PROCUREMENT PLAN Project information: China, World Bank Loan Second Gansu Cultural and Natural Heritage Protection and Development Project, P149528 Project Implementation agency: Second Gansu Cultural and Natural Heritage Protection and Development Project Provincial Management Office (Provincial PMO) Date of the Procurement Plan:December 30, 2020 Period covered by this Procurement Plan: from July 7, 2017 to December 31, 2023 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Law of the People’s Republic of China on Bidding Invitation and Bidding such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. The opening bidding and the invited bidding specified in the Law of the People’s Republic of China on Bidding Invitation and Bidding are required to ensure consistency with paragraph 5.4 of the Procurement Regulations. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations: Not Applicable. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is not applicable for those contracts identified in the Procurement Plan tables. Works: is not applicable for those contracts identified in the Procurement Plan tables. Contracte Cost Cost d WB Planned Construct Estimat Estimat The Main Contrac Contract e e Procureme Review Bid ion No. Body of t No. Description nt Method Opening Period Tendering Date (10,000 (10,000 Prior (month) CNY) USD) /Post Civil Works & Goods Lighting works and road- hardening works Jingchuan 1 PJ-A01 282.91 43.52 Shopping Post 2019.04 12 for Wanyan County PMO village community Luohandong cave scenic area Jingchuan 2 PJ-A02 100.46 15.46 Shopping Post 2019.05 12 power supply County PMO works Exhibition works in Wanyan folk Jingchuan 3 PJ-A03 122.5 18.85 Shopping Post 2018.08 3 culture County PMO exhibtion center Water supply works, tourist 1,469.7 Jingchuan 4 PJ-A04 footpath, four 226.12 NCB Post 2019.09 12 6 County PMO flushing toilets, managerial rooms, eco- parking lot, signing system and garbage collection in Luohandong Cave scenic area' road-hardening works, lighting works, drainage works and garbage collection in Luohandong village community Exhibition works in Jingchuan County Museum, Jingchuan 5 PJ-A05 exhibition works 720.00 110.77 NCB Post 2020.06 6 County PMO in Chenghuang Temple exhibition room Luohandong cave- Hanjiagou 2,794.0 Jingchuan 6 PJ-A06 grottoes cliff 429.85 NCB Post 2019.09 18 0 County PMO consolidation works Luohandong cave embossed, Jingchuan 7 PJ-A07 105.3 16.2 Shopping Post 2019.09 12 murals, Buddha County PMO protection works Hanwang Tomb antique security fence, Jingchuan County Grottoes relics Jingchuan 8 PJ-A08 417.36 64.21 NCB Post 2019.1 12 conservation County PMO works and Chenghuang Temple repair works Construction of Jingchuan County 3,108.1 Jingchuan 9 PJ-A09 Museum 478.17 NCB Post 2019.02 18 2 County PMO (including external works) 9,120.4 1,403.1 Sub total 1 5 Repair and conservation of Tanchang 1 LT-A01 84 12.92 Shopping Post 2019.08 4 wood-framed County PMO houses Power supply works and Tanchang 2 LT-A02 lighting works 782.9 120.45 NCB Post 2017.1 9 County PMO in the scenic area Qiangzang minority folk museum surrounding environment 1,747.0 Tanchang 3 LT-A03 enhancing works, 268.78 NCB Post 2019.04 12 5 County PMO Qiangzang minority historical villages upgrading works Construction of sewage works in 6,263.6 Tanchang 4 LT-A04 963.63 NCB Post 2017.1 11 the scenic area 2 County PMO (community) Mitigation measures and works for 1,653.9 Tanchang 5 LT-A05 geohazard risks 254.46 NCB Post 2017.1 10 6 County PMO in Guan’ergou National Geological Park Exhibition works in Qiangzang Tanchang 6 LT-A06 635.6 97.78 NCB Post 2020.06 6 Minority Folk County PMO Museum 11,167. 1,718.0 Sub total 13 2 Construction of Yinbazi-Xiaomomo 4,687.9 Kangxian 1 LK-A01 721.27 NCB Post 2018.09 12 Mountain fire- 1 County PMO fighting access Construction of patrolling path and ancillary facilities in the wet land, 3,657.4 Kangxian 2 LK-A02 watching tower 562.68 NCB Post 2019.02 12 1 County PMO and access in the forest (From Ticket office to MeiYuanWenCha bridge section) Exhibition works for the ancient tea horse Kangxian 3 LK-A03 56.93 8.76 Shopping Post 2019.12 6 courier station County PMO and tea house road Provision of interpretation and guiding signage system in the wet land、 construction of managerial room in Yangba scenic area and ancient tea horse courier station Kangxian 4 LK-A04 and 852.46 131.15 NCB Post 2019.01 12 County PMO rehabilitation of their surrounding environment . Construction and rehabilitation of Yinbazi Tourist Center and its surrounding environment Construction of patrolling path and ancillary 4,457.3 Kangxian 5 LK-A05 facilities in 685.74 NCB Post 2019.03 12 3 County PMO the wet land, watching tower (from You Fangba Bridge Section to Liujiaba and Xiagouli Section), forest patrol road Taiping Village, Tianba Village, and Meiyuan Valley Scenic Post Kangxian 6 LK-A06 5626.69 852.14 NCB 2021.03 18 Areas Review County PMO Infrastructure and Associated Facilities 19,338. 2,961.7 Sub total 73 4 Reconstruction of tourist Hezheng 1 LH-A01 footpath and 3300 507.69 NCB Post 2018.06 24 County PMO main road in the scenic areas Construction of drainage works 1,987.0 Hezheng 2 LH-A03 305.69 NBF Post 2017.08 14 and wastewater 0 County PMO treatment plant; Upgrading of fossil storage rooms, ecological dustbins, 2,360.6 Hezheng 3 LH-A05 363.17 NCB Post 2018.01 7 guiding systems, 1 County PMO solar lamps and road-hardening works in the community. 7,647.6 1,176.5 Sub total 1 5 Jingtai Binhe road County construction and Yellow its associated Prior 1 BJ-A01 4693.41 710.7 NCB 2021.02 12 River facilities and Review Stone associated water Forest - fun platforms PMO Gate construction, Jingtai Nanshan square County eco - parking Yellow Post 2 BJ-A02 lots 2854.71 432.27 NCB 2021.02 12 River Review construction, Stone and Nanshan Forest square water PMO supply and sewage construction project Tourist Service Jingtai Center County Construction and Post Yellow 3 BJ-A03 2405.1 364.19 NCB 2021.02 12 outdoor Review River associated Stone facilities Forest PMO Scenic areas passengers transfer station, wooden Jingtai walkway, County tourists Post Yellow 4 BJ-A04 walkway, Yellow 2288.58 346.54 NCB 2021.04 12 Review River river water Stone wagon bridge Forest PMO No.2, resting pavilion,and greening project. Village cultural fair, goat skin raft exhibition Jingtai hall, County agricultural Post Yellow 5 BJ-A05 products 1725.05 261.21 NCB 2021.03 12 review River exhibition hall, Stone and apples Forest PMO refrigerating warehouse construction. Tourism toilets, sewage treatment Jingtai station, and County garbage Post Yellow 6 BJ-A06 981.3 148.59 NCB 2021.04 12 collection Review River station Stone construction Forest PMO project Jingtai Viewing wall and county architectural Post Yellow 7 BJ-A07 shape 329.1 49.84 2021.08 6 Shopping Review River construction Stone project Forest PMO Family - fun park Jingtai construction and County village dancing Post Yellow 8 BJ-A08 stage 1473.21 223.08 NCB 2021.03 12 review River (management Stone committee Forest PMO square ) bricks laying project. 16,750. 2,536.4 Subtotal 46 2 Basic office equipment SJ-B01- 1 purchased for 150 23 Shopping Post 2019.06 6 PPMO 01 community development Basic office equipment SJ-B01- 2 purchased for 50 7.7 Shopping Post 2019.06 6 PPMO 02 community development Hezheng County Hua'er SJ-B01- intangible Hezheng 3 48.02 7.39 Shopping Post 2017.11 10 03 cultural County PMO heritage inheritance study equipments purchasing SJ-B02- Jingchuan: 2 4 70 10.77 Shopping Post 2019.04 6 PPMO 1 garbage trucks Kang county、(1) 1 garbage trucks; 1 suction sewage trucks; (2)six flushing toilets; (3)1 SJ-B02- 5 fire truck (Fire 248.8 38.28 Shopping Post 2019.04 6 PPMO 2 sprinkler, green irrigation integrated function car), 3 sets of firefighting equipment Smart scenic area (6 sites)informatio 1,438.5 6 SJ-B03 n system 221.3 NCB Prior 2020.09 6 PPMO 0 development equipment procurement, installation and adjustment Innovated sightseeing architecture Post Kang 7 LK-B01 (e.g.something 165 25.38 Shopping 2021.12 6 Review County PMO like statue) make and installation Jingtai Village dancing County stage equipment Post 8 BJ-B01 1333.9 201.98 NCB 2021.04 6 Yellow procurement and review River installation Stone PMO Smart scenic Jingtai areas County information Prior 9 BJ-B02 1976.43 229.28 NCB 2021.08 12 Yellow system equipment review River procurement and Stone PMO installation Jingtai Sewage treatment County station - sewage Post 10 BJ-B03 40 6.057 Shopping 2021.06 3 Yellow loading truck review River procurement Stone PMO 5,520.6 Subtotal 841.14 5 69,544. 10,637. In total(Works & Goods( 99 02 Consulting service Project Management Consulting 1,489.9 1 SJ-C01 229.23 QCBS Prior 2017.09 72 PPMO Services 7 (Project supervision、 Project Management Consulting Services (including contract 1,052.4 2 SJ-C02 161.91 QCBS Prior 2017.1 72 PPMO management, 2 design review, TOR preparation and progress report preparation) External 3 SJ-C03 environmental 110.49 17 CQS Post 2017.12 72 PPMO monitoring Minority development plan monitoring (covering all the ethnic 4 SJ-C04 60.27 9.27 CQS Post 2017.08 72 PPMO minority communities) (Tanchang County and Hezheng County) Community organization hatching services (6 5 SJ-C05 178.51 27.46 CQS Post 2017.08 72 PPMO scenic areas will hatch 31 community organizations) Smart scenic area information system 6 SJ-C06 196.72 30.26 CQS Post 2019.12 8 PPMO development design scheme (6 scenic areas) Scenic area operation and 7 SJ-C07 60 9.23 IC Post 2017.11 12 PPMO asset management study Social development monitoring 8 SJ-C08 evaluation 132.62 20.4 CQS Post 2017.08 72 PPMO (covering all project communities ) BoQ, technical specifications、 preliminary 9 SJ-C09 design and 195 30 CQS Post 2019.06 PPMO construction drawing of some sub-projects Community capacity 10 SJ-C10 943.53 145.16 QCBS Prior 2019.1 36 PPMO improvement and development Wanyan Folk Jingchuan 11 PJ-C01 History and 58 8.92 CQS Post 2017.09 14 County PMO Culture Study Luohandong cave murals and Jingchuan 12 PJ-C02 painting 79.4 12.22 CQS Post 2017.06 8 County PMO protection technology study Luohandong- Hanjiagou Scenic Jingchuan 13 PJ-C03 90 13.85 CQS Post 2018.09 12 Area Master County PMO Planning Cultural relics investigation study of Jingchuan County A Hundred Mile Jingchuan 14 PJ-C05 Grottoes 500 76.92 QBS Post 2019.06 36 County PMO Corridor (field work, antique evaluation and document compilation) Qiangzang Minority Traditional Tanchang 15 LT-C01 90 13.85 CQS Post 2018.1 9 Village County PMO Protection Master Planning Tanchang County Guan'egou Qiangzang Tanchang 16 LT-C02 74.87 11.52 CQS Post 2017.09 6 Minority's County PMO History and Folk Culture Study Investigation of rare wild plants Tanchang 17 LT-C03 and 30 4.62 IC Post 2019.03 12 County PMO popularization of science Preparation of cultural Hezheng 18 LH-C01 popularization 10 1.54 IC Post 2019.03 12 County PMO and publicity album for Hua'er Hezheng County Hua'er intangible cultural Hezheng 19 LH-C02 heritage 99.39 15.29 CQS Post 2017.08 12 County PMO investigation, systemization and inheritance study Study on the Optimization of the Exhibition Hezheng 20 LH-C03 49.68 7.64 CQS Post 2017.08 12 of Ancient County PMO Animal Fossil in Hezheng Museum Post Jingtai 21 BJ-C01 Scheme design 190 28.77 CQS 2021.02 4 County for viewing wall Review Yellow and architecture River shape Stone PMO Innovated sightseeing architecture(e.g Post Kang 22 LK-C01 135 20.77 CQS 2021.04 6 . something like Review County PMO statue) scheme design Kangxian County Post Kang 23 LK-C02 Tea Culture 30 4.62 IC 2021.04 12 Review County PMO Study 5,855.8 In Total(Consulting service( 900.44 6 75,400. 11,537. In Total 85 46 PROCUREMENT China : CH-Second Gansu Cultural and Natural Heritage Protection and Development Project PLAN General Information Country: China Bank’s Approval Date of the Original Procurement Plan: 2017-06-27 2021-02-01 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P149528 GPN Date: 2017-06-12 Project Name: CH-Second Gansu Cultural and Natural Heritage Protection and Development Project Loan / Credit No: IBRD / 86760 G Executing Agency(ies): ansu Cultural PMO WORKS Activity Reference No. / Estimated Actual Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification High SEA/SH Procurement Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Contract Description Component Review Type Method Market Approach Amount Amount Document / and Recommendation Signed Contract No. Process (Y/N) Risk Document Type Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Completion (US$) (US$) Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Heritage Conservation and LT-A02 / Power supply works Single Stage - One 1,201,746.5 2018-07- IBRD / 86760 Tourism Services Post Request for Bids Open - National 930,000.00 Signed 2017-09-28 2017-09-29 2017-09-29 2017-10-09 2017-10-31 2017-10-31 2017-11-30 2017-11-20 2018-01-04 2018-01-09 in the scenic area Envelope 3 03 Improvement LT-A04 / Construction of Heritage Conservation and sewage works and flushing Single Stage - One 9,646,726.7 2018-07- IBRD / 86760 Tourism Services Post Request for Bids Open - National 9,584,300.00 Signed 2017-09-28 2017-09-29 2017-09-29 2017-10-09 2017-10-31 2017-10-31 2017-11-30 2017-11-20 2018-01-04 2017-12-16 toilets in the scenic area Envelope 5 03 Improvement (community) LT-A05 / Mitigation Heritage Conservation and measures and works for Single Stage - One 2,541,959.9 2018-07- IBRD / 86760 Tourism Services Post Request for Bids Open - National 3,259,600.00 Signed 2017-09-28 2017-09-29 2017-09-29 2017-10-09 2017-10-31 2017-10-31 2017-11-30 2017-11-20 2018-01-04 2017-12-16 geohazard risks in Guan'ergou Envelope 1 03 Improvement National Geological Park LH-A05 / Upgrading of fossil storage rooms, ecologicla Heritage Conservation and dustbins, guiding systems, Single Stage - One 3,733,072.7 2018-10- IBRD / 86760 Tourism Services Post Request for Bids Open - National 4,033,300.00 Signed 2018-01-11 2017-12-06 2018-01-16 2018-01-23 2018-02-27 2018-01-09 2018-03-29 2018-03-19 2018-05-03 2018-04-23 solar lamps and road- Envelope 0 30 Improvement hardening works in the community. PJ-A03 / Exhibition works in Heritage Conservation and Pending Request for Single Stage - One 2019-03- Wanyan folk culture exhibtion IBRD / 86760 Tourism Services Post Open - National 188,500.00 0.00 Implementat 2018-08-06 2018-10-01 Quotations Envelope 30 center Improvement ion Heritage Conservation and Under LK-A01 / Construction of Single Stage - One 6,833,548.1 2019-05- IBRD / 86760 Tourism Services Post Request for Bids Open - National 7,221,431.00 Implementat 2018-08-01 2018-08-01 2018-08-03 2018-09-14 2018-09-04 2018-10-14 2018-09-07 2018-11-18 Yinbazi-Xiaomomo Mountain Envelope 5 17 Improvement ion LK-A04 / Provision of interpr etation and guiding signage s ystem in the wet land constru ction of managerial room in Y Heritage Conservation and Pending Single Stage - One 2019-11- angba scenic area, ancient tea IBRD / 86760 Tourism Services Post Request for Bids Open - National 1,276,800.00 0.00 Implementat 2019-01-15 2019-01-20 2019-03-03 2019-04-02 2019-05-07 Envelope 03 horse courier station and Yinb Improvement ion azi Tourist Center, and rehabil itation of their surrounding e nvironment . LK-A02 / Construction of patrolling path and ancillary facilities in the wet land, Heritage Conservation and Pending Single Stage - One 2019-12- watching tower and access in IBRD / 86760 Tourism Services Post Request for Bids Open - National 5,626,780.00 0.00 Implementat 2019-03-11 2019-03-16 2019-04-27 2019-05-27 2019-07-01 Envelope 28 the forest (From Ticket office Improvement ion to MeiYuanWenCha bridge section) LK-A05 / Construction of pat rolling path and ancillary facili ties in the wet land, watching Heritage Conservation and Pending Single Stage - One 2020-01- tower (From You Fangba Bridg IBRD / 86760 Tourism Services Post Request for Bids Open - National 6,857,430.00 0.00 Implementat 2019-04-04 2019-04-09 2019-05-21 2019-06-20 2019-07-25 Envelope 21 e Section to Liujiaba and Xiag Improvement ion ouli Section) Forest patrol roa d. PJ-A01 / Lighting works and Heritage Conservation and Under Request for Single Stage - One 2019-12- road-hardening works for IBRD / 86760 Tourism Services Post Open - National 435,200.00 0.00 Implementat 2019-04-23 2019-06-18 Quotations Envelope 15 Wanyan village community Improvement ion PJ-A02 / Luohandong cave Heritage Conservation and Under Request for Single Stage - One 2019-12- scenic area power supply IBRD / 86760 Tourism Services Post Open - National 154,600.00 0.00 Implementat 2019-04-23 2019-06-18 Quotations Envelope 15 works Improvement ion PJ-A07 / Luohandong cave Heritage Conservation and Pending Request for Single Stage - One 2019-12- embossed, murals, Buddha IBRD / 86760 Tourism Services Post Open - National 162,000.00 0.00 Implementat 2019-04-30 2019-06-25 Quotations Envelope 22 protection works Improvement ion LH-A01 / Reconstruction of Heritage Conservation and Under Single Stage - One 2020-02- tourist footpath and main IBRD / 86760 Tourism Services Post Request for Bids Open - National 5,000,000.00 0.00 Implementat 2019-04-25 2019-04-28 2019-04-30 2019-06-11 2019-07-11 2019-08-15 Envelope 11 road in the scenic areas Improvement ion LT-A01 / Repair and Heritage Conservation and Pending Request for Single Stage - One 2020-04- conservation of wood-framed IBRD / 86760 Tourism Services Post Open - National 129,200.00 0.00 Implementat 2019-08-19 2019-10-14 Quotations Envelope 11 houses; Improvement ion LT-A03 / Qiangzang minority folk museum surrounding env Heritage Conservation and Pending Single Stage - One 2020-06- ironment enhancing works Qi IBRD / 86760 Tourism Services Post Request for Bids Open - National 2,687,800.00 0.00 Implementat 2019-08-14 2019-08-19 2019-09-30 2019-10-30 2019-12-04 Envelope 01 angzang minority historical vil Improvement ion lages upgrading works PJ-A04 / Water supply works, toursit footpath, four flusting toilets, managerial rooms, eco- parking lot, signing system Heritage Conservation and Pending and garbage collection in Single Stage - One 2020-06- IBRD / 86760 Tourism Services Post Request for Bids Open - National 2,261,200.00 0.00 Implementat 2019-09-09 2019-09-14 2019-10-26 2019-11-25 2019-12-30 Luohandong Cave scenic area' Envelope 27 Improvement ion road-hardening works, lighting works, drainage works and garbage collection in Luohandong Page 1 PJ-A09 / Construction of Heritage Conservation and Pending Single Stage - One 2019-10- Jingchuan County Museum IBRD / 86760 Tourism Services Post Request for Bids Open - National 4,781,700.00 0.00 Implementat 2019-01-07 2019-01-12 2019-02-23 2019-03-25 2019-04-29 Envelope 26 (including external works) Improvement ion PJ-A08 / Hanwang Tomb Heritage Conservation and Pending antique security fence and Single Stage - One 2020-06- IBRD / 86760 Tourism Services Post Request for Bids Open - National 642,100.00 0.00 Implementat 2019-09-09 2019-09-14 2019-10-26 2019-11-25 2019-12-30 Chenghuang Temple repair Envelope 27 Improvement ion works PJ-A06 / Luohandong cave- Hanjiagou grottoes cliff consolidation works and Heritage Conservation and Pending Jingchuan County Grottoes Single Stage - One 2020-06- IBRD / 86760 Tourism Services Post Request for Bids Open - National 4,298,500.00 0.00 Implementat 2019-08-14 2019-08-19 2019-09-30 2019-10-30 2019-12-04 Relics Protection Works (fence Envelope 01 Improvement ion and drainage groove establishment and patrol roads construction). BJ-A03 / Jingtai County Yellow River Stone Forest Heritage Conservation and Pending Single Stage - One 2021-11- Subproject - Tourist Service IBRD / 86760 Tourism Services Post Request for Bids Open - National 3,641,900.00 0.00 Implementat 2021-01-31 2021-02-05 2021-03-19 2021-04-18 2021-05-23 Envelope 19 Center Construction and Improvement ion outdoor associated facilities BJ - A06 / Jingtai County Yellow River Stone Forest Heritage Conservation and Pending Subproject - Tourism toilets, Single Stage - One 2021-12- IBRD / 86760 Tourism Services Post Request for Bids Open - National 1,485,900.00 0.00 Implementat 2021-03-09 2021-03-14 2021-04-25 2021-05-25 2021-06-29 sewage treatment station, and Envelope 26 Improvement ion garbage collection station construction project BJ - A08 / Jingtai County Yellow River Stone Forest Subproject - Family - fun park Heritage Conservation and Pending Single Stage - One 2021-11- construction and village IBRD / 86760 Tourism Services Post Request for Bids Open - National 2,230,800.00 0.00 Implementat 2021-02-10 2021-02-15 2021-03-29 2021-04-28 2021-06-02 Envelope 29 dancing stage (management Improvement ion committee square ) bricks laying project. BJ-A01 / Jingtai County Yellow River Stone Forest Project - Binhe road Heritage Conservation and Pending Single Stage - One 2021-11- construction and its IBRD / 86760 Tourism Services Prior Request for Bids Open - National 7,107,000.00 0.00 Implementat 2021-02-02 2021-02-07 2021-03-21 2021-04-20 2021-05-25 Envelope 21 associated facilities and Improvement ion associated water - fun platforms LK - A06 / Infrastructure and Facilities Development of Heritage Conservation and Pending Single Stage - One 2021-11- Taiping Village, Tianba New IBRD / 86760 Tourism Services Post Request for Bids Open - National 8,521,400.00 0.00 Implementat 2021-02-09 2021-02-14 2021-03-28 2021-04-27 2021-06-01 Envelope 28 Village, and Meiyuan Valley of Improvement ion Kang County BJ - A02 / Jingtai County Yellow River Stone Forest - Gate construction, Nanshan Heritage Conservation and Pending Single Stage - One 2021-11- square eco - parking lots IBRD / 86760 Tourism Services Post Request for Bids Open - National 4,322,700.00 0.00 Implementat 2021-01-31 2021-02-05 2021-03-19 2021-04-18 2021-05-23 Envelope 19 construction, and Nanshan Improvement ion square water supply and sewage construction project BJ - A04 / Jingtai County Yellow River Stone Forest Subproject - Scenic areas Heritage Conservation and Pending passengers transfer station, Single Stage - One 2022-01- IBRD / 86760 Tourism Services Post Request for Bids Open - National 3,465,400.00 0.00 Implementat 2021-03-24 2021-03-29 2021-05-10 2021-06-09 2021-07-14 wooden walkway, tourists Envelope 10 Improvement ion walkway, Yellow river water wagon bridge No.2, resting pavilion,and greening project. BJ - A05 / Jingtai County Yellow River Stone Forest - Village cultural fair, goat skin Heritage Conservation and Pending raft exhibition hall, Single Stage - One 2021-11- IBRD / 86760 Tourism Services Post Request for Bids Open - National 2,612,100.00 0.00 Implementat 2021-02-09 2021-02-14 2021-03-28 2021-04-27 2021-06-01 agricultural products Envelope 28 Improvement ion exhibition hall, and apples refrigerating warehouse construction. GOODS Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SJ-B01-01 / Basic office Heritage Conservation and Under Request for Single Stage - One equipment purchased for IBRD / 86760 Tourism Services Post Open - National 230,000.00 0.00 Implementati 2019-04-13 2019-06-08 2019-12-05 Quotations Envelope community development Improvement on SJ-B01-02 / Basic office Heritage Conservation and Pending Request for Single Stage - One equipment purchased for IBRD / 86760 Tourism Services Post Open - National 77,000.00 0.00 Implementati 2019-04-13 2019-06-08 2019-12-05 Quotations Envelope community development Improvement on Heritage Conservation and Under SJ-B02-1 / Jingchuan: 2 Request for Single Stage - One IBRD / 86760 Tourism Services Post Open - National 107,700.00 0.00 Implementati 2019-04-16 2019-06-11 2019-12-08 garbage trucks Quotations Envelope Improvement on SJ-B02-2 / Kang county-1 ga rbage trucks, 1 suction sewag e trucks, six flusting toilets, 1 Heritage Conservation and Under Request for Single Stage - One fire truck -Fire sprinkler, gree IBRD / 86760 Tourism Services Post Open - National 382,800.00 0.00 Implementati 2019-04-16 2019-06-11 2019-12-08 Quotations Envelope n irrigation integrated functio Improvement on n car 3 sets of fire fighting e quipment BJ - B03 / Jingtai County Yellow River Stone Forest Heritage Conservation and Pending Single Stage - One Subproject - Sewage IBRD / 86760 Tourism Services Post Request for Bids Open - National 60,600.00 0.00 Implementati 2021-02-11 2021-02-16 2021-03-30 2021-04-29 2021-06-03 2021-11-30 Envelope treatment station - sewage Improvement on loading truck procurement Page 2 BJ - B01 / Jingtai County Yellow River Stone Forest Heritage Conservation and Pending Single Stage - One Subproject - Village dancing IBRD / 86760 Tourism Services Post Request for Bids Open - National 2,019,800.00 0.00 Implementati 2021-03-04 2021-03-09 2021-04-20 2021-05-20 2021-06-24 2021-12-21 Envelope stage equipment procurement Improvement on and installation BJ - B02 / Jingtai County Yellow River Stone Forest Heritage Conservation and Pending Subproject - Smart scenic Single Stage - One IBRD / 86760 Tourism Services Prior Request for Bids Open - National 2,992,800.00 0.00 Implementati 2021-07-08 2021-07-13 2021-08-24 2021-09-23 2021-10-28 2022-04-26 areas information system Envelope Improvement on equipment procurement and installation LK - B01 / Innovated viewing Heritage Conservation and Pending Single Stage - One stuff (as statue) making and IBRD / 86760 Tourism Services Post Request for Bids Open - National 253,800.00 0.00 Implementati 2021-05-11 2021-05-16 2021-06-27 2021-07-27 2021-08-31 2022-02-27 Envelope installation Improvement on BJ - A07 / Jingtai County Yellow River Stone Forest Heritage Conservation and Pending Single Stage - One Subproject - Viewing wall and IBRD / 86760 Tourism Services Post Request for Bids Open - National 498,400.00 0.00 Implementati 2021-07-08 2021-07-13 2021-08-24 2021-09-23 2021-10-28 2022-04-26 Envelope architectural shape Improvement on construction project SJ-B03 / Information system installation and equipment Heritage Conservation and Pending Single Stage - One procurement and installation IBRD / 86760 Tourism Services Prior Request for Bids Open - National 2,213,000.00 0.00 Implementati 2021-02-01 2021-02-06 2021-03-20 2021-04-19 2021-05-24 2021-11-20 Envelope of four scenic areas to Improvement on establish smart scenic areas NON CONSULTING SERVICES Activity Reference No. / Draft Bidding Bid Evaluation Report Loan / Credit Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Specific Procurement Bidding Documents as Proposal Submission / Description Component Review Type Method Market Approach Document / and Recommendation Signed Contract Contract Completion No. Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report Notice / Invitation Issued Opening / Minutes Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SJ-C02 / Project Management Capacity Building, Consulting Services (including Institutional Strengthening, Quality And Cost- contract management, design IBRD / 86760 Prior Open - International 2,000,000.00 1,522,550.00 Signed 2017-06-27 2017-06-28 2017-07-18 2017-06-28 2017-08-31 2017-07-28 2017-09-28 2017-09-21 2017-10-28 2017-12-02 2017-12-02 2017-12-26 2018-01-06 2018-01-10 2019-01-06 and Project Management Based Selection review, TOR preparation and Support progress report preparation) SJ-C01 / Construction Heritage Conservation and Quality And Cost- engineering supervision IBRD / 86760 Tourism Services Prior Open - International 2,521,600.00 2,254,595.53 Signed 2017-07-12 2017-07-11 2017-08-02 2017-07-17 2017-09-15 2017-08-15 2017-10-13 2017-10-11 2017-11-12 2017-10-23 2017-12-17 2017-12-01 2018-01-21 2017-12-17 2022-12-31 Based Selection including six scenic areas Improvement LT-C02 / Tanchang County Heritage Conservation and Consultant Guan'egou Qiangzang Under IBRD / 86760 Tourism Services Post Qualification Open - National 123,100.00 0.00 2018-04-23 2018-04-23 2018-04-23 2017-09-06 2018-04-23 2018-04-23 2018-04-23 Minority's History and Folk Implementation Improvement Selection Culture Study SJ-C04 / Minority development plan monitoring Heritage Conservation and Consultant (covering all the ethnic Under IBRD / 86760 Tourism Services Post Qualification Open - National 92,300.00 0.00 2018-04-24 2017-07-01 2018-04-24 2018-04-24 2018-04-24 2018-04-24 2018-04-24 minority Implementation Improvement Selection communities)(Tanchang County and Hezheng County) SJ-C05 / Community Heritage Conservation and Consultant organization hatching services Under IBRD / 86760 Tourism Services Post Qualification Open - National 276,900.00 0.00 2018-04-24 2017-07-01 2018-04-24 2018-04-24 2017-09-12 2018-04-24 2018-04-24 2018-04-24 (6 scenic areas will hatch 31 Implementation Improvement Selection community organizations) SJ-C08 / Social development Heritage Conservation and Consultant monitoring evaluation Under IBRD / 86760 Tourism Services Post Qualification Open - National 200,000.00 0.00 2018-04-24 2017-07-01 2018-04-24 2018-04-24 2017-08-24 2018-04-24 2018-04-24 2018-04-24 (covering all project Implementation Improvement Selection communities ) PJ-C03 / Luohandong- Heritage Conservation and Consultant Under Hanjiagou Scenic Area Master IBRD / 86760 Tourism Services Post Qualification Open - National 138,500.00 0.00 2018-08-03 2018-07-01 2018-08-24 2018-10-07 2018-11-06 2018-12-11 2019-06-09 Implementation Planning Improvement Selection LT-C01 / Qiangzang Minority Heritage Conservation and Consultant Under Traditional Village Protection IBRD / 86760 Tourism Services Post Qualification Open - National 138,500.00 0.00 2018-09-11 2018-08-31 2018-10-02 2018-11-15 2018-12-15 2019-01-19 2019-07-18 Implementation Master Planning Improvement Selection SJ-C09 / BoQ, technical speci Heritage Conservation and Consultant fications preliminary design a Under IBRD / 86760 Tourism Services Post Qualification Open - National 300,000.00 0.00 2019-04-18 2019-04-26 2019-05-09 2019-06-22 2019-07-22 2019-08-26 2020-02-22 nd construction drawing of so Implementation Improvement Selection me sub-projects SJ-C10 / Community capacity Heritage Conservation and Quality And Cost- Under improvement and IBRD / 86760 Tourism Services Prior Open - International 1,451,600.00 0.00 2019-04-22 2019-05-24 2019-05-13 2019-05-31 2019-06-26 2019-07-24 2019-08-23 2019-09-27 2019-11-01 2020-10-31 Based Selection Implementation development Improvement PJ-C05 / Cultural relics investigation study of Heritage Conservation and Jingchuan County A Hundred Quality And Cost- Under IBRD / 86760 Tourism Services Post Open - International 769,200.00 0.00 2019-04-25 2019-05-01 2019-05-16 2019-05-05 2019-06-29 2019-05-22 2019-07-27 2019-07-05 2019-08-26 2019-07-18 2019-09-30 2019-11-04 2020-11-03 Mile Grottoes Corridor (field Based Selection Implementation Improvement work, antique evaluation and document compilation) SJ-C10-A / Community Heritage Conservation and Quality Based Under capacity improvement and IBRD / 86760 Tourism Services Prior Open - International 1,451,600.00 0.00 2019-07-10 2019-07-24 2019-07-31 2019-07-31 2019-09-13 2019-08-30 2019-10-11 2019-10-15 2019-11-10 2019-11-11 2019-12-10 2019-12-09 2020-01-14 2021-01-13 Selection Implementation development Improvement SJ-C06 / Smart scenic area Heritage Conservation and Consultant Pending information system IBRD / 86760 Tourism Services Post Qualification Open - National 302,600.00 0.00 2019-07-29 2019-08-19 2019-10-02 2019-11-01 2019-12-06 2020-06-03 Implementation development design scheme Improvement Selection Page 3 Heritage Conservation and Consultant PJ-C01 / Wanyan Folk History Pending IBRD / 86760 Tourism Services Post Qualification Open - National 89,200.00 0.00 2019-07-24 2019-08-14 2019-09-27 2019-10-27 2019-12-01 2020-05-29 and Culture Study Implementation Improvement Selection PJ-C02 / Luohandong cave Heritage Conservation and Consultant Pending murals and painting IBRD / 86760 Tourism Services Post Qualification Open - National 122,200.00 0.00 2019-07-24 2019-08-14 2019-09-27 2019-10-27 2019-12-01 2020-05-29 Implementation protection technology study Improvement Selection BJ - C01 / Jingtai County Yellow River Stone Forest Heritage Conservation and Consultant Pending Subproject - Scheme design IBRD / 86760 Tourism Services Post Qualification Open - National 287,777.00 0.00 2021-02-07 2021-02-28 2021-04-13 2021-05-13 2021-06-17 2021-12-14 Implementation for viewing wall and Improvement Selection architecture shape LK-C01 / Innovated viewing Heritage Conservation and Consultant Pending stuff (as statue) Scheme IBRD / 86760 Tourism Services Post Qualification Open - National 207,700.00 0.00 2021-05-12 2021-06-02 2021-07-16 2021-08-15 2021-09-19 2022-03-18 Implementation Design Improvement Selection INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Loan / Credit Contract Type Estimated Actual Amount Draft Negotiated Description Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Heritage Conservation and Individual LK-C02 / Kang County Tea Pending IBRD / 86760 Tourism Services Post Consultant Open 46,200.00 0.00 2021-03-18 2021-05-06 2021-05-27 2021-07-01 2021-12-28 Culture Study Implementation Improvement Selection Page 4