REPORT NO.: RES35950




                                           RESTRUCTURING PAPER

                                                    ON A

                                    PROPOSED PROJECT RESTRUCTURING

                                                        OF
                         IDENTITY AND TARGETING FOR SOCIAL PROTECTION PROJECT
                                       APPROVED ON MARCH 10, 2017
                                                        TO

                                        THE KINGDOM OF MOROCCO

SOCIAL PROTECTION & JOBS
MIDDLE EAST AND NORTH AFRICA


                                             December 14, 2021




                             Regional Vice President:    Ferid Belhaj
                                   Country Director:     Marie Francoise Marie-Nelly
                                   Regional Director:    Keiko Miwa
                         Practice Manager/Manager:       Anush Bezhanyan
                                Task Team Leader(s):     Emil Daniel Tesliuc, Mahdi Barouni
        The World Bank
        Identity and Targeting for Social Protection Project (P155198)




ABBREVIATIONS AND ACRONYMS

AMO         Universal Health Insurance (Assurance maladie obligatoire)
BEC         Civil Registry Office (Bureau d’état Civil)
CNIE        National Electronic ID Card (Carte nationale d’identité électronique)
CNPD        Moroccan Data Protection Authority (Commission nationale de contrôle de la protection des données à
            caractère personnel)
DLR         Disbursement-linked Result
EEP         Eligible Expenditure Program
FA          Family Allowance
GoM         Government of Morocco
HCP         High Planning Commission (Haut Commissariat au Plan)
ID4D        Identification for Development
IDCS        Digital, Civil and Social Identifying Number (Identifiant digital civil et social)
IMSC        Inter-ministerial Steering Committee
IRI         Intermediate Result Indicator
IS          Information System
M&E         Monitoring and Evaluation
MEFAR       Ministry of Economy, Finance and Administrative Reform
MIS         Management Information System
MoI         Ministry of Interior
NIA         National Identity Agency
NPR         National Population Register
NRA         National Registry Agency (Agence nationale des registres)
PBC         Performance-Based Condition
PDO         Project Development Objective
PDOI        Project Development Objective Indicator
PMT         Proxy Means Testing
PMU         Project Management Unit
POM         Project Operational Manual
RAMED       Medical Assistance Regime (Régime d’assistance médicale)
RNEC        National Civil Register (Registre national de l’état civil)
SI          System Integrator
SP          Social Protection
SR          Social Registry
SSN         Social Safety Net
TF          Trust Fund
UIN         Unique Identifying Number




                                                            2
        The World Bank
        Identity and Targeting for Social Protection Project (P155198)




BASIC DATA


Product Information

Project ID                                                      Financing Instrument
P155198                                                         Investment Project Financing

Original EA Category                                            Current EA Category
Not Required (C)                                                Not Required (C)

Approval Date                                                   Current Closing Date
10-Mar-2017                                                     31-Dec-2021


Organizations

Borrower                                                        Responsible Agency
Ministry of Economy and Finance                                 Ministry of Interior

OPS_PROCESSING_DISCLOSABLE_TABLE
Processing (this section will be automatically removed by the system before the paper is disclosed)
Form Type                                                       Based on the proposed changes this Restructuring type is
Full Restructuring Paper                                        Level 2

Decision Authority

CD Decision


 Project Development Objective (PDO)
 Original PDO
 The objective of the Project is to expand coverage of a unique identifying number for the Moroccan population and
 foreign residents, and to improve targeting of Social Safety Nets in the Project Area.
 OPS_TABLE_PDO_CURRENTPDO
Summary Status of Financing (US$, Millions)
                                                                                          Net
Ln/Cr/Tf                   Approval       Signing Effectiveness            Closing Commitment Disbursed Undisbursed

IBRD-87180             10-Mar-2017    16-Jun-2017    27-Jun-2017     31-Dec-2021          100.00      79.55          20.45



                                                            3
        The World Bank
        Identity and Targeting for Social Protection Project (P155198)




Policy Waiver(s)

Does this restructuring trigger the need for any policy waiver(s)?
No




 I. PROJECT STATUS AND RATIONALE FOR RESTRUCTURING

     A. Project Status

1.      Progress towards the achievement of the Project Development Objective (PDO) and the overall project
implementation progress have been assessed as satisfactory. During the life of the project, the commitment of the
Government of Morocco (GoM) to achieve the project’s objective continued unabated. However, during implementation
the project and its specific implementation modalities have become more ambitious, in part thanks to exposure to
international best practices which was facilitated by the World Bank.

2.      The PDO is to expand coverage of a unique identifying number (UIN) for the Moroccan population and foreign
residents, and to improve the targeting of Social Safety Net (SSN) programs. To achieve the PDO and develop an
accurate, inclusive, digital identification and targeting system, the project supports the development of three (3) key
elements:
   a) A Social Registry (SR) for the gathering of socio-economic information from households to estimate the level of
       consumption per household member and, on this basis, identify the applicants who are eligible for SSN programs.
       The SR constitutes the first level of the universal social targeting system. Its objective is to improve the targeting
       of SSN programs, reduce fraud and error, including duplicate or ghost beneficiaries.
   b) A National Population Registry (NPR) for the accurate identification and digital authentication of individuals,
       which collects, registers, stores biographic and biometric identity data, and issues an UIN on demand called the
       Civil and Social Digital Identifier (Identifiant Digital Civil et Social, IDCS) for the Moroccan population (including
       minors and newborns) and the foreigners living in Morocco. Obtaining an IDCS is part of the application for SSN
       programs, though the number will also be optional for the rest of the population.
   c) A National Registry Agency (NRA) manages on behalf of the state the NPR and the SR enrolments as well as the
       effective use of both registers’ information to ensure a high level of protection and confidentiality of the
       collected data in compliance with the Moroccan data protection law (Law n° 09-08 of 18 February 2009) and the
       guidelines established by the Moroccan Data Protection Authority (Commission nationale de contrôle de la
       protection des données à caractère personnel- CNPD).




                                                             4
         The World Bank
         Identity and Targeting for Social Protection Project (P155198)




3.       The successful implementation of this strategic project includes the following significant achievements:

     a) All technical and legal prerequisites for rolling out the NPR, the UIN (IDCS) and the SR have been met . The Law
          72-18 related to the implementation of the NPR, the SR, and the NRA was adopted and published in the
          National Gazette on August 13, 2020, and the council of ministers adopted three implementation regulations
          on the NPR, the IDCS, the SR, and the NRA during May-August 2021.
     b) All major procurement processes related to the NPR, the NPR System Integrator, the biometric services, and
          the development of the SR Management Information System (MIS) have been completed and contracts are
          either executed or under implementation. The MOSIP software was also delivered, tested, and incorporated
          in the NPR software by the Ministry of Interior (MoI).
     c) The SR Proxy Means Testing (PMT) scoring formula was updated and validated by the Inter-ministerial
          Steering Committee (IMSC) on June 10, 2021. Simulations show that the PMT scoring formula correctly
          identifies seventy (70) percent of the poorest quintile of the population, a marked improvement compared to
          the 2019/2020 performance of RAMED (30 percent) and Tayssir (47 percent). The scoring formula was
          updated by the High Planning Commission (Haut Commissariat au Plan-HCP) using the most recent pilot
          household survey (ENSR December 2019/March 2020). The preparatory work for the use of the new scoring
          formula by RAMED, Tayssir, DAAM, or their successor programs and any new Social Protection (SP) program
          (i.e., the announced Family Allowance (FA) Program) is also well under way.
     d) Complementary activities financed outside the project are also well advanced. These includes several activities
          financed either by the MoI or the European Union, including the digitalization of the Civil registry local offices,
          the development of communication campaigns, the development of the error and fraud system of the SR, and
          the operation of the data exchanges through the inter-governmental gateway.

4.       On these solid foundations, the GoM will start piloting the NPR and the SR in the Rabat-Kenitra region,
starting with the NPR from December 2021 to August 2022 and continuing with the SR during March 2022 to
December 2022. The objectives of the NPR pilot are to: (i) assess the quality of the access of citizen to service centers;
(ii) measure the pre-enrollment and enrollment functionalities of the application; (iii) test the functionality of the
enrollment data upload link; (iv) receive and process enrollment data and data validation of the National Electronic ID
Card (Carte nationale d’identité électronique-CNIE), the Civil registry and the Register of foreigners; (v) test the
components of Data Center operations such as backup, replication, library, and application uptime; (vi) manage the life
cycle of the IDCS number; (vii) integrate ecosystem partners and exchange data; and (viii) test the authentication
features and the trusted service provider devices. As for the SR, the objectives of the pilot phase are to: assess the
quality of the access of households to service centers and to SR portal; manage the lifecycle of scoring of variables;
manage the life cycle of the scoring method and formula; measure the pre-registration and registration functionalities of
the SR application; test the functionality of the scoring data collection and verification; integrate ecosystem partners
(social programs, service providers for social programs, and scoring data verification providers) and exchange data;
exchange and reconcile declared scoring data and those obtained from public and private third parties; test the SR
components of Data Center operations such as backup, replication, library, and application uptime; test eligibility to
social programs checks features; and check the errors and fraud detection functionalities. The pilot phase will allow the
GoM to quickly identify issues and better calibrate the systems to maximize project impact and scale-up registration
nationwide quickly and effectively during the expansion phase. After the completion of the first phase of the pilot, the
national rollout of the two registries, supported by the extension of the project, will then start, with a special focus on
the beneficiaries of the SSN programs. It is estimated that by the end of the first phase of the national rollout, on
September 30, 2023, the NPR will have covered about 8 million individuals and the SR about 4 million individuals.


                                                              5
        The World Bank
        Identity and Targeting for Social Protection Project (P155198)




5.      The implementation of the three project components is progressing in a satisfactory manner:

Component 1: Design and Development of an NPR with an UIN, and Establishment of a National Identity Agency (NIA).
Investments totaling US$3.918 million have been engaged from the loan proceed to support the development, piloting,
and the NPR national rollout (phase 1). Several legal, regulatory, administrative, and technical inputs have been
completed, and the pilot phase of the NPR system is ready to be launched:
    a) An UIN generator was developed by the MoI in 2017 and has been used to attribute IDCSs to newborns since
         January 2018. Since the NPR was yet to be developed, the UIN generator was stored in the Civil registry MIS.
         Once the NPR and the NRA are operational, the same UIN generator will be used in both ID registries, the NPR,
         and the Civil registry.
    b) The attribution of UINs/IDCSs for newborns is well advanced, and the Project Development Objective Indicator
         (PDOI) number 1 related to the 266 thousand newborns receiving UINs can be achieved by the proposed
         extended closing date of the project. The process of attributing IDCSs to newborns started in 2018 in Rabat. It
         was extended to Casablanca in 2019 and is gradually expanded throughout Morocco, apace with the
         digitization of the Civil registry local offices (activity independently financed by MoI). As a result, at the end of
         2020, this indicator reached 161 thousand newborns with IDCS attributed and inscribed on their birth
         certificates in the same year, bringing the cumulative number of IDCSs issued since January 2018 to over
         400,000.
    c) The NPR Information System (IS) is ready for deployment and will attribute IDCSs to the rest of the population.
         Atos developed the IS, a System Integrator (SI) that incorporated (i) the core enrollment-deduplication-
         authentication software produced by the International Institute of Information Technology Bangalore (IIIT-B)
         as an open-source (the MOSIP project); and (ii) the biometric deduplication and authentication software
         provided by Idemia.
    d) Three PBCs with ten (10) indicators support this component. Three (3) indicators have been achieved and
         disbursed, while two (2) others have been achieved using a different modality than the one specified in the
         Loan Agreement. Of the remaining five (5) PBC indicators, two (2) intermediate indicators will be eliminated as
         part of the restructuring to shift resources towards the investment component, while two (2) final PBC
         indicators will be achieved within the loan extension period, and one will be revised and achieved during the
         extended implementation period.

6.     Component 2: Design and Development of an SR. Investments totaling US$0.253 million have been engaged
from the loan proceeds to support the SR’s development, piloting, and national rollout (phase 1). Progress on this
component can be summarized as follows:
    a) Sub-Component 2.1. the Design and Development of the SR systems finances the SR IS, which covers all critical
       business functions of a registry. The NPR revised architecture led to a re-thinking of the scope of this component
       during 2018-19. Initially, the SR was thought of as an independent but interoperable IT system. Once the NPR
       design was finalized, the GoM considered creating an integrated NPR-SR system that uses shared infrastructure
       and services to save costs, improve administration, and enhance functionality while preserving the integrity,
       separation, and data protection of each system. To achieve this objective, new technical specifications were
       developed to reflect the new thinking, and as a result, a new procurement process was launched in 2019. The
       developer for the SR MIS was selected in the first quarter of 2021 and will deliver the MIS by March 2022. The
       pilot phase of enrollments of beneficiaries into the SR will commence end of March 2022 in Rabat-Kenitra, with
       the national rollout scheduled for January 2023.
    b) Sub-Component 2.2: Establishment of the Legal Framework (Law and Regulations) for the SR to Become a
       Functional Unique Entry Point for SSNs was completed with the adoption of Law 72-18 by the Parliament and


                                                              6
         The World Bank
         Identity and Targeting for Social Protection Project (P155198)


       the approval of the Decree on the SR by the Council of Ministers in July 2021. The support for this sub-
       component has come primarily through PBC number 4, with three (3) indicators, all achieved and disbursed. In
       addition, the World Bank project team has supported the MoI with information about examples of the role,
       functioning, legislation, regulation of the SR in several countries such as Colombia, Chile, Turkey, and Georgia.
    c) Sub-Component 2.3: Transition of RAMED, Tayssir, DAAM’s Programs’ Beneficiaries into the SR in the Project
       Area has produced all critical inputs required for the launch of the SR pilot. A new scoring formula for the SR was
       developed, updated by HCP, and then validated by the project Steering Committee on June 10, 2021. This work
       contributed to the activities of sub-components 3.1 and 3.2 and the discussions with the Ministries and Agencies
       operating RAMED, Tayssir, and DAAM programs. The analytical work carried out by HCP was supported by the
       World Bank project team. It was financed by the Identification for Development (ID4D) Multi-Donor Trust Fund
       and a Trust Fund (TF) for the development and implementation of the 2019/2020 pilot household survey.
    d) PBCs 4 and 5 are supporting this reform through the achievement of 7 PBC indicators. Three (3) indicators have
       already been achieved and disbursed, and one has been achieved but is yet to be disbursed. Of the remaining
       three (3) PBC indicators, two (2) intermediate indicators are proposed to be eliminated to shift resources
       towards the investment component, while one final PBC indicator will be achieved during the new
       implementation period.

7.       Component 3: Project Management, Capacity Building, and Monitoring and Evaluation (M&E). During the
COVID-19 pandemic crisis, the Project Management Unit team has been involved in the design and the implementation
of the Emergency Cash Transfer Program and the Vaccination campaign. The MoI’s engagement in these emergency
activities provided some useful lessons that benefited the project. Furthermore, it is worth noting that these operations
contributed to strengthening the capacities of the MoI team while working on the RAMED (Medical Assistance Regime)
database and testing the reliability of the interoperability with other systems to implement a form of an SR for a large
Cash Transfer program covering about 5.5 million households. In addition, an ID4D TF of US$150,000 helped to support
the project implementation, including the organization of exchange workshop to take advantage of international best
practices in terms of data privacy/data protection, implementation of the NPR and the SR, and the development of a
M&E plan.

Table 1. Summary of Progress towards Achievements of Results by the Project
                                                              Targets achieved by    Progress towards achievements of results
                                           Target (prior to     December 2020
               Indicator
                                            restructuring)     As %
                                                                          Value
                                                              target
ODP
PDOI 1: Number of newborns for whom                                                 The implementation of the pilot phase of
an UIN has been attributed through civil                                            the modernization project of the civil
registration in the project area (of                                                registry started in the Commune of Rabat in
which at least 45 percent are female)                                               January 2018. It was gradually extended in
(Number) (Thousand)                                                                 the region of Rabat and Casablanca during
                                                 47             Ok
Intermediate Target 1                                                               2019. As a result, the annual attribution of
                                                 113            Ok
Intermediate Target 2                                                     161       IDCS for newborns has gradually increased
                                                 206           87%
Intermediate Target 3                                                               to reach a maximum of 162,100 IDCS in
                                                 266           68%
Intermediate Target 4                                                               2020. Expanding the civil registry
                                                                                    modernization and connecting all additional
                                                                                    civil registry offices to the IDCS generator
                                                                                    will allow to reach the final target.
                                                                                    To satisfy this indicator fully, the IDCS


                                                               7
         The World Bank
         Identity and Targeting for Social Protection Project (P155198)


                                                                                     generated needs to be integrated into the IS
                                                                                     NPR, while the NPR is not yet redeployed. To
                                                                                     credit the client for the results achieved, the
                                                                                     PBC should mention the attribution of IDCSs
                                                                                     by both NPR and Civil registry.
                                                                                     This PDOI and the associated PBC 2 will be
PDOI 2: Population (six years old and                                                revised. The value of 26 million persons
above) for which an UIN has been                                                     enrolled by the project closure was
attributed in the Project Area (of which       26            0%           --         estimated based on the potential merging of
at least 45 percent are female)                                                      the identity information from CNIE,
(Number) (Million)                                                                   MASSAR, Civil registry, and the Civil of
                                                                                     foreign residents. Currently, this approach is
                                                                                     no longer relevant since the registration of
                                                                                     citizens in the NPR is based on enrolment
                                                                                     and the collection of demographic and
                                                                                     biometric information. Therefore, the target
                                                                                     needs to be revised downwards, in line with
                                                                                     the achievement at the end of the extended
                                                                                     implementation period.
                                                                                     Due to the reforms of the RAMED and
PDOI 3: Share of beneficiaries of the                                                Tayssir programs initiated as part of the
RAMED, Tayssir, and DAAM programs                                                    overall ongoing SP reform, this indicator will
registered in the Social Register (SR)                                               be replaced with the new PDOI no. 3: The
and who are in the first consumption           65            0%           --         SR is using a scoring formula with a
quintile in the Project Area (of which at                                            simulated targeting accuracy of over 65
least 40 percent are female)                                                         percent and is operational beyond the pilot
(Percentage).                                                                        phase and has processed applications for at
                                                                                     least 4 million individuals.
Intermediate
Direct Project beneficiaries, of which 45                                      Target adjusted to account for the change of
                                             26,266               7,266
percent are female (Number)                                                    persons receiving an UIN from 26,000 to 7,000.
(Thousand)
Number of beneficiaries of RAMED,                                              No change
                                               9,3          --      9.3
Tayssir, and DAAM (Million)
Share of civil registry office (Bureaux                                        On 2364 BEC, more than 380 BEC are connected to
d’état civil, BEC) connected to an UIN         25           --      16         an UIN as of December 2020.
generator (Percentage)
Share of new individuals registered in
year t (MASSAR, CNIE, and Register of
foreign residents) are communicated            85           --      --
electronically to the NPR and attributed
an UIN (Percentage)                                                            This indicator will be dropped as the new GoM
Share of new individuals registered in                                         strategy moved away from the creation of the UIN
year t (MASSAR, CNIE, and Register of                                          based on merging existing databases.
foreign residents) are communicated
                                               40           --      --
electronically to the NPR and attributed
an UIN (of which at least 40 percent are
female) (Percentage)
Share of new applicants to RAMED,                                              This result depends on the deployment of the SR
                                              100
DAAM, and Tayssir programs registered                       --      --         and the registration of citizens. Therefore, the
in the SR (Percentage)                                                         timetable of this indicator needs to reflect the new


                                                             8
         The World Bank
         Identity and Targeting for Social Protection Project (P155198)


                                                                          SR implementation schedule.

Share of beneficiaries of RAMED/DAAM                                      This result depends on the deployment of the SR
                                                68
in SR (Percentage)                                                        and the registration of citizens. As a result, the
                                                             --     --
                                                                          timetable of this indicator needs to reflect the new
                                                                          SR implementation schedule.
                                                                          This result depends on the deployment of the SR
Number of programs/services that have
                                                                          and the registration of citizens. Therefore, the
included the UIN in their MIS (Number)           3                  --
                                                                          timetable of this indicator needs to reflect the new
                                                                          SR implementation schedule.
Share of beneficiaries of Tayssir in SR                                   This result depends on the deployment of the SR
                                                20
(percentage)                                                              and the registration of the citizens. Consequently,
                                                             --     --    the timetable of this indicator needs to reflect the
                                                                          new SR implementation schedule.

Share of claims and grievances of SR                                      This result depends on the deployment of the SR
beneficiaries documented, processed,                                --    and the registration of citizens. As result, the
                                                100
and resolved within 30 days                                               timetable of this indicator needs to reflect the new
(Percentage)                                                              SR implementation schedule.
Survey on a random sample of Tayssir,                                     ENSR Household survey from December
                                                Yes          Yes    --    2019/March 2020 carried out by HCP.
DAAM, and RAMED beneficiaries
                                                                          The operational Audit of the SR was initially
Operational audit conducted
                                                                          planned to be conducted in year 4 and the NPR in
                                            SR and NPR
                                                                    --    year 5 once those systems are operational. The
                                             projects
                                                                          NPR and SR will be put in place during 2022-2023,
                                                                          and the audit will be carried out during this period.
Capacity building                             Legal and                   A legal team has been well established within the
                                          Communication                   Home Office headed by the Governor Director of
                                                teams                     Regulation and Public Freedoms. In addition,
                                            established;                  exchange trips and workshops on best practices in
                                             Study tour                   targeting, identification, and data protection have
                                             organized                    taken place (India, Washington, Kuwait, and
                                                                   Yes
                                               to learn                   Rabat).
                                             about best                   A communication team has been established
                                              practices                   within the MoI and reinforced with consultants.
                                             (Targeting
                                                and/or
                                           Identification)

    B. Background and Rationale for Restructuring

8.      A formal request from the Ministry of Economy, Finance, and Administrative Reform (MEFAR) to restructure
the Project was received on June 9, 2021. The proposed restructuring aims to support the GoM in the
operationalization of the NPR, the SR, and the NRA, and more broadly, the ongoing reform of the SP program to
implement an efficient targeting tool within the SR.

9.       Throughout implementation, the GoM has adopted a more ambitious version of the project, moving the NPR
to the frontier of international good practice in terms of digital identification and the SR towards a modern, adaptive,




                                                              9
           The World Bank
           Identity and Targeting for Social Protection Project (P155198)


digital SR. The bolder vision aligns with the Principles on Identification for Sustainable Development.1 It was sparked by
exposure to international best practices facilitated by the World Bank including high-level peer exchanges, the advice of
the management consulting firm hired to define the strategy and the implementation plan for the NPR, and the decision
to incorporate MOSIP, a state-of-the-art open-source ID system software (for enrollment-deduplication-authentication)
developed by IIIT-Bangalore.

10.       The main design changes introduced during project implementation compared to the original design as
outlined in the 2017 PAD are detailed in the next section and broadly include:
    (i) A more accurate and inclusive NPR and UIN. In the project’s original design, the NPR was envisaged to be
            created through a back-end reconciliation of multiple databases with biographic and biometric information,
            including the CNIE and MASSAR databases, a database of foreign residents and eventually, digitalized civil
            register records. However, it was acknowledged that this approach could compromise the accuracy and
            inclusivity of the system, given the quality and coverage of these existing systems.2 Thus, the MoI adopted a
            new approach using fresh enrollment to reduce inaccuracies, ensure equal access across the population, and
            minimal data collection with biometric deduplication to achieve uniqueness within the system. The enrollment
            process will, therefore, be gradual, will take more time than originally envisaged, but it will be more accurate
            and inclusive. Moreover, it will allow for the incorporation of more people-centric and privacy-by-design
            features throughout the system.
    (ii) Advanced, versatile authentication and verification services. In addition to providing a trusted source of
            identity for the onboarding into the SR, the new NPR design incorporates services such as digital
            authentication and electronic “know-your-customer” (eKYC) services for the NPR and the SR beneficiaries. The
            new services contribute to extending the usefulness of the system and establish the basis for a modern, digital
            platform for citizens and residents to verify their identity in a remote and paperless form, which can be used
            across social programs (e.g., RAMED, Tayssir, or DAAM) and beyond.
    (iii) Adoption of open-source software to prevent vendor lock-in. Morocco will be an early adopter of the MOSIP
            platform based on a Memorandum of Understanding with IIITB, which provides a state-of-the-art, modular
            software with increased functionality and embedded privacy-by-design features.
    (iv) Deeper integration of the NPR and SR resources. This includes shared physical infrastructure (premises,
            hardware, data center, and communication lines) and an NRA that manages both registries. Initially, the
            project envisaged the creation of a NIA that will manage the NPR identity information. However, during the
            project implementation, the GoM expanded the agency’s mandate to include the SR. In addition, it extended
            the data protection and privacy arrangements to the management of the information in both registries since
            each registry contains personally identifiable information.
    (v) Initial focus of the NPR services on SSN programs and beneficiaries . During the implementation phase of the
            activities financed by the World Bank, the project will focus on covering the most vulnerable 30 percent of the
            population and support streamlining enrollment of SSN beneficiaries into the SR.
    (vi) Dynamic/Adaptive SR. Designing an SR which includes a scoring formula based on information that could be, in
            large, partly verified using existing Government or private databases (e.g., utilities) for increased accuracy,
            veracity, adaptability, and beneficiaries’ accessibility.




1 See the Principles on Identification: http://id4d.worldbank.org/principles.
2
  For example, it was determined that these existing databases had inconsistent quality and data formats, including data in both Arabic and Latin alphabets, that was
difficult to reconcile and would likely lead to substantial inaccuracies and data processing requirements. Combined with the fact that the existing system did not
provide universal coverage across all age groups and demographics, by using the mixed data quality in the existing systems, the NPR ran the risk of propagating these
inaccuracies and excluding a portion of the population. Furthermore, minimizing errors through demographic matching across these systems would require significant
time and resources for manual processes and likely result in a less reliable NPR with more false exclusions and a longer response time in case of authentication.



                                                                                10
           The World Bank
           Identity and Targeting for Social Protection Project (P155198)


11.      The project restructuring makes this project more forward looking and consistent with a broader GoM’s
strategy to implement an ambitious SP Reform announced in 2020 as a response to the COVID-19 crisis, offers more
functionalities for the NPR and SR, and will facilitate the administration of the SSN programs while requiring
additional time and investment. The new approach for the creation of the NPR and the SR has had an impact on the
initial design, including (i) the architecture of the system, which requires hardware, software, and processes for
registration and direct collection and processing of beneficiary’s data; and (ii) the implementation schedule, which
would need to be extended due to the nature of a large-scale enrollment campaign. In addition, the issuance of the new
IDCS through active enrollment of the population reduces the size of the population that can be reached in the early
years while keeping the focus on enrollment of the poorest and more vulnerable segments of the population to serve
them better. At the same time, the fresh enrollment, addition of digital services to the registries, and pro-inclusion
policies will reduce the cost of using the services for the Moroccan people and the probability for these vulnerable
groups to be excluded.3

12.   The restructuring is therefore needed to align the project activities and outputs to the updated strategy and
methodology to ensure the achieving of the project’s objectives.

13.     The project has also been subject to several delays compared to the initial planning. As a result, the original
project closing date will be extended to achieve the PDO. The development of the legislative framework took additional
two years to be finalized than initially planned. The start of important investments for the development of the NPR and
SR was postponed until the adoption of the legislative framework by the Parliament. The complexity of the NPR
contract4 contributed to increasing delays. Moreover, the validation of the scoring formula, based on a new survey
carried out by HCP, took longer than originally envisioned. The COVID-19 shock slowed the pace of the implementation
and caused the postponement of the start of the pilot because of the MoI team’s strong involvement in the organization
of the emergency cash transfer program. However, the development of the NPR and SR proceeded unabated, and
allowed the design of more performant registries. Considering these delays, the project’s current closing date would
need to be extended to achieve the PDO and the PDOIs, including a recalibration of PDOI2.

II.       DESCRIPTION OF PROPOSED CHANGES

14.      The proposed restructuring will further support the implementation of the building blocks of a modern safety
net and ensure that the project will continue supporting the operationalization of the NPR and the SR. The changes to
be introduced will entail (i) extending the current project closing date by 21 months; (ii) revising PBC 2 (Population (6
years and over) for which an IDCS has been assigned in the project area); (iii) streamlining the results framework; (iv)
reformulating, revising, or eliminating some PBCs, namely PBCs 1.2, 1.3, 1.4, 5.2, and 5.3; (v) reallocating the project
funds between disbursement categories; (vi) adjusting the current project costs; (vii) amending the verification protocol
to record the IDCS numbers issued by the UIN generator integrated into the NPR and/or the Civil registry; and (viii)
revising the current Eligible Expenditure Program (EEPs).




3
  For example, the GoM is undertaking extensive piloting, evaluation, and auditing of biometric technologies and end-to-end processes to ensure that systems are
calibrated to reduce instances of false exclusion and provide robust exception handling and grievance redress mechanisms. Enrollment for the NPR will be provided
through multiple modalities—including mobile and online applications and through a dense network of 2100 Citizen Service Centers nationwide—to increase
convenience and reduce cost barriers. Digital authentication and e-KYC services will be flexible, on-demand, privacy-protecting, and tailored to meet the needs of
different groups and programs (e.g., making biometric-based authentication an option for low-literacy people who have difficulties with personal identifications
numbers).
4 It took the MoI and the NPR Firm (IDEMIA) a few additional months to renegotiate the contract scope and agree on taking out the biometric deduplication

functionality.



                                                                               11
           The World Bank
           Identity and Targeting for Social Protection Project (P155198)




15.        The rationale for each of these changes is outlined below.

    a) Extension of the project current closing date. The proposed extension of the closing date by 21 months from
       December 31, 2021 to September 30, 2023, is needed to enable the implementation of project activities to make
       up for the slowdown in implementation due to the COVID-19 crises, take into account the new strategic
       orientations of the project, and respond to the needs of the ongoing SP reform. The ongoing SP reform will change
       the existing SP programs, and more specifically, RAMED and Tayssir programs. The RAMED beneficiaries will be
       integrated into the new universal health insurance system (Assurance maladie obligatoire -AMO) starting January
       2022. The Tayssir program would be replaced by the new Family Allowance program starting 2023. Within the
       ongoing SP reform, the SR is needed for identification, enrollment, and scoring. This 21-month extension of the
       current closing date of December 31, 2021, will allow the project to meet its objective of establishing a SR as a
       unique point of entry for SSN programs and supporting the delivery systems of the new programs.

    b) Streamlining of the results framework. The proposed changes to be introduced to the Results framework are
       reflected in Table 2:

Table 2: Changes to be Introduced in the Results Framework
CURRENT RESULTS FRAMEWORK                                               PROPOSED CHANGES




PDO                                                                     The current PDO as specified in paragraph 2, remains unchanged.

                                                     PROJECT DEVELOPMENT OBJECTIVE INDICATORS

      a)   PDOI no. 1: Number of newborns for whom                      Unchanged
           an UIN (IDCS) has been attributed through
           civil registration in the project area (of which
           at least 45 percent are female)

      b) PDOI no. 2: Population (6 years old and                        Decrease the end target value from 26 million to 7 million, based on
         above) for which an UIN (IDCS) has been                        confirmed achievements during the extended implementation period.
         attributed in the Project Area

      c)   PDOI no. 3: Share of beneficiaries of the                    Given that the achievement of this indicator will depend on the specific
           RAMED, Tayssir, and DAAM programs                            design and implementation arrangements of the SP reform, replace with
           registered in the SR and who are in the first                a new PDOI 3 that encapsulates the main results sought under the
           consumption quintile in the project area (of                 original indicator, which remain under the control of the project and to
           which at least 45 percent are female)                        be achieved during the proposed extension period as follows:
                                                                        New PDOI no. 3: The SR is using a scoring formula with a simulated
                                                                        targeting accuracy of over 65 percent5 and is operational beyond the

5 The original PDOI 3 aimed to recertify the beneficiaries of the RAMED, DAAM and Tayssir programs with a new scoring formula, with a higher targeting accuracy,
such as at least 65 percent of the SR beneficiaries will belong to the poorest quintile. This result could be achieved, but over a longer implementation period than 21
months. The new revised PDOI 3 measures the achievement of the preconditions for this result, that the Council of Government has adopted a SR formula with a
simulated targeting accuracy of over 65 percent, and that the formula is used by the SR to score the applicants for SSN programs. It is worth noting that the
simulations based on the current version of the PMT formula developed by HCP and adopted by the Council of Government correctly identifies 70 percent of the
beneficiaries from the poorest quintile. It ensures that the SR formula is used to score the applicants of RAMED, DAAM, Tayssir or their successor programs over and
above the pilot phase (estimated at 500,000 people enrolled) for an additional 3.5 million people. The process of enrollment and recertification for RAMED, DAAM,
Tayssir or their successor program will continue after the end of the program and, with sufficient time, will lead to the achievement of the original PDOI 3 (all



                                                                                 12
           The World Bank
           Identity and Targeting for Social Protection Project (P155198)


                                                                       pilot phase and has processed applications for at least 4 million
                                                                       individuals.

                                                                INTERMEDIATE RESULTS INDICATORS

     a)    Intermediary Indicator: Share of new                        Drop as no longer relevant given that the UIN (IDCS) will not be
           individuals registered in year t (MASSAR,                   generated by merging demographic information from these databases,
           CNIE, and Register of foreign residents) are                but by a process of direct enrollment of the population.
           communicated electronically to the NPR and
           attributed an UIN)

     b) Intermediary Indicator: Share of beneficiaries                 Increase the end target value from 20 percent to 23 percent, based on
        of Tayssir (or his successor program) in SR                    confirmed achievements during the extended implementation period.
        (Percentage)


     c) Adjustments to the PBCs. The streamlined and revised result framework will (i) retain the final PBC indicators
        for three of the five PBCs, namely PBCs 1, 3, and 5; (ii) revise the target values for PBC 2 from 25 million
        enrollments to 7 million; (iii) and replace the end-results for PBC 5, whose achievement depends on the
        implementation arrangements of the SP reform, with two PBCs indicators that are largely equivalent with the
        original PBCs, but are under the control of the project and could be achieved with the 21-month extension
        period; (iv) eliminate some intermediate PBCs to allow a shift of resources towards the investment component
        (PBCs 1.4, 2.1, 5.2 and 5.3); and (v) adjust the PBCs disbursement schedule.

             •        PBC 1: Number of newborns in the Project Area who have been attributed an UIN (IDCS) through the
                      UIN generator of the NPR and have their UIN (IDCS) printed on their birth certificates. The MoI had
                      made significant progress in the deployment of the IDCS identifier for newborns, reaching a cumulative
                      total of 330,000 identifiers assigned to children since January 2018 and exceeding the annual targets set
                      for PBC 1.2 (47,000 for a period of 12 months) and PBC 1.3 (113,000 for a period of 12 months).
                      However, these PBCs have not been achieved according to the modality initially specified in the
                      verification protocols: the IDCS number is issued by a unique number generator (IDCS software),
                      included in the Civil Registry, and printed in their birth certificates, as the NPR was not yet developed.
                      The IDCS software will also be integrated into the NPR during the enrollment and will be used to
                      attribute UINs. As part of the restructuring, the verification protocol will be changed to recognize the
                      IDCS numbers issued by the UIN generator integrated into the NPR and/or the Civil registry; and will
                      change the period of accounting for the indicator from “calendar year” to “over 12 months,” to allow for
                      a more flexible achievement schedule. The restructuring would also include a new deadline for the
                      achievement of PBC 1.5 (266,000 newborns were assigned an IDCS). The related PBCs 1.2 and PBC 1.3
                      would be completed after the restructuring, while PBC 1.4 (206,000 newborns were assigned an IDCS)
                      will be eliminated after the restructuring.

             •        PBC 2: Population (6 years old and above) for which an UIN has been attributed in the Project Area.
                      The strategic and operational orientations of the project require revising the target value and amount
                      allocated for the PBC 2. The two (2) PBC indicators (PBC 2.1: an UIN has been attributed to 19 million
                      individuals (6 years old and above); and (PBC 2.2: an UIN has been attributed to 25 million individuals (6

applicants are scored recertified with the new scoring formula, and the targeting accuracy of these program will exceed the share of 65 percent of beneficiaries from
the poorest quintile.



                                                                                13
           The World Bank
           Identity and Targeting for Social Protection Project (P155198)


                      years old and above)) will be replaced without being disbursed by a single PBC (PBC 2: an UIN has been
                      attributed to 7 million individuals (6 years old and above). PBC 2.1 will be eliminated and will not be
                      disbursed while PBC 2.2 will be updated to reflect a new target value of 7 million people to be enrolled
                      by the new closing date of the project. The original target values of the associated PDOI were 26 million6
                      (estimated for year 5 of project implementation) and 25 million (estimated for year 4 of project
                      implementation). The targets’ downward revision results from the adoption of a new approach to create
                      and generate IDCS numbers from merging existing databases for the active enrollment of individuals.
                      This approach contributes to reducing the number of individuals that can be enrolled by September
                      2023 to about 8 million individuals, of which 7 million will be 6 years and above. As mentioned in
                      paragraph 10 (points (i) to (v)), the reduction in the quantitative target is compensated by an increase in
                      the quality of the IDCS numbers that are generated. The current approach sets up a more accurate and
                      inclusive IDCS number and NPR, with new functionalities of digital authentication, eKYC and verification
                      services, and better integration into the SR. The NPR and IDSCS initially focused on the most vulnerable
                      part of the population (the beneficiaries of SSN programs). This new PBC 2 will have a target of 7 million
                      individuals (6 years and above) enrolled, and a value of US$4 million.

             •        PBC 3: NPR, UIN and NIA legally established and operational. The review of PBC 3 has shown important
                      progress in the approval and adoption of the legal framework related to the NPR, the UIN, and the NIA
                      with the publication of Law 72-18 and its application decrees. However, the achievement of the PBC 3.3
                      (NIA has been established and is operational) has been delayed compared to the initial plan. The
                      restructuring would include a new deadline for the operationalization of the agency while transitional
                      measures have been set by the MoI to ensure a rapid start of the implementation of the NPR and the SR.

             •        PBC 5: Share of the new applicants to RAMED, DAAM, and Tayssir programs registered in the SR. A
                      review of PBC 5 was carried out to take into account the new SR deployment strategy and the overhaul
                      of social programs (RAMED, DAAM, and TAYSSIR) within the ongoing SP reform. The PBC 5.1 was
                      technically achieved, and a new PMT formula was validated by the IMSC on June 10, 2021. The proposed
                      restructuring will eliminate two intermediate results yet to be disbursed: PBC 5.2 (40 percent of new
                      RAMED, DAAM, and TAYSSIR applicants, during a year, are registered with SR (including 45 percent
                      Female) and PBC 5.3 (80 percent of new RAMED, DAAM, and TAYSSIR applicants, during a year, are
                      registered with the SR (including 45 percent female). The final indicator PBC 5.4 (100 percent of new
                      applicants to RAMED, DAAM, and TAYSSIR programs in a given calendar year, have been registered in
                      the SR) will be revised, given that its achievement depends on the specific design and implementation
                      arrangements of the SP reform to be finalized. It will be replaced with two PBCs that encapsulate the
                      main results sought under the original indicator, under the control of the project and which could be
                      achieved during the proposed extension period: PBC 5.2: the SR is using a scoring formula with a
                      simulated targeting accuracy of over 65 percent; and PBC 5.3: the SR is operational beyond the pilot
                      phase and has processed applications for at least 4 million individuals.




6Before the restructuring, the final target for the PDOI 2 “Population (6 years old and above) for which an UIN has been attributed in the Project Area” was 26 million
people in year 5 of project implementation. The two PBC indicators associated with PDOI 2 estimated a level of enrollment of 19 million in the 3rd year of project
implementation (PBC 2.1) and 25 million in the 4th year of project implementation respectively.



                                                                                 14
         The World Bank
         Identity and Targeting for Social Protection Project (P155198)




Table 3. Summary description of the Proposed Changes to the PBCs and Current Status
         PBC Descriptions                               Initial                                        Action

PBC 1: Number of newborns            PBC 1.1–The UIN motor-generator for the        Achieved and disbursed
attributed an UIN at civil           NPR is operational and has been used to
registration in the project area.    attribute UINs to newborns in Casablanca
                                     through civil registration.
                                     PBC 1.2–47,000 newborns in the Project         Change NPR with “NPR or Civil Registry,” as
                                     Area have been attributed an UIN through       both are fundamental ID registries. Also
                                     the UIN generator of the NPR and have their    change “calendar year” to “over 12 months
                                     UIN printed on the birth certificates.         period” in the verification protocol.
                                     PBC 1.3–113,000 newborns in the Project        Change NPR with “NPR or Civil Registry,” as
                                     Area have been attributed an UIN through       both are fundamental ID registries. Replace
                                     the UIN generator of the NPR and have their    “calendar year” with “over 12 months
                                     UIN printed on the birth certificates.         period” in the verification protocol.
                                     PBC 1.4–206,000 newborns in the Project        Not disbursed to be eliminated
                                     Area have been attributed an UIN through
                                     the UIN generator of the NPR and have their
                                     UIN printed on the birth certificates.
                                     PBC 1.5–266,000 newborns in the Project        Replace NPR with “NPR or Civil Registry,” as
                                     Area have been attributed an UIN through       both are fundamental ID registries. Replace
                                     the UIN generator of the NPR and have their    “calendar year” with “over 12 months
                                     UIN printed on the birth certificates.         period” in the verification protocol.
PBC 2: Population (6 years old and   PBC 2.1–An UIN has been attributed to 19       Not disbursed to be eliminated
above) for which an UIN has been     million individuals (6 years old and above)
attributed in the project area 16    PBC 2.2–An UIN has been attributed to 25       PBC 2.2 – An UIN has been attributed to 7
                                     million individuals (6 years old and above).   million individuals (6 years old and above).
                                                                                    Change the value of the PBC 2.2. to US$4
                                                                                    million.
PBC 3: NPR, UIN, and NIA legally     PBC 3.1–Draft law(s) for NPR, UIN, and NIA     Achieved and disbursed
established and operational          has/have been validated by the IMSC and
                                     transmitted to the Government’s General
                                     Secretariat.
                                     PBC 3.2–The Council of Government has          Achieved and disbursed
                                     approved the draft law(s) for NPR, UIN, and
                                     NIA.
                                     PBC 3.3–NIA has been established and is        No change required
                                     operational.
PBC 4: SR legally established and    PBC 4.1–Draft law for the SR has been          Achieved and disbursed
operational to become a functional   validated by the IMSC and transmitted to
entry point for SSNs.                the Government’s General Secretariat.
                                     PBC 4.2–The Council of Government has          Achieved and disbursed
                                     approved the draft law for the SR.
                                     PBC 4.3–The law for the SR, setting forth      Achieved and disbursed
                                     that the SR is the entry point for the
                                     RAMED, DAAM, and Tayssir programs and
                                     for any new safety net programs to be
                                     introduced by the Borrower, has been
                                     published in the National Gazette.


                                                                  15
        The World Bank
        Identity and Targeting for Social Protection Project (P155198)


PBC 5: Share of new applicants to   PBC 5.1– The questionnaire and the PMT          Replaced with “The questionnaire and the
RAMED, DAAM and Tayssir             formula of the SR have been validated by        PMT formula of the SR have been validated
programs registered in the SR.      the IMSC after testing them on a                by the IMSC after testing them on a
                                    representative sample of beneficiaries of       representative sample of beneficiaries of
                                    RAMED, DAAM and Tayssir programs.               RAMED and Tayssir programs”
                                    PBC 5.2– 40 percent of new applicants to        Replaced with “The SR has been piloted and
                                    RAMED, DAAM and Tayssir programs in a           its scoring formula used to score the new
                                    given calendar year, have been registered in    applicants to RAMED, DAAM and Tayssir
                                    the SR.                                         programs (or their successor thereto) has a
                                                                                    simulated targeting accuracy of over 65%”
                                    PBC 5.3– 80 percent of new applicants to        Replaced with “The SR is operational and at
                                    RAMED, DAAM and Tayssir programs in a           least 4 million of new applicants to RAMED,
                                    given calendar year, have been registered in    DAAM and Tayssir programs (or their
                                    the SR.                                         successors thereto) have been registered in
                                                                                    the SR”
                                    PBC 5.4– 100 percent of new applicants to       Not disbursed to be eliminated
                                    RAMED, DAAM, and Tayssir programs in a
                                    given calendar year, have been registered in
                                    the SR.

    d) Reallocation of project funds between categories. This proposed change will entail the reallocation of savings in
       the amount of US$12 million from disbursement category (1) to category (2). This reallocation is needed to
       cover the larger volume of expenditures related to goods, consultants, and non-consultant services resulting
       from the more ambitious strategy for the design and the implementation of the NPR and the SR. These
       expenditures are associated to contracts already signed, for the design and the implementation of the NPR and
       the SR, in addition to the strengthening of the institutional capacity for M&E, as detailed in table below.

Table 4: Investment Amounts by Component including the Changes related to the NPR/SR Implementation Strategy
Component (US$ Million)                             Initial Amount         Contract Amount*          Gap
    Contract 1: Design, supply, implementation,
                                                                                   30,030,000
    launch, and maintenance of NPR IS
    Contract 2: Supply, design, launching, and
1                                                        7,000,000                 8,152,000                 32,629,000
    ground maintenance. Biometric of NPR IS
    Contract 3: Support for the establishment of
                                                                                   1,447,000
    the NPR
2 Design and development of the SR IS                   20,000,000                 3,132,000                -16,868,000
    Project management, institutional capacity
3                                                        4,750,000                  945,000                  -3,805,000
    building, and M&E
Total                                                   31,750,000                 43,706,000                11,956,000
* Total acquisition component of signed contracts (excluding maintenance)

    e) Adjustments to the original component cost. To meet the current project costs resulting from the GoM’s
       decision to adopt a more ambitious version of the project, such as the new approach adopted for the creation of
       the NPR and the SR which had a direct impact on the initial design in terms of system architecture and cost, the
       cost of components 2 and 3 will be reduced by US$25 million and US$3.75 million respectively, to increase the
       cost of component 1 by US$28.75 million for a total of US$73.75 million as shown in Table 4.




                                                              16
           The World Bank
           Identity and Targeting for Social Protection Project (P155198)


Table 5: Change in Component Cost
Component Name                                      Current Cost (US$ Million)               Proposed Cost (US$ Million)
Design and Development of the National                         45                                      73.75
Population Register (NPR) with a Unique
Identifying   Number      (UIN),    and
Establishment of a National Identity
Agency (NIA)
Design and Development of a SR                                 50                                         25
Project Management, Capacity Building,                        4.75                                        1
and M&E
                                                              99.75                                     99.75

      f)   Changes to the EEPs. The project EEPs will be changed to solely include the DAAM program. All the remaining
           planned disbursements will be covered by the DAAM program. This program has extensively grown. Transfers
           increased sensitively during the last 3 years to reach approximately US$50 Million7 in 2019. The budget forecasts
           transmitted by the Ministry of Economy and Finance confirmed increasing annual budget allocations to DAAM in
           comparison to 2019. Funds available for PBCs, equivalent to US$29 million, following the restructuring, are
           expected to be fully disbursed against DAAM expenditures.

16.        There are no outstanding audits. All audit reports covering exercises 2017-2020 were received.




7
    Data source: 2020 MEF Special funds execution report: https://www.finances.gov.ma/Publication/db/2020/cst-plf2020-fr.pdf


                                                                 17
       The World Bank
       Identity and Targeting for Social Protection Project (P155198)



III. SUMMARY OF CHANGES

                                                                        Changed   Not Changed
Results Framework                                                         ✔
PBCs                                                                      ✔
Components and Cost                                                       ✔
Loan Closing Date(s)                                                      ✔
Reallocation between Disbursement Categories                              ✔
Disbursement Estimates                                                    ✔
Implementation Schedule                                                   ✔
Implementing Agency                                                                   ✔
DDO Status                                                                            ✔
Project's Development Objectives                                                      ✔
Cancellations Proposed                                                                ✔
Disbursements Arrangements                                                            ✔
Overall Risk Rating                                                                   ✔
Safeguard Policies Triggered                                                          ✔
EA category                                                                           ✔
Legal Covenants                                                                       ✔
Institutional Arrangements                                                            ✔
Financial Management                                                                  ✔
Procurement                                                                           ✔
Other Change(s)                                                                       ✔
Economic and Financial Analysis                                                       ✔
Technical Analysis                                                                    ✔
Social Analysis                                                                       ✔
Environmental Analysis                                                                ✔


IV. DETAILED CHANGE(S)




                                                          18
                                               The World Bank
                                               Identity and Targeting for Social Protection Project (P155198)


OPS_DE TAILE DCHA NGES_ COMPONE NTS_TABLE




COMPONENTS
                                                                                 Current
Current                                                                                                     Proposed                                    Proposed
                                                                                    Cost          Action
Component Name                                                                                              Component Name                            Cost (US$M)
                                                                                 (US$M)
Design and Development of the                                                                               Design and Development of
National Population Register                                                                                the National Population
(NPR) with a Unique Identifying                                                                             Register (NPR) with a Unique
                                                                                   45.00         Revised                                                    73.75
Number (UIN), and                                                                                           Identifying Number (UIN), and
Establishment of a National                                                                                 Establishment of a National
Identity Agency (NIA)                                                                                       Identity Agency (NIA)
Design and Development of a                                                                                 Design and Development of a
                                                                                   50.00         Revised                                                    25.00
Social Registry (SR)                                                                                        Social Registry (SR)
Project Management, Capacity                                                                                Project Management, Capacity
Building, and Monitoring and                                                        4.75         Revised    Building, and Monitoring and                      1.00
Evaluation                                                                                                  Evaluation
 Front end fee                                                                      0.25                    Front end fee                                     0.25

 TOTAL                                                                           100.00                                                                    100.00



 OPS_DE TAILE DCHA NGES_ LOANCLOSING_TABLE




 LOAN CLOSING DATE(S)

                                                                                     Original                 Revised Proposed                 Proposed Deadline
Ln/Cr/Tf                                                     Status                  Closing                Closing(s) Closing                    for Withdrawal
                                                                                                                                                     Applications
IBRD-87180                                                   Effective           31-Dec-2021                            30-Sep-2023                     31-Jan-2024

OPS_DE TAILE DCHA NGES_REA LLOCAT ION _TABLE




           REALLOCATION BETWEEN DISBURSEMENT CATEGORIES

                                                                                                                                               Financing %
                                                  Current Allocation            Actuals + Committed             Proposed Allocation
                                                                                                                                               (Type Total)
                                                                                                                                            Current        Proposed

            IBRD-87180-001                               |    Currency: USD

          iLap Category Sequence No: 1                                            Current Expenditure Category: Eligible Expndture Parts1.2;1.3;2.3

                                                      68,000,000.00                  27,000,000.00                 56,000,000.00          100.00              100.00


          iLap Category Sequence No: 2                                            Current Expenditure Category: GD;TRG;IOC;NCS;CS 1.2;1.3;2.2;2.3




                                                                                                  19
                                             The World Bank
                                             Identity and Targeting for Social Protection Project (P155198)



                                                    31,750,000.00                  12,556,994.00                  43,750,000.00    100.00            100.00


          iLap Category Sequence No: 3                                          Current Expenditure Category: PREMIUM FOR CAPS/COLLARS

                                                             0.00                            0.00                          0.00                            0


           Total                                    99,750,000.00                  39,556,994.00                   99,750,000.00

OPS_DE TAILE DCHA NGES_ DISBURSEMENT_TABLE




DISBURSEMENT ESTIMATES

Change in Disbursement Estimates
Yes

      Year                                                                                                    Current                          Proposed
      2017                                                                                           20,000,000.00                       28,820,000.00

      2018                                                                                           23,000,000.04                          6,000,000.00

      2019                                                                                           21,000,000.00                       23,000,000.00

      2020                                                                                           24,000,000.00                       21,734,816.00

      2021                                                                                           12,000,000.00                          4,900,000.00

      2022                                                                                                       0.00                    12,545,000.00

      2023                                                                                                       0.00                       3,000,184.00

.




                                                                                                20
                                  The World Bank
                                  Identity and Targeting for Social Protection Project (P155198)



.
                                                                                          Results framework
                                                                                         COUNTRY: Morocco
                                                                          Identity and Targeting for Social Protection Project

Project Development Objectives(s)
The objective of the Project is to expand coverage of a unique identifying number for the Moroccan population and foreign residents, and to improve
targeting of Social Safety Nets in the Project Area.

Project Development Objective Indicators by Objectives/ Outcomes
    RESULT_FRAME_TBL_ PD O




                  Indicator Name                PBC Baseline                                           Intermediate Targets                                              End Target

                                                                1              2              3             4             5            6                7
Expand coverage of a unique identifying number for the Moroccan population and foreign residents
Number of newborns
for whom an UIN has
been attributed
                     PBC 1,
through civil               0.00                               0.00           41.00         128.00        161.00         170.00      220.00           266.00           266.00
                     1
registration in the
project area (Number
(Thousand))

                                               Rationale:
Action: This indicator This PDO indicator is revised as part of this restructuring to confirm the intermediate target values achieved and propose new ones for the extended implementation
has been Revised       period as agreed with the client.


                       Number of
                       newborns for whom
                       an UIN has been
                                                      0.00     0.00           18.00         57.00         70.00          77.00       100.00           120.00           120.00
                       attributed through
                       civil registration in
                       the project area -


                                                                                                     21
                              The World Bank
                              Identity and Targeting for Social Protection Project (P155198)



RESULT_FRAME_TBL_ PD O




              Indicator Name                PBC Baseline                                                       Intermediate Targets                                                     End Target

                                                                 1                2                3                4                5                6                7
                   Female (Number
                   (Thousand))

                                      Rationale:
                   Action: This
                                      This PDO indicator is revised as part of this restructuring to confirm the intermediate target values achieved and propose new ones for the extended implementation
                   indicator has been
                                      period as agreed with the client.
                   Revised

Population (six years
old and above) for
which an UIN has been PBC 2,
                              0.00                             0.00             0.00             0.00             0.00             0.00             2.50             7.00             7.00
attributed in the     2, 3, 3
project area (Milion)
(Number)

                                           Rationale:
Action: This indicator This PDO indicator is revised as part of this restructuring to confirm the intermediate target values achieved and propose new ones for the extended implementation
has been Revised       period as agreed with the client.


                   Population (six years
                   old and above) for
                   which an UIN has
                   been attributed in             0.00         0.00             0.00             0.00             0.00             0.00             1.00             3.00             3.00
                   the project area
                   (Million) - Female
                   (Number)




                                                                                                            22
                             The World Bank
                             Identity and Targeting for Social Protection Project (P155198)



RESULT_FRAME_TBL_ PD O




              Indicator Name              PBC Baseline                                                         Intermediate Targets                                                     End Target

                                                                 1                2                3                4                5                6                7
                                      Rationale:
                   Action: This
                                      This PDO indicator is revised as part of this restructuring to confirm the intermediate target values achieved and propose new ones for the extended implementation
                   indicator has been
                                      period as agreed with the client.
                   Revised

Improve targeting of Social Safety Nets in the project area
Share of beneficiaries
of the RAMED, Tayssir,
and DAAM programs
registered in the Social
                         PBC 4,
Registry (SR) and who           0.00                           0.00             0.00             0.00             65.00            65.00                                              65.00
                         5
are in the first
consumption quintile in
the project area
(Percentage)
Action: This indicator
has been Marked for
Deletion
                   Share of
                   beneficiaries of the
                   RAMED, Tayssir, and
                   DAAM programs
                   registered in the
                   Social Registry (SR)       0.00             0.00             0.00             0.00             40.00            40.00                                              26.00
                   and who are in the
                   first consumption
                   quintile in the
                   project area -
                   Female (Percentage)



                                                                                                            23
                             The World Bank
                             Identity and Targeting for Social Protection Project (P155198)



 RESULT_FRAME_TBL_ PD O




               Indicator Name              PBC Baseline                                            Intermediate Targets                                                        End Target

                                                           1              2              3              4                 5                6                 7
                    Action: This
                    indicator has been
                    Marked for Deletion
The SR is using a
scoring formula with a
simulated targeting
accuracy of over 65
percent and is         PBC 4,
                              No                          No             No            No             No                No                No                Yes              Yes
operational beyond the 5
pilot phase and has
processed applications
for at least 4 million
individuals (Yes/No)

                                          Rationale:
Action: This indicator is As part of the restructuring, this indicator will replace the original PDO indicator 3: Share of beneficiaries of the RAMED, Tayssir, and DAAM programs registered in
New                       the Social Register (SR) and who are in the first consumption quintile in the Project Area (of which at least 40 percent are female) (Percentage).


PDO Table SPACE

Intermediate Results Indicators by Components
 RESULT_FRAME_TBL_ IO




               Indicator Name              PBC Baseline                                            Intermediate Targets                                                        End Target

                                                           1              2              3              4                 5                6                 7
Design and Development of the National Population Register (NPR) with a Unique Identifying Number (UIN), and Establishment of a National Identity Agency (NIA)
Direct project
beneficiaries (Number                            0.00     0.00           41.00         128.00         161.00            170.00            2,720.00          7,266.00         7,266.00
(Thousand))


                                                                                                24
                             The World Bank
                             Identity and Targeting for Social Protection Project (P155198)



RESULT_FRAME_TBL_ IO




              Indicator Name            PBC Baseline                                                           Intermediate Targets                                                     End Target

                                                                 1                2                3                4                5                6                7
                                       Rationale:
Action: This indicator This PDO indicator is revised as part of this restructuring to confirm the intermediate target values achieved and propose new ones for the extended implementation
has been Revised       period as agreed with the client.


                   Direct project
                   beneficiaries -
                                              0.00             0.00             18.00            57.00            70.00            77.00            1,100.00         3,370.00         3,370.00
                   Female (Number
                   (Thousand))

                                      Rationale:
                   Action: This
                                      This PDO indicator is revised as part of this restructuring to confirm the intermediate target values achieved and propose new ones for the extended implementation
                   indicator has been
                                      period as agreed with the client.
                   Revised

Share of the civil
registry office (Bureaux
d'Etat Civil, BEC)                            0.00             5.00             10.00            15.00            15.00            15.00            20.00            25.00            25.00
connected to an UIN
generator (Percentage)

                                       Rationale:
Action: This indicator This PDO indicator is revised as part of this restructuring to confirm the intermediate target values achieved and propose new ones for the extended implementation
has been Revised       period as agreed with the client.


Share of new
individuals registered
in year t (MASSAR,
CNIE and Register of                          0.00             0.00             0.00             70.00            80.00            85.00                                              85.00
foreign residents) are
communicated
electronically to the

                                                                                                            25
                              The World Bank
                              Identity and Targeting for Social Protection Project (P155198)



RESULT_FRAME_TBL_ IO




              Indicator Name                PBC Baseline                                         Intermediate Targets                                                    End Target

                                                            1              2              3           4              5                 6                7
NPR and attributed a
UIN (Percentage)
Action: This indicator
has been Marked for
Deletion
                   Share of new
                   individuals
                   registered in year t
                   (MASSAR, CNIE and
                   Register of foreign
                   residents) are                 0.00     0.00           0.00          40.00        40.00          40.00                                              40.00
                   communicated
                   electronically to the
                   NPR and attributed
                   a UIN - Female
                   (Percentage)

                   Action: This
                   indicator has been
                   Marked for Deletion
Number of
programs/services that
                                                  0.00     0.00           0.00          0.00         0.00           0.00             0.00             3.00             3.00
have included the UIN
in their MIS (Number)

                                           Rationale:
Action: This indicator This PDO indicator is revised as part of this restructuring to confirm the intermediate target values achieved and propose new ones for the extended implementation
has been Revised       period as agreed with the client.


Design and Development of a Social Registry (SR)

                                                                                                26
                       The World Bank
                       Identity and Targeting for Social Protection Project (P155198)



RESULT_FRAME_TBL_ IO




              Indicator Name    PBC Baseline                                                   Intermediate Targets                                                      End Target

                                                     1              2              3                4                5                 6                7
Number of
beneficiaries of
RAMED, Tayssir, and
                                      9.30          9.30           9.30           9.30             9.30             9.30             9.30             9.30             9.30
DAAM (or their
successor programs)
(Million) (Number)

                               Rationale:
Action: This indicator This PDO indicator is revised as part of this restructuring to confirm the intermediate target values achieved and propose new ones for the extended implementation
has been Revised       period as agreed with the client.


Share of new
applicants to RAMED,
DAAM, and Tayssir
programs (or their                    0.00          0.00           0.00           0.00             0.00             0.00             0.00             100.00           100.00
successor programs)
registered in the SR
(Percentage)

                               Rationale:
Action: This indicator This PDO indicator is revised as part of this restructuring to confirm the intermediate target values achieved and propose new ones for the extended implementation
has been Revised       period as agreed with the client.


Share of beneficiaries
of RAMED/DAAM (or
their successor                       0.00          0.00           0.00           0.00             0.00             0.00             0.00             40.00            40.00
programs) in SR
(Percentage)

Action: This indicator Rationale:
has been Revised       This PDO indicator is revised as part of this restructuring to confirm the intermediate target values achieved and propose new ones for the extended implementation

                                                                                             27
                       The World Bank
                       Identity and Targeting for Social Protection Project (P155198)



RESULT_FRAME_TBL_ IO




              Indicator Name    PBC Baseline                                                   Intermediate Targets                                                      End Target

                                                         1          2              3                4                5                 6                7
                               period as agreed with the client.


Share of beneficiaries
of Tayssir (or his
                                      0.00              0.00       0.00           0.00             0.00             0.00             0.00             23.00            23.00
successor program) in
the SR (Percentage)

                               Rationale:
Action: This indicator This PDO indicator is revised as part of this restructuring to confirm the intermediate target values achieved and propose new ones for the extended implementation
has been Revised       period as agreed with the client.


Share of claims and
grievances of SR
beneficiaries
documented,                           0.00              0.00       0.00           0.00             0.00             0.00             0.00             100.00           100.00
processed, and
resolved within 30 days
(Percentage)

                               Rationale:
Action: This indicator This PDO indicator is revised as part of this restructuring to confirm the intermediate target values achieved and propose new ones for the extended implementation
has been Revised       period as agreed with the client.


Survey on a random
sample beneficiaries of
                                      No                No         No             No               Yes              No               No               Yes              Yes
Tayssir and RAMED
(Yes/No)

Action: This indicator Rationale:
has been Revised       This PDO indicator is revised as part of this restructuring to confirm the intermediate target values achieved and propose new ones for the extended implementation


                                                                                             28
                              The World Bank
                              Identity and Targeting for Social Protection Project (P155198)



    RESULT_FRAME_TBL_ IO




                      Indicator Name    PBC Baseline                                                 Intermediate Targets                                                End Target

                                                                 1           2             3             4             5               6                7
                                       period as agreed with the client.


Project Management, Capacity Building, and Monitoring and Evaluation
Operational audit
                                              No                No         No             No           No             No             No               Yes              Yes
conducted (Yes/No)

                                       Rationale:
Action: This indicator This PDO indicator is revised as part of this restructuring to confirm the intermediate target values achieved and propose new ones for the extended implementation
has been Revised       period as agreed with the client.


Capacity building
                                              No                Yes        Yes            No           Yes            Yes            Yes              Yes              Yes
(Yes/No)

                                       Rationale:
Action: This indicator This PDO indicator is revised as part of this restructuring to confirm the intermediate target values achieved and propose new ones for the extended implementation
has been Revised       period as agreed with the client.


IO Table SPACE


                                                                                 Performance-Based Conditions Matrix
DLI I N0107 5134 A CTI ON




PBC 1                                                 Number of newborns for whom an UIN has been attributed through civil registration in the project area

 Type of PBC                                          Scalability                  Unit of Measure       Total Allocated Amount (USD)        As % of Total Financing Amount

 Outcome                                              No                           Text                                     18,000,000.00 0.00

 Period                                               Value                                                     Allocated Amount (USD) Formula


                                                                                                  29
                            The World Bank
                            Identity and Targeting for Social Protection Project (P155198)




                                                 No UIN motor generator and 0 newborns with
 Baseline
                                                 UIN printed on their birth certificate
                                                 The UIN motor generator for the NPR or Civil
                                                 registry is operational and has been used to
 Calendar Year 2017                                                                                                    6,000,000.00
                                                 attribute UINs to newborns in Casablanca through
                                                 civil registration
 Calendar Year 2018                              47,000                                                                5,000,000.00

 Calendar Year 2019                              113,000                                                               4,000,000.00

 Calendar Year 2020                              206,000                                                               2,000,000.00

 Calendar Year 2021                              266,000                                                               1,000,000.00

 Calendar Year 2022

 Calendar Year 2023

 Action: This PBC has been Revised. See below.
DLI I N0107 7020 A CTI ON




PBC 1                                            Number of newborns for whom an UIN has been attributed through civil registration in the project area

 Type of PBC                                     Scalability                    Unit of Measure      Total Allocated Amount (USD)     As % of Total Financing Amount

 Outcome                                         No                             Text                                 16,000,000.00 37.50

 Period                                          Value                                                     Allocated Amount (USD) Formula
                                                 No UIN motor generator and 0 newborns with UIN
 Baseline
                                                 printed on their birth certificate
 Calendar Year 2017                                                                                                            0.00
                                                 The UIN motor generator for the NPR or Civil
 Calendar Year 2018                                                                                                    6,000,000.00
                                                 registry is operational and has been used to
                                                                                                30
                            The World Bank
                            Identity and Targeting for Social Protection Project (P155198)




                                                 attribute UINs to newborns in Rabat through civil
                                                 registration
 Calendar Year 2019                                                                                                              0.00

 Calendar Year 2020                                                                                                              0.00

 Calendar Year 2021                                                                                                              0.00
                                                 47000 newborns with UIN on birth certificates;
 Calendar Year 2022                              and 113000 newborns with UIN on birth                                  9,000,000.00
                                                 certificates
 Calendar Year 2023                              266000 newborns with UIN on birth certificates                         1,000,000.00
DLI I N0107 5137 A CTI ON




PBC 2                                            Population (six years old and above) for which an UIN has been attributed in the project area (Milion)

 Type of PBC                                     Scalability                    Unit of Measure      Total Allocated Amount (USD)       As % of Total Financing Amount

 Outcome                                         No                             Number                                  6,000,000.00 0.00

 Period                                          Value                                                      Allocated Amount (USD) Formula

 Baseline                                        0.00

 Calendar Year 2017                              0.00                                                                            0.00

 Calendar Year 2018                              0.00                                                                            0.00

 Calendar Year 2019                              19.00                                                                  4,000,000.00

 Calendar Year 2020                              25.00                                                                  2,000,000.00

 Calendar Year 2021                              --                                                                              0.00



                                                                                               31
                            The World Bank
                            Identity and Targeting for Social Protection Project (P155198)




 Calendar Year 2022

 Calendar Year 2023

 Action: This PBC has been Revised. See below.
DLI I N0107 7021 A CTI ON




PBC 2                                            Population (six years old and above) for which an UIN has been attributed in the project area (Milion)

 Type of PBC                                     Scalability                    Unit of Measure       Total Allocated Amount (USD)       As % of Total Financing Amount

 Outcome                                         No                             Number                                   4,000,000.00 0.00

 Period                                          Value                                                       Allocated Amount (USD) Formula

 Baseline                                        0.00

 Calendar Year 2017                              0.00                                                                             0.00

 Calendar Year 2018                              0.00                                                                             0.00

 Calendar Year 2019                              0.00                                                                             0.00

 Calendar Year 2020                              0.00                                                                             0.00

 Calendar Year 2021                              0.00                                                                             0.00

 Calendar Year 2022                              2.50                                                                             0.00

 Calendar Year 2023                              7.00                                                                    4,000,000.00




                                                                                               32
                            The World Bank
                            Identity and Targeting for Social Protection Project (P155198)



DLI I N0107 5141 A CTI ON




                                                 National Population Register (NPR) Unique Identifying Number (UIN) and the National Registries’ Agency (NRA) legally
PBC 3
                                                 established and operational

 Type of PBC                                     Scalability                    Unit of Measure      Total Allocated Amount (USD)     As % of Total Financing Amount

 Outcome                                         No                             Text                                 14,000,000.00 0.00

 Period                                          Value                                                     Allocated Amount (USD) Formula

 Baseline                                        No draft law for NPR, the UIN, and the NIA
                                                 Draft law(s) for NPR, UIN and NIA has/have been
 Calendar Year 2017                              validated by the IMSC and transmitted to the                         4,000,000.00
                                                 Government’s General Secretariat.
                                                 The Council of Government has approved the
 Calendar Year 2018                                                                                                   6,000,000.00
                                                 draft law(s) for NPR, UIN and NIA.
 Calendar Year 2019                                                                                                            0.00

 Calendar Year 2020                              The NIA has been established and operational                         4,000,000.00

 Calendar Year 2021                                                                                                            0.00

 Calendar Year 2022

 Calendar Year 2023

 Action: This PBC has been Revised. See below.




                                                                                                33
                            The World Bank
                            Identity and Targeting for Social Protection Project (P155198)



DLI I N0108 1260 A CTI ON




                                                 National Population Register (NPR) Unique Identifying Number (UIN) and the National Registries’ Agency (NRA) legally
PBC 3
                                                 established and operational

 Type of PBC                                     Scalability                    Unit of Measure      Total Allocated Amount (USD)       As % of Total Financing Amount

 Outcome                                         No                             Text                                   14,000,000.00 100.00

 Period                                          Value                                                      Allocated Amount (USD) Formula

 Baseline                                        No draft law for NPR, the UIN, and the NIA
                                                 Draft law(s) for NPR, UIN and NIA has/have been
 Calendar Year 2017                              validated by the IMSC and transmitted to the                           4,000,000.00
                                                 Government’s General Secretariat.
 Calendar Year 2018                                                                                                              0.00
                                                 The Council of Government has approved the
 Calendar Year 2019                                                                                                     6,000,000.00
                                                 draft law(s) for NPR, UIN and NIA.
 Calendar Year 2020                                                                                                              0.00

 Calendar Year 2021                                                                                                              0.00

 Calendar Year 2022                             The NIA has been established and operational                            4,000,000.00

 Calendar Year 2023                                                                                                              0.00
DLI I N0107 5144 A CTI ON




PBC 4                                            SR legally established and operational to become a functional entry point for SSNs

 Type of PBC                                     Scalability                    Unit of Measure      Total Allocated Amount (USD)       As % of Total Financing Amount

 Output                                          No                             Text                                   11,000,000.00 0.00

 Period                                          Value                                                      Allocated Amount (USD) Formula

                                                                                               34
                            The World Bank
                            Identity and Targeting for Social Protection Project (P155198)




 Baseline                                        No draft law for the SR
                                                 Draft law for the SR has been validated by the
 Calendar Year 2017                              IMSC and transmitted to the Government’s                                3,000,000.00
                                                 General Secretariat
                                                 The Council of Government has approved the
 Calendar Year 2018                                                                                                      5,000,000.00
                                                 draft law for the SR
 Calendar Year 2019                                                                                                              0.00

 Calendar Year 2020                                                                                                              0.00
                                                 The law for the SR, setting forth that the SR is the
                                                 entry point for the RAMED, DAAM and Tayssir
 Calendar Year 2021                              programs and for any new safety net programs to                         3,000,000.00
                                                 be introduced by the Borrower, has been
                                                 published in the National Gazette
 Calendar Year 2022

 Calendar Year 2023

 Action: This PBC has been Revised. See below.
DLI I N0108 1296 A CTI ON




PBC 4                                            SR legally established and operational to become a functional entry point for SSNs

 Type of PBC                                     Scalability                    Unit of Measure         Total Allocated Amount (USD)    As % of Total Financing Amount

 Output                                          No                             Text                                    11,000,000.00 100.00

 Period                                          Value                                                        Allocated Amount (USD) Formula

 Baseline                                        No draft law for the SR
                                                 Draft law for the SR has been validated by the
 Calendar Year 2017                                                                                                      3,000,000.00
                                                 IMSC and transmitted to the Government’s
                                                                                                  35
                            The World Bank
                            Identity and Targeting for Social Protection Project (P155198)




                                                 General Secretariat

                                                 The Council of Government has approved the
 Calendar Year 2018                                                                                                      5,000,000.00
                                                 draft law for the SR
 Calendar Year 2019                                                                                                              0.00
                                                 The law for the SR, setting forth that the SR is the
                                                 entry point for the RAMED, DAAM and Tayssir
 Calendar Year 2020                              programs and for any new safety net programs to                         3,000,000.00
                                                 be introduced by the Borrower, has been
                                                 published in the National Gazette
 Calendar Year 2021                                                                                                              0.00

 Calendar Year 2022                                                                                                              0.00

 Calendar Year 2023                                                                                                              0.00
DLI I N0107 5145 A CTI ON




PBC 5                                            Share of new applicants to RAMED, DAAM and Tayssir programs registered in the SR

 Type of PBC                                     Scalability                    Unit of Measure         Total Allocated Amount (USD)    As % of Total Financing Amount

 Outcome                                         No                             Text                                    19,000,000.00 0.00

 Period                                          Value                                                        Allocated Amount (USD) Formula

 Baseline                                        No SR
                                                 The questionnaire and the proxy means test
                                                 formula of the SR have been validated by the
 Calendar Year 2017                              IMSC after testing them on a representative                             7,000,000.00
                                                 sample of beneficiaries of RAMED, DAAM and
                                                 Tayssir programs
 Calendar Year 2018                                                                                                              0.00

                                                                                                 36
                            The World Bank
                            Identity and Targeting for Social Protection Project (P155198)




                                                 40 percent of of new applicants to RAMED, DAAM
 Calendar Year 2019                              and Tayssir programs in a given calendar year,                     5,000,000.00
                                                 have been registered in the SR
                                                 80 percent of new applicants to RAMED, DAAM
 Calendar Year 2020                              and Tayssir programs in a given calendar year,                     4,000,000.00
                                                 have been registered in the SR
                                                 100 percent of new applicants to RAMED, DAAM
 Calendar Year 2021                              and Tayssir programs in a given calendar year,                     3,000,000.00
                                                 have been registered in the SR
 Calendar Year 2022

 Calendar Year 2023

 Action: This PBC has been Revised. See below.
DLI I N0107 7023 A CTI ON




PBC 5                                            Share of new applicants to RAMED, DAAM and Tayssir programs registered in the SR

 Type of PBC                                     Scalability                    Unit of Measure    Total Allocated Amount (USD)     As % of Total Financing Amount

 Outcome                                         No                             Text                               11,000,000.00 0.00

 Period                                          Value                                                   Allocated Amount (USD) Formula

 Baseline                                        No SR

 Calendar Year 2017                              --                                                                          0.00

 Calendar Year 2018                              --                                                                          0.00

 Calendar Year 2019                              --                                                                          0.00

 Calendar Year 2020                              --                                                                          0.00


                                                                                              37
                        The World Bank
                        Identity and Targeting for Social Protection Project (P155198)




                                             The questionnaire and the proxy means test
                                             formula of the SR have been validated by the
Calendar Year 2021                           IMSC after testing them on a representative                            7,000,000.00
                                             sample of beneficiaries of RAMED and Tayssir
                                             programs
                                             The SR has been piloted and its scoring formula
                                             used to score the new applicants to RAMED,
Calendar Year 2022                           DAAM and Tayssir programs (or their successor                          2,000,000.00
                                             thereto) has a simulated targeting accuracy of
                                             over 65%.
                                             The SR is operational and at least 4 million of new
                                             applicants to RAMED, DAAM and Tayssir
Calendar Year 2023                                                                                                  2,000,000.00
                                             programs (or their successors thereto) have been
                                             registered in the SR.



                                                               Verification Protocol Table: Performance-Based Conditions
DLI_TBL_VERIFICATI ON




PBC 1                                      Number of newborns for whom an UIN has been attributed through civil registration in the project area
                                           Number of newborns who were attributed a UIN and had it printed on their birth certificate in year t in the project area.
                                           Indicator disaggregated by gender. In 2017, it will be necessary to prove that the motor to generate the UINs is operational
                                           and capable of serving all the Moroccan population (while assuring unicity and proper storage of the information). Between
                                           years 2018 and 2021 the motor will be used to attribute a UIN to newborns. The number will be printed in their birth
                                           certificate and communicated electronically to the NPR.
                                           DLR 1.1 : US$6m: The UIN motor generator for the NPR is operational and has been used to attribute UINs to newborns in
Description
                                           Casablanca through civil registration.
                                           DLR 1.2 : US$5m: 47,000 newborns in the Project Area have been attributed a UIN through the UIN generator of the NPR
                                           and have their UIN printed on the birth certificates.
                                           DLR 1.3 : US$4m: 113,000 newborns in the Project Area have been attributed a UIN through the UIN generator of the NPR
                                           and have their UIN printed on the birth certificates.
                                           DLR 1.4 : US$2m:206,000 newborns in the Project Area have been attributed a UIN through the UIN generator of the NPR

                                                                                            38
            The World Bank
            Identity and Targeting for Social Protection Project (P155198)




                               and have their UIN printed on the birth certificates.
                               DLR 1.5 : US$1m: 266,000 newborns in the Project Area have been attributed a UIN through the UIN generator of the NPR
                               and have their UIN printed on the birth certificates.
                               Data sources / responsible agencies to provide the data will include:
                               (i) The Project Management Unit; (ii) DSCI; (iii) Central data repository of the civil register; (iv) NPR’s management
Data source/ Agency            information system; (v) Database of the CNIE (National ID card); and (vi) Bureau d'Etat Civil (BECs) connected to the central
                               repository of the civil register.

                               General Inspectorate of Territorial Administration (Inspection Générale de l’Administration Territoriale - IGAT).
Verification Entity
                               The IGAT will undertake the following activities:
                               DLR 1.1:
                               (i) Verification that the UIN generator software of the RNP is operational; (ii) verification that all BECs within the
                               municipality of Casablanca have the necessary software, hardware and connections to request and recover the UIN
                               automatically from the UIN generator software, and to store it on the Civil Register’s central repository.
                               The verification will be conducted through site visits and based on inventory on a representative sample of BECs, selected
                               by the IGAT, in the municipality of Casablanca.
                               To conduct these verifications, DSCI will: (i) compile a list with the IT equipment provided for each BEC in Casablanca (self-
                               reported) and will share it with the IGAT at least three weeks before the verification mission; (ii) ensure the functioning of
                               the central civil registration system-monitoring module, to ensure the connectivity of the BECs to the said system and the
                               ability of the BECs to send requests to issue UINs to the UIN generation server, and send them electronically to the central
Procedure
                               system for storage;
                               To conduct these verifications, IGA will: (i) will select and visit a sample of the BECs and verify the accuracy of the self-
                               reported data; (ii) ensure that the list of self-reported equipment which was verified is correct; the BECs are connected to
                               the Civil Register’s central repository; the BECs can send and receive requests to generate the UIN to the UIN generation
                               server; and that the UIN thus generated are stored on the Civil Register’s central repository;
                               The IGAT will produce a verification report on the basis of the verification process. After the verification mission, the IGAT
                               will send to the World Bank: (i) the list of equipment of all Casablanca’s BECs; (ii) the verification report; and (iii) The
                               database with the equipment and the results of the depersonalized verifications, on a representative sample of BECs.
                               DLR 1.2, 1.3, 1.4, 1.5:
                               (i) Verification on an annual basis of the number of newborns, by gender, having a UIN printed on their birth certificates and
                               communicated automatically to the NPR (along with other identify data as required by the NPR’s data model); (ii)
                                                                                   39
                        The World Bank
                        Identity and Targeting for Social Protection Project (P155198)




                                           verification on an annual basis, and on the basis of a sample, that the UIN printed on birth certificates correspond to the
                                           UIN communicated to the NPR (data quality).
                                           To conduct these verifications, the DSIC will: (i) establish annually the list of BECs that has the UIN generator software
                                           operational and integrated into the information system of the Civil Register’s central repository and able to request and
                                           recover the UIN. This list will have to be sent to the IGAT no later than 3 weeks before the beginning of the verification
                                           mission; (ii) establish and communicate to the IGAT a depersonalized database, by gender, of the newborns with UINs from
                                           the NPR; (iii) and ensure the proper functioning of the modules for monitoring of Civil Register and of the NPR to allow the
                                           identification of newborns for whom a UIN was attributed and the verification of the accuracy of the data.
                                           At the end of verification mission, the IGAT will send to the World Bank the report of the mission of verification, showing
                                           the audits carried out and the results of the verifications mentioned above.
                                           The World Bank will participate in demonstration sessions of the operational systems and in interactive presentations of the
                                           interfaces and dashboards of the NPR, during which the World Bank would request to consult, on-site, the database to
                                           produce descriptive statistics and summary tables related to the achievement of the DLR and to ensure the quality of the
                                           information on newborns in the NPR.
DLI_TBL_VERIFICATI ON




PBC 1                                      Number of newborns for whom an UIN has been attributed through civil registration in the project area
                                           Number of newborns who were attributed a UIN and had it printed on their birth certificate in year t in the project area.
                                           Indicator disaggregated by gender. In 2017, it will be necessary to prove that the motor to generate the UINs is operational
                                           and capable of serving all the Moroccan population (while assuring unicity and proper storage of the information). Between
                                           years 2018 and 2023 the motor will be used to attribute a UIN to newborns. The number will be printed in their birth
                                           certificate and communicated electronically to the NPR.
                                           PBC 1.1 : US$6m: The UIN motor generator for the NPR is operational and has been used to attribute UINs to newborns in
                                           Rabat through civil registration.
Description
                                           PBC 1.2 : US$5m: 47,000 newborns in the Project Area have been attributed a UIN through the UIN generator of the NPR or
                                           the Borrower’s civil register and have their UIN printed on the birth certificates.
                                           PBC 1.3 : US$4m: 113,000 newborns in the Project Area have been attributed a UIN through the UIN generator of the NPR
                                           or the Borrower’s civil register and have their UIN printed on the birth certificates.
                                           PBC 1.4 : US$1m: 266,000 newborns in the Project Area have been attributed a UIN through the UIN generator of the NPR
                                           or the Borrower’s civil register and have their UIN printed on the birth certificates.



                                                                                           40
            The World Bank
            Identity and Targeting for Social Protection Project (P155198)




                               Data sources / responsible agencies to provide the data will include:
                               (i) The Project Management Unit; (ii) DSCI; (iii) Central data repository of the civil register; (iv) NPR’s management
Data source/ Agency            information system; (v) Database of the CNIE (National ID card); and (vi) Bureau d'Etat Civil (BECs) connected to the central
                               repository of the civil register.

                               General Inspectorate of Territorial Administration (Inspection Générale de l’Administration Territoriale - IGAT).
Verification Entity
                               The IGAT will undertake the following activities:
                               PBC 1.1: US$6m; UIN generator operational
                               (i) Verification that the UIN generator software is operational and seeded in the Civil Register central repository and/or NPR;
                               (ii) verification that all BECs within the municipality of Rabat have the necessary software, hardware and connections to
                               request and recover the UIN automatically from the UIN generator software, and to store it on the Civil Register’s central
                               repository.
                               The verification will be conducted through site visits and based on inventory on a representative sample of BECs, selected
                               by the IGAT, in the municipality of Rabat.
                               To conduct these verifications, DSCI will: (i) compile a list with the IT equipment provided for each BEC in Rabat (self-
                               reported) and will share it with the IGAT at least three weeks before the verification mission; (ii) ensure the functioning of
                               the central civil registration system-monitoring module, to ensure the connectivity of the BECs to the said system and the
                               ability of the BECs to send requests to issue UINs to the UIN generation server, and send them electronically to the central
Procedure                      system for storage.
                               To conduct these verifications, IGAT will: (i) will select and visit a sample of the BECs and verify the accuracy of the self-
                               reported data; (ii) ensure that the list of self-reported equipment which was verified is correct; the BECs are connected to
                               the Civil Register’s central repository; the BECs can send and receive requests to generate the UIN to the UIN generation
                               server; and that the UIN thus generated are stored on the Civil Register’s central repository.
                               The IGAT will produce a verification report on the basis of the verification process. After the verification mission, the IGAT
                               will send to the World Bank: (i) the list of equipment of all Rabat’s BECs; (ii) the verification report; and (iii) The database
                               with the equipment and the results of the depersonalized verifications, on a representative sample of BECs.
                               PBC 1.2: US$5m; PBC 1.3: US$4m; PBC 1.4: US$1m; Number of newborns for whom a UIN has been attributed through
                               civil registration in the project area during a period of 12 months
                               (i) Verification over a period of 12 months of the number of newborns, by gender, having a UIN printed on their birth
                               certificates and communicated automatically to the Civil fciRegistry’s central repository and/or to the NPR (along with other
                               identify data as required by the Civil Registry’s central repository and/or NPR’s data model); (ii) verification over a period of
                                                                                   41
                        The World Bank
                        Identity and Targeting for Social Protection Project (P155198)




                                           12 months, and on the basis of a sample, that the UIN printed on birth certificates correspond to the UIN communicated to
                                           the Civil Registry’s central repository and/or to the NPR (data quality).
                                           To conduct these verifications, the DSIC will: (i) establish annually the list of BECs that has the UIN generator software
                                           operational and integrated into the information system of the Civil Register’s central repository and able to request and
                                           recover the UIN. This list will have to be sent to the IGAT no later than 3 weeks before the beginning of the verification
                                           mission; (ii) establish and communicate to the IGAT a depersonalized database, by gender, of the newborns with UINs from
                                           the Civil Registry’s central repository and/or the NPR; (iii) and ensure the proper functioning of the modules for monitoring
                                           of Civil Register and/or of the NPR to allow the identification of newborns for whom a UIN was attributed and the
                                           verification of the accuracy of the data.
                                           At the end of verification mission, the IGAT will send to the World Bank the report of the mission of verification, showing
                                           the audits carried out and the results of the verifications mentioned above.
                                           The World Bank will participate in demonstration sessions of the operational systems and in interactive presentations of the
                                           interfaces and dashboards of the Civil Registry’s central repository and/or the NPR, during which the World Bank would
                                           request to consult, on-site, the database to produce descriptive statistics and summary tables related to the achievement of
                                           the PBC and to ensure the quality of the information on newborns in the NPR.
DLI_TBL_VERIFICATI ON




PBC 2                                      Population (six years old and above) for which an UIN has been attributed in the project area (Milion)
                                           Number of individuals (six years old and above) who were attributed a UIN in the NPR in year t in the project area. Indicator
                                           disaggregated by gender. This DLI pertains to the roll out of an administrative process of attribution in mass of UINs to the
Description                                population 6 + :
                                           DLR 2.1: US$4m: A UIN has been attributed to 19 million individuals (6 years old and above).
                                           DLR 2.2: US$2m: A UIN has been attributed to 25 million individuals
                                           Data sources / responsible agencies to provide the data: (i) PMU; (ii) DSIC; (iii) Central data repository of the civil register;
Data source/ Agency                        (iv) CNIE database; (v) MASSAR database; and (vi) Register of Foreign Residents.

                                           General Inspectorate of Territorial Administration (Inspection Générale de l’Administration Territoriale - IGAT).
Verification Entity
                                           The IGAT will undertake the following activities:
                                           DLR 2.1 and 2.2: (i) Verification of the number of unique individuals in the NPR with a UIN, using the NPR’s information
Procedure
                                           system; (ii) verification of the capacity of different data feeders (CNIE, MASSAR, Register of Foreign Residents) to request
                                           and recover the UIN for the flow of new entrants in the above-mentioned feeder systems; and (iii) verification on the basis
                                                                                             42
                        The World Bank
                        Identity and Targeting for Social Protection Project (P155198)




                                           of a representative sample that most of the identity data in the NPR is complete (based on the country’s data model).
                                           To conduct these verifications the DSIC will: (i) establish a depersonalized database of unique individuals in the NPR with a
                                           UIN. This data will need to be extracted from the NPR and communicated to the IGAT no later than 3 weeks before the
                                           beginning of the verification missions; (ii) ensure the proper functioning of the NPR monitoring module that allows the
                                           identification of the people for whom a UIN was attributed and the verification of the accuracy of the data.
                                           At the end of verification mission, the IGAT will send to the World Bank reports summarizing the verifications 1-2-3
                                           mentioned above; the technical specifications describing the requirements in terms of NPR data quality and reliability, and
                                           the process of updating and data feeding; and the documents with the tests (final product).
                                           The World Bank will participate in demonstration sessions of the operational systems and in interactive presentations of the
                                           interfaces and dashboards of the NPR, during which the World Bank would request to consult the database, on-site, to
                                           produce descriptive statistics and summary tables related to the achievement of the PBC and to ensure the quality of the
                                           information on the population of six years old and over in the NPR.
DLI_TBL_VERIFICATI ON




PBC 2                                      Population (six years old and above) for which an UIN has been attributed in the project area (Milion)
                                           Number of individuals (six years old and above) who were attributed a UIN in the NPR in year t in the project area. Indicator
Description
                                           disaggregated by gender.
                                           Data sources / responsible agencies to provide the data: (i) PMU; (ii) DSIC; (iii) NPR, either from PMU or the National
Data source/ Agency                        Registry’s Agency.

                                           General Inspectorate of Territorial Administration (Inspection Générale de l’Administration Territoriale - IGAT).
Verification Entity
                                           The IGAT will undertake the following activities:
                                           PBC 2 : US$4m: A UIN has been attributed to 7 million individuals (6 years old and above) (Million)
                                           (i) Verification of the number of unique individuals in the NPR with a UIN, using the NPR’s information system; and (ii)
                                           verification on the basis of a representative sample that most of the identity data in the NPR is complete (based on the
                                           country’s data model).
Procedure
                                           To conduct these verifications the DSIC will: (i) establish a depersonalized database of unique individuals in the NPR with a
                                           UIN. This data will need to be extracted from the NPR and communicated to the IGAT no later than 3 weeks before the
                                           beginning of the verification missions; (ii) ensure the proper functioning of the NPR monitoring module that allows the
                                           identification of the people for whom a UIN was attributed and the verification of the accuracy of the data.
                                           At the end of verification mission, the IGAT will send to the World Bank reports summarizing the verifications 1-2
                                                                                            43
                        The World Bank
                        Identity and Targeting for Social Protection Project (P155198)




                                           mentioned above; the technical specifications describing the requirements in terms of NPR data quality and reliability, and
                                           the process of updating and data feeding; and the documents with the tests (final product).
                                           The World Bank will participate in demonstration sessions of the operational systems and in interactive presentations of the
                                           interfaces and dashboards of the NPR, during which the World Bank would request to consult the database, on-site, to
                                           produce descriptive statistics and summary tables related to the achievement of the PBC and to ensure the quality of the
                                           information on the population of six years old and over in the NPR.
DLI_TBL_VERIFICATI ON




                                           National Population Register (NPR), Unique Identifying Number (UIN) and the National Registries’ Agency (NIA) legally
PBC 3
                                           established and operational
                                           This indicator measures the progress of the implementation of the regulatory and institutional framework for the
                                           operationalization of the NIA, the NPR, and the UIN. This based on (i) the development and transmission to Parliament of
                                           texts required for the creation of the NPR, the UIN, and the NIA; and (ii) assuring that regulation properly addresses the use
                                           of personal data according to international best practices and to Moroccan data privacy laws.
Description
                                           DLR 3.1: US$4m: Draft law(s) for NPR, UIN and NIA has/have been validated by the IMSC and transmitted to the
                                           Government’s General Secretariat.
                                           DLR 3.2: US$6m: The Council of Government has approved the draft law(s) for NPR, UIN and NIA.
                                           DLR 3.3: US$4m: NIA has been established and is operational.
                                           Data sources / responsible agencies to provide the data: Project Management Unit (PMU).
Data source/ Agency
                                           General Inspectorate of Territorial Administration (Inspection Générale de l’Administration Territoriale - IGAT).
Verification Entity
                                           The IGAT will undertake the following verifications and in accordance with the project’s scope:
                                           DLR 3.1: Verify that: (i) a legal team is in place to prepare the legal framework (laws and regulation) for NPR, UIN and NIA;
                                           (ii) a draft legal texts are transmitted by MoI to SGG; and (iii) the World Bank received the verification report of IGAT and
                                           the draft legal texts, which should be acceptable to the World Bank.
                                           DLR 3.2: Verify that: (i) the legal texts to support the creation of the NIA, NPR and UIN are approved by the Government
Procedure                                  Council (CG); and (ii) the World Bank received the verification report of IGAT and the draft legal texts, which should be
                                           acceptable to the Word Bank.
                                           DLR 3.3: Verify that :(i) the NIA is created (has a legal status that allows it to operate); (ii) the NIA is equipped with human
                                           and financial resources necessary for its functioning: (iii) the NIA has an operational manual (OM) defining its roles and
                                           responsibilities; (iv) the World Bank received the verification report of IGAT, the legal framework (laws and regulations)
                                           concerning the NIA, and the OM, which should be acceptable to the World Bank.
                                                                                                44
                        The World Bank
                        Identity and Targeting for Social Protection Project (P155198)




DLI_TBL_VERIFICATI ON




                                           National Population Register (NPR), Unique Identifying Number (UIN) and the National Registries’ Agency (NIA) legally
PBC 3
                                           established and operational
                                           This indicator measures the progress of the implementation of the regulatory and institutional framework for the
                                           operationalization of the NIA, the NPR, and the UIN. This based on (i) the development and transmission to Parliament of
                                           texts required for the creation of the NPR, the UIN, and the NIA; and (ii) assuring that regulation properly addresses the use
                                           of personal data according to international best practices and to Moroccan data privacy laws.
Description
                                           PBC 3.1: US$4m: Draft law(s) for NPR, UIN and NIA has/have been validated by the IMSC and transmitted to the
                                           Government’s General Secretariat.
                                           PBC 3.2: US$6m: The Council of Government has approved the draft law(s) for NPR, UIN and NIA.
                                           PBC 3.3: US$4m: NIA has been established and is operational.
                                           Data sources / responsible agencies to provide the data: Project Management Unit (PMU).
Data source/ Agency
                                           General Inspectorate of Territorial Administration (Inspection Générale de l’Administration Territoriale - IGAT).
Verification Entity
                                           The IGAT will undertake the following verifications and in accordance with the project’s scope:
                                           PBC 3.1: Verify that: (i) a legal team is in place to prepare the legal framework (laws and regulation) for NPR, UIN and NIA;
                                           (ii) a draft legal texts are transmitted by MoI to SGG; and (iii) the World Bank received the verification report of IGAT and
                                           the draft legal texts, which should be acceptable to the World Bank.
                                           PBC 3.2: Verify that: (i) the legal texts to support the creation of the NIA, NPR and UIN are approved by the Government
                                           Council (CG); and (ii) the World Bank received the verification report of IGAT and the draft legal texts, which should be
Procedure
                                           acceptable to the Word Bank.
                                           PBC 3.3: Verify that: (i) the NIA is created (has a legal status that allows it to operate); (ii) the NIA is equipped with human
                                           and financial resources necessary for its functioning; (iii) the NIA has an operational manual (OM) defining its roles and
                                           responsibilities; and (iv) the World Bank received the verification report of IGAT, the legal framework (laws and regulations)
                                           concerning the NIA, and the OM, which should be acceptable to the World Bank.
DLI_TBL_VERIFICATI ON




PBC 4                                      SR legally established and operational to become a functional entry point for SSNs
                                           This indicator measures the progress of the implementation of the regulatory and institutional framework for the
Description
                                           operationalization of the SR on the base of the following: (i) Development of texts of law for SR. The law should establish

                                                                                            45
                        The World Bank
                        Identity and Targeting for Social Protection Project (P155198)




                                           the SR as a required entry point and targeting mechanism for SSN programs; and (ii) Adoption of texts of Law of SR by the
                                           Government Council (CG).
                                           DLR 4.1: US$3m: Draft law for the SR has been validated by the IMSC and transmitted to the Government’s General
                                           Secretariat.
                                           DLR 4.2: US$5m: The Council of Government has approved the draft law for the SR.
                                           DLR 4.3: US$3m: The law for the SR, setting forth that the SR is the entry point for the RAMED, DAAM and Tayssir programs
                                           and for any new safety net programs to be introduced by the Borrower, has been published in the National Gazette

                                           Data sources/responsible agencies to provide the data: Project Management Unit (PMU)
Data source/ Agency
                                           General Inspectorate of Territorial Administration (Inspection Générale de l’Administration Territoriale - IGAT).
Verification Entity
                                           The IGAT will undertake the following verifications and in accordance with the project’s scope:
                                           DLR 4.1: The IGAT will verify that: (i) a legal team is in place to prepare the legal framework (laws and regulations) for the
                                           SR; (ii) draft(s) of legal text(s) are transmitted by Ministry of Interior (MoI) to the Secretary General of the Government
                                           (Secrétariat Général du Gouvernment (SGG); and (iii) the World Bank received the verification report of IGAT and the
                                           draft(s) of the legal text(s), which should be acceptable to the World Bank.
Procedure                                  DLR 4.2: The IGAT will verify that: (i) the draft law for SR is approved by the CG; (ii) the World Bank received the verification
                                           report of IGAT and draft law, which should be acceptable to the World Bank.
                                           DLR 4.3: The IGAT will verify that: (i) the law stipulating the SR as unique entry point for the Tayssir, RAMED , DAAM
                                           programs and for any new CT/SSNs is published in the National Gazette; (ii) the Word Bank received the verification report
                                           of IGAT and the law, which should be acceptable to the World Bank.
DLI_TBL_VERIFICATI ON




PBC 4                                      SR legally established and operational to become a functional entry point for SSNs
                                           This indicator measures the progress of the implementation of the regulatory framework for the operationalization of the
                                           SR. The law should establish the SR as a required entry point and targeting mechanism for SSN programs. This is based on:
                                           (i) the development of the text(s) of law for SR and the transmission to the Government’s General Secretariat; (ii) approval
Description                                of the draft law by the Council of Government; and (iii) adoption of the law by Parliament and publication in the National
                                           Gazette.
                                           PBC 4.1: US$3m: Draft law for the SR has been validated by the IMSC and transmitted to the Government’s General
                                           Secretariat.
                                                                                             46
                        The World Bank
                        Identity and Targeting for Social Protection Project (P155198)




                                           PBC 4.2: US$5m: The Council of Government has approved the draft law for the SR.
                                           PBC 4.3: US$3m: The law for the SR, setting forth that the SR is the entry point for the RAMED, DAAM, and Tayssir programs
                                           and for any new safety net programs to be introduced by the Borrower, has been published in the National Gazette.


                                           Data sources/responsible agencies to provide the data: Project Management Unit (PMU)
Data source/ Agency
                                           General Inspectorate of Territorial Administration (Inspection Générale de l’Administration Territoriale - IGAT).
Verification Entity
                                           The IGAT will undertake the following verifications and in accordance with the project’s scope:
                                           PBC 4.1: The IGAT will verify that: (i) a legal team is in place to prepare the legal framework (laws and regulations) for the
                                           SR; (ii) draft(s) of legal text(s) are transmitted by Ministry of Interior (MoI) to the Secretary General of the Government
                                           (Secrétariat Général du Gouvernment (SGG); and (iii) the World Bank received the IGAT’s verification report and the draft(s)
                                           of the legal text(s), which should be acceptable to the World Bank.
Procedure                                  PBC 4.2: The IGAT will verify that: (i) the draft law for SR is approved by the SCG; and (ii) the World Bank received the IGAT’s
                                           verification report and draft law, which should be acceptable to the World Bank.
                                           PBC 4.3: The IGAT will verify that: (i) the law stipulating the SR as unique entry point for the Tayssir, RAMED, DAAM
                                           programs and for any new CT/SSNs is published in the National Gazette; (ii) the Word Bank received the IGAT’s verification
                                           report and the law, which should be acceptable to the World Bank.
DLI_TBL_VERIFICATI ON




PBC 5                                      Share of new applicants to RAMED, DAAM and Tayssir programs registered in the SR
                                           This indicator measures the new applicants to RAMED, DAAM, and Tayssir beneficiaries at time t in the SR, including the
                                           annual new entries, using new registration and targeting frameworks of the SR (questionnaire/formula/targeting process).
                                           DLR 5.1: US$7m: The questionnaire and the proxy means test formula of the SR have been validated by the IMSC after
                                           testing them on a representative sample of beneficiaries of RAMED, DAAM and Tayssir programs
                                           DLR 5.2: US$5m: 40 percent of new applicants to RAMED, DAAM and Tayssir programs in a given calendar year, have been
Description
                                           registered in the SR
                                           DLR 5.3: US$4m: 80 percent of new applicants to RAMED, DAAM and Tayssir programs in a given calendar year, have been
                                           registered in the SR.
                                           DLR 5.4: US$3m: 100 percent of new applicants to RAMED, DAAM and Tayssir programs in a given calendar year, have been
                                           registered in the SR
                                                                                            47
            The World Bank
            Identity and Targeting for Social Protection Project (P155198)




                               Data sources / responsible agencies to provide the data: (i) Project PMU; (ii) HCP; (iii) MIS of SR; (iv) SR; (iv) RAMED
Data source/ Agency            database; (v) DAAM database; and (vi) Tayssir database.

                               General Inspectorate of Territorial Administration (Inspection Générale de l’Administration Territoriale - IGAT).
Verification Entity
                               The IGAT will undertake the following verifications and in accordance with the project’s scope:
                               DLR 5.1: verify that: (i) the Scoring formula and SR questionnaire were elaborated by HCP in close collaboration with the
                               World Bank, using the 2014 household survey, and is acceptable to the World Bank; (ii) the questionnaire and the SR
                               formula are tested on a representative sample of beneficiaries of RAMED /DAAM/Tayssir; (iii) methods of testing, the
                               representativeness of the sample and the test results are validated by the HCP; (iv) the formula’s errors of inclusion are
                               calculated by HCP in close collaboration with the World Bank and are acceptable to the World Bank; (v) the scoring
                               formula/questionnaire is adjusted based test (as required). These adjustments are made by the HCP, in close collaboration
                               with the World Bank; and (vi) the Scoring formula and questionnaire are acceptable to the HCP and the World Bank, and
                               validated by the IMSC.
                               At the end of verification mission, the IGAT will send to the World Bank: (i) the report with the simulations based on the
                               High Planning Commission - Haut Commissarit du Plan - HCP) 2014 household survey (verification point 1); (ii) the
                               depersonalized database of the test surveys (survey financed by the project in 2017); and (iii) the verification report with
Procedure                      the test based on a representative sample of beneficiaries of RAMED /DAAM/Tayssir (verifications (ii), (iii) and (iv)).
                               DLR 5.2, 5.3, 5.4: Based on the management and information systems (MIS) of the SR and the MIS of RAMED, DAAM, and
                               Tayssir (plus administrative data as required), the IGAT will verify that: (i) the new applicants of RAMED, DAAM, and Tayssir
                               in year t , including the renewals; (ii) the new applicants, by gender, of RAMED, DAAM, and Tayssir in year t , including the
                               renewals, that are registered in the SR (using the SR registration form and formula).
                               To conduct these verifications, DSIC will: (i) establish and send to the IGAT, no later than 3 weeks before the beginning of
                               the verification missions, a depersonalized database, by gender, from the SR and from new applicants to RAMED and DAAM
                               programs; (ii) the Ministry of National Education will establish and send to the IGAT, no later than 3 weeks before the
                               beginning of the verification missions, a depersonalized database, by gender, of Tayssir.
                               To conduct these verifications, the IGAT will ensure the technical quality of (a) the depersonalized data; (b) the process of
                               updating and feeding the databases; (c) the IT processes; (d) the monitoring interfaces; and (v) the dashboards of the
                               information system.
                               At the end of verification mission, the IGAT will send to the World Bank: (i) verification reports covering the process and the

                                                                                48
                        The World Bank
                        Identity and Targeting for Social Protection Project (P155198)




                                           results of the verifications; (ii) the technical specifications describing the requirements in terms of SR data quality and
                                           reliability, and the process of updating and data feeding; and (iii) the documents with the tests (final products).
                                           The World Bank will participate in demonstration sessions of the operational systems and in interactive presentations of the
                                           interfaces and dashboards of the SR, during which the World Bank would request, on-site, to consult the database to
                                           produce descriptive statistics and summary tables related to the achievement of the DLR and to ensure the quality of the
                                           information on the households in the SR.
DLI_TBL_VERIFICATI ON




PBC 5                                      Share of new applicants to RAMED, DAAM and Tayssir programs registered in the SR
                                           This indicator measures that the SR is using a scoring formula with a simulated targeting accuracy of over 65 percent, is
                                           operational beyond the pilot phase, and has processed applications for at least 4 million individuals.
                                           PBC 5.1: US$7m: The questionnaire and the proxy means test formula of the SR have been validated by the IMSC after
                                           testing them on a representative sample of beneficiaries of RAMED and Tayssir programs
Description                                PBC 5.2: US$2m: The SR has been piloted and its scoring formula used to score the new applicants to RAMED, DAAM and
                                           Tayssir programs (or their successor thereto) has a simulated targeting accuracy of over 65%.
                                           PBC 5.3: US$2m: The SR is operational and at least 4 million of new applicants to RAMED, DAAM and Tayssir programs (or
                                           their successors thereto) have been registered in the SR.

                                           Data sources / responsible agencies to provide the data: (i) Project PMU; (ii) HCP; (iii) National Gazette; and (iv) Project
Data source/ Agency                        PMU and/or National Registries’ Agency for the SR.

                                           General Inspectorate of Territorial Administration (Inspection Générale de l’Administration Territoriale - IGAT)
Verification Entity
                                           The IGAT will undertake the following verifications and in accordance with the project’s scope:
                                           PBC 5.1: verify that: (i) the Scoring formula and SR questionnaire were elaborated by the High Planning Commission - Haut
                                           Commissarit du Plan (HCP) in close collaboration with the World Bank, using the 2014 household survey, and is acceptable
                                           to the World Bank; (ii) the questionnaire and the SR formula are tested using a recent representative household survey; (iii)
Procedure                                  methods of testing, the representativeness of the new survey and the test results are validated by HCP; (iv) the formula’s
                                           errors of inclusion are calculated by HCP in close collaboration with the World Bank and are acceptable to the World Bank;
                                           and (v) the scoring formula/questionnaire is updated based on the results of the test (as required). These adjustments are
                                           made by the HCP, in close collaboration with the World Bank; and (vi) the Scoring formula and questionnaire are acceptable
                                           to the HCP and the World Bank, and validated by the IMSC.
                                                                                            49
The World Bank
Identity and Targeting for Social Protection Project (P155198)




                   At the end of the verification mission, the IGAT will send to the World Bank: (i) the report with the simulations based on the
                   HCP 2014 household survey (verification point 1); (ii) the report with the simulations carried out based on the test survey
                   (verification point 2); and (iii) the decision with the IMSC adoption of the updated scoring formula; and (iv) the verification
                   report.
                   PBC 5.2: verify that (i) the pilot phase of the SR was launched and is used to score the applicants of the RAMED, DAAM,
                   Tayssir or their successor programs; and (ii) that the SR formula embedded in the SR Information is identical with the
                   formula validated by the IMSC (with a simulated targeting accuracy of over 65 percent, based on HCP analytical work
                   carried out for PBC 5.1.)
                   PBC 5.3: verify that (i) the SR is operational beyond the pilot phase; and (ii) there are at least 4 million applicants of RAMED,
                   DAAM, and Tayssir or their successor programs (including the renewals) that are registered in the SR (indicator
                   disaggregated by gender).
                   To conduct these verifications, DSIC will: (i) establish and send to the IGAT, no later than 3 weeks before the beginning of
                   the verification missions, a depersonalized database, by gender, from the SR.
                   To conduct these verifications, the IGAT will ensure the technical quality of (i) the depersonalized data; (ii) the process of
                   updating and feeding the databases; (c) the IT processes; (iii) the monitoring interfaces; and (iv) the dashboards of the
                   information system.
                   At the end of the verification mission, the IGAT will send to the World Bank: (i) verification reports covering the process and
                   the results of the verifications; (ii) the technical specifications describing the requirements in terms of SR data quality and
                   reliability, and the process of updating and data feeding; and (iii) the documents with the tests (final products).
                   The World Bank will participate in demonstration sessions of the operational systems and in interactive presentations of the
                   interfaces and dashboards of the SR, during which the World Bank would request, on-site, to consult the database to
                   produce descriptive statistics and summary tables related to the achievement of the PBC and to ensure the quality of the
                   information on the households in the SR.




                                                                     50
The World Bank
Identity and Targeting for Social Protection Project (P155198)