PROCUREMENT PLAN
Project information: China, World Bank Loan Second Gansu Cultural
and Natural Heritage Protection and Development Project, P149528

Project Implementation agency: Second Gansu Cultural and Natural
Heritage Protection and Development Project Provincial
Management Office (Provincial PMO)
Date of the Procurement Plan:December 30, 2020
Period covered by this Procurement Plan: from July 7, 2017 to
December 31, 2023


Preamble

In accordance with paragraph 5.9 of the “World Bank Procurement
Regulations for IPF Borrowers” (July 2016) (“Procurement
Regulations”) the Bank’s Systematic Tracking and Exchanges in
Procurement   (STEP) system will be used to prepare, clear and
update Procurement Plans and conduct all procurement transactions
for the Project.

This textual part along with the Procurement Plan tables in STEP
constitute the Procurement Plan for the Project. The following
conditions apply to all procurement activities in the Procurement
Plan. The other elements of the Procurement Plan as required under
paragraph 4.4 of the Procurement Regulations are set forth in
STEP.

The Bank’s Standard Procurement Documents: shall be used for all
contracts subject to international competitive procurement and
those contracts as specified in the Procurement Plan tables in
STEP.

National Procurement Arrangements: In accordance with paragraph
5.3 of the Procurement Regulations, when approaching the national
market (as specified in the Procurement Plan tables in STEP), the
country’s own procurement procedures may be used.
   When the Borrower uses its own national open competitive
   procurement arrangements as set forth in Law of the People’s
   Republic of China on Bidding Invitation and Bidding such
   arrangements shall be subject to paragraph 5.4 of the
   Procurement Regulations and the following conditions.
   The   opening bidding and the invited bidding specified in the
   Law   of the People’s Republic of China on Bidding Invitation
   and   Bidding are required to ensure consistency with paragraph
   5.4   of the Procurement Regulations.

   When other national procurement arrangements other than
   national open competitive procurement arrangements are applied
   by the Borrower, such arrangements shall be subject to
   paragraph 5.5 of the Procurement Regulations.



Leased Assets as specified under paragraph 5.10 of the Procurement
Regulations: Not Applicable.
Procurement of Second Hand Goods as specified under paragraph 5.11
of the Procurement Regulations: Not Applicable.
Domestic preference as specified under paragraph 5.51 of the
Procurement Regulations (Goods and Works).
   Goods: is not applicable for those contracts identified in the
   Procurement Plan tables.
   Works: is not applicable for those contracts identified in the
   Procurement Plan tables.
                                                                          Contracte
                                  Cost    Cost                                d
                                                             WB   Planned Construct
                                 Estimat Estimat                                    The Main
       Contrac    Contract          e       e    Procureme Review   Bid      ion
 No.                                                                                 Body of
        t No.    Description                     nt Method        Opening Period
                                                                                    Tendering
                                                                   Date
                                 (10,000 (10,000           Prior
                                                                           (month)
                                  CNY)    USD)             /Post

Civil Works & Goods

              Lighting works
              and road-
              hardening works                                                      Jingchuan
  1    PJ-A01                    282.91   43.52   Shopping   Post   2019.04   12
              for Wanyan                                                           County PMO
              village
              community

              Luohandong cave
              scenic area                                                          Jingchuan
  2    PJ-A02                    100.46   15.46   Shopping   Post   2019.05   12
              power supply                                                         County PMO
              works

              Exhibition works
              in Wanyan folk                                                       Jingchuan
  3    PJ-A03                     122.5   18.85   Shopping   Post   2018.08   3
              culture                                                              County PMO
              exhibtion center

              Water supply
              works, tourist     1,469.7                                           Jingchuan
  4    PJ-A04 footpath, four             226.12     NCB      Post   2019.09   12
                                    6                                              County PMO
              flushing
              toilets,
          managerial
          rooms, eco-
          parking lot,
          signing system
          and garbage
          collection in
          Luohandong Cave
          scenic area'
          road-hardening
          works, lighting
          works, drainage
          works and
          garbage
          collection in
          Luohandong
          village
          community

           Exhibition works
           in Jingchuan
           County Museum,
                                                                         Jingchuan
5   PJ-A05 exhibition works 720.00 110.77    NCB   Post   2020.06   6
                                                                         County PMO
           in Chenghuang
           Temple
           exhibition room

           Luohandong cave-
           Hanjiagou
                            2,794.0                                      Jingchuan
6   PJ-A06 grottoes cliff           429.85   NCB   Post   2019.09   18
                               0                                         County PMO
           consolidation
           works
           Luohandong cave
           embossed,                                                             Jingchuan
7   PJ-A07                     105.3   16.2     Shopping   Post   2019.09   12
           murals, Buddha                                                        County PMO
           protection works

           Hanwang Tomb
           antique security
           fence, Jingchuan
           County Grottoes
           relics                                                                Jingchuan
8   PJ-A08                  417.36     64.21      NCB      Post   2019.1    12
           conservation                                                          County PMO
           works and
           Chenghuang
           Temple repair
           works

           Construction of
           Jingchuan County
                            3,108.1                                              Jingchuan
9   PJ-A09 Museum                   478.17        NCB      Post   2019.02   18
                               2                                                 County PMO
           (including
           external works)

                              9,120.4 1,403.1
       Sub total
                                 1       5

           Repair and
           conservation of                                                        Tanchang
1   LT-A01                      84     12.92    Shopping   Post   2019.08   4
           wood-framed                                                           County PMO
           houses
           Power supply
           works and
                                                                           Tanchang
2   LT-A02 lighting works    782.9   120.45   NCB   Post   2017.1    9
                                                                          County PMO
           in the scenic
           area

           Qiangzang
           minority folk
           museum
           surrounding
           environment
                            1,747.0                                        Tanchang
3   LT-A03 enhancing works,         268.78    NCB   Post   2019.04   12
                               5                                          County PMO
           Qiangzang
           minority
           historical
           villages
           upgrading works

           Construction of
           sewage works in   6,263.6                                       Tanchang
4   LT-A04                           963.63   NCB   Post   2017.1    11
           the scenic area      2                                         County PMO
           (community)

           Mitigation
           measures and
           works for
                             1,653.9                                       Tanchang
5   LT-A05 geohazard risks           254.46   NCB   Post   2017.1    10
                                6                                         County PMO
           in Guan’ergou
           National
           Geological Park
           Exhibition works
           in Qiangzang                                                           Tanchang
6   LT-A06                     635.6   97.78      NCB      Post   2020.06   6
           Minority Folk                                                         County PMO
           Museum

                              11,167. 1,718.0
       Sub total
                                13       2

           Construction of
           Yinbazi-Xiaomomo 4,687.9                                               Kangxian
1   LK-A01                          721.27        NCB      Post   2018.09   12
           Mountain fire-      1                                                 County PMO
           fighting access

           Construction of
           patrolling path
           and ancillary
           facilities in
           the wet land,
                            3,657.4                                               Kangxian
2   LK-A02 watching tower           562.68        NCB      Post   2019.02   12
                               1                                                 County PMO
           and access in
           the forest (From
           Ticket office to
           MeiYuanWenCha
           bridge section)

           Exhibition works
           for the ancient
           tea horse                                                              Kangxian
3   LK-A03                     56.93   8.76     Shopping   Post   2019.12   6
           courier station                                                       County PMO
           and tea house
           road
           Provision of
           interpretation
           and guiding
           signage system
           in the wet land、
           construction of
           managerial room
           in Yangba scenic
           area and ancient
           tea horse
           courier station
                                                                          Kangxian
4   LK-A04 and              852.46 131.15    NCB   Post   2019.01   12
                                                                         County PMO
           rehabilitation
           of their
           surrounding
           environment .
           Construction and
           rehabilitation
           of Yinbazi
           Tourist Center
           and its
           surrounding
           environment

           Construction of
           patrolling path
           and ancillary    4,457.3                                       Kangxian
5   LK-A05 facilities in            685.74   NCB   Post   2019.03   12
                               3                                         County PMO
           the wet land,
           watching tower
           (from You Fangba
          Bridge Section
          to Liujiaba and
          Xiagouli
          Section), forest
          patrol road


           Taiping Village,
           Tianba Village,
           and Meiyuan
           Valley Scenic                               Post                   Kangxian
6   LK-A06                  5626.69 852.14      NCB          2021.03    18
           Areas                                      Review                 County PMO
           Infrastructure
           and Associated
           Facilities

                              19,338. 2,961.7
       Sub total
                                73       4

           Reconstruction
           of tourist
                                                                              Hezheng
1   LH-A01 footpath and        3300   507.69    NCB    Post   2018.06   24
                                                                             County PMO
           main road in the
           scenic areas

           Construction of
           drainage works   1,987.0                                           Hezheng
2   LH-A03                          305.69      NBF    Post   2017.08   14
           and wastewater      0                                             County PMO
           treatment plant;
           Upgrading of
           fossil storage
           rooms,
           ecological
           dustbins,        2,360.6                                         Hezheng
3   LH-A05                          363.17    NCB    Post   2018.01   7
           guiding systems,    1                                           County PMO
           solar lamps and
           road-hardening
           works in the
           community.

                            7,647.6 1,176.5
       Sub total
                               1       5

                                                                            Jingtai
           Binhe road
                                                                            County
           construction and
                                                                            Yellow
           its associated                           Prior
1   BJ-A01                  4693.41 710.7     NCB          2021.02    12     River
           facilities and                           Review
                                                                             Stone
           associated water
                                                                            Forest
           - fun platforms
                                                                              PMO

           Gate
           construction,                                                    Jingtai
           Nanshan square                                                   County
           eco - parking                                                    Yellow
                                                     Post
2   BJ-A02 lots             2854.71 432.27    NCB          2021.02    12     River
                                                    Review
           construction,                                                     Stone
           and Nanshan                                                      Forest
           square water                                                       PMO
           supply and
          sewage
          construction
          project




           Tourist Service                                                 Jingtai
           Center                                                           County
           Construction and                          Post                   Yellow
3   BJ-A03                  2405.1 364.19     NCB          2021.02   12
           outdoor                                  Review                  River
           associated                                                       Stone
           facilities                                                     Forest PMO

           Scenic areas
           passengers
           transfer
           station, wooden
                                                                           Jingtai
           walkway,
                                                                            County
           tourists
                                                     Post                   Yellow
4   BJ-A04 walkway, Yellow   2288.58 346.54   NCB          2021.04   12
                                                    Review                  River
           river water
                                                                            Stone
           wagon bridge
                                                                          Forest PMO
           No.2, resting
           pavilion,and
           greening
           project.
           Village cultural
           fair, goat skin
           raft exhibition
                                                                                 Jingtai
           hall,
                                                                                  County
           agricultural
                                                           Post                   Yellow
5   BJ-A05 products         1725.05 261.21        NCB            2021.03   12
                                                          review                  River
           exhibition hall,
                                                                                  Stone
           and apples
                                                                                Forest PMO
           refrigerating
           warehouse
           construction.

           Tourism toilets,
           sewage treatment                                                      Jingtai
           station, and                                                           County
           garbage                                         Post                   Yellow
6   BJ-A06                    981.3   148.59      NCB            2021.04   12
           collection                                     Review                  River
           station                                                                Stone
           construction                                                         Forest PMO
           project

                                                                                 Jingtai
           Viewing wall and
                                                                                  county
           architectural
                                                           Post                   Yellow
7   BJ-A07 shape              329.1   49.84                      2021.08   6
                                               Shopping   Review                  River
           construction
                                                                                  Stone
           project
                                                                                Forest PMO
            Family - fun
            park
                                                                                  Jingtai
            construction and
                                                                                   County
            village dancing
                                                           Post                    Yellow
8    BJ-A08 stage            1473.21 223.08      NCB             2021.03    12
                                                          review                   River
            (management
                                                                                   Stone
            committee
                                                                                 Forest PMO
            square ) bricks
            laying project.

                             16,750. 2,536.4
        Subtotal
                               46       2

            Basic office
            equipment
    SJ-B01-
1           purchased for      150     23      Shopping    Post   2019.06   6      PPMO
      01
            community
            development

            Basic office
            equipment
    SJ-B01-
2           purchased for      50     7.7      Shopping    Post   2019.06   6      PPMO
      02
            community
            development

            Hezheng County
            Hua'er
    SJ-B01- intangible                                                            Hezheng
3                             48.02   7.39     Shopping    Post   2017.11   10
      03    cultural                                                             County PMO
            heritage
            inheritance
           study equipments
           purchasing


    SJ-B02- Jingchuan: 2
4                               70     10.77   Shopping   Post   2019.04   6   PPMO
       1   garbage trucks

            Kang county、(1)
            1 garbage
            trucks; 1
            suction sewage
            trucks; (2)six
            flushing
            toilets; (3)1
    SJ-B02-
5           fire truck (Fire   248.8   38.28   Shopping   Post   2019.04   6   PPMO
       2
            sprinkler, green
            irrigation
            integrated
            function car), 3
            sets of
            firefighting
            equipment

           Smart scenic
           area (6
           sites)informatio 1,438.5
6   SJ-B03 n system                 221.3        NCB      Prior 2020.09    6   PPMO
                               0
           development
           equipment
           procurement,
                installation and
                adjustment




                Innovated
                sightseeing
                architecture
                                                              Post                    Kang
7        LK-B01 (e.g.something     165    25.38    Shopping          2021.12 6
                                                              Review                  County PMO
                like statue)
                make and
                installation

                                                                                       Jingtai
                Village dancing
                                                                                       County
                stage equipment                                Post
    8    BJ-B01                    1333.9 201.98      NCB            2021.04     6     Yellow
                procurement and                               review
                                                                                        River
                installation
                                                                                      Stone PMO

                Smart scenic
                                                                                       Jingtai
                areas
                                                                                       County
                information                                   Prior
    9    BJ-B02                  1976.43 229.28       NCB            2021.08     12    Yellow
                system equipment                              review
                                                                                        River
                procurement and
                                                                                      Stone PMO
                installation

                                                                                       Jingtai
                Sewage treatment
                                                                                       County
                station - sewage                               Post
    10   BJ-B03                      40    6.057   Shopping          2021.06     3     Yellow
                loading truck                                 review
                                                                                        River
                procurement
                                                                                      Stone PMO
                                  5,520.6
             Subtotal                     841.14
                                     5

                                  69,544. 10,637.
      In total(Works & Goods(
                                    99      02

Consulting service

                Project
                Management
                Consulting        1,489.9
  1      SJ-C01                           229.23    QCBS   Prior 2017.09     72   PPMO
                Services             7
                (Project
                supervision、

                Project
                Management
                Consulting
                Services
                (including
                contract          1,052.4
  2      SJ-C02                           161.91    QCBS   Prior   2017.1    72   PPMO
                management,          2
                design review,
                TOR preparation
                and progress
                report
                preparation)

                External
  3      SJ-C03 environmental     110.49    17      CQS    Post    2017.12   72   PPMO
                monitoring
           Minority
           development plan
           monitoring
           (covering all
           the ethnic
4   SJ-C04                    60.27    9.27    CQS   Post   2017.08   72   PPMO
           minority
           communities)
           (Tanchang County
           and Hezheng
           County)

           Community
           organization
           hatching
           services (6
5   SJ-C05                    178.51   27.46   CQS   Post   2017.08   72   PPMO
           scenic areas
           will hatch 31
           community
           organizations)

           Smart scenic
           area information
           system
6   SJ-C06                  196.72     30.26   CQS   Post   2019.12   8    PPMO
           development
           design scheme (6
           scenic areas)

           Scenic area
           operation and
7   SJ-C07                     60      9.23    IC    Post   2017.11   12   PPMO
           asset management
           study
            Social
            development
            monitoring
8    SJ-C08 evaluation         132.62   20.4    CQS    Post    2017.08   72     PPMO
            (covering all
            project
            communities )

            BoQ, technical
            specifications、
            preliminary
9    SJ-C09 design and          195      30     CQS    Post    2019.06          PPMO
            construction
            drawing of some
            sub-projects

            Community
            capacity
10   SJ-C10                    943.53 145.16    QCBS   Prior   2019.1    36     PPMO
            improvement and
            development

            Wanyan Folk
                                                                              Jingchuan
11   PJ-C01 History and         58      8.92    CQS    Post    2017.09   14
                                                                              County PMO
            Culture Study

            Luohandong cave
            murals and
                                                                              Jingchuan
12   PJ-C02 painting           79.4     12.22   CQS    Post    2017.06   8
                                                                              County PMO
            protection
            technology study
            Luohandong-
            Hanjiagou Scenic                                               Jingchuan
13   PJ-C03                     90     13.85   CQS   Post   2018.09   12
            Area Master                                                    County PMO
            Planning

            Cultural relics
            investigation
            study of
            Jingchuan County
            A Hundred Mile
                                                                           Jingchuan
14   PJ-C05 Grottoes           500     76.92   QBS   Post   2019.06   36
                                                                           County PMO
            Corridor (field
            work, antique
            evaluation and
            document
            compilation)

            Qiangzang
            Minority
            Traditional                                                     Tanchang
15   LT-C01                     90     13.85   CQS   Post   2018.1    9
            Village                                                        County PMO
            Protection
            Master Planning

            Tanchang County
            Guan'egou
            Qiangzang                                                       Tanchang
16   LT-C02                    74.87   11.52   CQS   Post   2017.09   6
            Minority's                                                     County PMO
            History and Folk
            Culture Study
            Investigation of
            rare wild plants
                                                                             Tanchang
17   LT-C03 and                 30     4.62    IC     Post   2019.03   12
                                                                            County PMO
            popularization
            of science

            Preparation of
            cultural
                                                                             Hezheng
18   LH-C01 popularization      10     1.54    IC     Post   2019.03   12
                                                                            County PMO
            and publicity
            album for Hua'er

            Hezheng County
            Hua'er
            intangible
            cultural
                                                                             Hezheng
19   LH-C02 heritage           99.39   15.29   CQS    Post   2017.08   12
                                                                            County PMO
            investigation,
            systemization
            and inheritance
            study

            Study on the
            Optimization of
            the Exhibition                                                   Hezheng
20   LH-C03                    49.68   7.64    CQS    Post   2017.08   12
            of Ancient                                                      County PMO
            Animal Fossil in
            Hezheng Museum

                                                      Post                   Jingtai
21   BJ-C01 Scheme design      190     28.77   CQS          2021.02    4     County
            for viewing wall                         Review
                                                                             Yellow
                 and architecture                                                          River
                 shape                                                                   Stone PMO

                 Innovated
                 sightseeing
                 architecture(e.g                                 Post                   Kang
22        LK-C01                  135      20.77      CQS               2021.04 6
                 . something like                                Review                  County PMO
                 statue) scheme
                 design

                 Kangxian County
                                                                  Post                      Kang
     23   LK-C02 Tea Culture          30     4.62           IC          2021.04     12
                                                                 Review                  County PMO
                 Study

                                    5,855.8
 In Total(Consulting service(               900.44
                                       6

                                    75,400. 11,537.
              In Total
                                      85      46
PROCUREMENT
                  China : CH-Second Gansu Cultural and Natural Heritage Protection and Development Project
PLAN
General Information
Country:             China                             Bank’s Approval Date of the Original Procurement Plan:     2017-06-27
                                                                                                                  2021-02-01
                                                       Revised Plan Date(s): (comma delineated, leave blank if none)
Project ID:          P149528                           GPN Date:                                                  2017-06-12
Project Name:        CH-Second Gansu Cultural and Natural Heritage Protection and Development Project
Loan / Credit No:    IBRD / 86760
                     G
Executing Agency(ies): ansu Cultural PMO


WORKS
 Activity Reference No. /                                                                                                                                                                                  Estimated       Actual                                                                         Draft Bidding                                                                        Bid Evaluation Report
                                  Loan / Credit                                                                                       Procurement        Prequalification   High SEA/SH    Procurement                                   Process      Draft Pre-qualification     Prequalification                           Specific Procurement   Bidding Documents as Proposal Submission /                                                  Contract
        Description                                      Component               Review Type       Method         Market Approach                                                                           Amount        Amount                                                                          Document /                                                                           and Recommendation         Signed Contract
                                      No.                                                                                               Process               (Y/N)             Risk      Document Type                                   Status            Documents            Evaluation Report                            Notice / Invitation           Issued         Opening / Minutes                                                   Completion
                                                                                                                                                                                                             (US$)         (US$)                                                                          Justification                                                                              for Award
                                                                                                                                                                                                                                                       Planned      Actual      Planned     Actual    Planned       Actual    Planned     Actual     Planned      Actual  Planned     Actual    Planned      Actual     Planned     Actual   Planned

                                                  Heritage Conservation and
 LT-A02 / Power supply works                                                                                                        Single Stage - One                                                                   1,201,746.5                                                                                                                                                                                                         2018-07-
                             IBRD / 86760         Tourism Services            Post             Request for Bids   Open - National                                                                          930,000.00                   Signed                                                       2017-09-28 2017-09-29 2017-09-29 2017-10-09                         2017-10-31 2017-10-31 2017-11-30 2017-11-20 2018-01-04 2018-01-09
in the scenic area                                                                                                                  Envelope                                                                                       3                                                                                                                                                                                                            03
                                                  Improvement


 LT-A04 / Construction of
                                                  Heritage Conservation and
sewage works and flushing                                                                                                           Single Stage - One                                                                   9,646,726.7                                                                                                                                                                                                         2018-07-
                                 IBRD / 86760     Tourism Services            Post             Request for Bids   Open - National                                                                         9,584,300.00                  Signed                                                       2017-09-28 2017-09-29 2017-09-29 2017-10-09                         2017-10-31 2017-10-31 2017-11-30 2017-11-20 2018-01-04 2017-12-16
toilets in the scenic area                                                                                                          Envelope                                                                                       5                                                                                                                                                                                                            03
                                                  Improvement
(community)


 LT-A05 / Mitigation
                                                  Heritage Conservation and
measures and works for                                                                                                              Single Stage - One                                                                   2,541,959.9                                                                                                                                                                                                         2018-07-
                              IBRD / 86760        Tourism Services            Post             Request for Bids   Open - National                                                                         3,259,600.00                  Signed                                                       2017-09-28 2017-09-29 2017-09-29 2017-10-09                         2017-10-31 2017-10-31 2017-11-30 2017-11-20 2018-01-04 2017-12-16
geohazard risks in Guan'ergou                                                                                                       Envelope                                                                                       1                                                                                                                                                                                                            03
                                                  Improvement
National Geological Park


 LH-A05 / Upgrading of fossil
storage rooms, ecologicla
                                                  Heritage Conservation and
dustbins, guiding systems,                                                                                                          Single Stage - One                                                                   3,733,072.7                                                                                                                                                                                                         2018-10-
                                 IBRD / 86760     Tourism Services            Post             Request for Bids   Open - National                                                                         4,033,300.00                  Signed                                                       2018-01-11 2017-12-06 2018-01-16 2018-01-23                         2018-02-27 2018-01-09 2018-03-29 2018-03-19 2018-05-03 2018-04-23
solar lamps and road-                                                                                                               Envelope                                                                                       0                                                                                                                                                                                                            30
                                                  Improvement
hardening works in the
community.


 PJ-A03 / Exhibition works in                     Heritage Conservation and                                                                                                                                                             Pending
                                                                                               Request for                          Single Stage - One                                                                                                                                                                                                                                                                                       2019-03-
Wanyan folk culture exhibtion    IBRD / 86760     Tourism Services            Post                                Open - National                                                                          188,500.00          0.00     Implementat                                                                          2018-08-06                                                                                2018-10-01
                                                                                               Quotations                           Envelope                                                                                                                                                                                                                                                                                                    30
center                                            Improvement                                                                                                                                                                           ion


                                                  Heritage Conservation and                                                                                                                                                             Under
 LK-A01 / Construction of                                                                                                           Single Stage - One                                                                   6,833,548.1                                                                                                                                                                                                         2019-05-
                                 IBRD / 86760     Tourism Services            Post             Request for Bids   Open - National                                                                         7,221,431.00                  Implementat                                                  2018-08-01 2018-08-01 2018-08-03                                    2018-09-14 2018-09-04 2018-10-14 2018-09-07 2018-11-18
Yinbazi-Xiaomomo Mountain                                                                                                           Envelope                                                                                       5                                                                                                                                                                                                            17
                                                  Improvement                                                                                                                                                                           ion


 LK-A04 / Provision of interpr
etation and guiding signage s
ystem in the wet land constru
ction of managerial room in Y                     Heritage Conservation and                                                                                                                                                             Pending
                                                                                                                                    Single Stage - One                                                                                                                                                                                                                                                                                       2019-11-
angba scenic area, ancient tea IBRD / 86760       Tourism Services            Post             Request for Bids   Open - National                                                                         1,276,800.00         0.00     Implementat                                                  2019-01-15              2019-01-20                                  2019-03-03            2019-04-02              2019-05-07
                                                                                                                                    Envelope                                                                                                                                                                                                                                                                                                    03
horse courier station and Yinb                    Improvement                                                                                                                                                                           ion
azi Tourist Center, and rehabil
itation of their surrounding e
nvironment .


 LK-A02 / Construction of
patrolling path and ancillary
facilities in the wet land,                       Heritage Conservation and                                                                                                                                                             Pending
                                                                                                                                    Single Stage - One                                                                                                                                                                                                                                                                                       2019-12-
watching tower and access in     IBRD / 86760     Tourism Services            Post             Request for Bids   Open - National                                                                         5,626,780.00         0.00     Implementat                                                  2019-03-11              2019-03-16                                  2019-04-27            2019-05-27              2019-07-01
                                                                                                                                    Envelope                                                                                                                                                                                                                                                                                                    28
the forest (From Ticket office                    Improvement                                                                                                                                                                           ion
to MeiYuanWenCha bridge
section)


 LK-A05 / Construction of pat
rolling path and ancillary facili
ties in the wet land, watching                    Heritage Conservation and                                                                                                                                                             Pending
                                                                                                                                    Single Stage - One                                                                                                                                                                                                                                                                                       2020-01-
tower (From You Fangba Bridg IBRD / 86760         Tourism Services            Post             Request for Bids   Open - National                                                                         6,857,430.00         0.00     Implementat                                                  2019-04-04              2019-04-09                                  2019-05-21            2019-06-20              2019-07-25
                                                                                                                                    Envelope                                                                                                                                                                                                                                                                                                    21
e Section to Liujiaba and Xiag                    Improvement                                                                                                                                                                           ion
ouli Section) Forest patrol roa
d.


 PJ-A01 / Lighting works and                      Heritage Conservation and                                                                                                                                                             Under
                                                                                               Request for                          Single Stage - One                                                                                                                                                                                                                                                                                       2019-12-
road-hardening works for         IBRD / 86760     Tourism Services            Post                                Open - National                                                                          435,200.00          0.00     Implementat                                                                          2019-04-23                                                                                2019-06-18
                                                                                               Quotations                           Envelope                                                                                                                                                                                                                                                                                                    15
Wanyan village community                          Improvement                                                                                                                                                                           ion


 PJ-A02 / Luohandong cave                         Heritage Conservation and                                                                                                                                                             Under
                                                                                               Request for                          Single Stage - One                                                                                                                                                                                                                                                                                       2019-12-
scenic area power supply         IBRD / 86760     Tourism Services            Post                                Open - National                                                                          154,600.00          0.00     Implementat                                                                          2019-04-23                                                                                2019-06-18
                                                                                               Quotations                           Envelope                                                                                                                                                                                                                                                                                                    15
works                                             Improvement                                                                                                                                                                           ion


 PJ-A07 / Luohandong cave                         Heritage Conservation and                                                                                                                                                             Pending
                                                                                               Request for                          Single Stage - One                                                                                                                                                                                                                                                                                       2019-12-
embossed, murals, Buddha         IBRD / 86760     Tourism Services            Post                                Open - National                                                                          162,000.00          0.00     Implementat                                                                          2019-04-30                                                                                2019-06-25
                                                                                               Quotations                           Envelope                                                                                                                                                                                                                                                                                                    22
protection works                                  Improvement                                                                                                                                                                           ion


 LH-A01 / Reconstruction of                       Heritage Conservation and                                                                                                                                                             Under
                                                                                                                                    Single Stage - One                                                                                                                                                                                                                                                                                       2020-02-
tourist footpath and main        IBRD / 86760     Tourism Services            Post             Request for Bids   Open - National                                                                         5,000,000.00         0.00     Implementat                                                  2019-04-25 2019-04-28 2019-04-30                                    2019-06-11            2019-07-11              2019-08-15
                                                                                                                                    Envelope                                                                                                                                                                                                                                                                                                    11
road in the scenic areas                          Improvement                                                                                                                                                                           ion


 LT-A01 / Repair and                              Heritage Conservation and                                                                                                                                                             Pending
                                                                                               Request for                          Single Stage - One                                                                                                                                                                                                                                                                                       2020-04-
conservation of wood-framed      IBRD / 86760     Tourism Services            Post                                Open - National                                                                          129,200.00          0.00     Implementat                                                                          2019-08-19                                                                                2019-10-14
                                                                                               Quotations                           Envelope                                                                                                                                                                                                                                                                                                    11
houses;                                           Improvement                                                                                                                                                                           ion


 LT-A03 / Qiangzang minority
folk museum surrounding env                       Heritage Conservation and                                                                                                                                                             Pending
                                                                                                                                    Single Stage - One                                                                                                                                                                                                                                                                                       2020-06-
ironment enhancing works Qi IBRD / 86760          Tourism Services            Post             Request for Bids   Open - National                                                                         2,687,800.00         0.00     Implementat                                                  2019-08-14              2019-08-19                                  2019-09-30            2019-10-30              2019-12-04
                                                                                                                                    Envelope                                                                                                                                                                                                                                                                                                    01
angzang minority historical vil                   Improvement                                                                                                                                                                           ion
lages upgrading works


 PJ-A04 / Water supply works,
toursit footpath, four flusting
toilets, managerial rooms, eco-
parking lot, signing system
                                                  Heritage Conservation and                                                                                                                                                             Pending
and garbage collection in                                                                                                           Single Stage - One                                                                                                                                                                                                                                                                                       2020-06-
                                IBRD / 86760      Tourism Services            Post             Request for Bids   Open - National                                                                         2,261,200.00         0.00     Implementat                                                  2019-09-09              2019-09-14                                  2019-10-26            2019-11-25              2019-12-30
Luohandong Cave scenic area'                                                                                                        Envelope                                                                                                                                                                                                                                                                                                    27
                                                  Improvement                                                                                                                                                                           ion
road-hardening works,
lighting works, drainage
works and garbage collection
in Luohandong




                                                                                                                                                                                                                               Page 1
 PJ-A09 / Construction of                           Heritage Conservation and                                                                                                                                                              Pending
                                                                                                                                      Single Stage - One                                                                                                                                                                                                                                                                                    2019-10-
Jingchuan County Museum            IBRD / 86760     Tourism Services            Post             Request for Bids   Open - National                                                                           4,781,700.00         0.00    Implementat                                                2019-01-07             2019-01-12                                 2019-02-23              2019-03-25            2019-04-29
                                                                                                                                      Envelope                                                                                                                                                                                                                                                                                                 26
(including external works)                          Improvement                                                                                                                                                                            ion


 PJ-A08 / Hanwang Tomb
                                                    Heritage Conservation and                                                                                                                                                              Pending
antique security fence and                                                                                                            Single Stage - One                                                                                                                                                                                                                                                                                    2020-06-
                                   IBRD / 86760     Tourism Services            Post             Request for Bids   Open - National                                                                            642,100.00          0.00    Implementat                                                2019-09-09             2019-09-14                                 2019-10-26              2019-11-25            2019-12-30
Chenghuang Temple repair                                                                                                              Envelope                                                                                                                                                                                                                                                                                                 27
                                                    Improvement                                                                                                                                                                            ion
works


 PJ-A06 / Luohandong cave-
Hanjiagou grottoes cliff
consolidation works and
                                                    Heritage Conservation and                                                                                                                                                              Pending
Jingchuan County Grottoes                                                                                                             Single Stage - One                                                                                                                                                                                                                                                                                    2020-06-
                                   IBRD / 86760     Tourism Services            Post             Request for Bids   Open - National                                                                           4,298,500.00         0.00    Implementat                                                2019-08-14             2019-08-19                                 2019-09-30              2019-10-30            2019-12-04
Relics Protection Works (fence                                                                                                        Envelope                                                                                                                                                                                                                                                                                                 01
                                                    Improvement                                                                                                                                                                            ion
and drainage groove
establishment and patrol
roads construction).


 BJ-A03 / Jingtai County
Yellow River Stone Forest                           Heritage Conservation and                                                                                                                                                              Pending
                                                                                                                                      Single Stage - One                                                                                                                                                                                                                                                                                    2021-11-
Subproject - Tourist Service       IBRD / 86760     Tourism Services            Post             Request for Bids   Open - National                                                                           3,641,900.00         0.00    Implementat                                                2021-01-31             2021-02-05                                 2021-03-19              2021-04-18            2021-05-23
                                                                                                                                      Envelope                                                                                                                                                                                                                                                                                                 19
Center Construction and                             Improvement                                                                                                                                                                            ion
outdoor associated facilities


 BJ - A06 / Jingtai County
Yellow River Stone Forest
                                                    Heritage Conservation and                                                                                                                                                              Pending
Subproject - Tourism toilets,                                                                                                         Single Stage - One                                                                                                                                                                                                                                                                                    2021-12-
                              IBRD / 86760          Tourism Services            Post             Request for Bids   Open - National                                                                           1,485,900.00         0.00    Implementat                                                2021-03-09             2021-03-14                                 2021-04-25              2021-05-25            2021-06-29
sewage treatment station, and                                                                                                         Envelope                                                                                                                                                                                                                                                                                                 26
                                                    Improvement                                                                                                                                                                            ion
garbage collection station
construction project


 BJ - A08 / Jingtai County
Yellow River Stone Forest
Subproject - Family - fun park                      Heritage Conservation and                                                                                                                                                              Pending
                                                                                                                                      Single Stage - One                                                                                                                                                                                                                                                                                    2021-11-
construction and village       IBRD / 86760         Tourism Services            Post             Request for Bids   Open - National                                                                           2,230,800.00         0.00    Implementat                                                2021-02-10             2021-02-15                                 2021-03-29              2021-04-28            2021-06-02
                                                                                                                                      Envelope                                                                                                                                                                                                                                                                                                 29
dancing stage (management                           Improvement                                                                                                                                                                            ion
committee square ) bricks
laying project.


 BJ-A01 / Jingtai County
Yellow River Stone Forest
Project - Binhe road                                Heritage Conservation and                                                                                                                                                              Pending
                                                                                                                                      Single Stage - One                                                                                                                                                                                                                                                                                    2021-11-
construction and its               IBRD / 86760     Tourism Services            Prior            Request for Bids   Open - National                                                                           7,107,000.00         0.00    Implementat                                                2021-02-02             2021-02-07                                 2021-03-21              2021-04-20            2021-05-25
                                                                                                                                      Envelope                                                                                                                                                                                                                                                                                                 21
associated facilities and                           Improvement                                                                                                                                                                            ion
associated water - fun
platforms


 LK - A06 / Infrastructure and
Facilities Development of                           Heritage Conservation and                                                                                                                                                              Pending
                                                                                                                                      Single Stage - One                                                                                                                                                                                                                                                                                    2021-11-
Taiping Village, Tianba New        IBRD / 86760     Tourism Services            Post             Request for Bids   Open - National                                                                           8,521,400.00         0.00    Implementat                                                2021-02-09             2021-02-14                                 2021-03-28              2021-04-27            2021-06-01
                                                                                                                                      Envelope                                                                                                                                                                                                                                                                                                 28
Village, and Meiyuan Valley of                      Improvement                                                                                                                                                                            ion
Kang County


 BJ - A02 / Jingtai County
Yellow River Stone Forest -
Gate construction, Nanshan                          Heritage Conservation and                                                                                                                                                              Pending
                                                                                                                                      Single Stage - One                                                                                                                                                                                                                                                                                    2021-11-
square eco - parking lots          IBRD / 86760     Tourism Services            Post             Request for Bids   Open - National                                                                           4,322,700.00         0.00    Implementat                                                2021-01-31             2021-02-05                                 2021-03-19              2021-04-18            2021-05-23
                                                                                                                                      Envelope                                                                                                                                                                                                                                                                                                 19
construction, and Nanshan                           Improvement                                                                                                                                                                            ion
square water supply and
sewage construction project


 BJ - A04 / Jingtai County
Yellow River Stone Forest
Subproject - Scenic areas
                                                    Heritage Conservation and                                                                                                                                                              Pending
passengers transfer station,                                                                                                          Single Stage - One                                                                                                                                                                                                                                                                                    2022-01-
                                   IBRD / 86760     Tourism Services            Post             Request for Bids   Open - National                                                                           3,465,400.00         0.00    Implementat                                                2021-03-24             2021-03-29                                 2021-05-10              2021-06-09            2021-07-14
wooden walkway, tourists                                                                                                              Envelope                                                                                                                                                                                                                                                                                                 10
                                                    Improvement                                                                                                                                                                            ion
walkway, Yellow river water
wagon bridge No.2, resting
pavilion,and greening project.


 BJ - A05 / Jingtai County
Yellow River Stone Forest -
Village cultural fair, goat skin
                                                    Heritage Conservation and                                                                                                                                                              Pending
raft exhibition hall,                                                                                                                 Single Stage - One                                                                                                                                                                                                                                                                                    2021-11-
                                   IBRD / 86760     Tourism Services            Post             Request for Bids   Open - National                                                                           2,612,100.00         0.00    Implementat                                                2021-02-09             2021-02-14                                 2021-03-28              2021-04-27            2021-06-01
agricultural products                                                                                                                 Envelope                                                                                                                                                                                                                                                                                                 28
                                                    Improvement                                                                                                                                                                            ion
exhibition hall, and apples
refrigerating warehouse
construction.




GOODS
 Activity Reference No. /                                                                                                                                                                                                                                                          Draft Bidding                                                                        Bid Evaluation Report
                                    Loan / Credit                                                                                       Procurement        Prequalification    Estimated      Actual Amount     Process      Draft Pre-qualification       Prequalification                           Specific Procurement   Bidding Documents as Proposal Submission /
        Description                                        Component               Review Type       Method         Market Approach                                                                                                                                                Document /                                                                           and Recommendation         Signed Contract    Contract Completion
                                        No.                                                                                               Process               (Y/N)         Amount (US$)        (US$)          Status            Documents              Evaluation Report                            Notice / Invitation           Issued         Opening / Minutes
                                                                                                                                                                                                                                                                                   Justification                                                                              for Award
                                                                                                                                                                                                                              Planned        Actual      Planned     Actual    Planned       Actual    Planned     Actual     Planned      Actual  Planned     Actual    Planned      Actual     Planned     Actual    Planned     Actual

 SJ-B01-01 / Basic office                           Heritage Conservation and                                                                                                                                 Under
                                                                                                 Request for                          Single Stage - One
equipment purchased for            IBRD / 86760     Tourism Services            Post                                Open - National                                              230,000.00            0.00   Implementati                                                                            2019-04-13                                                                                2019-06-08            2019-12-05
                                                                                                 Quotations                           Envelope
community development                               Improvement                                                                                                                                               on


 SJ-B01-02 / Basic office                           Heritage Conservation and                                                                                                                                 Pending
                                                                                                 Request for                          Single Stage - One
equipment purchased for            IBRD / 86760     Tourism Services            Post                                Open - National                                               77,000.00            0.00   Implementati                                                                            2019-04-13                                                                                2019-06-08            2019-12-05
                                                                                                 Quotations                           Envelope
community development                               Improvement                                                                                                                                               on


                                                    Heritage Conservation and                                                                                                                                 Under
 SJ-B02-1 / Jingchuan: 2                                                                         Request for                          Single Stage - One
                                   IBRD / 86760     Tourism Services            Post                                Open - National                                              107,700.00            0.00   Implementati                                                                            2019-04-16                                                                                2019-06-11            2019-12-08
garbage trucks                                                                                   Quotations                           Envelope
                                                    Improvement                                                                                                                                               on


 SJ-B02-2 / Kang county-1 ga
rbage trucks, 1 suction sewag
e trucks, six flusting toilets, 1                   Heritage Conservation and                                                                                                                                 Under
                                                                                                 Request for                          Single Stage - One
fire truck -Fire sprinkler, gree IBRD / 86760       Tourism Services            Post                                Open - National                                              382,800.00            0.00   Implementati                                                                            2019-04-16                                                                                2019-06-11            2019-12-08
                                                                                                 Quotations                           Envelope
n irrigation integrated functio                     Improvement                                                                                                                                               on
n car 3 sets of fire fighting e
quipment


 BJ - B03 / Jingtai County
Yellow River Stone Forest                           Heritage Conservation and                                                                                                                                 Pending
                                                                                                                                      Single Stage - One
Subproject - Sewage                IBRD / 86760     Tourism Services            Post             Request for Bids   Open - National                                               60,600.00            0.00   Implementati                                                    2021-02-11              2021-02-16                                  2021-03-30            2021-04-29              2021-06-03            2021-11-30
                                                                                                                                      Envelope
treatment station - sewage                          Improvement                                                                                                                                               on
loading truck procurement




                                                                                                                                                                                                                                  Page 2
 BJ - B01 / Jingtai County
Yellow River Stone Forest                        Heritage Conservation and                                                                                                                                              Pending
                                                                                                                                            Single Stage - One
Subproject - Village dancing IBRD / 86760        Tourism Services               Post             Request for Bids    Open - National                                                  2,019,800.00               0.00   Implementati                                                       2021-03-04              2021-03-09                                       2021-04-20                2021-05-20                2021-06-24                2021-12-21
                                                                                                                                            Envelope
stage equipment procurement                      Improvement                                                                                                                                                            on
and installation


 BJ - B02 / Jingtai County
Yellow River Stone Forest
                                                 Heritage Conservation and                                                                                                                                              Pending
Subproject - Smart scenic                                                                                                                   Single Stage - One
                                IBRD / 86760     Tourism Services               Prior            Request for Bids    Open - National                                                  2,992,800.00               0.00   Implementati                                                       2021-07-08              2021-07-13                                       2021-08-24                2021-09-23                2021-10-28                2022-04-26
areas information system                                                                                                                    Envelope
                                                 Improvement                                                                                                                                                            on
equipment procurement and
installation


 LK - B01 / Innovated viewing                    Heritage Conservation and                                                                                                                                              Pending
                                                                                                                                            Single Stage - One
stuff (as statue) making and    IBRD / 86760     Tourism Services               Post             Request for Bids    Open - National                                                    253,800.00               0.00   Implementati                                                       2021-05-11              2021-05-16                                       2021-06-27                2021-07-27                2021-08-31                2022-02-27
                                                                                                                                            Envelope
installation                                     Improvement                                                                                                                                                            on


 BJ - A07 / Jingtai County
Yellow River Stone Forest                        Heritage Conservation and                                                                                                                                              Pending
                                                                                                                                            Single Stage - One
Subproject - Viewing wall and   IBRD / 86760     Tourism Services               Post             Request for Bids    Open - National                                                    498,400.00               0.00   Implementati                                                       2021-07-08              2021-07-13                                       2021-08-24                2021-09-23                2021-10-28                2022-04-26
                                                                                                                                            Envelope
architectural shape                              Improvement                                                                                                                                                            on
construction project


 SJ-B03 / Information system
installation and equipment                       Heritage Conservation and                                                                                                                                              Pending
                                                                                                                                            Single Stage - One
procurement and installation    IBRD / 86760     Tourism Services               Prior            Request for Bids    Open - National                                                  2,213,000.00               0.00   Implementati                                                       2021-02-01              2021-02-06                                       2021-03-20                2021-04-19                2021-05-24                2021-11-20
                                                                                                                                            Envelope
of four scenic areas to                          Improvement                                                                                                                                                            on
establish smart scenic areas




NON CONSULTING SERVICES
 Activity Reference No. /                                                                                                                                                                                                                                                                       Draft Bidding                                                                           Bid Evaluation Report
                                 Loan / Credit                                                                                                Procurement        Prequalification    Estimated       Actual Amount        Process      Draft Pre-qualification      Prequalification                                Specific Procurement     Bidding Documents as Proposal Submission /
        Description                                      Component                 Review Type        Method         Market Approach                                                                                                                                                            Document /                                                                              and Recommendation                 Signed Contract        Contract Completion
                                     No.                                                                                                        Process               (Y/N)         Amount (US$)         (US$)             Status            Documents             Evaluation Report                                 Notice / Invitation             Issued         Opening / Minutes
                                                                                                                                                                                                                                                                                                Justification                                                                                 for Award
                                                                                                                                                                                                                                        Planned        Actual     Planned       Actual      Planned       Actual    Planned       Actual      Planned      Actual  Planned     Actual    Planned      Actual             Planned       Actual      Planned     Actual




CONSULTING FIRMS
 Activity Reference No. /                                                                                                                                                                                                                                                                                                                                                        Combined Evaluation
                                 Loan / Credit                                                                                               Contract Type        Estimated         Actual Amount                                                    Expression of Interest    Short List and Draft     Request for Proposals   Opening of Technical        Evaluation of
        Description                                      Component                 Review Type        Method         Market Approach                                                                 Process Status       Terms of Reference                                                                                                                                       Report and Draft           Signed Contract        Contract Completion
                                     No.                                                                                                                         Amount (US$)           (US$)                                                               Notice            Request for Proposals          as Issued          Proposals / Minutes      Technical Proposal
                                                                                                                                                                                                                                                                                                                                                                                 Negotiated Contract
                                                                                                                                                                                                                         Planned         Actual       Planned     Actual       Planned       Actual     Planned      Actual      Planned      Actual     Planned      Actual     Planned     Actual         Planned       Actual      Planned       Actual

 SJ-C02 / Project Management
                                                 Capacity Building,
Consulting Services (including
                                                 Institutional Strengthening,                    Quality And Cost-
contract management, design IBRD / 86760                                        Prior                                Open - International                            2,000,000.00     1,522,550.00   Signed             2017-06-27     2017-06-28 2017-07-18 2017-06-28 2017-08-31 2017-07-28                                   2017-09-28 2017-09-21 2017-10-28 2017-12-02 2017-12-02 2017-12-26 2018-01-06 2018-01-10 2019-01-06
                                                 and Project Management                          Based Selection
review, TOR preparation and
                                                 Support
progress report preparation)


 SJ-C01 / Construction                           Heritage Conservation and
                                                                                                 Quality And Cost-
engineering supervision         IBRD / 86760     Tourism Services               Prior                                Open - International                            2,521,600.00     2,254,595.53   Signed             2017-07-12     2017-07-11 2017-08-02 2017-07-17 2017-09-15 2017-08-15                                   2017-10-13 2017-10-11 2017-11-12 2017-10-23 2017-12-17 2017-12-01 2018-01-21 2017-12-17 2022-12-31
                                                                                                 Based Selection
including six scenic areas                       Improvement


LT-C02 / Tanchang County
                                                 Heritage Conservation and                       Consultant
Guan'egou Qiangzang                                                                                                                                                                                  Under
                                IBRD / 86760     Tourism Services               Post             Qualification       Open - National                                  123,100.00              0.00                      2018-04-23                   2018-04-23               2018-04-23 2017-09-06                                                                              2018-04-23                2018-04-23                2018-04-23
Minority's History and Folk                                                                                                                                                                          Implementation
                                                 Improvement                                     Selection
Culture Study


 SJ-C04 / Minority
development plan monitoring
                                                 Heritage Conservation and                       Consultant
(covering all the ethnic                                                                                                                                                                             Under
                                IBRD / 86760     Tourism Services               Post             Qualification       Open - National                                    92,300.00             0.00                      2018-04-24     2017-07-01 2018-04-24                  2018-04-24                                                                                         2018-04-24                2018-04-24                2018-04-24
minority                                                                                                                                                                                             Implementation
                                                 Improvement                                     Selection
communities)(Tanchang
County and Hezheng County)


 SJ-C05 / Community
                                                 Heritage Conservation and                       Consultant
organization hatching services                                                                                                                                                                       Under
                               IBRD / 86760      Tourism Services               Post             Qualification       Open - National                                  276,900.00              0.00                      2018-04-24     2017-07-01 2018-04-24                  2018-04-24 2017-09-12                                                                              2018-04-24                2018-04-24                2018-04-24
(6 scenic areas will hatch 31                                                                                                                                                                        Implementation
                                                 Improvement                                     Selection
community organizations)


 SJ-C08 / Social development
                                                 Heritage Conservation and                       Consultant
monitoring evaluation                                                                                                                                                                                Under
                                IBRD / 86760     Tourism Services               Post             Qualification       Open - National                                  200,000.00              0.00                      2018-04-24     2017-07-01 2018-04-24                  2018-04-24 2017-08-24                                                                              2018-04-24                2018-04-24                2018-04-24
(covering all project                                                                                                                                                                                Implementation
                                                 Improvement                                     Selection
communities )


 PJ-C03 / Luohandong-                            Heritage Conservation and                       Consultant
                                                                                                                                                                                                     Under
Hanjiagou Scenic Area Master    IBRD / 86760     Tourism Services               Post             Qualification       Open - National                                  138,500.00              0.00                      2018-08-03     2018-07-01 2018-08-24                  2018-10-07                                                                                         2018-11-06                2018-12-11                2019-06-09
                                                                                                                                                                                                     Implementation
Planning                                         Improvement                                     Selection


 LT-C01 / Qiangzang Minority                     Heritage Conservation and                       Consultant
                                                                                                                                                                                                     Under
Traditional Village Protection IBRD / 86760      Tourism Services               Post             Qualification       Open - National                                  138,500.00              0.00                      2018-09-11     2018-08-31 2018-10-02                  2018-11-15                                                                                         2018-12-15                2019-01-19                2019-07-18
                                                                                                                                                                                                     Implementation
Master Planning                                  Improvement                                     Selection


 SJ-C09 / BoQ, technical speci
                                                 Heritage Conservation and                       Consultant
fications preliminary design a                                                                                                                                                                       Under
                               IBRD / 86760      Tourism Services               Post             Qualification       Open - National                                  300,000.00              0.00                      2019-04-18     2019-04-26 2019-05-09                  2019-06-22                                                                                         2019-07-22                2019-08-26                2020-02-22
nd construction drawing of so                                                                                                                                                                        Implementation
                                                 Improvement                                     Selection
me sub-projects


 SJ-C10 / Community capacity                     Heritage Conservation and
                                                                                                 Quality And Cost-                                                                                   Under
improvement and              IBRD / 86760        Tourism Services               Prior                                Open - International                            1,451,600.00             0.00                      2019-04-22     2019-05-24 2019-05-13 2019-05-31 2019-06-26                                              2019-07-24             2019-08-23                2019-09-27                2019-11-01                2020-10-31
                                                                                                 Based Selection                                                                                     Implementation
development                                      Improvement


 PJ-C05 / Cultural relics
investigation study of
                                                 Heritage Conservation and
Jingchuan County A Hundred                                                                       Quality And Cost-                                                                                   Under
                                IBRD / 86760     Tourism Services               Post                                 Open - International                             769,200.00              0.00                      2019-04-25     2019-05-01 2019-05-16 2019-05-05 2019-06-29 2019-05-22                                   2019-07-27 2019-07-05 2019-08-26 2019-07-18 2019-09-30                     2019-11-04                2020-11-03
Mile Grottoes Corridor (field                                                                    Based Selection                                                                                     Implementation
                                                 Improvement
work, antique evaluation and
document compilation)


 SJ-C10-A / Community                            Heritage Conservation and
                                                                                                 Quality Based                                                                                       Under
capacity improvement and        IBRD / 86760     Tourism Services               Prior                                Open - International                            1,451,600.00             0.00                      2019-07-10     2019-07-24 2019-07-31 2019-07-31 2019-09-13 2019-08-30                                   2019-10-11 2019-10-15 2019-11-10 2019-11-11 2019-12-10 2019-12-09 2020-01-14                         2021-01-13
                                                                                                 Selection                                                                                           Implementation
development                                      Improvement


 SJ-C06 / Smart scenic area                      Heritage Conservation and                       Consultant
                                                                                                                                                                                                     Pending
information system              IBRD / 86760     Tourism Services               Post             Qualification       Open - National                                  302,600.00              0.00                      2019-07-29                   2019-08-19               2019-10-02                                                                                         2019-11-01                2019-12-06                2020-06-03
                                                                                                                                                                                                     Implementation
development design scheme                        Improvement                                     Selection




                                                                                                                                                                                                                                            Page 3
                                               Heritage Conservation and                    Consultant
 PJ-C01 / Wanyan Folk History                                                                                                                                                  Pending
                              IBRD / 86760     Tourism Services            Post             Qualification   Open - National                        89,200.00            0.00                    2019-07-24               2019-08-14              2019-09-27                                                        2019-10-27   2019-12-01   2020-05-29
and Culture Study                                                                                                                                                              Implementation
                                               Improvement                                  Selection


 PJ-C02 / Luohandong cave                      Heritage Conservation and                    Consultant
                                                                                                                                                                               Pending
murals and painting           IBRD / 86760     Tourism Services            Post             Qualification   Open - National                       122,200.00            0.00                    2019-07-24               2019-08-14              2019-09-27                                                        2019-10-27   2019-12-01   2020-05-29
                                                                                                                                                                               Implementation
protection technology study                    Improvement                                  Selection


 BJ - C01 / Jingtai County
Yellow River Stone Forest                      Heritage Conservation and                    Consultant
                                                                                                                                                                               Pending
Subproject - Scheme design    IBRD / 86760     Tourism Services            Post             Qualification   Open - National                       287,777.00            0.00                    2021-02-07               2021-02-28              2021-04-13                                                        2021-05-13   2021-06-17   2021-12-14
                                                                                                                                                                               Implementation
for viewing wall and                           Improvement                                  Selection
architecture shape


 LK-C01 / Innovated viewing                    Heritage Conservation and                    Consultant
                                                                                                                                                                               Pending
stuff (as statue) Scheme      IBRD / 86760     Tourism Services            Post             Qualification   Open - National                       207,700.00            0.00                    2021-05-12               2021-06-02              2021-07-16                                                        2021-08-15   2021-09-19   2022-03-18
                                                                                                                                                                               Implementation
Design                                         Improvement                                  Selection




INDIVIDUAL CONSULTANTS
Activity Reference No. /                                                                                                                                                                                                      Invitation to
                               Loan / Credit                                                                                  Contract Type    Estimated       Actual Amount                                                                       Draft Negotiated
       Description                                    Component               Review Type        Method     Market Approach                                                    Process Status    Terms of Reference       Identified/Selected                             Signed Contract    Contract Completion
                                   No.                                                                                                        Amount (US$)         (US$)                                                                               Contract
                                                                                                                                                                                                                               Consultant
                                                                                                                                                                                                 Planned     Actual       Planned       Actual    Planned     Actual    Planned     Actual    Planned     Actual

                                               Heritage Conservation and                    Individual
LK-C02 / Kang County Tea                                                                                                                                                       Pending
                              IBRD / 86760     Tourism Services            Post             Consultant      Open                                   46,200.00            0.00                    2021-03-18               2021-05-06              2021-05-27            2021-07-01            2021-12-28
Culture Study                                                                                                                                                                  Implementation
                                               Improvement                                  Selection




                                                                                                                                                                                                                Page 4