               commercializati                                      applicable
               on of NW-1                                           taxes)
               Total               941.88                           Rs. 233.8
                                                                    Million + GBP
                                                                    0.74 Million +
                                                                    Euro 1.62
                                                                    Million + USD
                                                                    0.47 Million
                                                                    worth of
                                                                    contract
                                                                    awarded
PROCUREMENT
                  India : Capacity Augmentation of the National Waterway- 1 (JAL MARG VIKAS) Project
PLAN
General Information
Country:             India                               Bank’s Approval Date of the Original Procurement Plan:     2016-06-10
                                                                                                                    2021-04-19
                                                         Revised Plan Date(s): (comma delineated, leave blank if none)
Project ID:          P148775                             GPN Date:
Project Name:        Capacity Augmentation of the National Waterway- 1 (JAL MARG VIKAS) Project
Loan / Credit No:    IBRD / P4740, IBRD / 87520
                     Inland Waterways Authority of India
Executing Agency(ies):


WORKS
 Activity Reference No. /                                                                                                                                                                                        Estimated       Actual                                                                          Draft Bidding                                                                        Bid Evaluation Report
                                  Loan / Credit                                                                                             Procurement        Prequalification   High SEA/SH    Procurement                                   Process      Draft Pre-qualification      Prequalification                           Specific Procurement   Bidding Documents as Proposal Submission /                                                        Contract
        Description                                      Component                Review Type       Method         Market Approach                                                                                Amount        Amount                                                                           Document /                                                                           and Recommendation           Signed Contract
                                      No.                                                                                                     Process               (Y/N)             Risk      Document Type                                   Status            Documents             Evaluation Report                            Notice / Invitation           Issued         Opening / Minutes                                                         Completion
                                                                                                                                                                                                                   (US$)         (US$)                                                                           Justification                                                                              for Award
                                                                                                                                                                                                                                                             Planned      Actual       Planned     Actual    Planned       Actual    Planned     Actual     Planned      Actual  Planned     Actual    Planned      Actual       Planned       Actual     Planned

Folder # 6 / Construction of
                                                                                                                                          Single Stage - One                                                                   25,949,781.
Multimodal IWT Terminal at       IBRD / P4740                                  Prior            Request for Bids   Open - International                                                                                 0.00                  Signed                                                                                                                                                               2015-10-30                2016-05-13
                                                                                                                                          Envelope                                                                                      17
Varanasi, Uttar Pradesh


 CANW-1/IWAI/JMV/15 /
Procurement of EPC Contract                       Component A: Improving the
                                                                                                                                          Single Stage - One                                                    71,538,461.5   75,683,207.                                                                                                                                                                                                                2019-05-
for Construction of              IBRD / P4740     navigability of NW-1 (Haldia Prior            Request for Bids   Open - International                                                                                                       Signed                                                        2016-09-20 2017-01-12 2016-09-20 2017-01-12                         2016-09-20 2017-01-12 2016-10-20 2017-01-12 2016-11-24 2017-06-30
                                                                                                                                          Envelope                                                                         4            68                                                                                                                                                                                                                   06
Multimodal IWT Terminal at                        to Varanasi)
Haldia, West Bengal


 CANW-1-IWAI-JMV-11 /
Engineering Procurement and                       Component A: Improving the
                                                                                                                                          Single Stage - One                                                    44,938,461.5   40,963,712.                                                                                                                                                                                                                2019-04-
Construction (EPC) for           IBRD / P4740     navigability of NW-1 (Haldia Prior            Request for Bids   Open - International                                                                                                       Signed                                                        2016-09-20 2016-09-23 2016-09-20                                    2016-09-20 2017-01-12 2016-09-20 2017-01-12 2016-11-09 2017-01-12
                                                                                                                                          Envelope                                                                         4            56                                                                                                                                                                                                                   21
Construction of IWT Terminal                      to Varanasi)
at Sahibganj, Jharkhand


 CANW-1/IWAI/JMV/16 /
Procurement of EPC Contract                       Component A: Improving the
                                                                                                                                          Single Stage - One                                                    54,153,846.1   52,544,647.                                                                                                                                                                                                                2019-05-
for Construction of Navigation IBRD / P4740       navigability of NW-1 (Haldia Prior            Request for Bids   Open - International                                                                                                       Signed                                                        2016-09-20 2017-01-12 2016-09-20 2017-01-12                         2016-09-20 2017-01-12 2016-10-20 2017-01-12 2016-11-24 2017-01-01
                                                                                                                                          Envelope                                                                         5            94                                                                                                                                                                                                                   06
Lock at Farakka,                                  to Varanasi)
West Bengal


 CANW-1/IWAI/JMV/9 /
Performance based
                                                  Component A: Improving the                                                                                                                                                                  Under
Maintenance contract for                                                                                                                  Single Stage - One                                                    31,306,153.8   24,652,781.                                                                                                                                                                                                                2019-07-
                                 IBRD / P4740     navigability of NW-1 (Haldia Prior            Request for Bids   Open - International                                                                                                       Implementat 2017-06-23                  2017-09-08 2017-06-28 2017-09-08 2017-06-28 2017-06-28                                    2017-11-17 2017-06-28 2017-12-17 2017-06-28 2018-01-21
Navigation on Part of National                                                                                                            Envelope                                                                         4            86                                                                                                                                                                                                                   15
                                                  to Varanasi)                                                                                                                                                                                ion
Waterway - 1 (Farakka -
Bhagalpur)


 IN-IWAI-26080-CW-RFB /
Sultanganj - Mahendrapur -
                                                  Component A: Improving the
Performance based assured                                                                                                                 Single Stage - Two                                                    36,430,769.2                                                                                                                                                                                                                              2018-07-
                                 IBRD / 87520     navigability of NW-1 (Haldia Prior            Request for Bids   Open - International                                                                                              0.00     Canceled                                                      2017-08-24 2018-02-16 2017-08-29                                    2017-10-10            2017-12-23                2018-01-27
depth dredging between                                                                                                                    Envelope                                                                         3                                                                                                                                                                                                                                 26
                                                  to Varanasi)
Sultanganj - Mahendrapur
stretch of NW-1


 IN-IWAI-26081-CW-RFB /
Mahendrapur-Barh -
                                                  Component A: Improving the
Performance based Assured                                                                                                                 Single Stage - Two                                                    36,107,692.3                                                                                                                                                                                                                              2018-07-
                              IBRD / 87520        navigability of NW-1 (Haldia Prior            Request for Bids   Open - International                                                                                              0.00     Canceled                                                      2017-08-24 2018-02-16 2017-08-29                                    2017-10-10            2017-12-23                2018-01-27
depth dredging between                                                                                                                    Envelope                                                                         0                                                                                                                                                                                                                                 26
                                                  to Varanasi)
Mahendrapur - Barh stretch of
NW-1


 CANW-1/ IWAI / JMV /9 /
Procurement for Providing
Assured Least Available Depth
of 3.0 m by Dredging /                            Component A: Improving the
                                                                                                                                          Single Stage - One                                                                                                                                                                                                                                                                                              2019-02-
Bandalling as well as Erection IBRD / P4740       navigability of NW-1 (Haldia Prior            Request for Bids   Open - International                                                                               25.69          0.00     Canceled      2017-01-12                2017-03-30 2017-01-13 2017-03-30 2017-01-13 2017-01-17                                    2017-06-08 2017-01-13 2017-07-08 2017-01-13 2017-08-12
                                                                                                                                          Envelope                                                                                                                                                                                                                                                                                                           03
and Maintenance of                                to Varanasi)
Navigational Aids in Farakka -
Kahalgaon Stretch of National
Waterway -1 (River Ganga)


 IN-IWAI-46606-CW-RFP /
                                                  Component A: Improving the
Ghazipur - EPC contract for                                                                     Request for                               Single Stage - Two                                                    19,230,770.0                                                                                                                                                                                                                              2020-11-
                                 IBRD / 87520     navigability of NW-1 (Haldia Prior                               Open - National                                                                                                   0.00     Canceled                                                      2018-01-31              2018-02-10                                  2018-03-10            2018-04-29                2018-05-27
construction of IWT Inter                                                                       Proposals                                 Envelope                                                                         0                                                                                                                                                                                                                                 12
                                                  to Varanasi)
Modal Terminal at Ghazipur


 CANW-1/IWAI/JMV/9A /
Performance based
                                                  Component A: Improving the
maintenance contract for                                                                                                                  Single Stage - One                                                    31,306,153.8   23,084,025.                                                                                                                                                                                                                2023-04-
                                 IBRD / P4740     navigability of NW-1 (Haldia Prior            Request for Bids   Open - International                                                                                                       Signed        2018-03-09                2018-05-25            2018-05-25              2018-03-14                                  2018-08-03            2018-09-02 2018-03-14 2018-10-07 2018-04-09
navigation on part of National                                                                                                            Envelope                                                                         4            00                                                                                                                                                                                                                   30
                                                  to Varanasi)
Waterway - 1 (Farakka -
Kahalgaon)


 IN-IWAI-46606A-CW-RFB /
                                                  Component A: Improving the
Ghazipur - EPC Contract for                                                                                                               Single Stage - Two                                                    19,230,770.0                                                                                                                                                                                                                              2020-12-
                                 IBRD / 87520     navigability of NW-1 (Haldia Prior            Request for Bids   Open - National                                                                                                   0.00     Canceled                                                      2018-03-09 2018-03-26 2018-03-19 2018-03-28                         2018-04-16            2018-06-05                2018-07-03
construction of IWT Inter                                                                                                                 Envelope                                                                         0                                                                                                                                                                                                                                 19
                                                  to Varanasi)
Modal Terminal at Ghazipur


 IN-IWAI-65611-CW-RFB /
Procurement of EPC Contract                       Component A: Improving the                                                                                                                                                                  Under
                                                                                                                                          Single Stage - Two                                                    14,940,000.0                                                                                                                                                                                                                              2020-11-
for Construction of IWT          IBRD / 87520     navigability of NW-1 (Haldia Prior            Request for Bids   Open - National                                                                                                   0.00     Implementat                                                   2018-06-15 2018-08-14 2018-06-20                                    2018-08-01            2018-10-14                2018-11-18
                                                                                                                                          Envelope                                                                         0                                                                                                                                                                                                                                 17
Terminal at Ghazipur, Uttar                       to Varanasi)                                                                                                                                                                                ion
Pradesh


 IN-IWAI-68538-CW-RFB /
Procurement of Contractor for
Providing Assured Least
                                                  Component A: Improving the
Available Depth of 2.5 /3.0 m                                                                                                             Single Stage - Two                                                    36,430,766.2                                                                                                                                                                                                                              2023-12-
                              IBRD / 87520        navigability of NW-1 (Haldia Prior            Request for Bids   Open - International                                                                                              0.00     Canceled                                                      2018-07-06 2018-07-12 2018-07-11 2018-09-07                         2018-08-22 2018-09-24 2018-11-04                2018-12-09
by Performance Based                                                                                                                      Envelope                                                                         3                                                                                                                                                                                                                                 09
                                                  to Varanasi)
Dredging & Bandalling in
Sultanganj - Mahendrapur (74
km) of National Waterway - 1


 IN-IWAI-68539-CW-RFB /
Procurement of Contractor for
Providing Assured Least
                                                  Component A: Improving the
Available Depth of 2.5 /3.0 m                                                                                                             Single Stage - Two                                                    36,107,692.3                                                                                                                                                                                                                              2023-12-
                              IBRD / 87520        navigability of NW-1 (Haldia Prior            Request for Bids   Open - International                                                                                              0.00     Canceled                                                      2018-07-06 2018-07-26 2018-07-11                                    2018-08-22 2018-09-24 2018-11-04                2018-12-09
by Performance Based                                                                                                                      Envelope                                                                         0                                                                                                                                                                                                                                 09
                                                  to Varanasi)
Dredging & Bandalling in
Mahendrapur - Barh (71 km)
of National Waterway - 1




                                                                                                                                                                                                                                     Page 1
 IN-IWAI-77998-NC-RFB /
                                               Component A: Improving the
Paving the Back up area of                                                                                                    Single Stage - Two                                                                                                                                                        2018-11-
                              IBRD / 87520     navigability of NW-1 (Haldia Post    Request for Bids   Open - National                              290,000.00          0.00     Canceled      2018-09-20            2018-09-25              2018-10-11   2018-10-22            2018-10-30
Varanasi Multi Modal Terminal                                                                                                 Envelope                                                                                                                                                                     29
                                               to Varanasi)
with Paver Blocks


 IN-IWAI-96065-CW-RFB /
Bend Correction - Re-
engineering of River Bends in
                                               Component A: Improving the                                                                                                        Under
Approach Channel Up Stream                                                                                                    Single Stage - Two   16,000,000.0                                                                                                                                         2020-01-
                                IBRD / 87520   navigability of NW-1 (Haldia Prior   Request for Bids   Open - National                                                  0.00     Implementat   2019-01-31 2019-04-05 2019-02-05              2019-03-19   2019-06-01            2019-07-06
of Farakka Navigational Lock                                                                                                  Envelope                        0                                                                                                                                            02
                                               to Varanasi)                                                                                                                      ion
through LAD Dredging / dry
excavation or combination
there of.


 IN-IWAI-103402-CW-RFB /
                                               Component A: Improving the                                                                                                        Pending
Procurement of EPC Contract                                                                                                   Single Stage - Two   10,152,857.0                                                                                                                                         2021-08-
                                IBRD / 87520   navigability of NW-1 (Haldia Prior   Request for Bids   Open - National                                                  0.00     Implementat   2019-02-28            2019-03-05              2019-04-16   2019-06-29            2019-08-03
for Bank Protection Work in                                                                                                   Envelope                        0                                                                                                                                            02
                                               to Varanasi)                                                                                                                      ion
Feeder Canal


 IN-IWAI-68538-CW-RFB-A /
Procurement of Contractor for
Providing Assured Least
                                               Component A: Improving the
Available Depth of 2.5 /3.0 m                                                                                                 Single Stage - Two   36,430,766.2   22,421,443.                                                                                                                           2024-08-
                              IBRD / 87520     navigability of NW-1 (Haldia Prior   Request for Bids   Open - International                                                      Signed        2019-03-29            2019-04-03              2019-05-15   2019-07-28 2019-09-18 2019-09-01 2019-04-12
by Performance Based                                                                                                          Envelope                        3            14                                                                                                                              31
                                               to Varanasi)
Dredging & Bandalling in
Sultanganj - Mahendrapur (74
km) of National Waterway - 1


 IN-IWAI-68539-CW-RFB-A /
Procurement of Contractor for
Providing Assured Least
                                               Component A: Improving the
Available Depth of 2.5 /3.0 m                                                                                                 Single Stage - Two   36,107,692.3   26,368,711.                                                                                                                           2024-08-
                              IBRD / 87520     navigability of NW-1 (Haldia Prior   Request for Bids   Open - International                                                      Signed        2019-03-29            2019-04-03              2019-05-15   2019-07-28 2019-06-12 2019-09-01 2019-04-12
by Performance Based                                                                                                          Envelope                        0            29                                                                                                                              31
                                               to Varanasi)
Dredging & Bandalling in
Mahendrapur - Barh (71 km)
of National Waterway - 1


 IN-IWAI-68629-CW-RFB /
LAD - Ghazipur Varanasi
Stretch ( 133km) -
                                               Component A: Improving the
Procurement of dredging                                                                                                       Single Stage - Two   62,307,700.0                                                                                                                                         2023-12-
                               IBRD / 87520    navigability of NW-1 (Haldia Prior   Request for Bids   Open - International                                             0.00     Canceled      2018-07-13            2018-07-18              2018-08-29   2018-11-11            2018-12-16
Works & services for Providing                                                                                                Envelope                        0                                                                                                                                            16
                                               to Varanasi)
Assured Least Available Depth
of 2.2m by performance
Based Dredging & Bandalling.


 IN-IWAI-136395-CW-RFB /
Barh- Majuhua - Contract for
Quantity Based Dredging
Contract & Providing Target
                                               Component A: Improving the                                                                                                        Pending
Least Available depth LAD of                                                                                                  Single Stage - Two                                                                                                                                                        2020-09-
                                IBRD / 87520   navigability of NW-1 (Haldia Post    Request for Bids   Open - National                             5,653,846.00         0.00     Implementat   2019-10-15            2019-10-20              2019-12-01   2020-02-13            2020-03-19
2.50m and Channel Width of                                                                                                    Envelope                                                                                                                                                                     15
                                               to Varanasi)                                                                                                                      ion
30 m during 1st & 2nd year
and 35 m during 3rd year
onwards , On O&M Contract (
using IWAI Dredgers)


 IN-IWAI-133241-CW-RFB /
Ghazipur-Varanasi Stretch -
Procurement of contract for
Quantity Based Dredging
                                               Component A: Improving the
Contract & Providing Target                                                                                                   Single Stage - Two                                                                                                                                                        2020-08-
                                IBRD / 87520   navigability of NW-1 (Haldia Post    Request for Bids   Open - National                             6,468,000.00         0.00     Canceled      2019-09-16            2019-09-21              2019-11-02   2020-01-15            2020-02-19
LAD ( Least Available Depth)                                                                                                  Envelope                                                                                                                                                                     17
                                               to Varanasi)
of 2.20m and Channel Width
of 30m during 1st & 2nd year
and 35m during 3rd year
onwards.


 IN-IWAI-133235-CW-RFB /
Majhaua-Ghazipur stretch -
Procurement of Contract foe
Quantity Based Dredging
                                               Component A: Improving the
Contract & providing Target                                                                                                   Single Stage - Two   13,908,461.0                                                                                                                                         2020-08-
                                IBRD / 87520   navigability of NW-1 (Haldia Prior   Request for Bids   Open - National                                                  0.00     Canceled      2019-09-16            2019-09-21              2019-11-02   2020-01-15            2020-02-19
LAD I Least Available Depth)                                                                                                  Envelope                        0                                                                                                                                            17
                                               to Varanasi)
of 2.5 m & channel Width of
30 m during 1st & 2nd year
and 35 m during 3rd year
onwards.


 IN-IWAI-144901-CW-RFB /
Barh-Digha (69km) -
Procurement of Contract for
providing Assured LAD -
                                               Component A: Improving the
Least available Depth of 2.5 m                                                                                                Single Stage - Two   27,857,145.0                                                                                                                                         2020-10-
                               IBRD / 87520    navigability of NW-1 (Haldia Prior   Request for Bids   Open - National                                                  0.00     Canceled      2019-11-25 2020-01-09 2019-12-05 2020-04-01   2020-01-15   2020-03-29            2020-05-03
by performance Based                                                                                                          Envelope                        0                                                                                                                                            30
                                               to Varanasi)
Dredging / Bandalling as well
as Erection Maintenance of
Navigational Aids in Barh -
Digha Stretch of NW-1


 IN-IWAI-144903-CW-RFB /
Digha-Majhaua (98 Km) -
Procurement of contractor for
providing Assured LAD- Least
                                               Component A: Improving the
Available Depth of 2.5M by                                                                                                    Single Stage - Two   39,480,000.0                                                                                                                                         2020-10-
                                IBRD / 87520   navigability of NW-1 (Haldia Prior   Request for Bids   Open - National                                                  0.00     Canceled      2019-11-26 2020-01-07 2019-12-06 2020-04-01   2020-01-15   2020-03-29            2020-05-03
Performance Based Dredging                                                                                                    Envelope                        0                                                                                                                                            30
                                               to Varanasi)
/ Bandalling as well as
Erection Maintenance of
Navigational Aids in Digha -
Majhaua ( 98 Km) in NW-1


 IN-IWAI-176289-CW-RFB /
Tribeni - Farakka -
Procurement of
ADMEASUREMENT
CONTRACTS for Quantity                         Component A: Improving the                                                                                                        Under
                                                                                                                              Single Stage - Two                                                                                                                                                        2021-07-
Based Dredging Contract with    IBRD / 87520   navigability of NW-1 (Haldia Post    Request for Bids   Open - National                             9,210,527.00         0.00     Implementat   2020-08-16 2020-11-17 2020-08-21 2020-11-19   2020-10-02   2020-12-15            2021-01-19
                                                                                                                              Envelope                                                                                                                                                                     18
for 3m LAD and Channel                         to Varanasi)                                                                                                                      ion
Width of 36 m in Triveni –
Farakka stretch round the
year for 5 years Between
Farraka – Tribeni Stretch
(351KMs)

 IN-IWAI-185377-CW-RFB /
Kalughat IWT - Construction                    Component A: Improving the                                                                                                        Under
                                                                                                                              Single Stage - Two   13,214,285.0                                                                                                                                         2023-03-
of Inter-Modal IWT Terminal   IBRD / 87520     navigability of NW-1 (Haldia Prior   Request for Bids   Open - National                                                  0.00     Implementat   2020-08-17 2020-12-11 2020-08-24 2020-12-23   2020-10-23   2021-01-05            2021-02-09
                                                                                                                              Envelope                        0                                                                                                                                            01
on EPC Contract at Kalughat -                  to Varanasi)                                                                                                                      ion
Bihar




                                                                                                                                                                        Page 2
 IN-IWAI-189283-CW-RFB /
Majhaua-Ghazipur 121km -
Contract for Quantity Based
Dredging for providing LAD                        Component A: Improving the                                                                                                                                                                      Under
                                                                                                                                           Single Stage - Two                                                        12,915,000.0                                                                                                                                                                                                                   2023-12-
(Least Available Depth) of       IBRD / 87520     navigability of NW-1 (Haldia Prior             Request for Bids   Open - National                                                                                                       0.00    Implementat                                                2020-11-30             2020-12-07                                 2021-01-18              2021-04-02            2021-05-07
                                                                                                                                           Envelope                                                                             0                                                                                                                                                                                                                      31
2.0m /2.25m/2.5m. and                             to Varanasi)                                                                                                                                                                                    ion
Width of 30 m in Majhaua –
Ghazipur 121 km of National
Waterway – 1


 IN-IWAI-189285-CW-RFB /
(Ghazipur - Varanasi 133 km)
Contract for Quantity Based
Dredging for providing LAD                        Component A: Improving the                                                                                                                                                                      Pending
                                                                                                                                           Single Stage - Two                                                                                                                                                                                                                                                                                       2023-12-
(Least Available Depth) of       IBRD / 87520     navigability of NW-1 (Haldia Post              Request for Bids   Open - National                                                                                  7,577,428.00         0.00    Implementat                                                2020-12-10             2020-12-17                                 2021-01-28              2021-04-12            2021-05-17
                                                                                                                                           Envelope                                                                                                                                                                                                                                                                                                    31
2.0m /2.25m/2.5m. and                             to Varanasi)                                                                                                                                                                                    ion
Width of 30 m in Ghazipur -
Varanasi 133 km of National
Waterway – 1


 IN-IWAI-213010-CW-RFB /
Barh-Digha-Majhaua 167km -
Contract for Quantity Based
Dredging for providing LAD
                                                  Component A: Improving the                                                                                                                                                                      Pending
(Least Available Depth) of                                                                                                                 Single Stage - Two                                                                                                                                                                                                                                                                                       2023-12-
                             IBRD / 87520         navigability of NW-1 (Haldia Post              Request for Bids   Open - National                                                                                  4,864,286.00         0.00    Implementat                                                2021-01-20             2021-01-25                                 2021-03-08              2021-05-21            2021-06-25
2.0m /2.25m/2.5m. and                                                                                                                      Envelope                                                                                                                                                                                                                                                                                                    30
                                                  to Varanasi)                                                                                                                                                                                    ion
Width of 30 m in Barh-Digha-
Majhaua 167Km on O&M
contract using IWAI Dredgers
on National Waterway – 1


 IN-IWAI-228846-CW-RFB /
                                                  Component A: Improving the                                                                                                                                                                      Pending
Construction of 03 pairs of RO                                                                                                             Single Stage - Two                                                                                                                                                                                                                                                                                       2022-02-
                               IBRD / 87520       navigability of NW-1 (Haldia Post              Request for Bids   Open - National                                                                                  1,464,000.00         0.00    Implementat                                                2021-05-03             2021-05-08                                 2021-06-19              2021-09-17            2021-10-22
RO Terminals in the State of                                                                                                               Envelope                                                                                                                                                                                                                                                                                                    19
                                                  to Varanasi)                                                                                                                                                                                    ion
Bihar




GOODS
 Activity Reference No. /                                                                                                                                                                                                                                                                 Draft Bidding                                                                        Bid Evaluation Report
                                  Loan / Credit                                                                                              Procurement        Prequalification    Estimated       Actual Amount      Process      Draft Pre-qualification       Prequalification                           Specific Procurement   Bidding Documents as Proposal Submission /
        Description                                      Component                 Review Type       Method         Market Approach                                                                                                                                                       Document /                                                                           and Recommendation         Signed Contract     Contract Completion
                                      No.                                                                                                      Process               (Y/N)         Amount (US$)         (US$)           Status            Documents              Evaluation Report                            Notice / Invitation           Issued         Opening / Minutes
                                                                                                                                                                                                                                                                                          Justification                                                                              for Award
                                                                                                                                                                                                                                     Planned        Actual      Planned     Actual    Planned       Actual    Planned     Actual     Planned      Actual  Planned     Actual    Planned      Actual     Planned     Actual    Planned     Actual

 IN-IWAI-64317-GO-RFB /
                                                  Component A: Improving the
SPCSD - Self Propelled Cutter                                                                                                              Single Stage - Two
                                 IBRD / 87520     navigability of NW-1 (Haldia Prior             Request for Bids   Open - International                                             9,230,770.00             0.00   Canceled                                                        2018-05-28 2018-06-14 2018-06-02 2018-08-27                         2018-07-14 2018-09-17 2018-09-26              2018-10-31            2019-04-29
Suction Dredgers for JMVP-                                                                                                                 Envelope
                                                  to Varanasi)
NW-1 ( 2 Nos)


 IN-IWAI-29583-GO-RFB /
                                                  Component A: Improving the
SPCSD - Self Propelled Cutter                                                                                                              Single Stage - Two
                                 IBRD / 87520     navigability of NW-1 (Haldia Prior             Request for Bids   Open - International                                            12,307,700.00             0.00   Canceled                                                        2017-10-10 2017-12-18 2017-10-25                                    2017-12-24            2018-04-07              2018-05-21            2019-05-21
Suction Dredgers for JMVP -                                                                                                                Envelope
                                                  to Varanasi)
NW-1( 2nos)


 IN-IWAI-52298-GO-RFB /
VOIP- Voice Over Internet
                                                  Component A: Improving the
Protocol systems to be                                                                                                                     Single Stage - Two
                                 IBRD / 87520     navigability of NW-1 (Haldia Post              Request for Bids   Open - National                                                    67,700.00              0.00   Canceled                                                        2018-03-12 2018-05-01 2018-03-17 2018-05-16                         2018-04-28 2018-06-08 2018-07-11              2018-08-15            2019-02-11
installed at NOIDA, Varanasi,                                                                                                              Envelope
                                                  to Varanasi)
Patna, Sahibganj, Kolkatta &
Faraka.


 IN-IWAI-79679-GO-RFB /                           Component B: Institutional
Procurement of Equipment for                      Strengthening and improving
                                                                                                                                           Single Stage - Two
Solid & Liquid waste:          IBRD / 87520       the investment climate,       Post             Request for Bids   Open - National                                                   318,461.54              0.00   Canceled                                                        2018-09-26 2018-09-27 2018-10-01                                    2018-11-12 2018-10-12 2019-01-25 2018-11-02 2019-03-01              2020-02-29
                                                                                                                                           Envelope
Collection & Transportation at                    vessel design and
MMT Varanasi                                      construction framework


 IN-IWAI-96103-GO-RFQ /                           Component B: Institutional
Supply and Installation of                        Strengthening and improving
                                                                                                 Request for                               Single Stage - One
CCTV Surveillance system at      IBRD / 87520     the investment climate,       Post                                Open - National                                                    57,292.31         48,530.97   Signed                                                                                  2019-01-28                                                                                2019-03-25 2019-01-02 2019-05-09
                                                                                                 Quotations                                Envelope
Sahibganj Terminal, Farakka                       vessel design and
Lock and Haldia Terminal                          construction framework


 IN-IWAI-121793-GO-RFB /
Procurement of Waste
                                                  Component B: Institutional
Reception facility including
                                                  Strengthening and improving                                                                                                                                        Pending
collection, storage, treatment                                                                                                             Single Stage - Two
                                 IBRD / 87520     the investment climate,       Post             Request for Bids   Open - National                                                   987,652.43              0.00   Implementati                                                    2019-07-15              2019-07-20                                  2019-08-31            2019-11-13              2019-12-18            2020-12-17
and disposal of solid and                                                                                                                  Envelope
                                                  vessel design and                                                                                                                                                  on
liquid waste at MMT Varanasi,
                                                  construction framework
MMT Sahibganj and MMT
Haldia


 IN-IWAI-104973-GO-RFB /                          Component A: Improving the
                                                                                                                                           Single Stage - Two
Floating Debris Collector Work IBRD / 87520       navigability of NW-1 (Haldia Prior             Request for Bids   Open - International                                             3,321,428.57             0.00   Canceled                                                        2019-03-08 2019-05-03 2019-03-13 2019-05-24                         2019-04-24            2019-07-07              2019-08-11            2020-08-10
                                                                                                                                           Envelope
Boat and Twin Skipper Barge                       to Varanasi)


 IN-IWAI-228578-GO-RFB /                          Component B: Institutional
Procurement of FRP (12 Nos.)                      Strengthening and improving                                                                                                                                        Pending
                                                                                                                                           Single Stage - Two
and VIP (04 Nos.) boats on NW- IBRD / 87520       the investment climate,       Post             Request for Bids   Open - National                                                   653,333.33              0.00   Implementati                                                    2021-05-03              2021-05-08                                  2021-06-19            2021-09-01              2021-10-06            2022-04-04
                                                                                                                                           Envelope
1 under JMVP Phase-II (Arth                       vessel design and                                                                                                                                                  on
Ganga)                                            construction framework




NON CONSULTING SERVICES
 Activity Reference No. /                                                                                                                                                                                                                                                                 Draft Bidding                                                                        Bid Evaluation Report
                                  Loan / Credit                                                                                              Procurement        Prequalification    Estimated       Actual Amount      Process      Draft Pre-qualification       Prequalification                           Specific Procurement   Bidding Documents as Proposal Submission /
        Description                                      Component                 Review Type       Method         Market Approach                                                                                                                                                       Document /                                                                           and Recommendation         Signed Contract     Contract Completion
                                      No.                                                                                                      Process               (Y/N)         Amount (US$)         (US$)           Status            Documents              Evaluation Report                            Notice / Invitation           Issued         Opening / Minutes
                                                                                                                                                                                                                                                                                          Justification                                                                              for Award
                                                                                                                                                                                                                                     Planned        Actual      Planned     Actual    Planned       Actual    Planned     Actual     Planned      Actual  Planned     Actual    Planned      Actual     Planned     Actual    Planned     Actual

 IN-IWAI-55644-NC-RFB /
Geo-technical Investigation at                    Component A: Improving the
                                                                                                                                           Single Stage - One
various locations in NW-1 for    IBRD / 87520     navigability of NW-1 (Haldia Post              Request for Bids   Open - National                                                   125,262.00              0.00   Canceled                                                        2018-04-20 2018-05-30 2018-04-25 2018-06-04                         2018-06-06 2018-06-29 2018-07-06              2018-08-10            2019-02-06
                                                                                                                                           Envelope
Bank Protection, RO-RO and                        to Varanasi)
Ship repair complex


 IN-IWAI-55630-NC-RFB /                           Component B: Institutional
Procurement of Cargo Vessels                      Strengthening and improving
                                                                                                                                           Single Stage - Two
on leasing cum Time charter      IBRD / 87520     the investment climate,       Prior            Request for Bids   Open - National                                                  2,067,695.00             0.00   Canceled                                                        2018-05-24              2018-05-29                                  2018-07-10            2018-09-22              2018-10-27            2019-04-25
                                                                                                                                           Envelope
basis for capacity                                vessel design and
augmentation of NW-1                              construction framework




                                                                                                                                                                                                                                         Page 3
 IN-IWAI-55630A-NC-RFB /
Procurement of Non-                               Component B: Institutional
consulting Services for Cargo                     Strengthening and improving                                                                                                                                         Under
                                                                                                                                            Single Stage - Two
and Ro-Ro Vessel Hiring for      IBRD / 87520     the investment climate,       Prior            Request for Bids    Open - National                                                2,171,077.00               0.00   Implementati                                                       2018-08-31 2019-01-13 2018-09-05 2019-01-14                            2018-10-17                2018-12-30                2019-02-03                2019-08-02
                                                                                                                                            Envelope
Capacity Augmentation of                          vessel design and                                                                                                                                                   on
National waterways-1 ( River                      construction framework
Ganga)


 IN-IWAI-215436-NC-RFB /
                                                  Component A: Improving the                                                                                                                                          Under
CAMC AND O&M OF RIS                                                                                                                         Single Stage - Two
                                 IBRD / 87520     navigability of NW-1 (Haldia Post              Request for Bids    Open - National                                                  537,517.37               0.00   Implementati                                                       2021-01-27 2021-01-25 2021-02-01 2021-02-11                            2021-03-15                2021-05-28                2021-07-02                2024-07-02
STATIONS OF PHASE-I AND                                                                                                                     Envelope
                                                  to Varanasi)                                                                                                                                                        on
CAMC OF SHIP STATIONS




CONSULTING FIRMS
 Activity Reference No. /                                                                                                                                                                                                                                                                                                                                                    Combined Evaluation
                                  Loan / Credit                                                                                              Contract Type        Estimated       Actual Amount                                                    Expression of Interest    Short List and Draft   Request for Proposals   Opening of Technical       Evaluation of
        Description                                      Component                 Review Type        Method         Market Approach                                                               Process Status       Terms of Reference                                                                                                                                     Report and Draft           Signed Contract        Contract Completion
                                      No.                                                                                                                        Amount (US$)         (US$)                                                               Notice            Request for Proposals        as Issued          Proposals / Minutes     Technical Proposal
                                                                                                                                                                                                                                                                                                                                                                             Negotiated Contract
                                                                                                                                                                                                                       Planned         Actual       Planned     Actual       Planned       Actual    Planned     Actual      Planned     Actual     Planned       Actual     Planned     Actual         Planned       Actual      Planned       Actual

 IN-IWAI-188-CS-QCBS /
Consultancy Services for
Project Preparatory and
Definition Study for
Development of Ferry services                     Component A: Improving the
                                                                                                 Quality And Cost-
on NW-1. The scope of work      IBRD / P4740      navigability of NW-1 (Haldia Post                                  Open - International                            575,587.04       864,232.68   Signed             2016-09-20     2017-01-01 2016-09-20                  2016-09-20 2017-01-13                           2016-10-07 2017-01-13 2016-11-06 2017-01-13 2016-12-21 2016-11-04 2017-01-25 2016-12-21 2018-04-25
                                                                                                 Based Selection
includes a detailed strategic                     to Varanasi)
planning, design, and techno-
economic feasibility study that
sets out a broad planning
framework..


 CANW-1/IWAI/JMV/24 /
Technical Support Services
                                                  Component B: Institutional
Consultant, Cluster 1 for
                                                  Strengthening and improving
Capacity augmentation of                                                                         Quality And Cost-
                                 IBRD / P4740     the investment climate,       Prior                                Open - International                          2,907,692.32             0.00   Canceled           2017-01-12     2017-01-13 2017-02-02 2017-01-13 2017-03-18 2017-04-11                                 2017-04-15 2017-05-19 2017-05-15 2017-06-29 2017-06-19                     2017-07-24                2018-07-24
navigational infrastructure of                                                                   Based Selection
                                                  vessel design and
National Waterway-1 between
                                                  construction framework
Haldia to Allahabad (Jal Marg
Vikas Project)


 CANW-1/IWAI/JMV/25 /
Technical Support Services
Consultant, Cluster 2 for
                                                  Component A: Improving the
Capacity augmentation of                                                                         Quality And Cost-
                                 IBRD / P4740     navigability of NW-1 (Haldia Prior                                 Open - International                          1,927,692.30     2,262,754.86   Signed             2017-01-12     2017-01-13 2017-02-02 2017-01-13 2017-03-18 2017-06-28                                 2017-04-15 2017-05-19 2017-05-15 2017-06-29 2017-06-19 2017-11-02 2017-07-24 2017-11-08 2018-07-24
navigational infrastructure of                                                                   Based Selection
                                                  to Varanasi)
National Waterway-1 between
Haldia to Allahabad (Jal Marg
Vikas Project)


 IWAI/WB/NW-
1/11/3/8/2016 / Consultancy
                                                  Component A: Improving the
for Communication Needs                                                                          Quality And Cost-
                            IBRD / P4740          navigability of NW-1 (Haldia Post                                  Open - National                                  30,525.00        36,531.36   Signed             2017-01-16                   2017-02-06               2017-03-22 2017-10-24                           2017-04-19 2017-11-15 2017-05-19 2016-12-01 2017-06-23 2016-12-06 2017-07-28 2017-01-05 2018-07-28
Assessment Study for                                                                             Based Selection
                                                  to Varanasi)
Capacity Augmentation of
National Waterways -I


CANW-1/JMV/IWAI/4 /
Consultant for IWT Sector
                                                  Component A: Improving the
Development Strategy and                                                                         Quality And Cost-
                             IBRD / P4740         navigability of NW-1 (Haldia Prior                                 Open - International                          1,027,490.00     1,023,147.66   Signed             2017-03-21     2017-04-10 2017-04-11                  2017-05-25 2017-06-01                           2017-06-22 2015-03-13 2017-07-22 2017-06-22 2017-08-26 2017-06-30 2017-09-30 2015-04-24 2018-09-30
Market Development Study for                                                                     Based Selection
                                                  to Varanasi)
Capacity Augmentation of
National Waterway-1


CANW-1/JMV/IWAI/36 /
Consultancy Services for Risk                     Component A: Improving the
                                                                                                 Quality And Cost-
Assessment and Disaster       IBRD / P4740        navigability of NW-1 (Haldia Post                                  Open - International                            384,838.06       102,190.58   Signed             2017-04-11     2017-04-07 2017-04-26 2017-08-16 2017-06-09 2017-11-14                                 2017-07-07 2017-12-12 2017-08-06 2018-02-09 2017-09-10 2018-02-27 2017-10-15 2018-04-04 2018-04-13
                                                                                                 Based Selection
Management Plan for National                      to Varanasi)
Waterway-1


CANW-1/JMV/IWAI/37 /
Consultancy for Asset                             Component A: Improving the
                                                                                                 Quality And Cost-
Management Framework             IBRD / P4740     navigability of NW-1 (Haldia Post                                  Open - International                            469,676.11             0.00   Canceled           2017-04-11     2017-06-07 2017-05-02                  2017-06-15                                      2017-07-13             2017-08-12                2017-09-16                2017-10-21                2018-06-30
                                                                                                 Based Selection
Development for National                          to Varanasi)
Waterway-1


 IN-IWAI-26064-CS-LCS /
Ship Model testing -
Consultancy for Supporting
                                                  Component A: Improving the
Services for Ship Model                                                                          Least Cost
                                 IBRD / 87520     navigability of NW-1 (Haldia Post                                  Open - National                                 237,000.00       592,711.37   Signed             2017-08-24     2017-08-25 2017-09-14                  2017-10-28                                      2017-11-25 2017-10-25 2017-12-25 2017-11-08 2018-01-29 2017-11-10 2018-03-05 2017-11-28 2018-09-01
Testing of Design of Inland                                                                      Selection
                                                  to Varanasi)
Vessels for Capacity
Augmentation of National
Waterways-1


 IN-IWAI-27893-CS-QCBS /                          Component A: Improving the
                                                                                                 Quality And Cost-
Varanasi -Sahibganj - TSSC-I     IBRD / P4740     navigability of NW-1 (Haldia Prior                                 Open - International                          1,456,840.00     1,289,831.05   Signed             2017-09-08                   2017-09-29               2017-11-12 2017-11-10                           2017-12-10 2017-12-13 2018-01-09 2018-01-08 2018-02-13 2018-01-19 2018-03-20 2018-01-22 2019-03-20
                                                                                                 Based Selection
Technical support services.                       to Varanasi)


 IN-IWAI-28980-CS-QCBS /
Smartphone Based Geo-
                                                  Component A: Improving the
spatial Technology Tool for                                                                      Quality And Cost-
                                 IBRD / 87520     navigability of NW-1 (Haldia Post                                  Open - International                            100,000.00       100,000.00   Signed             2017-09-18     2017-04-07 2017-10-09                  2017-11-22 2017-09-26                           2017-12-20 2017-11-30 2018-01-19 2018-01-15 2018-02-23 2018-02-07 2018-03-30 2018-02-23 2019-03-30
Enhancing Monitoring &                                                                           Based Selection
                                                  to Varanasi)
Execution capability of JMVP
for NW-1


 IN-IWAI-29587-CS-QCBS /                          Component A: Improving the
                                                                                                 Quality And Cost-
ESIA,EMP,RAP for additional      IBRD / 87520     navigability of NW-1 (Haldia Post                                  Open - International                            737,450.00             0.00   Canceled           2017-10-04     2017-10-09 2017-10-25 2017-11-03 2017-12-08 2018-03-06                                 2018-01-05 2018-05-02 2018-02-04 2018-06-05 2018-03-11                     2018-04-15                2019-04-15
                                                                                                 Based Selection
interventions of JMVP                             to Varanasi)


 IN-IWAI-31158-CS-QCBS /
                                                  Component A: Improving the
Asset Management &                                                                               Quality And Cost-                                                                                 Under
                                 IBRD / 87520     navigability of NW-1 (Haldia Prior                                 Open - International                          1,953,788.00             0.00                      2017-10-05                   2017-10-05               2017-10-05 2017-10-06                           2017-11-04 2017-11-27 2017-11-06 2018-01-18 2017-11-07                     2017-11-10                2018-11-10
operational frame work                                                                           Based Selection                                                                                   Implementation
                                                  to Varanasi)
development for NW-1


 IN-IWAI-25121-CS-QCBS /
Asset Management -
                                                  Component A: Improving the
Consultancy Services foe                                                                         Quality And Cost-
                                 IBRD / 87520     navigability of NW-1 (Haldia Post                                  Open - International                            608,624.00             0.00   Canceled           2017-08-24     2017-08-25 2017-09-14 2017-08-28 2017-10-28 2017-09-05                                 2017-11-25             2017-12-25                2018-01-29                2018-03-05                2019-03-05
Asset Management &                                                                               Based Selection
                                                  to Varanasi)
Operational Framework
development for NW-1


 IWAI/TEST/06102017 / Test                        Component A: Improving the
                                                                                                 Quality And Cost-
- Consultancy services for       IBRD / 87520     navigability of NW-1 (Haldia Prior                                 Open - International                          1,000,000.00             0.00   Canceled           2017-10-06                   2017-10-20               2017-12-19                                      2018-01-16             2018-02-15                2018-03-22                2018-04-26                2019-04-26
                                                                                                 Based Selection
IWAI                                              to Varanasi)




                                                                                                                                                                                                                                          Page 4
 CANW-1/JMV/IWAI/35 /                           Component B: Institutional
Consultancy Services for Study                  Strengthening and improving
                                                                                      Quality And Cost-
on the effect of navigational  IBRD / P4740     the investment climate,       Post                        Open - International    227,570.85            0.00   Canceled         2017-04-07   2017-03-06 2017-04-18            2017-06-01              2017-06-29            2017-07-29            2017-09-02            2017-10-07            2018-10-07
                                                                                      Based Selection
activities on Dolphin in the                    vessel design and
National Waterway - 1                           construction framework



                                                Component B: Institutional
 CANW-1/JMV/IWAI/27 / Plan
                                                Strengthening and improving
and Implementation support                                                            Quality And Cost-                                                        Pending
                                 IBRD / 87520   the investment climate,       Post                        Open - International    529,578.95            0.00                    2018-03-28                 2018-04-18         2018-06-01              2018-06-29            2018-07-29            2018-09-02            2018-10-07            2019-10-07
for Commercialization of NW-                                                          Based Selection                                                          Implementation
                                                vessel design and
1
                                                construction framework


 IN-IWAI-67912-CS-QCBS /
Procurement of Consultancy                      Component A: Improving the
                                                                                      Quality And Cost-
Services for ESIA, EMP and RAP IBRD / 87520     navigability of NW-1 (Haldia Post                         Open - International    737,450.00     193,080.66    Signed           2018-06-29   2018-07-31 2018-07-20 2018-08-23 2018-09-02 2018-10-05   2018-09-30 2018-11-05 2018-10-30 2018-12-12 2018-12-04 2019-02-15 2019-01-08 2019-02-27 2019-07-07
                                                                                      Based Selection
for additional Interventions on                 to Varanasi)
NW-1


 IN-IWAI-29231-CS-QCBS /
RAP- Sahibganj -
Resettlement Action Plan for
                                                Component A: Improving the
the Multi Modal Terminal at                                                           Quality And Cost-
                                 IBRD / 87520   navigability of NW-1 (Haldia Post                         Open - National          54,500.00            0.00   Canceled         2017-09-20   2017-11-07 2017-10-11 2018-05-24 2017-11-24 2018-05-24   2017-12-22            2018-01-21            2018-02-25            2018-04-01            2019-04-01
Sahibganj for Jal Marg Vikas                                                          Based Selection
                                                to Varanasi)
Project for the Capacity
Augmentation of navigation
on National Waterway -1


 IN-IWAI-64340-CS-QCBS /
TSSC-3 , Technical                              Component A: Improving the
                                                                                      Quality And Cost-
Supervisory Support              IBRD / 87520   navigability of NW-1 (Haldia Prior                        Open - International   3,847,700.00           0.00   Canceled         2018-07-19                 2018-08-09         2018-09-22              2018-10-20            2018-11-19            2018-12-24            2019-01-28            2020-01-28
                                                                                      Based Selection
Consultancy for Dredging                        to Varanasi)
Contracts


 IN-IWAI-55634-CS-QCBS /
                                                Component B: Institutional
Setting up of Digital Control
                                                Strengthening and improving
Centre (War Room) for Real                                                            Quality And Cost-
                                 IBRD / 87520   the investment climate,       Post                        Open - National          36,881.17            0.00   Canceled         2018-03-28   2018-04-12 2018-04-18 2018-06-04 2018-06-01              2018-06-29            2018-07-29            2018-09-02            2018-10-07            2019-10-07
Time monitoring for Project                                                           Based Selection
                                                vessel design and
under Capacity Augmentation
                                                construction framework
of NW-1


 IN-IWAI-71540-CS-QCBS /
                                                Component B: Institutional
NINI - Framing of Guidelines
                                                Strengthening and improving
to Develop National Inland                                                            Quality And Cost-
                               IBRD / 87520     the investment climate,       Post                        Open - International    109,891.62            0.00   Canceled         2018-08-01   2018-08-10 2018-08-22            2018-10-05              2018-11-02            2018-12-02            2019-01-06            2019-02-10            2019-06-10
Navigation Institute (NINI) to                                                        Based Selection
                                                vessel design and
be Centre of Excellence in IWT
                                                construction framework
Sector


 IN-IWAI-64340A -CS-QCBS /
TSSC-3, Technical Support
Services Consultant Cum
Project Management
Consultant for Managing and                     Component A: Improving the
                                                                                      Quality And Cost-
Supervision of Contract on       IBRD / 87520   navigability of NW-1 (Haldia Prior                        Open - International   7,883,361.00   8,650,936.89   Signed           2018-09-26   2018-09-27 2018-10-17 2018-11-02 2018-11-20 2019-02-19   2018-12-18 2019-05-31 2019-01-17 2019-07-09 2019-02-21 2019-12-12 2019-03-28 2020-01-06 2024-03-26
                                                                                      Based Selection
Assured LAD by Dredging /                       to Varanasi)
Bandalling as well as Erection
and Maintenance of
Navigation Aids in NW-1 (
River Ganga)


 IN-IWAI-31158A-CS-QCBS /
                                                Component A: Improving the
Development Asset                                                                     Quality And Cost-
                                 IBRD / 87520   navigability of NW-1 (Haldia Prior                        Open - International   1,953,788.00   1,655,220.83   Signed           2018-10-16                 2018-10-16         2018-10-16              2018-11-15            2018-11-17            2018-11-18 2018-10-16 2018-11-21 2018-02-13 2019-06-30
Management Consultancy -                                                              Based Selection
                                                to Varanasi)
operational frame work


 IN-IWAI-68596-CS-QCBS /                        Component A: Improving the
                                                                                      Quality And Cost-
Implementation of RAP for        IBRD / 87520   navigability of NW-1 (Haldia Post                         Open - National          54,356.23            0.00   Canceled         2018-07-09   2018-07-30 2018-07-30 2018-08-23 2018-09-12              2018-10-10            2018-11-09            2018-12-14            2019-01-18            2019-07-17
                                                                                      Based Selection
MMT at Sahibganj                                to Varanasi)


 IN-IWAI-68596-CS-QCBS-2 /
Hiring of NGO for
Implementation of
Resettlement Action Plan                        Component A: Improving the
                                                                                      Quality And Cost-
(RAP) for the Multimodal      IBRD / 87520      navigability of NW-1 (Haldia Post                         Open - National          71,898.00      45,390.23    Signed           2019-07-10   2019-08-07 2019-07-31 2019-08-13 2019-09-13 2019-10-01   2019-10-11 2019-11-18 2019-11-10 2019-11-29 2019-12-15 2019-12-09 2020-01-19 2019-12-16 2021-01-18
                                                                                      Based Selection
Terminal at Sahibganj for Jal                   to Varanasi)
Marg Vikas Project for the
Capacity Augmentation of
National Waterway -1


 IN-IWAI-88532-CS-QCBS /
Digitization- designing an
                                                Component A: Improving the
End to End Digital Solution to                                                        Quality And Cost-
                                 IBRD / 87520   navigability of NW-1 (Haldia Post                         Open - International    670,293.00            0.00   Canceled         2018-11-30   2019-01-08 2018-12-21            2019-01-10              2019-02-07            2019-03-09            2019-04-13            2019-05-18            2019-11-14
enable Seamless and efficient                                                         Based Selection
                                                to Varanasi)
trade through National
Waterway-1.


                                                Component B: Institutional
 IN-IWAI-205136-CS-QCBS /
                                                Strengthening and improving
Project Management                                                                    Quality And Cost-
                              IBRD / 87520      the investment climate,       Prior                       Open - International   1,415,000.00           0.00   Under Review     2020-11-24   2020-12-04 2020-12-15 2020-12-22 2021-01-28              2021-02-25            2021-03-27            2021-05-01            2021-06-05            2024-06-04
Consultancy Services for JMVP                                                         Based Selection
                                                vessel design and
including Arth Ganga Program
                                                construction framework


 IN-IWAI-211551-CS-QCBS /
Comprehensive Consultancy
Services for preparation of                     Component B: Institutional
Detailed Project Report (DPR)                   Strengthening and improving
                                                                                      Quality And Cost-                                                        Under
for IWT sector development       IBRD / 87520   the investment climate,       Post                        Open - International    338,666.67            0.00                    2021-01-07   2021-01-18 2021-01-28 2021-02-11 2021-03-13              2021-04-10            2021-05-10            2021-06-14            2021-07-19            2022-03-19
                                                                                      Based Selection                                                          Implementation
for enhancement of socio-                       vessel design and
economic activities in and                      construction framework
around Ganga-Bhagirathi-
Hooghly river system (NW-1)


 IN-IWAI-215458-CS-QCBS /
Consultancy Service for
preparation of Detailed                         Component A: Improving the
                                                                                      Quality And Cost-                                                        Under
Project Report (DPR) for the     IBRD / 87520   navigability of NW-1 (Haldia Post                         Open - National         344,000.00            0.00                    2021-01-27   2021-01-27 2021-02-17 2021-02-24 2021-04-02              2021-04-30            2021-05-30            2021-07-04            2021-08-08            2022-04-05
                                                                                      Based Selection                                                          Implementation
work of renovation /                            to Varanasi)
modernization of existing
navigation lock at Farakka


 IN-IWAI-227401-CS-QCBS /
                                                Component B: Institutional
Consultancy Service for
                                                Strengthening and improving
Institutional Strengthening                                                           Quality And Cost-                                                        Under
                                 IBRD / 87520   the investment climate,       Post                        Open - International    706,719.30            0.00                    2021-04-12   2021-04-09 2021-05-03            2021-06-16              2021-07-31            2021-08-30            2021-10-04            2021-11-08            2023-11-08
and Capacity Building of                                                              Based Selection                                                          Implementation
                                                vessel design and
Inland Waterways Transport
                                                construction framework
Sector in India




                                                                                                                                                                                                  Page 5
INDIVIDUAL CONSULTANTS
Activity Reference No. /                                                                                                                                                                                                              Invitation to
                               Loan / Credit                                                                                       Contract Type    Estimated       Actual Amount                                                                         Draft Negotiated
       Description                                    Component                 Review Type        Method        Market Approach                                                     Process Status    Terms of Reference         Identified/Selected                           Signed Contract     Contract Completion
                                   No.                                                                                                             Amount (US$)         (US$)                                                                                 Contract
                                                                                                                                                                                                                                       Consultant
                                                                                                                                                                                                       Planned       Actual       Planned       Actual   Planned    Actual    Planned     Actual    Planned     Actual

 IN-IWAI-37888-CS-CDS /
Selection of consultant for
                                               Component A: Improving the
study on the effect of
                              IBRD / 87520     navigability of NW-1 (Haldia Post              Direct Selection   Direct                                 74,310.00        75,439.29   Signed           2017-11-29   2017-11-29 2017-12-10 2017-12-01                          2018-02-13 2017-12-20 2018-09-30
navigational activities on
                                               to Varanasi)
Dolphin in National Waterway-
1


 IN-IWAI-68596-CS-CDS /                        Component A: Improving the
Implementation of RAP for     IBRD / 87520     navigability of NW-1 (Haldia Post              Direct Selection   Direct                                 54,356.23             0.00   Canceled         2019-03-29                 2019-04-08                                  2019-06-12            2019-12-09
MMT at Sahibganj                               to Varanasi)


                                               Component B: Institutional
 IN-IWAI-158167-CS-CDS /
                                               Strengthening and improving
Consultancy Services for
                              IBRD / 87520     the investment climate,       Post             Direct Selection   Direct                                  5,000.00         4,631.21   Signed           2020-02-26   2020-02-02 2020-03-07 2020-02-07                          2020-05-11 2020-03-03 2020-11-07
Messaging Workshop for IWAI
                                               vessel design and
officers
                                               construction framework


 IN-IWAI-162537-CS-CDS /
Independent Quality                            Component B: Institutional
Inspection for the works of                    Strengthening and improving
New Navigation lock at        IBRD / 87520     the investment climate,       Post             Direct Selection   Direct                                 28,571.73        27,406.90   Signed           2020-03-11   2020-01-03 2020-03-21 2020-01-10                          2020-05-25 2020-07-13 2020-11-21
Farakka, MMT haldia, MMT                       vessel design and
Varanasi & MMT Sahibganj by                    construction framework
NTCPWC


                                               Component B: Institutional
 IN-IWAI-208579-CS-CDS /                       Strengthening and improving
                                                                                                                                                                                     Under
Engagement of M/s PwC for     IBRD / 87520     the investment climate,       Post             Direct Selection   Direct                                 24,000.00             0.00                    2020-12-14   2020-12-02 2020-12-24                                     2021-02-27            2021-03-31
                                                                                                                                                                                     Implementation
one resource person                            vessel design and
                                               construction framework




                                                                                                                                                                                                                        Page 6